Government of Jharkhand Road Construction Department

Document Sample
Government of Jharkhand Road Construction Department Powered By Docstoc
					                  Government of Jharkhand

               Road Construction Department

                R.C.D. Road Circle, Chaibasa

                Road Division, Jamshedpur.

NAME OF DIVISION : -   R.C.D. ROAD DIVISION, JAMSHEDPUR

NAME OF SUB DIVISION :- R.C.D. ROAD SUB DIVISION, JAMSHEDPUR

NAME OF THE WORK : -   BILL OF QUANTITY FOR SPECIAL REPAIRING OF
                       INSPECTION BUNGLOW BISTUPUR & MINI
                       INSPECTION BUNGLOW BISTUPUR




ESTIMATED COST : -     Rs. 999694.00

YEAR : -               2011-2012
                            PUBLIC WORKS DEPARTMENT (ROAD)
                               ROAD DIVISION, JAMSHEDPUR
                              NOTICE INVITING TENDER (N.I.T.)

                                                CHAPTER-1

       Sealed tender on approved Bill of quantity to be eventually drawn in PWD form No F2 will
be received from Registered illegible PWD/RCD contractors of appropriate category up to 03:00 PM on
25.10.2011 at Executive Engineer, R.C.D., Road Division, Jamshedpur for the work of Special repaire
of Inspection Bunglow Bistupur and Mini Inspection Bunglow Bistupur under
Road Division Jamshedpur for the year 2011-2012 of an estimated cost of Rs
9,99,694.00 which will be opened on 25.10.2011 at 03:30 PM by the Executive Engineer, R.C.D., Road
Division, Jamshedpur. The tenderers or their authorized agent who ever desire may remain present at the time
of opening of tender on the above said office.
       The work is to be completed in all respects in four calendar months from the date of written order
to commence the work. The items of works plan, specification or any information in connection with the work
can be seen in the office of the Executive Engineer, R.C.D., Road Division, Jamshedpur on any working day
during office hours before filing tender.
              Bill of Quantity/Tender document can be purchased from the office of Executive Engineer,
R.C.D., Road Division, Jamshedpur on payment of Rs. 1250.00 In shape of account payee Bank Draft in favour
of Executive Engineer, R.C.D., Road Division, Jamshedpur payable at Jamshedpur (None refundable) as
mentioned in the tender Notice on 17.10.2011 to 24.10.2011 during working hour.

EARNEST MONEY (E.M.)

                Tenderers are required to deposit EM amounting to Rs. 20000.00 in Shape of National Savings
Certificate (8/6 issue) or in shape of 3/5 year Post Office time Deposit should be issued from any of the Post
Offices within the State of Jharkhand but-these Should be duly pledged in favour of Executive Engineer,
R.C.D., Road Division, Jamshedpur.
1.1    Insurance guarantee Bond/Cash/Cheque/Bank Draft in place of those specified above shall not be
       accepted.
1.2    Duly pledged E.M. if any laying with the concerned E.E. against works already completed shall not be
       adjusted by transfer. In such cases the tenderer is required to get the same refunded and then attach the
       same with tender duty pledged afresh against the work for which tender is filled.
1.3    Tender not submitted with required E.M. in the prescribed shape shall be out right rejected and will have
       no place in the comparative statement.
1.4    Clauses 1.2 to 1.3 shall not apply to tenderer who are exempted from depositing E.M. But such
       tenderer must enclose Photostat copy of the exemption certificate issued by the competent authority in
       this respect.

1.5    Tenderer should quote his/her/their rates on overall cost basis in percentage above or below (Both in
       figure & word) over this mentioned in the bill of quantity issued by he authorized officer.
1.6    In case the over all rates quoted by the tenderer is below the less 15% limit values then it will be treated
       as unworkable & the tender may be treated as invalid.
1.7    It will be obligatory for the tenderer to keep their office establishment fixed at a place in the state of
       Jharkhand and communicated address and telephone No the authorities.
1.8    Tenderer shall enclose photo state copy of her his their registration exemption certificate if any in
       absence of which the tenders may not be considered.
1.9    Sales tax, Income tax clearance certificate, Labour license & letter of Registration as Contractor should
       be submitted by the tenderers for work consisting more that 10,000/- otherwise the tenders may be
       rejected.
1.10   Competent Authority reserves the right to reject any or all the tenders received or to allot the work to
       one or more contractors without assigning any reason.
1.11   In case of successful tenderer, the amount of earnest money will be transferred towards a part of the
       initial security deposit of 5% of the value of tender. Argumentation will be in the from of N.S.C. (8 th /6th
       issue) duly pledged to the Executive Engineer, R.C.D., Road Division, Jamshedpur. The total security
       deposit will be 10% of the tendred amount and the remaining 5% shall be recovered from the contractor
       by deduction from running account bills @ 5% of the total amount of each bill.
1.12   The earnest money of successful tenderer which accompanies the tender will be forfeited in case the
       tenderer denies to sign the agreement or contract or to deposit security money within 7 days of being
       called upon to do so, after approval of tender by competent authority.
       If the contractors who are exempted from depositing E.M fail to deposit initial security money within 7
       days of being called upon to do so or denies to sign the agreement all requisite sum of money, will be
       forfeited by way of adjustment from any sum to be paid to him by the department for other works
       including his security money & in addition he will be black listed and registration will be cancelled.
1.13   The NIT with general rules & special conditions will be a part of the contract documents.




                                                                               Executive Engineer
                                                                          RCD, Road Division, Jamshedpur
                                             CHAPTER—II
                                            GENERAL RULES
2.1    The complete tender with all its enclosures shall be enclosed in sealed envelope and delivered to the
       addresses as mentioned in NIT. So as to reach one hour before the date and time as stipulated in N.I.T.
2.2    The tendered should mention in his forwarding letter a list of all documents being submitted with the
       tender.
2.3    The tender shall contain the full name, address of residence and place of business of person or persons
       filling the tender. In case there is subsequent change in address it must be informed to the concerned
       E.E., S.E., and C.E. by registered post with A.D.
2.4    All pages of tender document, general rules and special condition must be initialed at the bottom left
       hand corner and signed wherever required in the tender paper by the tenderer or a person holding power
       of attorney authorized to sign on behalf of tendered/partners before submission of the tender.
2.5    In the event of the tender submitted by a firm it must be signed by each partner there of and in the event
       of absence of any of the partners the power of attorney authorizing the person who will sign must be
       enclosed. All Signatures should be dated.
2.6    No tenderer shall file tender for more than the one work in one sealed envelope tenderer desirous of
       submitting tender form more than the one work shall submit tender in separate sealed envelope for each
       work on appropriate and duly purchased B.O.Q. The name of the work should be clearly written on the
       sealed envelope.
2.7    The rates quoted by the tender shall be inclusive of Income tax. Sales tax, Royalty or any other
       Provincial and Central taxes applicable at that time.
2.8    The tenderer shall be presumed to have carefully examined the conditions of the contract and
       specification of the work, The tendered will also be deemed to have inspected the work site and to have
       satisfied herself himself/ their selves independently as to the nature extent and practicability of all works
       & required roads approach & other means of communication & access to the site available
       accommodations regards the land and buildings that may be required for temporary purposes in
       connection with the contract work and also availability of construction materials location of work site
       including its climate other geological characteristics, availability of skilled, semi skilled, un-skilled
       labourers. The consequence of the lack of necessary knowledge will be at the risk and cost of tenderer.
2.9    Generally Ministry of Surface Transport, Govt. of India MORTH specification would be followed for
       the execution of work. Items of work, which are not covered by MORT & H specification, R.C.D.,
       Jharkhand specification will be followed.
2.10   The tenderer will submit a work programme of the work with the tender.
2.11   All labours are to be paid as per minimum wages Act in force and as revised from time to time during
       the construction of work.
2.12   The tenderer will provide labour huts drinking water, and medical facilities to labour as site and keep the
       site clean at his own cost.
2.13   The tenderer must return all the tender papers duly signed on each page while submitting the tender
       failing which the same may be considered invalid.
2.14   On receipt of written order from the concerned Executive Engineer the successful tenderer will first
       deposit the balance amount of initial security deposit (ISD) within the specified period of seven day and
       the enter into agreement with the E.E. on the basis of the stipulation in the approved tender documents
       along with subsequent negotiation terms as mutually agreed upon before issue of work order. Written
       order to commence the work shall be issued by the E.E. after acceptance of agreement by the competent
       authority.
                                                                              Executive Engineer
                                                                           RCD, Road Division, Jamshedpur
                                                CHAPTER—III
                                 SPECIAL CONDITIONS. F2 CONTRACT

3.1    These are special conditions, which from a part of F-2 contract system and prevail in any
       ambiguity/contradiction.
3.2    The successful tenderer herein after-called contractor must maintain a site order book at each work site,
       which will be produced when asked for by the departmental officers for needful. Any order or
       instruction, assed on the site order book by the inspecting officer should be communicated to the SDO,
       E.E., S.E and concerned inspecting officers by J.E. The site order book may be submitted to E.E. with
       running on account bills, if needed but that must be submitted with final bill.
3.3    The contractor should always remain available at the work site but where ever it is not possible for him,
       he must appoint a representative for the purpose who would be duly authorized by contractor to receive
       instructions and carry out instruction of departmental officers, and also to receive letter. He may also
       delegate him any other power as he thinks fit but in every case he will inform immediately the
       concerned J.E., SDO and E.E regarding appointment of such representative along with his name and
       identity by regd. AD post.
3.4    It the royalty clearance certificate for mineral used in the work in not produced with the bill by the
       contractor, royalty will deducted by the department from the running bill at the rates prevailing at time
       of execution of work to which the bill relates. Production of royalty clearance certificate along with the
       final bill of the work, failing which final bill will not be paid and for such none-payment or delay in
       payment the whole and full responsibility will be of the contractor alone.
3.5    The contractor shall furnish sufficient plant equipments & labour & shall work at such hours & in shifts
       as may be necessary to maintain the progress schedule. The working and shift hours shall comply with
       all Govt. rules and Regulation in force from time to time during the entire period of construction.
3.6    The contractor shall make adequate arrangement for the safety of the labourers during execution of the
       work. He will be responsible for any compensation and the same will have to be paid by him as decided
       by the competent authority.
3.7    The contractor should get the sample of all materials approved by the E/I before collecting for use in
       work. The sample in sealed glass jars shall be kept in the custody of the E/I.
3.8    The contractor shall have to get tested the strength of cement concrete ( both plain & reinforced) for
       each days casting as per IRC codes. Although achievements of the prescribed cube strength is a must,
       concrete having lower value may be rejected or accepted with a suitably reduced rate under specific
       orders of the competent authority. The cost of concrete cube moulds, curing, carriage of cubes to and
       from the testing laboratory and all other incidental charges incurred in the regard shall be borne by the
       contractor.
3.9    The contractor shall, if, required by the E/I, arrange to test materials portion of work at his own cost or
       prove their quality, soundness and sufficiency if after test, quality of materials appears to be inferior or
       the portion of work is found to be defective or unsound, the contractor may be asked to remove and or
       pull down and re-execute the same at his own cost or in case such defect is found out by department to
       the soundness of the structure, he shall be paid at suitably reduced rates for items of work involved in
       such work. The contractor shall bear all cost in thus regard.
3.10   All rejected materials will have to be removed from the site by the contractor after their rejection within
       seven days of E.E’s notice in writing other wise E.E. may arrange to remove them in any way he links
       fit and also recovery the cost from the contractor for such remove after lapse of seven days time.
3.11   If the actual lead of materials like stone metal, stone chips, boulders, bricks and moorum etc is round to
       be less than the lead provided in B.O.Q. than its payment will be made on proportionately reduced rate
       (reduction in rate will be made in the ratio of approved rate and rate provided in the B.O.Q.). It will be
       mandatory to obtain prior consent of the authority, who approved the tender, before commencement of
       supply of such materials from the increased lead.
3.12   It will be essential to do all items of bad work (in original) works in sequence from one end in a
       scientific way so as to complete the work and it should not be done in haphazard way such as collection
       of materials in some kilometers box cutting in other kilometers consolidation work in patches etc.
       Contractor is to achieve progress in all items of work simultaneously K.M. wise quantity wise always
       from edge and so that the complete road is available for use in one stretch from that and only after
       completing the work in particular K.M. work in next Km would be taken up.
3.13   After completion of work the contractor will remove all debris, fill up vats etc. as desired by E/I and
       leave the site clear and tidy at his own cost.
3.14   The department reserves the right of omitting or suspending the construction of changing site etc. if
       considered necessary in subsequent stage.
3.15   The following shall not be paid extra and the tendered rates shall be inclusive of these:
       (i)     Site clearance such as clearing of shrubs, bush, wood under growth & small trees not exceeding
               300mm girth measured at height of 900mm above ground.
       (ii)    Setting out works, profile, layout etc.
       (iii)   Vent battering and benching or excavation of foundation trenches.
       (iv)    Forming (or leaving) Tell-tale or witness in borrows pits and their removal after measurement.
               However deduction will be made in quantity of earthwork for those.
       (v)     Excavation for inserting of planking and shuttering.
       (vi)    Forming (or leaving) step in sides of deep excavation & their after measurement.
       (vii)   Balling out rain water/and or surface water in case the excavated foundation trenches were filled
               up by during construction.
       (viii) Removing slips of fails in excavation.
       (ix)    Making vats, platform, channel etc.
3.16   The contractor may use his own machinery for the completion of the work within the time stipulated in
       the contract. The carriage of machinery to different sites under this contract from one place to another
       for the work will be the responsibility of the contractor and all expenses in this regard will be borne by
       him.
3.17   CLAIM- Not admissible under following circumstances :
       A. Extra items of work done without written order of departmental officer.
       B. Incase of sudden fluctuation and/or increase in rates of labour, material, royalty, various taxes,
          railway freight, fuel, lubricants, carriage cost etc. at any stage of work.
       C. Short supply and/or non-supply and or delay of departmental materials and/or equipments.
       D. None- availability of labour of any category required for the work.
       E. Labour sitting idle due to any cause.
       F. Delay in communication in changes or modification in design, drawing & specification at any
          stage of the work.
       G. Loss sustained due to :
               i) Acts of enemies including agitation by public and riot.
               ii) Transportation and procurement difficulties.
              iii) Natural circumstances.
              iv) Any other circumstance which are beyond human control.
3.18   Proportionate deduction shall be made from the bill of the contractors for less leads of materials like
       stone aggregates and moorum etc. from their sources of actual receipt in comparison to these provision
       in the bill of quantity but no extra payment will made for more leads if any involved.
3.19   The contractor will have to establish a field laboratory for testing materials and works. The contractor
       shall, if required by the E/I, arrange to test the materials at site or get them tested in recognized materials
       testing laboratories at his own cost to prove their soundness and sufficiency as per specification laid
       down. The number of tests required for different items will be specified by E/I.
3.20   Contractor has to maintain the road from the date of agreement till the date after six month from the date
       of completion. During six month contractor have to rectify all the defects developed at his own cost.
       Contractor will be fully responsible regarding the quality and specification of the work. The work has to
       be durable.




                                                                                 Executive Engineer
                                                                            RCD, Road Division, Jamshedpur
       TENDERERS ARE REQUIRED TO QUOTE THEIR RATES IN FOLLOWING MANNER


Name of Work :- Bill of quantity    for special repaire of Inspection Bunglow
                   Bistupur and Mini Inspection Bunglow Bistupur under Road
                   Division Jamshedpur for the year 2011-2012


1)           % Percent           Above on the estimated rate as written in bill of quantity


2)           % Percent           Below on the estimated rate as written in bill of quantity


3)           On estimated rate as written in bill of quantity



(Strike out the items which are not applicable)                   Signature of Tenderer

     TENDERERS ARE REQUIRED TO FURNISH THE FOLLOWING INFORMATION

1.     Name and address of the tenderer :
2.     S.T. & I.T.C.C attached
3.     E.M. deposited & N.S.C./Pass Book attached
4.     Registration No. and Date
5.     Time of Completion
6.     Condition, if any
7.     Letter of registration as contractor attached
8.     Labour license attached
9.     Authorized and valid certificates (s) regarding the ownership of following
       Machineries in working condition attached for :
a)     Mixer                                    ___________ Nos.
b)     Vibrator                                 ___________ Nos.
c)     Water Tanker                             ___________ Nos.
 ( For Tendered offering to use his/her/their own road Construction & Earth Moving
Machineries as per clause 1.16 to 1.20 of NIT )



                                                                    Signature of Tenderer
Bill of quantity for special repaire of Inspection Bunglow Bistupur and Mini
Inspection Bunglow Bistupur under Road Division Jamshedpur for the year 2011-
2012                                             Date of tender-25/10/2011
Estimated cost Rs 999694.00                      Earnest Money Rs 20000.00
Sl No                          Particulars                       quantity   unit                     rate
                                                                                    In figure            In words
  (A)      Main I.B. Bistupur, Jamshedpur
           Providing 12 mm cement plaster (1:6) with clean
           coarse sand of F.M. 1.5 including screening curing
    1      with all leads and lifts of water scaffolding Taxes
           and royality all complete as per building
                                                                                                Rupees Eighty Five - Paise
           specification and direction of E/L                                   2
                                                                 1454.354   M        85.65          Sixty Five Only
           Providing and applying plaster of peris putty of
2/13.26    2mm thickness over plastered surface to prepare                                        Rupees Fourty Seven -
           the surface even and smooth complete                  1454.354   M2        47.2         Paise Twenty Only
          Finishing walls with textured exterior paint of
          required shade :-New work (two or more coats
3/13.45.1 applied @3,28 ltr/10m20over and including base
          coat of water proofing cement pain applied
          @2.20 kg /10m2
           Area same as item no 1
                                                                                                Rupees Ninety Six - Paise
           1454.354 M2                                           1454.354   M2       96.25         Twenty Five Only
           Providing two coat of snowsem of approved
           shade and make over a coat of cement primer on
   4/      old surface including prepairing the plastered
 5.8.23    surface smooth with sand paper, scaffolding
           curing and taxes all complete as per building                                        Rupees Thirty Eight - Paise
           specification and direction of E/L                     729.79    M2       38.99          Ninety Nine Only
           Providing designation on 75 A brick work in c.m
           (1:6) in plinth and substructure with approved
           quality of clean coarse sand of F.M. 2 to 2.5
   5/
           including providing 10 mm thick morter joints to
 5.2.11
           15 mm depth curing , taxes and royality all
           complete as per building specification and
           direction of E/L

                                                                                                  Rupees Two Thousand
                                                                                    2323.22     Three Hundred & Twenty
                                                                                                Three - Paise Twenty Two
           Boundary wall (back side)                              15.75     M3                            Only
         Providing two coat of painting with ready mixed
         paint of approved shade and makeover old
         wooden surface including preparing the surface
  6/
         after cleaning, removing dirt, surface, smokes,
5.8.28
         grease and sand papering including cost of
         scaffolding and taxes all complete as per building
         specification and direction of E/L

                                                                                              Rupees Fourty Three -
                                                                             2
         Area same as item no 1                                 136.89   M        43.79      Paise Seventy Nine Only
         Providing two coat of painting with ready mixed
  7/     paint approved shade and make over steel
5.8.43   surface do---do etc all complete job as per
         building specification and direction of E/I
                                                                                            Rupees Thirty Eight - Paise
         Boundary wall (back side)                              59.709   M2       38.16           Sixteen Only
         Renovation lawns, including weading forking the
  8      ground top dressing with forked soil etc all                                         Rupees Eleven - Paise
         complete job as per direction of E/I                    525     M   2
                                                                                   11.2           Twenty Only
         Suplying, fitting, fixing electric fitting old work
         with all fitting and wiring and displacing old
  9      damage wiring and with electric tube 20 nos&fan                 LS      20000.00
         seven nos etc all complete job as per direction of                                 Rupees Twenty Thousand
         E/I(standard make)                                                                          Only
         Purchase of godrej sofa set of standard quality
         and size with one piece three set and two number
 10
         single seat etc all complete job as per direction of
         E/I
         Godrej - STS FPARS019 PART 0
                                                                                               Rupees Fourty Five
                                                                                            Thousand Six Hundred &
         Sofa set (3 +1+1) - Two set                              2      NOS 45604.56       Four - Paise Fifty Six Only
                                                                                              Rupees Two Thousand
                                                                                             Seven Hundred & Thirty
                                                                                             One - Paise Fourty Four
         Chair CH 7B                                              8      NOS     2731.44              Only
                                                                                               Rupees Twenty One
                                                                                            Thousand Nine Hundred &
                                                                                            Eighty Nine - Paise Fourty
         WARDROBE H1 PACIFIC BLUE                                 2      NOS 21989.46                Six Only

         Purchase of bedseet, Parda and pillow cover of
 11      standard quality and size etc all complete job as
         per direction of E/I
                                                                                            Rupees Five Hundred &
                                                                                            Ninety Eight - Paise Fifty
         Bedseet                                                  6      NOS      598.5               Only
                                                                                         Rupees Two Hundred &
                                                                                          Seventy Four - Paise
           Pillow cover(16" X 26")                              10     NOS    274.99        Ninety Nine Only
                                                                                            Rupees Fourteen
                                                                                        Thousand Two Hundred &
                                                                                        Fourty Four - Paise Ninety
           STMAT787204 ORTHO DELUX                              2      NOS 14244.99             Nine Only


           Purchase of godrej bed(ZURINA KING) of standard
  12       quality and size with one piece three set and two
           number single seat etc all complete job as per
           direction of E/I
                                                                                          Rupees Twenty Five
                                                                                        Thousand Three Hundred
                                                                                         & Seventy Eight - Paise
           4 SET @Rs each                                       4      NOS 25378.68         Sixty Eight Only
                                                                                         Rupees Eight Thousand
                                                                                         Two Hundred & Three -
           Zurina Dressing table                                2      NOS   8203.44      Paise Fourty Four Only
                                                                                         Rupees Four Thousand
                                                                                        Nine Hundred & Fifty Two
           Sparkile Coffee table                                2      NOS   4952.16       - Paise Sixteen Only
           Purchase of crokery of standard quality and size
  13       all complete set etc all complete job as per
           direction of E/I
                                                                                        Rupees One Thousand One
           Tea set      ( bone china)                           2      SET    1100          Hundred Only
                                                                                         Rupees Two Thousand
           Dinner Set   (Lao polo)                              3      SET    2700       Seven Hundred Only
                                                                                         Rupees Five Hundred
           Stell Jug                                            2      NOS     500               Only
           Providing tor steel reinforcement of10mm diaas                                  Rupees Fifty Eight
14/5.5.4   per approved design and drawing do do all                                    Thousand Two Hundred &
           complete job as per building specification and                               Twenty Seven - Paise Fifty
           direction of E/I                                    0.225   MT    58227.57         Seven Only
           Repair of Dinning table, pelmate, Dressing table
           and Palang etc all complete job as per direction
  15
           of E/I(sofa set two nos,dining table one
           nos,palang two nos)
          Providing 63 mm av thick RCC M150 with
          approved quality of mixof (1:2:4)chajja with
          approved quality of stone chips 20mm to
          6mmsize graded and clean course sand of FM 2.5
          TO 3 including making drip cource in concrete
          ,screening centering shuttering and mixing
16/5.3.15                                                         34.2     M2      637.65
          cement concrete in mixer and placing in position
          vivrating stricking6mm cement plaster (1:4) in
          ceiling and side of chajja with sand of
          FM1.5curing( but excluding cost of reinforcement
          )taxes and royaltyall complete as per building                                     Rupees Six Hundred &
          specification and direction of E/I                                                Thirty Seven - Paise Sixty
                                                                                                    Five Only
          Dismentling of old plaster and painting in cement
17/5.10.7 or lime and reaching out joints to 15 mm etc all                                     Rupees Eight - Paise
          complete job as per direction of E/I                  1454.354   M2       8.29        Twenty Nine Only
  (B)      Mini I.B. Bistupur, Jamshedpur
          Dismentling of old plaster and painting in cement
          or lime and reaching out joints to 15 mm depth
18/5.10.7 watering and disposal of under visible material
          with all leads all complete job as per direction of
                                                                                               Rupees Eight - Paise
          E/L
                                                                 184.28    m2       8.29        Twenty Nine Only
           Providing 12 mm cement plaster (1:6) with clean
           coarse sand of F.M. 1.5 including screening curing
   19/     with all leads and lifts of water scaffoldingsea
  5.7.3    Taxes and royality all complete job as per
                                                                                            Rupees Eighty Five - Paise
           building specification and direction of E/L
                                                                 184.28    m2      85.65        Sixty Five Only
           Providing 6 mm thick cement plaster (1:4) in
           ceiling with clean coarse sand of F.M. 1.5
   20/     including screening curing with all lead and lifts
  5.7.6    all all complete job as per building specification
           and direction of E/L                                                              Rupees Seventy Seven -
                                                                 17.157    m2      77.66       Paise Sixty Six Only
           disinfection room with one coat of bleaching
           powder shoultion finished with one coat of wite
  21/      wash with approved quality of lime after
 5.8.40    scrubbing the old plaster aera surface including
           scaffolding taxes all complete job as per building
           specification and direction of E/I                                               Rupees Six - Paise Fourty
                                                                               2
                                                                809.115    m       6.48           Eight Only
           Providing two coats of dry distamper of approved
           shade and make over old surface including
  22/      washing cleaning and prepairing xxx walls,
  8.14     seafolding washing of floor and taxes all comlete
                                                                                            Rupees Thirty Nine - Paise
           as per building specification and direction of E/L
                                                                 276.42    m2      39.26        Twenty Six Only
          Providing two coat of snowsem of approved
          shade and makeover old surface including
          washing, cleaning and prepairing the plastered
 23/
          surface by rubbing smooth with pumile stone or
5.8.23
          fine sand paper, whereever required, seafounding
          washing of floor and taxes all complete as per
          building specification and direction of E/L                                        Rupees Thirty Eight - Paise
                                                                  809.115   m2     38.99         Ninety Nine Only
          Providing two coats of dry distamper of approved
          shade and makeover a prime coat of working
          over new surface including prepairing the
 24/      plastered surface by rubbing smooth with pumei
5.8.23    stone or fine sand paper, whereever required,
          seafoulding washing of floor and taxes all
          complete as per building specification and
                                                                                             Rupees Fourty Two - Paise
          direction of E/L
                                                                  184.28    m2     42.47        Fourty Seven Only
          Supplying fitting and fixing good quality well
          dressed and well seasoned sal wood work in
          choukhat in door window sky light,fan light,and
          c/w celestial window opening including wedge
  25/
          over all complete,including application oftow coat
 5.4.7
          of wood preservative of approved qualityon the                                       Rupees Fourty Three
          surface,butting wallsand lintalall complete as per                                 Thousand Five Hundred &
          building specification and direction of E/I                                         Thirty One - Paise Fifty
                                                                  0.1898    m3    43531.51           One Only
          Taking down old door and window shuttors
  26/     including servcle material with 15 mm lead and
5.10.10   disposal of un servisable material with lead all
                                                                                               Rupees Sixteen - Paise
          complete job as per direction of E/L
                                                                    5       nos    16.58          Fifty Eight Only
          Taking down C.A. Sheet in roof with ridge
  27/     including staking the servisable material within 15
5.10.15   mm lead and disposal of unservisble material with
                                                                                             Rupees Eight - Paise Eighty
          lead all lead as per direction of E/L
                                                                  66.9125   M2      8.85             Five Only
           Labour for fitting and fixing ca sheet,
          ridge,including the cost of (j)and(l) hook limpet
 28/
          and bitumen washer carriage sheet to work site
5.9.11
          and taxes all complete job as per building                                          Rupees Twenty Seven -
          specification and direction E/I                         66.9125   m2     27.53       Paise Fifty Three Only
          Supplying fitting and fixing C.A. sheet including all
  29      taxes all complete job as per building specification
          and direction of E/L
          (A) C.A. rdge valley long
                                                                                              Rupees Two Hundred &
                                                                   14.25    m2     203.5      Three - Paise Fifty Only
          (B) Corrugated 6 mm thick
                                                                                              Rupees One Hundred &
                                                                                              Ninety Two - Paise Fifty
                                                                  66.9125   m2     192.5               Only
         Supplying fitting and fixing 32 mm thick good
         quality well dressed and well seasoned sal wood                                   Rupees Two Thousand
 30/
         fully panneled in doors and windows with 20 mm                                      Three Hundred &
5.4.12
         thick panel in all complete job as per building                                  Seventeen - Paise Thirty
         specification and direction of E/L                     6      m2      2317.32           Two Only
         Supplying fitting and fixing 32 mm thick good
         quality well dressed and well seasoned sal wood
 31/
         panneled shutter in doors and windows in all                                     Rupees Three Thousand
5.4.9
         complete job as per building specification and                                  Eight Hundred & Fifty Nine
         direction of E/L                                      8.01    m2      3859.02        - Paise Two Only
         Providing two coat enamel synthetic paints of
         approved shade and make over new wooden
 32/
         surface including prepairing the surface in all
5.8.32
         complete job as per building specification and                                   Rupees Fifty Two - Paise
         direction of E/L                                     82.215   m2       52.21        Twenty One Only

 33      Providing labour for cleaning outside I.B. Campus
                                                                                          Rupees One Hundred &
                                                               30      NOS               Thirty Three - Paise Eighty
                                                                               133.81             One Only
         Renovation of lawns, including weding, forking
 34/
         the ground top dressing, the forked soil in all                                   Rupees Eleven - Paise
5.8.10
         complete job                                          360     m   2
                                                                                11.2           Twenty Only
         Providing and fixing sainitory item such as water
 34      tape, flush cistern,and mirror in bathroom etc all                              Rupees Two Thousand Five
         complete job                                                  LS       2500         Hundred Only
                                                                                          Rupees Nine Thousand
 35      Add labour cess @1%except c.p                                                       &Fifteen - Paise
                                                                               9015.17       Seventeen Only




                                                                                                    E.E.
                                                                                           R.C.D., Road Division
                                                                                               Jamshedpur

				