Project Report for Convergence of NREGA and KVK

Reviews
Shared by: quearess
Stats
views:
106
rating:
not rated
reviews:
0
posted:
8/12/2009
language:
English
pages:
0
Project Report for Convergence of NREGA and KVK District : Burdwan 1. District Resource Group (DRG) A District Resource Group (DRG) has been constituted with the following Officers : 1. District Magistrate & DPC NREGS. 2. ADM & AEO Zilla Parishad. 3. District Nodal Officer NREGS. 4. PD, DRDC. 5. DFO, Burdwan Division. 6. DFO, Durgapur Division. 7. Principal Agricultural Officer, Burdwan. 8. Budbud KVK. 9. Dy. Director, ARD. 10. Asst. Director, Fisheries. 11. Superintending Engineer, Irrigation. 12. District Engineer, Zilla Parishad. 13. Exe. Engineer, Agri Irrigation. 14. Exe. Engineer, Minor Irrigation. 15. Asst. Director, Sericulture. 16. Asst. Engineers District NREGS Cell. A similar Committee has been constituted at the Block level constituting of : 1. BDO & BPO NREGS. 2. Jt. BDO & Jt. BPO NREGS. 3. FEO. 4. BLDO. 5. BL & LRO. 6. Asst. Prog. Officer NREGS. 7. Agril. Dev. Officer. Page 1 of 9 8. 9. SAE (RWP)—Nodal technical person for convergence. Block Nodal Officer, SGSY. 10. Block LGS. 11. Block SGSY Superviser. 2. Name of Pilot Block : Galsi-I Development Block 3. Planning : At the District Level Meeting held with Budbud KVK held on 8-6-09, which was the first district level meeting, the following draft plan was made : A Draft Plan was made in consultation with KVK, CADC, Department of Agriculture, Department of Animal Husbandry, Department of Fisheries which is as follows : 1. Krishi Vigyan Kendra : KVK will tie up with NREGS in 3 phases : Phase – I : Training : Training will be organised at KVK, Budbud, Burdwan District for Block Sub Assistant Engineers, Technical Assistant, Nirman Sahayak of Gram Panchayat who will implement the scheme with advance scientific application and technology. Annual Allocation from NREGS : Rs. 50,000/- Phase – II : Development of 18 Area of Demonstration Plot : The Demonstration Plot / Farms of KVK in Budbud Gram Panchayat will be developed. Budbud Gram Panchayat will act as PIA. Annual Allocation of fund from NREGS : Rs. 19,50000/- Phase – III : District Cell will hold co-ordinating meeting with KVK & Block Development Officers after which details of Water Bodies reexcavated / renovated under NREGS in Page 2 of 9 2008-2009 will be analysed & Schemes will be identified which will be taken up by the concerned Gram Panchayats. KVK will provide technical support. Annual Allocation of fund from NREGS : Rs. 30,00000/- 2. Animal Husbandry : The Animal Husbandry Department will be doing convergence work of NREGS in 2009-2010. They will be using their departmental fund for works which cannot be taken up in NREGS. They will be developing the water bodies in NREGS around which they will be taking up departmental works. Annual Allocation of fund from NREGS : Rs. 100,00000/- 3. CADC : CADC will be converging with NREGS work especially in Horticulture, Orchard & Social Forestry Sectors. Annual Allocation of fund from NREGS : Rs. 10,00000/- 4. Fishery : District Fishery Department is keen in convergence programme. They have been supplied with the details of water bodies renovated & re excavated under NREGS. Annual Allocation of fund from NREGS : Rs. 50,00000/- 5. Agriculture : Agriculture Department will also be taking up schemes for convergence. They will take up NREGS support along with departmental Fund. Annual Allocation of fund from NREGS : Rs. 60,00000/- Page 3 of 9 4. Planning from KVK : Budbud KVK has submitted a plan which is as follows : Summary of the Action Plan of NREGS-KVK-Convergence for the financial year 2009-10 Work site at Krishi Vigyan Kendra, Burdwan under NREGS Name of the Block- Galsi-I SL Type of Scheme No of Scheme Expenditure on Man days( In Lac) 2.73375 0 1.1664 0 2.45025 6.98058 0 0 0 Name of the GP- Budbud. Other Exp (In Lac) 0.26625 0 0.09916 0 1.04975 0.27118 0 0 0 Total Exp (In Lac) 3 0 1.26556 0 3.5 7.25176 0 0 0 Mandays Generated 3375 0 1440 0 3000 8618 0 0 0 A. Water Conservation and Water Harvesting. B. Drought Proofing C. Irrigation Canals Including Micro & Minor Irrigation Works D. Provision of Irrigation Facility to land owned by SC/ST/Patta Holders etc. E. Renovation of Traditional water bodies including desiltation of Tanks. F. Development of Land owned by SC/ST/Patta Holder etc. G. Flood control and protection works including drainage in water. H. Rural Connectivity Road improvement. I. Any other Work. 3 0 1 0 1 1 0 0 0 Grand Total . 6 13.33098 1.68634 15.01732 16433 Page 4 of 9 Supplementary Annual Action Plan for the financial year 2009-10 under NREGS/WBREGS Work site at Krishi Vigyan Kendra, Burdwan under NREGS Sector-I Water Conservation and Water Harvesting Name of the BlockGalsi-I SL No AAP NO Name of the Scheme GP Name Sansad No Plot NO JL No/Mouza Name of the GP - BUDBUD Quan of work Total project cost(In lac) 3 Expenditure (Lac) Exp for Man days 2.73375 Other Exp(Lac) 0.26625 3375 Total Mandays 1 12/01/02/01/759 Water conservation and water harvesting -Excavation of pond in the KVK campus (3 nos) Budbud BudbudII 0 Budbud 55 m x 30m x 1.5m cum x3 nos Total 3 2.73375 0.266 3375 Page 5 of 9 Supplementary Annual Action Plan for the financial year 2009-10 under NREGS/WBREGS Work site at Krishi Vigyan Kendra, Burdwan under NREGS Sector-3 Drainage and Irrigatin Channel Name of the BlockGalsi-I SL No AAP NO Name of the Scheme GP Name Sansad No Plot NO JL No/Mouza Name of the GP - BUDBUD Quan of work Total project cost(In lac) Expenditure (Lac) Exp for Man days 1.1664 Other Exp(Lac) Total Mandays 1 12/01/01/03/205 Drainage and irrigation channel creation of drainage system from the water logged areas Budbud BudbudII 0 Budbud 2 km length x1m breadth x 1m avg. 1.26556 0.09916 1440 Total 1.26556 1.1664 0.0992 1440 Page 6 of 9 Supplementary Annual Action Plan for the financial year 2009-10 under NREGS/WBREGS Work site at Krishi Vigyan Kendra, Burdwan under NREGS Sector-5 Renovation of traditional aquatic bodies Name of the Block- Galsi-I SL No AAP NO Name of the Scheme GP Name Sansad No Plot NO JL No/M ouza Name of the GP - BUDBUD Quan of work Total projec t cost(I n lac) 3.5 Expenditure (Lac) Exp for Man days 2.45025 Other Exp(Lac) Total Manday s 1 12/01/02/05/364 Renovation of traditional aquatic bodies: Renovation of one existing pond like fencing, digging bund leveling etc. Budbud Budbud-II 0 Budb ud 1 ha with 2 feet digging . 1.04975 3000 Total 3.5 2.45025 1.04975 3000 Page 7 of 9 Supplementary Annual Action Plan for the financial year 2009-10 under NREGS/WBREGS Work site at Krishi Vigyan Kendra, Burdwan under NREGS Sector-6 Land Development Name of the BlockGalsi-I SL No AAP NO Name of the Scheme GP Name Sansad No Plot NO JL No/Mouza Name of the GP - BUDBUD Quan of work Total project cost(In lac) 7.25176 Expenditure (Lac) Exp for Man days 6.98058 Other Exp(Lac) 0.27118 8618 Total Mandays 1 12/01/02/06/167 Land development Earth filling of low areas of the building periphery and orchard areas Total Budbud BudbudII 0 Budbud 2 ha x 1m digging. 7.25176 6.98058 0.27118 8618 Page 8 of 9 5. Action Points : the following is the action point for convergence works among NREGS, KVK and SGSY. Sl. No. Date 30-6-09—3-7-09 Programme Training of SAE (RWP) of 31 Blocks by KVK to act as resource persons. Training of 30 beneficiaries of Budbud and Paraj GP on pisciculture by KVK and FEO. Training of 30 SHG Members on animal husbandry schemes by KVK & BLDO. Start of work of re-excavation of Ponds & drains at 1. 2. 3-7-09—6-7-09 3. 6-7-09—8-7-09 4. 30-6-09 demonstration plots at KVK by JC holders of Budbud GP. DM & DPC NREGS, Burdwan Page 9 of 9

Related docs
convergence or coexistence
Views: 3  |  Downloads: 0
Convergence-or-Coexistence
Views: 4  |  Downloads: 0
Digital Convergence
Views: 9  |  Downloads: 0
Convergence-and-IT
Views: 1  |  Downloads: 0
publ 3858 convergence of bas & it
Views: 0  |  Downloads: 0
project report
Views: 26  |  Downloads: 4
THE CONVERGENCE OF CONTRACT AND PROMISE
Views: 0  |  Downloads: 0
Convergence Chart Processing
Views: 0  |  Downloads: 0
Convergence Chart Processing
Views: 12  |  Downloads: 0
Other docs by quearess
Inclusion of settlement for past services
Views: 627  |  Downloads: 0
Transcript of United Nations Charter
Views: 151  |  Downloads: 0
Security Agreement for Buying Goods
Views: 171  |  Downloads: 3
Separation Agreement and General Release
Views: 570  |  Downloads: 22
MEETING PARTICIPANT LIST
Views: 234  |  Downloads: 5
Sample Executive Summary SanaSana
Views: 425  |  Downloads: 10
Transcript of Treaty of Alliance with France
Views: 176  |  Downloads: 0
Sample Executive Summary onlinephoto
Views: 465  |  Downloads: 8
Amendment to Contract
Views: 393  |  Downloads: 11
Transcript of Federal Judiciary Act
Views: 149  |  Downloads: 1
CORPORATE TAX RESOLUTIONS
Views: 312  |  Downloads: 9
President Woodrow Wilsons 14 Points info
Views: 807  |  Downloads: 1