					BHEL-ISG               GENERAL SPECIFICATION FOR
                                                        SPECIFICATION NO
              PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                        IS- 1-10-2013 / 005
                      WORKS OF CHP & AHP PACKAGE
                                                              DATE:04/06/2011
                 2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                  Volume-1




     SL No.                     TITLE              SECTION   PAGES

                Project Synopsis
       1                                              1      1 TO 3



       2        Scope of Work                         2      1 TO 17


       3        Instruction to Bidders                3      1 TO 7


       4        Project completion schedule           4      1 TO 1


       5        BHEL-GCC                              5      1 + 39


       6        Special Conditions of Contract        6      1 TO 33

       7        HSE Policy                            7      1 + 29


       8        List of Equipments                   10      1 TO 4


       9        Man Power                            11      1 TO 1




           ENQUIRY No.
                                         REV. R0
           88/11/6010/AK
BHEL-ISG             GENERAL SPECIFICATION FOR
                                                      SPECIFICATION NO
            PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                      IS- 1-10-2013 /005
                    WORKS OF CHP & AHP PACKAGE
                                                        DATE:04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT

                         PROJECT SYNOPSIS                  VOLUME 1/
                                                           SECTION 1




                         SECTION 1:
                      PROJECT SYNOPSIS




      ENQUIRY No
                             REV. R0
      88/11/6010/AK
BHEL-ISG             GENERAL SPECIFICATION FOR
                                                      SPECIFICATION NO
            PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                      IS- 1-10-2013 /005
                    WORKS OF CHP & AHP PACKAGE
                                                                      DATE:04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT

                          PROJECT SYNOPSIS                                 VOLUME 1/
                                                                           SECTION 1

                            PROJECT SYNOPSIS


1.0    GENERAL PROJECT INFORMATION:

      Bihar State Electricity Board (BSEB) is setting up a Coal fired
      Thermal Power plant at Barauni, Begusarai District, Bihar. The
      capacity of the proposed thermal power project is 500MW with 2 x
      250 MW configurations with sub – critical steam parameters. The
      power generated from the plant will be sold to BIHAR as well as to
      other states through interstate transmission system. BHEL is the
      EPC contractor for the above plant and M/s BSEB has appointed
      M/S EVONIC as the owner’s consultant for the project.

1.1   Site /Ambient condition

           Longitude / latitude             -   86001’36”E /
           Average elevation       Mean         25023’36”N
           Sea Level                        -
                                                RL (+) 45.3m
                                                (approximately) for
                                                main plant block.
           Maximum Monthly average -            42.4 deg C
           temperature
           Minimum              monthly -       8.4 Deg C
           temperature
           Maximum relative Humidity -          81 %
           Minimum Relative Humidity -          43 %
           Design relative Humidity         -   80 %
           Annual     Maximum       Wind -      17 m/ sec
           speed
           Average Annual rainfall          -   1119.1mm
           Maximum rainfall in 24 hrs       -   352.8mm


      ENQUIRY No
                                  REV. R0                    PAGE 1 of 3
      88/11/6010/AK
BHEL-ISG                GENERAL SPECIFICATION FOR
                                                         SPECIFICATION NO
               PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                         IS- 1-10-2013 /005
                       WORKS OF CHP & AHP PACKAGE
                                                               DATE:04/06/2011
                  2X250 MW BARAUNI THERMAL POWER PROJECT

                             PROJECT SYNOPSIS                        VOLUME 1/
                                                                     SECTION 1




      Ambient Air Quality: Laden with coal and steel dust particles, fumes,
      chemical gases.

1.2        Topographical survey

            The entire area of the proposed thermal power plant was found
      filled up by fly ash, perhaps the site was used as ash pond for
      disposal of fly ash accumulated/produced in the existing plant. The
      site was found undulated having very loose to loose deposits. The
      average R.L of the finished ground level will be (+) 45.0 m

1.3        Seismological Parameters

       The proposed project is located in seismic Zone IV, as per IS:
       1893:2002, Seismic forces would be considered as per the IS Code
       accordingly.

1.4        Wind loading

       The various design parameters, as defined in IS: 875 (part 3), to
       be applied for the project site shall be as follows
       (a) The basic wind speed “Vb” at ten mtrs above the mean
          ground level – 47 m/sec
       (b) Other parameters or coefficients shall be as per IS: 875 (part
          3) stipulations.

1.5        Construction Material

       It is expected that all necessary construction material should be
       available from nearby sources. However, bidders are requested to
       satisfy themselves in this regard.


       ENQUIRY No
                                   REV. R0             PAGE 2 of 3
       88/11/6010/AK
BHEL-ISG                GENERAL SPECIFICATION FOR
                                                         SPECIFICATION NO
               PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                         IS- 1-10-2013 /005
                       WORKS OF CHP & AHP PACKAGE
                                                                  DATE:04/06/2011
                  2X250 MW BARAUNI THERMAL POWER PROJECT

                               PROJECT SYNOPSIS                         VOLUME 1/
                                                                        SECTION 1

1.6        Raw Water Source

      The source of water for the proposed project will be met from River
      Ganga at a distance of 3 to 4 Km from site. Raw water is proposed
      to be stored in an existing pond on the west of NH 31 and north of
      river Ganga .Semi Open recirulating cooling water system using
      induced draft cooling tower has been proposed for the extension
      TPS.

1.7        Power Supply Characteristics

                   Parameter           LT
             Power Supply              415V, 3phase, 50 Hz,
             Voltage variations        + 10% - 10%
             Frequency variation       + 6% - 6%
             Combined       V&      F +/-10%
             variation
             System neutral            solidly grounded
             System    short    circuit 50 kA rms. at 415V for 1 second
             level




      ENQUIRY No
                                   REV. R0                PAGE 3 of 3
      88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
                                                       SPECIFICATION NO
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                       IS- 1-10-2013 / 005
                     WORKS OF CHP & AHP PACKAGE
                 2X250 MW BARAUNI THERMAL POWER PROJECT   DATE: 04/06/2011
                                                            VOLUME 1/
                              SCOPE OF WORK                  SECTION 2




                              SECTION 2:
                            SCOPE OF WORK




           ENQUIRY No.
                                     REV. R0
           I88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
                                                       SPECIFICATION NO
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                       IS- 1-10-2013 / 005
                     WORKS OF CHP & AHP PACKAGE
                 2X250 MW BARAUNI THERMAL POWER PROJECT           DATE: 04/06/2011
                                                                    VOLUME 1/
                              SCOPE OF WORK                          SECTION 2


SCOPE OF WORK:

The scope of work in general, comprises the design, detailed engineering,
documentation, preparation of all types of drawings, execution including
supply of construction materials (U.O. mentioned in B.O.Q), construction,
fabrication, erection and detail drawings, preparation of as built drawings,
to be made based on the approved GA / Civil assignment drawings and its
approval from BHEL/customer-BSEB / customer’s consultant -EVONIK /
Indian Railway etc.

The scope also includes supply/provision of all equipments, tools and
plants etc. necessary for carrying out piling, civil, structural and
architectural works and construction of all piling, civil, structural,
architectural, services, development and finishing works required for the
civil and structural works of coal and Ash handling plant.
The Scope of Work is as follows:

Sl.    Package       Description of Work                              Remarks
No
1.     CHP           Design & Drawing for Pilling,           Civil,   By Bidder
       Package       Structural Work on item Unit rate basis as
                     per the BOQ enclosed in Volume - III for
                     the entire CHP Package
                     Execution of Pilling, Civil, Structural Work     By Bidder
                     including supply of cement , building
                     material etc on item unit rate basis as per
                     the BOQ enclosed in Volume - III for for
                     entire CHP Package
2      AHP           Design & Drawing for Pilling,           Civil,   By AHP
       Package       Structural Work for AHP                          Vendor
                     Execution of Pilling, Civil, Structural Work     By Bidder
                     including supply of cement , building
                     material on item unit rate basis as per the
                     BOQ enclosed in Volume - III for for entire
                     AHP Package (except BAH Structure )
3      CHP /         Free issue of Structural & Reinforcement         By BHEL-
       AHP           steel for CHP & AHP to Bidder                    ISG



           ENQUIRY No.
                                       REV. R0                PAGE 1 of 11
           I88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
                                                       SPECIFICATION NO
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                       IS- 1-10-2013 / 005
                     WORKS OF CHP & AHP PACKAGE
                 2X250 MW BARAUNI THERMAL POWER PROJECT                  DATE: 04/06/2011
                                                                           VOLUME 1/
                                SCOPE OF WORK                               SECTION 2




1.   DESIGN, Drawing ,Engineering of CHP/AHP Package:

1.1 For CHP Package:

Primarily the scope of design work for CHP shall consist of, but not limited to,
preparation of Schemes ,specification and Conceptual Designs according to the
requirements, detailed Civil, Piling, Structural, Architectural Design and Analysis on the
basis of loading parameters, preparation of analysis / design document and
preparation of Construction Drawings, preparation of specification and DM for civil and
pilling work , preparation of fabrication, erection, connection and detail drawings, As-
built drawings, to be made based on the approved GA / Civil assignment drawings
supplied by BHEL and approval by customer / customer’s consultant / Indian Railway,
checking of design and drawings of BHEL/ BHEL vendor providing Design
Clarifications during Construction Stage as and when required at Site, documentation,
Review of Structural Steel Shop Drawings, preparation of all types of drawings
including supply of construction materials (U.O. mentioned in B.O.Q).

BHEL shall carry out review of design and drawings submitted by contractor. The
suggestions made during the review shall be incorporated in the designs and
drawings by contractor and the drawings/designs shall be resubmitted for re-approval
from BHEL, BSEB / BSEB's consultants / Indian Railway.

Detailed Scope of work for Design Engineering & Detailing is mentioned in Section -
X of Technical Specifications Volume- II.

1.2: For AHP Package:

The design for the AHP Package shall be done by BHEL/ BHEL Mechanical
Vendor.




           ENQUIRY No.
                                          REV. R0                    PAGE 2 of 11
           I88/11/6010/AK
BHEL-ISG                GENERAL SPECIFICATION FOR
                                                         SPECIFICATION NO
               PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                         IS- 1-10-2013 / 005
                       WORKS OF CHP & AHP PACKAGE
                  2X250 MW BARAUNI THERMAL POWER PROJECT           DATE: 04/06/2011
                                                                     VOLUME 1/
                              SCOPE OF WORK                           SECTION 2



2.0   Execution of CIVIL, PILING AND ARCHITECTURAL WORKS of
      CHP/AHP Package :


Primarily the kind of Civil, Piling and Architectural works required for the
structures and buildings of the CHP and AHP shall consist of, but not
limited to, the following:

           •        Surveying, field and laboratory testing etc. as necessary

           •        Area clearance - the area to be excavated shall be
                    cleared of all vegetation / foreign materials and the
                    spoils shall be deposited at places directed by Engineer-
                    in-Charge.

           •        All excavation works in all types of soils / rocks including
                    backfilling, dewatering, as necessary, transportation and
                    stockpiling of excavated material as directed by
                    Engineer, shoring, strutting, leveling and grading.

           •        Enabling works like diaphragm walls / sheet piling to
                    ensure availability of suitable working areas with due
                    regard to safety of the existing structures and their
                    foundations.

           •        Construction of RCC piles, Stone Piles for foundations, if
                    required.

           •        RCC work in underground(Tunnels, Piling, Under Ground
                    TP’s etc ) & over ground structures, foundations, floors,
                    lintels, roof slabs, precast concrete, storm anchors etc.
                    at all levels.

           •        Sub grade and base preparation with rubble soling, etc.
                    for pavements, grade slabs, etc.

           •        Scaffolding, form work, masonry work, floor finishes
                    including dado and skirting, plastering painting, paving,
                    plinth protection, roof finishes,       grouting, doors,


           ENQUIRY No.
                                       REV. R0                 PAGE 3 of 11
           I88/11/6010/AK
BHEL-ISG                GENERAL SPECIFICATION FOR
                                                         SPECIFICATION NO
               PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                         IS- 1-10-2013 / 005
                       WORKS OF CHP & AHP PACKAGE
                  2X250 MW BARAUNI THERMAL POWER PROJECT             DATE: 04/06/2011
                                                                       VOLUME 1/
                               SCOPE OF WORK                            SECTION 2


                    windows, ventilators, rolling shutters, false flooring,
                    false ceiling, required toilet facilities including all fitting
                    and fixtures, internal and external plumbing, water
                    supply, drainage & sewerage , water proofing, fencing,
                    roads, MS embedment, steel structural work, sheeting
                    and brick Masonry work in cement mortar at all levels.

           •        Brick masonry works in cement mortar at all level

           •        Cement plasters, painting etc. on internal and external
                    walls.

           •        All types of floor finishing such as IPS, ironite, mosaic
                    tiles etc.

           •        Damp proofing and cement/            chemical    grouting   of
                    underground structures.

           •        Roof water proofing treatment, over / under deck roof
                    insulation, Roof gutters and rain water down comer
                    pipes.

           •        Plinth protection, garland drains, storm water drains
                    connected to nearest existing drains / final disposal
                    point, as required.

           •        All sanitary and sewage fittings and plumbing works for
                    water supply and sewerage.

           •        Septic tanks soak pits, sewer lines, inspection chambers,
                    manholes etc.

           •        Staircase, walkways, handrails, etc.

           •        Roads, pavements, drains, culverts, common settling
                    basin etc. complete.

           •        Civil works for fire fighting and dust suppression system
                    lines
           •        Surveying, geo-technical investigations, field and
                    laboratory testing etc. as necessary.

           ENQUIRY No.
                                        REV. R0                  PAGE 4 of 11
           I88/11/6010/AK
BHEL-ISG                GENERAL SPECIFICATION FOR
                                                         SPECIFICATION NO
               PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                         IS- 1-10-2013 / 005
                       WORKS OF CHP & AHP PACKAGE
                  2X250 MW BARAUNI THERMAL POWER PROJECT          DATE: 04/06/2011
                                                                    VOLUME 1/
                              SCOPE OF WORK                          SECTION 2



           •        Area clearance and qrading in the end.



3.0   Execution of STRUCTURAL AND ARCHITECTURAL WORKS of
      CHP/AHP Package

Primarily the kind of structural works required for the structures and
buildings of the CHP shall consist of, but not limited to the following:

           3.1.1 Area clearance, dismantling and removal of temporary
                 facilities like fabrication yard, etc. in the end as required,
                 for performing all operations of the work in satisfactory
                 manner, as directed by Engineer-in-Charge.

           3.1.2 Structural steel works for conveyor galleries, trestles,
                 transfer points, superstructures, sheds for underground
                 structures, cable racks, etc.

           3.1.3 Structural steel works for FAE Tower, Silo Stair Case, Silo
                 Roof Structures, Pipe Racks, ASDPH Roof Truss, for all
                 underground/ over ground structures, etc. Fabrication
                 & erection of BAH is in the scope of BHEL/BHEL
                 mechanical vendor

           3.1.4 CGI/ Translucent sheet/ Color coated sheet covering for
                 superstructures and under/ over ground structures,
                 conveyor galleries, transfer towers, FAE Tower, Silo Stair
                 Case, Silo Roof Structures, ASDPH Roof Truss etc., all as
                 given in other sections of the tender specifications for
                 CHP and AHP works.

           3.1.5 Painting of str. Steel members, plastered walls, doors,
                 windows, etc. complete.

           3.1.6 Staircases, walkways, handrails, dust chutes, seal plates,
                 louvers and doors, PTFE bearings, grouting etc.


           ENQUIRY No.
                                      REV. R0                 PAGE 5 of 11
           I88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
                                                       SPECIFICATION NO
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                       IS- 1-10-2013 / 005
                     WORKS OF CHP & AHP PACKAGE
                 2X250 MW BARAUNI THERMAL POWER PROJECT           DATE: 04/06/2011
                                                                    VOLUME 1/
                              SCOPE OF WORK                          SECTION 2


            3.1.7 Foundation bolts/ Anchor bolts, etc. for embedding in
                  RCC members by others.

            3.1.8 Tests on welds, etc., as required as per specifications and
                  as directed by Engineer-in charge.

            3.1.9 Steel/ aluminum doors, windows            and    ventilators
                  including glazing, etc. complete.

            3.1.10 Providing and placement of insert plates, kerb angles,
                   anchor bolts, pie sleeves etc. in RCC members including
                   placement of embedment.

            3.1.11 Cable/pipe trenches and racks. Pipe saddle supports.



4.0   SUPPLY of Items for CHP/AHP Package:

      4.1     For CHP and AHP package

The materials required as mentioned below shall be arranged by the
contractor at their cost within the quoted price:

      a)      Cement & Building materials
      b)      All types of gratings including hopper gratings.
      c)      Hand rails
      d)      All sheeting materials for cladding, roofing (deck sheet) etc.
      e)      Dust chutes
      f)      Foundation bolts, nuts, washers etc. with primer.
      g)      All fasteners like bolts, nuts, washers etc.
      h)      PTFE bearing
      i)      Profiled/ Plane deck sheet for supporting RCC intermediate
              floors/ roof slabs.
      j)      Rain water down comers pipes.
      k)      Wash water down comers pipes
      l)      Bolts and fasteners required for fixing monorails.
      m)      Doors, windows, louvers, ventilators with mesh, glazing etc.
      n)      MS rods and MS Flats

           ENQUIRY No.
                                      REV. R0                PAGE 6 of 11
           I88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
                                                       SPECIFICATION NO
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                       IS- 1-10-2013 / 005
                     WORKS OF CHP & AHP PACKAGE
                  2X250 MW BARAUNI THERMAL POWER PROJECT                DATE: 04/06/2011
                                                                          VOLUME 1/
                               SCOPE OF WORK                               SECTION 2


      o)      All primer and painting materials.
      p)      Scrap materials required for all type of counter weights.
      q)      All kinds of erection materials & scaffolding materials required.
      r)      Any other material required other than specified above in the
              scope of contractor.

      4.2 Free issue to bidder by BHEL :
 BHEL shall supply reinforcement steel for Piling and Civil Work, and
structural steel materials listed below free of cost required for only
Structural buildings, like Wagon Tippler Shed, Junction Tower/Transfer
houses, Crusher house, Cable Racks, Stacker Conveyor gallery & Trestles,
Monorails, cable racks and other remaining structures connected with coal
handling plant and FAE TOWER, Pipe Racks, Silo Stair Case, Silo Roof,
Crane Girder material, etc connected with ash handling plant:


             a)   M.S. plates conforming to IS: 2062 of various thicknesses
             b)   M.S. rolled structural sections of beams, channels, angles.
             c)   Chequered plates
             d)   Seal plates for conveyors

5.0   The major structures, buildings and systems broadly covered
      under Coal and Ash handling plant package are as follows:

      5.1     For Coal Handling Plant :

   a) Wagon Tippler House Wagon Tippler foundation, Gratings, Monorails/Crane
      girders, Insert plates, Side arm charger foundations including rail foundation,
      and shed over wagon tippler and side arm charger.
   b) Reclaim hopper with shed and shed over wagon tippler and side arm charger.
   c) Under Ground Tunnel from WT to TP& ERC to TP
   d) Under Ground Transfer houses
   e) Conveyor Galleries with Trestles
   f) Transfer house/ Junction Towers
   g) Crusher House


           ENQUIRY No.
                                         REV. R0                    PAGE 7 of 11
           I88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
                                                       SPECIFICATION NO
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                       IS- 1-10-2013 / 005
                     WORKS OF CHP & AHP PACKAGE
                 2X250 MW BARAUNI THERMAL POWER PROJECT          DATE: 04/06/2011
                                                                   VOLUME 1/
                                 SCOPE OF WORK                      SECTION 2


   h) Stacker Reclaimer with anchors blocks
   i) Emergency Reclaim Hopper with tunnels
   j) Control Rooms for WT, TP & CH
   k) Stock Pile area paving with drainage system
   l) Drive house
   m) DS Pump House with tanks
   n) Coal Settling basin
   o) In motion weighing Bridge
   p) Inter Roads & Drainage system
   q) Equipment Foundation & ventilation Room
   r) Other miscellaneous substructure / superstructure building required for
      completion of CHP package.
5.2 For Ash Handling Plant:
   1) Bottom Ash Hoppers – Only Civil Works.
   2) Bottom ash handling System up to common slurry sump.
   3) Fly ash storage Silos
   4) Fly ash handling system.
   5) Ash water pump house
   6) Ash Slurry pump house
   7) Compressor house
   8) Chemical house
   9) ESP control-cum-Fly Ash equipment building
   10) Clarifier and connected systems
   11) Recovery water pump house
   12) Ash slurry disposal arrangement.
   13) Pipe racks / bridge foundations
   14) Ventilation rooms


           ENQUIRY No.
                                          REV. R0            PAGE 8 of 11
           I88/11/6010/AK
BHEL-ISG               GENERAL SPECIFICATION FOR
                                                        SPECIFICATION NO
              PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                        IS- 1-10-2013 / 005
                      WORKS OF CHP & AHP PACKAGE
                   2X250 MW BARAUNI THERMAL POWER PROJECT                 DATE: 04/06/2011
                                                                            VOLUME 1/
                                  SCOPE OF WORK                              SECTION 2


     15) Control room / battery rooms / AHU (Ventilation equipment) rooms
     16) MCC / Switchgear rooms
     17) Transformer yard
     18) Various equipment foundations and grouting
     19) Pedestals for ash water recovery system
     20) Structural steel works and cladding works
     21) Underground road / railway crossings by providing RCC hume pipe
     22) Providing approach road and culverts for road and railway crossings etc.
     23) RCC underground water tank, ash slurry tank etc.
     24) Interconnecting drains and sewerage
     25) Any other building, foundation, structures and facility required for completing
        the AHP.



6.0     General : For CHP/AHP

a)      The final dimensions for the structures / buildings shall be as per the
        approved drawings of the CHP equipment contractors, electrical
        assignment drawings by BHEL and other + equipment suppliers
        pertaining to CHP system which is presently under finalisation.
        Eventually detailed drawings viz., plant layout, flow diagrams,
        longitudinal profiles along the conveyor galleries, electro -
        mechanical and civil assignment GA (General Arrangement)
        drawings will be submitted and got approved by the plant
        equipment contractor and those drawings shall then be the design
        reference base drawings for the Civil, architectural & Structural
        contractor's detailed engineering.

b)      The works covered in the contract shall include supplying of all
        materials (except structural steel and reinforcement steel
        which will be supplied by BHEL on free issue basis up to the
        extent as per theoretical requirement with allowable
        wastages as specified elsewhere in the tender (Ref SCC)),

           ENQUIRY No.
                                           REV. R0                    PAGE 9 of 11
           I88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
                                                       SPECIFICATION NO
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                       IS- 1-10-2013 / 005
                     WORKS OF CHP & AHP PACKAGE
                 2X250 MW BARAUNI THERMAL POWER PROJECT         DATE: 04/06/2011
                                                                  VOLUME 1/
                            SCOPE OF WORK                          SECTION 2


      labour, tools, plant and equipments, transportation, fabrication,
      supervision, construction as per drawings including embedment of
      bolts, inserts, leaving holes, pockets, grooves, chamfers as shown
      therein and all incidental items not shown or specified but
      reasonably implied and necessary for satisfactorily completing the
      project as a whole.

c)    It is not the intent to specify completely herein all details of design
      and construction of the works covered under this specification. All
      works shall be done as per specification and as per approved for
      construction drawings and in a manner acceptable to "Engineer",
      who shall have the power to reject any work or material which in his
      judgment is not in full accordance therewith. In case of any conflict
      regarding the interpretation of the intent or meaning of the
      specifications or drawings, Engineer shall interpret such intent or
      meaning, which will be final and binding on the contractor.

d)    The scope of work shall include detailed engineering, detail
      designing, preparation of drawings, including preparation of
      fabrication drawings for structural steel works, submission and
      obtaining approvals on designs, drawings and other engineering
      documents from all the approval authorities involved including
      statutory authorities, where applicable.

e)    The scope of work also includes attending meetings at BHEL, Owner
      / Owners Consultant's offices at Project site / Barauni / Bangalore or
      at places decided by Owner / BHEL as and when necessary for
      review, discussions, co-ordination, etc.

f)    The scope of work also includes collection and transportation of
      materials supplied, if any, by the Owner / Purchaser from his stores
      located in the plant site (or) to receive the materials directly from
      the steel supplier at site as directed by BHEL.

g)    The scope of work also includes making all necessary arrangements
      for access to the storage yard from the nearest approach roads and
      further to the actual site of work including dewatering, as necessary,
      and maintenance of the same in order to facilitate transportation of
      machinery and equipment such as cranes, etc. Refurbishment of

           ENQUIRY No.
                                     REV. R0               PAGE 10 of 11
           I88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
                                                       SPECIFICATION NO
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                       IS- 1-10-2013 / 005
                     WORKS OF CHP & AHP PACKAGE
                 2X250 MW BARAUNI THERMAL POWER PROJECT           DATE: 04/06/2011
                                                                    VOLUME 1/
                             SCOPE OF WORK                           SECTION 2


      existing access roads, if necessary, shall also be done by Contractor
      at no extra cost.

h)    The scope of work also includes checking the adequacy and doing
      the appropriate modifications in some of the structures of the
      existing CHP for interconnection with the new CHP, if calls so.

i)    The scope of work shall include all other works not specifically
      mentioned above but necessary for the satisfactory completion of
      the project as a whole.

j)    The Contractor shall be fully responsible for arranging all materials
      to meet the requirements of the project. BHEL shall provide
      structural steel on free issue basis up to the extent as per
      theoretical requirement with allowable wastages as specified
      elsewhere in the tender. The scope of supply of structural steel and
      other steel items if any by the contractor shall be procured from
      SAIL or approved equivalent.

k)    Illumination & electrical works such as cabling, cable trays etc for
      permanent works are not envisaged in bidders scope. However
      inserts, embedment etc, required for supporting the electrical works
      shall be provided.

l)    Bidders to furnish the details required in the Price Schedule- Item
      description of civil & structural works without price along with
      technical bid.

m)    Bidders to furnish the credentials of their engineering designers/
      consultant for approval by BHEL.

Further common works like construction of Covered Storage yard & Site office
also shall be included in the scope and the construction of the same shall be
completed within specified time as mentioned in the relate clauses of LOI.




           ENQUIRY No.
                                      REV. R0                 PAGE 11 of 11
           I88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                     WORKS OF CHP & AHP PACKAGE        SPECIFICATION NO
                                                       IS- 1-10-2013 / 005
                2X250 MW BARAUNI THERMAL POWER PROJECT
                                                          DATE: 04/06/2011
                                                             VOLUME 1
                           INSTRUCTION TO BIDDERS            SECTION 3




                       SECTION 3:
                 INSTRUCTION TO BIDDERS




           ENQUIRY No.
                                      REV. R0
           88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                     WORKS OF CHP & AHP PACKAGE        SPECIFICATION NO
                                                       IS- 1-10-2013 / 005
                2X250 MW BARAUNI THERMAL POWER PROJECT
                                                               DATE: 04/06/2011
                                                                  VOLUME 1
                           INSTRUCTION TO BIDDERS                 SECTION 3


PURPOSE

The purpose of these instructions is to serve as a guideline to Bidder when
preparing proposal for the work described in the attached specification.

All the pages of the tender document enclosed including drawings
and this page shall form part of the tender document and shall be
signed and stamped and returned.


INTRODUCTION

The scope of work is “Piling, Civil, Structural and Architectural works” for
the “coal handling works & ash handling works” required for completion of
2 x 250 MW at BARAUNI TPS, Dist. BEGUSARAI, Bihar.

Note: The term 'Engineer' used in this tender, means the 'Engineer-in-
charge' of BHEL for the particular work pertaining to the contract.

1. SCOPE OF CIVIL, ARCHITECTURAL AND STEEL STRUCTURAL WORKS
     AND OTHER INSTRUCTIONS:

      This scope of work covers making design, engineering, preparation of
      general arrangement drawings, construction as well as fabrication
      drawings based on the approved GA drawings provided by system
      designers, approvals from BHEL and BSEB / Consultants of BSEB’s,
      incorporation and supply of "as built drawings ( for CHP alone)",
      supply of all labour, materials (except structural steel and
      reinforcement steel which will be supplied by BHEL on free issue
      basis up to the extent as per theoretical requirement with allowable
      wastages as specified elsewhere in the tender) and construction of all
      civil, structural and architectural works as described below. However
      detailed scope of shall be as per the Section- II of Vol- I of General
      Specifications.


      Any other works not mentioned above specifically but required for
      completion of Part CHP & AHP also shall be executed by the


           ENQUIRY No.
                                      REV. R0               PAGE 1 of 8
           88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                     WORKS OF CHP & AHP PACKAGE        SPECIFICATION NO
                                                       IS- 1-10-2013 / 005
                2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                DATE: 04/06/2011
                                                                   VOLUME 1
                           INSTRUCTION TO BIDDERS                  SECTION 3


      successful bidder as per the quoted rate. The above scope is
      tentative and subject to change by the BHEL.

      The location and numbers of structures indicated in plot plan &
      related drawings are tentative and are subject to change depending
      upon the detail engineering at later date.


      The works shall be executed as below:-

1.1 The scope include providing all labour, supervision, material,
    scaffolding, construction equipments, tools and plants, temporary
    works, supplies including POL, transportation and all incidental
    items not shown or specified but reasonably implied or necessary
    for the proper completion of work in all respects. Establishment of
    laboratory at site with all the required testing facility for concrete,
    earthwork, other allied works, preparation of fabrication drawings
    etc. are included in the rates for work. Works shall be carried out
    based on approved drawings only. The scope of work also includes
    providing of PTFE bearing’s design & drawings approval.

1.2 The area of work shall be cleared of all vegetation, rubbish and other
     objectionable matter and the materials removed, shall be burnt or
     otherwise disposed of as directed by the Engineer-in-charge. No
     separate payment shall be made for the above.

1.3 All gold, silver, oil or other minerals of any description and all
    precious stones, coins, treasures, relics, antiques, and other similar
    things which may be found in or upon the site shall be the property
    of BHEL / GSECL. The contractor shall duly preserve the same and
    from time to time deliver the same to such person or persons as
    BHEL may from time to time appoint to receive the same.

1.4 All the work areas shall be adequately flood lighted to the
     satisfaction of the Engineer-in-Charge when the work is in
     progress during the night shifts.



           ENQUIRY No.
                                      REV. R0               PAGE 2 of 8
           88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                     WORKS OF CHP & AHP PACKAGE        SPECIFICATION NO
                                                       IS- 1-10-2013 / 005
                2X250 MW BARAUNI THERMAL POWER PROJECT
                                                               DATE: 04/06/2011
                                                                  VOLUME 1
                           INSTRUCTION TO BIDDERS                 SECTION 3




1.5   Layout and Levels:-


      Permanent base lines and cross lines shall be established by the
      Contractor at sufficiently close intervals as may be directed by the
      Engineer with bench marks at all end points to serve as 'Reference
      Grid'. The contractor shall provide at his expense all templates,
      pillars and stakes, equipment, materials and labour for establishing
      the Grid lines and pillar and shall be responsible for their
      maintenance during the whole period of construction. These shall be
      laid out with the prior approval of and checked by the Engineer-in-
      Charge. No base line or mark of level for the work etc., without the
      prior approval of the Engineerin-Charge. The contractor shall
      maintain a certified copy of drawing showing such approved
      reference lines, marks and levels and shall not remove any of them
      without the prior approval of the Engineer-in-Charge.

      The reference points and pillars already established by BHEL in the
      works area shall be fully protected and maintained by the
      Contractor. He shall repair and rebuild the same in case of any
      damage intentional or otherwise.

      The contractor shall layout the work from these reference base
      lines in consultation with the Engineer-in-Charge and shall be
      responsible for the correctness of all measurements and levels in
      connection there with not withstanding the fact that the staff of the
      Engineer-in-Charge might have checked the same.

      The contractor shall be responsible for the proper execution of the
      work to such lines and grades as may be specified in the drawing or
      established or indicated by the Engineer-in-Charge from time to.



1.6   SETTING UP OF LABORATORY WORKS:-

      The contractor shall set up his own laboratory in the very close

           ENQUIRY No.
                                      REV. R0               PAGE 3 of 8
           88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                     WORKS OF CHP & AHP PACKAGE        SPECIFICATION NO
                                                       IS- 1-10-2013 / 005
                2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                DATE: 04/06/2011
                                                                   VOLUME 1
                           INSTRUCTION TO BIDDERS                  SECTION 3


      vicinity of the work site as per the directions of engineer-in-charge.

      The laboratory shall he equipped with latest testing equipment in
      sufficient number to carry out all the tests as required under a
      contract. The contractor should ensure that the equipment is
      available well in advance of starting of the work to avoid stoppage
      of work on this account.

      All the tests shall be carried out by the contractor in the presence of
      the Engineer's representative and a joint record of all observations
      and results thereof shall be maintained, and available with the
      Engineer.


1.7   BHEL reserves the right to split and place the order for any of
      the package / packages in whatsoever manner to facilitate
      the ease of handling the package and may also reject the
      offer. BHEL's decision shall be final and binding on the
      bidders.

 1.8 Soil investigation report, reduced levels, survey reports etc.,
     enclosed in the tender as a guideline. The details given are correct
     to the best of the knowledge of BHEL. However it is the
     responsibility and in the scope of the successful contractor to
     ensure the correctness of the same and to collect any additional
     information required for the work. Any changes due to the
     variations in the reports provided by BHEL shall be incorporated in
     the works and the quoted rate shall be deemed to include for the
     above.

 1.9 Detailed scope of work, specification and tender drawings are
     available else wherein this tender document. Bidders shall study
     these and quote accordingly for the entire civil, structural and
     architectural works part wise as per BOQ enclosed.

      Contractor shall execute the work within the contractual period
      based on the construction drawings supplied by successful bidder
      after approval by BHEL / Customers / Customers consultant which

           ENQUIRY No.
                                      REV. R0                PAGE 4 of 8
           88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                     WORKS OF CHP & AHP PACKAGE        SPECIFICATION NO
                                                       IS- 1-10-2013 / 005
                2X250 MW BARAUNI THERMAL POWER PROJECT
                                                              DATE: 04/06/2011
                                                                 VOLUME 1
                           INSTRUCTION TO BIDDERS                SECTION 3


      are based on the requirement of project.

2.0   PERIOD OF CONSTRUCTION:-

      The completion of all “piling, Civil, Structural and Architectural
      works” for the “coal handling works and ash handling works” shall be
      as mentioned in the relevant clauses. Civil, Structural and
      architectural works shall be completed in time on priority basis and
      fronts shall be handed over to other agencies working for this
      project as per the L-2 network and instructions of BHEL.

      The successful bidder shall submit a bar chart within 7 days from
      the award of work considering the over all project completion
      schedule.

3.0   PAYMENTS:-

      Payment shall be made based on the actual quantity of works done
      duly certified by the engineer in charge and as per terms of
      payment shown somewhere else in the tender document.

      The rates quoted by the bidder shall be deemed to include cost of
      engineering, design, approvals, material, equipment, fixtures,
      labour, construction plant, temporary works and everything
      whether of a permanent or temporary nature necessary for the
      completion of the job in all respects, all materials irrespective of
      whether it is mentioned in the item description or not. The bidder
      shall be deemed to have satisfied him-self before bidding to the
      correctness and sufficiency of their bid for the work and of the
      rates and prices quoted by them, which shall cover all their
      obligations under the contract necessary for successful completion
      and maintenance of work. No extra charges whatsoever
      consequent or any misinterpretation or otherwise shall be
      allowed.

4.0   BIDDERS RESPONSIBILITY:-

4.1   Bidders shall prepare the proposal in accordance with the conditions

           ENQUIRY No.
                                      REV. R0              PAGE 5 of 8
           88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                     WORKS OF CHP & AHP PACKAGE        SPECIFICATION NO
                                                       IS- 1-10-2013 / 005
                2X250 MW BARAUNI THERMAL POWER PROJECT
                                                               DATE: 04/06/2011
                                                                  VOLUME 1
                           INSTRUCTION TO BIDDERS                 SECTION 3


      mentioned in BHEL tender document / Bill of Quantities and
      drawings enclosed.

      No further technical inputs other than those given in this tender shall
      be made available by BHEL. Hence bidder shall make their own
      assumptions on the basis of their experience and shall not approach
      BHEL for any such inputs for the purpose of quoting.

4.2   By submitting the bid for civil works, bidders shall be deemed to
      have inspected and examined the work site, its surroundings,
      locality, nature of the ground and subsoil, the scope and nature of
      work, materials necessary for the completion of work, safety
      requirements, quality requirements, statutory requirements of
      "BHEL, BSEB, Government", local clearances for execution of work,
      approach roads, deviations in approach road during the execution,
      means of access to site and accommodation which may be required
      for the storage office, residence etc., Bidders will also be deemed to
      have obtained all information to the risks and contingencies,
      responsibilities and other circumstances which might influence affect
      on his bid and to have taken into account all conditions and
      difficulties that may be encountered during the progress of work.
      The rates quoted in the bid shall be deemed adequate to complete
      the work according to the agreement and to cover the entire
      responsibility involved in the execution, completion and maintenance
      of works considering the above site conditions. Bidder shall further
      be deemed to have included all labour and materials (except
      structural steel and reinforcement steel which will be
      supplied by BHEL on free issue basis up to the extent as per
      theoretical requirement with allowable wastages as specified
      elsewhere in the tender), rates with taxes, octroi and other
      duties, quarry fee, royalty, lead, lift, loading and unloading, freight
      for the materials, transportation storage, labour license and all other
      charges necessary for completion of the work.

4.3   Proper motorable approach for construction areas shall be made and
      maintained to the working site / sites at all seasons of the year by
      the successful contractor. Separate payments shall not be made for
      these activities and the rates quoted are deemed to have been

           ENQUIRY No.
                                      REV. R0               PAGE 6 of 8
           88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                     WORKS OF CHP & AHP PACKAGE        SPECIFICATION NO
                                                       IS- 1-10-2013 / 005
                2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                DATE: 04/06/2011
                                                                   VOLUME 1
                           INSTRUCTION TO BIDDERS                  SECTION 3


      included for these works.

      Contractors to make their own arrangements for labour camp etc.
      Any statutory requirement shall be followed without fail.

4.5   Any material or service to be issued / rendered by the BHEL (unless
      specifically stipulated to be free of cost / cost recoverable basis) to
      the contractor, the same shall be made available along with 15%
      departmental charges over and above the cost. BHEL shall not be
      responsible for any delay due to this reason and delay shall be to
      contractors account.

4.6   Minimum requirement of the equipment for civil works are listed in
      Volume-2, Section 10 in this document. These equipments shall be
      engaged without fail for the execution of the work. Price quoted
      includes providing these equipments.

4.7   Quantities indicated in Bill of quantities are tentative and are
      likely to vary to any extent during detail engineering and as per
      site condition.

4.8   Contractor shall establish a full fledge batching plant at site
      exclusively for the work covered under this contract.

4.9   Detail specifications of the item are given in the technical section of
      the tender. In case detail specification for a certain item is not
      available in tender doc, specifications as per IS (Latest edition) and
      CPWD shall be followed. However in case the detail specification for
      that item is not available in IS (Latest edition) and CPWD
      specification, then the specification fixed by BHEL shall be followed.
      No additional commercial implication in any case shall be admitted.

4.10 Quality assurance plan shall be submitted for the approval of BHEL
     and GSECL. The approved plan shall be strictly followed without fail.
     Site facilities for day - to - day quality check shall be provided. All
     the expenses in assuring quality shall be to the account of contractor
     and BHEL shall make no extra payment on account of this. This
     expenditure is deemed to have been included in the rates quoted.

           ENQUIRY No.
                                      REV. R0               PAGE 7 of 8
           88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                     WORKS OF CHP & AHP PACKAGE        SPECIFICATION NO
                                                       IS- 1-10-2013 / 005
                2X250 MW BARAUNI THERMAL POWER PROJECT
                                                              DATE: 04/06/2011
                                                                 VOLUME 1
                           INSTRUCTION TO BIDDERS                SECTION 3



4.11 Safety norms as per BHEL HSE policy / BSEB shall be strictly
     followed. (Copy of BHEL's HSE policy is enclosed with this tender)

4.12 Site organization chart shall be submitted in the offer along with the
     plan for deployment of manpower, tools, tackles, equipment etc.
     required for this work.

4.13 Method of work measurement for all purposes shall be as per IS-
     1200 (latest) where ever applicable.

4.14 Please refer the "Additional Terms and Conditions of Contract
     (BHEL) enclosed along with this document, which shall be
     applicable to this contract and part of this tender.

4.15 Deviations are not acceptable from the tender conditions. Bids
     with deviations are liable for rejection




           ENQUIRY No.
                                      REV. R0              PAGE 8 of 8
           88/11/6010/AK
BHEL-ISG               GENERAL SPECIFICATION FOR
                                                        SPECIFICATION NO
              PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                        IS- 1-10-2013 / 005
                      WORKS OF CHP & AHP PACKAGE
                                                           DATE: 04/06/2011
                 2X250 MW BARAUNI THERMAL POWER PROJECT
                                                              VOLUME 1/
                      PROJECT COMPLETION SCHEDULE             SECTION 4




                    SECTION 4:
           PROJECT COMPLETION SCHEDULE




           ENQUIRY No.
                                    REV. R0
           88/11/6010/AK
BHEL-ISG               GENERAL SPECIFICATION FOR
                                                        SPECIFICATION NO
              PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                        IS- 1-10-2013 / 005
                      WORKS OF CHP & AHP PACKAGE
                                                                           DATE: 04/06/2011
                  2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                               VOLUME 1/
                      PROJECT COMPLETION SCHEDULE                              SECTION 4


1.0 TIME OF COMPLETION AND WORK SCHEDULE

1.01 Time is the essence of the contract. Contractor's particular attention is drawn to
the fact that the given time schedule elsewhere in the commercial conditions for
completion of this contract is firm and has to be strictly complied with.

The Contractor shall within 2 weeks of the date of award of contract, commence
work, submit to the Owner for his approval a detailed work schedule along with a
detailed PERT network and BAR charts showing how he proposes to carry out the
work at the required rate specifically mentioning time period as well as date of
completion and such approved schedules must be strictly adhered to by the
Contractor.    The Schedules shall be reviewed periodically to ensure that the
completion date will be met and to institute all corrective steps such as mobilizing
additional resources in terms of labour, materials, equipment, tools and plant, night
work etc. at no extra cost to BHEL to achieve any accelerated progress at any time
to the extent required to adhere to the completion dates. BHEL reserves the right
to revise the work schedule at his discretion in order to keep up to the completion
date and to suit the project requirements and such alterations shall not entitle
the Contractor to any extra payment.

1.02 The     Contractor shall furnish BHEL fortnightly progress reports with colour
photographs in       triplicate on     the Saturday of every fortnight in the
following format:-


Item       Schedule for the Actual                Reason       for Steps taken
           fortnight        Progress              shortfall,     if to make up shortfall
                                                  any




1.03 In the event of the Contractor failing to furnish the fortnightly reports on time as
detailed in above clause, the running payments shall be withheld till submission of
such reports.

 1.04 The Contractor shall not construct his stores, office sheds and labour colony etc
without approval of site and demarcation of land from Client, and also the date of final
completion of works shall be considered as the date when the Contractor will demolish

           ENQUIRY No.
                                           REV. R0                       PAGE 1 of 2
           88/11/6010/AK
BHEL-ISG               GENERAL SPECIFICATION FOR
                                                        SPECIFICATION NO
              PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                                                        IS- 1-10-2013 / 005
                      WORKS OF CHP & AHP PACKAGE
                                                                          DATE: 04/06/2011
                 2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                              VOLUME 1/
                      PROJECT COMPLETION SCHEDULE                             SECTION 4


all his temporary structures for stores, office sheds and labour colony hutments etc and
clear the debris and handover the area in original good condition.

1.05 The total completion period is 24 months from the date of LOI. However
stage wise fronts for the erection of equipments have to be handed over to the
other executing agencies of the project.




           ENQUIRY No.
                                           REV. R0                     PAGE 2 of 2
           88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR        SPECIFICATION NO
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                     WORKS OF CHP & AHP PACKAGE        IS- 1-10-2013 / 005

                 2X250 MW BARAUNI THERMAL POWER PROJECT   DATE: 04/06/2011


                     GENERAL CONDITIONS OF CONTRACT
                                                             VOLUME 1 /
                                                             SECTION 5




                  Section-5
             GENERAL CONDITIONS OF
                  CONTRACT




           ENQUIRY No.
                                   REV. R0
           88/11/6010/AK
                                                                                         ""..,'-
      .', t
                      ,',
                                                          ,        :'~~fo"'"
                                                                                         '~*-,*ft
                                                                                                      ~        ;;

                      IlIlVISIlO Gl!NllI!.AL CONDITIONS OF CONTRAct, IV• • :r. '·4-1915.
                                                        CONTENTS



                             Description'                  eondltt••
                                                           Nllmoer.
                                                                                                       ,
                                 CIlAt'tBR .\                 ll.       'APP"~I ofwn,Iu by ttag..
                                                              34. Exec.lloo or.,jrb
    I•• boo.ltlo!ll                                           35. Pay w'ork     ~
                  ,              CIlAPTIlR ·11                36. Inspection of t14; work
                                                               37, Responsibility lPr building
  '1. tt..dllit to Ill. "".thlofot                 'f         .38. Insurance of ~rks against damage &.Ioti: -
   -j. Cbl1tnd ~ootunen";                          ,.                         to
                                                                   due fire. tem~t. flood. ete,
 , ; 4., v,>orlu 10 be ca,rIed •• t                           39. Damage (It 101. to. private property and JuJury
    ~.     r_"illttm.                  '                           to wotknten
     tJovla!/clii
    ~.                                                        40. Comple~oo
  ,? tI...       ",                                           41. CompemtiOtt r dalay
 ..:t.     .Iom ••lliltLtII                                   42. Laws 8-ovemin the. contuet
 • ~ g. ~t "GtttaiJon oUbn"                                    4.1. CanceUttkm of ntract for ~tJupf act
'~dIO.; iIlwlttltbl.                                          44. CalloeUation 0( contract for insolvency.
 ,,1\.. f 6ett.I A .Ihot dollel                                     AS$ignmertt or· sub-ietting of contract - ,
 ,.It
  ,13.
           byalt{e;
           PI.nl'" Ilqulpinent
                                                              .cs. Caneell.Uon Of u)!1tcaet for default-
                                                              46. Tehninflion (lrto'tfffiorror death
   14.     AWa:runcrtt Of Transfer of Contract                41. Spocla1~powm dt determination
                                                                                     ,          '

          , i)' SuI.-Contraet ,                               ~8. 1'.1, wag<         ,                        I' ,
                                                                          I          •
 . ·B.      Com~lla"'lo R<gol.d... and Bye-law.
                                                                                   ,      ' (IHAPTER • ~
                       ,         CHAPTER,' III                                V~WAnI'N                AND PAYMENT
   '16. S...rity D<posIt                                      49. Record. and ~uremel1ts
    '\14 OrdeU: under the Contracf                            SO. Valuati611 of De~il\tiol1$.                            '
     Is. Admission 10 .Ite
     19,' Co'otrao1or" Supervi$ioll
                                    .,                        51. Relmburse.mefitlt..efltud on varja!ion
                                                              52. Ad••_ b. "cco\Unt
                                                                                                                    '0 prke
     20. Labou,·                                              53. Fi,..1 hill      1,
     tl.. Watet                                               54, 'Paymen\ of bUb i
    12. tem~ Workshop., .10r.. Ilt•. ,                        "55. !\¢QOvery from ~-ntractor         .
   tt         S(~     ;. i.b!erl.,......I!. 010.              5£. Po,H""knl",,( ••~It of w"~ .od bill,
   14.        too"" Plant.n .Ite                               57. ReI\IbdM..ts...rR1.Deposli
   l!.        Sill,..... of HI,..harg..                       .!lS· A",bi, ",4Ii->!.         :
 , '6.        I>!wullons ...10.1 IUtkt.
                                                                          .
                                                                                   I
                                                                                   II"
                                                                                              '            ,
                                                                                                           '.
, • t1. NoUo.d; F...
    28, s.ttln,oo\ of the "orb .nd protecting It                                   ':      Acaexute-' A'
           . l1Ia1ito101l1i.' marb                                  I                         '
    U. SI16d....                   '                                    , BflEL-Cootriot~r" Labo., Reg.falleJ,
    10;' ~ hlles, eIo.                                                   . and BHIlL s.reti ('~de

    '1 .
    a,.  l'mdatlotit
    t:! __ " .
              C6Wrla.lb' ,work
                           V'"     '7 •• ',
                                                                                                  ,
                                                                                          (S!Oeonditiun 20)
                                                                                                   I!                          -I
                                                                                                                               ,,
                                                                                                                                                                  ,
                                                                                                                                                                -_::.: «
                                                                                                                                                                           ~




                                                                                           ,       -I
                                                                                                   .
                                                                              DEI1NIiTlQNS!                                              ,      _
                   . I. tbete a.ntral CondIU.n, or eootr••t, tbe roll.wing 'er."                         .b,n ~.ve tbe meanJng I/ertb~ .n/slI<d
              _
                  to 1M", ex",pl wbe'" the .. oted .tberwlfo requlrel:
                                   •   •
                                                         .
                                                                              .                               .
                                                                                                              :.
                                                                                                              f
                                                                                                                                    '.          ;,
                                                                                                                                                .
                , "'1 'tb<! "CONTRACT" _no I~ «ooI1menu ronnlnglbe tender 'I"" _pt ••co there.f, tog.ther
          . , wlth.1I lbe docu""nt. rcrerred t. tb ...llI , ..Iudln, 0 ......1 .~d Special Condlti.", of Conlr,'!'o' Soh•.
            t dutal ·A'. "8'. 'C' • 'D' • 'tS' and/of Genera1 Summary .att~ to tM (firm of tender. tbe Karflltlika
            , f.W,I),                  ScM<\'"
                                  of l\ltes ilt 'oai,oded upw 1979·gl) the Spoolflcati&o, ,.d the Orawlngs. All 'ib...
           .i' d<lEll~.I! U ",pllcabl. tak••. Ieietber .tiall lie d<tmed to form .ne C~nlracl and ,ban be ""mplcm...
         ;n    I~f¥ 16 .~ tdbther.          :                                            ':                                .
         ut !':~;'61
                   tIi6 "rIlNDEJt DOCUMSNtilh . . . .n! Ih. form of Tind.i, thy applicable Sohedul" 'A';'B',
         Hf
          'C • '11' , 11' I.d/.r a.ntrat Summit)', OebCral and Specl'l C.~dill.oii ot C<>n"act .nd' Ibe ~lfICll"
              l
     'I;? I~~!"'lid/ot tlfOwlng. 4. thiillo CoOJlnl<itq..... paym"t ror ~ Pu~l!c of p..parlo. their W!<I....     '
         .,           "J Tht' waRK" m.... tbe ....ck deoerlbed i. th' t,ndet docum"Du, In Itldll<ld..1 work ord...
                   ~~dl" ac«"ilr~.rlnl Onhribg" and. Speclfkatl.o.... may be i~sued fr<Ji'. time to tim. to tb. Contractor
                   ~~ Ih. Se.I.t'I!~tl."t (CI'lI)/D.,puty Monater (1'..1«1» or thl Engl...,.I...barl!" wi.bl.. tbe """'''
                  ,ch.feliM. up.,n tbem, '""Iudlng .11 modilled or additlonal worU and ob!lgations (0· be ",rled out .elther
                  'It U,'h .Ite or at any t!'&etory Workshop or .place as required (or t~le perfQtwaace (If the 'Contract.
                         ,                              , other                                                   ,




                   . d) the "sna" ,meant tbe J4;Dd and/qr other place$ on;·iu. into or; Ib~9"gt\ which the work is to
                  he't'xeoated :under the C!Onitacl_of anr . adjacent land, path or nreet th{<:h may be aUotted to ot used
                  for Ib, pur",,!. or carrying out            lh. ""ntract              ' ,_                  i"
                        9:-T6t ~:CONTItACTOtt.. mum tlu> h:ad~vldtJal," firm Of ConlPil!t. whethcr,inoo'rporaftd or hOt,
                  .d.'di'r(ir:~Jlg tnt, work ,~ thail 'n;ctude cft~ Iq;at peOOllAt t~vresenUtiVfl of f1Ioh in4ividuals or the
                  ~lOM oom~ the tittn 01 QlntpuYt Of th~ iU«es$or.$ of the firm tr Company "and tbe permitted
                  tidths of ,ikh indtvidulil or f1nn or CCmpany.

                        f) . Thc .•bb"vati.", DOM/p, Sr. !dIP
                                                              "         •
                                                                               S.B/c
                                                                  means Oy, 0,,,,,,,1 M ..                                ger/pr.)ecu,~.ior M'.'il¢fl I
                  ftrojeQU, and Sealor Bl'I~rlCivii mpecti:vety, who-direct tbe oontract !lnd the ItUers EtC                                 means: En&f",
                  fleet fCivil in-.charge of the parficular wed:: pertaining to tbe. Contract,                    ;                                   ,

                              l}       tht ,HEn,ineer-in-ehargeU   rn¢an,~   the   HngiM:¢t/Ch'i! deputed by S!tJlklf Bngincer/ChU to ,u~rvise
                   the work. Ot pact of the work.
                          .                    -                                                        !,            .
                   Il) 4<APPRovtm·u arid ';OUU1CTSO" welnt t.b¢ approval of dirn;tlOA of th~ DOM/P•. Sr.                                             M/P,:
           . ,'.r.S:ti/C. or I""0n deputed by tbem r.r tbe p"ticul.r.purpose.                                                                   i·"
                       I) "aHARAt HEAVY Bt.llctlUcALS UMltllD" herej"fter i.r'tred 10 as SHIlL; ,h.\( mean
                   {~e Soaed or D[ftCtors •. Resident DI~or~. 04Mfat ~ati.gertPe6J¢¢t Adn!inlstretot or other Adrnfnfstra."
                   I.,.Off.,..., or the .ald t:Ompaily '",,(udlns tit. p,.jeetJ officer, Sr. Mtn>ger/Pro)ect" ~r Senior Eogln.",
                   Civil, ~nglneer/ci\'n authorised to 'tivlte' (••den .lId enter I'to .the to.i,act.                        r.,
                                                                                                             work. on behalf or
:1                 "Dh",t lleav1 Electrical. Lholted", Unit, ~~I~;,I''iifIiJ!l.li;~·'~'.~".,B.I\sato'''''''''12
                                                                                                         ,
t
                         j) Inth< .....r I_um "DtfOcI" ';CONTItACTOR'S PBRCBtl,TAOO" mea., the P«ooot.g.
,                  off....d bl the Co.t".1qr .. addition to or cliduo;lloo from the ..,t .r blI18ing" or .ther work. 1I,(ed
"                  10 Sohedule, 'N to pc.vI'" • lump.um qu.lttl•• fo, perf.rm.... ofi Ute .,ntract lncluslv~.r all
 ,                 utu CO~Ut profilJ c.tabU,bment eht"O$, earria.&t, Ibsur.noe ete.:oomplet,.                      .
 ,   '
                      ' .                                              .                       " I
I
                        tli t~o ete of peroeataae .Rate CoQ.trlcts, ftCoatraetor', I'erc;en,~tf ~ball. If t~ context 110 psttniu.


               ,aiMlItH4 Upf6 . . u adjutted by !be uItI eootraotor', pe~\Ift, w. ItlJ'.
                                                                                                             ,p,
                   ·....U the uniform _ t... tendesed by tbe coatroctor .nd .odpi<d by,tho A"""pllng Om-, .nd '"'
                ..jl.<II106 "toHTI\ACT ltATE" Ih,n IIbwIte m... th< ra ... ill!.!be  W,I>, 'lKIhedul. or                                        t".       'll



              . ,         tM "CONTRACT SUM" _0' tbe 111m l<ll'ep\«I. or the "on (.Ca1.I,ted In ."",dan""
                                                                ,
                                                                                                                                                    tb Ibe
                                                                                                                        I
                                                                                                         ,;

                                                                                                         ,
                                                                                                         r


                                                                                                i         .                     I                                            (

                                                                                       Pl)'tblel+ 0.. Co~ltlK:t.r rot the ,ntlte ex
,.I).
  jltlcet   """'PI<"I, ill     lb. tender Ind/or tMoonUtet filii ..                                                                                                 flo.
. Ind   r.1I ....ple!I•••r tho work.                                               .            I ; " ".            '
            "FJNAL SUM" _iii tb·lK:tuol . _•• p'aY'b~ 11.;0.. .,..tra<tby BHIlL, 0 the
  eont,._ for 0.. ••tt.. ,~ ad
                        .
                                    oompledoJl 'of 0..
                                    "             .
                                                          t       run            •             .tor..
                                                                                               .;       : :                                                !
                                                 .'           .       -            ' .          ' I                                                         j           •

      ,:m) The ".DATIl OF COMPUmON" I. I'" da.. or dat.. ifor """':I'I•• ;.n of the whol • • .n,..                                                         1                 !
  patt off . wort .. tet out III , or ascertained In I.ccordaoce wJth the' individual work orden br tho.
    •
           !be                      •                                                                         j                                        ,    •
                                                                                                                                                                             1
 ,tender c!ooumebtt, or a.y ••btoeq...t qtee<! .mend...." thereto.!                         . '
                 .            ,           .                                                                   I                 . .                                 "
  . nl A ··~BSKu tneaDl, tevcn dayt without Rglrd to the BlImber· _, boun WQtttd- o~ noot \forked
  I...y day i. that                     w.o.. . .
                                         . '
                                                                  .
                                                                              '        .        . ' ..                                .
                                                                                                                                          '                ,'
        0) A "tlAY" me••• a dar .f 24 rr"'nlyf..,j fioon 1"""",,1~.r Ih. number Ol' h....
  wcftbd

  "
             ,
                 (It   not   fll:   tbat day..

        pt A ''WoIlItING DAY.' "'~Il$
                                                      1               .           _.                "

                                            lily day otber th •• tb.t p~rtt'il:j' by lb. Negoti,ble i ••t,.·
                                                                                                              .
                                                                                                              ;>..                             _

  m.1i;j Act al bel",. ho1l4'r,,~ .~ th~ ....ber .r b•• rl ~'I.bo.flU «Im"",.ly """gnlsed by
  B~~ etitployeft In the trade Iti the DJ!trkt 'whe~ the' W9rk is ear~lea o~l pi u laid down jfi 'th~' BHEL
  a.g.latlo";'                                                       ,

   , ill "bEVtAT1oN ORollll" ~"" a.. oro... ,I",. by IIi ~.i.' ilngiDeer/Clvn or En&iooer-lo-
  cb',.. t~ ~rfOd ...11.",.1<1•• liddl,ic'" « dcdbetion. _ <I"", .bi radIcAlly arr"" the ""'pc or ••tu ••
  of In. _t""",                                                   I '                            '
      , 'r)-' "EMEltOI!NC¥ WORKS» m.... _ r utg<ill _urea which. -I.
                                        ••                                                       tl,. opinion or the En;i~.l••
  eli..... ~ ~ duJlnt                                     the I>~ or tn. ....... to obviate any rtlk of .""d••1 0' taiiu~ or'
  'iriikl....~_ _ itor ",:""ilty.                                         .              -'.             I        h"                               •



        •) uPkOV1SIONA,L SUM" or "'PROVISIONAL LUMPSUM n means la,
  '8H~ Ja: lb' ~ docutrlent. a.f1~ repmtl1ts Ute e4titnated 'Value d
  i'lll.bloi'llt the dmd of Invlting tI~ i.,der.                     -I
                                                                                                                  rrk   lumV~SUJll            inehtded by .Ute
                                                                                                                             fOT wbicR detatls ate not
                                                                                                                                                                                 .
                                                                                                                                                                            , !
 , '.   t~ .cPR~V1SI0NAL ITEMS" tndtl$ items f(lt which approximate .qua\titiCS ~ave ~n ~nclud,ed in the
   ,••der <IocamMI$.·                                                                                                    "
        u) ·'DAY WORK" means,on it~m ()f work requiting the employmellt (If labour with or wIthout                                                                           ,       ,
'_ mittrial; a. the ca.. mly be, whkfi. i. 110< opint" of the Senior i!nti.",'CIv!I-in-ohallle. - 1$ n<>I
  . Capable of beitlg eval~ed by the'aroeptcd fllttltods of measur¢ment or !asse~ent and it paid rOT ·on the
    bam of the actual labour attd maferials utlUsed
     ,
                                                                              on
                                                         the particular item of work rererred to.
                                                                                .
                                                                                                                  I •
                                                                                                                                                                                 b'. ;
             . .. ,
                                                                                                         'r
                                                                                                                                                                I




                                                                                                                  .
                                                                                                                  .
                                                                                                                   j
                                                                                                                   t
                                                                                                            I
                                                                                                        J
                                                             Cf!APTBR-1I '       j                      f
,( j

                                                 SCOPE, OF CONTRACT
         2. 'HBADINO TO THB CONTllA(lT,                                                          j
                                                          ,,                       I
               TItc: kadlng to tbote ..ndillo.. ,hall ,II<>I ,[eel tbe interp..tatton thereor
         3. , CONTI\A(lT DOCUMENts,                                            i ':                         '
         tbe .ceI:IlUlig olli"';r Ihalt' furnioh t. the Conlract.r on d...~~d "FRJli OF              ~sr" th ... cop         of .I..,.d
         Drawhtp and .,ne copy of the sij;~ al~tUCDt oOmprls.lng. of 'p'~8mbk-' to Agreement! Geflerat ltd Special
                                                                                                      ,.!
        ,¥P.plfiOltl9.... Schedur..' ''A,' 'S' '(Y 'D' and il!' etc.. (btl) e,clud(" o.... 'Condition. f Cont,l'4OI
         ••d ,brl'!lop) tnd tbt.. coplea of III fU,rih<:r dr...t!!A' ~suod dUring the        proerea,
                                                                                         of "ork.
         O.\~it.t; M.riY addilion.l";pl.. at i •• q/temont .(:dnw;ngt tequlr..iby the Contta<tor. the Lm.;WIU be
  '..   '1~!l>IiOd &."
         , P ' -'jl;iebt        Ih. S~ned t..t
                                     "....."            ,"                           '       :
                                                                                             ,
                                                                                             ,
                                                                                                                    .   'r .
                                                                                                                         I
          The Co~triet()r shall keep one copy of all the dcawillgt.and or the .pecifiptions on the site and the Engineer...
        " !fl..m.~or- tak reprcseQtative Ib~1I at all reasOnable times have a~'e$$ tOjtberu.
        '..    WORK TO BE       CARlUI!O .!ltrr ,                                            !
                                                                                             •
        . The- Cl?otraCt 'ba~l. except. provided a~der ~tduleJ 'D' and 'C' inclu~ alllaoour'j materials, -.tool., plmtt
          cqdipmtut altd (taMpOn whfeb may bt tequ!,ted in preParation for f and In the entire e:((lCu(iotr hd (uU eom~
          plett.. of,lM work. ~.Ie 'A' .hall he d_ed'io h... bee.pteparedi. '"""rda_ "lth,,00<1 pt'IICII.. 0Il\I
         ,f~gl1bed prlt1cipl~ aod utd. otbtrwise ttttcd, tbe descrip!i~m given ·~ltereiQ ,hall be held to loclu40'wftte
         ott matetiah. qmage and ci~~ lead, return- of1emptle$? hoisting, 5'ettlng. fittIng in PQsition and aUotfitt
         labour ~a9' in and for (fie entire e:K.ecutro-n and fult ooinpletion :'foresaid. Any error In descrlptro'n Of
         quar:atit)' fa Schedtde 'N or anr omwioll therefrom $bat~ nM vitiate ih~ Contract or release the Ooatntcor
          rroin the.e)tecutrori cir the wh(i1~ or any part or the work oom-prt$ed tMrej~ aec-ording t(J-tne ofttwlngl4nd spc¢t.
          bdo,aa, Of fcom any of hie obligafioN onder tbe Con(raet. 1hC insettfoia 'of tbtl name (,f _any firm of fUppUOn
          in the tender Oooumenu l$ ror the pul'pO$C: of oh~lning a partfcula.r cla~ or quality of materiau Or workman.. ,
          ship but the artic1et or ~aterials specUied ,way be obtained from attiotbet firm .ubject to- the prior wNUen
        , approval of tbeS<nlor Ilngineer /ClvilI Ilogl_r I Civil.         c




                      of
         In-lAC case a di$Cfe-pancy b¢tWoeeR S<:beduk -A" the ,Specifications a              Ht lhe Dra,wJngs., i'ht: e.~pUng Q!li¥tc
         shtll be the: ro\e decidlq. authority u to w6ieb sltalLtlt'Cv.n and h               dtcl$ion $haU 00 finn] and cODClusivc.
         If ttelthet drawrngs nor $pcd6cat.iQnlloontafn lny meation of m.inor detai           of condructron, which in tbe <tpinion
         of the A~tlng OffICer whe$e decision .han be fift$1 and conc-lusite                 are R$sonabt~ and obvious and r.tf1y
         Inteoded rur tbe satisfactory comptetion of the work. -fluch detallnhili               provided bi nle Contractor without
         tny ~tr. cost u' if they wcrt tp¢clally mentioned and man be dffiTltd t              bel included In the oo-ntri,Ct.;
          the Con\t;~i will bO deemed to have ..t~food .1....lf .. to lb. nat.ro r the .It., 1 1 faelIlIl« of.""" ."d
                                                                                                 ...
          ail matt«s, affcotlng tbb exeetiUoit ..~ co111~J~~'n or. the work,> No e'dca, hargeu:onsequ~nt on any mjs-:under..
          ,l.nding In th... ""peet.   or olh«wlie ,,"111\0 ,110"'<1.                  ,  ,  ,


          S.    PROVISIONAL ITIlMS:                 "    :

          The fdll .... unl of provislonallump-lUtn •.rId thi! vil\lt aM..ed to .aeh:provldonal Item In ..rled In the Tender
                                                       .            .      I                              .


               ,_!oed
          ddcumuls .halt be deducted from til<> coIIUaoIlum and the valll< of \VOl'!; ordeted and ..... ted lIIercuDder ihaU
          be             by m......tn<Ill of vl.lUltlo" .. ror d,vlatlol".
                             -              ,                   .
                                                                   "
                                                                      .
                                                                                    "                          :
                                                                                                               I
                                                                                                                        I
           No work ond" tbote Ilem.l. to be beg•• wlt••ullnotructio., in       ",ri«.~       rrom Ih.llnglneer.I.-chilrae.
                                          ,                                          ,,                         '       1
          ,n.....toot or q•••dtl....t ilOml deoctibed It "provlslon.I" .hlil n.(~ held 10 'U'~'.I" orJI~I ih •• , ''''A('
          _rid ",rlptloa or the wotl: to he "Ci¢U1td by tho (OIIIIo<I.r 'ither I. r..peet or, lito ilen1leo... rned or the
          ,~Ika.. wile"'.                                                       .,
                                                                                         ,;I                              "

                                                                                                                              j
                                                                                    !. :                                  l
      N. addltIou or doducti.n .b.n he m.de by 1M COntrtttor 10 lhe tlll<lun!.f lb. provillonalluml'l\l11\' II Inclu.
      dod Itt the Iondot doou........                                              .; :. .
                                                                                         l
                                                                                                                              .             "   ,
                                                                                    I
                                                                           ,         i

      f. DeVIATIONS:                                                         I         i
      ne _             ..... aoIlIIIb • ., ......... laaddl~ 10 or ...iolUm ~ tbewotk II "-ib<d 1.·lMtolldot
    · do< I 1'111-": Ito _             01' the -..IItea loottuotIont 0[ the l!nttncef.!:wI>I .... No .ud! deviation rIO..
      the ..t ........11. 1M ~ ........... sh•• he~lId u..... tlle itmt bi.~ bcott rpCoirieolly ....flrmed aDd
      lccepted 1>J III_ ~d,,* 0fIIe0r la 'Ii'1ld., ..Dd IlIOCI'pOllt.d In 11.6 <>:>njr'Iil!i. .' . •
                                              .                                   .
                                                                                                               I,
-      _ "
     _ IIX>OpIUJc 0II1c0r ....y dovii.., olther by
      ne                                             w',                   i             J '.          '
                                                                                                               '0
                                                       or addlUon .r d6,ductlon, 'fOnt tho OI!.rk d...ri ,pl'Clvl-
                                                                                                                      "       .

      dod dJ&t the contraetor ..... he ....1 1belOby .. dod oil !be wIIi~1iy DIo~ tUl>lb' pe.i,o.tagnet. t I. tho
      I<!Gder ............ Tho ~I"" 0[ 1Il.ddllloM and doducti~•• wm . t,ddod IB,.r dedp.,ted r      .... th ~lIlratt
      _ . ~ 1M Aboept!q 0IrI0i0r              'aloJid.  10 ...."... ,..... • ,1i1ill...
                                                                             •      tIotl: iII,n ipooIr)' !bed• .ta~
      ....hIck ItO to .......do. the 1."psulIJ ......me.t or the propo«d. _.r' ~'I.oti~ I'" ..Ira Ii... · loWed, If
      .R1.andtbeda.. 'or .....l'ltIl•• o[the ..,I.. "".tratt... .         ;1 . ..:.                              .
     · A.yobjectloo by the COJIlnttor 10 ca, Inttlet ..        s ,be .rII.. ~Ile noIlriod by him I. 'rfri~'8 to tho
                                                             ......ih.
       lIoni.or!!",1_ (civll)/ EngIneer. in du... within SIlVIlN DAYS, f,o .. th~d.l. or .uob order, but :'oacr bO
       ci",ums!a..,..lball the work be .topped (unl", .. order by {he ScblorEngl;.t<,IClyli/ EtC owing t• .IIir,,.,,,,,,,
       oronntto""l"1 tbat ",y am. r.....!Iob a. "bjecU••• t. tlte t~ <lC >II<\!. ...UClll8~.n or o\ljecti'o•• by the
       ..,.tq.otor;"" will be ~ 10 &.... _l'Icd til••,dored .."I the ...DdIUc<jl.ti.ted Ihe,.I •• I. tbe ....1or the
       ~. falUqlo """ wICh 1M SeaIor &gineer / a.utl!lC_rdl"llj16 ....... Or the jifoposocl sl<>latlmt,
       the oIIjocI/oti ~I'", . . - to the OOM/f'/Sr.M/I', wb.... ~a
       flo> 'ioootsoc.tor.                                                 .    1.
                                                                                   .haII'"
                                                                                    Rnal, ..,.clust"" and Wndl", on
                                                                                                       -
          ,.In
       ,. ""'e.
      4.           ~.                                                                    ,
                                                                                         ',-
     · 'I'kiIe Is tIo; ...."'" 0[ the co./ratt and is tpcoi!ied In tbe tc.der dOOum<Ul~ In eaob Individual Work .rd....
                                                                         . .
      .0;
    • ··I\A.IIOOto .. poiIIblc after lho C!'nltact Is let.r a.y .ub~ntlal w.rk order Ui~I'ood and heCore work ~i1d.r It b~
                 the SeaIor Bngl_/O,U or 1l1Ig'-"'''' charge aod tbe Cdnttaetor .hall (If '" ""Iulrod by lbe S,.IlICl
    . ~ to • Ibn> and pro..... chart. 'I'b6 Chart sloan be _ted d;Hl!t ..!allli. 10 .Ihe II... staled in tbe Icni!ct
        d"""mcn!s or the Work Ordot rot the ""mt>letlon or the Indivldu..lltem. tt.:...or,.ndlot lb. oonltact or Order
      &S a whole. it shall j~icate the tor«:ast of tbe dateS for the commt~l.ttdQ()ruplcdol1 of the variODS trade
      ~ or ,.que""", 0[ the work, ond ct.ttl             be.,;,..                                or-
                                                              <kd .. ",ay '" ,.quIKd >it...,enl bet....... the Sr. EfC
      Or flo&l-~ douge, .n<! the ""litrtetnr wlthl. (be lI.,ltallo. ~ lbe tln\e Impo«d I. tne lender doooineots
       ., OIlDIlR.                                                             .             ,             .

      lh.'be  .boe..,.                  I .

                        or ~ny sp<cliQ t'
                                                                               '         .             .

                                         ....n<! P'''ll".. Chart to he agrted 'obet1l<jOn lh. Contractor and lh,; Sr.Ete.
      or Bn"Mef-kl~al'le. the eontnctor tllall enlu~ tnd maintain ,utdntertu&?ted ptOgrtu of the work iueh that
      ,he """'" work _n he ~ within the time hnpo«d In                   I'"t..acr doIo\Imenls or order an<! thai    pro-         I'"           •
      1'OfCIoIa..rMd: cbmpld.c1.pJ" ~ time In 1OI.lIon '" tbe 'ntlrework            t.1ledo... 011<1••         t...
                                                                                                        Contract otOtdot
      ....1I1IOt t.e ..... lban tire profonlOli lbat th.lI... olapied t.ean to the total time 0[ comp!elion provldod In
      iI!o ,.......~ otOtdot.
       11", ~ .hall lUopea<I the .... tlo. or the work, '" any part or par t......r wb.neY« ..lIod upo. In
       ..flll", lor 1Io!1ln&I.....~n,ehatie 10 do .., and .h.1I 001 .... me ":'ork I ••• 111 .. dl"",od in 'rfritln&. by
       I"'~, Uoc.m...cto, will ... allowed all -..no.. or ~               for oompletloo oot .... !han the
       ,...Iad 01' ...peoaIon ....1 .. odI« doImlu Ifd. ~ for compoDlll . 0' oIhe~ h........r Will be
       a4m1Uoc1. 'l11li011, aIso"'~ 10 .11ow for .11m~ ..r .... d< ...a.:by the <IevlaIIo. otdct.
                                                                                                                                        j
       I.   StOlES ~ MA1I!IUAt.s:
       'nIc~"'1I, at IIW. . 1II(Miuio, ....11" 110* tad ~It ~ fot IM~ other tIIIn
       tIKMe IisIoiIIiI Scbo4.to 'II' IiIIldlma1'" lIMfded by Ihmt Ha\-r Illectrloal. Ltmlted .llhe ..loS detallod·
        I...... lU~ject 10 their ....labUlI1 .t the· pi... of I.... l.dloated Ih""I.; All S"'ret ••d ...1eH1II to bo . "
                                                                                                           !



                                                                                                           j
                                                                             5                    i                         !.
           ir rtquired by 'he Engineer~-in../}bargt furnish him with proof to bls &a1isfa i-on that the stores aad materials to
           eomply with the .peeI"",I"'n,.
           The oo~ttactof shan. at hI;           own
                                             eKpense and witboot delay, supp1y llampU,s of stores and mnt~ial$ proposed
           to be vied in the execution or the work for tbe approval of tbe En,jlleer·I~-char&e. wha muy reject, aU atOTes
           and materials not corrtsponding 'either in quality or eharaeter to the appro:Ved samples,
                                                  .
                                                                                       .'
                                                                                       I,              1            "                .
                                                                                                                                         .
           ]n the CtlSf: of .tores pro:vid«l'und~ Schedule 'B' (he Contract-or than bear the oOit of loading, transporting to
           &lte, unloading. Iloring under covet as required. anembllng &- ~inting tl!o several parts to~etber ~$ necessary
           Md tllOOtp)ratfn& & fixIng ~hesc Ito~ &:. materials In lbe work, lneilldin,g     prep'aratory work  an   whatevof        or
           deroription ~at may be required. a~d ct."ing. preparins:, l¢ading and rht¥',dng empty ~se3 Of eontr'Inert to the
           pI....r lmIo Wlthe.ot ..y_ obai1<'.
                          . .
                                                                              ,      .. :            .            I
      .
      ,
      ,
          . 9.DBLAY AND JlXT1lNSION OPTIMB,
            lr, In tho opinion or .senior en,1neer/civil/enginecr/civU the work
                                        .
                                                                                      b dp!a~i!
                                                                                         .    "
to.
          • l)       by Rl$QD of aboormany bad yteatber, Of
            Ii)     by reason of serious joss or damage: by fire. Of                                   i
                                                                                                       !                .
            iii) by reason of civiJ commoHoD? local combination of worknien, .dtike or }~out,                                -llIeoti1•any of tho '
                 trades crup~ on the wotk t Of'       "                , ' ; ;                                                                   ,
                        "               . .                   .        I                 ;
            Iv)     by"'"      00  the part of the agenc, or tradesman
                    part of thit toDtraot. or
                                                                                   en!~ by ~HEL- in eiC':Utin.g
                                                                                      !;           ,                .'
                                                                                                                               WOlktt formIng
                                                                                                                                .
            .)       by R;UOn of      .~y  other caus¢ which in the tltm>lute    diS<::~i~R ~e:
                                                                                         of    Sr. M/'. S'f, BIC. oc,        (.:             ~
                     he II the Aocep-ting Officer of the Coiltract) ~:y()nd (be (X)otractot', control, then In any aucb cu::, the
                     AcoeptiBg Qffi.cer, oh the r«omtnendatioo of ttie ~f. B/C..:E/C (de illcher authority) may mkke r,lt lnd
                     reasonabt~ extensroiJ in tbe oomp1etion dates of the indi-v-idua( Items Dr work or the contract ~ , II, 'Mlotc.
                     Such extension which will be communicated to the contractor hy th4 Sr. E./C,/B/G in' writitJg thall be
                    ,finaf and binding on the contractor. No other claim in this re$p~ct for compensation or other wise
                     Ilawsoe'vcr h .admissihl¢. Upon tll¢ happening of any Wvb event 'CJ'~Siog deia),. thtH)ontractor sbatt irom ..
                     ediately Bi'i'1;: notice thereof in writing to the Sr, BiClH/C but sh41 neverlbless U~ oonmritly bis belt
                     enduvuur to prevent or make &o(ld the delay and sball do aU tba~ may reasonably be r~quirod (0 the

                                                 ,.
                     mU~8ction of the Sr. E/ClE{C to proceed with the work.
                                                 ,
             IQ. PATENT RIGHTS,
                                                                                 ..        .
            the contrt«or shall fully'ltRiernniry Bnar..., or the Agerlt, servant, . or em~loyee of Sf-tEL, against
                                                                                                                Any 3C1iOQ,
             cW"m Of proceeding rtlating:to infringement ~r tbe use of any pdent Of d~sigfl or any alleged patent af doifgn
             righu, .nd .hlll pay any royalties wbich may be 'payable In fe~pect of ~ny artiele/or part thereof included
                 In t~c contract.                     '
                                            .
             In tbe event of aoy e1atms being made or a<:tl?n brought 1&8io$t ,Unal, ?f any agent. or s¢rvent or employee
             of BHEl.t in respect of a~y of t~ matten afQrlmid, the oontraCtof shah immediately be notified thereof for
             taking neceuary action. provJd«f tbat payment ofindemnlt,- thaU not apf.1y whet! such infringement has liken
             pi... i~ <»mplylng wUb'the .peclflc dltcctlon.I...td by the BHBL .. ,bu(lhe eontroctor ,h.n p.y any royaill••
             poyoblola ROpec! or a.y luoh ....                                       ;
                                                                                                   I'
                 II. OCTROI AND OTHER DUTIES,                                                      i
                                                                                                  .I
                 An chiracs Oft     a-cooUf\(   or octroi, Terminal   or' Sales Tax and J{)f otl~t duties on materials obtained fot tile
                                                                                                                             : :;:~,;...
                                                                                                                             ~-~.

                                                                                    ,
                                                                                    ,
                                                                6                   •

      12. ROYALTIIIS'                                                               I·,
                                                                                    I

                     a1_
     . ~Ip.. fhed f_1Imo io II..... po< j>m'O/Ioot local rules will .,.
       eIqr ....J .,.
                                                                          ~ Cot II1II"""11, wbloh tltt ..nlt.-
                                                                                                r,.
                      "l Rmove rro.. '1..m.. situated .... Iaod whicllia • • of die a.IUI,t" au/boritleJ.


      Tht CotitJ1Iotor. ,baU at kll OWII _ _ • t1Ipply .11 tool., plollla'" ulpm••! (b.reIIH10er r.ferred .... T
      ~ I')nqUked fof tho ClO9UIIoa of IIie ...tract. a. opeclfjed In tho IeruI documents.
      14. ASSIGNMBNT OR TIlANSPBR OF CONTRACT,
      'TIt. Coattaet·,han not..w....llh. lir!?' writ... approval of Ih. A~UIIf omcer••,,1,. ~ tr~p~ tb.
       ...Ita« Or .at pari th• ...r. or ',.y,hm, or ioteMl6.relo tt any Qt par... , No ,uRlofm_ wltld"...y
      ,"-me p.yoble und", lb. Conl_ .balj be payoble to ..y peUo. oIht1r IbM Ih . . . ntractor, ••Jos$ Ihe prior
       wrltt.en approvat ,of t~c Aoccptlng Off'k»r to Ihe assignment O'r ;tr.nd'~ ~r 1UC!b mohe)' ;s given.             i
       .) SUII-CONTIlACT,·                                             .        :   j           ,        , '.           ,i                     .•
       The Oontrtctor shall not $lib-let any portion of (he contract witbou't   the1)1'ior wriHe~ approval ontbe ACC(:pling-               /
       Officer.
      U. 'CoMPLIANCE TO REOULAnONS AND IIY1!-LAWS.
                                                                        .!          ,
       The eoniw;tor ahatl oonfrom to ~he proviskHlis of auy_Jtatule rehitiqi t~ (be w'3rk and regulationS ·.nd byeo-Iaw
       of an,. IOc&lauthority and of any w~tec.and li,htins: 'Companici or Und;t talcingl with those syticm tho woru

                  _.ted
        Is propaed to be conoeeted, He ,hall befo.. making any ""rio~bn from \lit d ....,I.... 0"' Ihetpeejllco.tl... thaI
                               .JIdI
       '_1 .,.
        CJI!j>tO<It.'"        (or
                        ma6. . .d the
       "/lI$Itu.tlo.. !'tom tho S<n1~r 1l.p;i_fClvlJ/Il/C In respect
      ., - ""Iulmiby St«lute R.,.I.tl.ns .. bji:- I~w... al" I~ and pay an (ee, and lax.. iY••le 10 any
       ••Iltorio, In ....pect_.
                                   =-
                                                                    tlt
                                      <>;!!I_OS Ci.. the ~ior IlnginierfCivll. I!/C Mli"" ."",Ifylng ~ ....totlo. pr-
                                             ,he..r... and .Itolt not varY out .or '.."", varl.tion unal hd has _1m!

                                                                      i ,
                                                                              Tkel:ontraolo"'haU be bo••1! to gi.. all
                                                                                    p
                                                                      'I "              ,
                                                                      "                 ,
                                                     ____~__--~I--                      :
                                                                                        •
                                                                                        ·
                                                                                        ,
                                                                                                                                           ,    I
- - - - - - - - -_ _ _ _           ~   _____    ....
                                            ._."_ c ...______                                       n.          .   '   'I
                                                                                                         LdL~ _ _ _ _ _ _ _                _JJ,




                                                                                            •
                                                                                            ,
                                                                 CHAPTERm

                                                 PERFORMANCE OF 11IE CONTII.ACT

             16.     Securjly nepo,U

             i)            Sewrily Deposit should t,. ",Reefed lrom ilw suCOOlllful teruIerer. 1'1w rute of s-ily Deposit
             wj]I be      .. bdow;                                                    .

             0)            Up'" Rs. 10Irurns                             10%

             b)            A!xwe Rs. 10 Iakhs upW Rs..SO Iakhs           Ilokh+75%ofilwamountexcceiling Rs.lOlrurns.

             0)            Above Rs. 50 lakhs                            41akh.'l+ 5% Qfthe tlffiQUnt ex~g Rs501akhs.

                    The securiIy Deposit ,""",ld be oollected beibJe ..... of61e_ by61eOOlltractor.

                    Sooutity Deposit mliy be ft.tmi8hed in any one of the following fonns '

                    i)       Cash (lIS pmnis,.ble under ilw Inc<>m<> Tax Act)

                   til
                   ill)

                    iv)
                             Pay Qrdcor, Demand DfatHn Uvow·ofBHEL.

                             LoooI cheques of   _ed      banl:s.·subjoot to reaIizalioa
                                                          ,
                                SewritiesavailablolromPost OfJicoo...ell ",Na1iooaI Savlngsc..tificates, KiSon Vb
                                Palm de. (CertiIIcatos mould be held in ilw ""'"' of Cootnro;,r !ilmiJtIing lhe """'"'Y
                                and dulypledgedin r.vour ofBHE!.. and di!<lmgOO on the back)•

                    •)          Bank GIl""""", tiom Sdwduled Banks I Public Fmanoia! Institutions ., _         in ilw
                                Compani", lid. subject to • _        of 5()% of the loW securi1y dqrosit value. The
                                bal"'''' 5()% has '" be _     "tho< by _ or in ilw oO!ur _ of securi1y. The Ilank
                                0 _ _ shouldlum fue~vnlufll!lEL.                                                    .

                    vi)         Fi.>«<l Deposit R=ipt issued by Sdwduled Banks I Public Firumciallnslilutimls "" deli.ruxi
                                in ilw Companies Act. The FOR Would be in iIle "'""" of to. <>«ltt>c!or, AIC 1lHBL. duly
                                """'''ll''l 00 ill. bade
                    ,ii)        ScQurlty deposit em aloo be ~ at. the rate f)f 1m from the running bills. However in
                                such ""'" at least SQ% of 1he Seanity Deposit Would be oolkot<:d !><foro """ of 61._.
                                and the balance SO% may be recovered fratn \he riwning bills.

                    viii)       BMD of the SI.lCCeSsful tenderer shall be oonv~"d and Idjustcrl ag.airurt the security deposit

                    Lx)         The securitidepositshaU notcany any~

                     NOTE, A=;>hmce of Securily Depo:rit against 51. No. (fV) and (VI) abo\~ will be subj<:<t to
                   , hypothecation (ll" endorsement 00 the documen.ts in favour of BHEL. H~. BHEL will not be
                     liable OCrespOUSlole in any rnanner fur 1bo co~ion of interest orrenewtd ofthedootunOOts or in any



                    -
                     01h<r _     C<Jtl1leded 61crewi1h.                  .

                    Se<:urily deposit shall not be refunded to the cantractor excq:rt     :in aoocrdsnoe with the talhs of thQ
                                                                                             .
                    ii) The !kM,fUnlt may w';.. 1he s-ily Depo:rit in ""P'l" ofPublic _                 UndernIldngs,
                         particuJ.rly on a re<:Ipt:ocoIbW.
"                                                                .                                '.
         ~",~~, ab-a1t It<'It be teSPot1tibtelor any lots o~~rit1~ due to ,iqoidat1on ~r an)' ather re"S!)n whatsoever or
         thy depKclation In the value or the Steltrities wht~ in tt,eir charge or for ant lou ortnferut thereon •
                                                                                                 ..
        JUl ,All eoml"",.I1"" 0' other ~••" of money payable by the Conttactor t<>j pilEI, untltr the lerm. of thl.
        ·inct, or Q!Id<r ••y othe, "".lrIct with 8HIli., !1I'ybe d<duct«l r-the ~rit1 Depotlt 0' ...IJIOdby the
         • '.!llsocu. or riom tho 1.......1trill", t......ftom or rrom .oy "'/ll' ".k'ch ma, be du, or rna,
       . ' I~ iI!O e._or payable ~y BHBL. on toy ....... ".IW>Ve/ ...l1li1 jill, oonlraot or a.y olher 00"",,-,
       . 11k, 811J!L,h4 In lb...... of lilt SeoiJrily ~poJIt          bel., ted.cod by ...... 'oI'.1K'h deductl.. or ..1....I'ote-
         tMUtlftI._
    \. . .101, I.e Coftltt_ .h,il, ,,11M........ dal" t......R... make 800d I. cash 0' ,,, """tltl....dor!ed l.ar.,...ld.
                                  ,be Securitv 1l<mosI, ha._to teduoOcl.
                                                                                                                                                                  .,          '




                                                                                                                                        I                         v'


                                                                                                               ,                       II                             I




                                                                                                        ~',!   : .
     11. ORDl!'RSUNDIlIt THII (lONnACT: ,                                                                  ,
                                 " I                            •        :
    All ordett, lIOIiw etc. toht "Yen ••der the cootra¢( sh.U be Inwr'ting. type            ptfn~oll'.ttd if ...it by'                          "",'pt:.f
    .esls!eIOd ..,st to tho add,," "",. 1ft ',6. tendO" of tht contractor, .b,1I be de<med 10 baV4'1leo1/ iIof1'l!d on
    tho date ""•• i~ ill. o,dioary ..."",hey would hIVe beend.n......d ;0 him,
                              (           • <.-I' ,                      "            ,
                                                                                                  i ., ,               ,     ,1,~,                                I                .
.                                 , le,     .'.       .'.       '.   •                        -                              I                               '            '

    The ...t".'or shall"iIr~.t MtII~u,:d.III1.11 orde.. given to him,,!
                                                                                                                                                                                  .'
    ,I', ADMISSION TO,SITl!:,;, ' '
              .           '   ..                  "" .                                                                   '/
                                                                                                                             ,                                        ,,

,                                                                        tde pos~eUrOtl 1,1" :tb'e ',Ife dhlC$!
     ~ contrtmor ab'alt nOt cnttt'Qb (titMt t~trfol iA~peCtion purpo$d~ 'or
     petmlUod to do to '81 .... Sen16t flbglme'/.Cl.vlUI!/C. The ..,;Uo., or .h••I.e     ht .oc.pled by I""                                                 '0
     O>b~ctor will ~c\tiijt,d~Ud.iMtki:d·itDJ""'I' pl.n, and: !he ...."'otot will' on' .. ''''''''a. ht
     allowed to ..i<nd hI. 6P,mt.... ~tid U-llea<.                 'i '
     if.... COiilRctdi <hil1 lm:vM6; ir~lt, of ~i,;d a. 'i"':tlti; ,~r'fy a&m                                                                         IbmW: "lid ~.II l!lter~, '
                                        IvqdIted frdd. '!lme t. '"ll:Oe.llubaU tlke out ltId, tt.ihwlir thU6/;ei., ,
    ,nl6d'!I:r.. nd maliotil.1hc ..... Itt
     rout!>   ""e.   ItO i _ reqlllr<d _i", (he;';" to Itt origll.il",",d1\iod~             .' ',;
     T~ 'soliior 1!i.g'~'ICivllfl!/C ,ball bit.. ~:,,( Ih•.eut! ;ofw' wli;~, ("hQih<i"~ ti.1 t;;~'iv1tI. the,
     WOii 10 ifiOl.I.dftadl ~.t) luibb                                                .U. '
                                                      """telilpoiai!.&dily·lrttb lb. ''',:uilOn'.r t~" oriilndl'w,d: 1M'
     _~cIi.t'P'",,,U.,..bl6f..mI""!or till!1pu,p.se. '" ,'"                       . . , t.' t·              ,


      BHBt, twervef iM right of t.kint f)Vet, Ilt any U~~ ,ad potJion or.tbe.lito yffiicb they may lequirt and
    , tho ",.1"""""..." .1 bis own upon.. clea, .... portlcitrotibltb.! No pUbtogiapbs '.r I*~' .-Ue ., i>f' .be
      \!IO.k,'" ony p u t _ shall be' t.~ publithed or olhenlJ,q.ti"",lated, witb.. t lhe prlo",ppto..' or
      the Senlo, Bhginee,iciY;II!!IC.                  -                                                             'I                          " ,, " , , ,,                                   ,.
                                                                                                                     1 to                                '                              '
                                            •                                                                                j                  .                 ,

     ~o ,~ approv~1 $hall hO~1; . ex~mp~ tht ~Jltt3ctor from, eJmtl'lyf~.: with aa'}' .t~tt1~otY, ~rlsj9ns in
     regard to the (akin, and publicatIOn of such pbotGgrlpbs.
     Blh~L officlal$ (!Qnneq~ with t~ ~nt~act ,han ba~ the rilbt ~f                                                          try   tbe'.ite at        .n    ti~~U                 , . -"          ,
    , Senior lln&i-rIQvn/Il/C /baU ha,.. lhe P,O"'" I. "".l.d.                                                 [,om~••it•• ny-pet,.h wh.....~mlS$lo. (h~J
     ,lnay, in bts optnion, be undesirablo for any reatbQ whatsovcr.
                                                            ,                                                        '
                                                                                                                         !             ".
                                                                                                                                                ,
                                                                                                                                                                  .•
                                                                                                                                                                   '
                                                                                                                                                                                             :

      19. CQNTRACTOR'S SUl'SlWISION"
            , ,                  .                                                                                                          ,    ,           .;
      'tltf Cotttra<>ti»' .!jan ~Itl!<, Llm..tc ~..'Iii< ."""'lio, of .b~ Contra<t Of 'h3l1' appolilll eompeleaj Ag\lbt.
      ipPioved I., tbt_ ~VIIII!IC to aclln hIiI u..t6.                                                               !' "                                    .- i "
      Tht Contraeto' ....nemploy on E.gln..../Agent bavlng                                          .ile."
                                                               i '~rtt.r nach.lo! ~fviI ,""llI<Oti",'
      from • _ _ Un~"" ••y _                     witb • COntra" Val .......edl", rupee. I 11Ik•• aod ..vi.. ,
      .i~ "bl~ 10 CIVIl Eo,loeItI..' nOlO. _."", I!MIiie pri work wllfr i .. ':' "" \1.1.1: .~~

                                     I.
      at. JIQ,OOOf· ,1Itit tfot i",,*~ _ tWo I'~l<bl. ,':

      jIoi"liI06iiff~""'oIooI~""IsItiOfJ.ior IM'~ l!diIiWtMInuc ,~.
                                                                                I ' '

                    ~f.AclIaI t .. aro;...id,Miin tIoi to........1ry if the ~... II III'
      nO . ,. . :<II'                                                                                                                                                                   'r
      91" ~ ~ <II' iIi¥ ~.Jj....."" ... of .......,.. iItt iI-ork !OlIMil,it~ ~~iho
       titltlHliot~IMMI1f'                            ,                      '.           ,       ,".                '             '
       .,                                                                "-       "           '
                                                                                                                                                .
                                                                                                                                                . . .,.                                . '::
                      .,
                       ,


                                             \
                                                                                          i!
                                                                                          ,
\ , due tlhlll ",co da,; os ".IIO~le Engineer/A•••, b~ppoi.i.d ••d II.. «).J~ct9f 'hall b< held '<:1Ipon.ible fot
     lb. delay ""used 10 the work lnd no "'e••lo. of U... on Ihi> ."", •• t ,6011 bn ilv.. to blm ·,,·,tlpulated In
   . ..ndilion (9) abo...     . , ! .                                                                    .
                                                    .                                .    ,
       Orden glom to 'be conlraelo'" ....'I••gl .... ' ••• 1I be conildit,oo ',to bav. to... me forea as If they bad bee.
       ,ivt~ t9 tlHr contractor himself.

        Thec6otrtctot Qr his .gent .hall be ill "Uend.net at the sire du~inl.1l woi~it'18 bouu and $baU.uperinttndto·
                                                                             ,            .               .
        ted the C!xccution of work wltb IUch additional aSibtaMt in ~oo trade at the Senior e1'l,ginett/Ovll{B1C trlay
        c<l4!\der _~:                                                        .
        l)M ..ntraoto, or his &C!lredltcd I . ."t challattecd, wll<n uqulred and wltllllut making any .Iab. fo, dolns ...
        elth« the omce of the Ilngi ....'-l...ob.rge or the ""rli·o!te 10 reeei"" l""ruOtioDa•
    . T!teSonio; tJngln..../Civil/llic   ,h~1I
                                        hi.. rutfpowe". and wi,h.u.u.I••                 i.l· ~ny
                                                                                      ;....n. to require tbecontra-
      C!Qf immediately to Cease to employ in connection with th1:s cO·nt11\Ct .n~ agent. scn<ant or employee who~
      e6atfnue4 ~loyment is, in hi. ophdoni uruiesi'rJ.bte.            "I
, -)    Tb~ OOntr~or $han not be aUowed tn~ oom.pen$~tktn (11'J this ~unt.
        20. LABOUR:
        Th¢    coUtl1lCtOT shall employ labour in sufficient numbeu either dire<;tly ()f throogb $Ub-eofltriOlOU to
        niaJntah~ th~ required date of progress and of quality to ensure workman~hlp of the degree sptclfjei in t~
        (lQntract.M to the .aUsfaction of th¢ engtnt«-in-hl.arge. The rontr*clot &halt not,employ in oonMCtloft with                      I
                      r.r-
        tIJe ....-u ...        who hI. n.teompleted.hlt fift... yUI'11 W'Il'!',                          '
        The contractor shaH furnish to the; engineer,.jn..marge at the inmva~ speclfi~N,y him. a distrihution return of
        the Dumber ",ad description by tflldet of th$ work pwple tmpl()yed on the ,,<boo. The contractor shali alSQ
        IUbmit 01'4 Cbe 4th ..nd (9th of every month to tb¢ engineer~jno(:b..rtl= a t~ statement $howiu4 in retpkt 0( the
        ~ ~tr'Of the prooeding M(lRth,'.nd the first half of' the curr¢nt mOflt~ (~) tbe iu:ddenu tbat OO(urPd during
        the saW fottalght ' sno,wing the clrrumstan<:es under whieb they ha91?C~,a~d the .extent uf damage .Ld injury
        caum by them and      em   the number of r~malewnrke~ who hue, Men ~Ho'fI>d mat~itj' benefit 1$ 'pto'Yided
                                                                                               .
         in the Mlt«nity beoent A~t, 1961 (lr Rules made thereunder and th~ &mOUltt paid to' them.
                                                    ,
                                                                                 ,
                                                                                      ,
                                                                                         , .
                                                                                           '                                  ,
   _ The oonlrac(or lhall pay to 1abour ~mploytd by him either dIrectly orlthr~h                       ,ub~ntraeto.rs   wagC$- not lets
 '-l)tha", fair wa~ as defined in the:' eotttuctor'siabouf regula~(H's.      . :                                              .
                                           f       ·                                           ;

         l11e.o:,ntr*"tor shaU in resp«t of labour empl0yt4. by him eilber dilceUy or Ihrougb or sufj-ronitaetors comply
         ·wltb or ..... to be oompiiod with
              .   -        . .
                                             oo.,,.,lot'.
                                                        Lo.6~(tr lJ.eg.la,kiM te@ard to
                                                                 .
                                                                                 I.
         n. cootrtc!or mall comply with lbe pro,blo" of ,be p.yment of Wag" ACI. i93~,; Minimum
                                                                                               ~
                                                                                                       In
                                                                                             ma"ers pruvld«l ..,..10.
                                                                                                                    Act.
                                                                                                                         ,    .g
                                                                                                                             w'
        ·1941. Employora li.~lIIly Ac!·t9la. Work ...n', Com",,",",i•• ACt: 1913, . Indu.!ni! m,put" A • 19f1.
          Maternity Jlen<t!I Act. 1961 Ina Mine. Ael19S1 OrlO1 modiflc4!I&.i Ih....,,,( or ony ~th.r I,.. ",l.t! g the"
         to.n<! rules and th... uodor from dmet. time.                  ,I: I                  .               ~
          tM Contractor ,htlU ~ Hable to pay "Is contribution .. nd the emJ~yeet' co:ntribution to the Slate naurame
          Scheme in ~t of aU l-a:bolJf employed by hi", for the elt~ut~on of th~Contrt()l. in accorJance with the
          protisloa "'The Bmplo1«Su State rnsurllnct Act. 1948" las: atnel1dc~ from triM to time. In ~ase the! oontfa~
          010( rllb 10 ..bonlt rulld.t~II' of hb i=unt.r labour ~m~loyed .i'd lbe ~.~!rlbu\b. rayabl" the +ngl"!,,,-
          I ............n........ rrom tbe run.I., bill. of ""ntraetor an Im.ti.t of ....,Irlbull•• as .".'sed by IiIm. Th,
          ..,...... .. ....,.,... ch.U be adjll$\.d agat..1 thelelull eonrrlbuCinn ral'lb~ for 'mpl.,..~,' SIal, l~ .. ranco
                                                    .                                              '   .
     T/I6·"'«I_.ftH:b......baU ... J "'I'Oft bivlb, bet~ .,ade by In ....peo«lng ~mcer .. defined In Ihe conlll·
   ) ofIIr' fll>otIt ftI.lttloM haYe Ibe ........ 10 deduct I'rom tbe mood,. due to·tIj<: eom....., aiiy 10m nequl ..d or
     ofj!Ifit'1ed to be ",!alred r.nli.klot 80M flit '".....ltered by I woiker or ~br' by...... n.r no.·rulfll_t
          .                 or lilt ....ntet ror Ib, benell! or ~k~........raymo••f 1'.....r of dod••tlon. made fmm                       I .
                                                                                        .
                                                                                        ..
                                                                                                                                       >-t,';:...
                                                                                                                                      ~,
                                                                                                                                              ,
                                                                                                                                              ,
                                                                                                                                              ,
                                                                         1q             i!                   •
     hi. or 1IIelt ...... which ,.te 'bot justiflod by the t......       .,,;~ ~ .Nio.~bser..n'" of tho ..Id <j>ri                                                        .' ,
     cfoc·...bodt &o,uktlOns.· ", " '. -                    .      ~!1;·. :'<~.
                                                                            'I -        ;•
                                                                                             '"           _';'f,r.,~,1       .'         , .' j'I'-                 .H"
                                                                                                                                                                   .
      The ""_"" ,ball        Indemalfy tho BRIlL "PI\I'! ••y j,ay_ to lie maok Under and (,·~twvi.Jli·~'
     th.IlOllu'.ti...·.lill<tald "Ilbm pkJu<ll<!o, to' LIS 'rlJbll.I>I"'.. ~'"fy f_thl, ••b·_traolcn, ,,·".t:
     ,In.!'" ....t of tbe eootraolor ....mitti.' • ok<ault 0' bnltCh of ,~y .r lit<: provlsl••• bC                      .,;~i..;·..   'hhr;,'K.Ll.i'
      ctorl' {about iI/iUlaa• .., ' .. Amended .!rom: time to U... , or f..~ishl"',                   '.1
                                                                                             'Inl'ortl1a!loo,l", ,Mmttll", orr
      filII., loy r.,in!R"';II<t/Sllp'.n"d."tho pfovl.lllns of tb... iOgutatlom,,,hloh I., 11111<,1011, ,jd""moI. th •• ,On ,',
      the "'Port or the Impeell., olllem al defined In the eontract.rt'Lahour 1l.,.t.tlOn, tho co_or .bIIl.'
      without proJudlco1O any ~ lIablllt,,., .... tb.· BIUlL ••..j! lIO! ..ceedior-io Ri, ~. as Uquldaft4

                                                        I.
      '~ to!' 1.~'W4tt &iOal:Ia :/If llirllllllilig; m~ldnt. ~ballCllJs, fllliat InlItWdUt lti~ ftlftIIf6tll U
      lIIay ho rlltcd b,Ch. llu&l...r.I&Jbli..~·ti.d tho ....t "r"lll'o~actiJt'hu.r.bll hohllt!lfli,fll,I. ~
      t'" lI.uldated d..... M'l'''' eitb'1i~ '" 14, SO/- per dOl ff.r caobA,."r okr••li "'blOC! t......!mOm
      ~prtht"'~Um ..ted~ ~bn:tit~T[t~. 0' ;" *'H!' I ~;t.m'n. 1.<q=. .._)'dlun"'H1~4"{~r
         .....    -<  ,".     • • • • • ~.,. -:.><,P ....... · . '':',..•. !!G:!i'  I"'; .... t'l .,.>:nj~' ·/I~··· :,1lr't"';)ft

      The ll.gl_''''n.cba/p.";n4t1 dcduot such alit.... from' hllli Ot,Jijlfll)' 1I\!tJi!!lt ar IfI< \lblillietin'W6 '~I
 ,    Ih... rue to tbe Weir.':'; fund 'oo!istll.ted ,under, R.g.~~p,.." ~n' de<;bjo~.•f.th,. n~~?~;,101!l'r:mt •
,j     ,«peel .ball be ftcal and blndl.,.. ' 1                                                                    ,           ,~ r
                                                                                                                                                                                1
     -MODIlL ItUUlS FOR LAPOUIt WI!LFARE:
       • .                              . • '           .

      ~ ~tt. ~~il·it h~ own ~~~~~~,-•.with «'~seto~' oompii~ ~1ii. modM- a~tei; t6r"UboV ~
     woir'' ' :' ..dod' tli'" ~."';" "" t...mod!iY'o...;'.rmefttliOm'l.( 10 ft' ''It.f''!1l\~'
     ori.caitb a~;r Oia:;:;~ .~ni:ry arra~u ,tOt w~fkr' i#'~ ~'~h·.~ii4~ !!~ ~ ~ ~1~;
                                                                                                                                                    'I"" ,.,I,r,
                                                                                                                                                    .                           r




     "".. Ut. eont....., rail, to ",ake .""""""••"' .. ,r.,.,.rd, the Th.s!neiir.ja-ehtrge J/,.U Go eJdtIt<I: III &; 1& '
      d~:~~~~r tbt,cijstthe~ftom th~ ~trt~~.                         '    -r'      L.                 .   0, .. ,;',   ~':, ~i'.• : .. _,       'b,:          .:;:~-:::."r~l.
      SAfEtY COQE:                                  "'                     , ·,ff : , ".  .". '1' .- *1~ , •• ,  ,,, liJ"(-'

      'fbt t;;dt...!ldr 411.11 iiI ~ll.d expcd;'; tmnge, for tlit oiI'Oty!~IoVI;l.M i~l'PPe~d<id'lII'lhai\! ....~uJonl·                                                6,·
      .~'~u!rod by tM Edg!k""'.ln.t'll~tli~:, r. tt$j;iei ot.n 1i1OO~tE''~t IdW1I!i!dt" '''';jI!dytd rOI ,elt:drlliluli'
      ';rJrii. .,o,!c1Iadil . ,h.ll:j;,O+ldb 1 '411 (.<!llif In ",oW!octlon t .mIlth. tn ~~'th~""lr~.t r..lt. fd ...I<!
                                                           ...
      arra"",ments and p,dlrd. nbee:lniji 't.cl6d.j,ij afo,mlG; the' 1i..w:fn.eha',g6 .hlil lJlI ~nlllted'io do'ilifM
      ~Ye(·the~t\h.erefl{lfql1i~hrf,Vt'\ttaxtor.,                 ,,Ill""     f                     :1,',,1 , : ,          .\

      Foll.", to co",ply with modellt~le, fo,. ~~., Welr~!i:j' SiI\!y,Ood.; 6/ of llie plbvl$lodll,t!:httl1lt '" ,,At
                         to.
      ... ~deot•• 04 i'~nt,Jlf '',je,01l1, ~oeIj~ to r.....1e,...'ie'l .~.II m~ke, t~eeo.Ita<:!O\". l!abkl"lil,Pl1 ,If,
      the" JlttllL, ",i H'l"lda\ed ,d~"'get,l\••mount ••t ex""!!!i"" Ra,$W- to!, ...~ de!a.lt at, inamldl,. I~
                TO. .....1.. or ClIo 1i.&I_.in-clJoI,e I. _ 011«0" liaicd o. _ttl rrOm the 1",,,,,"0,
      ......... l
     ',0_ uil!ftll6\till iii. Cii.tiact<k', LtIliMr·Resulltilm,., ~rItd to tbdI<",,~.,.iIItll ... ftnll aiIIt
               ,ltd
      COatfaCtoi.!                           ,.' '" '                ,;..
                                                                                   m.,
      I>!nalita dea.u6lh t.i ffilovery bf 1U<:b" Ilquldalob d.m.~· be mt.du irorllltlj'~!!l<l1lDl payble !1O'1m
                                                                                                           I,               "I        ',_, '.1          <;   <I,        '.

                                                                ;'        '.:       '" !n-!,.,     . It
      21f1 •. W~~t,          >. i " · , ' , .                   J.          "f      f..!UII .... , :,',
                                 •                           -   "                                ,                               j


      ~ "e;;"",ctO; ~It .Ii... );. hb \Ood., a.d piO~~.~ Idtc.>lhn ~I<f ~I~jh.~tko{ 1I~
      . 1..... u.. ,..rk,. ~ wltlt.l\plp...ed fiul.,. .. '!""" ~ C'Jr-!~~ ~ '" ,,,"lor. reqJft/
      t ......... proper Iud ....plo.~ 0( Wlt.dor I" pal"""'"!'""1Iocted ,,1tIl,!M ~ '".".,,:         :','
      J~'~     ...-'.;r.  pi4Y1tI.a \ _ ''''it.!J lOtI4et .......l'"t.t~«_·K,.,~ by lIliAti
       H,..y aecttl<ill"u..t\Io4;. __       ..m'"
                                               loppIW .... ... ~H6L                          njopI,.,..,
                                                                                         Of!llfl!lt - -••••
       ""'.tt II.... by u.e Sontor 1lnIl_/OIY1I6.. tho oIcur ""Il- '1'I1Ie _ _ ""''' . . . .1     !III.,.:" 'N'
       MMt,'_ 1Ifft...-, -hd'Mflfn.: 'M~_ M d8IlYllVIM fila_let J reod.trtxlat hlf OWIUMt.",1TJje 1e<W.;    ht-
                                                                                                               "   .             -,
                ,....,.. J*,..,.:   ' ..._       "   !   °ILF':"'   '. F.
                                                                            -'t,   ,v
                                                                                        ..4-:~
                                                                                        I~ .... "t, '
                                                                                                        'I'.   "             f                           -"




    --
                                                                                                                       '0,




    "=-                                                                                                                                                       -   "




                              23,,_ ilJEFlOC:'l'S Ll:Al3!IiITY Wl'\lOD
                                             •

                            ~eoontra= shall J:>e responsibl", to make gOoil
                           'and remeCly "at hl.s own expenses wi thin I!lUch period,,'
                           , .... may be sttptllated by the En¢peer-in-charve I eny
                             de£<>et 'Which may developer rnay be notioed b,,£=e the
            .                ~ .of the -maintenance wriod of six months, he~no
:   --   un," _. _ _                -~e-ce;;t1£iea' aa.e~·-"fC!aopI"'=!>m('l·,-:int.i.I1U!ttiOO ." ... ",' ..•.._ .                    ·".H
                            of 'Whi.ch has been sent to the cotitra01::Or wi th1.n seven .
                            ileys of the. expiry of the said pE!d.od by a letter
                            "sent by "nand -di!']±ve:ry 'or by n¢sterea post.           '.. - . .-                                            __   'T"




                                                                                                                                                                      15
                                                                                                                                  \\                                  9
                                                                                                                                                                      ~




                      •




                                                                                                                                                              "


                                                                                                                                                                      'f'
                                                                                                                                                                      ,    ,




                                                                                                                                                                  ,
                     ,



                                                                            11
 22.  ~RY WORK.SHOPS, ,STOI\IlS IITC:                      ..'                                             1
 tit. c....-...11, .0rin(·tI.o _ _ .r tho ...rI: provld<, 'ereot ••a"",lotal. at                                               hit ..... .x.........11
 - . , IIIolpOI'ary _bites><, 010,.., om... eto., niquit<d [<>f 111<1 prope' .nd effiolen' executlo. of the
 ....rIc.. n. pia ......, • . . , and fi'OCtJon ofthae bldg!. ,h,1I have the l.pp,...1 of the llnal •..,.ln-<l!••g.;
 an4 tho: Coatraclor lbiU at ·.11 times' keep.: them                            'th'y
                                                                 and ta a clean and sanitary condition to the trrtire
 Citl.rIdH""r the Bngin«or-j.""'rp.                                        , ,
           ,   •                      _.      "                                             _         •     f                      ,      •
 o. compldloo of the work ,II ,uoh temPo,a!,), building...'U 1>1: cleared ",."y and the ,ile restaled' and I<ft In
 a ' . , ~re .~"r.cdo. of Ih. Bnal.ee,·ln-<b.ul!",
   .!<an One! Udy ..odlt(on to lb.                                        i                               .
                                                                                                              .
 il. stow                AND    idATIlRlld.s ON srtli:
                                                                                            i
 ;'0._00<1 m.~I. "'Iul~d fo, ,he,wotk.,eco be depo.lttd by ihe Contractor' onty in placet 10 be,
 lbak>l,ed by tho Boglniet-i•
   ,                          . .    ..,har". .            "


                                                                                                            .
_ W~ blaecordan(e .~th 1M OOtittaet .tipulations certain Start" and MAterials (fot incorpotutlon. itt (he
, ~) ate to be iuued to"the <?ctJtraetor by tlie DUaL -as detailed                                        un;"
                                                                               Schedule'S' such limes Wii.! ,be $0
  i$S~ only '!1 'he "~t r;equ'rcd f~f ltic .:Wu.1 to~pldion of the work •• ',upUlat«i in the Contract. The
  d""'.lon of IheSenlor ~~/CIvllll!IC ....",1., tho quant/Ilea ~be ...0«1 .. abo.. 'hall be nod and
  btfMti~g 011 (he'contraCior. For anY,exc.us quantitJes eotJSUmed on the wick thdrcost wilt be reco\'Med from.
                          ...
  IbO C:o......w~t ~ltl", .. te. Wbleh will be 100Y.: (Huodet<d per""'I)~ tlta. tho ...... rates of the BH~l.'
 .fa "",hi 10 III. _terlit. illld It.... whlch ...y be issued 10 lite co tactor                                           by BHIlL the CO._to,
  a:..tI aM iM Entkw«·tn..eh4t,e rea I () n' b. e notice '(1 writing 'of his
 and inatwlS and on the approval of bit demand heine notified t
                                               ,
 ....rahgetMt\ts for drawil1~ tllt~: Such $f<lres IU:ld materials .haU be t~mpotted by Contractor at hit awp:
                                                                                                                .        requiroment1l of ,tueh ·stores
                                                                                                                    him. 1u:: ,halt make imtl]~iatc-

 "'*'*'    ditt.¢t from the place of isstl(' ,to the site of the work, uok$s pdtlt tniUtt1 approvalls obtaiMd from
 1M EngCoe¢(.in-chargc to tel!' them to a itOre ar worKsiu)p elsew~re. ,                                .
 The ',Contractor 3hall Ilatt    j      t<J       build • \\.--eather·proof shed for the./brage (If ccmet1t                       reqlJi~ed lor 15 days
 "'",...ption of tho worl:.                                                             .         .'        .I ,                    . , :.
                                                          ,   ,                                 • j                                           I
 BHEI. otlJcirtconnect«i 'kith the Contniel shall have the power at any iil.1Se to in$(t«"t and eltamin6 any stQru
 or ma(eri<its icttended. to b¢ \fsod In or on the w.orfc, "hetber on tbe ,ite ~r )u afty r.«OfY or ...orktb~ or otbec                                    ,
 plAee ~ looh ttoref or -materials are being (abrica'~ or manuractu~ 6r at any ptace ,where th<!1 so.mt: a:re
 tytng and the COh~ractor shaU ,tve itect~sary (acilities for such i~ion ... examination.                       +t
  Tile Bngi_-in-<h.... Jhlll lie ••tl~ 10
                                                      .
                                                                        iI...                              ,
                                                         I,,{j ma~' or in; slo,es or material, .uppittd by Ibe
                                                                                                                '
  Cc-.tot .......h.1I provide at hi.....n ...,.... &II laellilies wldCb Ith. J!ngl ...,.ln.eba'l" may toguire r.r
  ltits ...__ IT It lhe dl....lloo ,01 tho llnal"""r.lo.ebarge.n ld~nile~1 expert ltemplo"" 10 m,lot 'any
  • •·btI ...... ~ slU.lI be Ili>rd6 blIlhe «>iltras:tor .nij If the 1001 dlscl~ Ihal the IIId .tor"; or mate..,,,
. • .. not la ~ lfiltll tho pfovlllotjl tho ..1)Iract.        or     ,         j           ,            I
  .'."                     .                    "."-                        t                        :
  ShoooW tho lrotdor Bnalnee'/CIvllfll/C ...sld.. 01,n1 time during 'tbe 0011$1_. or;....,.nst'Ucl""'i. on prior
  to . . ~ ... tho 'MAlNTl!NANCB nRIOD·. Ibollhe .10re...1 inlterltl. pro.wed by I~Ll!.ttaotor
                   .r,
                    qullty '!'ferlor ':' I/I,t                               ....
                                                                   toGlr".ed r
                                                         or oI,~I" '"It I......""... with the~Conl'l<iI'
           rdpor;t........,die_.
  aft . _.......
  (I.                           ofu,o $enlot ~aI~rltlvll/llfC~iII.bc !IoII.nd "'!DclosI••).ho .traolor
  allia .......... ~ friml the Sr. B/C. I!IC aPeelfylng the: itIOr<o             ",mplained or. not wltb·       0"_'"
  llU<IIoia'" \lao _ ...t 1IM,'1NOli ~d, pu,"", ~1Iod r.ll4p'1!i Cor. forthwkh                     • ,he
                                                                           ..
  _ _ . . . .It ........ Ind "",orkIoOlhet ~.nd aultOl!/e ....., or ...~Is.t his ow.; .......... ;
  10 ....... .wactlolt ... \lao ~,I!/('.I!/Cand In the lI'I<Oforltlt,MIl",lo 40 .. wllllIn. petlod'tohe
  ipietIIIod 1t1 .. Sr. ~ SIC lrI hlf ......tId .rormld.' tbe Sr.1ljC. E/C.!tar ..pia.. wll/Il.• ot,",.. ~ •• ~
       .       _..          ... -.,. .d.__ ._.......               ~"    ,-.-._ ............ _ . .                                     _ ........   ~.
                                                                                                         ~2                     !        ~I             --

 II,,;" or m.torl.1s wbkh ,b. Sr. EJC.IlIC ,ball h:"           pr.~!iIl!ljl~IVik""Ii<!6 ~r
                                                                         to tho &.ltfltttl("lM
 Im,lutelia"", ptriod tor ••y. work under ChIS OQl••I.. d~. will bula lI\onth, r",m th'd",! •.f J<
, W.mj\ltiloli.6r~ p"!~~!'.',~,~~,~~~Hg o\tt MB.Il.I!,~'                          ,:'d'," ":' ':~' ',."" .",.,,,j.!;
  ",n.lotei and itIlte,I.I, broutht to tb.lit"bal1 be<om•• rld r"";tln the !~:.~~.l:f'~:~i:~:;a:
  be' "lIIo"'d,fro!llIbo,,!I.' ·Vlitb.~t·th. plior ..,iIt.n .p~rtw.1 oT t!).S.tJjor
  tho work Is finally compl<>,;d tb6 Cont'!"'.' ,hall at, ~is aVin ,xpen$O
  !uryl•• &tom tnd ",aterl;l. orlgln.tty ,uppll<>d by him .nd upo." au"" IOI11Ov.l. the ..me Iban
   f:J!cilil\~ tHo 'pllltl€1ly ~t'~l!ilfelbl, Alr·stl.I!L d"I'tI'ttOd hlaf!il-1tlllrill,~ 16 &rilh!~t';llIrI!!f "~~~
  6thi., In tbe wo,k and whlcb, trlakllll\ ali•• U nce' rbt tetI~lih~rc ,mY'ild1l'\dl.{6'I 'W~iO;I'
                                                  ....
  completion of tb. wo.k bee... Inoorpotaled of fixed. '~II ho t!~u ••ed by tho Cont'~ct.r pt~l. 'wl~-tliM
  ~ tlie   pia"" of Imle, •                                                                              :                  .'                                          .'
  ");11,                ':'.        ,':'      :.' ',"":                  ,1: :'.'                     _ ,,'                     :' ...    l'           "}', ..• j_., ~Ir"'-"t.!'l·'·"
  CredIt torsu,p!u& ••d/or material, ""urn,d by tbe c.n,,,oI., ':' ~Hl!L will he !I..p.",!>" blm, al.
  based on the- prcvaiUng ml.rket rate but not exceeding that at wllich thuald stOfe$an::~":"~I'jrl!;'II~'~wt~"'~·::~
  iJtttel.l to_hiln but dut: ~jderati()b' "btll be given tbe ..UQWaMC claimed by                         '0
                                                                                                         .
  d,pr<claUon.,. dlm'''' ,elforOd by tb. 1I<>t"S .... /....!'lm.1s whits, in th, "nMy
  t,tgarding which th: decision otS.r. B/CIEIC shalt be ~~l.and cfmdusi,:"e. " : , __ I - '. _ .
   II. In't•••pibioh of iM Sr. EJt;irJ{1::. (Viliicb ,hall be Anal • ..{ ""ncluMe) ,.,              ,..
 . J!j.~ elliitt during tdttt'"=t oflhij \lIbtk ., afte, clJnlpltll.~"r ,h.w.jtk .,hllot .
   &I.ltto,o,. btcom< d!]!'atta'ib JuCh tn' HIt.t thd Ih!, & •••! IlSllt"lly bll!it..d,                       '
   ~r)n oth~r works. ,the Sr, 'EtC/Etc shall not aco:pt t~(I iW:res a -in :he elllet.tJof ~l$ ~~.,.lhe' ~~,~::3
   Ib"a~t, be ebar~d (~r ~e, $~id., st<;«:s. j'l.lt .. r~~e fixed by the ,oce~tmg Officer, __The: ~p,ttacto('l
   en.uped to an)' efaltn_,:~at~ver;oo ,Uus lecount.                     :             ,             I., ,: ' ;j: '."'1

                                               .                                                                                                                    "
                                                   ~   ,-
                                                                                                               'I': '. ""","1                                      .•   I~    <{"_

  All ioo!sj plant and_ equiptnent brQught to tbe-site shall beoome ~th~ property of Bl1E!.rdtid than notCbi!nI"""1
  \'OIl from Che oil< withou. Che prior mill•• app,oval of;I'" Se<Ilrir Engl.,,'/ClvlI/E/C. ! When Ihe work
  _6.lly &"iI~ftt~d u/' lB. Cort!,R161l, ··~,I.tlllin«l fo/                                                  ''''''II!
                                                                     \;ttiet 'hKh thrl d.T'\rI!'.~llI! c.liliil&:M
  forthwith remoVe from tbe tIM .U tools. plant, equipment dr' (oth~~ U.~n 'thO$(! .!'~',fh'4~ M '..:;;~;!'I
  ~ ~y ,B,H.~L,~!!~~_ u,pon such r:e~.Y!iI. the. same shall rev~t         and beco~e l,he rrope;rty                         In,
   is.StAtBMI!Nr OF 1I1111! cHAlttlils, .
                                >'1;'          '.,          ".                  - ,""         •
                                                                                                        ,!,!
                                                                                                                    "'.
                                                                                                                                         .,.,"
                                                                                                                                                   j--'.'
                                                                                                                                                                   i.;'           I,..
                                                                                                                                                                             't"t' I~"'"
                                                                                                                                                                                            ""

   A monthfy delailed, ttat¢ftlent -of thl; bire charges .io(:!ltd:i1 :In te,pee\ Qf Ihll!.Il,lJdioill'j '111"'~·"'4.lpm.h01
  ~ttc,) sbalt be given {o the oontractof by the F,l1,glneef,.i~--chatg~: j  "
            ,       -   L,,;,~,""    ;,,,,,                      1111'   ,n,         h            '          ';
   26;\ PRECAUttONS ,AOi\lNaT ·RISKS I
      \         '         -!.        :.                                  ,.',
                                                                                                         ,. ; " i :.
                                                                                                        :tIl.;,'                          ,:,
                                                                                                                                                                       '.    ,.
                                                                                                                                                                                     -. :
                                                                                                                                                                                            .. " j-




   T~•.Cq,crnc'tot Ihali )Ie ""!",,iSibl~ ro, Rr~~ldi.& .1 lilj p;'. '1'7".'" ;fa.', all
   damage Irom any and all n,b and to ..I..ml", th•• J\i<)un! of 4"y ,uch 1"" ..qr
   (ttl»    to be taken for the said purpo$e unlUt tbe 'Wod;,· have ~n Itt"~ oVtt
   Bo8lneer In.eha~.j,·                                     I·" l'   _"          -r', ',. J ,,"        "'fii!     '-·f:     :                  -   1         "'\

          ~ ,.'.                           j,.-:                     '_,', '''Il.~                    "I,J:>,             '1,1                 , -... ,        I
   the Cq.nlrtctor .hlh provide ,til ...!C.h"l~' .Dfcess"y I roo/. tho ~tot""I•• ,of tbo ailo.,

    b.~Il$I~I~ lO( .ndlh.II,!.~. all ",a..u't>te '!'<I tli~ iiI' '~'.for pr.Iecti""
                             ~'Ylblng eisq.lyl", oil p~ 4"1,,,
    toolo. plaot. equlpme.t and                                                                                                     tlto,pmg'"" o::tb~:'!h;I~~~::~~::!I~~~~
    .il   ,p"ce...'        '0;' .bout.        tlto ".rk ,.d.              Che I\~ wMoll               m.i1 be da~.u'IO "Y, parlon                                  .
    11; R'OTICM ANO' FnM t                                                               ..             .', ,.             :"
    . ;, -' , .,,' ,>   - ..                                              '1-     ... ' . '.           "1; ,", ", ~."
    '11M Conll1et4/' .•hill ~.. III ~ ft<jbift<j bY'.r lilt. lory             01 by'ilIO
    or Illy lodil ","'011111114/01 of • ., I'tIbtleSen-il!e" Company /lr AUlhotitjo
                                                                                                                           tiIo"'' '.
     ....... lJIIlom the " ...;1It ~r 'WI!I be ..ruI~. '11M Cqhb,- ,hall;'y and
!                                                                                                                 I
!J            ." ; , , 1 3 :                                                                                                      /       '
     ~ .hy'ntIll!d cli~"d.m.ttd.bl. by I." \Indo, .udI. AcIt I!.eguIIUoo. Ind/o; by..,.". ,. ,..""" .00:tIU> WOIIo
       a.d thall mm and '01'1'11 aU ~tlwllI8' and pi.... reqult04lo ....'I.<<'l10. wid. ..youch IIOj/ee. "'"''''''
; ,28. SmlNG OUT OF nIB WOW A.ND 1'1t0TllC11Vl! \AND                                                              ~AINTAINlNG SIGN,\IrIl' ANt> .
       ,."WOItU:                                   ..••                                              ,                                \
     · TIle ~.fD_'" ,hall suppIJ dlm...lo""" drawl...,                                   Iev_"
                                                                               1llId otb.... lllforril.ilo. n...... ry I\> •••ble,
       Ibo !lI>OlracIo, to lOt out th. '/¥Od'. TIle Coutnoto, "'all II! hil.",. ex""",: ..t ont aocuralelyac«lrdloi to
       tIiO d.wl.... and !la.red· dlmeli$lo. thelOan, .11 tbe wor~ «.ml'rboJ·ln Ih. "".tfllctO'" ••y "tr.~ or
     · addldoao tholO!<l and ,h.U b. tiSlely ,,1/>'60.161. rOt tb'elt being so set .u, ... execuled.· . ' .        4
      All beneb mark<, peg" 'Igrihl', ott the ...,f..., allg_oJ It....i ",lIeOtoit... ad ,II ....liar matkJ' whe!het
      po' I. by B H B L Authorlil.. Cor the pu'pose or chockl", ttl. ~';Ita.lOi'•.work or 'n. tho                         of .                         "'!U..
      p!ll'D:Ia1Wlt survey mam wi1l duriog the teDU~ Of the oontract, be UDder tile ~rt of' the contractor. who .nal1,
      It hI! .... "1'00;0, lake alll',oper ..d ...."'••ble .1'......110.. .oiI car. to p_m and mal.taIn ~h.m I.
      ""'It ....  po!ltolt. 'In the ev!nt or th..e marlel being' disturbed ·.r .ilill_tcd by accidonl or dlle to 8':'1 other
      eaIlkeWb._, the .am. moy, Itd..mod _11'1 to..plared b, tb<l Sr. ElCIiiic at Ilie Coo*_"
;.    eipeuje: u.d the iKJSt thereof dtdueted fNm any money then or thereafter beco'ming due to tbe contractdr.

      Wh.... requested by Ihe ConlraetOr, lhe level mark. cet!tre.lillC                        ••    ~ id.aiaag; ' _ ..~=pondi61 Ii tbo"
     · sltown .. U" drawl", will be pointed oul to tbe ""O_O( on the ;U.bd b.t'~II.bencb. mar'" or                                                ""all&<    pea!.
       .ddillooll to'those .hown on tbe 4,...108 will be leI ooi by BRilL .i+th.ritlis:
         . .                                                               ,, .                                                                          .     .
                                                                                                                                                               .
        ..            .                   -                                     -             'i
       19.dltnlDRAtNAOl!:
                              -
                                     .,,'
                                                          - -                  : •
                                                                                    '1",                  • j
                                                                                                             !     •• '

      .An .Iib< Ihal may .oc.muiale ba ibe lite ddrl", the prot_ or tbe WOrk, or fit !tCII,h.. and ••""vallo!\s.billV
       M .~ tQ the .entire utisfaetioh of tOe l!ngtneer"'l1-(:ba~ and at Contfa¢tt.lr·, e;(peme.
                                                                          .                                  !
                                                                                                                          .
       :10. IlXCAVATI<iNS, RELICS, ETC:
                          ,           -                                                                                   I           .       ~
       MatiHW bf any kind obtaIned fr\)m elCavatioll on'the sIte .balt remaJn :th~ prdr'(ty (If BRBL and ,lian.be
       4Iopostd orr .. lhe Engin_I"""a"" dlt<ets.                                    I


        AU,gold~ film, oil and other mhlertls of any descriptwn and all precious lio"~1 ooins, treasured, relics,
      · lriUquities and otber aimililf It<:nu;w1:ikb may be found in Of upon the site sht1i Ix: the properly of Bharllt
        JiiJVy Ekctrieab Umifed and Contractor sba.1I duly preserve Jbe Nme to the $:!ltisfaction of tlK: BaEL and'
        .hkll from ~~ to Urtl¢ deliver ill<: "Old to -,ucn person or p¢noM 0 tbe Bopral Heavy Elect-rica1s Umi~.                                                        \.J)
        Dlt1-appoint to reedve the same.                                                  ;                        ..
              roUNDATloNS :
                    ,
                                                                          ubdl the ....vad.n' rot lltt ..... h.v<; bccl1 .....lncd tlid·
                                                                                                         '.
                                                                                                         .,   '




             . Cont_ .h,U " .. _ble IIOIlco I. wrltl., 10 tb.lin,tncer.in.char,~ wbeoo_any work Is 10 ....
                      ~ up·or......ted, Ifbotberby ..rth or oIbor ...... IOl1llt It.,.. flnally he ICIIpC<)IM or
                     «-fl"         1._lIIiorlOdoblg, tbeeOllt_ thall, If t.qulnid by Ib<l Ilu&l...,~.-cbat&<
                   ncIt work .t hie ..... ~~     .'                            1 '
                                                                                                                              !
               APH.oVAL OF WOIlK.$ BY STAOIlS I                                                      .                    ~
              !II:'lhlba.I,...I\'6 ..... '"'" pro- ahaU be                    ,,"joel to ...lIlItIltiouttd. prcVllat eadl .1... lboteO!'·
                   J_~L
                               .              eI.. 4111111OJlOo III_ ",...... 10_ t~'}!";~~!."!.b~t.. .'.' , eo"" 'Ia",
                              ... ~d __ L..t ___ ~"""'.-J<_.  _ mm '"..,..~                t.    .,. .•
                                                                                .4'__ ~ •• _<-- ••                    ~
                                                                                                                                                  II   .udy.       In
                                                                           .--                                                          --
  j!
 !i                                             I.                                     14                                                                              1
                                                           etl~te.ahd                  4~Y
  "
              fker1eof kt-iu), th1itdie' may            in the event of    <Hspuic;' the rledsiotl of 9te -                   sbn,or BogiDect/CivD                     \
              thereOn $haU be Hltift lind Mtitiliisive. . '             ~;      ~.                    -                        i'                                      t
                                                                                       I i
              The wo-rk shall be exout6d tn a worktnao-like manner a d to the satisfaction hi aU,m~ of (be n:llgin~.ib"
              chat~.                            t"                         '-                                                 'i,                          ->11
                                                                                                                                        .
          -The Etlglh~t·It1-ch:arl::e ViHl comunk;3te ot .confirm his: f ruct.lou to the Coutractor in respeCt i)'the ~leQutjoli
           of the-work in .: H w<ftk Site Order Book" maintained p.l hb ofRcc and thc.oQntnictot aftall visit tb.h: office
           daJlyand shaU 'confirm receipt of such instructions by si.niag tb.~ -relevant entries itt this loook. SUch entrlCf(
           wl!t'I1,"~ .,~kd.r ·.t ,,~ticejlri "~I.ti.t within th' lot.ot and me1t~e· of in.", Coodl~oIl'. . '             . . ' '1

              ~l; DAY WORI(,\., "".                                  ",.. ,I          . . ' ; '                                                                "I'
 ;1
.:\I
                .                 'j                                                                 ~


              ~ ~~y~~~rk ~.~·~ll:!el~~o~.~e1i; _~i.t.~,~Jk~'prl,Qr wnUeIl inhti,~fions ot Hie Acce~ting Omcet.                                   ;       -~"   J
                                                                                                                                                               "




  .)
  h,
              TM '\::ilt!ffilctot MbaU give !<lIb; I!flgl!i4!r-I!K>/",g' ...,.b.bl<:f.·t1cO of the st.ri ufany work ordottd; tv
              ......t.Hi';· aaY',.*Mk .~1i '''II'd'IiI:''~ 16 th. seni." IJngl           /Civ;tilo .....rge,t!/G witbln tWO da,. .1 ••~
                                                                                                                                                           be!
      I       o(e4tb pty-wtek b!turfi Jil driplicate gl'\I'1l1g ~U .dewte<t tccoun{ (If htbour and rnl\t~riau Cor tb~t .pay week.-.
 '1           ~~~ ~~:V 0t ~ahb ~,r these. t~~~i~~ -l~ t~~,~~ oor;«;t. wp! _" ~ ~_tt6ed by t~"e F.l,gilleer-irt1h'tttg~'!i1d "tetti~:i
  i           "to \be oontractor  an~ must be pro~uoo~ a:t the tithe of adiutttlled~~~f ll!X;QwiU,             :"     t "._ " -"j
              Ail 't.rwoke'in: duplicate lligned by tbe Contractot or bi~ agent llliall be 4ent with each delIVery ,o(~..teriab Io["~
              duy~rk and the t;i3nUactot' wltl he tiJrtiisbed with a receipt ~ti:ued by the Engineer-J.n-dHtrce .~nf die ":1
              d~Pd(in., q~nl"it~ weight or,trlUsurement. (~$ the ea~ itla~ b?), of ~he adlcles awr~~ t~~QO wm,~ed
              I:na& in ~bl~ receipt iu the retUrll ilroresa,id andl the teQeipt itseJf~ to be producM1in eupportofih¢Jl
              Cohtracror', bilL
                                            .
                                                                   I' ':              '. '
                                                                                            I
                                                                                                    ~          .      ~                              .

 .,
  ,
          .                       '                                                         t    t                     .
              In t1lIrcate of LUni{)Sum Contracts, the r:ah~$ to be changed and the ,peccentage idditi 11 for profit aDd
              eitiblitfubent ehki!es, etc. )'ViII 'be agreed upo.n be:t~h tbh ,\~ceptillg Officer srid the tractor pdQ{' t<1
                                                                                                                                             I . .
                                                                                                                                                                           !
                                                                                                                                                                           ,
 !.
              the f.l:ccunoo of fhe .,ork..                                       ,     t! !               :   f                    ,
                        •                                                               ;        t'                            I
              .16. 'INSPECTION ()~ THll WORK:                                          ",
              DUEL   ~fficers t:~qOOfUed with (be Co~tr8ct<lr sind! have-~wer at;a:ny time io lnspec; .nd ~ eJlamine any p~t;.
              ~f ,t~ wo.r" lind th~ oontractor sball give sucil,facilities 1~ay e:r~lllred t? be given for ~uclt i~pection and"
              ex.mmattOtl:                       ,'                     ",.'                I"       :   '":           :~,                                         '
              Should Sr. E/C/E/C consider at any time' during. the exp!ry:or-Chi\ maintet1~nce            t        pet:f9d.         at any work hll;;:
              ~n t:x:cutcd wltb ~nsound; irupetfect or tlt:isi<:flled wormanship ~r of a ;quality Inferior                          0 that oontractedl
              fot: or Dot otherwIse in,accordance. with the contract {f"1e4pCct:,*,berwr t~e d~cJl!ldfi of,                         eSt. B/CIShaU          be:
              flnl1 and ooncfuslvo) ,the Contractor sbaU t Oil del.tl~~ i, wrltif.g fro.q1 ~~ Sr; B1C~ ~/~                          pedf)tlng the (autl
              nolwilbstandiflC that tbe ;lJtne may have ~n Inadvert tJ ",paSsedl cerU6e lnd paid for                                    Cotthwlth t«:tlt'y,
              or remove-.tld rtro~8Ir-uct the W<trk IIQ .peelfled, in . hble or iii part as he case mat                             -rcqulro at ~1t ()wtf~
              e~pense. tQ the entittl satisfaction o( the Sr: BlC. and HI id the elMt of his ~al1fng to ;do                         witbhi .. periOd to"
              be; spedf!ed by tUe Sr. EtC, E/C,ln hi. demark! a            SaId, the St. ntc!'mlY oarty au                          th~ work by otbor'
              meahf at t~ risk": and· npel1$e in.U te$~ ~f the tttrae«;r. H6wet'er. the UabJU                                        of thO Contractor,
              untkt this oond~dQ& Shall not extend beyotid tile mdfttenhnce flCtk,d except as tttat~S" .                           rk..-nan!hflJ, wbl:cb
              tbe Sr, n/c, RIC ,btU bave prevtoudy !liven notice of to[tbe oontractor to-rectify.       <                                      " '




              37. IUlSl'ONSlblLITY FOR bUILDING:                                                     !


              Ii> !be _vent of til)' bUild!og, or part .f til)' building heibg h ••ded'I.""' to llIe Coilll:Mlor f'l':' ·th. "'_" or.
              work th."", \tndct !be provl.lon. of the eontraot, .he .litll give,. Wrilteo rOCOipl (ot'lIIi imIt<it. II... ~
          "    .n4 .. """It .. "qul,t<! m.ke sood dbi. "'"' ~... 'l'A'~.1'!!Y!Yl>gjl:ruru"v ""I!$O. lIlat.....' wbllt
                    "       ••.   , __   " ..... 0 _ ' • • _..........-_ .. , _       " " ,                                        •


                                                                                                                                                          "
        .   ,                                                                - .
                                                                        15
            in htHharge and on- completion of -the work 10 deliver up tbe said building or part Iheteof a                  clean- stafe"
            ccmph;te in every particular I0 th~ ~ntire satisfaction of tile ~ngineer~in-chitTg!~
                                                                                     ,
            lL INSURANCll OF WORKS AGAINST DAMAGE AND LOSS, DUE TO FIRE, TBMPEST,
               FLOODS, EARTHQUAKB, RIOT AND AOAINST DAMAGll BY AIR-CRAFT.  .

            nC.ContractOf than, within one moaU, after the date of aCceptllAC<l of Ibe C{''ltract. in}llre the work against
            lou m da~ by .fire, tempest, SOW." eartbquake. dou and against damaae by air-emf) with an insuraoce
            ofIb- approved by the: Accepting Officer. Sueh msuJal'lce sban be atrected in ~be name of BARl and shall be
            b'the full value of lb~ coutcact sum.. The CODtr.aetor sban'lodge with the: ~HEL the policies and receipts of
            the pRmmms for .neb insnrance, -and Ib.U maiat:ain such polidu in force ~DtiJ the cQtire completion of the
            _ .. _ill"! II\' the S<nior IInglneer/CiYlI/!I/C.                             .

            Ii the wntraetor faib to comp-Iy with the term, or" tbi. condition that tbe I~tip. officer may inwre th~ work
            IJl'ld rna)' deduct the amount of premiums from aD)' money become paybb 10 tbe Co1)uactor or      at bis       mar
            ~'ion reru4¢ payment of any adva~$ to tbe Coot~actor unlll tbe cODtract~r shall bave oomplied -with the
            terms of tbis condlHon.      . -                                       .
.   .
                                                                                                .
            Such insuranee whether effected by lhe: Atttpting OrJker or the Cbntractof sbaH D('It be a 'imit (If ba~. to the
                                                                             r
                                                                                                .                             .
                                                                                                                              ,
                                                                                                                              i
                                                                                           M                       -       _ ,




             liabHtty and obligation of the eontcllctor 10 <;empie-Ie the entire wor~ in aU    ~l$         as certified by tht: Senior
            E°tencer/CiviltBiC.         _                                            ':.        .                             I
            In caM: of s:ncb 8: 10$s or damage as aforesaid. the: money payble under any lIu:b irumrance shall be tcceived
            and may be retained by the BHEL until the work iJ finally completed :aod shall then be credite9 to the
            amtrutor in the tinaJ $Ulement of aceounls in the event Df llis contract not hAvins been previo_usly caneetltd
            Htkt tltese: <::OJ\ditions.                                                     .                -          ',--:

            39. DAMAGE AND LOSS TO PRIVATE PROPERTY "- INJURY                                  ~ WORKMEN:
                                                                                                ,
            .The oonrraclot .halt at-his own expense ~jostate and make good to the $atu{actiOR .of the Sr. F:JClf.{C and
             pay compensation for any injury, loss Of damage (IC(2Sioned to any propttty or fights: whatever inclodiog
             ptoperty tnd, right' of DUEL, (or "-gents, 's«Vanls or empioj'tt$ or BliRL) the Mju!)" los!; or daDlage
             .,ising out of -';t in any way itt-ronoecuoo with the execution of purpor!ed execution of the coiutact and
             furthet (he oontr~ctr)r shall indemoiry BHUL llgaimt all claim! enforeeal,)e against D-UEt.. '(or any agent.
             kfY3l1t or emplt1y~ (If DHEL or wbich would be so enforceable- apinst BI-1EL) where a private perron. in
                                                                                                                                           I   ,


             r~t or any $ucn injury (inc1uding injury resulting in death lou Or dam~&.;- fo any pcnonJ whosoever or
             pcl)perly. iMhuUng all ctaitM which may aris<t under tbe workmen'oS Compem:tCioll Act Of otherwise.

            .10.    COMPIiW:                                                                        .
            ne works .shan be tampleted 10 the enfire slltisfaction of the Eueineer.in-c!f3rge and-in 'ceotdanco ",vlUnht
            ~tor'!I forecast of Time and Progttts whtre oper.five~ and aU Uillsed $fQrtJ ana I:bateriak~ toois.
             ,.~; tquipment. temporarybuU4IP8$. and tbin", ,baJl.k Rmoved aDd tilt site nil WQ(k eJear«t of rubbish
            .ind aU
                waste tiUlttriab and deUv(red up cleall and tidy to tbe sati5:racfiot,o( the Engineer·jn--charse at the
        , CMtnctor's expense onj<>f befote tbe Scbeduled dillte of completion.       ,
                                                                                     ;
                                                                                                    I ..
             nc DUEL ~hall have power 10 take over from         'he Contraetor from time to    time such $t'tliqns     hf Ihe work as
                bYC been oompleled to the satisfaction of tbe Eogjneer~iD·clrA~.                    •
                                                                                        ,
            ~      Senior Engineer}Civii/EtC shan ctl1ify to tbt Citnlnctot ibe date on whkb tnt work is compltted and'                    t
            tilt state thereof.
                                                                                                    !
            .n. Seaior Engineer/Civn/EjC
                                                                                                    ,
                                                  sball' afso ctrtify. fo the Contractor tJle $t.~le of the, wnrk at the en~f
                            .period, where: .applicable.
                                                                                                                                  of the   I
                                                                                                                                           ,
                                                                                                                                           L
                                                                                                        ,
I
i
             41. COMPBtolSATiON FOR Dl!LAY:
                                                                  -
                                                                                     16                 ,


                                                                                                        ,
                                                                                                        •
                                                                                                       "j
             Ir the conlractor fall. 10 m.!.Wn flle required _ _ I.. "ron, or 'I""dillon 7 or ttl compt.te the ",rI: lnd
                                                                                                                                     -


             clear the site on or befo~ the eontrae~ed ()J extt.oded date pc/dod o{ oompletion, he shanT Without prejudice
             to ally other right or remtdey of the BHBt. ott aooount '.If SUCh brea.~h.pay u agreed wmpensation all anto1Ul.t,
             calculated a$ .t~plllated below or IUCh .maller amount at may be fi¥d by the 8HEL 00 the Cootraet value or
             (he: 'WOrk' for every weelc that the progrm remains below tbat speclfiOd in condHion 7 or rut tbe work "maiDS
                                                       -                       . ,                           .
             incomplete.                                                           .
                                                                                                        ,
             This win also appJy to' items or gr.oup! or it«nS ror ~bi¢b $¢})arate period of completio~n hlU beth .pedflcd.
                           -                                               , .                         ljn .. ,               -          I
             For this purpose the term.' oontraet value' than be the value •.t C!C~ct ra.tes                               of the work ~8 ord¢i'cd.
                     t)        Comptoll•• perlod (as odglnally .tipulal,d),
                               1.10t elcteding (j month!•..
                                             ,   ' I        '-.                                             ,
                     b) Compl.tlon period (to origln.ny .Iip.laled)                                             @ 1/2   .,.,..,"t per week.
                        t~iog 6 months and Dot u~iflg 2 years.
        !
                     c), 'O>mplctiot! perlod           (Jj origiual1y·ttlpulllted)                          ','@,,1/4pereenlperWeek,
                               cx~ing     2 )'Qf$.                    "

             Provided always that ~t fQlalam<tunt of eo~pen!i3;tion (Qf delay (0                            be
                                                                                      paid under this wnd!ttoD $hall not
             exeted the underoote<l pereentage of the eonlr.tct valu~ Qr of tlle conind value or the item Qr gtoJJV d items
             of work tor whIch a &eparate period of completion it> given:           i                            '
                     a) CQmp!eUod           ~md
                                       (as odgftially-ttipulate4j                                           i10 pereent.
                        not c~tig 6 months: '                  ,                                            t
                     b) Complelion ",tlod              In
                                                o}/ginally.,tipu12t<d)                                      "I'perce"!.
                                                                                                            ,
                       . e:Jtoeedi~ 6 months aed Dot e~ceeding 2 yean.
                     c) 'Completiun period I'" origiMlly .lipDlded)                                         , 5 pere.ent
                         exceediq 1 )'taN.
                                                                                              ,             .
              The'amount of com'pemation may be adjuned or set off against tny:~mm pa}'hle to,the ContraCtor under tub
                                                                                                                              ,



              01"   .n, other contf'lCt 'With 1110 BRHL..
                                                                                                       , ,
              42, LAWS GOVERNING                        me     CONTRAct:                               , !
                                                                                          ,
              This'contract shan be'governed by 'the Indian Laws fo~ (he time beioa in rorre.
                                                                                                                "

            . ~ 4.. .CANCELLATION OF CONTRAcT FOR CORRUPT Acrl,
                                           . :               !                                                                                    •
              The A«:tt>tlng om"" ",hose d..l~o.' dtan be final and "bndl1,,;ve, .1Ia1l, wilboUI r"Jvdlce to any other
              tf,bl or ..medy 'fIII1clt 'hall have accrued or ,han ",,",D. th.reatt« to 9b''''1 H""vylllectrieall LImited,
              can",1 the conlnot I. auy or the foUowlng eo... and Ill. cobtraotnr ,\ian be lI,bl, to ma•• payment to BHIIt.
              fot any 10&' or' damage ,rtsultlng (rom ny m.eh «noelladoil to t~",arne extent as l1iovid~ in the <;&St of
              eaneel1ation rOt default.                                        '
                                                                                                  ,,
              If Ihe eo.tract,lnan,
                                  .   .                                                       ,                 .
                      0)       Offer or aive Of.,...   to ,I", to Illy peno~ !n IlHllLI, ..,.1... 'Y glflor oonolderatt,lp of any kind
                               II AA fnd ......nl '" ~"ard ror dol", or f.,WIi", 10 dt or for b"'llic ~o.... r fo~born. ,. :,;
                               act In ..11110. to the obWnI", or mouli"" or tbl; or a.y, othe...,O.tra<t for UHIlt.I<!r.IOo,
    ,                                                                                             .'            .                             ,
                                                                               "OR                      ,       ,
                                Ent« IIIto ...._          WIth 'I!Hl!Ll. "",.<OlIo.
                                                                                                                                     , ,1
                                                             I                                   17
                                                             i

.                       ~id by him or wltb ~j. ~.ow¥ge.                               1111"" the patliculJ1l.r "Y ••cb~•••4                                               UI. to"", of
                        p.y....t       Il!<roofbo"~.1ISIf boon diJclooOd la"tldlbll to iht .-.....pd.. QftIcor•
                                                                                            0&
         . 9) Obtain a coolract Wi~' QUIlL .. • _It of lUNa \COded.. or by ....bon<l;de method, of
             , """,politi....ndcrl.~ '!hou' nn' dllc!osIllg Ihq 14et In ~rl'ln, 10 th,,, },""'PU., O-r; , , .
    44. CANCIlLLATJON OF   NTRI;CT POR INSOLVENCY; ASSIQNMBNT OR TRI;NS!,IlR OR
        SUB LBITlNG OF CO ?RI;CT.        . ".           ' . j'   .        .


    Tho /",~Ptlo!l Ol!leer. wilbont ~",Judlee to ,.y otber right or _dy wi>loh ~h.il ba"
    I~r..ncr 10 llHB.L 'baU caue<>lt.lhe ""0l,<act In. aoy of the roll"l'1iI!J ""... ,- , .
                                                                                                                                                            ¥Cf.'" or 6[aU -un       .'
    IfIh> ';'oltaCtOr: .           ., i '
                                                         ,
                                                             ..                 ,....                                                                                                .
                                                         .                                                 -,                '                          -                                 -
          a)
           ,-                                                                '.
               bcil1g an individual, or 'if a firm any partner tl~erecf~ sball at any time be adju&tcd ·bat$:rqpt 'Qr bIVe
                       -                    ' .                        -
                a receivfog order of orders for ~ adrotnbtrl~Uon of his Esttte made agailUt ~jm e>f shall take lilY
                I
             ; pre<;eedings, for liquidlllion OCcfIDP()sition under lJaD~uptcy A.Ct:t~1' the', time 'bei~ in_ force 'or
             : ~ake any conveyance -0 ••ssign~ent of hlli effects of com~~" or ~r.tangeweo.ts (or the beuefit- of'
             ;' hl~ credlwr Of purpOrt ::.0 do 50, lor if any application be made ~l1d,¢f any Battkruptcy A91 for lQ.e
                i'
                tip:Jc; ~jllg in force tor. the lieq~~iTatiOn cf bj~ !Wiatt:: ~~ if a truttt ~ ~P #£anted by bim OJ' beta-If
                , or
                ,-
                     h~ crOditou ;           ,      ,
                                                     1!·
                                                                                                                      '
                                                                                                                                     , -
                                                     ,,! I
                I
                1
                                                     "
                                                     .
                                                                       ."
                                                                       I .
                                                                                            OR "
                                                                                                                "
                                                                                                                             ,             '
                                                                                                                                               '
                                                                                                                                                                                               .

          b) ; being.-a, OOrtlpany~ sbJII ~ass e. ~Iution or We Court sball mak<: au order for the Uquidlldon otiui
                !
               aKalr$•.cr It rt~ivef or. Manag:~ on bebalf of tho debentufeS botd~ ,~. be appo;q:~,of ~f<ilJm:
              ;,tanoes shall arise whico: entitle tbe court Of deben.tUfOS holders to apPocnt a k@iver Of Manager;
                                                         •                                , OR
                                                                                                                                          -'   '
                    .                       ,                j           ; ,                                                                                 '.
          e) ~u$lt::~. transfers. SUb-let or attetPPts to as'Sign transf~ <H-', ~!,b-~( AUY, pafti9U J?L the .wark                                                                 ,lthoo l
             I the pri<u:,writtetl appro"..-l of the Aoo<;ptill& Otftocr.
                                       ,                     I                    I
                                                                                              I             • ,

                    ,                                                                                                        , .-
    W.b~v~ 11><: Accepting OJficef ~er,,/sly bi4 !i\1thorlty to cancel ~~~ ~Pfrac~ i 1'Ilder qli~; .oof1~Hion                                                                     ,ftc: ~~Y:
    ~Jn                                         dp:. t~ ~.~ l't:QyI~:al~~r~ Chl\t I iq tftr !3~~~.pf tA'f
                        tb~ WOfk br_ al1j' UleaM ~t -tpc ColltractoC~
    ~Vf ..pt.rlon (as certl!l<d bypr. B/C~C which I~ ~o~' 1Rd ""~91"fY9) .~lag .... '~qo fll9 ."'IR!r,OI ..!t., ,
    the a4Y .""',ohaU _""n, t. ~ 'JlHBlj .n~
    contra
                                                                                         tjl.,
                                                   ifl¥ ""lOr. "'''''!lI."~ X'(<l!¢S tl>~ I!lpq"ys, ~y", \0 ~"! .
              uDder the oo~tract. (h~~CoDtrae ' r shaJJ 'cifflcr ~ tbe excess amoUnl'ordcred 'bj' t~ Sr. E/C. fi/C
    or the sa e .b.U be recover¢ froi'4 the, trac~ot b,y othcr cneaIlII.              ';,                 ' ,:
                             .             '.         l,     .'.   ~'         .:c·   ..                             '>1.:')
                                                                                                                    j .. ,       -,'                              . ' .


    I"c':"" I           ",Bl1ilL o;O"lpl'~' 1M r:qr~ ~   the tm>Yit1,~~ o,f '~III"'n4lt"'& ~. '!l!l <>1','.,$ ~1~lIqq 'I~ Ill'
    lai!"D ,           ....... '" d~"nlll.lnf>b. , pool '0 he ~f~ I~, !~ !rl1'~R!"F .. l\I1<!!'l: il>1t '1Q.~III.A IIlaII
    co                Ihc cost of          m:t'(I.lJ
                                            l"f':oh~, $ ~/"I1.~our provl!l;d ~y 14\ 1l\Ili\. with aD .gdllion of ,"""
                    , ,10 '!'W' ,u ulcQdc"!" a.d <!O~~llsb_' 'h~~I'1'~y,be~""4!4 byl\l<~r. Mar. (f) Sc,ll/CflllC
                                                "
                            .obaIllio 01 &tid ... " ' l n s l v e ·                                                   ,
                .                ..'            .                \ l          .-",                                                                                '           ,           '
    .5.                   CI!!.l-ATION OF CONTRA                                  'IN PART Oil IN FULL FOR CONTI\;"qo~:S PllI'hULT.
    Iflhc~mctDr:                                .'           ';    1         I             .          .   ','                                      ,.                 '
     .   . I)           .~ d<&.1t b, ......,~ t~. ,...k wllhhI. 'F'I!Ol!.~I. ~ frn!'1 ~te .f ~~\l<U", OVO'                                                                          of Ihc
                        .~ _tid ".Iin1I?'lt I. tbar'" ~~. ~:" flOljco. flO!!, ~r~...,tavu ll/C;                                                                                       .
                        ..                      ..               ..""
                                                                  • I,        ..
                                                                                         - '                                 .   '   -'

                                                                                                                                     "
                                                                                                                                                                          ,
           0)              1iIt~ «to lit. ~     or                           'l''''
                                                                 limo. wbIIbcr Wore Of an.t'lhc date Of •• !oodod d..~
                            .....plotlO.....to dofa'l" ill ~rooe«ImJ mil> Ih> work. with due <Illlge"", '.4 oonll•••• ln tll"
                                 er'tealouabJo              St. CiB/C.'         "j      .,._,:1              "
                                                             18!
                                                                 II
                                                                                                         , I
                                                                 ,'           .i
                                                            ORII '
     oj     r,u. to comply wldi ••y.r the t<:rm. •••
                             0«1." properly _
                                                          dmdtlj"",
                                                               ,            or Jhe
                                                                               ,
                                                                               ,
                                                                                               or       .rr.l'llOo.bl.           lOti.. I.
            ,.,,~ing   whh                         tber...der: :
                                                                             ,.,                             ,   ,
                                                                                                                 I
                                                                                                                 ,
                                                   , OR                                         !    i\J,
                                       .              .     .                             -      !
      d) f.aits to complete the work, work order and item, or work with individua.'l dates fori completion and
                                                                       ,
         clear the ute on or before the date of,completion, or rail, tf}: achieve the progres$' at $et out uDder
         clause 1 or these General Con'ditlom: or Contract,             I             -

                                                                            ~
. Tbe.Aoocpting Officer may, witbout.prejudite to any other .right ftme<ty whkit she'; htve                      ~¢CtUed
                                                                                                            or Ihall
                                                                                                                                                 I
                                                                                                                                                 •
  accrue thcnmfter to B, H B.L .uubel the contract 1$ • whole or in pt tbef'Cl}f or only IUC~ work order or
  Items of·work ill dJault from the- contr.cL . Wbmevor the A~Ua@ Officer exercl$« his authority to Cloocl
  tbe eontra« as a whole pr iu part tIlmer tbit: (lOudltioft be may comp\ete the work at. the Contractor", riik lad
                                                                                                                                                 I
                                                                                                                                                 I
, Coit, p1'ovlded always tl\at In tbe mo. of the ",,"of completion (.. Certified by St. B(CiEfC wblch, ~ ,fioat
                                                                                                                                                 ,
  and ~nc:l\1si\'e) being le'u tbatl th~ contract OOlt, tb,e advanlage shalfi ~~ru~ 10 rhe I) H n L If the cost of"                              ~
  oompittioui exceeds,: the' moneys ~uc to the eontractot undu. this eot.\tact, tbe contractor th.U dtMr pal' the
  the eioeu amount ordered 'by Sr. M.P JSr.' EfC!E/C'or the (ame 1:ba.1t he r~lv-ed from the Contractor by
                                                                                                                                                 ,
                                                                                                                                                 I
                                                                                                                                                 ,
                                                                                                                                                 i
                                                                                   ;
 'n csi;t: the n H B L cOmpletes tbe work c;r ahy patt thereof tiru.fet lllh provis)on~ or this cooditim:l tb~ (()$l or
 sl1ch wmpletfoo (0 be hken hiro a¢COunt in determinilig the~exeest t(~"t to be'ch;t~~ed Jo the coh,tractor aDdu
 this condition 'halt ron$ist of the cost (}f materials purchased' and/or J~tx)Ur provided by the BHEL with an
 addltioO of su¢b pereenfage to COY«' rupertnlendence and ettab1ishmelU ch:u-ges as nuty be df!cided by tbe St.
 M,P./Sr. EIC/H/C who" deoliw••ball be find and oonel",lve,                :'
                                                                           •                                                                 ,   ,
,46,. TERM!NA'!10N OF CONTRACT FOR DEATf!:                                 I"
 Without'.prejudice to any of the rights or rerne4ies under this cont(lIc1. if the coiltr.lldor dies. tbe UCi:lepttllg
 (')ffictr $hall :have the opihkln (If terminating the (,On tract without com~en5atl{/n'to 1he contraet<}r.
                            .,                                .               I '
 41. SPECIAL POWER OF DI!Tl!RMINATION: .                                               I                                     .
                                                        »
  1f at any time a~ter the acceptance of the tender, H E L shalt for ~ny reason whalsoe~r not r~qujte the
  whole or any part of (he wotk, to be carded out, the St. M.P/Sr. E/q/EC ~hall five notice ill writing of the-
  [aet -to the Contractor who shall have no claim to any payment of corrtptnsatkm Qr otherwise ·h.ow·st>-e~r On'
                                                                         ,
  'account of any profit itr advantage wbkh he migbt havt derhw from th~ executlou or dw work ttl filII but
   which he did ~t derive in coo5eqllenoe of tbe; fortt<!oslug of the wo~.              -'             I
                       '     I                               "                                      >

   He sball be paid at Contract rates, rOf lbe full amount of tbe work ~ltecuted including sucb addltioml :workS', ,
   e.g. dearing of site, etc .• as may be rendered necessary by       the
                                                                       said foti<losilig. He shalf abo be allowed .. I
   reasonable payment (tt-$ ;.1ecldcd by tbo ACcepting Offt<:-er) for ~ny ell;~~ sustained on ncc()unt:Of labour and
  'm~tedal$ c:olketed but which could not be utilffled on tbe work, as ver)fied by tbe Sr. EfC Neither shall tho
 • eol\lractQr hat!! «n)' <:Iahn for compensation OQ account of nnY\illenHions: ha"ing 00e." made id the .original                               ,   .
   speciR9atlOhs drtwirigs. designs lad instr\!cti<>N, involving any,: ~ir!ailment or the work!' I' originally
   oonte1llptated.·                                                             .

   4a, FAIR WAGS:
       A)       '1M. Contractor ;liaU pay not less: than tbe "Fair WS~I to 1-A,*lIfen engaged by him ott'tbe work.
                'Fair wqe:' meads: Wlac -.hether for tirue or piece worlCnoti!le,j at (he tIme or in'liUo, tehdott foc the
                ...rk 1m! wh,,, ••ch ~ ..... not been notiAed, the w>get :prmtlbed hr the Sr. MI.ater/Pro~/
            , ,St.ll/C/E/C lorllle claU.....t wblch'the wrk ~ done.,                                                     i
            .                                               . !                            .    ,                    -               ."
       ,b) ,TIle oo.tracloullll~ lIohltbtlam!lDt tile "",vldo. ohny ~O.Ir'ct 10 the """tral')' ..... 10 be .
            plld • 'Fair "ate' 101."""..... IndirectlY'.Wed OIl the _~, Including a.y labour
                   •              •           ,           d work. u Ittlie libo l~b.d
                                                                                                     bJ hit'
                                                                                           ~ndiJ'eetlnt'Rt;:Wi4 h.. him.
                                                                                                                         .1,;.od
             ,
                                                                         ,         )
                                                          ", 19          I.
                                                                         ,
                                                                         I
   c) Tn ttspoc:t .r 0111,'00'" dlreotly or IndirOctly employed on tb. '\work for the performa... of tho
                                                                              0'
      ..~.,,' port ~ Ibis "_"'~ \be COnl.......r "".U ..mplt witb ea... It> bo cotnplkod "tb
      \be BBEL ... tractor·. l.bo.r R<l8ul,U... ('P""nded~~O u An",,~ ... ',., to _
       condiIions) in reeard to pJynMut of wages, wage p¢ri.od. ded iON rrom wages. RCOVC1)' of wases.
       not poId and doduetlo ••••••• tbbrl..aij made. mal.l.n~n.. of I"",go, book, wage .1Ip', publioat".
       orale of wages .nd other fc';rm.s of ett'Iptoyment, inspeetiori I,d submission of pcirlodlcal return.
          aDd all other mattcn of •   lik.~   natut'(!.                  ~

   d) ThO' SeDlor Engineer/Civil/SIC concerned shall have the right to deduct from the nloneys due to tho
      CoDthtCtot Jny $U,u r¢quhed oresdmate4 to be ~quffed tor m,aldos good ttie toS8 IUfIOt¢d by •
      'WOrker or WoW" by ~G of nOD.~ful1itment of the edndhlons pC ~he contract tor tbe benefit of the
      ~ non""paymelJt of w'JCI or of deduction~ made froQ'l IhJa '!Ir tbelr wages wbloh 'are lot
      justlfied by the terms of tho conttaot or ,'O!K>b<orvan<:e .r III. regulatl....          :
.; e)    Vi~...m    BBEL the Conttlct~r $halt be-liable primarily (It a'ii payments to ltC- madJ under the
         .coatmt lind [or tM 900ecV4n* or the Regulations «iorcsAid! without pr~jlJdlce' to ~is tight (()
        . claim lmfeJnnl(y [rom hi~ $tlb-COlltfl0t6n.                  ~                        1


   f). The R,utat1('iD! aforesaid shaH be deemed to be apart (if this co~tract and any breach thereof shall
       be deCmed to be Ii breaoh of thb eonlraet.                     - •

                        ,

                                                                         ;
                                                                         ,
                                                                         I
                                                                                               i



                                                                  ,,
                                                                  ,
                                                                  , ,
                                                                         ,
                                                                                               I
                                                                                               ,
                                                                  ~ '-



                                                                                               ,
                                                                                               z
                                                                                               ,
                                                                                               ,I
               -                                                CHAPTER-IV
                                                                                                                   -
                                                   VALUATION AND PAY~ENT
49. RECORt)S AND MIlASUlUlMBNTS:
                                                                                           ,
                                                                             i.
AIlItOmG having. fi...clal ..I....hall be ontered In the! IBRIlL ;M•••• te"l<nl Book s. IMI • <ompiele
. - is obtained or an _       performed umler the ....In\dt. '   ,
                                                                            iI.
 Buildinl etc.. priced 10 Schedule' At              IS   a unit lump!um   wilt be enterCd by numher at the unit iumpsW11.
                                                                                 I         •
 Work carried out fot agreed IUinp'-$ums will be-dcaCribed aad timl!arly ttcord.ed.
                .                                                  . ,                                                      I
                                       -                            ,    .,                I                                 )
 LUf'lPSUM omlssiolU win be entered for d.eduction. Meawrement :chal1 be re&tcicted to that' reqoired to
 a......ln the financial lI.blllty ..r BHst umler Ibe contraot,' :                    .:
 , •                          .             '-           •                 . •                         -       J                       •

  Work whlob rail. t. he mea.ured In detail .!mUho measured physic'U),. without ..r.,,,,,,,, 10"Y .....1 _
· that may obtaht excepting lV.here It may otherWise. be directed in tM _
                                                                        tender \fQCtltneUt&. TIl" meuvrelttenu
 tban be laken jointlY by any ptf'$t)n duly authorised ~n :he pa,:!-.of ,the BHE.L and b! the Coottao~r.
 1lte !Jtglneer-ln-ehlll1e shaH. ,lve reasonAble tIOtioe In wribng-                        '0
                                                                             the Corttract<ir -Qf appointment                                  ~or
                                                                                                                                                     I
 The Contractor ,h.U.          ~,j(hout extra chaf1'!~        provide·.assilltan<le   'Wj1h~ tppUallCes            ,"d odiei' lbings neee..,
 for measurement.
           -           .
 The O:mtractor $hall behr all the coSt of measurement of his work. ;
                                                                             '             .   '

                                                                    ,-                 "       .
 Measumnent thall be eo~ in the IntEL Mta.ruremettt b60k lind ~igned and da~t'<f.by bollt parties t4ch efty
 .t the site on wmpletiol1 crmea$Ure~ent. lt the Cotltraeto~ objedsl? .flY of tbe tr'leaturetnet1ts ~ .00
  behalf of the DltEl. • not. that'- ",lIIbe mad. In the D!fE~ ......ftlI1<IIt IxIok of, ngalru. III. Itooi·


-
· ori~ obJeo!ed to: and ...,., •••• shall be .igned and da;'d by. both tile .,.rIle< "11g.se<! In taking. tile .


If, a ... ruult O(.IIC'b objeetion, if Mcomt$ nec.es&aty t<t r~measure (Tie work wMlly or In part. (be expeue
or such re-measufef1.1ent shan be borne by tne party requiring the mwucement to- be ~.akeQ provid~ Ib.t I
net error is found by tbis fe-measurement to amolfnt to lest tban 5% t~.ve pel;"CC:nt) at t~ value as recorded by
the fint measu,remenL But. where the net errors amount to 5% and flver of the uid value. then the CQst Is
1.0 be bo-rnc by tbe other party,   If ,'illY case; if the net vaJue of errofl found exceeds: Rs. $00/. tbe _expenSQ of
re-measurement is to be SQftle by the other party.                           I.
                                                                                                   •                                       •
INhe CcDtractor'$ f¢pre~tative fa.il$ to attend wIleD ~u1red. the_E~Jinee(~{n-Charge shall have PQwe-r                                         t!
                                                              -                        "1'
p~ by himse:lr to take meuumnent!:and in that case the!e m1surements ,ball be accepted by the
Col1t~r as final.                                                                                                                ..
T~ ~t:tOr .hall. once ...1] montb         .ubmit to the Senior I!IIllI "ClvlltBfC witb • copy to the S•• ·M/P. .
·d"'"lItor bli .clalms ror the work da.. by ~Im npl4 and including Ibe previa... montb which ... not covered
 'by hb ConItaot A....menl In any or the rollowlng .-..peets.
      ..
         ai Pomatioa fm .. tb. it.... Ind Speclficatio... p,ovlded In Ibe Cbotraol documents. .
         \Ii
                  .                '



               llat,. Ikma/New It.... or ...,ri<.
                                                                                .
                                                                                           . 1
                                                                                                   .
                                                                                                   •
                                                                                                           ,




       .. e)   Qu ••titiu   in ex .... or Ibe.. p,ovi4ed in the ""ntract _uk.
         ~l     ,..., In respoctor         "blob
                                            tiles b.", ..theen settled. He; sIt.old. In .ddiC;.... rum;,h ,et...,
               '00I'Il!iea«> 10 lb••Irect Ib,t Ibe cilim. ",bmltted oy !11m .. ·afo....ld _ aU bl. ~ andtl10t DO
                IUtIbet daillls ,haU be ,",Iced bY lIim.", mp..I or the wort ...... lII'to and incJu410. the period
               .uu40r report.
 30, VALUATION OP· DllVlATlONS :
                                                                                                   ,
                                                                                                   ,


           Rates rot deviated 1_ or work ..HI be fi.ed II f.n"". :
                                                  --                                               --
                                                            21
        1. for ally     iter!' .. f work ttquirw to he carricd out after Ule e(lnfract has betn' awarded and
              which is not covered by CQntractot~s Schedule but is coveted by K,P. W.D. s<:bedUle of rates tbt tate
              payable fM such    3   fresh item. will be derived from K.P.W.D. S:'oedule by the melhod of proportion
              as (oHows :

        a} In the same proportion to the tate in K.P.W,D. schedule of RatF.. a$lhe tendered tate for tbe nearest
              analogous item of work in ConUliCtor's Schedllle bean: to the raJe for the particular 31'1lt1ogous item or
                                                                              ,
              w{lck in K,P.W .0., schedule (If Rates.                         !   ,
        b) J( a single appropriate anaolgou5 item of work is not aVilab~le
                                                                         lin both Scbedule Contractor's and
                K.P.W.D. Schedule tben the method -of proportion will be app ed to tbe nearest analogous group
                or itcfI'ls avanable in 60th -tb\!: tlebeduJes teferrtd I.e. in the sa 'proportion as the t()tal temkred CbSt
              , ()f that parlicular group ()f Item$ (the-lurn of the prooucls of th~ tendered rates and the quantiti!!$
                for which orders art. placed) bears to the total cost of th~ same!items and quantiti~$ at the K..P. W.D.
              scbeduk: of rates.
         c)   If even an OlpprQpriate analogous ,rol,lp (If i!~. is not ,available in Contractor's Schedule and
               K:P,W.D, Schednle, theu the methods of ptOJ?('rliotl will be at'P1ted to all those items of the wh(l!e
               work. which are available in both the Sched{l~ aOO rot whit)_ orders have bten placed _on the
               Contractor. i.e., 10 tbe fame proporatwn as the toU! cod of ~n these items of work (tbe sum of the.
               product! of the tendered rates and the quantities for which orde"u are placed} bears to the tolal cost Qf
               the same items,ana quanti-Ires: at the K.P.W.D. Schedule ()f Ra;es,
                     ,                                                          I                ,
         JI. lf any W(}fk not covt(f;d by any of the foregoing. is ordered on the Contractor. the basis, of payment
             shall be decided by tbe Accepting Officer whose <kclsi~n sbalt r:e final and conciusive and bi.nding on
               the parties.

               The selection of analogous- item or anarogue grollp of items reC(rred tu above shall be "done by tbe
               Sr.EjC. H/C. Where the rates for deviated items. or new items 0;' work can be derived by the $eJection
               of different analogouS items (lr IOaJ08?US gmu-p of items, the 16west of all such derived Tates- thall
               be taken as the corrtcl rate..
                                                                                 ,
,               In the case of the oontract!! for ,!bkh the Sr. E/C., E/C i~ the Aa::eptrng officer. aU disputes
f               r~afding'the settlement of rates of deviated or new item..~ Itf V{(:rk shall be ,referred to !the Sr. MfP,
              , whose decision s.han be final and conclusive,                     '                           i
                                                                                                              i
    51. REIMBURSEMHNT/UlFUND ON VARIATION IN ,PRICE, MATERIALS:                                               I
     In afler submission of   (b~                                     ()~ WOtlc:~.
                                  tender and/or during the progress :llt'e            the price of n ny maferLI$ (not being
      a mattrlal supplied from the BHRL, stortS In accordance with the Cunditions of the Contract)          is;
                                                                                                              increased -Qr
      decreased by an Act of ~-eghlature (Cen~rat __or, Stale) and/or an~ no(!Jlcation ~her~uri~er. or on
     ·lC(otInt"o'f new duties or Jevies such as ()C~roi or on ll<X:oUtlt of inere;m;r d~re-a~ in sueh d\lHeJ~ .affecti~g the
      price or malerials required for illcorporatiop in the worb or-t~ price 'of 3ny item t(l he ineorporated in the
    . works and made from materials of wbich the priCt bas increased or dect'eaSClt as aforesaid and t~- Contr.etor
      ~~s thereupon 10 pay in respect of sireb material or item a priee which i~ higher Of lower than tbe price of
      tbat material or item as p~\'ailin.g jmmedi~teJy bef~re t~e passing of suqh. Act'or levying, irwrelUingJde~easfog:
      of such duty. lhe BHEL., shall m eMe of mcrease UI price or t~ duty ~elmburse the Contractor tbe mc-rtase
      in price or additional or il1Cr"!ltscd duly paid by the Contractor and jp use (If dectea:>e in price, tbe SHEt
      sban be Mtitled to a refund of the reduction if) (luty. Provid~d howe{'er no reimbursement or refund shalt
      be made if the iotrelJse/d~teuc is-not more thao plus JOY. or the- said    price.  and jf SOt the reimbursement of
      refund sllall be made Quly on the e:lct$$ over 10% ptovidtd always- that any web increase shan oof be payable
      if. in the opinion of the St. MJP whose decision shall be finat and cuntllJsive tbe increase " attributable to
      the delay in the el:ecution of the contract within the ~(mtrol of the Co6tract. or that any ,sueh increasf
      beeome operative arter the corttracled/or,extended date of completion t:f the worh or items of wcr); 1tI
                  .                 .                   .                ,
 Tfle Contractor ~htl1l r('Jt the purpose ofthis condition, krAp suCh '~(>ob of a~n( and other ooclJmeof II
 arc ,fteCCS$ary to sbow the amount of .laY' increase (llalmed or I.ny ~uetton avtllable.;.nd Iball tnow lnspectfOl
 of ihe sam. by any duly authorised. tep....nta6ve of IbfiIH1!L .nd further ,han at the r<qucst of lilt
 Sr. BICIIlIC. rurni,h fo, "".ificati •••oob other .Informatlo••fih.~!. BlB/Cm.y ....uj,..
 The Contractor $haU wl,tbln a reasonable time of.hls beeothing awa're of Iny alteration in the prices of Any
 ,uch ma'e,i,Is, give notice thereor I. wrltlng,toth. S•. Bib. fJlC 't~llng Iha! tb. rat. I••ubrbitted In       "",,,,,Ute
 to this condition together with aU inform. don ttlaling th~te            .
                                                                     to \\'hlch be mily be in a posil~on to supply.
                                                                                                 .
 52. ADVANCES ON ACCOUNT:                                                :.
                                                                 I       .
  No payment ,hall be mad. fo, work "tlrolted to "'''.t J"~ than Ru(l<c' One T·houland till • or the ..hole Of
  the work .I>on b••, beeo·""nipJ.ted aud a ",rtllieate of ~~PJ.tlOtt ~I... by the Competeilt u(horily •
. In the cue of work ~Imated to COlt more than Ru.pees ODe Tbou$~nd thClC oonttactor may· a Intervals of, DOt
  Je$S thn one month or'.$. otherwise 'provided for In tbe C/:tntraet d(:cvrnenU, oolIoting from he date (In which
 ·Qrd-er fo comm~nce w(lrk is given by Sr. B/C: ~C submit claims ~~ BHBt forms for payme4t of advance .on
  a<;COl,lttt of work don¢ e.nd .of materia1s dellver«i !n con~lon witbltht Contract.            !.            -
   The Contractor sbaH be paid in ~. of Illcb claims to the extent :approvtd and pa.sse4 by ~t~ Sr. me. EjC
   subJe<:t a madmum -of9O*..{ ortbe value oftbe,work act!.Itlty tX~ed if! s;ite prov1ded ttic' wod: . ~as been
'. uecu.tt:d to the satIsraeUon of tbe Engineer~fo~httge. The t:eftifiQlte of :the Sr~B/C. E/C regl.riJing such
  ~ppro"'&1 and' passing of the sums 10 payable tball be fina' and OOI1'rusive against tbe Coat(~ot.        .
             U  After the ful! .ampunt Qf Seoority Deposit is made ~p th':Ough the 10~ dedlJe~on' {rOOl 'Oa--
              aecoul1(' btus.• 100% of aU subsequent bills: may be made;to tbe -Conkattor~·.
  The ~ntractor may ciso be paid during the P.l'Ogrest of the work 7~% or the ,,:due of any -materill-It. .~[eB: are /
  in tlte Qplnion of 1M ·Bti~rwin-cllarg~ in aocord~ with cOntrac?., a~d aN: actUally         ~uired (or incorpQn~
  don in the workan.d which b3:v¢ f(a$Onabty been brou#bt to the sitp fn~noection therewith and-arc a&qll~te
  Itom anA/or protected against d~m3ge by weather or other C4i.1$t;$. put 'Which ht!¢ not at the time of payment
  of the ~vanoc been incorPorated in the work. Payment of s1}cb ,advances bo~ver sbaU be purely at t.he
  di~on of tbe- Sr. Mrp/Sr. SIC.IEte provided arwa~ that payments shall not be made uuder these
  periodical certlficates in respect or f'l¢tlsbabte materials like lime, ~~t. timber. _sand hnkar etc.
   Any $Umsfdu~ from tht; Cnntractor ()n a«Xlunt of tools and Plant, stores: or any other Items provided by
   nHEL 'hall be deduclod from·the respective ad ..._.                                                       .
  The ScAior E(lgineer/CivU{BIC shan from time t(l time certHy' the sumS" paybk: to the Contractor afl«-
   reiafnin, (he n:JefY(!$.
   Any certificate relating to work <lone or materIals deliver?d may bc~odifkd (lr t9rrccted by any subsequeut
   interim ~rtjficate Or by the iinal certificate and no certificate of tbe ~t. EtC/RIC il.ipporting an advtnetpa.yment
  'shall itselr ~ <»nelusive eVidence that uy ",,"ork ·or materials tojWhich it relates a.re in accord~noe witb the
   contract. AU Such intermediate payrneDts shaU be regarded 1$ ltdrauces agahuf lite final Pfymeat only lnd
   thall not be. considered 1:$ an edmmiau of tbe due perfllmt:tnce of tit\~l.",ntra~ or any part th¢tcof in tespect
   c,c tk aec.roing (lr Ih)' dafm 'Whatsoever: Soob Intermediate payQx{tltnbaU not ooneh.uk. determine aT- effect
    in ••, way the """"n or the Sr. I!/CiSIC It tn the finnl ..W""".~.nd adju.tln<nl of the ....,u.l, or other·
    wise. or in any way vary or affect the Contraet.                        1                 -
   53. fiNAL BILL:                  .                                    .'                                         ..
   As SDOII as. possible. afier the compfetlon              or
                                                       tbe work to (he s~tfsfaction of the En.gineer.in·ch8r&c:~ the

                      ._h...
   ""offllcl.r ,hall rorward a "",116.d fin.l ....... On BHBL form" in dupllate. It .hln be t""""'P'nicd by
   an_ct"                   ole:, Itt .upport tbeeeof ••d ,1>011 be prcpart;d i. tilt m....r pmcrlbOd., IhO Se.lor
   EnP-fCl¥II/Il/C No e1~lm "III b...terulned aft.., thO m:elpt the 6nal bin..r
                                    ~       .                                ,\                      ;
   Th' ""nt'aeror ,hall be entitled 10 be paid tile fi.al .um I... tbe ..1110 of p")'1lIenta .Iready ",.d ••n ateOl",
   ..bjoct to certllicatlon" ,!!:,Ihe AtIIl bill by the Sr. E/CIIlIC .ny ._, due from the co"ftclor' on ......111 of '
   Tool. and PIa.at, Sto.... ~, ~.y.~tb.d\<!!!' I!.'l!~~"" by BRSt .ot yet """..nod fro,,! lb. ~.tft"or .bln be
    o4aA8""".1 tN._ It...- Atu, I .n...... r...   _.w       ,-   ,      ..               .           .
                                                                                                                               ..
                                                            ,
                                                                           l
                                                                           •
                                                                                                                               -    ~




                                                                           •
                                                     , 23
                              ,                      .
 No cha"••hall be aliowtd lolh< CoM"."" on a"",••t ofth< prepa";llo•. oflh, n.~ bilL
 $.I.. PAYMIlNT'OF BILLS :

 ·...u",,_II '" be m.~. '" 1M Co._or under Ihl. ""ntracI.ball be by .. Cr.,...,j Cbeque" marked .. Ale
 ,.,.. ooIy" (wllbi•• """":ble limo ,11.. 110, ..nliioodon       by Ib, Sl.B/elsle .llbe..._ ......__.. ,_..._,.
  _ _ ... " .......____ .___.____ ...__............. _ ............._ ..~,Iocated ia tbe .tation where either tho
  Work ,. tneUteli or ~ .reodew:l or at their branCh nearest to tk ~"Uon wb~rt the Ofticc. the Scoior  of
 .1!II1i_rIChll/BiC 1.lo<:olod.)
  5$.. RIlCOVER Y PROM CONTRACTOR:
                                                                              ,
                                                                            I·
                                                                         *
 Wbontvor ..der lb. """trae! '.Y·.. I11.r .....; .hlil be toCOv....blo r*,m or payablo by Ih< ",nt-.r Il>e
 ItIQO may be. deducted (tWa any ium then due or wbJcb at I"Y
 " ' . _ under lbe ",.."nl.1 or uoder      '.Y
                                                                           fhcreafter m.), become due t13 tho
                                           olber ..nlract wllh BIIIlL of from hi. Securlly o.po.it .r be ",.U
 ,,"1 the oIlim on demaD<!,                                                                                 '
  56. POST TECHNICAL AUDIT OP WORK AND B1US:
"fIRm. Je$erve the righe to ctrry out. post-payment audit and teehnic:allexamination or the work and iNl
  blJline1mfing .tll\lpporting voucltm. abstra~( ttc.~ and to "force rn»'very of any sumS becoming due tIS a .
  result . t~t:reor  in
                      the manuet provided itt the proceedin! suirparacraphs provid¢d however that no                    $tXh
  rewrni .ball !JO enf(){ced .n..  !hr..
                                    yeo.. of paos!ng the final bill.
  $7. RIlPUND OF SIlCURITY DI!I'OSIT:
                          ,                                                    .
  sOok of the Security o.posil ...nlloood in ""ndition 16 abe.e, ;"'y be r~undod 10    the ecntractot'ln ....pcet of
  .n cocUncts 00 comptetion of W()tk and after payment of fiDal bill ~nd the balance SOO'A oa;clpiry of the
  mal........ period, (d"",,"" .nder ela... 23) provided tbe ..ntra<Wti shall have render«! a ":No Demand
  Ortifteate." In cue of' works where maiotenance perl04 is not' involved'! 100,", or tbe S(fW"rity leposit may be
                 .                                                        I
   refunded after, Plyment of final bill provided that the' contractor ,'haU have rendered a ·f No Demutd
  CertifieMe:"'.

  51. AUITRA nON:
    Except where othe:rwlse provided for in (be oontrllct all questions tnd diiputes relating to the meaain, or til¢:
  'specifications, design, dr.wings and instruction! hereinbefore mentit.nle(f: and u to the quality ot -workmaosbip
    or materials tued on 1he work o£ as to any other question. daim. right' l matter or thing \Vbats~ In Iny', ;
    Wlly arking out of or retating to the contract. de$igN1 drawing. specifita(i<lns. ettim4tes, insCrn¢tioos. orders .
    or tbete (X)nditi<:lns or otherwise conce.rning the work$ or the. exeeution (II' r.ilure toleKecute, (he • me whether
    arislat during lbe ptogrtU of tbe work or after lhe OOmp1<:tion~r. aband~ment 'h~reaf shaH be feried to tho
    ac!o arbltrallon of til< Managh., Dluclor/Chlef Enclneer.f liB(, ljld if tM Managing                       _rleblef
    lIoIi..... 1s ...ble or u.wnling '" let. 10 lbe solo arlIltroUon .ome .l~r person appointed by .. Manaslng
    I:lIrecIorfOellet.1 M....ser;ChIef I!og/_r, willing'" act .. ~ 'arbltltior. The ......     ref"'""          arbltratio.
    obI1 be "''''' thaD Ihose ror "hlch tbe dccbion or Ibe Sr. M/P:/D.C.EE:!r, B/C. k ••p....sed I. tho _~
   '" be."'"     .and coae!u.I... There will be no obJ«ll~n If tb. arbltralor '" appointed I. an ...playeo or 1I11EL
    .... that be bad 10 deal with tho matt... to whi,h tho eontrl.1 telatt$ .~d Ihat in lbe «>.". or         dta 4..tlea ..
    suet. be had c:xpresttd vkwt on aU or tny offhe matten in dlspate or dlrr~. The arbittatOt to, whom
     tile ...ti.. b ",,,10,111 ..corrod being transfertod by vacatins his o!lice 0;' belngunahle to act for' a.y ........
     _ Mi• • Dlm::torJ(lueraI td'•• ger/Cblef llniinee, II afo ....W.i Ih. Ii",. of ouch            masret.       vacalio•
   ..r.... ..r    habllity tote!, aball appoict ..olber """,A \<I .ct....rl>,ltnitor In """"",.""" wllh lilt ' - "r
                                                                                    I               ...
     tho - . Snch _                                                         ....
                                    aball be ..«tlcd to proeoed wIlb III• ..r , from the"'le .t wltloh It _     len      by
    loll fIII!deeonot.                                                         I              .                     .
                                                                                •
    Iobj«t ...roraald Ih. womionor the ArbIt••tloc -A!>I, 1940 or       '.Y    sf;'Mory modfiiootlon   0' .......
                                                                                                         o!JnellI
                                      ~ for lbe tlllllOliollil u..r.... ""'" apply I. tho arbit,tlIon p"""",,,l.,.
                                   ....;!Ide••
    tIMioeor _lI<I!be .ules ...de "'•
                                                                                                             .• 1)
                                                                                                         ,   ",              "-' ~




                                                           24
                                                                                 ,                                   "
                                                                                                                                     !
                                                                                                                                     I

 It i$ a term of tbe contract that the party InvolVing atbltration (shaH          di"pult Of '-dlsplJtet; to be
                                                                               £pedfy ,the                                           !
 refCtfM 10 arbitration undenbi$ cla\lse 10getner with tho amount or amounts daimed in respect       tach HId;   or
 -~                                                                             "                                    ,   .
                                                   .                  .         I
 The arbitrator (5) may (rom time to time with 'C()nsent o{ the parriell :entarge the time, for making uHf
 publishins the award .
. Tho work under thc ContrJct sball, if reasonable possible, eontin:~e,durihg ~lIe .rbHraflofi     proceedings and no
 pay~eot   due to payable to the Contractor ~hall      be withhe1d on account ~.r such proceedings;       _

 Tho Arbitrator shalt be deemed to have enfered ~n the rcfet¢~!on the 'date he Issue; notice 10 both tfl:c
 PAtties fiJdng tho date of lb. flist he,nng.·                        i         ,            I
                                                                                             .
                                                                      ,                ..
 The Arbitrator stun gjv~ a fCparate award in relpect of each difpu{(! of ~rrerence          r~rcrted   to Mm.j -
 The Venue of ~rbitration .haH be such pJace.,l may be fixed        by'~~ Arbitrator in his SQ!e dll!l,\fetiO~.
   "                          •
                                                                      II
                                                                      '!   '
                                                                                "   ,
                                                                                             .;
 The award or tbe arbitrator shall be   .rnal,   conclusive llld biMl(qg ali pn~ie$ to this contract.
                                                                     ".         '



                                                           I




                                                                                .
                                                                                ,




                                                                                ,
                                                                                I'
                                                                     ,
                                                                                        ,



                                                    ANNEXURE - ' A
                                                        ..                          ,!.
                  B HE LCONTRAcrOR'S LABOUR REC?ULATtONS.
                        :     (See condition 2 0 ) :    .'
    I. D6FIIIJfION;          ~                      :
         In ..... ,...u.-. unless othetwke "r""scd ., Indlookd. tb. roj.,,,,,", _d,.nd ••pres.i.....h.U
         ha.. 1h _""" .....by ...iped tolhem.                             .     •.
        a)   H Labour .. means workers employw: by a oontractor dirteUy Of ~ndirettlY through a suh-<:on1racto'l',
              or by an ~nt on his beh~l( on ~ pa,yrnent not exceeding R8. 500;'~ Jklr mont!,.                             .
        b) "' Pair Wage·' means wages, whi~h that! include wages for weekl\\ day or rUt "nd olhl!f al1ow.ance.,
        Whether (or time Of piece work. antr taking in to consideration pr.ev,a!l!lJg 'market ral~3 fo't ,.Imilar employ-
        ment in the neighbourhood but shall not be ~ tha~ the minftnum r.~ Qf wag~ fixed und_er the .
        MloIm......ges Act.               .                           .
                                                                                 •      .
        c). -If Cotltt1\C{or ~~ for the purpose of these Rq:lI~ations ahaU ioctud¢)'Jn agent ~r Jub-eontracfor' employ-
        ittS labour. ott tbe wort ta~ on contract..                              .      I
        d) n laspeetin, Officer .~ meaps .~y Labour EnCorcement Offi<:er O( 4~$;stant 1.ahour COll1mlS$ione:r or
        the Chief Labour Comm\S510nor.S orptdzation.
        e) .. Form meafl1l: a form appended to these Regulations.
     2. Nonca OF COMMENCEMeNT: .
                                                                                   1
                                                                                   I
                                                                                       f
        Ttte Cont~or shalf. within seven days, (If commencement of the wor furnish in writing to 'he Ins.pecting
        Ol'fieu ohhe area concerned the following inFormation. with copy to . Engineet«;n c.hargQ. .
        a)    N_.  and situation of the work.
        b) COf\tf'aelOr's name and address.
                                                                           •

        e) 'attkulars 9f the Department for which tbe work VI ttnderutken.
        d). Namo and. address of su&-eooCract.o(s as and W~Q they ~re appointed.
        C") qomtMnl.':ement .and probable duration 9F the wotk,            t
         f) Number or workers 'employed and likely to be emptoyed. :       f
        s) f "Fait Wages: • for different ~t¢gories, of "ot"kcrs.          1·
                                                                                                                     ,
                                                                                                                     •
     3. i)       Number of hour.; Wnlch "hall constitute It Mrtnal working day. ;The Number of hours ~hich ;.hall
                 oo(l$Utute a Mrrna) working day for an I'dult $hall he NINE h.;H1r, The working dny o~ l!.11 adiflt
                 worker shaU be so .arranged tbat of intervals, if any for tat it shdl not spread over more tbap twelve
                 hOl.its on any day, wf;¢n an adult ~rker is made to work for Ul~re (han NI NE hours on any day or
                 fur more thall Forty Eight hours in any week he s'han in r~pect qi overtime wntk, be paid wages at
                 double tbe ctdinary tab: (If w.ges.                          ,     ~                     . ,           .
        Ii)' Wecl<ty day of..,t : Every worker .natt be given n _kty J~y of irc<t which shaUbe fixed and notified
              at1eul ten days in advanc:c,< .A worker silaU not be required nr aHowed'lo work on the weekly rett
                                                                                        i
              day unless he bas Of wlU lul"Ve Ii substitutioR rest. day, on one of the fiV¢ ,daya Jmtnedfa1ety before,
              Of afte, the ,est day. Provided tha! "",un.titption shaU be nu!d. whlen' will ",.. U In          work...fh<
             'wqrkiog ft)f more than ten days. oonsecutive1r witnout a res.f day-for a wl1o)e'day.         I
                 Wbctt'in accorda11ce··with tbe 'foregoing ofo'Visions a wor~e; ....orkti~o.n the test day and hastfen gt\'fill a
                 .....tu~ test day he shall be "ald wages for the work ~ ~one on ~he wtek~Y res:t day at tleo~ ertime
                 _    ......geS.                                                "       "
             NOTl!.,                                               .     "                                                       ,
             11iO-,ion 'ordlnary ..t. of """"~ mea.. the                 r.i,
                                                                        wage the ",.rk., I, entitled to,
    4. DlSl'l..AY OF Nonce ROOARDING WAilES, WBllKLY DA! Of REST I!TC.          : •                               l
         11Ic00alnct0rahall-..ho_hlI_ ... _                                     dI<PIoy .nd _ I y maJotalo and
         _liMe to dlqoIq ... correcIIJlIIII1otaln ,•• "'""" ... IosIbIe·~ In~. ....... "'" the
         -t.. _10 I!qtloIo ... lIIlhe Iocoll..... "'............ t;y ...jorily Of -bR,' 1M", Ibe
        ,........... fair ..,..., the ,lIoim ... w«!< for ""'Ida iucIt ""'" .'" pmblt. 111< _11 ~ dI)'I ""rbn
. = ' ."'lIIIlItled to and ...,. ••d .dd.....r I"" ~f Oftlcor. ' The ;e..l•••lor .haff lend • ~ .r ...... "
   "f"''''''wch notice to the 1m         na: Oftkora aDd the' Bn neet            :i- ',""'!""'" ...."'J _ _ ''''''c'''''' ",., .. '.."
                                                                    26
(   5. FIXATION OF WAGll PIlRIOOS I
       The Contractor ,b'aU fi~ wage (]¢flnd$ in respect of whk:h waget d,all be payable, No wage perkxl chaU
       normally tx¢t!ed one work.
    6, PAYMENT OF WAGES :
         i} Wages due to every'worker ,baU be ~id to him d~re¢t. All WII~ ,ft.U be pald' in current coins 'cr
            currency or-In both.
          ii)     Wages of every worker employed on tbe contrnct ~hall be ,;aid where tho wage periof is one-week,. ; ,
                  within thret days from tbe end of the wage: period, and in liny otber cas~ befote the expiry or the ·1tl1 '
                                                            .
                  day or 10lh day Crom the end of the,wage period aecordiog: as the' number of ",Jrkert does not
                           .
                  ..ceed 1.000 in .Jceed. 1000.                               i
                                                                                             .


          UI) When empklyment of any worker is terminattd. by ,Qf cJ behalf of tbe <;(lutra~tor, the. waSti
               earned by bim chall be p:dd before (!xpiry of the day ftlcce~ing the one on which his employment is
              'terminated.                                                .
          .iy) Payme~t of wages ,-hall he made at the work lite on a watking day exoept' whe~ the: wuk is

                                                                                                         I',
               completed before expiry (If the wage fJ'lriod. 'in which cue ~nal 'paym~El{ .haH be liJa'de at the ?;,4rk
               site within 43 hours of tbe int working dJ), and drrin g no~1 working timo!.

                 Note:                                           it            1                     I
                 T'b;;rm ~'Wotking day" meatU; a day 9"_ whieb t1~~ w:ocl::. O~Wftlch Jabour is emPlo1'Is io pro,~,

     7.   REOISTIlR OF WORKMEN,.                                         :.    .'           .
          A register of wt>rkmen shatt tie        maintal~bt iu the f~tm   appJ.ded-to !lIese' regullitiOCl$~nd kept_t th¢
          ~ .ite or as neat to it u pomule, and tbe tefeavant parti(.ulats of every workmen s~n                 be- etlt~ .
          tlItre-in witldn tbrte days of his, employment.                                                !



     8.   EMPLOYMENT CARD:
          The contrac,tor shaU I~lk: an employment card in tne form appen~ed to these regulations td each womr
          on tbe day of won: or entry Into his employment. Jf.a W(lrker .bAs a(ready au)' such Cltrd with him
          issued by (ho previQus employer the contractor shal! merdy end!)'~e that employment card with releavattf
          entries. On lerm!n~dQu of employm<tnt (he employment card sb~lI again be l!ndoned by tbe: Contractor
          and returned to the worker.                           '              :
     9. REGISTER OF WAGES                mc:                                   .
            i) A register of wages-tum-muster HIll in the f{)rm appended' to lhese regulatiom sh,al! be maintained
               and kept at the 'fIOrk site or as neat to it as possible. ,  .
          iI) A wage dip in the form appended to (he$t regulations sbaft ge is::tued 10 every worker employ«! by
               the O?ntractdr atleast .. day pliar to disbursem~t of wages ..
    IQ, .FINES AND DBDUCTIQNS WHICH MAY BE MAOa fROM WAGES :
            ;) Wages of worker shaH be paid to him without an}, deduction!' or any ~Ind except the followlog:
                  a)   Fines.
                                                                            •
                   b) DedUctiom rQr absence rrom duty, tt. from the place ot, the places where hy (he terms or hill
                                                                                                    .
                      emptoyment ht is ~uired to work, The amount of ~ltction sball be in ~proJl¢rtlotl tt) tbe
                       Jli'I'Iod ror "hleh h~ .... absent               ':                                      .
                  c) Deduction for, damage' to Of loss, of goods e;t;p~IY enf"tuste;d fo tbe employed penon fn~
                     (:UstOdy. 'or for lets of money which he is ffittdl«i to a¢ount for, wbere luch 4amage Qr k;':_.[
                      I, dl...lly allrlbull\W, to bi. neg1eot .. def••lt ;      I.                  .
                   d) tleduollo.. for ....very or .d" •.,.. or ror ,d).'lm,! or over p.y ....! of       w,S".   Ad",..,..
                         a.to<! ,ban be Ot!tored 10 • nelsto':·.M· .. ·.... .. I  .                              .
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                         DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                            Volume-1
                      SPECIAL CONDITIONS OF CONTRACT        Section - 6




                 SECTION 6:
       SPECIAL CONDITIONS OF CONTRACT




      ENQUIRY No.
                                   REV. R0
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                             DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                 Volume-1
                      SPECIAL CONDITIONS OF CONTRACT             Section - 6


GENERAL

The special conditions of contract and other contract documents are
complimentary to each other and shall be read in conjunction with
each other. In case of any confliction of meanings between the special
conditions of contract and the BHEL GCC, provisions of special
conditions of contract shall over ride the corresponding provisions of
the BHEL GCC.

GENERAL SCOPE OF WORK

This tender specification for Pilling, Civil & structural steel works
includes detailed design, engineering, construction , shop & field
fabrication, inspection, storage and inplant transportation for all
facilities of the inplant coal & ash handling system(design & detailing
for AHP will be in BHEL/BHEL vendor scope) and handing over to
employer as per the scope defined in Section -2, Volume-1.

The detailed scope of work and the technical requirements for the
work to be executed under this specification shall be as per the
approved drawings, technical requirements enclosed in Vol-II

The detail scope of work covered in the section 2 is not a
comprehensive list of items of work involved. The detail scope of work
may vary considerably depending on the actual requirements at site as
per the requirements of the customer if any.

ALSO INCLUDED IN THE SCOPE
Unless otherwise specified, the work to be provided by the contractor
for the items shall include but not be limited to the following:



a)    Furnishing all labour, materials, supervision, construction plans,
equipment, supplies, transport to & from the site, fuel, electricity,
compressed air, water, transit and storage insurance and all other
incidental items and temporary works not shown on specified but


      ENQUIRY No.
                                   REV. R0                PAGE 1 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                             DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                  Volume-1
                      SPECIAL CONDITIONS OF CONTRACT              Section - 6


reasonably implied or necessary for the proper completion,
maintenance and handing over the works, except in accordance with
the stipulations laid down in the contract documents and additional
stipulations as may be provided by the engineer during the course of
works.

b)     Furnishing samples of all materials required by the engineers
for testing / inspection and approval for use in the works. The samples
may be retained by the engineer for final incorporation in the works.

c)     Furnishing test reports for the products used or intended to be
used, if called for the specifications or if so desired by the engineer.

d)     Giving all notices, paying all fees, taxes etc., in accordance with
the general conditions of contract, that is required for all works
including temporary works.

e)   Arranging manufacturer's supervision for items of work done as
per manufacturer's specifications when so specified.

f)     Carrying out required survey and establish levels and coordinates
at suitable intervals from existing grid levels and coordinates furnished
by the owner established bench marks, setting out the locations and
levels of proposed structures, constructions and marking of reference
pillars and other identifications works etc as required. The contractor
shall provide the owner / BHEL such an assistance, instruments,
machines, labour and materials as are normally required for examining,
measuring and testing any work and the quality, weight or quantity of
any material used.

g)    Providing all incidental items not shown or specified but
reasonably implied or necessary for the successful completion of the
work in accordance with contract.


      ENQUIRY No.
                                   REV. R0                 PAGE 2 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                              DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                   Volume-1
                      SPECIAL CONDITIONS OF CONTRACT               Section - 6



 BHEL / ISG is an ISO 9001-2000, ISO 14001-1996 and OHSAS 18001-
1999 certified company. Quality of work to customer's satisfaction and
system requirements is the essence of these certifications. The
contractor in all respects will organize his work, systems, environment,
process control documentation, tools, plant, inspection, measuring and
testing equipments etc. as per instructions of BHEL engineer.

 The contractor shall also comply with applicable legislation and
regulations with regard to health, safety and environmental aspects for
minimizing risk arising from occupational health, safety hazards,
controlling pollution and wastages.

h)    The customer M/s. Bihar State Electricity Board. (BSEB) and / or
their consultant may depute their representative for checking and
supervision of important stages of work. The contractor shall be
required to provide all facilities for inspection of works at no extra cost
to BHEL. Any defect in quality of work or deviations from
drawings/specifications pointed out during such inspection shall be
made good by the contractor in the same way as if pointed out by the
BHEL Engineer, without any cost implications to BHEL

INSTRUCTION TO TENDERERS

The tenderer are advised to physically visit the site and fully acquaint
themselves with site conditions, transportation routes, various
distances and the fact that other contractors would be working in this
area their structures are to be protected. The material brought and
stacked for construction should not make hindrance to other
contractors. Necessary precaution and arrangements including
sprinkling of water during work as acceptable to BHEL for safety &
security for the above have to be made by the contractor. No claim will
be entertained by BHEL on ground of lack of knowledge and the
contractor's rates shall be deemed to have taken this into account.

      ENQUIRY No.
                                   REV. R0                  PAGE 3 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                              DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                   Volume-1
                      SPECIAL CONDITIONS OF CONTRACT               Section - 6



The contractor, in the event of this work awarded to him, shall
establish an office at site and keep posted an authorized, responsible
officer with valid Power of Attorney for the purpose of the contract.
Any order or instructions of the engineer or his duly authorized
representative, communicated to the contractor's representative at
site office will be deemed to have been communicated to the
contractor at his legal address.

SITE FACILITIES

LAND

BHEL shall allot land to the contractor if customer GSECL allots the
same to BHEL for his office & stores. Contractor must maintain the
areas allotted to him in a neat and clean condition as required by the
Employer. The contractor shall provide adequate storage, testing and
office facilities with approval from the engineer. The rate quoted by
the contractor shall be deemed to include for these and no separate
payment will be made towards these.

On completion of work, the site shall be cleaned by the contactor of all
materials, temporary sheds, debris, rubbish plants and equipments,
belonging to the contractor at no extra cost. The site and surroundings
shall be handed over in neat and clean conditions. Periodical house
keeping shall be done by contractor as per the instructions of BHEL
and GSECL at no extra cost. In case of any failure by the contractor,
the employer will get set at risk and cost of the contractor.

SUPPLY OF POWER, WATER, ETC.

Construction power and construction water shall be supplied free of cost.
However this shall not be binding on BHEL / Customer. In case BHEL /
Customer are unable to supply due to any reasons, contractor shall
arrange Construction power and construction water on his own.

However both construction power & water is supplied at one point within
the thermal power plant boundary. Successful contractor of BHEL shall
arrange by suitable means to tap the same. All the safety precautions shall

      ENQUIRY No.
                                   REV. R0                  PAGE 4 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                              DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                   Volume-1
                      SPECIAL CONDITIONS OF CONTRACT               Section - 6


be followed in taping the same. Consumption meter shall be established to
meter the consumption. The power and water so issued shall not be
misused.

However due to some reason Contractor is not been able to supply
construction power and water the same shall be arranged by bidder at his
own cost. No additional commercial implication is applicable. Such charges
are deemed to have been included in the offer. No separate payment is
admitted.

MACHINERY

The contractor shall at his own expenses supply all tools, plant and
equipment (herein after referred to as T&P) required for the execution of
contract.

CONTRACTOR’S SUPERVISION

The contractor shall either himself supervise the execution of the contract
or shall appoint a competent engineer / agent approved by the engineer to
act in his stead.

The contractor shall employ required number of engineers and site staff for
executing the above work. A list of minimum manpower proposed to be
deployed shall be enclosed in this offer.

If the contractor fails to appoint a suitable engineers/ manpower as
aforesaid, the engineer shall have full powers to suspend the execution of
work and stop payment of any money that may have become due until
such date as a suitable engineers/ manpower is appointed and the
contractor shall be held responsible for the delay caused to the work
and no extension of time on this account shall be given to him.

Orders given to the contractor's engineers shall be considered to have
the same force as if they had been given to the contractor himself.

The contractor or his authorized site in charge shall be in attendance
at the site during all working hours and shall superintend the

      ENQUIRY No.
                                   REV. R0                  PAGE 5 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                            DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                Volume-1
                      SPECIAL CONDITIONS OF CONTRACT            Section - 6


execution of work with such additional assistance in each grade as the
engineer may consider necessary.

The contractor or his authorized site in-charge shall attend, when
required and without making any claim for doing so, either the office
of the engineer or the work site to receive instructions.

The BHEL engineer shall have full powers to instruct the contractor to
arrange for immediate termination of services in connection with this
contract, of any agent, servant or employee whose continued
employment is, in his opinion, undesirable without assigning any
reason.

SUPERVISORY STAFF AND WORKMEN

The contractor shall deploy all the experienced skilled, semi skilled
and unskilled workmen required for all the works under these
specifications. BHEL reserves the right to decide on the suitability of
the workers and other personnel who will be deployed by the
contractor. BHEL reserves the right to insist on removal of any
employee of the contractor at any time, if they find him unsuitable
and the contractor shall forth with remove him.


The supervisory staff including qualified engineers deployed by the
contractor shall ensure proper out-turn of work and discipline on the
part of the labour put on the job by the contractor and in general see
that the works are carried out in a safe and proper manner and in
coordination with other labour and staff deployed directly by BHEL or
other contractors of BHEL / BHEL's client / other agency.

The work shall be executed under the usual conditions like rain,
insufficient space, improper approach roads etc., effecting major
construction work and in conjunction with numerous other operations
at site. The contractor and his personnel shall cooperate with other
personnel/contractor, coordinating his work with others and proceed
in a manner that shall not delay or hinder the progress of work as a
whole.

      ENQUIRY No.
                                   REV. R0               PAGE 6 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                              DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                   Volume-1
                      SPECIAL CONDITIONS OF CONTRACT               Section - 6



The contractor's supervisory staff shall execute the work in the most
substantial and workman like manner in the stipulated time. Accuracy
of work and aesthetic finish are essential part of this contract. The
contractor shall be responsible to ensure that assembly and
workmanship conform to the dimensions and tolerances given in the
drawings/documents/instructions given by BHEL engineer from time to
time.

It is the responsibility of the contractor to engage his workmen in
shifts or on overtime basis for achieving the targets set by BHEL. The
contractor's finally accepted rates shall include all these contingencies.
During the course of construction, if the progress is found
unsatisfactory, or in the opinion of SHEL, if it is found that the skilled
workmen like carpenter, bar bender, masons, welder, fitters,
technicians etc. deployed are not sufficient, BHEL after giving
reasonable opportunity to the contractor, will induct on the work the
required workmen in addition to contractor's workmen to improve the
progress and recover from the contractor's bills.

If the contractor or his workmen or employees shall break, deface,
injure or destroy any part of a building, road kerb, fence, enclosure,
water pipes, cables, drains, electric or telephone posts or wire, trees
or any other property or to any part of erected components etc., the
contractor shall make the same good at his own expense or in default,
BHEL may cause the same to be made good by other workmen or by
other means and deduct the expenses (of which BHEL's decision will
be final) from any money due to the contractor.

The month wise manpower deployment plan to be submitted. This is
only to assess the capability as well as understanding of the contractor
to execute the work. It shall be the contractor's responsibility to
deploy the required manpower, for timely and successful completion
of the job, to any extent over and above those indicated in the above
deployment plan (including those which are not covered in the plan
submitted) without any compensation on this account.



      ENQUIRY No.
                                   REV. R0                  PAGE 7 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                            DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                Volume-1
                      SPECIAL CONDITIONS OF CONTRACT            Section - 6


TOOLS AND PLANTS AND MACHINERY

Providing of required Tools and plants and machinery for executing
the subject work is the responsibility of Contractor. Minimum
requirement of tools and plants and machinery shall be indicated in
the offer.

In the event of failure of contractor to bring necessary and sufficient
T&Ps & Machinery, BHEL will be at liberty to arrange the same at the
risk and cost of contractor including transportation cost of same from
any of BHEL site/place and hire charges as applicable shall be
deducted from contractor's bill. Decision of BHEL in this regard shall
be final and binding on contractor.

All distribution boards, connecting cables/welding cables, wire ropes,
hoses etc., including temporary air/water/electrical connectors etc.
shall have to be arranged by the contractor at his own cost.

The contractor shall engage trained and experienced operators for the
operation of T&P's and machinery. BHEL engineer will check their skill
and performance before they are allowed to operate the same.
However, checking of skills by BHEL does not absolve the contractor of
his responsibilities for proper and safe handling of equipment,
consistent good performance of operators and regular performance
evaluation of operators.

The day to day and routine maintenance of T&Ps and machinery
should be carried out by contractor and these shall be maintained in
good working condition during the entire period of use T&Ps in
defective/damaged condition shall be rectified promptly to the full
satisfaction of BHEL engineer. Contractor shall maintain records for
maintenance of major T&Ps which shall be made available for
inspection whenever required. In case of any lapses on the part of the
contractor, BHEL at its own discretion get the servicing/repair of
equipment done at the risk and cost of the contractor with BHEL
overheads as applicable time to time.

The contractor shall arrange all spares needed for upkeep of all T&Ps

      ENQUIRY No.
                                   REV. R0               PAGE 8 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                              DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                  Volume-1
                      SPECIAL CONDITIONS OF CONTRACT              Section - 6


and machinery. For cranes, contractor shall arrange spares for
repair/replacement of filter, batteries, self, dynamo, gaskets, hoses,
oil seals and rubber parts.

The contractor shall permanently deploy with them minimum number
of mechanics and skilled workers for undertaking the regular
maintenance of tools and plants and machinery and for increasing /
shortening of the crane boom as required. The contractor shall also
arrange required tools, supports, consumables, illumination etc. for
the above purpose.

The contractor shall arrange for consolidation of ground and
arrangement of sleepers/sand bag filling etc. for safe operation /
movement of equipment including cranes/trailers etc. at his cost.

In the event of BHEL arranging T&P's and Machineries at the cost and
risk of contractor, any loss / damage to any part of T&Ps and
machineries provided by BHEL shall be to the contractor's account
and any expenditure on these accounts by BHEL will be recovered
from the contractor's bill in case the contractor fails to make good the
loss.

Further it shall be the responsibility of the contractor to take delivery
of T&Ps from stores or place of use by other contractor at project site,
transport the same to site and return the same to BHEL store/place
as intimated by BHEL Engineer in project site in good working
conditions after use.

Contractor shall ensure deployment of serviced and healthy T&Ps
including cranes, lifting tackles, wire ropes, manila ropes, winches
and slings etc. History card and maintenance records for major T&Ps
will be maintained by the contractor and will be made available to
BHEL engineer for inspection as and when required. Identification for
such T&Ps will be done as per BHEL Engineer's advice.

Contractor shall ensure deployment of reliable and calibrated IMTEs
(Inspection Measuring and Test Equipment). The IMTEs shall have
test/calibration certificates from authorized / Govt. approved /

      ENQUIRY No.
                                   REV. R0                 PAGE 9 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                            DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                Volume-1
                      SPECIAL CONDITIONS OF CONTRACT            Section - 6


accredited agencies traceable to National/International standards.
Each IMTE shall have a label indicating calibration status Le., date of
calibration, calibration agency and due date for calibration. A list of
such instruments deployed by contractor at site with its calibration
status is to be submitted to BHEL engineer for control.

Re-testing / re-calibration shall also be arranged at regular intervals
during the period of use as advised by BHEL Engineer within the
contract price. The contractor will also have alternate arrangements
for such IMTE so that work does not suffer when the particular
instrument is sent for calibration. Also if any IMTEs not found fit for
use, BHEL shall have the right to stop the use of such item and
instruct the contractor to deploy proper item and recall i.e., repeat
the readings taken by that instrument, failing which BHEL may deploy
IMTEs and retake the readings at contractor's 'cost.



BHEL shall have lien on all T&P, IMTEs and other equipment of the
contractor brought to the site for the purpose of erection, testing and
commissioning. BHEL shall continue to hold the lien on all such items
through out the period of contract. No material brought to the site
shall be removed from the site by the contractor and/or his sub-
contractors without the prior written approval of the engineer.

The contractor shall submit month wise T&P deployment plan. It is
only to assess the capability as well as understanding of the
contractor to execute the work. However it shall be the contractor's
responsibility to deploy the required T&Ps, for timely and successful
completion of the job, to any extent over and above those indicated
in the above deployment plan (including those which are not covered
in the plan submitted) without any compensation on this account.

MATERIALS

The contractor shall at his own expenses provide all materials
including cement, paints, welding electrodes, PTEF bearings, etc
required for the work. However for permanent structural steel works

      ENQUIRY No.
                                   REV. R0               PAGE 10 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                             DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                 Volume-1
                      SPECIAL CONDITIONS OF CONTRACT             Section - 6


BHEL will supply structural steel free of cost as per terms & conditions
specified elsewhere in the tender. Along with that BHEL will also
supply reinforcement steel free of cost.

All materials to be provided by the contractor shall be of the best kind
in conformity with the specifications laid down in the contract or as
per relevant Indian standards and the contractor shall, if requested by
the engineer, furnish proof to the satisfaction of engineer that the
materials so comply.

The contractor shall, at his own expenses and without delay, supply
to the engineer samples of materials proposed to be used in the
works. The engineer shall within seven days of supply of samples or
within such further period as he may require will intimate to the
contractor in writing, whether samples are approved by him or not. If
samples are not approved, the contractor shall forthwith arrange to
supply to the engineer for his approval fresh samples complying with
the specifications laid down in the contract. Any delay in approval of
samples (original or fresh ones) shall not make the contractor eligible
for any compensation.

The BHEL engineer shall have full powers for removal of any or all of
the materials brought to site by the contractor which are not in
accordance with the contract specifications or do not conform in
character or quality to samples approved by him. In case of default
on the part of the contractor in removing rejected materials, the
engineer shall be at liberty to have them removed by other means.
The BHEL engineer shall have full powers to procure other proper
material to be substituted for rejected materials and in the event of
the contractor refusing to comply, he may cause the same to be
supplied by other means. All costs, which may attend upon such
removal and / or substitution shall be borne by the contractor.

Cement, as received from the manufacturer / stockiest shall be
supplied by contractor. The contractor shall maintain good stores for
storing the cement brought by him. The flooring of the storage house,
the clearance of cement bags from the side walls etc. shall be as per
the instructions of the Engineer-in-charge. The cement stores shall be

      ENQUIRY No.
                                   REV. R0                PAGE 11 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                             DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                 Volume-1
                      SPECIAL CONDITIONS OF CONTRACT             Section - 6


open for supervision and verification by the Engineer-in-charge or his
authorized representative by any time when the Engineer-in-charge
feels the need to do so.

In the case of steel materials, the same shall be supplied generally on
the basis of weight and will be calculated as per Indian standard. For
the purpose of billing and accounting, only linear measurement
multiplied by the standard unit weight will be considered and the
difference between the measured weight and actual weight shall be to
contractor's account. Quoted price shall be deemed to include the
above. No claim whatsoever shall be entertained on account of
wastage and difference in weight as referred to above.

The contractor shall bear all incidental costs including site lifting,
carting from Issue points to site / contractor's store, custody and
handling etc.,

The contractor will have to submit their design mix for different grades
of concrete keeping in view the requirements stipulated in 1S-456. The
minimum cement content for various grades of concrete shall be as
specified in the design memorandum/ design basis report.

The contractor shall indemnify BHEL, its representatives or employees
against any action, claim or proceeding relating to infringement or use
of any patent or design or any alleged patent or design rights and shall
pay any royalties or other charges which may be payable in respect of
any article or material or part thereof included in the contract. In the
event of any claim being made or action being brought against BHEL
or any agent, servant or employee of BHEL in respect of any such
matters as aforesaid, the contractor shall immediately be notified
thereof, provided that such indemnity shall not apply when such
infringement has taken place in complying with the specific directions
issued by BHEL but the contractor shall pay any royalties or other
charges payable in respect of any such use, the amount so paid being
reimbursed to the contractor only if the use was the result of any
drawings and / or specifications issued after submission of the tender.

The engineer shall be entitled to have tests carried out as specified in


      ENQUIRY No.
                                   REV. R0                PAGE 12 of 33
      88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
             PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                     WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                                        DATE: 04/06/2011
                 2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                             Volume-1
                       SPECIAL CONDITIONS OF CONTRACT                        Section - 6


the contract for any materials supplied by the contractor other than
those for which, as stated above, satisfactory proof has already been
furnished, at the cost of the contractor and the contractor shall provide
at his expense all facilities which the engineer may require for the
purpose. If no tests are specified in the contract and such tests are
required by the engineer, the contractor shall provide all facilities
required for the purpose and the charges for these tests shall be borne
by the contractor only.

MATERIAL SUPPLY BY BHEL FREE OF COST

The contractor shall at his own expenses provide all construction materials (including
cement) required for the work.
However BHEL will supply Structural steel & Reinforcement steel free of cost
as per following terms & conditions:
CHP
All structural & reinforcement steel required for CHP shall be supplied by BHEL free
of cost.

AHP
All structural & reinforcement steel required for AHP shall be supplied by BHEL free
of cost.

Materials will be issued only for building structures, permanent works
and not for technological ( BAH alone) structures, for making
templates, other temporary works, enabling works etc. and the same
shall not be into account for purpose of material reconciliation.

The contractor shall bear all other costs including the lifting, carting
from issue points to works site/contractor's stores, custody and
handling etc. and return of surplus/serviceable materials to owner's
stores to be designated by the Engineer-in-charge and all expenditure
will be made by the contractor.


The structural steel and reinforcement steel shall be issued in
available lengths / shapes on weight basis and cost of all
straightening, cutting and jointing if any required shall be borne by


       ENQUIRY No.
                                       REV. R0                       PAGE 13 of 33
       88/11/6010/AK
BHEL-ISG             GENERAL SPECIFICATION FOR
            PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                    WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                              DATE: 04/06/2011
                2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                  Volume-1
                       SPECIAL CONDITIONS OF CONTRACT             Section - 6


the contractor and no claims for extra payment on account of issue of
non-standard lengths/shapes will be entertained by BHEL.

For the purpose of accounting of structural steel, the steel received by
the contractor on weight basis from BHEL stores / directly from steel
supplier on F.D.R site basis shall be the basis for received quantity of
steel. The charges of weighing if any , loading and unloading of steel,
further transport, lead, lift etc., shall be borne by the contractor. The
difference in unit weight as per IS and actual as issued, if any shall be
to the contractor's account and contractor shall quote the rates for
corresponding item to take care of such difference.

Measurement of work done and reconciliation will be done on the
following basis:

a)Measurement of work done shall be on the basis of bill of materials
furnished (based on unit weights as per IS) in the approved
fabrication drawings OR as per the revised sections mutually agreed at
site due to non-availability of sections mentioned in the drawings. The
difference in unit weight as per IS and actual as issued, if any shall be
to the contractor's account.

b)3.5% allowance for all kinds of permissible wastages including 0.5%
invisible wastage/ scrap, over theoretical quantity incorporated in the
works considering the unit weight as per IS code of practice shall be
considered for reconciliation purpose but not for payment. However
scrap generated due to the wastages mentioned above belongs to
BHEL.

c)Balance steel shall be returned to BHEL in good condition and in
acceptable length / size as mentioned below.

i)     Any rolled steel sections other than plates : 1.25 Mtrs (or)
longer

ii)    Plates: Minimum width of 0.3 Mtr and length not less than 1.25
Mtrs


       ENQUIRY No.
                                    REV. R0                PAGE 14 of 33
       88/11/6010/AK
BHEL-ISG             GENERAL SPECIFICATION FOR
            PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                    WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                               DATE: 04/06/2011
                2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                  Volume-1
                       SPECIAL CONDITIONS OF CONTRACT             Section - 6


iii)   Reinforcement steel not less than 3.0 Mtrs in length.

d)Quoted price by the contractor shall be deemed to include the above
and the permissible wastages mentioned. No claim whatsoever shall
be entertained on account of wastage and difference in weight as
referred to above.

Issue of stores material is subject to availability and the contractor
shall not be entitled to any claim or compensation for non supply or
delay in the supply under any circumstances. The material will be
issued generally during the working hours.

The contractor shall submit proper account of material/material
reconciliation statement for the material drawn by him from stores
once in every month along with running account bill. Failing
compliance of this requirement further issue of steel to the contractor
may be suspended and no claim of compensation for delay in
execution on this account shall be entertained.

Any unused / serviceable quantity of structural steel and
reinforcement    steel not  returned    in  good    condition   &
wastages/loss/consumption beyond specified/agreed limits shall be
charged at penal rate.

EXECUTION OF WORK

The work shall be executed in a workman like manner and to the
entire satisfaction of the engineer and as per technical specification
issued with tender, IS codes, CPWD specifications as applicable. In
case of conflict, the decision of the engineer shall be final and binding.

The engineer will communicate or confirm his instructions to the
contractor in respect of the execution of the work in a "Work Site
Order Book" maintained at his office and the contractor shall visit this
office daily and shall confirm receipt of such instructions by signing the
relevant entries in this book. Such entries will rank as order or notices
in writing within the intent and meaning of these conditions.


       ENQUIRY No.
                                    REV. R0                PAGE 15 of 33
       88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                               DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                   Volume-1
                      SPECIAL CONDITIONS OF CONTRACT               Section - 6


Only BHEL approved make electrodes will be used. All electrodes shall
be heated and dried in the electric electrode drying oven to the
required temperature for the period specified by the engineer before
these are used in erection work. All welders shall have electrodes
drying portable oven at the work spot. The electrodes brought to site
will have valid manufacturing test certificates. The test certificate shall
have co-relation with the lot no./ batch no. given on the electrode. No
electrodes will be allowed to be used in the absence of above
requirement. The thermostat and thermometer of electrode drying
over will be also calibrated and test certificate from Govt.
approved/accredited test house traceable to National/International
standards will be submitted to BHEL before putting the over in use.
Periodical calibration for the same shall also be arranged by the
contractor within the finally accepted rates.

SETTING OUT

All the works shall be set out to the true lines, grades and elevation
indicated on the drawing. The contractor shall be responsible to locate
and set out the works. Only one grid reference line and bench mark
will be made available for setting out the works under the contract.
This reference lines shall be used as datum for the works under the
contract and the contractor has to establish for his work area at
available points horizontal and vertical control points. The contractor
shall inform BHEL well in advance of the times and places at which he
wishes to do work in the area allotted to him so that suitable datum
points established by him are checked by BHEL / customer to enable
the contractor to proceed with the works. Any work done without
being properly located may be removed and / or dismantled by BHEL /
customer at contractor’s expense.

The contractor shall at his own expense take all proper and
responsible precautions to preserve and maintain these datum marks
to its true position. In the event of these marks being disturbed. or
obliterated by accident or due to any other cause whatsoever, the
same may be deemed necessary placed by BHEL / customer at
contractor's expenses.




      ENQUIRY No.
                                   REV. R0                  PAGE 16 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                               DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                   Volume-1
                      SPECIAL CONDITIONS OF CONTRACT               Section - 6



SITE DRAINAGE

All water including sub-soil water which may accumulate on the site
during the progress of the works or in trenches and excavations,
including monsoon period shall be removed by the contractor from the
site to the satisfaction of the engineer. It will also be responsibility of
the contractor to de-water all the foundation pits, trenches with
suitable dewatering methods like, pumping out, well point system etc.
considering the depth of water table at plant site. All such expenditure
on de-watering shall be deemed to be included in quoted rates.

INSPECTION AND STAGE APPROVAL OF THE WORK

The owner or his duly authorised representative shall have at all
reasonable times access to the contractor's premises or works and
shall have the power to inspect drawings or any portion of the work,
examine the materials and workmanship and shall have the authority
to reject any work. This would be implemented through joint
inspection by the representative of the owner and BHEL / third party
appointed by BHEL and in the form of joint protocols without any extra
claims and loss of time and amount.

All work embracing more than one process shall be subject to
examination and approval at each stage thereof and the contractor
shall give due notice in writing to the engineer when each stage is
ready. In default of such notice being received, the engineer shall be
entitled to approve the quality and extent thereof at any time he may
choose and in the event of any dispute, the decision of the engineer
thereon shall be final and conclusive.

UNCOVERING AND MAKING GOOD

The contractor shall uncover any part of the works and/or make
openings in or through the same as the engineer may from time to
time direct for his verification and shall reinstate and make good such
part to the satisfaction of the engineer. If any such part has been
covered up or put out of view after being approved by the engineer
and is subsequently found on uncovering to be executed in accordance
with the contract, the expenses of uncovering and / or making opening

      ENQUIRY No.
                                   REV. R0                  PAGE 17 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                           DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                               Volume-1
                      SPECIAL CONDITIONS OF CONTRACT           Section - 6


in or through reinstating and making good the same shall be borne by
BHEL. In any other case all such expenses shall be borne by the
contractor.

DISCREPANCIES AND ADJUSTMENT FOR ERRORS

The several documents forming the contract are to be taken as
mutually explanatory of one another, detailed drawings being followed
in preference to small scale drawings and figures dimensions in
preference to scale and special conditions in preference to general
conditions.

In case of discrepancies between schedules of quantities, the
specification and/or the drawings, the following order of preference
shall be observed

a)Design Basis Report
b)Description in schedule of items
c)Special conditions
d)Specific technical requirements
e)Drawings
f)Technical specifications
g)General conditions of contract

If there are varying or conflicting provisions made in anyone
document forming part of the contract, the engineer shall be the
deciding authority with regard to the document.

Any error in description, quantity in schedule of quantities or any
omission there from shall not vitiate the contract or release the
contractor from the execution of the whole or any part of the works
comprised there in according to the drawings and specifications or
from any of his obligations under the contract.

If on check there are found to be differences between the rates given
by the contractor in words and figures or in the amount worked out by
him in the schedule of quantities and general summary, the same
shall be adjusted in accordance with the following rules:


      ENQUIRY No.
                                   REV. R0              PAGE 18 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                             DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                 Volume-1
                      SPECIAL CONDITIONS OF CONTRACT             Section - 6


A)In the event of discrepancies between description in words and
figures quoted by a tenderer, the lesser of the two will be treated as
valid rate.

B)In the event of an error occurring in the amount column of schedule
of quantities as a result of wrong extension of the unit rate and
quantity, the unit rate shall be regarded as firm and extension shall be
amended on the basis of the rate.

C)All errors in totaling in the amount column and in carrying forward
totals shall be corrected.

D)The totals of various sections of bill of quantities amended shall be
carried over to the general summary and the tendered sum amended
accordingly. The tendered sum so altered shall, for the purpose of
tender, be substituted for the sum originally tendered and considered
for acceptance instead of the original sum quoted by the tenderer. Any
rounding of quantities or in sections of bill of quantities or in general
summary, by the tenderer, shall be ignored.

E)If neither drawing nor specification contain any mention of minor
details of construction which in the opinion of the engineer whose
decision shall be final and conclusive, are reasonable and obviously
and fairly intended for satisfactory completion of work, such details
shall be provided by the contractor without any extra cost, as if they
were specially mentioned and shall be deemed to be included in the
drawings.

Besides provision with regard to safety, contractor shall note that
explosives shall not be used on the work by contractor except with
permission in written the engineer and in manner and to the extent to
the he has presented. Where explosives are used, the same shall be
stored in a special magazine to be provided by and at the cost of the
contractor who shall be liable for all damages, losses and injury to any
person or property and shall be responsible for complying with all
statutory obligations in this respect.

The contractor will be responsible for health, safety and environment

      ENQUIRY No.
                                   REV. R0                PAGE 19 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                              DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                  Volume-1
                      SPECIAL CONDITIONS OF CONTRACT              Section - 6


management at site for the construction activities to be carried out by
them in accordance with requirements given in the tender document.

Contractor shall arrange for following provisions of HSE (Health,
Safety & Environment Policy):

1.    Contractor has to maintain contact with local hospital having
scanning and other modern medical facilities required during
emergency.

2.     Contractor has to ensure pre-employment medical check for all
staff and workers.

3.     Contractor has to ensure that adequate first aid facilities with
trained nurse and ambulance are available at work site for emergency
purpose. This emergency set-up should include, but not limited to
following :

(i)Male Nurse (In shifts) (ii)Oxygen set up (iii) Breathing apparatus
(iv) Eye wash facility (v) Stretcher (vi) Trauma blanket (vii) Medicines.

The ambulance is required to be arranged and maintained at site and
for entire contract period for subject work by the successful bidder.
This emergency facility set up including ambulance, male nurse etc.
will be shared by BHEL and its other contractors working at same
project in case of an need at no extra cost to BHEL and its sub-
contractors.

NUISANCE

The contractor shall not at any time do, cause or permit any nuisance
on site or do anything which shall cause unnecessary disturbance or
inconvenience to owners, tenants or occupiers of other properties near
the site and to the public generally.

MATERAIL OBTAINED FROM EXCAVATION

Materials of any kind obtained from excavation on the site shall

      ENQUIRY No.
                                   REV. R0                 PAGE 20 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                               DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                   Volume-1
                      SPECIAL CONDITIONS OF CONTRACT               Section - 6


remain the property of BHEL/ Its client and shall dispose/ utilizes as
per the direction of engineer in charge at no extra cost.

TRESASURE, TROVE, FOSSILS ETC.

All fossils, coins, articles of value or antiquity and structures and other
remains or things of geological or archaeological interest discovered
on the site shall be the absolute property of SHEL / SHEL's client and
the contractor shall take reasonable precautions to prevent his
workmen or any other person from removing or damaging any such
article or thing, shall immediately upon discovery and carryout the
engineer's directions as to the disposal of the same.

PROTECTION OF WORK

Trees designated by the engineer shall be protected from damage
during the course of the works and earth level within 1 meter of each
such tree shall not be charged. Where necessary, such trees shall be
protected by providing temporary fencing.

The contractor shall provide and maintain at his own expense all
lights, guards, fencing and watching when and where necessary or
required by the engineer for the protection of the works or for the
safety and convenience of those employed on the works or the public.

The contractor shall have total responsibility for protecting his works
till it is finally taken over by the engineer. No claim will be entertained
by the engineer for any damage or loss to the contractor's works and
the contractor shall be responsible for the complete restoration of the
damaged works to its original condition to comply with the
specifications and drawings. Should any such damage to the
contractor's works occur because of other party not under his
supervision or control, the contractor shall make his claim directly with
the party concerned. The contractor shall not cause any delay in the
repair of such damaged works because of any delay in the resolution
of such disputes. The contractor shall proceed to repair the work
immediately and no cause thereof will be assigned pending resolution
of such disputes.


      ENQUIRY No.
                                   REV. R0                  PAGE 21 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                               DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                   Volume-1
                      SPECIAL CONDITIONS OF CONTRACT               Section - 6



RECORD FOR MATERIALS CONSUMED

The contractor shall maintain and furnish to the engineer the record of
materials consumed in the works for each activity. The statement
showing the theoretical vis-a-vis actual consumption of specified
materials, such as structural steel, grouting compound, paint etc. shall
be enclosed along with the running bills submitted by the contractor.
Contractor has to also furnish the test results of the materials used in
the work as per IS specifications.

PROTECTION OF EMBEDMENTS, BOLTS ETC


The contractor shall ensure proper protection to the satisfaction of the
engineer, of all bolts, inserts, embedment etc. from weather etc. by
greasing, rapping them with gunny bags or canvas or by any other
means as directed by engineer. Cost of such protections shall be
deemed to be included in the rates quoted for the item.



CLEARANCE OF SITE AND REPAIRS

Contractor has to clear the site/area where mechanical and electrical
erection work is to be commenced or in progress. The contractor shall
remove construction materials and equipment lying in the vicinity and
causing obstruction in the erection work within 24 hrs. notice. In case,
he fails to clear the site, this will be done at his risk and cost by BHEL.

QUALITY ASSURANCE

The contractor shall submit the following quality document for approval
of BHEL and its client.

1.    Quality plan for civil and structural works.
2.    Welding procedure
3.    Quality plan for painting work
4.    Quality plan for sheeting work

      ENQUIRY No.
                                   REV. R0                  PAGE 22 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                             DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                 Volume-1
                      SPECIAL CONDITIONS OF CONTRACT             Section - 6



The contractor has to establish / arrange at site the field testing
facilities for ensuring the proper quality, grade and strength of the
materials used in the construction in line with approved field quality
plan / check list. Contractor has to submit detailed report for testing of
all material used etc. All testing shall be done as per IS code
specifications / approved quality plan. If further test is required by the
engineer to be carried from outside laboratory, the cost of the same
shall be borne by the contractor.

COMPLETION OF WORK

The works shall be completed to the entire satisfaction of the engineer
and in accordance with the completion schedule as specified in the
contract and all unused stores and materials, tools, plant, equipment,
temporary buildings, site office, labour hutments and other things shall
be removed and the site and work cleared of rubbish and all waste
materials and delivered up clean and tidy to the satisfaction of the
engineer at the contractor's expenses.


BHEL shall have power to take over from the contractor from time to
time such sections of the work as have been completed to the
satisfaction of the engineer. Such work however shall not be treated as
have been completed until the extra works are executed to the
satisfaction of engineer. The guarantee period shall commence only
after handing over of the entire works.

The engineer shall certify to the contractor the date on which the work
is completed and the date thereof.

RECORDS AND MEASUREMENT

All items having a financial value shall be entered in BHEL
measurement book so that a complete record is obtained of all works
performed under the contract.

ITEM RATE omissions will be entered for deduction. Measurement shall

      ENQUIRY No.
                                   REV. R0                PAGE 23 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                               DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                   Volume-1
                      SPECIAL CONDITIONS OF CONTRACT               Section - 6


be restricted to that required to ascertain the financial liability of BHEL
under the contract.

Work which fails to be measured in details shall be measured
physically without reference to any local custom that may obtain
excepting where it may otherwise be directed in the tender
documents. The measurements shall be taken jointly by any person
duly authorized on the part of BHEL and by the contractor.

The engineer shall give reasonable notice in writing to the contractor
of appointment for measurement. The contractor shall, without extra
charge, provide assistance with appliances and other things necessary
for measurement and shall bear all the cost of measurement of his
work.

Measurement shall be entered in BHEL Measurement Book and signed
and dated by both parties each day at the site on completion of
measurement. If the contractor objects to any of the measurements
recorded on behalf of SHEL, a note to that effect will be made in BHEL
Measurement Book or against the item or items objected to and such
note shall be signed and dated by both the parties engaged in taking
the measurement.

If, as a result of such objection, it becomes necessary to re-measure
the work wholly or in part the expense of such re-measurement shall
be borne by the contractor.

If the contractor's representative fails to attend when required, the
engineer shall have power to proceed by himself to take
measurements and in that case these measurements shall be accepted
by the contractor as final.

The contractor shall, once in every month, submit to the engineer
details of his claims for the work done by him up to and including the
previous month which are not covered by this contract agreement in
any of the following respects:

a)    Deviation from the items and specifications provided in the

      ENQUIRY No.
                                   REV. R0                  PAGE 24 of 33
      88/11/6010/AK
BHEL-ISG             GENERAL SPECIFICATION FOR
            PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                    WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                             DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                 Volume-1
                      SPECIAL CONDITIONS OF CONTRACT             Section - 6


contract.

b)    Extra item/ new items of work

c)    Quantities in excess of those provided in the contract schedule.

d)    Items in respect of which rates have not been settled.


MEATHOD OF MEASUREMENT

Method of measurements shall be as per standard specifications
included in the tender. For other items measurements shall be as
per relevant IS codes.

COMPLIANCE TO REGULATIONS AND BYELAWS:

The contractor shall conform to the provisions of any statute
relating to the work and regulations and bylaws of any local
authority and of any water and lighting companies or undertaking
with whose system the work is proposed to be connected. He
shall, before making any variation from the drawings or the
specifications that may be necessitated for such connections give
the engineer, notice specifying the variation proposed to be
made and the reasons therefore and shall not carryout any
variation until he has received instructions from the engineer in
respect thereof. The contractor shall be bound to give all notices
required by statute, regulations or bye-laws as aforesaid and to
pay all fees and taxes payable to any authority in respect
thereof.

FACILITES TO BE PROVIDED BY THE BHEL/ CONTRACTOR

BHEL shall provide free of charge limited open space, for office
and storage shed, as and where made available by M/s GSECL. It
is the responsibility of the contractor to construct sheds, provide
all utilities and dismantle and clear the site after completion of
work or as and when required, as a part of his scope of work.

      ENQUIRY No.
                                   REV. R0                PAGE 25 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                              DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                  Volume-1
                      SPECIAL CONDITIONS OF CONTRACT              Section - 6



Contractor shall be responsible for providing all necessary
facilities like residential accommodation, transport, electricity,
water, medical facilities etc. as required under various labour
laws and statutory rules and regulations framed there under to
the personnel employed by him.

Construction power, for construction purposes will be provided by BHEL
at one point. Further distribution of power shall be done by contractor
at his cost. All wiring must comply with local regulations and will be
subject to engineer's inspection and approval before connecting supply.

Provision of distribution lines of power from the central points to the
required place with proper distribution boards observing the safety
rules laid down by the authorities of the state shall be done by the
contractor, supplying all the materials like cables, distribution board,
switch board, TPN, CBS, ELCBS, MCCBs, Copper, brass clamps, copper
conductor, change over switches, pipes etc. at his own cost. If any
failure is caused in supply of the power and water, it is the
responsibility of the contractor to make alternate arrangements at his
cost. The contractor shall adjust his working shift / hours accordingly
and deploy additional manpower if necessary so as to achieve the
targets.

In case of power cuts / load shedding no compensation for idle labour
or extension of time for completion of work will be given to contractor.

Adequate lighting facilities such as flood lamps, hand lamps and area
lighting shall be arranged by the contractor at the site of construction,
contractor's material storage area etc. Quoted rate by the contractor
shall be deemed to include cost of all above work.

Construction water, for construction purposes will be provided by
BHEL free of cost and at one point. Further distribution of water shall
be done by contractor at his cost. Contractor to satisfy himself that
the water drawn by him is fit for construction/consumption and
adequately treat such water at his cost when it is not found fit for the
said purposes. The contractor should make arrangements for storage


      ENQUIRY No.
                                   REV. R0                 PAGE 26 of 33
      88/11/6010/AK
BHEL-ISG             GENERAL SPECIFICATION FOR
            PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                    WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                             DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                 Volume-1
                      SPECIAL CONDITIONS OF CONTRACT             Section - 6


of sufficient quantity of water required for work.

The contractor shall during the progress of the work, provide, erect
and maintain at his own expenses all necessary temporary workshops,
stores, consumables, offices etc. required for the proper and efficient
execution of the work. The planning, setting and erection of these
buildings shall have the approval of the engineer and the contractor
shall at all times keep them tidy and in a clean and sanitary condition
to the entire satisfaction of the engineer.

On completion of work or as and when required by BHEL, all the
temporary buildings, structures, pipe lines, cables etc. shall be
dismantled and leveled and debris shall be removed as per instruction
of BHEL by the contractor at his cost. In the event of his failure to do
so, same will be got done by the engineer and expenses incurred shall
be recovered from the contractor along with prevailing overhead. The
decision of BHEL engineer in this regard shall be final.

DEVIATION

The contractor shall not make any alteration in addition to or omission
from the work as described in the tender documents except in
pursuance of the written instructions of the engineer. No such
deviation from the work described in the tender documents shall be
valid unless the same has been specifically confirmed and accepted by
the engineer in writing and incorporated in the contract.

The engineer may deviate, either by way of addition or deduction,
from the work so described, provided that the contract sum be not
thereby varied on the whole by more than the percentage set out in
the tender documents. The value of all additions and deductions shall
be added to or deducted from the contract sum. Whenever the
engineer intends to exercise such a right his intentions shall specify
the deviations which are to be made, the ITEM RATE assessment or
the proposed basis of payment, the extra time allowed, if any, and the
date for completion of the entire contract. Any objection by the
contractor to any matter concerning the order shall be notified by him
in writing to the engineer within seven days from the date of such

      ENQUIRY No.
                                   REV. R0                PAGE 27 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                              DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                  Volume-1
                      SPECIAL CONDITIONS OF CONTRACT              Section - 6


order, but under no circumstances shall the work be stopped unless so
ordered by the engineer, owing to differences or controversy that may
arise from such an objection. In the absence of such a notification of
objection by the contractor, he will be deemed to have accepted the
order and the conditions stated therein.

VALUATION OF DEVIATIONS

Rates for deviated items or new items of work shall be as follows:

New Items and specifications shall be selected from DSR- CPWD –
2007. For such items the rate shall be DSR- CPWD – 2007 + the
enhancement factor as fixed by CPWD for that zone and the year of
execution.

If the rates for the additional, altered or substituted work are not
specifically provided in the contract for the work, the rates will be
derived from the rates for a similar class of work as are specified in
the contract for the work.

If the rates for the altered, additional or substituted work cannot be
determined in the manner specified in above clauses, the rates for
such part or parts will be determined by the engineer on the basis of
prevailing market rates when the work was done and the decision
given in this behalf shall be final and binding on the contract. Rate
analysis will be worked on CPWD manual of rate analysis as guidance.

If the rates for the altered, additional or substituted work cannot be
determined in the manner specified in above clauses, then the
contractor shall within 7 days of the date of receipt of order to carry
out the work inform the engineer of the rate at which it is his intention
or charge for such class of work, supported by analysis of the rate or
rates claimed, and the engineer shall determine the rate or rates on
the basis of prevailing market rates and pay the contractor
accordingly. However, the engineer, by notice in writing, will be at
liberty to cancel his order to carry out such class of work and arrange
to carry it out in such manner as he may consider advisable. But
under no circumstance the contractor shall suspend the work on the

      ENQUIRY No.
                                   REV. R0                 PAGE 28 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                            DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                Volume-1
                      SPECIAL CONDITIONS OF CONTRACT            Section - 6


plea of non-settlement of rates falling under the clause or claim any
compensation on that account. Elements of profit, overheads,
supervision and establishment charges will be taken as 11 % over
direct cost.

PROGRESS REPORT

Contractor is required to draw mutually agreed monthly programme in
consultation with BHEL well in advance. Contractor shall ensure
achievement of agreed programme and shall also timely arrange
additional resources considered necessary at no extra cost to BHEL.

Weekly progress review meetings will be held at site during which
actual progress during the week vis-a-vis scheduled programme shall
be discussed for actions to be taken for achieving targets. The
programme for subsequent week shall also be presented by contractor
for discussions. The contractor shall constantly update/revise his work
programme to meet the over all requirement. All quality problems
shall be discussed during above review meetings. Necessary
preventive and corrective action shall be discussed and decided upon
in such review meetings and shall be implemented by the contractor in
time bound manner so as to eliminate the cause of non-conformities.

The contractor shall submit weekly and monthly progress reports,
materials reports, consumables (gases/electrodes) report and other
reports as per Performa considered necessary by the engineer.

The progress report shall indicate the progress achieved against
planned, with reasons indicating delays, if any, and shall give the
remedial actions which the contractor intends to take to make good
the slippage or lost time, so that further works again proceed as per
the original programme and the slippages do not accumulate and
effect the overall programme.

The daily manpower reports shall clearly indicate the manpower
deployed, categorywise specifying also the activities in which they are
engaged.



      ENQUIRY No.
                                   REV. R0               PAGE 29 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                            DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                Volume-1
                      SPECIAL CONDITIONS OF CONTRACT            Section - 6


DRAWING AND DOCUMENT

The detailed drawings and documents shall be prepared by the
successful contractor as per the specification, system requirement and
the scope. These drawings and documents shall be submitted to
BHEL/Customer/Customer's consultant for checking and approval.
Approved drawings shall be released for construction. The contractor
will also ensure availability of all drawings/documents at work place.
Contractor shall ensure safe storage and quick retrieval of these
documents.

The contractor shall maintain a record of all drawings and documents
available with him in a register as per format given by BHEL engineer.
Contractor shall ensure use of pertinent drawings / detail documents
and removal of obsolete ones from work place and return to BHEL.

The data furnished in various annexure enclosed with this tender
specification are only approximate and for guidance. However, the
change in the design and in the quantity may occur as is usual in any
such large scale of work.

Should any error or ambiguity be discovered in the specification or
information the contractor shall forthwith bring the same to the notice
of BHEL before commencement of work. BHEL's interpretation in such
cases shall be final and binding on the contractor.

Deviation from design dimensions should not exceed permissible limit.
The contractor shall not correct or alter any dimension / details,
without specific approval of BHEL.

DELAY AND EXTENSION OF TIME

If, in the opinion of the engineer, the work is delayed :
a)      by reason of abnormally bad weather, or
b)      by reason of serious loss or damage by fire, or
c)      by reason of civil commotion, local combination of workmen,
strike or lockout, affecting any of the trades employed on the work, or


      ENQUIRY No.
                                   REV. R0               PAGE 30 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                            DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                Volume-1
                      SPECIAL CONDITIONS OF CONTRACT            Section - 6


d)     by delay on the part of the agency or tradesmen engaged by
the BHEL in executing work not forming part of the contract, or
e)     by reason of any other cause which in the absolute discretion of
the engineer is beyond the contractor’s control, then in any such
case,    the engineer (or higher      authority)  may make fair and
reasonable extension in the completion dates of the individual items
of work or the contract as a whole. Such extension which will be
communicated to the contractor by the engineer in writing shall be
final and binding on the contractor. No other claim in this respect for
compensation or otherwise howsoever is admissible.           Upon the
happening of any such event causing delay, the contractor shall
immediately give notice thereof in writing to the engineer but shall
nevertheless use constantly his best endeavor to prevent or make
good the delay and shall do all that may reasonably be required to
the satisfaction of the engineer to proceed with the work.

INCOME TAX AND SALES TAX :

Unless specified elsewhere, Income Tax at the prevailing rate on gross
value of work done and applicable surcharge shall be deducted from
the running bills unless exempted by the Income Tax Authorities.

Contractor shall get his organization registered with concerned sales
tax authorities within 15 days of award of this contract. The delay on
this account and delay in bringing the material shall be to contractor’s
account and no extension of time shall be allowed on this account.
The sales tax registration for this contract shall be forwarded to BHEL
within 30 days from the date of LOI. In case the contractor is already
registered for sales tax with Govt. Authorities he must quote his
registration no. While submitting their tender.

Contractor has to make his own arrangement at his cost for
completing the formalities, if required, with Sales Tax Authorities,
for bringing their materials, plants, and equipment at site for the
execution of the work under this contract.

TIME SCHEDULE:


      ENQUIRY No.
                                   REV. R0               PAGE 31 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                             DATE: 04/06/2011
               2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                 Volume-1
                      SPECIAL CONDITIONS OF CONTRACT             Section - 6


The contractor is required to mobilize at site / commence the work
within 7 days from the date of issue of letter of intent unless BHEL
decided to fix any other later date. Entire work as detailed in tender
specification shall be completed within period mentioned elsewhere
from the scheduled date of start of work as per the programs /
milestones indicated by BHEL. Contractor has to mobilize adequate
resources to meet BHEL’s commitments to their customer as indicated
from time to time. In case due to reasons not attributable to the
contractor,       the    work    gets        delayed   and   additional
manpower/resources have to be mobilised so as to expedite the
work to meet various milestones,        same shall be done within the
quoted rates as per Rate Schedule, at no extra cost to BHEL. In the
event the contractor fails to respond to these requirements,     BHEL
shall take appropriate actions to meet customer’s commitments in line
with the provisions of general conditions of contract.

In case due to reasons not attributable to the contractor, the work
gets delayed and scheduled completion gets        extended,    time
extension  will be granted by BHEL but in       no case    over run
compensation will be payable.

The work under the scope of this contract is deemed to be completed
in all respects, only when all the works are carried out as per
satisfaction of BHEL. The decision of BHEL on completion date shall be
final & binding on the contractor.

TERMS OF PAYMENT :

The terms of payment shall be as mentioned elsewhere in the tender
document. The contractor shall be paid monthly running bill       as per
billing schedule, provided the work has been executed to the
satisfaction of the engineer. BHEL site in charge, at his discretion can
split this payment, to facilitate site operations. The engineer may
after a measured bill allow and certify payment to the contractor on
the basis of abstract measurement bill submitted by the contractor.
Contractor will also submit the floppy / CD containing abstract and
measurement sheets of the bill which will be returned to him after
correction for further resubmission of bill.        From this amount

      ENQUIRY No.
                                   REV. R0                PAGE 32 of 33
      88/11/6010/AK
BHEL-ISG            GENERAL SPECIFICATION FOR
           PILLING, CIVIL, STRUCTURAL & ARCHITECTURAL SPECIFICATION NO
                   WORKS OF CHP & AHP PACKAGE         IS- 1-10-2013 / 005

                                                                   DATE: 04/06/2011
                2X250 MW BARAUNI THERMAL POWER PROJECT
                                                                       Volume-1
                      SPECIAL CONDITIONS OF CONTRACT                   Section - 6


recovery such as advances, security deposit taxes etc. would be
made. The certificate of the engineer regarding such approval and
passing of sums so payable shall be final and conclusive against the
contractor.

Any certificate relating to the work done may be modified by any
subsequent interim certificates or by the final certificates and no
certificate of the engineer supporting an advance payment shall of
itself be conclusive evidence that any work or materials to which is
relates are in accordance with the contract.

INSURANCE:

Besides provisions under clause No.38 of                    GCC    regarding
insurance, is not applicable for this contract.

BHEL / its customer shall arrange for insuring the materials of BHEL /
its customer covering the risks during transit, storage, erection and
commissioning.

However contractor shall take the insurance for their labours, tools,
tackles, equipment etc.


RATE SCHEDULE CUM BOQ/ VARIATION:

Contractor shall fully understand description and scope of work before
quoting.    The scope of work and responsibility of the contractor as
mentioned under this specification shall be covered within the quoted /
finally accepted rates.

BHEL Site Office:

Tenderer to construct the BHEL- Site office, Covered store and open storage yard
with paved surface and fencing around the open store.




      ENQUIRY No.
                                    REV. R0                     PAGE 33 of 33
      88/11/6010/AK
BHEL-ISG               GENERAL SPECIFICATION FOR        SPECIFICATION NO
              PILING, CIVIL, STRUCTURAL & ARCHITECTURAL
                      WORKS OF CHP & AHP PACKAGE        IS- 1-10-2013 / 005

                  2X250 MW BARAUNI THERMAL POWER PROJECT   DATE: 04/06/2011

                                                              VOLUME 1 /
                               HSE MANUAL
                                                              SECTION 7




                            SECTION 7:
                           HSE MANUAL




           ENQUIRY No.
                                     REV. R0
           88/11/6010/AK
BHEL-ISG              GENERAL SPECIFICATION FOR
                                                         SPECIFICATION NO:
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL   IS-1-10-2013/ 005
                    WORKS OF CHP & AHP PACKAGE
               2X250 MW BARAUNI THERMAL POWER PROJECT    DATE :04/06/2011


                            LIST OF EQUIPMENTS                 Volume 1/
                                                               Section 8




                                SECTION 8:
                           LIST OF EQUIPMENTS




           ENQUIRY No.
                                       REV. R0
           88/11/6010/AK
BHEL-ISG                     GENERAL SPECIFICATION FOR
                                                                   SPECIFICATION NO:
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL              IS-1-10-2013/ 005
                    WORKS OF CHP & AHP PACKAGE
                2X250 MW BARAUNI THERMAL POWER PROJECT             DATE :04/06/2011


                                LIST OF EQUIPMENTS                        Volume 1/
                                                                          Section 8

SCOPE:

The below said list is indicative. However the deployment of the equipments shall
be as per the requirement at site.


           MINIMUM REQUIREMENT OF EQUIPMENTS,INSTRUMENTS AND TOOLS ETC.
               FOR CIVIL WORKS TO BE PROVIDED BY THE CONTRACTOR.

  SL
                                                             QTY                UNIT
 NO. DESCRIPTION
                                                              3
  1                                                                             no
      L&T Poclain CK 90 Excavator
                                                              2
  2                                                                             No.
      JCB excavator
                                                              2
  3                                                                             Nos.
      Vibratory rollers
                                                              4
  4                                                                             Nos.
      Plate vibrators
                                                              1
  5                                                                             No.
      Escort Crane
                                                              6
  6                                                                             Nos.
      Dumpers
                                                              2
  7                                                                             Nos.
      Tractor with trailer
                                                              1
  8                                                                             No.
      Concrete batching plant
                                                              2
  9                                                                             Nos.
      Transit Mixer
                                                              1
 10                                                                             Nos.
      Concrete pump
                                                              1
 11                                                                             Nos.
      Concrete mixer 7/10 Cft operated
                                                              1
 12                                                                             Nos.
      Concrete weigh batchers
                                                              8
 13                                                                             Nos.
      Concrete immersion vibrators
                                                              2
 14                                                                             Nos.
      Air Compressors



           ENQUIRY No.
                                           REV. R0                PAGE 1 of 7
           88/11/6010/AK
BHEL-ISG                 GENERAL SPECIFICATION FOR
                                                                       SPECIFICATION NO:
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL                 IS-1-10-2013/ 005
                    WORKS OF CHP & AHP PACKAGE
                2X250 MW BARAUNI THERMAL POWER PROJECT                 DATE :04/06/2011


                                LIST OF EQUIPMENTS                           Volume 1/
                                                                             Section 8

                                                                 2
 15                                                                                Nos.
      Concrete pressure grouting pumps
 16                                                                                lot
      Field testing equipment
                                                                 1
 17                                                                                No.
      Compression Testing Machine
                                                                 1
 18                                                                                No.
      Total station
                                                                 2
 19                                                                                Nos.
      Levelling instruments ( dumpy, laser)
                                                                8000
 20                                                                                Sqm
      Steel forms/Plywood
                                                                100
                                                                                   Mt
 21   Steel props/steel spans/steel staging/
      scaffolding pipes
                                                               20000
 22                                                                                Nos.
      Steel couplers for staging pipes
                                                                 1
 23                                                                                Nos.
      Builders Hoists(Electrically operated)
                                                                 2
 24                                                                                Nos.
      Jack Hammers
                                                                 1
 25                                                                                No.
      Pavement breakers
                                                                 3
 26                                                                                Nos.
      Water pumps of various sizes
                                                                 6
 27                                                                                Nos.
      Dewatering pumps of different capacities
                                                                 3
 28                                                                                Nos.
      Welding transformers
                                                                 1
 29                                                                                No.
      Water tanker
                                                                 1
 30                                                                                No.
      Electrode baking oven-fixed type
                                                                 1
 31                                                                                No.
      Electrode baking oven-portable type
 32   Welding accessories                                    as required
 33   Portable Grinding machine of various sizes             as required
 34   Boom Placer Min. 35 m long                                  1                No.
 35   All special tools & equipment                          as required
 36   Fillet weld measuring gauge                            as required
 37   Electronic distance measuring device                        1                No.



           ENQUIRY No.
                                                   REV. R0           PAGE 2 of 7
           88/11/6010/AK
BHEL-ISG                 GENERAL SPECIFICATION FOR
                                                                         SPECIFICATION NO:
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL                    IS-1-10-2013/ 005
                    WORKS OF CHP & AHP PACKAGE
                2X250 MW BARAUNI THERMAL POWER PROJECT                   DATE :04/06/2011


                               LIST OF EQUIPMENTS                              Volume 1/
                                                                               Section 8

 38   Spring balance                                                 2                Nos.
 39   Electric Winches                                               2                Nos.
 40   Spray painting equipments                                      1
 41   Paint thickness measuring instrument                           1                No.
 42   Drilling machine                                          as required
 43   Safety net                                                as required
 44   Steel tapes & measuring device                            as required
 45   Safety devices for usage at work site                     as required
 46   Portable fire extinguisher                                as required
 47   Noise level indicator                                          1                No.
 48   Air quality monitoring instruments                             1                No.
 49   Walkie & talkie                                                3                No.
 50   Emergency medical aid kits                                     1                Nos.
      Portable insulated metal site office (cabin) of minimum
      size 35m length,5 m width,3m height with required
 51   furniture, lighting, ventilation and air conditioned          1                 No.
      space and with required doors and windows
      aluminium fittings etc.

      Portable insulated metal/plastic (sintex or approved
 52                                                                 1                 No.
      equivalent) toilet of size 5m length,3m width,3m
      height with required sanitary fittings

 53   PVC (sintex or approved equivalent) water tank of             2                 Nos.
      3000 litres capacity
 54   All other equipments, instruments, tools etc.             as required




           ENQUIRY No.
                                                 REV. R0                PAGE 3 of 7
           88/11/6010/AK
BHEL-ISG                       GENERAL SPECIFICATION FOR
                                                                                  SPECIFICATION NO:
              PILING, CIVIL, STRUCTURAL & ARCHITECTURAL                            IS-1-10-2013/ 005
                     WORKS OF CHP & AHP PACKAGE
                  2X250 MW BARAUNI THERMAL POWER PROJECT                          DATE :04/06/2011


                                    LIST OF EQUIPMENTS                                    Volume 1/
                                                                                          Section 8

Minimum requirement of equipments, instruments and tools etc. For structural
and fabrication works to be provided by the contractor.
Sl.No   DESCRIPTION                                                     QTY        UNIT

1       Trucks-20 T capacity                                              2        No

2       Tractor with Trailer                                              2        Nos.

3       Tractor with Trailer – 40 feet length                             2        Nos.

4       Total station (one second accuracy, digital)                      1        No

5       Levelling Instruments (dumpy, laser)                              1        Nos.

6       Welding Transformers                                              8        Nos.

7       Welding rectifier, 600/400 AMS and generator sets                 4        Nos.

8       Electrode Baking Oven – Fixed Type                                3        Nos.

9       Electrode Baking Oven – Portable Type                             6        Nos.

10      Welding Accessories                                        As Required

11      Portable Grinding Machine of various sizes                 As Required

12      All special Tools & equipment                              As Required

13      Fillet Weld measuring gauge                                As Required

14      Any other equipments, instruments, tools etc.              As Required


        Escort Crane – 10 T Capacity
15                                                                        3        Nos.

16      Escort Crane – 5 T Capacity                                       1        Nos.

17      Crane 955 – 75 T Capacity –min. 75 M Boom Length                  1        Nos.

18      Crane 855 – 40 T Capacity –min. 50 M Boom Length                  2        Nos.

19      Crane tyre mounted – 10 T Capacity- min.15 M Boom Length          1        Nos.




           ENQUIRY No.
                                                        REV. R0                  PAGE 4 of 7
           88/11/6010/AK
BHEL-ISG                    GENERAL SPECIFICATION FOR
                                                                               SPECIFICATION NO:
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL                          IS-1-10-2013/ 005
                    WORKS OF CHP & AHP PACKAGE
                 2X250 MW BARAUNI THERMAL POWER PROJECT                        DATE :04/06/2011


                                   LIST OF EQUIPMENTS                                  Volume 1/
                                                                                       Section 8

20     Jib Arm minimum 10 M length                                     2        Nos.

21     Hydras – 20 T Capacity                                          2        Nos.

22     Jeep – Car                                                      2        Nos.

23     Diesel power generator of required capacity                     3        No.

24     Portable hand held welding generator                            3        Nos.

25     Pencil grinding                                                 -        Nos.

26     Hand grinding-Min. 2.5 m long                                   -        Nos.

27     Buffing Tools of required size                                  5        Nos.

28     Plane and Milling machine --- Required capacity                 2        No.

29     Electronic Plumb 10 kg & 20 kg capacity                         2        Nos.

                                                                As per
30     Illumination Dome lights and general illumination
                                                                requirement

                                                                As per
31     Marking tools etc.
                                                                requirement

32     Grouting pump                                                   2        Nos.

33     Pug cutting machine                                             2        Nos.

34     Gas cutting sets                                                7        Nos.

35     Electric Winches 10T,5T, 3T & 1T                                3        Nos.

36     Hook Chuck                                                      3        Nos.

37     Chain Pulley Block 3 T to 10 T capacity                         3        Nos.

                                                                As per
38     Other Erection tools and tackles
                                                                requirement

39     Sand blasting equipment required capacity                       1        Sets




           ENQUIRY No.
                                                      REV. R0                 PAGE 5 of 7
           88/11/6010/AK
BHEL-ISG                    GENERAL SPECIFICATION FOR
                                                                                     SPECIFICATION NO:
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL                                IS-1-10-2013/ 005
                    WORKS OF CHP & AHP PACKAGE
                 2X250 MW BARAUNI THERMAL POWER PROJECT                              DATE :04/06/2011


                                   LIST OF EQUIPMENTS                                        Volume 1/
                                                                                             Section 8

40     Spray painting equipments required capacity                           2        Sets

41     Paint thickness measuring instrument                                  1        Nos.

42     Torque Wrench                                                         1        Sets

43     Drilling machine --- Radial type required capacity                    2        Nos.

44     Drilling machine --- Pillar type required capacity                    1        Nos.

45     Drilling machine --- Hand drill required capacity                     4        Nos.

46     Lathe machine required capacity                                       1        Nos.

47     Safety ladder for AC sheet laying required size                       -        Sets

                                                                      As per
48     Safety net
                                                                      requirement

                                                                      As per
49     Steel tapes and measuring device
                                                                      requirement

       Personal protective safety equipments for usage at work site   As per
50
       including safety helmets, shoes, goggles etc.                  requirement


51                                                                           4        Nos.
       Portable fire extinguisher
52     Noise level indicator                                                 1        Nos.

53     Air quality monitoring instruments                                    1        Nos.

54     Walkie and talkie                                                     1        Sets

55     Emergency medical aid kits                                            2        Nos.

56     Welding quality control equipment such as MPI, LPI. R.T &      As per
       U.T etc.                                                       requirement

                                                                      As per
57     Local stress relieving equipment
                                                                      requirement




           ENQUIRY No.
                                                           REV. R0                  PAGE 6 of 7
           88/11/6010/AK
BHEL-ISG                  GENERAL SPECIFICATION FOR
                                                                SPECIFICATION NO:
             PILING, CIVIL, STRUCTURAL & ARCHITECTURAL           IS-1-10-2013/ 005
                    WORKS OF CHP & AHP PACKAGE
                2X250 MW BARAUNI THERMAL POWER PROJECT          DATE :04/06/2011


                                   LIST OF EQUIPMENTS                   Volume 1/
                                                                        Section 8

58     Concrete/steel scraper for storage               1000     Nos.

59     Storage yard steel sheets                        50       MT




           ENQUIRY No.
                                              REV. R0          PAGE 7 of 7
           88/11/6010/AK
BHEL-ISG                   GENERAL SPECIFICATION FOR
                      PILLING, CIVIL, STRUCTURAL &        SPECIFICATION NO:
                                                           IS-1-10-2013/ 005
                   ARCHITECTURAL WORKS OF CHP & AHP
                                PACKAGE                   DATE: 04/06/2011
                 2X250 MW BARAUNI THERMAL POWER PROJECT
                           MAN POWER REQUIRMENT                Volume 1 /
                                                                Section 9




                                  SECTION 9:
                    MAN POWER REQUIRMENT




           ENQUIRY No.
                                      REV. R0
           88/11/6010/AK
BHEL-ISG                   GENERAL SPECIFICATION FOR
                      PILLING, CIVIL, STRUCTURAL &                           SPECIFICATION NO:
                                                                              IS-1-10-2013/ 005
                   ARCHITECTURAL WORKS OF CHP & AHP
                                PACKAGE                                      DATE: 04/06/2011
                 2X250 MW BARAUNI THERMAL POWER PROJECT
                             MAN POWER REQUIRMENT                                 Volume 1 /
                                                                                   Section 9

List of Minimum Requirement of Supervision Personals at site:



SL.                                                        Min.               Min. yr of
No.               Details                 Nos.
                                                      Qualification          Experience

 1    Site-In-charge                        1          B.Tech (civil)             10

      Engineer-in-charge for CIVIL
 2                                          1          B.Tech (civil)             5
      works

      Engineer-in-charge for
 3                                          1          B.Tech (civil)             5
      STRUCTURAL works

 4    Civil Supervisors                     4          Diploma (civil)            3

 5    Structural Supervisors                4          Diploma (civil)            3

 6    Quality Supervisor                    1          Diploma (civil)            3

 7    Surveyors                             2                                     3

 8    Quality Engineers (civil)             1                                     5

 9    Quality Engineers (Structural)        1                                     5

      Clarical staff for stores &
 10                                         3
      building




           ENQUIRY No.
                                         REV. R0                         PAGE 1 of 1
           88/11/6010/AK

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:48
posted:10/8/2011
language:
pages:127