Docstoc

Daily Reporter

Document Sample
Daily Reporter Powered By Docstoc
					                                                                                                                  September 13, 2011                      The
                                                                                                                                                         Daily Reporter
                                                                                                                  Vol 17, No. 37




                                                                                                                                                                              North State Edition

         Quick Start Guide
         This is your navigation bar, located at the bottom of the right-hand pages:                               Construction (Finally) Begins
                                                                                                                    On Livermore Outlet Mall
                                                                                                                  After a long series of changes and setbacks, ground    foot center at Interstate 580 and El Charro Road will
         Navigating the digital newspaper is easy! The two arrow buttons at the ends of                           finally has been broken on a $165 million high-end     be a regional destination drawing shoppers from as
         the navigation panel take you forward or back one page. You can also use your right                      outlet mall project in the East Bay suburbs. About     far east as Stockton and as far west as San Fran-
         and left arrow keys on your keyboard, or the page up (Pg Up) and page down (Pg Dn)                       2,000 jobs — construction and retail positions —       cisco, developers and city leaders say.
         keys, also on your keyboard.                                                                             are expected to be created.
                                                                                                                                                                         Numerous designer discount stores have signed
                  The Index button in the navigation bar will take you back to the page with the Table Of
                                                                                                                  The economic boost is “extraordinary in this day-      leases, among them Banana Republic Factory, Bar-
                  Contents. Anything in the digital paper with an underline or a box around it is a working
                  link, which will take you to a web page, or open an e-mail box.                                 and-age,” said city engineer Cheri Sheets. The area    ney’s New York Outlet, Cole Haan Company Store,
                                                                                                                  will benefit from flood-control improvements, and      J. Crew, Michael Kors, Nike Factory Store and Tom-
                  The Print button will let you print any page, or the entire digital publication. The page       roadway and other infrastructure projects related to   my Hilfiger, according to a Paragon news release.
                  will print out on standard 8 1/2 by 11” paper, in landscape mode. When you print, be sure       the project, Sheets said.                              About 64 percent of the space, which is expected
                  you tell your print to print in landscape, and also be sure to set PAGE SCALING to: FIT TO                                                             to feature more than 120 stores, has been leased,
                  PRINTABLE AREA.
                                                                                                                  With retailers such as Saks Fifth Avenue OFF 5th       Brvenik said, adding that the goal is to open the
                  The E-mail button will let you share this digital publication with your friends and             and Neiman Marcus Last Call, the 543,000-square-       mall in time for the 2012 holiday shopping season.
                  associates.

                  Toggle to Full Screen Mode. This button gives you your best reading experience. Use it to ex-
                  pand the paper to cover your entire monitor. Use the keyboard escape (Esc) key to return to
                                                                                                                    San Francisco Construction Preps
                  standard mode.                                                                                  It’s too soon to say whether GLL Development &         While GLL has not decided whether to go or not,
                                                                                                                  Management will take the plunge this year at 350       Shorenstein      Properties’ outcome at nearby 188
                  Save to desktop. This button will save a copy of the digital magazine to your desktop.          Mission Street. The company has said it would          Spear St. could offer some guidance. Shorenstein
                                                                                                                  like to pre-lease about 100,000 square feet before     is adding four floors of new construction there, and
                                                                                                                  starting construction on the 27-story tower, a LEED    will have 105,000 square feet of contiguous space
                  Online help. If you ever need help, this button take you to a web page with FAQ and support     platinum project. But, just in case, GLL is getting    to offer tenants. If Shorenstein is able to obtain
                  information.                                                                                    ready. The company has pulled two permits related      commitments for some or all of the space before
                                                                                                                  to the project: one for the $597,000 demolition of     construction is even complete — and market ru-
                  The Close button will, of course, close the newspaper.                                          the four-story Heald College building that current-    mors suggest such a deal may be imminent — that
                                                                                                                  ly occupies the site; and one for the $84.1 million    could provide a strong argument in favor of GLL go-
                                                                                                                  construction of the new highrise.                      ing spec on its Mission Street building.

            The
Page 2      Daily e-Reporter                    September 13, 2011               www.TheDailyReporter.net                                                                               ➤                           Page 1
Construction Industry News In Brief ...                                                                                                 polluting the Salinas River,” said Matt
                                                                                                                                        Thompson, the city’s wastewater
                                                                                                                                                                                  cusp of creating the downtown it’s
                                                                                                                                                                                  never had.
                                                                                                                                                                                                                               get a second project under way, and
                                                                                                                                                                                                                               developer Friedman intends to build
                                                                                                                                        manager.                                                                               a small park next spring a short walk
  Electric Truck Incentive                      the replacement of older diesel trucks        for thrill-seeking visitors. A business                                             Even the riverfront area’s name has          from Raley Field, patterned after San
    Program Announced                           operating within non-attainment areas         owner has created what amounts to a       The discharge of salts, nitrates,         changed. For years it was known as           Francisco’s intimate South Park, itself
                                                of California with certified/approved         life-sized sandbox for adults who pay     disinfection byproducts and other         the Triangle area, but now the 188-          a short walk from that city’s AT&T
The        Sacramento       Metropolitan        medium- and heavy-duty trucks                 up to $750 each to push around dirt,      chemicals doesn’t meet state and          acre wedge at the foot of the Tower          baseball park.
Air Quality Management District                 using electric technology to lower            rock and huge tires with the earth-       federal water quality standards —         Bridge is officially called the Bridge
(SMAQMD) in partnership with                    emissions and fuel dependence using           moving construction equipment. All        and the city pays monthly fines for it.   District.                                    “We     missed      the   entire   last
the United States Environmental                 a comparable vocation and mileage.            it takes is a 10-minute classroom                                                                                                (building) cycle because we lacked
Protection Agency (USEPA), has                                                                lesson and guidance from trainers         There’s no way to stop them without       Only one housing project is officially       infrastructure,” said Gregg Harrington
announced the availability of $138,000,         For more details to the program,              through headsets.                         the upgrade. It’s slated to cost $49.6    scheduled to be built in the Bridge          of the Unger Group, a major
to offset the incremental cost to replace       please see the program page.                                                            million in 2014 dollars, the year         District next year – a 70-unit affordable    landowner. “Now, we’ve cracked that
old trucks with new, certified medium-                                                        “I thought it would be much clunkier,     contractors will use to estimate the      housing complex. It is one of several        nut. We’re on an even playing field
and heavy-duty ELECTRIC vehicles.               For any questions, please contact             and the lighter you are with the          cost of materials by accounting for       affordable housing projects required         with the rest of the region. We’re
(Hybrid vehicles do not qualify for this        Freya Arick at Sacramento AQMD at             controls, the easier it worked,” said     expected inflation.                       over time by the state in exchange for       shovel ready.”
funding.)This USEPA grant will offset           farick@airquality.org or 916-874-4891.        Mary Fitzsimons, an emergency room                                                  West Sacramento’s use of $23 million
up to $46,000 of the incremental cost                                                         doctor from Walnut Creek, who spent       The upgrade is essentially the            in Proposition 1C state bond funds.
of an electric vehicle, as long as the              Want To Drive A Dozer?                    roughly two hours digging a trench,       construction of a new sewage-
total contributed cost does not exceed                                                        moving tires and using the machine’s      treatment plant, which is expected        City officials are talking about trying to                 Continued on next page
the incremental cost of the vehicle.            Las Vegas has seen its share of               bucket to scoop basketballs atop          to take 2½ years. Building it could
                                                heavy construction equipment as it            cones.                                    involve more than 300 workers
The SMAQMD funds are now available              bulldozed its way through one giant                                                     such as engineers, ironworkers and

                                                                                                                                                                                              In This
statewide on a first-come, first served         casino project after another. But             “I thought I wouldn’t pick it up, I       carpenters, planners say.
basis, but the SMAQMD program                   with the recession having gutted the          thought I would totally futz it up,”
ends December 31, 2011.                         Las Vegas construction industry,              Fitzsimons said.                          The design, already complete, would

The goal of the program is to accelerate
                                                excavators and bulldozers near the
                                                Strip are being put to use as toys            Ed Mumm, 45, said he started Dig
                                                                                                                                        eliminate the state compliance
                                                                                                                                        issues and fines, Thompson said.                      Issue:                                 Click the blue-underlined
                                                                                                                                                                                                                                     page numbers to jump to
                                                                                                                                                                                                                                     the section you want.
                                                                                              This after renting and operating an       The city’s proposed new sewer plant
                                                                                              excavator for himself for two days        is estimated to cost $49.6 million in
     The Daily Reporter — North State                                                         while building a house in Steamboat       estimated 2014 dollars (accounting          Construction Industry News in Brief                         Pages 2 - 5
                                                                                              Springs, Colo. He quickly realized        for expected inflation), the year
                          www.TheDailyReporter.net



     CSP
                                                                                                                                        contractors will use to estimate the        Legal Advertisements (DVBE/DBE/MBE/SBE)                     Page 7 - 8
                                                                                              that toying with heavy construction
                                                                                              equipment is a diversion that takes       cost of materials.                          Placer County Contractors Association                       Page 12
                                                                                              participants completely out of their
      &                  ublishing
                                                                                              everyday lives.
                                                                                                                                                Development In
                                                                                                                                               West Sacramento
                                                                                                                                                                                    NEWLY ADDED Sacramento/Placer Projects

                                                                                                                                                                                    Sacramento/Placer County Projects
                                                                                                                                                                                                                                                Pages 13 - 15

                                                                                                                                                                                                                                                Pages 16 - 30
                                                                                              “I thought to myself, ‘If I’m having      The old freeway that once cut
                         Bringing your publications to life!                                  this much fun, imagine the amount of      West Sacramento in half has been            NEWLY ADDED San Francisco Bay Area                          Pages 33 - 35
                                                                                              people that don’t get to do this stuff    ripped out and trucked off. A rail
                                                                                              that would love to do this.’                                                          San Francisco Bay Area Projects                             Pages 37 - 47
                                                                                                                                        line that blocked river access has
                       CandSpublishing@gmail.com                                                                                        been scraped away and replaced              BART Projects Open For Bid                                  Page 48
         PMB 208, 7909 Walerga Road, Suite 112, Antelope, CA 95843                             $49.6 Million Sewer Plant                by a recreation trail. Manufacturing
                                                                                                Needs To Break Ground                   businesses have been sent packing           NEWLY ADDED Central Valley Projects                         Page 49
                   (916) 729-5432 Fax: (916) 729-1588
                                                                                                                                        and warehouses torn down, replaced
 The Daily Reporter was founded in 1994 by C&S Publishing a DGS certified Small               Paso Robles could face steeper                                                        Central Valley Projects                                     Pages 50 - 57
                                                                                                                                        by new roads and park sites.
 Business Enterprise (SBE) No.: 1605840. The Daily Reporter is a recognized minority-         fines and even a state order halting                                                  NEWLY ADDED Caltrans Projects                               Page 58 - 61
 focused (MBE/WBE/SBE/DBE/DVBE) newspaper certified by the State of California,               growth if the city does not complete      After several years of frenetic,
 Dept. of General Services. All ads published during the week online are collected into       a multimillion upgrade of its sewage                                                  Caltrans Projects                                           Pages 62 - 68
 this digital edition, which is provided without cost to state-certified minority (MBE/WBE/
                                                                                                                                        landscape-altering     work,    West
                                                                                              treatment plant built in 1954.            Sacramento officials this summer
 SBE/DBE/DVBE) companies and many others in the building and construction trades.                                                                                                   NEWLY ADDED Misc Projects                                   Pages 70 - 71
 Advertisements are also published online at: www.TheDailyReporter.net and emailed                                                      finally have an uncluttered view of
 to every state-certified DVBE and SBE with a listed email address.                           “The plant is already 15 years beyond     their waterfront vision: The once-          Misc Projects Open For Bid                                  Pages 72 - 84
                                                                                              its useful life and is essentially        dusty little west-bank city is on the

                   The
 Page 2            Daily e-Reporter                             September 13, 2011               www.TheDailyReporter.net                                                                                                 ➤                             Page 3
Construction Industry News In Brief ...                                                                                        we anticipated.” The goal before the        site permit and has started bulldozing    a pipeline distribution system for
                                                                                                                               event was $40,000 to $50,000.               the old movie theater, which will take    a recycled water irrigation project.
                                                                                                                                                                           45 days to erase from the landscape.      The funding will allow construction
Continued from last page                  the project would fill the last vacant     Hotel, the new Five Guys Burgers          Mills said the organizers did “a            “It’s nice to be going—we’re fortunate    of the main distribution backbone
                                          lot among the apartment complexes          on Dana Drive, and Famous Dave’s          tremendous job, everything was top-         to say to be able to say that we’re       infrastructure to supply and deliver
   Fresno Habitat For                     that line the cul-de-sac.                  barbecue at Hilltop Drive and             notch,” and the up-swell of support         actually doing work,” said Vice           recycled water from the city’s state-
                                                                                     Browning Street. The actual building      that surrounded the event became “a         President Brent Gaulke.                   of-the-art sewer plant.
Humanity Holds Wine Walk
                                          It was recommended for approval last       plans for Turtle Bay’s 120-unit hotel     perfect storm.” It attracted 144 golfers
Habitat for Humanity Fresno County        week by Concord’s Design Review            could be submitted later this month.      and 400 people for the dinner and           Construction will take 22 months and      Rep. Mike Thompson, D-St. Helena,
and the merchants of Fig Garden           Board; it will go to the Planning                                                    auction.                                    the leasing office will likely open in    announced that the city was awarded
Village are teaming up again this year    Commission in October, said Ryan           Calistoga Project Approved                                                            the first quarter of 2013.                a $1 million grant from the U.S.
for the 2nd Annual Fig Garden Village     Lenhardt, a senior planner for the city.                                             “I feel so blessed to be a part of such a                                             Department of Agriculture toward
Wine Walk and Moonlight Sidewalk                                                     Plans for the first new building          wonderful community,” Dede Ledford,         Look for Gerding Edlen, a green           construction of the pipeline, along
Sale. Please join your friends and        The property owner, B.L. Williams          downtown in decades got a cautious        Ron’s widow, was quoted as saying.          building pioneer in the northwest,        with another $5 million low-interest
neighbors on Thursday, September          Custom Homes of Concord, wants to          nod of approval from city planners        “The support from Ukiah has been            to pick up more projects in San           loan from the agency to help complete
29th from 5:00 PM to 8:00 PM for a        get the commission’s approval before       last week, but the owners will need       overwhelming, and we are so lucky to        Francisco. The firm is looking for        the project.
chance to sample wines from over          deciding when to get building permits      to make changes before beginning          be able to carry on Ron’s legacy and        both housing and office opportunity,
25 California wineries, be treated to     and start construction, Lenhardt said.     construction.                             give back.”                                 with a big emphasis on transit-first      The pipeline will enable the city to
food pairings from restaurants in the                                                                                                                                      locations. “We want to go long in San     begin the first phase of a stalled $14.5
Village and take advantage of great       The complex would include three            Olaf and Elizabeth Carmel want to         “I have so many memories of Anton           Francisco,” said Gaulke. “The city has    million wastewater irrigation system
sidewalk sales and special deals.         duplexes and two single-family             erect a two-story Spanish Colonial–       Stadium -- it was an integral part          a lot that aligns with our principles.”   Healdsburg has been planning for
                                          homes. Each of the eight three-story       style building at 1329 Lincoln Ave.,      of growing up, for myself and for                                                     use in vineyards, parks and open
                                          units would have a footprint of about      between the Bank of the West branch       countless other Ukiahans,” said Alan                                                  space.
Tickets for the event are $25 per                                                                                                                                             Hotel Project In Alpine
person or $40 for two. All proceeds       20 feet by 27 feet.                        and Sugardaddy’s. It would serve as       Ledford, Ron and Dede’s son. “My
will benefit Habitat for Humanity                                                    an art gallery where they would sell      dad would have been so pleased to           Viejas tribal officials have announced      Facebook Plans Second
                                          The first floor of each home would         copies of their large-format landscape    see the response from the community,        plans to build a hotel next to their
Fresno County in their mission to                                                                                                                                                                                       Campus In Menlo Park
build affordable housing for Fresno       be a two-car garage, the second            photography and works by other            and so heartened by the impact we           casino in Alpine. Ground-breaking is
County residents.                         floor would be the living room and         artists.                                  made.”                                      scheduled for early next year on the      Even as Facebook starts moving
                                          kitchen, and the top floor would have                                                                                            150 room building, which amenities        its workforce to Menlo Park, the
You may purchase your tickets online      two bedrooms, according to plans           The Calistoga Planning Commission         Mills said the money raised from the        will include a pool, fitness room and     social networking company is
here or in person at Elbow Room           submitted to the city. Each unit would     got its first look at the plan on Aug.    tournament brings the project very          business center.                          unveiling plans for the second
or Bella Vino Cellar in Fig Garden        have a small private patio area.           24. Although commissioners did not        close to meeting its fund-raising goal.                                               campus it expects to construct. The
Village. You can also get updates on                                                 take a formal vote on the plan, they      “We’re on the 10-yard line and going        The project is expected to create         recently filed plans provide a view of
the event by becoming a fan of Fig            Thirty Projects Are In                 declared themselves pleased in most       in,” he said, estimating that the city is   more than 400 construction jobs, plus     Facebook’s ambitious road map for
Garden Wine Walk on Facebook.                Plan Review In Redding                  respects.                                 about $30,000 away from “completing         many more permanent jobs once the         the near-term future, as it expands
                                                                                                                               everything.”                                hotel opens. Viejas officials say the     its local workforce from slightly
If you have any questions please feel     More than 30 projects are going            “I think it is a beautiful building,”                                                 hotel will provide vacationers with       more than 1,500 people currently
free to contact Holly Furtado via email   through the City of Reddings plan          Commissioner Matt Moye said, “and I       Anyone interested in donating money         more options which is always good         shoehorned into two buildings in the
at holly@cfanda.com or by phone at        review process.                            like the fact that a unique business is   or time to the project is asked to call     for the customer.                         Stanford Research Park, to what in
(559) 320-1120.                                                                      coming into town.”                        Mills at 467-5719. Justine Frederiksen                                                five years could be a signature Silicon
                                          Some of the more notable projects                                                    can be reached at udjjf@pacific.net         “Competition is important, the more       Valley corporate complex occupied
  Contemporary Cottage                    include a remodel of Lithia Motors, the       Golfers Raise $110,000                 or 468-3521.                                competition the better as far as we’re    by more than 9,000 employees.
  Project In Walnut Creek                 new Subaru dealership, and a facade            For Stadium Project                                                               concerned, it causes us to go up
    Receives Approval                     face-lift for Crown Nissan, renovation                                                San Francisco Apartment                    another level and provide a greater       Documents filed with the city of Menlo
                                          work on the former Gottschalks             A benefit golf tournament last month        Building Breaks Ground                    and better experience for our guests,”    Park include the first details of the
A developer has proposed building         to make room for Sportsman’s               proved wildly successful, raising more                                                said Anthony Pico, from the Viejas        smaller “West Campus” planned by
eight single-family homes and             Warehouse, the $6 million terminal         than $100,000 to help rebuild Anton       Gerding Edlen, a Portland-based             Tribal Council.                           Facebook, which will use a tunnel
townhouses on less than a quarter-        expansion at Redding Municipal             Stadium, the city of Ukiah reported.      developer, has started demolition at                                                  under Highway 84 to connect to the
acre downtown. The homes are              Airport, a remodel at C.R. Gibbs           Guy Mills, the city’s project and         the old Galaxy Theater site at 1285         Healdsburg Pipeline Project               former Sun campus on the east side
designed as “contemporary cottages,”      American Grille, converting the old        grant administrator, said the first Ron   Sutter Street for a 107-unit apartment          Awarded $6 Million                    of the highway. The 22-acre West
according to a city staff report, and     Greyhound Bus Station downtown to          Ledford Memorial Golf Tournament          building designed by Christiani                                                       Campus could house 2,800 workers
would be sold, not rented. Located on     California Physician Reimbursement         held Aug. 20 raised about $110,000,       Johnson     Architects.     Contractor      Healdsburg is getting $6 million          and will feature five three- and four-
Pine Street south of Clayton Road,        Inc., grading plans for the Turtle Bay     which he said was “way more than          Howard S. Wright       has obtained a       in grants and loans to help build         story buildings on a central courtyard.

                 The
 Page 4          Daily e-Reporter                       September 13, 2011              www.TheDailyReporter.net                                                                                                ➤                             Page 5
Featured Article                                                                                   Legal Advertisements
                                                                                                                                                                               ADVERTISEMENT FOR BID
                                                                                                              BRCO Constructors, Inc.                                   Please refer to additional requirements contained in the com-

  76,000 Construction Jobs At Risk                                                                              Subcontractor Bids Requested For:
                                                                                                                    Library Project In Three Parts
                                                                                                                                                                        plete Advertisement for Bids published on-line at http://dcm.
                                                                                                                                                                        ucdavis.edu.
                                                                                                                                                                        Subject to conditions prescribed by the University of California,
                                                                                                               City of Pittsburg, Contract No.: 2009-32
Thousands of Californian construction workers could return to work, and millions more                             September 14, 2011 @ 2:00 p.m.
                                                                                                                                                                        Davis, sealed bids for a lump-sum contract are invited for the fol-
                                                                                                                                                                        lowing Work: MRAK HALL, ELEVATOR REPLACEMENT, Con-
would spend less time in traffic, if federal lawmakers would only break their logjam over                                                                               tract No. Q-214053.
                                                                                                    Upgrade Fire Alarm — Sonoma Developmental Center (SDC)
a long-term transportation bill, officials announced last week at a regional transportation                          Eldridge, Sonoma County                            DESCRIPTION OF WORK: Provide all labor, materials, equip-
summit. Congress and others in Washington “have dithered for far too long on the deficit                   State of California, Dept. of General Services               ment, tools, transportation, insurance and services to modern-
                                                                                                                 September 29, 2011 @ 2:00 p.m.                         ize traction passenger Elevator Numbers 1 and 2 with new non-
and the debate,” Los Angeles Mayor Antonio Villaraigosa said at the gathering hosted by                                                                                 proprietary controls, selectors, signals and fixtures, cabs, door
                                                                                                   We are an equal opportunity employer and request subcontractor,
Mobility 21, a consortium of government and business leaders focused on regional trans-            supplier and trucker bids from SMALL BUSINESS and SMALL              operating equipment, machines, governors, safeties, pit ladders,
                                                                                                                                                                        hoistway wiring; recondition other equipment as specified. The
portation investment.                                                                              DISADVANTAGED BUSINESS CONTRACTORS, SUPPLIERS,
                                                                                                                                                                        Work of this Contract is divided into 2 Phases.
                                                                                                   TRUCKERS, WOMEN and MINORITY OWNED BUSINESS
                                                                                                   ENTERPRISES and DISABLED VETERAN BUSINESS                            Alternate Number 1, if chosen, will provide for all work to be per-
“We must reject the politics of cut and cap and embrace the politics of create and collabo-        ENTERPRISES.                                                         formed between the hours of 6:00 P.M. and 6:00 A.M., Monday
rate,” Villaraigosa asserted. “It has never been a partisan issue until this year, and it’s time      100% Payment & Performance Bonds may be required on               through Friday.
                                                                                                       Subcontracts over $50,000. Alternative forms of security         Estimated Construction Cost of this project is $510,000.00 (Base
for the politicians in the Congress to get the message.”                                                will be considered. BRCO will reimburse bond costs.             Bid)

Leaders, angered by bickering in Washington, pressured Congress to reauthorize surface                     BRCO Constructors, Inc.                                      A MANDATORY Pre-Bid Conference and MANDATORY Job
                                                                                                                                                                        Walk will be conducted on Thursday, September 8, 2011 begin-
transportation funding. That includes the highway trust fund and affects tens of thousands              P.O. Box 367, Loomis, CA 95650      License: 511602             ning promptly at 12:30 P.M. Participants shall meet at the Design
                                                                                                              Contact: Susan Sykes at (916) 652-3868                    and Construction Management - Main Conference Room lo-
of jobs. The spending authorization ends September 30. Without the authorization, high-                        (916) 652-3868    Fax: (916) 652-3922                    cated at 255 Cousteau Place, Davis, CA 95618. Bidders must
way, bridge and transit projects already in the pipeline will grind to a halt. The Federal                          Equal Opportunity Employer                          be present at the Pre-Bid Conference no later than the scheduled
                                                                                                                                                                        start time. Only bidders who participate in both the Conference
Transit Administration (FTA) estimates that a lack of funding would put at risk more than                                                                               and the Job Walk in their entirety will be allowed to bid on the Proj-
134,000 active projects such as building bridges and paving roads.                                            Brown Construction, Inc.                                  ect as prime contractors. For further information, contact Marjorie
                                                                                                          Invites bids from Qualified MBE/WBE/DVBE/SBE                  Riley at (530) 752-1458. The Job Walk will last approximately 2
                                                                                                              & Section 3 Subcontractors/Suppliers For:                 hours. Transportation will be provided to the Job Walk.
Deputy Secretary of Transportation John Porcari says now is the time to spend more on
                                                                                                                  FELIX TORRES FARMWORKER                               IMPORTANT NOTICE - THERE WILL BE NO EXCEPTIONS
infrastructure.                                                                                                        DAYCARE CENTER                                   FOR LATE ENTRY INTO PRE-BID CONFERENCE OR DEAD-
                                                                                                                          PLANADA, CA                                   LINE FOR SUBMITTING A BID.
“There’s over 76,000 jobs at risk in California,” said Porcari. “There are literally thousands                           All trades needed.                             Bids will be received only at: Design and Construction Manage-
of highway and transit projects throughout the state of California that will grind to a halt if                       Bonding May Be Required                           ment, Contract Services, University of California, Davis, 255
                                                                                                                                                                        Cousteau Place, Davis, California 95618.
the bill is not extended.”                                                                           Copies of our Subcontract Agreement and Material Supply
                                                                                                   Contract are available for viewing at our main office. If awarded,   Bid Deadline: Sealed bids must be received on or before Wednes-
                                                                                                    Subcontractor/Supplier consents to execute our agreement            day, September 21, 2011, at 11:00 A.M. Bids will be opened at:
The authorization includes the federal gas tax, which funds many of the nation’s transit                                without modifications.                          11:01 A.M. or promptly thereafter.
programs and highway construction. The FTA estimates 1 million jobs are in jeopardy na-                        Bids: September 14, 2011 @ 1:00 p.m.                     The successful Bidder will be required to have the following Cali-
                                                                                                                                                                        fornia current and active contractor’s license at the time of sub-
tionally if transportation funding expires. Statewide, more than 75,000 people are currently                                                                            mission of the Bid: Elevator Contractor, C-11.
employed because of federal transportation funding, according to a report released by the                     Brown Construction, Inc.
                                                                                                         1465 Enterprise Blvd., West Sacramento, CA 95691               Every effort will be made to ensure that all persons have equal
National Economic Council , which coordinates economic policy for the White House.                                    Contact: Diana Houston                            access to contracts and other business opportunities with the Uni-
                                                                                                               (916) 373-9300 FAX (916) 374-8616                        versity within the limits imposed by law or University policy. Each
                                                                                                                                                                        Bidder may be required to show evidence of its equal employment
The situation of keeping workers employed and projects continuing is more dire today,                         AN EQUAL OPPORTUNITY EMPLOYER
                                                                                                                                                                        opportunity policy.
officials said, because the federal transportation bill has been extended for the past two                                                                              THE REGENTS OF THE UNIVERSITY OF CALIFORNIA
years via short-term funding continuations.                                                                  The Daily Reporter has been serving                        University of California, Davis
                                                                                                             the construction industry since 1994                       September 8, 2011


           The
Page 6      Daily e-Reporter               September 13, 2011          www.TheDailyReporter.net                                                                                           ➤                                   Page 7
Legal Advertisements                                                         Sub Bid Requested From Qualified
                                                                             DBE Subcontractors/Suppliers for:

                                                                            Placer County Contract #04835
                                                                SMD 1 Wastewater Treatment Plant Upgrade and Expansion
                                                                                                                                              Okay, we can’t give
                        ATP
          Requests sub bids from qualified
         SLBE/ELBE/DBE/DVBE/WBE/OBE
                                                                                     Auburn, CA
                                                                         Bid: September 22, 2011 at 3:30 p.m.                                 you the moon . . .
                                                           Subcontractor/Supplier Opportunities: Demolition, Earthwork, Erosion
      Subcontractors/Suppliers for the following:
                                                           Cntrl, Rebar, Painting, U/G Pipe furnish &/or install, Fencing, Striping,
               CITY OF SAN DIEGO                           Electrical, Minor Conc., Masonry, Steel Supply &/or Erection, Welding,            But when you run your Invitations To Bids
   FY’11 ASPHALT OVERLAY GROUP I PROJECT                   Aggregates Supply, Ready-Mix Supply, Conc. Pumping, Trucking, Supply
       K-12-5400-DBB-C, SAP (WBS) B-11050                  SWPPP/Geotech Matrls, Supply U/G Precast, Monitoring, Survey, Q/C                 and Sub Bids Requested advertisements in
    BID DATE: SEPTEMBER 27, 2011 @ 2:00 PM                 Testing, Supply &/or Install Doors/F/H & OH Doors, Glazing, Drywall/
            STATE PREVAILING WAGE                          Framing, Acoust. Ceilings, Misc. Arch. Bldg. Specialties, Water Treatment         this newspaper they will be emailed to every
                                                           Equip., Pumps & Valves, Gates, Metal Bldg Supply &/or Erect, Supply/Install
ATP GENERAL ENGINEERING IS REQUESTING SUB
BIDS FROM ALL QUALIFIED SLBE/ELBE/DBE/DVBE/
                                                           Cranes, Fire Suppression Systems, HVAC                                            State-Certified DVBE/MBE/SBE firm in
WBE/OBE SUBCONTRACTORS AND SUPPLIERS FOR
THE FOLLOWING TRADES: ASPHALT CONCRETE;
                                                           Non-DBE Subs/Suppliers: Indicate 2nd-tier DBE participation offered               California at no additional cost!
                                                           on your quotation as it will be evaluated along with your price. Please use
COLD MILLING; HUMP REMOVAL; NON-WOVEN
                                                           DBE trucking companies and suppliers where there are opportunities as
FIBERGLASS/POLYESTER INTERLAYER PAVING
                                                           part of your work. Contact Flatiron/ Shannon Reid at Tel #707-742-6053
MAT; TRAFFIC LOOPS; ADJUST MANHOLES,
                                                           for assistance locating 2nd-tier DBE’s.
GATE VALVES, AND MONUMENTS; PCC CURB,
GUTTER, CROSS GUTTER, SIDEWALK, PED RAMPS,
                                                           Flatiron will assist and support a consortium of DBE companies who join
& BUS PAD; TRAFFIC STRIPING & MARKING,
                                                           together for covering larger scopes of work. Please contact Flatiron for DBE
TRAFFIC CONTROL; WATER POLLUTION CONTROL
                                                           consortium assistance.
DEVELOPMENT.
SPECIAL INSTRUCTIONS: SLBE & ELBE                          DBE’s, if haven’t already, will be asked to register in the U.S. federal govt’s
SUBCONTRACTORS ARE ENCOURAGED TO                           SBA Pro-Net website http://www.ccr.gov for certification as DBE. Please
PA RT I C I PAT E F O R I N F O R M AT I O N O N T H E     contact Shannon Reid at Flatiron for more details about DBE participation
AVAILABILITY OF PLANS & SPECIFICATIONS AND                 and registration.
THE BIDDERS POLICY CONCERNING ASSISTANCE                                                                                                          Run your good-faith advertisements here and be published in:
                                                           Time frames for subcontracts, P.O.’s and delivery schedules will be optimized
TO SUBCONTRACTORS IN OBTAINING BONDS,
LINES OF CREDIT, AND/OR INSURANCE, PLEASE                  to facilitate DBE participation.
                                                                                                                                                    • The North State edition
CONTACT OUR OFFICE. EMAIL mike@paveitgreen.
                                                           Owner Requests all bids remain valid for 100 days. California Prevailing
                                                                                                                                                    • The So-Cal edition
com
                                                           Wage Scale applies.                                                                      • Online at www.TheDailyReporter.net
                        ATP
 187 Mace Street, Chula Vista, CA 91911 License            Form EPA 6100-3 must be submitted with the bid, Contact Flatiron/                        • Emailed to every state-certified DVBE/SBE firm with a listed email
                     502506-A                              Shannon Reid for a copy of this form and or prevailing scales wage
Contact: Mike Oppenheimer at mike@paveitgreen.com          rates.
       (619) 271-3445   Fax: (619) 934-5685
            Equal Opportunity Employer                     Plans can be seen and downloaded at Flatiron’s FTP site. If you would like
                                                           access the FTP site, please call Janet Buchmiller at 801-756-0404 or email
                                                           at jbuchmiller@flatironcorp.com
                                                                                                                                             No Price Increase!
                                                           Performance & Payment Bonds by admitted surety, naming prime contractor
                                                                                                                                             Just more exposure for your dollar
      C&S Publishing’s exclusive
                                                           as the obligee, in full amount of the subcontractor’s bid, subject to approval
      Delivery Manager software                            by Flatiron required. Bonding assistance is available. Flatiron will pay          And, as always, ads run from the
      will deliver this newspaper                          bond premium up to 2.0%. Worker’s Compensation Waiver of Subrogation
                                                           required. Please contact Flatiron for bonding and insurance requirements,         day you send them to us until
   to you every week automatically!                        or if any other assistance is needed.
                                                                                                                                             the bid date in all the digital
                   Click this                                             FLATIRON WEST, INC.                                                editions and online.
    button for more information                                          2100 Goodyear Rd. Benicia, CA 94510
                                                                        (707) 742-6053           Fax (707) 746-1603
                                                                                Equal Opportunity Employer


                  The
 Page 8           Daily e-Reporter                       September 13, 2011                     www.TheDailyReporter.net                                                                        ➤                    Page 9
                                                                                 Only the Daily Reporter newspaper
                                                                             will email your advertisement to 9,000+ firms!
                                                                                                             Your Invitations To Bids and
                                                                                                    Sub Bids Requested advertisements are
                                                                                                          emailed to every State-Certified
                                                                                                      DVBE/MBE/SBE firm in California
                                                                                                                   at no additional cost!

                                                                                                                  Running your good-faith
                                                                                                                      advertisements in the
                                                                                                                 Daily Reporter newspaper
                                                                                                                 will get you published in:
                                                                                                                 • The North State edition
                                                                                                                      • The So-Cal edition
                                                                                                    • Online at www.TheDailyReporter.net
                                                                                                           • And emailed to state-certified
                                                                                                                   DVBE/MBE/SBE firms

                                                                                                                 All for one low price!
                                                                                                          And, as always, ads run from the
                                                                                                      day you send them until the bid date
                                                                                                      in all the digital editions and online.


                                                                                 www.TheDailyReporter.net

          The
Page 10   Daily e-Reporter   September 13, 2011   www.TheDailyReporter.net                                      ➤                     Page 11
                                                                                             Sacramento/Placer Counties Projects Open For Bid
                                                                                             Added since the last issue
                                                                                             Tulare Iris Triplex                                                   Invitation No. ISP 2000-01
                                                                                             Bids: September 13, 2011 at 2:00 PM                                   Special Tax Refunding Bonds
                                                                                             Description: Simile Construction Service, Inc. is requesting          Bids: September 29, 2011 at 4:00 PM
                                                                                             bids for the ground up construction of 1 Triplex unit located         Estimated Bid Value $4,495,000.00
                                                                                             in Visalia CA. Please provide a bid for unit 1 complete, and          StartlDalivary Date approx. Oct. 31, 2011
                                                                                             alt bid for unit 2. Unit 1 & 2 are identical. Unit 2, if built will   Scope of Services Sealed proposals will be received for
                                                                                             be constructed concurrently with Unit 1 using the same sub-           the purpose of selecting a qualified financial institution to
                                                                                             contractor for both. Please keep this in mind when present-           make a taxable and tax-exempt loans to the Community
                                                                                             ing your bid alternative. If you have any questions please            Facilities District No. 2000-1 of the South Lake Tahoe Rec-
     Plans On-Line                                                                           contact Pat Seefeldt our Senior Estimator at 209-545-6111             reation Facilities Joint Powers Authority (the “AuthOrity”) in
                                                       A Licensed Contractor
                                                                                             Location: Visalia, CA                                                 the amount of not-to-exceed $3,145,000’ bearing a fixed
     Two Planrooms                                    An Architect or Engineer               Company: Simile Construction Service, Inc.                            interest rate per annum to be evidenced by the Authority’s
     Private Project Planroom                        A Supplier or Manufacturer              Contact: Pat Seefeldt 209-545-6111                                    Special Tax Refunding Bonds, Series 2011A (Taxable) (the
                                                                                             Notes: “Please specify economical building materials, ie…             ‘2011A Taxable Refunding Bonds”) and a not-to-exceed
     Daily Email Updates                              Provide a service to the               Fiber glass tub and shower, formica countertops, vinyl                $1,350,000’ bearing a fIXed interest rate par annum to be
                                                       Construction Industry                 floors in kitchen and bathroom areas, and carpet in living            evidenced by the AuthOrity’s Special Tax Refunding Bonds,
     Weekly Construction Newsletter                                                          and bedrooms, one color paint (Swiss Coffee) on interior,             Series 2011 B (TaxExempt) (the “2011 B Tax-Exempt Re-
                                                                                             and assume to paint colors on exterior”                               funding Bonds”), collectively, (the “2011 Bonds’). Proceeds
     Monthly Safety Newsletter                   Apply On-Line at www.placerbx.com           Contact: Simile Construction Service, Inc.                            of the 2011 Bonds will be used to refund the Authority’s
                                                                                             4725 Enterprise Way, Suite 1 Modesto, CA 95356                        Special Tax Bonds, Series 2001 and to pay costs of issu-
     Membership Directory Online & Semi              For more information contact
                                                                                             Ph. 209-545-6111                                                      ance of the Special Tax Bonds. The principal amount of
      Annual Publications                             Jeff Henry at 916-771-7229             Fax 209-545-6112                                                      the 2011A Bonds is estimated not-to-exceed $3,145,000’
                                                                                             Invitation To Bid                                                     and the principal amount of the 2011 B Bonds is estimated
     Referral Services                         • Obtain quality services for you, your       More Information                                                      not-toexceed $1,350,000*. The actual amount will be de-
                                                 business and employees                                                                                            termined prior to closing. Other Details Any inquiries, sug-
     Copy and Print Services                                                                 110291.OS                                                             gestions or requests concerning interpretation, clarifica-
                                               • Attend educational and training courses     THERMAL POWER PLANT ENGINEERING SERVICES                              tion, or additional information pertaining to the Invitation for
     Advertising & Marketing Opportunities                                                   Bids: September 22, 2011 at 5:00 PM                                   Proposals (the -ISP”) shall be made to the City’s Financial
                                                 coordinated by our professional staff
                                                                                             Pre Bid Conference: Yes                                               Advisor, Craig Dunlap at jcdunlap@dunlapandassociates.
     Group Health Insurance Program            • Acquire bidding opportunities for your      Date: 8/25/2011 @ 11:00 AM                                            com or (407) 678-0977 or Michael Levinson at mlevinson@
     Group Workman’s Comp                        company                                     Location: SMUD Headquarters                                           relhinkgov com or (954-2584900), Dunlap & Associates,
                                                                                             6201 ‘S’ Street Sacramento, Ca 95817                                  Inc.
     Group Liability                           • Save money…..through workmans comp,         Description: The Proposer shall provide all labor, material,          Contact Information
                                                 medical insurance, print on demand &        and equipment required to perform the Service described               Contact Info Patrick Enright, City Attomey, 530-542-6046
     Networking Opportunities                    more..                                      as: THERMAL POWER PLANT ENGINEERING SERVIC-                           penrighl@cityofslt.us
                                                                                             ES                                                                    Bids to Commun~ Facilities District No. 2000-1 of the South
     Social Affairs                            • Access to the latest industry information   The Sacramento Municipal Utility District’s Balancing Au-             Lake Tahoe Recreation Facil~ies Joint Powers
                                                                                             thority includes power supply from 3 co-generation, 1 sim-            Owner’s Agent J. Craig Dunlap, Dunlap & Assoc., 407-678-
     Training and Educational Workshops        • Keep up with your competitors               ple cycle and one combined cycle thermal power plants.                0977
                                               • Develop professional relations              Ownership of all of these plants is through Joint Powers              Michael Levinson, Dunlap & Assoc., 954-2584900
     Voice in local Government and                                                           Authority (JPA). SMUD manages these JPAs and has                      More Information
     Community Affairs                         • Be a part of an association that cares      set up operations contractors for all of the thermal power
                                                 about you and your business                 plants. The operations contractors coordinate operations              Solicitation No. OT-PS-11-012.00
                                                                                             and maintenance activities, but include SMUD in design                Sonoma-Marin Area Rail Transit District
                                                                                             change review and approval.                                           Bids: September 29, 2011 at 11:00 AM
                                                                                             Oscar Santos                                                          The SMART project is being phased and the initial operat-
                                                                                             Phone: 916-732-5616                                                   ing segment, to be constructed over the next three years,
                                 www.placerbx.com                                            Email: osantos@smud.org
                                                                                             More Information                                                                                            Continued on next page


           The
Page 12    Daily e-Reporter           September 13, 2011         www.TheDailyReporter.net                                                                                          ➤                                Page 13
Sacramento/Placer Counties Projects Open For Bid                                                                                   at minimizing the scour potential of the structure. A copy of     40/Lincoin Highway CMU roadside monument, traffic con-
                                                                                                                                   the report and all findings will be provided to the County.       trol, SWPPP implementation and monitoring, coordination
Added since the last issue                                                                                                         Contact: Scott Riddle, Associate Civil Engineer                   with local businesses, water system improvements and
                                                                                                                                   Sutter County Public Works                                        pump modifications at the Ophir Road Pump Station, and
Continued from last page                                          RFP/RFQ or Contract Number: 610882                               1130 Civic Center Boulevard                                       corrosion control systems.
encompasses a 37 mile segment connecting downtown                 Shasta County Mental Health Facility Renovation - Ar-            Yuba City, California 95993                                       A MANDATORY pre-bid walk-through meeting will be held
Santa Rosa to downtown San Rafael. The project includes           chitectural and Engineering Services                             Telephone (530) 822-7450 Fax (530) 822-7457                       on Tuesday, October 18, 2011 at 9:00 a,m, All walk-through
construction of an adjacent multi-use bicycle/pedestrian          Bids: October 7, 2011 at 3:00 PM                                 More Information                                                  attendees shall meet at PCWA’s Heritage Center located
pathway to provide alternative modes of transportation            RFP/RFQ Contact:Shawn Ankeny                                                                                                       at 10681 Ophir Road, At this meeting, representatives of
along the U.S. Highway 101 corridor in Sonoma and Marin           County of Shasta                                                 Contract No. 2011-05                                              Owner and the Design Engineer will discuss the bid doc-
Counties. Refer to SMART’s website (www.sonomamarin-              1855 Placer Street                                               Ophir Road Pipelines                                              uments, site constraints, order of work and other items
train.org) for a map of the project corridor, which generally     Redding, CA 96001                                                Bids: October 27, 2011 at 2:00 PM                                 specific to this project A project walk-through will follow, A
parallels U.S. Highway 101.                                       Tel:(530) 245-6810                                               The estimated cost of construction is $18,800,000                 sign-in sheet will be available up until 9: 15 a,m, only, At-
Contact:                                                          Fax:(530) 225-5667                                               The total Contract Time to achieve Final Completion is 600        tendance at the entire pre-bid meeting and walk-through is
Sonoma-Marin Area Rail Transit District                           Non-Mandatory Pre Proposal Conference Date: 09/23/11             calendar days.                                                    mandatory for bidding, Bids received from Bidders who did
750 Lindaro Street, Suite 200                                     Pre Proposal Conference Time: 9:00 AM                            Project Description: In accordance with plans and speci-          not sign the sign-in sheet and attend the meeting and walk-
San Rafael, California 94901                                      Pre Proposal Conference Location: 2640/2644 Breslauer            fications prepared by West Yost Associates, the Work in-          through will be returned to the Bidder unopened, Atten-
Attention: Mr. David Heath, Chief Financial Officer               Way                                                              cludes the furnishing of all labor, materials, tax, equipment     dance by subcontractors is not mandatory, but all interest-
More Information                                                  RFP/RFQ Description: Shasta County is seeking quali-             and services for the construction and completion of approx-       ed prospective subcontractors are encouraged to attend,
                                                                  fied providers of Architectural and Engineering Services         imately 4,923 lineal feet of 60-inch diameter treated water       The Owner will transmit to all recipients of complete sets
Project Number: PW-99-01                                          for design and construction review services for the Shasta       pipeline, 4,676 lineal feet of 45-inch diameter raw water         of Contract Documents such Addenda as Owner considers
MANTHEY ROAD RELOCATION, PHASE I                                  County Mental Health Facility renovation.                        pipeline, 285 lineal feet of 42, 39, and 36-inch diameter raw     necessary in response to questions raised at the meeting
Bids: October 6, 2011 at 2:00 PM                                  The scope of work will include an interior remodel of ap-        water pipeline, 9,799 lineal feet of 18-inch diameter treated     and walk-through.
Description: MANTHEY ROAD RELOCATION, PHASE I -                   proximately 3,000 sf of the Mental Health Building, includ-      water pipeline, 6,217 lineal feet of 12-inch diameter treated     The successful Bidder will be required to furnish both a
The relocation of Manthey Road west of I-5 will realign a         ing reception, client waiting, confidential meeting space, re-   water pipeline, 88 lineal feet of 6 and 4-inch diameter treat-    Faithful Performance Bond in the amount of one hundred
portion of Manthey Road to satisfy Caltrans’ requirements         strooms, office and administrative areas. The design shall       ed water pipeline, trenchless crossings of 1-80 and UPRR,         percent (100%) and a Payment Bond in the amount of one
due to the reconstruction of the French Camp Road/I-5 In-         include an entry foyer and energy efficient glazing. The         three 60- inch diameter steel casings, fiber optic conduit        hundred percent (100%) of the Contract price.
terchange (Phase II). In general, the project will construct a    Services shall include, at a minimum, design of the HVAC,        and manholes, outfall and crossing of Dutch Ravine, earth-        Contact: Attn: Nicole Snyder
two-lane roadway, install a traffic signal, striping, and widen   plumbing, electrical and structural systems. The Services        work, twin 72-inch corrugated metal pipes, concrete head          Placer County Water Agency
French Camp Road. This project is within both the City and        shall also include design and scheduling of temporary ac-        walls, AC pavement, approximately 50 lineal feet of 4 foot        Engineering Division
San Joaquin County jurisdictions.                                 cess and reception during the construction period.               by 6 foot reinforced concrete box culvert, channel improve-       P,O, Box 6570
Contact: Project Manager, Ray Deyto                               More Information                                                 ments, SCADA flow monitoring system, aluminum slide               Aubum, CA 95604
(209) 937-8869                                                                                                                     gate, clearing, grubbing, tree removal, chain link fencing,       More Information
ray.deyto@stocktongov.com                                         Federal Aid Project No.: BRLS - 5918(076)                        concrete and asphalt concrete pavement replacement, US
More Information                                                  Pennington Road Bridge over Sutter Butte Canal
                                                                  Bids: October 18, 2011 at 11:00 AM
                                                                  Prepare a bridge structural design, civil roadway design,
                                                                  general plans with associated CAD detailing, project tech-
                                                                  nical provisions and hydraulic report to complete the Pre-         Links to more information
                                                                  liminary Engineering phase for the replacement of the ex-
                                                                  isting bridge identified as 18C-0 1 00.                            City of Roseville http://www.roseville.ca.us/rfps/default.asp
                                                                  PROJECT DESCRIPTION: The County will have the bridge               Site lists Requests for Quote and Bids and also Requersts for
                           Newspaper Tip:                         design completed per the latest Caltrans and FHW A de-
                                                                  sign and construction standards. The Consultant engineer
                                                                                                                                     Proposals.

                                                                  will be responsible to stamp and sign the final construction       City of Sacramento        http://www.cityofsacramento.org/fi-
                           All of the email links shown           documents.                                                         nance/bids/ Design & Construction links to listing of bidding
                           in this newspaper work!                It will be the responsibility of the Consultant to obtain the      opportunities and RFPs from Department of Public Works.
                           Just click on the email                water level, flow rates and irrigation schedule for the Sutter
                                                                  Butte Irrigation Canal from Butte Water District, 735 Vir-         Sacramento County http://www.saccountybids.com/ Lists
                           address to send off your
                                                                  ginia Street, Gridley, Ca. 95948 (Phone Number 530-846-            current and upcoming bidding opportunities with the county
                           request for information or             3100). Additionally, a consultant prepared hydraulic report        and at Sacramento International Airport; includes Q&A on the
                           plans!                                 will be required to demonstrate the scour potential for the        bidding process.
                                                                  new structure and provide design recommendations aimed

                  The
 Page 14          Daily e-Reporter                         September 13, 2011               www.TheDailyReporter.net                                                                                                ➤                               Page 15
Sacramento/Placer Counties Projects Open For Bid                                                                                    Plans, specifications and other bid documents may be ex-         The City of Dixon that sealed bids will be received by the
                                                                                                                                    amined and/or obtained at the City of Elk Grove City Hall,       City Clerk at City Hail, 600 East A Street, Dixon, Califor-
Project Number 09-32                                              ment rehabilitation on Railroad Avenue and Kirker Pass            Public Works Department, located at 8401 Laguna Palms            nia on Thursday, September 15, 2011, until 3:00 p.m. at
Library Project in Three Parts                                    Road, from Linscheid Drive to South City Limit. The scope         Way, Elk Grove, CA 95758. A copy of the bid documents            which time all bids will be publicly opened and read by the
Bids: September 14, 2011 at 2:00 PM                               includes, but is not necessarily limited to, construction sig-    may be obtained at the City Hall upon request and payment        City Clerk. All bids will be considered for award by the City
Sealed proposals for the work entitled: Library Project in        nage; repair and replacement of existing AC dike, side-           of $30.00 or may be mailed upon request and payment of           of Dixon City Council at their regular meeting on Tuesday,
Three Parts, Project Number 09-32 will be received by the         walk, curb and gutter, curb ramps, and median curb; ad-           $40.00. The amount of the payment is non-refundable.             September 27, 2011, for the following project: HEATING,
of City of Pittsburg at the Office of the City Clerk, 65 Civic    justment of utility structures to grade; roadway cold planing     Description: The proposed work shall be performed in ac-         VENTILATION, AIR CONDITIONING (HVAC) MAINTE-
Avenue, First Floor, Pittsburg, California until 2:00 PM on       and asphalt concrete inlay paving; paving mat; removal of         cordance with the plans, specifications and other contract       NANCE PROJECT 2011
Wednesday, September 14, 2011 at which time they will be          roadside signs; traffic signal detector loop replacement;         documents and shall consist of the following: install drain-     LOCATION OF WORK: City buildings within the City of
opened and read aloud.                                            pavement delineation and all other work necessary for a           age improvements consisting of storm drain pipe and a drop       Dixon, Solano County.
This Contract is anticipated to have a construction duration      complete project in accordance with the Plans and Speci-          inlet. Improvements shall also include utility coordination,     DESCRIPTION OF VVORK: HVAC Maintenance
of no more than 360 calendar days from the date of Notice         fications.                                                        demolition work, surface restoration, and traffic control.       EXPERIENCE Minimum of five years experience in HVAC
to Proceed.                                                       The Underutilized Disadvantaged Business Enterprise               Invitation To Bid                                                maintenance.
The Engineer’s Estimate for this Contract is $1,280,000.00        (UDBE) goal is 6%. CLICK HERE to run your DVBE/SBE/               More Information                                                 If you desire a copy of the plan holders list, call City Hall at
total for Parts A and B, and $85,000.00 for Part C.               MBE advertisement in the Daily Reporter and get it in the                                                                          (707) 678 7000 or fax 678-1489. If you have questions re-
Attention is directed to the provisions of Chapter 9 of Divi-     newspaper, posted online, and also emailed to all state-          REBID                                                            garding this project, fax to Martha Jensen, (707) 693-1423.
sion 3 of the Business and Professions Code concerning            certified DVBE and also SBE firms in California.                  Project Number: PW-11-09-REBID                                   The HVAC maintenance contract will be for a three tear
the licensing of Contractors. The Contractor shall possess        Engineer’s Estimate for cost of construction is approxi-          PLAYGROUND FALL ATTENUATION SURFACING AT 11                      period.
a California Class B Contractor’s License. The Contrac-           mately $1.2 Million.                                              PARK LOCATIONS                                                   Packet For Bid
tor shall perform with his own organization Contract work         The Contractor shall possess either a Class A or a Class          Bids: September 15, 2011 at 2:00 PM                              More Information
amounting to not less than 30 percent of the original total       C-12 license at the time this contract is awarded.                The City of Stockton, California, will receive sealed bids
contract price.                                                   Attention is directed to the provisions of Chapter 9 of Divi-     until Thursday, September 15, 2011, 2:00 p.m. for the Play-      NEW BID DATE
The Pre-Bid Conference and Site Inspection for this proj-         sion 3 of the Business and Professions Code concerning            ground Fall Attenuation Surfacing at 11 Park Locations in        Elk Grove Teen Center Retrofit Replacement Window
ect is scheduled for 10:00 AM on Thursday, September 01,          the licensing of Contractors. The Contractor shall possess        accordance with the plans and specifications for Project         Project
2011, at the Pittsburg Civic Center City Council Chambers         either a Class A or Class C-12 license at the time that the       No. 1109. Each bid submitted for this project shall be on the    Bids: September 15, 2011 at 2:00 PM
on the third floor at 65 Civic Avenue, Pittsburg, California.     contract is awarded.                                              official bid form obtained from the City of Stockton web site,   Sealed bids will be opened and tabulated by or on behalf
All prospective bidders are encouraged to attend.                 Notice To Contractors                                             and must conform to the requirements of the official bid         of the City Clerk at the City Clerk’s designated office lo-
Description: The work of this Contract consists, in general,      More Information                                                  documents, including the plans and specifications. Each          cated at 8401 Laguna Palms Way, First Floor, Elk Grove,
of all necessary construction activities to build two single                                                                        bid shall be presented under sealed cover and shall be           California, 95758 immediately after 2:00 P.M. local time on
story additions to the existing City of Pittsburg Library and     Project WDR006                                                    accompanied by the Bidder’s Guaranty, NonCollusion Af-           Thursday, September 1, 2011 for
to provide interior remodeling of the existing Library. Part A    Old Town Stub (9070 Elk Grove Boulevard) Drainage                 fidavit, and all of the required documents and information.      furnishing all labor, materials, tax, transportation, equip-
of the work consists of a 1,280 SF Coffee House addition.         Improvements                                                      Each bidder shall be licensed in accordance with applica-        ment and services necessary for the: Elk Grove Teen Cen-
Part B consists of a 2,120 SF Library addition, Part C con-       Bids: September 15, 2011 at 11:00 AM                              ble State laws.                                                  ter Retrofit Replacement Window Project. Any bids re-
sists of interior Library remodeling.                             Sealed bids will be opened and tabulated by or on behalf of       The City of Stockton is requesting bids to provide all labor     ceived after the time specified shall be returned unopened.
Technical questions should be directed in writing to Mahta        the City Clerk at the City Clerk’s designated office located at   and materials necessary to replenish the playground fall         Engineer’s Estimate: $15,200
Khalatbari, Civil Engineer II, City of Pittsburg, Development     8401 Laguna Palms Way, First Floor, Elk Grove, California,        surfacing at 11 locations using wood chips meeting ADA,          An optional pre-bid meeting will be held on Tuesday, Au-
Services Department, 65 Civic Avenue, Pittsburg, Califor-         95758 immediately after 11:00 A.M. local time on Thursday,        ASTM and CPSC playground surfacing standards.                    gust 23, 2011 at 10:00am at the Teen Center at 8978 Elk
nia, 94565, facsimile number (925) 252-6928 or by email to        September 15, 2011 for furnishing all labor, materials, tax,      Engineer’s Estimate: Below $40,000                               Grove Boulevard, Elk Grove, CA, 95624.
2009-32bidinfo@ci.pittsburg.ca.us                                 transportation, equipment and services necessary for the:         For questions about this project, please contact Tracy Pen-      For Pre-Bid Information and Information Pertaining to the
Invitation To Bid                                                 Old Town Stub (9070 Elk Grove Boulevard) Drainage Im-             gilly, (209) 937-8867, or email tracy.pengilly@ci.stockton.      Construction Plans and Specifications, Contact: Doug
More Information                                                  provements Project WDR006. Any bids received after the            ca.us                                                            Scott, Project Manager, City of Elk Grove, Fleet and Fa-
                                                                  time specified shall be returned unopened.                        Project Manager: Tracy Pengilly                                  cilities Department. Telephone: (916) 478-3443 or Email:
CONTRACT NO. 2009-28                                              The Engineer’s estimate for the work is $25,000.                  209-937-8867                                                     dscott@elkgrovecity.org.
Federal Aid Project No. STPL 5127(026)                            For Pre-Bid Information and Information Pertaining to             tracy.pengilly@stocktongov.com                                   For Obtaining Bid Documents, Contact: Stephany Bauder,
RAILROAD AVENUE PAVEMENT REHABILITATION                           the Construction Plans and Specifications, Contact:               Invitation To Bid                                                Administrative Assistant, City of Elk Grove, Public Works
(LINSCHEID DRIVE TO SOUTH CITY LIMIT)                             Juan Chavez, Project Manager, City of Elk Grove, Public           More Information                                                 Department. Telephone: (916) 478-2212 or Email: sbaud-
Bids: September 14, 2011 at 3:00 PM                               Works Department. Telephone: (916) 478-3661 or Email:                                                                              er@elkgrovecity.org
Bids will be received by the City of Pittsburg in the Office of   jchavez@elkgrovecity.org.                                         Bids: September 15, 2011 at 3:00 PM                              Plans, specifications and other bid documents may be ex-
the City Clerk, 65 Civic Avenue, First Floor, Pittsburg, Cali-    For Obtaining Bid Documents, Contact: Stephany Bauder,            HEATING, VENTILATION, AIR CONDITIONING (HVAC)                    amined and/or obtained at the City of Elk Grove City Hall,
fornia until 3:00 p.m. on September 14, 2011 at which time        Administrative Assistant, City of Elk Grove, Public Works         MAINTENANCE PROJECT 2011                                         Public Works Department, located at 8401 Laguna Palms
they will be opened and read aloud.                               Department, Telephone: (916) 478-2212 or Email: sbaud-            Mandatory Pre-Bid Site Tour: September 7, 2011 at City
The work of this Contract consists in general of the pave-        er@elkgrovecity.org                                               Hall, 600 East A Street, Dixon, CA                                                                     Continued on next page


                  The
 Page 16          Daily e-Reporter                         September 13, 2011               www.TheDailyReporter.net                                                                                                 ➤                                Page 17
Sacramento/Placer Counties Projects Open For Bid                                                                                    electrical room at operation center as shown on plans and         ward onto private property to the corrugated metal barn.
                                                                                                                                    as specified herein.                                              Description: The scope of this project continues restoration
Continued from last page                                          Robert Swift, (916) 854-1935. At 2:00 p.m., on September          6. Furnish and install new underground ductbank including         efforts for the Napa River. Re-vegetation efforts will be per-
                                                                  15, 2011 all bids received will be publicly opened and read       conduit, Power cables for the existing three power oper-          formed to establish native species on all areas that have
Way, Elk Grove, CA 95758. A copy of the bid documents             at the Office of the Adjutant General, 9800 Goethe Road,          ated gate, fence Obstruction lights, single mode fiber cable      been graded and stabilized. Construction for this project
may be obtained at the City Hall upon request and payment         Sacramento, California, 95827-3563. Bid results will not be       for telephone and new panel board as shown on plans.              will take place on both sides of the Napa River. The Mee
of $20.00 or may be mailed upon request and payment of            divulged by telephone or available via facsimile. Official bid    7. Furnish and install new 100-Ampere, 120/208, three             Lane location will allow contractors to evaluate west bank
$25.00. The amount of the payment is non-refundable.              results will be posted on BidSync.                                phase manual transfer switch as shown on plans.                   conditions. After observing the west bank construction ar-
Description: The proposed work shall be performed in ac-          The contractor/bidder must be licensed by the State of Cal-       8. Perform trenching, back filling, landscape modification        eas, contractors will be required to follow County staff to a
cordance with the plans, specifications and other contract        ifornia, Contractors State License Board (CSLB) in com-           and restoring, asphalt pavement patching on site in accor-        pre-designated location along the east bank of the river to
documents and shall consist of the following: The proposed        pliance with the following to perform services identified in      dance with plans and specifications.                              evaluate east bank conditions.
work generally includes providing and installing energy ef-       the Technical Specifications: Possess an “A” General En-          Questions regarding this IFB should be directed as follows:       All questions must be must be submitted in writing and
ficient retrofit windows at the Elk Grove Teen Center – 8978      gineering Contractor’s License. All listed subcontractors         Technical Specifications, worksite conditions and contrac-        mailed, faxed, or e-mailed to John Vicencio (John.Vicen-
Elk Grove Boulevard, Elk Grove, CA, 95624.                        must provide the required licenses/certificates listed above      tor responsibilities, contact the Military Department PM, Mr.     cio@countyofnapa.org) , Napa County Department of Pub-
Invitation To Bid                                                 and in Section 4 (Scope of Work) upon bid opening; failure        Robert Swift at (916) 854-1935.                                   lic Works 1195 Third St., Napa, CA 94559, Fax # 707-299-
More Information                                                  to comply with this requirement may be considered non-            Contract administration, contractor qualifications and rules      4040 by September 7, 2011 at 12:00 noon.
                                                                  responsive and may lead to the rejection of your bid.             of bidding, contact the Contracting Officer, Chief Warrant        Notice To Contractors
Solicitation Number: 110307.CJB                                   Prospective bidders must attend the mandatory job walk            Officer Allen McCord, at (916) 854-3141.                          More Information
Roof Replacement - SMUD Wellness Center                           on August 24, 2011, at 10:00 A.M. at the California National      Notice Inviting Bids
Bids: September 15, 2011 at 2:00 PM                               Guard facility located at 10616 Superfortress Drive, Sac-         More Information                                                  INVITATION TO PRE-QUALIFY
Est. Amount : $120,000.00                                         ramento, California, to be considered responsive to the                                                                             Diamond Valley Ranch Irrigation Improvs Phase 1
Work Location : Adjacent to 6301 S Street, Sacramento,            bidding requirements of this IFB. Prospective bidders may         PW 11-18 RE-VEGETATION CONTRACT                                   September 16, 2011 District receives Pre-qualification
CA                                                                obtain directions to the job walk site by calling Robert Swift,   NAPA RIVER RUTHERFORD RESTORATION PROJECT,                        Packages
Licenses Required : C39-Roofing                                   (916) 854-1935. Prospective bidders must sign-in prior to         REACH 4                                                           Notice is hereby given that the South Tahoe Public Utility
Pre Bid Conference: 9/1/2011 at 2:00 PM                           the start of the job walk, attend the entire job walk and be      Bids: September 15, 2011 at 3:30 PM                               District has determined that all General Contractors bid-
Location: SMUD Headquarters. 6201 ‘S’ Street Sacramen-            present for roll call at the conclusion of the job walk. Bid-     Sealed proposals will be received at the office of the Clerk      ding on the Diamond Valley Ranch Irrigation Improvements
to, CA 95817                                                      ders who do not remain for the entire job walk will be con-       of the Board of Supervisors, Napa County Administration           Phase 1 project to be undertaken by the District must be
Description: Provide labor, material, tools, equipment, su-       sidered non-responsive and will not be allowed to bid on          Building, 1195 Third Street, Room 310, Napa, California,          pre-qualified prior to submitting a bid on that project. It is
pervision to complete the installation of thermoplastic poly-     this project.                                                     until 3:30 P.M. on September 15, 2011 (no bids will be ac-        mandatory that all General Contractors who intend to sub-
olefin (TPO) 80 mil (0.080), white membrane, including            THERE IS A 10% DISABLED VETERAN BUSINESS EN-                      cepted after 3:30 P.M.) after which they will be publicly         mit a bid fully complete the pre-qualification interest form
flashings and accessories. Roofing will be installed over         TERPRISE PARTICIPATION REQUIREMENT FOR THIS                       opened and read for the construction in accordance with           and pre-qualification questionnaire provide all materials
the top of existing Thermoplastic polyolefin roof membrane.       PROJECT. CLICK HERE to run your DVBE advertisement                the Plans and Special Provisions thereto, to which special        requested, and be approved by the District to be on the
Roofing shall also include walkway pads as indicated on           in the Daily Reporter and get it in the newspaper, posted         reference is made as follows: NAPA RIVER RUTHER-                  final qualified Bidders list. No bid will be accepted from a
drawings.                                                         online, and also emailed to all state-certified DVBE firm in      FORD RESTORATION PROJECT, REACH 4 RE-VEGE-                        General Contractor that has failed to comply with these re-
Tech Contact: Scott Blangeres                                     California.                                                       TATION CONTRACT.                                                  quirements.
Phone: (916)732-6742                                              Contractor will be allowed 60 working days to complete this       The Plans and Specifications may be seen at the office            The project is located at the Diamond Valley Ranch in
Email: sblange@smud.org                                           project.                                                          of the County of Napa Department of Public Works, 1195            eastern Alpine County, approximately twenty-six (26) miles
More Information                                                  Description: The work consists of furnishing all equipment,       Third Street, Room 201, Napa, California. Plans, Special          southeast of South Lake Tahoe, CA. The purpose of the
                                                                  materials, and labor necessary to accomplish the following:       Provisions (excluding State Standard Specifications and           project is to construct an irrigation system that would be
Bid Number: A0197                                                 1. Furnish and install a new 150-Amperes, 120/208-Volt,           other documents included by reference), Proposal Forms            used in the future to dispose of recycled water. Additionally,
Electrical System Upgrade, Mather AFB                             three Phase, circuit breaker in Armory main switch board          and Contract Forms may be obtained at said office by pro-         the project would provide an emergency containment area
Bids: September 15, 2011 at 2:00 PM                               as shown on plans and as specified herein.                        spective bidders to those licensed by the State of California     for recycled water and generate power using a hydroelec-
The State of California Military Department will accept           2. Furnish and install new panel boards at east side of the       for the type of work involved, for a fee of thirty five dollars   tric facility to run the site. The proposed irrigation system
sealed bids until 2:00 p.m. on September 15, 2011 from            field near the fuel farm as shown on plans and as specified       ($35) per set, which fee is not refundable.                       would use fresh water supply at the beginning of the proj-
qualified bidders, who attended the Mandatory Job Walk            herein.                                                           Two mandatory pre-bid site visits for Contractors bid-            ect which requires a series of pipelines, diversions and a
on August 24, 2011 at 10:00 AM, offering to provide equip-        3. Furnish and install new pole mounted floodlights as            ding the project are scheduled for August 25, 2011 and Au-        freshwater pump station. Due to the size of the project it
ment, materials, labor, licenses, bonds and insurance re-         shown on plans and as specified herein.                           gust 31, 2011 at 10:00 AM. Contractors need only attend           will be phased over the course of several years. Below is
quired to provide power and control to the fence obstruction      4. Remove existing underground ductbank including con-            one of the two meeting dates. Contractors are required to         a description of the Phase 1 project components which will
lights and to the three electrically powered gates at the Na-     duits, power cables from the three power                          sign in for these site visits. Any Contractor failing to sign     be constructed under this contract.
tional Guard facility located at 10616 Superfortress Drive,       operated gates to the electrical room at operation center as      in for either site visit will be disqualified from the bidding    The main components of the Phase I irrigation system im-
Sacramento, California in accordance with the terms, con-         shown on plans and as specified herein.                           process.                                                          provements include:
ditions, and requirements of this Invitation for Bid (IFB). The   5. Remove existing underground ductbank including con-            The meeting point is located at the east end of Mee Lane
contracting officer’s representative (COR) for this project is    duits, power cables from the Fence Obstruction lights to the      in St. Helena. Drive to the end Mee Lane and continue for-                                             Continued on next page


                  The
 Page 18          Daily e-Reporter                         September 13, 2011               www.TheDailyReporter.net                                                                                                  ➤                              Page 19
Sacramento/Placer Counties Projects Open For Bid                                                                                    fundable charge of $125.00 for each set payable to Winslow          tecturallEngineering Services shall include but not be lim-
                                                                                                                                    Reprographics, Inc, 2337 Lexington Street, Sacramento,              ited to; schematic design, design development, construc-
Continued from last page                                            Sept 30, 2011: District issues recommendation of qualified      CA 95815, attention Mr. Steve Fankhauser; telephone (916)           tion and bid documents, bidding, and construction phase
                                                                    bidders list for General Contractors                            921-9311. Orders shall include physical address to which            services utilizing a Professional Services Agreement. All
• DVR Pipeline Loop – Installation of approximately 15,400          Oct 6, 2011: Last day for General Contractors to appeal         documents will be delivered (P.O. Boxes not acceptable),            services are subject to requirements of the State CDBG
linear feet of 18-inch 300 psi pressure rated and 150 psi           District’s decision with respect to pre-qualification ratings   contact person at delivery address, telephone number, and           Program including specific reporting requirements and pro-
pressure rated pipeline: 1) High pressure reach (300 psi)           October 13, 2011: Last day for appeals to be heard by the       identification if bidding as Prime Contractor. Bidders may          visions to be included in Contract Documents.
from a new connection to the C-line, within CALTRANS                District                                                        also view and order the secure plans and specifications on             Lisa Watson
right of way, at the intersection of Ca-89S and Diamond             Oct 20, 2011: District considers adoption of qualified bid-     the following web site: http://www.winslowreprographics.               City of South Lake Tahoe
Valley Road in the SW ¼ Sec 35 T11N R19E to the Ranch               ders list for General Contractors                               com. Click on the “Plan Well” link at the top, then the “Go”           Development Services
House / Pump Station location on District Property (APN             November 22, 2011: District begins advertising for bids         link under the Public Planroom header at the bottom of the             1052 Tata Lane
001-080-060) in the NE ¼, Sec 36 T11N R19E; 2) low pres-            November 30, 2011: District holds Mandatory Pre-Bid             page on the left.”                                                     South Lake Tahoe, CA 96150
sure reach (150 psi) from the Ranch House / Pump Station            Meeting and Site Walk                                           Description: Project comprises labor, material and services            (530) 542-6021
location to tie back in to the C-line on District Property (APN     January 3, 2012: District opens bids                            necessary for: reconfiguration of Victorville DMV Office in-           (530) 541 -7524 - Fax
002-230-029) in the NE ¼, Sec 5 T10N R20E.                          General Contractors interested in bidding the project are       cluding interior and exterior demolition, site improvements,           E-mail: lwatson@cityofslt.us
• Center Pivot Irrigation System - Two center pivots with           invited to submit a Pre-Qualification Interest form by 5:00     framing, interior finishes, roofing, mechanical, plumbing,          More Information
approximately 41 acres of irrigation fields (Field A & B) plus      pm on Tuesday, August 23, 2011, to the South Tahoe Public       electrical, fire suppression and alarm, security systems and
one center pivot bid alternate with approximately 29 acres          Utility District offices located at 1275 Meadow Crest Drive,    related Work.                                                       Project No. 15010
of irrigation field (Field C) with filtration system and controls   Customer Service Rm 123, South Lake Tahoe, California.          Bid Contact: Eric Waddell                                           State Route 32 Widening-Forest Ave Frontage Improve-
and 1,100 GPM at 120 psi (approximately 100 hp) booster             Pre-Qualification Packets will be received until 5:00 pm        916-376-1768                                                        ments From Humboldt Road to State Route 32
pump station.                                                       on Friday, September 16, 2011, at the South Tahoe Public        Eric.Waddell@dgs.ca.gov                                             Bids: September 20, 2011 at 4:00 PM
• Freshwater Pump Station with associated Ditch & Diver-            Utility District offices located at 1275 Meadow Crest Drive,    Packet For Bid                                                      The City of Chico will receive sealed bids for this project
sions & Pipelines - 1) One 1,500 GPM at 80 psi (100 hp)             Customer Service Rm 123, South Lake Tahoe, California.          More Information                                                    at the Capital Project Services Department, located at the
vertical turbine pump station, including associated pre-cast        Specific questions regarding the Project or the prequali-                                                                           Chico Municipal Center, Second Floor, 411 Main Street,
concrete sump with dimensions and capacity for two (2)              fication process or any requests for appeals shall be ad-       RFP 2011-09-20                                                      Chico, CA (mailing address: PO Box 3420, Chico, CA
future vertical turbine pumps; 2) Concrete diversion struc-         dressed to:                                                     Architectural/Engineering Services (A/E) for ADA Ac-                95927), until 4:00 p.m. September 20, 2011, at which time
ture at Millich Ditch and associated gravity pipeline to pump          South Tahoe Public Utility District                          cess Improvements for Three City-Owned Buildings                    they will be publicly opened and read aloud.
station site; 3) Concrete diversion structure at Millich Ditch         Customer Service, Rm 123                                     Proposals Due: September 20, 2011 at 3:00 p.m.                      Description: The work, in general, to be done under this
for option to bypass flow to Harvey Channel; 4) Subsur-                Attn: Heidi Baugh, Contracts Administrator                   The City of South Lake Tahoe (City) is soliciting written pro-      contract consists of reconstruction & widening of roadway,
face PVC interceptor drain and associated gravity pipeline             1275 Meadow Crest Drive                                      posals from qualified Architectural!Engineering (AE) firms          drainage improvements, street light installation and signal
to pump station site; and 5) Overflow gravity PVC pipeline             South Lake Tahoe, CA 96150                                   or individuals to perform architectural! engineering design         modifications, all in conformance with the attached contract
to carry excess flow back to the former channel of Millich             (530) 544-6474                                               services for ADA access improvements for three city-owned           specifications and the details as shown on the contract
Ditch at the far eastern boundary of the project.                   Invitation To Pre-Qualify                                       buildings. Improvements generally consist of the: Installa-         plans.
• Hydroelectric project – Piping and space provided inside          More Information                                                tion of automatic accessible doorways, doorway modifica-            For additional information about this project, please contact
the overall control building at the freshwater pump station                                                                         tions, exterior ramps and grade changes, parking and route          Craig Murray, Associate Civil Engineer, City of Chico Capi-
location for a future turbine.                                      Bid Number: 124627                                              striping, interior lexterior signage, public restroom modifica-     tal Project Services Department at (530) 879-6931.
• SCADA System- SCADA control system center at the                  Victorville Office Reconfiguration Project                      tions, door closures, phone services, elevator sensor and           Plans
existing ranch house to control and monitor the irrigation          Bids: September 20, 2011 at 2:00 PM                             call button. For a firm to be considered, the City must re-         Specifications
system.                                                             Expected Expenditure: $2,400,000.00                             ceive three (3) copies of the proposal by 3:00 p.m. on Tues-        Supplemental Information:
• Utility Service- 277/480 volt, three phase power supply           License required to bid project: B.                             day, September 20, 2011. All proposals must be in a sealed             Cross-sections
from connection near intersection of Ca-89S and Diamond             Pre-Bid Conference August 9, 2011 at 10:00 AM PDT               envelope and clearly marked “Sealed Proposal: RFP 2011-                Final Materials Report
Valley Road to the pump station control building.                   Attendance is mandatory                                         09-20”. Proposals will be received at the following address:           Utility Undergrounding Plans
The expected duration of the Phase 1 project is 279 Calen-          Location: 14855 Corta Drive, Victorville. Prospective bid-         Gary O’Neill                                                     More Information
dar Days, with an anticipated completion date of January            ders must attend mandatory pre-bid site inspection tour            Purchasing Division I Finance Department
25, 2013. The total costs for the Phase 1 Project are cur-          on AUGUST 9th, at 14855 CORTA DRIVE VICTORVILLE                    City of South Lake Tahoe                                         Project/Contract Number: T15068401
rently estimated at approximately $5.3 million (without Bid         SAN BERNARDINO COUNTY, CA. Inspection tour will be-                1901 Airport Rd Ste 207                                          Norwood Avenue & Fairbanks Avenue Traffic Signal
Alternate Field C) to $5.9 million (with Bid Alternate Field        gin at 10:00 A.M. The State’s requirements for Disabled            South Lake Tahoe CA 96150-7048                                   Project (#B111500034)
C).                                                                 Veteran Business Enterprise (DVBE) participation will be        Description: Services provided under this Proposal are to           Bid Due: 9/21/11 at 2:00 PM
The anticipated Project schedule is summarized as follows:          presented along with other contract requirements. CLICK         include all services related to the design of the described         Bid due date: 2:00PM, Wednesday, September 21, 2011,
July 26, 2011: District issues invitation for Pre-qualification     HERE to run your DVBE ad in the Daily Reporter and get          work including but not limited to architectural, civil, structur-   City Clerk’s Office, Historic City Hall, 915 I St, Ste #116,
Aug 23, 2011: District receives Pre-qualification Interest          it in the newspaper, posted online and also emailed to all      al, mechanical, electrical, plumbing, elevator, and security        Sacramento, CA 95814.
Forms                                                               state-certified DVBE firms in California.                       coordination. Design must contemplate construction in an
Sept 16, 2011: District receives Pre-qualification Packages         Drawings and Project Manuals may be ordered for nonre-          occupied building while open to the general public. Archi-                                              Continued on next page


                  The
 Page 20           Daily e-Reporter                          September 13, 2011              www.TheDailyReporter.net                                                                                                  ➤                               Page 21
Sacramento/Placer Counties Projects Open For Bid                                                                                 at all times a valid Class A General Engineering Contrac-       partment, City of South Lake Tahoe, 1901 Airport Rd Ste.
                                                                                                                                 tor’s License issued by the State of California.                207, South Lake Tahoe, California 96150-7048
Continued from last page                                         SBE advertisement in the Daily Reporter and get it in the       Obtaining Contract Documents: Official, paper copies of         The City of South Lake Tahoe (City) is soliciting written pro-
                                                                 newspaper, posted online, and also emailed to all state-        the Contract Documents for bidding may only be obtained         posals from design consultants to develop a complete con-
Project Type: Engineering/Civil                                  certified SBE firms in California.                              from the Office of Procurement Services, 2964 Richardson        struction bid package for streetscape improvements along
Project City, State: Sacramento, California                      Project Duration: 290 Work Days                                 Drive, Auburn, CA 95603, (530) 889-7776, upon payment           Harrison Avenue. The consultant (or team of consultants)
Engineer’s Estimated Cost: $98,000-$98,000                       Liquidated Damages: $500.00 Per Calendar Day                    of Four Hundred and Fifty Dollars ($450.00), or Five Hun-       will demonstrate the ability to perform all work necessary
Pre-Qualification for Bidders: Not Required                      Bid Bond Percentage: 10%                                        dred Dollars ($500.00) with shipping. In addition to the pa-    to complete design services and bid package consisting
SBE Goal Percentage: 20% CLICK HERE to run your SBE              Cost of Printed Plans & Specs: $35.00                           per documents, interested parties may also purchase unof-       of plans, specifications, and engineering estimates, and
advertisement in the Daily Reporter and get it in the news-      Description: The work to be performed under the Special         ficial electronic copies (.pdf) of the documents on compact     including but not limited to bringing the project from the
paper, posted online, and also emailed to all state-certified    Provisions consists of furnishing and placing 6-inch, 8-inch,   disc for Fifty Dollars ($50.00) per copy, plus Five Dollars     conceptual stage to final design documents. The Harrison
SBE firms in California. There is a 20% Emerging and             and 12-inch diameter water mains. Also included is furnish-     ($5.00) for shipping one or more copies to one location if      Avenue Project boundary extends from Lakeview Avenue
Small Business Enterprise (E/SBE) project participation          ing and installing fittings, valves, water services, fire hy-   shipping is required. The official, paper copy is the govern-   to Los Angeles Avenue and one block length of each side
requirement assigned to this project. Failure to meet this       drants, meter setters, idlers, meter boxes, meter lids, and     ing version of the Contract Documents, and bidders must         street in between (Los Angeles, Modesto, Tallac, Alameda,
requirement, will result in a non-responsive bid. For more       other appurtenances, and connecting to the existing dis-        submit their bids on an official paper copy (see NTC-5, be-     and Merced Avenues). The Harrison Avenue Streetscape
information regarding the E/SBE program and its require-         tribution system as indicated on the Plans. This contract       low). Contract Documents may be purchased in person at          Improvements conceptual plan is attached for interested
ments, please contact Trevor Walton (916) 808-6764.              also covers connecting city water services to existing resi-    Procurement Services, or can be ordered online on July          consultant’s use in preparing their proposal.
Project Duration: 30 Work Days                                   dential water services, removing existing fire hydrants and     25, 2011, at www.placer.ca.gov/admin/procurement/open-          As a Request for Proposal (RFP), this is not an invitation to
Liquidated Damages: $910.00 Per Work Day                         abandoning existing mains as shown on the Plans and in          constructionbids.aspx. The payment is non-refundable.           bid, and although price is very important, other factors will
Cost of Printed Plans & Specs: $45.00                            the Special Provisions. The Contractor shall provide all la-    Bidders are strongly encouraged to attend the pre-bid con-      be taken into consideration. There is no express or implied
Description: The City of Sacramento is currently soliciting      bor, materials, tools, and equipment to complete in place       ference and job walk on Thursday, August 11, 2011 at 9:00       obligation for the City of South Lake Tahoe to reimburse
bids for Norwood Avenue & Fairbanks Avenue Traffic Sig-          all work necessary to furnish, install, remove, abandon,        a.m. at the project site, 11755 Joeger Road, Auburn, Cali-      responding firms for any expenses incurred in preparing
nal (PN: T15068401). The project will consist of in general,     pressure test, disinfect, and connect the water pipe, appur-    fornia 95602. An additional opportunity to view the site will   proposals in response to this request.
includes furnishing and installing all necessary equipment       tenances as shown in the Plans and as specified in these        be held on August 22 from 9:00 a.m. to 11:00 a.m. on a          Three (3) copies of the Harrison Avenue Streetscape Im-
and material to install a new traffic signal as indicated on     Special Provisions. The work shall be so performed that         drop-in basis. Contractor questions will not be accepted at     provement Project proposal shall be delivered by 4:00 p.m.
the plan sheets and special provisions at the intersection of    upon contract completion the project shall be ready for use     this event. The site will not be available at any other time.   on September 26, 2011. All proposals must be in a sealed
Norwood Avenue and Fairbanks Avenue.                             as described in the Special Provisions.                         Description: The Work consists generally of the following:      envelope and clearly marked “Sealed Proposal — Harrison
No pre-bid meeting scheduled.                                    Project Contact: Paul Barnes                                    Construction and renovation of the existing wastewater          Avenue Streetscape Design Services”. Proposals will be
Project plans and specifications may be purchased for $45        City of Sacramento Engineering                                  treatment plant including a new headworks, new primary          received at the following address:
per set through Signature Reprographics (916) 454-0800.          1395 35th Ave., Sacramento, CA 95822                            clarifiers, new aeration basins for nutrient removal, new          Gary O’Neill
Project Contact: Kaleb Haile                                     Tel:(916) 808-1442                                              secondary clarifiers, new filters, new ultraviolet disinfec-       Purchasing Division / Finance Department
City of Sacramento Department of Transportation                  Fax:(916) 808-1498                                              tion, renovation of waste sludge holding and new solids            City of South Lake Tahoe
915 I Street, 2nd Floor, Sacramento, CA 95814                    pbarnes@cityofsacramento.org                                    thickening and dewatering, an anaerobic digester, and an           1901 Airport Rd Ste 207
Tel:(916) 808-7020                                               More Information                                                Operations Control Building. Work includes excavation,             South Lake Tahoe CA 96150-7048
Fax:(916) 808-7903                                                                                                               rock excavation, dewatering, backfilling, concrete, piping,     It is anticipated the selection of a firm and execution of a
khaile@cityofsacramento.org                                      PROJECT NO. 04835                                               pumps, electrical, SCADA, instrumentation, steel and ma-        contract by City Council will occur on October 18, 2011.
More Information                                                 PLACER COUNTY SMD 1 WASTEWATER TREATMENT                        sonry buildings, roofing, painting, specialized equipment,      More Information
                                                                 PLANT UPGRADE AND EXPANSION                                     laboratory furnishings, office furnishings, paving and site
Project/Contract Number: Z14010054                               Bids: September 22, 2011 at 3:30 PM                             restoration.                                                    BID SCHEDULE NO. 4417
CURTIS PARK WATER MAIN REPLACEMENT PROJ-                         Sealed bids will be received by the County of Placer herein     Questions regarding the Work or the contract Documents          Job No. 2388
ECT (B123331010)                                                 referred to as “County,” at the Office of Procurement Ser-      shall be directed to Keith Schmidt, County Project Manag-       JENNY CREEK SEWER UPSTREAM REPLACEMENT
Bid Due: 9/21/11 at 2:00 PM                                      vices, located at 2964 Richardson Drive, Auburn, CA 95603       er, using the Bid Question Form provided in the specifica-      PROJECT
The Bids are due and must be delivered to the Office of          prior to 3:30:00 p.m., Thursday September 22, 2011, for         tions. Bid questions may be submitted until eight (8) days      Bids: September 27, 2011 at 3:00 PM
the City Clerk, Historic City Hall, 915 I St.1st Floor, Sacra-   furnishing all labor, material, tax, transportation, equip-     before the bid opening.                                         In accordance with the Municipal Code of the City of Red-
mento, CA 95814.                                                 ment, and services necessary for PLACER COUNTY SMD              Invitation To Bid                                               ding, sealed bids will be received at the office of the City
Project Type: Engineering/Civil                                  1 WASTEWATER TREATMENT PLANT UPGRADE AND                        More Information                                                Clerk, 777 Cypress Avenue, Redding, CA 96001, until 3
Project City, State: Sacramento, California                      EXPANSION, PROJECT NO. 04835.                                                                                                   p.m., Tuesday, September 27, 2011, at which time they
Engineer’s Estimated Cost: $4,000,000-$4,000,000                 Bids will be opened and tabulated at said location immedi-      REQUEST FOR PROPOSALS NO. 09-26-2011                            will be publicly opened and read for the performing of the
Pre-Qualification for Bidders: Not Required                      ately after 3:30 p.m., on said September 22, 2011. Any bids     DESIGN SERVICES FOR HARRISON AVENUE                             work as follows: Replace approximately 730 linear feet of
License Type Required: A                                         received after 3:30:00 shall be returned unopened.              STREETSCAPE PROJECT                                             12-inch VCP sewer main with new 15-inch PVC pipe from
Plans and specifications can be purchased through Signa-         The County has estimated cost of the Work to be Forty Sev-      Bids: September 26, 2011 at 4:00 PM                             manhole K3-11 to K3-21. Work shall include construction of
ture Reprographics (916) 454-0800                                en Million One Hundred Thousand Dollars ($47,100,000.00)        Proposals will be received until the hour of 4:00 o’clock
SBE Goal Percentage: 20% CLICK HERE to run your                  Construction License: The successful bidder must possess        P.M. September 26, 2011 in the office of the Finance De-                                             Continued on next page


                  The
 Page 22          Daily e-Reporter                        September 13, 2011              www.TheDailyReporter.net                                                                                               ➤                              Page 23
Sacramento/Placer Counties Projects Open For Bid                                                                                REBID                                                            specified in the Special Provisions. The City shall supply
                                                                                                                                Bid Number: 11-096 RE-BID                                        meters and lid locks to the Contractor for installation. Re-
Continued from last page                                        CA 94513, Attention: Engineering Division). A bidders list of   Floor Repairs - DMV Headquarters Sacramento                      fer to the section for Contractor Receipt of City Supplied
                                                                companies that have obtained bidding documents, as well         New Bid Date: September 28, 2011 at 2:30 PM                      Materials. The Contractor shall provide all labor, materials,
new sanitary sewer main, trench backfill and resurfacing,       as project information and bid results will be available on     Expected Expenditure: $15,000.00                                 tools, and equipment to complete meter retrofits in place
existing sewer manhole rehabilitation, new sewer manhole        the City’s web site at www.ci.brentwood.ca.us under Gen-        Term: 60 Calendar Days                                           and all work necessary to furnish, install, remove, abandon,
construction, sewer lateral reconnection, bypass pump-          eral Information - CIP Projects - Current Projects Out to       Contractor must have a valid State of California C-15 li-        pressure test, disinfect, and connect the water pipe and ap-
ing, catch basin replacement and all work as shown on the       Bid.                                                            cense.                                                           purtenances as shown in the Plans and as specified in the
plans and as detailed in the specifications.                    Description: Furnishing all labor, materials, equipment,        Pre-Bid Conference August 31, 2011 at 10:00 AM PDT               Special Provisions. The work shall be so performed that
The Engineer’s Estimate is $245,000.                            and performing all work necessary and incidental to the         Attendance is mandatory                                          upon contract completion the project shall be ready for use
The Contractor shall possess a Class A or C-34 license at       construction of the project known as FIBER OPTIC LINK           Location: DMV - HQ Building East Main Lobby Security,            as described in the Special Provisions.
the time bid is opened.                                         - PHASE II, CIP Project No. 337-37213, according to draw-       2145 First Avenue, Sacramento, CA 95818                          Project Contact: Chris Powell
The City of Redding hereby notifies all bidders that it will    ings and specifications as prepared by the City of Brent-       Description: Contractor agrees to provide to the Depart-         City of Sacramento Department of Utilities
affirmatively insure that in any contract entered into pursu-   wood and according to the Contract Documents. The work          ment of Motor Vehicles (DMV) all labor, tools, materials and     5730 24th Street, Bldg 22, Sacramento, CA 95822
ant to this advertisement, minority business enterprises will   includes installation of conduits, pull boxes and fiber optic   equipment necessary to provide flooring repairs/replace-         Tel:(916) 808-4031
be afforded full opportunity to submit bids in response to      cable from 120 Oak Street (existing Pull Box No.2) to the       ment as specified herein. The services shall be performed        Fax:(916) 808-4596
this invitation and will not be discriminated against on the    City Corporation Yard located at 2201 Elkins Way, complete      at 2415 First Avenue, Sacramento, CA 95818.                      cpowell@cityofsacramento.org
grounds of race, color, or national origin in consideration     and in satisfactory condition, all as shown on the plans and/   Bid Contact: Cindy N Huynh                                       More Information
for an award.                                                   or as specified herein.                                         Department of Motor Vehicles
Notice Inviting Bids                                            Notice To Contractors                                           (916) 657-6972                                                   Bid Number: PRKIFBJS1102
More Information                                                Project Plans                                                   Packet For Bid                                                   Putah Creek Access Project
                                                                Plan Holder’s List                                              More Information                                                 Bids: September 28, 2011 at 3:00 PM
Fiber Optic Link - Phase II                                     More Information                                                                                                                 Sealed bids on the above project shall be filed with the Yolo
CIP Project No. 337-37213                                                                                                       Project/Contract Number: Z14010056                               County General Services Department, Parks Division locat-
Bid Opening - September 27, 2011 at 2:00 p.m.                                                                                   APARTMENT METER RETROFIT (B123331011)                            ed at 120 W. Main Street, SUITE C, Woodland, CA 95695,
SEALED BIDS will be received by the City Clerk, or desig-                                                                       Bid Due Date: 9/28/11 at 2:00 PM                                 on or before 3:00 pm on September 28, 2012. All bids must
nee, of the City of Brentwood until Tuesday, September 27,                                                                      Project Type: Engineering/Civil                                  be marked clearly on the envelope: “Putah Creek Access
2011 at 2:00 p.m. for CIP Project No. 337-37213. Please                                                                         Project City, State: SACRAMENTO, California                      Project.” Said bids will be opened in public after 3:01 pm of
be certain that any sealed bid submitted is addressed and                                                                       Engineer’s Estimated Cost: $531,750-$531,750                     said day in the Parks Division Conference Room, 120 W.
noted as follows:                                                                                                               Plans and specifications can be purchased through Signa-         Main Street, SUITE C, Woodland, CA 95695.
   City Clerk                                                                                                                   ture Reprographics (916) 454-0800                                Expected Expenditure: $97,000.00
   City of Brentwood                                                                                                            Pre-Qualification for Bidders: Not Required                      Pre-Bid Conference September 21, 2011 at 10:00 AM PDT
   708 Third Street                                                                                                             License Type Required: A                                         Attendance is mandatory
   Brentwood, CA 94513                                                                                                          The Bids are due and must be delivered to the Office of          Location: MANDATORY Pre-bid job walk will be held at
    Sealed Bid for Construction of FIBER OPTIC LINK -                                                                           the City Clerk, Historic City Hall, 915 I St.1st Floor, Sacra-   10:00am on September 21, 2011 at Putah Creek Park Site
PHASE II                                                                                                                        mento, CA 95814.                                                 #4.
All potential bidders must contact and obtain the contract                                                                      SBE Goal Percentage: 20% CLICK HERE to run your SBE              Description: This project invloves the demolition of an exist-
documents from the City of Brentwood-Engineering Divi-                                                                          advertisement in the Daily Reporter and get it in the news-      ing 400 LF rock path and installation of a 400 LF concrete
sion by e-mailing engmessages@ci.brentwood.ca.us or                                                                             paper, posted online, and also emailed to all state-certified    park path and installation of road-side boulders - requires
calling (925) 516-5420 to have their bid be considered valid.                                                                   SBE firms in California.                                         experience with Caltrans traffic control plans. The work to
Engineers Estimate is approximately $140,000                                                                                    Project Duration: 60 Work Days                                   be completed generally consists of but is not limited to the
Bidders may obtain an electronic copy of the document                                                                           Liquidated Damages: $500.00 Per Calendar Day                     following:
(via e-mail) at no charge by sending an e-mail to: engmes-                                                                      Bid Bond Percentage: 10%                                         • Protection of existing project site facilities.
sages@ci.brentwood.ca.us or by calling (925) 516-5420.                                                                          Cost of Printed Plans & Specs: $30.00                            • Fencing off the work area with temporary fencing and
Hard copies of the document are also available from the                                                                         Description: The work to be performed by the Contractor          posting signs before start of the project.
Public Works Department, Engineering Division at 118 Oak                                                                        under the Special Provisions generally consists of furnish-      • Installation of BMP’s and other erosion control measures
                                                                C&S Publishing is certified by the Dept. of General Ser-
Street, Brentwood, California. A non-refundable charge of                                                                       ing and installing meter setters, meter boxes, lids, meter       related to the SWMP. A SWPPP is not required for this proj-
$25.00 in the form of cash, or a check payable to the City      vices as a Small Business Enterprise (SBE). Running             valves and water meters at various commercial and resi-          ect, but a SWMP is required – see the project plans for
of Brentwood, will be required for each set of documents.       your Good Faith advertisements in this newspaper                dential properties within designated areas of the City of        more information.
A set of the documents may also be obtained via the mail        may help meet your bid goals, and ads always run in             Sacramento as indicated in the Appendix. The work to be          • Clearing, grubbing, demolition, and/or site preparation to
(California Overnight) upon payment of $35 per set. (Send       both newspaper editions and are posted on the web               performed includes excavation, backfill, surface restora-        prepare the site as necessary to complete the work.
requests and check for project drawings and specifica-          site and now they are also emailed to every state-certi-        tion, retrofitting water meters on existing water services,
tions to City of Brentwood, 708 Third Street, Brentwood,        fied DVBE and SBE at no extra cost!                             and any other work required to complete the project as                                                Continued on next page


                 The
 Page 24         Daily e-Reporter                        September 13, 2011              www.TheDailyReporter.net                                                                                                ➤                              Page 25
Sacramento/Placer Counties Projects Open For Bid                                                                                 work.                                                             state-certified DVBE firms in California. Questions regard-
                                                                                                                                 Site security is the responsibility of the Contractor. Due to     ing DVBE participation should be directed to Procurement
Continued from last page                                         • Prepare a traffic control plan or other plans and docu-       the popularity of the facility, it may not be closed down for     Services, 6000 J Street, California State University, Sac-
                                                                 ments as requested by Caltrans and/or the encroachment          the duration of the project. At critical times of construction    ramento, Sacramento, CA 95819-6008: Attention Suzanne
• Surveying/staking to lay out, identify grades, and provide     permit.                                                         and as approved by the county, the site may be closed as          Swartz at swartzsd@csus.edu telephone (916) 278-5797.
control points as needed.                                        • Finalize Encroachment permit and coordinate inspection        necessary to protect the public. The county will not be re-       Bidders must be pre-qualified with California State Univer-
• Providing clean potable water for the project. No potable      with Caltrans, as required for inspection or as requested on    sponsible for reimbursing the contractor for vandalism, acts      sity, For Pre-Qualification, Contact:
water is available at the facility. Water from the creek may     the encroachment permit.                                        of nature, actions of the public, or extending the contract                 California State University, Office of the Chancellor
or may not be available through the flood control district. It   • Site clean up on a day to day basis and leaving the site in   period to accommodate problems associated with site se-                     Capital Planning, Design and Construction
is the contractor’s responsibility to gain permission from the   a condition acceptable to the county.                           curity.                                                                     401 Golden Shore, 2nd Floor East
flood control district for use of creek water.                   • Furnish and install a gate at the water guaging station as    Bid Contact: Jennifer Santos                                                Long Beach, CA 90802-4210
• Grading and/or other site work and relocation and dis-         shown and described on the plans and as shown on-site by        Parks Planner                                                               Attention: Teri Carr
posal of excavated soil as necessary to prepare the site for     the county construction manager or project manager.             530-406-4886                                                                Telephone (562) 951-4114
the proposed improvements.                                       • Add alternate items to the contract include adding more       jennifer.santos@yolocounty.org                                    It will be the responsibility of each bidder to obtain a Bid
• Excavation, compaction of sub-grade, and installation/         boulders to a section of the project site as shown on the       Packet For Bid                                                    Form package in sufficient time to fulfill requirements there-
compaction of aggergate baserock (AB), for the path ac-          plans and also adding additional boulders as specified by       More Information                                                  in. Bid Form packages are obtainable only by pre-qualified
cording to specifications and other associated work.             the construction manager or project manager.                                                                                      contractors that are licensed in the State of California with
• Excavation and grading necessary to form a drainage in-        • Other work as shown on the plans, discussed in the Spe-       Bid Number : PW100013A                                            a C-10 or C-20 license. The Bid Form packages must be
filtration basin adjacent to the path as it existis now.         cial Provisions, and/or as necessary to comply with State       Smart Grid - Energy Management & Control System                   requested from Facilities Services, 6000 J Street, Califor-
• Installation of reinforced integral colored concrete as        laws, county ordininaces, permit conditions applicalbe          Bids: September 29, 2011 at 2:00 PM                               nia State University, Sacramento, Sacramento, CA 95819-
shown on the plans including reinforcement placement,            codes and complete the project.                                 Expected Expenditure: $2,200,000.00                               6002: Attention: Robin Eicher, telephone 916-278-4895 or
forming, finishing, and curing the concrete as specified in      • The project deadline is final,contractor must work through    The Trustees of the California State University and the Cali-     eicherr@csus.edu
the geotechnical report.                                         with no rain-days except in the event of extreme weather as     fornia State University Sacramento will receive sealed bid        Description: In general, the work includes supplying all la-
• Purchase and transport and installation of boulders to pro-    judged by the county – otherwise work will continue without     proposals in the Facilities Services Office, at the above ad-     bor, equipment, materials, and supervision required to re-
tect the non drive areas from vehicles as speciefied on the      delay. Weekend work may or may not be acceptable but            dress for furnishing all labor and material for the Smart Grid    place and/or upgrade eight buildings’ Energy Management
plans and on-site by the construction and project manager.       must be approved in writing by the County prior to weekend      – Energy Management & Control System (EMCS) Phase                 & Control System tied to a central graphical user interface.
                                                                                                                                 3A project for the California State University, Sacramento.       Restore all disturbed areas including walls, ceilings, and

                                   You can pay more and get less,                                                                Sealed proposals will be received in the Facilities Services
                                                                                                                                 Office on September 29, 2011 at 2:00 p.m., in accordance
                                                                                                                                                                                                   other penetrations to former construction condition. The
                                                                                                                                                                                                   construction cost estimate is $2,200,000.00. The construc-

                                   but why would you?
                                                                                                                                 with the contract documents, at which time the proposals          tion period for this project is 365 calendar days with a start
                                                                                                                                 will be publicly opened and read. The bid must be submit-         date of on or after October 29, 2011.
                                                                                                                                 ted on the Bid Proposal Forms provided by the University,         Packet For Bid
                                              The Daily Reporter newspaper gives you so much more and charges                    completely filled out and sealed in an envelope.                  More Information
                                              so much less!                                                                      The plans and specifications will be available from Signa-
                                                                                                                                 ture Reprographics (916)454-0800 or through the on-line           Bid Number: 6857
                                              Most ads only $35 and include:                                                     public plan room at signaturerepro.com on or after Septem-        Field House Boiler Project
                                               • Published in both the North State edition and the So-Cal edition                ber 12, 2011. The documents were prepared by SAIC En-             Bids: September 29, 2011 at 2:00 PM
                                               • Advertisements published daily                                                  ergy, Environmental & Infrastructure. Questions during the        Sealed proposals will be received by California State Uni-
                                               • Tear sheet supplied (printed copy of ad) by first-class mail                    bid period should be directed only to the project engineer        versity, Stanislaus at MSR290 for the Field House Boiler
                                               • Printed affidavit provided by first-class mail                                  George Skene at GEORGE.A.SKENE@saic.com                           project located at California State University, Stanislaus,
                                                                                                                                 A pre-bid walkthrough and conference will be held on Sep-         Turlock California. In general, the work shall consist of re-
                                               • Net 30 days to pay
                                                                                                                                 tember 15, 2011 at 10:00 a.m. The meeting will be held at         moval of the existing Kewanee hot water boiler, supply and
                                                                                                                                 Facilities Services, 6000 J Street, Sacramento, CA 95826.         install a new high efficiency low emissions hot water boiler.
                                                                 Advertisements published online at
                                                                                                                                 It is strongly recommended that both general contractors          The bid opening shall be held in room MSR260.
                                                                 www.TheDailyReporter.net
                                                                                                                                 and subcontractors attend the walkthrough, as it will be the      Pre-Bid Conference September 15, 2011 at 10:00 AM PDT
                                                                 Ads EMAILED directly to 9,000+                                  only time bidders can visit the site with the Design Architect.   Attendance is mandatory
                                                                 state-certified DVBE and SBE firms in California!               The Trustees require the successful bidder to achieve a           Location: CSU Stanislaus, South Dining Hall, One Univer-
                                                                                                                                 minimum goal of 3% DVBE participation in contracting con-         sity Circle, Turlock, CA
                                                                 Ads DELIVERED to the computers of 1,350+
                                                                                                                                 struction projects as established in the bidding documents.       Plans and specifications may be seen at Financial Services
                                                                 construction firms via our unique Delivery Manager              Two copies of the Documentation of DVBE participation             Department at the University and local Builders Exchange.
                                                                 software!                                                       must be supplied within 2 days of the bid. CLICK HERE to          Plans and specifications may be obtained at the mandatory
                                                                                                                                 run your DVBE advertisement in the Daily Reporter and get
                                                                     No one gives you more for this price!                       it in the newspaper, posted online, and also emailed to all                                             Continued on next page


                 The
 Page 26          Daily e-Reporter                        September 13, 2011              www.TheDailyReporter.net                                                                                                 ➤                               Page 27
Sacramento/Placer Counties Projects Open For Bid                                                                                   of proposals.                                                     The State’s
                                                                                                                                   Description: This project involves, but is not limited to, the    Project Director is Diana Tibor at (916) 376-1716.
Continued from last page                                         discuss the landscape maintenance specifications. Quali-          construction of asphalt pavement, drainage structures,            Bid Contact: Eric Waddell
                                                                 fied contractors bidding this project may present any ques-       storm drain pipe, landscaping. restroom fence, curb gutter        916-376-1768
pre-bid conference telephone after the required refundable       tions pertaining to the project for city staff comment.           and sidewalk, accessible parking stalls, truncated domes,         Eric.Waddell@dgs.ca.gov
deposit of $100.00 has been made. A non-refundable ship-         The Scope of Work and Special Provisions for this project         curb ramps, concrete paving, traffic stripes and pavement         Packet For Bid
ping/handling fee of $20.00 per set in a separate check is       may be secured at the General Services Department Of-             markings, wheel stops at McNear’s Beach Park for path of          More Information
also required if standard delivery mailing is requested by       fice, 965 Fir Street, Chico, CA 95928 Telephone (530) 896-        travel and parking improvements as shown on the plans
the bidder; bidders requesting overnight or two day deliv-       7800 or by email at parkinfo@ci.chico.ca                          and these contract documents.                                     Solicitation Number: 110110.CJB
ery may be charged a higher fee. Checks shall be made            DESCRIPTION: The scope of work, in general, includes              Notice To Contractors                                             RFO - Development of Sacramento Solar Highways
payable to California State University, Stanislaus. General      landscape maintenance on approximately 210 landscape              More Information                                                  Bids: October 3, 2011 at 5:00 PM
Contractors are allowed two (2) sets each; subcontractors,       areas, including parks, medians, and greenways, located                                                                             License Required: Contractor A - General Engineering
one (1) set each on plan deposit.                                throughout the city. Landscaping varies in intensity from         Bid Number: 124690                                                ;Photovoltaic Power ;Services, Architectural ;Services,
The University requires Disabled Veteran Business En-            flat mowing to complex park facility maintenance. This is a       Upgrade Fire Alarm System                                         Engineering ;Contractor, Photovoltaic System Installation
terprise participation. The successful bidder shall achieve      five year contract, and the City reserves the right at its sole   Bids: September 29, 2011 at 2:00 PM                               ;Services, Specialized Design
a minimum three (3) percent DVBE participation goal.             discretion to award any individual bid item, any group of bid     Bid opening will be September 29, 2011, at 2:00 P.M., at          Pre Bid Conference: 8/23/2011 at 10:00 AM
CLICK HERE to run your DVBE advertisement in the Daily           items, or all bid items to one or more firms or companies.        the Project Management Branch, 707 Third Street, Suite            Description: The Sacramento Municipal Utility District
Reporter and get it in the newspaper, posted online, and         Invitation To Bid                                                 3-305, West Sacramento, California 95605.                         (SMUD) is soliciting qualified Offers to develop the first
also emailed to all state-certified DVBE firms in California.    More Information                                                  Expected Expenditure: $3,800,000.00                               phase of its Sacramento Solar Highways project. This
Description: Sealed proposals will be received by California                                                                       License required to bid project: B or C-10.                       unique demonstration project will be highly visible within
State University, Stanislaus at MSR290 for the Field House       County Project No. CAP-09011                                      The term of this project is 485 calendar days.                    the Cities of Sacramento and Rancho Cordova and to the
Boiler project located at California State University, Stan-     McNEAR’S BEACH PARK PATH OF TRAVEL AND                            Pre-Bid Conference August 2, 2011 at 9:00 AM PDT                  traveling public, and will serve as a model to guide the de-
islaus, Turlock California. In general, the work shall consist   PARKING IMPROVEMENTS                                              Attendance is mandatory                                           velopment of future highway solar installations throughout
of removal of the existing Kewanee hot water boiler, supply      Bids: October 12, 2011 at 2:00 PM                                 Location: Sonoma Developmental Center, 15000 Arnold               the state and the nation. SMUD intends to stimulate in-
and install a new high efficiency low emissions hot water        Sealed Proposals will be received by the Clerk of the Board       Drive, Eldridge                                                   novation in the implementation of this project so overall
boiler. The bid opening shall be held in room MSR260. All        of Supervisors, Room 329, Marin County Civic Center, San          Prospective bidders must attend mandatory pre-bid site            project design, in addition to project cost and relevant pro-
work is to be in accordance with the plans and specifica-        Rafael, California 94903, until 2:00 p.m. on Wednesday,           inspection tour on August 2, 2011 at Sonoma Develop-              poser experience, will be a critical factor in the selection
tions prepared by Geng Liu, Engineer/Project Manager. All        October 12, 2011. Proposals will be collected by County           mental Center, 15000 Arnold Drive, Eldridge, Sonoma               of a project developer. The intent of this RFO is to select
technical questions shall be addressed to the Project Man-       staff at 2:00 p.m. and will be opened and read in Room            County. Inspection tour will begin at 9:00 A.M. at Plant          a developer to design, construct, finance, own and oper-
ager only. Questions regarding the bid process and related       No. 404, of the Marin County Civic Center for: McNEAR’S           Operations Office located on Wilson Drive. The State’s            ate new Photovoltaic (PV) and Concentrating Photovol-
bid forms should be addressed to Debbie DaRosa, Buyer            BEACH PARK PATH OF TRAVEL AND PARKING IM-                         requirements for Disabled Veteran Business Enterprise             taic (CPV) systems located on two specified sites within
III Lead, Procurement Services, (209) 667-3987.                  PROVEMENTS                                                        (DVBE) participation will be presented along with other           the Caltrans Right of Way (ROW) along US Highway 50
Bid Contact Debra Da Rosa                                        Work shall be done in accordance with official plans and          contract requirements.                                            within SMUD service territory. SMUD plans to purchase
209-667-3987                                                     specifications, which are available at the Department of          Drawings and Project Manuals may be ordered for nonre-            the electrical output. Desired proposals will include PPA
ddarosa@csustan.edu                                              Public Works, County of Marin, Room 404, Civic Center,            fundable charge of $100.00 for each set payable to Winslow        offers of twenty-five (25) years. Each submittal in response
Packet For Bid                                                   San Rafael, California, and may be purchased for $50.00           Reprographics, Inc., 2337 Lexington Street, Sacramento,           to this RFO shall include both project sites specified: East
More Information                                                 per set (non-refundable). There will be a $12.00 service fee      CA 95815, attention Mr. Steve Fankhauser; telephone (916)         Sacramento and Mather Field Road. This project has re-
                                                                 for returned checks. Mailed requests shall be addressed           921-9311. Orders shall include physical address to which          ceived $1,670,800 in grant funding from the US Depart-
Budget Account No.: 002-686-5415                                 to the Department of Public Works, County of Marin, P.O.          documents will be delivered (P.O. Boxes not acceptable),          ment of Energy as part of SMUD’s Community Renewable
LANDSCAPE MAINTENANCE SERVICES FOR CITY                          Box 4186, Civic Center, San Rafael, California 94913. For         contact person at delivery address, telephone number, and         Energy Deployment program. An additional $100,000 is
PARKS, MUNICIPAL FACILITIES, MAINTENANCE AS-                     questions regarding the project, and/or plans & specifica-        identification if bidding as Prime Contractor. Bidders may        available from the California Energy Commission (CEC)
SESSMENT DISTRICTS AND OTHER PUBLIC PLANT-                       tions, call (415) 499-7877.                                       also view and order the secure plans and specifications on        in matching funds, pending final execution of the funding
INGS                                                             The Engineer’s Estimate for this project is $250,000.             the following web site: http://www.winslowreprographics.          agreement with the CEC. SMUD intends to distribute the
BID OPENING:September 29, 2011 at 2:00 PM                        The County of Marin hereby notifies all bidders that it will      com. Click on the “Plan Well” link at the top, then the “Go”      DOE grant funding to the successful project developer (as
The City of Chico will receive sealed bids for the above         affirmatively insure that in any contract entered into pur-       link under the Public Planroom header at the bottom of the        key milestones are achieved) to subsidize the development
project at the City of Chico General Services Department         suant to this advertisement, disadvantaged business and           page on the left.                                                 of the project. The CEC funding will be used to cover ongo-
Office, 965 Fir Street, Chico, CA 95928, until 2:00 PM,          woman owned business enterprises will be afforded full op-        Description: Project comprises labor, material and services       ing SMUD staff and other project support costs. In addition,
Thursday, September 29, 2011, at which time they will be         portunity to submit bids in response to this invitation and       necessary for: asbestos/lead removal, demolition, smoke/          SMUD’s grant partner Satcon was awarded CEC funding
publicly opened and read.                                        will not be discriminated against on the grounds of race,         heat detectors, manual pull stations, chimes, horns, bells,       to install a 500kW inverter and a lithium ion battery storage
MANDATORY PRE-BID MEETING. A mandatory pre-bid                   color or national origin in consideration for an award.           strobes, dome lights, magnetic door hold opens, electri-          system at the East Sacramento project site, further offset-
meeting will be held on Thursday, September 8, 2011 at           Award of contract, if awarded, will be to the lowest respon-      cal raceway, wiring, cable, fire alarm panels, panelboards,       ting project costs. Note that the DOE grant funding speci-
10:00 AM in the General Services Department Conference           sible bidder whose proposal complies with prescribed re-          plastering, acoustical ceiling tiling, fire caulking, painting,
Room, 965 Fir Street, Chico, CA, for prospective bidders to      quirements, and will be within thirty (30) days after receipt     and related work.                                                                                     Continued on next page


                  The
 Page 28          Daily e-Reporter                        September 13, 2011               www.TheDailyReporter.net                                                                                                 ➤                               Page 29
                                                                                                                                     CSPublishing
Sacramento/Placer Counties Projects Open For Bid
Continued from last page                                        tive to the established FIT rates. All interconnection costs
                                                                from project location to SMUD distribution system will be
fies the use of SolFocus CPV technology at the Mather
Field Road project site, however the flat plate technology
                                                                assumed entirely by Proposer. SMUD intends to negotiate
                                                                and execute a set of agreements with the successful bid-
                                                                                                                                             &
to be utilized at the East Sacramento site is to be specified   der which will govern the design, construction and ongoing
by the project proposer. SMUD is offering its Feed-in Tariff    operations and maintenance of the facility. These agree-
for Distributed Generation (FIT) rates, Effective January 1,    ments shall include a Power Purchase Agreement (PPA),                                  Bringing your publications to life!
2010 for a 2012 Start Year. The FIT rates appear in Ap-         an Interconnection Agreement (IA), a Sub-Recipient Agree-
pendix B (The 20 year rates should be applied to a 25 year      ment (SRA) to govern the use of Department of Energy
project). Proposers are strongly encouraged to utilize the      (DOE) and California Energy Commission (CEC) grant
FIT rates, as significant additional funding within SMUD or
from other agencies will be challenging to secure in the cur-
                                                                funding, a Sublease to govern the use of the Caltrans ROW
                                                                and the assignment of a patent license to operate a solar              Running your UDBE/DVBE/DBE/MBE/WBE/SBE ads
rent economic climate. Proposers may request additional         energy facility within the transportation ROW.
compensation for the generated electricity, expressed as a
% increase over the established FIT rates, but must provide
justification for any additional compensation requested,
and the request must be in the format specified. Proposers
                                                                PP Name: Cesar Beltran
                                                                Phone: 916-732-6925
                                                                Email: cbeltra@smud.org
                                                                More Information
                                                                                                                                   is fast, easy and inexpensive
may also submit offers expressed as a % decrease rela-                                                                                             with this State-Certified newspaper.
                                                                                                                                                         ~ Most ads only $35 ~
  WE DELIVER ANYWHERE!                                                                                                           and includes all digital editions, and also posted on the Internet at
  Get this newspaper delivered to your computer                                                                                                      www.TheDailyReporter.net
  automatically with our free
  Delivery Manager software                                                                                                                          Try Us, You’ll Love Us.
  Click here for details                                                                                                                            We Are VERY Easy To Work With!
                                                                                                                                                         CLICK HERE for the online form
                                                                                                                                           or try the convenient online form found at:
                                                                                                                                         www.TheDailyReporter.net/Advertising.Form.asp
                                                                                                                                         Send us your ad, and we’ll typeset it and send back a proof and a price.
                                                                                                                               Approve the ad and we’ll run it, and post it online, from the day you send it until the bid date.

                                                                                                                                                   Same Day Publishing At NO EXTRA COST!
                                                                                                                                           The Daily Reporter is a state approved, certified and recognized
                                                                                                                                                 TRADE and also a MINORITY-FOCUSED newspaper
                                                                                                                                          approved and certified for all DVBE/DBE/UDBE/MBE/SBE/WBE ads

                 The
 Page 30         Daily e-Reporter                        September 13, 2011              www.TheDailyReporter.net                                                                            ➤                       Page 31
                   Open House Invitation                                                            San Francisco/Bay Area Projects Open For Bid
                                                                                                    Added since the last issue
                   Doing Business at SFO                                                            Continued from last page                                        Contact’s Name: Gwendolyn Williams
                                                                                                                                                                    Phone: 415-701-4215
                   September 14, 2011, 9:30 to 12:30                                                12-000103-MQ
                                                                                                    NEW BOILER
                                                                                                                                                                    E-mail: oca@sfgov.org
                                                                                                                                                                    More Information
                                                                                                    Bid Due: 9/22/2011 at 3:00 pm
          at the Louis A. Turpen Aviation Museum (Intl Terminal “A” Departure Level)                Description: The bid is attached as separate pdf files. We      12-000108-MQ
                                                                                                    encourage you to copy these files to your computer, and         CUSTOM ALARM ASSY W/MOUNTING BRACKET
  RSVP to 650-821-5142 or email to sfo.asbao@flysfo.com by Friday, September 9, 2011                then click the Let OCA know that you have downloaded a          Bid Due: 9/27/2011 at 3:00 pm
                                                                                                    bid package link below to notify us. For some bids, we send     Description: The bid is attached as separate pdf files. We
                                   9:30 - 10:30 am:    General session and upcoming contracts       bid addendums or change notices to vendors who have let         encourage you to copy these files to your computer, and
                                                                                                    us know they have downloaded the bid. For some bids we          then click the Let OCA know that you have downloaded a
                                   10:30 - 11:00 am:   Networking session                           do not, so it is important for you to check the bid website     bid package link below to notify us. For some bids, we send
                                   11:00 - 12:30 pm    Small business sessions:                     often to determine if you have seen all bid addendums,          bid addendums or change notices to vendors who have let
                                                        • How To Do Business at SFO                 change notices or other changes to the bid.                     us know they have downloaded the bid. For some bids we
                                                                                                    If the proposal is changed, a CHANGED flag will appear in       do not, so it is important for you to check the bid website
                                                        • Surviving the contracting process         front of the bid title on the bid listing page. Bid Addendums   often to determine if you have seen all bid addendums,
                                                        • Resources for Small Businesses            will be posted here.                                            change notices or other changes to the bid.
                                                        • How to become certified LBE, DBE or SBE   You will need Adobe Acrobat Reader to open or print these       If the proposal is changed, a CHANGED flag will appear in
                                                                                                    pdf files. Acrobat Reader is available for free from Adobe’s    front of the bid title on the bid listing page. Bid Addendums
                                                                                                    website. Click the Get Adobe Reader button to obtain a          will be posted here.
                                                                                                    copy.                                                           You will need Adobe Acrobat Reader to open or print these
                                                                                                    If you have any general questions, please send an e-mail to     pdf files. Acrobat Reader is available for free from Adobe’s
                                                                                                    Office of Contract Administration                               website. Click the Get Adobe Reader button to obtain a
                                                                                                    Contact’s Name: Howard Tevelson                                 copy.
                                                                                                    Phone: 415-487-5267                                             If you have any general questions, please send an e-mail to
                                                                                                    E-mail: oca@sfgov.org                                           Office of Contract Administration
                                                                                                    More Information                                                Contact’s Name: GWENDOLYN WILLIAMS
                                                                                                                                                                    Phone: 415-701-4215
                                                                                                    12-000105-MQ                                                    E-mail: oca@sfgov.org
                                                                                                    SKODA PARTS                                                     More Information
                                                                                                    Bid Due: 9/22/2011 at 3:00 pm
                                                                                                    Description: The bid is attached as separate pdf files. We      Elevator and Life Safety Upgrades SUBJECT TO THE
                                                                                                    encourage you to copy these files to your computer, and         NEW S.F. LOCAL HIRING POLICY
                                                                                                    then click the Let OCA know that you have downloaded            Bid Due: 9/28/2011 at 2:00 pm
                                                                                                    a bid package link below to notify us. For some bids, we        Duration: 300 days
                                                                                                    send bid addendums or change notices to vendors who             LBE: Submit a request for interest in HRC-certified LBE
                                                                                                    have let us know they have downloaded the bid. For some         subcontractors
                                                                                                    bids we do not, so it is important for you to check the bid     Description: Barrier Removal - Elevator Replacement in
                                                                                                    website often to determine if you have seen all bid adden-      an existing three-story over basement residential building.
                                                                                                    dums, change notices or other changes to the bid.               Work includes new elevator cab and mechanical equip-
                                                                                                    If the proposal is changed, a CHANGED flag will appear in       ment reusing the existing elevator shaft wall, new elevator
                                                                                                    front of the bid title on the bid listing page. Bid Addendums   machine room, and new elevator smoke doors and new
                                                                                                    will be posted here.                                            flooring at elevator lobby at each floors.
                                                                                                    You will need Adobe Acrobat Reader to open or print             Pre-bid conference. Attendance at the conference is man-
                                                                                                    these pdf files. Acrobat Reader is available for free from      datory:
                                                                                                    Adobe’s website. Click the Get Adobe Reader button to           Wednesday, September 14, 2011, 10:00 a.m. and
                                                                                                    obtain a copy.                                                  Friday September 16, 2011, 10:00 a.m.
                                                                                                    If you have any general questions, please send an e-mail
                                                                                                    to Office of Contract Administration                                                                Continued on next page


             The
Page 32      Daily e-Reporter               September 13, 2011         www.TheDailyReporter.net                                                                                    ➤                               Page 33
San Francisco/Bay Area Projects Open For Bid                                                                                   Phone: (415) 554-6229                                          Location: San Francisco International Airport, Jason G.
                                                                                                                               Fax: (415) 554-6232                                            Yuen Architecture and Engineering Building, 676 North Mc-
Added since the last issue                                                                                                     E-mail: contractadmin.staff@sfdpw.org                          Donnell Road, Conference Room C
                                                                                                                               More Information                                               Contact’s Name: Lalesh Sharma
Continued from last page                                        LBE: Submit a request for interest in HRC-certified LBE                                                                       Contact’s Phone, Fax, Email Address
                                                                subcontractors                                                 9104                                                           Phone: 650-821-7754
1370 California Street                                          Description ID No.: FCE12012                                   Airport Lighting System Repairs and Construction               E-mail: lalesh.sharma@flysfo.com
San Francisco, CA 94109                                         Contract No.: 1709J                                            Bids: October 6, 2011 at 2:00 PM                               More Information
This Project is subject to the requirements of the San Fran-    The Work is providing curb ramp construction at various        Duration: 730 Calendar Days
cisco Local Hiring Policy for Construction (“Policy”) as set    locations in San Francisco, including, but not limited to,     Estimated Cost: $371,000.00                                    2010124
forth in Section 6.22(G) of the San Francisco Administrative    demolition, curb ramp with detectable surface tiles, related   LBE: Submit a request for interest in HRC-certified LBE        680 Folsom Street/ 50 Hawthorne Street Building Reno-
Code.                                                           sidewalk and paving, pull-box relocation, traffic routing,     subcontractors                                                 vations
Pre-bid Conference Date: 9/14/11 @ 10:00 am                     and other related work. The time allowed for completion is     Description: This project will procure an on-call contractor   Bids: October 7, 2011 at 12:00 PM
Location: 1370 California Street                                180 consecutive calendar days. The Architect”s estimate is     to perform emergency necessary repairs, construction and/      Estimated Cost: $87 Million
San Francisco, CA 94109                                         in excess of $500,000. For more information, contact the       or upgrade to the runway and taxiway wiring and conduits,      Description: Building renovations, additions and site work
Contact’s Name: Nick Nestal                                     Project Manager, Kenneth Spielman at 415-558-4541.             lighting, updating airfield computer, and guidance signs.      at 680 Folsom to include: LEED Gold, fully-accessible
Phone: 510-760-9971                                             The Specifications include liquidated damages. Contract        The tasks under this project are outside the capabilities of   building with all-new curtain wall cladding, all new plumb-
E-mail: nick@ncrconstructioninc.com                             will be on a Unit Price basis. Progressive payments will be    Airport maintenance crew either due to complexity or due       ing, fire protection, HVAC, electrical systems, and seismic
More Information                                                made.                                                          to other commitments and a shortened response time is          bracing to 100% of current code requirements.
                                                                Bid discounts may be applied as per SFAC Chapter 14B.          required.                                                      Pre-bid Conference Date: 9/21 - 23 @ 10 AM
12-000119-CD                                                    Subcontracting goal is 25% LBE. Call Selormey Dzikunu at       Bid documents can be found at www.sfoconstruction.com          Location: 680 Folsom Main Entrance
SOLID GROOVED BRONZE WIRE                                       415-558-4059 for details. In accordance with SFAC Chap-        Solicitations from Potential Prime Bidders for LBE Partners    Contact’s Name: Steve Shores
Bid Due: 10/3/2011 at 2:00 pm                                   ter 14B requirements, all bidders, except those who meet       and Subcontractors: see attached file “Solicitations for LBE   Phone: (415) 550- 5849
Description: The bid is attached as separate pdf files. We      the exception noted below, shall submit documented good        Partners and Subcontractors”                                   E-mail: steves@plantco.com
encourage you to copy these files to your computer, and         faith efforts with their bids and must achieve 80 out of 100   Pre-bid Conference Date: 9/22/11 @ 10:00 AM                    More Information
then click the Let OCA know that you have downloaded            points to be deemed responsive. Bidders will receive 15
a bid package link below to notify us. For some bids, we        points for attending the pre-bid conference. Refer to HRC
send bid addendums or change notices to vendors who             Form 2B for more details. Exception: Bidders who demon-


                                                                                                                                WE DELIVER ANYWHERE!
have let us know they have downloaded the bid. For some         strate that their total LBE participation exceeds the above
bids we do not, so it is important for you to check the bid     subcontracting goal by 35% will not be required to meet the
website often to determine if you have seen all bid adden-      good faith efforts requirements.
dums, change notices or other changes to the bid.               Digital files of Bid Documents may be downloaded at no
If the proposal is changed, a CHANGED flag will appear in
front of the bid title on the bid listing page. Bid Addendums
                                                                cost from the Department of Public Works (DPW) Electronic
                                                                Bid Documents download site at http://bsm.sfdpw.org/con-
                                                                                                                                Get this newspaper delivered to your computer
will be posted here.
You will need Adobe Acrobat Reader to open or print
                                                                tractadmin, or purchased on a CD format from 875 Steven-
                                                                son Street, Room 420, San Francisco, California 94103,
                                                                                                                                automatically with our free
these pdf files. Acrobat Reader is available for free from
Adobe’s website. Click the Get Adobe Reader button to
                                                                telephone 415-554-6229, for a non-refundable $15.00 fee
                                                                paid by cash or check to “Department of Public Works”.
                                                                                                                                Delivery Manager software
obtain a copy.                                                  Addenda and other bid changes will be distributed by email
If you have any general questions, please send an e-mail        only to plan holders with email addresses, and will be post-    Click here for details
to Office of Contract Administration                            ed on the Bids and Contracts page at the City”s Office of
Contact’s Name: HERMILO RODIS                                   Contract Administration website address: http://mission.sf-
Phone: 415-701-4216                                             gov.org/OCABidPublication/
E-mail: oca@sfgov.org                                           Please refer to the Office of Labor Standards Enforcement
                                                                (OLSE) website at http://sfgsa.org/index.aspx?page=391
More Information                                                to obtain documents distributed at the pre-bid conference
FCE12012 1790J                                                  and other information. Documents include:
Proposition K Curb Ramps Fiscal Year 2010-2011 -                - 2010 Healthcare Security Ordinance
SUBJECT TO THE NEW LOCAL HIRE POLICY                            - Pre-bid and pre-construction information
Bids: October 5, 2011 at 2:30 PM                                - Paid Sick Leave Ordinance Fact Sheet
Class “A” license required to bid.                              Pre-bid Conference Date: 9/20/2011 @ 1:30 PM
Estimated Cost: In Excess of $500,000                           Location: 1680 Mission Street, 3rd Floor.
Duration: 180 Consecutive Calendar Days                         Contact’s Phone, Fax, Email Address

                 The
 Page 34         Daily e-Reporter                         September 13, 2011             www.TheDailyReporter.net                                                                                            ➤                             Page 35
                                                                              San Francisco/Bay Area Projects Open For Bid

          Many companies will run your                                        Mission Bay Block 2 – Special Inspection, Surveying
                                                                              & Earthwork Bids for 315 units of market rate housing
                                                                              Bid Due: 9/14/2011 at 2 PM
                                                                                                                                              Agency: Public Works, Department of
                                                                                                                                              Duration: 180 consecutive calendar days
                                                                                                                                              Estimated Cost: In excess of $3,400,000

          DVBE/UDBE/MBE/SBE/WBE                                               Agency: San Francisco Redevelopment Agency
                                                                              Estimated Cost: $93,000,000.00
                                                                              Pre-bid Conference 9/1/2011 at 11:00 AM
                                                                                                                                              Description: The work to be done under this contract is lo-
                                                                                                                                              cated at San Francisco County Jail 3, One Moreland Drive,
                                                                                                                                              San Bruno, CA and consists of hazardous materials abate-


                advertisements.
                                                                              Location: Mission Bay Development Group, 255 Channel            ment, demolition of historic jailhouse building, site grad-
                                                                              St., San Francisco, CA 94158                                    ing, hydro-seeding, electrical work, and all other related
                                                                              The SFRA project goals are as follows: 31% for MBE Sub-         work. The time allowed for completion is 180 consecutive
                                                                              contractors and 10% for WBE Subcontractors. CLICK               calendar days. The Architect’’’’s estimate is in excess of
                                                                              HERE to run your DVBE/SBE/MBE/WBE advertisement in              $3,400,000. For more information, contact the Project Man-
                                                                              the Daily Reporter and get it in the newspaper, posted oon-     ager, Stephen Kay at (415) 557-4706.
                                                                              line and also emailed to all state-certified DVBE firms and     Bid discounts may be applied as per SFAC Chapter 14B.

                 But only the Daily Reporter
                                                                              SBE firms in California.                                        Subcontracting goal is 16% LBE. Call Gary Wong at (415)
                                                                              Description: We are requesting bids from Special Inspec-        558-4080 for details. In accordance with SFAC Chapter
                                                                              tions, Surveying and Rough Grading Subcontractors in-           14B requirements, all bidders, except those who meet the

                     publishes them and
                                                                              cluding those certified with the San Francisco Redevelop-       exception noted below, shall submit documented good faith
                                                                              ment Agency and would like to receive a proposal from you.      efforts with their bids and must achieve 80 out of 100 points
                                                                              This project consists of approximately 452,786 square feet      to be deemed responsive. Bidders will receive 15 points for


                     also emails them
                                                                              and includes 315 units of market rate housing, over 8,000       attending the pre-bid conference. Bidders that are unable
                                                                              square feet of street level retail and two levels of interior   to attend the pre-bid conference will receive 15 points for
                                                                              parking for 315 cars.                                           attending the site walk-through. Refer to HRC Form 2B
                                                                              Contact’s Name: Wendy Church                                    for more details. Exception: Bidders who demonstrate that

           to 9,000+ DVBE and SBE firms!                                      Phone: 415.863.1820
                                                                              E-mail: wendyc@nibbi.com
                                                                              More Information
                                                                                                                                              their total LBE participation exceeds the above subcon-
                                                                                                                                              tracting goal by 35% will not be required to meet the good
                                                                                                                                              faith efforts requirements. CLICK HERE to run your DVBE/
                                                                                                                                              SBE/MBE/WBE advertisement in the Daily Reporter and
    Email your ads to: CandSpublishing@gmail.com                              Energy Efficiency Upgrades of Four (4) Existing Build-
                                                                              ings (Padre Apartments, Leland Polk, Junipero Serra
                                                                                                                                              get it in the newspaper, posted oonline and also emailed to
                                                                                                                                              all state-certified DVBE firms and SBE firms in California.

      or use the handy online order form online at:                           House, Rose Hotel)
                                                                              Bid Due: 9/14/2011 at 2:00 pm
                                                                                                                                              A pre-bid conference will be held at 2:00 PM on Wednes-
                                                                                                                                              day, August 17, 2011, at 30 Van Ness Avenue, Suite 4100,
                                                                              Agency: Mercy Housing California                                San Francisco.
  http://www.thedailyreporter.net/advertising_form.asp                        Mandatory pre-proposal conference: Wednesday, Au-
                                                                              gust 31, 2011 at 1:00 PM at Rose Hotel and Thursday, Sep-
                                                                                                                                              A site walk-through will be held at 9:00 AM on Wednesday,
                                                                                                                                              August 24, 2011 at the San Francisco County Jail 3, One
                                                                              tember 1, 2011 at 1:00 PM at Junipero Serra House               Moreland Drive, San Bruno, CA. Bidders must obtain man-
                                                                              Description: AmOne Corporation is the General Contractor        datory clearance from the San Francisco Sheriff’’’’s Depart-
                                                                              and is seeking subcontractor bids for the trades for the GRI    ment (SFSD), for all persons who intend to enter the project
                                                                              program involving energy and water efficiency improve-          site, as follows: (1) at least 10 calendar days before the



           The Daily Reporter
                                                                              ments and associated repairs for four buildings: Padre          scheduled site walk-through, Bidders shall contact Mr. Ste-
                                                                              Apartments, Leland Polk, Junipero Serra House, and Rose         phen Kay at (415) 557-4706 to obtain information on meet-
                                                                              Hotel.                                                          ing location and the mandatory clearance requirement; and
                                                                              Contact: Alex Ruiz                                              (2) at least 5 calendar days before the scheduled site walk-
                                                                              Phone: 415-826-9678                                             through, Bidders shall submit to Mr. Stephen Kay, 30 Van


    http://www.TheDailyReporter.net
                                                                              E-mail: amone_corp@yahoo.com                                    Ness Avenue, Suite 4100, San Francisco, CA, 94102, the
                                                                              More Information                                                following information in a sealed envelope labeled “CON-
                                                                                                                                              FIDENTIAL”: each person’’’’s full name, date of birth, valid
                                                                              ID No.: FCA11096                                                driver’’’’s license number (indicate state of origin), address,
                                                                              Contract No.: 7308A                                             and phone number.
                                                                              San Francisco County Jail 3 Replacement Phase 2, Jail           All provisions of Contract Specification Section 01014
                                                                              3 Demolition
                                                                              Bid Due: 9/14/2011 at 2:30 pm                                                                         Continued on next page


           The
Page 36    Daily e-Reporter   September 13, 2011   www.TheDailyReporter.net                                                                                   ➤                               Page 37
San Francisco/Bay Area Projects Open For Bid                                                                                         ber 8, 2011 at 1:00 PM at 225 Huntington Avenue. Please             & 11,469 square-feet of retail and leasing office space.
                                                                                                                                     RSVP to 650-616-7065. The Pre-Bid Conference is esti-               Contact’s Name: Wendy Church
                                                                                                                                     mated to last approximately one hour. Only those contrac-           Phone: 415.863.1820
Continued from last page                                         Project No. 84710-A                                                 tors who attend the Pre-Bid Conference will be allowed to           E-mail: wendyc@nibbi.com
                                                                 PUMP STATION NO. 6 SPRAY FOAM ROOFING PROJ-                         submit bids for this project.                                       More Information
(Work Resptrictions) and Appendix A to 01010 (Summary            ECT                                                                 Bidders may obtain bidding documents from the Public
of Work) shall govern bidder’’’’s conduct during the on-site-    Bids: September 15, 2011 at 10:00 AM                                Services Department, Engineering Division, located at 567           10036-F52ZP4
walk-through.                                                    The City of San Bruno (the “City”) will receive sealed bids         El Camino Real, San Bruno, California 94066, for the cost           Ettie Street Pump Station PCC Slab and Column Res-
Class “B” license required to bid.                               on the proposal forms furnished by the City and in accor-           of forty dollars ($40), or forty five dollars ($40.00) if mailed.   toration
Digital files of Bid Documents may be downloaded at no           dance with the plans and specifications on or before Thurs-         For information pertaining to the bidding documents, please         Bids: September 15, 2011 at 2:00 PM
cost from the Department of Public Works (DPW) Elec-             day, September 15 at 10:00 AM by the Office of the City             contact the Public Services Department, Administration &            Description: Repair of a slab and columns a the Ettie Street
tronic Bid Documents download site, or purchased on a            Clerk, located at 567 El Camino Real, San Bruno, Califor-           Engineering at (650) 616-7065.                                      Pump Station.
CD format from 875 Stevenson Street, Room 420, San               nia 94066.                                                          Description: The work includes, but is not limited to, remove       Contractor: Agbayani Construction Corporation
Francisco, California 94103, telephone 415-554-6229, for         A California Class “C-39” contractor’s license is required          existing coating/paint and recoat/repaint the following: the        Contact: Terry Lang
a non-refundable $15.00 fee paid by cash or check to “De-        to bid on this contract. Joint ventures must secure a joint         interior of 2 concrete potable water holding tanks, each with       Address: 88 Dixon Ct., Daly City, CA 94014
partment of Public Works”.                                       venture license prior to award of this Contract.                    a capacity of 50,000-gallons, and each measuring approxi-           Phone: (650) 994-9380
Contact Info:                                                    The City will conduct a mandatory Pre-Bid Conference                mately 25’x25’x12.5’; and the interior and exterior of intake       Contact Person: David Lewis
Phone: (415) 554-6229                                            on Thursday, September 8, 2011 at 9:30 AM at 225 Hun-               pipes. All work items shall be constructed in accordance            davidl@acpwa.org
E-mail: contractadmin.staff@sfdpw.org                            tington Avenue. Please RSVP to 650-616-7065. The Pre-               with the contract documents and specifications. Bidding             (510) 670-5599
More Information                                                 Bid Conference is estimated to last approximately one hour.         Documents contain the full description of the Work. All work        More Information
                                                                 Bidders may obtain bidding documents from the Public                under this contract shall be completed within 30
NEW BID DATE                                                     Services Department, Engineering Division, located at 567           working days from the Notice to Proceed effective date.             WD-2652
(CIP 612)                                                        El Camino Real, San Bruno, California 94066, for the cost           Invitation For Bids                                                 San Antonio Creek Bioregional Habitat Restoration
WATER MAIN CONDITION SURVEY PROJECT                              of forty dollars ($40), or forty five dollars ($45.00) if mailed.   More Informatios                                                    Bid due: 09/15/2011 at 2:00 PM
The new due date is Thursday, September 15, 2011 by              For information pertaining to the bidding documents, please                                                                             ESTIMATED COST: $13 Million
5:00 PM.                                                         contact the Public Services Department, Administration &            Mission Bay Block 3 West – MEPF Design Assist for                   DURATION: approximately 60 months
RETURN PROPOSAL TO:                                              Engineering at (650) 616-7065.                                      147 units of market-rate apartments.                                LOCATION: 1145 Market Street, 1st floor, SF CA 94103
   City of Foster City/Estero Municipal Improvement District     Description: The work includes, but is not limited to, clean-       Bid Due: 9/15/2011                                                  Pre-Bid Conference: 8/17/2011 at 10:00 AM
   Public Works Engineering Department                           ing and prepping of existing tar and gravel roof of ap-             Agency: San Francisco Redevelopment Agency                          ATTENDANCE Not Mandatory
   610 Foster City Boulevard                                     proximately 4,000 square feet; and application of a spray           Duration: 17 MONTHS                                                 LOCATION: Fremont Regional Office, 39465 Paseo Padre
   Foster City, CA 94404                                         polyurethane foam and coating. All work items shall be con-         Estimated Cost: 46,500,000.00                                       Parkway, Suite 3000. Fremont, CA 94538
   Attn: Laura Galli                                             structed in accordance with the contract documents and              Pre-Bid Conference: 9/1/2011 at 10 AM                               There will be no bid discounts for this contract. The LBE
   650-286-3280                                                  specifications. Bidding Documents contain the full descrip-         Location: Mission Bay Development Group, 255 Channel                subcontracting goal is 13%. Both San Francisco Small
Description: The City of Foster City/Estero Municipal Im-        tion of the Work. All work under this contract shall be com-        St., San Francisco, CA 94158                                        & Micro-LBEs and SFPUC-LBEs (Firms certified by SF
provement District (EMID) is requesting proposals from           pleted within 30 calendar days from the Notice to Proceed           Description: We are requesting Design Assist bids from              Human Rights Commission) can be utilized to meet this
qualified firms to conduct a comprehensive leak detection        effective date.                                                     Mechanical, Plumbing, Fire Sprinkler and Electrical Sub-            requirement. Please contact Amy McConnell at 415-554-
inspection of its entire 4-mile length of the 24-inch diameter   Invitation For Bids                                                 contractors including those certified with the San Francisco        3106 for HRC related issues. Hard copy versions of plans,
transmission main to determine if any leaks, air pockets,        More Information                                                    Redevelopment Agency and would like to receive a propos-            specifications and bidding documents are available at 1155
and other anomalies (obstructions) along the pipe exist.                                                                             al from you. The SFRA project goals are as follows: 31%             Market St., 1st Floor, Contract Admin. Service Desk, SF,
The Work to be performed includes the preparation of a           Project No. 84710-B                                                 for MBE Subcontractors and 10% for WBE Subcontractors.              CA 94103 for a non-refundable $210 fee paid by cash or by
report analyzing the data collected from the inspections (lo-    WATER HOLDING TANKS INTERIOR RECOATING                              This project consists of a 227,392 square-foot building that        check payable to “SFPUC”. Contractors requesting Plan/
cations of leaks, air pockets, anomalies, and associated im-     PROJECT                                                             will contain 147 units of market-rate apartments with 5 sto-        specs be shipped to them should send their request, the ap-
pacts), identifying recommended corrections/modifications,       Bids: September 15, 2011 at 10:30 AM                                ries of Type III over a 2 level at-grade and underground            propriate payment amount and return shipping information
and providing associated estimated costs. The selected           The City of San Bruno (the “City”) will receive sealed bids on      parking garage. This project has high level exterior & inte-        to: Contract Administration Bureau at 1155 Market Street,
firm is required to have completed similar work on other         the proposal forms furnished by the City and in accordance          rior finishes, a community center, courtyard, fitness center        9th Floor, San Francisco, CA 94103. Bid date change from
water systems and possess expertise in acoustic pipeline         with the plans and specifications on or before Thursday,                                                                                Sept 8 to Sept. 15. Description: The objective of the project
inspection techniques under live operating conditions.           September 15 at 10:30 AM by the Office of the City Clerk,                                                                               is to restore approximately 9,000 feet of San Antonio Creek
QUESTIONS: Contact Laura Galli, Assistant Engineer, at           located at 567 El Camino Real, San Bruno, California 9406.
                                                                                                                                           The FREE Delivery Manager                                     upstream of the existing San Antonio Reservoir, restore ri-
(650) 286-3280 or by email at lgalli@fostercity.org with         A California Class “C-33” contractor’s license is required                 software will deliver this                                   parian habitat and reestablish Oak Savannah. The work is
questions/concerns pertaining to this RFP.                       to bid on this contract. Joint ventures must secure a joint              newspaper to you every week!                                   to be performed in Alameda County, CA. This contract
Request For Proposals                                            venture license prior to award of this Contract.                                                                                        requires bidder pre-qualification by the SFPUC. The appli-
More Information                                                 MANDATORY PRE-BID SITE VISIT: The City will conduct                                     CLICK HERE
                                                                 a mandatory Pre-Bid Conference on Thursday, Septem-                                                                                                                         Continued on next page


                  The
 Page 38          Daily e-Reporter                        September 13, 2011                www.TheDailyReporter.net                                                                                                    ➤                               Page 39
San Francisco/Bay Area Projects Open For Bid                                                                                      ence and the Job Walk in their entirety will be allowed to bid    Location: Mission Bay Development Group, 255 Channel
                                                                                                                                  on the Project as prime contractors. Description: The work        St., San Francisco, CA 94158
                                                                                                                                  will primarily occur within two rooms on the ground floor;        Description: We are requesting bids from Tower Crane w/
Continued from last page                                        Pre-Qualification Process: Access the Prequalification            Server and UPS rooms. The scope of work is the complete           Operator & MEPF Subcontractors including those certified
                                                                Packet                                                            installation of the IT server support system and infrastruc-      with the San Francisco Redevelopment Agency and would
cable category of work for this contract is “Habitat Restora-   You may also send a Request for Prequalification Form to:         ture in the Server and UPS rooms. Clark Construction will         like to receive a proposal from you. The SFRA project goals
tion Specialist”                                                  Turner Construction Company                                     have ongoing Building 19A construction activities outside         are as follows: 31% for MBE Subcontractors and 10% for
More Information                                                  343 Sansome Street, Suite 500                                   of these two (2) rooms, but will not have any concurrent          WBE Subcontractors. This project consists of approximate-
                                                                  San Francisco, CA 94104                                         activities inside the UPS or Server rooms. There may be           ly 452,786 square feet and includes 315 units of market
Office of AIDS Renovation (SOAR)                                  Attention: Marlene Guzman                                       some minor commissioning type activities from Clark Con-          rate housing, over 8,000 square feet of street level retail
RFQ for Trade Contracts                                           Phone: (415) 705-7909                                           struction that will need to be coordinated with this project.     and two levels of interior parking for 315 cars.
Bids: September 16, 2011 at 5:00 PM                               Fax: (415) 705-7949                                             The Server Room will include Server Cabinets with integral        Contact’s Name: Wendy Church
The total project cost is approximately $5.5 million dollars,     Email:mguzman@tcco.com                                          in-row cooling system and overhead cabletray hung from            Phone: 415.863.1820
and consists of the selective demolition and renovation of      Return completed prequalification forms by mail, fax, or          overhead uni-strut grid. Mechanical systems in the serv-          E-mail: wendyc@nibbi.com
approximately 30,000 square feet of occupied building at        email to the above location no later than September 16,           er room include new VAV and exhaust box, chilled water            More Information
25 Van Ness Avenue in the City of San Francisco. The ex-        2011 at 5:00 PM.                                                  piping from stubs within the room to the Cooling Distribu-
isting space is mostly office, with some examination rooms,     Prequalified bidders will be announced no later than Sep-         tion Unit, solenoid isolation valves activated by wall switch     Cameron House Pedestrian Traffic Coating for Their
and the finished work includes mostly office space with         tember 21, 2011. The Pre-Qualification Process and details        and leak detection connected to BMS. Electrical includes          Playgrounds
some examination rooms. All work will be performed in an        of scoring, qualification, dis-qualification and appeal will be   overhead bus bars including connection devices, electrical        Bids: September 20, 2011 at 2:00 PM
occupied facility.                                              included in the Pre-Qualification package.                        feeders from UPS to Server Room bus bars routed in ex-            Estimated Cost: $60,000
Description: Turner Construction Company is accept-             Contact’s Name: Marlene Guzman                                    isting conduit in the corridors, EPO connections and relo-        Pre-bid Conference 9/1/11 at 10:00 am
ing Subcontractor Pre-Qualification Applications for the        Phone: (415) 705-7909                                             cate overhead lighting. Architectural Finishes include finish     Attendance at the pre-bid conference is mandatory
Department of Public Health, Office of AIDS Renovation          Fax: (415) 705-7949                                               walls, painting and floor sealing. The UPS Room Mechani-          Location: 920 Sacramento Street, San Francisco
(SOAR). Turner Construction Company is currently seek-          E-mail: mguzman@tcco.com                                          cal includes two fan coil units including electrical connec-      Description: Furnishing and install a surface applied, high
ing Pre-Qualified submittals from Subcontractors for the                                                                          tions, chilled water piping from stubs within the room to the     solids, two component, chemically curing, fire retardant,
following bid packages:                                         Project No.: M0513                                                fan coil units, solenoid isolation valves activated by wall       traffic bearing surface, intended for use as heavy duty pe-
101- General Requirements – Estimated Value $430,000            Contract No.: SL0251                                              switch, condensate pump including electrical connection.          destrian playground surface. Installers must have recent
102- Selective Demo – Estimated Value $130,000                  MISSION BAY 19A - NEUROSCIENCES LAB IT INFRA-                     Electrical includes UPS and distribution PDU and electrical       installation experience and submit current “Approved Appli-
103- Concrete – Estimated Value $55,000                         STRUCTURE                                                         feeders from electrical room to UPS in existing conduit. Ar-      cator” agreement from Gaco Western for their Pedestrian
104- Structural Steel – Estimated Value $130,000                Bids: September 16, 2011 at 3:00 PM                               chitectural Finishes include finish walls, painting and floor     Traffic Coating.
105- Carpentry (Rough & Finish) Millwork Custom Case-           Bidding Documents will be available to Bidders on August          sealing.                                                          Contact’s Name: Mike Neumann
work – Estimated Value $110,000                                 29, 2011 (10:00AM), and will be issued only at:                   BIDDER QUALIFICATIONS: Electrical Contractors with                Phone: 415-334-9465
106- Doors, Frames & Hardware – Estimated Value                   UCSF Documents, Media & Mail (UCSF-DMM)                         C10 and B license: To be eligible for consideration for           E-mail: mike@neumanncm.com
$200,000                                                          1855 Folsom Street, Room 135                                    award, bidders (Electrical Contractors with C10 and B li-         More Information
107- Aluminum and Glazing – Estimated Value $120,000              San Francisco, CA 94103                                         cense) must have the minimum experience of successfully
108- Drywall/Plaster – Estimated Value $670,000                 Contact Persons: Ben La (415) 476-5030 (9:00 AM – 5:00            completing at least three (3) office projects involving Server    Bid#11-030
109- Ceilings – Estimated Value $220,000                        PM)                                                               Rooms, including Server Racks and MEP infrastructure, or          Measure WW Citywide Play Equipment Replacement
110- Ceramic Tile – Estimated Value $40,000                     Mario Carmona (415) 476-2518 (before & after working              equivalent, each of $300,000 construction contract amount         (PWC)8733/8670/8770
111- Carpet, Resilient Flooring and Base – Estimated Value      hours)                                                            or greater within the last 5 years of the bid opening date. All   Bids On: September 21, 2011 at 2:00 PM
$140,000                                                        Fax No. (415) 476-8278                                            bidders must submit with their bid a completed Contractor’s       Estimated value: $3,200,000
112- Paint and Wall Cover – Estimated Value $90,000             Log into http://www.cpfm.ucsf.edu/contracts/index.htm and         Statement of Experience (Exhibit 13) as an attachment to          Pre-Bid Conference: A pre-bid conference is scheduled for
113- Toilet Accessories – Estimated Value $12,000               Click on the UCSF Documents, Media & Mail button                  the Bid Form.                                                     1:00 PM on Thursday, September 8, 2011, at the Main Play
114- Medical Equipment – Estimated Value $70,000                ESTIMATED CONSTRUCTION COST: $350,000                             For further information, contact University’s Project Man-        Area in Central Park, located adjacent to the Community
115- Residential Kitchen Equipment – Estimated Value            Bids will be received only at Campus Life, Facilities & Ad-       ager Steve Schacher at (415) 476-8865.                            Center and Band Pavillion at 40204 Paseo Padre Parkway
$1,500                                                          ministrative Service FAS Finance Service Center, Univer-          Notice Inviting Bids                                              in Fremont, Ca
116- Signage – Estimated Value $25,000                          sity of California, San Francisco, 654 Minnesota Street,          More Information                                                  Copies of the Contract Documents are available from Pen-
117- Misc Specialties – Estimated Value $27,000                 2nd Floor, San Francisco, CA 94107-3027. Phone: (415)                                                                               insula Digital/ARC at 44846 Osgood Rd, Fremont, Ca or
118- Wheel Chair Lift – Estimated Value $50,000                 476-5343.                                                         Mission Bay Block 2 – Tower Crane w/ Operator &                   599 Fairchild Dr, Mountain View, Ca 94043.
119- HVAC – Estimated Value $800,000                            A mandatory Pre-Bid Conference and mandatory Pre-Bid              MEPF Bids for 315 units of market rate housing                    Description: Demolition of existing play equipment, con-
120- Fire Protection (Design Build) – Estimated Value           Job Walk will be conducted on September 6, 2011 begin-            Bids: September 20, 2011 at 2:00 PM                               crete paving, concrete curbing & safety surfacing, site grad-
$40,000                                                         ning promptly at 10:00AM. Participants shall meet at 19A          Duration: 26 MONTHS                                               ing, excavation & import, drainage, installation of concrete
121- Plumbing – Estimated Value $280,000                        Construction Trailer, 1400 6th Street, San Francisco, CA          Estimated Cost: 93,000,000.00
122- Electrical – Estimated Value $850,000                      94158. Only bidders who participate in both the Confer-           Pre-bid Conference 9/1/2011 at 11 AM                                                                  Continued on next page


                 The
 Page 40         Daily e-Reporter                        September 13, 2011               www.TheDailyReporter.net                                                                                                 ➤                               Page 41
San Francisco/Bay Area Projects Open For Bid                                                                                       Francisco, CA 94103.                                             Bidding Documents will be available on September 6, 2011
                                                                                                                                   More Information                                                 (12:00pm\ and will be issued from: UCSF Documents Me-
                                                                                                                                                                                                    dia & Mail (UCSF-DMM), 1855 Folsom Street, Room 135,
Continued from last page                                          Contractor shall purchase a complete set of plans and            WW-533                                                           San Francisco, CA 94103
                                                                  specifications and provide contact information to the City       Wastewater Facility Lighting Efficiency Improvements             Contact Persons: Ben La (415) 476-5030 (9:00am -
paving, mow bands & curbs, installation of play equipment         in order to be eligible to bid on this project. The Contract     - North Point, Oceanside & Bruce Flynn Facilities                5:00pm)
(Custom & Standard), installation of resilient rubber safety      Book, plans and proposal forms are available at the Public       Bid due: 9/22/2011 at 2:00 PM                                    Mario Carmona (415) 476-2518 (before & after working
surfacing (Poured in Place), pre-cast concrete, simulated         Works Department, City Hall, 330 West 20th Avenue, San           ESTIMATED COST: $493,300                                         hours)
rock climbing structures, & site furnishings such as bench-       Mateo, California. A non-refundable fee of $40.00 per set        Pre-Bid Conference 9/08/2011 at 10:30 AM                         Fax No. (415) 476-8278
es, picnic tables, trash receptacles & drinking fountains,        is required if picked up or $50.00 for each set if mailed.       ATTENDANCE Not Mandatory                                         Log into http://www.cpfm.ucsf.edu/contracts/index.htm
tree & shrub installation, sod & irrigation repair & replace-     Any questions regarding the contract documents should be         LOCATION: 750 Phelps St, SWPCP Building 930 Main                 Click on the UCSF Documents, Media & Mail Button
ment & other such items or details that are required by           directed to Homayoun Ariasp, Assistant Engineer, at 650-         Conference Room, SF CA 94124                                     Bidding documents are available for pick-up during working
Plans, Standard Specifications & these special provisions.        522-7332 or in writing at the above address.                     Description: The objective of the project Is to replace high-    hours (9:00 AM - 5:00PM). Submit a NON-REFUNABLE
Contact: Andrew Mayes                                             The estimated construction cost of this project is               intensity discharge lighting fixtures with high-efficiency LED   FEE of $35.00 per set of Bidding Documents. Company
510-494-4741                                                      $1,000,000.00.                                                   fixtures and add some additional lighting in the Oceanside       checks should be made payable to “Regents of the Uni-
More Information                                                  Contact Person:                                                  ERB. A Class “C-10” California Contractors License is re-        versity of California” and submitted to UCSF Documents,
                                                                  Homayoun Ariasp, Assistant Engineer                              quired to bid. The work is to be performed in San Fran-          Media and Mail (UCSF-DMM). Major credit cards are ac-
2011 Sidewalk Repair Project                                      (650) 522-7332                                                   cisco, CA.                                                       cepted. There is an additional charge, paid by the Bidder,
Bids: September 22, 2011 at 10:00 AM                              Invitation For Bids                                              The LBE subcontracting goal is 10% and ONLY San Fran-            for shipping and handling fees for overnight mail. UCSF-
Sealed bids will be received by the City Council of the City      More Information                                                 cisco (Local) Small & Micro-LBEs can be utilized to meet         DMM will charge fees according to option selected in ship-
of San Mateo, California, for the 2011 SIDEWALK Repair                                                                             this requirement (Firms certified by SF Human Rights Com-        ping documents to you. Bidders may call UCSF-DMM to
Project and other work as described in this Contract Book         HH-953                                                           mission). SFPUC-LBEs cannot be utilized to meet the 10%          place an order. Personal Checks and Cash not accepted.
and the APWA-AGC Standard Specifications for Public               Tesla Portal Protection                                          LBE subcontracting goal requirement. Please contact An-          The parking lot and facility entrance can be accessed from
Works Construction, 2009 Edition. The work described re-          Bid due: 9/22/2011 at 2:00 PM                                    drew Houston at 551-4335 for HRC related issues.                 15th Street. There is a 15-minute Green Zone free parking
quires that the bidder be licensed by the State of California     ESTIMATED COST: $2.38 million                                    Plans & Specs are available for purchase at 1155 Market          available at this location for order pick-ups.
as a Class A Contractor.                                          DURATION: Jan 2012 to Aug 2012                                   Street, 1st floor Contract Service Desk. SF CA for a non-        Description: The Medical Sciences Building (MSB) 1320
Contractor shall purchase a complete set of plans and             Pre-Bid Conference 9/08/2011 at 9:00 AM                          refundable $60 paid by cash or by check payable to “SF-          Anatom~ Teaching Lab Renovation involves the renovation
specifications and provide contact information to the City        Not Mandatory                                                    PUC”. Contractors requesting Plans/specs be shipped to           of approximately 6,800 square feet at the 13 floor of Medi-
in order to be eligible to bid on this project. The Contract      LOCATION: 1145 Market Street, 1st floor conference               them should send their request with the signed Confiden-         cal Sciences Building for new a anatomy teaching lab, pro-
Book, plans and proposal forms are available at the Public        room, SF CA 94103                                                tiality Agreement, the appropriate pay-ment amount and           cedural skills lab, multipurpose classroom, administration
Works Department, City Hall, 330 West 20th Avenue, San            he objective of the project is to construct a protective steel   return shipping information to: Contract Admin Bureau at         offices and locker rooms. The work includes abatement/de-
Mateo, California. A non-refundable fee of $30.00 per set         enclosure for the existing tunnel portal and exposed piping      1155 Market Street, 9th floor, San Francisco, CA 94103.          molition, casework, doors/frames/hardware, metal studs/
is required if picked up or $40.00 for each set if mailed.        including blast doors, access shaft, cranes, ventilators and     More Information                                                 drywall, flooring, acoustical ceilings, audio-visual, plumb-
Any questions regarding the contract documents should be          fans, electrical work, site earthwork, and concrete work re-                                                                      ing, HVAC & electrical/life safety systems.
directed to Otis Chan, Senior Engineer, at (650) 522-7305,        location and upgrade of the sampling room including new          M9449                                                            Contact Name: Denis Driscoll at (415) 401-4204
or in writing at the above address.                               analyzers and pumps; upgrade of the domestic water sys-          MSB 1320 ANATOMY TEACHING LAB RENOVATION                         FOR: Demolition and Asbestos Abatement
The estimated construction cost of this project is                tem. The work to be perform is located at the Tesla Portal       Sealed Bids Due (to Herrero Contractors): September              General Building Contractor with ASB Certification (B with
$160,000.00.                                                      facility at 9000 West Vernalis Road, Tracy, in San Joaquin       22, 2011 at 3:00 PM                                              ASB)
Contact Person:                                                   County, CA.                                                      CM/Contractor: Herrero Contractors, Inc.                         More Information
Otis Chan, Senior Engineer                                        Bid discounts may be applied as per SF Administrative            Herrero Contractors, Inc. is requesting subcontractor bids
(650) 522-7305                                                    Code Chapter 14B. The LBE subcontracting goal is 17%.            for asbestos abatement/demolition for a lump sum contract.       NEW BID DATE
Invitation For Bids                                               Both San Francisco Small & Micro-LBEs and SFPUC-LBEs             A Mandatory Pre-Bid Meeting will be conducted on                 The Midori Hotel and Lyric Hotel Green Retrofit Initia-
More Information                                                  (Firms certified by SF Human Rights Commission) can be           September 9, 2011, beginning promptly at 9:00AM. Par-            tive (GRI) Project
                                                                  utilized to meet this requirement. Please contact Amy Mc-        ticipants shall meet atuCSF, 513 Parnassus Avenue, Medi-         Now Bids On: September 23, 2011 at 2:00 PM
2011 Street Resurfacing Phase II                                  Connell at (415) 554-3106 for HRC related issues.                cal Sciences Building, San Francisco, CA. Meet at the 1jh        Pre-bid Conference: By Appointment – Contact Derek Chau
Bids: September 22, 2011 at 2:00 PM                               Plans & Specs are available for purchase at 1155 Mar-            Floor Elevator Lobby. For further information, contact Denis     Site Visit Required
Sealed bids will be received by the City Council of the City of   ket Street, 1st floor Contract Admin Service Desk, SF CA         Driscoll at Herrero Contractors, at (415) 8247675.               Meet at 240 Hyde Street, San Francisco, CA 94102
San Mateo, California, for 2011 Street Resurfacing Phase          94103 for a non-refundable $150 fee paid by cash or by           The successful Bidder will be required to have the follow-       Travel to: 140 Jones Street, San Francisco, CA 94102
II as shown on the Contract Drawings and as described in          check payable to SFPUC. Contractors requesting Plans/            ing California current and active contractor’s license at the    Description: Insulation, heating, lighting, HVAC, bathroom
this Contract Book and the APWA-AGC Standard Specifi-             Specs be shipped to them should send their request with          time of submission of the Bid: LICENSE CLASSIFICA-               ventilation, installation of new hot water boiler system in or-
cations for Public Works Construction, 2009 Edition. The          the signed Confidentiality Agreement, the appropriate pay-       TION: GENERAL BUILDING with ASB CERTIFICATION;                   der to reduce gas and electrical usage and improve energy
work described requires that the bidder be licensed by the        ment amount and return shipping information to: Contract         LICENCE CODE: Band ASB CERTIFICATION
State of California as a Class A Contractor.                      Administration Bureau. 1155 Market Street, 9th floor, San        ESTIMATED CONSTRUCTION COST: $100,000                                                                 Continued on next page


                  The
 Page 42          Daily e-Reporter                         September 13, 2011               www.TheDailyReporter.net                                                                                                ➤                               Page 43
San Francisco/Bay Area Projects Open For Bid                                                                                       to all submissions will be sent to each plan holder three       Pre-bid Conference 9/7/11 at 10:00 AM
                                                                                                                                   days prior to bid opening date via the fax number provided      Location: San Francisco International Airport, Delta/Singa-
                                                                                                                                   upon purchasing the Contract Documents. Bidders will be         pore Building, Design & Construction, 710 N. McDonnell
Continued from last page                                        Bid documents can be found at www.sfoconstruction.com              added to the plan holder list upon purchase of the Contract     Road, 2nd Floor, Conference Room B, San Francisco, CA
                                                                Contact’s Name: Omar Dapiaoen                                      Documents from the City. If no fax number is provided, the      94128
efficiency.                                                     Phone: 650-821-7725                                                Contractor is responsible for obtaining a copy of clarifica-    Contract Documents, Plan Holders Lists, Addenda, and Bid
Duration: Approximately 4 months                                E-mail: omar.dapiaoen@flysfo.com                                   tions before submitting a proposal. Only Contractors listed     Results will only be available to download at no charge from
Contact: Derek Chau                                             More Information                                                   on the plan holders list shall receive responses to bidder      the following website: http://www.sfoconstruction.com/, af-
Phone: 415-334-8066                                                                                                                questions. Only signed addenda issued by the Department         ter August 24, 2011.
E-mail: fdc262@yahoo.com                                        Fire Station No. 21 Roofing Replacement                            of Public Works are binding.                                    Description: The Terminal 3, Boarding Area E Improve-
More Information                                                Bids: September 29, 2011 at 2:00 PM                                Fire Station No. 21 Bid Notice                                  ments Project will add additional floor area, and replace or
                                                                Sealed bids will be received by the City Council of the            Fire Station No. 21 Contract Book                               upgrade components and systems that are obsolete or at
Bid No.: 11-12.005                                              City of San Mateo, California, for Roofing Replacement at          More Information                                                the end of their useful life.
FURNISH AND INSTALL FENCE AT PD PARKING LOT                     Fire Station No. 21, 120 S. Ellsworth Avenue, San Mateo,                                                                           For technical questions on the Bid Documents, scheduling
Bids: September 27, 2011 at 3:00 PM                             CA as described in this Contract Book and Public Works             Mission Bay Block 11 Warehouse Demo Project                     of special field visits, and submittal of Request for Product
Bids to:                                                        Standards, Inc. Standard Specifications for Public Works           Bids: September 30, 2011 at 2:00 PM                             Substitutions, contact the following:
  City of San Leandro                                           Construction, 2009 Edition. Said sealed proposals shall be         Mission Bay Development Group is actively seeking con-            Judi Mosqueda
  Purchasing Department                                         delivered to the City Clerk, City Hall, 330 West 20th Av-          tractors for upcoming Block 11 Warehouse Demo Proj-               San Francisco International Airport
  835 East 14th Street                                          enue, San Mateo, California 94403, at or before 2:00 PM.,          ect. Minority and women owned business participation is           Delta\Singapore Building
  San Leandro, CA 94577                                         Thursday, September 29, 2011, and they shall be opened             strongly encouraged. The project manual and bid docu-             710 N. McDonnell Road, 2nd Floor
A pre-bid meeting and site visit is set for 11:00 AM, Wednes-   and read by a City Representative at said date and time at         ments are available at no charge at:                              San Francisco, California 94128
day, September 14, 2011 at San Leandro City Hall Sister         a public meeting called by him.                                      Mission Bay Development Group                                   650-821-0163 Telephone
Cities Gallery, 1st Floor, 835 E. 14th Street, San Leandro,     The work described requires that the bidder be licensed by           255 Channel St                                                  650-821-7799 Fax
CA.                                                             the State of California as a Class C 39 Contractor.                  San Francisco, CA 94158                                       More Information
Description: Furnish and install fence with two man gates       The Contract Book and proposal forms are available at the            Attn: JT Matarangas
and one rolling gate at Police Department parking lot at        Public Works Department, City Hall, 330 West 20th Avenue,          Estimated Cost: $650,000                                        Bid Number: 6405
San Leandro City Hall. Successful bidder will furnish and       San Mateo, California 94403. A non-refundable fee of $15           A pre-bid conference will be held at Mission Bay Visitor Cen-   Coleman Soccer Fields Design Build Project
install 8” tall black vinyl coated cyclone fencing (8 gauge,    per set is required if picked up or $25 for each set if mailed.    ter at 255 Channel Street, San Francisco, CA on Thursday        Bids: October 6, 2011 at 3:00 PM
½” mesh, approximately 260 lineal feet) with one (1) 8” tall    The Contract Book and proposal forms are also available            September 15, 2011 at 10:00 AM. MBE and WBE subcon-             Sealed written proposals are invited by the CITY OF SAN
X 17’ wide single slide gate and two (2) 4’ wide walk gates     as a free download at http://www.cityofsanmateo.org/bids.          tractors are strongly encouraged to attend. Attendance is       JOSE for: 6405 COLEMAN SOCCER FIELDS DESIGN
per the attached Specifications/Scope of Work                   aspx. Contractors who download the documents will not be           not mandatory but extremely recommended.                        BUILD PROJECT. The City is using BidSync to facilitate
Contact: Don Brockman                                           added to the plan holder list or notified of any addenda.          For additional information, please contact JT Matarangas        the solicitation of bids. BidSync is an online bid solicitation
Purchasing Agent                                                Addenda will be available as a download at the same web            at (415) 355-6626.                                              website. Bidders must register with BidSync to participate
(510) 577-3472 Fax (510) 577-3312                               location. Any questions regarding the contract documents           Contact: JT Matarangas                                          in this procurement. There is no cost associated with reg-
dbrockman@sanleandro.org                                        should be directed to Chet Gossett, Project Manager, at            Phone: (415) 355-6600                                           istering. To register, bidders must go online to http://www.
Invitation For Bids                                             (650) 522-7360 or in writing at the above address.                 E-mail: JTMatarangas@MBayDevelopment.Com                        bidsync.com. This request for bids is registered under the
More Information                                                The estimated construction cost of this project is                 More Information                                                following classifications: [909-16] - Athletic Facility Con-
                                                                $150,000.00. This estimate is not based on a “contractor’s                                                                         struction. Once registered, bidders can view and down-
Bid Number: 8496                                                cost take off” of the project, but is derived from an averag-      Bid Number: 8974B                                               load information regarding this request for bids – including
AOA Security Checkpoints Improvements                           ing of costs for work on similar projects in the area of which     Design-Build Services for Terminal 3, Boarding Area E           the bid and contract documents. When a bidder views or
Bids: September 29, 2011 at 2:00 PM                             the City is aware. This figure is given to indicate the relative   Improvements                                                    downloads information, the bidder becomes a “planholder.”
Agency: Airport Commission                                      order of magnitude of this project and is not intended to in-      Bids: September 30, 2011 at 3:00 PM                             BidSync will send “planholders” notification every time the
Duration: 210 Consecutive Calendar Days                         fluence or affect in any way the amount bid for this project.      Bids shall be submitted by messenger or hand delivery at        City posts an addenda and/or new information related to
Estimated Cost: $1,500,000                                      A mandatory pre-bid walk-through is scheduled on                   San Francisco International Airport, Delta\Singapore Build-     this request for bids. All proposals must be filed with the
Pre-bid Conference 9/15/11 at 2 PM                              Tuesday, September 6, 2011, 10:00 AM, at the City of San           ing, 710 N. McDonnell Road, 2nd Floor, Design and Con-          Director of Public Works, City of San José, City Hall, 200 E.
Location: 676 North McDonnell Road, San Francisco, CA           Mateo Fire Station No. 21, 120 South Ellsworth Avenue,             struction no later than the date and time, and at the place     Santa Clara St., 5th Fl., San Jose, CA 95113-1905, on or
94128, Conference Room C.                                       San Mateo CA 94401. Failure to attend the walk-through             specified in the Advertisement for Bids (Document 00100),       before 3:00 p.m. as set forth in the specifications. A repre-
Description: This project will provide needed repair and        will disallow submitted bids.                                      or as subsequently specified if changed by Addendum.            sentative of the Director of Public Works will publicly open
upgrades to the Airfield Operations Area (AOA) checkpoint       All questions prior to deadline shall be directed to Chet Gos-     Bids submitted by mail shall be submitted to Judi Mosque-       and declare the aggregate bid of each bidder, in Room
security systems at the North Field, West Field, and South      sett, Project Manager, via fax at (650) 522-7301, or in writ-      da, Contract Manager, San Francisco International Airport,      T550 at 3:00 p.m. on Thursday, October 6, 2011.
Field checkpoints. This project will replace the existing       ing at the above address. The deadline for submission of           P.O. Box 8097, San Francisco, CA 94128                          Bidders DO NOT need to be pre-qualified to bid on this
security barriers, tire shredders, control systems, remove      questions and clarifications concerning the Contract Docu-         Duration: 670 Consecutive Days to Substantial Completion
hydraulic pumps, and improve area lighting.                     ments is seven days prior to bid opening date. Responses           Estimated Cost: $71,000,000                                                                           Continued on next page


                 The
 Page 44         Daily e-Reporter                        September 13, 2011                www.TheDailyReporter.net                                                                                                ➤                               Page 45
San Francisco/Bay Area Projects Open For Bid                                                                                         pied 2,500 sq. ft. minimum sports facilities in such capacity   of the date of bid submittal, the buildings must be available
                                                                                                                                     within a time period of five (5) years of the bid submittal.    for verification by City staff. The designer shall possess a
Continued from last page                                          of hazardous materials. The Contractor or subcontractor            Sports facility projects shall be considered to be those that   California Architecture license.
                                                                  performing such removal or remediation work shall have a           include a sports stadium or multiple sports fields along with   Project Plans
project; however attendance at the mandatory pre-bid              Hazardous Substance Removal Certification (HAZ) issued             the necessary support facilities including public restrooms,    Packet For Bid
meeting and submission of evidence of qualifications will         by the California State Contractor’s License Board prior to        concession area, office space, and associated utilities. As     More Information
be required at bid. The City intends to award the contract        the start of such work. Such certification is not required at
for the design and construction of this Project to the lowest     the time of bid submittal but must be obtained prior to the
responsive bidder. See CONTRACTOR QUALIFICATIONS                  start of construction.
REQUIRMENTS on the next page for further bid submis-              In addition to being licensed per the Project Design Man-
sion information.                                                 ual, to be considered responsive each bidder shall, on the           Our staff search more than a hundred
One mandatory pre-bid meeting will be held on Wednes-             forms provided, furnish satisfactory evidence of compe-
day, August 31, 2011 at 10:00 AM, The meeting will be held        tency to perform the work contemplated including, without            sites every week looking for jobs that
at the site, located off Coleman Ave. between Aviation Ave.       limitation, documentation of the following:
and Newhall Dr. directly adjacent to the existing San Jose
Earthquakes practice field, San José, CA 95110. Atten-
                                                                  1. The bidder (or, if bidder is a joint venture, one of the
                                                                  joint venture partners of bidder) as prime or sub-contractor
                                                                                                                                       you can bid on.
dance at the pre-bid meeting is MANDATORY. All Prospec-           directly responsible for such portion of the work shall have
tive General Contractors/Bidders must attend. The purpose         installed at least three (3) synthetic play fields over the size     We put that information into this
of this meeting is for the bidders to ascertain existing condi-   of 2 acres within five (5) years of the date of bid submittal. A
tions and for the City to provide important information about
project requirements. NOTE: City staff will not answer any
                                                                  minimum of one such field must be substantially complete
                                                                  and available for verification by City staff as of the date of
                                                                                                                                       newspaper and give it away
questions at the mandatory pre-bid meeting. Bidders will          the bid submittal.
need to submit questions after the meeting via BidSync.           2. The bidder’s designated design firm (or bidder, or one of         absolutely free!
City Staff will respond to any such questions via BidSync.        bidder’s partners if bidder is a joint venture, should bidder
All prospective bidders are hereby cautioned that the Con-        intend to perform such portion of the project itself) shall,
tractor’s State License Law regulates contractor licensing
matters. The Contractor, in its bid proposal, shall be re-
                                                                  within five (5) years of the date of bid submittal, show ex-               No login required.
                                                                  perience as the design engineer or landscape architect of
quired to disclose its license type, number, and expiration
date. Bidders must have a California contractor’s license,
                                                                  record and, in such capacity, have designed a minimum of
                                                                  three (3) synthetic play fields over the size of 2 acres, and              No password or registration.
classification A at the time of bid submittal to bid this proj-   a minimum of two of the three fields must be substantially
ect, unless the bidder is a joint-venture. A bidder that is       complete and available for inspection by City staff as of                  Always free.
a joint-venture must have its joint-venture license before        the date of the bid submittal. The designer shall possess
Contract award. However, each contractor submitting the           an appropriate California license for such design, either a
joint-venture bid must have an active license at the time         California Civil Engineer or California Landscape Architec-
of bid submittal, and among the active licenses there must        ture license.
be at least one license for each classification required as       3. The bidder’s designated design firm (or bidder, or one
stated immediately above. (See, California Business and           of bidder’s partners if bidder is a joint venture, should bid-
Professions Code Sections 7028.15, 7029 and 7029.1.).             der intend to perform such portion of the project itself)
In addition to the above license requirements, the project        shall show experience as the design architect of record
involves the handling and potential removal or remediation        and have designed a minimum of three (3) built and occu-


  Links to more information
  City and County of SF http://mission.sfgov.org/OCABidPubli-
  cation/ Bids and Contracts Listing.

  Alameda County http://www.acgov.org/gsa_app/gsa/purchas-
  ing/bid_content/contractopportunities.jsp The County of Alam-
  eda Contracting Opportunities Website

  San Jose http://www.sanjoseca.gov/purchasing/default.asp
  City of San Jose Bid Line.


                  The
 Page 46          Daily e-Reporter                         September 13, 2011                www.TheDailyReporter.net                                                                                               ➤                               Page 47
                                                               contractor with a valid asbestos registration from the Di-     Central Valley Projects Open For Bid
                                                               vision of Occupational Safety and Health in the California
                                Open For Bid                   State Department of Industrial Relations.                      Added since the last issue
                                                               INVITATION TO BIDDERS: 79HT-110
                                                               CONTACT: sgunawa@bart.gov                                      City Project Number: 10-70                                     and grates to finish grade and pavement and furnishing all
                                                                                                                              906 & 930 North Olive Avenue Sidewalk Improvements             necessary labor, materials, tools, equipment and inciden-
       CLICK HERE for more information                         CONTRACT NUMBER: 09AU-110                                      Bids: October 13, 2011 at 2:00 PM                              tals needed to perform the improvements as shown on the
                                                               Transbay Tube Internal Retrofit                                Engineer’s Estimate: $42,000.00                                contract plans complete and in place.
                                                               BIDS DUE: November 8, 2011                                     Contractor License Required: A                                 Cost of Plans and Specifications: $25.00
AGREEMENT NUMBER: 6M8051                                       REQUEST NON-DISCLOSURE AGREEMENT (PRIME):                      The work consists, in general, of: clearing and grubbing,      Technical Contact: Jeff Haney 209.668.5599 Ext. 4485
Construction Management in Support of Various BART             July 5, 2011                                                   earthwork, installing curb, gutter, sidewalk, raising frames   More Information
Projects                                                       NON-DISCLOSURE AGREEMENT (PRIME) DUE DATE:
PROPOSALS DUE DATE: October 4, 2011                            July 19, 2011


                                                                                                                                          Many companies will run your
PRE-PROPOSAL MEETING: September 14, 2011                       REQUEST 3rd PARTY NON-DISCLOSURE AGREEMENT:
ESTIMATED COST: $20,000,000                                    September 13, 2011
SUMMARY OF SCOPE: Provide construction manage-                 3rd PARTY NON-DISCLOSURE AGREEMENT DUE
ment services in support of various BART projects.             DATE: September 27, 2011
INVITATION TO PROPOSERS: 6M8051
CONTACT: rcoffey@bart.gov
                                                               MANDATORY PRE-BID MEETING/SITE INSPECTION:
                                                               August 31, 2011 / September 6, 2011
                                                               ESTIMATED COST: $14,000,000 and $16,000,000
                                                                                                                                          DVBE/UDBE/MBE/SBE/WBE
                                                                                                                                                advertisements.
AGREEMENT NUMBER: 6M8056                                       SUMMARY OF SCOPE: Furnishing all labor, equipment,
Request for Statement of Qualifications to Provide Sustain-    tools, materials, management, coordination, professional
ing Construction Management Services for BART Projects         services and other services required to fabricate and in-
QUALIFICATION STATMENT DUE DATE: October 4, 2011               stall 360 tons of two-inch thick steel plate in one bore of
ESTIMATED COST: $3,000,000                                     the Transbay Tube. A minor amount of lead paint is pres-

                                                                                                                               But only the Daily Reporter publishes them and
PRE-SUBMITTAL MEETING: September 14, 2011                      ent and will require removal. Painting, grouting behind the
SUMMARY OF SCOPE: Assist and advise BART in con-               new steel plate and temporary electrical infrastructure is
struction management, procurement activities and related       required. The contractor shall provide two hi-rail vehicles


                                                                                                                                                                also emails them
issues associated with BART design-bid-build and design-       for the transportation of materials and equipment. The work
build projects on other project issues.                        also includes the replacement of three temporary plugs in
INVITATION TO PROPOSERS: 6M8056                                the outer wall of the Transbay Tube with permanent plugs.
CONTACT: amaynar@bart.gov                                      INVITATION TO BIDDERS: 09AU-110, Attachment 1, At-

CONTRACT NUMBER: 79HT-110
Civic Center, 19th Street and Downtown Berkeley Sta-
                                                               tachment 2, Addendum
                                                               CONTACT: gary.leong@bart.gov                                                   to 9,000+ DVBE and SBE firms!
tions Site Hardening                                           CONTRACT NUMBER: 15TH-110
BIDS DUE: October 11, 2011
NON-DISCLOSURE AGREEMENT (PRIME) DUE DATE:
                                                               Pleasant Hill Station Water Intrusion Repair
                                                               BIDS DUE DATE: December 20, 2011
                                                                                                                                    Email your ads to: CandSpublishing@gmail.com
                                                                                                                                      or use the handy online order form online at:
September 6, 2011                                              ESTIMATED COST: $1,800,000 to $2,200,000
REQUEST 3rd PARTY NON-DISCLOSURE DUE DATE:                     PRE-BID MEETING/SITE INSPECTION: July 8, 2011
August 23, 2011                                                SUMMARY OF SCOPE: Provide all labor, materials, equip-
3rd PARTY NON-DISCLOSURE DUE DATE: September
6, 2011
                                                               ment and other accessories necessary to complete the sta-
                                                               tion water intrusion repair (WIR) which includes removing
                                                                                                                                  http://www.thedailyreporter.net/advertising_form.asp
MANDATORY PRE-BID MEETING/SITE INSPECTION:                     the existing waterproofing membrane from the concrete



                                                                                                                                                The Daily Reporter
September 2011                                                 surface of trackways, cleaning and prepping the concrete
ESTIMATED COST: $5,800,000 to $6,500,000                       surface to receive a new waterproofing membrane, install-
SUMMARY OF SCOPE: Providing all labor, equipment,              ing new waterproofing membrane on the trackways, remov-
materials and services required to design and install se-      ing and installing sealant at the platform concrete slab and
curity related systems and equipment such as close circuit     trackways, performing water intrusion testing, cleaning out
television (CCTB), access control, door monitoring, unin-
terruptible power supply (UPS) in three (3) BART stations,
including removal and proper disposal of asbestos contain-
                                                               existing trackways drains and providing new access panels
                                                               for clean-outs.
                                                               INVITATION TO BIDDERS: 15TH-110, Addendum
                                                                                                                                     http://www.TheDailyReporter.net
ing materials if any, which shall be performed by a licensed   CONTACT: sgunawa@bart.gov

                 The
 Page 48         Daily e-Reporter                        September 13, 2011             www.TheDailyReporter.net                                                                                           ➤                             Page 49
                                                                                                                                2037 West Cleveland Avenue MS D, Madera, CA 93637                  Sealed Bid for Runway 1-19 Rehabilitation
Central Valley Projects Open For Bid                                                                                            Tel:(559) 675-7811 x3529                                        A PRE-BID MEETING WILL BE HELD AT THE PASO RO-
                                                                                                                                Fax:(559) 675-7631                                              BLES MUNICIPAL AIRPORT AT 9:00 AM ON SEPTEM-
Bid No.: 2498                                                  location Board pursuant to the Leroy F. Greene School Fa-        hhemaidan@madera-county.com                                     BER 8, 2011. MEET AT THE TERMINAL. THIS MEETING
BAKERSFIELD HIGH SCHOOL BUILDING DEMOLITION                    cilities Act of 1998 for construction or modernization and       More Information                                                WILL NOT BE A MANDATORY MEETING, HOWEVER
AND STUDENT PARKING LOT EXPANSION                              expended each year by the Owner.            CLICK HERE to                                                                        CONTRACTORS ARE ENCOURAGED TO ATTEND AS
Bids: September 14, 2011 at 2:00 PM                            run your UDBE/DBE/SBE/MBE/WBE advertisement in the               Project/Contract Number: 11-019                                 ACCESS TO THE WORK AREA IS RESTRICTED.
Plans available at: Kern High School District (OWNER),         Daily Reporter and get it in the newspaper, posted online        Landfill Gas Remediation Program LFG Probes GMP-                Project is to be completed within sixty (60) calendar days
Business Services Department, 5801 Sundale Avenue, Ba-         and also emailed to all state-certified DVBE firms and SBE       8R And GMP-9R at Fairmead Landfill                              from the date specified in the Notice to Proceed.
kersfield, CA 93309, (661) 827-3122; www.kernhigh.org          firms in California.                                             Bid Due Date: 9/15/11 at 3:00 PM                                THE LOCAL AGENCY’S ANNUAL ANTICIPATED DIS-
PROJECT LOCATION: Bakersfield High School, 1241 “G”            Descriptions:                                                    Project Type: Engineering/Civil                                 ADVANTAGED BUSINESS ENTERPRISE (DBE) TOTAL
Street, Bakersfield, CA 93301. Building Demolition: 2030 –     Bid No. 2712 - Demolition and removal of steel canopies,         Project City, State: Chowchilla, California                     PARTICIPATION LEVEL IS 10%, WITH A RACE CON-
14th Street, Bakersfield, CA 93301                             concrete, asphalt, lead paint, asbestos roof membrane on         Engineer’s Estimated Cost: $1-$1                                SCIOUS GOAL OF 6% (UDBE), AND A RACE NEUTRAL
Estimated bid value: $400,000                                  canopies and interior demolition of Buildings A, B, D, and P.    Pre-Qualification for Bidders: Not Required                     GOAL OF 4% (DBE). The bidder shall make good faith ef-
Project duration: 45 calendar days                             649 Calendar Days; C-21, ASB & HAZ                               License Type Required: C57, A                                   forts, as defined in Appendix A of 49 CFR Part 26, Regu-
Non–Mandatory Job Walk: Thursday, August 25, 2011 at           Bid No. 2713 - Provide for the installation of structural con-   Liquidated Damages: $1,000.00 Per Calendar Day                  lations of the Office of the Secretary of Transportation, to
2:00 p.m.                                                      crete and reinforcement. 649 Calendar Days; C-8                  Bid Bond Percentage: 10%                                        subcontract fifteen percent of the dollar value of the prime
Meet at 2030 14th Street, Bakersfield, CA (Buildings be-       Bid No. 2714 - Provide for the installation of the structural    Cost of Printed Plans & Specs: $20.00                           contract to small business concerns owned and controlled
hind Bakersfield High School)                                  steel canopies and buildinQ additions. 649 Calendar Days;        Mandatory Pre Bid Conf: 9/09/11 at 11:00 AM                     by socially and economically disadvantaged individuals. In
DESCRIPTION: Demolition of old Gleaners Building and           C-51                                                             Location: Fairmead Landfill, 21739 Road 19, Chowchilla,         the event that the bidder for this solicitation qualifies as a
finish grading to a parkable surface.                          Bid No. 2715 - Provide for the installation of the storm &F      CA                                                              DBE, the contract goal shall be deemed to have been met.
This project is anticipated to start on approximately Octo-    water system at Buildings C,D, & F. 649 Calendar Days;           A list of attending contractors will be taken during the man-   Individuals who are rebuttably presumed to be socially and
ber 10, 2011 and is anticipated to have a duration of forty-   A or C-34                                                        datory meeting and no bids shall be accepted from contrac-      economically disadvantaged include, women, Black Ameri-
five (45) calendar days for completion.                        Questions should be directed to: Richard J. Ruiz. Director.      tors not identified on said list.                               cans, Hispanic Americans, Native Americans, Asian-Pacific
Contact: Linda Goodman                                         Business Services (661) 827-3122.                                Description: This project consists of constructing four va-     Americans, and Asian-Indian Americans. All competitors
linda_goodman@khsd.k12.ca.us                                   Contact: Sandy Castorena                                         dose zone landfill wells and one landfill gas probe and con-    will be required to submit information concerning the DBE’s
More Information                                               sandy-castorena@khsd.k12.ca.us                                   necting them with HDPE piping to existing system.               that will participate in this contract. This information will in-
                                                               More Information                                                 Bid Documents shall be obtained by bidders from Madera          clude the name and address of each DBE, a description
South High School Modernization Phase 2-2006                                                                                    County Resource Management Agency, 2037 West Cleve-             of the work to be performed by each named firm, and the
Bids as follows:                                               Project/Contract Number: 11-03-RD                                land Avenue, Madera, CA 93637, upon receipt of a non-re-        dollar value of the contract. If the bidder fails to achieve the
Bid No. 2712 - Demolition of Steel Canopies/Concrete/          Active Advance Flashing Beacons For Road 22 and                  fundable deposit, by cerified check or cash, in the amount      contract goal stated herein, it will be required to provide
Soft Demolition; est. value $2,500,000                         Road 35 BNSF Railroad Crossings in Madera County                 of $20.00 per set.                                              documentation demonstrating that it made good faith ef-
Bid No. 2713 - Structural Concrete; est. value $1,500,000      Bid Due Date: 9/14/11 at 2:00 PM                                 Project Contact: Project Manager                                forts in attempting to do so. A bid that fails to meet these
Bid No. 2714 - Structural Steel; est. value $1,000,000         Project Type: Engineering/Civil                                  County of Madera Engineering Department                         requirements will be considered nonresponsive. CLICK
Bid No. 2715 - Storm Water Lines for Buildings C, D,           Project City, State: Madera, California                          2037 West Cleveland Avenue, Madera, CA 93637                    HERE to run your DBE/SBE/MBE/WBE advertisement in
&F                                                             Engineer’s Estimated Cost: $75,000-$105,000                      Tel:(559) 675-7820                                              the Daily Reporter and get it in the newspaper, posted on-
Bids: September 14, 2011 at 2:00 PM                            Pre-Qualification for Bidders: Not Required                      Fax:(559) 675-7820                                              line and also emailed to all state-certified DVBE firms and
OWNER: Kern High School District                               License Type Required: Class A or Combination of Class C         planroom@ebidboard.com                                          SBE firms in California.
Plans available at: Kern High School District (OWNER),         UDBE Goal Percentage: 1%                                         More Information                                                Description: Furnishing all labor, materials, equipment, and
Business Services Department, 5801 Sundale Avenue, Ba-         Project Duration: 30 Work Days                                                                                                   performing all work necessary and incidental to the con-
kersfield, CA 93309, (661) 827-3122; www.kernhigh.org          Liquidated Damages: $1,000.00 Per Calendar Day                   AIP 3-06-0184-20                                                struction of the project known as Runway 1-19 Rehabilita-
Estimated bid value: $250,000                                  Bid Bond Percentage: 10%                                         DPW PROJECT NO.11-012                                           tion, Project No. 11-012, AIP 3-06-0184-20, according to
Project duration: 649 calendar days                            Cost of Printed Plans & Specs: $31.00                            RUNWAY 1-19 REHABILITATION                                      drawings and specifications prepared by the City of Paso
License requirted: A or C-34                                   Description: The work to be done consists, in general, of        Bids: September 15, 2011 at 2:00 PM                             Robles and according to the Contract Documents. The work
Non-Mandatory Job Walk: Tuesday, August 23, 2011 at            Furnishing and Installing advance warning beacons and            SEALED BIDS will be received by the City Clerk, or his          shall include but is not limited to, earthwork and subgrade
9:30 a.m.                                                      related signage, and associated poles, trenching, electrical     designee, of the City of El Paso de Robles until Thursday,      preparation, aggregate base and asphalt pavement, airfield
Location: Meet at the South High School Flagpole, 1101         conduits, conductors, controllers, pull boxes, and placing       September 15, 2011 at 2:00 p.m. for Runway 1-19 Reha-           electrical improvements including taxiway edge lights and
Planz Road, Bakersfield, CA 93304                              pavement markings at the following railroad crossings:           bilitation, Project No. 11-012, AIP 3-06-0184-20. Please be     guidance signs, storm drainage improvements, pavement
DVBE & LCP COMPLIANCE REQUIRED. In accordance                  1. Road 22 South of Santa Fe Drive at the BNSF crossing          certain that any bid submitted is sealed and addressed and      marking, and hydro-mulch erosion control, all as shown on
with Education Code Section 17076.11, the Owner has a          2. Avenue 7 and Road 35 at the BNSF crossing                     noted as follows:                                               the plans and/or as specified herein.
participation goal for disabled veteran business enterpris-    Project Contact: Hisham Hemaidan                                   City Clerk                                                    Notice Inviting Bids
es of at least three percent per year of the overall dollar    County of Madera - Road Dept.                                      City of El Paso de Robles                                     More Information
amount of funds allocated to the Owner by the State Al-        Road Department                                                    1000 Spring Street, Paso Robles, CA 93446                                                            Continued on next page


                 The
 Page 50         Daily e-Reporter                        September 13, 2011              www.TheDailyReporter.net                                                                                               ➤                                 Page 51
Central Valley Projects Open For Bid                                                                                                           essary in order to be listed as a Prospective Bidders List          by the contractor and/or by the utility companies.
                                                                                                                                               which ensures receipt of any addenda on the project.                All questions regarding this project and/or the Responsi-
Continued from last page                                                  BUYER: LAURA RAPP, BUYER II                                          The Contractor must possess a valid Class A Contractor’s            bility Statement and Questionnaire documents must be di-
                                                                          PHONE (559) 621-1169 or 621-1332                                     License at the time bids are received for this project. The         rected to Luis Topete, Public Works-TRIP, e-mail: Itopete@
PROJECT ID #RC00114                                                       FAX: (559) 488-1069                                                  Contractor shall ensure that all subcontractors are properly        bakersfieldfreeways.us or phone: 661-326-3700
FUND/ORG: 40501/413501                                                    Contact: Laura Rapp                                                  licensed for the work they are to perform.                          Contact: Luis Topete
P.W. FILE NO.: 11569                                                      laura.rapp@fresno.gov                                                Description: The work to be performed consists, in general,         661-326-3700
BID FILE NUMBER: 3107                                                     More Information                                                     of furnishing all materials and labor necessary to construct        Itopete@bakersfieldfreeways.us
SEWER REHABILITATION IN N. FRESNO STREET AND                                                                                                   and install two (2) concrete block pump houses, installa-           More Information
N. COLLEGE AVENUE                                                         PROJECT NO.: E7J009                                                  tion of two (2) deepwell turbine pumps and motors, two (2)
Bids: September 15, 2011 at 2:59 PM                                       CBK-53 BLOCK PUMPHOUSE and CBK-55 BLOCK                              electrical panel boards, and all miscellaneous piping and           BID FILE NUMBER: 3127-11555
The Construction Allocation for this project is $2,410,000.00.            PUMPHOUSE                                                            appurtenances, providing P. G. & E. service to each facility,       CALIFORNIA AND MARKS AVENUES STREET WIDEN-
No bid will be considered for award unless the Bidder at                  Bids: September 16, 2011 at 11:00 AM                                 one (1) generator and any other appurtenant installations           ING
the time of bid opening, is licensed with a valid Class “A”               SEALED PROPOSALS will be received by the City of Ba-                 and equipment to provide for two (2) “turn-key” domestic            Bids: September 22, 2011 at 2:59 PM
or Class “C34” Contractor’s License issued by the State of                kersfield at the Office of the Purchasing Officer, City Hall         water pump plants as shown on the plans and specifica-              Sealed bids will be received at the office of the Purchasing
California.                                                               North, 1600 Truxtun Avenue, Second Floor, Bakersfield,               tions. Note: The two (2) well locations are approximately           Manager of the City of Fresno for the following: CALIFOR-
Bids will be taken on complete work, in accordance with                   California, until the time and date indicated on the cover           a mile and a half (1 ½) apart. The two (2) wells have been          NIA AND MARKS AVENUES STREET WIDENING, BID
Plans and Specs on file in the office of the Purchasing                   sheet of this document, to be publicly opened and read               drilled and the casing stubbed above existing ground.               FILE NUMBER: 3127-11555
A pre-bid conference will be held at 10:00 a.m., on August                immediately thereafter in the City Hall North First Floor            Estimated cost: $1,000,000.                                         The Construction Allocation for this project is $1,245,000.00.
31, 2011, in the conference room at the City of Fresno                    Conference Room, for the following work: CBK-53 BLOCK                City of Bakersfield Water Resources Department                      No bid will be considered for award unless the Bidder at the
Purchasing Division, 2101 G Street, Fresno, California.                   PUMPHOUSE AND CBK-55 BLOCK PUMPHOUSE.                                1000 Buena Vista Road, Bakersfield CA,93311                         time of bid opening, is licensed with a valid Class “A” Con-
Prospective Bidders are encouraged to attend since City                   Plans, specifications, and forms of proposal, bonds, and             (661) 326-3715                                                      tractor’s License issued by the State of California.
Staff will be present to answer any questions regarding the               contract may be obtained at the office of the Purchasing Of-         Questions to: Stephen Choate                                        Bids will be taken on complete work, in accordance with
Specifications, and there may be an inspection tour of the                ficer (phone, 661-326-3746; fax, 661-852-2100). The City             City of Bakersfield, Water Resources Department                     Plans and Specifications on file in the office of the Purchas-
job site(s).                                                              is not charging a purchase price nor requiring a deposit for         1000 Buena Vista Road, Bakersfield, CA 9331                         ing Manager, 2101 “G” Street, Building “A,” Fresno Califor-
Description: The scope of work includes rehabilitation on                 these documents. However, the person requesting a copy               Email: schoate@bakersfieldcity.us                                   nia, 93706-1675 , phone number (559) 621-1332.
approximately 2,187 linear feet of 12” sewer line along Col-              of the documents will be responsible for payment of any              Fax: 661-852-2127                                                   Specifications for these items can be downloaded at the
lege Avenue between Andrews Avenue and Terrace Av-                        shipping and mailing costs. The City assumes no responsi-            More Information                                                    City’s online website. Bid Proposal forms, Instructions to
enue, and the rehabilitation of approximately 6,836 linear                bility for non-receipt of bids due to any delay, including but                                                                           Bidders and copies of the plans and/or specifications can
feet of sewer lines ranging in sizes from 12” to 21” along                not limited to carrier delay. It is the bidder’s responsibility to   Invitation No, T9WP6B                                               also be obtained at the Office of the Purchasing Manager.
Fresno Street between San Gabriel Avenue and Dakota                       meet the project’s deadlines. Alternatively, plans, specifica-       Responsibility Determination for General Contractors                Bid Proposals must be filed with the Purchasing Manager
Avenue and along Dakota Avenue between Fresno Street                      tions, and forms of proposal, bonds, and contract may also           for Westside Parkway Phase 6-8                                      prior to the bid opening at 3 p.m. on Thursday, September
and Thesta Street. Sewer rehabilitation consists of furnish-              be obtained from the Internet site www.planetbids.com/por-           Bids: September 16, 2011 at 4:00 PM                                 22, 2011, when the bids will be publicly opened and re-
ing and installing a Cured-In-Place-Pipe (CIPP) liner and                 tal/portal.cfm?CompanyID=14660#. There is no charge for              Estimated Bid Value: $10,000,000.00                                 corded.
applying a protective epoxy coating on all the manholes                   downloading a copy of these documents from this website.             License Requirement: Class A                                        A pre-bid conference will be held at 10:00 a.m., on Septem-
along these alignments including traffic control and tempo-               However, in order to download these files, the requestor             No Pre Bid Meeting                                                  ber 7, 2011, in Room 4017N, City Hall, 2600 Fresno Street,
rary bypass of sewer flows as required.                                   must first register as a vendor on this website; there is no         RESPONSIBILITY STATEMENT AND QUESTIONNAIRE                          Fresno, California. Prospective Bidders are encouraged to
PROJECT MANAGER: KEVIN NORGAARD                                           charge for this registration. Registration is absolutely nec-        (RSQs) submitted in conformance wilh the City’s RSQ will            attend since City Staff will be present to answer any ques-
                                                                                                                                               be received by the City of Bakersfield at the Thomas Roads          tions regarding the Specifications, and there may be an in-
                                                                                                                                               Improvement Program Office. 2nd floor. Suite 200. 900               spection tour of the job site(s).
                                                                                                                                               Truxtun Ave. Bakersfield. CA 93301 until 4:00 p.m. SEP-             Description: The scope of work includes installation of con-
  Links to more information                                                                                                                    TEMBER 16. 2011.                                                    crete curb, gutter, sidewalk, wheel chair ramps, AC pave-
                                                                                                                                               Description: The purpose of this project is to advance the          ment, signage and striping, street lighting, storm drain sys-
  City of Fresno                                                                                                                               construction of the Westside Parkway and make a func-               tem and a basin.
  http://www.fresno.gov/Businesses/                                                                                                            tional connection to Allen Road to facilitate the construction      Contact: Mike Brown
                                                                                                                                               of the next phase of this project without major interruptions       mike.brown@fresno.gov
  Lists bidding opportunities, which are organized by Construction, Products
  and Services, including the city and Fresno Yosemite International Airport.
                                                                                                                                               to traffic in the area. This project will construct a porlial in-   More Information
                                                                                                                                               terchange at Allen Rd and the Westside Parkway including
  County of Fresno                                                                                                                             the Allen Rd bridge, the eastbound on ramp and the west-            Bid No. 2501
  http://www.co.fresno.ca.us/DepartmentPage.aspx?id=15075                                                                                      bound off ramp. Also included in the project is the widening        Football Stadium Visitor Bleacher Demolition & Site
                                                                                                                                               of Allen Rd, the construction of concrete structures such as        Work
  Lists open soliocitations                                                                                                                    retaining walls, drainage system, and soundwalls. Under-            Ridgeview High School
                                                                                                                                               ground utilities will have to be relocated to the new bridge                                             Continued on next page


                   The
 Page 52            Daily e-Reporter                             September 13, 2011                   www.TheDailyReporter.net                                                                                                     ➤                              Page 53
Central Valley Projects Open For Bid                                                                                              Bid No.: 2723: Storefront & Aluminum Windows. Provide          kersfield, CA 93309
                                                                                                                                  and install storefront & aluminum windows at Buildings A,      (661) 827-3122
Continued from last page                                        Bid Submittal Date: September 28, 2011 at 2:00 P.M.               B, C, D, E, P at South High School. Anticipated duration:      OR, DOWNLOAD PDFITIFF FILE: www.kernhigh.org
                                                                Location: Conference Room E (Board Room)                          649 days. Required License: C-17. Anticipated start date:      NON-MANDATORY JOB WALK: Meet at: Wednesday.
Bid Submittal Date: September 28, 2011 at 2:00 P.M.             Non-Mandatory Job Walk: Thursday, September 8, 2011 at            October 10, 2011.                                              September 7.2011 9:30 am
PLACE OF BID RECEIPT: Kern High School District (OWN-           10:30 a.m.                                                        Bid No.: 2724: Rough Carpentry. Provide and install rough      Location: Meet at the Ridgeview High School Stadium En-
ER), Conference Room “E” (Board Room), 5801 Sundale             Location: Meet at the South High School Flagpole, 1101            carpentry at Buildings A, B, C, D, E, F, H and P at South      trance. 8501 Stine Road, Bakersfield. CA 93313
Avenue, Bakersfield, CA 93309                                   Planz Road, Bakersfield, CA 93304                                 High School. Anticipated duration: 649 days. Required Li-      If a job walk is required on this project, attendance at the
Non-Mandatory Job Walk: Wednesday, September 7, 2011            DVBE & LCP COMPLIANCE REQUIRED                                    cense: C-5. Anticipated start date: October 10, 2011.          entire job walk is mandatory and failure to attend the en-
at 9:30 a.m.                                                    Bids to: Kern High School District (OWNER)                        Bid No.: 2725: Insulation. Provide and install insulation at   tire job walk may result in your bid being rejected as non-
Location: Ridgeview High School Stadium Entrance, 8501          Conference Room E (Board Room), 5801 Sundale Avenue,              Buildings A, B, C, D, E, F, H and P at South High School.      responsive. Contact OWNER for details on required job
Stine Road, Bakersfield, CA 93313                               Bakersfield, CA 93309                                             Anticipated duration: 649 days. Required License: C-2.         walks and related documentation.
NON-MANDATORY JOB WALK: Meet at: Wednesday.                     Plans available at: Kern High School District (OWNER)             Anticipated start date: October 10, 2011.                      The school district shall evaluate the effort made by the
September 7.2011 9:30 am                                        Business Services Department, 5801 Sundale Avenue, Ba-            Bid No.: 2726: Mobile Book Storage Shelving. Provide           bidder to seek out and consider DVBEs as potential sub-
Location: Meet at the Ridgeview High School Stadium En-         kersfield, CA 93309                                               and install mobile book storage shelving in Building B at      contractors, and/or material or equipment suppliers. In
trance. 8501 Stine Road, Bakersfield. CA 93313                  (661) 827-3122                                                    South High School. Anticipated duration: 649 days. Re-         evaluating such effort, the school district shall consider
PROJECT DESCRIPTION:                                            OR, DOWNLOAD PDFITIFF FILE: www.kernhigh.org                      quired License: D-24. Anticipated start date: October 10,      documentation of the actions specified above. Based on
CONTRACT 11-DEMOLITION AND SITE WORK: All labor,                NON-MANDATORY JOB WALK: Thursday. September 8.                    2011.                                                          this evaluation, the school district may make a finding that
materials and equipment required to provide and install         2011 10:30 a.m.                                                   Bid No.: 2727: Metal Roofing and Wall Panels. Provide          the three percent DVBE participation goal or the good faith
all site improvements to support bleacher installation (see     Location: Meet at the South High School Flagpole. 1101            and install new metal roofing and wall panels at South High    effort requirement has been met. The school district find-
Contract I below for exceptions) to include but not limited     Planz Road, Bakersfield. CA 93304                                 School. Anticipated duration: 649 days. Required License:      ing in this regard is subject to audit by OPSC. A bidder is
to AC paving, curbs & gutters, concrete walkways, site          If a job walk is required on this project, attendance at the      C-39; C-43; ASB & HAZ. Anticipated start date: October         eligible for award of a school district contract upon a finding
grading, drainage, utilities, storm drain, parking, signage,    entire job walk is mandatory and failure to attend the en-        10, 2011.                                                      by the school district that a three percent DVBE participa-
chain link fencing, gates & modifications as indicated @        tire job walk may result in your bid being rejected as non-       Contact: Sandy Castorena                                       tion goal or good faith effort to meet the participation goal
Building 100 Field House and as indicated on the drawings       responsive. Contact OWNER for details on required job             Kern High School District                                      has been achieved. If a bidder fails to meet either the goal
and specifications. Coordinate with bleacher contractor to      walks and related documentation.                                  Business Services Department                                   or a good faith effort to meet the three percent goal, such
insure a complete project.                                      PRE-BID MEETING is scheduled for Thursday, Septem-                5801 Sundale Ave., Bakersfield, CA 93309                       bidder shall be deemed not to be a responsive bidder for
CONTRACT 1- BLEACHERS: All labor, materials and                 ber 8, 2011 at the South High School Flagpole, 1101 Planz         sandy_castorena@khsd.k12.ca.us                                 purposes of the school district’s evaluation of an award of
equipment required to provide and install bleachers as          Road, Bakersfield, CA 93304, to acquaint prospective bid-         More Information                                               contract and is thus ineligible for an award. CLICK HERE
specified, including structural foundations (including earth-   ders with the requirements of the District’s Labor Compli-                                                                       to run your DVBE advertisement in the Daily Reporter and
work, concrete & reinforcing steel pertaining to the founda-    ance Program and Disabled Veteran Business Enterprise             South High School Modernization Phase 2-2006                   get it in the newspaper, posted online, and also emailed to
tions) & attachments, steel substructure, decking systems,      (DVBE) Program. The school district shall evaluate the ef-        Bids as follows:                                               all state-certified DVBE firms in California.
ramps, stairs, handrails, guardrails, engineered drawings!      fort made by the bidder to seek out and consider DVBEs            Bid No. 2716 - HVAC                                            Contact: Sandy Castorena
calculations, DSA submittal, any & all corrective or support-   as potential subcontractors, and/or material or equipment         Bid No. 2717 - Plumbing                                        Kern High School District
ing documentation with Architect, Consultants, Owner &          suppliers. In evaluating such effort, the school district shall   Bid No. 2718 - Electrical                                      Business Services Department
site contractor.                                                consider documentation of the actions specified above.            Bid No. 2719 - Doors/Frames and Hardware                       5801 Sundale Ave., Bakersfield, CA 93309
This project is anticipated to start on approximately Octo-     Based on this evaluation, the school district may make a          Bid No. 2720 - On-Site Concrete                                sandy_castorena@khsd.k12.ca.us
ber 17, 2011 and is anticipated to have a duration of one       finding that the three percent DVBE participation goal or         Bid No. 2721 - Metal Stud/Drywall and Plaster                  More Information
hundred forty five (145) calendar days for completion.          the good faith effort requirement has been met. The school        Bid No. 2722 - Reroofing Buildings A, B, C1, C2, C3, C4,
Contact: Sandy Castorena                                        district finding in this regard is subject to audit by OPSC. A    C6, D1-D5, E1-E2.1, F1-F1.1-F2.1, H, I, J, K, M, N, O &        BID FILE NUMBER: 3120 – 11595
Kern High School District                                       bidder is eligible for award of a school district contract upon   Building Additions                                             ARRA – HERNDON TOWN WELL SITE DESTRUCTIONS
Business Services Department                                    a finding by the school district that a three percent DVBE        Bid Submittal Date: September 28, 2011 at 2:00 P.M.            Bids: September 29, 2011 at 1:59 PM
5801 Sundale Ave., Bakersfield, CA 93309                        participation goal or good faith effort to meet the participa-    Location: Conference Room E (Board Room),                      The Construction Allocation for this project is $25,000.00.
sandy_castorena@khsd.k12.ca.us                                  tion goal has been achieved. If a bidder fails to meet either     Non-Mandatory Job Walk: Thursday, September 8, 2011 @          No bid will be considered for award unless the Bidder at the
More Information                                                the goal or a good faith effort to meet the three percent         10:30 a.m.                                                     time of bid opening, is licensed with a valid Class “C-57”
                                                                goal, such bidder shall be deemed not to be a responsive          Location: Meet at the South High School Flagpole, 1101         Contractor’s License issued by the State of California.
South High School Modernization Phase 2-20                      bidder for purposes of the school district’s evaluation of        Planz Road, Bakersfield, CA 93304                              Bids will be taken on complete work, in accordance with
Bids as follows:                                                an award of contract and is thus ineligible for an award.         DVBE & LCP COMPLIANCE REQUIRED                                 Plans and Specifications on file in the office of the Purchas-
Bid No. 2723 - Storefront & Aluminum Windows                    CLICK HERE to run your DVBE advertisement in the Daily            This project is anticipated to start on approximately Octo-    ing Manager, 2101 “G” Street, Building “A,” Fresno Califor-
Bid No. 2724 - Rough Carpentry                                  Reporter and get it in the newspaper, posted online, and          ber 17, 2011 and is anticipated to have a duration of one      nia, 93706-1675 , phone number (559) 621-1332.
Bid No. 2725 - Insulation                                       also emailed to all state-certified DVBE firms in California.     hundred forty five (145) calendar days for completion.         Specifications for these items can be downloaded at the
Bid No. 2726 - Mobile Book Storage Shelving                     Meet at: South High School Flagpole. 1101 Planz Road,             Plans available at: Kern High School District (OWNER)
Bid No. 2727 - Metal Roofing & Wall Panels                      Bakersfield. CA 93304                                             Business Services Department, 5801 Sundale Avenue, Ba-                                               Continued on next page


                 The
 Page 54         Daily e-Reporter                        September 13, 2011               www.TheDailyReporter.net                                                                                               ➤                               Page 55
Central Valley Projects Open For Bid                                                                                                 For further information, contact University’s Representative      or on any other basis prohibited by law.
                                                                                                                                     Erich Brown at 805-893-4128.                                      Description: The Scope of Work includes the demolition,
Continued from last page                                          Fax: 805/962-8776                                                  Notice Inviting Bids                                              clearance and rough grading of 329 College Avenue in
                                                                  S.J. Amoroso Construction Co., Inc.                                Plan Holders List                                                 Fresno, CA 93701 (APN# 467-245-03). This work includes
City’s online website.                                            275 East Baker Street, Suite B, Costa Mesa, CA 92626                                                                                 the complete removal/disposal of all above and below
A mandatory pre-bid conference will be held at 10:00              Ph: 714-433-2326                                                   BID FILE NUMBER: 3126                                             ground site improvements and the complete remediation/
a.m., on Wednesday, September 14, 2011, in Room 4017N,            Fax: 714-433-2329                                                  329 COLLEGE DEMOLITION                                            disposal of asbestos containing hazardous materials (see
City Hall, 2600 Fresno Street, Fresno, California. Prospec-       Stronghold Engineering, Inc.                                       Bids: September 29, 2011 at 3:00 PM                               Appendix A) within the property.
tive Bidders MUST attend, City Staff will be present to an-       2000 Market Street, Riverside, CA 92501                            Sealed bids will be received for the Redevelopment Agency         Contact: Jean Runnels
swer any questions regarding the Specifications, and there        Ph: 951-684-9303                                                   of the City of Fresno (here below referred to as the “Rede-       jean.thomas-runnels@fresno.gov
may be an inspection tour of the job site(s).                     Fax: 951-684-9329                                                  velopment Agency”) at the office of the Purchasing Man-           More Information
The scope of work includes, but is not limited to: This proj-     Suffolk-Roel dba Suffock Construction Co. Inc.                     ager of the City of Fresno for the following: 329 COLLEGE
ect requires the demolition and removal of the following          38 Discovery, Suite 200, Irvine, Ca 92618                          DEMOLITION                                                        Bid Number: I-000423-KF
surface, subsurface structures, and equipment as depicted         Ph: 949-453-9400                                                   The Construction Allocation for this Project is $20,000.          California Institution for Men, Hospital Roof
in Exhibits 2 and 3. Such as; all discharge pipe lines to the     Fax: 949-453-9495                                                  Bids will be taken on complete Work, in accordance with           Bids: October 10, 2011 at 2:00 PM
back of curb and property line, discharge blow-off and pip-       Bidding Documents will be available to Bidders on August           Plans and Specifications on file in the office of the Purchas-    Expected Expenditure: $420,000.00
ing, site utilities lines, concrete substructures/tank support,   15, 2011 at 1:30 PM, and will be issued at:                        ing Manager, 2101 “G” Street, Building “A,” Fresno Califor-       Pre-Bid Conference September 22, 2011 at 8:00 AM PDT
power poles, concrete pads and electrical panel.                      Tri-Co Blue Print & Supply                                     nia, 93706 1675, phone number                                     Attendance is mandatory
Contact: Mike Brown                                                   513 Laguna Street                                              (559) 621-1332.                                                   Location: California Institution for Men, 5405 Eucalyptus
mike.brown@fresno.gov                                                 Santa Barbara, California 93101                                Specifications for these items can be downloaded at the           Avenue, Chino, CA 91710.
More Information                                                      Ph: (805) 966-1701 Fax: (805) 966-9484                         City of Fresno’s online website at: http://www.fresno.gov.        Gate Clearance required, read directions in IFB. Meet at
                                                                  FAX your request for Contract Documents to Lorena at Tri-          For Businesses (to the left of the screen), Bid Opportunities.    main entrance, please read directions for walk through and
University Project No. FM110407L/986315                           Co (805) 966-9484. Prospective bidders will receive One            Bids will not be accepted Online or via Fax. Bid Proposal         contacts.
North Campus Faculty Housing Phase II                             (1) Full sized set and One (1) Half sized set at no charge.        forms, Instructions to Bidders, and copies of the Plans and/      Description: This is a product only purchase with some
Sealed bids must be received on or before 2:30 P.M. on            Additional sets will require a non-refundable fee of the ac-       or Specifications may also be obtained at the Office of the       technical assistance, the State to install the roof. Manda-
September 29, 2011                                                tual cost of reproduction                                          Purchasing Manager. Bid Proposals must be filed with the          tory walk through is required to attend in order to bid the
  Contracting Services                                            per set of Bidding Documents. Arrangements for payment             Purchasing Manager prior to the bid opening at 3:00 p.m.          job. Please read all bid documents and attachments. Gate
  Facilities Management, Building #439                            and receipt of all sets should be made directly to Tri-Co.         on Thursday, September 29, 2011, when the bids will be            clearance into institution is required, please read contact
  Door #E, Reception Counter                                      A mandatory Pre-Bid Conference and mandatory Pre-                  publicly opened and recorded.                                     information with key dates. ROOFING SYSTEM, fully ad-
  University of California, Santa Barbara                         Bid Job Walk will be conducted on August 23, 2011 be-              A pre bid conference will be held at 10 a.m. on Friday            hered roof assembly, single ply, poly vinyl chloride (PVC),
  Santa Barbara, California 93106-1030                            ginning promptly at 1:30 PM. (There is no grace period.)           September 16, 2011, at 329 College Avenue in Fresno,              80 mil fabric reinforced PVC membrane, per attached
Estimated Construction Cost: $22,000,000.00                       Participants shall meet at:                                        CA 93701. Prospective Bidders are encouraged to attend            specifications, plan sheets, and construction bulletin. Ap-
The following General Contractors have been pre-qualified             Facilities Management, Building 594 – Learning Center          since staff will be present to answer any questions regard-       proximately 54,940 square feet. Scope to include all “Pent-
to bid on this project:                                               University of California, Santa Barbara                        ing the Specifications, and there may be an inspection tour       house” roofs (with a minimum 1/2:12 slope). Provide split /
Bernards Bros. Inc.                                                   Santa Barbara, California                                      of the job site(s).                                               straight flashings for duct supports and split/ angled flash-
555 First Street, San Fernando, Ca 91340                          Only Pre-Qualified General Contractors who participate in          The Redevelopment Agency hereby notifies all Bidders that         ings w/ clamps for diagonal duct support braces.
Ph: 818-898-1521                                                  both the Conference and the Job Walk in their entirety, will       no person shall be excluded from participation in, denied         Bid Contact: Katie S. Frazier
Fax: 818-838-7956                                                 be allowed to bid on the Project as prime contractors.             any benefits of, or otherwise discriminated against in con-       Associate Governmental Program Analyst
C.W. Driver Incorporated                                          DESCRIPTION: Twenty two (22) building types with a total           nection with the award and performance of any contract            916-255-2883
468 N. Rosemead Blvd., Pasadena, CA 91107                         of thirty seven (37) units of type VB (nonrated) construc-         on the basis of race, religious creed, color, national origin,    Katie.Frazier@cdcr.ca.gov
Ph: 626/351-8800                                                  tion, sprinklered (13D & Full 13), wood-frame & plaster,           ancestry, physical disability, mental disability, medical con-    Packet For Bid
Fax: 626/351-8880                                                 3 & 4 bedroom residential housing. Mix of units includes,          dition, marital status, sex, age, sexual orientation ethnicity,   More Information
Jeffery C. Stone, Inc. dba Summit Builders                        five (5) buildings of two story duplexes, ten (10) buildings       status as a disabled veteran or veteran of the Vietnam era
4010 Watson Plaza Drive, Suite 260, Lakewood, C 90712             of three story duplexes, and seven (7) three story single
Ph: 562-429-6540                                                  family residences, a community building, and a pool facil-
Fax: 562-429-6025                                                 ity. Units total approximately 92,504 GSF. Work includes all
                                                                  site improvements and all infrastructure. Project site area
                                                                                                                                                                   Run your good faith DVBE/MBE/SBE/UDBE
Kitchell Contractors Inc.
2476 Lillie Avenue, Summerland, CA 93067                          is approximately 21.08 acres of development, 9.28 acres of                                            advertisements right here in this
Ph: 805-969-1531                                                  the site area is set aside for habitat restoration. Grading will
                                                                  be required in the restoration area, but irrigation and plant-
                                                                                                                                                                    State Certified paper — Published DAILY!
Fax: 805-969-4623
Melchiori/Matt A Joint Venture                                    ing of habitat areas is by owner. Roof trusses and fire sprin-
809 De La Vina Street, Santa Barbara, CA 93101                    kler systems are design/build, provided by general contrac-                                          CLICK HERE to place your ad online
Ph: 805/962-9505                                                  tor, and are a deferred submittal for approvals needed.

                  The
 Page 56          Daily e-Reporter                         September 13, 2011                www.TheDailyReporter.net                                                                                                 ➤                               Page 57
                                                                                                                             01-479204 Replace Ogac, Install In-ground Rumble               The Contractor must have either a Class A license or any
                                                                                                                             Strip, Reconstruct Mbgr                                        combination of the following Class C licenses which consti-
                                                                                                                             01-Lak-29, 53-20.1/20.4, 0.0/2.9                               tutes a majority of the work: C-8, C-12.
                                                                                                                             Bids Opening in Sacramento 9/28/2011                           710 Working Days * 4% UDBE Requirement * Cost per set:
                                                                                                                             Estimate: $5,300,000                                           Bidders: $E-ad, Non-bidders: $E-ad
~ Added since the last issue ~                                 Subs/Suppliers: Opt In | 4 prime contractors looking for
                                                               help | Primes: Advertise for help | See 12 opt-in records
                                                                                                                             In Lake County On Route 29, From 0.2 Mile South Of Route
                                                                                                                             53 To 0.1 Mile North Of Route 53; On Route 53, From Route
                                                                                                                                                                                            Subs/Suppliers: Opt In | 0 prime contractors looking for
                                                                                                                                                                                            help | Primes: Advertise for help | See 21 opt-in records
                                                                                                                             29 To 0.1 Mile South Of 40th Avenue                            See Non-Bidding Planholders | See Bidding Planholders
01-474804 Realign Roadway, Place Hma Over Ab And               01-475204 Place Hma Over Cl2 Ab And Replace Csp               The Contractor must have either a Class A license or one of
Install Drainage Systems.                                      Culverts.                                                     the following Class C licenses: C-12.                          04-049074 Replace Timber Fenders Piers 2 & 3 , Pile,
01-Men-1-38.5/38.9                                             01-Hum-254-22.3,40.1                                          90 Working Days * 6% UDBE Requirement * Cost per set:          And Ring Beams
Bids Opening in Sacramento 9/28/2011                           Bids Opening in Sacramento 9/21/2011                          Bidders: $E-ad, Non-bidders: $E-ad                             04-CC,Sol-80-13.9/14.2; 0.0/0.5
Estimate: $1,280,000                                           Estimate: $620,000                                            Subs/Suppliers: Opt In | 5 prime contractors looking for       Bids Opening in Sacramento 9/27/2011
In Mendocino County Near Elk From 1.7 Miles To 1.4 Miles       In Humboldt County Near Redcrest At 1.7 Miles North Of        help | Primes: Advertise for help | See 23 opt-in records      Estimate: $16,346,947
South Of Navarro River Bridge                                  South Fork Eel River Bridge 04-0010 And At 2.9 Miles                                                                         In Contra Costa And Solano Counties At The Carquinez
The Contractor must have either a Class A license or one of    South Of Bear Creek Bridge 04-0012                            01-480504 Construct Roundabout With Plain Jointed              Bridges
the following Class C licenses: C-12.                          The Contractor must have either a Class A license or one of   Concrete Pavement And Hma                                      The Contractor must have either a Class A license or a
55 Working Days * 7% UDBE Requirement * Cost per set:          the following Class C licenses: C-12.                         01-Lak-20-11.9/12.4                                            combination of Class C licenses which constitutes a major-
Bidders: $E-ad, Non-bidders: $E-ad                             45 Working Days * 8% UDBE Requirement * Cost per set:         Bids Opening in Sacramento 10/4/2011                           ity of the work.
                                                               Bidders: $E-ad, Non-bidders: $E-ad                            Estimate: $4,290,000                                           200 Working Days * DVBE participation incentive up to
                                                               Subs/Suppliers: Opt In | 4 prime contractors looking for      In Lake County Near Nice From 0.3 Mile West To 0.2 Mile        $250,000 * Cost per set: Bidders: $E-ad, Non-bidders: $E-
                                                               help | Primes: Advertise for help | See 8 opt-in records      East Of Lucerne Cutoff                                         ad
                                                                                                                             The Contractor must have either a Class A license or one of    Subs/Suppliers: Opt In | 7 prime contractors looking for
                                                                                                                             the following Class C licenses: C-12.                          help | Primes: Advertise for help | See 16 opt-in records
                                                                                                                             105 Working Days * 6% UDBE Requirement * Cost per set:
                                                                                                                             Bidders: $E-ad, Non-bidders: $E-ad                             04-1A6824 Roadway Rehabilitation, Crack And Seat
                                                               Most ads only $35 and include:                                Subs/Suppliers: Opt In | 1 prime contractor looking for help   And Overlay Concrete Pavement
                                                                Published in both the North State edition                    | Primes: Advertise for help | See 12 opt-in records           04-Ala-880-28.2/29.9
                                                                        and the So-Cal edition                                                                                              Bids Opening in Sacramento 10/20/2011
                                                                                                                             02-2C9504 Replace Culverts, Const Headwalls, Install           Estimate: $14,510,000
                                                                     Advertisements published daily                          Culvert Liners And Rsp.                                        In Alameda County In Oakland From 0.5 Mile North Of The
                                                                 Tear sheet supplied (printed copy of ad)                    02-Sis-96-R0.0/R12.0                                           High Street Separation Overhead To 0.5 Mile South Of The
                                                                             by first-class mail                             Bids Opening in Sacramento 10/4/2011                           Fifth Avenue Overhead
                                                                                                                             Estimate: $1,900,000                                           The Contractor must have either a Class A license or any
                                                              Printed affidavit provided (with wet signature)                In Siskiyou County From Humboldt County Line To Ti Creek       combination of the following Class C licenses which consti-
                                                                             by first-class mail                             Bridge                                                         tutes a majority of the work: C-8, C-12.
                                                                                                                             The Contractor must have either a Class A license or any       375 Working Days * 6% UDBE Requirement * Cost per set:
                                                                             Net 30 days to pay
                                                                                                                             combination of the following Class C licenses which consti-    Bidders: $E-ad, Non-bidders: $E-ad
                                                                   Advertisements published online at                        tutes a majority of the work: C-12, C-42.                      Subs/Suppliers: Opt In | 1 prime contractor looking for help
                                                                       www.TheDailyReporter.net                              65 Working Days * 6% UDBE Requirement * Cost per set:          | Primes: Advertise for help | See 24 opt-in records
                                                                                                                             Bidders: $E-ad, Non-bidders: $E-ad
         For companies that                                            Ad emailed directly to every                          Subs/Suppliers: Opt In | 4 prime contractors looking for       04-264044 Construct Bridge, Retaining Walls, Ramps,
          have not placed a                                    state-certified DVBE and SBE in California!                   help | Primes: Advertise for help | See 10 opt-in records      Sewer And Water Lines.
                                                                                                                                                                                            04-Son-101-7.3/8.3
     DVBE/MBE/SBE/WBE/UDBE                                                                                                   03-0A5804                                                      Bids Opening in Sacramento 10/5/2011
        advertisement with us                                 No one gives you more for this price!                          Cold Plane Ac, Excavate Roadway And Place Hma And              Estimate: $10,700,000
                                                                                                                             Reinforced Pccp.                                               In Sonoma County In Petaluma On Route 101 From 0.4
        in the past 6 months:                                       In fact, no one gives you                                03-Yub-20, 70-0.8/R2.0, 14.4/15.0                              Km South To 0.7 Km North Of East Washington Street
           Run an ad at the                                          this much at any price!                                 Bids Opening in Sacramento 10/26/2011                          Overcrossing
                                                                                                                             Estimate: $32,000,000                                          The Contractor must have either a Class A license or a
      regular low price, and get                                                                                             In Yuba County In Marysville On Route 20 From F Street To      combination of Class C licenses which constitutes a major-
   a second ad published for free!                             Convenient online form                                        Buchanan Street And On Route 70 From 6th Street To 0.2         ity of the work.
                                                                                                                             Mile South Of Binney Junction Underpass                                                            Continued on next page


                 The
 Page 58         Daily e-Reporter                       September 13, 2011              www.TheDailyReporter.net                                                                                           ➤                              Page 59
                                                                                                                             combination of Class C licenses which constitutes a major-     | Primes: Advertise for help | See 4 opt-in records
                                                                                                                             ity of the work.                                               See Non-Bidding Planholders | See Bidding Planholders
                                                                                                                             630 Working Days * DVBE participation incentive up to
                                                                                                                             $250,000 * Cost per set: Bidders: $E-ad, Non-bidders: $E-      08-0P1604 Treat Bridge Decks With Methacrylate And
                                                                                                                             ad                                                             Replace Joint Seals.
~ Added since the last issue ~                                795 Working Days * DVBE participation incentive up to
                                                              $250,000 * Cost per set: Bidders: $E-ad, Non-bidders: $E-
                                                                                                                             Subs/Suppliers: Opt In | 0 prime contractors looking for       08-SBd-10,215-9.1/R36.9,4.0
                                                                                                                             help | Primes: Advertise for help | See 27 opt-in records      Bids Opening in Sacramento 10/6/2011
Continued from last page                                      ad                                                                                                                            Estimate: $726,000
500 Working Days * 8% UDBE Requirement * Cost per set:        Subs/Suppliers: Opt In | 1 prime contractor looking for help   06-0M4004 Construct New Office Building.                       In San Bernardino County East Of Ontario At Various Loca-
Bidders: $E-ad, Non-bidders: $E-ad                            | Primes: Advertise for help | See 36 opt-in records           06-Ker-5703-                                                   tions From Milliken Avenue Overcrossing To Wilson Creek
Subs/Suppliers: Opt In | 2 prime contractors looking for                                                                     Bids Opening in Sacramento 10/4/2011                           Bridge And On Route 215 At Junction 10/215
help | Primes: Advertise for help | See 32 opt-in records     04-3S6204 Place Anchored Wire Mesh System And                  Estimate: $500,000                                             The Contractor must have either a Class A license or any
                                                              Erosion Control.                                               In Kern County At Bodfish At The Bodfish Maintenance Sta-      combination of the following Class C licenses which consti-
04-2708U4                                                     04-SCl-9-1.6/5.3                                               tion At 3115 Kern River Canyon Road                            tutes a majority of the work: C-8, C-32.
Replacement Planting                                          Bids Opening in Sacramento 9/20/2011                           The Contractor must have either a Class A license or Class     80 Working Days * 10% UDBE Requirement * Cost per set:
04-SM-92,280-6.9/8.0,10.4/11.2                                Estimate: $380,000                                             B license or a combination of Class C licenses which con-      Bidders: $E-ad, Non-bidders: $E-ad
Bids Opening in Sacramento 11/2/2011                          In Santa Clara County Near Saratoga At Various Locations       stitutes a majority of the work.                               Subs/Suppliers: Opt In | 1 prime contractor looking for help
Estimate: $1,540,000                                          From 1.6 Miles North Of Route 35 To 0.4 Mile South Of          125 Working Days * 5% DVBE Requirement * Cost per set:         | Primes: Advertise for help | See 5 opt-in records
In San Mateo County Near San Mateo On Route 92 From           Pierce Road                                                    Bidders: $E-ad, Non-bidders: $E-ad
0.4 Mile West Of Route 280 Separation To Ralston Avenue       The Contractor must have either a Class A license or any       Subs/Suppliers: Opt In | 2 prime contractors looking for       10-340424 Realign Highway By Grading And Paving
And On Route 280 From 0.4 Mile South Of Route 92 Sepa-        combination of the following Class C licenses which consti-    help | Primes: Advertise for help | See 8 opt-in records       With Hma And Construct Bridge.
ration To 0.4 Mile North Of Route 92 Separation               tutes a majority of the work: C-12, C-27.                                                                                     10-Tuo-108-R4.0/R6.0
The Contractor must have either a Class A license or one of   90 Working Days * 5% DVBE Requirement * Cost per set:          07-215914 Widen And Realign Freeway And Recon-                 Bids Opening in Sacramento 10/4/2011
the following Class C licenses: C-27.                         Bidders: $E-ad, Non-bidders: $E-ad                             struct Overcrossing Structure.                                 Estimate: $22,800,000
875 Working Days * 6% UDBE Requirement * Cost per set:        Subs/Suppliers: Opt In | 0 prime contractors looking for       07-LA-5-1.2/2.1                                                In Tuolumne County Near Sonora From 0.3 Mile West Of
Bidders: $E-ad, Non-bidders: $E-ad                            help | Primes: Advertise for help | See 11 opt-in records      Bids Opening in Sacramento 10/27/2011                          Peaceful Oak Road To Via Este Road
Subs/Suppliers: Opt In | 6 prime contractors looking for                                                                     Estimate: $45,000,000                                          The Contractor must have either a Class A license or a
help | Primes: Advertise for help | See 22 opt-in records     04-4A07U4                                                      In Los Angeles County In Santa Fe Springs From 0.3 Mile        combination of Class C licenses which constitutes a major-
                                                              Const Truck Climbing Lane, Ret. Walls, And Rehab               South Of North Fork Coyote Creek Bridge To 0.3 Mile North      ity of the work.
04-292274 Construct Bikeway                                   Traveled Way.                                                  Of Marquardt Avenue And At Norwalk Hub And Los Ange-           350 Working Days * DVBE participation incentive up to
04-Ala-80-1.7/2.5                                             04-Ala-580-R4.7/R8.2                                           les Regional Transportation Management Center                  $250,000 * Cost per set: Bidders: $E-ad, Non-bidders: $E-
Bids Opening in Sacramento 10/11/2011                         Bids Opening in Sacramento 9/27/2011                           The Contractor must have either a Class A license or a         ad
Estimate: $2,640,000                                          Estimate: $57,000,000                                          combination of Class C licenses which constitutes a major-     Subs/Suppliers: Opt In | 2 prime contractors looking for
In Alameda County In Oakland From 0.3 Mile West To 0.5        In Alameda County In And Near Livermore From 1.0 Mile          ity of the work.                                               help | Primes: Advertise for help | See 32 opt-in records
Mile East Of The San Francisco-oakland Bay Bridge Toll        East Of North Flynn Road To Greenville Road Undercross-        770 Working Days * DVBE participation incentive up to
Plaza                                                         ing                                                            $250,000 * Cost per set: Bidders: $E-ad, Non-bidders: $E-      11-2T0974 Install Planting, Erosion Control And Auto-
The Contractor must have either a Class A license or a        The Contractor must have either a Class A license or any       ad                                                             matic Irrigation Systems.
combination of Class C licenses which constitutes a major-    combination of the following Class C licenses which consti-    Subs/Suppliers: Opt In | 0 prime contractors looking for       11-SD-15, 163-M11.2/M14.5,R10.8/R11.1
ity of the work.                                              tutes a majority of the work: C-12, C-8.                       help | Primes: Advertise for help | See 26 opt-in records      Bids Opening in Sacramento 10/13/2011
1000 Working Days * 3% UDBE Requirement * Cost per            600 Working Days * 4% UDBE Requirement * Cost per set:                                                                        Estimate: $2,660,000
set: Bidders: $E-ad, Non-bidders: $E-ad                       Bidders: $E-ad, Non-bidders: $E-ad                             08-0N7104 Construct Wellhead Shed Building And Up-             In San Diego County In San Diego On Route 15 From 0.3
Subs/Suppliers: Opt In | 0 prime contractors looking for      Subs/Suppliers: Opt In | 14 prime contractors looking for      grade Drinking Water System.                                   Mile South Of H Avenue Overcrossing To 0.2 Mile North
help | Primes: Advertise for help | See 12 opt-in records     help | Primes: Advertise for help | See 70 opt-in records      08-Riv-5755                                                    Of Pomerado Road Overcrossing And On Route 163 From
                                                                                                                             Bids Opening in Sacramento 10/6/2011                           Kearny Villa Road Overcrossing To Route 163/15 Separa-
04-298304 Widen I-880, One Lane In Each Direction             04-4A3304 Construct Auxiliary Lanes & Extend Exist.            Estimate: $420,000                                             tion
04-SCl-880-4.1/8.7                                            Hov Lanes In Both Direction.                                   In Riverside County In Desert Center At The Desert Center      The Contractor must have either a Class A license or one of
Bids Opening in Sacramento 10/25/2011                         04-SCl-101-48.7/52.0                                           Maintenance Station                                            the following Class C licenses: C-27.
Estimate: $47,000,000                                         Bids Opening in Sacramento 11/1/2011                           The Contractor must have either a Class A license or Class     950 Working Days * 3% DVBE Requirement * Cost per set:
In Santa Clara County In San Jose And Milpitas From 0.1       Estimate: $54,000,000                                          B license or a combination of Class C licenses which con-      Bidders: $E-ad, Non-bidders: $E-ad
Mile North Of Route 101 To 0.3 Mile North Of Route 237        In Santa Clara County In Mountain View And Palo Alto           stitutes a majority of the work.                               Subs/Suppliers: Opt In | 2 prime contractors looking for
The Contractor must have either a Class A license or a        From 0.1 Mile North Of Shoreline Boulevard Overcrossing        122 Working Days * 5% DVBE Requirement * Cost per set:         help | Primes: Advertise for help | See 9 opt-in records
combination of Class C licenses which constitutes a major-    To Oregon Expressway Overcrossing                              Bidders: $E-ad, Non-bidders: $E-ad
ity of the work.                                              The Contractor must have either a Class A license or a         Subs/Suppliers: Opt In | 1 prime contractor looking for help

                 The
 Page 60         Daily e-Reporter                       September 13, 2011             www.TheDailyReporter.net                                                                                            ➤                              Page 61
                                                                                                                            the work. 95 Working Days. 3% UDBE Requirement.                In Humboldt County Near Redcrest At 1.7 Miles North Of
                                                                                                                            Bidding Plan Holders List                                      South Fork Eel River Bridge 04-0010 And At 2.9 Miles
                                                                                                                            Contract Plans and Special Provisions                          South Of Bear Creek Bridge 04-0012. The Contractor must
                                                                                                                                                                                           have either a Class A license or one of the following Class
                                                                                                                            03-0F1104                                                      C licenses: C-12. 45 Working Days. 8% UDBE Require-
NEW BID DATE                                                  Estimate: $2,480,000                                          Expand Park And Ride, Earthwork, Paving, Highway               ment.
04-2285E4                                                     In San Diego County In San Diego On Route 15 From             Planting, Electrical                                           Bidding Plan Holders List
Freeway Widening From 4 Lanes To 8 Lanes And Re-              0.5 Mile North Of Mira Mesa Boulevard Undercrossing To        03-Sut-99-27.7                                                 Contract Plans and Special Provisions
construct Interchange 04-CC-4-R26.6/R27.5                     Route 56/15 Separation And On Route 56 At 56/15 Separa-       Bids Opening in Sacramento 9/20/2011
Bids Opening in Sacramento 9/14/2011                          tion. The Contractor must have either a Class A license or    Estimate: $670,000                                             11-2E0064
Estimate: $51,000,000                                         one of the following Class C licenses: C-27. 950 Working      In Sutter County Near Yuba City At A Park And Ride Facility    Mitigation Planting, Irrigation And Erosion Control.
In Contra Costa County In Antioch From 0.3 Mile West Of       Days. 3% DVBE Requirement.                                    At Bogue Road. The Contractor must have either a Class         11-SD-56-3.5
Contra Loma Boulevard Undercrossing To 0.2 Mile East Of       Bidding Plan Holders List                                     A license or one of the following Class C licenses: C-12. 45   Bids Opening in Irvine 9/22/2011
G Street Overcrossing. 720 Working Days. DVBE partici-        Contract Plans and Special Provisions                         Working Days.                                                  Estimate: $1,970,000
pation incentive up to $250,000.                                                                                            Bidding Plan Holders List                                      In San Diego County In San Diego At 0.2 Mile Southeast
Bidding Plan Holders List                                     11-403304                                                     Contract Plans and Special Provisions                          Of Camino Santa Fe Overcrossing. The Contractor must
Contract Plans and Special Provisions                         Clean Bridge Deck And Treat With Polyester Concrete                                                                          have either a Class A license or one of the following Class
                                                              And Methacrylate.                                             05-0M14V4                                                      C licenses: C-27. 660 Working Days. 3% DVBE Require-
04-2642A4                                                     11-SD-5-R22.3                                                 Perform Highway Planting And Install Irrigation System         ment.
Establish Existing Highway Planting And Irrigation            Bids Opening in Irvine 9/15/2011                              05-SB-101-26.5/27.1                                            Bidding Plan Holders List
Systems                                                       Estimate: $520,000                                            Bids Opening in Sacramento 9/20/2011                           Contract Plans and Special Provisions
04-SM-101-13.5/17.7                                           In San Diego County In San Diego At Clairemont Drive          Estimate: $770,000
Bids Opening in Sacramento 9/14/2011                          Overcrossing. The Contractor must have either a Class         In Santa Barbara County In Goleta From 0.3 Mile South To       NEW BID DATE
Estimate: $130,000                                            A license or one of the following Class C licenses: C-8. 65   0.3 Mile North Of Cathedral Oaks Road Overcrossing. The        This project has a mandatory pre-bid meeting
In San Mateo County In San Mateo And Burlingame On            Working Days. 5% DVBE Requirement.                            Contractor must have either a Class A license or one of the    12-0F0404
Route 101 From 0.2 Mile South Of Millbrae Avenue Over-        Bidding Plan Holders List                                     following Class C licenses: C-27. 860 Working Days. 5%         Widen Nb Route 57 And Bridges Between Katella Ave
crossing In Millbrae To 3rd Avenue Overcrossing In San        Contract Plans and Special Provisions                         DVBE Requirement.                                              And Lincoln Ave. 12-Ora-57-12.2/15.2
Mateo. The Contractor must have either a Class A license                                                                    Bidding Plan Holders List                                      Bids Opening in Irvine 9/22/2011
or one of the following Class C licenses: C-27. 500 Working   11-297804                                                     Contract Plans and Special Provisions                          This project has a mandatory pre-bid meeting
Days. DVBE participation incentive up to $250,000.            Widen Intersection, Place HMA And Install Signal And                                                                         Estimate: $24,900,000
Bidding Plan Holders List                                     Lighting.                                                     04-3S6204                                                      In Orange County In Anaheim From 0.3 Mile South Of Ka-
Contract Plans and Special Provisions                         11-SD-76-28.8/29.1                                            Place Anchored Wire Mesh System And Erosion Con-               tella Avenue Undercrossing To 0.3 Mile North Of Lincoln
                                                              Bids Opening in Irvine 9/15/2011                              trol.   04-SCl-9-1.6/5.3                                       Avenue Overcrossing. The Contractor must have either a
07-253504                                                     Estimate: $690,000                                            Bids Opening in Sacramento 9/20/2011                           Class A license or any combination of the following Class
Replace Thrie Beam And Type 50 Barrier With Type 60           In San Diego County Near Pauma Valley From 0.2 Mile           Estimate: $380,000                                             C licenses which constitutes a majority of the work: C-8,
Concrete Barrier.                                             West Of To 0.1 Mile East Of Pauma Reservation Road.           In Santa Clara County Near Saratoga At Various Locations       C-12. 520 Working Days. DVBE participation incentive up
07-LA-5-6.8/11.6                                              The Contractor must have either a Class A license or any      From 1.5 Miles North Of Route 35 To 0.4 Mile South Of          to $250,000.
Bids Opening in Irvine 9/15/2011                              combination of the following Class C licenses which consti-   Pierce Road. The Contractor must have either a Class           Bidding Plan Holders List
Estimate: $9,300,000                                          tutes a majority of the work: C-10, C-12, C-32. 90 Working    A license or any combination of the following Class C li-      Contract Plans and Special Provisions
In Los Angeles County In Downey And City Of Commerce          Days.                                                         censes which constitutes a majority of the work: C-12,
From Route 5/605 Separation To Washington Boulevard           Bidding Plan Holders List                                     C-27. 90 Working Days. DVBE participation incentive up         07-260104
Undercrossing. The Contractor must have either a Class        Contract Plans and Special Provisions                         to $250,000.                                                   Replace Bridge Railing And Crash Cushion.
A license or any combination of the following Class C li-                                                                   Bidding Plan Holders List                                      07-LA-91, 710-R11.7, 13.0
censes which constitutes a majority of the work: C-8, C-12.   02-2E2004                                                     Contract Plans and Special Provisions                          Bids Opening in Irvine 9/22/2011
240 Working Days. 7% UDBE Requirement.                        Construct Retaining Wall, Place HMA Over Cl2 Ab, And                                                                         Estimate: $1,270,000
Bidding Plan Holders List                                     Install Culvert.                                              01-475204                                                      In Replace Bridge Railing.
Contract Plans and Special Provisions                         02-Tri-299-19.2/19.6                                          Place HMA Over Cl2 Ab And Replace Csp Culverts.                The Contractor must have either a Class A license or one of
                                                              Bids Opening in Sacramento 8/16/2011                          01-Hum-254-22.3,40.1                                           the following Class C licenses: C-8, C-13, C-32. 95 Work-
11-2T0994                                                     Estimate: $1,240,000                                          Bids Opening in Sacramento 9/21/2011                           ing Days.
Install Highway Planting And Automatic Irrigation Sys-        In Trinity County About 8 Miles East Of Burnt Ranch From      Estimate: $620,000                                             Bidding Plan Holders List
tems.                                                         0.3 Mile West To 0.2 Mile East Of Swede Creek Road. The                                                                      Contract Plans and Special Provisions
11-SD-15, 56-M16.4/M19.5, 9.0                                 Contractor must have either a Class A license or a combi-              The Daily Reporter has been serving
Bids Opening in Irvine 9/15/2011                              nation of Class C licenses which constitutes a majority of             the construction industry since 1994                                                     Continued on next page


                 The
 Page 62         Daily e-Reporter                       September 13, 2011             www.TheDailyReporter.net                                                                                           ➤                             Page 63
                                                                                                                             01-480504                                                     08-0N7104
                                                                                                                             Construct Roundabout With Plain Jointed Concrete              Construct Wellhead Shed Building And Upgrade Drink-
                                                                                                                             Pavement And HMA                                              ing Water System. 08-Riv-5755
                                                                                                                             01-Lak-20-11.9/12.4                                           Bids Opening in Irvine 10/06/2011
                                                                                                                             Bids Opening in Sacramento 10/04/2011                         Estimate: $420,000
Continued from last page                                     Bids Opening in Sacramento 9/27/2011                            Estimate: $4,290,000                                          In Riverside County In Desert Center At The Desert Cen-
12-0E0304                                                    Estimate: $1,230,000                                            In Lake County Near Nice From 0.3 Mile West To 0.2 Mile       ter Maintenance Station. The Contractor must have either
Slab Repl, approach Slab, slope Paving, Grind/groove         In Kern County Near Fort Tejon From 0.2 Mile North To           East Of Lucerne Cutoff. The Contractor must have either       a Class A license or Class B license or a combination of
Conc Pvmt, Hma Pvmt                                          0.9 Mile North Of Fort Tejon Overcrossing. The Contrac-         a Class A license or one of the following Class C licenses:   Class C licenses which constitutes a majority of the work.
12-Ora-5-6.8/ 14.5                                           tor must have either a Class A license or a combination of      C-12. 105 Working Days. 6% UDBE Requirement.                  122 Working Days.
Bids Opening in Irvine 9/22/2011                             Class C licenses which constitutes a majority of the work.      Bidding Plan Holders List
Estimate: $14,400,000                                        330 Working Days                                                Contract Plans and Special Provisions                         08-0N7104
In Orange County In Dana Point, San Juan Capistrano, La-                                                                                                                                   Upgrade Drinking Water System
guna Niguel And Mission Viejo From Route 5/1 Separation      01-474804                                                       02-2C9504                                                     08-Riv-5755
To 0.3 Mile South Of Oso Creek Bridge. The Contractor        Realign Roadway, Place HMA Over Ab And Install                  Replace Culverts, Const Headwalls, Install Culvert Lin-       Bids Opening in Irvine 10/06/2011
must have either a Class A license or one of the following   Drainage Systems.                                               ers And Rsp.                                                  Estimate: $420,000
Class C licenses: C-8. 200 Working Days.                     01-Men-1-38.5/38.9                                              02-Sis-96-R0.0/R12.0                                          In Riverside County In Desert Center At The Desert Cen-
Bidding Plan Holders List                                    Bids Opening in Sacramento 9/28/2011                            Bids Opening in Sacramento 10/04/2011                         ter Maintenance Station. The Contractor must have either
Contract Plans and Special Provisions                        Estimate: $1,280,000                                            Estimate: $1,900,000                                          a Class A license or Class B license or a combination of
                                                             In Mendocino County Near Elk From 1.7 Miles To 1.4 Miles        In Siskiyou County From Humboldt County Line To Ti Creek      Class C licenses which constitutes a majority of the work.
NEW BID DATE                                                 South Of Navarro River Bridge. The Contractor must have         Bridge. The Contractor must have either a Class A license     122 Working Days. DVBE participation incentive up to
04-4A07U4                                                    either a Class A license or one of the following Class C        or any combination of the following Class C licenses which    $250,000.
Construct Truck Climbing Lane, Retainng Walls, And           licenses: C-12. 55 Working Days. 7% UDBE Requirement            constitutes a majority of the work: C-12, C-42. 65 Working
Rehab Traveled Way.                                          Bidding Plan Holders List                                       Days. 6% UDBE Requirement.                                    03-1F7504
04-Ala-580-R4.7/R8.2                                         Contract Plans and Special Provisions                           Bidding Plan Holders List                                     Cold Plane AC, Rhma-g, Rhma-o, Mbgr, Electrical.
Bids Opening in Sacramento 9/27/2011                                                                                         Contract Plans and Special Provisions                         03-Col-20-10.2/23.8
Estimate: $57,000,000                                        01-479204                                                                                                                     Bids Opening in Sacramento 10/11/2011
In Alameda County In And Near Livermore From 1.0 Mile        Replace Ogac, Install In-ground Rumble Strip, Recon-            04-264044                                                     Estimate: $7,000,000
East Of North Flynn Road To Greenville Road Undercross-      struct Mbgr                                                     Construct Bridge, Retaining Walls, Ramps, Sewer And           In Colusa County In And Near Williams From 3.1 Miles
ing. The Contractor must have either a Class A license or    01-Lak-29, 53-20.1/20.4, 0.0/2.9                                Water Lines.                                                  West Of Leesville Road To 0.2 Mile East Of Husted Road.
any combination of the following Class C licenses which      Bids Opening in Sacramento 9/28/2011                            04-Son-101-7.3/8.3                                            The Contractor must have either a Class A license or one
constitutes a majority of the work: C-12, C-8. 600 Working   Estimate: $5,300,000                                            Bids Opening in Sacramento 10/05/2011                         of the following Class C licenses: C-12. 110 Working Days.
Days. 4% UDBE Requirement.                                   In Lake County On Route 29, From 0.2 Mile South Of Route        Estimate: $10,700,000
Bidding Plan Holders List                                    53 To 0.1 Mile North Of Route 53; On Route 53, From Route       In Sonoma County In Petaluma On Route 101 From 0.4            04-292274
Contract Plans and Special Provisions                        29 To 0.1 Mile South Of 40th Avenue. The Contractor must        Km South To 0.7 Km North Of East Washington Street            Construct Bikeway
                                                             have either a Class A license or one of the following Class     Overcrossing. The Contractor must have either a Class A       04-Ala-80-1.7/2.5
04-049074                                                    C licenses: C-12. 90 Working Days.                              license or a combination of Class C licenses which consti-    Bids Opening in Sacramento 10/11/2011
Replace Timber Fenders Piers 2 & 3 , Pile, And Ring          Bidding Plan Holders List                                       tutes a majority of the work. 500 Working Days.               Estimate: $2,640,000
Beams                                                        Contract Plans and Special Provisions                           Bidding Plan Holders List                                     In Alameda County In Oakland From 0.3 Mile West To 0.5
04-CC,Sol-80-13.9/14.2; 0.0/0.5                                                                                              Contract Plans and Special Provisions                         Mile East Of The San Francisco-oakland Bay Bridge Toll
Bids Opening in Sacramento 9/27/2011                         10-340424                                                                                                                     Plaza. The Contractor must have either a Class A license
Estimate: $16,346,947                                        Realign Highway By Grading And Paving With HMA                  08-0P1604                                                     or a combination of Class C licenses which constitutes a
In Contra Costa And Solano Counties At The Carquinez         And Construct Bridge.                                           Treat Bridge Decks With Methacrylate And Replace              majority of the work. 1,000 Working Days.
Bridges. The Contractor must have either a Class A license   10-Tuo-108-R4.0/R6.0                                            Joint Seals.
or a combination of Class C licenses which constitutes a     Bids Opening in Sacramento 10/04/2011                           08-SBd-10,215-9.1/R36.9,4.0                                   06-0F8004
majority of the work. 200 Working Days. DVBE participa-      Estimate: $22,800,000                                           Bids Opening in Irvine 10/06/2011                             Remove Contaminated Material And Place Backfill Ma-
tion incentive up to $250,000.                               In Tuolumne County Near Sonora From 0.3 Mile West Of            Estimate: $726,000                                            terial.
Bidding Plan Holders List                                    Peaceful Oak Road To Via Este Road. The Contractor must         In San Bernardino County East Of Ontario At Various Loca-     06-Tul-198-L5711
Contract Plans and Special Provisions                        have either a Class A license or a combination of Class C li-   tions From Milliken Avenue Overcrossing To Wilson Creek       Bids Opening in Sacramento 10/11/2011
                                                             censes which constitutes a majority of the work. 350 Work-      Bridge And On Route 215 At Junction 10/215. The Con-          Estimate: $480,000
06-0L1804                                                    ing Days. DVBE participation incentive up to $250,000.          tractor must have either a Class A license or any combina-    In Tulare County Near Lemon Cove At The Lemon Cove
Construct Median Barrier And Widen Inside Shoulder.          Bidding Plan Holders List                                       tion of the following Class C licenses which constitutes a    Maintenance Station. The Contractor must have either a
06-Ker-5-5.2/5.9                                             Contract Plans and Special Provisions                           majority of the work: C-8, C-32. 80 Working Days.                                                Continued on next page


                The
 Page 64         Daily e-Reporter                      September 13, 2011             www.TheDailyReporter.net                                                                                           ➤                             Page 65
                                                                                                                            07-277804                                                     Class A license or one of the following Class C licenses:
                                                                                                                            Install Sidewalk And Curb Ramps.                              C-12. 160 Working Days.
                                                                                                                            07-LA-1-18.0/39.3
                                                                                                                            Bids Opening in Irvine 10/13/2011                             03-2F0304
                                                                                                                            Estimate: $300,000                                            Pavement Rehabilitation And Overlay
Continued from last page                                     03-2F5804                                                      In Los Angeles County At Various Locations From Camino        03-Pla-80-5.1/14.5
Class A license or one of the following Class C licenses:    Ac Pavement Cold In-place Recycling, Place Rhma                De Las Colinas To Sunset Boulevard. The Contractor must       Bids Opening in Sacramento10/19/2011
C-12, HAZ. 30 Working Days. DVBE participation incen-        Surfacing, Mbgr       03-Sie-89-0.0/15.1                       have either a Class A license or one of the following Class   Estimate: $7,200,000
tive up to $250,000.                                         Bids Opening in Sacramento 10/12/2011                          C licenses: C-8, C-12, C-10. 90 Working Days.                 In Placer County 1.0 Mile East Of Route 65/80 Separation
                                                             Estimate: $5,340,000                                                                                                         To 0.2 Mile East Of Route 193/80 Separation. The Con-
05-402824                                                    In Sierra County At Sierraville From Nevada County Line To     07-260504                                                     tractor must have either a Class A license or one of the fol-
Perform Highway Planting And Install Irrigation System       The South Junction Route 49. The Contractor must have          Repair Br Cracks & Joints And Place Polyester Con-            lowing Class C licenses: C-12. 100 Working Days.
05-SLO-101-45.3/45.7                                         either a Class A license or any combination of the following   crete Overlay. 07-LA-91, 110, 710-R6.3, 9.9, R11.7, 13.0
Bids Opening in Sacramento 10/11/2011                        Class C licenses which constitutes a majority of the work:     Bids Opening in Irvine 10/13/2011                             04-1A6824
Estimate: $520,000                                           C-12. 120 Working Days.                                        Estimate: $1,440,000                                          Roadway Rehabilitation, Crack And Seat And Overlay
In San Luis Obispo County In Atascadero From 0.5 Mile                                                                       In Los Angeles County In Los Angeles And Long Beach At        Concrete Pavement
North Of Curbaril Avenue To Atascadero Creek Bridge.         03-2F0404                                                      Route 110/91 Separation And Route 91/710 Separation.          04-Ala-880-28.2/29.9
The Contractor must have either a Class A license or one     Grind And Groove Concrete Pavement And Replace                 The Contractor must have either a Class A license or one      Bids Opening in Sacramento 10/19/2011
of the following Class C licenses: C-27. 870 Working Days.   Pcc Slabs                                                      of the following Class C licenses: C-8, C-32, C-61D06. 170    Estimate: $14,510,000
5% DVBE Requirement.                                         03-Sac-80, 244-VAR                                             Working Days.                                                 In Alameda County In Oakland From 0.5 Mile North Of The
                                                             Bids Opening in Sacramento 10/12/2011                                                                                        High Street Separation Overhead To 0.5 Mile South Of The
04-4S6504                                                    Estimate: $6,300,000                                           11-2T0974                                                     Fifth Avenue Overhead. The Contractor must have either a
Construct Soldier Pile Wall, Tieback Wall And Rein-          In Sacramento County In And Near Citrus Heights On             Install Planting, Erosion Control And Automatic Irriga-       Class A license or any combination of the following Class
forced Cidh Piles. 04-Son-101-R52.1/R52.5                    Route 80 Between Madison Avenue Overcrossing And 0.3           tion Systems.                                                 C licenses which constitutes a majority of the work: C-8,
Bids Opening in Sacramento 10/11/2011                        Miles West Of South Roseville Overcrossing And On Route        11-SD-15, 163-M11.2/M14.5,R10.8/R11.1                         C-12. 375 Working Days
Estimate: $1,720,000                                         244 Between Watt Avenue And Auburn Boulevard. The              Bids Opening in Irvine 10/13/2011                             Bidding Plan Holders List
In Sonoma County In Cloverdale From First Street Under-      Contractor must have either a Class A license or one of        Estimate: $2,660,000                                          Contract Plans and Special Provisions
crossing To 1.7 Miles South Of 101/128 Separation. The       the following Class C licenses: C-8, C-12, C-61D06. 120        In San Diego County In San Diego On Route 15 From 0.3
Contractor must have either a Class A license or a combi-    Working Days.                                                  Mile South Of H Avenue Overcrossing To 0.2 Mile North         08-384344
nation of Class C licenses which constitutes a majority of                                                                  Of Pomerado Road Overcrossing And On Route 163 From           Widen Ramps, Install Ramp Metering And Highway
the work. 165 Working Days.                                  10-414824                                                      Kearny Villa Road Overcrossing To Route 163/15 Separa-        Planting
                                                             Highway Planting And Irrigation                                tion. The Contractor must have either a Class A license or    08-SBd-10-9.9/R24.5
                                                             10-Mer-99-24.4/R25.8                                           one of the following Class C licenses: C-27. 950 Working      Bids Opening in Irvine 10/20/2011
                                                             Bids Opening in Sacramento 10/12/2011                          Days. 3% DVBE Requirement                                     Estimate: $8,592,000
                                                             Estimate: $780,000                                                                                                           In San Bernardino County From 0.1 Mile East Of Route 15
                                                             In Merced County In And Near Atwater From 0.7 Mile North       05-0P9704                                                     Separation To 0.3 Mile East Of Route 215 Separation. The
                                                             Of Atwater Overhead To 0.7 Mile South Of Arena Way. The        Place Hot Mix Asphalt On Existing Pavement.                   Contractor must have either a Class A license or a combi-
                                                             Contractor must have either a Class A license or one of the    05-Mon-68-R3.9/10.8                                           nation of Class C licenses which constitutes a majority of
                                                             following Class C licenses: C-27. 910 Working Days. 5%         Bids Opening in Sacramento 10/18/2011                         the work. 500 Working Days. DVBE participation incentive
                                                             DVBE Requirement.                                              Estimate: $3,040,000                                          up to $250,000
                                                                                                                            In Monterey County In And Near Monterey From Route
                                                             10-0S1904                                                      1/68 Separation To Spca Road. The Contractor must have        07-4Y2404
                                                             Remodel Weigh Station Facilities And Ramps.                    either a Class A license or one of the following Class C      Treat Bridge Deck With Methacrylate & Polyester Con-
                                                             10-Mer-5-23.1/24.0                                             licenses: C-12. 65 Working Days.                              crete. 07-LA-110-R1.2/31.0
            What can we do?                                  Bids Opening in Sacramento 10/12/2011
                                                             Estimate: $1,190,000                                           03-2F0204
                                                                                                                                                                                          Bids Opening in Irvine 10/20/2011
                                                                                                                                                                                          Estimate: $1,720,000
  We know some of the projects listed here                   In Merced County Near Santa Nella From 0.5 Mile North Of       Cold Plane And Place Rhma Overlay On Roadway                  In Los Angeles County In Los Angeles, Carson, South Pas-
  don’t have links to the planholders, but we                Mccabe Road Overcrossing To 0.2 Mile North Of Whitworth        03-ED-50-R4.1/R14.2                                           adena And Pasadena At Various Locations From Channel
  can only give you what we can get from Cal-                Road Overcrossing And At Santa Nella Weigh Station. The        Bids Opening in Sacramento 10/18/2011                         Street Overhead To Fremont Avenue Overcrossing. The
  trans. If it’s not here this week we’ll try to             Contractor must have either a Class A license or Class B       Estimate: $9,400,000                                          Contractor must have either a Class A license or one of
                                                             license or a combination of Class C licenses which consti-     In El Dorado County Near El Dorado Hills From 0.3 Mile        the following Class C licenses: C-8, C-32, C-61D06. 100
  get it for you next week. You can always
                                                             tutes a majority of the work. 90 Working Days. 5% UDBE         East Of Bass Lake Road Undercrossing To Missouri Flat         Working Days.
  search the Caltrans website for updates.
                                                             Requirement.                                                   Road Overcrossing. The Contractor must have either a                                              Continued on next page


                The
 Page 66         Daily e-Reporter                      September 13, 2011             www.TheDailyReporter.net                                                                                           ➤                               Page 67
                                                                                                                            We work hard
Continued from last page                                      Bids Opening in Sacramento 11/01/2011
                                                              Estimate: $54,000,000
04-298304                                                     In Santa Clara County In Mountain View And Palo Alto
Widen I-880, One Lane In Each Direction                       From 0.1 Mile North Of Shoreline Boulevard Overcross-
04-SCl-880-4.1/8.7                                            ing To Oregon Expressway Overcrossing. The Contractor



                                                                                                                            to find jobs for
Bids Opening in Sacramento 10/25/2011                         must have either a Class A license or any combination of
Estimate: $47,000,000                                         the following Class C licenses which constitutes a majority
In Santa Clara County In San Jose And Milpitas From 0.1       of the work: C-12, C-8. 630 Working Days. DVBE participa-
Mile North Of Route 101 To 0.3 Mile North Of Route 237        tion incentive up to $250,000.
The Contractor must have either a Class A license or a


                                                                                                                            you to bid on!
combination of Class C licenses which constitutes a ma-       04-2708U4
jority of the work. 795 Working Days. DVBE participation      Replacement Planting
incentive up to $250,000                                      04-SM-92,280-6.9/8.0,10.4/11.2
Bidding Plan Holders List                                     Bids Opening in Sacramento 11/02/2011
Contract Plans and Special Provisions                         Estimate: $1,540,000
                                                              In San Mateo County Near San Mateo On Route 92 From
03-0A5804                                                     0.4 Mile West Of Route 280 Separation To Ralston Ave-             Project Leads,
Cold Plane AC, Excavate Roadway And Place HMA And             nue And On Route 280 From 0.4 Mile South Of Route 92
Reinforced Pccp.                                              Separation To 0.4 Mile North Of Route 92 Separation. The          Requests for Subcontractors and
03-Yub-20, 70-0.8/R2.0, 14.4/15.0                             Contractor must have either a Class A license or one of the
Bids Opening in Sacramento 10/26/2011                         following Class C licenses: C-27. 875 Working Days. 6%            Invitations to Bid updated daily at
Estimate: $32,000,000                                         UDBE Requirement.
In Yuba County In Marysville On Route 20 From F Street To     Bidding Plan Holders List                                         www.TheDailyReporter.net
Buchanan Street And On Route 70 From 6th Street To 0.2        Contract Plans and Special Provisions
Mile South Of Binney Junction Underpass. The Contractor                                                                         Click Here to visit the web site
must have either a Class A license or any combination of      11-259804
the following Class C licenses which constitutes a majority   Replace Nordahl Bridge And Widen Off-ramp.
of the work: C-8, C-12. 710 Working Days.                     11-SD-78-15.3/15.7
                                                              Bids Opening in Irvine 11/03/2011
07-215914                                                     Estimate: $10,000,000
Widen And Realign Freeway And Reconstruct Over-               In San Diego County In Escondido And San Marcos From
crossing Structure.                                           0.2 Mile West To 0.2 Mile East Of Nordahl Road Overcross-
07-LA-5-1.2/2.1                                               ing. The Contractor must have either a Class A license or
Bids Opening in Irvine 10/27/2011                             one of the following Class C licenses: C-8. 630 Working
Estimate: $45,000,000                                         Days. 5% UDBE Requirement.
In Los Angeles County In Santa Fe Springs From 0.3 Mile
South Of North Fork Coyote Creek Bridge To 0.3 Mile North     05-0M7504
Of Marquardt Avenue And At Norwalk Hub And Los Ange-          Place Hot Mix Asphalt On Existing Pavement.
les Regional Transportation Management Center. The            05-SCr-1-r0.0/10.2
Contractor must have either a Class A license or a combi-     Bids Opening in Sacramento 11/08/2011
nation of Class C licenses which constitutes a majority of    Estimate: $15,000,000
the work. 770 Working Days. DVBE participation incentive      In Santa Cruz County In Watsonville And Aptos From Paja-
up to $250,000.                                               ro River Bridge To North Aptos Underpass. The Contractor
                                                              must have either a Class A license or one of the following
04-4A3304                                                     Class C licenses: C-12. 120 Working Days.
Construct Auxiliary Lanes & Extend Exist. HOV Lanes
                                                                The Delivery Manager software will deliver
In Both Direction.
                                                                   this newspaper to you every week!
04-SCl-101-48.7/52.0

                 The
 Page 68         Daily e-Reporter                       September 13, 2011             www.TheDailyReporter.net                                                      ➤   Page 69
Misc Projects Open For Bid                                                                                                        All plans, specifications, and project information can be        Bid #Spec. No. 11-12, C51441
                                                                                                                                  found here                                                       Crafton Hills Reservoir Enlargement, East Branch
~ Added since the last issue ~                                                                                                    100 Working days                                                 Extension - Phase I Improvement
                                                                                                                                  Bid Package available: September 12, 2011.                       Bids: October 20, 2011 at 11:00 AM
Continued from last page                                         of California is not responsible for a prospective bidder’s      For Contract and Bid Information Contact the Bidder’s Ex-        Contractor License Type: Class A license or a combination
                                                                 misunderstanding of the bid solicitation or nonresponsive        change after bid package available date.                         of Class C licenses which constitute a majority of the work.
Bid #03-2F0204                                                   bid due to failure to check these websites for updates or        Bidder’s Exchange                                                Pre-Bid Conference Sep 29, 2011 10:00:00 AM PDT
Cold plane and place RHMA overlay on roadway                     amendments to bid documents, and/or other information            Phone (916) 227-6259                                             Attendance is mandatory
Bids: October 18, 2011 at 2:00 PM                                regarding the bid solicitations. Failure to periodically check   Fax (916) 227-6248                                               Location: Meet THURSDAY, SEPTEMBER 29, 2011 at
Expected Expenditure: $9,400,000.00                              these websites will be at the bidder’s sole risk.                Packet For Bid                                                   10:00 A.M. at the unmarked turnoff to Crafton Hills Reser-
Contractor License Type: Class A license or one of the fol-      The information published and/or responded to on these           More Information                                                 voir and Dam located on the south side of State Highway
lowing Class C licenses: C-12.                                   websites is public information. Confidential questions/is-                                                                        38 (Mill Creek Road) approximately 1/2 mile west of the
Standard Disclaimer: The State of California advises that        sues/concerns should be directed to the contact on the ad.       Bid #12-0K6204                                                   intersection of State Highway 38 and Bryant Street. The
prospective bidders periodically check the websites, includ-     Description: 05-Mon-68-R3.9/10.8 ** Monterey County in           Groove Pavement, Overlay Ramps with OGHMA, and                   meeting site is east of the town of Mentone, San Bernardi-
ing but not limited to Bidsync, and/or other state depart-       and near Monterey.                                               Modify Signals                                                   no County, California.
ment links for modifications to bid documents. The State         All plans, specifications, and project information can be        Bids: October 20, 2011 at 2:00 PM                                To access the meeting site, take Interstate 10 (San Ber-
of California is not responsible for a prospective bidder’s      found here                                                       Expected Expenditure: $1,570,000.00                              nardino Freeway) east from the junction with Interstate
misunderstanding of the bid solicitation or nonresponsive        65 Working days                                                  Contractor License Type: Class A license or a combination        215. Continue east on Interstate 10 for 6.3 miles to the
bid due to failure to check these websites for updates or        CLICK HERE to run your DVBE/SBE/MBE advertisement                of Class C licenses which constitute a majority of the work.     Pearl Avenue off ramp. Turn left (north) at the intersection
amendments to bid documents, and/or other information            in the Daily Reporter and get it in the newspaper, posted        Standard Disclaimer The State of California advises that         onto Orange Street.
regarding the bid solicitations. Failure to periodically check   online, and also emailed to all state-certified DVBE and         prospective bidders periodically check the websites, includ-     Continue on Orange Street for 0.6 mile and turn right at
these websites will be at the bidder’s sole risk.                also SBE firms in California.                                    ing but not limited to Bidsync, and/or other state depart-       E. Lugonia Avenue (State Highway 38). Proceed approxi-
The information published and/or responded to on these           Bid Package available: September 12, 2011.                       ment links for modifications to bid documents. The State         mately 5 miles east, through the town of Mentone and turn
websites is public information. Confidential questions/is-       For Contract and Bid Information Contact the Bidder’s Ex-        of California is not responsible for a prospective bidder’s      right onto the unmarked road which is the turnoff to the
sues/concerns should be directed to the contact on the ad.       change after bid package available date.                         misunderstanding of the bid solicitation or nonresponsive        Crafton Hills Reservoir and Dam. This turnoff is approxi-
Description: 03-ED-50-R4.1/R14.2 ** El Dorado County             Bidder’s Exchange                                                bid due to failure to check these websites for updates or        mately 1/2 mile west of Bryant Street. Park at the meeting
near El Dorado Hills.                                            Phone (916) 227-6259                                             amendments to bid documents, and/or other information            site location along the side of the road.
All plans, specifications, and project information can be        Fax (916) 227-6248                                               regarding the bid solicitations. Failure to periodically check   From this meeting location, interested parties will be es-
found here                                                       Packet For Bid                                                   these websites will be at the bidder’s sole risk.                corted to the project site.
160 Working days                                                 More Information                                                 The information published and/or responded to on these           Standard Disclaimer The State of California advises that
CLICK HERE to run your DVBE/SBE/MBE advertisement
                                                                                                                                  websites is public information. Confidential questions/is-       prospective bidders periodically check the websites, includ-
in the Daily Reporter and get it in the newspaper, posted        Bid #03-2F0304                                                   sues/concerns should be directed to the contact on the ad.       ing but not limited to Bidsync, and/or other state depart-
online, and also emailed to all state-certified DVBE and         Pavement rehabilitation and overlay                              Description: 12-Ora-5-17.1/17.8 *** Orange County in Lake        ment links for modifications to bid documents. The State
also SBE firms in California.                                    Bids: October 19, 2011 at 2:00 PM                                Forest, Laguna Hills, and Mission Viejo from 0.4 mile south      of California is not responsible for a prospective bidder’s
Bid Package available: September 12, 2011.                       Expected Expenditure $7,200,000.00                               of Alicia Parkway Overcrossing to 0.3 mile north of Alicia       misunderstanding of the bid solicitation or nonresponsive
For Contract and Bid Information Contact the Bidder’s Ex-        Contractor License Type: Class A license or one of the fol-      Parkway Overcrossing.                                            bid due to failure to check these websites for updates or
change after bid package available date.                         lowing Class C licenses: C-12.                                   All plans, specifications, and project information can be        amendments to bid documents, and/or other information
Bidder’s Exchange                                                Standard Disclaimer The State of California advises that         found here                                                       regarding the bid solicitations. Failure to periodically check
Phone (916) 227-6259                                             prospective bidders periodically check the websites, includ-     90 Working days                                                  these websites will be at the bidder’s sole risk.
Fax (916) 227-6248                                               ing but not limited to Bidsync, and/or other state depart-       Bid Package available: September 12, 2011.                       The information published and/or responded to on these
Packet For Bid                                                   ment links for modifications to bid documents. The State         Bid Opening: October 20, 2011 - 2:00 p.m.                        websites is public information. Confidential questions/is-
More Information                                                 of California is not responsible for a prospective bidder’s      For Contract and Bid Information Contact the Bidder’s Ex-        sues/concerns should be directed to the contact on the ad.
                                                                 misunderstanding of the bid solicitation or nonresponsive        change after bid package available date.                         Description: The work for this project includes a modern,
Bid #05-0P9704                                                   bid due to failure to check these websites for updates or        Bidder’s Exchange                                                dual-row grout curtain in the dam foundation using stable,
Place hot mix asphalt on existing pavement                       amendments to bid documents, and/or other information            Phone (916) 227-6259                                             high mobility grout, a zoned earthen embankment dam,
Bids: October 18, 2011 at 2:00 PM                                regarding the bid solicitations. Failure to periodically check   Fax (916) 227-6248                                               a large common fill buttressing the dam with an underly-
Expected Expenditure: $3,040,000.00                              these websites will be at the bidder’s sole risk.                Packet For Bid                                                   ing seepage collection system, imported clay and crushed
Contractor License Type: Class A license or one of the fol-      The information published and/or responded to on these           More Information                                                 rock for dam construction, paved roads, vegetation clear-
lowing Class C licenses: C-12.                                   websites is public information. Confidential questions/is-                                                                        ing, reservoir shaping, corrugated metal pipe, fencing, rein-
Standard Disclaimer: The State of California advises that        sues/concerns should be directed to the contact on the ad.                                                                        forced concrete, electrical installation, and seeding.
prospective bidders periodically check the websites, includ-     Description: 03-Pla-80-5.1/14.5 ** Placer County 1.0 mile            The Delivery Manager software will
                                                                                                                                                                                                   Bid documents will be furnished only to prequalified bidders
ing but not limited to Bidsync, and/or other state depart-       east of Route 65/80 separation to 0.2 mile east of Route          deliver this newspaper to you every week
ment links for modifications to bid documents. The State         193/80 separation.                                                                                                                                                     Continued on next page


                  The
 Page 70          Daily e-Reporter                        September 13, 2011               www.TheDailyReporter.net                                                                                                ➤                              Page 71
Misc Projects Open For Bid                                                                                                      specified herein.                                                All bidders for state contracts must meet the minimum
                                                                                                                                8. Perform trenching, back filling, landscape modification       Disabled Veteran Business Enterprise (DVBE) participa-
Continued from last page                                      qualified bidders, who attended the Mandatory Job Walk            and restoring, asphalt pavement patching on site in accor-       tion requirement of 3% of the awarded contract to a DVBE
                                                              on August 24, 2011 at 10:00 AM, offering to provide equip-        dance with plans and specifications.                             contractor or supplier. CLICK HERE to run your DVBE ad
Bid Number: 127826                                            ment, materials, labor, licenses, bonds and insurance re-         Questions regarding this IFB should be directed as follows:      in the Daily Reporter and get it in the newspaper, posted
Wastewater System Repairs                                     quired to provide power and control to the fence obstruction      Technical Specifications, worksite conditions and contrac-       online and also emailed to all state-certified DVBE firms in
Bids: September 14, 2011 at 2:00 PM                           lights and to the three electrically powered gates at the Na-     tor responsibilities, contact the Military Department PM, Mr.    California.
Bid opening will be September 14, 2011, at 2:00 P.M, at 707   tional Guard facility located at 10616 Superfortress Drive,       Robert Swift at (916) 854-1935.                                  Description: Contractor agrees to provide all personnel, la-
3rd Street, West Sacramento, CA.                              Sacramento, California in accordance with the terms, con-         Contract administration, contractor qualifications and rules     bor, tools, equipment, materials, permits and licenses nec-
Expected Expenditure: $450,000.00                             ditions, and requirements of this Invitation for Bid (IFB).       of bidding, contact the Contracting Officer, Chief Warrant       essary to provide Generator Maintenance at the CHP Otay
License required to bid project: A.                           THERE IS A 10% DISABLED VETERAN BUSINESS EN-                      Officer Allen McCord, at (916) 854-3141.                         Mesa IF.
The term of this project is 182 calendar days.                TERPRISE PARTICIPATION REQUIREMENT FOR THIS                       Invitation To Bid                                                Bid Contact: Corinne Newcomer, ABMA
Pre-Bid Conference August 16, 2011 at 10:00 AM PDT            PROJECT.                                                          More Information                                                 916-375-2135
Attendance is mandatory                                       Contractor must possess an “A” General Engineering Con-                                                                            cnewcomer@chp.ca.gov
Location: Veterans Home, 100 California Dr, Yountville, CA    tractor’s License.                                                Bid Number: PW1102                                               Packet For Bid
Prospective bidders must attend mandatory pre-bid site in-    Prospective bidders must attend the mandatory job walk            Redwood Hall Mechanical Replacement Project                      More Information
spection tour on August 16, 2011 at the Veterans Home         on August 24, 2011, at 10:00 A.M. at the California National      Bids: September 15, 2011 at 3:00 PM
at 100 California Drive, Yountville, Napa County, CA. The     Guard facility located at 10616 Superfortress Drive, Sac-         Expected Expenditure: $1,500,000.00                              PROJECT NUMBER: 08-0K710
inspection tour will begin at 10:00 A.M. in room 210 at the   ramento, California, to be considered responsive to the           Start/Delivery Date: ASAP                                        I-15/I-215 Interchange Improvements, Devore
Members Services Center.                                      bidding requirements of this IFB. Prospective bidders may         Project Duration: 210 calendar days                              Bids: September 15, 2011 at 3:00 PM
The State’s requirements for Disabled Veteran Business        obtain directions to the job walk site by calling Robert Swift,   License Requirements: “B”                                        Expected Expenditure: $250,000,000.00
Enterprise (DVBE) participation will be presented along       (916) 854-1935. Prospective bidders must sign-in prior to         Pre-Bid Meeting Date: 8/09/11 at 10:00 AM                        Pursuant to Public Contract Code §6800 et seq., the Cali-
with other contract requirements. CLICK HERE to run your      the start of the job walk, attend the entire job walk and be      Location: 18226 Halstead St., Room 110A, Northridge, CA          fornia Legislature has authorized the Department of Trans-
DVBE/SBE/MBE advertisement in the Daily Reporter and          present for roll call at the conclusion of the job walk. Bid-     Successfull bidder is required to obtain 3% DVBE participa-      portation (Department) to award 10 design-build contracts
get it in the newspaper, posted online, and also emailed to   ders who do not remain for the entire job walk will be con-       tion, failure to do so will cause the bid to be nonresponsive.   for highway, bridge, or tunnel projects as part of a pilot pro-
all state-certified DVBE and also SBE firms in California.    sidered non-responsive.                                           CLICK HERE to run your DVBE/SBE/MBE advertisement                gram under the new Design-Build Demonstration Program
Drawings and Project Manuals may be ordered for nonre-        Contractor will be allowed 60 working days to complete this       in the Daily Reporter and get it in the newspaper, posted        enacted by Senate Bill 4 (second extraordinary session).
fundable charge of $50.00 for each set payable to Winslow     project.                                                          online, and also emailed to all state-certified DVBE and         The contracts are to be awarded on the basis of the lowest
Reprographics, Inc, 2337 Lexington Street, Sacramento,        Description: The work consists of furnishing all equipment,       also SBE firms in California.                                    responsible bid or best value, as authorized by the Califor-
CA 95815, attention Mr. Steve Fankhauser; telephone (916)     materials, and labor necessary to accomplish the following:       Plans are available to purchase from Reliable Graphics at        nia Transportation Commission. The design-build process
921-9311. Orders shall include physical address to which      1. Furnish and install a new 150-Amperes, 120/208-Volt,           818-908-0222 prior to the job walk. Cost TBD                     for these projects will consist of the following: Request for
documents will be delivered (P.O. Boxes not acceptable),      three Phase, circuit breaker in Armory main switch board          Description: Replacement of mechanical air handlers serv-        Qualifications (RFQ), submittal of a Statement of Qualifica-
contact person at delivery address, telephone number, and     as shown on plans and as specified herein.                        ing the main gymnasium or Matadome and the air handlers          tions (SOQ), evaluation of submittals and pre-qualification
identification if bidding as Prime Contractor. Bidders may    2. Furnish and install new panel boards at east side of the       serving the upper gymnasiums.                                    of Proposers, Request for Proposals (RFP) from the pre-
also view and order the secure plans and specifications on    field near the fuel farm as shown on plans and as specified       Contact Information: Anita Kaiserman                             qualified Proposers, submittal of proposals, evaluation of
the web site: http://www.winslowreprographics.com             herein.                                                           818-677-6568                                                     proposals, selection of Best Value, and award and execu-
Description: Project comprises labor, material and services   3. Furnish and install new pole mounted floodlights as            Email: anita.kaiserman@csun.edu                                  tion of contract. The Department hereby requests State-
necessary for: wastewater system repairs and replacement      shown on plans and as specified herein.                           Packet For Bid                                                   ments of Qualifications (SOQs) from qualified firms Pro-
including patching and replacement of site improvements       4. Remove existing underground ductbank including con-            Bidder’s List                                                    posers interested in submitting proposals for the design
such as landscaping, sidewalks, parking and driveway ar-      duits, power cables from the three power operated gates to        More Information                                                 and construction of the I-15/I-215 Interchange Improve-
eas.                                                          the electrical room at operation center as shown on plans                                                                          ments, Devore (Project) through a design-build contract.
Project Manager is Don Tarnasky at (916) 375-4322.            and as specified herein.                                          Bid Number: 078CP1041                                            The Project, further defined in Appendix A, is intended to
Bid Contact: Eric Waddell                                     5. Remove existing underground ductbank including con-            HVAC Maintenance - Otay Mesa IF                                  eliminate existing lane reductions on I-15, reduce problems
916-376-1768                                                  duits, power cables from the Fence Obstruction lights to the      Bids: September 15, 2011 at 4:00 PM                              caused by weaving trucks, reduce operational deficiencies
Eric.Waddell@dgs.ca.gov                                       electrical room at operation center as shown on plans and         Expected Expenditure: $24,999.00                                 at theI-15 / I-215 interchange as well as the local service
Packet For Bid                                                as specified herein.                                              LICENSE REQUIREMENT: Any local city or county license            interchanges that are adjacent to the freeway-to-freeway
More Information                                              6. Furnish and install new underground ductbank including         A mandatory walk through will be held on August 25,              interchange, including non-standard design features, and
                                                              conduit, Power cables for the existing three power oper-          2011 at 11:00 am. The current contractor is Countrywide          correct arterial highway deficiencies related to portions
Bid Number: A0197                                             ated gate, fence Obstruction lights, single mode fiber cable      Mechanical, with a cost of $380.00 per quarter. Bidders are      of I-15 and I-215 that are adjacent to the Community of
Electrical System Upgrade                                     for telephone and new panel board as shown on plans and           required to examine the work site and specifications at the      Devore. This document specifies the requirements of the
Bids: September 15, 2011 at 2:00 PM                           as specified herein.                                              California Highway Patrol (CHP) Otay Mesa Inspection Fa-         submittal and the evaluation process to be used by the De-
The State of California Military Department will accept       7. Furnish and install new 100-Ampere, 120/208, three             cility, 2335 Enrico Fermi, San Diego, CA 92154, on August
sealed bids until 2:00 p.m. on September 15, 2011 from        phase manual transfer switch as shown on plans and as             25, 2011, promptly at 11:00 a.m.                                                                     Continued on next page


                 The
 Page 72         Daily e-Reporter                      September 13, 2011               www.TheDailyReporter.net                                                                                                 ➤                               Page 73
Misc Projects Open For Bid                                                                                                      identification if bidding as Prime Contractor. Bidders may         Any omissions, ambiguities, or conflicts in or among the
                                                                                                                                also view and order the secure plans and specifications on         contract documents shall be brought to the State’s atten-
Continued from last page                                        quirements of this IFB. Prospective bidders may obtain          the following web site: http://www.winslowreprographics.           tion by submitting written questions directly to John Loftus,
                                                                directions to the job walk site by calling Robert Tarleton,     com. Click on the “Plan Well” link at the top, then the “Go”       Department of Forestry and Fire Protection, 135 Ridgway
mit Proposals when the Department issues a RFP for the          (916) 654-3535. Prospective bidders must sign-in prior to       link under the Public Planroom header at the bottom of the         Ave., Santa Rosa, CA 95401, or John.Loftus@fire.ca.gov
Project.                                                        the start of the job walk, attend the entire job walk and be    page on the left.”                                                 - BY NO LATER THAN 11:00 a.m., September 9, 2011. An-
UDBE Goal: This solicitation is subject to 49 CFR 26. Pro-      present for roll call at the conclusion of the job walk. Bid-   Description: Project comprises labor, material and services        swers will be provided by addendum on BidSync.
posers shall be fully informed of the requirements of the       ders who do not remain for the entire job walk will be con-     necessary for: reconfiguration of Victorville DMV Office in-       Bid Contact:
regulations and the Department’s Disadvantaged Business         sidered non-responsive and will not be allowed to bid on        cluding interior and exterior demolition, site improvements,       John Loftus, Project Manager
Enterprise (DBE) and Underutilized Disadvantaged Busi-          this project.                                                   framing, interior finishes, roofing, mechanical, plumbing,         Department of Forestry and Fire Protection
ness Enterprise (UDBE) programs developed under the             The contractor/bidder must be licensed by the State of Cali-    electrical, fire suppression and alarm, security systems and       135 Ridgway Ave.
regulations. Design-Builders involved in the performance        fornia, Contractors State License Board (CSLB) in compli-       related Work.                                                      Santa Rosa, CA 95401
of work resulting from this RFQ shall take all necessary and    ance with the following to perform services identified in the   Bid Contact: Eric Waddell                                          Phone: (707) 484-4976
reasonable steps to ensure that DBEs have the maximum           Technical Specifications: Possess a “B” General Contrac-        916-376-1768                                                       Fax: (707) 576-2717
opportunity to compete for and perform on this contract.        tor’s License. All listed subcontractors must provide the re-   Eric.Waddell@dgs.ca.gov                                            Email: John.Loftus@fire.ca.gov
CLICK HERE to run your DVBE/SBE/MBE/UDBE adver-                 quired licenses/certificates listed above and in Section 4      Packet For Bid                                                     Packet For Bid
tisement in the Daily Reporter and get it in the newspaper,     (Scope of Work) upon bid opening; failure to comply with        More Information                                                   More Information
posted online, and also emailed to all state-certified DVBE     this requirement may be considered nonresponsive
and also SBE firms in California.                               and may lead to the rejection of your bid.                      Bid Number: 9TSC0034                                               Bid Number: F201106
Description: Caltrans is soliciting Statements of Qualifica-    Questions regarding this IFB should be directed as follows:     Thorn Paving                                                       Construction Management Services Waste Water Plant
tions from qualified firms for the design and construction of   Technical Specifications, worksite conditions and contrac-      Bids: September 19, 2011 at 11:00 AM                               Projects
the I-15/I-215 Interchange Improvements, Devore Project         tor responsibilities, contact the Military Department PM, Mr.   Expected Expenditure: $100,000.00                                  Bids: September 26, 2011 at 2:00 PM
(in San Bernardino County), that may lead to the award of       Robert Tarleton at (916) 854-3535.                              Contractor must have either a California Class A Contrac-          Expected Expenditure: $6,000,000.00
a design-build contract.                                        Contract administration, contractor qualifications and rules    tor’s License or a California Class C-12 Contractor’s Li-          The California Department of Corrections and Rehabilita-
Contact: California Department of Transportation                of bidding, contact the Contracting Officer, Chief Warrant      cense.                                                             tion (CDCR), Project Management Branch is requesting
Division of Procurements and Contracts                          Officer Allen McCord, at (916) 854-3141.                        Pre-Bid Conference September 7, 2011 at 11:00 AM PDT               Statements of Qualifications from firms interested in provid-
1727 30th Street                                                Invitation To Bid                                               Attendance is mandatory                                            ing professional Construction Management services for two
Sacramento, California 95816-7006                               More Information                                                Location: 13298 Briceland-Thorn Road, Whitethorn, CA               major capital outlay projects; one at the California Men’s
Attention: Denetia Smith, Contract Analyst                                                                                      95589                                                              Colony (CMC) located near San Luis Obispo and the other
e-mail: denetia_smith@dot.ca.gov                                Bid Number: 124627                                              The State has established goals for Disabled Veteran Busi-         at Mule Creek State Prison (MCSP) located in Ione. The
Bidding Plan Holders List                                       Victorville Office Reconfiguration Project                      ness Enterprise (DVBE) participating in state contracts. To        projects will range from $4M to $6M+ in construction costs
More Information                                                Bids: September 20, 2011 at 2:00 PM                             be considered responsive, bidders must complete and re-            and involve upgrades to the existing wastewater treatment
                                                                Expected Expenditure: $2,400,000.00                             turn the Bidder Declaration, GSPD-05-105 and the DVBE              facility. At CMC the work consists of construction and com-
Bid Number: A0191                                               License required to bid project: B.                             Declarations, STD. 843, as applicable. Failure to complete         missioning of a new ultraviolet light disinfection system to
National Guard Field Maintenance Shop #34                       Pre-Bid Conference August 9, 2011 at 10:00 AM PDT               and submit all required forms with the bid, that fully docu-       replace the existing chlorination system, a standby genera-
Bids: September 16, 2011 at 2:00 PM                             Attendance is mandatory                                         ment and meet the DVBE program requirement, may cause              tor, an underground ductbank, an electrical building, modi-
The State of California Military Department will accept         Location: 14855 Corta Drive, Victorville. Prospective bid-      the bid to be rejected. This solicitation provides an incen-       fications to the main switchboard, and a new Parshall flume
sealed bids until 2:00 p.m. on September 16, 2011 from          ders must attend mandatory pre-bid site inspection tour         tive for DVBE participation. The California DVBE Program           structure. At MCSP, the work consist of constructing a sec-
qualified bidders, who attended the Mandatory Job Walk on       on AUGUST 9th, at 14855 CORTA DRIVE VICTORVILLE                 Requirements packet includes information about the DVBE            ondary clarifier, a mixed liquor splitter box, a chlorine con-
August 24, 2011 at 10:00 AM, offering to provide equipment,     SAN BERNARDINO COUNTY, CA. Inspection tour will be-             incentive. As an incentive, a non-small business prime             tact basin, a disinfected secondary effluent pump station,
materials, labor, licenses, bonds and insurance required to     gin at 10:00 A.M. The State’s requirements for Disabled         contractor who uses certified small business subcontrac-           a staff facilities building, the motor speed controls for the
replace the latrines, offices, break room, storage and work     Veteran Business Enterprise (DVBE) participation will be        tors for at least 25% of its net bid price is eligible for a bid   return activated sludge (RAS) pumps, chemical feed equip-
bays, upgrade the electrical and mechanical systems, per-       presented along with other contract requirements. CLICK         preference of five percent (5%) of the lowest responsible          ment, power supply, electrical equipment, instrumentation
form interior and exterior concrete repair, painting and site   HERE to run your DVBE ad in the Daily Reporter and get          bid when competing against another non-small business.             and controls, piping and valves, and site work.
improvements at the National Guard Field Maintenance            it in the newspaper, posted online and also emailed to all      CLICK HERE to run your DVBE/SBE/MBE advertisement                  The Construction Management services shall include par-
Shop #34 located in Santa Rosa, California in accordance        state-certified DVBE firms in California.                       in the Daily Reporter and get it in the newspaper, posted          ticipation in the design phase, performing constructability
with the terms, conditions, and requirements of this Invita-    Drawings and Project Manuals may be ordered for nonre-          online, and also emailed to all state-certified DVBE and           reviews of design documents, development and revision of
tion for Bid (IFB). The contracting officer’s representative    fundable charge of $125.00 for each set payable to Winslow      also SBE firms in California.                                      site-specific contract conditions, developing detailed con-
(COR) for this project is Robert Tarleton, (916) 654-3535.      Reprographics, Inc, 2337 Lexington Street, Sacramento,          Description: Contractor to provide grading and paving ser-         struction schedules, and participation in the bid and award
Prospective bidders must attend the mandatory job walk          CA 95815, attention Mr. Steve Fankhauser; telephone (916)       vices at Thorn Forest Fire Station. Grading consists of ex-        process. Construction phase services may include either
on August 24, 2011, at 10:00 A.M. at the California National    921-9311. Orders shall include physical address to which        cavation, filling, and compacting necessary to bring surface       full or part-time onsite representation on behalf of the State
Guard facility located at 1500 Armory Drive, Santa Rosa,        documents will be delivered (P.O. Boxes not acceptable),        of subgrade to cross sections and grades shown on the
California, to be considered responsive to the bidding re-      contact person at delivery address, telephone number, and       plans.                                                                                                  Continued on next page


                 The
 Page 74         Daily e-Reporter                        September 13, 2011              www.TheDailyReporter.net                                                                                                  ➤                              Page 75
Misc Projects Open For Bid                                                                                                        Control Business License and Qualified Applicator Certifi-       at 2:30 p.m.
                                                                                                                                  cate Category B.                                                 All bidders for state contracts must meet the minimum Dis-
Continued from last page                                        Contractor must meet DVBE participation goals of 3% or            A mandatory walk through will be held on September 1,            abled Veteran Business Enterprise (DVBE) participation
                                                                more. CLICK HERE to run your DVBE ad in the Daily Re-             2011 at 2:30 pm. The current contractor is Grounds Keeper,       requirement of 3% of the awarded contract to a DVBE con-
sary documentation, providing specialty inspection servic-      porter and get it in the newspaper, posted online and also        with a cost of $675.00 per month. Bidders are required to        tractor or supplier. CLICK HERE to run your DVBE adver-
es, and participation in claims management and resolution.      emailed to all state-certified DVBE firms in California.          examine the work site and specifications at the California       tisement in the Daily Reporter and get it in the newspaper,
CDCR encourages DVBE and SBE participation. CLICK               For a complete bid packet, please contact Suzee Buhn at           Highway Patrol (CHP) Willow Creek Resident Post, State           posted online, and also emailed to all state-certified DVBE
HERE to run your DVBE/SBE/MBE advertisement in the              (707) 938-6426 or suzee.buhn@sonoma.dds.ca.gov                    Route 96, North of 299, Willow Creek, CA 95573, on Sep-          firms in California.
Daily Reporter and get it in the newspaper, posted online,      Description: Contractor to furnish all materials, labor, parts,   tember 1, 2011, promptly at 2:30 p.m.                            Description: Contractor agrees to provide all personnel, la-
and also emailed to all state-certified DVBE and also SBE       tools, equipment, transportation, and services necessary          All bidders for state contracts must meet the minimum Dis-       bor, tools, equipment, materials, permits and licenses nec-
firms in California.                                            to complete and ready for operation a new functional and          abled Veteran Business Enterprise (DVBE) participation           essary to provide Landscape Maintenance at the CHP Uki-
To be considered for selection, firms must submit State-        code compliant exhaust and flue system. Contractor will re-       requirement of 3% of the awarded contract to a DVBE con-         ah Area Office. This work shall include all equipment, labor,
ments of Qualifications to:                                     move and dispose of the complete flue and exhaust ventila-        tractor or supplier. CLICK HERE to run your DVBE adver-          materials, services, and supplies to sustain and maintain in
   California Department of Corrections and Rehabilitation      tion systems on the four ovens located at the Main Kitchen.       tisement in the Daily Reporter and get it in the newspaper,      an attractive, healthy, and safe condition all flowers, ground
   Project Management Branch                                    The existing systems are comprised of approximately 8 feet        posted online, and also emailed to all state-certified DVBE      covers, lawns, shrubs, trees, and all other plants. It shall
   Attention: Sara Sexton                                       of 14-inch galvanized steel round pipe, 75 feet of 10-inch        firms in California.                                             also include the proper clean-up and off-site disposal of all
   9838 Old Placerville Rd., Suite B                            galvanized steel round pipe, 32 feet of 5-inch galvanized         Description: Contractor agrees to provide all personnel, la-     clippings, debris, prunings, etc., generated in the process.
   Sacramento, CA 95827                                         steel round pipe, plenums, 2 electric duct fans with cords,       bor, tools, equipment, materials, permits and licenses nec-      All work shall be in full compliance with procedures and
Submiittttall Deadlliine: 2:00 p..m. on Friday,, September      galvanized steel transitions, transitions with dampers, take      essary to provide Landscape Maintenance at the CHP Wil-          techniques as described and outlined in the specifications.
26, 2011.                                                       off’s, manifolds, beauty rings, and supports. Contractor is to    low Creek RP. This work shall include all equipment, labor,      Paved surfaces should be kept clean.
Statements of Qualifications are required to meet certain       install a completely new code-compliant exhaust and flue          materials, services, and supplies to sustain and maintain in     Bid Contact: Julian A Munoz, ABMA
specifications as outlined in the Request for Qualifications    systems to replace the systems that are to be removed.            an attractive, healthy, and safe condition all flowers, ground   916-843-3818
(RFQ). You can obtain a copy of the RFQ via the Internet at     Contractor will also provide restraints and supports as           covers, lawns, shrubs, trees, and all other plants. It shall     jumunoz@chp.ca.gov
http://www.dgs.ca.gov/pd/Programs/eprocure.aspx. Enter          needed. Contractor may re-use the existing chimney roof           also include the proper clean-up and off-site disposal of all    Packet For Bid
the contract number RFQ No. F201106 and you will access         caps only. Phase I: The Contractor is to completely demol-        clippings, debris, prunings, etc., generated in the process.     More Information
the RFQ as an attachment to the ad. To obtain a copy of the     ish and dispose of existing flue and vent piping systems          All work shall be in full compliance with procedures and
RFQ via email, you can call (916) 255-2224, or submit your      and all appurtenances on two ovens; install a completely          techniques as described and outlined in the specifications.      Bid Number: 07A3018
request in writing to: FPCMPCMRFQ@cdcr.ca.gov When              new code-compliant flue and venting system and all appur-         Paved surfaces should be kept clean.                             Traffic Control Services
you request a copy of the RFQ, please leave a message,          tenances, utilizing materials as specified, on the ovens to       Bid Contact: Julian A Munoz, ABMA                                Bids: September 27, 2011 at 2:15 PM
which includes your name, firm, mailing address, e-mail ad-     be identified in Phase I; verify that the new system is func-     916-843-3818                                                     Expected Expenditure: $680,000.00
dress, phone number, and RFQ number F201106.                    tioning and complete; and submit a request to the Chief of        jumunoz@chp.ca.gov                                               Contractor shall be properly licensed in accordance with
Description: The California Department of Corrections and       Plant Operations III or his designee for an inspection of the     Packet For Bid                                                   the laws of the State of California and shall possess a Class
Rehabilitation (CDCR) intends to contract with a firm for       new piping system. After the new installation is approved         More Information                                                 31 - Construction Zone Traffic Control Contractor license.
Construction Management Services for two Major Capital          and in operation the Contractor can begin on Phase II.                                                                             Disadvantaged Business Enterprise (DBE) participation
Outlay projects; one at the California Men’s Colony (CMC)       Phase II: The Contractor is to address the remaining two          Bid Number : 078CP1044                                           applies to this IFB. The Caltrans DBE overall goal is 13.5
located near San Luis Obispo and the other at Mule Creek        ovens in the same manner as outlined in Phase I.                  Landscape Maintenance - Ukiah Area Office                        percent (13.5%), of which the Underutilized DBE (UDBE)
State Prison located in Ione.                                   Bid Contact: Suzee Buhn                                           Bids: September 27, 2011 at 4:00 PM                              goal is not less than 7 percent (7%). See Section D, Item
Bid Contact Xavier Contreras                                    707-938-6426                                                      Expected Expenditure: $49,999.00                                 3, in this IFB for requirements. CLICK HERE to run your
916-229-5064                                                    suzee.buhn@sonoma.dds.ca.gov                                      Regardless of postmark or method of delivery, the Depart-        DVBE/SBE/MBE advertisement in the Daily Reporter and
Xavier.Contreras@cdcr.ca.gov                                    Packet For Bid                                                    ment of California Highway Patrol, Facilities Section must       get it in the newspaper, posted online, and also emailed to
Packet For Bid                                                  More Information                                                  receive bid packages no later than September 27, 2011, by        all state-certified DVBE and also SBE firms in California.
More Information                                                                                                                  4:00 p.m.PST.                                                    Description: Contractor agrees to provide to the California
                                                                Bid Number: 078CP1045                                             LICENSE REQUIREMENT: C-27; Maintenance Gardener’s                Department of Transportation (Caltrans) Emergency, On-
Bid Number: SN119201 / 11 PO 2                                  Landscape Maintenance - Willow Creek RP                           Pest Control Business License and Qualified Applicator           Call, As Needed Basis Traffic Control Services. The servic-
Replace Oven Flue & Vent Piping Systems                         Bids: September 27, 2011 at 4:00 PM                               Certificate Category Q or Landscape Maintenance Pest             es shall be performed at various locations in Los Angeles
Bids: September 27, 2011 at 3:00 PM                             Expected Expenditure: $24,999.00                                  Control Business License and Qualified Applicator Certifi-       and Ventura
Estimated Dollar Range: $20,000 to $40,000                      Regardless of postmark or method of delivery, the Depart-         cate Category B.                                                 Counties.
Pre-Bid Conference September 13, 2011 at 10:00 AM PDT           ment of California Highway Patrol, Facilities Section must        A mandatory walk through will be held on September 1,            Bid Contact: Calandra Tillman
Attendance is mandatory                                         receive bid packages no later than September 27, 2011, by         2011 at 2:30 pm. The current contractor is Grounds Keeper,       California Department of Transportation (Caltrans)
Location: Sonoma Developmental Center, Plant Operations         4:00 p.m.PST.                                                     with a cost of $950.00 per month. Bidders are required to        Telephone Number (916) 227-6124
Building, 15000 Arnold Drive, Eldridge, CA 95431. Late ar-      LICENSE REQUIREMENT: C-27; Maintenance Gardener’s                 examine the work site and specifications at the California       Fax Number (916) 227-6138
rivals to the mandatory site inspection will not be admitted!   Pest Control Business License and Qualified Applicator            Highway Patrol (CHP) Ukiah Area Office, 540 South Or-
Contract Term: 30 Working Days                                  Certificate Category Q or Landscape Maintenance Pest              chard Ave, Ukiah, CA 95482, on August 31, 2011, promptly                                              Continued on next page


                 The
 Page 76         Daily e-Reporter                        September 13, 2011               www.TheDailyReporter.net                                                                                                 ➤                              Page 77
Misc Projects Open For Bid                                                                                                          phone (916) 921-9311. Orders shall include physical ad-           Pre-Bid Conference September 20, 2011 at 10:00 AM PDT
                                                                                                                                    dress to which documents will be delivered (P.O. Boxes not        Attendance is mandatory
Continued from last page                                          dredging operations are allowed, an abbreviated timeline          acceptable), contact person at delivery address, telephone        Location: Sonoma Developmental Center, Plant Opera-
                                                                  is necessary. A mandatory prebid conference is scheduled          number, and identification if bidding as Prime Contractor.        tions Building, 15000 Arnold Drive, Eldridge, CA 95431
calandra_tillman@dot.ca.gov                                       at 4:30 PM on Friday, September 16, 2011; prospective             Bidders may also view and order the secure plans and              Description: Contractor will remove and dispose of asbes-
Packet For Bid                                                    bidders are to be assembled at the Batiquitos Lagoon E-1          specifications on this web site.                                  tos insulation of various types and quantities, asbestos
More Information                                                  Least Tern Nest Site off La Costa Avenue Park & Ride (See         Description: Project comprises labor, material and services       containing “popcorn” ceiling material, asbestos containing
                                                                  attached map). BIDDER MUST COME PREPARED TO IN-                   necessary for: asbestos/lead removal, demolition, smoke/          resilient floor tiles, any/all asbestos containing adhesives
Bid Number: 6000000663                                            SPECT AND ASSESS THE ENTIRE JOB. If joint ventures                heat detectors, manual pull stations, chimes, horns, bells,       and binders associated with floor tiles, and any identified
Construction Surveying Services IWL Region III                    wish to bid, at least one participant in the joint venture must   strobes, dome lights, magnetic door hold opens, electri-          lead-based paint located at Sonoma Developmental Cen-
Bids: September 27, 2011 at 2:00 PM                               attend this Pre-bid Conference/Site Inspection.                   cal raceway, wiring, cable, fire alarm panels, panelboards,       ter. Contractor is responsible for furnishing all material,
The California Department of Corrections and Rehabilita-          Location: Mandatory Pre-bid Conference /Site Inspection is        plastering, acoustical ceiling tiling, fire caulking, painting,   labor, parts, tools, transportation, equipment and services
tion (CDCR), Inmate Ward Labor (IWL) program, hereafter           scheduled at 4:30 PM on September 16, 2011 at Batiquitos          and related work.                                                 necessary to complete each job in its entirety.
referred to as the State, is inviting responses to this Invita-   Lagoon E-1 Least Tern Nest Site off La Costa Avenue. La           The State’s Project Director is Diana Tibor at (916) 376-         Bid Contact: Suzee Buhn
tion For Bid (IFB) entitled CONSTRUCTION SURVEYING                Costa Avenue exit from I-5 east to La Costa Park & Ride.          1716.                                                             707-938-6426
SERVICES IWL REGION III.                                          Tern colony entrance is from the Park & Ride.                     Bid Contact Eric Waddell                                          suzee.buhn@sonoma.dds.ca.gov
Description: Contractor shall provide all labor, equipment,       Interested firms may obtain a copy of the solicitation pack-      916-376-1768                                                      Packet For Bid
transportation, licenses and insurance for construction sur-      age by downloading it from the California State Contracts         Eric.Waddell@dgs.ca.gov                                           More Information
veying services for the California Department of Correc-          Register on the Internet or http://www.slc.ca.gov/Misc_           Packet For Bid
tions and Rehabilitation (CDCR), Inmate Ward Labor (IWL)          Pages/Contracting_Opportunities_Home_Page.html or fax             More Information                                                  Bid Number: 6857
Program, Region III Headquarters and Southern California          request to (916) 574 1875 or email abeleda@slc.ca.gov                                                                               Field House Boiler Project
Offices located at twelve (12) work sites. Contractor shall       with Bidlog Number, contact person name, firm name, firms         Bid Number: ITB-PRO-FY12-0035                                     Bids: September 29, 2011 at 2:00 PM
perform, by work assignment, general construction survey-         Federal Employer Identification Number (FEIN), e-mail,            Water Purification System Maintenance, Tank Replace-              Sealed proposals will be received by California State Uni-
ing to establish alignment and elevation controls for the         mailing address and phone number.                                 ment and Service                                                  versity, Stanislaus at MSR290 for the Field House Boiler
construction of single story buildings and related infrastruc-    Bid Contact: Annabell Abeleda                                     Bids: September 29, 2011 at 3:00 PM                               project located at California State University, Stanislaus,
ture systems including, but not limited to, site preparation,     Contract Officer                                                  Pre-Bid Conference September 7, 2011 at 3:00 PM PDT               Turlock California. In general, the work shall consist of re-
building construction, infrastructure (water, sewer, electric,    916-574-1871                                                      Attendance is optional                                            moval of the existing Kewanee hot water boiler, supply and
gas, communication lines) systems, surface drainage sys-          Annabell.Abeleda@slc.ca.gov                                       Location: County of Santa Clara, 2310 North First Street,         install a new high efficiency low emissions hot water boiler.
tems, paved surfaces including sidewalks, roadways and            Packet For Bid                                                    Suite 201, San Jose, CA 95131 OR Dail-In : 1-866-249-             The bid opening shall be held in room MSR260.
parking lots.                                                     More Information                                                  5279 CODE: 559951                                                 Pre-Bid Conference September 15, 2011 at 10:00 AM PDT
Bid Contact: Karen Ronningen, Contract Analyst                                                                                      Description: The County of Santa Clara is requesting bids         Attendance is mandatory
916-255-6163                                                      Bid #124690                                                       from propective contractors for water purification system         Location: CSU Stanislaus, South Dining Hall, One Univer-
karen.ronningen@cdcr.ca.gov                                       Upgrade Fire Alarm System                                         maintenance, tank replacement and service. Work will              sity Circle, Turlock, CA
Packet For Bid                                                    Bids: September 29, 2011 at 2:00 PM                               be performed at various County of Santa Clara locations           Plans and specifications may be seen at Financial Services
More Information                                                  Expected Expenditure: $3,800,000.00                               (Crime Laboratory, Public Health, Renal Care Center, and          Department at the University and local Builders Exchange.
                                                                  License type required is B or C-10.                               Vector Control District) as described in Scope of Work. It        Plans and specifications may be obtained at the mandatory
Solicitation Bid Log 2011-01                                      The term of this project is 485 calendar days.                    is the intent of the County to award a multi-year (3-year)        pre-bid conference telephone after the required refundable
Batiquitos Lagoon Maint. Dredging Project                         Pre-Bid Conference August 2, 2011 at 9:00 AM PDT                  contract, with the option by County to renew for two (2) ad-      deposit of $100.00 has been made. A non-refundable ship-
Bids: September 28, 2011 at 2:00 PM                               Attendance is mandatory                                           ditional years, to a single contractor.                           ping/handling fee of $20.00 per set in a separate check is
The California State Lands Commission is currently solicit-       Location: Sonoma Developmental Center, 15000 Arnold               Bid Contact: Tom Reddie                                           also required if standard delivery mailing is requested by
ing for a Contractor to perform Maintenance Dredging in           Drive, Eldridge                                                   Procurement Contract Specialist                                   the bidder; bidders requesting overnight or two day deliv-
Batiquitos Lagoon Ecological Reserve. The work consists           Prospective bidders must attend mandatory pre-bid site            408-491-7406                                                      ery may be charged a higher fee. Checks shall be made
of furnishing all labor, equipment and materials and per-         inspection tour on August 2, 2011 at Sonoma Develop-              tom.reddie@proc.sccgov.org                                        payable to California State University, Stanislaus. General
forming all operations as required that may be necessary          mental Center, 15000 Arnold Drive, Eldridge, Sonoma               Packet For Bid                                                    Contractors are allowed two (2) sets each; subcontractors,
to provide earthwork and dredging; including excavation,          County. Inspection tour will begin at 9:00 A.M. at Plant          More Information                                                  one (1) set each on plan deposit.
dredging, transporting, beach placement, measuring, fill-         Operations Office located on Wilson Drive. The State’s                                                                              The University requires Disabled Veteran Business En-
ing, fencing and final grading. Must have Class A, General        requirements for Disabled Veteran Business Enterprise             Bid Number: SN119200 / 11 PO 2                                    terprise participation. The successful bidder shall achieve
Engineering Contractor license and minimum of 5 years of          (DVBE) participation will be presented along with other           Annual Asbestos Abatement                                         a minimum three (3) percent DVBE participation goal.
experience in dredging or similar projects required.              contract requirements.                                            Bids: September 29, 2011 at 2:00 PM                               CLICK HERE to run your DVBE advertisement in the Daily
Pre-Bid Conference September 16, 2011 at 4:30 PM PDT              Drawings and Project Manuals may be ordered for non-              Contract Term: November 1, 2011 through June 30, 2012             Reporter and get it in the newspaper, posted online, and
Attendance is mandatory. Mandatory Pre-bid Confer-                refundable charge of $100.00 for each set payable to              Estimated Dollar Range: $40,000 to $60,000
ence/Site Inspection: To meet environmental and rec-              Winslow Reprographics, Inc., 2337 Lexington Street, Sac-          Site inpection is MANDATORY-Please come early as late
reational restrictions and the window of time for which           ramento, CA 95815, attention Mr. Steve Fankhauser; tele-          arrivals will not be admitted.                                                                        Continued on next page


                  The
 Page 78          Daily e-Reporter                         September 13, 2011               www.TheDailyReporter.net                                                                                                 ➤                               Page 79
Misc Projects Open For Bid                                                                                                       Bid Number: C1142007                                           License required: A
                                                                                                                                 Sewer Lift Station Conversion/Replacement McGrath              Engineer’s Estimate: $800,000.00 - $1,500,000.00
Continued from last page                                           916-227-6138                                                  State Beach                                                    Pre-Bid Conference September 13, 2011 at 10:00 AM PDT
                                                                 Bid Contact: Donna Freeman                                      Bids: September 30, 2011 at 2:30 PM                            Attendance is mandatory
also emailed to all state-certified DVBE firms in California.    916-227-6491                                                    Pre-Bid Conference September 14, 2011 at 10:00 AM PDT          Location: A MANDATORY job showing will be held at 10:00
Description: Sealed proposals will be received by California     Donna_Freeman@dot.ca.gov                                        Attendance is optional                                         a.m., Tuesday, September 13, 2011, at MENDOCINO
State University, Stanislaus at MSR290 for the Field House       Packet For Bid                                                  Location: Pre-bid site inspection will be held at 10:00 AM     WOODLANDS STATE PARK, 39350 Little Lake Road,
Boiler project located at California State University, Stan-     More Information                                                on Wednesday, September 14, 2011. Attendance is highly         Mendocino, California 95640. Attendance at the job show-
islaus, Turlock California. In general, the work shall consist                                                                   recommended. Meet at the McGrath State Beach entrance          ing is MANDATORY and will be the only opportunity made
of removal of the existing Kewanee hot water boiler, supply      Bid Number: 6000000709                                          station                                                        available for prospective bidders to view the site with park
and install a new high efficiency low emissions hot water        Construction Testing and Inspection Services                    Construction license type revised to the following: A/C36/     personnel. No Bid will be considered from a Prime Contrac-
boiler. The bid opening shall be held in room MSR260. All        Bids: September 30, 2011 at 11:00 AM                            C42                                                            tor that did not attend the mandatory job showing.
work is to be in accordance with the plans and specifica-        DVBE participation of no less than 3 percent is mandatory.      Certified Small Business Contractors are encouraged to         Participation in Disabled Veteran Business Enterprise Pro-
tions prepared by Geng Liu, Engineer/Project Manager. All        CLICK HERE to run your DVBE advertisement in the Daily          bid on this project. 6% DVBE participation MUST be met.        gram (DVBE): The minimum DVBE participation percent-
technical questions shall be addressed to the Project Man-       Reporter and get it in the newspaper, posted online, and        CLICK HERE to run your DVBE/SBE/MBE advertisement              age goal is 6%. Failure to fulfill the DVBE requirement will
ager only. Questions regarding the bid process and related       also emailed to all state-certified DVBE firms in California.   in the Daily Reporter and get it in the newspaper, posted      render your bid non-responsive. DVBE Incentive: For eval-
bid forms should be addressed to Debbie DaRosa, Buyer            Description: Construction Testing and Inspection Services       online, and also emailed to all state-certified DVBE and       uation purposes only, an incentive will be given to bidders
III Lead, Procurement Services, (209) 667-3987.                  for CDCR’s Salinas Valley State Prison, Enhanced Outpa-         also SBE firms in California.                                  who exceed the 6% DVBE participation requirements.” Re-
Bid Contact Debra Da Rosa                                        tient Program-General Population Treatment and Office           Description: Project will convert existing dry well to a wet   fer to the DVBE forms beginning with DPR 479IP. Small
209-667-3987                                                     Space located in Soledad, CA.                                   well and a adjacent wet well will be converted to a holding    Business Preference and Small Business Subcontractor
ddarosa@csustan.edu                                              Bid Contact: Debbie Fong                                        tank.                                                          Participation: A five percent (5%) Small Business
Packet For Bid                                                   916-255-6164                                                    Bid Contact: GAYLA SWANN                                       Preference will be granted to properly certified small busi-
More Information                                                 Debbie.Fong@cdcr.ca.gov                                         Department of Parks and Recreation                             nesses (a completed STD 811 Form must be submitted
                                                                 Packet For Bid                                                  Channel Coast District                                         with the bid proposal). CLICK HERE to run your DVBE/
Bid Number: 11A1970                                              More Information                                                805-585-1854                                                   SBE/MBE advertisement in the Daily Reporter and get it in
Dennery Canyon West Mitigation Site, Maintenance                                                                                 gswann@parks.ca.gov                                            the newspaper, posted online, and also emailed to all state-
and Monitoring                                                   Bid Number: C1142006                                            Packet For Bid                                                 certified DVBE and also SBE firms in California.
Bids: September 29, 2011 at 2:15 PM                              Sewer Force Main Replacement McGrath State Beach                More Information                                               Description: Rebuild the Camp #1 water distribution system
Expected Expenditure: $600,000.00                                Bids: September 30, 2011 at 2:00 PM                                                                                            including all work shown on sheets 8 through 19; Project
As required by Executive Order S-02-06, Department of            Expected Expenditure: $350,000.00                               Bid Number: C11E0012                                           B: Rebuild the Camp #2 water storage tank including all
Transportation (Caltrans) is committed to meeting the            Construction License Type: A - General Engineering Con-         MENDOCINO WOODLANDS STATE PARK, Water Sys-                     work shown on sheets 20 through 22; Project C: Rebuild
State’s 25 percent (25%) Small Business (SB) participa-          tractor; C-12 Earthwork and Paving Contractor; C-32 Park-       tem Repair                                                     the Camp #2 water distribution system including all work
tion goal. Certified SBs, Microbusinesses (MB), and con-         ing and Highway Improvement Contractor                          Bids: October 4, 2011 at 2:00 PM                               shown on Sheets 23 through 27; Project D: Rebuild the
tractors willing to commit to subcontracting a minimum of        Certified Small Business Contractors are encouraged to          Sealed bids will be received at the office of the Department   Camp #3 water storage tank including all work shown on
25 percent (25%) of their net bid price to certified SBs or      bid on this project. 6% DVBE participation MUST be met.         of Parks and Recreation, One Capitol Mall, Suite 410, Sac-     sheets 28 through 30; Project E: Rebuild the Camp #3 wa-
MBs, are encouraged to submit bids. See Section D, Item          CLICK HERE to run your DVBE/SBE/MBE advertisement               ramento, California 95814, up to 2 p.m., Tuesday, Octo-        ter distribution system including all work shown on sheets
1, in this IFB for requirements. The Disabled Veteran Busi-      in the Daily Reporter and get it in the newspaper, posted       ber 4, 2011, at which time and place they will be publicly     31 through 46 at MENDOCINO WOODLANDS STATE
ness Enterprise (DVBE) Participation Program applies and         online, and also emailed to all state-certified DVBE and        opened and read for performing the work as follows: Fur-       PARK in Mendocino County, California
a five percent (5%) goal is required for this IFB. The DVBE      also SBE firms in California.                                   nish all labor, materials, tools and equipment necessary to    Bid Contact: Christina Soares
Incentive Program may also apply to this IFB. See Section        Description: Contract is to replace the Sewer Force Main        Project A: Rebuild the Camp #1 water distribution system       plans_counter@parks.ca.gov
D, Item 2, in this IFB for requirements. CLICK HERE to           at McGrath State Beach. Job consists of the removal of          including all work shown on sheets 8 through 19; Project       Packet For Bid
run your DVBE/SBE/MBE advertisement in the Daily Re-             old sewer line and replacement of approximately 1925 LF         B: Rebuild the Camp #2 water storage tank including all        More Information
porter and get it in the newspaper, posted online, and also      of existing 4” diameter Ductile Iron Pipe (DIP)sewer force      work shown on sheets 20 through 22; Project C: Rebuild
emailed to all state-certified DVBE and also SBE firms in        main that is attached to the under side of the Santa Clara      the Camp #2 water distribution system including all work       Bid Number: 078CP0283R
California.                                                      River Bridge on Harbor Blvd., Oxnard, CA.                       shown on Sheets 23 through 27; Project D: Rebuild the          HVAC Maintenance - Garberville Area Office
Description: Contractor shall provide on an on-call, rou-        Bid Contact: GAYLA SWANN                                        Camp #3 water storage tank including all work shown on         Bids: October 6, 2011 at 4:00 PM
tine, and emergency basis all labor, materials, equipment,       Department of Parks and Recreation                              sheets 28 through 30; Project E: Rebuild the Camp #3 wa-       Expected Expenditure: $24,999.00
tools, and incidentals necessary to maintain and monitor         Channel Coast District                                          ter distribution system including all work shown on sheets     LICENSE REQUIREMENT: C20
the Dennery Canyon West Mitigation Site.                         805-585-1854                                                    31 through 46 at MENDOCINO WOODLANDS STATE                     A mandatory walk through will be held on September 22,
The designated contact person for this IFB is:                   gswann@parks.ca.gov                                             PARK in Mendocino County, California, complete and in
   Jean Mallare                                                  Packet For Bid                                                  accordance with the plans and specifications therefore and              The Daily Reporter has been serving
   Department of Transportation                                  More Information                                                such addenda thereto as may be issued prior to bid open-                the construction industry since 1994
   916-227-6115                                                                                                                  ing date.

                  The
 Page 80          Daily e-Reporter                        September 13, 2011              www.TheDailyReporter.net                                                                                             ➤                              Page 81
Misc Projects Open For Bid                                                                                                         vestigations, construction phase contract administration,           systems consulting (including cladding systems, building
                                                                                                                                   building information modeling, design review, and peer re-          enclosure systems, structural systems), lighting consulting,
Continued from last page                                          Associate Governmental Program Analyst                           view.                                                               acoustical consulting, signage and art consulting, labora-
                                                                  916-255-2883                                                     Environmental services means those services performed in            tory planning services, building maintenance system con-
2011 at 3:00 pm. Those who attended the first bid walk on         Katie.Frazier@cdcr.ca.gov                                        connection with project development and permit process-             sulting, green and sustainable building consulting, LEED®
July 7, 2011 do not need to attend this bid walk and are          Packet For Bid                                                   ing in order to comply with federal and state laws and pro-         consulting, alternative and clean energy consulting, energy
eligible to submit a bid. The current contractor is Silver Hair   More Information                                                 cessing and awarding of claims pursuant to Chapter 6.75             efficiency and sustainability marketing and outreach servic-
Inc dba KC Mechanical, with a cost of $485.00 per quarter.                                                                         (commencing with Section 25299.10) of Division 20 of the            es, food services consulting, traffic and transportation stud-
All bidders for state contracts must meet the minimum Dis-        Solicitation 2010AA                                              Health and Safety Code including, but not limited to, the           ies and analysis, energy studies and analysis, utility pro-
abled Veteran Business Enterprise (DVBE) participation re-        2011 Annual Advertisement                                        following: preparation of environmental documents and               curement and rate analysis consulting (including electricity,
quirement. CLICK HERE to run your DVBE advertisement              Time Ends: Dec 31, 2011 at 5:00 PM PST                           supporting studies for CEQA/NEPA compliance (includ-                gas and water), roof inspection, independent review (includ-
in the Daily Reporter and get it in the newspaper, posted         This annual announcement is intended to result in the iden-      ing but not limited to Initial Studies, Negative Declarations,      ing constructability review and cost review), schedule and
online, and also emailed to all state-certified DVBE firms        tification of persons and firms which are interested in pur-     Mitigated Negative Declarations, Environmental Impact               claims analysis, source selection and product specification
in California.                                                    suing contracts to perform the below types of services for       Reports, Environmental Assessments, and Environmen-                 (including furniture and equipment), value engineering, life
Description: Contractor agrees to provide to the Depart-          the named projects. This annual announcement may result          tal Impact Statements); technical studies or plans in sup-          cycle studies, sustainability studies, funding strategy con-
ment of California Highway Patrol (CHP) Garberville Area          in the award of contracts to multiple consultants at each        port of environmental documents, permits or plans (e.g.,            sulting, existing condition verification, as-built studies, code
office, the services described herein: furnish all supplies,      University campus or facility office. However, this adver-       transportation studies, biological studies, habitat conserva-       compliance, accessibility compliance, specialty design
materials, tools, equipment, labor, personnel, and supervi-       tisement does not commit the University to award any con-        tion plans, geotechnical studies, air, archaeology, histori-        consulting (including food service, laboratory, classroom,
sion; pay all taxes, insurance, bonds, license and permit         tract at a particular campus or facility office nor to award a   cal, socio-economic, hazardous materials studies, noise/            child care, parking), safety consulting, security consulting,
fees, and all other direct and indirect costs necessary to        contract for a particular type of service or type of project.    acoustical studies, wetlands, etc.); and land use feasibil-         traffic and transportation studies, heating ventilation and
provide HVAC maintenance and repair services in accor-            The estimated amount of each contract may be up to               ity, design, and planning studies (e.g., urban design plans,        air conditioning (HVAC) consulting, energy management
dance with the terms set forth in this Agreement.                 $100,000.                                                        design guidelines, precinct plans, neighborhood plans,              and control systems (EMCS) consulting, cogeneration con-
Bid Contact: Julian A Munoz, ABMA                                 Interested persons and firms should contact the each             infrastructure plans, transportation demand management              sulting, electrical and power systems consulting, elevator
916-843-3818                                                      campus or facility office at the respective points of contact    plans, sustainability plans, financial and economical feasi-        consulting, casework and cabinetry design, lighting design,
jumunoz@chp.ca.gov                                                listed at the end of this announcement. Persons or firms         bility studies).                                                    renewable energy consulting, solar energy consulting, wind
Packet For Bid                                                    which provided statements of interest to one or more cam-        Construction project management means those services                surveys, studies, and analysis, water intrusion and mold
More Information                                                  puses in response to the annual announcement for year            relating to management and supervision of work performed            investigations, industrial hygiene consulting, audio/video/
                                                                  2010 are requested to inform each campus by March 31,            on university construction projects and provided by a li-           data consulting services, color consulting, permit expedit-
Bid Number: I-000423-KF                                           2011, if they wish to remain on the roster for the new year.     censed architect, registered engineer, or licensed general          ing, historic preservation consulting, master equipment and
California Institution for Men, Hospital Roof                     Selections may begin at any time after January 1, 2011           contractor that has expertise and experience in construction        material procurement, materials management, contract ad-
Bids: October 10, 2011 at 2:00 PM                                 but interested persons and firms may continue to provide         project design review and evaluation, construction mobili-          ministration, archiving and document management, reloca-
Expected Expenditure: $420,000.00                                 statements of interest thereafter because selections may         zation and supervision, bid evaluation, project scheduling,         tion/transition logistics, window washing system consulting,
Pre-Bid Conference September 22, 2011 at 8:00 AM PDT              continue throughout year 2011.                                   cost-benefit analysis, claims review and negotiation, and           laboratory consulting, athletic facility consulting, project in-
Attendance is mandatory                                           This is an annual announcement to solicit interest from          general management and administration of a construction             formation consulting (including publicity and photography),
Location: California Institution for Men, 5405 Eucalyptus         consultants to perform architectural, landscape architectur-     project. Other facility-related professional services may in-       reprographic services, and scientific consulting (including
Avenue, Chino, CA 91710.                                          al, engineering, environmental, land surveying, construc-        clude, but are not limited to, the following: strategic planning,   arborist, biologist, paleontologist, archeologist, veterinary,
Gate Clearance required, read directions in IFB. Meet at          tion project management services, and other facility related     urban and master planning, educational facility planning            hydrology, forestry and radiation physicists).
main entrance, please read directions for walk through and        services. The University of California, through its respec-      (including pre design studies, lab planning and classroom           The types of projects that may require services include new
contacts.                                                         tive campuses and facility offices, is seeking consultants to    planning), real estate services including, but not limited to       construction, alteration, repair, demolition, addition, modifi-
Description: This is a product only purchase with some            perform such services for projects located in various coun-      site selection and analysis, assistance with acquisitions,          cation, renovation, remodeling, retrofit, upgrade, enhance-
technical assistance, the State to install the roof. Manda-       ties throughout the State of California.                         appraisals and approvals; post occupancy reviews, com-              ment, remediation, deferred maintenance, renewal, or im-
tory walk through is required to attend in order to bid the       Architectural, landscape architectural, engineering, en-         missioning, space planning and utilization, graphic design          provement of the following facilities, systems, equipment
job. Please read all bid documents and attachments. Gate          vironmental, and land surveying services include those           and artist work (including signage, illustration, renderings,       and related infrastructure: classrooms and lecture halls;
clearance into institution is required, please read contact       professional services of an architectural, landscape archi-      visual simulations, computer imaging), model construction,          laboratories and research facilities, observatories, field re-
information with key dates. ROOFING SYSTEM, fully ad-             tectural, engineering, environmental, and land surveying         photography/videography, CAD services, interior design,             search stations, and extension centers; marine biology and
hered roof assembly, single ply, poly vinyl chloride (PVC),       nature as well as incidental services that members of these      cost estimation and projection, fiscal and economic impact          aquatic research facilities, libraries and archives, athletic
80 mil fabric reinforced PVC membrane, per attached               professions and their employees may logically or justifiably     analysis, soils testing, material testing and inspection, haz-      and recreational facilities (including courts, fields, gymna-
specifications, plan sheets, and construction bulletin. Ap-       perform. Architectural, landscape architectural, and engi-       ardous materials services (including planning, monitoring,          siums, stadiums, and swimming pools), faculty and admin-
proximately 54,940 square feet. Scope to include all “Pent-       neering services include, but are not limited to, the follow-    testing and inspections), noise testing and monitoring, ra-         istrative offices, conference and meeting facilities (includ-
house” roofs (with a minimum 1/2:12 slope). Provide split /       ing: project programming, scoping, preliminary design, de-       diation and shield testing and inspections, medical gases           ing faculty clubs), residential halls and housing (including
straight flashings for duct supports and split/ angled flash-     sign development, preparation of construction documents          surveys and studies (including O2), wireless systems sur-           common areas and individual residences), dining and food
ings w/ clamps for diagonal duct support braces.                  (including drawings and specifications), studies, civil and      veys (including RFID), roofing and waterproofing consult-           services (including cafeterias, kitchens, restaurants and
Bid Contact: Katie S. Frazier                                     building surveys (including GPS and laser), subsurface in-       ing, coatings consulting, curtain wall consulting, building                                               Continued on next page


                  The
 Page 82          Daily e-Reporter                         September 13, 2011               www.TheDailyReporter.net                                                                                                   ➤                                Page 83
                                                                                                                                         CSPublishing
Misc Projects Open For Bid
Continued from last page                                         dations, retaining walls, paving, fencing, partitions, walls,
                                                                 doors, windows, fenestrations, awnings and shutters, el-
cafes), restrooms and showers, computer rooms, health fa-
cilities (including clinics and medical centers), student cen-
                                                                 evators and lifts, smoke control systems, signage and traf-
                                                                 fic control devices, building management systems, under-
                                                                                                                                                 &
ters and student services facilities, museums and galleries,     ground storage tanks, hazardous materials, environmental
performing arts facilities (including stages and theatres),      mitigation and remediation, habitat conservation, wetlands,
child care, community centers, historic buildings, grounds       weather protection systems, cathodic protection systems,                                  Bringing your publications to life!
(including trees, landscape, irrigation, hardscape and side-     solar energy systems, tenant improvements and fit-outs,
walks), botanical gardens, facilities supporting police, fire,   warehouses, animal research and housing facilities, ag-
mail, communications, and campus operations, physical            ricultural facilities and ancillary buildings, storage sheds,
plant, shops, building services, and maintenance facilities,     wells, greenhouses/glasshouses, lathhouses, screenhous-
parking facilities (including garages and lots), telecommu-      es, barns, stalls, corrals, insectory, cold storage facilities,           Running your UDBE/DVBE/DBE/MBE/WBE/SBE ads
nications and data infrastructure (including antenna), multi-    pesticide/evaporative bed facilities, temporary and surge


                                                                                                                                       is fast, easy and inexpensive
media facilities (including video conferencing), central util-   facilities (including mobile modular units).
ity plant and cogeneration systems and facilities, steam/        Every effort will be made to ensure that all persons have
chilled water systems, energy generation or conservation         equal access to contracts and other business opportuni-
systems, utilities, piping, duct banks and conduits, sanitary    ties with the University within the limits imposed by law or
and sewer systems, domestic water systems, irrigation wa-
ter systems, wells, electrical distribution systems, labora-
                                                                 University policy. Each consultant may be required to show
                                                                 evidence of its equal employment opportunity policy.
                                                                                                                                                       with this State-Certified newspaper.
tory exhaust systems, lighting and power systems, fire and       Bid Contact: Emily Montan
security systems (including monitoring and alarms), access
control systems, HVAC systems, EMCS systems, storage
                                                                 Design and Construction Analyst
                                                                 510-987-9287
                                                                                                                                                             ~ Most ads only $35 ~
rooms, mechanical rooms, roads, paths (including bike            emily.montan@ucop.edu
and pedestrian paths), public spaces, bridges, culverts,         Packet For Bid                                                      and includes all digital editions, and also posted on the Internet at
flatwork, earthwork, drainage, and erosion control, foun-        More Information
                                                                                                                                                         www.TheDailyReporter.net

                                                                                                                                                         Try Us, You’ll Love Us.
                                                                                                                                                        We Are VERY Easy To Work With!
 WE DELIVER ANYWHERE!                                                                                                                                        CLICK HERE for the online form
                                                                                                                                               or try the convenient online form found at:
 Get this newspaper delivered to                                                                                                             www.TheDailyReporter.net/Advertising.Form.asp
 your computer automatically with
                                                                                                                                             Send us your ad, and we’ll typeset it and send back a proof and a price.
 our free Delivery Manager software                                                                                                Approve the ad and we’ll run it, and post it online, from the day you send it until the bid date.

 Click here for details                                                                                                                                Same Day Publishing At NO EXTRA COST!
                                                                                                                                               The Daily Reporter is a state approved, certified and recognized
                                                                                                                                                     TRADE and also a MINORITY-FOCUSED newspaper
                                                                                                                                              approved and certified for all DVBE/DBE/UDBE/MBE/SBE/WBE ads

                  The
 Page 84          Daily e-Reporter                        September 13, 2011               www.TheDailyReporter.net                                                                                                      Page 85

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:166
posted:10/17/2011
language:English
pages:43