Construction Bridge Loan

Reviews
Shared by: hithereladies
Stats
views:
0
rating:
not rated
reviews:
0
posted:
8/10/2009
language:
English
pages:
0
MassHousing Bridge Loan Financing Underwriting Standards Maximum Loan Amount: The sum of the bridge loan and any MassHousing construction/permanent loan may not exceed 90% of Total Development Cost. The sum of the bridge loan and the initial capital contribution may not exceed 60% to 90% of the gross syndication raise, depending on the terms and conditions of subsequent capital contributions. Interest Rates: Tax-Exempt Financing • Fixed Rate: 150 Basis Points above 10-Year Treasury • Variable Rate: 150 Basis Points above weekly BMA Swap Index Taxable Financing • Fixed Rate: 150 Basis Points above 1-Year LIBOR • Variable Rate: 150 Basis Points above weekly LIBOR Term/Amortization: Schedule: 1-2 years for construction period bridge loan. 3-7 years for construction period and lease-up bridge loan. Principal and interest will be repaid in accordance with the investors’ scheduled capital contributions. At minimum, principal amortization will be on an annual basis with monthly interest payments. Loan terms and amortization may be modified based on MassHousing’s review of the Partnership Agreement. Non-Recourse Debt: Pro Forma Components: Bridge loans are non-recourse debt secured, in part, by a second mortgage on land and improvements. Underlying construction/permanent financing must meet established Agency underwriting guidelines. Development Team Requirements: Eligible Borrowers: Project sponsors must be organized as a partnership or limited liability company with the general partner or managing member having commitments from each investor to contribute equity to the project in exchange for an ownership interest conveying the tax credits, losses or other tax benefits that the project generates. The syndicator/investor must demonstrate the financial and managerial resources to contribute the required equity to the development. Eligible Investors: Last Updated May 2009 Massachusetts Housing Finance Agency One Beacon Street, Boston, MA 02108 TEL: 617.854.1000 VP: 866.758.1435 FAX: 617.854.1091 www.masshousing.com MassHousing | Bridge Loan Financing | Term Sheet Environmental: A Phase I Environmental Site Assessment (ESA), completed within six (6) months of application. The ESA must follow the most recently revised version of ASTM Standard Practice E-1527 and must include a visual assessment of potentially hazardous building materials/components. If the subject property is a disposal or release site, the ESA must also include the report content described in the M.G.L. 21E Phase I Initial Site Investigation Report standards of 310 C.M.R. 40. MassHousing may require environmental insurance on a case-by-case basis. Bridge Loan Conditions: Investor: Investor must either (i) have at least investment grade rating by a national investment advisory service (Moody's BAA or better, Standard and Poor’s BBB or better); or (ii) provide a letter of credit from an entity meeting the same rating requirements; or (iii) pledge government securities acceptable to the Executive Director in an amount equal to the investor’s subscription in the project partnership. General Partner must have sufficient resources to fund any loan security requirements of the investor. Partnership Agreement must be acceptable to MassHousing. General Partner: Partnership Agreement: For additional information, contact Daniel Staring, Relationship Manager 617.854.1365 ⏐dstaring@masshousing.com MassHousing | Rental Lending Division⏐ One Beacon Street ⏐Boston, MA 02108 | Page 2 of 2 |

Related docs
bridge loan financing
Views: 80  |  Downloads: 3
Bridge Loan Term
Views: 11  |  Downloads: 2
Commercial Bridge Loans
Views: 22  |  Downloads: 0
bridge home loan purchase
Views: 25  |  Downloads: 0
Housing Construction Loan Application
Views: 49  |  Downloads: 1
loan construction
Views: 146  |  Downloads: 3
loan construction
Views: 213  |  Downloads: 9
BANC OF AMERICA BRIDGE LLC Loan Agreement
Views: 4  |  Downloads: 0
construction loan
Views: 50  |  Downloads: 1
construction documents
Views: 200  |  Downloads: 7
premium docs
Other docs by hithereladies
Enterprise Licensing Agreement
Views: 60  |  Downloads: 0
Ford Motor Lease
Views: 75  |  Downloads: 0
Ford Motor Leasing
Views: 83  |  Downloads: 0
Form An Opinion
Views: 48  |  Downloads: 0
Forest International Llc
Views: 82  |  Downloads: 0
Ford Motor Coach
Views: 95  |  Downloads: 0
Foreign Joint Ventures
Views: 69  |  Downloads: 1
Form Of Addendum
Views: 63  |  Downloads: 0
Form Of Deed
Views: 164  |  Downloads: 2
For Detachable Warrants
Views: 72  |  Downloads: 0
Folgers Coffee Employment
Views: 353  |  Downloads: 1
Food Co Pack
Views: 125  |  Downloads: 1
Ford Credit Lien
Views: 334  |  Downloads: 0
Florida Hotel Development
Views: 114  |  Downloads: 0
Florida Corporation Change
Views: 42  |  Downloads: 0