LCS Acquisition Approaches Brief to ASN

Document Sample
LCS Acquisition Approaches Brief to ASN Powered By Docstoc
					                                                     Modular Approach
                             LCS Seaframe modular in architecture
                             Enables multiple “focused” missions to be
                              accomplished with use of modular mission
                              packages
                                           – Primary, secondary & possible future missions
                                           – Separate acquisition from core Seaframe
                             Common core mission and HM&E systems and
                              adapters to support multiple modules
                                           – Enables ability to reconfigure, refocus, and adapt
                             Integration via standard interfaces (technical
                              architecture) developed to support current and
                              future technologies

21.1.2. RDML Hamilton MINWARA Brief 22Aug 03    Slide 1   10/12/2011
                                                                        LCS Vision
                     Reconfigurable Mission Systems




                     Standard Interfaces

                     Seaframe Zones                                                   C4

                                                                          Air                   Air
                                                         Sea                    Sea
                                                                                           C4


21.1.2. RDML Hamilton MINWARA Brief 22Aug 03   Slide 2     10/12/2011
                                                   Core Systems
                                               and Mission Packages
                                                             +                              =
             CORE SYSTEMS
            • Self Defense
            • Navigation                                              MISSION PACKAGE
            • C4                                                       • Modules
            • Mine Avoidance                                                                    FOCUSED
            • Torpedo Detection
              & Avoidance
            • Warning Shots
                                                          +            • Manned Aircraft
                                                                       • UVs
                                                                       • Offboard Sensors
                                                                       • Mission Crew
                                                                                            =    MISSION

            • Detect, ID, & Track
              Surface Contacts
            • Limited ISR
            • Core Crew

21.1.2. RDML Hamilton MINWARA Brief 22Aug 03   Slide 3   10/12/2011
                        Module / Seaframe Interface Concept
                               Systems                                Modules                   Seaframe Zone


                                                                      Module
                                                                                                                  Module
                                                                                                                  Station

                                                                                                 Module Station

                                                                                                         Module Station
                                                                           Module


                                                                                              Common resource stations/
                                                                                             panels for services connection




                                                                                    Module




                        PackUp Kits, etc
21.1.2. RDML Hamilton MINWARA Brief 22Aug 03   Slide 4   10/12/2011
Mission Package Development & Modules
                                                                           Process to Select
                                                                              and Validate         Littoral Gaps:
       Spectrum of Modularity




                                                                           Mission Packages          Quantified
                                                                           for Each Warfare
                                                                           Area (MIW, ASW,
                                                                                                  Mission Profiles:
                                                                                 SUW)
                                “Tightly coupled” Zones and Modules                                  Identified


                                                                                               Required Capabilities:
                                                                                                   Determined

                                               Module Box
                                                                                                 Mission Modules:
                                                                                                     Selected


                                                                                               Wargaming / Analysis:
               Large Mission Bay Zone with Greater Tolerances                                       Validation
21.1.2. RDML Hamilton MINWARA Brief 22Aug 03        Slide 5   10/12/2011
                                                        LCS Reconfigurability
                                                                                  VERTREP/                                  Core OA C2        Innovative transfer
                                             Use of
                                                                                   CONREP                                 system enables     systems for simplified
                                          commercial
                                                                                                                           rapid module        module load-out
 Rapid module                           modules enables
                                                                                                                          “plug and play”
   shipping                             rapid movement
  worldwide                              via ramps and                                            Multi-Purpose
                                             cranes                                                Flight Deck
                                                                              Potential for at-
                                                                               sea module
                                                                                 transfer




                                                                                                                   Large Offboard Vehicle
                                                                                                                    Zones (Hangars) for            Common,
                                                                                                                  combinations of modules        Reconfigurable
                                                                              Cranes, Elevators, and                                                storage
                                                   3 Day                    Innovative Technologies for
                                               threshold for              internal module reconfiguration
                                               module install
                                                                                                                               Boat / Offboard Vehicle
                                               & OPTEST -
                                                                                                                             Ramp and/or Davits enables
                                                   1 Day
                                                                                                                               launch and recovery of
                                                 objective
                                                                                                                                  multiple modules
21.1.2. RDML Hamilton MINWARA Brief 22Aug 03           Slide 6   10/12/2011
                      Target LCS Flight 0 MIW Mission Package
                                     Detect                                                                                                  Engage
                       Battlespace Minehunting
                       Preparation (Detect/ Classify/                                                                                Neutralize   Sweep
                                       Identify)
Beach                                                                                                                                  Naval
Surf                    VTUAV+                   VTUAV+                                                                               Special
                        COBRA                    COBRA                                                                               Clearance
Zone                                                                                                                  Near Surface     Team
                                                                     Surface
Near                                                                                                                                  MH-60+
surface &                                      MH-60+ALMDS                                                                            RAMICS
floating                                                                                                                             NSCT, EOD
                                                                      30 ft
                                                MH-60 &                                                       Volume
                                                 RMS +                                                                               MH-60 +
                                                AQS-20                                                                                AMNS
Volume                                                                                                                                 EOD
and                                                                   150 ft                         Close-Tethered
bottom
                                                                                                                                                  MH-60 &
mines
                                                                                                                                                   USV +
                                                                                                                                                   OASIS
                                                                                             Close-Close-                            MH-60 +
                                                MH-60 &
                      SCULPIN                                                                 Tethered                                AMNS
                      BP-AUV
                                                 RMS +                 30 ft            EOD
                                                AQS-20                                  Bottom
                                                                                                                                       EOD        MH-60 &
                                                                               Buried                                                              USV +
                                                                     Bottom
Buried                                                                                                                                             OASIS
                                                                               * NOTE : Depth Coverages Vary with System and Mine Type
21.1.2. RDML Hamilton MINWARA Brief 22Aug 03          Slide 7   10/12/2011
                           Target LCS Flight 0 Ship 2 ASW Mission
                                          Package
                          Detect                                                                                                                     Engage

                                                                                                           Non-Acoustic Sensor
                                                                                                        Surface Tactical Data Radar
  LF Active Acoustic                                                                                             (ARPDD)
       (ALFS)
                                                                                                                                                        Weapons Delivery
                                                                                                        Surv/Data Relay: VTUAV
                                            Multi-Static Active                                                                                            MH-60R /
                                        Distributed LF Sonobuoys:                                                          Torpedo Countermeasures      SPARTAN USV
                                        ACES/EER/DMNS Family                          Mobile Units                         Torpedo Defense Systems
                                                                                                                LCS

                                                                                 Transmit and Receive                                                  Mk54 Torpedo
                                                                                    Acoustic Arrays
                                                                                (RMS and Spartan USV)
                                                                                 (Towed Array / MFTA)




                                               Distributed Passive Sensors:
                                               Advanced Deployable System




21.1.2. RDML Hamilton MINWARA Brief 22Aug 03             Slide 8   10/12/2011
                            LCS Mission Systems and Ship
                                  Integration Team
          FY03 LCS Mission Systems and                                                                                                     Integrated Product Team (IPT)
            Ship Integration (MSSI) IPT                                                                                                     comprised of Government and
                                                                                                                                            Industry Reps
        OPNAV SPONSOR              PEO               HEADQUARTERS/ONR           OTHER SYSTEMS COMMANDS          LABORATORIES
                                                                                                                                           Reports to the LCS Program
                                                                                                                                            Manager
                                                          SEA 05D2
         CDR Jim Malloy                                                                                     Jose Casals, Roy Okamoto,
           Jeff Kent        PEO SHIPS PMS 501
                               Bill Schoenster,
                               Todd Tompkins,
                                                       CDR Al Gaiser,
                                                      Jeff Koleser, Pete
                                                         Czapiewski
                                                                                          PEO C4I
                                                                                        Chuck Auxter
                                                                                         CDR Stone
                                                                                                           Tom Owen, Miguel Rivera, Joe
                                                                                                              Schaaf, Terry Sheehan        Integration efforts:
                                                                                                                                              – Develop & maintain Technical
                            Ken Montgomery, John           05D1
                                   Vasilakos            Tim Barnard
                                Mark Shiffler
                                                          SEA 03
                                                        Jim Thurber
                                                                                           AIR 4
                                                                                                            Dan Harris, Jose Velez,             Architecture for LCS Mission
                                                          SEA 04                                              Guy Santora, Rob
                                                        Charles Hall
                                                           SEA 06
                                                                                       Bob Jackson
                                                                                     Mike Van Ryswick
                                                                                                                  McDonald
                                                                                                                                                Systems (Interface Control
                                                                                   PMA263 Mike Henthorne
                                 PEO LMW
                             CAPT Walter Wright
                                  PMS-420
                                                      Colleen Cannon
                                                                                        CDR Spitz                                               Document (ICD))
      Including Industry                                                                                   Jack Abbott, Bill Tootle, S.
                                                                                                                                                    Targeted Interface Development
                              Charles Barnes
                                  PMS-490                                                                          Peterson
      During LCS               Philip Marshall
      Preliminary Design                                    Dick
                                                          Vogelsong
                                                                                                                                                        » JUSC2 ACTD, Others
                                                                                           NWDC
                                                                                        CDR Todd Haeg
                                                                                                             Chris Colby, Vic Ricci
                                                                                                                                              – Spiral Development & Technology
                                 PEO IWS
                                                                                                                                                Management
                                                      SPAWAR SSC
                            J. Jerry LaCamera, Jr.
                                Adrian Eversoll       Dorrance / Chagnon                  Deepwater
                                                                                         Steve Cohen            Richard Oropeza
                                                                                                                                                    Flight 0 Mission Module offsites
                                                                                                                                              – T&E / experimentation

              Goal: Develop a LCS Technical Architecture (Seaframe to Mission Module ICD)
                    sufficiently “open” to insure mission reconfigurability and lifecycle
                    technology adaptability
21.1.2. RDML Hamilton MINWARA Brief 22Aug 03                Slide 9        10/12/2011
                                      Mission Module Contracting
                                              Approach
                             Separate from Seaframe contracts
                             PEO(LMW) lead
                                           –   Direct mission module development and coordination
                                           –   Develop contracts
                                           –   Manages funds
                                           –   Schedule development of each module to suit overall
                                               mission module schedule
                             PEO Ships
                                           –   Overall Program Management\
                                           –   Ship integration of mission modules
                                           –   Coordinate overall budgeting
                                           –   Implement acquisition strategy
21.1.2. RDML Hamilton MINWARA Brief 22Aug 03     Slide 10   10/12/2011
                                                                       Summary
                       U.S. Navy is Committed to a Littoral
                        Combatant to Address Anti-Access Threats
                        in the Littorals




21.1.2. RDML Hamilton MINWARA Brief 22Aug 03   Slide 11   10/12/2011
                                                                       BACKUP




21.1.2. RDML Hamilton MINWARA Brief 22Aug 03   Slide 12   10/12/2011
                                                           Program Status
       23 Feb 02                              ASN(RDA) directed establishment of LCS Program
       08 Jul 02                              N76 letter provided interim direction to PEO(S) on top
                                               level objectives for exploratory studies for Family of Ships
                  concept
       14 Aug 02                              RFP released for Ship Concept Studies
       17 Sep 02                              Establishment of LCS Program Office (under PEO(S))
       08 Nov 02                              Contract award for Family of Ships Concept Studies (focused-
                                               mission high-speed ship)
       15 Nov 02                              Congressional New Start approval for Littoral Combat
                                               Ship Program ($30M Congressional Plus-up)
       28 Feb 03                              Planned solicitation for LCS Flight 0 preliminary designs
                     –        Receipt of proposals                                14 April 03
                     –        Proposal evaluation                                 15 April-13 July 03
                     –        Contract(s) Award                                   17 July 03

21.1.2. RDML Hamilton MINWARA Brief 22Aug 03   Slide 13   10/12/2011
                                                   Mid-term Schedule
         Preliminary design                                           17 Jul 03 – 11 Feb 04
         1st update / contract modification
          for option items                                             15 Oct 03
         Final update / contract modification
          for option items                     01 Dec 03
         Industry submit proposals for
          next phase                                                   31 Dec 03
         Downselect to one or two for
          final design                                                 03 May 04
         Exercise 1st construction option                             18 Jan 05
         Exercise 2nd construction option                             31 Dec 05

21.1.2. RDML Hamilton MINWARA Brief 22Aug 03   Slide 14   10/12/2011
                                      LCS Developmental Process is
                                              Continuing
                  Concept Development
                         Phase




                              Flight 0                                              Flight 1


                                Fleet Battle
                                                                                                                        Flight 2
                                Experiments                                           Flight 0 Ship RDT&E
                                                 NWC                                         Results
                                                Studies
                                Industry                                             Tailored
                                Concept                                                           Concept Development
                                                                                       AOA
                                               Preliminary                                             Document
                       Mission                  Designs
                       Analysis                                                      Analysis of Multiple
                                                                                          Concepts
                                    Interim Requirements
                                          Document




                                                                                                                            October
            January                                                      October                                          2005 (FY 06)
               2002
21.1.2. RDML Hamilton MINWARA Brief 22Aug 03       Slide 15          2004 (FY 04)
                                                              10/12/2011
                                               LCS Execution MOA
                     ASN (RDA) Memo 17 March 2003 outlines PEO
                      roles in execution of LCS program
                     PEO Ships charged with overall program
                      management, acquisition, total ship systems
                      engineering, integration of the LCS and lifecycle
                      support
                         –        Including SeaFrame-Module Interface Control
                                  Document (ICD)
                         –        Single point of contact to Congress, OSD, Media
                         –        Overall budgeting and implementation of the LCS
                                  Acquisition Strategy
                     PEO Littoral and Mine Warfare (LMW) charged with
                      Mission Module development and lifecycle support
                     PEO Integrated Warfare Systems (IWS) charged
                      with platform warfare system development and
                      ensuring compliance with computing environment
                      Open Architecture standards

21.1.2. RDML Hamilton MINWARA Brief 22Aug 03   Slide 16   10/12/2011
                                               LCS Flag Action Group
         Established to clarify/assign responsibilities and
          take coordinated action to support the LCS within
          the accelerated and aggressive timeline
         Representing organizations with responsibility over
          one or more critical areas that support the
          development of LCS
                        – CNSL, N76, N76B, N70, N75B, N780, PEO (LMW), PEO(IWS),
                          N76C, N77B, OLA, SEA05, DNAVSEA, N81, N61, N51, NWDC,
                          CFFC N-8, FORCEnet, DASN (SHIPS), COMOPTEVFOR,
                          NETWARCOM, N12, DJ8
21.1.2. RDML Hamilton MINWARA Brief 22Aug 03    Slide 17   10/12/2011
                                         LCS Ship Integration Team
            Given the complexity of the integration and Seaframe-Module
             ICD development challenge, we established the Mission
             Systems and Ship Integration IPT
                          – Mission Modules (PEO Littoral and Mine Warfare lead)
                                              PEO LMW Systems (Remote Minehunting System, etc)
                                              PEO IWS Systems (Guns, etc)
                                              PEO A Systems (Helicopters)
                                              PEO W Systems (UAVs)
                                              Future developmental systems and possible commercial / foreign systems
                          – Seaframe (PEO Ships lead)
                                              PEO IWS Systems (Guns, etc)
                                              PEO C4I Systems (Communications, etc)
                                              Industry/Commercial Systems (engines, etc)
                                              Future developmental systems and possible commercial / foreign systems
                          – Technical Authority
                                       NAVSEA, NAVAIR, SPAWAR
21.1.2. RDML Hamilton MINWARA Brief 22Aug 03        Slide 18   10/12/2011
                   LCS Experimentation Battle Lab Team
                    To insure the development of an integrated Experimentation plan, we
                     established an LCS Experimentation Battle Lab Team
                    Phase I development completed 16 July 03          Draft LCS Experimentation Roadmap

                        –         LCS T&E strategy developed; being signed
                        –         LCS experimentation roadmap process developed
                        –         Draft LCS Experimentation Roadmap developed
                                    Extensive leveraging of HSV 2
                                    X-Craft use TBD
                                    Extensive Mission Module testing outlined
                    Phase II initiated with “Mini-Summit” 16 July 03
                      – Expanded Team including Fleet, PEO IWS, NAVSEA, NAVAIR, etc.
                    Initial Roadmap complete 31 October 03
                      – Linked with LCS Spiral Development process
                      – Updated as required
21.1.2. RDML Hamilton MINWARA Brief 22Aug 03   Slide 19   10/12/2011
                  LCS Experimentation Battle Lab Team
        Oversight                                                 Fleet
                                                                  Input COMNAVSURFOR
          Team


                                                                                                                                           PEO C4I
           SEA 05D                                 Dick                                                                                   Chuck Auxter
         CDR Al Gaiser,                          Vogelsong
        Pete Czapiewski
            SEA 03                                                                                               PEO SHIPS
          Jim Thurber                                                                          PEO IWS            PMS 501                   AIR 4
                                               CDR Jim Malloy                PEO LMW
            SEA 06                                                      CAPT Walter Wright   CAPT Al Greco       Bill Schoenster,       Bob Jackson
             TBD                                 Jeff Kent                  PMS-420          Adrian Eversoll     Todd Tompkins        Mike Van Ryswick




                                                                              Execution Team
                                                                                                                               Tom Owen
                                    Mark Shiffler
                                  Ken Montgomery                         WB
                                                                         &B
                                                                    Brian Schires              Rob McDonald ,                 NWDC
                                 Chris Colby                      Larry Zimmerman              Mario Berenger,             CDR Todd Haeg
                                                                                                 Jose Velez                Dave Lumsden
21.1.2. RDML Hamilton MINWARA Brief 22Aug 03         Slide 20   10/12/2011
                                               LCS Flight 0 Mission
                                                Package Selection
                         CONOPs                                        NWC
                                                                                Analysis of
                     NWDC                                                        Multiple
                                                   Technology                   Concepts
                                                   Management                   (phase II)
                                                      PEO’s
                                                      MSSIT
                                                                                                 Baseline
                                                                             Mission              Mission
                                                                             Module               Module
                                                                                                 Analyses
                                                                             Offsites
                                                                                                Module
                                                                                              Investment
                                                                                                Strategy
                                                                                         OPNAV / PEO’s
21.1.2. RDML Hamilton MINWARA Brief 22Aug 03   Slide 21   10/12/2011
                                                 CONOPS
                                         Modular Mission Capabilities
      Mine Counter Measure package                                     Small boat prosecution package
      Provide organic punch through capability.                       “Need to engage from close aboard to
                                                                       over-the-horizon”.
      Search, map, avoid with limited
      neutralization.                                                  Stabilized gun and missile system.
      Support remote & autonomous UVs and                             Integrated with EO/IR system.
      operate helos.
                                                                       Include non-lethal capabilities.
      Massed LCS Division = Dedicated MCM
      capability.                                                      Helos & off-board systems.


      Littoral ASW package                                             Inherent missions
      Integrated with multiple                                        SOF
      off-board sensor systems.                                        Maneuver, logistics, replenishment
      Automatic on-board processing.                                  NEO
                                                                                              Missions made
      Helicopter(s).                                                  MIO                   possible by the
                                                                                            removal of focused
      Permits dedicated LCS ASW division.                             Medical …            mission modules

21.1.2. RDML Hamilton MINWARA Brief 22Aug 03   Slide 22   10/12/2011
                                               Technology Management
                  Based on CONOPS, conducted targeted Technology
                   surveillance
                                – PEO’s and Naval War College
                                – Numerous offsites for technology “harvesting”
                                – Ongoing
                  Evaluation of possible candidates for LCS Mission Architecture
                  Facilitated by LCS Mission Systems and Ship Integration IPT
                   (MSSIT)
                  Fed to analysis efforts as inputs for possible core Seaframe
                   and Mission Modules




21.1.2. RDML Hamilton MINWARA Brief 22Aug 03     Slide 23   10/12/2011
                                                 Offsites: LCS Flight 0
                                               Mission Package Selection
              Need to make rapid programming decisions supporting
               Mission Packages for Flight 0 due to programming cycle and
               aggressive LCS schedule (FY07 ship 1 delivery)
              A Mission Module “Offsite” analysis process conducted
                             – Over course of 5 months, over 150 total participants
                             – COMNAVSURFOR, CFFC, NWDC, Fleet, resource sponsor, technical
                               community participants
                             – Numerous studies as input, including:
                                              CONOPS
                                              Technology Management study
                                              NSWC DD Analysis of Multiple Concepts
                                              SPA Mission Analysis
              Necked down approximately 1000 systems to ~30
              Culminating in Mission Module Offsite #3
                             – Focused on Mission Package capability definition

21.1.2. RDML Hamilton MINWARA Brief 22Aug 03       Slide 24   10/12/2011
                     LCS Flight 0 Mission Modules - PB04

            MIW Module Package – Ship 1                                                     ASW Module Package – Ship 2
                         MIW Mission Modules                               QTY                   ASW Mission Modules                   QTY

              RMS (AN/WLD-1)                                                2        SPARTAN USV                                         2
              SPARTAN                                                       1                              SPARTAN ASW Package           2
                                               MIW Package                  1        MH-60R Helicopter                                   1
              MH-60S                                                        1                                                Torpedo    set
                                                    ALMDS                   1                                                  Sonar    set
                                                  AQS-20A                   2                                             Sonobuoys     set
                                                     AMNS                   1        ACES Family (EER) / Multistatic System (DMNS)       1
                                                   RAMICS                   1        Torpedo Countermeasures                             1
                                               OASIS Sweep                  1        ASW RMV                                             2
              LMRS                                                       1 set (2)   Towed Arrays (Emit / Receive)                     2 sets
              Explosive Ordnance Disposal Det
              or Naval Special Clearance Team                               1
              BPAUV                                                         3
              REMUS / SCULPIN                                               3




21.1.2. RDML Hamilton MINWARA Brief 22Aug 03     Slide 25   10/12/2011

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:27
posted:10/12/2011
language:English
pages:25