Time Management Planner for MYP Technology

Document Sample
Time Management Planner for MYP Technology Powered By Docstoc
					          Time Management Planner for MYP Technology
          In Criterion B: Plan, you need to demonstrate your ability to organise both time and resources.
          The Task Organiser below helps you to organise the tasks in order, and to produce a Gantt Chart to show your planning.

          Task name (15 characters)        Time in minutes

Task 1                                                                   Instructions:
Task 2
Task 3                                                                   1.
Task 4
Task 5
Task 6
Task 7
Task 8
Task 9
Task 10                                                                  2.
Task 11
Task 12                                                                  3.
Task 13
Task 14
Task 15                                                                  4.
Task 16
Task 17                                                                  5.
Task 18
Task 19
Task 20
Task 21
Task 22
Task 23
Task 24
Task 25
YP Technology
bility to organise both time and resources.
asks in order, and to produce a Gantt Chart to show your planning.



          Instructions:

              Type in a name for each task in the order you will do them.

              The task organiser is limited to a maximum of 25 tasks.
              If you have more than this number, you should create more than one chart.
              There is no minimum number of tasks, but there should be enough for you to plan the creation of your
              product/solution effectively. If you do not have enough, your plan is less likely to be successful.


              Enter a time (in minutes) for each task.

              View the Gantt Chart by clicking on the tab below.
              The Task Organiser can be edited as many times as you need.


              Print the chart.

              Save this file for future use if required (strongly advised).




                                                                        MYP Gantt - Version 1.00 - Paul Harrison - September 2002
                      Project Creation Timeline



0   0.1   0.2   0.3     0.4          0.5          0.6   0.7   0.8   0.9

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:12
posted:10/8/2011
language:English
pages:3