					     Status FEC tester
               Topics:

               ●   electronics: prototype finished

               ●   Mechanics: prototype finished

               ●   burn in tester

               ●   readout: RCU II




ner Renfordt IKF                           1         TPC meeting, Oct 7th/8th, 2003, at CE
   FEC Tester Prototype                                         To PC
                            Signal
                            generator
                            board


                                        Controller board

                      Fanout board
             To FEC




                                        measurement board




ner Renfordt IKF                        2              TPC meeting, Oct 7th/8th, 2003, at CE
                   FEC Tester Prototype




ner Renfordt IKF            3        TPC meeting, Oct 7th/8th, 2003, at CE
                         FEC Tester Prototype


           Subcards of tester are tested individually

           Final test of complete system pending: delay due to inadvertant
           connection to power with reversed polarity.

           Still missing: bar code reader: in the process of beeing purchased

           question: at the test points only one voltage accessible
           Is it sufficient to read out the other voltages via the DCS features
           of the FEC? Otherwise we need an additional needle tester.




ner Renfordt IKF                         4                TPC meeting, Oct 7th/8th, 2003, at CE
                                    Mechanics
         Original idea:


                             Bar code reader
             Needle tester
                                                       Piston
                                    Flat cables
ower, readout                                              Tester
                      FEC


                                  Support


                                         Cable guide


ner Renfordt IKF                            5           TPC meeting, Oct 7th/8th, 2003, at CE
   FEC tester prototype




ner Renfordt IKF   6   TPC meeting, Oct 7th/8th, 2003, at CE
                   FEC tester prototype




ner Renfordt IKF            7         TPC meeting, Oct 7th/8th, 2003, at CE
                   FEC tester prototype




ner Renfordt IKF            8         TPC meeting, Oct 7th/8th, 2003, at CE
                   FEC tester prototype




ner Renfordt IKF            9         TPC meeting, Oct 7th/8th, 2003, at CE
                   FEC tester prototype




ner Renfordt IKF            10        TPC meeting, Oct 7th/8th, 2003, at CE
                   FEC tester prototype




ner Renfordt IKF            11        TPC meeting, Oct 7th/8th, 2003, at CE
                   FEC tester prototype




ner Renfordt IKF            12        TPC meeting, Oct 7th/8th, 2003, at CE
                   FEC tester prototype




ner Renfordt IKF            13        TPC meeting, Oct 7th/8th, 2003, at CE
                   FEC tester prototype




ner Renfordt IKF            14        TPC meeting, Oct 7th/8th, 2003, at CE
                   Detail 1




ner Renfordt IKF      15      TPC meeting, Oct 7th/8th, 2003, at CE
                   Detail 2




ner Renfordt IKF      16      TPC meeting, Oct 7th/8th, 2003, at CE
                   Detail: cables




ner Renfordt IKF         17         TPC meeting, Oct 7th/8th, 2003, at CE
                          Burn in Tester



roblem: mechanics gets very elaborate with 20 – 30 cards to connect
> size problem



roposal: get away from burnin test under power
> do only passive burnin before cards are tested.




ner Renfordt IKF                    18              TPC meeting, Oct 7th/8th, 2003, at CE
                         Readout: RCU II
e problem solved with firmware: program for flash PROM (permanent
mory) was different from version used for non permanent storage (loaded v
AG connection and “Jamplayer”/”Byteblaster” software).

e RCU II had problem with a trigger signal not beeing there.
e daughtercard had contact problems. More daughter cards are available fro
rgen/Oslo.

r the time beeing there are 4 RCUII + 1 spare for GSI/Da/FRA foreseen
ore motherboards would be helpful but not available)

 ser part of the tester at the moment operated with LabView under WINDOW
s to be migrated to LINUX since driver for RCU II readout exists only unde
NUX. It was a bit tedious to install the software for the control of the Natl.
 tr. Card which controls the pulser part of the tester (open source software, n
ectly supported by LabView).
>still not finally tested.
ner Renfordt IKF                     19              TPC meeting, Oct 7th/8th, 2003, at CE
   Conclusions
         Progressing well

         test software still needs attention

         should be ready for larger scale test in ~ December




ner Renfordt IKF                         20            TPC meeting, Oct 7th/8th, 2003, at CE

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:0
posted:10/1/2011
language:English
pages:20