professional documents
home
Upload
docsters
Upload

National Nuclear Security Administration RSS Feed

search

Startup Management Self Assessment - Achieving Readiness

NuclearSafety 7/9/2008 | 0 (0) | 44 | 0 | 0 | English

CH2M HILL Hanford Group, Inc. STARTUP MANAGEMENT SELFASSESSMENT Manual Document Page Issue Date Effective Date USQ #06-0098-AA Projects TFC-PRJ-PM-C-07, REV B 1 of 23 February 2, 2006 February 2, 2006 Ownership matrix TABLE OF CONTENTS 1.0 2.0 3.0 4.0 PURPOSE AND SCOPE .............................................................................  ... more>>

Operational Readiness Program Plan - Achieving Readiness

NuclearSafety 7/9/2008 | 0 (0) | 45 | 0 | 0 | English

USQ#07-0122-S CH2M HILL Hanford Group, Inc. OPERATIONAL READINESS PROGRAM PLAN Manual Document Page Issue Date Effective Date Management Plan TFC-PLN-16, REV C 1 of 11 January 23, 2007 January 23, 2007 Ownership matrix TABLE OF CONTENTS 1.0 2.0 PURPOSE AND SCOPE ......................................................................................  ... more>>

Proposed ORR Training Workshop - Training Curriculum

NuclearSafety 7/9/2008 | 0 (0) | 36 | 0 | 0 | English

Tie workshops together where possible: Workshop 1 – Develop CRAD (use “Engineering” Subject Matter Expert base) Workshop 2 – (Short) Selecting Documents to review and Activities to Observe: Using performed based principles and the CRAD as a basis, select the Documents to Review and Activities to Observe. (This may be a two part workshop.) Workshop  ... more>>

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

NuclearSafety 7/9/2008 | 0 (0) | 44 | 0 | 0 | English

DOE Hydrogen Program FY 2005 Progress Report VIII.A.3 Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project (Chevron Technology Ventures) Mr. Rajesh Paulose Chevron Technology Ventures LLC Room F-1200 6001 Bollinger Canyon Drive San Ramon, CA. 94583-2324 Phone: (925) 842-1360; Fax: (732) 352-6667; E-mail: paulor@chevro  ... more>>

Recommended Training Classes in Support of Readiness Review Processes - Training Curriculum

NuclearSafety 7/9/2008 | 0 (0) | 41 | 0 | 0 | English

15 July 2008 MEMORANDUM FOR DICK CROWE AND MIKE HILLMAN FROM BILL HICKS SUBJECT: RECOMMENDED TRAINING CLASSES IN SUPPORT OF READINESS REVIEW PROCESSES PER DOE O 425.1(-) AND ASSOCIATED STANDARD AND HANDBOOKS The purpose for this memo is to discuss what I recommend as a complete suite of training classes in support of a more complete and successful  ... more>>

ORR RA Team Member Training Outline - Training Curriculum

NuclearSafety 7/9/2008 | 0 (0) | 38 | 0 | 0 | English

Draft 1, 4/18/07 ORR/RA TEAM MEMBER TRAINING OUTLINE 1. INTRODUCTION & COURSE CONDUCT 2. AUTHORIZATION BASIS/SAFETY BASIS RELATIONSHIP TO THE READINESS REVIEW PROCESS 3. INTRODUCTION TO PERFORMANCE-BASED CONCEPTS 4. INTRODUCTION TO ORR/RA PROCESS 5. TEAM MEMBER RESPONSIBILITIES 6. DEVELOPMENT OF CRITERIA AND REVIEW APPROACH DOCUMENTS (CRADS) (inclu  ... more>>

Startup Testing Program Plan - Achieving Readiness

NuclearSafety 7/9/2008 | 0 (0) | 39 | 0 | 0 | English

CH2M HILL Hanford Group, Inc. STARTUP AND TESTING PROGRAM PLAN Manual Document Page Issue Date Effective Date Management Plan TFC-PLN-77, REV A-1 1 of 3 April 6, 2006 April 6, 2006 Ownership matrix 1.0 PURPOSE AND SCOPE (6.1.1. 6.1.2, 6.1.3, 6.1.4) This plan describes the Tank Farm Contractor (TFC) Startup and Testing Program. The Startup and T  ... more>>

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

NuclearSafety 7/9/2008 | 0 (0) | 40 | 0 | 0 | English

DOE Hydrogen Program FY 2005 Progress Report VIII.A.4 Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project (General Motors) Rosalind (Roz) B. Sell General Motors Commercial Program Manager 30500 Mound Road Warren MI 48090-9055 Phone: (586) 986-7676; Fax: (586) 986-9359; E-mail: roz.sell@gm.com DOE Technology Developm  ... more>>

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

NuclearSafety 7/9/2008 | 0 (0) | 40 | 0 | 0 | English

DOE Hydrogen Program FY 2005 Progress Report VIII.A.2 Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project (Ford Motor Company) Gregory Frenette (Primary Contact), G. J. Brooks, B. Chander Ford Motor Company Room 2AA05 15000 Commerce Dr N. Dearborn, MI 48120 Phone: (313) 390-2505; Fax: (313) 206-2361; E-mail: gfrenett  ... more>>

System-Level Analysis of Hydrogen Storage Options

NuclearSafety 7/9/2008 | 0 (0) | 38 | 0 | 0 | English

DOE Hydrogen Program FY 2005 Progress Report VI.F.3 System-Level Analysis of Hydrogen Storage Options Rajesh K. Ahluwalia (Primary Contact), J-C Peng, and Romesh Kumar Argonne National Laboratory 9700 South Cass Avenue Argonne, IL 60439 Phone: (630) 252-5979; Fax: (630) 252-5287; E-mail: walia@anl.gov DOE Technology Development Manager: Sunita S  ... more>>

Standardized Testing Program for Emergent Chemical Hydride and Carbon Storage Technologies

NuclearSafety 7/9/2008 | 0 (0) | 40 | 0 | 0 | English

DOE Hydrogen Program FY 2005 Progress Report VI.F Testing & Analysis VI.F.1 Standardized Testing Program for Emergent Chemical Hydride and Carbon Storage Technologies Richard A. Page (Primary Contact) and Michael A. Miller Southwest Research Institute™ P. O. Drawer 28510 6220 Culebra Road San Antonio, TX 78228-0510 Phone: (210) 522-3252; Fax: (21  ... more>>

Advanced Concepts for Containment of Hydrogen and Hydrogen Storage Materials

NuclearSafety 7/9/2008 | 0 (0) | 32 | 0 | 0 | English

DOE Hydrogen Program FY 2005 Progress Report VI.E.2 Advanced Concepts for Containment of Hydrogen and Hydrogen Storage Materials Salvador M. Aceves (Primary Contact), Andrew Weisberg, Francisco Espinosa-Loza, Scott Perfect, Gene Berry Lawrence Livermore National Laboratory 7000 East Avenue, L-644 Livermore, CA 94551 Phone: (925) 422-0864; Fax: (9  ... more>>

Analyses of Hydrogen Storage Materials and On-Board Systems

NuclearSafety 7/9/2008 | 0 (0) | 31 | 0 | 0 | English

DOE Hydrogen Program FY 2005 Progress Report VI.F.2 Analyses of Hydrogen Storage Materials and On-Board Systems Stephen Lasher (Primary Contact), Eric Carlson, John Bowman, Mark Marion, Yong Yang TIAX, LLC Acorn Park Cambridge, MA 02140 Phone: (617) 498-6108; Fax: (617) 498-7054; E-mail: Lasher.Stephen@tiaxllc.com DOE Technology Development Mana  ... more>>

Hydrogen Storage in Novel Molecular Materials

NuclearSafety 7/9/2008 | 0 (0) | 30 | 0 | 0 | English

DOE Hydrogen Program FY 2005 Progress Report VI.D.3 Hydrogen Storage in Novel Molecular Materials Viktor Struzhkin (Primary Contact), Wendy L. Mao, Burkhard Militzer, Ho-kwang Mao, and Russell J. Hemley Carnegie Institution of Washington 5251 Broad Branch Road, NW Washington, D.C. 20015 Phone: (202) 478-8952; Fax: (202) 478-8901; E-mail: struzhki  ... more>>

Low Cost, High Efficiency, High Pressure Hydrogen Storage

NuclearSafety 7/9/2008 | 0 (0) | 37 | 0 | 0 | English

DOE Hydrogen Program FY 2005 Progress Report VI.E Compressed/Liquid Tanks VI.E.1 Low Cost, High Efficiency, High Pressure Hydrogen Storage Jui Ko (Primary Contact), Ken Newell, Bradley Geving, and Walter Dubno Quantum Fuel Systems Technologies Worldwide, Inc 17872 Cartwright Road Irvine, CA 92614 Phone: (949) 399-4500; Fax: (949) 399-4600; E-mail  ... more>>

   
  results / page   15/25/50 Page: 1 of 430 << prev 1234...430 next >>