professional documents
home
Upload
docsters
Upload

Energy Efficiency and Renewable Energy RSS Feed

search

United States Industrial Electric Motor Systems Market Opportunities Assessment

EERE 6/19/2008 | 0 (0) | 73 | 10 | 0 | English

United States Industrial Electric Motor Systems Market Opportunities Assessment December 2002 F O R E W O R D I This document was originally published by the U.S. Department of Energy’s (DOE) Office of Energy Efficiency and Renewable Energy (EERE) in Decem­ ber 1998. As of fiscal year 2000, DOE’s Motor Challenge Program was inte­ grated into BestP  ... more>>

Alcoa Lafayette Operations Energy Efficiency Assessment

EERE 6/19/2008 | 0 (0) | 49 | 2 | 0 | English

Aluminum January 2001 BENEFITS • Estimated annual savings of $1,974,300 for phase I • Estimated payback of 1.2 years for phase I • Additional savings measures identified for phase II APPLICATIONS A systematic approach for a plantwide energy efficiency assessment was employed at Lafayette Operations. Energy use for each manufacturing process was det  ... more>>

Arizona Public Service - Alternative Fuel (Hydrogen) Pilot Plant Design Report - Appendix H

EERE 6/19/2008 | 0 (0) | 46 | 0 | 0 | English

APPENDIX H – CODES AND STANDARDS Research into the applicability of codes and standards for a facility to generate hydrogen shows that there is no comprehensive standard governing the design of such facilities. The Idaho National Engineering and Environmental Laboratory (INEEL) reports that "There are no specific codes pertaining to the generation  ... more>>

Arizona Public Service - Alternative Fuel (Hydrogen) Pilot Plant Design Report - Appendix E

EERE 6/19/2008 | 0 (0) | 46 | 0 | 0 | English

APPENDIX E – HYDROGEN SYSTEMS OPERATIONS Rev. 3, July 9, 2001 E.1 HYDROGEN SYSTEM ALARMS E.1.1 Process Alarm A process alarm indicates that the process is deviating from the normal condition but does not represent a hazardous or incipient hazardous condition. An example would be a high-pressure switch on the PDC compressor that hits the high set  ... more>>

Energy Matters - Summer 2003

EERE 6/19/2008 | 0 (0) | 45 | 0 | 0 | English

“TURNING INFORMATION INTO ENERGY SOLUTIONS FOR INDUSTRY” Energy Matters I N D U S T R I A L T E C H N O L O G I E S P R O G R A M Summer 2003 A Flowchart Approach to Motor Repair/Replace Decisions ISS U E FOCUS: By Thomas H. Bishop, P.E. EASA Technical Support Specialist Many decisions need to be made between the time a motor fails and when t  ... more>>

Arizona Public Service - Alternative Fuel (Hydrogen) Pilot Plant Design Report - Appendix G

EERE 6/19/2008 | 0 (0) | 48 | 0 | 0 | English

APPENDIX G – COMPRESSED NATURAL GAS SYSTEM OPERATIONS Rev. 0, July 9, 2001 G.1 NORMAL STARTUP To conduct normal startup, proceed as follows: 1. Open the supply from Southwest Gas (V-101) and activate AOV-102. a. b. c. 2. 3. Open one filter (V-105/V-108 or V-109/V-112), with the other filter line closed and filter drains closed. Verify that the SWG  ... more>>

GPLA Awards Ceremony Booklet for 2007

EERE 6/19/2008 | 0 (0) | 47 | 0 | 0 | English

2007 Green Power Leadership Awards The 2007 Green Power Leadership Awards are hosted by the United States Environmental Protection Agency (EPA), the United States Department of Energy (DOE), and the Center for Resource Solutions (CRS). EPA and DOE recognize leading green power purchasers and green power suppliers respectively. CRS recognizes leadin  ... more>>

Arizona Public Service - Alternative Fuel (Hydrogen) Pilot Plant Design Report - Appendix C

EERE 6/19/2008 | 0 (0) | 43 | 1 | 0 | English

APPENDIX C – GASEOUS HYDROGEN PIPING SPECIFICATION February 19, 2001, Rev. 0 C.1 GENERAL This specification provides guidelines for designing and installing the gaseous low-pressure (<275 psig) and high-pressure (276 to 7,000 psig) high-purity hydrogen process piping. For both low- and highpressure, stainless steel (303, 304, 316) tubing, piping  ... more>>

Arizona Public Service - Alternative Fuel (Hydrogen) Pilot Plant Design Report - Appendix D

EERE 6/19/2008 | 0 (0) | 45 | 0 | 0 | English

APPENDIX D - TRAINING PROGRAMS In accordance with the APS Safety Manual, training programs have been prepared for the APS Alternative Fuel Pilot Plant. A video-based program has been developed to provide general information concerning the APS Alternative Fuel Pilot Plant. This program is used to provide general information concerning the facility t  ... more>>

Arizona Public Service - Alternative Fuel (Hydrogen) Pilot Plant Design Report - Appendix F

EERE 6/19/2008 | 0 (0) | 38 | 0 | 0 | English

APPENDIX F – FLAME SCANNERS AND SENSORS Figures F.1 and F.2 depict the gas detector scan footprint (blue). The six combustible gas detectors monitor both hydrogen and natural gas levels in the equipment room in 1% increments of lower flammability limit (LFL). An alarm condition exists if 25% of LFL for either hydrogen or natural gas is reached. An  ... more>>

   
  results / page   15/25/50 Page: 1 of 312 << prev 1234...312 next >>