									CONFIDENTIAL                                                                AP/OCT 2008/QSD131/101
                                                /|jjjf\

                                 UNIVERSITI TEKNOLOGI MARA
                                     FINAL EXAMINATION




     COURSE                             MEASUREMENT OF CONSTRUCTION WORKS I
                                        (PAPER 2)
     COURSE CODE                        QSD131/101
     EXAMINATION                        OCTOBER 2008
     TIME                               3 HOURS




INSTRUCTIONS TO CANDIDATES

1.          This question paper consists of two (2) parts: PART A (3 Question)
                                                           PART B (3 Question)

2.          Answer Question 1 and one (1) other question from PART A and two (2) questions from
            PART B.

3.          All measurement shall be in strict accordance with the principles laid down in the Malaysian
            Standard Method of Measurement of Building Works 2nd Edition (SMM2).

4.          Do not bring any material into the examination room unless permission is given by the
            invigilator.

5.          Candidates are allowed to use calculators.

6.          Please check to make sure that this examination pack consists of:

                i)   the Question Paper
               ii)   a one-page Appendix 1 (Drawing No. PUB/QSD13.1/101/P2/1)
              iii)   a one-page Appendix 2
              iv)    Traditional Dimension Papers - provided by the Faculty
               v)    a two (2) Answer Booklets - provided by the Faculty
             vi)     an Answer Booklet's Cover - provided by the Faculty
             vii)    SMM2 - provided by the Faculty




                      DO NOT TURN THIS PAGE UNTIL YOU ARE TOLD TO DO SO
                            This examination paper consists of 3 printed pages
© Hak Cipta Universiti Teknologi MARA                                                   CONFIDENTIAL
CONFIDENTIAL                                   2                   AP/OCT 2008/QSD131/101



PART A


QUESTION 1

a) The accompanying Drawing No. PUB/QSD131/101/P2/1 shows a proposed garden wall.
   The drawing forms part of a contract based on Bills of Quantities.

     Take off all works below ground level excluding damp proof course (dpc).
                                                                                   (25 marks)


QUESTION 2


a) Explain with suitable example where applicable the following general principles of
   measurement.

        i)    Order of Dimensions
       ii)    Timesing
      iii)    Alteration to Dimension
                                                                                   (15 marks)

b) The Bills of Quantities is a comprehensive document prepared by the Quantity Surveyor.
   Describe five (5) main uses of Bills of Quantities.
                                                                               (10 marks)


QUESTION 3


Describe the following clauses in the Malaysian Standard Method of Measurement of
Building Works (Second Edition) (SMM2). Give suitable examples and sketches were
applicable.

a)   Clause   D. 12.3
b)   Clause   D.26
c)   Clause   D. 10
d)   Clause   G.2.2(a)
e)   Clause   K.2.3(a)
                                                                                   (25 marks)




© Hak Cipta Universiti Teknologi MARA                                           CONFIDENTIAL
CONFIDENTIAL                                      3               AP/OCT 2008/QSD131/101



PARTB


QUESTION 1

a) Explain the following terms:

     i)   Profit
    ii)   Overheads
   iii)   Shrinkage & Consolidation
   iv)    Labour Constant
    v)    Wastage
                                                                                 (25 marks)


QUESTION 2


Build up the rate of the following items:

a) Excavate trench to receive foundation starting from reduced level maximum depth not
   exceeding 2.00m (by machine) -m3
                                                                            (15 marks)

b) Disposal of surplus excavated materials 5km away from site. -m3
                                                                                 (10 marks)


QUESTION 3


Build up the rate of the following items:

a) Plain in-situ concrete (1:3:6- 38mm aggregate) in isolated foundation bases (by
   machine)- m3
                                                                         (10 marks)

b) 1B brickwall in common bricks in cement and sand (1:3) mortar laid in English Bond, in
   foundation -m2
                                                                               (10 marks)

c) Filling to make up levels with materials obtained off site consisting 200mm thick broken
   bricks well compacted, consolidated and watered and blinded with sand - m2
                                                                                   (5 marks)




                                        END OF QUESTION PAPER

© Hak Cipta Universiti Teknologi MARA                                       CONFIDENTIAL
                                                                                                                                                                                                                         AP/OCT 2008/QSD131/101
CONFIDENTIAL                                                                                          APPENDIX 1                                                                                                                      (PAPER 2


                                                                                                                                                                            - 3 0 0 m m x 1 0 8 m m saddleback
                                              - 3 0 0 m m X 1 0 8 m m saddleback                                                                                              precast concrete coping.
                                                precast concrete coping.

                                                                                                                                                                                                                          UNIVERSITITEKNOLOGI MARA
        150                                                                         450mm x 450mm x 150mm
                                                                                    cast concrete pier cap
                                                                                    secured with 2 nos. 1 5 m m dia.
                                                                                                                                     108                    e?                                                           NOTES:
                                                                                    copper dowels 7 5 m m long.
                                                                                                                                                                            - 2 1 5 m m thk. brickwall faced bothsides
                                                                                                                                                                              in red facing bricks in English Bond
                                                                                                                                                                              in cement m o r t a r (1:3).
                                                                                   -bitumen hessian—based
                                                                                    damp—proof course.                                                                      -Bitumen hessian—based
                                                                                                                                                                             damp—proof course.

                                                                            ground level.                                                    •T551
                                                                                                                                                                 \
                                                                                     515mm x 215mm
                                                                                     concrete foundation
                                                                                     (1:2 1 / 2 : 5 - 2 0 m m   agg.)                                            \
        225                             -L.
                                                        j      |-
                                                                L
                                                                     .j_J                                               Concrete Foundation
                                                                                                                        (1:2 1 / 2 : 5 - 2 0 m m agg.)
                                                                                                                                                           £ i:4 215
                                                                                                                                                           f^U-
                                                                                 328mm x 328mm
                                                                                 brick pier.                                                             SECTION A-A
                                                                                                                                                         Scale       1:50                                                  YOU CAN MAKE ALL NECESSARY
                                                                                                                                                                                                                           AND REASONABLE ASSUMPTIONS
                                                                                        rr                                                                                                                                 WHERE APPLICABLE
                                                                                              ?j]
                                                                                             Kb
                                                                                        l____J
                                                                                                                                                                                                                         PROJECT TITLE:
                                                                                                                                                     SPECIFICATION NOTES
                                                                                                                                                                                                                           PROPOSED DEVELOPMENT
                                                                                                                                                     A. EXCAVATOR.                                                         1N MERU HEIGHT

                                                                                                                                                     1. Excavate trench get out and
                                                                                                                                                        c a r t away 100M within the site.

                                                                                                                                                     B. CONCRETOR.                                                       DRAWING TITLE:

                                                                                                                                                     1. Plain in—situ concrete Grade 25                                    PROPOSED GARDEN WALL]
                                                                                                                                                        in foundation.                                                      PLAN, ELEVATION AND
                                                                                                                                                                                                                               SECTION A-A
                                                                                                                                                     2. Coping Pier cap in Precast concrete
                                                                                                                                                        with and including 2 nos. 1 0 m m                                ELEMENT:
                                  L____J                                                                                                                diameter mild steel reinforcement.
                                                                                                                                                                                                                                MEASUREMENT OF
                                                                                                                                                                                                                              CONSTRUCTION WORK I
                                                                                                                                                     C. BRICKLAYER .
                                                                                                                                                                                                                             QSD131/101 (PAPER 2)        )
                                                                                                                                                     1. All bricks above ground level shall
                                                                                                                                                        be in red facing bricks in English
     328mm x 328mm                                   PLAN                                                                                               Bond.
                                                                                                                                                                                                                         CHECKED BY:
     brick pier.                                     Scale   1:50
                                                                                                                                                     2. Damp—proof course shall be single
                                                                                                                                                        layer hessian based to BS 7 4 3
                                                                                                                                                        bedded in gauged m o r t a r 1:1:6.                                       ASNIZA HAMIMI THARIM

                                                                                                                                                     3. All bricks below ground level shall
                                                                                                                                                        be in c o m m o n clay bricks in                                  DRAWN BY     HISHAM
                                                     2 1 5 m m brickwall faced both
                                                     sides in red facing bricks in                                                                      English Bond.                                                     SCALE        1 :50
                                                     English Bond in cement m o r t a r ( 1 : 3 ) .
                                                                                                                                                                                                                          DATE         OCTOBER 2008

                                                                                                                                                                                                                         DRAWING NO. :


                                                                                                                                                                                                                                 PUB/QSD131/101/P2/1


© Hak Cipta Universiti Teknologi MARA                                                                                                                                                                                                   CONFIDENTIAL
CONFIDENTIAL                                   APPENDIX 2   AP/OCT 2008/QSD131/101




Plant Cost

Excavator (1/2 m3 bucket)

Initial cost                      RM 150,000.00
Useful life                       5 years
Interest rate                     9% per annum
Scrap value at end of year        RM 50,000.00

Concrete Mixer (7/5)

Initial cost                      RM 60,000.00
Useful life                       5 years
Interest rate                     9% per annum
Scrap value at end of year        RM 15,000.00

Basic Material Prices

Cement                            RM 13.50 /bag
Sand                              RM 40.00/m3
Lime                              RM 4.00/bag
Aggregate                         RM 37.00 /m3
Common Brick                      RM 0.25 / piece
Broken bricks                     RM 20.00/m3
DPC                               RM 5.50/m2
Exmet                             RM2.20/m
Diesel                            RM 2.58 / litre
Lubrication oil                   RM 30.00 / litre


Labour waaes per dav

Skilled                            RM70/day
Unskilled labour                   RM35/day




© Hak Cipta Universiti Teknologi MARA                               CONFIDENTIAL

								