					This is a plan that examines whether a product or system designed by a company
properly functions as advertised. This plan includes a list of project requirements,
involved parties and their responsibilities, key deliverables and milestones, timeline,
budget, checklists for testing requirements and product feature test planning. The test
planning section includes a variety of test plans to ensure the proper functionality of the
business product or system. This document should be used by small businesses or
other entities that want to test a product or system before releasing it to the general
public.
Project Management
Project Test Plan




                     2010
Table of Contents
  List of Project Requirements ....................................................................................................... 4
  Involved Parties and Their Responsibilities ................................................................................. 4
  Key Deliverables and Milestones ................................................................................................. 5
  Timeline ....................................................................................................................................... 6
  Budget.......................................................................................................................................... 6
  Checklists for Testing Requirements ........................................................................................... 8
  Product Feature Test Planning .................................................................................................... 8




© Copyright 2010 Docstoc Inc. registered document proprietary, copy not                                                           3
List of Project Requirements
Project requirements define the essential objectives of an undertaking. They give project
managers the resources that will be needed to integrate processes and successfully apply them to
improve project success rates, reduce developmental costs, reduce rework, and accelerate time to
market, or “go live” dates. They are based on experience and best practice models. Concise
project requirements will detail all concrete requirements that are needed to initiate the project or
scope of work. The following is an outline of typical components that need to be addressed
when developing project requirements.

Include a breakout of costs for:
       Equipment
       Materials
       Supplies
       Labor
You will also want to include design specifications, any functional requirements, a process flow
schematic or logic diagram, and a proto type or mock up. Give more detailed elaborations
regarding your quality measures, review and scheduling processes. With your system
requirements documentation, include system architecture diagrams, technical specifications, and
information on user requirements.

Involved Parties and Their Responsibilities
  First Name                Last Name                     Company         Responsibility




© Copyright 2010 Docstoc Inc. registered document proprietary, copy not                    4
Key Deliverables and Milestones

            Deliverable                    Milestone Delivery Date        Notes

Test Resource Utilization

Developing Test Scenarios

Test Scripts

Developing Test Scenarios
   1. Unit testing
     2. Performance testing
     3. Integration testing

Input Test Screens

Update Function Tests

Security

User Documentation

Hardware

Network

Printers

Integration Test Samples

Performance or Stress Testing

Example Test Scenario

Example Test Scripts

Random Testing




© Copyright 2010 Docstoc Inc. registered document proprietary, copy not           5
Timeline

            Deliverable                          Description of Activities      Notes

Test Resource Utilization

Developing Test Scenarios

Test Scripts

Developing Test Scenarios
     1. Unit testing
     2. Performance testing
     3. Integration testing

Input Test Screens

Update Function Tests

Security

User Documentation

Hardware

Network

Printers

Integration Test Samples

Performance or Stress Testing

Example Test Scenario

Example Test Scripts

Random Testing


Budget
The budget is a calculation of all expenditures that would be associated with administering the
project test plan. Costs include labor, materials, and any other expenses that are connected to the
venture. Many times, project budgets are broken down into specific segments or tasks, with
cumulative budgets assigned to each.




© Copyright 2010 Docstoc Inc. registered document proprietary, copy not                 6
                                   Pr o j e c t T e s t Pl a n - S a mp l e B u d g e t
                              BUDGET ALLOCATION                                             EXPENSES
Line Item ID                       Description                              Amount        Date    Amount




      ALLOCATION TOTAL:                                    EXPENSE TOTAL:                 ENDING BALANCE:




© Copyright 2010 Docstoc Inc. registered document proprietary, copy not                           7
Checklists for Testing Requirements

            Requirement                    Date Administered                           Notes

Test Resource Utilization

Test Scripts

Unit Test

Performance Test

Integration Test

Input Test Screens

Update Function Tests

Security

User Documentation

Hardware

Integration Test

Performance or Stress Test

Example Test Scenario

Example Test Scripts

Random Testing


Product Feature Test Planning
Test plans will give details about the strategy that will be used to verify and ensure that a product
or system meets the required design specifications as well as the other requirements. Test plans
are generally designed or prepared with input from Test Engineers and will depend on the
product and the responsibility of the organization to which the test plan applies. A test plan may
include one or more of the following:

              Type of Test Plan                                           Test Plan Purposes

Design Verification or Compliance Test                Conducted during the product’s developmental or approval
                                                      stages.




© Copyright 2010 Docstoc Inc. registered document proprietary, copy not                               8
Manufacturing or Production Test                      Performed during the preparation or assembly of a product.
                                                      Testing is ongoing; this ensures that performance is
                                                      continually verified and quality is constantly monitored.

Acceptance or Commissioning Test                      Performed at the time when products are installed or delivered.

Service and Repair Test                               Routinely conducted on an as needed bases throughout the
                                                      service life cycle of the product.

Regression Test                                       Carried out on existing products that are operational, the
                                                      process verifies the product’s current functionality; even when
                                                      other aspects of the environment have changed. (e.g.,
                                                      upgrading the platform that an existing application is currently
                                                      running on.)

The following is a sample of a test plan, and its testing criteria.

Test Plan Identifier                                      Test Item Name

Requirement to be tested
Features to be tested                    Document handler                 Drum                        Toner cartridges
       Features not listed:
Features not to be tested                Photo receptor                   Imaging component           Sheet feeder
       Features not listed:
Testing approach                  Describe the methodology or the steps taken to apply the test.
                                     1. Start with the first activity in the test
                                     2. Next logical activity
                                     3. Third activity
                                     4.
                                       5.
Item pass/fail criteria           Expected results:                           Actual results:
(expected results)                1. First activity in the test               1. Result of first activity
                                  2. Next sequential activity
                                                                              2. Result of next sequential activity
                                  3.
                                  4.                                          3.
                                                                              4.
Suspension Criteria               Use this to submit recommendations based on item pass/fail criteria.




© Copyright 2010 Docstoc Inc. registered document proprietary, copy not                                     9

				
DOCUMENT INFO
Description: This is a plan that examines whether a product or system designed by a company properly functions as advertised. This plan includes a list of project requirements, involved parties and their responsibilities, key deliverables and milestones, timeline, budget, checklists for testing requirements and product feature test planning. The test planning section includes a variety of test plans to ensure the proper functionality of the business product or system. This document should be used by small businesses or other entities that want to test a product or system before releasing it to the general public.
This document is also part of a package Project Management Starter Kit 18 Documents Included