									                                                     EXHIBIT 3. ACTIVITY OVERVIEW
     Part C. Development Cost Schedule
     This Development Cost Schedule must be consistent with the Summary Sources and Uses of Funds Statement. All applications must
     complete the total development cost column and the Tax Payer Identification column. Only LIHTC applications must complete the eligible basis
     columns and the Requested Credit calculation below.
     DEVELOPMENT NAME:
                                                      TOTAL DEVELOPMENT SUMMARY                            Expected Payee Taxpayer
                                                Total        Eligible Basis (If Applicable)               Identification Number (TIN)1
                                          Development Cost   Acquisition         New/Rehab.        (and % of cost if item involves multiple payees)
     ACQUISITION
     Site acquisition cost
     Existing building acquisition cost
     Closing costs & acq. legal fees
     Other2: (specify)
     Subtotal Acquisition Cost                          $0               $0                   $0
                 3
     OFF-SITES
     Off-site concrete
     Storm drains & devices
     Water & fire hydrants
     Off-site utilities
     Sewer lateral(s)
     Off-site paving
     Off-site electrical
     Other2: (specify)
     Subtotal Off-Sites Cost                            $0               $0                   $0
     SITE WORK4
     Demolition
     Rough grading
     Fine grading
     On-site concrete
     On-site electrical
     On-site paving
     On-site utilities
     Decorative masonry
     Bumper stops, striping & signs
     Landscaping
     Pool and decking
     Athletic court(s), playground(s)
     Fencing
     Other2: (specify)
     Subtotal Site Work Cost                            $0               $0                   $0
     DIRECT CONSTRUCTION COSTS*:
     HARD COSTS
     Concrete
     Light weight concrete
     Masonry
     Metals
     Carpentry
     Waterproofing
     Insulation
     Roofing
     Sheet metal
     Electrical



      TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS - UNIFORM APPLICATION (MULTIFAMILY HOUSING DEVELOPMENT)
04b2d17e-f56a-4188-b571-89518d148c6a.xls, Version Date: 9/19/2011
                                                     TOTAL DEVELOPMENT SUMMARY                          Expected Payee Taxpayer
                                               Total        Eligible Basis (If Applicable)             Identification Number (TIN)1
                                         Development Cost   Acquisition         New/Rehab.      (and % of cost if item involves multiple payees)
     DIRECT CONSTRUCTION COSTS (Continued):
     Plumbing
     HVAC
     Doors
     Windows
     Glass
     Lath & plaster
     Drywall
     Tile work
     Acoustical
     Resilient or other flooring
     Carpeting
     Painting & decorating
     Specialties
     Cabinets
     Appliances
     Fireplaces
     Carports or garages
     Accessory buildings
     Elevator
     Lead-Based Paint Abatement
     Asbestos Abatement
     Other2: (specify)
     Subtotal Hard Costs                               $0               $0                 $0
     OTHER CONSTRUCTION COSTS
     General requirements (<6%)
     Field supervision (within GR limit)
     Contractor overhead (<2%)
     G & A Field (within overhead limit)
     Contractor profit (<6%)
     Contingency
     Other2: (specify)
     Subtotal Direct Const. Costs                      $0               $0                 $0
     INDIRECT CONSTRUCTION COSTS4
     Architectural - Design fees
     Architectural - Supervision fees
     Engineering fees
     Housing consultant fees5
     Real estate attorney/other legal fees
     Accounting fees
     Impact Fees
     Building permits & related costs
     Appraisal
     Market analysis
     Environmental assessment
     Soils report
     Survey
     Marketing
     Course of construction insurance




      TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS - UNIFORM APPLICATION (MULTIFAMILY HOUSING DEVELOPMENT)
04b2d17e-f56a-4188-b571-89518d148c6a.xls, Version Date: 9/19/2011
                                              TOTAL DEVELOPMENT SUMMARY                            Expected Payee Taxpayer
                                        Total        Eligible Basis (If Applicable)               Identification Number (TIN)1
                                  Development Cost   Acquisition         New/Rehab.        (and % of cost if item involves multiple payees)
     INDIRECT CONSTRUCTION COSTS (Continued)
     Hazard & liability insurance
     Real property taxes
     Personal property taxes
     Tenant relocation expenses
     Other2: (specify)

     Subtotal Indirect Const. Cost               $0               $0                  $0
                        4
     DEVELOPER FEES
     General & administrative
     Profit or fee
     Subtotal Developer's Fees                   $0               $0                  $0
     FINANCING:
     CONSTRUCTION LOAN(S)4
     Interest
     Loan origination fees
     Title & recording fees
     Closing costs & legal fees
     Inspection fees
     Credit Report
     Discount Points
     Other2: (specify)
     PERMANENT LOAN(S)
     Loan origination fees
     Title & recording fees
     Closing costs & legal
     Bond premium
     Credit report
     Discount points
     Credit enhancement fees
     Prepaid MIP
     Other2: (specify)
     BRIDGE LOAN(S)
     Interest
     Loan origination fees
     Title & recording fees
     Closing costs & legal fees
     Other2: (specify)
     OTHER FINANCING COSTS4
     Tax credit fees
     Tax and/or bond counsel
     Payment bonds
     Performance bonds
     Credit enhancement fees
     Mortgage insurance premiums
     Cost of underwriting & issuance
     Syndication organizational cost
     Tax opinion
     Other2: (specify)
     Subtotal Financing Cost                     $0               $0                  $0




      TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS - UNIFORM APPLICATION (MULTIFAMILY HOUSING DEVELOPMENT)
04b2d17e-f56a-4188-b571-89518d148c6a.xls, Version Date: 9/19/2011
                                                        TOTAL DEVELOPMENT SUMMARY                                    Expected Payee Taxpayer
                                                  Total        Eligible Basis (If Applicable)                       Identification Number (TIN)1
                                            Development Cost   Acquisition         New/Rehab.                (and % of cost if item involves multiple payees)
     RESERVES
     Rent-up
     Operating
     Replacement
     Escrows
     Subtotal Reserves                                     $0                 $0                 $0
     TOTAL DEVELOPMENT
     COSTS6                                                 0                   0                  0
                                   7
     - Commercial Space Costs
     TOTAL RESIDENTIAL COSTS                               $0
     If the contractor is guaranteeing financing for the transaction for a fee, such fees are:           $                                                -


                   The following calculations are for LIHTC Applications only.
     Deduct From Basis:
     Fed. grant proceeds used to finance costs in eligible basis
     Fed. B.M.R. loans used to finance costs in eligible basis
     Non-qualified non-recourse financing
     Non-qualified portion of higher quality units (42.(d)(5))
     Historic Credits (residential portion only)
     Total Eligible Basis                                             $0                         $0
     High Cost Area Adjustment (100% or 130%)
     Total Adjusted Basis                                             $0                         $0
     Applicable Fraction8
     Total Qualified Basis                                $0          $0                         $0
     Applicable Percentage9
     Owner's Requested Credits                            $0          $0                         $0

     Applicant and contractor certify that, to the best of their knowledge, the provided costs and supporting information represent an accurate,
     uninflated estimate of the costs associated with this development. They also certify that no fees, other than for activities identified in this form,
     will be paid to the contractor.


                                            Development Owner Name                                      Contractor Name


                                     By:                                                         By:
                                            Signature                                                   Signature
                                     Its:                                                        Its:

                                                             Date                                        Date




      TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS - UNIFORM APPLICATION (MULTIFAMILY HOUSING DEVELOPMENT)
04b2d17e-f56a-4188-b571-89518d148c6a.xls, Version Date: 9/19/2011
                                                    TOTAL DEVELOPMENT SUMMARY                                Expected Payee Taxpayer
                                              Total        Eligible Basis (If Applicable)                   Identification Number (TIN)1
                                        Development Cost   Acquisition         New/Rehab.            (and % of cost if item involves multiple payees)

     Footnotes:
     1The taxpayer identification number (TIN) of the Person(s) or Entity(s) to whom payment for the cost associated with each line item must be

     provided to fulfill the requirements of HB2577, Sec. 2306.184. If multiple payees are involved, indicate the estimated percentage of the total
     fee that the payee will receive next to their TIN. If the payee has not been determined at this time, enter "Undetermined." All known payees
     must be described in the Project Development Team Members form.
     2An itemized description of all "Other" costs must be included at the end of this exhibit.
     3 All Off-Site costs must be justified by a third party engineering in accordance with the Department's format provided in Part E of this exhibit.
     4(LIHTC Only)Site work expenses, indirect construction costs, developer fees, construction loan financing and other financing costs may or

     may not be included in the eligible basis.
     5(LIHTC Only)Only fees paid to a consultant for duties which are not ordinarily the responsibility of the developer, as defined in the Developer's

     Service Agreement, can be included in eligible basis. Otherwise, consulting fees are included in the calculation of maximum developer fees.
     6(LIHTC Only)Provide all costs & eligible basis associated with the project.
     7(LIHTC Only)Costs associated with construction of facilities that generate revenue through commercial uses or from fees charged to tenants

     (covered parking, individual storage units, etc.) must not be included in eligible basis and must be removed from "Total Development Costs" to
     determine "Total Residential Costs".
     8(LIHTC Only)Applicable Fraction Percentage as calculated in the Square Footage and Applicable Fraction Calculation form.
     9(LIHTC Only)Use the appropriate Applicable Percentages defined in the QAP.

     * (LIHTC Only)If the project is located in a QCT and includes a community service facility designed to serve primarily individuals whose income
     is 60% or less of the area median income, the adjusted basis of the facility should not exceed 10% of the eligible basis of the project.




      TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS - UNIFORM APPLICATION (MULTIFAMILY HOUSING DEVELOPMENT)
04b2d17e-f56a-4188-b571-89518d148c6a.xls, Version Date: 9/19/2011
       2001 LIHTC APPLICATION SUBMISSION PROCEDURES MANUAL - APPLICATION EXHIBITS PROVIDED BY THE DEPARTMENT


                                              EXHIBIT 3. ACTIVITY OVERVIEW
Part D. Work Write-Up for Rehabilitation Developments
                                                  (Only available in Excel Format)
     The Development Owner's architect or contractor should complete this form which helps the Department ensure that the
     redevelopment costs are realistic. The activity descriptions provided below should be detailed enough so that a staff member may
     clearly identify the proposed work and may evaluate the cost against current market standards. Each item should include the cost
     of labor and material plus any charges for equipment, overhead and profit from a subcontractor or material supplier.
      Attach all building by building itemizations that led to the summary totals below.
             Name of Development:
  Example:
  Roofing                                Removed all existing shingles and felt.          160 Squares           30          2,700             $7,500
                                         Replaced 10% of roof decking and soffit
                                         material. Entire development reroofed
                                         with roofing felt, flashing and shingles.
                                         Attic roof ventilators replaced.
                                                                                             Material                       Labor
                                                                                                Type of
                                                                                              Measure




                                                                                                             Cost/Measure
                                                                                             (squares,




                                                                                                                            Total Labor
                                                                                              linear ft.,
                                         Brief Description of Activity Performed or          sq. ft, lbs.,
Item                                     Material Installed                         Quantity     etc.)                                    Total Cost
OFF-SITES
   Off-site concrete                                                                                                                              $0
   Storm drains & devices                                                                                                                         $0
   Water & fire hydrants                                                                                                                          $0
   Off-site utilities                                                                                                                             $0
   Sewer lateral(s)                                                                                                                               $0
   Off-site paving                                                                                                                                $0
   Off-site electrical                                                                                                                            $0
   Other: (specify)                                                                                                                               $0
Subtotal Off-Sites Cost                                                                                                                           $0
SITE WORK
   Demolition                                                                                                                                     $0
   Rough grading                                                                                                                                  $0
   Fine grading                                                                                                                                   $0
   Storm drain & detention ponds                                                                                                                  $0
   On-site concrete                                                                                                                               $0
   On-site electrical                                                                                                                             $0
   On-site paving                                                                                                                                 $0
   On-site utilities                                                                                                                              $0
   Decorative masonry                                                                                                                             $0
   Bumper stops, striping & signs                                                                                                                 $0
   Landscaping                                                                                                                                    $0
   Pool and decking                                                                                                                               $0
   Recreational facilities/playgrounds                                                                                                            $0
   Fencing
       Fencing Description                                                                                                                        $0
       Security gate and controls                                                                                                                 $0
   Post Office Boxes                                                                                                                              $0
   Trash collection facilities                                                                                                                    $0
   Other: (specify)                                                                                                                               $0

       TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS - UNIFORM APPLICATION (MULTIFAMILY HOUSING
                                                         DEVELOPMENT)
04b2d17e-f56a-4188-b571-89518d148c6a.xls, Version Date: 9/19/2011
       2001 LIHTC APPLICATION SUBMISSION PROCEDURES MANUAL - APPLICATION EXHIBITS PROVIDED BY THE DEPARTMENT

                                                                                             Type of
                                                                                           Measure




                                                                                                          Cost/Measure
                                                                                          (squares,




                                                                                                                         Total Labor
                                                                                           linear ft.,
                                      Brief Description of Activity Performed or          sq. ft, lbs.,
Item                                  Material Installed                         Quantity     etc.)                                    Total Cost
Subtotal Site Work Cost                                                                                                                        $0

DIRECT CONSTRUCTION
  Concrete                                                                                                                                    $0
  Light weight concrete                                                                                                                       $0
  Masonry                                                                                                                                     $0
  Metals                                                                                                                                      $0
  Rough Carpentry                                                                                                                             $0
  Finish Carpentry                                                                                                                            $0
  Waterproofing                                                                                                                               $0
  Insulation (specify installation locations and R-rating)                                                                                    $0
  Roofing                                                                                                                                     $0
  Sheet metal                                                                                                                                 $0
  Electrical                                                                                                                                  $0
  Plumbing
      Water and gas pipe fittings, pipe installation etc.                                                                                     $0
      Bathtubs/Shower Enclosures                                                                                                              $0
      Toilets                                                                                                                                 $0
      Sinks                                                                                                                                   $0
      Lavatories                                                                                                                              $0
      Fixtures                                                                                                                                $0
      Water Heater (Provide Flue Effic.)                                                                                                      $0
      Other (describe)                                                                                                                        $0
  HVAC
      Air Conditioners (Provide SEER Rating)                                                                                                  $0
      Ductwork, electrical, lines, etc.                                                                                                       $0
      Ceiling Fans                                                                                                                            $0
      Other (describe)                                                                                                                        $0
  Doors                                                                                                                                       $0
  Windows
      Windows (describe i.e. double hung, dual pane)                                                                                          $0
      Solar Screens                                                                                                                           $0
  Glazing (Mirrors, window walls and special glazing not incl. in Windows.                                                                    $0
  Lath & plaster                                                                                                                              $0
  Drywall                                                                                                                                     $0
  Tile work                                                                                                                                   $0
  Acoustical                                                                                                                                  $0
  Resilient or other flooring                                                                                                                 $0
  Carpeting                                                                                                                                   $0
  Painting & decorating                                                                                                                       $0
  Specialties                                                                                                                                 $0
  Cabinets                                                                                                                                    $0
  Equipment for modification for persons w/ disabilities                                                                                      $0
  Appliances
      Range                                                                                                                                   $0
      Oven                                                                                                                                    $0
      Refrigerator                                                                                                                            $0

       TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS - UNIFORM APPLICATION (MULTIFAMILY HOUSING
                                                         DEVELOPMENT)
04b2d17e-f56a-4188-b571-89518d148c6a.xls, Version Date: 9/19/2011
       2001 LIHTC APPLICATION SUBMISSION PROCEDURES MANUAL - APPLICATION EXHIBITS PROVIDED BY THE DEPARTMENT

                                                                                           Type of
                                                                                         Measure




                                                                                                          Cost/Measure
                                                                                        (squares,




                                                                                                                         Total Labor
                                                                                         linear ft.,
                                    Brief Description of Activity Performed or          sq. ft, lbs.,
Item                                Material Installed                         Quantity     etc.)                                      Total Cost
      Microwave                                                                                                                                $0
      Dishwasher                                                                                                                               $0
      Disposal                                                                                                                                 $0
      Other (describe)                                                                                                                         $0
      Washer                                                                                                                                   $0
      Fan/Hood                                                                                                                                 $0
      Dryer                                                                                                                                    $0
  Special Equipment (describe)                                                                                                                 $0
  Fireplaces                                                                                                                                   $0
  Carports or garages                                                                                                                          $0
  Accessory buildings                                                                                                                          $0
  Elevator                                                                                                                                     $0
  Lead-Based Paint Abatement                                                                                                                   $0
  Asbestos Abatement                                                                                                                           $0
  Other: (specify)                                                                                                                             $0
  Miscellaneous (not to exceed $1000)                                                                                                          $0
Subtotal Direct Construction                                                                                                                   $0
Total Construction Cost (Number should tie with "Construction Hard Costs" amount shown in "Cost Breakdown.")                                   $0



  Development Owner Name                                                           Architect/Contractor Name


By:                                                                        By:
    Signature                                                                      Signature
Its:                                                                        Its:

       Date                                                                                    Date




       TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS - UNIFORM APPLICATION (MULTIFAMILY HOUSING
                                                         DEVELOPMENT)
04b2d17e-f56a-4188-b571-89518d148c6a.xls, Version Date: 9/19/2011
                                            EXHIBIT 3. ACTIVITY OVERVIEW (Only available in Excel Format)
Part E. Offsite Costs Breakdown
     This form must be submitted with the Development Cost Schedule if the development has Off Site Costs.

Column A: The off-site activity reflected here must match the off-site activity reflected in Exhibit 102, Project Cost Schedule.
Columns B and C: In determining actual construction cost, two different methods may be used. Either, the construction costs may be broken into labor (Col. B) and materials (Col. C) for
the activity; OR The other method involves the use of unit price (Col. B) and the number of units (Col. C) data for the activity.
Column D: If based on labor and materials, add Column B and Column C together to arrive at total construction costs. If based on unit price measures, Column B is multipilied by Column
C to arrive at total construction costs.
Column E: Any proposed activity involving the acquisition of real property, easements, rights-of-way, etc., must have the projected costs of this acquisition for the activity.
Column F: Engineering/architectural costs must be broken out by the off-site activity.
Column G: Figures for Column G, Total Activity Cost, are obtained by adding together Columns D, E, and F to get the total costs.
For pubic facility projects, this form must be completed by a professional engineer or architect, licensed to practice in the State of Texas. His or her signature and registration seal must be
on the form.


                                              Development Name:
                                 A.                                        B.              C.                   D.                    E.                     F.                      G.
                                                                                 MATERIALS                TOTAL                                      ENGINEERING/
                                                                      LABOR OR    OR # OF              CONSTRUCTION            ACQUISITION          ARCHITECTURAL           TOTAL ACTIVITY
ACTIVITY                                                              UNIT PRICE   UNITS                  COSTS                  COSTS                  COSTS                  COSTS




                                                                                                                                Signature of Registered Engineer/Architect Responsible for
                                                                         (SEAL)                                                                    Budget Justification

                                                                                                                             Date




                                      TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS - UNIFORM APPLICATION (MULTIFAMILY HOUSING DEVELOPMENT)
04b2d17e-f56a-4188-b571-89518d148c6a.xls, Version Date: 9/19/2011
                                                  EXHIBIT 3. ACTIVITY OVERVIEW
         Part F. Annual Operating Expenses
         General & Administrative Expenses
                   Accounting                                                             $
                   Advertising                                                            $
                   Legal fees                                                             $
                   Leased equipment                                                       $
                   Postage & office supplies                                              $
                   Telephone                                                              $
                   Other office expenses                                                  $
                   Supportive service contract fees                                       $
                   Compliance fees                                                        $
                   Security                                                               $
                   Miscellaneous          Describe:                                       $
                   Total General & Administrative Expenses:                                       $
         Management Fees:                  Percent of Effective Gross Income:              %      $
         Payroll, Payroll Tax & Employee Benefits
                   Management                                                             $
                   Maintenance                                                            $
                   Other                  Describe:                                       $
         Total Payroll, Payroll Tax & Employee Benefits:                                          $
         Repairs & Maintenance
                   Elevator                                                               $
                   Exterminating                                                          $
                   Grounds                                                                $
                   Make-ready                                                             $
                   Repairs                                                                $
                   Pool                                                                   $
                   Miscellaneous          Describe:                                       $
                   Other                  Describe:                                       $
         Total Repairs & Maintenance:                                                             $
         Utilities (Enter development owner expense)
                   Electric                                                               $
                   Natural gas                                                            $
                   Garbage/trash                                                          $
                   Water & sewer                                                          $
                   Cable TV                                                               $
                   Other, Describe:                                                       $
         Total Utilities:                                                                         $
         Annual Property Insurance:                        Rate per net rentable square foot: $   $
         Property Taxes:
                   Assessed Value:                                                        $
                   Tax Rate per $100 of Assessment:                                       $
                   Annual Property Taxes:                                                 $
                   Payments in Lieu of Taxes:                                             $
                   Other Taxes:           Describe:                                       $
         Total Property Taxes:                                                                    $
         Reserve for Replacements:                          Reserves per unit per month: $        $
         Other Expenses:                  Describe:                                               $
         TOTAL ANNUAL EXPENSES                                         Expense per unit: $        $
         NET OPERATING INCOME (before debt service)                                               $
         ANNUAL DEBT SERVICE                                           Debt Coverage Ratio:       $
         NET CASH FLOW                                                                            $


    TEXAS DEPARTMENT OF HOUSING AND COMMUNITY AFFAIRS - UNIFORM APPLICATION (MULTIFAMILY HOUSING DEVELOPMENT)
04b2d17e-f56a-4188-b571-89518d148c6a.xls, Version Date: 9/19/2011
                                   Texas Department of Housing and Community Affairs
                                        Multi-Family Sources and Uses Worksheet

                                                                   Exhibit A
Summary Sources and Uses of Funds
Describe all sources and uses of funds. Information must be consistent with the information provided throughout the Application (i.e. Financing
Participants and Development Cost Schedule forms). Where funds such as tax credits, loan guarantees, or bonds are used, only the proceeds
going into the development should be identified so that "sources" match "uses."
SOURCES OF FUNDS
                                                                                 Application
Source                                                       Priority of                                Project Final
       Funding Description                                                     Construction or                                    Financing Participants
  #                                                             Lien                                 Development Costs
                                                                                Rehab. Costs
   1 Conventional Loan
   2 Conventional Loan/FHA
   3 Conventional Loan/Letter of Credit
   4 HOME                                                                                                                 TDHCA
   5 Housing Trust Fund                                                                                                   TDHCA
   6 CDBG
   7 Mortgage Revenue Bonds
   8 LIHTC Syndication Proceeds
   9 Historic Tax Credit Syndication Proceeds
  10 USDA/ TXRD Loan(s)
  11 Other Federal Loan or Grant
  12 Other State Loan or Grant
  13 Local Government Loan or Grant
  14 Private Loan or Grant
  15 Cash Equity
  16 In-Kind Equity/Deferred Developer Fee
TOTAL SOURCES OF FUNDS                                                     $                -        $            -
USES OF FUNDS
                                                                                 Application
Source                                                       Priority of                                Project Final
       Funding Description                                                     Construction or                                    Financing Participants
  #                                                             Lien                                 Development Costs
                                                                                Rehab. Costs
   1 Land Acquisition
   2 Existing Building Acquisition
   3 Off-Site Construction Cost
   4 Sitework Construction Cost
   5 Hard Construction or Rehabilitation Cost
   6 Contractor's General Requirements
   7 Contractor's Overhead
   8 Contractor's Profit
   9 Construction Contingency
  10 Indirect Construction Costs
  11 Developer's Fees
  12 Interim Financing Cost
  13 Permanent Financing Cost
  14 Other Financing Costs
  15 Reserves
  16 Other (describe):
TOTAL USES OF FUNDS                                                        $                     -   $                -

EXCESS / (NEGATIVE) FUNDS                                                  $                     - $                  -



    TDHCA - Portfolio Management Compliance
    Form 11.19 - Multi-Family Sources and Uses Worksheet                                                                                      January, 2006

								
To top