Community Initiative URBACT _2000 – 2006_

Shared by: qingyunliuliu
Categories
Tags
-
Stats
views:
30
posted:
10/15/2011
language:
English
pages:
21
Document Sample
scope of work template
							                                 The URBACT II Operational Programme

                                                  (2007 – 2013)




                 Declaration of Interest for Working groups

     To be completed by Lead Partner (LP):

Short title of working group or acro-
nym
Full title
Lead Partner (institution and country)

     To be completed by the URBACT Secretariat (US):

Project number (serial number/code)
Received by URBACT Secretariat (date)
Eligibility check (date)
Submitted to          External    Assessment
Panel (date)
Approved        by   Monitoring   Committee
(date)

     Form to be submitted to the URBACT Secretariat by 15 February 2008:
        -      in an electronic format (only if applicants have an electronic signature)
               to the following address: project.application@urbact.eu;
        -      or by regular mail (documents must be postmarked no later than 15
               February 2008) to the following address:
                      URBACT Secretariat
                      194, Avenue du Président Wilson
                      93217 St Denis La Plaine – France

     List of   documents to be attached:
         -     4 Letters of commitment
         -     Excel Financial tables
         -     CV of appointed coordinator at Lead partner‟s
         -     CV of planned appointed Lead expert
                                                 Contents

1            PROJECT SYNTHESIS ........................................................... 3
     1.1     PROJECT IDENTITY ................................................................................   3
     1.2     SUMMARISED DESCRIPTION OF THE PROJECT (MAX. 100 WORDS) .........................                    3
     1.3     PARTNERSHIP (4 PUBLIC AUTHORITIES FROM AT LEAST 3 DIFFERENT MEMBER STATES)                          3
     1.4     RELATION TO URBACT THEMATIC COVERAGE ................................................               4
     1.5     PROJECT COST (IN €) ............................................................................    4
2            PROJECT PRESENTATION ..................................................... 5
     2.1     DESCRIBE THE STARTING SITUATION AND THE MAIN CHALLENGES THAT PARTNERS FACE
             IN RELATION WITH THE THEME OF THE PROJECT .............................................. 5
     2.2     SYNTHETIC PRESENTATION OF THE WHOLE PROJECT ......................................... 6
     2.3     SUMMARY FRAMEWORK FOR THE PROJECT DEVELOPMENT PHASE (FIRST 4 MONTHS) ... 7
     2.4     SCHEDULE FOR THE DEVELOPMENT PHASE (FIRST 4 MONTHS) ............................. 8
     2.5     FIRST ATTEMPT AT AN ESTIMATE OF THE CARBON FOOTPRINT AND RESOURCE
             CONSUMPTION ..................................................................................... 9

3            INITIAL PARTNERS INVOLVED IN THE PROJECT................ 10
     3.1     LEAD PARTNER’S EXPERIENCE .................................................................. 10
     3.2     LEAD PARTNER’S POLITICAL INVOLVEMENT ................................................... 10
     3.3     EXPERIENCE AND EXPECTATIONS OF EACH PARTNER ........................................ 11
     3.4     APPOINTED LEAD EXPERT ....................................................................... 13
     3.5     PARTICIPATION OF MANAGING AUTHORITIES OF OPERATIONAL PROGRAMMES .......... 13
4            PROJECT FINANCE ............................................................. 14

5            BANK INFORMATION ......................................................... 14

6            DETAILED INFORMATION ON THE LEAD AND PROJECT
             PARTNERS ......................................................................... 15

7.           CERTIFYING BODIES ......................................................... 18

8            CERTIFICATION ................................................................. 19
     OUTLINE TEXT FOR A LETTER OF COMMITMENT BY A LEAD PARTNER................................. 20
     OUTLINE TEXT FOR A LETTER OF COMMITMENT BY A CITY PARTNER.................................. 21
  1      PROJECT SYNTHESIS

     1.1 Project identity
  Short title or acronym
  (max. 20 characters)
  Full title
  Lead Partner (institu-
  tion and country)



     1.2 Summarised description of the project (max. 100 words)




     1.3 Partnership (4 public authorities from at least 3 different
         Member States)


          Name       of    Type of insti-   Convergence/   Member/         Region      in
          partner insti-   tution           Competitive-   Partner State   which partner
          tution                            ness                           is situated (if
                                                                           relevant)
LP
PP 1
PP 2
PP 3




                                                                                 3
 1.4 Relation to URBACT thematic coverage

Which of the seven URBACT II themes do you see your project relat-
ing to most strongly? (Please select one theme only, writing „X‟ in the
right hand column)

             Priority Axe 1 – Cities, Engines for growth and jobs
1.1. Promoting Entrepreneurship
1.2. Improving Innovation & Knowledge Economy
1.3. Employment & Human Capital
                Priority Axe 2 – Attractive and cohesive cities
2.1. Integrated development of deprived areas and areas at risk
of deprivation
2.2. Social integration
2.3. Environmental issues
2.4. Governance & Urban Planning

 1.5 Project cost (in €)
ERDF funding
Public co-financing (EU PP)
Private co-financing (EU PP)
Public co-financing (Non EU PP)
Private co-financing (Non EU PP)
TOTAL




                                                                    4
2   PROJECT PRESENTATION


2.1 Describe the starting situation and the main challenges that
    partners face in relation with the theme of the project

     (You may use problem tree if possible - 1 page max.)




                                                            5
 2.2 Synthetic presentation of the whole project
(Please present here the main objective, issue and expected outputs relating to the
implementation of the project over its entire duration – 1 page maximum)


      Main objective (please focus on one objective)




      Main issue to be addressed in relation with the selected theme
       (please focus on the core issue)




      Main expected outputs (Local Action Plans, good practices,
       policy recommendations, recommendations, etc.)




                                                                              6
     2.3 Summary framework for the Project Development Phase (first
         4 months) 1


           Objectives      Actions to be implemented in rela-         Related outputs
                                 tion with the objective
Objec-   (e.g. Finalising 1.1. (e.g. Searching for potential part- (e.g. 1    partner-
tive n°1 partnership)     ners and contacting them by phone, ship)
                          etc.)
                         1.2. (e.g. Meeting with all partners to
                         agree on project objectives, issues, etc.)
                         1.3.
                         etc.
Objec-   (e.g. Comple- 2.1. (e.g. Visiting all partners to com- (e.g. 1       baseline
tive n°2 tion of baseline plete local enquiries)                  study)
         study)
                          2.2. (e.g. Realising the “State of the
                          art” of existing knowledge at EU level)
                         2.3.
                         etc.
Objec-   (e.g. Comple- 3.1. (e.g. Completing Final Application (e.g. Final Appli-
tive n°3 tion of Final Form)                                    cation Form, 4
         application)                                           letters of Com-
                       3.2. (e.g. Collecting letters of commit- mitment, etc.)
                       ment from all partners)
                         3.3.
                         etc.
Etc.
(add
rows if
needed)




 1
   The excel spreadsheet n° 1.5 of the annexed financial tables shall indicate the
 budget per action. This must be coherent both with paragraph 2.3 of the Declara-
 tion of Interest and with table 1.4 of the budget.
                                                                               7
 2.4 Schedule for the Development phase (first 4 months)
Please define the schedule for the implementation of the actions listed in section 2.3.
Use reference number and short title of the actions listed above.
For each action, fill in the boxes corresponding to the period during which the action will be undertaken.


                           Month 1              Month 2             Month 3               Month 4
(e.g.)          1.1.
Searching      part-
ners
(e.g. 1.2. Meeting                                                              X
with partners)




Etc.
Add rows as needed




                                                                                                             8
2.5 First attempt2 at an estimate of the carbon footprint and re-
source consumption

    Activity           Estimation of Total carbon Actions to mitigate
                       carbon     per to be con- carbon (e.g. virtual
                       unit of travel sumed       meetings, video con-
                                                  ference, sustainable
                                                  meetings)
    Flight   dis-
    tances    for
    European
    meetings
    Train    dis-
    tances    for
    European
    meetings
    (km)
    Car distances
    for      Local
    meetings km
    Public trans-
    port distances
    for       local
    meetings km
    Virtual    meet-                        0
    ings
    Other
    Total


GUIDANCE TO FILL THIS TABLE WILL BE MADE AVAILABLE IN THE
APPLICANTS PACK




2
   Face to face meetings are important but scores will be awarded for efforts to mitigate impact. In the
final application waste minimisation (e.g. of paper) will also be evaluated.


                                                                                                 9
 3   INITIAL PARTNERS INVOLVED IN THE PROJECT



   3.1 Lead Partner’s experience

LP’s experience of the
problem to be ad-
dressed by the network
LP’s   experience        in
European networks
Experience of the LP’s
named officer in charge
of leading the network
(Please attach CV)



   3.2 Lead Partner’s political involvement

 If an elected representative has been nominated, within the LP’s institution,
 to follow the project, please indicate his/ her name and responsibilities/ pol-
 icy field he/ she is entrusted with.


 Name of elected representative/
 official in charge of the project
 Responsibilities/ Policy field




                                                                          10
 3.3 Experience and expectations of each partner

(1 table per partner, including LP – ½ page max. per partner)



Lead Partner
Local problem and chal-
lenge   regarding  this
problematic
Policies and concrete ac-
tions developed regarding
this problematic
Willingness to define and
adopt a local action plan
Willingness to set up an
URBACT Local Support
Group (Give first ideas of
the ULSG composition)
Experience of working in
related   fields  through
transnational exchange
Expected learning    from
the network




Partner 1
Local problem and chal-
lenge   regarding  this
problematic
Policies and concrete ac-
tions developed regarding
this problematic
Willingness to define and
adopt a local action plan
Willingness to set up an
URBACT Local Support
Group (Give first ideas of
the ULSG composition)
Experience of working in
related   fields  through
transnational exchange
Expected learning    from
the project




                                                                11
Partner 2
Local problem and chal-
lenge   regarding  this
problematic
Policies and concrete ac-
tions developed regarding
this problematic
Willingness to define and
adopt a local action plan
Willingness to set up an
URBACT Local Support
Group (Give first ideas of
the ULSG composition)
Experience of working in
related   fields  through
transnational exchange
Expected learning    from
the project




Partner 3
Local problem and chal-
lenge   regarding  this
problematic
Policies and concrete ac-
tions developed regarding
this problematic
Willingness to define and
adopt a local action plan
Willingness to set up an
URBACT Local Support
Group (Give first ideas of
the ULSG composition)
Experience of working in
related   fields  through
transnational exchange
Expected learning    from
the project




                             12
 3.4 Appointed Lead expert

Please designate the Thematic expert you intend to appoint as Lead expert
if the project is approved for Development phase (the designated expert
should be selected from the URBACT II pool of approved Thematic experts
available on the URBACT website).


Name of Lead expert
Brief description of ex-
perience relevant to the
project’s theme (Please
attach CV)



 3.5 Participation of Managing Authorities of Operational Pro-
     grammes

If you intend to associate Managing authorities to the network’s activities,
please present briefly how you plan to do so.




Please list Managing Authorities to be involved in network’s activities if
available:


  PARTNER                  MANAGING AUTHORITY INSTITUTION




                                                                      13
4   PROJECT FINANCE



Please complete separate Excel financial tables.




5   BANK INFORMATION

Name and address of Lead Partner’s bank



Bank account number



IBAN (International Bank Account Number) and SWIFT/BIC



Internal reference
If relevant




                                                         14
      6   DETAILED INFORMATION ON THE LEAD AND PROJECT PARTNERS


LEAD PARTNER
Institution
Department
               Use the most appropriate 3-character code from the list in the Guide
Legal status
               for Applicants
Contact per-
son
Address
Postal code
Town
Region
Country
Phone
Mobile phone
Fax
E-mail



Person responsible for Project Coordination at the Lead partner
Name
Institution
Function
Address
Country
Phone (of-
fice)
Mobile phone
Fax
E-mail



Person responsible for Financial management at the lead partner
Name
Phone
Mobile phone


                                                                           15
Fax
E-mail



Person responsible for Communication at the lead partner
Name
Phone
Mobile phone
Fax
E-mail

      Financial Contribution
         Source          Legal basis for decision of funding       Amount (in €)




PARTNER 1
Organisation
Department
                  Use the most appropriate 3-character code from the list in the Guide
Legal status
                  for Applicants
Address
Postal code
Town
Region
Country
Contact per-
son
Phone (of-
fice)
Mobile phone
Fax
E-mail

      Financial Contribution
         Source          Legal basis for decision of funding       Amount (in €)




                                                                              16
PARTNER 2
Organisation
Department
                Use the most appropriate 3-character code from the list in the Guide
Legal status
                for Applicants
Address
Postal code
Town
Region
Country
Contact per-
son
Phone
Mobile phone
Fax
E-mail

      Financial Contribution
      Source         Legal basis for decision of funding         Amount (in €)




PARTNER 3
Organisation
Department
                Use the most appropriate 3-character code from the list in the Guide
Legal status
                for Applicants
Address
Postal code
Town
Region
Country
Contact per-
son
Phone (of-
fice)
Mobile phone

                                                                            17
Fax
E-mail

      Financial Contribution
      Source            Legal basis for decision of funding              Amount (in €)




      7.        CERTIFYING BODIES3

      Please indicate in this table the certifying bodies proposed for each partner.4


                  Partners                            Certifying bodies5
                                         (Name, Surname, Institution, Function, ad-
           LP                            dress, telephone number, fax number, email
                                             address, additional info if necessary)
                                         (Name, Surname, Institution, Function, ad-
          PP1                            dress, telephone number, fax number, email
                                             address, additional info if necessary)
                                         (Name, Surname, Institution, Function, ad-
          PP2                            dress, telephone number, fax number, email
                                             address, additional info if necessary)
                                         (Name, Surname, Institution, Function, ad-
          PP3                            dress, telephone number, fax number, email
                                             address, additional info if necessary)




      3
          According to Article 16 of Regulation (EC) 1080/2006.
      4
         Before the expenditure can be claimed to the Commission, every partner has to
      fill in and sign a checklist indicating the proposed certifying body (a model of check-
      list shall be provided by the URBACT Secretariat). The filled in and signed checklist
      must be sent to the national authority concerned. Evidence of the approval has to
      be sent by the national authority to the URBACT Secretariat in order to provide the
      certifying body with a personal login and password to access PRESAGE-CTE.
      5
       In the case of a centralised financial management system, only the certifying body
      at LP level needs to be indicated. In the case of a decentralised or mixed financial
      management system, the certifying bodies of the partners spending, accounting
      and claiming a part or the totality of their contributions need to be indicated.

                                                                                      18
     8      CERTIFICATION



I hereby certify that the information stated in this application is to the best of my
knowledge accurate and true.

Signature (elected Member):




Name (capital letters):




Position:




Date:




Signature (Lead Partner Fi-
nancial Responsible:




Name (capital letters):




Position:




Date:




 Official stamp
     Official stamp




                                                                               19
    Outline text for a letter of commitment by a Lead partner
(On Lead partner‟s institution headed paper)

URBACT Managing Authority
194, avenue du Pdt Wilson
F-93217 Saint Denis la Plaine Cedex

                                                                      Date
Dear Sir,

The public Authority XXX wishes to be the Lead Partner in the activities of
the URBACT Working group named YYY. Our working group project builds
on an initial partnership of 4 partners in total that belong to ZZZ Member or
Partner States and we consider that we have achieved a good balance be-
tween convergence and competitiveness Objective regions by having WWW
partners from convergence regions.

The specific challenge we wish to address in this working group as a partner
is … AAAAA.

We are convinced that by working through this URBACT project, we will be
able to better address these challenges. In this context, if successful with
our proposal, we commit to put in place a URBACT local support group
made up of key local stakeholders relevant to the theme of our project. This
local support group will work to define and implement a Local Action Plan
using the knowledge and expertise generated by our joint working.

To this end we also formally commit to engaging the funds needed to co fi-
nance ERDF. In the first phase, this is estimated to amount to BBB €


Yours sincerely6                                                 Official stamp
_________________________________
Name in capital letters:
_________________________________
Function:
_________________________________




6
  The signatory person has to be an elected representative with authority to sign for
the Lead Partner city

                                                                              20
    Outline text for a letter of commitment by a project partner

(On partner’s institution headed paper)

URBACT Managing Authority
194, avenue du Pdt Wilson
F-93217 Saint Denis la Plaine Cedex

                                                                      Date
Dear Sir,

The Public authority of XXX wishes to join in the activities of the URBACT
working group named YYY led by the Public authority of WWW.

The specific challenge we wish to address in this project as a partner is
AAAAA.

We are convinced that by working through this URBACT project, we will be
able better address these challenges. In this context if successful with our
proposal, we commit to put in place a URBACT local support group made up
of key local stakeholders relevant to the theme of our project. This local
support group will work to define and implement a Local Action Plan using
the knowledge and expertise generated by our joint working.

To this end we also formally commit to engaging the funds needed to cofi-
nance ERDF. In the first phase this is estimated to amount to ZZZZ €



Yours sincerely7
_________________________________                                Official stamp

Name in capital letters:
_________________________________
Function:
_________________________________




7
  The signatory person has to be an elected representative with authority to sign for
the Partner city.

                                                                              21

						
Related docs
Other docs by qingyunliuliu
tuvalu worksheet
Views: 38  |  Downloads: 0
PHCcom
Views: 151  |  Downloads: 0
CALM_SLI
Views: 254  |  Downloads: 0
2010BillStatusReport_000
Views: 3  |  Downloads: 0
SAN MANUEL AIRPORT
Views: 145  |  Downloads: 0
Chapter 6 Coding and Classification
Views: 151  |  Downloads: 0
CA2009-20_UWGuidelineSum
Views: 1  |  Downloads: 0
guze05_fox
Views: 0  |  Downloads: 0
Untitled - Idaho
Views: 359  |  Downloads: 0