AGENDA

Document Sample
AGENDA Powered By Docstoc
					                                              AGENDA
                                Lake Huron Primary Water Supply System
                                      Joint Board of Management

Council Chambers                                                                               l1:00 a.m.
2nd Floor, City Hall                                                               Thursday, June 9,2011




PART    I      DISCLOSURE OF PECUN¡ARY INTEREST



PART 2         ADOPTION OF MINUTES

1.     Minutes of the 2nd Meeting held on Thursday, March 3, 2011.

PART 3         CONSENT ITEMS

l.   Gorrespondence

       A.      Note and File:

2.     E. Kirk, Quality Assurance and Compliance Manager, Lake Huron Primary Water Supply
       System - Lake Huron Primary Water Supply System 2010 Annuâl Report.

3.     City Clerk - Municipal Council resolution adopted at its meeting on April4, 2011 - Revised
       Appointments to the Lake Huron and Elgin Area Primary Water Supply System Joint
       Boards of Management.

       B.      Receipt with response by Administration:


       C.       Receiot and Deferral Peìndinq Report from Administration:

ll. Staff Reports
4. P. McNally, Chief Administrative Officer- CAO By-law.
5. -. P. McNally, Chief Administrative Officer - Backup Generator Project - Status Report
6. P. McNally, Chief Administrative Officer - Lake Huron Primary Water Transmission Main
       Twinning (Phase    l) - Class EnvironmentalAssessment and Preliminary Design Report
       Status Update.

7.     P. McNally, Chief Administrative Officer   -   2010 Audited Financial Statement.

8.     J. Braam, Director, Water and City Engineer - Key Performance lndicators       - 1st Quarter
       2011.

9.     J. Braam, Director, Water and City Engineer      -   Quarterly Gompliance Report (1st Quarter
       2011: January- March)
                                                   Page2 of 2


10.     J. Braam, Director, Water and City Engineer      - Environmental     Management System and
        Quarterly Management System

11.     J. Braam, Director, Water and City Engineer      - Clean Water Act- Risks from Vulnerability
        Changes.

PART 4         ITEMS FOR DISCUSSION

12.     P. McNally, Chief Administrative Officer   - Bulk Water Sales Policy.
13.     P. McNally, Chief Administrative Officer   -   Ministry of the Environment lnspection Report.

14.     P. McNally, Chief Administrative Officer   -   Exeter-Hensall Pumping Station Dehumidifier      -
        Tender Award.

15.     J. Braam, Director, Water and City Engineer      -   Ontario Water/ Wastewater Agency Response
        Network.

16.     J. Braam, Director, Water and City Engineer- Surge Tank Compressors and Liquid Level
        Sensors Replacement Project - Tender Award.

17.     Brent Kittmer, Utilities Superintendent, Municipality       of   Bluewater   -   Hensall Water Usage
        lncrease lnvestigation.

PART    5      ADDITIONAL BUS¡NESS



PART    6      DEFERRED ITEMS, PENDING NEW ITEMS AND REPORTS



PART 7         CONF¡DENTIAL MATTERS

A ConfidentialAgenda is enclosed separately in Members' Envelopes.

'PART   8      UPCOMING MEET¡NG DATES

Thursday, August 4, 2011
Thursday, October 6, 2011
Thursday, December 1, 201 I
                                  [I.[î
                                      MINUTES OF THE

                                    2ND MEETING OF THE

                             JOINT BOARD OF MANAGEMENT

                    LAKE HURON PRIMARY WATER SUPPLY SYSTEM


Meeting held on Thursday, March 3,2011 at the LondonCity Hall, commencing at 1:34 p.m.

PRESENT: A. Ëdmondson (Chair), J. Baechler, D. Brown, C. Burghardt-Jesson, A. Hemming, D.
Hockey, M. Underwood, P. Van Meerbergen and J. Vanderheyden and B. Westlake-Põwer
{Secretary).

ALSO PRESENT: J. Braam, B. Dowson, A. Henry, B. Lima, M. Looby, M. McLaughlin, p. McNally
and J. Walker.


'1.   Disclosures of Pecuniarv lnterest

      None are disclosed.

2:    Adoption of Minutes

      BROWN AND BURGHARDT-JËSSON

      Thatthe Minutes of the January 28,2011 meeting of the Lake Huron PrimaryWaterSupply
      System Joint Board of Management BE NOTED AND FILED. CARRIED

3.    Environmental Management svstem and Quatity Manaqement system

      VAN MEERBERGEN AND UNDERWOOD

      That, on the recommendation of the Director, Water & Engineering Review, the attached
      Environment Management Policy BE ENDORSED and the report dated March 3,2011, with
      respect to follow-up related to the Environmental Management System and Quality
      Management System, BE RECEIVED for information. CARRIED

4.    Quarterlv Com,ptiánce Reoort (4th Quarter: Qctober- December.2010ì

      VAN MEERBERGEN AND UNDERWOOD

      That, on the recommendation of the Director, Water& Engineering Review, the reportdated
      March 3, 2011, with respect to the general, regulatory and contractual obligations of the
      Lake Huron Primary Water Supply System; for October to December, 2010, BE RECEIVED
      for information. CARRIED

5.    Anticipated 2011 lnflationarv Costs

      VAN MEERBERGEN AND UNDERWOOD

      That, on the recommendation of the Director, Water & Engíneering Review, the report dated
      March 3,2011, with respect to the anticipated 2011 inflationary operating costs BE
      RECEIVED for information.   CARRIED
                                                                                           l
                                    EE
                                    Agcndr ltcm




                                                -2-
                                                    I   Page   I




 6.    Kev Performance lndicators

       VAN MEERBERGEN AND UNDERWOOD

       That, on the recommendation of the Director, Water & Engineering Review, the report
                                                                                           with
       PsPe_ct
                to the regional water supply system's Key Performance lnlbators bg REõE|VED
       for information. CARRIED

7.     Schedule of Board Meetinq    -   June 2011

       CAMPBELL AND BAECHLER

       That, on the recommendation of the Chief Administrative Officer, the rescheduling of the
       {ll._e_qqt{m99!ing from June 2, 2011, at 1:00 p.m., to June g, 2011, at 11:00 alm., BE
       APPROVED. CARRIED

8.

      BROWN AND HOCKEY

      That, on the recommendation of the Chief Administrative Offioer, the staff BE AUTHoRTZED
      to undertake a design/buildcompetitive bid process forthe detailed desigrr and construction
      of the Lake Huron Primary Water Transmission Main Twinning projectänd tÀe report with
      respect to this matter BE REGEIvED for information. CARRIED



      UNDERWOOD AND BROWN

      That, on the recommendation of the Chief Administrative Officer, the report dated March 3,
      ?011, with respect to the action plan from American Water Canada Corp., BE RECEIVED
      for information. GARRIED

10.   Contractual Penalty Options

      BAEGHLER AND VANDERHEYDEN

      That, in accordance with the penalty clauses of Article 5.3 (1)(e) "Routine Maintenance of
      Civil, Structural and Site Related Assets - Civil Maintenanòé Þi'ogram' and Article 5.6 (f)
      "Routine Maintenance of Mechanical and Electrical Equipment" coniained in the Operations,
      Management and Maintenance Agreement with Amerícan Water, the Administiation BE
      DIRECTED to withhold payment to the contracted service provider until such time as the
      matters identified by the Administration are satisfactorily completed. CARRIED
                                 ffi        -3-


      UNDERWOOD AND BROWN

      That, on the recommendation of the Director, Water& Engineering Review, the reportdated
      March 3, 2011, w¡th respect to the Contractual eenãfiy Options BE REGEIVED for
      information. CARRIËD

11.   Adiournment

      BROWN AND VANDERHEYDEN

      That the meeting of the Lake Huron Primary Water Supply System Joint Board of
      Management adjourn. CARRIED

      The meeting adjourns at 2:39 p.m.




                                                  A. Edmondson, Chair




                                                  B. Westlake-Power, Secretary
       ê
    Laþe Huron                                                                              File No. H1712O11
    ,
        Primary Water Supply   $¡*em




The Lake Huron Joint Board of Management (LHJBOM) is the owner and provides governarlce for the
Lake Huron Primary Water Supply System. Benefiting member municipalities currently participating in
the LHJBOM include the City of London, Municipality of Bluewater, Municipality of North Middl€Êex,
Municipality of Lambton Shores, Municipality of South Huron, Township of Lr¡can-Biddulph, Municipality
of Middlesex Centre and the Municipality of Strathroy-Caradoc.

The Lake Huron Primary Water Supply System is comprised of the Lake Huron Water Treatment Plant
located near Grand Bend, the McGillivray Booster Purnping Station and Reservoir, the Exeter-Hensall
Booster Pumping Station and Reservoir, the Arva Terminal Reservoir, the Komoka-Mt. Brydges
Booster Pumping Station, and the associated interconnecting transmission water mains, which includes
the primary, Strathroy, Exeter-Hensall, and Komoka-Mt. Brydges transmission water mains.

The LHJBOM provides management oversight for the Quality Management System (QMS), approves
and monitors policy and continual improvement, and also provides the necessary resource support for
the successfut implementation and ongoing viability of the QMS at all of its facilities.

The LHJBOM currently utilizes the services of an independent contract Operatiñg Authority who
operates and maintains the Lake Huron Primary Water Supply System on behalf of the LHJBOM.
Ùnder the QMS, the Operating Authority is responsible for implementing and maintaining the QMS in
partnership with the LHJBOM.

Together, the LHJBOM and Operating Authority are committed to:

'       Providing the customer with clean, safe drinking water.

"   Managing and operating the Lake Huron Primary Water Suppty System in a responsible manner in
    accordance with documented quality management policies and procedures.

        Being a quality leader in the business sector in which we participate.

o       Promoting owner and consumer confidence in the safety of the drinking water supply.

o   At a minimum, meeting all relevant legislative and other requirements and encouraging our
    suppliers and subcontractors to similarly meet these requirements.

"       Promoting resource stewardship, including conservation'

The LHJBOM and Operating Authority will periodically undertake appropriate reviews, evaluations and
performance measuiements of its operations to ensure compliance with the LHJBOM Quality
Management Policy.

The LHJBOM and Operating.Authority are committed to accomplishing our goals through the
dedication, support and partìcipation of allemployees, and maintenance and continual improvement of
our Quality Management SYstem.


Report Page 5 of 22                                                                              January 20,20'11
                                                   Environmental Management System and Quali$ Management System
  Lake Huron                                                                                               File No. H1712011
    Prirnary Wãter Supply   Sysem




Table of Revisions
Date                                DescrÍ nti o n   of Revi si o n
December 2,2004                      lnitial lssue of Document
March 2,2006                         Added Township of Strathroy-Caradoc as a member municipality
                                     Correction - Municipalitv of 'North Middlesexu                '


January 18,2007                      Last paragraph: changed'strive to accomplish" to     "are committed to
                                     accomplishing"
                                     Last paragraph: added "maintenance" of QMS
December 13,2007                    Zrparagraph: reservoir located "neaf Arva; water mains (plural),
                                     '\nrhich includes the Strathroy transmission water main'
                                     I "t parag raph :'Municipality" of Strathroy4a radoc
                                     Changed the order so the commitment to providing the customer with
                                     clean. safe drinking water is listed first
October 1,2009                      ì-paragraph:"Municipality"of MiddlesexCentre
                                     2"d paragraph - revised system description; added Exeter-Hensall
                                     oumpino stàtion. reservoir and transmission main to the description
January 20,2011                     @edsystemdescription;addedKomoka-Mt.Brydges
                                    Booster Pumpino Station and transmission main to the description-




Report Page 6 of22                                                                                              January 20,20'11
                                                                 Environmental Management System and Quality Management System
                                            Agenda ltem #




                                            Iøke Huron
                                            Piimary Water Supply System


  March 2,2011

  Board Chair and Members
  Lake Huron PrimaryWater Supply System

  Re: Lake Huron Primary Water Supply System 2010 Annual Report
  Dear Sir/Madam:

 Please find the âttached 2010 Annual Report for the Lake Huron Primary Water Supply System
 (LHPWSS). As required under Section 1l of O,Reg . 17OlA3, the LHW\/SS owner is-oOiigâteO to
 provide a copy of this report to all systems that are connected to ahd receive drinking watei
 from thÍs system. The report was issued to all connected drinking water systems on Fábruary
 25,2011.

 fh¡s report has glso bgen gosted on the
                      for public
                                                                  Regional Water Supply website
 {gryv.watersuÞÞlv.lonOo                )    viewing. Cop'lès will be made availàbb uþon request at
 the Regional Water Supply Office in London.

 Should you have any questions or @mments, please contact our office at your earliest
 convenience.

 Best regards,


 {^;^*ü<
 Erin l(irk
 Quality Assurance & Compliancè Manager
 Lake Fluron PrimaryWater Supply System




Lafê Hú.ron Primary Water Supply: System                                             c/¡ The Cþ of Lonrion
Office   :51   9.930.3505 ext. 271 4                                        Regional Water Supply Division
f,axsig.+T+.usl                                                           235 North Centre Road, Sulte 200
etii*@ionoon.ca                                                                            London, Ontalio
htlp:/r!vatersuppf    y.   london.cal                                                            N5X:487
                                           E.lî
ÐÞontario Drinking-Water Systems Regulation O. Reg. 170/03

  Drinking-Water System Num ber:                21000079t
  Drinking-Water System Name:                   Lake Huron Primary Water Sunnlv Svstem
  Drinking-Water System Owner:                  Lake Huron Primary Water Supply System Joint Board
                                                of Management c/o the City of London
  Drinking-Water System Category:               Large Municipal Residential
  Period being reported:                        January 1.2010 throueh December 31.2010


  Comnlete íf vour Categorv ß Løree Munícipal                Comnlete for all other Catesoríes.
  Resídential or Smøll Munícípal Resídentíal

  I)oes your Drinking-Water System serve                Number of Designated Facilities seled:
  more than 10,000 people? Yes          [X] No I   I

  Is your annual report available to the public         Did you provide a copy ofyour annual
  at no charge on a web site on the fnternet?           report to all Designated Facilities you
  Yes [Xl        Noll                                   serve?
                                                        Yes[ ] No[    ]
  Location where Summary Report required
  under O. Reg. 170103 Schedule 22 will be              Number of Interested Authorities you
  available for inspection.
      Lake Huron and Elgin Area Water Supply.systems
                                                        reporr to,
                                                                  I   N¡e I
      c/o Regional Water Supply Divlsion                Did you provide a copy of your annual
      235 North Centre Road, London, ONNsX 4E7          report to all Interested Authorities you
      http;//Www.waters upply.london.ca                 report to for each Designated Facility?
      Lake Huron Water Treaùnent Plant
                                                        Yes[   | No[ I
      71155 Bluewater Hwy., Grand Bend, ON




  List all Drinking-Water Systems (if any), which receive all of their drinking water from
  your system:

             that receive their dri    water from the LIfWSS:
  Drinkins Water Svstem Name                              Drinkinp Water Svstem Number
  City of London                                          264004917
  Municipality of Bluewater                               260006s42
  Municipality of Lambton Shores (East Lambton Shores     260006s68
  Water Distribution System)
  Township of Lucan-Biddulph                              26000307r
  Municipality of Middlesex Centre (Middlesex Centre      260004202
  Distribution System)
  Municipality of North Middlesex                         260006s29



  Drinking Water Systems Regulations                                                 Page   I of7
  (PIBS 4435e01) February 201I
s*'
{in     OntAffO
                                              F]Ë
                          ortn*tng-water systems Resutation o. Res. lrotog
  Municipality of Strathroy-Caradoc (Strathroy Water                       260080106
  Works)
  Municipality of Strathroy-Caradoc (Mt. Brydges Water                     210003985
  Works)
  Municipality of South Huron (South Huron Water                           220001s20
  Distribution Svstem)

      tems that ma          their d       water from the LHPWSS:
  Drinkine Water Svstenir Name                            Drinking Water System Number
  Municipality of Lambton Shores (West Lambton Shores     260006s81
  Distribution System)
  *Normally supplied by the Lambton Area Water Supply System (LAWSS) but
  a connection to the LHPWSS exists


      Did you provide a copy of your annual report to all Drinking-Water System owners that
      are connected to you and to whom you provide all of its drinking water?
          Yes [X] No I I

  Indicate how you notified system users that your annual report is available, and is free of
  charge.
      [Xl Public access/notice via the web
      [Xl Public access/notice via Government Office
      [ | Public access/notice via a newspaper
      Ël Public access/notice via Public Requesú
      [ | Public access/notice via a Public Library
      [Xl Public access/notice via other method News Release
         Describe your Drinkin g-Water System
         The Lake Huron Water Treatment Plant (WTP) employs pre-chlorination, screening, powder
         activated carbon addition (seasonally on an as-required basis), coagulation, flocculation,
         sedimentation, dual-media filtration, post-chlorination, and sodium hydroxide addition to
         treat raw water obtained from Lake Huron. The WTP intake crib and raw water intake pipe
         have an estimated gross capacity of 454.6 Megalitres/day (MLD). The WTP rated capacþ
         is 340,0 MLD.
        The distribution system is comprised of the McGillivray Booster Pumping Station and
        Reservoir, the Exeter-Hensall Booster Pumping Station and Reservoir, the Arva Terminal
        Reservoir, the Komoka-Mt. Brydges Booster Pumping Station (PS#4) and the associated
        interconnecting transmission water mains, which includes the primary, Strathroy, Exeter-
        Hensall, and Komoka-Mt. Brydges transmission water mains.
        The drinking water system is monitored at various locations throughout the system via a
        Supervisory Control and Data Acquisition (SCADA) system.




  Drinking Water Systems Regulations                                                   Page2 ol7
  (PIBS 4435e01) February 201I
                                            ËËï
                      Drinking-Water Systems Regulation O. Reg. 170/03
      List all water treatment chemicals used over this
 Filter aid polymer (on an as-required basis)
 Acidified alum
 Powder activated carbon
 Dewatering polymer
 Chlorine gas
 50% Sodium Hydroxide
 12% Sodium H


     Were any significant expenses incurred to?
        [X] Install required equipment
        [Xl Repair required equipment
       [Xl Replace required equipment
     Please       a brief                       and a breakdown of                           incurred
Lake Huron Water Treatment Plant
Re-commissioned Service Water pumping system
Repaired various cooling water lines
Conducted numerous valve repairs/replacements throughout plant and distribution system
Replaced Filter Influent, Rate and Drain valves on South filter bank
Repaired Flocculator Drives
Cleaned water intake structure
Installed data logger on 2 hydro lines coming into Huron WTP
Replaced UPS components as required
SCADA upgrades
Repaired or replaced interior and exterior doors, as required
Installed new motor on Backwash Pump # 4
Installed new analyzers to effectively calculate CT through the system
Reffofitted Cenhifuge # I with digital controls
Repaired 48" pipeline break
Upgraded Backwash MCC
Installed new liner in South Alum tank
Replaced HLP#3 discharge valve
Conducted various repairs to High     Lift, Low Lift   and Backwash Pumps
Replaced Surge Tank Valves
Installed bollards around meter chamber to prevent vehicles from being parked on top of it
Installed Cyberlock key system
Replaeed sample pump in LL Building
Purchased Replacement pieces     of   Pressure Pipe for pipeline break repair inventory




Drinking Water Systems Regulations                                                        Page 3   of7
(PIBS ¿1435e01) February 201I
                       i0,   Or¡nf¡ng-Water Systems Regulation O. Reg. t70103

 Pumping Station #4
 Commissioned Pump Station #4 to extend service to Komoka-Kilworth (Middlesex Centre Distribution
 System) and Mt. Brydges (Strathroy-Caradoc Distribution System)


 McGillivray Booster Pumping Station
 Installed check valve on Booster Pump # 4
 Rebuilt pump bases for Booster Pumps #l & 2

 Exeter Hensall Booster Pumping Station
 Replaced solenoid valve on surge protection valve
            chlorine i

      Provide details on the notices submitted in accordance with subsection 18(l) of the Safe
      Drinking-Water Act or section 16-4 of Schedule 16 of O.Reg.l70l03 and reported to
      S     Action Centre
   Incident Date                                                                 Unit of                                              Corrective
                                     Parameter                   Result                                Corrective Action
                                                                                Measure                                               Action Date
                                                                 railure to                          Filter# l2 analyser light           September
   September 17,2010         Filter #12 Effluent Turbidity                         NTU
                                                                  record                             bulb reolaced                          l7.20to

   November 22,2010                  #l Effluent Turbidity       Failu¡e to                          Filter#l analyser sensor            November
                             Filær                                                 NTU
                                                                  record                            replaced.                               22,20t0


      Microbiological testing done under the Schedule 10, 11 or 12 of Regulation 170103,
      durins this renorti¡
                                                                                                                Number
                                                                              Range ofTotal
                                Number
                                                  Range of E Coli
                                                                                 Coliform
                                                                                                                   of              Range ofIIPC
                                                     Results                                                  Ileterotrophic          Results
                                      of           (CFU/I00mL)
                                                                                  Results
                                                                                                                Plate Count          (CFU/ImL)
                                Samples                                       (CFU/r00mL)
                                                  (min #)-(max #)                                                  (HPC)          (min #)-(max #)
                                                                              (min #)-(max #)
                                                                                                                S¡mnles
Raw                                   98                (0x57)                   (0)   - (sr00)                     98              l<10)   -   t>2000t
Treated                              246                 0-0                           0-0                         246                (<10)- (170)
Distribution                          4s6                0-0                           0-0                         456                (<r0)- (10)


     Operational testing done under Schedule 7,8 or 9 of Regulation 170/03 during the
           covered by this Annual
                                                                                                                           Range of Results
                                                                                 Number of Grab
                         Parameter                                                                                         (min #!(max #)
                                                                                         Samples
Treated \ilater Free Chlorine (meíLl                                                       105t20                                 0.55-2.00
Treated lYater Turbiditv INTU)                                                             105120                                 0.02-2.00
Filtered \üater Turbiditv - F'ilter #1 INTUì                                               t05120                                 0.00-2.00
Filtered lVater Turbiditv - Filter #2 INTUI                                                t0sl20                                 o.02-2.M
Filtered TVater Turbiditv - Filter #3 INTU)                                                105120                                 0.02-2.00
Filtered lVater Turbiditv - Filter #4INTU)                                                 105 120                                0.01-2.00
Filtered \ilater Turbiditv     - Filter #5 (NTU)                                           105120                                 0.u2-2.00
Filtered TVater Turbiditv      - Filter #6lNTUl                                            l0sl20                                 0.01-2.00
Filtered Water Turbiditv       - Filter #7 fNTIi)                                          105120                                 o.o2-2.00
Filtered \ilater Turbiditv     - Filter #8 INTUI                                           105r20                                 o.02-2.40




Drinking Water Systems Regulations                                                                                               Page 4 of 7
(PIBS 4435e01) February 201I
fuffiarrO
                                              EË
                          Or¡n¡<¡ng-Water Systems Regulation O. Reg. I7OIO}

  Filtered Water Turbiditv - Filter #9 INTIIì                                        t05t20                         0.01-2.00
  Filtered Water Turbiditv - Filter #10 INTU)                                        105120                         o.o2-2.oo
  Filtered TVater Turbiditv - Filter #l I INTU)                                      I   05120                      0.02-2.00
  Filtered Water Turbiditv - Filter #12 INTU)                                        t05tæ                          0.00-2.00


 NOTE: There were afew instances in 2010 when the treatedwater turbídity exceeded 1.00
 NW.   Each of these events coincíded with a pump start-up. Fílter effluent turbidíty spikes
         than 1.00 NTU díd not exceed         minutes on anv of the
 NOTE: WhereJìltered water turbidity min # is equal to 0.00 NTU, there was a short períod
 where the anølylerfaíled to record. See above list of reports made to the Spitt Action Centre.

        Sum          of        nlc                        ested       durine this
        Parameter              Sample Date                    Result Value                Unit of Measure           Exceedance
 Antimony                      January 13,2010                 Not Detected                      ñ{L                     NO
 Arsenic.                      January 13,2010                 Not Detected                      MEIL                    NO
 Barium                        January 13,2010                        0.0t4                                              NO
                                                                                                 'rngL
 Boron                         January 3,2010                  Not Detected                      mglL                    NO
 Cadmium                       January   3,20to                Not Detected                      NL                      NO
 Chromium                      January 3,2010                  Not Detected                      mglL                    NO
                               January 13,2010                 Not Detected
 Lead                            Julv 6- 2010                                                    mglL                    NO
                                                               Not Detected
 Mercury                       January 13,2010                 Not Detect€d                      mglL                    NO
 Selenium                      January 13,2010                 Not Detected                      mglL                    NO
 Sodium                        January 13.2010                         t4                        melL                    NO
 Uranium                       January 13,2010                 Not Detected                      msJL                    NO
 Fluoride                            N/A                        Not Tested                       múL                     NO
                               January 13,2010                 Not Detected
                                 April 4,2010                  Not Detected
 Nitrite                        July 6,2010                                                      mglL                    NO
                                                               Not Detected
                              October 25.2010                  Not Detected
                              January 13,2010                         0.5
                                April 42010                           0.4
 Nitrate                        July 6,2010                                                      me/L                    NO
                                                                      o.4
                              October 25.2010                         0.3


      Summary of Organic parameterc sampled during this reporting period or the most
      recent sa     results
             Parameter            Sample Date
                                                  Result        Unit of
                                                                                                                     Exceedance
                                                                                Value               Measure
 Alachlor                                         January 13,2010             Not Detecled               trqlL              NO
 Aldicarb                                         January 13,2010             Not Detected               trúL               NO

 Aldrin + Dieldrin                                January 13,2010             Not lÞtected               pdL                NO


 Atrazine + N-dealkylated metobolites             January 13,2010             Not Detected               vúL                NO

 Azinphos-methyl                                  January 13,2010             Not Detected               ttgL               NO

 Bendiocarb                                       Januarv I 3. 2010           Not Detected               pelL               NO
 Benzene                                          January 13,2010             Not lÞtected               \slL               NO
 Benzo(a)pyrene                                   January 13,2010             Not Detected               u,eJL              NO
 Bromorynil                                      January 13,2010              Not Detected               |.,,E/L            NO




 Drinking Water Systems Regulations                                                                                Page 5   of7
 (PIBS 4435e01) February 20ll
.','#{OfftafiO Drinkins-water
                                            EË
                                            systems Resutation o. Res. 170/03

    Carbaryl                                 January 13,2010     Not lÞtected   ttdL              NO


    Carbofuran                               January 13.2010     Not Detected   pEtL              NO
    Carbon Tetrachloride                     January I 3, 2010   Not Detected   ttúL              NO
    Chlordane (Total)                       January 13,2010      Not Detected   uplL              NO
    Chlorpvrifos                             January 3,2010      Not Detected   ¡tP/L             NO
    Cyanazine                               January 3,2010       Not Detected   ldL               NO
    Diazinon                                January 3,2010       Not Detected   ttüL              NO
    Dicamba                                 Januarv 3- 2010      Not Detect€d   ueIL              NO
    12-Dichlorobenzene                      January 3,2010       Not Detected   ueIL              NO
    1,4-Dichlorobenzene                     January   3,20t0     Not Detected   peIL              NO
    Dichlorodiphenyltrichloroethane
                                            January 13,2010      Not Detected   pelL              NO
   lDDTl * metabolites
    1'2-Dichloroethane                      January 13,2010      Not Detected   lu,PlL            NO
   lrl-Dichloroethylene
                                            January 13,2010      Not Detected   ItglL             NO
   lvinvlidene chloride)
    Dichloromethane                         Januarv !3,2010      Not Detected   ttúL              NO
   2-4 Dichlorophenol                       January 13,2010      Not Detected   usIL              NO
   2,4-Dichlorophenoxy acetic acid (2,4-
                                            January 13,2010      Not Detected   $gL               NO
   DI
   Diclofop-methyl                          January 3,2010       Not Detected   uslL              NO
   Dimethoate                               January 3,2010       Not Detected   trdL              NO
   Dinoseb                                  January 3,2010       Not Detected   vzlL              NO
   Diouat                                   Januarv 3.2010       Not D€tected   ueIL              NO
   Diuron                                   January 3,2010       Not Detected   ve/L              NO
    Glvohosate                              January   3,2010     Not Detected   tts/L             NO
   Henfachlor * Henfnehlor Enori¡le         January   3,20t0     Not Detected   ttilL             NO
   Lindane lTotal)                          Januarv   3- 2010    Not Detected   uslL              NO
   Malathion                                January   3.2010     Not Detected   vs/L              NO
   Methoxvchlor                             January 3,20t0       Not Detected   ttglL             NO
   Metolachlor                              January 3.20t0       Not Detected   ttÚL              NO
   Metribuzin                               Januarv   3- 2010    Not Detected   uslL              NO
   Monochlorobenzene                        January   3,2010     Not Detected   ve/L              NO
   Paraquat                                 January   3,2010     Not Detected   uüL               NO
   Parathion                                January 13.2010      Not Detected   vúL               NO
   Pentachloronhenol                        January 13,2010      Not Detected   veIL              NO
   Phorate                                  January 13,2010      Not Detected   dL                NO
   Picloram                                 January 13,2010      Not Detected   ItgL              NO
   Polychlorinated BiphenylsßCB)            January 13,2010      Not Detected   ttslL             NO
   PrometrYne                               January 23.2010      Not Detected   ttilL             NO
   Simazine                                 January 13,2010      Not Detected   I'E/L             NO

                                            January 13,2010         0.0t39
   TIIM(ARVA)                                April s,2010           0.0275
                                                                                mglL              NO
                                              July 6, 2010          0.0254
                                            October 25, 2010        0.0r96


                                            January 13,2010         0.0156
                                             April 5,2010           0.0251
   THM (Exeter-Hensall)                       July ó,2010          0.0338
                                                                                mglL              NO
                                            October 25, 2010       0.0263

   Temenhos                                 January 13.2010      Not Detected   ttdL              NO
   Terbufos                                 Janua¡v 13.2010      Not Detected   uslL          NO




    Drinking Water         Systems Regulations                                           Page 6   of7
    (PIBS 4435e01) February   20ll
                                       þJL.l¿j
                       Drinking-Water Systems Regulation O. Reg. 170/03
Tetrachloroethvlene                    January 13,2010   Not Detected    ueIL             NO
234.6-Tetrachloronhenol                January 13,2010   Not Detected    vslL             NO
Triallate                              January 13,2010   Not Detected    tElL            NO
Trichloroethvlene                      January 13,2010   Not Detected    tt{L            NO
                                                         Not Detected
2r4,6Trichlorophenol                   January 13,2010                   ttúL            NO
2r4r5-Trichlorophenoxy acetic acid
                                       January 13,2010   Not Detected    ttúL            NO
l2A-çTl
Trifluralin                            January 13,2010   Not Detected    uPlL            NO
Vinvl Chloride                         January 13,2010   Not Detected    velL            NO


NOTE: During 2010, no Inbrganic or Organic parameter(s) exceeded half the standard prescribed in
Schedule 2 of Ontarío Drinking Water Qualíty Standards.




Drinking IVater       Systems Regulations                                         PageT ol7
(PIBS 4435e01) February   20ll
     London
      CANADA
                     300 Dufferin Avenue
                     P.O. Box 5035
                     London, ON
                     Nô4419
                                              Ëffi
.    April 5,2011

     Councillor D. Brown

     Councillor M. Brown

     I hereby certiþ that the Municipal Council, at its session held on April   4,2011 resolved:
     3.          That the following aotions be taken with respect to the Lake Huron and Elgin Area Primary
    Water Supply Systems Joint Boards of Management:

    (a)      Councillor D. Brown BE REMOVED from the Elgin Area Primary Water Supply System Joint Board
             of Management and, instead, BE APPOINTED to the Lake Huron Primary Water Supply System
             Joint Board of Management for the term ending November 30, 2014; and

    (b)      Councillor M. Brown BE REMOVED from the Lake Huron Primary Water Supply System Joint Board
             of Management and, instead, BE APPOINTED to the Elgin Area PrimaryWater Supply System Joint
             Board of Management for the term ending November 30,2O14

    it being noted that the Finance and Administration Committee received a communication dated February 17,
    2011fron Councillors D. Brown and M. Brown requesting thatthey switch membership on the Elgin Ãrea
    Primary Water Supply System Joint Board of Management and the Lake Huron Primary Water Supply
    System Joint Board of Management. (2011-G03-00) (3/f 3/CW)




    C. Saunders
    City Clerk
    /hw


    cc:     Chair and Members, Lake Huron and Elgin Area Primary Water Supply Systems
               Joint Boards of Management
            H. Woolsey



    The Corporation of the City of London
    Office: 51 9€61 -2500 ext. 4599
    Fax 519€ôf 4892
    www. london.ca
           È
           ^
  Iake Huron
    Primary Water Supply System
                                                 EE                                       Fife No. H1712O11

                         To:      Chair and Members
                                  Lake Huron Primary Water Supply System Joint Board of Management

                    From:         Pat McNally, P.Eng.
                                  Chief Administrative Officer

        Meeting      Date:        June 9, 2011

                Subject           CAO Bylaw




That the Board of Management for the Lake Huron Primary Water Supply System APPROVE the
proposed CAO Bylaw as attached.



Bylaw No.5, a bylaw relating to the appointment of a Chief Administrative Officer for the Lake Huron
Primary Water Supply System, was introduced and approved on March 20,2008. This Bylaw included
a definitíon of the Chief Administrative Officer as the "General Manager of Environmental Services and
City Engineer" of the Administering Municipality, and atlowed the Chief Administrative Officer to
delegation duties and authorities, in whole or in part.



Earlier this year, the City of London began an organizational review which among other things
eliminated the position of General Manager of Environmental and Engineering Services. For reasons of
efficiency, that position has been combined with the main duties of another vacant Generat Manager
position within the City of London. ln order to ensure this Joint Board of Management receives the
senior level oversight and management support required, it is recommended that the responsibilities of
the Board's Chief Administrative Officer be appointed to the City of London - City Engineer. ln order to
transfer these responsibilities, Bylaw No. 5 must be updated to reflect the current titles within the City of
London organizational structure.

The City of London's CÍty Engineer is currently held by Mr. John Braam (Director of Water & City
Engineer). Mr. Braam's background, knowledge, experience and presence in the municipal water
sector in Ontario make him an ideal candidate for this position and in keeping with the intent of the
current bylaw and original assignment of these duties.

ln order to assist with the transition period, it is proposed the Mr. Braam assume full duties for the next
scheduled meeting of the Board, scheduled to occur on August 4, 2011. ln addition a similar transfer
will take place with respect to Recipient Co-Chair position on the Agreement Management Committee
for the HELP Clean Water Project, effective the , next meeting of that committee scheduled for August
23,2011.




Report Page 1 of3
                                                             #


                                               EE
                                               Agenda ltem           Page #




   La,ke       Huron                                                               File No. H1712011
    Primary Water Supply System


On a personal note, I thank the Board members, both past and present, for their support and oversight
                                                                 I
in guiding this organization during the almost years I have had the pleasure to serve. I remain
available to assist as you or your senior staff may deem appropriate.




Attachments:                      Draft CAO Bylaw

cc.      Jeff Fielding, CAO, City of London
         Rob McCallum, Federal Co-Chair, HELP/BGF Agreement Management Committee
         Dino Radocchia, Provincial Co-Chair, HELP/BCF Agreement Management Committee




Report Page 2 of 3                                                                        June 9, 201 1
                                                                                           CAO Bylaw
                                            til
                                            Agpnda ltem




                                              BYLAW    No._
                            A by-law relating to the appointment of a Chief
                         Administrative Officer for the Lake Huron Primary Water
                                              Supply System.


BE lT ENACTED as a by-law of the Joint Board of Management of the Lake Huron Primary Water
Supply System as follows:

DeRnr¡ons

1.0     ln this by-law, unless the context otherwise requires:

    "Administering Municipality" means the corporation of the city of London;

    "Board" means the Joint Board of Management for the Lake Huron Primary Water Suppty System;

DeRNr¡o¡¡ oF "CH¡EF Aoru¡usrR¡nve OrHceR" REpEALED

2.1    Section 1 "Definitions" of By-Law No.2 (August 31, 1999), in part, specifically with regard to the
       definition of the "Chief Administrative Office/' is repealed.

2.2    Bylaw No.5 (March 20, 2008) is repealed in whole.


Appo¡¡lrurNT oF "CHtEF Aon¡¡ru¡srn¡TvE OFFrcER"

3.1    In this by-law and all other by-laws and resolutions of the Joint Board of Management for the
       Lake Huron Primary Water Supply System, the Chief Administrative Officer of the Lake Huron
       Primary Water Supply System shall be the City Engineer of the Administering Municipality.

3.2
'      The Chief Administrative Officer of the Lake Huron Primary Water Supply System shall be
       responsible for the provisions and obligations of the Administering Municipality as provided by
       the Transfer Order for the Lake Huron Primary Water Supply System W1/1998) dated
       September 15, 2000, as amended by by-law, or directed by by-law or resolution of the Board
       from time to time.

3.3    The City Engineer of the Administeríng Municipality may delegate the appointment of the Chief
       Administrative Officer, in whole or in part, in respect to the responsibilities of the Administering
       Municipality regarding the Lake Huron Primary Water Supply System. Delegation of the
       appointment of the Chief Administrative Officer shall be in writing to the Board.

3.4    The delegation of the appointment of the Chief Administrative Officer may be rescinded at the
       discretion of the City Engineer of the Administering Municipality. Rescinding the delegation of
       the appointment of the Chief Administrative Officer shall be in writing to the Board.
                                                trtr
                                                 Agenda ltem        #         Page #




           ê
  Lake Huron                                                                                              File No. H17 (20111
    Primary Water Supply System




                        To:       Chair and Members
                                  Lake Huron Primary Water Supply System Board of Management

                   From:          Pat McNally, P.Eng.
                                  Chief Administrative Officer

         Meeting Date: June 9, 2011

                Subject:          Backup Generator Project                -   Status Report



                                               ütrii             ii;,:*l;iìiîiirli ll:ffi
That the Board          of   Management RECEIVE this report for information regarding the status of the
Emergency Backup Generator Project.



    October 1,  2009                Back-up   Power       Project:        Construction Tender Award
    June 6,   2010                  Back-up   Power       Project:        Construction Tender Rejection and Cancellation
    October 1,  2009                Back-up   Power       Project:        Status Report
    October 9,  2008                Back-up   Power       Project:        Status Report
    June 5,   2008                  Back-up   Power       Project:        Status Report
    March    20,2O0B                Back-up   Power       Project:        Status Report
    December        13,2007         Back-up   Power       Project:        Status Report
    October     11,2007             Back-up   Power       Project:        Status Report
    June 7,2007                     Back-up   Power       Project:        Status Report
    March 22,2007                   Back-up   Power       Project:        Status Report
    January 18,2007                 Back-up   Power       Project:        Status Report
    October 5, 2006                 Back-up   Power       Project:        Status Report

                                                                               ,.jtrii'ìi:
  iD_,i$._êitg,"è",rp .i:i                             .'.
                                              't't,, .'.' 'a ,t.,. ',
                                               :.i:;.      .      .¡,.:

At the time of writing this report, constructíon on site is underway with only a few complications, largely
related to weather. The bedding for the new turfstone driveway to the new building extension has been
installed, the excavation for the foundation for the new building has been completed and the footings
have been placed.

The íssues that have been encountered to date include:
    1.   lnterference caused by an existing underground duct bank located during the excavation,
         required the footing to be re-engineered prior to the completion of the foundation construction,
         resulting in an extra cost valued at approximately 924,300.
    2.   The cooling water pipes for the existing generator needed to be exposed within the excavation
         to install new silencers. At the time of exposing the existíng cooling water pipes, these pipes
         were discovered to have no restraints installed and came apart when the supporting soils were


Report Page 1   of4
  Iake Huron
      Primary Water Supply System
                                              trtr                                      File No. H17 (20111

           removed. A temporary repair was conducted to remedy this until the old generator                       is
           decommissioned, resulting in an extra cost valued at approximately $9,500.




                                Final Pre-Design Report            February 2007
                             Tender for Major Equipment           September 2009
                             Pre-Purchase Generator Sets           October 2009
                                    Detailed Design                  April2010
                                Tender for Construction           November 2010
                                         Award                      January 2O11
                            Final Commissioning & Testing           Spring 2012
                                Substantial Completion             Summer 2012




Summarv of Proiected Gosts
                       Engineering (Design, Tendering and                   $    842,000
                       Construction Administration)
                       Major Equipment Pre-Purchase                          4,638,600
                       Construction                                          4,113,260
                       Net taxes (net HST @1.760/0)                             73,630
                       Total l                                              $9,674,490

                       HELP/BCF Funding                                     (4,605,448)
                       Total Cost to Boardl                                 $5,062,042
  '   Total estimated cost excludes administration costs


Summarv of Expenditures to Date
                       Engineering                                          $   672,843
                       Equipment Pre-Purchase                                 4,076,100
                       Construction                                                     0
                       Administration                                           14.135
                       Total                                                $4,763,078



Capital Project LH1326 Backup Generator has a total budget of $10.1 million.




Report Page 2 of 4                                                                                     June 9, 201 1
                                                                       Back-up Generator Project   -   Status Report
                                     trE
                                     Agenda   ltem#   Page#




  Lake Huron                                                                              File No. H17 (20111
    Primary Whter Supply System




Despite cunent weather conditions and minor difficulties encountered during the initial mobilization and
site excavation, good progress has been made on the project.

lnformation forthis report was provided by John Walker, Operations Manager.




 Division Manage¡ Regional Water Supply                              of Water & City Engineer




                                                              Pat McNally, P. Eng.




Attachments:
         Appendix A: Construction site photographs




Report Page 3 of 4                                                                                       June 9, 201 I
                                                                         Back-up Generator Project   -   Status Report
                                               trtr
                                               Agenda ltem   #   Page #




                 ê
        Lake Huron                                                                                     File No. H17 (20111
          Primary Water Supply System




Photo            the North-East angle of the building and the
        1 shor,r¡s                                                Photo 2 shor,r¡s the East face of the existing building and the
                excavation for the sife seryices.                         excavation in preparation of the building addition.




  Photo 3 shows one of the four new generators during                Photo 4 shows the scale of 7 of the 20 new switchgear
              factory a cce pta nce te sting.                              cabinets during factory acceptance testing.




   Report Page 4 of 4                                                                                                 June 9, 201 1
                                                                                      Back-up Generator Project   -   Status Report
  Lake Huron
   Primary Water Supply System

                                                                                                File No. H1712011

                          To:     Chair and Members
                                  Lake Huron Primary Water Supply System Board of Management

                     From:        Pat McNally, P. Eng.
                                  Chief Adm inistrative Officer

        Meeting       Date:       June 9, 2011

                   Subject:       Lake Huron Primary Water Transmission Main Twinning (Phase 1) - Class
                                  EnvironmentalAssessment and Preliminary Design Report Status Update




That this report regarding the status of the Lake Huron Primary Water Transmission Main Twinning
Project BE RECEIVED by the Board of Management for information.



December 10, 2009                Transmission Main Twinning (Phase 1) - Award of EnvironmentalAssessment &
                                 Preliminary Design
March   4,2010                   Transmission Main Twinning (Phase 1) - Status Report
March 3,2011                     Transmission Main Twinning (Phase 1)   - Status Report


The Lake Huron primary water transmission main was originally constructed in 1966 and consists of
approximately 47km of 1200mm concrete pressure pipe from the water treatment plant in the
Municipality of South Huron, north of the community of Grand Bend, to a terminal reservoir located west
of the community of Arva within the Municipality of Middlesex Centre. The 1200mm water transmission
main was partially twinned in 1996 at three (3) different locations utilizing both steel and concrete
pressure pipe for a total approximate distance of 21km (each segment approximately 7km), to reduce
the risk of a main break over potentially "failure-prone" high pressure areas along the pipeline.

The engineering assignment awarded to Stantec Consulting at the December 2009 meeting of the
Board consisted of a Municipal Class Environmental Assessment and Preliminary Design Report, along
with further definition of the scope of work for the project and identification of limiting factors associated
with the proposed pipeline twinning project, as well as the provision of some assistance in the ongoing
landowner consultation process.




Report Page   '1   of 5                                                                                  June 9, 201 1
                                                                  Lake Huron Primary Water Transmission Main Twinning
  Lake Huron
   Ptimary Water Supply System

                                                                                        File No. H1712011


The Board of Management for the Lake Huron Primary Water Supply System (LHPWSS) awarded the
engineering assignment to undertake the Municipal Class Environmental Assessment and Preliminary
Design for twinning of the Lake Huron Primary Transmission Main to Stantec Consulting Ltd. on
December 10, 2009 in accordance with the approved procurement and consultant selection process.

Municipal Class Environmenta! Assessment
The Municipal Class Environmental Assessment (Class EA) study report component of the project was
completed in March 2011 and defines the scope of the project, limits of the study area, outlines the
selection of the preferred twinning segment locations, and estimates the duration of construction. The
Class EA report evaluated and identified Alternative 2 - "Twin within Existing Transmission Main
Easement" as the prefered alternative.

As part of Class EA process, notification was sent in the form of letters to all potentially affected
landowners throughout the easement corridor and applicable agencies to engage the public in a
manner so to inform them of the project and maintain communiðation througñout tne assessment
process. ln advance of the finalization of the Environmental Assessment process, a draft copy of the
Class EA document was forwarded to the Lake Huron Pipeline Landowners Association for information
and comment.

Following completion of the Class EA study report and upon receipt of Lake Huron Pipeline
Landowners Association review comments, a Notice of Completion was published in the Saturday April
2,2011 edition of the London Free Press as well as other local papers informing the public that the
LHPWSS will proceed with the design and construction of this project subject to any comments
contained within the Class EA for a period of 3O-days which concluded May 3, 2011.

Upon conclusion of the public review and comment period, one review submission was received on
behalf of the Lake Huron Pipeline Landowners Association requesting from the Minister of Environment
that a Part ll Order under the Environmental Assessmenf Acf be undertaken elevating this project to a
Schedule C so to inventory and address environmental concerns and mitigation measures as
requested by the association. At the present time due to the nature and sensitivity of the ongoing
negotiations with the association, Stantec is preparing rebuttaldefense documents, with the assistance
of the legal firm retained for the ongoing negotiations with the Landowners Association, in support of
the project concluding as a Schedule B and progressing through to detailed design.

Preliminarv Desion Report
The preliminary design phase of the project was initiated in January 2010 and a Preliminary Design
Report was completed in March 2011.

The finalized preliminary design proposes to extend parallel twinning of two sections of the primary
transmission main last constructed in 1996 within the existing transmission easement with a new 1200
mm (4ft) diameter transmission main. The 'North Section" runs from the interconnection chamber at
Shipka Line running south west to South Rd west of Blackbush Line parallel to the existing pipeline for
a length of approximately 3,350m. The "South Section" runs from the interconnection chamber at
Maguire Rd north of Maple Lodge Dr southeast to Elginfield Rd (formerly Highway 7) parallel to the

Report Page 2 of 5                                                                               June 9, 201 I
                                                          Lake Huron Primary Water Transmission Main Twinning
  Lake Huron
   PrimaryltvalerSupplvsvstem
                                                                                      Fire No. H17tzo11
existing pipeline alignment for a length of approximately 4,200 m. The general location of the proposed
twinning sections are identified in Appendix A attached to this report.

As part of the Preliminary Design Report, Stantec provided a preliminary construction cost estimate of
of approximately $26,648,335 (excluding HST), based on a number of assumptions regarding
construction conditions and connection requirements. Board staff have reviewed the preliminary
construction cost estimate and have concluded that it is very conservative and contains several
assumptions that would not apply. Based on similar projects undertaken in the region, including the
pipeline twinning for the Elgin Area Primary Water Supply System currently underway, it is the opinion
of staff that the construction cost should be in the order of $19 million, including detailed engineering.

Desiqn-Build Procurement Process
Subject to the approval of the Class EA document by the Ministry of the Environment, and based upon
Board approval at the March 2011 meeting, this project is cunently proceeding as a design-build
project. An expedited three stage design-build competitive procurement process is being undertaken
with the award anticipated for Board approval at the October 6, 2011 Board meeting. Based on
comparable projects, it is anticipated that the proposed Lake Huron Primary Water Transmission Main
Twinning Project will be substantially complete by December o12O12.




This project is included as one component of the HELP Clean Water initiative; a partnership between
the Lake Huron Primary Water Supply System, the Elgin Area Primary Water Supply System and the
City of London for regionally-significant water-related projects. This project has received grant funding
from senior levels of government under the Building Canada Fund and accordingly additional reporting
and coordination requirements are requisite to meet the obligations of the Contribution Agreements.
Each of Canada and Ontario are contributing up to one-third of the eligible project costs, to a maximum
contribution of $9,433,333 (each).

The following summary of estimated costs is provided for review and will be confirmed throughout the
project:
          Class EA and Preliminary Design                                                  $222,534
          Landowner compensation (estimate)                                                $550,000
          Detailed Design and Contract Administration                                    $2,000,000
          Construction                                                                  $17.000.000
                     Total Proiected Costs                                              $19,772,534

                 TotalApproved Budgetl                                                  $28,300,000
    l.   Approved budget includes senior government funding up to   a maximum contribution of $9,433,333 from each of
         Canada and Ontario for eligible costs.




Report Page 3 of 5                                                                                       June 9, 201   1
                                                                Lake Huron Primary Water Transmission Main Twinning
  Lake Huron
    Primary Water Supply System

                                                                                                       File No. H1712011


The anticipated schedule for completing this project is as follows:

                           Execution of Landowner Agreements              Fall2011

                           Completion of Class EA*                       Summer 2011
                           Detailed Design & Approvals                   Summer/Fall2011

                           Construction                                   May   2012-Dec.2012

         '     Landowner consultations have been undertaken concurrently throughout the duration of the Class EA
               process to fìnalize access, construction, and mitigation requirements. Landowners will continue to be
               consulted throughout the entire construction program.




lnformation for this report was provided by Brian Lima, P.Eng, Capital Projects Engineer.




 Division Manager, Regional Water Supply                                      of Water & City Engineer




Appendix A: Proposed Twinning of the Primary Water Transmission Main




Report Page 4 of 5                                                                                           June 9, 201 1
                                                                      Lake Huron Primary Water Transmission Main Twinning
  Iake Huron
    Primary Wäler Supply System

                                                                                      File No. H1712011




          r¡xgHr¡¡onú¡mn
           'REÀÎfiEilTP{,â'Vi
      ¿.{ Ã' É                           HURON
    ¡f t'¡l (J r
                                                                                  PERTH
                                  7¿,




                                                  h
                                                       ,?è



                                  É     M'lllit.E$nX      û




Report Page 5 of 5                                                                            June 9, 201 1
                                                       Lake Huron Primary Water Transmission Main Twinning
           s
  Lake Huron
    Primary Water Supply System

                                                                                                                 File No. H1712011


                         To:      Ghair and Members
                                  Lake Huron Primary Water Supply System Board of Management

                     From:        Pat McNally, P.Eng.
                                  Chief Ad m inistrative Officer

        Meeting         Date:     June 9, 2011

                 Subject          2010Audited FinancialStatement


                                                                                            .   .:f :i  :,,
                                                                                                            :rr'.: -ìi;iiir.,,:,:,, :,.t :.,;:)';:: ;...;' ..' : :.   :,
                                                                                                i:   ' ,:' . . .11 ;,;. i:r,i .¡i ;:. 'itii;:ì':'. r :'":,lr          .il
                                                                                            .


That the 2010 Audited Financial Statement and related Auditors Report for the Lake Huron Primary
Water Supply System be received by the Board of Management for the Lake Huron Primary Water
Supply System for information.



The fìnancial statements for the Lake Huron Primary Water Supply System are audited on an annual
basis and provided to the members of Board of Management for information. Copies of the audited
statements are also forwarded to each of the benefiting municipalities.

Normally the audit of the financial statements and the provision of the auditors report is completed by
mid-April of each year, however due to the implementation of PSAB 3150 for the Lake Huron Primary
Water Supply System, the completion of the audit was delayed.




 Division Manager, Regional Water          Supply              (   Di¡/ector of Water & City Engineer




Attachments:
         Auditor's Report, KPMG
         Audited Financial Statements, 2O1O

Report Page 1 of    1
                                                    KPMG tLP
                                                                iä.hîi                                                   Telephone    (519) 6724880
                                                    Charte¡ed Accountôntg                                                 Fax         (519) 672-5684
                                                    140 Fullanon Street Su¡te 1400                                        lnlernet    vwvwkpmg.ca
                                                    PO Box 23O5
                                                    London     ON N6A 5P2
                                                    Canada


                                   INDEPENDENT AU D¡TORS' REPORT
To the Board of Directors of Lake Huron Area Primary Water Supply System


We have audited the accompanying financial statements of Lake Huron Area Primary Water Supply System,
which comprise the statement of financial position as at December 31 , 2010, the statements of operations,
change in net financial assets (debt) and cash flows for the year then ended, and notes, comprising a summary
of significant accounting policíes and other explanatory information.

M a n age m e nt's ResponsrÖ i I ity fo r th   e   F i n a n c i al   Stalements

Management is responsible for the preparation and fair presentation of these financial statements in
accordance with Canadian generally accepted accounting principles, and for such internal control as
managernent determines is necessary to enable the preparation of financial statements that are free from
material misstatement, whether due to fraud or error.

Auditors' Respon sibility

Our responsibility is to express an opinion on these financial statements based on our audit. We conducted our
audít in accordance with Canadian generally accepted auditing standards. Those slandards require that we
comply with ethical requirements and plan and perform the audit to obtain reasonable assurance about
whether the financial statements are free from material misstatement.

An audit involves performing procedures to obtain audit evidence about the amounts and disclosures in the
financial statements. The procedures selected depend on our judgment, including the assessment of the risks
of material misstatement of the financial statements, whether due to fraud or error. ln making those risk
assessments, we consider internal control relevant to the entity's preparation and fair presentation of the
financial statements in order to design audit procedures that are appropríate in the circumstances, but not for
the purpose of expressing an opinion on the effectiveness of the entity's ínternal control. An audit also includes
evaluating the appropriateness of accounting policies used and the reasonableness of accounting estimates
made by management, as well as evaluating the overall presentation of the financial statements.

We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our
audit opinion

Opìnion

ln our opinion, the financial statements present fairly, in all material respects, the financial position of Lake
Huron Area Primary Water Supply System as at December 31, 2010, and its results of operations and its cash
flows for the year then ended in accordance with Canadian generally accepted accounting principles.


   /fu¿                     '/¿'?
Chartered Accountants, Licensed Public Accountants

May 25, 201L

London, Canada

                                                    XPMG LLP ¡s a Camd¡a^ l¡mired l¡âÞil¡ry põmorsttip and a msmb€r ti.m ot Ùþ KPMG
                                                    ætwdl ol rnd9pffdsil mgmbù ltrms af¡liated w¡ìh KPMG ht€rnational C@pe.arivê
                                                    l-KPMG lntårmrio¡al',. e Su¡iss onti¡y.
                                                    KPMG Cúâde Þ.@¡des srvices to KPMG LLP
     E.fËi



Financial Statements of

LAKE HURON AREA PRIMARY WATER
SUPPLY SYSTEM
December 31,2010
LAKE HURON AREA PRIMARYWATER SUPPLY SYSTEM
Staúement of Flnanclal Posltlon
As at December 31, 2010



Flnanclalassets



Financlal llabllltles
 Bank indebtedness (note 5)                                                    1,355,358      1,72ô,015
 Accounts oavable and accrued                                                         779     6
Total flnanclal                                                                       ìm       1




Non.flnanclal assets
 Tangible capltal assets (note 4)                                            124,639,025    119,038,512
                                                                                  1                1




The accompanying notes are an integral part of these financial statements.
LAKE HURON AREA PRIMARY WATER SUPPLY SYSTEM
Statement of Operatlons
Year ended December 31, 2010
                                                                     EË
Revenues
  User charges                                                               16,722,775    16,939,107    15,385,597
  lnvestment income                                                                             62,249       60,374
  Transfer payments
     Provincial                                                               1,460,608      lì460,609
     Federal                                                                  1,450,474      1,460,q14      278,646
     Other municipaliiies                                                     2,796,806      2,796,906    13,489,963
_olher
Total revenues
                                                                              .. ,gg,ggg ,, 66,i52
                                                                             22,490,662 ??,655,394
                                                                                                                   -
                                                                                                         29,214,490

Expenses
   Salaries, wagôs and benefits                                                 455,693        456,214      422,260
   Materlals and supplles                                                     7,494,918      9,460,177     8,830,523
   Contracted services                                                          743,058        698,664      317,779
   Rents and financial expenses                                                 457,328       4&,062          32,933
   Interest on long-term debt                                                                                341,589
  Amortlzatlon                                                                               3497,246      2,840,419
             billed                                                                                         131
                                                                                300,241




Accumulated surplus, beglnnlng of year (note 6)                              117.422.371   117.422.371   101j24¿46
                              year (noþ 6)                                   130,6A2,792 126,364,860
-Aqcu¡4ulqtgd surplus, end of                                                                            117,422.371




The accompanying notes are an integral part of these financial statements.
IÁKE HURON AREA PRIMARYWATER SUPPLY SYSTEM
Statement of Net Debt
Year ended December 31, 2010




Annualsurplus                                                                13J8A,421 9,942,499         16,297;925

Acquisition of tangible capital assets                                       (18,562,357) (8,996,7õ8i   (16,439,583)
âmortization of tqngiblg capitalassets                                        .__ - _- -      g,49T,Zß   2,940,415

                                                                                      :
Prepaid   expenses                                                                        -    (8,895)       (1,g91)

Change in net debt                                                            (5,391,936) 3,434,091      2,696,770

Net debt, beginning of year                                                  (1,618,132) (t,6t8,132)     (4,314,902)




The accompanying notes are an integral part of these financial statements.
LAKE HURON AREA PRIMARYWATER SUPPLY SYSTEM
Statement of Cash Flows
Year ended December 31, 2010




Cash provlded by:

Operatlng acdv¡t¡æ:
  Annualsurplus                                                              8,g42,4gg     16,297,925
Items not lnvolvlng cash:
 Amortlzation                                                                g,497,246     2,f!i0,41g
Ghange ln non.cash assets and llabllltles:
 Prepaid expenses                                                               (8,895)      (1,991)
 Trade and other  receivables                                                  662,590  (5,917,g17)
                          liabilities
 Accounts payable and accrued                                                (3,226:015) 4,962,9g6,
 Accrued interesl on lo
                              actlvitles
Net change in cash from ope¡atlng                                            gffi
Capltal actlvltles:



Flnancing activities:

-
Net change in cash and short-term lnvestments (bank lndebtedness)              370,657     (4,731,996)

Cash and short-þrm ¡nvestments (bank lndebtedness) , beglnnlng of year       (1,726,015)   3,005,981




The accompanying notes are an integral part of these flnancial statements.
IAKE HURON AREA PRIMARYWATER SUPPLY SYSTEM
Notes to Financial Statements
Year ended December 31, 2010
                                                                     til'[Ël
1.     Slgnificant accounting policies

       The financial statements of the Lake Huron Area Primary Water Supply System are the
       representation of management, prepared in acoordance with Canadian generally accepted
       accounting principles as defined in the Canadian lnstitute of Ghartered Accountants Public Sector
       Accounting Handbook. Since precise determination of.many asseß and liabilitles depends upon
       future events, the preparation of periodic financial statemenß necessarily involves the use of
       estimates and approximations.

       (a)     Accrual accountlng

               Sources of financing and expenses are reported on the accrual basis of accounting.

       (b)     Non-flnancialassets

               Non financial assets are not available to discharge existing liabilities and are held for use
               in the provision of services. They have useful lives extending beyond the current year
               and are not intended for sale in the ordinary course of operations.

               i)    Tangible capital assets

               Tangible capital assets are recorded at cost which includes amounts that are directly
               attributable to acquisition, construction, development or betterment of the asset. The
               cost, less residual value, of the tangible capital assets, excluding land and landfill sites,
               are amortized on a straight line basls over their estimated useful lives as follows:

                                                                                      Useful Life - Years

                Buildings and building improvements                                                10-60
                Vehicles                                                                               4-12
                Machinery and equipment                                                                3-60
                Water lnfrastructure                                                              10   -   100

               Annual amortization is charged in the year of acquisition and in the year of disposal using
               the half year rule. Assets under construction are not amortized until the asSet is available
               for productive use.

               ii)    Contributions of tangible capital assets

               Tangible capital assets received as contributions are recorded at theír fair market value at
               the date of receipt and also are recorded as revenue.

               iii)   lnterestcapitalization

               The intereSt costs associated with the acquisition or construction of a tangible capital
               asset are not capitalized.

       (c)     Revenue recognition

               The Company recognizes revenue when water is drawn by each customer, collection of
               the relevant receivable is probable, persuasive evidence of an arrangement exists and
               the sales price is fixed or determinable.
LAKE HURON AREA PRIMARY WATER SUPPLY SYSTEM
Notes to Financial Statements
Year ended December 31,2010


     (d)     Use of estimates.

             The preparation of financial statements in conformity with Canadian generally accepted
             accounting principles requires management to make estimates and assumptions that
             affect the reported amounts of assets and liabilities and disclosure of contingent assets
             and liabllities at the date of the financial statements and the reported amounts of
             revenues and expenses during the year. Significant items subject to such estimates and
             assumptions include the valuation allowances firr reqeivables.

             ln addition, the City's implementation of the Public Sector Accounting Handbook PS 3150
             has required management to make estimates of historical cost and useful lives of tangible
             capitalassets.

             Actual results could differ from those estimates.

2.   Nature of reporting entity

     The final transfer order for Lake Huron Area Primary Water Supply System was effective
     September 15, 2000, transferring assets along with any other real property to The Corporation of
     the City of London in trust to act as the Administering Municipality on behalf of the participating
     municipalities.

     Under the transfer order, the works, properties and all assets, liabilities, rights and oblþations of
     the system are conveyed, assigned and transferred to The Corporation of the City of London as
     Trustee. Each of the benefitting municipalities, for so long as the municipality is serviced by the
     works has an undivided beneficial ownership interest ln the works as tenant in common with all
     other municipalities jointly. The proportion that each municipali$'s interest bears to the total of all
     municipalities' interests shall be in the same ratio that the quantity of water supplied from the
     works to the municipalities at any time and from time to time bears to the total quantity of water
     supplied to all municipalities at such time. At present, he benefitting municipalities are The City
     of London, the Municipalities of Bluewater, South Huron, Lambton Shores, North Middlesex,
     Lucan-Blddulph, Middlesex Centre and Strathroy-Caradoc.

     The transfer order established a joint board of management to govem the management of the
     water supply system. The joint board of management is comprised of eleven representatives of
     the municipalities appointed by the respective councils of participating municipalities. The
     representation is broken down as follows:




      The City of London                                                         4                      16
      Bluewater                                                                   1                      1
                                                                                                         ,l
      South Huron                                                                 1
      Lucan-Biddulph                                                              1                      1
      Lambton Shores                                                              1                      1
                                                                                  ,l
      North Middlesex                                                                                    3
      Middlesex Ceritre                                                           1                      1
      Strathroy-Caradoc                                                           1                      3


3.    Gash and short-term investments

     Cash and short-term investments are held by the Corporation of the City of London and set aside
     for use by Lake Huron Area Primary Water Supply System.
I.AKE HURON AREA PRIMARYWATER SUPPLY SYSTEM
Notes to Financial Statements
Year ended December 31, 2010


4.   Tan$ible capital assete


                                                  Balance at                                          Balance at
                                               December 31,                                        December 31,
                                                                   Additions        Disposals
                                                       2009                                                2010

     Land                                          1,843,513                                           1,843,513
     Buildings and building improvements          19,521,693         6,118,25;                        25,639,950
     Vehicles, machinery and equipment            16,649,432         4,454,6.1           29,454       21,074,589
     Water infrastructure                         66,183,622       29,863,411                         9ô,047,033
     Assets under construction                    36,491.670        4.948,118        36.387.638        5.052.150
                                                 140.689.930       45,384,397        36,417,092      149.657.235


                                                   Balance at                                         Balance at
                                               December3l,       Amortization                      December 31,
             Accumulated Amortization                    2010 exþense               Disposals                2010

     þnd
     Buildings and building improvements           4,771,055           600,079               -         5,971,ß;
     Vehicles, machinery and equipment              5,610,666        1,300,912           29,454        6,992,124
     Water infrastructure                          11,269,697_       1,596,255               -        12,965,952
     Assets under construction
     Total                                        21,651,418         3,497,246           29,454       25.119.210

                                                   Net book                                              Net book
                                                      value                                              value
                                               December 31,                                        December 31,
                                                       2009                                                  20'10

     Land                                          1,943,513                                           1,843,513
     Buildings and building improvements          14,750,638                                          20,269,916
     Vehicles, machinery and equipment            11,038,766                                          14,192,465
     Water infrastructure                         54,913,925                                          83,181,081
     Assets under construction                    36.491.670                                           5.052.150
     Total                                       119.038.512                                         124.538.025

     (a)       Assets under construction

               Assets under construction having a value of $5,052,150 (2009 - $36,491,670) have not
               been amortized. Amortization of these assets will commence when the asset is put into
               service.

     (b)       Gontributed tanglble capital assets

               Contributed capital assets have been recognized at fair market value at the date of
               contribution. The value of contributed assets received during the year is nil (2009 - nil).

     (c)       Tangible capital assets dlsclosed at nomlnal vatues

               Where an estimate of fair value could not be made, the tangible capital asset was
               recognized at a nominal value. Land is the only category where nominal values were
               assigned,
LAKE HURON AREA PRIMARYWATER SUPPLYSYSTEM
Notes to Financial Statements
Year ended December 31, 2010
                                                                       trrË
     (d)     Writedown of tangible capital assets

             The write-down of tangible capital assets during the year was nil (2009 - nil).

5.   Bank indebtedness

     As the Administering Municipalty, the Corporatlon of the City of London manages the daily
     oÞgrations of the joint water board. The Corporation maintains a separate general ledger on
     behalf of the joint water board. Funds are transferred to and from the joint water board bank
     account as funds are paid and received by'the City of London.

     At December 31, 2010, the Lake Huron Area Primary Water Supply System is showing bank
     indebtedness of $1,355,358.(2009 - $1,726,015), which represents funds due to the City of
     London bank account for expenses paid on behalf of the joint water board.

6.   Accumulated surplus

     Accumulated surplus consists of individual fund surplus and reserve funds as follows:

                                                                           2010                  2009

      Surplus:
         lnvested in tangible capital   assets                         $118,382,464 9114,785/76
         Totalsurplus                                                   118,382,4il            114,785,476

      Reeeùve funds set aside       for speclfic purpose by the
      Board:
         lnfrastructure renewal - water
         Total reserve funds


7.   Fair value of financial lnstruments:

     (a)     The carrying values of cash and short-term investments, trade accounts receivable and
             accounts payable and accrued liabilities approximate their fair values due to the relatively
             short periods to maturity of the instruments.

             The fair value of long-term debt approximates its carrying value as interest rates are
             similar to cunent market rates of interest available to the Company.

     (b)       Credit and foreign curency risk:

             The Company is not exposed to any foreign cunency or credit risk.

8.   Comparative figures

     Certain of the comparative figures in the financialstatements have been reclassified to conform to
     financialstatement presentation adopted in the current year.
                                              trtr
                                              Agenda ltem   #   Page #




 Lake Huron
   Primary Water Supply System
                                                                                                     File No. H1712011

                           To:   Chair and Members
                                 Lake Huron Primary Water Supply System Board of Management

                      From:      John Braam, P.Eng.
                                 Director of Water & City Engineer

        Meeting Date: June 9, 2011

                  Subject:       Key Performance lndicators     -   1"t Quarter 201   1




That the Board of Management for the Lake Huron Primary Water Supply System RECEIVE this report
on the regional water supply system's Key Performance lndicators for information.



The Board of Management for the Lake Huron Primary Water Supply System has received periodic
reports since 2003 on the performance of the system with respect to contractual and regulator
obligations, as well as environmental performance and quality management, related to our
management system approach to administering and governing the water supply system.

ln order to provide a higher-level assessment to the Board on the overall performance of the system in
general, staff have initially developed five (5) Key Performance lndicators (KPl) to be reported to the
Board on a periodic basis. The proposed KPls are identified and briefly summarized as follows:

    1. Process Lost Water: Water is used         and/or "lost" throughout various parts of the treatment
          processes. This includes the need to clean filters through a backwash process, periodic draining
          of tanks, pump seals, and tank cleaning.
          Excess waste of water within the plant can occur for a variety of reasons, including increased
          frequency of filter backwashes due to chemical treatment process imbalance, treatment "upset"
          due to a rapid change in raw water quality or slow response of chemical treatment processes,
          and lack of adequate filter maintenance. There will always be "unaccounted for wated' within the
          treatment system, and may vary seasonally due to seasonal raw water quality, but it is prudent
          to limit the amount of "lost wate/'as much as possible in order to maximize cost effectiveness.
          The Process Lost Water KPI is a measure of the volume of treated water discharged from the
          water treatment plant versus the volume of raw water extracted from the source water. Typically
          for the Lake Huron water treatment plant, this KPI should be in the order of 5%




Report Page 1     of4                                                                                               June 9, 201   1

                                                                               Key Performance lndicators   -   1"r Quarter 201   1
                                       trtr
                                        Agenda   ltem#   Page#




   Lake Huron
    Prim¿ry Water Supply System
                                                                                              File No. H1712011
    2.   Non-Revenue Water: Water can be lost within a municipal water distribution system, and can
         typically be attributed to:
             o Leakage from the distribution pipelines and services, typically through joints and pipe
                 fractures;
             . Meter accuracy, which can also diminish overtime due to wear;
             . Meter reading errors;
             ¡ Maintenance and construction activities, typically associated with flushing programs;
             o Theft;
             o Storage (water accounted for but not sold and is stored within a reservoir, water tower,
                 or standpipe)

         Although the regional water transmission system is much smaller and less complex that a
         typical municipal water distribution system, these factors will generally still apply.
         The Non-Revenue Water KPI is a measure of the volume of water supplied (sold) to the
         benefiting municipalities versus the volume of treated water discharged from the water
         treatment plant. Typically for the Lake Huron water system, this KPI should be in the order of
         4% or less.

    3.   Energy Efficiency: A significant amount of energy is required in order to extract, treat, transmit
         and monitor water being supplied to the benefiting municipalities. The quantity of energy
         consumed at any given time can vary appreciably due to needed pumping rates to supply the
         benefiting municipalities (day versus night, and summer versus winter).
         It is important to note that the most'efficient use of energy' can be counter productive to energy
         cost effectiveness as the commodity cost of the energy can vary significantly over time (day
         versus night, and seasonally) inespective of the most efficient way of moving the water through
         the system. ln that regard, the 2011 Capital Budget projected a proposed future study which
         reviews pump optimization and energy efficiency, cunently projected for 2012.
         The Enerqv Eff¡ciencv KPI is a measure of the total kilowatt-hours of energy consumed per
         cubic meter of water volume of treated water discharged from the water treatment plant.
         Typically for the Lake Huron water system, this KPI should be in the order of 750kwh per million
         litres of water.

    4.   Disinfection: One of the single most important aspect of the treatment and supply of drinking
         water is disinfection during the treatment process, as well as ensuring adequate amount of
         residual chlorine to ensure secondary disinfection in the transmission and distribution systems.
         The quantþ of chlorine utilized for primary (treatment) and secondary (distribution) system may
         vary depending on the quality of the source water, water temperature, and desired residual
         quantity of chlorine within the water distribution systems.
         Excess utilization of chlorine within the water system can be indicative of degraded source
         water quality, reduced effectiveness of water treatment processes, and degraded water quality
         within the distribution system.

         The Disinfection KPI is a measure of the total amount of chlorine per cubic meter of water
         volume of treated water discharged from the water treatment plant. Typically for the Lake Huron
         water system, this KPI should be in the order of 2.3 kg of chlorine per million litres of water.

Report Page 2 of 4                                                                                         June 9, 201   1

                                                                       Key Performance lndicators   -   1"t Quarter 2011
                                             trtr
                                             Agenda   ltem#   Page#




   Lake Huron
    Primary Water Supply Sysìem
                                                                                                File No. H1712011

    5. Chemical Efficiency: Beyond the disinfection        process within the treatment plant, numerous
         other chemicals are required to ensure the effective treatment of water. Chemicals utilized
         within the water treatment plant include aluminum sulphate (alum) and polymers for the effective
         removal of particles from the source water, chlorine for disinfection, powder activated carbon for
         taste and odour control, and caustic soda for conosion control.
         Excess or inadequate utilization treatment chemicals can be indicative of ineffective treatment
         processes, inadequate maintenance and/or operation of the treatment systems, or degraded
         source water quality.
         Due to a monitoring issue, the caustic soda data from August 2010 to present contained
         inaccuracies, therefore the quantity of caustic soda had to be removed from the cunent
         chemical efficiency KPI in order to avoid skewed results.

         The Chemical Efficiency KPI is a measure of the total amount of treatment chemicals utilized
         per cubic meter of water volume of treated water discharged from the water treatment plant.
         Typically for the Lake Huron water system, this KPI should be in the order of 27 kg per million
         litres of water (excluding caustic soda).



Future quarterly reports to the Board will provide periodic updates of seasonal variations of KPI's in
comparison to base 'benchmark" values. This will also provide the opportunity to identify and target
efficiency and optimization programs for the regional water system, with the objective to reduce overall
long-term costs of the water system, as well as opporlunities to improve operational practices and
processes.

lnformation for this report was provided by Erin Kirk, Quality Assurance & Compliance Manager.




 Division Manager, Regional Water Supply                                 of Water& City Engineer




Attachments: Appendix             A:   2011 Key Performance lndicators




Report Page 3 of 4                                                                                            June 9, 201 1
                                                                         Key Performance lndicators   -   1"t Quarter 2011
                                                   trE
                                                   Agenda ltem   #   Page #


          ^^
          È
 Iake Huron
   Prìmary Yy'ater Supply   Syslen                                                  File No. H17l2Af




                                                                              (Dec-F eb)

                        Process Lost Water                                     3.65%

                        Non-Revenue Water                                      5.47o/o

                             Efficiency
                        Energy                           kwh/Ml                763.4

                        Disinfection                      kg/ML                 2.15
                        ChemicalEfficiency                kg/ML                30.67
                        lexcludes caustic soda ì




Report Page 4 of 4                                                                          June 9, 201't
                                                                               Key Performance lndicators
                                                                    #



                                                      trtr
                                                      Agenda ltem        Page #




           ê
    Lake Huron
    Primary Vlater Supply System
                                                                                                                      File No. H'1712011


                            To:     Chair and Members
                                    Lake Huron Primary Water Supply System Board of Management

                       From:        John Braam, P.Eng.
                                    Director of Water & City Engineer

         Meeting       Date:        June 9, 2011

                    Subject:        Quarterly Compliance Report (l"tQuarter 20'11: January - March)




That this Quarterly Compliance report with respect to the general, regulatory and contractual
obligations of the Lake Huron Primary Water Supply System BE RECEIVED for the information of the
Board of Management.



Pursuant to Board of Management resolution, this Compliance Report is prepared on a quarterly basis
to report on general, regulatory and contractual compliance issues relating to the regional water
system. For clarity, the content of this report is presented in two basic areas, namely regulatory and
contractual, and does not intend to portray an order of importance or sensitivity nor a complete list of all
applicable regulatory and contractual obligations.

:,,ìiRÈ       ürlöff               ,S,ü:Ë 'r,tifr,:,,'.tl'r,',,'',1ii,i'i:¡it'.,,,,i,Ì$:,i,¡.-,iiiì;t,iiïiii,,.: l;.iiiil¡iì ¡ii,,iiii:i:i   ,ii:r:
Recent Requlatory Chanqes:

.   Policy Decision: Second Extension            of the 2007 Canada-Ontario Agreement (COA)
    Respecting the Great Lakes Basin Ecosystem
    The current COA expired, and was previously extended for one year to March 31, 2011 . Because
    the process to amend the Canada-U.S. Great Lakes Water Quality Agreement (GLWQA) is
    ongoing, the governments of Ontario and Canada considered a further extension to the COA to
    maintain momentum on the restoration, protection and conservation of the Great Lakes Basin
    Ecosystem while the GLWQA is being amended. The Canadian and Ontario governments have
    decided to move forward with the second extension (to June 24, 2012). Through the extension,
    Canada and Ontario are considering amendments to update and refresh some commitments under
    the Agreement. They will be implementing six new commitments related to harmful pollutants,
    nearshore framework, stewardship activities, binational cooperative monitoring programs, aquatic
    invasive species complete prevention plan, and spills prevention and response. Once the
    binational Great Lakes priorities are confirmed, priorities under a new COA will be realigned and
   redefined.
Potential impacts on the Board: None anticipated.



Report Page     I   of 15
                                              ltem#



                                     trtr
                                     Agenda           Page#



           ê
    Lake Huron
    Primary Water Supply System
                                                                                      File No. H1712011
New Envifonmental Bill of Riqhts (EBR) Reqistry Postinqs: At the time of drafting this report, there
are proposed regulations, protocols and guidelines posted on the Environmental Bill of Rights (EBR)
Registry for comment, or in the draft consultation process with the Ministry of the Environment (MOE)
or other agencies as follows:

r  Policy Proposal: Proposed Amendments to the technical rules made under section 107 of
   the Clean Water Act, 2006 with respect to the preparation of an assessment report.
   The goal of the Clean Water Act is to protect existing and future sources of drinking water as part of
   the overall commitment to human health and the environment. A General Regulation under the Act
   establishes the requirements for preparing terms of reference, assessment reports, and source
   protection plans. ln addition, the Act authorizes technical rules governing the preparation of an
   assessment report. Proposed amendments to the technical rules include alignment of the technical
   rules with new guidance documents that have recently been developed for the dgvelopment of
   water budgets to ensure a consistent approach is used across the province, and amended rules
   regarding climate change data in the preparation of water budgets.
Potential impacts on the Board: None anticipated.

r   Regulation Proposal: Proposed Regulatory Amendments as a Result of Ghanges to
    Environmental Protection Act and Ontario Water Resources Act, as Amended by the Open
    for Business Act, 2010
r   Regulation Proposal: Requirements for Submitting a Gomplete Environmental Compliance
    Approval Application
    The MOE has developed legislation that will enable a modernized approvals system in Ontario.
    The MOE is developing a risk-based approach to environmental approvals that will focus on
    environmental protection, while still providing enhanced services for businesses. For example,
    there will be a simplified registration process for activities/sectors with potentially lower
    environmental impacts. The framework has two processes; a registry process for prescribed
    activities, and an approvals process for activities not prescribed that require a detailed technical
    review of submitted documentation as well as public input. Various regulations are currently in
    development to address proposed classifications, application requirements etc.
 Potential impacts on the Board: None anticipated. The guidance document for the proposed
framework indicates that the proposed new modemized approach to the approvals process is not
intended to include legislative changes to the existing processes related to permits to take water,
renewable energy approvals, drinking water systems and municipal licensing, or licensing and
certification prog rams.

Quarterlv Water Qualitv Reports: Although no longer required to be submitted to the Ministry of the
                                    heWaterQualityQuarter|yReportfortheperiodofJanuary1"tto
March 31't, 2011 inclusive was completed by the Board's Operating Authority, American Water Canada
Corp (AWCC). The full Quarterty Report for the primary system is posted on the Water Systems'
website at www.watersupplv.london.ca and is included in this report as Appendix A for the Board's
information. A summary of water quality sample results will continue to be provided and posted on a
quarterly basis for the Board's and the public's information.




Report Page 2 of 15                                                                            June 9, 2011
                                                                                 Quarterly Compliance Report
                                              ltem#



                                      trtr
                                     Agenda           Page#




  Lake Huron
   Primarywatersupplvsvstem
                                                                                      Fire No. H1,tzo11
O.Req. 170/03. Section 1l "Annual Reports": Under the Drinking Water Systems Regulation
(O.Reg. 170103), an Annual Report for the Lake Huron Primary Water Supply System (LHPWSS) is
required to be prepared by February 28th,2011 by the contracted operating authority. Although the
report is no longer required to be submitted to the Ministry of the Environment, the LHPWSS is required
to provide copies of the report to drinking water systems that obtain water from this system. Copies of
the report were forwarded to the benefiting municipalities as required. The report summarizes water
quality and maintenance information for the 2010 calendar year. The Annual Report is posted on the
Water Systems'website at www.watersupplv.london.ca for public information. All Annual Reports are
available for viewing at the Lake Huron Water Treatment Plant and at the Board's Administration Office
in London. Copies of all reports are available to the public upon request and free of charge as required
by O.Reg. 170103.

O.Req. 170/03. Section 22 "Summarv Reports             for Municipalities":   Under the Drinking Water
Systems Regulation (O.Reg. 170/03) a summary report is required by March 31't of each yearwhich:
    ¡ Lists the requirements of the Act, the regulations, the system's approval and any order that the
      system failed to meet at any time during the period covered by the report, and the duration of
      the failure. For each failure referred to, a description of the measures that were taken to correct
      the failure is required.
    ¡ ln order to allow the system's owner to "assess the capability of the system to meet existing and
      planned uses of the system" provide a summary of the quantities and flow rates of the water
      supplied, including monthly average and maximum daily flows and daily instantaneous peak
      flow rates, with a comparison to the systems rated capacity and flow rates in the Certificate of
      Approval.
The Summary Report was completed by the contracted operating authority and submitted to the MOE
on March 25th, 2011 deadline. The report is posted on the Water Systems' website at
www.watersupplv.london.ca for public information and printed copies of the report were forwarded to
the benefiting municipalities as required by Regulation. All Summary Reports are available for viewing
at the Lake Huron Water Treatment Plant and at the Board's Administration Office in London. Copies
of all reports are available to the public upon request and free of charge as required by O.Reg. 17OlO3.



ARTIGLE 3. "Manaoement. Operation and Maintenance of the Facilities - General":
At the time of writing this report, the Administering Municipality had not yet received the first quarter
Operations and Maintenance Report from American Water Canada Corp. (AWGC). A quarterly
administration meeting between Board staff and AWCC is scheduled to take place on June 20, 2011.
Board staff informally meets with AWCC on a monthly basis to discuss operations and maintenance
issues, and on a formal basis quarterly to review contractual performance. Copies of the quarterly
Operations and Maintenance Reports are available at the Board's Administration Office in London upon
request.




Report Page 3 of 15                                                                            June 9, 201 1
                                                                                 Quarterly Compliance Report
                                                           #



                                              trtr
                                              Açnda ltem       Page   #



           ê
   Lake Huron
    Primary Vlater Supply System

                                                                                                  File No. H1712011
lnformation for this report was provided by Erin Kirk, Quality Assurance & Compliance Manager.




  Division Manager, Regional Water Supply                                   of Water and City Engineer




Attachments:
         Appendix        A:   Water Quality Quarterly Report   -   1't Quarter 2011 (January - March)




Report Page 4 of 15                                                                                       June 9, 201 1
                                                                                            Quarterly Compliance Report
             ê
    Lake Huron
      Primary Water Supply System
                                                                                                                                     File No. H17nÙfl




Analytical Test Resulfs;        (Altvatues are repofted in mg/Lunless otherwise noted)
Microbiological Parameters (Required Testing Under O.Reg. 170103):

                                                            No. Of       No. Of                                Results
                                     MAC or       No. Of                                     Sampling
    tvtrLtvur9rv9rwr                                       Detectable   Adverse     Method                                                      Commenls
                                      IMAC       Samples    Þccrrllc    Flacrrllc              Date     Min.    Max-     Avg.
                                                                                                                                   raramelal samPreq ¡s usog to ¡¡9I fot
                                       Not                                                                                         tho poss¡blo presence of fecal matþr,
Totâl Collfo?m (counts/l 00mll'                    6¡t         0           0         MF      Jan-Mar     0        0        0
                                                                                                                                   A ZERO test result3 lndlcato that no
                                    Dstecl¿ble
                                                                                                                                   Totâl collfofms ware datactêd-
                                                                                                                                   Paramoter campled 13 u3od to test fot
                                       Not                                                                                         the possible pro3once of focal mettor.
E   Cori (counts/loomll   '         Detect¿blè
                                                   6¿l         0           0         MF      Jan.Ma¡     0        0        0
                                                                                                                                   A ZERO test ¡osulls lndlcste th¡t no
                                                                                                                                   E-Coli was ðø1..1..1-
                                                                                                                                   Tost pafam€tor ¡s ussd as an
                                                                                                                                   lndicato¡ of pGslblo dotorloratlon of
                                                                                                                                   water quallty. The Wator guallty
Heterotroph¡c Plate Count              N'A         64          6          N/A         SP     Jan.llet   <10      90      16.189    standard of 500 counts/l0oml 3st
(countsrlmll                                                                                                                       undor O.Rog. 169 fo¡ this paramotot
                                                                                                                                   h¡s begn revoked. The avarage value
                                                                                                                                   ls based on six f6l numerical values.




Adverse Results:
                                                                                                                                                               r-lå
There were no adverse microbiological test results during this quarter for the Lake Huron Primary Water Supply System.


                                                                                                                                                               H$           {t




Report Page 5 of 15                                                                                                                             June 9,2011
                                                                                                                                                               B
                                                                                                                               Quarterly Compliance Report
 Lake Huron
   Primary Water Supply System
                                                                                                                                                          File No. H1712011
Operational Parameters:

                                 MAC or   o6¡eaive           No. of       Sampling             Results
 Operational Parameters                                                                                                                           Comments
                                  IMAC    AO/OG             Samples         Dale       M¡n.     Max.     Avo.
                                                           uonünuous
                                                           monlûorlng                                             fhe ma¡ntenance of an adcquato ftoe chlorlno rældual ¡n æsontlel to
 Chlorlne Reslduatr'¡, Free                 >02             pluc 6 grab   Jan.fllar    0.99     1.35     1.17     fhe proloction of publlc hee¡th, Valuee reportad aro an avorägs of tho
          (mgrLl
                                                           samplee per                                                                     6 dally grab samples.

                                                           uonünuous
  chlor¡ne Rss¡dualt, Tota¡
                                                            monltotlng                                            fte malnûenance of an adequate fres ch¡or¡ne rosldu¡l ln essentl¡l to
                                  ¿¡.0      >o.2            plus 2 grab   Jan-llter    1.08     l.¡16    1.n      the protèctlon of publlc he¡lth. Vduæ repoÉed er€ an avorage of tlro
           lmgrL)                                          samples per                                                                     2 dalþ grab samples.

                                                             ¿ grz0
           Colour                                          samples per    J¡n.llar      <l       <1       <l
                                               5
           frcul                                               drw
                                                           (;onünuous
                                                            mon¡torlng                                             Valuos r€portod arê basod on on.llno contlnuous monllorlng of raw
CondúcdvÌty (mlcro mhorcm)                                  plus 2 grab   Jan.lì¡lar   211.4    286.9    234.0
                                                                                                                                                     waþr.
                                                           samplæ por

                                                           uon¡tnuous
                                                            mon¡torlng
             pH                           65   -     8.5    plus 5 grab   Jan{llar     7.09     Ll8      8.58            Values repoÉed are an average of thê 6 delly gr¡b semplos.
                                                           sâmplæ por

                                                           uon¡rnuous                                               r   urD¡oly lctouornessl o¡watef 13 an rnorcanon of mo pfosonco o¡
                                                           mon¡þdng                                                      part¡clos ¡n tho w¡ûor. lf excessive, lt may ¡ntorfore with prope.
         Turbldltyr                                         plus 6 grab   Jan.llar     0.0¿r    0.073    0.050          d¡s¡núoctlon. V.lues rcported ere an average of the 6 dally grab
                                  1.0
           (NTU}
                                                           sâmplos por                                                                                samples.

                                                             ¿ grag
         Alümlnum                                                                                                 Aluminum levels are sligh$y elevaled during treetmenl ås â rêsult ofth6
           (mgrLl
                                               0.1         samplos psr    Jan{l¡r      0.005    0.087    0.02't
                                                                                                                  use of alum to help in the removal of parliculates.
                                                               â;v
                                                           ugnunuou5
                                                            monitorlng
        lemperaturo                            .l5          plus 6 gnb    Jan.lll¿r     1A       3.3     1.826    Raw waler temperature
          (Coblu3l
                                                           samples per


                                                                                                                                                                                         -t
                                                                                                                                                                                              -o

Report Page 6 of 15                                                                                                                                             June 9, 201 1
                                                                                                                                                  Quarterly Compliance Report
     Lake Huron
     Primarywate¡supplvsvstern
                                                                                                                       Fire No. H1zrzo11
lnorganic Parameters (Required Testing Under O.Reg. 170103            -   Schedule 23):

                                                     O.Reg.
                                                                             2010           2011
                                                     170t03                                         Reporlable
                               MAC or
     Schedule 23 - lnorganic            Objective    Required                                       Deleclion
                                IMAC                                                                             Comments
          Parameters                    AO/OG       Frequency                                         Limit
                               (ms/L)                           Q2           Q3       Q4     QI
                                                    ofTesting                                         (mg/L)
                                                    lmonlhcì

1.            Antlmony          0.006                  12       NT           l,¡T     NT     ND       0.001


2,             Ar3onlc          0.025                  12       NT           t{T      NT     ND       0.001


3.              Barlum           1.0                   12       NT           t{T      NT    0.0f5     0.005


4,              Boron            6.0                   12       NT           t'¡T     t{T    ND        0.0{


5.             Cadm¡um          0.005                  12       l{1          NT       NT     ND       0.0001


o.            Chromlum          0.05                   12       N1           NT       NT     ND       0,005


7.             Mercury          0.001                  12       NT           NT       NT     ND       0.rx,01


8.             Selsnlum         0.01                   12       t{T          NT       NT     ND       0.002


9.             UÌan¡um          0.10                   12       NT           NT       NT     ND       0.0002




                                                                                                                                           Eå  t*

                                                                                                                                           l-1"
                                                                                                                                          EJT
Report Page 7 of 15                                                                                                            June 9, 201 1
                                                                                                                 Quarterly Compliance Report
              â
             È
 Lake Huron
      Primarywatersupplvsvstem
                                                                                                                                                                Fite No. H1Tt2o11
Organic Parameters (Required Testing Under O.Reg. 17OlA3                                    - Schedule 24):
                                                                                  (J,Reg.
                                                                                  170103               2010        2011   Reportable
                                                          MAC or
                                                                    Objective     Required                                 Detection
         Schedule 24   -   Organic Paramelers              IMAC
                                                                    AO/OG       Frequency of                                 Limit
                                                                                                                                                          Comments
                                                          (ms/L)
                                                                                   Testing       Q2     Q3    Q4   Q1       (mg/L)
                                                                                 lmonlhsì

  I                             Alachlot                   0.005                    12           NT     t{f   NT   ND       0.0005     Herb¡clda


  2.                            Aldlcarb                   0.009                    12           NI     NT    NT   ND       0.005      lnsecticlde


  3.                        Aldrln + Dleldrln             0.0007                    12           ilT    NT    NT   ND      0.000012    ln3ectlclde


  4.          Atr¡zlne     * Ndo¡lkyl.tod   metâbol¡tes    0.005                    12           NT     NT    N1   I'lD     0.00r      Herblclds


  5.               Az¡nphos-mothyl lcuthlonl               0.02                     12           NT     NT    N1   ND       0.002      lnsecticldo


  6.                          Bandiocarb                   0.0¡l                    12           NT     NT    NT   ND       0.002      ln¡ecücide

                                                                                                                                       An

                                                                                                                                                                                          E1
                                                                                                                                           aromat¡c hydrocarbon prssent ln
  f,                            Benzgne                    0.005                    12           NT     NT    N1   ND       0.0001
                                                                                                                                       g.sollno
                                                                                                                                       A   POryCyCrrc   åromauc nyofocarDon lPAlr,
                                                                                    12           ilT    NT    NT           0.000q¡9'
                                                                                                                                       that torms dur¡ng tho combusüon of
  E.                        Benzo(alpyrene                0.00001                                                  ND
                                                                                                                                       organic matter (Eg. Emlsslons from
                                                                                                                                       hr¡mlna faccll frr¡lcl




                                                                                                                                                                                          w
  9.                          Bromorynll                   0.005                    12           NT     NT    NT   1{D      0.0005     Horblcldê

 ,t0.                           Carbaryl                   0.09                     12           N1     NT    NT   ND       0.005      lnsectlclde


  11.                         Carbofuran                   0.09                     12           NT     t{T   NT   ND        0.005     lniectlclde
                                                                                                                                       An organlc ¡lquld that ls          pdmerlly
  12,                                                      0.005                    12           NT     f{T   NT   ND       0.0001     rele¡sed from man.mado sourc€s; usod
                         C.rbon Tetrachlorlde

  .t3,                      Chlordane (total!              0.007                    12           t{T    NT    NT   ND      0.000012    Pestlclde


  't4,                 Chlorpyrlfos (Dutsban)              ô.os                      12          NT     NT    NT   ND        0.001     Pe¡$clde




Report Page E of 15                                                                                                                                                     June 9, 201   1

                                                                                                                                                        Quarterly Compliance Report
            ê
  Lake Huron
    Primary Watu Supply System

                                                                                                                                                            File No. H1712011
                                                                             u.Keg.
                                                                             170t03              2010         2011   Reportable
                                                      MAC or
                                                               Objective     Required                                Deteclion
        Schedule 24   -   Organic Parameters           IMAC
                                                               AO/OG       Frequency of                                Limit
                                                                                                                                                      Comments
                                                      (ms/L)
                                                                              Testing     Q2     Q3     04    Q'l      (mg/L)
                                                                            lmnnlhcì

  15.                 Cy¡n¡zlns lBhde¡l                0.0r                    12         NÏ     N1     N1    ND       0.001      Herbiclde

  16.                          Dl¡dnon                 0.02                    12         NT     t¡T    NT    ND       0.001      lnsecdclde

  17.                          Dlcamb.                 0.12                    12         I'lT   ilï    NT    ND       0.001      Horölcldo

                                                                                                                                  An org¡nlo compound uæd ¡n both
  18.                 1,2Ðlchlorobonzôn.               o.2       0.003         12         N1     NT     NT    irD      0.0002     lndu¡trl¡l and commerc¡el productt
                                                                                                                                  lcôôlâñl- dmEâaôr- aôlv.ñll
                                                                                                                                  An ofganrc eompouno ¡Æeo ¡n ootn
  19.                 I,4.Olchlorobenzono             0.005      0.00r         12         NT     NT     NT    ND       0.0002     l¡dßülal and commerelal products
                                                                                                                                  I   ààãA^rlrô.   ß¡ral¡l¿la   hrhá-Àñl

  20.
               OlchloÌod¡phonyltrlchloræth.n.                                  ,t2        NT     llï    NT
                      (DDT) + ¡¡s¡¿¡6¡¡¡6"
                                                       0.03                                                   ND      0.000024    lnsoctlcldo

                                                                                                                                  An organlc        compound usgd          ln both
  21.                     I,2.Dlchloroethana          0.005                    12         NT     NT     t{T   ND       0.000t     lndust¡lal       .nd    commorclel products
                                                                                                                                  fsolvónt furn¡oânt ¡no¡edlentln          ol.st6l
  22.


  23.
               1,1.D¡ch¡oroothylene lVinylldene
                              chloridel

                 Dlchloromethane (tlothylene
                          chlorido)
                                                      0.0{¡l


                                                       0.05
                                                                               12


                                                                               12
                                                                                          NT


                                                                                          NT
                                                                                                 ItT


                                                                                                 NT
                                                                                                        NT


                                                                                                        N1
                                                                                                              ND


                                                                                                              r{D
                                                                                                                       0.0001


                                                                                                                       0¡005
                                                                                                                                  Volet¡lg org¡nlc compound; lmportsd Íot
                                                                                                                                  use ln the food peck¡glng and tsrtlle
                                                                                                                                  lndrrcldac
                                                                                                                                  Vohüle organlc compound usod ln .
                                                                                                                                  v¡rbty of ¡ndßbbs (Glecùonlcs, text¡los,
                                                                                                                                                                                     lrË
                                                                                                                                                                                     I   tg
                                                                                                                                  ohanacautlmk- blßtlÉ- âtc-ì
  21.                 2,¡l-Dlchlorophenol              0.9      0.0003         12         NT     NT     NT    ND       0.0005
                                                                                                                                  An organ¡c compound u3od ln lndusby
                                                                                                                                  ¡nd chsmlcal manufacü¡dng.
             2,¡0-DlchloroÞheno¡ry ac6üc ac¡d (2,¡þ
  25.
                                  D)
                                                       0.t                     12         NT     NÏ     NT    ilD      0.001      Herblclde

  26.                      Dlclofop.methyl            0.009                    12         t{Î    NT     NT    ND       0.0009     Horbþ]de

                                                                               ,t2
                                                                                                                                                                                     Æ
  27.                        Dlmothoate                0.02                               NT     NT     NT    tr¡D     0.0025     lßoctlcldo

  24.                          Dlnosob                 0.01                    12         NT     NT     NT    ND       0.001      ln¡ecüclde, Herblolde

  29.                           D¡quat                 0.07                    12         NT     t{T    NT    ND       0.007      Herbiclde




Report Page 9 of 15                                                                                                                                              June 9, 201 1
                                                                                                                                                   Quarterly Compliance Report
             ê
  Lahe Huron
     Primary Water Supply System

                                                                                                                                                 File No. H1712011
                                                                           (,.}<eg.
                                                                            170t03           2010        2011   Reportable
                                                   MAC or
                                                            Objeciive     Required                              Detection
         Schedule 24   -   Organic Parameters       IMAC
                                                             AO/OG      Frequency of                               Limit
                                                                                                                                             Comments
                                                   (ms/L)
                                                                           Testing     a2    Q3     Q4   QI       (mg/L)
                                                                         lmônthsl

  30.                          Dluron               0.15                    12         NT    NT     NT   ND       0.010      Herbiclde


  31.                        Gþphosate              0.2E                    12         NT    NT     NT   ND       0.0't0     Herblclde

  3L           Heptachlor + Heptachlor Epoxlde     0.003                    12         NT    NT     NT   ND      0.000012    lnsectlclde

  33.                      Llndane (Tota[          0.00¡l                   12         NT    NT     NI   ND      0.000008    Pe¡ticlde

  34.                         M¡lathlon             0.19                    12         NT    NT     NT   ND       0,005      lnsectlclde

  35.                       Methorychlor            0.e                     12         NT    t{T    NT   ND      0.000024    ltlsscüclds

  36.                        Hêtolachlor            0.05                    12         t{T   NT     NT   ND       0.0005     Herblcldo

  37.

 38.


 39.
                       fUletrlbuzln (Sonco4


             lllonochlorobenzene (Ghlorobenzene)

                              Paraquet
                                                    0.0E


                                                    0.08


                                                    0.01
                                                              0.03
                                                                            12


                                                                            12


                                                                            12
                                                                                       NT


                                                                                       NT


                                                                                       t{T
                                                                                             NT


                                                                                             NT


                                                                                             N1
                                                                                                    NT


                                                                                                    NT


                                                                                                    NT
                                                                                                         ND.


                                                                                                         ilD

                                                                                                         ND
                                                                                                                  0.005


                                                                                                                  0.0001


                                                                                                                  0.001
                                                                                                                             Horblclde

                                                                                                                             A man.made organlc
                                                                                                                             prlmarlly usod a3 a solvont

                                                                                                                             llorb¡clde
                                                                                                                                                           compound;
                                                                                                                                                                          Eï
                                                                                                                                                                           t|

 ¡10.




  41.


  12.
                              Parethlon


                       Pentachlorophenol


                              Phorate
                                                    0.05


                                                    0.06


                                                   0.002
                                                                            12



                                                                            12



                                                                            17
                                                                                       NÎ


                                                                                       Nf

                                                                                       NT
                                                                                             NT


                                                                                             NT



                                                                                             NT
                                                                                                    NT



                                                                                                    NT



                                                                                                    NT
                                                                                                         ND



                                                                                                         ND



                                                                                                         ND
                                                                                                                  0.001



                                                                                                                  0.0005


                                                                                                                  0.0005
                                                                                                                             lnsoctlcld6

                                                                                                                             An org¡nlc
                                                                                                                             pæücldo and wood
                                                                                                                             (manufacture and u3â banned slnco the
                                                                                                                             {Oeîtol

                                                                                                                             lnsecllc¡do
                                                                                                                                             compound; usod      as   a
                                                                                                                                                           p¡escrv¡tlvo
                                                                                                                                                                          E
 ¿ti¡,                        Piclorem              0.19                    12         NT    ItT    NT   ND       0.005      Horblclde

                                                                                                                             An ofganrc çomPouno; useg rn algcúlcal
 u.            Polychlorlneted Blphsnyls (PCBI     0.003                    12         NT    NT     NI   ND      0.00005     oqulpmont ¡nd as a frrs rotardånt (uso
                                                                                                                             hrs beån benned slnce thê 1980'Gì




Report Page 10 of 15                                                                                                                                     June 9, 201 1
                                                                                                                                           Quarterly Compliance Report
  Lake Huron
     Primary Water Supply System

                                                                                                                                                      File No. H1712O11
                                                                        O.Reg.
                                                                        170t03            2010          201'l   Reportable
                                                 MAC or
                                                          Objedive     Required                                  Detection
         Schedule 24   -   Organic Parameters     IMAC
                                                           AO/OG     Frequency of                                  Limit
                                                                                                                                                Comments
                                                 (mg/L)
                                                                        Testing     Q2    Q3     Q4     QI        (mg/L)
                                                                      lmnnlhcl

  ¡15.                        Promoflms          0.001                   12         NT    N1     NT      ND      0.00025     Horblclde

  46,                          Slmaz¡ne           0.01                   12         t{T   N1     NT      ND       0.001      Herblclde

  17.                         Temopho3            0.28                   12         NT    NT     NT      ND        0.01      lnsectlclde

 ¡18.                          Terbufos          0.001                   12         NT    NT     NT      ND       0.0007     lrleect¡cldê

                       Tetrechloroethyleno                                                                                   An org¡nac compound; usod as        ¡solvont
 49.
                       (perchloroethylene)       0.030                   12         NT    NT     NT     ND        0.000r     ln dry       c¡ean¡ng   and metal   cleanlng
                                                                                                                             lnrùntrl¡¡

 50.               2,3,46.Tetrachlorophenol       0.10     0.001         12         NT    N1     N1     ND        0.0005
                                                                                                                             An organlc compound; cunenüy            used
                                                                                                                             malnly ac a wood preservative

 51.                           T¡lallate          0.23                   12         NT    NT     NT     ND        0.001      Herblcldo

                                                                                                                             vola¡lþ organlc compound; used ln
                                                                                                                                                                            t-]å
  52.                      Trlchloroothylona      0.05                   12         N1    NT     NT     t{D       0.0001     mst l degreaslng operatlons ¡nd
                                                                                                                             êhañ¡¿al     ñâñiírêf   ¡rdñd

 53.


  64.
                       2.¡t o.Trlchloroph€nol

               2d6.Trlchlorophonory ¡cedc acld
                           (2,45-n
                                                 0.005


                                                  0.28
                                                           0.002


                                                            0.02
                                                                         12


                                                                         12
                                                                                    NT


                                                                                    NT
                                                                                          N1

                                                                                          NT
                                                                                                 MT


                                                                                                 NT
                                                                                                        1{D


                                                                                                        ND
                                                                                                                  0.0005


                                                                                                                  0¡01
                                                                                                                             Volatfle organlc compound; usod ln tho
                                                                                                                             manufactr¡rs of po¡ücldca

                                                                                                                             Horblcld€
                                                                                                                                                                            L1i    *



                                                                                                                                                                            B
 55.                          Trif,uralln        0.o¿ts                  12         NT    NT     itr    NO        0.001      Horb¡cldo


                                                                                    NT    l{T           ND
                                                                                                                             Volatlle organlc compound; wod ¡n tho
 50.                        Vlnyl Chlorlde       0.002                   12                      tr¡T             0.0002     productlon of PìlC p!âstlc ltems




Report Page 11 of 15                                                                                                                                      June 9, 201 I
                                                                                                                                            Quarterly Compliance Report
  Lake Huron
   Primary watet Supplv   svstern
                                                                                                                                                      Fite   No. H1zt2o11
GeneralChemistry and Physical Parameters (Additional Regulatory and.ContractualTesting)

                                                    O.Reg.      Contrac{ual                                   Reportable
                           MAC                      170/03       Required                                     Detection
General Chemistry                  Objective                                        2010               2011                                  Commenls
                            or                     Required     Frequency                                        Limit
  and Physical                     AO/OG           Frequency    ofTesting                                       lmnll ì
                           IMAC
   Parameters                       (mg/L)         of Testing    (months)
                          (ms/L)
                                                   (months)                   Q2     Q3        Q4      Q1


     Alkallnþ                      30   -   500       NR            NR        87     81        83       87        I

  Ammon¡a, Total                                      NR            NR        NT     N1        N1      ND        0.05


     Calclum                                          NR            itR       NT     ¡{T       NT       30       o.2


     Chloildo                           2õ0           NR            NR        NT     NT        NT       10        1



      Gopper                            1.0           NR            NR        NT     NT        NT      ND       0.001


 Dlssolved Organlc
      Cerbon                             5            NR            NR        NT     NT        t{T     1.2       0.1
    (msrl as   C)




                                                                                                                                                                          Hi
                                                                                                                                Fluorlde was last trstod ln 2009 (frrst
     Fluorlde              1.5                         60           60        NT     NT        NT      NT                                     guarter).
                                                                                                                                     The result was NonÐetecL
                                                                                                                              Co€mln ls tsslgd wselrJy dur¡ng þste and
                                                                                                                              odour seeson. Results ers €xprossod ¡s
  Geosmin (ug/L)                                      NR
                                                                Weekþas
                                                                 Requlred
                                                                              t{T   0.0030   0.00090   Nf     0.0005   ugtl    the average per qu¡rt r whon testlng 13      *



                                                                                                                                                                          B
                                                                                                                                              'ffrr¡rôr{
                                                                                                                                ill¡r rs r3s¡eq weeKy qunng Ias¡o ano
2.llethyllsobomeol                                    NR
                                                                Weeklyas      NT     ND        t{D     NT     0.001    ugtl   odour soason. Results are erpreased as
    lmlBl lugrrLf                                               Rsgulrod                                                       the ¡yorago por qu¡rt r when tætlng ls
                                                                                                                                                rôãrrlÈ,l

     Hardness
  {mgúL as CaCO¡)
                                   80   -    100      NR            NR        NT     NT        NT      110        'l




Report Page 12 ol'15                                                                                                                                       June 9,2011
                                                                                                                                            Quarterly Compliance Report
  Lake Huron
    Prímary Water Supply System
                                                                                                                                          File No. H1712011
                                                   (J.r<eg,   çon¡rac¡uat                              Keponaorc
                          MAC                      170t03      Required                                 Detection
General Chemistry                     Objective                                   2010          2011                               Comments
                            or                     Required   Frequency                                   Limit
   and Phpical                         AO/OG      Frequency   ofTesting                                  lmo/Lì
                          IMAC
    Pârâmeters                         (ms/L)     ofTesting    (months)
                         (ms/L)
                                                  (months)                  Q2     Q3     04    Q1

                                                                                                                    Leaq samPilng faqurf€meil !r. rfog.r ruru.t
                                                                                                                    Schedulo 13€ rovokod ¡n Ju¡y 2007. Load
                                                                                                                     sampllng ls now a rcquhement undgr O.
                                                                                                                      Reg. 170103 Schodule 15.1 &'15.2, The
                                                                                                                     new load sampl¡ng roqu¡r¿ment doss not
        Lead               0.0r                      NR           12        NT     ltD    NT    IrlD     0.0005         applyto ths LHPWSS. Although the
                                                                                                                      contract rêqulrss only one sample to be
                                                                                                                       colleclod and tsstsd for leed snnually,
                                                                                                                    waûsr samples ars collected and bstod for
                                                                                                                    lo¡d ün lco â yeâr. Sâmple collectlon t¡kos
                                                                                                                      olace ln Januarv and Julv of each vsar.

       Nitrate            l0.o    t                   3            3        o.4    0.4    0,3   0.8        0.1



       N¡trlto             l.o I                      3            3        ND     ND     ND    ND        0.01



 Organlc Nltrogen'                      0.15         NR           NR        NT     t{T    itT   N1        0.1



 Orthophosphatos                                     NR           NR        NT     NT     t{T   ND        0.0t


       Sillc¡                                        NR           NR        t{T    ti¡Î   NT    2.0       0.05

                                                                                                                       Ðootum nas rnct€asoo rTgm a.'¡ mgrL
                                                                                                                    (record ¡n 20041 to spprox¡mâto¡y l0 mgrl

      Sodium                20          200           60          60        NT     NT     NT     14        0.5
                                                                                                                    wlth the addltlon of cåßdc aod.. Caurüc
                                                                                                                    sod¡ ¡s usod to ¡ncrcase the pH of teated
                                                                                                                    weûe. and lt ¡3 ultlmately u3ed to prcvent
                                                                                                                        the le.ch¡ng ofloed from p¡pe3 lnto
                                                                                                                     drlnklng.water. Addlüon of causllc ¡oda
                                                                                                                          commonced on Jenurrv 8. 2008
                                                                                                                                                                  Eå
 Dlsso¡ved Sülphats




                                                                                                                                                                  W
                                        500          NR           NR        NT     NT     NT     32         I
       (Sorl

      Toluêne                           0.024        NR           NR        NT     NT     NT    ND       0.0002




Report Page 13 of '15                                                                                                                           June 9, 201 1
                                                                                                                                  Quarterly Compliance Report
           È
            ^,
 Løke             Huron
   Primary Water Supply System
                                              -:
                                                                                                                                                          File No. H1712011
                                                    (¡Keg.     uonracluat                                         Reporlable
                                                    't70/03     Required                                          Detect¡on
                         MAC                                                         2010               20't1                                     Comments
General Chemistry                 Objective         Required   Frequency                                             Limit
                           or
  and Physical                    AO/OG            Frequency   ofTesting                                            /mô/l ì
                         IMAC
    Parameters                     (mg/L)          ofTesting    (months)
                        (mg/L)
                                                   (months)                  Q2       o3        Q4        o1

   Tot¡l (ieldahl                                     NR          NR         NT       NT        NT        NT         0.1
   Nitrogen as N
                                                                                                                               Tho ctand¡rd 18 oxprossod a3 a runnlng
                                                                                                                                annual average of quarterly sample3
 Trlhalomoth¡nes                                                                                                                 moasurod at a po¡nt rGÍoctlng tñe
                         0.100                         3           3        0.o275   0.025¡t   0.0r96   0,01¿16     0.0003
      (ARvA)                                                                                                                       maxlmum rosldêncê tlmo ¡n tho
                                                                                                                                            dlstrlbuüon syskm.
                                                                                                                                Þr¡nnlna ¡nnrr¡l      ewaaaa.    n î?11 nall
                                                                                                                               The 3tandend ls expressêd as a runnang
                                                                                                                                annual average of quarterly samples
 Trlhalomethane3                                                                                                                 moasurod at a polnt r¿ñscüng tho
                         0.'t00                        3           3        0.0251   0.0338    0.0263   0.0201      0.0003
  (Eroter.Hoßal0                                                                                                                  mexlmum resldonce Umo ln the
                                                                                                                                        dþtr¡but¡on rystom.
                                                                                                                                Þ..ñh¡ñâ    ¡¡¡¡¡¡l   ¡uar¡a¡.   ñ ñtÂî ññrl
                                                                                                                               The atsndard B oxprossêd a3 a runnlng
                                                                                                                                 annual averaga of qüarterly samplas
                                                                                                                                   measured at a polnt refrectlng the
  Trihalomethanes                                                                                                                   maxlmum resldenco üme ln tho
(Komoka Mt Brydges       0.r00                         3           3         Nf        NT       NT      0.0195      0.0003
                                                                                                                                         dlstrlbution cyetem.
       MS2l                                                                                                                     Running annual average: 0.0195 mg/L
                                                                                                                               (b.sod on ono ll) av.lleble rc3ult durlng
                                                                                                                                           f{r¡ l¡ct f¡rrr rrr¡É¡nl
                                                                                                                               The standard ls oxpr€3sod a3 a runnlng
                                                                                                                                annual average of quarterþ samples
                                                                                                                                  nrea¡ulrd at a polnt rcñecdng the



                                                                                                                                                                               Ei
 lrlhalomethanes                                                                                                                   mexlmum rDsldonco ümo ln tho
 (Strethroy Car¡doc      0.100                         3           3         Nf        N1       NT      0.0t73      0.0003
                                                                                                                                         dlst¡buuon system,
       (ftrs2))                                                                                                                  Runnlng annua¡ averego: 0.0173 mgúL
                                                                                                                               {besed on ono (1} avallable result durlng
                                                                                                                                        lhâ ¡ßl lôilr d[ârlnEì
                                                                                                                                                                                *
        z.nc                         5.0              NR          NR          NT       NT       NT        ND        0.005




                                                                                                                                                                               B
Report Page 14 of 15                                                                                                                                          June 9,2011
                                                                                                                                                Quarterly Compliance Report
 Lake Huron
             +
     Primary ìelater Supply Systern

                                                                                                                                                                         File No. H1712011
Discusslo n of Analytical Resulús,'
 ' lndicator of adverse water quatity
 2
     There is no regulated MAC for free chlorine. The regulated minimum for free chlorine residual concentration in a water distibution syslem is 0.2 mg/L at a pH 8.5 or less.
 '\Mere
 a
            both nitrate and nitrite are present, the total of the two should not exceed 10 mg/L (as n¡trogen)
     Organic nitrogen is calculated by subtracting Total Ammonia from Totral Kjeldahl Nitrogen



Definitions of Acronyms:
 MF - Membrane Filtration
 SP - Spread Plate
 NT - Nol Tested during this quarter
 NR - Not Required
 ND - Not Detecled




                                                                                                                                                                                            Eå
                                                                                                                                                                                                B
Report Page 15 of 15                                                                                                                                                             June 9, 2011
                                                                                                                                                                  Quarterly Compliance Report
                                                   trtr
                                                   Agenda ltem   #   Page #




      ê
   Lake Huron
     Prirary Viater Supply System                                                          File No. H1712011

                            To:     Chair and Members
                                    Lake Huron Primary Water Supply System Board of Management

                       From:        John Braam, P.Eng.
                                    Director of Water & City Engineer

        Meeting         Date:       June 9, 2011

                  Subject:          Environmental Management System and Quality Management System




ïhat thefollowing report with respect to the Environmental Management System and Quality
Management System for the Lake Huron Primary Water Supply System BE RECEIVED for information.



The completion of corrective actions in a timely fashion, and implementing measures to ensure the root
cause of issues are addressed to make certain issues do not recur, continue to be an ongoing
challenge. A number of action items remain outstanding from 2009 and 2010, with additional items
being recently identified from internal audits and inspections. lt is clear that this will be an ever
increasing challenge in 2011 as the end of the existing contract with the Operating Authority draws
near.




Environmental Management System (EMS)
The Lake Huron Primary Water Supply System (LHPWSS) has an Environmental Management System
(EMS) which has been registered to the 1SO14001 standard since December 19, 2003. The LHPWSS
underwent a three-year re-registration audit on September 3, 2009 and is now registered to the
1SO14001 :2004 standard for another three-year period (ending March 2013).

Drinking Water Quality Management System (DWaMS)
ln 2005, a Drinking Water Quality Management System (DWOMS) was integrated with the existing
EMS and the combined EMS/DWQMS system is maintained for the LHPWSS by the Operating
Authority, American Water Canada Corp. (AWCC). The LHPWSS received the official DWQMS
accreditation in June 2009. The accreditation is the first issued in the province and is valid until June
10,2011. Accreditation is normally for 3 years; however the 2 year accreditation cycle for the LHPWSS
is due to the LHPWSS participation in the Ministry of the Envíronment's DWQMS pilot implementation
program. The Operating Authority was technically accredited as part of the pilot program in December
2006, which resulted in a modified accreditation cycle. Moving forward, the normal 3 year accreditation
cycle will be in effect and is tied to the system's Municipal Drinking Water Licence.




Report Page 1 of 15
                                     trtr
                                     Agenda ltem   #   Page #




   Lake Huron
    Primary Wata Supply Syslem                                                          File No. H17//2011
As the existing DWQMS accreditation is only valid until June 10,2011, the Operating Authority has
expressed concem to the external registrar, the Canadian General Standard Board (CGSB), that a re-
accreditation audit has not yet been scheduled. ln a similar fashion, Board staff have expressed
concern to the Ministry of the Environment about the timeliness of the re-accreditation process. As of
May 9, 2011, CGSB has confirmed that they will work on the necessary paperwork to extend the
existing accreditation until they can complete the re-accreditation process.

Management Rev¡ew
The documented EMS/DWQMS requires management review by Senior Management a minimum of
once annually to ensure that the management team of the Board and the Operating Authori$ stay
informed of environmental and quality issues. ltems discussed at the management review include
water quality test results, environmental performance, legislative changes, significant non-
conformances, corrective actions, changing circumstances and business strategies, and resource
requirements.

ln order to carry out more effective management reviews, the Board's administration has opted to
conduct shorter management review meetings at more frequent intervals generally coinciding with the
scheduled monthly operations meetings. Although each Management Review aspect may not be
covered at each meeting, over the course of the year the entire system is reviewed at least once.
Management Review meetings were held on February 9 and April 13,2011. The Management Review
meeting minutes can be found in Appendix A of this report for the information and reference of the
Board.

lnternalAudits
Pursuant to the íntemational 1SO14001:2004 EMS standard and the Provincial DWQMS             standard,
periodic "internal" audits are performed by the Board's administration to ensure continued compliance
with legislated and other requirements, as well as conformance with the 1SO14001:2OO4 EMS standard
and DWQMS standard. lnternal audits also ensure that the ongoing operation of the water supply
system complies with the EMS and DWQMS as implemented. As required by the standard, intemal
audits are performed a minimum of once annually.

As required by the    1S014001:2004 standard, intemal audits of legal and other requirements are
required to be conducted at least once every three years. The operating contract between the Joint
Board and the Operating Authority is one of these requirements that must be audited. An intemal
contract audit took place on April 15, 201 1 . The most significant finding during the audit was that for
the audit period, reporting and payment deadlines were often not being met. This was also identified in
2008 and was attributed to the loss and subsequent replacement of management staff of the Operating
Authority. A summary of the contract audit is included as Appendix B of this report for the information
and reference of the Board

ExternalAudits
Annual surveillance audits (third-party extemal audit) are conducted for both the EMS and DWQMS,
with a recertification audit taking place every third year. The external registrars for the EMS and
DWQMS are QMI and the Canadian General Standards Board (CGSB) respectively. External audits
review all aspects of the EMS or DWQMS, including the intemal audits conducted by the Board's Water
Compliance Coordinator, the subsequent management reviews, and conective actions. No external
audits were conducted during this reporting period.


Report Page 2 of 15                                                                             June9,201l
                                               Environmental Management System and Quality Management System
                                     trø
                                     Agenda ltem   f   Page #




   Lake Huron
    Primary Waler Supply System                                                         Fife No. H1712011
Corrective Actions
At the October 1, 2009 Board meeting, the Huron Board requested that all 2008 corrective action items
be completed by the end of the year, and the 2009 corrective action items be 90% completed.
Currently the 2008 action items are 99% complete, the 2009 action items are 90% complete, the 2010
action items are 56% complete, and the 2011 action items are 297o complete. There has been no
change in the completion of action items by the Operating Authority since the last quarterly report to the
Board. A Corrective Actions Summary can be found in Appendix C of this report for the information and
reference of the Board.

At the March 3, 2011 Board meeting, the Huron Board expressed concem over the number of
corrective actions identified. The number of corrective actions isn't necessarily a bad thing, as
corrective actions represent continual improvement of the system. Rather, concern should be
expressed over corrective action items that are typically reoccurring. This indicates that the root
causes of the findings are not being addressed to prevent them from reoccuning. An assessment of
reoccuning conective actions can be found in Appendix D of this report for the information and
reference of the Board.

PLAN.DO.CHECK.IMPROVE
It should be noted that the 'PLAN-DO-CHECK-IMPROVE' system required by the 15014001 and
DWQMS standards requires continuous monitoring of the EMS/DWQMS, with periodic review and
audits conducted to demonstrate conformance. A key concept of this approach (Plan-Do-Check-
lmprove) is that it does not require or expect 100% conformance, but promotes an environment of
continual review and improvement by identifying shortfalls, implementing corrective measures, and
setting objectives and targets for improvement.

The monitor, review and audit philosophy is integrated in not only the monitoring of the registered EMS
and DWQMS, but also the Board's contract with American Water Canada Corp.

Effectiveness of the EMS/DWQMS
On an annual basis, top management will review the continuing suitability, adequacy and effectiveness
of the EMS/DWQMS from an overall perspective. Top management must review the EMS/DWQMS
from a macro level, looking at trends, resources, challenges, successes, and improvements in order to
assess the overall effectiveness.

Although notable issues and challenges have been observed, top management has seen improvement
in several areas of the EMS/DWQMS over the past years. lmprovements noted have been
maintenance and calibrations of EMS/QMS related equipment, and the Operating Authority has
dedicated more resources in 2O11to help maintain the EMS/QMS.

Areas    of the EMS/DWQMS that still require improvement include the Operating Authority's
management of subcontractors, difficulty with management of change for new capital projects, and
verifying the effectiveness of corrective actions that have been implemented. With the end of the initial
operating contract with the cunent operator, continued progress in2011-2012 could be impacted by the
procurement process and staff turnover. Particular focus will have to be made on the procurement
process to limit the impact on the EMS/QMS. Board staff will ensure that these areas are the focus for
improvement in 2011.




Report Page 3 of 1 5                                                                            June 9, 201 1
                                               Environmental Management System and QualiÇ Management System
                                      trE
                                      Agenda ltem   #   Page#




   Iake Huron
    PrirÍary Water Supply System                                               File No. H1712011
Overall, the EMS/DWQMS has continued to prove its worth as being beneficial, as the management
systems prompt positive changes to be made not only in the management and administration, but in the
ongoing operation of the system. Therefore, it is the opinion of Board staff that overall the
EMS/DWQMS continues to be effective




The internal audits and frequent management review meetings continue to effectively identify system
deficiencies. The EMS and QMS for the Lake Huron Primary Water Supply System continue to be
suitable, adequate and effective.

This report was prepared by Erin Kirk, Quality Assurance & Compliance Manager, and Greg Henderson,
Compliance Coordinator.




 Division Manager, Regional Water   Supply              /       Direftor of Water and City Engineer




                                                                Pat McNally, P. Eng.
                                                                Chief Administrative Officer


Attachments:
        Appendix A:   Management Review Meeting Minutes
        Appendix B:   EMS lnternal Contract Audit Report
        Appendix C:   Corrective Action Summary
        Appendix D:   Reoccurring Conective Actions




Report Page 4 of 15                                                                               June 9, 2011
                                                Environmental Management System and Quality Management System
                                            nE
                                            Agenda ltem   #   Page   #




   Lake Huron
     Pdmary hrater Supply System                                                               File No. H1712011




                                   Lake Huron & Elgin Area Water Supply Systems
                                         EMS/DWQMS Manaqement Review
Date                                                       Februarv 9.2011
Time                                                       1030-1230
Location                                                   RWS Boardroom
Attendees                                                  Andrew Henry (RWS), Erin Kirk (RWS), Greg
                                                           Henderson (RWS), Vaughan Martin (AWCC),
                                                           Robert Kinq (AWCC), KarelKamerman (AWCC).
Reqrets
c.c.                                                           John Walker (RWS). Brian Sorinoer IAWCC)

                                                  -Meeting Notes         ---
Lake Huron Environmental Management System Policy
Handout: Lake Huron Environmental Policy

The Lake Huron Environmental Management System Policy was revised to include the Komoka-Mt.
Brydges Booster Pumping Station and watermains. The Policy was reviewed and approved. The
policy will be brought forth to the Lake Huron Water Board on March 3,2011 for approval.

Effectiveness of the EMS/QMS

The effectiveness of the EMS/QMS was discussed. lmprovements noted have been maintenance and
calibrations of EMS/QMS related equipment, and the Operating Authority dedicated more resources in
2010 to help maintain the EMS/QMS. Areas to continue to focus on in 2011 are the management of
change process and the effectiveness of completing conective actions. lt was noted that with the end
of the initial operating contract with the current operator, continued progress in 2O11-2012 could be
impacted by the procurement process and staff turnover. Particular focus will have to be made on the
procurement process to limit the impact on the EMS/QMS.

Actions Required:
Andrew Henry will report on the overall effectiveness of the EMS/QMS to both Joint Boards of
Management in June 2011. Due June 2, 20ll

Objectives, Targets, and Programmes
Handouts:             Elgin Objectives, Targets, and Programmes
                      Huron Objectives, Targets, and Programmes

Status of the existing Elgin and Huron Objectives, Targets, and Programmes were discussed.
Proposed new Objectives, Targets and Programmes were presented and discussed.




Report Page 5 of 15                                                                                    June 9, 201   1
                                                      Environmental Management System and Quality Management System
                                             trE
                                              Agenda   ltem#   Page#




   Lake Huron
    Primary Water Supply Systern                                                   File No. H17//2011
Actions Required:
Greg Henderson will provide information on chemical consumption compared to raw water volume on a
month by month basis. This will also be done for energy consumption. Greg Henderson will also clean
up and revise the handouts provided with suggestions given at the meeting. Objectives, Targets and
Programmes to be further reviewed at the next management review meeting.
Due: March 9,2011

Regulatory Updates and Potential Regulatory Changes

Tifle                   Proposed Amendments to the Municipal Engineers Association's
                        Municipal Class Environmental Assessment
Source                  EBR Postíno - lnformation Notice (MOE)
Date Posted/            January 11,2011
Notice Received
Comments Due            N/A
Summary                 The changes to the Municipal Class Environmental Assessment (EA) consist
                        of three main components: enhancement and clarification to the lntegral
                        Provisions for improved efficiencies and ease of use; revised project
                        schedule defi nitions: housekeeoino amendments.
AdditionalNotes         The integration provisions will combine environmental assessment and land
                        use planning requirements into a single process.
                        Project schedule definition changes include modifications for 40 year old
                        structures, local projects redefined as Schedule A, and minor projects with
                        follow-uo aoorovals redefined as Schedule A+.

Title                   Second Extension of the 2007 Ganada-Ontario Agreement Respecting
                        the Great Lakes Basin Ecosvstem
Source                  EBR Postino   -   Policv Prooosal (MOE)
Date Posted/            January 12,2011
Notice Received
Comments Due            Februarv 28.2011
Summary                 The cunent Agreement expired, and was extended for one year to March 31,
                        2011. Because the process to amend the Great Lakes Water Quality
                        Agreement (GLWOA) is ongoing, the govemments of Ontario and Canada
                        are considering a further extension to maintain momentum on the
                        restoration, protection and conservation of the Great Lakes Basin Ecosystem
                        while the GLWOA is being amended. Through the extension Canada and
                        Ontario are considering amendments to update and refresh some
                        commitments under the Agreement.
AdditionalNotes         The second extension will be until June 24.2012.

Title                   Renewable Enerqv Aoproval (REAI Fees
Source                  EBR Postino - lnformation Notice (MOE)
Date Posted/            January 14,2011
Notice Received
Gomments Due            N/A
Summary                 The MOE has the ability to charge fees for Renewable Energy Approvals
                        under the EPA. Entities, companies and individuals who want to engage in
                        renewable energy projects are subject to approval and associated fees
                        (excludes some smaller projects). Renewable Energy Approvals for wind
                        oroiects are subiect to fees ranoino from $1000 - S67.905 deoendinq on the


Report Page 6 of   15                                                                                      June 9,2011
                                                         Environmental Management System and Quality Management System
                                          Agenda ltem   #   Page #




      ê
   Lake Hu ron
                                          tr@                                                     File No. H1712011

                      The approval fees may apply to the Board's if the wind generation projects
                      proceed. lt should be noted that the MOE has a 6 month guarantee for


Title                 Renewable Energy Approval Technical Guideline for Water Assessment
                      and Water Bodv Reports
Source                EBR Postino - Policv Prooosal(MOE)
Date Posted/          January 28,2011
Notice Received
Comments Due          March 14,2011
Summary               ln order to protect the quality and quantity of surface water and groundwater,
                      the MOE is providing clarity and transparency with respect to Renewable
                      Energy Approvals. The guidance will assist proponents in the preparation of
                      water assessment studies and water body reports which are required to be
                      submitted as part of the application for approval.
AdditionalNotes       The guídance document covers all Renewable Energy Generation Facilities,
                      except certaín classes of wind facilities. This policy may affect the Board's if
                      the wind qeneration proiects proceed.

Title                 Gonsequential amendment to O.Reg. 675/98 - Classification and
                      Exemption of Spills and Reporting of Discharges made under the
                      Environmental Protection Act. I 990
Source                EBR Postino - lnformation Notice IMOE)
Date Posted/          January 28,2011
Notice Received
Comments Due          N/A
Summary               Changes to this regulation were required as a consequentíal amendment to
                      Ontario's Ozone Depleting Substances (ODS) and Other Halocarbons
                      regulation (O.Reg. 463i10). Five existíng ODS regulations were
                      consolidated into one single regulation. The references in O.Reg. 675/98
                      have been updated to reflect this.
AdditionalNotes       The amendment is administrative only, and does not result in changes to the
                      policv or intent of the requlation.

Title                 EPA To Develop Regulation for Perchlorate and Toxic Ghemicals in
                      Drinkino Water
Source                U.S. Environmental Protection Aoencv     -   Information Notice
Date Posted/          February 2,20'11
Notice Received
Comments Due          N/A
Summary               The U.S. EPA has decided to regulate perchlorate in drinking water.
                      Perchlorate may have adverse health effects as it can disrupt the thyroid's
                      abílity to produce hormones needed for growth and development. The U.S.
                      EPA will also be developing a regulation that will cover up to 16 chemicals
                      that mav c€¡use cancer.
AdditionalNotes       Perhclorate is not cunently regulated in Ontario. This notice is being
                      provided for information only, as Canada/Ontario regulations tend to minor
                      U.S. regulation. There is no data on perchlorate for the Lake Huron & Elgín
                      svstems




Report Page 7 of 15                                                                                      June 9, 2011
                                                     Environmental Management System and Quality Management System
                                          trtr
                                          Agenda ltem   #   Page #




   Lake Huron
    Primary W¿þr SuDply System                                                               File No. H1712011


                                 Lake Huron & Elgin Area Water Supply Systems
                                       EMS/DWQMS Manaqement Review
Date                                                     April 13,2011
Time                                                     1030-1330
Location                                                 RWS Boardroom
Attendees                                                Andrew Henry (RWS), Erin Kirk (RWS), Greg
                                                         Henderson (RWS), Vaughan Martin (AWCC),
                                                         Robert Kinq (AWCC). KarelKamerman (AWCC)
Reqrets
c.c.                                                         John Walker (RWS), Brian Sprinqer (AWCC)

                                                -Meeting Notes       ---
Review of Previous Management Review Meeting Minutes

Action items from the January 31s and February 9th, 2011 meeting were discussed. The following
action items are still outstanding or have been updated:

Average day fluoride residual spikes over 1.0 mg/L were reported at Elgin in 2008.
Greg Henderson will look into whether AWCC is reporting fluoride dosage or fluoride residual.
Update: AWCC is reporting both fluoride dosage and residual in the monthly report. The data being
graphed is fluoride dosage. Greg will update the graphs with fluoride residual instead of dosage.

Pre-Chlorine, specifically at Elgin has been trending upwards over the past couple of years. Karel
Kamerman and Robert King will investigate if the pre-chlorine data includes the crib chlorine usage.
Update: Karel reported that crib chlorination is not being included with pre-chlorine for Elgin; this still
needs to be determined at Lake Huron.

Huron caustic soda usage has risen significantly. This is likely due to a faulty levelsensor. AWCC
shallfix the faulty levelsensor. Karel Kamerman and Robert King willfix the erroneous data and
provide correct caustic soda usage. Greg Henderson will eliminate erroneous data from graphs and
update with corected data.
Update: Erroneous data has been removed from graphs. The data for caustic soda usage has been
collected but still needs to be calculated.

Huron post-chlorine usage and dosage have been trending upwards. Vaughan Martin has indicated
the operations staff has had difficulty controlling the post-chlorine dosage on SCADA. Andrew Henry
will discuss the use of the Mantra system with John Walker
Update: Andrew will go back on talk with John about the use of the Mantra system and ensure
lnsyght implemented what was agreed upon.

The majority of corrective actions deadlines pertainÍng to the Huron DWQMS lnternal Audit have now
passed. Karel Kamerman will update the CAF tracking sheet and provide a copy to RWS.




Report Page   I   of   15                                                                            June 9, 201   1
                                                    Environmental Management System and Quality Management System
                                                ltem#



                                       EE
                                       Agenda           Page#




  Iake Huron                                                                              File No. H1712011
    Primary Waler Supply System

Results from Joint Board of Management Meetings

The Huron Environmental Policy was endorsed by the Lake Huron Joint Board of Management at the
March 3,2011 meeting. However, Board asked for consideration of stronger language with regard to
" . .. encourage suppliers and sub-contractors.' After discussion, it is recommended to keep the

terminology the same. Changing the terminology could open this up for auditing, and would require
staff to police/audit every subcontractor to ensure they follow applicable environmental laws and
legislation.

Resources needed to Maintain the EMS/QMS

AWCC has reported that they still need resources to help continually improve and maintain the
EMS/QMS. AWCC noted that hiring the second QA/QC Manager had initially helped with the backlog
of corrective actions, but with a QA/QC Manager going on maternity leave, the training of the temporary
QA/QC Manager has taken time and the backlog continues. AWCC also reported that software
solutions will help free up more of their time. Upgrades to VantagePoint will reduce the amount of time
required to access SCADA data and will allow more time for EMS/QMS items. A document
management system will help with the annual review and revisions of EMS/QMS and Emergency
Response procedures.

Deviations from Critical Control Point limits and Response Actions
Handouts: Elgin Alert Action Report (2010)
              Lake Huron Alert Action Report (2010)

Deviations from critical control points for the EAPWSS and the LHPWSS were discussed.

Actions Required:

As discussed at the monthly operations meeting held earlier, a chlorine analyzer is needed at the Elgin
terminal reservoir outlet. Two analyzers may be needed (one on north side, one on south side).
AWCC to review the location options and provide a recommendation.
Due: May 11,2011

Due to the high number of chlorine alerts at Elgin, Vaughan Martin is to instruct operations staff to
target free chlorine residual leaving the plant at 1.2 mg/L when the raw water temperature reaches
12oC (to coincide with zebra mussel control for convenience). The free chlorine target for the winter
months shall be 1.0 mg/L. The EAPWSS will only accommodate municipal requests for higher chlorine
under special circumstances.
Due: May 11,2011

Due to the high number of fluoride alerts at Elgin, AWCC to consider installing a motorized valve at the
fluoride pump to replace the manual ballvalve. The motorized valve will be linked and programmed
into SCADA to allow the operator to shut off fluoride flow if the plant is offline, and start dosing fluoride
after plant start up.
Due: May 11,2011

Etgin had 2 alerts for exceedences of aluminum residual. Greg Henderson will investigate the cause
for these exceedences.


Report Page 9 of 15                                                                                June 9, 201   1
                                                  Environmental Management System and Quality Management System
                                       trE
                                       Agenda ltem   #   Page #




   Iake Huron
    Primarywatersupplysystem                                                               File No. H1712011
Due: May 11,2011

Huron had I alerts for exceedences of alum residual. Erin Kirk inquired about plant status at the time
of these alerts. AWCC reported that there is an issue with alum dosing on SCADA. Vaughan Martin
and John Walker will review the deficiency list to determine if the issue has been noted to be
corrected.
Due: May 11,2011

AWC indicated that Elgin filter media top-ups will have to wait until September 2011 as filters cannot be
offline for a long period at this time. AWC has received quotes for rebuilding filters 3 and 4. During the
rebuilds, AWC recommends underdrain inspections be undertaken at the same time. Andrew Henry
to note for budget purposes.

AWC suspects a rupture in the post-chlorine line at Huron. They may be dosing chlorine upstream of
the injection point. This will require a shutdown to investigate.


Consumer Feedback        -   Huron & Elgin

There has been no consumerfeedback at this time.




Report Page 10 of   15                                                                             June 9, 2011
                                                 Environmental Management System and Quality Management S¡atem
                                         Agenda ltem   #   Page #




    Iake Huron
     Primary Waler Supply Syslem
                                         tr@                                                 File No. H1712O11




                                      INTERNAL AUDIT
                                      Service Agreements for the Operation and
     Iake Huron                       Maintenance of the Lake Huron and Elgin
        Primary Water Supply Syslem
                                      Area Primary Water Supply Sysfems

                                      Audit   Date:        April 15,2011

     Elgin Area                       lnternal Auditor: Greg Henderson (Compliance Coordinator, Joint
                                                        Board of Mariagement)
        Primary Water Supply System




SUMMARY

Audit Purpose:
The purpose of the audit was to veriff conformance of the Operating Authority (American Water
Services Canada) and the Lake Huron and Elgin Area Joint Boards of Management to their operating
contracts. Non-conformances are identified below.

As a requirement of the 15014001 Environmental Management System (EMS), a contract audit must
be conducted once every three years. The last contract audit was conducted in October, 2008.

Audit Griteria:
t Seruice Agreement for the Operation and Maintenance of the Lake Huron Primary Water Supply
    Sysfem
o   Service Agreement for the Operation and Maintenance of the Elgin Area Primary Water Supply
    Sysfem
e   Water Supply Agreements for Bluewater; Middlesex Centre; North Middlesex; Strathroy-Caradoc;
    Southwold-West Elgi n lnterconnection ; and London-EM PS.

Methodology:
The audit was comprised of a conformance review of the operation and maintenance of the Lake Huron
and Elgin Area Primary Water Supply Systems. The audit was limited to the operation of the water
supply system by the current contracted operating authority, American Water Services Canada, for the
period of their operating tenure, starting January 1,2OO2.

Nofe; The audit was conducted through a review of a samolinq of documents, limited interviews and
observations by the auditor to demonstrate conformance with the operating contfact. The review and
audit should not be construed as a complete and comprehensive revíew of all documents.




Report Page 11 of 15                                                                                 June 9, 201 1
                                                   Environmental Management System and Quality Management S¡atem
                                           trE
                                           Agenda ltem   #   Page   #



          s
   Lake Huron
    Primary Water Supply SÞtem                                                                File No. H1712011



FINDINGS

The following is a summary of the non-conformance issues. The detailed audit checklist is also
attached for further information (Appendix A).

Non-Gonformances:

Non-conformance              #l
General    -   Reporting and Payment Deadlínes
Forthe audit period, it was apparent that reporting and payment deadlines are often not being met.

ln the following areas, one or more reports or statements were not received on time:
Section 3.7(4) - Quarterly Operations Reports
Section 3.7(5) - Quarterly Maintenance Reports
Section 3.7(7)(a) - Financial Reports (quarterly)
Section 3.7(7Xb) - Financial Reports (annually)
Section 8.9(a) - lnvoices (monthly)
Section 14.1 - lnsurance (confirmation of renewal)

ln the following areas, one or more payments were not made on time:
Section 5.14(a) - Annual Maintenance Fund
Section 5.14(c) - lncentive Payment
Section 8.5(2Xd) - Adjustment to the Service Fee

                                    -
Note: As per section 3.7(9) Deficient or Late Reports, if the Operator fails to deliver four or more
reports within the prescribed time period the Joint Board may deduct $50,000.00 from the service fee.
For every subsequent occurence the Joint Board may deduct $100,000.00. lf the total of all
occurrences exceeds five, this can be considered an Event of Default. To date, the Joint Boards have
not enforced these penalties for late or deficient reports.

Non-conformance #2

Secfibn 3.7(6)      -   Annual Operations and Maintenance Repoñ
Secfibn 5.2(2)      -   Annual Condition Survey
Sectíon 5.5(3)      -   Annual Revíew of Mechanical and Electrical Equipment

Within sixty days at the end of each contract year, the Operator shall provide the Joint Board with a
detailed report summarizing the operations and maintenance activities of the previous contract year.
The Operator must conduct an annual inspection and review of the civil, structural and site-related
assets as well as the mechanical and electrical equipment and provide the results of the reviews as
part of the Annual Operations and Maintenance Report.

A separate Annual Operations and Maintenance Report has not been provided since 2003. The annual
regulatory compliance report which is prepared for the Ministry of the Environment (MOE) as required


Report Page 12ol 15                                                                                   June 9, 201 1
                                                     Environmental Management System and Quality Management System
                                            trtr
                                             Agenda   ltemf   Page#




  Iake Huron                                                                                     File No. H1712011
    Primary Wãter Supply Syslern

under O.Reg. 17OlO3 meets some but not all of the reporting requirements outlined in these sections. lf
the regulatory compliance report is intended to meet this requirement, it is not being received within the
sixty day deadline and is deficient in some areas.


Non-conformance #3

Secûbn 3.23          -   Workplace Safety and lnsurance Act

The Operator is required to provide the Joint Boards' Manager monthly with clearance certificates from
the Workplace Safety and lnsurance Board. No certificates are cunently being provided.

Non-conformance #4

Secflon 8.6      -   Business P/an

The Operator is required to update the three year Business Plan on an annual basis. No updated
Business Plans have been provided since the start of the contract (2001).

Non-conformance #5

Water Supply Agreements for North Middlesex and Southwold-West Elgin lnterconnection
Secfibn 2.18 - Meter Calíbration
Secfibn 2.19 - Meter Maintenance
Secfi'on 2.1.1 0 - Calibration Repoñing

The Operator is required to carry out the calibration of the Meter annually, and as required by
applicable legislation, Certificate of Approval, licence and/or permit;to maintain the Meter at a
frequency of not less than that recommended in the literature published by the manufacturer of the
Meter; and to provide promptly the results of all calibration testing of the Meter to municipalities upon
request.

During the intemal audit, the Operating Authority was unable to provide evidence/calibration certificates
for some meters.




Report Page 13 of        15                                                                               June 9, 2011
                                                        Environmentar Management system and euarity Management system
                                               trtr
                                                Agenda ltem   #    Page #




      ê
   Lake Huron
    Ptinary Watu Supply System                                                                          File No. H1712011




                                    2009 Lake Huron Primary Water Supply System
                                                Gorrective Action Summary

Total Corrective Actions For 2009: 122
Total Corrective Actions Outstandinq: 12
                                     Sourceffvpe                                               Amount Outstandinq
                                 DWOMS Audit- lnternal                                                   2
                                  EMS AudiËExternal                                                      6
                                    MOE lnsoection                                                       1

                                   EMS Audiþlnternal                                                     2
                                  Manaoement Review                                                      1



                                    2010 Lake Huron Primary Water Supply System
                                                Corrective Action Summary

Total Corrective Actions For 2010: 175
Total Corrective Actions Outstandinq: 76
                                     Source/Type                                               Amount Outstandinq
                                  DWQMS Audit- lnternal                                                  2
                             lncident Report - Hiqh Turbiditv                                            0
                                     MOE lnspection                                                      2
                                   Manaoement Review                                                     3
                                 Health and Safetv Audit                                                 31
                            lncident Reoort - Pipeline Break                                             I
                            Environmental Comoliance Audit                                               13
                                   EMS ExternalAudit                                                     11
                                         ADWQI                                                            1

                                    EMS lnternalAudit                                                    4
                                  DWQMS ExternalAudit                                                     1




                                    2011 Lake Huron Primary Water Supply System
                                                Corrective Action Summary

Total Corrective Actions For 2011:. 49
Total Corrective Actions Outstandinq: 35
                                     Source/Tvpe                                               Amount Outstandino
                                 DWQMS Audit- lnternal                                                   12
                                  Manaoement Review                                                      13
                                    MOE Insoection                                                       14




Report Page 14 o'f 15                                                                                           June 9, 201'1
                                                              Environmental Management System and Quality Management System
                                                  trtr
                                                  Agenda ltem   #       Page #




      ê
   Lake Huron,
    Prinnary Water Supply System                                                                            File No. H1712011


Source of                 Requirement of                        Summary of Reoccurring Findings
Finding                   DWQMS/EMS Standard or
                          Ministrv of the Environment
DWQMS Audits              Element 5: Document and                   .     Annual review of administrative, process,
                          Record Control                                  emergency response procedures and
                                                                          forms not taking place.
                                                                    .     Records not retrievable.
                                                                    .     lnconsistencies with log book entries.
                                                                    ¡     Records not filled out orooerlv.
                          Element 6: Drinking Water                 .     Description of drinking water system does
                          System                                          not meet the reouirement.
                          Element 10: Competencies                  o     DWQMS orientation and other training
                                                                          reouírements not takino olace.
                          Element 17: Measurement                   .     Calibration of equipment not taking place
                          and Recording Equipment                         as required.
                          Calibration and Maintenance               .     lnconsistencieswith calibration
                                                                          documentation
                          Element 18: Emergency                     .     Emergency response testing not taking
                          Management                                      olace as reouired.
                          Element 21: Continual                     .     Corrective actions from previous audits not
                          lmprovement                                     complete
                                                                    .     90 day checks for effectiveness of
                                                                          correctíve actions not takino olace.
EMS Audits                4.4.2: Competence,   trai ning,           .     Traíning requirements are not being met.
                          and awareness
                          4.4.5: Control of Documents               .     Annual review of administrative, process,
                                                                          emergency response procedures and
                                                                          forms not takinq olace.
                          4.4.7: Emergency                          .     Emergency response testing not taking
                          Preparedness                                    olace as reouired.
                          4.5.3: Nonconformity,                     .     Corrective actions from previous audits not
                          corrective and preventative                     complete
                          action                                    .     90 day checks for effectiveness of
                                                                          corrective actions not takino olace.
                          4.5.4: Control of Records                 .     Records not retrievable.
                                                                    .     lnconsistencies with log book entries.
                                                                    .     Records not filled out properlv.
MOE                       Permit to Take Water                      .     Maximum water takings were not in
lnspection                                                                accordance with the Permit to Take Water.
                          Treatment Process                         .     The facility and treatment process did not
                                                                          appear to be in a fit state of repair.
                          Logbooks                                  .     Logbooks did not contain the required
                                                                          information.
                          Reportin g/Corrective Actions             .     All required notifications of adverse
                                                                          drinking water quality incidents were not
                                                                          immediately provided.
                                                                    .     No written notice of resolution was
                                                                          provided as required.


Report Page 15 of 15                                                                                          June 9, 201 1
                                                            Environmental Management System and Quality Management System
                                                 trE
                                                 Agenda ltem   #   Page #

            f\,
     È
  Lake Huron
   PriTery rvrt3r Slpplt STslen
                                                                                           File No. H1712011

                            To:   Chair and Members
                                  Lake Huron Primary Water Supply System Board of Management

                       From:      John Braam, P.Eng.
                                  Director of Water & City Engineer

        Meeting         Date:     June 9, 2011

                  Subject         Clean Water Act   -   Risks from Vulnerability Changes



    Recolrn¡eNDATtoN
That the Board of Management for the Lake Huron Primary Water Supply System take the following
äctions with respect to Risks from Vulnerability Changes under the Clean Water Act:

    a) That      the Board of Management for the Lake Huron Primary Water Supply System
           ENCOURAGE the Ministry of the Environment to consider activities which increase thè
           vulnerability of an intake or wellhead to be a threat to drinking water systems under the Clean
           Water Act and develop associated risk assessment tools to be used in the development of
           Source Protection Plans; and,

    b) That this report be forwarded to the Ausable Maitland Valley Source Protection Committee for
           information

    DscussfoH
The Clean Water Act establishes a process to determine protection zones for wellheads and surface
water intakes for municipal drinking water systems, assess the vulnerability of intakes and wellheads,
identiñ7 threats to the intakes and wellheads, and develop Source Protection Plans to manage and
control the risks to the drinking water systems. The risk assessment process established under the
Clean Water Act is premised on the principle that an activity (business operation, residential septic
system, storage of chemicals, etc.) or site condition due to past activities can potentially pose a threat
to an intake or wellhead, and the degree of risk to the drinking water systêm is related to both the threat
itself and the vulnerability of the intake or wellhead.

                                          Rsx = THREAT x VuLNERABTLTTY
In all cases, the assessment of threats (biological or chemical) is related to human activities (past
conditions or present activities). By way of example, the storage of 1.5 million litres of Urea Ammonium
Nitrate can pose a risk to a drinking water intake or wellhead, and the degree of risk (significant,
moderate, minor, negligible) depends on how vulnerable the intake or wellhead is in relation to the
storage system.

The development of Source Protection Plans is premised on the control of activities, through land use
controls (zoning bylaws, official plans, etc.) or other controls (permits and approvals, prohibitions, etc.)


ReportPage 1 of2
                                        trE
                                         Agenda ltem   #       Page   f

       È
        ^,
    Lake ÍIurctrt
     Prir¿qr l'l?l1r SrpÞly SisiËn;
                                                                                                          File No. H1712011
in order to manage and mitigate the risks to the drinking water system at the source. ln theory, this
should also controlfuture risks by controlling and preventing future threats.

ln the cunent version of the Clean Water Act and the development of Source Protection Plans, the
vulnerability of the intake and wellhead is assumed to be static. The vulnerability rating of an intake or
wellhead may be changed in future as a result of specific site investigations, such as subsurface
geotechnical and groundwater studies, which amends previously unknown conditions near the
wellhead. The Clean Water Act and the technical rules for risk assessment does not contemplate an
activity which could specifically change the vulnerability of an intake or wellhead.

For example, a new quarry near a wellhead (subsequent to the vulnerability assessment undertaken)
would change the vulnerability as it provides a direct flow path for contaminants to the wellhead. The
act of extracting the soil and quarry material in itself does not constitute a risk to the drinking water
system as it is not an activity associated with a microbiological or chemical contaminant.

During informal discussions with the Ministry of the Environment, it was recognized that this theoretical
situation could represent a flaw in the Clean Water Act, but could potentially require amendments to the
Clean Wate¡ Act and its regulations. At that time, Ministry staff indicated that the focus of the Clean
Water Act and source protection activities are being specifically directed to the mitigation of significant
threats as currently defined under the Act, and there are no efforts at this time to address activities
which change the vulnerability of intakes and wellheads.

    Got¡ctuslon
Although it is not immediately apparent that there are any proposed or existing activities in the region
which increase the vulnerability of the intake for the Lake Huron Primary Water Supply, it is the position
of Board staff that the Ministry of the Environment be encouraged to assess the potential implications of
activities which may increase the vulnerability of an intake or wellhead, and develop threat and risk
assessment tools to be incorporated as part of the development Source Protection Plans in Ontario.




 Division Manager, Regional Water     Supply               /      '       Dir/ctor of Water & City Engineer




Report Page 2 of 2                                                                                                June 9, 2011
                                                                                                 Clean Water Act -Vulnerability
                                                         trtr
                                                         Agenda ltem   #   Page #




  Lake Huron                                                                                     File No. H1712011
     Prlmary Y,,ater Supply Slstern




                               To:        Chair and Members
                                          Lake Huron Primary Water Supply System Board of Management

                          From:           Pat McNally, P.Eng.
                                          Chief Administrative Officer

          Meeting           Date:         June 9, 2011

                     Subject:             Bulk Water Sales Policy




That the following actions be taken with regard to the Bulk Water Sales Policy:
a)   The Board of Management for the Lake Huron Primary Water Supply System RESCIND Policy 28
     regarding Bulk Water Sales;
b) The Board of Management for the Lake Huron Primary Water Supply System                          APPROVE the
      proposed policy regarding Bulk Water Sales as attached to this report as Appendix B; and,
c)   The Board of Management REGEIVE this report regarding the status of the Bulk Water Sales Policy
     for information.



      Board Policy #28                -   Bulk Water Sales
     September 12,2002                     -   Bulk Water Sales



On September 12, 2002 the Lake Huron Primary Water Supply System (LHPWSS) Board of
Management approved the current version of Policy 28 - Bulk Water Sales (Attached as Appendix A).
Since that time, the contracted Operating Authority has been responsible for the provision of bulk water
to local agriculture or construction operations in accordance with the Policy. Due to operational
challenges within the facility, including limited staff resources, the contracted operating authority have
not been able to fully follow this policy.

On April 29,2011 the administrative staff of the municipalities of South Huron, Bluewater and Lambton
Shores were informed that the LHPWSS would consider terminating the current practice of providing
bulk water to local farmers.




Report Page 1 of5                                                                                          June 9, 201 1
                                                                                                       Bulk Water Sales
  Lake Huron
    Pimary Waler Supply Sylem
                                      trtr                                              File No. H1712011



The policy adopted by the Board of Management in September 2OO2 allows for the provision of bulk
water for the purpose of agricultural or construction use. The policy was initially adopted by the Board
as a result of a pre-existing practice by the previous owner/operator of the facility (Ministry of the
Environment and the Ontario Clean Water Agency) whereby the plant operator would load local
farme/s trailer-mounted tank with water from an onsite hydrant. Typicatly this water is used for fertilizer
operations.

Ïhe Board and   Board staff were not made aware of this previous practice until early 2002 when the
contracted operating authority was contacted by local farmers to arrange filling their tanks. At that time
it was discovered that the previous operator of the facility was charging the farmers $25 for a "small
load' (typically 2,500 to 4,000 gallons) and $50 for a "large load' (greater that 4,500 gallons). No
monies were remitted to the Board in the interim period from the time of ownership transfer (2000) to
the start ofthe new contact (January 2002).

On an annual basis, between 725,000 litres (160,000 gallons) and 900,000 litres (200,000 gallons) are
supplied to area farmers at the water treatment plant. To date, Board staff are not aware of any
construction contractors that have been supþlied bulk water at the water treatment plant.

Upon adoptíon of the Bulk Water Sales Policy (Polioy #28), the current contracted operating authority
has continued to supply bulk water to area farmers. Due to limited operating staff available, this practice
has been difficult to sustain and has resulted in the lack of recording the percon receiving the water and
the volume of water supplied. ln addition, the operator never charged the farmer for the water.

The cunent practice of supplying bulk water through a hydrant at the water treatment plant has resulted
in increased maintenance and repairs to the hydrant. In order to maintain the current practice and
supply of water to local farmers and contractors in accordance with the Board Policy, an additional
operator is required at the plant and an increased level of maintenance and repair to the hydrant needs
to be undertaken.

At the time of drafting the original policy in 2002, Board staff were informed that the municipalities of
Bluewater and South Huron were reviewing a proposed bulk water policy but cunently only use 'bulk
wate/ for municipal operations or municipal capital projects. The Municipality of Lambton Shores
maintains two bulk water filling stations in Forest and Norfolk, operated on accounts with key/cards.
The use of hydrants for bulk water is restricted to emergencies only.

As an alternative to rescinding the current policy and terminating bulk water sales to local farmers and
contractors vià the onsite hydrant, the Board could choose to install a bulk water filling station operated
on accounts with key/cards, similar to that utilized by various municipalities. !t is the recommendation of
Board staff that the supply of treated municipal drinking water (bulk or otherwise) to individual
consumers should remain the purview of the municipalities.

The estimated cost to install a bulk filling station at the water treatment plant, including an account
management system and road modifications for traffic management, is anticipated to be in the order of
$125,000 to $150,000, with an estimated annual operating and maintenance cost of $5,000.




Report Page 2 of 5                                                                              June 9, 201 1
                                                                                            Bulk Water Sales
           ê
  Iøke Huron
    Primary Water SuÞply System
                                               trtr                                           File No. H1712011



To date, the contracted operating authoriÇ has not identified the amount of bulk water supplied on an
annual basis nor have they charged and remitted the funds in accordance with Board's Bulk Water
Sales policy (Policy #28). This is largely due to the lack of resources to appropriately manage the
practice of bulk water supply to area farmers and contractors.

It is the recommendation of Board staff that the current policy of supplying bulk water at the water
treatment plant to local farmers and contractors be rescinded, and that area municipalities consider
appropriate policies and practices within their respective water distribution systems.


Information for this report was provided by John Walker, Operations Manager.




 Division Manager, Regional Water Supply                                of Water & City Engineer




Attachments:

          Appendix A:             Board Policy #28 - Bulk Water Sales (September 2002)
          Appendix B:             Proposed Policy - Bulk Water Sales




Report Page 3 of 5                                                                                     June 9, 2011
                                                                                                   Bulk Water Sales
                                                        trtr
                                                                           #

          s
                                                         Agenda ltem              Page #




  LakeHu ron                                                                                                                  File No. H1712011
   Pr¡m¿ry Weter Supply System




                                                                 al Water Su                  Policies

                             Section:     Financ¡al                               Policy No.: 28

                             Topic: Sulk WaÞr Sales                               lssue Date; Augusl 7, 2OA2

                             Approved by:                                         Date of Last Revision:
                             The Board



                  The policy for bulk water sales     ì/yi¡l   be as foilo'res:

                  Sulk water nìay be loâded and sold            fom the Lake Huron water featment facif¡ty under the following
                  tenns and conditions:

                 'Eulk u¡ater' !s defined os treated wster in excese of 4,540 Litres (1,000 lmperisl Galbns) dispensed
                  ìnto a tank mounted on o t'a¡ler or simìlar vehicle.

                           ai    Bulk water fi¡aded and sold at the water beatrnent facil¡ty  þ to be used for agricultural or
                                 construtt¡on purposes only and mfiy not be used for domeslic (potaþle) consunrpt¡on or
                                 well (groundwater) recharge;
                           b)    Ðulk water loâding will be perfornred by plar¡t stnfi at a dæignated loading etation or site
                                 nith adequote facililiee and equipment necessory to n¡easure arid contnol the yolume of
                                 w¡ter loaded and prevent backfiow int¡c the planfs treaüîent or water distribution srystenr;
                           c)    Bulk waler loading and slles may be tempomrity $uspended during emergencies or such
                                 tinìes as determined Þy plant staff or the Administering Municipatity in which the lo€d¡ng of
                                 bulk water wÞuld impede, impair or is determined to be det¡imental to the planfs treafnent
                                 pmcess or operat¡on in general;
                           d)    The charge for b,ulk nrater loaded and $old at the water ùeatrnent facility shall be $5.00
                                 plus $5.tÐ per 4,54t Utres {'1.000 lmperial Gallons) pa¡d to the facility operator and
                                 remítted to the Joint Board on an snnual ba6És, and,
                           e)    ThÊ Adnrinistering ltdunicipelity shall report to the Joint Ðoard of Management on an
                                 annual basis the quantity of bulk wûter sold, tlte purchaser(s) of the bulk water, Ênd the
                                 total relenue received by Americån \¡ïoter Canada (AWC) and ren'¡itted to the Joint Board
                                 of ì,lanagernent.




                                                                                                           Lale e
                                                                                                                    s   I{uron
                                                                                                             hrøry \\t¡er   Supply Ststrm




Report Page 4 of 5                                                                                                                       June 9, 201 1
                                                                                                                                     Bulk Water Sales
           s                            trtr
                                         Agenda ltem   #   Page #




   Lake Huron                                                                            File No. H1712011
    Pr¡ßary Water Supply System




                                  Regional Water Supply Policies

             Section: Financial                            Policy No.:

             Topic: Bulk Water Sales                       lssue Date:

            Approved by:                                   Date of Last Revision:




It is the policy of the Board of Management for the Lake Huron Primary Water Supply System, with
respect to the supply and sale of water, that:

    a)    With the exception of emergencies, where warranted, water will not be supplied via hydrants
          owned and operated by the Lake Huron Primary Water Supply System. Hydrants located at the
          water treatment plant and/or remote facilities will only be used for fire fighting and operational
          purposes;

    b)    The Lake Huron Primary Water Supply System shall only sell water on a wholesale basis to
          municipalities connected to the primary water supply system.




Report Page 5 of 5                                                                               June 9, 2011
                                                                                             Bulk Water Sales
                                                              #


                                                EE
                                                Agenda ltem       Page #




  Iake Huron
   Primary Wáter Supply System
                                                                                          File No. H1712011


                           To:   Chair and Members
                                 Lake Huron Primary Water Supply System Board of Management

                      From:      Pat McNally, P.Eng.
                                 Chief Administrative Officer

        Meeting        Date:     June 9, 2011

                  Subject:       Ministry of the Environment lnspection Report




That this report with respect to the Ministry of Environment's annual inspection BE RECEIVED for the
information of the Board of Management.



    o     Ministry of the Environment lnspection Report             -   June 3,2010
    .     Ministry of the Environment lnspection Report             -   June 1 1, 2009



The Ministry of the Environment (MOE) conducts an annual inspection of the Lake Huron Primary
Water Supply System (LHPWSS). The objective of the inspection is to determine the compliance of the
drinking water system with requirements under the Safe Drinking Water Acf, associated regulations,
and MOE issued licenses, permits and approvals. An inspection report is issued by the MOE which
outlines any non-compliances as well as recommended best management practices.

Violations identified in an inspection report, if any, have been evaluated by the MOE based on potential
risk to the community. Any identified violations are monitored for compliance with the minimum
standards for drinking water in Ontario as set forth under the Safe Drinking Water Act and associated
regulations. Where risk is deemed to be high and/or compliance is an ongoing concern, violations are
forwarded to the Ministry's lnvestigation and Enforcement Branch by the MOE lnspector.



Non-Compliances and Best Management Practices
The MOE conducted an inspection at the LHPWSS on February 10,2011 and the inspection report was
issued on April 2A, 2011. A complete copy of the MOE inspection report, as issued, is available to the
Board upon request. The report noted seven (7) non-compliance issues and nine (9) recommended
best management practices.

The seven noted non-compliance issues relate to:
   . Logbooks (1 non-compliance)
  o Process wastewater (1 non-compliance)
   . Treatment processes (2 non-compliances)
Report Page 1 of     11                                                                           June 9, 201 1
                                                                                         MOE lnspection Report
                                         trtr
                                         Agenda ltem   #   Page #




   Iake Huron
    Primarywatersupplvsvslem
                                                                                            Fire No. H1Tt2o11
   .   Water quality monitoring (3 non-compliances)

A summary of the non-compliance items, conective actions required and anticipated completion dates
is found in Appendix A of this report.

Best management pnactices are recommendations only and not considered mandatory requirements.
ln the interest of continuous improvement, the MOE recommends that drinking water system owners
and operating authorities consider these practices as well as measures to implement them. A summary
of the best practice issues is found in Appendix B of this report.

This Board report contains a summary of the findings and action plans only, as the final inspection
report issued by the Ministry of the Environment is 127 pages in length. Copies of the complete
inspection report are available from the Regional Water Supply office in London upon request.

Risk Rating
The MOE applies a risk rating methodology to establish an annual inspection rating. Each non-
compliance identified in the inspection report is evaluated based on the potential to compromise the
delivery of safe drinking water. The primary goal of this type of assessment is to encourage ongoing
improvement and to establish a way to measure improvement. A low inspection rating doeé not
necessarily mean that drinking water is unsafe, rather it is an indication of the degree to which there is
room for improvement with respect to meeting provincial regulatory requirements.

This methodology has been used consistently over a period of years, and therefore can serve as a
comparative measure both provincially and specifically to the LHPWSS. The following table ouflines
the inspection rating for the LHPwss over the past five inspection periods.

                          lnspection Year                       Final lnsoection Ratino
                             2005-2006                                 97.590/
                             2006-2007                                 99.22o/o
                             2007-2008                                 97.03%
                             2008-2009                                 90.16%
                             2009-2010                                 82.90Yo
                             2010-20't1                                92.27%

The final inspection report was discussed at the May 16,20'1'1 management review meeting between
the operating authority management and the Board's management staff. Conective action iiems have
been assigned to either operating authority or Board staff for completion. Board staff monitors and
tracks the status of conective action items through its Drinking Water Quality Management System
(DWAMS).




Report Page2o111                                                                                   June 9, 2011
                                                                                          MOE lnspection Reporl
                                      Agenda   ltem#   Page#




   Iake Huron
     Pdmary Water Supply Sptem
                                      trEr                                                    File No. H1712011



The Ministry of the Environment inspection report has indicated that all requirements of applicable
legislation for the area water supply system were not met for this inspection period. Corrective action
plans are in progress to address the non-compliance issues identified in the inspection report.

lnformation for this report was provided by Erin Kirk, Quality Assurance & Compliance Manager.




 Division Manager, Regional water   supply             (       Dirgbtor of water & city Engineer




                                                               Pat McNally, P. Eng.




Attachments:
         Appendix A: Summary of Non-compliances
         Appendix B: Summary of Best Management Practices




Report Page 3 of    1 1                                                                              June 9, 201   1
                                                                                            MOE lnspection Report
           È
           ^,
  Lake Huron
    Primary Water Supply System
                                                   trtr                                                        File No. H1712011


* Denotes a more serious finding from a risk-based perspective
Nöäiôö'räìdiäh'öê:.#i,i:i"::iiir
MOE lnspection                     Treatment Processes
Module
Non-compliance                     The owner did not comply with the requirement to seek changes to the Permit, Licence
(Summary)                          or Approval issued under Part V of the SDWA where required when changes were
                                   made.

                                   The owner fulfìlled the requirements for documenting the work under Form 3 but failed
                                   to provide a Director Notifìcation Form indicating alterations to the drinking water system
                                   within 30 days of placinq equipment into service.
Corrective Action                  The owner has provided confirmation that the required form was submitted to the fi4OE
Required by MOE                    on April 4,2O11. The owner shall develop a procedure to ensure that the requirements
(Summary)                          specified in the Drinking Water Works Permit (DWWP) conditions are met.
Responsibilitv                     RWS
Deadline for                       May 31,2011
Completion
Status Update                      complete. The required procedure was developed and submitted to the MoE oñ [r/ay
                                   15,2011.




Non-compliance                     The facility did not appear to be maintained or in a fit state of repair.
(Summary)
                                   A visual examination of unit process equipment indicated that regular routine
                                   maintenance was typically being conducted in a timely manner. However, during the
                                   backflow assemble maintenance log review,'Testing and lnspection Report'
                                   documentation provided indicated that many of the devices tested in December of 2010
                                   had malfunctioned and had not been repaired nor re-tested at the time of inspection. On
                                   February 18,2011, further information provided by the operator indicated that the
                                   backflow devices would be repaired and completed in the following week. Also during
                                   the LHPWSS plant physical inspection, it was observed that annual inspection and
                                   calibrations are not identifiable on multiple testable backflow devices located throughout
                                   the plant.
                                   Additionally, as noted during the previous inspection at the Exeter/Hensall Pumping
                                   Station the rechlorination system was found to have excessive sodium hypochlorite
                                   leaks; corrosion of pipíng and appurtenances; poor building ventilation, and heavy
                                   condensation on all piping. lt should be noted that the owner will be taking steps to
                                   retrofit the HVAC design of the Exeter/Hensall Pumping station Facility and have
                                   provided a tentative project completion date of the upgrades by September, ZOll.




Report Page 4 of      11
                                                                                                                                   MOE ln
                                                  trtr
                                                  Agenda ltem   #   Page #




   Lake Huron
     Primary Waler Supply System
                                                                                                          File No. H1712011


Corrective Action                  The Owner/Operating Authority shall forthwith assess all essential system components
Required by MOE                    of the LHPWSS to address ongoing issues related to maintenance, operational
(Summary)                          requirements and the prevention of system contamination. The assessment shall
                                   identify deficiencies in the protection of the facility's components and a table top review
                                   of all preventative maintenance recommendations as provided by the equipment
                                   manufacturers.
                                   Additionally, the Owner/Operating Authority shall ensure that all aspects of the drinking
                                   water system such as: spare critical instrumentation equipment, chemical pumps,
                                   controllers, electrical system components, ventilation systems, screens, roofs, doors,
                                   drainage systems, airlvacuum relief chambers; surge facilities etc. are managed,
                                   maintained and operated to comply with all applicable regulations.
                                   The Owner/Operating Authority shallensure allidentifìed deficiencies in the system are
                                                    ired or replaced bv Mav 31.2011 .

                                   May31,2011



Nôn.cérrripliâncê'#j'1
MOE lnspection                     Process Wastewater
Module
Non-compliance                     Process wastewater monitoring was not being performed as required by the Permit,
(Summary)                          Licence, or Approval issued under Part V of the SDWA.

                                   The LHPWSS is required to sample and test at a minimum monthly frequency for total
                                   solids of the filter backwash and centrifuge centrate. ln the month of March 2010
                                   samples were not collected and submitted for analysis as required.
Corrective Action                  lmplement a sample protocol and check list to ensure that all required samples are
Required by MOE                    collected and submitted as per the prescribed direction of the Licence.
(Summary)
Responsibilitv                     AWC
Deadline for                       None given
Comoletion
Status Uodate                      lncomplete as of Mav 20.2011


MOE lnspection                     Logbooks
Module
Non-compliance                     The operator-in-charge did not ensure that records were maintained of all adjustments
(Summary)                          made to the processes within his or her responsibility.

                                   The operating authority failed to ensure that all actions taken by the operator were
                                   appropriately recorded. The SCADA system upgrades resulted in a failure to include an
                                   event logger which records all changes made to the treatment/operational system and
                                   alarm setpoints.
Corrective Action                  Ensure that all record keeping requirements for the operation of the system meet log or
Required by MOE                    record keeping requirements as per the regulation.
(Sumrnary)
Resoonsibilitv                     AWC


Report Page 5 of      11
                                                                                                                                 MOE ln
                                                  trtr
                                                  Agenda ltem   #   Page #



            ê
   Iake Huron
     Primary Waler Supply System
                                                                                                         File No. H1712011

Deadline for                       May 31,2011
Comoletion
Status Update                      ln March 2011 the scADA Event Logging system at the LHPWSS was commissioned
                                   and tested, which will resolve this non-compliance. As of May 20,2011 , a response had
                                   not yet been provided to the MOE.


                                   Water Quality Monitoring

Non-compliance                     Raw water samples were not being collected and analyzed at the appropriate
(Summary)                          frequency.

                                   The operating authority is required to collect one raw water sample each week and
                                   analyze the sample for E.coli and total coliforms. The operating authority typically
                                   collects two samples each week. The operating authority failed to ensure a sample was
                                   collected the week of Mav 9. 2010.
Corrective Action                           that a water sample is taken at least once every
Required by MOE                    system's raw water, before any treatment is applied. Prior to collecting the raw water
(Summary)                          sample he operator shall test the raw water for total chlorine to ensure that no treatment
                                   has been applied to the water. After confirming that no treatment has been applied, the
                                         tor shall record the total chlorine value on the chain of




                                   The operating authority has indicated that the required sample was taken; however a
                                   problem with the courier that delivers the samples to the lab resulted in the sample
                                   being held passed the allowable hold time and the sample was therefore rendered
                                                          20,2011a

MOE lnspection                     Water Quality Monitoring **
Module
Non-compliance                     Operators were not examining continuous monitoring test results or they were not
(Summary)                          examining the results within 72 hours of the test.

                                   The operating authority failed to review and verify fìlter effluent performance to ensure
                                   the 95% criteria.
Corrective Action                  The operating authority shall implement the fìlter performance review criteria described
Required by MOE                    to ensure that fìltered water turbidity is less than or equal to 0.3 NTU in 95% of the
(Summary)                          measurements each month. The operating authority has provided conventional filtration
                                   performance calculations for the inspection period: no further actions required.
Resoonsibilitv                     AWC
Deadline for                       Completed
Comoletion
Status Update                      Filter performance calculations were provided prior to the final inspection report being
                                   issued. No further action was reouired.




Report Page 6 of     '1   1

                                                                                                                                MOE ln
                                                 trø
                                                  Agenda ltem   #   Page #



           ê
   Iahe Huron
    Ptimary Waler Supply System
                                                                                                          File No. H1712011



                                             monitoring equipment that was being utilized to fulfill O.Reg. 17OlO3
                                  requirements was not performing tests for the parameters with at least the minimum
                                  frequency specified in the Table in Schedule 6 of O.Reg. 17OlO3.

                                  The operating authority failed to ensure that the continuous monitoring and recording
                                  occuned at all times as prescribed by the regulation. Continuous monitoring data
                                  indicates that treated water free chlorine residual and filter effluent turbidity were not
                                  monitored and recorded with the minimum frequency of testing and recording as
                                  prescribed. The events took place on multiple dates and variable time frames during

                                  Ensure that all continuous monitoring equipment used for sampling and testing that is
Required by MOE                   required by regulation ís monitoring, testing and recording with the minimum frequency
(Summary)                         specified. lmplement clear and concise protocols to ensure staff responsible for the
                                  operations and maintenance of the drinking water system is provided with direction.
                                                       of this review and the actions taken to

                                  May 31, 2011




Report Page 7 of     1 1

                                                                                                                               MOE ln
                                                           trtr
                                                            Agenda ltem     #       Page #



        ê
     Lake Huron
       Primary Water SupÞly System
                                                                                                                                             File No. H1712011




                                     Where a potential bypass of primary or secondary treatment equipment existed,
                                     measures were not taken to ensure that raw or partially treated water was not directed

Corrective Action                    It is recommended that the owner/operating authority conduct an assessment of all
Recommended                          potential system bypasses that may direct raw or partially treated water to the
(Summary)                            distribution system. lf during the review a potential bypass is identified, the
                                     owner/operating authority must ensure measures are in place including staff training to




BeÞçMd¡?seme4!i;;;                    2,;,..1,",;rìj,J.l.lli'ì",-i:::,r:::r.ir,:r,.:r:iii.¡i_,::Ì'i;iliii:;,.,:,i,,:rf'.,.iir ,:
Fräôticë,#;: r'.:'::; :; :.::: ;.    ;:o;1:1.,'rf.',ll,t1ri¡f'...'..t;i.rlåìii,i",.:J;;lil.i::.;,i.;i,l,ii;:,'1.,j,,;.. .,t,iÌ:li¡¡íjí,T**rii.i
MOE Best                             There was no program or maintained schedule for routine cleanout, inspection and
Management Practice                  maintenance of reservoirs and elevated storage tanks within the distribution system.
(Summarv)
Corrective Action                    It is strongly recommended that the owner/operating authority undertake efforts to
Recommended                          ensure that sanitary inspections and maintenance of all storage facilities are carried out
(Summary)                            on a routine basis. Storage facilities should be regularly inspected and maintained to
                                     minimize the potential for water quality issues before they develop, and maximize the
                                     service life of the facility. Additionally, a maintenance program to evaluate the internal
                                     integrity of the storage facility should be established pending the specifìc conditions to
                                     determine how often insoections should be oerformed.
Responsibility                       AWC
Deadline for                         To be discussed
Comoletion


                                     t'$i*'li¡iifiií
MOE Best                             Based on record available the owner was not able to maintain proper pressure in the
Management Practice                  distribution system.
(Summary)
                                     The LHPWSS log indicates that on many occasions low pressure complaints were
                                     received by the OIC at the plant. Pressure failures or low pressure events resulted from
                                     various causes including watermain break, high líft pump failures, power outages,
                                     scheduled plant shutdowns, loss of communications at water storage facilities used to
                                     maintain pressure and other conditions related to equipment failure such as the
                                     incorrect installation of control valves.




Report Page 8 of 1'l
                                                                                                                                                                 MOE ln
                                                             trE
                                                             Agenda ltem   #   Page #




    Lake Huron
      Pr¡mary Water Supply SÞtem
                                                                                                             File No. H1712011

,tsesf M                                     ir::,:l',
rÍiia¿iiä                                    ìt¡ri
 Corrective Action                     It is recommended that action be taken by the Owner/Operating Authority to ensure that
 Recommended                           all low pressure situations (for example at booster stations or transmission mains
 (Summary)                             providing service to other systems) are appropriately responded to. Due to the number
                                       of low pressure complaints the Owner/Operator should conduct a comprehensive
                                       internal investigation or retain the services of a qualifìed consultant to address the low
                                       pressure issues. A study of the water transmission mains using portable pressure data
                                       loggers installed at strategic locations to trend water distribution system pressure may
                                       help to identifu localized system pressure problems.
Responsibility                         AWC and RWS
Deadline for                           To be discussed
Comoletion

'BêCt,Mähãoêrirênt,' .,':,.        l
 pill¡¡[i #,.:.-.,i..'r,.',,,,..,
 MOE Best                              Spill containment was not provided for process chemicals.
 Management Practice                   It was found that the alum chemical unloading area outside spill containment area and
 (Summary)                             the Exeter-Hensall Booster Pumping Station sodium hypochlorite outside containment
                                       area were full of frozen ice and snow making these containments ineffective in the
                                       event of a soill.
Corrective Action                      It is highly recommended that the Owner/Operating Authority conduct an assessment of
Recommended                            all chemical storage and transfer areas within the LHPWSS and remote Facilitíes to
(Summary)                              ensure proper containment is provided and maintained. The evaluation should consider
                                       operator safety, public safety, and potential impacts to the water treatment facility and
                                       the natural environment, partícularly with respect to risk in the event of a spill.
                                       ln addition to the above, the Owner/Operating Authority should conduct an assessment
                                       of the LHPWSS chemical storage facilities to carefully evaluate the design and capacity
                                       of all storaqe containment.
Responsibility                         AWC
Deadline for                           To be discussed
Comoletion
                                                     ,. "ì
                                       5:r::i:
                                       r¿ìi;.,r:,,'--:.
MOE Best                               Operators were not regularly trained with respect to the contents of the operations and
Management Practice                    maintenance manual and Contingency/Emergency Plan.
(Summary)
                                       Review of the training records provided, indicate that all operators are not regularly
                                       trained with respect to the contents of the operations and emergency manuals. The
                                       Owner/Operating Authority should ensure that the operators are able to dealwith
                                       continoencies and emeroencies when thev occur in order to safeouard the water suoolv
Corrective Action                      The Owner/Operatíng Authority is responsible to ensure that an up{o-date contingency
Recommended                            plan is in place.
(Summary)                              Emergency planning and the procedures under which the employees of the Lake Huron
                                       Area Water Supply respond to an emergency should be incorporated into the training
                                       program. All staff responsible for the system should participate in the training. This will
                                       help the responder to fully understand the steps necessary during an emergency
                                       situation. Mock training sessions also identify any deficiencies in the plan, and would
                                       ensure that the correct and most aoorooriate instructions are in place.
Responsibility                         AWC


Report Page 9 of       11
                                                                                                                                     MOE ln
                                                     trtr
                                                     Agenda ltem   #   Page #



      ê
   Lake Huron
    Pr¡m¿ry Weter Supply System
                                                                                                                   File No. H'1712011


                                                   ii'ffi n'l1riff
                                                                                                     l;r:i:lr';rr Ir

                                  ',qi*i;ffi                               itï,f     rigg¡ig* i:li
                                                                                                iìi:iiiii.$r,rrir,;    iiiiiiiiitiir,jffi
Deadline for                      To be discussed
Comoletion


                                                             ,#iiiiliiiijiiii
MOE Best                          Records did not confirm that the maximum free chlorine in the distribution system was
Management Practice               less than 4.0 mg/L or the combined chlorine residual was less than 3.0 mg/L.
(Summary)
                                  During the inspection documentation review, it was found that the South Exeter/Hensall
                                  Reservoir and Pumping Station Re-chlorination Facility recorded elevated free chlorine
                                  levels greater than 4 mg/L on numerous occasions. The Procedure for Disinfection of
                                  Drinking Water in Ontario (section 4) states that "The maximum chlorine residual at any
                                  time and at any location should not exceed 4.0 mg/L". High chlorine residuals in the
                                  distribution system (i.e. >4.0 mg/L) may also result in high disinfection byproduct
                                  concentrations (trihalomethanes)which may have long term health impacts. Elevated
                                  chlorine residual levels can also result in taste and odour complaints and promote
                                  deterioration of water distribution svstem components, etc.
Corrective Action                 It is highly recommended that the Owner/Operating Authority review the current
Recommended                       secondary chlorination control strategy at the Exeter/Hensall Reservoir and Pumping
(Summary)                         Station Re-chlorination Facility, and make the necessary changes to ensure that the
                                  free chlorine leaving the facility is maintained below 4 mg/L in accordance with the
                                  "Procedure for Disinfection of Drinkinq Water in Ontario".
Responsibility                    AWC
Deadline for                      To be discussed
Completion



MOE Best
                                  7,:'ll.;,:
                                  'ri: ' ¡ '-
                                                ¡itffi                          :i::1,::':
                                                                                '!:- r,i:
                                                                                ,;"ìÌj;!,
                                  Best Management Practices and Recommendations are provided by the ministry to
Management Practice               promote the owner/operator's ability to ensure conlinuous improvements with the overall
(Summary)                         operation and maintenance of
                                  the drinkinq water svstem and onqoinq protection of public health.
Corrective Action                 It is very important for the Owner/Operating Authority be aware of the following
Recommended                       provisions in the Safe Drinking Water Act of their roles and responsibilities under the
(Summary)                         Standard of Care for Municipal Drinking Water Systems section 19 proclaimed in May
                                  2007 that will come into force on January 1,2013,
                                  Standard of care, municipal drinking water system 19. (1) Each of the persons listed in
                                  subsection (2) shall, (a) exercise the level of care, diligence and skill with respect to the
                                  operation of a municipal drinking water system that a reasonably prudent person would
                                  be expected to exercise in a similar situation; and (b) act honestly, competently and with
                                  integrity, with a view to ensuring the protection and safety of the users of the municipal
                                  drinking water system .2002, c. 32, s. 19 (1).
                                  (2) The following are the persons listed for the purposes of subsection (1):
                                  1. The owner of the municipal drinking water system.
                                  2. lf the municipal drinking water system is owned by a corporation other than a
                                  municipality, every offìcer and director of the corporation.
                                  3. lf the system is owned by a municipality, every person who, on behalf of the
                                  municipality, oversees the accredited operating authority of the system or exercises
                                  decision-makinq authoritv over the svstem. 2002. c.32. s. 19 (2\.
Responsibilitv                    AWC and RWS

Report Page 10 of I      1
                                                                                                                                            MOE ln
                                                             trtr
                                                              Agenda ltem   #   Page #



               ê
     Iake Huron
       Ptimary Water Supply Syslem
                                                                                                                    File No. H1712011




Piè, "s!.,.Wlãrl.ä,ö"ërliëìît,   .;:t,'l
il.Íâ'åiïäá-i*iií;.li; ;Ì:,,'r   ;.ii      r


MOE Best                                       None given.
Management Practice
lSummarv)
Conective Action                               It is strongly recommended that the Operating Authority ensure that all personnel
Recommended                                    responsible for the safe operation of the drinking water system have the expertise and
(Summary)                                      training to operate the facility to comply with the prescribed parameters as required by
                                               the Safe Drinking Water Act and applicable regulations. Actions should also conform
                                               with guidance provided through any Standard Operating Procedures (SOPs) and/or
                                               Emerqencv manaqement Svstems (EMS) in olace.
Responsibility                                 AWC
Deadline for                                   To be discussed
Comoletion




Report Page '11 ot 11
                                                                                                                                          MOE ln
                                                  trE
                                                  Agenda ltem   #   Page #



     ê
  Lake Huron,                                                                                     File No. H1712011
     Pr¡mary Water Supply System




                             To:   Chair and Members
                                   Lake Huron Primary Water Supply System Board of Management

                        From:      Pat McNally, P.Eng.
                                   Chief Ad ministrative Officer

          Meeting         Date:    June 9, 2011

                    Subject: Exeter-Hensall         Pumping Station Dehumidifier - Tender Award




That the following actions be taken with regard to the Dehumidification Systems and Controls Upgrade
Project for the Exeter - Hensall Pumping Station:

a)   That the Board ACCEPT the tender for the Dehumidification Systems and Controls Upgrade as
     submitted by C & C Enterprises Electrical Construction Ltd. in the amount of $100,095.00 plus HST,
     it being noted that the bid submitted by C & C Enterprises Electrical Construction Ltd. was the
     lowest of three (3) received and meets the tender specifications and requirements;

b) Thatan additional$31,190     BE APPROVED fora totalapproved budgetof $131,190, with the
     additionalfunds being provided from the Capital Reserve Fund;

c)   That the Board Chair and Chief Administrative Officer BE AUTHORIZED to execute an agreement
     with C & C Enterprises Electrical Construction Ltd. for the construction of the proposed HVAC and
     Dehumidification Systems Replacement Project; and;

d)   That the approval given herein be conditional upon the execution of an agreement and issuance of
     a Purchase Order relating to this Tender #T11-43.



     2011 Current Operating & Capital Budgets



Background
,The new Exeter-Hensall pump station was constructed as part of the Exeter-Hensall Pipeline design-
 build project, completed in late 2008. Since that time, it has been noted that significant pipe sweating is
occurring, impacting the control systems, electrical cabinets and pipe finishes. The constructed air
 handling units were found to be insuffìcient to remove the amount of humidity actually experienced at
this location, and additional dehumidification and modifications to the air handling controls are required.




Report Page 1       of2                                                                                    June 9, 201 1
                                                                              EPS Dehumidification and Controls Upgrade
                                                 trE
                                                  Açnda ltem   #   Page #




  La,ke       Huron                                                                                        File No. H1712011
   Primary Water Supply System


Project Tendering
Tender #T11-43 was issued on April 2}th,2011 and closed on May                        4th, 2011 .   Three (3) submissions
were received and are summarized as follows:

                            Gontractor                                                  Tender Price
                                                                                         (excluding HST)

                           C&C Enterprises Electrical Constr. Ltd.                         $100,095
                           Brad Baker Plumbing, Heating & Electrical lnc.                  $100,629
                           Collective Contracti ng Corp.                                   $107,490

All bids received complied with the tender process and project specifications.




                                        Detailed Design                             March 2011
                                    ïender for Construction                        April/May 2011
                                             Award                                   June 201 1
                                 Final Commissioning & Testing                     Summer 2011
                                     Substantial Completion                           Fall2O11



Capital Project LH1359 EPS Dehumidification and controls has a total budget of $100,000. With the
approval of the award of this contract, it is the recommendation of staff to increase the approved budget
to $131,190.
Summarv of Proiected Gosts

                       Engineering                                                              $19,000
                       Construction                                                             100,095
                       Net HST (gt.taw)                                                           2,095
                       Contingency                                                               10,000
                       Total                                                                   $131.190

lnformation for this report was provided by John Walker, Operations Manager.




 Division Manager, Regional Water Supply                                           of Water& City Engineer




                                                                            Pat McNally, P. Eng.


Report Page 2 of 2                                                                                                 June 9, 201 1
                                                                                      EPS Dehumidification and Controls Upgrade
           s                                        trtr
                                                    Agenda ltem   #   Page #




  Lake Huron
    Prirary Waler Supply System
                                                                                          File No. H1712011

                            To:    Chair and Members
                                   Lake Huron Primary Water Supply System Board of Managemenl

                       From:       John Braam, P.Eng.
                                   Director of Water & City Engineer

         Meeting        Date:      June 9, 2011

                  Subject:         Ontario WaterMastewaterAgency Response Network



ffiRg                         ffiäþTitäiiiiiËií*i
That the Board of Management for the Lake Huron Primary Water Supply System ENDORSE the
creation and development of a WaterMastewater Agency Response Network for Ontario, and receive
this report for information.


                           $iiääçlîi,ii:
ln the last decade, various water/wastewater agency response network (WARN) programs have been
implemented or are being developed in each state of the United States of America (USA), as well as
the Province of Alberta. The program is premised on the principle of "lJtitities hetping tltilities", and
designed as a type of voluntary mutual-aid between water and wastewater utilities in a region. The
program is being coordinated in the USA through the American Water Works Association (AWWA).

Many municipalitíes in Ontario have specific mutual aid agreements between them and a neighbouring
municipality for fire fighting assistance, and there may be an informal "understanding" that a municipal
water or wastewater utility could call upon its neighbouring utility for assistance. ln recent years,
concern has been raised in respect of this latter informal practice with regard to liability, legal and
regulatory requirements, and Workplace Safety and lnsurance Board (WSIB) requirements. The WARN
program establíshes a legal framework where any subscribing utility can call upon the assistance of
other subscribing utilities, with the response being provided within the context of a blanket "mutual aid"
type of agreement. The blanket agreement would cover all aspects of legal liability, availability of
response and the provision of services, and health and safety requirements, to name a few.

A 'Frequently-asked-Questions" fact sheet, developed by the American Water Works Association                  is
attached to this report as Appendix A for the Board's information and reference.

WARN in Ontario
ln previous years, Board staff have investigated the possibility of establishing a mutual-aid type of
agreement between the benefiting municipalities of the Lake Huron Primary Water Supply System and
the Elgin Area Primary Water Supply System. During the course of the investigation, similar
discussions have been undertaken with the Ontario Water Works Association (a Section of the
American Water Works Association), the Critical lnfrastructure Assurance Program via the Minístry of
the Environment, and Emergency Measures Ontario.



Report Page 1     of5                                                                           June 9, 201   1
  Iake Huron
   Pilmary Water Supply Syslem
                                      trE                                               File No. H1712011

Similar efforts were being undertaken within the Ontario Water Works Association to establish an
Ontario-based mutual assistance program, based on the AWWA WaterMastewater Agency Response
Network. The purpose of a WARN system is to enable municipalities to provide mutual aid in preparing
for, and responding to, intem.rptions in water and wastewater services resulting from natural and man-
made disasters. ln the event of an emergency, the WARN program is one tool in the toolbox' for
responding to and dealing with significant emergencies which are beyond the immediate capacity of the
utility. This is especially beneficialwhen there is a ôommunity-wide, county-wide or greater emergency,
wherein a given utility can be more self-sufficient allowing the community emergency response to focus
resources in other areas if needed.

Participation in the WARN program does not specifically require a subscribing municipality to respond
to any and all calls for assistance, nor does it obligate a subscribing municipality to call upon         all
subscribers for assistance in the even of an emergency.

On April 7, 2011 the O\Â/WA arranged for municipal representatives to attend a workshop entitled
"Utilities Helping Utilities: MutualAid Response Networks for Water and Wastewater Systems." OIÂ/WA
sent invitations to a small group of municipalities intending to get a representative sample of the Ontario
WaterMastewater utilities. Municipalities in attendance included Guelph, Sudbury, Peterborough,
Durham, London, Waterloo, Niagara, Windsor, Toronto and Midland. An Ontario WARN Leadership
Team chaired by Peterborough (Patricia Skopelianos) and co-chaired by London (Andrew Henry, Lake
Huron/Elgin Area Water Supply) was established. The responsibilities of the Leadership Team include
establishing the OnWARN govemance structure and mutual aid agreement and establishing the
OnWARN membership network. Attendees were tasked with confirming their membership on the
OnWARN Leadership team and gathering sample mutualaid agreements.

A follow-up meeting of ihe Leadership Team was held on May 12,2011 in Toronto, and the established
Leadership Team is now fully committed to the development of an Ontario-based WARN program.

Exa m ple WARN P rog ra mlS ce n a rio
Events such as 9/11, the 1994 Northridge earth-quake, the 1997 Red River flood, and Hunicane
Katrina in 2005 identified a need for water and wastewater utilities in the USA to create intra-state
mutual aid and assistance programs, and further discussions are ongoing with developing inter-state
agreements between state WARN progmms. WARNs were developed because Water and Wastewater
utilities require specialized resources; critical infrastructure depends on water services; and promoting
mutual aid/assistance meets with emergency preparedness and response requirements.

ln 2006 four States implemented WARNs (Florida, California, Louisiana and Texas) and currently forty
seven American States and the Province of Alberta have developed and implemented WARN
initiatives. Delaware, Mississippi and Alaska have not yet fully implemented a WARN, but have started
the process.




Report Page 2 of 5                                                                             June 9, 201 1
                                                           Ontario WaterMastewater Agency Response Network
  Lake Huron
    Pr¡mary lvater Supply   Sysleñ
                                         Ëtr                                               File No. H1712011

wARNs have been used successfully in response to many incidents including:
     .     2005 Hurricane Katrina (FIaWARN)
     o     2008 Detroit Oregon Blizzard (ORWARN)
     ¡     2008 Waterbome Salmonella Outbreak Alamosa CO (CoWARN)
     ¡     2009 lce Storm (ARWARN, TNWARN, KYWARN)
     o     2010 Baja Califomia Earthquake (CaIWARN

ln 2008 the AWWA studied the benefit of utilities participation in a WARN. The study included literature
reviews, consultations with utiliÇ managers and a survey. Seventy eight utilities responded to the
survey; a significant number were located in North Eastern USA, 11o/o ol water utility respondents
represented utilities which served a population greater than I million and 16% of the wastewater
respondents represented utilities which served a population greater than 1 million. The findings include
the following:
    o      82o/o of the 76 respondents provided mutual aid and/or assistance in the last 20 years. The most
           common forms were personnel (86%), generators (38%), other equipment (67%), vehicles
           (49o/o), other parts and supplies (35%), laboratory services (17Vo\. Financial aid, chemicals, and
           water, were less common (all11o/o or less)
    o      The costs to participate in a WARN, exclusive of the cost of actually providing mutúal aid,
           includes staff time to develop resource listing for databases and legal and planning costs to
           establish and maintain participation.

Based on the information available at this time, the following has been identified as potential benefits to
participation in the proposed Ontario WARN program:
    o     Establishment of an Ontario WaterMastewater Agency Response Network (OnWARN) is
          encouraged by the Ministry of Environment, Emergency Measures Ontario and Environment
          Canada, as the initiative supports voluntary Federal and Provincial programs aimed at
          strengthening resiliency of Canada's critical infrastructure. The support of a large utilities such
          as Toronto, London, and Windsor would likely influence other utilities to become members and
          thereby strengthen the resiliency of the Ontario WaterMastewater sector as a whole.
    o     Establishment of a standard mutual aid agreement with other water utilities will help utilities to
          better predict, track and recover costs associated with providing and receiving mutual aid.
    o     The mutual aid agreement template developed as part of the OnWARN initiative can be
          extended to other parties. The Kansas mutual aid network KASMAP includes gas and electric
          utilities. The New Hamshire mutual aid network (NHPWMA) includes other public works
          departments such as transportation and building inspectors.
    r     An OnWARN would provide an additional forum for municipal water and wastewater utilities to
          network, and share operational and emergency preparedness information with other utilities.
          There is an opportunity to work collaboratively, share information and pool resources in the area
          of emergency planning, as well as the opportunity to develop and participate in joint training
          sessions and exercises.


Report Page 3 of 5                                                                                June 9, 2011
                                                              Ontario WaterMastewater Agency Response Network
                                      Agenda   ltem#   Page#




  Iake Huron
   Primary Water Supply   Sy{em
                                      trril                                                  File No. H17//2011



As evidenced by its successful implementation and use in the United States and the Province of Alberta,
the WaterMastewater Agency Response Network program is seen as a potentially significant benefit to
water and wastewater utilities in Ontario. Board staff are cunently participating in the development of a
program and template agreement for and Ontario-based WARN prog!?¡m, along with other municipalities
such as Guelph, Sudbury, Peterborough, Durham, Waterloo, Niagara, Windsor, Toronto and Midland.

The Board's endorsement of the development of this program will be beneficial, and afford the
opportunity for the regional water systems to showcase the program to the area municipalities.




 Division Manager, Regional Water   Supply                ( Directgf of Water & City Engineer




                                                               Pat McNally, P. Eng.
                                                           Chief Administrative Officer


Attachments:
          Appendix A: W.A.R.N. Frequently Asked Questions




Report Page 4 of 5                                                                                  June 9, 201 1
                                                                Ontario WalerMastewater Agency Response Network
                             WffiRNrËiË
                              WATEß /WASTEWATEß AGENCY RESPONSE NETWOßK


                                                     WARN FAQ
                                                   Updated May 5,2010

1.   What is a WaterMastewater Agency Response Network (WARN)?
     o   A WARN is a network of utilities helping utilities.
     o   A WARN program uses a mutual aid and assistance agreement that allows utilities to cross jurisdictional
         boundaries to provide aid and assistance(personnel, equipment, and other resources) in preparing for,
         responding to, or recovering from an emergency.
     r   Participation is voluntary; there is no obligation to respond.


2.   Why is a WARN important? What is the purpose of a WARN?
     ¡ A WARN establishes an agreement and protocols to access specialized resources such as knowledgeable
       water and wastewater utility personnel or utility specific heavy equipment, tools and supplies.
     o A WARN provides a forum for establishing and maintaining emergency contacts.
     o   A WARN can facilitate training.
     ¡   A WARN helps fill the need for personnel and resources before the arrival of government aíd.


3.   What are the benefits of a WARN?
     o There is no cost to participate.
     ¡   WARN is like investing in a no cost insurance policy to enhance access to specialized water and wastewater
         resources.
     ¡   WARN increases emergency preparedness and coordination.
     o   WARN provides a single agreement to access resources statewide.
     o   WARN expedites arrival of aid (don't have to work out the administrative items; the agreements and WARN
         protocols work them out in advance for you).
     .   WARN agreement contains indemnification and worker's compensation provisions to protect participating
         utilities and provide reimbu rsement protocols.
     o   WARN collaborates and responds to the needs of the public and private utility members.


4.   How does a utility get assistance during an emergency?
     r  The WARN member who needs help identifies the resources needed to respond.
     ¡  The WARN membei in need can either directly contact a fellow WARN member who has the necessary
        resources or use a state specific process of requesting aid.


5.   Are member utilities required to respond and send resources?
     .   There is no obligation to respond.
     o   lt is up to the lending utility to determine if resources are available and if it can send the requested resource.




                                                        Page 1   of4
                                            American Water Works Association
6.
                                                      E.läj
      What happens if a utility sends resources and needs them back?
      o Under no circumstances is a utility to send resources if it impacts their ability to manage daily operations or
          manage response to its own emergency.
      o   Resources remain under the authority of the sending utility, and as such can be recalled any time.


7.    What happens if equipment on loan is damaged or stolen?
      o Articles Vll, Vlll, and lX of the sample agreement offer a framework for how to manage the issue of loss or
          damage with clear identification of cost reimbursement, dispute resolution, and indemnification.


8.    Are WARN mutuat aid and assistance activities eligible for FEMA reimbursement?
      o   FEMA reimbursement may apply only after a Presidential declaration of emergency.
      r   FEMA-specific requirements related to WARN include:
            o The agreement was in effect p¡lg¡ to the response/deployment to the incident.
            o The assistance must be requested by the utility ín need;
            o The work performed, supplies used and materials consumed are directly related to the disaster and
                is otherwise eligible for FEMA assistance;
                The entity can provide documentation of rates and payment for services, if requested; and


9.    Will a utility be reimbursed for the use of their resources?
      o While a utility may offer assistance free from reimbursement, Article Vll of the sample agreement details
          how a utility that sends assistance is reimbursed by the utility in need.


10. How is WARN different from an existing statewide mutual aid program managed by emergency
    management?
    o Statewide mutual aid/assistance agreements typically require a declaration of "emergency' by a local and/or
      state officialto activate the agreement; WARN agreements do not require the declaration of an emergency,
      saving criticaltime in response to needs identified by the utility.
    o Statewide programs typically do not include private utilities; WARN agreements do.
    . Statewide agreements are managed by the state emergency management agency;WARN is managed by
          utilities.


ll.   ls WARN help available for disasters other than hurricanes or earthquakes?
      o   WARN is avaílable ín all types of emergencies, whether they are small, medium, or large. WARNs have
          been activated to respond to a wide variety of emergencies such as fires, floods, and water supply
          contamination as demonstrated in the report Economic Benefits of Forminq & Participatinq in WARN.
      .   Signatories to a WARN agreement can provide and/or request assistance any time their system needs
          emergency assistance.


12. Who should be involved in helping develop and sustain a WARN?
    . Utility owner/operators with varied professional association representation
    o State water and wastewater primacy agency (State health, environmental protection, etc.)
    o State emergency management and/or homeland security agency
    . US EPA region representation



                                                       Page2ol4
                                           American Water Works Association
                                                       ttr.lffi
13. What help is available to form a WARN?
    o AWWA reporl- Utilities Helpinq Utilitíes: An Action Plan For Mutual Aid and Assistance Networks for Water
      and Wastewater Utilities provide the foundation for the formation of a WARN program.
    o EPA can often help wíth post workshop support on a case-by-case basis, depending on available funding
      and the specific needs of-the program. Support could include facilitation of meetings and workshops,
      administrative support, and answer technical questions.


14. How do WARNs work across state lines?
   o   The key issues of interstate response are differences in tort liability, immunity and licensing requirements.
   o   Currently, the Emergency Management Assistance Compact (EMAC) is being used by all fifty states and the
       District of Columbia to share resources across state lines, because it already addresses the key issues.
   o   AVVWA is a member of the EMAC Advisory Gouncil with intent to facilitate greater cooperation and
       coordination between WARN and EMAC.
   .   The water sector is evaluating issues related to improving interstate aid while working with the
       administrators of EMAC to ensure that it can be used effectively for the water sector.


15. Existing WARNs do not appear to be legal entities. Should they acquire non-profit organization status?
    o At this point none of the WARNs have established themselves as a separate entity requiring any special
       status, as there are no funds transferred between the members and the WARN.
    ¡ ln several instances utitities or associations have acted as a grant recipient on behalf of the WARN, thus
       acting as the fiduciary agent, to support training, website, and related activities
   r   Existing WARN programs are free for utilities to participate.


16. Are funds available to support the WARN efîort?
    o Each existing WARN program has handled things differently, with many using voluntary time/services that
       may be supplemented with funding from various sources, such as supporting associations or state primacy
       agency grants.
    r The collaboration with primacy and emergency management agencies on the WARN program may lead to
       opportunities to fund specific WARN activitíes.
    ¡ Some existing WARNS have used Homeland Security and US EPA grants. Others have obtained local
       grants.


17. What does managing a WARN entail?
    . Establishing regular meetings of the leadership team and/or steering committee which can be done via
      phone conferences, web conferences or face to face.
    o Coordinationwith professionalassociation meetings.
    o Facilitate annual meetings or quarterly/monthly conference calls of the steering committee to address
      develop issues, plan WARN activities.
    o Manage outreach and marketing of the WARN program for new membership, including 'holding" the
      agreements
    o Services can be managed with in kind contributions from the members or by using grant funds.

18. How do we get a website going?
    o AWWA has reserved the domain name for every state, Canadian Province, and Mexico.
    . A\A/WA will release the domain name when a steering committee has been established and is prepared to
       initiate development of a website at no charge.
    . Other existing WARNs have offered their source code free of charge to emerging WARNS.

                                                      Page 3 of 4

                                          American Water Works Association
                                               Aoençla ltem #




19. lf a resource database is established, how is it updated and who updates it?
    . Many WARN websites include resource databases that are maintained by the member utilities.
    o Reminder e-mails are sent to the member utilities to remind them to update the information.
    o A\Â/WA's Water and Wastewater Mutual Aid and Assistance Resource Tvpino Manual provides consistent
        terms and definitions for specific resources to expedite both requests and responses and has been
        recognized as a resource by EMAC.


20. How do WARNs support training and exercises?
    o   WARNs historically have held annual meetings which include training components.
    .   A small fee for the training has been charged to pay for material duplication and food.
    o   Each WARN has created a set of its own best practices, including FIaWARN's review of lessons learned
        from the 2005 hurricane season.
    o   Nationally, a variety of supporting training has been or is being developed including NIMS and can be
        conducted at WARN programs.
    .   Many WARN programs have conducted tabletop exercises based on EPA's WARN Tabletop Exercise
        Facilitator Guide.


21. How do you get members to buy-in to the WARN concept?
    o While the benefits of participating in a WARN is obvious to many, others require more explicit evidence.
    o A sampfe flyer is included in the Action Plan, and the report Economic Benefits of Formino & Participatinq in
       WARN was prepared to help a utility make the 'business case" for leadership.
    r WARNs are encouraged to participate in professional association programs to announce WARN activities.
    r Presentations may be required to elected boards.
    .   Copies of presentations used by existing WARN may be available.
    r   AWWA has published a Webcast and articles on the subject.


22. How does a WARN operate before, during, and after an emergency?
   .    Some existing WARNs created by-laws along with the agreement that help outline the pre-emergency
        governance and activities.
    o   Each WARN is encouraged to develop an Operational Plan that outlines how it functions during and after an
        emergency. lf the WARN does not have by-laws, the Operational Plan would include pre-emeigency
        information as well.
    o   A Sample Operational Plan is located on www.NationalWARN.orq and is consistent with the National
        lncident Management System lC 510 training module on mutualaid.


22. How does the WARN integrate with local Emergency Management Agencies?
    o The relationship between WARN and localemergency management agencies is addressed in the WARN
       Operational Plan WARNs are encouraged to meet with local and state emergency management agencies to
        discuss how to provide representation at the local and state emergency operation centers.
   o    While WARN members can request aid dírectly from each other, WARNs should communicate mutual aid
        and assistance activities with the local and state emergency management agencies to minimize potential
        duplication of effort and coordinate security and access needs.




                                                    Page 4   of4
                                         American Water Works Association
                                                                 #


                                                   EE
                                                   Agenda ltem       Page #




  Lake Huron
     Primary Water Supply System                                                                  File No. H1712011



                           To:      Chair and Members
                                    Lake Huron Primary Water Supply System Joint Board of Management

                      From:         John Braam, P.Eng.
                                    Director of Water & City Engineer

         Meeting        Date:       June 9, 2011

                  Subiect:          Surge Tank Compressors and Liquid Level Sensors Replacement Project        -
                                    Tender Award




That the following actions be taken with regard to project LH1604 - Surge Tank Compressors and
Liquid Level Sensors Replacement Project:

a)   The Board of Management for the Lake Huron Primary Water Supply System ACCEPT the bid for
     the supply and installation of new air compressors and liquíd level sensors for the hydro-pneumatic
     surge tanks as submitted by Díelco lndustrial Contractors Ltd. in the total amount of $354,950.00
     plus HST; it being noted that the bid submitted by Dielco lndustrial Contractors Ltd. was the lowest
     of five (5) received and meets the tender specifications and requirements;

b)   That an additional $52,272 BE APPROVED for a total approved budget of $452,272 for the Surge
     Tank Compressors and Liquid Level Sensors Replacement Project with increased funding provided
     from the Capital Reserve Fund;

c)   That the Chair and Chief Administrative Officer BE AUTHORIZED to execute an agreement with
     Dielco lndustrial Contractors Ltd for the supply and installation of the proposed Surge Tank
     Compressors and Liquid Level Sensors; and,

d)   That the approval given herein be conditional upon the execution of an agreement and issuance of
     a Purchase Order relating to this Tender #T11-20.



October 1, 2009                    Hydraulic Transient Analysis
January      20,2011               Surge Tank Compressors and Liquid Level Sensors Replacement Project




Report Page 1     of3                                                                                     June 9, 2011
                                                                              Surge Tank Compressors and Level Sensors
                                       trtr
                                        Agenda ltem   #   Page #

          (\
          È
  Lake Hurot't,                                                                        File No. H1712011
   Primary Watet Supply System




On September 10, 2009, Genivar Consultants submitted their report for "The Hydraulic and Operation
Study of the Lake Huron Water Transmission Sysfem; Hydraulic lesfs, Analysis and
Recommendations - Final Report." ln this report, Genivar preformed operational tests and computer
modeling for hydraulic pressure transients. These were used to study and update flow and surge
control systems and strategies for the Lake Huron water treatment plant and the McGillivray booster
pumping station. The report considered appurtenances such as air compressors and surge tank level
controls at both facilities.

The existing air compressors supply air for the surge tanks (also known as hydro-pneumatic surge
tanks). The study reviewed the sizing of the air compressors with respect to the anticipated changes in
liquid levels in the surge tanks with one to four pumps in operation. The replacement compressors can
delíver a sufficient level of service with a lower air supply and power consumption rating, based on the
hydraulic tests and analysis.

Genivar noted that changes to the Electrical Code would require substantial electrical upgrades if new
similar air compressors were provided with equivalent capacity. Further, the upgrades would have to be
undertaken immediately in order to address the risks associated with the current system. Using its
experience with several large tank and compressor designs on other projects, Genivar examined the
option of using lower-Capacity compressors for the LHPWSS and found that this option would be the
most cost effective solution for the LHPWSS, and would not increase the risk to the plant provided that
appropríate control modifications were also undertaken.

Genivar understood that the liquid level control system for the surge tanks are not being used as it was
originally intended, with different level control probe sets based on the number of pumps in operation.
The controlled released of excess pressures from the surge tanks at the water treatment plant also was
examined and it is preferable to minimise venting since this air had to be compressed at some cost.



On Wednesday April 13, 2011, the tender for the Surge Tank Compressors and Líquid Level Sensors
Replacement Project closed. Below is a summary of the tender results (excluding HST, but including a
$35,000.00 contingency allowance).

         Dielco lndustrial Contractors Ltd.                                   $354,950.00
         Wellington Construction lnc.                                         $373,200.00
         Belmont Group                                                        $417,690.00
         CDI Contracting lnc.                                                 $437,603.00
         CRA Contractors Ltd.                                                 $444,140.00

All bids received complied with the tender process and project requirements. lt is the recommendation
of staff that the bid submitted by Dielco lndustrial Contractor Ltd. in the amount of $354,950.00
(excluding HST) be accepted.




Report Page 2 of 3                                                                             June 9, 201 1
                                                                   Surge Tank Compressors and Level Sensors
          s                           trtr
                                      Agenda ltem   #   Page #




 Lake Huron                                                                             File No. H1712011
   Primary Watet Supply Sptem




Capital Project LH1604 Huron Surge Protection (Air Compressors) Project has a totalapproved budget
of $400,000.

Summarv of Proiected Costs:
            Engineering                                                     $  89,500
            Construction                                                      354,950
            Net HST (@1.76%)                                                   7,822
            Total                                                           $452,272

Summarv of Proiect Costs to Date:

                     Engineering                                          $50,383.65
                     Construction                                              $0.00
                     Total                                                $50,383.65

Proiect Schedule:

Tender Close                                                                  April 13,2011
Tender Award                                                                   June 9, 201 1
Construction Start                                                            June 27,2011
Substantial Completion                                                    December 31,2011




lnformation for this report was provided by Brian Lima, P.Eng. Capital Projects Engineer and David Scott,
A.Sc.T. Capital Projects Coordinator.




 Division Manager, Regional Water Supply                         of Water & City Engineer




Report Page 3 of 3                                                                             June 9, 2011
                                                                   Surge Tank Compressors and Level Sensors
                                                             Agcnda ltem      t PaO¡ *

                                                             L,!Lr*J
                            P.O. Box 250 14 Mi¡l Avenue, Zurich Ontario - NOM 2T0
                                  PHONE: (519)236-435t FÂX: (519) 236- 4329
                                             www.town.bluewater,on.ca


Mr. Andrew Henry, P.Eng.                                                            March 29,2011
Division Manager, Regional Water Supply                                  SENT VIA ELECTRONIC MAIL
Lake Huron & Elgin Area Vy'ater Supply Systems
c/o City of London Regional Water Supply Division
235 North Centre Rd., Suite 200
London,ON N5X487

RE: Hensall lVater Usage Increase Investigation

Dear Andrew,

Thank you for taking the time to meet with Bluewater, B.M Ross & Associates, and Veolia staff
on March 18 to review Bluewater's current investigation into elevated water usages in the
Hensall distribution system.

As discussed, in November of 2010 it became apparent that water usage in Hensall has increased
since connecting to distribution from the Lake Huron Primary Water Supply System in January
of 2W. Attåched to this letter is Figure I presenting monthly water usages for periods before
and after connecting to the LHPWSS supply. The three year (2006 - 2008) monthly average
usage prior to connection was 16,653 m' while the cunent monthly average (2010 - 2011) is
29,820mr (2009 data was omitted from average value calculation due to several anomalies in the
data). This represents an increase of 13,167 m3 per month, or under the current water rate
structure an annual cost to Bluewater of approximately $57,000.

Bluewater has engaged the services of B.M Ross & Associates to assist with investigating
potential sources ofthe increased usage. To date we have investigated four possible causes
including increased residentiaUcommercial water usage, a leak in tlie system, a metering error in
the old Hensall well system, and a metering error in the LHPWSS owned Airport Road meter.

Increased Commercial/Residential V/ater Usage
Attached to this letter is Figure 2 presenting the total annual usage of metered commercial
customers in the Hensall distribution system. The2007 - 2010 annual average use for monthly
and quarterly commercial customers is 8,886 m3 and 26,073 m3respectively. A review of the
annual commercial water usages prior to and after connecting to the LIIWPSS supply does not
reveal any significant increase. As such, we do not believe that the increased water usage is a
result of increased commercial water use.

Residential customers in the Hensall distribution system are not metered, however changes in
water use patterns can be determined by reviewing annual sewage flows. Presented in Figure 3
are the monthly sewage flows to the Hensall sewage treatment plant from 2007 - 2010. The
average monthly flowprior to connecting to the LHPWSS supply was 15,836 m3. After




               Valuing our unique qualíA af life, recognizíng our diversity, respecting our traditians.
                                       E.lËl
connection, the average monthly has decreased slightly to 14,146 m3. Based on this information,
we do not believe that the increased water usage is a result of increased residential water use.

Distribution System læak
To date a formal leak detection program has not been undertaken for the Hensall distribution
system, however informal inspections have occurred. During the fall flushing program the
municipality's contract operating authority (Veolia Water Canada) instructed its flushing crew to
pay particular attention to ponding or an¡hing visual cues that might suggest a leak in the
Hensall system. After flushing every section of the system they reported that there were no signs
of water escaping. The Village of Hensall is located on clayey soils, and we feel that a leak of
this magnitude over the past two years would most definitely have surfaced.

It is possible that a potential leak could be escaping through the sanitary or storm sewers. It is not
Iikely that the leak is entering the sanitary sewers based on the negligible change in sewage flows
as discussed above. To date we have been unable to observe the storm sewer outlets for the
village due to snow cover and spring melt. When the weather permits we plan on reviewing each
storm sewer outlet to observe if there is an increased flow.

Error in Hensall Well System Meter (Pre-2009ì
We have reviewed with Veolia the possibility of a meter error occurring in the old Hensall
distribution system prior to connecting to the LHPWSS (i.e. was the meter was reading too low
leading to a lower than actual average water usage?). Veolia has informed Bluewater that the
meter for the well distribution system was a small diameter mechanical meter that was changed
out annually, with each new meter properly calibrated prior to installation. As such, we do not
think that it is likely that there was an error with the meter reads for the former well distribution
system.

Error in the Aimort Road Meter (Post-2009)
We understand that the as constructed drawings indicate the current flow meter measuring
Hensall water usage is an 8-inch magnetic meter. We also understand that this size of meter was
chosen based on flows that were anticipated to be present in the system after Greenfield Ethanol
connected to the distribution system. As you are aware, Greenfield Ethanol is not cunently
connected to the distribution system and has not provided a timetable for when they reasonably
expect to construct in Hensall. As discussed at our March 18,2011 meeting, the current flows for
the distribution system are much less than were anticipated when the meter was selected, and
could potentially lead to errors in the flow reading.

Enclosed at the end of this package is flow data for Hensall from 2006 - 2008 which we feel is
generally representative of typical flows for the distribution system. We are requesting that you
and your staff review the flow information, and determine if a more appropriate meter size could
be used to record Hensall water usage until such a time that the flows anticipated from the
Greenfield Ethanol plant are realized. We also request that you review the operating philosophy
of the Hensall supply and provide any suggested changes that you feel may optimize metering
accuracy.

For Bluewater's purposes, it is beneficial for us to fully rule out a metering error as the source       of



              Valuing our unÍque qualíty of life, recognizing our diversig, respecting our traditions.
                                            ffiË
the increased water usage. We are prepared to undertake an extensive leak detection program to
determine if there is/are leaks in the system. However, this is a costly approach, and it would be
beneficial for all other potential sources of the increase to be ruled out before such an investment
is made.

I look forward to our continued cooperation              as we work through this current issue. Should you
have any comments or concerns, please do note hesiøte to contact me.


Best regards,




U tilítíe s S up e rint e nde nt

Municipality of Bluewater
Phone: 519 -2364351 ext. 221
b.kittmer@ town.bluewater.on.ca

Cc:      I¡ri   Wolfe CAO, Municipality of Bluewater
         Steve Burns, B.M. Ross & Associates
         John Walker, LHPWSS

KBK:kbk




                  Valuing our unique quality of life, recognizing our diversity, respecting our traditians.
                                                                    E'lffl

                                                     Figure 1: Hensall Water Usage (2006 - 2011)

    45,000                                           Janu.y 2009 - Conmcüü   b
                                                     üþ L}PWSSsl¡Dply
    40,000
                                                                                                               |           2g,g2o m3/month
    35,000

    30,000
o
P es,ooo
lt,
=a 20.000
c
E
    15,000

    10,000
                                16,653 m3/month                                                                                       3   mottB FDorÞd w¡lh Eoès ol 0
                                                                                                                                      D3,   O   m3, and   <lot   m3
    5,000

         0
             .s6 .s6 .db..s6 .o6 .s6         .ó .ó .S ..S .S .S .sS ,& .ss .o0 <g .sS .59 ¡59 .59 .ss .õs .ss .rs .rs .rs .\S .\s .\s .+
        :""   Sg^   Sd   ¡ù'   *,oQ   çd         *g\ :l' uøQ *d E" St ¡g\ 9'*,øa Ud :"" .S $\ :st aøe Ud 5uo {g^ .¡"{ >st øøa èd gs
                                           r"" +.t




                                            Valuing aur uoþue qualry o{ life, recogn¡zing oul diverslty, rêspêcling our tradilians.
I




                         Flgure 2: Hensall iletered Water Usage (2007 - 2010)

        3s,000



        30,000



        25,000



    o
    ð   20,000
    E
    3
    Ë   ,u,ooo


        10,000



        5,000



            0
                                                                     2009
                                                                     Ye¡r

                               I   lvlonthly lvbteredCuslomers         I   Quartêrly Meteied Customers




                 Valu¡t g out unigua qualily   oî   ltte, te@gnlàng our divetsity. raspecfttg our tnd¡tionâ.
                                                     lr.lËl

                                      Figure 3: Hensall Sewage Flows (2007-2010)


                                       Ja¡mry ã¡09 - Coñæcliø     b                   I
                                       mlrlPwsssl¡pprt




                                                                      -¡                                                         14,146 m3/month
     20,000
B
o
tr   15,000
ç)
E

     10,000


     5,000



              .s .ó .s .s .s
          gs ¡'ó gtr :s'
                                 .s    .ss drs .s9 .ss .os ..ss .sg .d, .ú .sq .sg ,s9 .ts .rs .rs .,rs .\s ñ .s
                           uøa ud     >A çó ¡g\ rù øE èd yÑ $ +"{ ls' *,oa *d rô *s' .s"{ \ù' ød èd )ô




                              Vãluing aw únique qualíly   ol   life, recogntzißg our dìve,slly, rêspecliru   a.r   trâdltians.
 Hensall Well Svstem Flow lnforniation

2008

          Month      I*{!É¡f"€r.ti#}¡T*iälü*',*å*8#,*&ffi,**tf,r téilÁllå'fai frlötit.ì-ì,i:.8$?ilir                                       i
                                                                                                                                               j:t".::a:".!¿:Í:;;t4!\1í...,\1:àrtiiüüir"È¡.:äj


                    Averaoe Maximum Monthlv AVèiäöè Máxlrñiiiù Ifi¡ihrlitü                                                                                              Max¡muir
                      Dailv     Dailv    Total:.                               .ilDä¡lV.,.]          Däilv,                   'iîlálili           Dâ¡IV,                       DâIlv:"
                    1000rm3' tl000 m3l 11000 m3l                              ,rr (tñ31.1            fm:ìl !i'ìi: iitl:i:iÌl                           /s)                     fLliì         r:'

 Jan'08               0.545           0,800                   16.892           544.90               800.00 1 6892.0(                               6-3      1                  9.26
 =eb'08               0.585           0.831                   16.971           585.21               831.00 ,l6971 .0(                              6.77                        9.62
 Mar'08               0.553           0.815                   17.150           553.23               815.00             17150.0(                    6.40                        9.43
 \or'08               0.556           o.767                   16.694           556"47              767.OO            16694.0t                      6.44                        8.88
 vlav'08              0.529           o.704                   'f 6.385         528.55              704.OO            I 6385.0r                     6.12                        8.15
 Jun'08               0.520           o.759                   15.607           520.23              759.00            15607.0C                      6.02                        B.7B
 ,ul '08              0.518           0.799                   16.073           518.48              799.00            16073.0C                      6.00                        9.25
  uo'08               0.554           0.926                   t 7.1 BB         554.45              926.00            17188.0C                      6.42                        1o.72
  ep'08              0.462            0.624                  13.848            461.60              624.OO            13848.0(                      5.34                        7.22
)ct'08               0.498            0.887                  15.449            tgti.35             887.00            15449.0(                      5.77                        1f).27
\,lov'08             0.458            0.650                  1s.747            458.23              650.00            13747.0(                      5.30                        7.52
lec'O8               0.697            1.071                  21.608            697.03           1071.00 21608.0(                                   8.07                        12.40
Total                              197.612                                                     97.6r 2.000                                                        N/A
\veraqe Dailv                       0.540                                                          539.923                                                       6.249
Vlaximum Daily                        1.071                                                    1.071.000                                                        't2.396

2007

          Month    ê,.ë.1-$â?Æffif.ìís,ii                                  iïîàä1ëtt.w¿Ìêi:filóB.lilâ{ä,$r1t*,;ry
                    Averaoe Mäximum MonthlV                                    Àtió;àÈä Maiiiräiì'ìä                   AvéraoÊ Max¡mum
                      DãIIV     Dailv   Töfal                                     á¡ly]r'    pâltyti 1*ttâ1..ì,i; iiiDâ¡lü.:tì   DãIlv
                   (1000.m3) t1000 mÍ 11000im3                                    ä3}li:i  , ¡m:l       .ir{ltl3}lii;ì  lLlSìr':  (Us);,
lan'O7               0.509           0.662                   't   5.783        509 00      662.00 '15783.0C              5.89      /.bb
Feb'07               0.536           0.681                   15 001            536.00      681.00 15001.0c               6.20     7.88
Var'O7               0-569           0.835                   17.631            569.00      835.00 17631.0C               6.59     9.66
{or'O7               0.526           0.820                   15.791            526.00      820.00 15791 .0C              6.09     9.49
Vav'O7               0.557           t.1 18                  17 -281           557.00     1 t18.00     17241 .OC         6.45    12.94
lun'07               0.667           1.099                  20.010             667.00     1099.00 20010.0c               /./2    12.72
Jul'07               0.639           0.887                   '19.805           639.O0      887.00 19805.0C               7.40    10 27
\uo'07               0,649           o.92il                  20.'t07           649.00      923.00 20107.0C               7.51    10.68
3eo'O7               o_665           0.842                   19.952            665.00      842.00      1 9952.0C         7.70     9.75
fct'07               o 599           1.011                   18.574            599.00     f011.00 18574.0(               6.93    't1.70
tlov'07              0.550           0.755                   16.504            550.00      755.00 16504-0(               6.37     4.74
)ec'O7               0.518         o.704                     16.o58           5 t 8_O0             704.OO           16058.O(                      6.OO                         8.   t5
Total                             212.497                                                     212.457-OOO                                                         N/A
Averaoe Dailv                      0.582                                                           582.000                                                      6.736
Maximum Dailv                        1.1 18                                                    1   .1 1 8.000                                                   12.940

2006

        Month                   íñráÍ;tii,iia:t\fï.!.V;ii!tr;i;.,i;.tzîi             ö.t¡ll
                   iAvérâqé: Max¡mum MonthlV                                       raog M¿í1¡niliîh                                       :^v€íiâri1i|                 Máiiräiirñ
                      Dnllv       . t)¡ih    Iciläl::                                                                                           iDållv
                                                                                  4T¡           ,llDällilri::il    ì¡¡i:l'l   ellAli                                     ;i DàllV:r,
                   lÌ1000:rm3l fl;000 m3l l100O,m                                 ñgliJ       ¡lii;llrn3liliiair     iìi:lrñ3)ì           ìi;Ì{hls},:.                     r   flls)
Jan'06                0.513         0.560    5.897                            512.81               560.00          1 5897.0C                      5.94                         6.48
:eb'06                0.499         0.563    3.964                            498.71               563.00          1 3964.0C                      5,77                         6.52
Mar'06                0.480         o.547    4.AA7                            4AO.23               547.OO          14887.Or                       5.56                         6.33
Aor'06                o.494         0.614    4.8t1                            493.70               614.00          1481 1.0C                      5.71                         7   .11
Vav'06                0.51 1        0.715    5.832                            510.71               715.00          15832.0C                       5.91                         8.28
Jun '06               o 580         0.907    7.397                            579.90               907.00          17397.OC                       6.71                         10.50
Jul '06               0.540        o.749     6.725                            539.52               749-OO          16725.OC                      6.24                          8.67
Auq'06                0.503        0.678     5.594                            503.03               678.00          1 5594_0C                     5.A2                          7.85
SeÞ'06              0.499          0.733                          4s62        498.73               733.00          1   4962.00                   5.77                          8.48
fct'06              o.497          0.715                          5.417       497.32               715.00          15417.0C                      5.76                          B.2B
tJov'06             0.529          0.812                          5.873       529.1 0          812.00              1 5873.0C                     6.12                          9.40
)ec'06              0.550          0.763                          7.O37       549.58           763.00              17037.O(                      6-36                          8.83
foþl                              188.396                                                     88.396.000                                                      N/A
Averaoe Dailv                      0.5f 6                                                      516.112                                                       5.974
tl/laximum Dailv                    0.907                                                      907,000                                                       10.498


                   Valuing our uniqrie quality of life, recogniz¡ng aur Civersity. respecting our traditians

				