professional documents
home
Profile
Upload
docsters
Blogs
Upload

Tennessee Valley Authority RSS Feed

search

Exhibit C for Craft Augmentation

TVA 6/30/2008 | 0 (0) | 35 | 0 | 0 | English

Package revised 1-1-01 INSTRUCTIONS EXHIBIT C FOR CRAFT AUGMENTATION TENNESSEE VALLEY AUTHORITY HOURLY RATES OF PAY AND FRINGE BENEFITS FOR CRAFT AUGMENTATION OF WORK PERFORMED UNDER CONTRACT This Exhibit C lists the classifications and rates of pay for craft contractor employees augmented (craft augmentation) to the TVA annual work force. INSTRU  ... more>>

Wage Schedule P Maintenance and Modifications Work

TVA 6/30/2008 | 0 (0) | 39 | 0 | 0 | English

Package revised 1-1-01 INSTRUCTIONS FOR TVA CONTRACTORS WITH CONTRACTS CONTAINING WAGE SCHEDULE 1851P (MAINTENANCE AND MODIFICATIONS WORK) Revision Dates 1-1-01 • WAGE NOTICE (POSTER) Each contractor is required to post a Wage Notice at each job site for all of their trades and labor employees. This notice should be posted in a visible location (b  ... more>>

Wage Schedule C Office Construction Maintenance and Modification Work

TVA 6/30/2008 | 0 (0) | 41 | 0 | 0 | English

Package revised 1-1-01 INSTRUCTIONS FOR TVA CONTRACTORS WITH CONTRACTS CONTAINING WAGE SCHEDULE 1851C (OFFICE CONSTRUCTION, MAINTENANCE, AND MODIFICATION WORK) Revision Dates 1-1-01 • WAGE NOTICE (POSTER) Each contractor is required to post a Wage Notice at each job site for all of their trades and labor employees. This notice should be posted in  ... more>>

Augmentation Package with instructions

TVA 6/30/2008 | 0 (0) | 33 | 0 | 0 | English

2006 Augmentation Package 1-13-06 REVISIONS REVISION DATE DESCRIPTION Rev. 1 January 13, 2006 Revisions to the rate for annuity contributions for all Boilermaker apprentices classifications in the TVA Project Agreement and 1851 wage schedules for 2006 (Exhibit A (page 7), Exhibit C (page 6), and Exhibit S-1 (page 7)) revised to $1.75 rather t  ... more>>

Construction Project Agreement CPA

TVA 6/30/2008 | 0 (0) | 38 | 0 | 0 | English

Package revised 1-1-01 INSTRUCTIONS FOR TVA CONTRACTORS WITH CONTRACTS CONTAINING THE CONSTRUCTION PROJECT AGREEMENT (CPA) Revision Dates 5-23-00 • SIGNATURE AND REQUIRED NOTICE Contractors (and subcontractors with contracts more than $100,000) with TVA contracts containing the Project Maintenance and Modification Agreement are required in Article  ... more>>

How to Select Wage Packages

TVA 6/30/2008 | 0 (0) | 29 | 0 | 0 | English

HOW TO SELECT WAGE PACKAGES Project Agreements Packages The following thresholds do not apply to any contractors performing specialty work (see Articles V and VI). Also, subordinate contracts for $100,000 or less are not required to become signatory to the Project Agreements (Article I). Even if not required, the contractor or subordinate contracto  ... more>>

Wage Schedule A Construction Work

TVA 6/30/2008 | 0 (0) | 34 | 0 | 0 | English

Package revised 1-1-01 INSTRUCTIONS FOR TVA CONTRACTORS WITH CONTRACTS CONTAINING WAGE SCHEDULE 1851A (CONSTRUCTION WORK) Revision Dates 1-1-01 • WAGE NOTICE (POSTER) Each contractor is required to post a Wage Notice at each job site for all of their trades and labor employees. This notice should be posted in a visible location (bulletin boards, et  ... more>>

Project Maintenance and Modification Agreement PMMA

TVA 6/30/2008 | 0 (0) | 32 | 0 | 0 | English

Package revised 1-1-01 INSTRUCTIONS FOR TVA CONTRACTORS WITH CONTRACTS CONTAINING PROJECT MAINTENANCE AND MODIFICATION AGREEMENT (PMMA) Revision Dates 5-23-00 • SIGNATURE AND REQUIRED NOTICE Contractors (and subcontractors with contracts more than $100,000) with TVA contracts containing the Project Maintenance and Modification Agreement are requir  ... more>>

Construction Project Agreement Package with instructions

TVA 6/30/2008 | 0 (0) | 39 | 2 | 0 | English

2006 CPA Package 1-13-06 REVISIONS REVISION DATE DESCRIPTION Rev. 1 January 13, 2006 Revisions to the rate for annuity contributions for all Boilermaker apprentices classifications in the TVA Project Agreement and 1851 wage schedules for 2006 (Exhibit A (page 7), Exhibit C (page 6), and Exhibit S-1 (page 7)) revised to $1.75 rather than $1.50  ... more>>

Office Supplement Construction Project Agreement Package with instructions

TVA 6/30/2008 | 0 (0) | 33 | 0 | 0 | English

2006 CPA-S Package 1-13-06 REVISIONS REVISION DATE DESCRIPTION Rev. 1 January 13, 2006 Revisions to the rate for annuity contributions for all Boilermaker apprentices classifications in the TVA Project Agreement and 1851 wage schedules for 2006 (Exhibit A (page 7), Exhibit C (page 6), and Exhibit S-1 (page 7)) revised to $1.75 rather than $1.  ... more>>

Form TVA Request to Move Household Goods

TVA 6/30/2008 | 0 (0) | 27 | 0 | 0 | English

REQUEST TO MOVE HOUSEHOLD GOODS To be supplied by Transportation Procurement Carrier: Route Control No: Name Social Security No. PRESENT LOCATION Street and No. City, State, Zip Code: Home Phone No. ( ) Weight, if known Piano? Alternate date Work Phone No. ( ) No. of rooms occupied Do you have a freezer? Prefer to move on (date) NEW LOCATION S  ... more>>

Purpose and Need for Action

TVA 6/30/2008 | 0 (0) | 28 | 0 | 0 | English

Project Maintenance and Modification Agreement Package with instructions

TVA 6/30/2008 | 0 (0) | 34 | 0 | 0 | English

2006 PMMA Package 1-13-06 REVISIONS REVISION DATE DESCRIPTION Rev. 1 January 13, 2006 Revisions to the rate for annuity contributions for all Boilermaker apprentices classifications in the TVA Project Agreement and 1851 wage schedules for 2006 (Exhibit A (page 7), Exhibit C (page 6), and Exhibit S-1 (page 7)) revised to $1.75 rather than $1.5  ... more>>

FEDERAL FINANCIAL ASSISTANCE CONTRACTS NON DISCRIMINATION NOTICE

TVA 6/30/2008 | 0 (0) | 28 | 0 | 0 | English

FEDERAL FINANCIAL ASSISTANCE CONTRACTS NON-DISCRIMINATION NOTICE Recipient shall include the following statement in all handbooks, manuals, pamphlets, and other material ordinarily distributed to the public to describe the program, including, where TVA deems appropriate, notices posted by recipient. This program is supported by assistance from the  ... more>>

Final Environmental Statement Related to the Operation of Watts Bar Nuclear Plant Units and NUREG

TVA 6/30/2008 | 0 (0) | 42 | 0 | 0 | English
   
  results / page   15/25/50 Page: 1 of 18 << prev 1234...18 next >>