Passenger Boarding Bridges                                   KROnUS  PR2  +  PR3                                                               CRUISE




THE PROJECT
Kiel, one of the most important ports in Germany, inaugurated in april
2007 its third cruise facility: the Cruise Terminal 'Ostseekai' to provide
preferential berthing to Costa Cruises and mSC Cruises. Team delivered
on-time two Passenger Boarding Bridges to connect with the elevated
walkways leading to the terminal building.


EL PROYECTO
Kiel, uno de los puertos más importantes de alemania, inauguró en abril
2007 su tercera terminal para cruceros "Ostseekai" para satisfacer las
demandas operativas de sus clientes Costa Cruceros y mSC Cruceros.
Team diseñó y construyó dos innovadoras pasarelas de embarque de
pasajeros, capaces de conectar con las pasarelas elevadas que dirigen
hacia la terminal.




      THE CLIEnT                                                             EL CLIEnTE
      name: SeeHaFen KIeL GmbH                                               nombre: SeeHaFen KIeL GmbH
      Solution: Passenger Boarding Bridges “KrOnUS Pr2 + Pr3”                Solución: Pasarelas de embarque de pasajeros ‘KrOnUS Pr2 + Pr3’
      Project time: august 2006 - april 2007                                 Duración del proyecto: agosto 2006 - abril 2007
      Location: Cruise Terminal ‘Ostseekai’                                  Localización: Cruise Terminal ‘Ostseekai’
                                        KIEL
                                                                                                                        T H E   B O A R D I n G C O M PA n Y
                               (aLemanIa)



             Pasarelas de embarque de pasajeros                                               KROnUS  PR2  +  PR3                                                        CRUCERO



             TECHnICAL FEATURES                                                               CARACTERISTICAS TéCnICAS
             Two double glazed passenger boarding bridges of the 3-tunnel apron               Dos pasarelas de embarque de pasajeros acristaladas tipo "apron
             Drive increasing section type. each bridge has the possibility to                Drive" de 3 cuerpos y de sección creciente con una longitud operacio-
             extend from 25 to 49 metres. The smaller tunnel is adjacent to the               nal que va desde los 25 a los 49 metros. el túnel más pequeño es adya-
             pier building / fixed bridge and the shorter tunnel is adjacent to the           cente al edificio del muelle / pasarela fija y el túnel más ancho es
             cruise vessel entrance door. The bridges are rectangular in shape with           adyacente a la puerta de atraque de los cruceros. La pasarela se
             steel guides for tunnel guidance. The bridges are completed by the               completa con una rotonda móvil, una columna de apoyo, un pórtico de
             movable rotunda, the support column, the elevation frame with radial             elevación con ruedas direccionales, una cabina y una rampa de atra-
             wheels, cabin and the connecting telescopic docking ramp.                        que telescópica de conexión.

             KRONUS PR2 + PR3                                                                 KRONUS PR2 + PR3
             Service Height (on water) 3,05 / 12,0 m   Motion drive package:                  Altura Servicio (sobre agua) 3,05 / 12,0 m   Sistemas motorización:

             Maximum slope 15,9%                       - electromechanical lifting            Pendiente máxima 15,9%                       -elevación electromecánica

             Auto - levelling system                   - electromechanical movement           Sistema Autonivelación                       -traslación electromecánica

             Power source: Electrical                  - telescopic boarding pod, hydraulic   Sistema de potencia: Eléctrico               -rampa atraque hidráulica




             TEAM, S.L.                                                                                                TEAM PORT SERvICES Inc.
DC 12/2008




             c/ Buenos aires 1, 08029 Barcelona, SPaIn                                                                 2655 Le Jeune road, Suite 810 Coral Gables, FL 33134 U.S.a.
             Tel./Phone: +34 902 300 601 / +34 933 632 294 Fax: +34 933 632 295                                        teamportservices@teamcompany.com
             team@teamcompany.com
             www.teamcompany.com

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:3
posted:10/13/2011
language:Esperanto
pages:2