index

Document Sample
index Powered By Docstoc
					                                                                                                                                                                                                                                                             Date last
      check       STSP # to enter              Description                            Directions and Fields                      Information to enter                                            Technical Notes                                             updated
        X            000-000        Template                                                                                                            Use this template to create an article for a SPV item.
                         102-005    Proposal Guaranty             Enter dollar amount of propsal guaranty                                               Multiple projects: A, B, A&B. STSP 103-010 is also required                                          8/20/2003
                                                                  Enter project id #
                                                                  Enter project id #
                                                                  Enter project id #
                                                                  Enter project id # (Delete any unnecessary fields.)
                         102-010    Mandatory Pre-Bid Meeting     Enter the date and time of the meeting                                                Use when a pre-bid meeting is required                                                               4/15/2004
                                                                  Enter the location of the meeting
                         103-005    Consideration of Proposals    Enter the project id number                                                           Alternative Materials; 2 proposals                                                                   8/20/2003
                         103-010    Consideration of Proposals    Enter first project number                                                            Multiple projects: A, B, A&B. STSP 102-005 is also required                                          8/20/2003
                                                                  Enter second project number
                                                                  Enter third project number
                                    Scope of Work                 This is part of the basic template so it will not need to be                          Required on all contracts; included in the general template. Formerly 104-005.                       9/1/2009
                                                                  inserted as a building block. Fill in the description of the
                                                                  major work being performed.
                  Use P&P Ribbon    Completion Date tab -                                                                                               Required for Completion Date Contracts. (Formerly STSP 108-010)                                      9/1/2009
                                    Timeframe button
                  Use P&P Ribbon    Working Day and Calendar      Enter the year of the construction season                                             Request contractor proposed time frame for working day and calendar day contracts. (Formerly         9/1/2009
                                    Day tabs - Timeframe                                                                                                STSP 108-015)


                  Use P&P Ribbon    Working Day and Calendar      Enter completed work                                                                  Fall Suspension. (Formerly STSP 108-030)                                                             9/1/2009
                                    Day tabs - Fall Suspension    Enter the year the work will be suspended
                                    button                        Enter required construction
                                                                  Enter the year the work will resume
                                                                  Enter the year the work will resume
                  Use P&P Ribbon    Working Day tab - Interim     List appropriate construction operations                                              Working day contract with Interim Liquidated Damages. (Formerly STSP 108-035)                        9/1/2009
                                    Liquidated Damages group -    Enter Route # / Street Name
                                    Working Day button            Enter number of working days
                                                                  List appropriate construction operations
                                                                  Enter Route # / Street Name
                                                                  Enter number of working days
                                                                  Enter dollar amount of interim liquidated damages
                                                                  Enter number of working days
                  Use P&P Ribbon    Calendar Day Ttb - Interim    List appropriate construction operations                                              Calendar Day Contract with interim Liquidated Damages based on Calendar Days; eliminate              9/1/2009
                                    Liquidated Damages group -                                                                                          excusable delays. DESIGNER NOTES: Use this STSP very judiciously and only when
                                    Eliminate Excusable Delays                                                                                          absolutely necessary. See FDM Procedures 19-15-15 and 19-15-16 for guidance on using this
                                    Calendar Days button                                                                                                language. Refer to FDM Procedure 11-60-5 for calculating interim liquidated damages
                                                                                                                                                        amount(s). Designer is strongly encouraged to consider the following alternative special
                                                                                                                                                        provisions: Prosecution and Progress (Calendar Day Contracts with Interim LDs and the
                                                                                                                                                        restriction on granting weather delays); Incentive/Disincentive for Interim Completion of Work,
                                                                                                                                                        Item 108.3100.S. See FDM Procedure 19-15-18. Calendar Day Contract with Interim
                                                                  Enter Route # / Street Name
                                                                                                                                                        Liquidated Damages based on Calendar Days; elminate excusable delays. Do not use this
                                                                  Enter number of calendar days
                                                                                                                                                        special provision if there is a strong likelihood of utility or other third-party delays that are
                                                                  Describe work
                                                                                                                                                        beyond the control of the contractor. Do not edit this special to eliminate any additional
                                                                  Enter Route # / Street Name
                                                                                                                                                        excusable delays beyond the three listed. (Formerly STSP 108-036)
                                                                  Enter number of calendar days
                                                                  Enter dollar amount of interim liquidated damages
                                                                  Enter number of calendar days
                  Use P&P Ribbon    Completion Date tab -         List appropriate construction operations                                              Completion Date Contract with Interim Liquidated Damages based on Calendar Days;                     9/1/2009
                                    Interim Liquidated Damages                                                                                          eliminate excusable delays. Designer Notes: Use this special provision judiciously and only
                                    group - Eliminate Excusable                                                                                         when absolutely necessary. See FDM Procedures 19-15-15 and 19-15-16 for guidance on
                                    Delays Calendar Days button                                                                                         using this language. Refer to FDM Procedure 11-60-5 for calculating interim liquidated
                                                                                                                                                        damages amount(s). Designer is strongly encouraged to consider the following alternative
                                                                                                                                                        special provisions: Prosecution and Progress (Calendar Day Contracts with Interim LD's and
                                                                                                                                                        the restriction on granting weather delays.); Incentive/Disincentive for Interim Completion of
                                                                  Enter Route # / Street Name
                                                                                                                                                        Work, Item 108.3100.S. See FDM Procedure 19-15-18. Do not use this special provision if
STSP Index Spreadsheet                                                                                                                                  there is a strong likelihood of utility or other third-party delays that are beyond the control of               10/12/2011
                                                                                                                                                        the contractor. Do not edit this special to eliminate any additional excusable delays beyond the
                                                                                                                                                        three listed. (Formerly STSP 108-037)
                                    group - Eliminate Excusable                                                                                      when absolutely necessary. See FDM Procedures 19-15-15 and 19-15-16 for guidance on
                                    Delays Calendar Days button                                                                                      using this language. Refer to FDM Procedure 11-60-5 for calculating interim liquidated
                                                                                                                                                     damages amount(s). Designer is strongly encouraged to consider the following alternative
                                                                                                                                                     special provisions: Prosecution and Progress (Calendar Day Contracts with Interim LD's and
                                                                                                                                                                                                                                                          Date last
                                                                                                                                                     the restriction on granting weather delays.); Incentive/Disincentive for Interim Completion of
      check       STSP # to enter           Description                               Directions and Fields                   Information to enter                                              Technical Notes                                           updated
                                                                                                                                                     Work, Item 108.3100.S. See FDM Procedure 19-15-18. Do not use this special provision if
                                                                  Enter number of calendar days
                                                                                                                                                     there is a strong likelihood of utility or other third-party delays that are beyond the control of
                                                                  Describe work
                                                                                                                                                     the contractor. Do not edit this special to eliminate any additional excusable delays beyond the
                                                                  Enter Route # / Street Name
                                                                                                                                                     three listed. (Formerly STSP 108-037)
                                                                  Enter number of calendar days
                                                                  Enter dollar amount of interim liquidated damages
                                                                  Enter number of calendar days
                  Use P&P Ribbon    Calendar Day tab - Interim    List appropriate construction operations                                           Calendar Day contract with interim Liquidated Damages based on Calendar Days; restrict               9/1/2009
                                    Liquidated Damages group -                                                                                       granting a weather delay. Designer Notes: Calendar Day contract with interim Liquidated
                                    Restrict Weather Delays                                                                                          Damages based on Calendar Days; restrict granting a weather delay. See FDM Procedures 19-
                                    Calendar Days button                                                                                             15-15 and 19-15-16 for guidance on using this special provision. Refer to FDM Procedure 11-
                                                                                                                                                     60-5 for calculating interim liquidated damages amount(s). By increasing the number of
                                                                                                                                                     adverse weather days during the road closure period, this special provision reduces the
                                                                                                                                                     likelihood of granting the contractor a weather delay for the road closure period. Time
                                                                                                                                                     extensions are granted when the number of adverse weather days actually occurring exceeds
                                                                                                                                                     the number of adverse weather days listed in the contract. The designer needs to select the
                                                                                                                                                     appropriate number of adverse weather days for the months between April and Nov 1 through
                                                                                                                                                     15 as follows, and enter that value in the table provided: Total Anticipated Adverse Weather
                                                                                                                                                     Days for Each Calendar Month[2]
                                                                                                                                                     Jan[1] 31      Aug 3 or 6
                                                                                                                                                     Feb[1] 28      Sept 4 or 7
                                                                                                                                                     Mar[1] 31 Oct 5 or 8
                                                                                                                                                     April 5 or 8 Nov 1 through 15 2 or 5
                                                                  Enter Route # / Street Name
                                                                                                                                                     May 4 or 7 Nov 15 through 30[1] 15
                                                                  Enter number of calendar days
                                                                                                                                                     June 4 or 7 Dec[1] 31
                                                                  Describe work
                                                                                                                                                     July 3 or 6
                                                                  Enter number of adverse weather days allowed in April
                                                                                                                                                      [1] Includes an anticipated winter suspension from November 16 through March 31.
                                                                  Enter number of adverse weather days allowed in May
                                                                                                                                                      [2] The number of days will be modified in the special provision for year-round and painting
                                                                  Enter number of adverse weather days allowed in June
                                                                                                                                                     contracts.
                                                                  Enter number of adverse weather days allowed in July
                                                                                                                                                     For months that include the road closure, select the higher number of adverse weather days.
                                                                  Enter number of adverse weather days allowed in August
                                                                                                                                                     For months that don't include the road closure, select the lower number of adverse weather
                                                                  Enter number of adverse weather days allowed in September
                                                                                                                                                     days. (Formerly STSP 108-038)
                                                                  Enter number of adverse weather days allowed in October
                                                                  Enter number of adverse weather days allowed November 1st
                                                                  through November 15th
                                                                  Enter Route # / Street Name
                                                                  Enter number of calendar days
                                                                  Enter dollar amount of interim liquidated damages
                                                                  Enter number of calendar days
                  Use P&P Ribbon    Completion Date tab -         List appropriate construction operations                                           Completion Date contract with Interim Liquidated Damages based on Calendar Days; restrict            9/1/2009
                                    Interim Liquidated Damages                                                                                       granting a weather delay. Designer Notes: See FDM Procedures 19-15-15 and 19-15-16 for
                                    group - Restrict Weather                                                                                         guidance on using this special provision. Refer to FDM Procedure 11-60-5 for calculating
                                    Delays Calendar Days button                                                                                      interim liquidated damages amount(s). By increasing the number of adverse weather days
                                                                                                                                                     during the road closure period, this special provision reduces the likelihood of granting the
                                                                                                                                                     contractor a weather delay for the road closure period. Time extensions are granted when the
                                                                                                                                                     number of adverse weather days actually occurring exceeds the number of adverse weather
                                                                                                                                                     days listed in the contract. The designer needs to select the appropriate number of adverse
                                                                                                                                                     weather days for the months between April and Nov 1 through 15 as follows, and enter that
                                                                                                                                                     value in the table provided: Total Anticipated Adverse Weather Days for Each Calendar
                                                                                                                                                     Month[2]
                                                                                                                                                     Jan[1] 31       Aug 3 or 6
                                                                  Enter Route # / Street Name                                                        Feb[1] 28       Sept 4 or 7
                                                                  Enter number of calendar days                                                      Mar[1] 31        Oct 5 or 8
                                                                  Describe work                                                                      April 5 or 8 Nov 1 through 15 2 or 5
                                                                  Enter number of adverse weather days allowed in April                              May 4 or 7 Nov 15 through 30[1] 15
                                                                  Enter number of adverse weather days allowed in May                                June 4 or 7      Dec[1] 31
                                                                  Enter number of adverse weather days allowed in June                               July 3 or 6
                                                                  Enter number of adverse weather days allowed in July                                [1] Includes an anticipated winter suspension from November 16 through March 31.
                                                                                                                                                      [2] The number of days will be modified in the special provision for year-round and painting
STSP Index Spreadsheet                                                                                                                               contracts. For months that include the road closure, select the higher number of adverse                         10/12/2011

                                                                                                                                                     weather days. For months that don't include the road closure, select the lower number of
                                                                                                                                                     April 5 or 8 Nov 1 through 15 2 or 5
                                                                                                                                                     May 4 or 7 Nov 15 through 30[1] 15
                                                                                                                                                     June 4 or 7     Dec[1] 31
                                                                                                                                                     July 3 or 6                                                                                           Date last
      check       STSP # to enter           Description                             Directions and Fields                     Information to enter    [1] Includes an anticipated winter suspension from November 16 through March 31.
                                                                                                                                                                                             Technical Notes                                               updated
                                                                  Enter number of adverse weather days allowed in August                              [2] The number of days will be modified in the special provision for year-round and painting
                                                                  Enter number of adverse weather days allowed in September                          contracts. For months that include the road closure, select the higher number of adverse
                                                                  Enter number of adverse weather days allowed in October                            weather days. For months that don't include the road closure, select the lower number of
                                                                  Enter number of adverse weather days allowed November 1st                          adverse weather days.
                                                                  through November 15th                                                              (Formerly STSP 108-039)
                                                                  Enter Route # / Street Name
                                                                  Enter number of calendar days
                                                                  Enter dollar amount of interim liquidated damages
                                                                  Enter number of calendar days
                  Use P&P Ribbon    Calendar Day tab - Interim    Enter Route # / Street Name                                                        Calendar Day contract with Interim Liquidated Damages based on a Fixed Date; eliminate                9/1/2009
                                    Liquidated Damages group -                                                                                       excusable delays. Designer Notes:
                                    Eliminate Excusable Delays                                                                                       • Use this special provision judiciously and only when absolutely necessary. See FDM
                                    Fixed Date button                                                                                                Procedures 19-15-15 and 19-15-16 for guidance on using this language. Refer to FDM
                                                                                                                                                     Procedure 11-60-5 for calculating interim liquidated damages amount(s).
                                                                                                                                                     • Designer is strongly encouraged to consider the following alternative special provisions:
                                                                                                                                                     o Prosecution and Progress (Calendar Day Contracts with Interim LD's and the restriction on
                                                                                                                                                     granting weather delays.)
                                                                                                                                                     o Incentive/Disincentive for Interim Completion of Work, Item 108.3100.S. See FDM
                                                                                                                                                     Procedure 19-15-18.
                                                                                                                                                     • Do not use this special provision if there is a strong likelihood of utility or other third-party
                                                                  Enter Date
                                                                                                                                                     delays that are beyond the control of the contractor.
                                                                  List appropriate construction operations
                                                                                                                                                     • Do not edit this special to eliminate any additional excusable delays beyond the three listed
                                                                  Enter Route # / Street Name
                                                                                                                                                     above. (Formerly STSP 108-051)
                                                                  Enter Date
                                                                  Enter dollar amount of interim liquidated damages
                                                                  Enter date
                  Use P&P Ribbon    Completion Date tab -         Enter Route # / Street Name                                                        Completion Date contract with Interim Liquidated Damages based on a Fixed Date; eliminate             9/1/2009
                                    Interim Liquidated Damages                                                                                       excusable delays. Designer Notes:
                                    group - Eliminate Excusable                                                                                      • Use this special provision judiciously and only when absolutely necessary. See FDM
                                    Delays Fixed Date button                                                                                         Procedures 19-15-15 and 19-15-16 for guidance on using this language. Refer to FDM
                                                                                                                                                     Procedure 11-60-5 for calculating interim liquidated damages amount(s).
                                                                                                                                                     • Designer is strongly encouraged to consider the following alternative special provisions:
                                                                                                                                                     o Prosecution and Progress (Calendar Day Contracts with Interim LD's and the restriction on
                                                                                                                                                     granting weather delays.)
                                                                                                                                                     o Incentive/Disincentive for Interim Completion of Work, Item 108.3100.S. See FDM
                                                                                                                                                     Procedure 19-15-18.
                                                                  Enter date                                                                         • Do not use this special provision if there is a strong likelihood of utility or other third-party
                                                                  List appropriate construction operations                                           delays that are beyond the control of the contractor.
                                                                  Enter Route # / Street Name                                                        • Do not edit this special to eliminate any additional excusable delays beyond the three listed
                                                                  Enter date                                                                         above. (Formerly STSP 108-052)
                                                                  Enter dollar amount of interim liquidated damages
                                                                  Enter date
                  Use P&P Ribbon    Calendar Day tab - Interim    Enter Route # / Street Name                                                        Calendar Day contract with Interim Liquidated Damages based on a Fixed Date; restrict                 9/1/2009
                                    Liquidated Damages group -                                                                                       granting a weather delay. Designer Notes: See FDM procedures 19-15-15 and 19-15-16 for
                                    Restrict Weather Delays                                                                                          guidance on using this special provision. Refer to FDM procedure 11-60-5 for calculating
                                    Fixed Date button                                                                                                interim liquidated damages amount(s). By increasing the number of adverse weather days prior
                                                                                                                                                     to the interim completion date, this special provision reduces the likelihood of granting the
                                                                                                                                                     contractor a time extension for the interim completion date. Time extensions are granted when
                                                                                                                                                     the number of adverse weather days actually occurring exceeds the number of adverse weather
                                                                                                                                                     days listed in the contract. The designer needs to select the appropriate number of adverse
                                                                                                                                                     weather days for the months between April and Nov 1 through 15 as follows, and enter that
                                                                                                                                                     value in the table provided: Total Anticipated Adverse Weather Days for Each Calendar
                                                                                                                                                     Month[2]
                                                                                                                                                     Jan[1] 31       Aug 3 or 6
                                                                                                                                                     Feb[1] 28       Sept 4 or 7
                                                                                                                                                     Mar[1] 31 Oct 5 or 8
                                                                  Enter date                                                                         April 5 or 8 Nov 1 through 15 2 or 5
STSP Index Spreadsheet                                                                                                                               May 4 or 7 Nov 15 through 30[1] 15                                                                                10/12/2011
                                                                                                                                                     June 4 or 7 Dec[1] 31
                                                                                                                                                     July 3 or 6
                                                                                                                                                          value in the table provided: Total Anticipated Adverse Weather Days for Each Calendar
                                                                                                                                                          Month[2]
                                                                                                                                                          Jan[1] 31      Aug 3 or 6
                                                                                                                                                          Feb[1] 28      Sept 4 or 7
                                                                                                                                                          Mar[1] 31 Oct 5 or 8                                                                                Date last
      check       STSP # to enter           Description                                Directions and Fields                       Information to enter   April 5 or 8 Nov 1 through 15 2 or 5 Technical Notes                                                updated
                                                                   List appropriate construction operations                                               May 4 or 7 Nov 15 through 30[1] 15
                                                                   Enter number of adverse weather days allowed in April                                  June 4 or 7 Dec[1] 31
                                                                   Enter number of adverse weather days allowed in May                                    July 3 or 6
                                                                   Enter number of adverse weather days allowed in June                                    [1] Includes an anticipated winter suspension from November 16 through March 31.
                                                                   Enter number of adverse weather days allowed in July                                    [2] The number of days will be modified in the special provision for year-round and painting
                                                                   Enter number of adverse weather days allowed in August                                 contracts. For months preceding the interim completion dates, select the higher number of
                                                                   Enter number of adverse weather days allowed in September                              adverse weather days. For months after the interim completion dates, select the lower number
                                                                   Enter number of adverse weather days allowed in October                                of adverse weather days. (Formerly STSP 108-053)
                                                                   Enter number of adverse weather days allowed November 1st
                                                                   through November 15th
                                                                   Enter Route # / Street Name
                                                                   Enter date
                                                                   Enter dollar amount of interim liquidated damages
                                                                   Enter date
                  Use P&P Ribbon    Completion Date tab -          Enter Route # / Street Name                                                            Completion Date contract with interim Liquidated Damages based on a Fixed Date; restrict            9/1/2009
                                    Interim Liquidated Damages                                                                                            granting a weather delay. Designer Notes: See FDM Procedures 19-15-15 and 19-15-16 for
                                    group - Restrict Weather                                                                                              guidance on using this special provision. Refer to FDM Procedure 11-60-5 for calculating
                                    Delays Fixed Date button                                                                                              interim liquidated damages amount(s). By increasing the number of adverse weather days prior
                                                                                                                                                          to the interim completion date, this special provision reduces the likelihood of granting the
                                                                                                                                                          contractor a time extension for the interim completion date. Time extensions are granted when
                                                                                                                                                          the number of adverse weather days actually occurring exceeds the number of adverse weather
                                                                                                                                                          days listed in the contract. The designer needs to select the appropriate number of adverse
                                                                                                                                                          weather days for the months between April and Nov 1 through 15 as follows, and enter that
                                                                                                                                                          value in the table provided: Total Anticipated Adverse Weather Days for Each Calendar
                                                                   Enter date                                                                             Month[2]
                                                                                                                                                          Jan[1] 31 Aug
                                                                   List appropriate construction operations
                                                                                                                                                          Feb[1] 28 Sept
                                                                   Enter number of adverse weather days allowed in April
                                                                                                                                                          Mar[1] 31 Oct
                                                                   Enter number of adverse weather days allowed in May
                                                                                                                                                          April Nov 1 through 15
                                                                   Enter number of adverse weather days allowed in June
                                                                                                                                                          May Nov 15 through 30[1] 15
                                                                   Enter number of adverse weather days allowed in July
                                                                                                                                                          June Dec[1] 31
                                                                   Enter number of adverse weather days allowed in August
                                                                                                                                                          July
                                                                   Enter number of adverse weather days allowed in September
                                                                                                                                                           [1] Includes an anticipated winter suspension from November 16 through March 31.
                                                                   Enter number of adverse weather days allowed in October                                 [2] The number of days will be modified in the special provision for year-round and painting
                                                                   Enter number of adverse weather days allowed November 1st                              contracts. For months preceding the interim completion dates, select the higher number of
                                                                   through November 15th                                                                  adverse weather days. For months after the interim completion dates, select the lower number
                                                                   Enter Route # / Street Name                                                            of adverse weather days. (Formerly STSP 108-054)
                                                                   Enter date
                                                                   Enter dollar amount of interim liquidated damages
                                                                   Enter date
                  Use P&P Ribbon    Completion Date tab -          Enter the project id number                                                            Completion Date contract with multiple project number; Interim Competion Dates based on             9/1/2009
                                    Interim Liquidated Damages                                                                                            Calendar Days; eliminate excusable delays. Designer Notes: Use this special provision
                                    group - Multiple Proj button                                                                                          judiciously and only when absolutely necessary. See FDM Procedures 19-15-15, 19-15-16,
                                                                                                                                                          and 19-15-17 for guidance on using this language. Refer to FDM Procedure 11-60-5 for
                                                                                                                                                          calculating interim liquidated damages amount(s). Designer is strongly encouraged to consider
                                                                                                                                                          the following alternative special provisions: Prosecution and Progress (Calendar Day Contracts
                                                                                                                                                          with Interim LD's and the restriction on granting weather delays.) Incentive/Disincentive for
                                                                   Enter the number of calendar days                                                      Interim Completion of Work, Item 108.3100.S. See FDM Procedure 19-15-18. Do not use this
                                                                   Enter the interim liquidated damages dollar amount                                     special provision if there is a strong likelihood of utility or other third-party delays that are
                                                                   Enter the number of calendar days                                                      beyond the control of the contractor. Do not edit this special to eliminate any additional
                                                                   Enter the project id number                                                            excusable delays beyond the three listed. (Formerly STSP 108-055)
                                                                   Enter the number of calendar days
                                                                   Enter the interim liquidated damages dollar amount
                                                                   Enter the number of calendar days
                  Use P&P Ribbon    Working Day, Calendar Day      Enter a description of the work needing completion before the                          Expedited work schedule - Use appropriate paragraph (Formerly STSP 108-075)                         9/1/2009
                                    & Completion Date tabs,        suspension.
                                    Expedited Schedule button
STSP Index Spreadsheet                                                                                                                                                                                                                                                    10/12/2011
                  Use P&P Ribbon    Working Day, Calendar Day                                                                                          Expedited work schedule - Use appropriate paragraph (Formerly STSP 108-075)                          Date last
                                                                                                                                                                                                                                                            9/1/2009
      check       STSP # to enter           Description
                                    & Completion Date tabs,                           Directions and Fields                     Information to enter                                        Technical Notes                                                 updated
                                    Expedited Schedule button     Enter the calendar year


                  Use P&P Ribbon    Working Day, Calendar Day     There is one building block with a dropdown box for fish                             DNR Fish Spawning Window. Use when construction cannot occur within a range of dates,                9/1/2009
                                    & Completion Date tabs,       spawning. There is no title, as the fish spawning                                    prior to a particular date, or after a particular date, due to fish spawning. Formerly STSP
                                    Fish button                   restrictions affect a contractor's schedule of work and                              107-051, 107-052, and 107-053.
                                                                  therefore part of the prosecution and progress article. In
                                                                  the first field enter the name of the waterway.
                                                                  In DD, Select from: 1. ___ to ____ both dates inclusive; 2.
                                                                  prior to _____; and, 3. after ____. Highlight the line and
                                                                  enter date(s)
                                                                  Enter the name of the fish.
                  Use P&P Ribbon    Working Day, Calendar Day     DD - Select the appropriate bid item: 1. Removing Old                                Migratory Birds (Formerly STSP 108-070). Use when migratory birds are present and the                9/1/2009
                                    & Completion Date tabs,       Structure; 2. Removing Old Structure Over Waterway; 3.                               bridge must be netted to preclude bird nesting.
                                    Birds button                  Removing Old Structure Over Waterway with Minimal
                                                                  Debris; or, 4. Removing Old Structure Over Waterway with
                                                                  Debris Capture System.
                         104-010    Partnering Charter                                                                                                 Partnering. If adding this STSP to the special provisions, add to the end of Article 2, Scope of     9/2/2008
                                                                                                                                                       Work.
                         105-001    Municipality Acceptance of    Enter the municipality name (City of ____, Town of ____, or                          Required in all contracts that contain sanitary sewer and water main construction.                   10/9/2006
                                    Sanitary Sewer and Water      Village of ____)
                                    Main Construction

                         105-005    Project Communication                                                                                              Use on selected large or complicated contracts to require the use of the Project Communication       9/1/2009
                                    Enhancement Effort                                                                                                 Enhancement Effort packet of tools. Porjects that involve significant utility coordination, the
                                                                                                                                                       likelihood of unknown utilities or differing site conditions, multiple stages and sequencing,
                                                                                                                                                       complicated traffic control, expedited schedules, or significant 3rd party involvement warrant
                                                                                                                                                       inclusion of this provision. It may also be appropriate for inclusion by change order on projects
                                                                                                                                                       where field staffs experience communication issues that may be mitigated by using the PCEE
                                                                                                                                                       tools or where the prime contractor has requested their use.


                         107-001    Public Convenience and Safety Enter night time hour                                                                Use when the hours of operating motorized equipment are different than standard spec                 5/12/2006
                                                                  Enter day time hour                                                                  107.8(6), i.e., from 6:00 AM to 10:00 PM.

                         107-005    Holiday Work Restrictions     Enter the roadway name(s)                                                            Enter the dates and days that Holiday Work restrictions are in effect. Delete any                    5/2/2005
                                                                  Enter the date                                                                       unnecessary fields.
                                                                  Enter the date
                                                                  Enter the day
                                                                  Enter the date
                                                                  Enter the day
                                                                  Enter the date
                                                                  Enter the date
                                                                  Enter the date
                         107-026    Railroad Insurance and                                                                                             Use STSP 107-026 on projects that require less extensive flagging. Use STSP 107-034 on               6/15/2011
                                    Coordination                                                                                                       projects that require more extensive flagging. Use for all federal-aid projects on or within 50
                                                                                                                                                       feet of railroad property, unless STSP 107-034 is used. Refer to FDM Procedure 19-15-35 for
                                                                                                                                                       guidance on which railroad STSP to use and the legal name of the railroad(s) to be named as
                                                                                                                                                       insured. Refer to FDM Procedure 17-50-5 for guidance on insurance requirements. Confirm
                                                                                                                                                       with the regional Railroad Coordinator.
                                                                                                                                                       • Provide a separate railroad STSP (107-026 or 107-034) for each railroad company that owns
                                                                                                                                                       property or tracks within the project limits; or, in the case of the state-owned railroad system,
                                                                                                                                                       holds the operating agreement for the tracks.
                                                                                                                                                       • If fiber optic lines are located on railroad right-of-way, include STSP 107-065 in the project’s
                                                                                                                                                       special provisions.




STSP Index Spreadsheet                                                                                                                                                                                                                                                  10/12/2011
                                                                                                                                                                                                                                                             Date last
      check       STSP # to enter            Description                                Directions and Fields                       Information to enter                                            Technical Notes                                          updated
                     A1 or A2       Section A Description of 107- Choose A1 or A2 -- use A1 if railroad will NOT provide                                                                                                                                     7/9/2010
                                    026                           flagging services; use A2 if railroad will provide flagging
                                                                  services. Enter A1 or A2, and press F3.
                                                                  Enter official legal company name.
                                                                  If using A2, enter the number of days that the RR company
                                                                  will provide flagging.
                    B1, B2, or B3   Section A.1 Railroad          Choose B1, B2, or B3 -- use B1 when there is only one                                    Refer to FDM 19-15-35 for the name of the person to furnish insurance to for Canadian             9/30/2011
                                    Insurance Requirements of railroad and one crossing in the project; use B2 when                                        National (WCL, SSM BrCo, DM&IR and DWP), Union Pacific BNSF, WSOR and Canadian
                                    107-026                       railroad is owned by one company and leased by another;                                  Pacific (Soo Line). For other railroads, confer with the regional railroad coordinator. On
                                                                  use B3 when there is more than one railroad owner on the                                 railroad lines that are owned by one company and leased to another company for operations,
                                                                  project. Enter B1, B2, or B3, and press F3.                                              insurance must be extended to both companies. Refer to the "leased lines" discussion in FDM
                                                                                                                                                           Procedure 17-50-5. In such situations, use B2 or B3 (instead of B1).
                                                                   Enter official legal RR company name of the RR that owns                                Use B2 if sending evidence of insurance coverage to the representative of the RR company that
                                                                   tracks                                                                                  leases the line.
                                                                   If using B2 or B3, enter the official RR company name of the                            Use B3 if sending evidence of insurance coverage for both policies to the representative of the
                                                                   RR leasing the tracks.                                                                  RR company that leases the line.

                                                                 Enter Contact Name
                                                                 Enter contact address and phone number
                                                                 Enter project id #
                                                                 Enter road name I___ or USH ____ or STH ____ and county
                                                                 name
                                    Section A.2 Work by Railroad Enter the description of the work that the RR will complete; if
                                    of 107-026                   there is no work, enter "None."
                WSOR, CN, UPR, Section A.3 Names and            Use WSOR for WSOR Railroad Company; CN for                                                 Current railroad contacts are listed in the building block.                                       9/30/2011
                BNSF, or CP(SOO) Addresses of RR                Canadian National (WCL, SSMBrCo, DM&IR & DWP)
                                 Representatives for            Railroad Company; UPR for UPPR Railroad Company;
                                 Consultation & Coordination    BNSF for BNSF Railroad Company; and CP(SOO) for
                                 of 107-026                     Canadian Pacific (Soo Line). Enter one of the choices above
                                                                and press F3.
                         C1 or C2   Section A.4 Temporary Grade Choose C1 or C2 -- use C1 if the department has NOT                                        For Crossings (C1 or C2), confer with the Railroads and Harbors Section early in the project      7/9/2010
                                    Crossing of 107-026         made arrangements for temporary grade crossings; use                                       development if a crossing is needed.
                                                                C2 if the department has made arrangements for
                                                                temporary grade crossings. Enter C1 or C2, and press F3.

                                    Section A.5 Train Operation    Enter the number of passenger trains                                                    Regular passenger operations exist on Soo Line d/b/a Canadian Pacific on their Chicago-
                                    of 107-026                                                                                                             Milwaukee-LaCrosse Line and on Union Pacific between Kenosha and the Illinois/Wisconsin
                                                                   Enter the number of through trains                                                      line. Wisconsin Great Northern, Mid Continent Railway, Laona & Northern, East Troy Electric
                                                                   DD - Select daily or weekly                                                             Railway and Osceola & St. Croix Valley Railway operate tourist trains. Delete reference to
                                                                   Enter the highest speed for passenger trains                                            passenger train operations if no passenger trains are operated.
                                                                   Enter the highest speed for through trains
                                                                   If there is switching movement for trains, add the following
                                                                   sentence to the last paragraph of A.5: "In addition to through
                                                                   movements, there are switching movements at slower speeds."

                   CNSAFETY or      Section A.6 Rail Security      Choose CNSAFETY or Others -- Use CNSAFETY if                                            Before using these paragraphs, confer with the regional railroad coordinator.                     7/9/2010
                      Others        Awaremenss & Contractor        railroad is Canadian National; use Others for all other
                                    Orientation of 107-026         railroad companies. Enter CNSAFETY or Others, and press
                                                                   F3




STSP Index Spreadsheet                                                                                                                                                                                                                                                   10/12/2011
                                                                                                                                                                                                                                                               Date last
      check       STSP # to enter            Description                              Directions and Fields                        Information to enter                                            Technical Notes                                             updated
                     107-034        Railroad Insurance and                                                                                                Use STSP 107-034 on projects that require more extensive flagging. Use STSP 107-026 on               6/15/2011
                                    Coordination                                                                                                          projects that require less extensive flagging. Refer to FDM Procedure 19-15-35 for guidance
                                                                                                                                                          on which railroad STSP to use and the legal name of the railroad(s) to be named as insured.
                                                                                                                                                          Refer to FDM Procedure 17-50-5 for guidance on insurance requirements. Confirm with the
                                                                                                                                                          regional Railroad Coordinator. Add Section A.6 if horizontal or vertical clearances are to be
                                                                                                                                                          different than standard spec 107.17.1; requires prior coordination with the railroad.

                                                                                                                                                          If clearance fence is desired, prior railroad approval is required; include bid item 606.0700.S
                                                                                                                                                          and STSP 616-050 Fence Track Clearance. Use clearance fence when work is less than 25 feet
                                                                                                                                                          from the nearest track to reduce the amount of flagging needed.

                                                                                                                                                          • Do not use Section D, Rail Security Awareness and Contractor Orientation, unless authorized
                                                                                                                                                          by the Railroads and Harbors Section.
                                                                                                                                                          • Provide a separate railroad STSP (107-026 or 107-034) for each railroad company that owns
                                                                                                                                                          property or tracks within the project limits; or, in the case of the state-owned railroad system,
                                                                                                                                                          holds the operating agreement with the railroad.
                                                                                                                                                          • If fiber optic lines are located on railroad right-of-way, include STSP 107-065 in the project’s
                                                                                                                                                          special provisions.



                                    Section A Description of       Enter official, legal RR company name
                                    107-034
                    B1, B2, or B3   Section A.1 Railroad           Choose B1, B2, or B3 -- use B1 when there is only one                                  Refer to FDM 19-15-35 for the name of the person to furnish insurance to for Canadian                9/30/2011
                                    Insurance Requirements of      railroad and one crossing in the project; use B2 when                                  National (WCL, SSM BrCo, DM&IR and DWP), Union Pacific BNSF, WSOR and Canadian
                                    107-034                        railroad is owned by one company and leased by another;                                Pacific (Soo Line). For other railroads, confer with the regional railroad coordinator. On
                                                                   use B3 when there is more than one railroad owner on the                               railroad lines that are owned by one company and leased to another company for operations,
                                                                   project. Enter B1, B2, or B3, and press F3.                                            insurance must be extended to both companies. Refer to the "leased lines" discussion in FDM
                                                                                                                                                          Procedure 17-50-5. In such situations, use B2 or B3 (instead of B1).


                                                                   Enter official legal RR company name of the RR that owns                               Use B2 if sending evidence of insurance coverage to the representative of the RR company that
                                                                   tracks                                                                                 leases the line.
                                                                 If using B2 or B3, enter the official legal RR company name                              Use B3 if sending evidence of insurance coerage for both policies to the representative of the
                                                                 of the RR leasing the tracks.                                                            RR company that leases the line.
                                                                 Enter Contact Name
                                                                 Enter contact address and phone number
                                                                 Enter project id #
                                                                 Enter road name I___ or USH ____ or STH ____ and county
                                                                 name
                                    Section A.2 Work by Railroad Enter the description of the work that the RR will complete; if
                                    of 107-034                   there is no work, enter "None."
                WSOR, CN, UPR, Section A.3 Names and               Use WSOR for WSOR Railroad Company; CN for                                             Current railroad contacts are listed in the building block.                                          9/30/2011
                BNSF, or CP(SOO) Addresses of RR                   Canadian National (WCL, SSMBrCo, DM&IR & DWP)
                                 Representatives for               Railroad Company; UPR for UPPR Railroad Company;
                                 Consultation & Coordination       BNSF for BNSF Railroad Company; and CP(SOO) for
                                 of 107-034                        Canadian Pacific (Soo Line). Enter one of the choices above
                                                                   and press F3.
                         C1 or C2   Section A.4 Temporary Grade Choose C1 or C2 -- use C1 if the department has NOT                                       Confer with the Railroads & Harbors Section early in the project development if a crossing is        7/9/2010
                                    Crossing of 107-034         made arrangements for temporary grade crossings; use                                      needed.
                                                                C2 if the department has made arrangements for
                                                                temporary grade crossings. Enter C1 or C2, and press F3.
                                    Section A.5 Train Operation    Enter the number of passenger trains                                                   Regular passenger operations exist on Soo Line d/b/a Canadian Pacific on their Chicago-
                                    of 107-034                                                                                                            Milwaukee-LaCrosse Line and on Union Pacific between Kenosha and the Illinois/Wisconsin
                                                                                                                                                          line. Wisconsin Great Northern, Mid Continent Railway, Laona & Northern, East Troy Electric
                                                                                                                                                          Railway and Osceola & St. Croix Valley Railway operate tourist trains. Delete reference to
                                                                                                                                                          passenger train operations if no passenger trains are operated.
STSP Index Spreadsheet                                                                                                                                                                                                                                                     10/12/2011
                                    Section A.5 Train Operation                                                                                            Regular passenger operations exist on Soo Line d/b/a Canadian Pacific on their Chicago-
                                    of 107-034                                                                                                             Milwaukee-LaCrosse Line and on Union Pacific between Kenosha and the Illinois/Wisconsin
                                                                                                                                                           line. Wisconsin Great Northern, Mid Continent Railway, Laona & Northern, East Troy Electric
                                                                                                                                                           Railway and Osceola & St. Croix Valley Railway operate tourist trains. Delete reference to        Date last
      check       STSP # to enter            Description                                Directions and Fields                       Information to enter   passenger train operations if no passenger trains are operated.
                                                                                                                                                                                                   Technical Notes                                           updated
                                                                   Enter the number of through trains
                                                                   DD - Select daily or weekly
                                                                   Enter the highest speed for passenger trains
                                                                   Enter the highest speed for through trains
                                                                   If there is switching movement for trains, add the following
                                                                   sentence to the last paragraph of A.5: "In addition to through
                                                                   movements there are switching movements at slower speeds."
                                    Section A.6 Temporary         Horizontal clearance needed: Enter number of feet                                        If fixed object clearances will be different than those provided in standard spec 107.17.1,       7/9/2010
                                    Clearances During             Horizontal clearance needed: Enter number of inches                                      include section A.6 Temporary Clearances During Construction with STSP 107-034. Some
                                    Construction of 107-034       Horizontal clearance needed: Enter metric measurement                                    railroads require greater horizontal or vertical clearances than provided in the standard
                                                                  Vertical clearance needed: Enter number of feet                                          specifications. Confer with the Railroad Coordinator of the Railroads & Harbors Section.
                                                                  Vertical clearance needed: Enter number of inches
                                                                  Vertical clearance needed: Enter metric measurement
                                    Section B Railroad Flagging DD - Select "if clearances specified in subsection 107.17.1
                                    of 107-034                    are not maintained during construction operations" OR "when
                                                                  working between the clearance fences specified"
                                                                  DD - Select "between clearance fenses" OR "within 25 feet of
                                                                  the centerline of any track"
                                                                  DD - Select "between clearance fenses" OR "within 25 feet of
                                                                  the centerline of any track"
                                                                  DD - Select "between clearance fenses" OR "within 25 feet of
                                                                  the centerline of any track"
                           D1       Section C Flagging - Railroad Use D1 if railroad pays for flagging; use D2 (see next row)                              Flagging Costs: If the railroad is paying flagging costs, use Section C Flagging by Railroad –
                                    Pays Flagging Costs of 107- if railroad does NOT pay for flagging; Enter D1 if railroad                                Railroad Pays Flagging Costs and the subsections C.1 and C.2, which immediately follow it. If
                                    034                           pays for flagging, and press F3                                                          the contractor must pay for flagging, use Section C Flagging by Railroad -- Railroad Does Not
                                                                                                                                                           Pay Flagging Costs of STSP 107-034 and subsections C.1 through C.5.
                                                                 Enter number of days (the number of business days before
                                                                 contractor begins work near RR tracks), enter at least 5
                                                                 days.
                        D2          Section C Flagging by        Enter D2 if the railroad does NOT pay for flagging, and press
                                    Railroad - Railroad Does Not F3.
                                    Pays Flagging Costs of 107-
                                    034
                                                                 Enter number of days (the number of business days before
                                                                 contractor begins work near RR tracks), enter at least 5
                                                                 days.
                E1, E2, E3, E4, E5, Section C.2 Rates - (RR      If D2 was chosen above, enter E1, E2, E3, E4, E5, or E6 and                               Select E1 (flagging rates for BNSF), E2 (flagging rates for Canadian Pacific (Soo Line)), E3      6/15/2011
                      or E6         Company) of 107-034          press F3. See the technical notes for a description of each                               (flagging rates for Excanaba and Lake Superior, Wisconsin and other Short Line RR), E4
                                                                 building block.                                                                           (flagging rates for Wisconsin & Southern RR Co), E5 (flagging rates for Canadian National
                                                                                                                                                           (WCL, SSMBrCo, DM&IR, DWP)), or E6 (flagging rates for Union Pacific).

                   CNSAFETY or      Section D Rail Security     Enter CNSAFETY or Others, and press F3, if the project                                     Direct all questions to the regional railroad coordinator about whether section D Rail Security
                      Others        Awareness and Contractor    involves Canadian National Railroad properties, use                                        Awareness and Contractor Orientation should be included.
                                    Orientation of 107-034      CNSAFETY; if the RR is not CN and there is an
                                                                agreement with the RR to include these paragraphs, enter
                                                                Others.
                         CNADD      Section E Canadian National Enter CNADD and press F3, OR delete field if other RR                                      Use section E Canadian National On Track Safety Rules and Procedures Training only
                                    On Track Safety Rules and   company. Use CNADD if the RR is Canadian National                                          when required by agreement with CN. Before using, confer with the Railroads & Harbors
                                    Procedures Training of 107- and there is an agreement to use this language. Do not                                     Section.
                                    034                         include if the RR is NOT CN.
                         107-054    Information to Bidders, U.S.   Enter contact person's name                                                             Use on all projects that require a COE Permit                                                     9/1/2008
                                    Army Corps of Engineers
                                    Section 404 Permit
                                                                   Enter contract person's phone number


STSP Index Spreadsheet                                                                                                                                                                                                                                                   10/12/2011
                                                                                                                                                                                                                                                                  Date last
      check       STSP # to enter            Description                                Directions and Fields                         Information to enter                                           Technical Notes                                              updated
                     107-055        Environmental Protection -                                                                                                                                                                                                    6/15/2011
                                    Aquatic Exotic Species
                                    Control
                         107-060    Construction Over or Adjacent Enter the name of the navigable waterway                                                                                                                                                        4/15/2004
                                    to Navigable Waters

                         107-065A   Utilities (Trans 220 project)                                                                                            Select this STSP if the utility conforms to Admin Rule Trans 220. You must include 107-065A          5/1/2008
                                                                                                                                                             or 107-065B in the special provisions.

                         107-065B   Utilities (not Trans 220                                                                                                 Select this STSP if the utility does not conform to Admin Rule Trans 220. You must include           5/1/2008
                                    project)                                                                                                                 107-065A or 107-065B in the special provisions.
                         107-065C   Utilities (Union Pacific)       Enter the name of the railroad station, or if between stations,                          Railroad Fiber Optic Lines: Add if utility coordination includes fiber optic lines present within    5/1/2008
                                                                    say between railroad Station ____ and railroad Station _____.                            railroad right-of-way belonging to Union Pacific Railroad Company.

                                                                    Enter the mile post number
                                                                    Enter the name of the subdivision
                         107-065D   Utilities (Soo Line Railroad Co Enter the mile post number                                                               Railroad Fiber Optic Lines: Add if utility coordination includes fiber optic lines present within    5/1/2008
                                    d/b/a/ Canadian Pacific)        Enter the name of the subdivision                                                        railroad right-of-way belonging to Soo Line Railroad Company (d/b/a Canadian Pacific
                                                                    Enter railroad station                                                                   Railrway).
                         107-065E   Utilities (BNSF Railway Co)                                                                                              Railroad Fiber Optic Lines: Add if utility coordination includes fiber optic lines present within    5/1/2008
                                                                                                                                                             railroad right-of-way belonging to BNFS Railway Company.
                         107-065F   Utilities (All other railway    Enter railway name                                                                       Railroad Fiber Optic Lines: Add if utility coordination includes fiber optic lines present within    5/1/2008
                                    companies)                      Enter contact person and railroad company name                                           railroad right-of-way belonging to railroad companies other than UP, Soo, or BNFS.
                                                                    Enter the phone number
                         107-070    Erosion Control Structures                                                                                               Required in all contracts with waterway structures                                                   8/20/2003

                         107-100    Notice to Contractor -          Enter the Station #                                                                      WisDOT STSP Hazmat petroleum Remediation Scenario 1 - Petroleum contamination is                     8/20/2003
                                    Contamination Beyond            Enter the Station #                                                                      located beyond the construction limits. This is a notice to the contractor that contamination is
                                    Construction Limits             Enter the number of feet                                                                 located in the vicinity of the project, but is not expected to be encountered. If contamination is
                                                                    Enter LT or RT                                                                           encountered, then the contractor shall stop operations and notify the engineer. Often the
                                                                    Enter the number of feet                                                                 department utilizes existing information from investigations performed by nearby property
                                                                    Enter LT or RT                                                                           owners and their environmental constultants; if that is the case, then make appropriate changes
                                                                    Enter the Station #                                                                      above. Depending on the project, the contact for the reports may be the project engineer,
                                                                    Enter the Station #                                                                      regional environmental coordinator, Bureau of Equity and Environmental Services, Department
                                                                    Enter the number of feet                                                                 of Natrual Resources Regional Office, or the Department of Commerce Regional Office.
                                                                    Enter LT or RT
                                                                    Enter the number of feet
                                                                    Enter LT or RT
                                                                    Enter the name, address and phone number of the contact
                                                                    person
                         107-105    Notice to Contractor -          Enter the Station #                                                                      Use this STSP if there is contamination within construction limits, but others will remove it        9/2/2008
                                    Contamination Removed           Enter the Station #                                                                      before construciton.
                                    Before Construction             Enter the number of feet
                                                                    Enter LT or RT
                                                                    Enter the number of feet
                                                                    Enter LT or RT
                                                                    Enter the Station #
                                                                    Enter the Station #
                                                                    Enter the number of feet
                                                                    Enter LT or RT
                                                                    Enter the number of feet
                                                                    Enter LT or RT
                                                                    Enter the name, address and phone number of the contact
                                                                    person
                         107-110    Notice to Contractor -          Enter the Station #                                                                      Use if contamination is present within construction limits, and others will remove it during         8/20/2003
                                    Contamination Removed           Enter the Station #                                                                      construction. WisDOT STSP Hazmat Petroleum Remediation Scenario 3 - Petroleum
STSP Index Spreadsheet
                                    During Construciton                                                                                                      contamination is located within the construction limits but the contamination will be removed                    10/12/2011
                                                                                                                                                             by others during construction. This is a situation where a willing responsible party and their
                                                                                                                                                             environmental consultant (or the department's environmental consultant) will perform the
                     107-110        Notice to Contractor -                                                                                                 Use if contamination is present within construction limits, and others will remove it during        8/20/2003
                                                                                                                                                                                                                                                               Date last
      check       STSP # to enter   Contamination Removed
                                             Description                               Directions and Fields                        Information to enter   construction. WisDOT STSP Hazmat Petroleum Remediation Scenario 3 - Petroleum
                                                                                                                                                                                                    Technical Notes                                            updated
                                    During Construciton            Enter the number of feet                                                                contamination is located within the construction limits but the contamination will be removed
                                                                   Enter LT or RT                                                                          by others during construction. This is a situation where a willing responsible party and their
                                                                   Enter the number of feet                                                                environmental consultant (or the department's environmental consultant) will perform the
                                                                   Enter LT or RT                                                                          remediation and provide a "clean" area for the road contractor. Depending on the number of
                                                                   Enter the Station #                                                                     sites and the extent and volume of contamination, the time window needed for these activities
                                                                   Enter the Station #                                                                     will vary anywhere from a few days to a few weeks. Plan accordingly and consult the district
                                                                   Enter the number of feet                                                                environmental coordinator or BEES for help. Often the department utilizes existing information
                                                                   Enter LT or RT                                                                          from investigations or remediations performed by nearby property owners and their
                                                                   Enter the number of feet                                                                environmental consultants; if that is the case, make the appropriate changes to the article.
                                                                   Enter LT or RT                                                                          Depending on the project, the contact for the reports may be the project engineer, regional
                                                                   Enter # of calendar days                                                                environmental coordinator, Bureau of Environment, Department of Natrual Resources Office,
                                                                   Enter the allowed work                                                                  or the Department of Commerce Regional Office.
                                                                   Enter the allowed work
                                                                   Enter the # of calendar days
                                                                   Enter the name, address and phone number of the contact
                                                                   person
                         107-115    Health and Safety                                                                                                                                                                                                          5/2/2005
                                    Requirements for Workers
                                    Remediating Petroleum
                                    Contamination

                         107-120    Notice to Contractor, Asbestos Enter the inspector's name                                                              Use this STSP for bridges that have been tested for asbestos, where asbestos is present but will    7/9/2010
                                    Containing Materials on        Enter the license number                                                                not be disturbed during construction. To obtain the information needed in parentheses to
                                    Structure                      Enter the Structure #                                                                   complete this article, refer to the Highway Structures Inventory (HSI) on the DOT extranet site
                                                                   Enter the date of inspection                                                            at https://trust.dot.state.wi.us/hsi/HSIController. From that screen go to File, Open Inventory,
                                                                   Enter what bridge materials has ACM, where it is found on                               and type in the bridge number. Use the tabs to find specific information on the various screens.
                                                                   the bridge, what category of material it is and how much of it                          To find street address of county highway commission or town clerk, use the following website:
                                                                   is present.                                                                             http://www.wicounties.org
                                                                   Enter the name and phone number of the regional contact
                                                                   Enter the name and phone number of the regional contact
                                                                   Enter the Structure #
                                                                   Enter the Route on from HSI Route Screen
                                                                   Enter the Route under from HSI Route Screen
                                                                   Enter lat. long. if available from HSI location/ID screen
                                                                   Section ___ Town ____ Range ____ (town/city/village) of
                                                                   _____
                                                                   Enter Street address of county highway commission if county,
                                                                   street address of town clerk if township. If WisDOT
                                                                   ownership, use the following format: WisDOT Transportation
                                                                   (Location) Region, Street Address, PO Box, City, State, Zip

                                                                   Enter the regional construction engineer's name
                                                                   Enter the regional construction engineer's phone number
                                                                   Enter age in years
                                                                   Enter the construction date from HIS
                                                                   Enter the deck area in SF from HSI geometry screen
                         107-125    Notice to Contractor,          Enter the inspector's name                                                              Use this STSP for bridges that have been inspected and have no asbestos, or no regulated levels     7/9/2010
                                    Notification of Demolition     Enter the license number                                                                of asbestos. To obtain the information needed in parentheses to complete this article, refer to
                                    and/or Renovation              Enter the Structure #                                                                   the Highway Structures Inventory (HSI) on the DOT extranet site at
                                                                   Enter the date of inspection                                                            https://trust.dot.state.wi.us/hsi/HSIController. From that screen go to File, Open Inventory, and
                                                                   Enter the name and address of the regional contact                                      type in the bridge number. Use the tabs to find specific information on the various screens. To
                                                                   Enter the Structure #                                                                   find street address of county highway commission or town clerk, use the following website:
                                                                   Enter the Route on from HSI Route Screen                                                http://www.wicounties.org
                                                                   Enter the Route under from HSI Route Screen
                                                                   Enter lat. long. if available from HSI location/ID screen and
                                                                   Section ___ Town ____ Range ____ (town/city/village) of
                                                                   _____
STSP Index Spreadsheet                                                                                                                                                                                                                                                     10/12/2011
                                                                                                                                                         find street address of county highway commission or town clerk, use the following website:
                                                                                                                                                         http://www.wicounties.org


                                                                                                                                                                                                                                                                  Date last
      check       STSP # to enter            Description                                Directions and Fields                     Information to enter                                             Technical Notes                                                updated
                                                                   Enter Street address of county highway commission if county,
                                                                   street address of town clerk if township. If WisDOT
                                                                   ownership, use the following format: WisDOT Transportation
                                                                   (Location) Region, Street Address, PO Box, City, State, Zip
                                                               Enter the regional construction engineer's name
                                                               Enter the regional construction engineer's phone number
                                                               Enter age in years
                                                               Enter the construction date from HIS
                                                               Enter the deck area in SF from HSI geometry screen
                         107-200    Native American Employment DD - Select: 1. on, or 2. near                                                            Use this entire article for all projects, regardless of whether the project is on, or partially on the   6/15/2011
                                                               Enter name of the reservation                                                             reservations. See NAE1 building block Technical Notes for when to include NAE1.
                                                               Enter name of contact for Native American employment
                                                               Enter title of contact for Native American employment                                     Insert the labor contact information for each tribe that has labor interest in the county the
                                                               Enter the tribe name for Native American employment                                       project is located.
                                                               Enter address of contact for Native American employment
                                                               Enter phone number of contact for Native American                                         See the "Native American Hiring Provision-Counties and Contacts" matrix located on the
                                                               employment                                                                                HCCI website at http://roadwaystandards.dot.wi.gov/hcci/ to identify which tribes should be
                                                               Enter email address of contact for Native American                                        included based upon the county the projec is located.
                                                               employment
                                                               Enter fax number of contact for Native American employment                                The Native American Hiring Tracking Form (DT2405) can be accessed at the HCCI website at
                                                                                                                                                         http://roadwaystandards.dot.wi.gov/hcci/



                         NAE1       Optional paragraph within      Enter name of the reservation                                                         Use NAE1 if project is on, or partially on, the reservation. Do not include this section if project      6/15/2011
                                    STSP 107-200                   Enter name of contact for Native American employment                                  is NOT on, or NOT partially on the reservation.
                                                                   Enter title of contact for Native American employment
                                                                   Enter the tribe name for Native American employment
                                                                   Enter address of contact for Native American employment
                                                                   Enter phone number of contact for Native American
                                                                   employment
                                                                   Enter email address of contact for Native American
                                                                   employment
                                                                   Enter fax number of contact for Native American employment

                         108-056    Incentive/Disincentive for     Enter the requirements for work completion                                                                                                                                                     5/1/2008
                                    Interim Completion of Work,    Enter date
                                    Item 108.3100.S                Enter the requirements for work completion
                                                                   Enter date
                                                                   Enter the dollar amount for incentive
                                                                   Enter date
                                                                   Enter the maximum incentive payment
                                                                   Enter the requirements for work completion
                                                                   Enter date
                                                                   Enter the dollar amount for disincentive
                                                                   Enter date
                         108-060    Coordination with Businesses   DD - Select the department; the contractor                                            Use where applicable. Choose who shall conduct the meeting - the department or the                       8/20/2003
                                                                                                                                                         contractor. Other attendees may be included.


                         203-005    Abatement of Asbestos         Enter structure number                                                                 Use this STSP for bridges that have been inspected, have regulated asbestos on them, and the             7/9/2010
                                    Containing Material Structure Enter inspector's name                                                                 contractor will remove the asbestos during construction. To obtain the information needed in
                                    ______, Item 203.0210.S       Enter license number                                                                   parentheses to complete this article, refer to the Highway Structures Inventory (HSI) on the
                                                                  Enter structure number                                                                 DOT extranet site at https://trust.dot.state.wi.us/hsi/HSIController. From that screen go to File,
                                                                  Enter date of inspection                                                               Open Inventory, and type in the bridge number. Use the tabs to find specifiec information on
                                                                                                                                                         the various screens. To find street address of county highway commission or town clerk, use
                                                                                                                                                         the following webstites: http://www.wicounties.org or
                                                                                                                                                         http://elections.state.wi.us/municipalclerkslist.txt.
STSP Index Spreadsheet                                                                                                                                                                                                                                                        10/12/2011
                         203-005    Abatement of Asbestos                                                                                                 Use this STSP for bridges that have been inspected, have regulated asbestos on them, and the         7/9/2010
                                    Containing Material Structure                                                                                         contractor will remove the asbestos during construction. To obtain the information needed in
                                    ______, Item 203.0210.S                                                                                               parentheses to complete this article, refer to the Highway Structures Inventory (HSI) on the
                                                                                                                                                          DOT extranet site at https://trust.dot.state.wi.us/hsi/HSIController. From that screen go to File,   Date last
      check       STSP # to enter            Description                                 Directions and Fields                     Information to enter   Open Inventory, and type in the bridge number. Use the tabs to find specifiec information on
                                                                                                                                                                                                    Technical Notes                                            updated
                                                                    Enter state what bridge material has ACM, where it is found                           the various screens. To find street address of county highway commission or town clerk, use
                                                                    on the bridge, what category of material it is, and how much                          the following webstites: http://www.wicounties.org or
                                                                    of it there is.                                                                       http://elections.state.wi.us/municipalclerkslist.txt.
                                                                    Enter name and phone number of regional contact
                                                                    Enter name and phone number of regional contact
                                                                    Enter structure number
                                                                    Enter Route on from HSI Route screen
                                                                    Enter Route under from HSI Route screen
                                                                    Enter Lat. Long. If available from HSI location / id screen
                                                                    Section ____ Town _____ Range _____ (Town of / City of/
                                                                    Village of ____)
                                                                    Enter street address of county highway commission if county,
                                                                    street address of town clerk if township. If WisDOT
                                                                    ownership, use the following format: WisDOT transportation
                                                                    (location) Region, Street Address, PO Box, City, State, Zip

                                                                 Enter regional construction engineer's name
                                                                 Enter regional construction engineer's phone number
                                                                 Enter age in number of years
                                                                 Enter construction date from HSI
                                                                 Enter deck area in SF from HSI geometry screen
                                                                 Enter structure number
                         203-010    Debris Containment Structure Enter the Structure #                                                                    Use where structure removal, reconstruction, or other construction operations may generate           9/2/2008
                                    ____, Item 203.0225.S                                                                                                 falling debris that might pose a safety hazard to facilities like railroads, bike paths, roadways,
                                                                                                                                                          or navigable waterways located under the structure in question. For work over waterways,
                                                                                                                                                          independently review the need for Removing Old Structure Over Waterway STSPs (203-015,
                                                                                                                                                          203-020, or 203-025) to address potential waterway contamination concerns. Work over
                                                                                                                                                          railroads may required special consideration, and early coordination with the region railroad
                                                                                                                                                          coordinator will be necessary. Designer Note: A separate bid item is required for each
                                                                                                                                                          applicable structure on a project. Enter the name of the railroad, bike path, roadway, navigable
                                                                                                                                                          waterway, or other facility to be protected in the form field in paragraph C(1). Adjust the
                                                                                                                                                          timing requirement in paragraph C(3) if something other than 15 working days is more
                                                                                                                                                          appropriate. Enter contact information in the form fields in paragraph C(3). If no notice is
                                                                Enter the name of the facility (highway, railroad line, trail,                            required before conducting debris generating operations, delete paragraph C(3).
                                                                property, etc.)
                                                                Enter the name and contact information
                                                                Enter the name and contact information
                                                                Enter the Structure #
                                                                Enter the Structure #
                         203-015    Removing Old Structure Over Enter the Station #                                                                       Use this special provision where it is not possible to remove the structure without dropping it,     9/1/2005
                                    Waterway Station_____, Item                                                                                           or a portion of it, into a waterway or wetland; and that waterway or wetland is not highly
                                    203.0500.S                                                                                                            environmentally sensitive. This special provison is typically appropriate for removing the
                                                                                                                                                          following structure types: Slab spans; Earth-filled bridges; Cast-in-place girders bridges;
                                                                                                                                                          voided slabs; some large trestle bridges. Designer Notes: This special provsion is 1 of 3
                                                                                                                                                          special provisions for removing structures over waterways: Removing Old Structure Over
                                                                                                                                                          Waterway, Item 203.0500.S; Removing Old Structure Over Waterway with Minimal Debris,
                                                                                                                                                          Item 203.0600.S; Removing Old Structure Over Waterway with Debris Capture System, Item
                                                                                                                                                          203.0700.S. Designer should review all 3 specials and coordinate with DNR to reach
                                                                                                                                                          consensus on which special to use for the removal: The special provision language provided is
                                                                                                                                                          intended to be a reasonable starting point; however, the designer may need to expand the
                                                                                                                                                          special provision language to address additional DNR or other concerns and issues.

                                                                    Enter the Structure # (being removed)
                                                                    Enter the waterway name
                                                                    Enter the Station #


STSP Index Spreadsheet                                                                                                                                                                                                                                                     10/12/2011
                                                                                                                                                                                                                                                            Date last
      check       STSP # to enter            Description                           Directions and Fields                         Information to enter                                             Technical Notes                                           updated
                     203-020        Removing Old Structure Over Enter station number                                                                    Use this special provision where it is possible to remove the structure without dropping it, or a   9/2/2008
                                    Waterway with Minimal                                                                                               portion of it, into a waterway or wetland; and that waterway or wetland is not highly
                                    Debris Station _____, Item                                                                                          environmentally sensitive. This special provision is typically appropriate for removing all
                                    203.0600.S                                                                                                          structures types except for the following bridges which are typically covered under STSP 203-
                                                                                                                                                        015: Slab spans; Earth-filled bridges; Cast-in-place girders bridges; Voided slabs; Some large
                                                                                                                                                        trestle bridges. For unique or difficult removals, designers should consult with the contracting
                                                                                                                                                        community to assess costs and the feasibility of a particular removal technique. Designers may
                                                                                                                                                        need to customize this special provision to deal with pier or abutment removal and other project
                                                                                                                                                        specific details. Designer Notes: This special provision is 1 of 3 special provisions for
                                                                                                                                                        removing structures over waterways: Removing Old Structure Over Waterway, Item
                                                                                                                                                        203.0500.S; Removing Old Structure Over Waterway with Minimal Debris, Item 203.0600.S;
                                                                                                                                                        Removing Old Structure Over Waterway with Debris Capture System, Item 203.0700.S.
                                                                                                                                                        Designer should review all 3 specials and coordinate with DNR to reach consensus on which
                                                                                                                                                        special to use for the removal: This special provision will likely be used for most removals.
                                                                                                                                                        The special provision language provided is intended to be a reasonable starting point; however,
                                                                                                                                                        the desinger may need to expand the special provision language to address additional DNR or
                                                                                                                                                        other concerns and issues. CMM Procedure 2-410-50 contains example removal and clean-up
                                                                                                                                                        methods corresponding to this special provision.




                                                                Enter structure number (being removed)
                                                                Enter waterway name
                                                                Enter station number
                         203-025    Removing Old Structure Over Enter station number                                                                    Consider using this special provision where a waterway or wetland is highly environmentally         9/2/2008
                                    Waterway With Debris                                                                                                sensitive. Before including this special provision in the contract, consult with the department's
                                    Capture System Station                                                                                              regional environmental coordinator to determine if the affected waterway or wetland is highly
                                    ________, Item 203.0700.S                                                                                           environmentally sensitive and if this special provision is appropriate. For unique or difficult
                                                                                                                                                        removals, designers should consult with the contracting community to assess costs and the
                                                                                                                                                        feasibility of a particular removal technique. Designers may need to customize this special
                                                                                                                                                        provision to deal with pier or abutment removal and other project specific details. Designer
                                                                                                                                                        Notes: This special provision is 1 of 3 special provisions for removing structures over
                                                                                                                                                        waterways: Remove Old Structure over Waterway, Item 203.0500.S; Removing Old Structure
                                                                                                                                                        Over Waterway With Minimal Debris, Item 203.0600.S; removing Old Structure Over
                                                                                                                                                        Waterway With Debris Capture System, Item 203.0700.S. Designer should review all 3
                                                                                                                                                        specials and coordinate with DNR to reach consensus on which special to use for the removal:
                                                                                                                                                        The special provison language provided is intended to be a reasonable starting point; however,
                                                                                                                                                        depending on the situation the designer may need to expand the special provison language to
                                                                                                                                                        address additional DNR or other concerns and issues. CMM Procedure 2-10-50 contains
                                                                                                                                                        example removal and clean-up methods corresponding to this special provision.

                                                                   Enter structure number (being removed)
                                                                   Enter the waterway name
                                                                   Enter the waterway name
                                                                   Enter the Station #
                         204-025    Removing ____ (Item            Enter item description                                                               General STSP for removing miscellaneous items. A specific number according to the unit of           10/5/2004
                                    description), Item 204.9025.S- DD - select 204.9025.S; 204.9035.S; 204.9060.S; 204.9070.S;                          measure is available in Trans*port: 204.9025.S CF, 204.9035.S CY, 204.9060.S Each,
                                    204.9195.S                     204.9090.S; 204.9105.S; 204.9125.S; 204.9165.S;                                      204.9070.S GAL, 204.9090.S LF, 204.9105.S LS, 204.9125.S MI, 204.9165.S SF, 204.9170.S
                                                                   204.9170.S; 204.9180.S; 204.9195.S. In addition, add the                             STA, 204.9180.S SY, 204.9195.S Ton. Put correct item number, including the supplemental
                                                                   supplemental number that follows the ".S"; for example,                              number following the .S (such as .01 for item 204.9060.S.01), in the title and payment table
                                                                   in item 204.9105.S.01, the supplemental number will be                               when using this STSP.
                                                                   "01."
                                                                   Enter item description
                                                                   Enter item description
                                                                   Enter unit of measure


STSP Index Spreadsheet                                                                                                                                                                                                                                                  10/12/2011
                                                                                                                                                             when using this STSP.


                                                                                                                                                                                                                                                                Date last
      check       STSP # to enter            Description                                 Directions and Fields                        Information to enter                                          Technical Notes                                             updated
                                                                     DD - select 204.9025.S; 204.9035.S; 204.9060.S; 204.9070.S;
                                                                     204.9090.S; 204.9105.S; 204.9125.S; 204.9165.S;
                                                                     204.9170.S; 204.9180.S; 204.9195.S; Include supplemental
                                                                     number that follows ".S"
                                                                     Enter item description
                                                                     Enter unit of measure
                         204-041    Removing Concrete Surface                                                                                                                                                                                                   9/2/2008
                                    Partial Depth, Item 204.0109.S


                         204-050    Abandoning Sewer, Item                                                                                                                                                                                                      9/2/2008
                                    204.0291.S
                         205-003    Excavation, Hauling, and         Enter name and address of the nearest DNR approved                                      Highway contractor (or their subs) performs excavation, loading, hauling, and disposal of          9/2/2008
                                    Disposal of Petroleum            bioremediation facility                                                                 petroleum-contaminated soils. Unit of measurement is tons. Designer Notes: WisDOT STSP
                                    Contaminated Soil, Item                                                                                                  Hazmat petroleum remediation Scenario 4 - Petroleum contaminated soil to be excavated and
                                    205.0501.S                                                                                                               hauled by contractor to a DNR approved bioremediation facility. The department is not the
                                                                     For first location of contaminated soil, enter station number
                                                                                                                                                             responsible party for the contamination, so soil remediation (excavation) will be limited to the
                                                                     Enter station number
                                                                                                                                                             planned zone of construction. The bid item is only for excavation, loading, hauling, and
                                                                     Enter number of feet
                                                                                                                                                             disposal of petroleum contaminated soil and where to no groundwater contamination will be
                                                                     Enter LT or RT
                                                                                                                                                             encountered, i.e., excavation activities will occur above the groundwater table and no
                                                                     Enter number of feet
                                                                                                                                                             dewatering is required for project. For a list of the most recent DNR approved bioremediation
                                                                     Enter LT or RT
                                                                                                                                                             facilities, contact the DNR regional solid waste coordinator, (contact list can be found at:
                                                                     For second location of contaminated soil, enter station number
                                                                                                                                                             http://dnr.wi.gov/org/aw/wm/contacts/regions.htm) or contact the regional environmental
                                                                                                                                                             coordinator, _______: or Bob Pearson from the Bureau of Equity and Envrionmental Services
                                                                     Enter station number
                                                                                                                                                             (BEES) at (608) 266-7980. Note: Also must show extent of contamination on plan and profile
                                                                     Enter number of feet
                                                                                                                                                             sheets using data from Phase 2, 2.5 or 3 work that was performed by department's
                                                                     Enter LT or RT
                                                                                                                                                             environmental consultants or other consultants for nearby property owners. For example, shade
                                                                     Enter number of feet
                                                                                                                                                             areas of contamination or draw iso-concentration lines. For help, consult a regional
                                                                     Enter LT or RT (If there are more than two areas of
                                                                                                                                                             environmental coordinator or BEES. Often the department utilizes information from
                                                                     contaminated soil, add information for additional areas.)
                                                                                                                                                             investigations or remediations performed by nearby property owners and their environmental
                                                                                                                                                             consultants; if that is the case, then make the appropriate changes above. Depending on the
                                                                     Enter the regional contact name
                                                                                                                                                             project, the contact for the reports may be a project engineer, district environmental
                                                                     Enter the regional contact address
                                                                                                                                                             coordinator, BEES, Department of Natural Resources Regional Office, or Department or
                                                                     Enter the regional contact phone number
                                                                                                                                                             commence regional Office. The BEES contracted environmental consultants are required to
                                                                     Enter the regional contact fax number
                                                                                                                                                             provide oversight. Contact BEES (Bob Pearson 608-266-7980) and they will assign and
                                                                     Enter the regional contact email address
                                                                                                                                                             provide consultant information. BEES will develop a work order with input from the region
                                                                     Enter the environmental consultant's company name
                                                                     Enter the environmental consultant's address
                                                                     Enter the environmental consultant's contact person
                                                                     Enter the environmental consultant's phone number
                                                                     Enter the environmental consultant's fax number
                                                                     Enter the environmental consultant's email address
                                                                     Enter the number of cubic yards (w/respect to sampling
                                                                     frequency)
                         205-007    Settlement Gauges, Item                                                                                                                                                                                                     9/2/2008
                                    205.2000.S
                         205-010    Grading and Shaping              Enter the location. In addition, add supplemental number                                Use when reconstructing intersections and there are no other excavation bid items in the           8/20/2003
                                    Intersection ____(location),     following ".S"; for example, ".01."                                                     contract. Use a separate bid item for each intersection; for example, use 205.9010.S.01 for
                                    Item 205.9010.S                                                                                                          Location A and use 205.9010.S.02 for Location B.
                                                                   Enter the location (must match previous field).
                         205-015    Grading, Shaping and           Enter the location. In addition, add supplemental number                                  Same as STSP 205-010, except finishing items are included. Use a separate bid item for each        5/12/2006
                                    Finishing Intersection _______ following ".S"; for example, ".01."                                                       intersection; for example, use 205.9015.S.01 for Location P and use 205.9015.S.02 for
                                    (location), Item 205.9015.S                                                                                              Location Q.

                                                                     Enter the location (must match previous field).



STSP Index Spreadsheet                                                                                                                                                                                                                                                      10/12/2011
                                                                                                                                                                                                                                                            Date last
      check       STSP # to enter             Description                              Directions and Fields                     Information to enter                                        Technical Notes                                                updated
                     205-020        Temporary Emergency                                                                                                 Use with standard detail drawing Temporary Emergency Pullouts.                                      9/2/2008
                                    Pullouts, Item 205.3000.S
                         205-050    General Requirements for                                                                                            Consult with regional soils engineer before using this STSP, and coordinate all blasting            9/2/2008
                                    Blasting Rock                                                                                                       activities with the regional soils engineer.
                         206-005    Temporary Shoring,Item                                                                                                                                                                                                  6/15/2011
                                    206.6000.S


                         206-050    Underwater Foundation         Enter Location                                                                        Location may be a pier footing or abutment.                                                         7/9/2010
                                    Inspection Location ________, Enter Location
                                    Item 206.1050.S
                         208-005    Select Borrow                 Enter material requirements of the select borrow.                                                                                                                                         11/3/2003
                         208-020    Fly Ash for Subgrade                                                                                                                                                                                                    9/2/2008
                                    Stabilization Furnished, Item
                                    208.2100.S
                         208-025    Fly Ash for Subgrade                                                                                                                                                                                                    9/2/2008
                                    Stabilization, Item 208.2110.S

                         209-010    Backfill Controlled Low                                                                                                                                                                                                 9/1/2009
                                    Strength, Item 209.0200.S
                         209-030    Backfill Coarse Aggregate        Enter the size number. In addition, add supplemental                               Use a separate bid item for each size in the project. For example, use 209.0300.S.01 for            8/20/2003
                                    Size No ______, Item             number that follows the ".S"; for example, "01," if there                          Backfill Coarse Aggregate Size No. 2 and use 209.0300.S.02 for Backfill Coarse Aggregate
                                    209.0300.S                       is more than one bid item.                                                         Size No. 3.
                                                                     Enter the size number (must match above).
                                                                     Enter the size number (must match above).
                         301-010    QMP Base Aggregate                                                                                                  Use on projects with any Base Aggregate Open Graded or Base Aggregate Dense bid items.              7/9/2010
                                                                                                                                                        For dense graded, apply to all grades except reclaimed asphaltic pavement. Apply to all open
                                                                                                                                                        graded base aggregates. Do not apply to the Aggregate Detours. Salvaged Asphaltic pavement
                                                                                                                                                        Base, Breaker Run, Select Crushed, Pit Run, Subbase, or Riprap bid items.


                         301-020    QMP Base Aggregate Lab                                                                                              Notes to Designer: 1. Typically the timing requirements for records and control charts in           9/2/2008
                                    Location                                                                                                            STSP 301-010 QMP Base Aggregate is adequate. On some select projects, the region may
                                                                                                                                                        want to limit the distance between the laboratory and the project site. When laboratory distance
                                                                                                                                                        is a concern, use STSP 301-020 to supplement the QMP Base Aggregate article. 2. Discuss the
                                                                                                                                                        planned coordination of project construction inspection with the construction staff before
                                                                                                                                                        incorporating this special provision in the contract. 3. Using this special provision will likely
                                                                                                                                                        increase the amount the contractor bids for the Base Aggregate Dense bid items.


                         305-005    Shaping Roadway, Item                                                                                               Use when existing shoulder aggregates are to be bladed across pavement removal areas.               9/2/2008
                                    305.0502.S
                         305-010    Hauling Excess Shoulder                                                                                             Use when there is excess shoulder material to be moved after asphaltic salvaging                    8/20/2003
                                    Material, Item 305.0504.S
                         305-015    Base Aggregate Dense 3-Inch                                                                                         Use to require Base Aggregate Dense 3-Inch in lower base layers for projects where crushed          9/2/2008
                                    for Lower Base Layers                                                                                               stone aggregate sources are readily available. Use with the Base Aggregate Dense 3-Inch
                                                                                                                                                        standard bid item number 305.0130 or 305.0135.

                         305-020    Base Aggregate Dense 1 1/4-                                                                                         Use to prohibit Base Aggregate Dense 3-Inch in lower base layers.                                   9/2/2008
                                    Inch for Lower Base Layers
                         325-001    Pulverize and Relay                                                                                                 Use in pulverize and relay contracts for projects requiring more accurate grade and slope           9/2/2008
                                                                                                                                                        control



STSP Index Spreadsheet                                                                                                                                                                                                                                                  10/12/2011
                                                                                                                                                                                                                                                         Date last
      check       STSP # to enter            Description                               Directions and Fields                   Information to enter                                            Technical Notes                                           updated
                     330-001        Mill and Relay                                                                                                    Use in mill and relay contracts for projects requiring more accurate grade and slope control.      9/2/2008


                         415-010    Concrete Pavement Fast Track, Enter pavement thickness. In addition, add supplemental                             Allows pavement to be open to traffic as soon as possible. Use a different supplemental            6/15/2011
                                    _______-Inch, Item            number that follows the ".S" for each pavement                                      number, number that follows the ".S" for each pavement thickness; for example, use bid item
                                    415.1150.S                    thickness; for example, "01." for 9-Inches and "02." for                            415.1150.S.01 for Concrete Pavement Fast Track, 9-Inch and bid item 415.1150.S.02 for
                                                                  10-Inches.                                                                          Concrete Pavement Fast Track, 10-Inch.
                                                                  Enter pavement thickness (must match above).
                         415-100    Rout and Seal, Item                                                                                                                                                                                                  9/2/2008
                                    415.6000.S
                         416-010    Pavement Dowel Bars Retrofit                                                                                      Use on concrete pavement rehabilitation or repair projects.                                        6/15/2011
                                    Warranted, Item 416.0623.S

                         416-015    Concrete Pavement Partial     Delete from the title and table in E Payment all bid items                                                                                                                             6/15/2011
                                    Depth Repair Joint Repair,    that are NOT included in the Schedule of Items.
                                    Item 416.0750.S; Concrete
                                    Pavement Partial Depth Repair
                                    Crack Repair, Item
                                    416.0752.S; Concrete
                                    Pavement Partial Depth Repair
                                    Surface Repair, Item
                                    416.0754.S; Concrete
                                    Pavement Partial Depth Repair
                                    Edge Repair, Item 416.0756.S;
                                    Concrete Pavement Partial
                                    Depth Repair Full Depth
                                    Adjustment, Item 416.0758.S.


                         416-020    High Performance Dowel Bars                                                                                       Use on projects designed for extended pavement life that may justify the additional cost of high   9/1/2009
                                    for Concrete Pavement                                                                                             performance dowel bars.
                         420-010    Concrete Pavement                                                                                                                                                                                                    9/30/2011
                                    Continuous Diamond
                                    Grinding, Item 420.1000.S
                         440-010    QMP Ride; Incentive IRI Ride,                                                                                     Use on paving projects that contain HMA or concrete pavement bid items. Use a pre-                 7/9/2010
                                    Item 440.4410.S                                                                                                   established unit price of $1 in the Schedule of Items and a quantity based on $2000 per lane
                                                                                                                                                      mile of pavement covered under the specification.
                         460-001    Warranted HMA Pavement          Enter warranty dollar amount                                                      Refer to FDM 14-20-5 for instructions on how to determine an appropriate warranty dollar           6/15/2011
                                    Mainline, Item 460.1905.S;                                                                                        amount.
                                    Warranted HMA Pavement
                                    Ancillary, Item 460.1955.S.
                         460-015    Reheating HMA Pavement                                                                                                                                                                                               9/1/2009
                                    Longitudinal Joints, Item
                                    460.4100.S
                         460-020    QMP HMA Pavement Nuclear                                                                                          Use on projects with 10,000 tons or greater, for all types of mixes.                               7/9/2010
                                    Density
                         460-021    Compactive Effort Acceptance                                                                                                                                                                                         9/1/2009
                                    for SMA and Coarse-Graded
                                    Pavements
                         460-030    HMA Pavement Intersections, Enter intersection location. In addition, add supplemental                            Use for high volume and critical HMA intersections and roundabouts. Use a separate bid item        7/9/2010
                                    Item 460.4200.S             number following ".S"; for example, ".01."                                            for each intersection or roundabout; for example, use 460.4200.S.01 for Location X and use
                                                                                                                                                      460.4200.S.02 for Location Y.
                                                                    Enter intersection location (must match previous field
                                                                    entry).
STSP Index Spreadsheet                                                                                                                                                                                                                                               10/12/2011
                                                                                                                                                                                                                                                   Date last
      check       STSP # to enter            Description                                 Directions and Fields             Information to enter                                           Technical Notes                                          updated
                     492-005        Sealing Cracks/Joints with Hot-                                                                                                                                                                                9/1/2009
                                    Applied Sealant, Item
                                    492.2010.S
                         495-005    Warranted HMA Pavement            Enter warranty dollar amount                                                Refer to FDM 14-20-5 for instructions on how to determine an appropriate warranty dollar         6/15/2011
                                    Functional Overlay Mainline,                                                                                  amount.
                                    Item 495.0100.S; Warranted
                                    HMA Pavement Functional
                                    Overlay Ancillary, Item
                                    495.0200.S.
                         502-010    Pier Construction                                                                                             Allows concrete to be deposited under water. Title may be changed to Abutment Construction.      5/2/2005

                         502-015    Crack Sealing Epoxy, Item                                                                                                                                                                                      9/1/2009
                                    502.0717.S
                         502-020    Expansion Device, Structure B- Enter structure number(s).                                                     This STSP is required when Item 502.3100 Expansion Device (Structure) is in the proposal.        6/15/2011
                                    XX-XX.
                         502-021    Expansion Device Modular,         Enter structure number                                                                                                                                                       7/9/2010
                                    Structure B-XX-XX., Item
                                    502.3110.S                        Enter structure number (must match above field)

                         502-025    Ruptured Void Repair, Item                                                                                    Use with bridge deck overlays of voided slab decks.                                              8/20/2003
                                    502.4200.S
                         502-050    Pigmented Protective Surface                                                                                  Use for parapets that require aesthetic treatment with a pigmented surface treatment.            9/2/2008
                                    Treatment, Item 502.3210.S

                         502-055    Protective Surface Treatment                                                                                  Use for let maintenance projects to reseal existing structures constructed in the year 1999 or   9/2/2008
                                    Reseal, Item 502.3215.S                                                                                       earlier.

                         503-020    Prestressed Girders Box Type Enter Type                                                                                                                                                                        7/9/2010
                                    _____, Item 503.0200.S       Enter Type (must match above field)

                         503-040    Precast Prestressed Concrete      Enter structure number(s)                                                                                                                                                    7/9/2010
                                    Deck Panels, Structure            Enter structure number (must match above field)
                                    ______, Item 503.0400.S
                         503-100    Removing and Resetting            Enter structure number(s)                                                                                                                                                    7/9/2010
                                    Prestressed Girders Structure     Enter structure number (must match above field)
                                    _______, Item 503.1005.S

                         504-010    Precast Concrete Wingwalls        Enter structure number(s), and bid item number(s).                                                                                                                           9/2/2008
                                    Structure _________, Item
                                    504.1000.S.
                                                                  Enter structure number (must match above field)
                                                                  Enter structure number (must match above field)
                         504-015    Precast Concrete Box Culvert, Enter dimension (width of box culvert)                                                                                                                                           4/15/2004
                                    ___ FTx ___ FT, Item          Enter dimension (height of box culvert)
                                    504.2000.S                    Enter dimension (width; must match dimension provided
                                                                  above)
                                                                  Enter dimension (height; must match dimension provided
                                                                  above)
                                                                  Enter dimension (width; must match dimension provided
                                                                  above)
                                                                  Enter dimension (height; must match dimension provided
                                                                  above)
                         504-020    Construction Alternative for  Enter structure number                                                          Use with 504-015                                                                                 8/20/2003
                                    Precast Concrete Wingwalls
STSP Index Spreadsheet                                                                                                                                                                                                                                         10/12/2011
                                    and Aprons, Structure ______.
                                                                                                                                                                                                                                                       Date last
      check          504-020
                  STSP # to enter   Construction Alternative for
                                              Description                            Directions and Fields                     Information to enter   Use with 504-015                         Technical Notes                                         8/20/2003
                                                                                                                                                                                                                                                       updated
                                    Precast Concrete Wingwalls    Enter number of inches (width)
                                    and Aprons, Structure ______. Enter number of inches (height)
                                                                  Enter number of inches (width; must match dimension
                                                                  provided above)
                                                                  Enter number of inches (height; must match dimension
                                                                  provided above)
                                                                  Enter number of inches (width; must match dimension
                                                                  provided above)
                                                                  Enter number of inches (height; must match dimension
                                                                  provided above)
                         505-025    Steel Fabric Reinforcement                                                                                                                                                                                         8/20/2003
                                    Bridges, Item 505.0650.S
                         506-025    Bearing Replacement          Enter structure number (If more than one structure, add                              If more than one structure, use supplemental .S numbers; for example, for replacing the          8/20/2003
                                    Structure_______, Item       supplemental .S number, e.g., .01.)                                                  bearings on Structure B-59-100, use 506.7000.S.01, and for replacing the bearings on Structure
                                    506.7000.S                   Enter structure number (must match above field)                                      B-59-101, use 506.7000.S.02.
                                                                 Enter structure number (must match above field)
                         506-035    Removing Bearings, Structure Enter structure number (If more than one structure, add                              If more than one structure, use supplemental .S numbers; for example, for removing the           8/20/2003
                                    ______, Item 506.7050.S.     supplemental .S number, e.g., .01.)                                                  bearings on Structure B-40-250, use 506.7050.S.01, and for removing the bearings on Structure
                                                                 Enter structure number (must match above field)                                      B-40-262, use 506.7050.S.02.
                                                                 Enter structure number (must match above field)
                         506-040    Bridge Jacking,              Enter structure number (If more than one structure, add                              If more than one structure, use supplemental .S numbers; for example, for bridge jacking         8/20/2003
                                    Structure_____, Item         supplemental .S number, e.g., .01.)                                                  Structure B-01-062, use 506.7060.S.01, and for bridge jacking Structure B-01-063, use
                                    506.7060.S                   Enter structure number (must match above field)                                      506.7060.S.02.
                                                                 Enter structure number (must match above field)
                         506-045    Hinge Replacement, Item                                                                                                                                                                                            8/20/2003
                                    506.7070.S
                         506-080    Prefabricated Steel Truss        Enter structure number (If more than one structure, add                                                                                                                           7/9/2010
                                    Pedestrian Bridge Structure      supplemental .S number, e.g., .01.)
                                    ________, Item 506.8000.S
                                                                     Enter structure number (must match above field)


                         509-005    Removing Concrete Masonry                                                                                                                                                                                          7/9/2010
                                    Deck Overlay, Item
                                    509.9005.S
                         509-010    Removing Asphaltic Concrete                                                                                                                                                                                        6/15/2011
                                    Deck Overlay, Item
                                    509.9010.S (Structure)
                         509-020    Epoxy Crack Sealing, Item                                                                                                                                                                                          7/9/2010
                                    509.9020.S

                         509-025    Epoxy Injection Crack Repair,                                                                                                                                                                                      7/9/2010
                                    Item 509.9025.S; Cored Holes
                                    2-Inch Diameter, Item
                                    509.9026.S
                         509-050    Cleaning Parapets, Item                                                                                                                                                                                            7/9/2010
                                    509.9050.S

                         511-005    Piling Steel Delivered HP        Enter Inch and LB measurement                                                                                                                                                     7/9/2010
                                    ____Inch x ____ LB, Item         Enter Inch and LB measurement (must match above field)
                                    511.2125.S
                         511-010    Pipe Piles Delivered and                                                                                          Use when steel oil field pipe piling is required.                                                8/20/2003
                                    Driven, Item 511.7000.S
                         513-005    Railing Pipe, Item 513.2050.S.                                                                                                                                                                                     8/20/2003


STSP Index Spreadsheet                                                                                                                                                                                                                                             10/12/2011
                                                                                                                                                                                                                                                                  Date last
      check       STSP # to enter            Description                               Directions and Fields                          Information to enter                                            Technical Notes                                             updated
                     513-090        Removing and Resetting          Enter Structure Number                                                                                                                                                                        7/9/2010
                                    Tubular Railing Structure
                                                                    Enter structure number (must match above field)
                                    ______, Item 513.9005.S
                         516-060    Sheet Membrane                                                                                                           Waterproofing membrane for use on bridge decks to be overlaid with asphaltic concrete.               9/30/2011
                                    Waterproofing, Item
                                    516.0600.S.
                         516-061    Sheet Membrane                  Enter Structure Number                                                                   Waterproofing membrane for use on the top slab of buried structures that are to be directly          9/30/2011
                                    Waterproofing for Top Slab                                                                                               overlaid with asphaltic concrete and the top slab of buried structures that are not to be directly
                                    Structure ______, Item                                                                                                   overlaid with asphaltic concrete.
                                    516.0610.S
                                                                    Enter structure number (must match above field)
                         517-005    Structure Repainting General.                                                                                            Required on all structure repainting proposals.                                                      8/20/2003

                         517-010    Preparation and Coating of      Enter structure number (If more than one structure, add                                  For use on bridge rehabilitation contracts when preparation of top flanges on existing steel         7/9/2010
                                    Top Flanges (Structure), Item   supplemental .S number, e.g., .01.)                                                      girders is required. If there is more than one structure, use supplemental .S numbers; for
                                    517.0900.S.                                                                                                              example, if the top flanges are being coated on B-14-100 and B-14-200, use 517.0900.S.01 for
                                                                                                                                                             Structure B-14-100 and use 517.0900.S.02 for Structure B-14-200.
                                                                    Enter structure number (must match above field)
                         517-025    Structure Repainting Organic    Enter structure number (If more than one structure, add                                  If more than one structure, use supplemental .S numbers; for example, if repainting two              8/20/2004
                                    Zinc Rich System, Structure     supplemental .S number, e.g., .01.)                                                      structures, say B-14-100 and B-14-200, use 517.1000.S.01 for Structure B-14-100, and
                                    _____, Item 517.1000.S.         Enter the structure number, areas to be cleaned and painted;                             517.1000.S.02 for Structure B-14-200.
                                                                    and if desired, description of area being painted
                                                                    (If there are two structures, enter the following for the
                                                                    2nd structure:) Enter the structure number, areas to be
                                                                    cleaned and painted; and if desired, description of area being
                                                                    painted
                                                                    Enter structure number(s)
                         517-036    Structure Overcoating           Enter structure number (If more than one structure, add                                  Under Section C.1 Surface Preparation, designer may choose to add language if special tools          5/1/2008
                                    Cleaning and Priming            supplemental .S number, e.g., .01.)                                                      are required; for example, vaccuum shrouded power tools. If working on more than one
                                    Structure ______, Item          Enter structure number                                                                   structure, use supplemental .S numbers; for example, if overcoating, cleaning and priming two
                                    517.3000.S                      Enter square footage with SP 1 cleaining (delete line, if zero)                          structures, say B-25-100 and B-25-126, use 517.3000.S.01 for Structure B-25-100, and
                                                                                                                                                             517.3000.S.02 for Structure B-25-126
                                                                    Enter square footage with SP 2 cleaining (delete line, if zero)

                                                                    Enter square footage with SP 3 cleaining (delete line, if zero)

                                                                  Enter square footage with SP 11 cleaining (delete line, if
                                                                  zero)
                                                                  Enter square footage for total three-coat area
                                                                  DD - select hand; power
                                                                  DD - select 2; 3; 11
                                                                  DD - select hand; power
                                                                  DD - select 2; 3; 11
                                                                  DD - select 2; 3; 11
                                                                  Enter structure number(s)
                         517-037    Containment and Collection of Enter structure number(s) (If more than one structure, add                                 If this bid item is used for more than one structure, use supplemental bid numbers.                  9/2/2008
                                    Waste Materials               supplemental .S number, e.g., .01.)
                                    Stucture_____, Item
                                    517.4000.S.
                                                                  Enter structure number(s)--must match entry above.
                         517-041    Painting Epoxy System         Enter structure number(s)                                                                  Existing structure to be repainted with epoxy.                                                       8/1/2004
                                    Structure _____.
                         517-045    Painting Vinyl System           Enter structure number(s) (If more than one structure, add                               Existing structure is painted with vinyl, not for new steel.                                         8/20/2004
                                    Structure ____, Item            supplemental .S number, e.g., .01.)
                                    517.0700.S
STSP Index Spreadsheet                                                                                                                                                                                                                                                        10/12/2011
                     517-045        Painting Vinyl System                                                                                             Existing structure is painted with vinyl, not for new steel.                                         8/20/2004
                                                                                                                                                                                                                                                           Date last
      check       STSP # to enter             ____, Item
                                    Structure Description                             Directions and Fields                    Information to enter                                            Technical Notes                                             updated
                                    517.0700.S                    Enter structure number (must match above field)
                                                                  Enter structure number (must match above field)
                         517-050    Structure Repainting Recycled Enter structure number(s) (If more than one structure, add                          Blast cleaning with painting                                                                         5/2/2005
                                    Abrasive Structure ______,    supplemental .S number, e.g., .01.)
                                    Item 517.1800.S               Enter structure number (must match above field)
                                                                  Enter square footage
                                                                  Enter color name and number
                                                                  Enter structure number (must match above field)
                         517-055    Labeling and Disposal of      Enter EPA ID number of the waste that will be generated                             This STSP is typically used with STSP 517-060 and STSP 517-065. The EPA ID number is                 7/9/2010
                                    Waste Material                from each structure.                                                                site/structure specific, so if this STSP covers more than one structure on a project, the designer
                                                                                                                                                      may need to enter multiple bridges and ID numbers in the required field.
                         517-060    Portable Decontamination                                                                                          This STSP is typically used with STSP 517-055 and STSP 517-065.                                      5/2/2005
                                    Facility, Item 517.6001.S.
                         517-065    Negative Pressure             Enter structure number(s) (If more than one structure, add                          You must use STSP 517-055, Labeling and Disposal of Waste Material, and STSP 517-060,                10/8/2010
                                    Containment and Collection of supplemental .S number, e.g., .01.)                                                 Portable Decontamination Facility, with this STSP.
                                    Waste Materials,
                                    Structure_____, Item
                                    517.4500.S.
                                                                  Enter structure number(s)--must match entry above.
                         517-070    Painting Warranted Structure Enter structure number                                                               The warranty bond $ amount is 60 percent of the sum of the estimated contract amounts for            9/2/2008
                                    ____, Item 517.2000.S.        Enter structure number (must match above field)                                     cleaning and coating the existing structure.
                                                                  Enter project id #
                                                                  Enter project id # (must match previous field)
                                                                  Enter project id # (must match previous field)
                                                                  Enter the warranty dollar amount
                                                                  Enter structure number (must match above field)
                         517-110    Concrete Staining Structure   Enter Structure #                                                                                                                                                                        7/9/2010
                                    _________, Item 517.1010.S Enter structure number (must match above field)
                         517-115    Concrete Staining Multi-Color Enter Structure #                                                                                                                                                                        7/9/2010
                                    Structure _________, Item     Enter structure number (must match above field)
                                    517.1015.S
                         517-150    Architectural Surface         Enter Structure #                                                                                                                                                                        6/15/2011
                                    Treatment Structure           Enter structure number (must match above field)
                                    _________, Item 517.1050.S
                         520-015    Culvert Pipe Liners, _____-   Enter size (if more than one size, use supplemental .S                              This STSP is only intended to be used for circular culverts. The STSP should not be used on          6/15/2011
                                    Inch, Item 520.0700.S.        numbers; one for each size of liner)                                                culverts that are:
                                                                                                                                                      1. Located in a mapped floodplain unless culvert with liner is modeled to show upstream water
                                                                                                                                                      surface elevation is not increased when compared to the existing culvert.
                                                                                                                                                      2. Located in drainage districts unless the drainage board approves the installation of the liner.
                                                                                                                                                      3. Located on a stream where aquatic organism passage is a concern unless WDNR is in
                                                                                                                                                      agreement with the use of a liner.
                                                                                                                                                      4. Crushed, collapsed or have excessive deflection that may make liner installation impossible.
                                                                                                                                                      5. Horizontal elliptical or arch pipes.
                                                                                                                                                      Plans must include characteristics of the existing culvert including material of construction,
                                                                                                                                                      diameter and pipe slope. Field verify culvert material of construction, size, shape and condition
                                                                                                                                                      during design.
                                                                                                                                                      When specifying liners for concrete pipe, designers should verify the hydraulic requirements of
                                                                                                                                                      this special provision can be met.
                                                                                                                                                      Perform a complete culvert hydraulic analysis on culverts to be lined that have hydraulically
                                                                                                                                                      sensitive structures and/or property upstream and in low cover areas where over topping may
                                                                                                                                                      be a concern.




STSP Index Spreadsheet                                                                                                                                                                                                                                                 10/12/2011
                                                                                                                                                                                                               Date last
      check       STSP # to enter            Description                                Directions and Fields                            Information to enter                                Technical Notes   updated
                                                                     Enter size (must match previous field)
                         520-020    Culvert Pipe Concrete Collar,                                                                                                                                              9/2/2008
                                    Item 520.8000.S
                         521-005    Surface Drain Pipe Corrugated Enter size (if more than one size, use supplemental .S                                        For use in paved shoulders                     9/2/2008
                                    Metal Slotted, ___-Inch, Item numbers; one for each size of drain pipe)
                                    521.2005.S
                                                                  Enter size (must match previous field)
                         526-005    Temporary Pedestrian          Enter station #                                                                                                                              8/20/2003
                                    Structure Station________,
                                    Item 526.0200.S
                                                                  Enter dimension in feet
                                                                  Enter station # (must match previous "station" field)
                         526-010    Temporary Structure Station Enter station #                                                                                                                                8/20/2003
                                    _______
                                                                  Enter dimension in feet
                         531-005    Noise Barriers Single-Sided   Enter structure number(s) (If more than one structure, add                                                                                   6/15/2011
                                    Sound Absorptive Structure    supplemental .S number, e.g., .01.)
                                    ______, Item 531.0200.S
                                                                  Enter structure number(s)--must match entry above.
                                                                  In B.2.5, enter specifics of color and surface texture.
                                                                  In B.2.5, enter specific listing of color numbers, if applicable.

                                                                     In B.2.5, enter specifics if panels will be more than one color.

                                                                     In B.2.9.2, insert table of structure and retaining wall-
                                                                     mounted noise barrier if applicable.
                         531-010    Noise Barriers Double-Sided      Enter structure number(s) (If more than one structure, add                                                                                6/15/2011
                                    Sound Absorptive Structure       supplemental .S number, e.g., .01.)
                                    ______, Item 531.0300.S
                                                                     Enter structure number(s)--must match entry above.
                                                                     In B.2.5, enter specifics of color and surface texture.
                                                                     In B.2.5, enter specific listing of color numbers, if applicable.

                                                                     In B.2.5, enter specifics if panels will be more than one color.

                                                                  In B.2.9.2, insert table of structure and retaining wall-
                                                                  mounted noise barrier if applicable.
                         531-015    Noise Barriers Non-Absorptive Enter structure number(s) (If more than one structure, add                                                                                   9/2/2008
                                    Structure _______, Item       supplemental .S number, e.g., .01.)
                                    531.0400.S
                                                                  Enter structure number(s)--must match entry above.
                         532-030    Wall Modular Block Gravity,                                                                                                                                                6/15/2011
                                    Item 532.0200.S

                         532-031    Wall Modular Block                                                                                                                                                         6/15/2011
                                    Mechanically Stabilized Earth,
                                    Item 532.0300.S
                         532-032    Wall Concrete Panel                                                                                                                                                        6/15/2011
                                    Mechanically Stabilized Earth,
                                    Item 532.0500.S.
                         532-033    Wall CIP Facing Mechanically                                                                                                                                               6/15/2011
                                    Stabilized Earth, Item
                                    532.0600.S



STSP Index Spreadsheet                                                                                                                                                                                                     10/12/2011
                                                                                                                                                                                                                                                          Date last
      check       STSP # to enter            Description                                Directions and Fields                       Information to enter                                         Technical Notes                                          updated
                     532-034        Wall Modular Bin or Crib,                                                                                                                                                                                             9/1/2009
                                    Item 532.0900.S

                         532-035    Wall Wire Faced Mechanically                                                                                                                                                                                          6/15/2011
                                    Stabilized Earth, Item
                                    532.0700.S

                         532-036    Wall Gabion, Item 532.0800.S                                                                                                                                                                                          9/1/2009


                         532-037    Temporary Wall Wire Faced                                                                                                                                                                                             6/15/2011
                                    Mechanically Stabilized Earth,
                                    Item 532.0750.S
                         550-005    Piling (Type) (Size); Piling   Enter Pile Type (enter all piling type needed for proposal)--                           Use this STSP when any of the following items are included in the project, and the Modified    6/15/2011
                                    Precast Concrete Testing; Pile Delete Pile Type and Size from title if item is not in                                  Gates Equation will be used to determine pile capacity.
                                    Splices Precast Concrete       proposal.                                                                               550.0010.S Pre-Boring Unconsolidated Materials LF
                                    (Size); Pile Points; Pile                                                                                              550.0020.S Pre-Boring (Rock) LF
                                    Redriving; Pre-Boring                                                                                                  550.0500.S Pile Points Each
                                    (Material Type)                                                                                                        550.0600.S Pile Redriving Each
                                                                                                                                                           550.1100.S – 1140.S Piling Steel HP (Size) LF
                                                                                                                                                           550.2102.S – 2168.S Piling CIP Concrete (Size) (Shell Thickness) LF
                                                                     Enter Pile Size (enter all piling sizes needed in proposal)                           550.3010.S Piling Precast Concrete Testing LF
                                                                                                                                                           550.3100.S – 3160.S Piling Precast Concrete (Size) LF
                                                                   Enter Pile Splices Precast Concrete Size (enter all piling                              550.3810.S – 3816.S Pile Splices, Precast Concrete (Size) Each
                                                                   splice sizes in proposal). Delete item from title if item is
                                                                   not in proposal.
                                                                   Enter Preboring Material Type (enter all material types
                                                                   through which piles will be pre-bored). Delete item from
                                                                   title if item is not in proposal.
                         550-010    Piling (Type) (Size); Piling   Enter Pile Type (enter all piling type needed for proposal)--                           Use this STSP when any of the following items are included in the project, and Wave Equation   6/15/2011
                                    Precast Concrete Testing; Pile Delete Pile Type and Size from title if item is not in                                  Analysis will be used to determine pile capacity.
                                    Splices Precast Concrete       proposal.                                                                               550.0010.S Pre-Boring Unconsolidated Materials LF
                                    (Size); Pile Points; Pile                                                                                              550.0020.S Pre-Boring (Rock) LF
                                    Redriving; Pre-Boring                                                                                                  550.0500.S Pile Points Each
                                    (Material Type)                                                                                                        550.0600.S Pile Redriving Each
                                                                                                                                                           550.1100.S – 1140.S Piling Steel HP (Size) LF
                                                                                                                                                           550.2102.S – 2168.S Piling CIP Concrete (Size) (Shell Thickness) LF
                                                                                                                                                           550.3010.S Piling Precast Concrete Testing LF
                                                                     Enter Pile Size (enter all piling sizes needed in proposal)                           550.3100.S – 3160.S Piling Precast Concrete (Size) LF
                                                                                                                                                           550.3810.S – 3816.S Pile Splices, Precast Concrete (Size) Each
                                                                     Enter Pile Splices Precast Concrete Size (enter all piling
                                                                     splice sizes in proposal). Delete item from title if item is
                                                                     not in proposal.
                                                                     Enter Preboring Material Type (enter all material types
                                                                     through which piles will be pre-bored). Delete item from
                                                                     title if item is not in proposal.
                         601-005    Concrete Curb Precast, Item                                                                                                                                                                                           9/2/2008
                                    601.0199.S.
                         604-010    Slope Paving Repair Crushed                                                                                                                                                                                           7/9/2010
                                    Aggregate, Item 604.9010.S

                         604-015    Reseal Crushed Aggregate                                                                                                                                                                                              7/9/2010
                                    Slope Paving, Item 604.9015.S




STSP Index Spreadsheet                                                                                                                                                                                                                                                10/12/2011
                                                                                                                                                                                                                                                                      Date last
      check       STSP # to enter            Description                                  Directions and Fields                          Information to enter                                             Technical Notes                                             updated
                     606-005        Transition Mat, Item                                                                                                        A transition mat is an alternative for rip rap. It is a mat mechanically-anchored by rust resistant   9/30/2011
                                    606.1100.S                                                                                                                  cable or banding and earth anchor system and is designed with voids throughout the structure
                                                                                                                                                                which enable vegetative growth. Transition mats provide mechanical protection over highly-
                                                                                                                                                                erosive areas, like pipe outfalls, over-flow structures, and stream banks. Transition mats
                                                                                                                                                                provide resistance against much greater shear stress and velocities than vegetation alone,
                                                                                                                                                                provide a reasonably flat surface that can be used within a roadway clear zone, are more
                                                                                                                                                                aesthetically pleasing than riprap and in some cases driven over. Transition mats generally do
                                                                                                                                                                not dissipate energy by impact, but mechanically protect the critical area until the high energy
                                                                                                                                                                forces have dissipated via expansion/widening of the scour area. The resulting downstream
                                                                                                                                                                forces are managed by appropriate soil covers calculated and specified as part of the transition
                                                                                                                                                                mat engineered system. Transition mats may be used in conjunction with riprap sections
                                                                                                                                                                providing flow leveling or transitions not accommodated by vegetation alone. In special
                                                                                                                                                                circumstances may be used to provide immediate erosion and scour protection in earthen
                                                                                                                                                                channels where such protections are justified.

                                                                                                                                                                Vegetation may be difficult to establish with a transition mat due to limited sunlight and water,
                                                                                                                                                                consider using a Watering SPV when vegetation will be an integral part of the system.
                         607-005    Storm Sewer Pipe _____-Inch, Enter size (if more than one size, use supplemental .S                                         Alternative SS Pipe: HDPE, PVC, SSR, Nonreinforced Concrete, Composite or Reinforced                  5/1/2008
                                    Item 607.0600.S              numbers; one for each size of pipe)                                                            Concrete for volumes less than or equal to 7,000 ADT
                                                                 Enter size (must match previous field)
                         611-005    Adjusting Manhole Covers.    Delete paragraph 2, if bid item 611.8120.S is NOT in the                                       Requires cover plates and establishes tolerance in accuracy for placing covers. If paragraph No       8/20/2003
                                                                 proposal.                                                                                      2 is used, STSP 611-006 is required.
                         611-006    Cover Plates Temporary, Item                                                                                                Cover inlets and manholes during pavement rehab. Use with STSP 611-005                                8/20/2003
                                    611.8120.S.
                         611-010    Pipe Grates, Item 611.9800.S                                                                                                Provides safety grates on the ends of pipes.                                                          8/20/2003

                         611-015    Drain Slotted Vane, Item                                                                                                    Use with standard detail drawing Slotted Vane Drain.                                                  8/20/2003
                                    611.9900.S
                         612-005    Insulation Board Polystyrene,    Enter thickness (if more than one thickness, use                                           Design Note: 1", 2", 3" thicknesses are available                                                     8/20/2003
                                    _____ Inch, Item 612.0902.S.     supplemental .S numbers; one for each thickness of
                                                                     insulation)
                                                                     Enter thickness (must match previous field)
                         616-005    Fencing Small Animal, Item                                                                                                  Small animal fencing used as a barrier to prevent small animals from entering travel lanes or to      9/30/2011
                                    616.0120.S                                                                                                                  funnel them into animal crossings
                         616-025    Fence Temporary, Item                                                                                                                                                                                                             10/8/2010
                                    616.0600.S
                         616-030    Fence Safety, Item 616.0700.S.                                                                                              All purpose safety fence                                                                              5/10/2007

                         616-035    Gates Wood Single Leaf,          Enter the length of gate in feet                                                                                                                                                                 8/20/2003
                                    _____ Ft., Item 616.0350.S
                                                                     Enter the length of gate in feet (must match previous field)

                         616-040    Gates Wood Double Leaf,          Enter the length of gate in feet                                                                                                                                                                 8/20/2003
                                    ____ Ft, Item 616.0352.S
                                                                     Enter the length of gate in feet (must match previous field)

                         616-045    Gates Pipe Single Leaf, _____ Enter the length of gate in feet                                                                                                                                                                    11/3/2003
                                    Ft., Item 616.0360.S.

                                                                     Enter the length of gate in feet (must match previous field)

                         616-050    Fence Track Clearance, Item      Enter distance in feet fences need to be from the centerline                               Use item Fence Track Clearance and STSP 616-050 with STSP 107-034 - For Wisconsin and                 5/2/2005
                                    616.0800.S                                                                                                                  Southern Railroad Co use 100 feet beyond edges of overpass structure(s)
                                                                     DD - Select both sides of track; north side of the track; south
                                                                     side of the track; east side of the track; west side of the track



STSP Index Spreadsheet                                                                                                                                                                                                                                                            10/12/2011
                         616-050    Fence Track Clearance, Item                                                                                               Use item Fence Track Clearance and STSP 616-050 with STSP 107-034 - For Wisconsin and            5/2/2005
                                    616.0800.S                                                                                                                Southern Railroad Co use 100 feet beyond edges of overpass structure(s)

                                                                                                                                                                                                                                                               Date last
      check       STSP # to enter            Description                                Directions and Fields                          Information to enter                                          Technical Notes                                           updated
                                                                    Enter distance in feet fences need to be from the centerline

                         628-050    Stone or Rock Ditch Checks,     Enter the type of excavation (Excavation type must be a bid                               To be used with CADDS Stone or Rock Ditch Check Details. Bid Geotextile Fabric Type SAS          9/2/2008
                                    Item 628.7560.S                 item in the proposal)                                                                     separately if used. Specify the type of excavation to be used for removal of sediment. See FDM
                                                                                                                                                              Cahp 10-10-25 for guidance on applications. If stone or rock ditch checks are to remain
                                                                                                                                                              permanently make sure they are outside the clear zone or are sloped no steeper than a 6:1 on
                                                                                                                                                              both sides.

                         632-005    Landscape Planting            Enter the dollar amount for damages                                                         Use this STSP whenever bid item 632.9101 Landscape Planting Surveillance and Care Cycle is       5/10/2007
                                    Surveillance and Care Cycles.                                                                                             used.
                         635-005    Sign Supports Shorten                                                                                                                                                                                                      9/1/2009
                                    Structural Steel, Item
                                    635.9010.S
                         638-010    Removal of Specific                                                                                                                                                                                                        10/9/2006
                                    Information Signs and
                                    Associated Posts.
                         640-001    Ground Water Monitoring         Enter station number                                                                      FDM Chapter 29: Recovered and Recycled Materials.                                                9/1/2005
                                    Well.
                         640-005    Aggregate for Seal Coat                                                                                                   FDM Chapter 29: Recovered and Recycled Materials.                                                8/20/2003
                                    Cover.
                         640-010    Placing Industrial (Byproduct), Enter name of byproduct                                                                   FDM Chapter 29: Recovered and recycled materials. Designer needs to supply name of               8/20/2003
                                    Item 640.0200.S                 Enter name of byproduct (must match previous byproduct                                    byproduct material, name of plant where it is being generated and a contact person at the
                                                                    field)                                                                                    generator.
                                                                    Enter name of byproduct (must match previous byproduct
                                                                    field)
                                                                    Enter name of generator
                                                                    Enter name of byproduct (must match previous byproduct
                                                                    field)
                                                                    Enter name and telephone number (of contact at generator
                                                                    of industrial byproduct)
                                                                    Enter station #
                                                                    Enter name of byproduct (must match previous byproduct
                                                                    field)
                                                                    Enter name of byproduct (must match previous byproduct
                                                                    field)
                                                                    Enter name of byproduct (must match previous byproduct
                                                                    field)
                                                                    Enter location from where contractor is to obtain the industrial
                                                                    byproduct
                         640-015    Clay Liner, Item 640.0303.S                                                                                               FDM Chapter 29: Recovered and Recycled Materials.                                                9/2/2008
                         640-020    Clay Cap, Item 640.0305.S                                                                                                 FDM Chapter 29: Recovered and Recycled Materials.                                                9/2/2008
                         640-025    Hauling Industrial           Enter name of byproduct                                                                      FDM Chapter 29: Recovered and recycled material. Designer needs to supply name of                8/20/2003
                                    (Byproduct), Item 640.0250.S Enter name of byproduct (must match previous byproduct                                       byproduct material, the generator and a contact person at the generator.
                                                                 field)
                                                                 Enter location from where contractor is to obtain the industrial
                                                                 byproduct
                                                                 Enter name of byproduct (must match previous byproduct
                                                                 field)
                                                                 Enter name of generator
                                                                 Enter name of byproduct (must match previous byproduct
                                                                 field)
                                                                 Enter location


STSP Index Spreadsheet                                                                                                                                                                                                                                                     10/12/2011
                                                                                                                                                                                                                                                      Date last
      check       STSP # to enter             Description                            Directions and Fields                    Information to enter                                         Technical Notes                                            updated
                                                                  Enter name of byproduct (must match previous byproduct
                                                                  field)
                                                                  Enter name and telephone number (of contact at generator
                                                                  of industrial byproduct)
                                                                  Enter name of generator
                                                                  Enter name of byproduct (must match previous field)
                                                                  Enter name of byproduct (must match previous byproduct
                                                                  field)
                                                                  Enter name of byproduct (must match previous byproduct
                                                                  field)
                                                                  Enter name of byproduct (must match previous byproduct
                                                                  field)
                         640-030    Maintenance of Cells          Enter name of byproduct                                                            FDM Chapter 29: Recovered and Recycled Materials.                                                8/20/2003
                                    Byproduct ____, Item          Enter name of byproduct (must match previous field)
                                    640.0270.S                    Enter name of byproduct (must match previous field)
                                                                  Enter name of byproduct (must match previous field)
                                                                  Enter name of byproduct (must match previous field)
                                                                  Enter name of byproduct (must match previous field)
                                                                  Enter name of byproduct (must match previous field)
                                                                  Enter name of byproduct (must match previous field)
                                                                  Enter name of byproduct (must match previous field)
                         640-035    Basin Lysimeter, Item                                                                                            FDM Chapter 29: Recovered and Recycled Materials.                                                9/2/2008
                                    640.0400.S
                         640-040    Head Monitoring Well, Item                                                                                       FDM Chapter 29: Recovered and Recycled Materials.                                                8/20/2003
                                    640.0500.S
                         642-005    Field Facilities                                                                                                                                                                                                  9/2/2008
                         643-005    Traffic Control               DD - select three; seven (the number of days by which                              This option is allowed at the discretion of the designer on roadways with AADT less than 3500.   9/2/2008
                                                                  pavement markings must be complete)                                                Signs described in this special provision are an option to same-day centerline and no passing
                                                                                                                                                     zone pavement marking requirements. Signs should be paid as Traffic Control Signs (DAYS).
                                                                                                                                                     STSPs 646-005 and 649-005 are required with this special provision. Designer Note: On
                                                                                                                                                     roadways with AADT less than 1500, use "seven" in the blank. On roadways with AADT
                                                                                                                                                     greater than 1500 but less than 3500, use "three" in the blank.

                         643-010    Nighttime Work Lighting-                                                                                                                                                                                          7/9/2010
                                    Stationary
                         643-045    Traffic Control Type 1 Sign                                                                                                                                                                                       9/30/2011
                                    Covering, Item 643.0910.S

                         645-030    Geotextile Fabric Type MS     Enter Minimum Tensile Strength Machine Direction in lb/in                          Required with bid item 645.0125. Note to Designer - Be sure to specify both the standard and     9/2/2008
                                                                                                                                                     the equivalent metric dimensions for each dual-dimensioned property.
                                                                  Enter Minimum Tensile Strength Machine Direction in N/m

                                                                  Enter Minimum Tensile Strength Cross Direction in lb/in
                                                                  Enter Minimum Tensile Strength Cross Direction in N/m
                                                                  Enter Maximum Elongation at required strength in %
                                                                  Enter minimum puncture strength in lb/in
                                                                  Enter minimum puncture strength in N/m
                                                                  Enter maximum apparent opening size No.
                                                                  Enter maximum apparent opening size µm
                                                                  Enter minimum permittivity s-1
                         645-035    Geotextile Fabric Type SR     Enter Minimum Tensile Strength in lb/in                                            Required with bid item 645.0135. Note to Designer - Be sure to specify both the standard and     9/2/2008
                                                                  Enter Minimum Tensile Strength in N/m                                              the equivalent metric dimensions for each dual-dimensioned property.
                                                                  Enter Maximum Elongation at required strength in %
                                                                  Enter minimum puncture strength in lb
                                                                  Enter minimum puncture strength in N
STSP Index Spreadsheet                                                                                                                                                                                                                                            10/12/2011
                         645-035    Geotextile Fabric Type SR                                                                                          Required with bid item 645.0135. Note to Designer - Be sure to specify both the standard and        9/2/2008
                                                                                                                                                       the equivalent metric dimensions for each dual-dimensioned property.

                                                                                                                                                                                                                                                           Date last
      check       STSP # to enter            Description                                Directions and Fields                   Information to enter                                           Technical Notes                                             updated
                                                                   Enter maximum apparent opening size No.
                                                                   Enter maximum apparent opening size µm
                                                                   Enter minimum permittivity s-1
                         645-040    Geotextile Fabric Type ES      Enter Minimum Tensile Strength Machine Direction in lb/in                           Required with bid item 645.0115. Note to Designer - Be sure to specify both the standard and        9/2/2008
                                                                   Enter Minimum Tensile Strength Machine Direction in N/m                             the equivalent metric dimensions for each dual-dimensioned property.
                                                                   Enter Minimum Tensile Strength Cross Direction in lb/in
                                                                   Enter Minimum Tensile Strength Cross Direction in N/m
                                                                   Enter Maximum Elongation at required strength in %
                                                                   Enter maximum apparent opening size No.
                                                                   Enter maximum apparent opening size µm
                                                                   Enter minimum permittivity s-1
                         646-005    Pavement Marking Epoxy 4-      DD - select three; seven                                                            This option is allowed, in lieu of same-day centerline and no passing zone pavement marking,        5/12/2006
                                    Inch                                                                                                               at the discretion of the designer on roadways with AADT less than 3500. STSPs 643-005 and
                                                                                                                                                       649-005 are required with this special provision. Designer Note: On roadways with AADT
                                                                                                                                                       less than 1500, use "seven" in the blank. On roadways with AADT greater than 1500 but less
                                                                                                                                                       than 3500, use "three" in the blank.
                         646-010    Pavement Markings Late                                                                                             Use this bid item/special provision for late season marking on all projects projected to be         6/15/2011
                                    Season, Item 646.0900.S                                                                                            completed after November 15. Also use on multi-year projects where pavement markings will
                                                                                                                                                       need to be placed between November 15 and April 15.
                         646-017    Pavement Marking Wet           Delete from the title and table in E Payment all bid items                          Designer Notes:                                                                                     7/9/2010
                                    Reflective Tape 4-Inch, Item   that are NOT included in the Schedule of Items.                                     ∙ These items are not appropriate with Stone Matrix Asphalt; instead, use bid items Pavement
                                    646.0871.S; 8-Inch, Item                                                                                           Marking Grooved Wet Reflective Tape 4-Inch, Item 646.0881.S; 8-Inch, Item 646.0883.S.
                                    646.0873.S                                                                                                         ∙ Delete the inappropriate items for your project from the title and from the table in section E
                                                                                                                                                       Payment



                         646-018    Pavement Marking Grooved      Delete from the title and table in E Payment all bid items                           Designer Notes:                                                                                     7/9/2010
                                    Wet Reflective Tape 4-Inch,   that are NOT included in the Schedule of Items.                                         * Delete the inappropriate items for your project from the title and from the table in section
                                    Item 646.0881.S; 8-Inch, Item                                                                                      E Payment.
                                    646.0883.S                                                                                                            * These bid items are appropriate for Stone Matrix Asphalt.
                                                                                                                                                       Add quantities of the following bid items to the contract documents:
                                                                                                                                                          * Temporary Pavement Marking Reflective Paint 4-Inch, Item 649.0200. (Use when
                                                                                                                                                       temperatures will generally be over 40 degrees F and for asphalt roadways open to traffic that
                                                                                                                                                       have the 10-day wait period before placing the tape.)
                                                                                                                                                          * Pavement marking Epoxy 4-Inch, Item 646.0106. (Use for late season constructure when
                                                                                                                                                       expected temperatures are below 40 degrees F to provide pavement marking lines that are
                                                                                                                                                       durable enough to last over the winter months prior to placing tape in the spring.)
                                                                                                                                                          * Quantites of Traffic Control will also need to be included in the plans for both of the
                                                                                                                                                       above situations in which the tape is placed after the road has been opened to traffic.




STSP Index Spreadsheet                                                                                                                                                                                                                                                 10/12/2011
                                                                                                                                                                                                                                                                 Date last
      check       STSP # to enter             Description                            Directions and Fields                            Information to enter                                           Technical Notes                                             updated
                     646-022        Pavement Marking Grooved     Delete from the title and table in E Payment all bid items                                  Designer Notes:                                                                                     7/9/2010
                                    Wet Reflective Contrast Tape that are NOT included in the Schedule of Items.                                                * Delete the inappropriate items for your project from the title and from the table in section
                                    4-Inch, Item 646.0841.S; 8-                                                                                              E Payment.
                                    Inch, Item 646.0843.S                                                                                                    Add quantities of the following bid items to the contract documents:
                                                                                                                                                                * Temporary Pavement Marking Reflective Paint 4-Inch, Item 649.0200. (Use when
                                                                                                                                                             temperatures will generally be over 40 degrees F and for asphalt roadways open to traffic that
                                                                                                                                                             have the 10-day wait period before placing the tape.)
                                                                                                                                                                * Pavement marking Epoxy 4-Inch, Item 646.0106. (Use for late season constructure when
                                                                                                                                                             expected temperatures are below 40 degrees F to provide pavement marking lines that are
                                                                                                                                                             durable enough to last over the winter months prior to placing tape in the spring.)
                                                                                                                                                                * Quantites of Traffic Control will also need to be included in the plans for both of the
                                                                                                                                                             above situations in which the tape is placed after the road has been opened to traffic.



                         646-030    Pavement Marking Paint High Delete from the title and table in E Payment all bid items                                   Designer Note: Delete the inappropriate items for your project from the title and from the table    9/2/2008
                                    Build 4-Inch, Item 646.0101.S; that are NOT included in the Schedule of Items.                                           in section E Payment
                                    8-Inch, Item 646.0121.S


                         646-035    Pavement Marking Outfall,                                                                                                This item marks the locations of edge drain outlets                                                 8/20/2003
                                    Item 646.0805.S
                         646-070    Removing Raised Pavement                                                                                                 Use for overlaying projects.                                                                        9/4/2007
                                    Markers, Item 646.0790.S
                         647-005    Pavement Markings for                                                                                                    Always use with STSP 460-001 and 495-005 on warranty projects to place marks across the             6/15/2011
                                    Warranty Projects Epoxy 6-                                                                                               centerline to identify warranty projects.
                                    Inch, Item 647.8106.S
                         648-005    Locating No-Passing Zones,      DD - select 0.16 miles (845 feet); 0.21 miles (1108 feet); 0.26                          Use with bid item 648.0100 Designer's note: Consult the region's traffic section before inserting   5/12/2006
                                    Item 648.0100                   miles (1373 feet)                                                                        one of the following three options for the spotting sight distance in areas with a 55 mph posted
                                                                                                                                                             speed limit: 1) 0.16 miles (845 feet) 2) 0.21 miles (1108 feet) 3) 0.26 miles (1373 feet)


                         649-005    Temporary Pavement Marking DD - select three; seven                                                                      This special provision is used when no passing zones are designated by signs in lieu of             5/12/2006
                                    4-Inch                                                                                                                   pavement markings immediately following paving operations, and is allowed at the discretion
                                                                                                                                                             of the designer on roadways with AADT less than 3500. STSPs643-005 and 646-005 are
                                                                                                                                                             required with this special provision. Designer Note: On roadways with AADT less than 1500,
                                                                                                                                                             use "seven" in the blank. On roadways with AADT greater than 1500 but less than 3500, use
                                                                                                                                                             "three" in the blank.
                         651-005    Signal Controller Training,                                                                                                                                                                                                  8/20/2003
                                    Item 651.1000.S
                         652-070    Install Conduit Into Existing   Enter Type, Size, and Number of Conduit                                                                                                                                                      7/9/2010
                                    Item, Item 652.0700.S
                         657-060    Anchor Assemblies Light                                                                                                                                                                                                      7/9/2010
                                    Poles on Structures, Item
                                    657.6005.S.
                         658-008    Traffic Signal Face - LED                                                                                                Only use this STSP on State-Owned installations                                                     9/2/2008
                                    State Furnished, Item
                                    658.0190.S
                         658-009    Pedestrian Signal Face - LED                                                                                                                                                                                                 9/2/2008
                                    State Furnished, Item
                                    658.0420.S
                         661-001    Lighting Control Cabinet        Enter type of cabinet                                                                    Use with standard detail drawing Signal or Lighting Control Cabinet                                 8/20/2003
                                    (Type) Item 661.0400.S          Enter type of cabinet (must match previous field)
                                                                    Enter type of cabinet (must match previous field)
                         670-005    Intelligent Transportation      Enter Item Name (that will be furnished by the state)                                                                                                                                        7/9/2010
                                    Systems (ITS) - Control of
STSP Index Spreadsheet              Materials                                                                                                                                                                                                                                10/12/2011
                                                                                                                                                                                                                                                     Date last
      check          670-005
                  STSP # to enter   Intelligent Transportation
                                              Description                               Directions and Fields                 Information to enter                                          Technical Notes                                          7/9/2010
                                                                                                                                                                                                                                                     updated
                                    Systems (ITS) - Control of        Enter Item Name (that will be furnished by the state)
                                    Materials                         Enter Item Name (that will be furnished by the state)
                                                                      Enter Item Name (that will be furnished by the state)
                                                                      Enter Item Name (that will be furnished by the state)
                         670-010    Intelligent Transportation                                                                                                                                                                                       7/9/2010
                                    Systems - General
                                    Requirements
                         671-005    Intelligent Transporation                                                                                                                                                                                        7/9/2010
                                    Systems - Conduit
                         673-005    Install ITS Field Cabinet, Item                                                                                  Use this STSP when installing a state-furnished ITS Field Cabinet.                              7/9/2010
                                    673.0200.S
                         673-010    Install Pole Mounted Cabinet,                                                                                    Use this STSP when installing department-furnished aluminum enclosures on poles for ITS         7/9/2010
                                    Item 673.0225.S                                                                                                  equipment.
                         675-040    Install Ethernet Switch, Item                                                                                    Use this STSP when installing a department-furnished Ethernet switch.                           7/9/2010
                                    675.0400.S
                         676-900    Removing Advance Flasher                                                                                                                                                                                         7/9/2010
                                    Assemblies Type 1, Item
                                    676.9001.S; Type 2, Item
                                    676.9002.S
                         677-030    Install Video Encoder, Item                                                                                      Use this STSP when installing a department-furnished video encoder.                             7/9/2010
                                    677.0300.S
                         677-040    Install Video Image Detector                                                                                     Use this STSP when installing a department-furnished video image detector card.                 7/9/2010
                                    Card, Item 677.0400.S
                         677-050    Install Video Detection                                                                                          Use this STSP when installing a department-furnished video detection camera.                    7/9/2010
                                    Camera, Item 677.0500.S
                         677-060    Install Video Detection                                                                                          Use this STSP when installing a department-furnished video detection processor.                 7/9/2010
                                    Processor, Item 677.0600.S
                         677-900    Salvage 50-Foot Camera Pole                                                                                      This STSP should be used when contractor needs to disconnect all cables and wiring and          7/9/2010
                                    with Lowering System, Item                                                                                       salvage and store the camera pole. To reinstall the camera with lowering system, include bid
                                    677.9050.S; Salvage 80-Foot                                                                                      item 677.0100 Install Camera Pole in the proposal.
                                    Camera Pole with Lowering
                                    System, Item 677.9080.S

                         677-901    Removing 50-Foot Camera                                                                                                                                                                                          7/9/2010
                                    Pole, Item 677.9051.S;
                                    Removing 80-Foot Camera
                                    Pole, Item 677.9081.S
                         677-902    Removing CCTV Camera,                                                                                                                                                                                            7/9/2010
                                    Item 677.9200.S
                         678-010    Install Overhead Freeway                                                                                         Use this STSP for installing a state-furnished, or an existing salvaged, dynamic message sign   7/9/2010
                                    DMS Full Matrix, Item                                                                                            on a new sign structure.
                                    678.0100.S
                         999-005    Seismograph, Item 999.1000.S                                                                                                                                                                                     8/20/2003


                         999-010    Crack and Damage Survey,          Enter location                                                                                                                                                                 8/20/2003
                                    Item 999.1500.S

                         999-015    Picnic Tables Single Pedestal,                                                                                                                                                                                   8/20/2003
                                    Item 999.1800.S

                         999-150    Bicycle Rack Asphalt or                                                                                                                                                                                          9/2/2008
                                    Concrete-Mounted, Item
                                    999.1950.S




STSP Index Spreadsheet                                                                                                                                                                                                                                           10/12/2011

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:11
posted:10/12/2011
language:English
pages:28