CCNA 4 Final Exam 2011

Document Sample
CCNA 4 Final Exam 2011 Powered By Docstoc
					                                                               CCNAAnswers.com

CCNA 4 Final Exam
1. Which functions are provided by LCP and NCP as part of the PPP layered
architecture?

LCP sets up the PPP connection and its parameters. NCP terminates the PPP connection.

LCP sets up the PPP connection and its parameters. NCP handles higher layer protocol
configurations.

LCP includes the link-establishment phase. NCP includes link-maintenance and link-
termination phases.

LCP negotiates options for multiple network layer protocols. NCP agrees automatically
on encapsulation formats.



2.




Refer to the exhibit. EIGRP has been configured on routers R1 and R2. Connectivity
across the Frame Relay switch between routers R1 and R2 is successfully verified using
the ping command. However, no EIGRP routes are appearing in the routing table. What
could be a cause for this failure?
                                             CCNAAnswers.com

The Frame Relay switch has failed.

The frame-relay map statement is incorrect

Read more…

				
DOCUMENT INFO
Stats:
views:128
posted:9/23/2011
language:English
pages:2
Description: ccna final, ccna exam