									                        Govt. of Madhya Pradesh
                 Water Resources Department
                           GANGA BASIN REWA (M.P.)




                BHADAR DIVERSION SCHEME, BLOCK-MANPUR

                          WATER RESOURCES DIVISION

                                UMARIA (M.P.)

                   PRE-QUALIFICATION DOCUMENT

                                    FOR

 Construction of Main Canals,(RBC&LBC)and Minor Canals &
Canal Structures of Bhadar Diversion scheme in Manpur Block.



   Executive Engineer                                 Superintending Engineer

  WATER RESOURCES                                      WATER RESOURCES
DIVISION UMARIA (M.P.)                               CIRCLE, SHAHDOL (M.P.)



                              CHIEF ENGINEER
                           GANGA BASIN REWA (M.P.)




                                                                      Page 1 of 34
   INDEX

             PART I - Information and Instruction for the Applicants                  I-1 to I - 8

            Important instructions for the Applicants.                              I– 1
Page No.

  01       General                                                         I–2

  02       Method of applying                                              I-3

  03       Final decision making Authority                                 I–3

  04       Provisional Particulars of the Scheme                           I-3

  05       Site Visit                                                       I –4

  06       Eligibility for Pre-qualification                                I-4

  07       Minimum qualification criteria                                   I – 2 to I - 5

  08       Evaluation Criteria for Pre-qualification                        I-5

  09       Bid Capacity                                                     I 5

  10       Appendix 1– Details of the work proposed to be put to tender.    I-7

  11       Appendix 2 – Minimum qualification criteria.                      I –8

            PART I I- Application form for Pre-qualification.                II-1 to II -19

           1. Letter of transmittal                                          II – 1

           2. Form : F-1 Structure and Orgnisation                           II – 2

           3. Form : F-2 Financial Statment                                  II – 3

           4. Form : F-3 Experience -Geographical                             II –4

           5. Form : F-4 Additional information                               II – 5

           6. Form : F-5 Resources Personal                                   II – 6

           7. Form : F-6 Resources Plant & Equipment.                         II – 7

           8. Form : F-7 Experience -Geographical                            II – 8




                                                                                           Page 2 of 34
S.No.                                   Description                                    Page
  1                                          2                                         No.
                                                                                        3
         ANNEXURE : ‘A’ – Proforma for work completed and Applicant’s
                    performance record for the last 5 financial years.                 II- 9

         ANNEXURE : ‘B’ – Proforma for work in hand and performance for
                      the last 5 financial years                                       II - 11

         ANNEXURE : ‘C’ – Proforma for Details of plant and equipment owned
                     by the applicant which may be used for construction
                     of this work.                                                      II - 12

         ANNEXURE : ‘D’ – Proforma for Details of how additional plant and
                      equipment which may be required for the work
                      would be obtained                                                II - 13

        ANNEXURE : ‘E’          “kiFk&i=+ (Affidavit)                                             II - 14

         Statement : ‘S-1’     Proforma for Excavation    in all types of Strata and
                              Earth work.                                              II - 15

         Statement : ‘S-2’     Pitching and Boulder toe                                II – 16

         Statement : ‘S-3’     Proforma for P.C.C./R.C.C. stone Masonry and

                           Grouted Stone pitching.                                      II – 17

         Statement S-4 :        Data regarding All Types of Filter & Filter Blanket.   II – 18

         Statement S-5 :        Data regarding cost of work executed and in

                                Progress during the last 5 financial years.             II – 19



        PART III -                    Information about Project.
    1. Brief Note.                                                                     III – 1
    2. Salient Features of the project.                                                III – 3
    3. Statement indicating quantities of different items of work.       III - 5




                                                                                           Page 3 of 34
                                          PART - I

  INFORMATION & INSTRUCTIONS FOR THE APPLICANTS


                            Important Instructions
                                                for
                                  APPLICANTS
  Applications are required to go through the document carefully and note the procedure for
submission of the documents. The applications should be filled up completely and carefully and
sign the documents wherever it is prescribed.

  The entire physical and financial turnover must be supported by the clients certificates not
below the rank of Executive Engineer duly attested should be submitted. The details without
client’s certificate will not be considered and the applicant would be disqualified for which he
himself would be responsible.




                                                                                      Page 4 of 34
              Information & Instructions for Applicants
   1.0     General :
   1.1     Forms for Pre- qualification and letter of transmittal are attached herewith.

   1.2     All information required for, in the enclosed forms should be furnished against the
           respective columns in the forms, if information is furnished in separate document;
           reference to the same should be given against respective columns. If information is
           ‘NIL’ it should also be mentioned as ‘NIL’ or ‘No such case’. If any particular
           query is not applicable in case of the applicant, it should be stated as not
           applicable. However, the applicants are cautioned that not giving complete
           information called for in the application, in the form required or not giving it in
           clear terms of making any change in the prescribed forms may result in the
           applicant being summarily disqualified. Applications made by telegram or telex
           and those received late will not be considered.

   1.3     The application must be type-written and the applicant’s name must appear on
           each page of the application.

   1.3.1   All financial / monetary figures to be furnished in any of the pages/forms in these
           pre-qualification documents shall be in’ Rupees‘

   1.4     Over-writing should be avoided. Mistake should be scored through and corrections
           incorporated and attested with the applicants initials written in ink. All pages of
           the Pre-qualification document shall be numbered and submitted as a package with
           the signed letter of transmittal.

   1.5     All the information must be submitted in English.

   1.6     Reference, information and certificate form the respective clients certifying the
           suitability, technical knowledge and capacity of the applicant should be signed by
           the client.

   1.7     The applicant is advised to attach any additional information which he thinks
           necessary in regard to his capabilities. No further information will be entertained
           after submission of pre-qualification documents unless it is called for by the Water
           Resources Department.

   1.8     The applications are invited for the work as detailed in the brief note. The Pre-
           qualification documents in prescribed form duly completed and signed shall be
           submitted.

   1.9     The copies of the documents must be submitted in a sealed cover. The sealed
           cover must be superscribed:-

“Pre-Qualification documents for CONSTRUCTION OF R.B.C. & L.B.C. MAIN CANAL,
MINOR & CANAL STRUCTURES, BARREL CUM TROUGH ESCAPE, DRB, AQUADUCT,
HEAD CUM CROSS REGULATOR, V.R.B., C.D. WORK AND HEAD REGULATOR OF
BHADAR DIVERSION SCHEME, BLOCK-MANPUR
                                                                                     Page 5 of 34
   And shall be submitted to the Engineer-in-Chief, W.R.D. Bhopal or Chief-Engineer,
   GANGA BASIN REWA (M.P.) or Superintending Engineer , WATER RESOURCES
   CIRCLE, SHAHDOL (M.P.).
          Documents submitted in connection with the pre-qualification will be treated as
         confidential and shall not be returned.

1.10.    The cost incurred by the Applicant in preparing this application, in providing
         clarification or attending discussion, conferences in connection with document
         shall not be reimbursement under any circumstances.

1.11     An affidavit in the prescribed format as per Annexure-E should be furnished by
         the Applicant ( Tenderer ) regarding correctness of the information furnished at
         Annexure F-2 and Annexure – A & B

2.0      Method of Applying.

2.1      If the application is made by an individual, it shall be signed by the individual
         above his full name and the full name of his firm with its current address.

2.2      If the application is made by a firm in partnership, it shall be signed by all partners
         of the firm above their full names and current address. Or by a partner holding the
         power of allorney which shall accompany the application. A Certified copy of the
         partnership deed, current address of the firm and the full name and the current
         address of all the partners of the firm shall also accompany the application.

2.3      If the application is made by a limited Company or a limited Corporation, it shall
         be signed by a duly authorised person holding the power of attorney for signing
         the application, in which case, a certified copy of the power of attorney shall
         accompany the application. Such limited company or corporation may be required
         to furnish satisfactory evidence of its existence before pre-qualification is filed.
         They should also furnish article of Memorandum of Association.

2.4      If the application is made by a group of firms, the sponsoring firm shall submit
         complete information pertaining to each firm in the group and state in covering
         letter attached to the application as to which of the firm have the responsibility
         of applying for tender, submission of tender and for completion of contract
         documents and furnish evidence admissible in law in respect of the authority
         assigned to such firm on behalf of the group of firms for applying for tender,
         submission of tender and for completion of contract documents. The full and
         satisfactory evidence pertaining to the participation and responsibility of each
         member of the group of the firm in the tender shall be furnished along with the
         pre-qualification documents duly signed by each firm.

2.5      Witnesses and sureties shall be, person of status and probity and their full names,
         occupations and addresses shall be stated below their signatures.




                                                                                      Page 6 of 34
2.6    If the application is made by a proprietary firm it shall be signed by the proprietor
       above his full type written name and the full name of his firm with its current
       address.

2.7    Any change in the legal status of the applicant, subsequent to submission of Pre-
       qualification Application will render the application as non responsive.

3.0    Final Decision Making Authority:

3.1    Government of Madhya Pradesh, Water Resources Department reserves the right
       to accept or reject any of the Application for pre-qualification without assigning
       any reasons thereof and their decision shall be final.

4.0    Particulars Provisional:
4.1    The particulars of the proposed work given as well as in the brief note are
       provisional and must be considered only as advance information to assist
       applicants.

5.00   Site Visit:

5.1    The site or work may be inspected by the Applicant or his Representative at his
       own cost in consultation with the Executive Engineer, WATER RESOURCES
       DIVISION, UMARIA (M.P.) indicated vide statement under Para 1.1 of the
       invitation for pre-qualification applications. The same is detailed at Appendix -1

6.0    Eligibility for Pre-qualification:

6.1    The application in the same name and styles must be a well established Civil
       Engineering Contractor with five years experience and capability in construction
       of earthen dam and masonry and concrete work of structures or similar civil
       engineering works involving excavation in all types of soil and rock, earth work,
       pitching, rock-toe, structures of stone masonry and reinforced and mass concrete
       work and other items, connected with construction of an earthen dam.

6.2    The applicant in the same name and style must give evidence of having adequate
       financial capability for mobilizing equipment and personnel for similar value of
       contract and in the deployment of suitable equipment for excavation of all type of
       soil and rock, earth work, pitching, rock toe, structures of stone masonry and
       reinforced and mass concrete work stone masonry works and jobs as indicated
       vide 6.1 above.

7.0    Minimum Qualification Criteria:

7.1    To qualify, each applicant in the same Name and style should have in last five
       financial years 2006-07 to 2010-11



                                                                                  Page 7 of 34
(a)       Executed similar work as indicated vide Para 6.1 in any one year during the last
          five financial year 2006-07 to 2010-11 which shall not be less than the minimum
          physical turnover fixed for the work in quantum vide Appendix –II

(b)       Achieved Annual Financial Turnover in any one of the last five financial years
          2006-07 to 2010-11 price level not be less than minimum financial turnover fixed
          for the work in quantum vide Appendix-II

Note:     Turnover of previous years shall be given an additional weightage 10% per year to
          bring them 2010-11 price level to account for price escalation as illustrated below:

          Year                  Annual Turnover             Assumed Annual Turnover
                                                               at.2009 Price level

        2006-2007                           A                        1.4 X A
        2007-2008                           B                        1.3 X B
        2008-2009                           C                        1.2 X C
        2009-2010                           D                        1.1 X D
        2010-2011                           E                        1.0 X E



7.2       The Physical and financial requirement for Pre-qualification, as per Para 7 are
          given in Appendix – II

7.3       To be eligible for Pre-qualification , applicants shall provide evidence of Madhya
          Pradesh Water Resources Department of their meeting eligibility indicated in Para
          7.1 & 7.2 above .For this the applicants are required to furnish along with their
          applications, certificates obtained from the concerned authorities/employers
          towards proof of their having executed the contracts satisfactorily including
          details of quantities executed . All other certificates should be countersigned by
          the Engineer-in-charge, not below the rank of Executive Engineer towards proof
          of there having executed the contracts satisfactory including details of quantities
          executed physically and financially.

7.4       The application submitted shall also include the following:-

          (a)      Letter of transmittal.

          (b)       Copies of original documents defining the construction or legal status,
                structure and organization, place of registration and principal place of
                business of applicant in For- F-1

          (c)      Report on the financial standing of the Applicant in Form-F-2

          (d)      Details of experience in form F-3 and past performance of the applicant for
                construction of earthen dam and its appurtenant works with masonry and
                P.C.C./R.C.C. works of structures and of similar nature during the last five

                                                                                    Page 8 of 34
              financial year 2006-07 to 2010-11 in Annexure-A , and details of Plant and
              Equipment in Annexure- ‘C’ & ‘D’.

        (e) Any other relevant additional information in Form – F 4

7.5     Statement No. S-1 to S-4 for indicating quantities of various items executed during
        last five financial years 2006-07 to 2010-11 are to be enclosed for furnishing the
        desired information while submitted the pre-qualification applications. Similarly
        Statement No.S-5 is meant for indicating cost of these works completed and in
        hand during the said five financial years 2006-07 to 2010-11

7.8     Even though, the applicants satisfy the above requirements, they are subjected to
        be disqualified if they have.

        (a)       Made signature or false representations in the forms, statements and
              attachments required in pre-qualification documents and or have;

        (b)     Record of poof performance such as abandoning the work, not properly
              completing contracts etc. or financial failures.

7.7     Evaluation Criteria for Pre-qualification.

7.8     The details provided by the applicants will be scrutinized as per physical and
        financial criteria prescribed under Para 7 above and the applicant’s eligibility for
        pre-qualification for the work evaluated.

8.0     Bid Capacity:

8.1     Applicants who meet the minimum qualifying criteria in the evaluation as stated
        above are to be evaluated further for bid capacity as under:

        Bid Capacity = (1.5 A X B)      C

        Where

  A =    Maximum value of civil engineering works executed in any one year during the
         last five year (10% weightage per year shall be given to bring the value of work
         executed at present price level)

  B =    Proposed contract period in years.

  C =    Amount of work in hand at present.

8.2      The applicant will be pre-qualified only, if this bid capacity. (Total cost of work
         as per Annexure-1) is considered adequate for the work.


                                                                                  Page 9 of 34
8.3   At the bid evaluation stage, a careful check of appropriate reference with
      reference to updated information on pre-qualification will be done and in no
      event a contract will be awarded to a bidder lacking the financial and technical
      resources to undertake the work regardless of pre-qualification.

9.0   Pre –qualification applications received after the time and date stipulated will not
      be considered. Water Resources Department will not be responsible for delay in
      receipt due to postal delay or loss, if applicant is sent by post.




                                                                               Page 10 of 34
                                        Appendix -I
             BHADAR DIVERSION SCHEME, BLOCK-MANPUR
                            WATER RESOURCES DIVISION
                                  UMARIA (M.P.)

                       Details of work proposed to be put to tender

S.No.     Particulars of works      Approxim       Particulars of main clubbed     Remarks.
                                    ate cost of               items
                                     work in

 01     Construction    of   Main   Rs 614.57     (1) All type of 327969.00        Quantities
        Canals,(RBC&LBC)and          lacs (Rs.    Excavation   like Cum.           shown are
        Minor Canals &      Canal   Six Carore    Soil,       Hard
        Structures   of    Bhadar                                                 approximate.
                                      fourteen    Moorum, Rock like
        Diversion scheme       in
        Manpur Block.               Lakhs fifty   D.R. & S.R.
                                       seven
                                    thousand      (2) All type of 8042.07
                                        only)     P.C.C, R.C.C, & Cum.
                                                  Stone Masonry


             Total                                               Rs 614.57 lacs



                                                             Executive Engineer
                                                       Water Resources Division Umaria
                                                            District-Umaria (M.P.)




                                                                                  Page 11 of 34
                                                             Appendix -II
                                      WATER RESOURCES DIVISION UMARIA (M.P.)
                                     BHADAR DIVERSION SCHEME, BLOCK-MANPUR
                                             Minimum Qualification Criteria
S.N.   Physical &            During any one of the last five Financial Years 2006-07 to 2010-11                    Remarks
        Financial
                        All types of Excavation Like Soil,   All types of PCC , R.C.C. & UCR Stone
                       Hard Moorum, Rock Like D.R. & S.R.                   masonary

 1          2                          3                                         4                                     5

 1     Department                76526.00 Cum                               1876.48 Cum                 Work Order period has been
        Minimum                                                                                         treated as 18 months including
       Qualification                                                                                    rainy season.


                                                                                                        Executive Engineer
                                                                                                  Water Resources Division Umaria
                                                                                                       District-Umaria (M.P.)




                                                                                                                           Page 12 of 34
     PART - II



APPLICATION FORM

       FOR

PRE-QUALIFICATION




                    Page 13 of 34
                                      Letter of Transmittal
   Place…………………….                                                               Date ............................


      Engineer –in-Chief                   Chief Engineer                 Superintending Engineer

  WATER RESOURCES DEPT              WATER RESOURCES DEPTT.              WATER RESOURCES CIRCLE,
      BHOPAL (M.P.)                 GANGA BASIN REWA (M.P.)                 SHAHDOL (M.P.)

Subject:- Submission of Pre-qualification for the work of “Construction of Main
Canals,(RBC&LBC)and Minor Canals &                 Canal Structures of Bhadar
Diversion scheme in Manpur Block.
Sir,
1. Having examined the details given in the invitation and the brief note for BHADAR DIVERSION
SCHEME, BLOCK-MANPUR, DISTT. UMARIA WATER RESOURCES DIVISION,
UMARIA (M.P.), We hereby submit the pre–qualification information and relevant documents.


       2. We hereby certify that the statements made and information supplied in the enclosed forms F-1
       to F-7, Annexure A to E and Statement S -1 to S-5 are true and correct.

       3. We submit the requisite certified solvency certificate (s) and authorise the Water Resources
       Department to approach the authority issuing the solvency certificate(s) to verify the correctness
       thereof. We also authorise the water Resources Department to approach individuals, employers,
       Firms and corporations to verify our competence and general reputation.

       We submit the following certificates in support of our suitability, technical knowledge, capability
       for having successfully completed the following works as per the minimum qualifications fixed
       vide Appendix-II

       S.No.                          Works                                 Client/Owner
         1

         2

         3




Enclosures:

Date of Submission:                                              (Signature of Applicant)

                                                                           (Seal)




                                                                                                     Page 14 of 34
                                            Form : F-1
                                2. Structures And Organisation
1.   Name of the applicant                         :
2.   Nationality of the applicant                  :
3.   Office Address                                :

     Telegraphic Address                           :
     Telephone Number                              :
     Telex Number                                  :
     Fax Number                                    :
4.   Date and location of establishment            :
5.   The applicant is :                            :
     (a)       An Individual.                      :
     (b)       A Proprietary firm.                 :
     (c)       A Firm in partnership         .     :
     (d)      A limited Company or                 :
        Corporation.
     (e)       A Group of firm/Joint venture       :
        and each group of firm (if yes ,
     give complete information in
     respect of each partner)
     (f) A group of companies
6.   Attach the organization chart                 :
     showing the structure of the organ -
     nization including the names of the
     Directors and position of Offi cers.
7.   Number of years of experience                 :
     (a)       As a Prime contractor               :
        (Contractor shouldering major
     responsibility).
     (b)       In a Joint venture                  :
       (i)     In own country                      :
       (ii)   In other countries (Specify          :
       countries)
     (b)       As a Sub-Contractor                 :
       (i)     In own country                      :
       (ii)   In other countries (Specify          :
       countries)
8.   Name and address of any associates            :
     the applicant has in India who is
     knowledgeable in the procedure of



                                                                 Page 15 of 34
     Customs, Immigration Taxes and other
     information necessary to do the work.
9.   For how many years has your organi -           :
     zation been in business under its pre -
     sent name(s) what are your fields when
     your organization was established?
     Whether any/new field were added in
     your organization? And if so; when?
10. Were you ever required to suspend
    construction works for a period of
    more than six months continuously
    since you started? If so, give the
    names of the proj ect and reasons of
    failure.
11. Have you ever not completed any work        :
    awarded to you? (If so, give names
    of projects are reasons for not comp -
    leting the work).
12. In how many projects you were impo -            :
    sed penalties for delay? Please give
    details.
13. In which of field of Civil Engineering          :
    Construction do you claim specialis ation
    and interests ?
14. Give details of your experiences in             :
    construction of -
     (i) Excavation in all type of soils            :
     and rock and earth work,
     watering etc.
     (ii) Construction of rock toe and              :
     stone pitching works etc.
     (iii) All type of concrete works i.e.          :
     R.C.C., P.C.C. & Stone
     masonry, G.S. Pitching etc.
     (iv) Filter Blanket                            :

              (Signature of the Contractor)              (Seal)




                                                        Page 16 of 34
                                            Form : F-2
                                      3. Financial Statement
               (Must be given Separately for each partner in case of joint venture)

1.   Name of Firm                                    :


2.   Name of Partners / Directors                    :


3.   Capital                                         :


     (a) Authorised                                  :

     (b) Issued and Paid-up                          :
4.   (a) Details of the works completed              :
     and the applicants performance
     record for the last five financial
     years 2006-07 to 2010-11.
     (vide Annexure A-II).


     (b) Details of works on hand and                :
     the applicant's performance
     record for the last five financial
     years 2006-07 to 2010-11as
     on the date of submission of
     pre-qualification application.
     (Vide Annexure B-II).


   (c) Furnish Balance sheet and Profit          :
& Loss statement with Auditor's
   report for the last five financial
   years i.e 2006-07 to 2010-11.
   It should interalia include the
   following information.

5.   (a) Working Capital                         :
     (b) Foreign Investment                      :
     (c) Turnover (furnish reference page        :
        number of balance sheet attached)

     (i)   For the financial year - 2006-2007        :
     (ii) For the financial year - 2007-2008         :
     (iii) For the financial year - 2008-2009        :



                                                                                      Page 17 of 34
      (iv) For the financial year - 2009-2010    :
      (v)   For the financial year - 2010-2011   :
(d) Gross Income                                 :
      (i)   For the financial year - 2006-2007   :
      (ii) For the financial year - 2007-2008    :
      (iii) For the financial year - 2008-2009   :
      (iv) For the financial year - 2009-2010    :
      (v)   For the financial year - 2010-2011   :
(e) Total Liabilities
      (i) Current ratio =                        :
       current assets to current liabilities.

      (ii) Total liabilities to net worth        :
6.     Gross income from contract works          :
     which may be maximum during the
     last five years period.
7.     What is the maximum annual Turnover       :
     of the project that you can handle?
8.  Have you ever been denied tendering          :
  facilities by any Government Depart-
ment (If yes, give details).
9.    List your sources of finance               :
10. Certificate of financial soundness by        :
    Bank.
11. Name and address of your Bankers             :
   from whom reference can be obtained.
12. Have you, ever been declared bank-           :
   rupt ? (If yes, please give details)


                                                     (Signature of the Contractor)
                                                          (Seal)




                                                                                     Page 18 of 34
                                          Form : F - 3
                               4. Experience - Geographical
A.   Give summary of experience outside India in similar work /works costing more than
     Rs. ..............................Lakhs in any one of the last five fi nancial years i.e. 2006-07
     to 2010-11.                                                  .
     (Add pages, if necessary).




B.   Give summary of experience inside India in similar work, works cost ing more than
     Rs.............................Lakhs in any one of the last five financial years i.e 2006-7 to
     2010-11                                            .
     (Add pages, if necessary).




                                                              (Signature of Applicant)
                                                                 (Seal)



                                          Form : F - 4
                                  5. Additional Information
A.   Please add any further information which the Applicant considers relevant in regard
     to his capabilities.




B.   Please add any further information which the Applicant considers himself eligible for
     Pre-qualification for the work (For details please see Para 6.0 in Part -I; information
     and Instructions for the Applicants).




                                                             (Signature of Applicant)
                                                                             (Seal)




                                                                                           Page 19 of 34
                                         Form : F- 5
                                    6. Resources Personnel
      Details of Key Technical and Administrative personnel who could be

assigned to, the work in the following proforma. (Attach separate sheet if necessary)

A.     Details of the Board of Directors :
     1. Name of the Director.                    :
     2. Organisation.                            :
     3. Address.                                 :
     4. Remarks.                                 :
B.   Key Technical and Administrative
     Personnel and Consultants                   :
     1. Individual Name.                         :
     2. Qualification.                           :
     3. Present Position in office.              :
     4. Professional Experience and              :
     Details of Works carried out.
     5. Years with the applicant.                :
     6. Languages known.                         :
     7. Remarks.                                 :
C.   Managers of Firms                           :
     1. Individual's Name.                       :
     2. Qualification.                           :
     3. Present position in office.              :
     4. Professional experience and              :
     details of works carried out.
     5. Years with the applicant.                :
     6. Languages known.                         :
     7. Remarks.                                 :




                                                        (Signature of Applicant)
                                                               (Seal)




                                                                                   Page 20 of 34
                                     Form : F - 6
                          7. Resources : Plant & Equipment
A.   Details of the plant and equipment owned by the applicant which may be used for
     construction of this work (vide Annexure -'C').




B.   Give details of how additional plant and equipment may be required by the applicant
     for the work would be obtained (vide Annexu re - 'D').




                                                     (Signature of Applicant)
                                                                   (Seal)




                                     Form : F - 7
                             8. Experience : Geographical
1.   Give summary of experience outside INDIA in similar works.




2.   Give summary of experience in INDIA in similar works (add additional pages, if
     necessary).




                                               (Signature of Applicant)
                                                            (Seal)




                                                                                Page 21 of 34
                                         Annexure - 'A'
                               Applicants Performance Record

     Details of the works completed and Applicant's performance record for the last five
financial years i.e. 2006-07 to 2010-11 in the following proforma. (Attach separate sheet in
case of more works).

     Proforma :
1.   Name of work.                                :



2.   Place and Country.                           :



3.   Client's Name and Address                    :




     Agreement(s) number and date.                :

4.   Total Tender cost of work.                   :

5.   Brief description of work including          :
     principal features and quantities of                                           main
items of the work executed                                            (duly supported by
certificates from                                              the Engineer-in-charge).



6.   Annual Turnover (Statement S-5)              :
     (a) Key quantities (separately) for          :
     excavation in all types of strata
     and earthwork, construction of
     rock toe and pitching, all types
     of Concrete work including
     R.C.C., Stone masonry works
     and Grouted Stone pitching.
Filter & Filter blanket.

     (b) Amount (Rs. in Lakhs) including          :
     cost of material supplied by the
     department.
7.   Period of completion                         :
     (a)   Originally stipulated time limit       :

     (b)   Extended time limit, if any            :

     (c) Actual time taken to complete            :
     the work.



                                                                                  Page 22 of 34
     (d) Reasons for non-completion of         :
     work in the stipulated time/
     extended time limit, if so.

8.   Name of Applicant's Engineer -in-         :
     charge of the work and his/their
     educational qualifications.

9.   Were there any penalties/fines/           :
     stop notices/compensation/liquidated
     damages imposed? (Yes or no, if
     yes, give amount and explanation).

10. Give details of your annual production     :
    record in respect of: (vide Statements

     S-1 to S-4) :-

     - Excavation in all types of strata and
     earth work;

     - Construction of rock toe & pitching;

     - All types of concrete work including
     R.C.C. / P.C.C. stone masonry works,
     and Grouted Stone Pitching.


     -   Filter and Filter blanket.




                                                   (Signature of the Applicant)
                                                                 (Seal)




                                                                             Page 23 of 34
                                   Annexure - 'B'
                 Applicants performance Record including Works in hand.
     Details of the work completed and applicant's performance record for the last five
financial years i.e. 2006-07 to 2010-11 (including works in hand) as on the date of
submission of Pre-qualification documents in the following proforma.
     Proforma : (Separate Form for each work)
1. Name of work                                 :
2. Place and Country                            :
3. Tendered Cost                                :
4. Name of applicant's Engineer -in-            :
    charge with educational qualifications.
5. Brief description of work including          :
    principal features and quantities of
    main items.
6. Details of work on hand                      :
    (a) Percentage of physical comple-          :
    tion and amount billed for the
    completed work.
    (b) Cost of work remaining to be            :
    done (in Rs. Lakhs).
    (c) Stipulated date of completion           :
    (d) Anticipated date of completion          :
7. Explain for non-completion of work           :
    within the stipulated time limit, if so
8. Were there any penalties/fines/stop          :
    stop notices/compensations. Liquidated
    damages imposed? (Yes or No, if
    yes, give amount and explanation).
9. Give details of your experience in           :
    annual production record: (vide
    Statements         S-1 to S-4):-
    - Excavation in all types of strata and
    earth work;
    - Construction of rock toe & pitching;
    - All types of concrete work including
    R.C.C. / P.C.C., Stone Masonry
    works & Grouted Stone Pitching.                                                   -
    Filter and Filter Blanket.
10. Were there any fines, claims or stop :
    notices filled by the employer?
    (Yes or No, if yes give amount and
    explanation).
                                                       (Signature of Applicant)
                                                              (Seal)




                                                                              Page 24 of 34
                                      Annexure - 'C'
                  Details of Plant & Equipment Owned by the Applicant
                   Which May be Used for Construction of this Work

1.   Name of equipment                         :




2.   Number of units (for each)                :




3.   Kind of make (for each)                   :




4.   Capacity (for each)                       :




5.   Normal life specified by the manufa -     :
     ctures. (for each category)




6.   Number of actual working hours put        :
     in by the machines. (for each category)




7.   Present Location(s)                       :




8.   Remarks                                   :




                                                       (Signature of the Applicant)
                                                                     (Seal)




                                                                                 Page 25 of 34
                                         Annexure - 'D'

                  Give details of how Additional Plant and Equipment,
                 which may be required for the work would be Obtained

     (A)                                    (B)                        (C)
     Available                       To be hired                To be procured
     in India                        in india                          by Import



1.   Name of equipment(s).           :



2.   Number of units. (for each)            :



3.   Kind of make. (for each)               :



4.   Capacity. (for each)                   :



5.   Normal Life prescribed by the          :
     Manufacturer (for each catagory).



6.   Approximate cost (for each in          :
     Rupees).



7.   Approximate cost or CISF value.        :
     (for each)



8.   Remarks.                               :



                                                          (Signature of Applicant)
                                                                 (Seal)




                                                                             Page 26 of 34
                                          Annexure - 'E'

                                      'kiFk&i=        (Affidavit)



     eSa@ge ¼'kiFk i= izzLrqr djus okys O;fDr@O;fDr;ksa ds
uke½         tks      fd      esllZ ---------------------------------------------------- ¼Bsdsnkj
QeZ@dEiuh dk uke½ ds                              -------------------------------------------------------

¼daiuh@QeZ esa gSfl;r½ gS vkSj                              ------------------ QeZ@dEiuh -------

-------------------- dh    vksj ls 'kiFk&i= izLrqr djus ds fy;s l{ke gS ] bl
'kiFk&i= }kjk 'kiFk iwoZd ;g izekf.kr djrk gWw@djrs gS] fd                                          -----

-----------------------------------   dk;Zikyu          ;a=h]       ty      lalk/ku        laHkkx]
e+anlkSj }kjk vkeaf=r fufonk lwpuk Øekad ----------------------------------
------------------- okLrs ---------------------------------------   ds fy;s fnukad ------------
--------------------------- dks   vkeaf=r fufonkvksa ds ckjs es izLrqr fd;s
tk jgs fufonk izi= es] fuEufyf[kr tkudkjh ds leFkZu es tks Hkh
izek.k&i=@vfHkys[k izLrqr fd;s tk jgs gSa                                       mlls eSa@ge
O;fDrxr :i ls iwjh rjg ls larq"V gSa rFkk ,rn~ laca/kh
tkudkfj;ksa] vfHkys[kksa ,oa izek.k&i=ksa dh lR;rk ds fy;s
eSa@ge iw.kZ :i ls mRrjnk;h gSa %&

     1½-        foRrh; vgZrk rFkk okf"kZd VuZ vksoj dh tkudkjh
vkfnA

     2½-        fofHkUu HkkSfrd vgZrkvksa dh tkudkjhA

     3½-        Work in hand     dh tkudkjhA

                                                                         (Signature of Applicant)
                                                                                    (Seal).




                                                                                             Page 27 of 34
                                                 Statement No. S-1
                                            All types of Excavation
                            Like Hard Soil, Hard Moorum, Rock Like DR and SR

          Minimum required Qualification 76526.00 Cum in any one year of last five financial

                                       year i.e. years 2006-07 to 2010-11

              The data to be supported by client’s certificates as required vide Para -7 Part-1

                                                                                 Quantity ( Cum)
S.No.   Name of project/ work
                                  Year        Quantity     Year       Quantity     Year       Quantity     Year       Quantity       Year        Quantity
                                2006-2007    Completed   2007-2008   Completed   2008-2009   Completed   2009-2010   Completed     2010-2011    Completed
                                               (Cum)                   (Cum)                   (Cum)                   (Cum)                      (Cum)
 1               2                 3            4           5           6           7           8           9          10            11             12




                                                                                                                 Signature of Applicant

                                                                                                                          (Seal)




                                                                                                                                    Page 28 of 34
                                               Statement No. S-2
                                All types of PCC , R.C.C. & UCR Stone masonary

           Minimum required Qualification 1876.48 Cum in any one year of last five financial

                                          year i.e. years 2006-07 to 2010-11

              The data to be supported by client’s certificates as required vide Para -7 Part-1

                                                                                   Quantity ( Cum)
S.No.   Name of project/ work
                                     Year       Quantity     Year       Quantity     Year       Quantity     Year       Quantity     Year        Quantity
                                   2006-2007   Completed   2007-2008   Completed   2008-2009   Completed   2009-2010   Completed   2010-2011    Completed
                                                 (Cum)                   (Cum)                   (Cum)                   (Cum)                    (Cum)
 1               2                    3            4          5            6          7            8          9            10         11            12




                                                                                                       Signature of Applicant

                                                                                                                   (Seal)




                                                                                                                                    Page 29 of 34
                                                Statement No. S-3
                           Data Regarding Cost of Different Items of work.
               Minimum required Qualification Rs. 204.86 lacs in any one year of last five
                                       year i.e. years 2006-07 to 2010-11

             The data to be supported by client’s certificates as required vide Para -7 Part-1

                                                                                   Quantity ( )
S.No.   Name of project/ work
                                  Year       Quantity     Year       Quantity     Year       Quantity     Year       Quantity     Year        Quantity
                                2006-2007   Completed   2007-2008   Completed   2008-2009   Completed   2009-2010   Completed   2010-2011    Completed
                                              (Cum)                   (Cum)                   (Cum)                   (Cum)                     ()
 1               2                 3           4           5           6           7           8           9             10       11             12




                                                                                                    Signature of Applicant)

                                                                                                                (Seal)




                                                                                                                                 Page 30 of 34
    PART - III



  INFORMATION

ABOUT THE PROJECT




                    Page 31 of 34
                               BHADAR DIVERSION SCHEME


       BLOCK - MANPUR                                               District-Umaria

                                  Salient features of the project


(1)    Name of Project                       -             Bhadar Diversion Scheme
(2)    Category/Basin                        -             Minor/Ganga Basin
(3)    Village, Taluk, District              -             Amarpur/Manpur/Umaria
(4)    Name of River/Nalla                   -             Bhadar River
(5)    Tribal/Non Tribal                     -             Non Tribal
(6)    Date of Commencement                  -             2011-12
(7)    Distance from District H/Q (Km.)      -             60 Km.
(8)    Original Cost (Rs. In lakhs)          -             593.06
(9)    Culturable Command Aera
       Under the project CCA (Hect.)         -             1060 Hect.


(10)   HYDROLOGICAL DATA


(a)    Catchment Aera (Sq.Km.)               -             304.00 Sq.km.
(b)    Maximum Flood Discharge (Cumec) -                   1411.90 Cumecs
(c)    Annual average rainfall (mm)          -             1013.46 mm.
(d)    75% Dependability (Mcft)              -             956.53 Mcft.


(11)   RESERVOIR DATA


(a)    Gross storage (Mcft.)                 -             NA
(b)    Live Storage(Mcft.)                   -             NA
(c)    Silt reserve (Mcft.)                  -             NA
(d)    Submergence of FRL (Ha.)              -             35.99 Ha. At HFL




                                                                                      Page 32 of 34
(12)   DAM


(a)    Length of Weir (meters)             -   68.30 M.
(b)    Maximum Height of Weir              -   7.00 M.
(c)    Top Width of Dam (meters)           -   NA
(d)    Length of waste weir (meters)       -   NA


(13)   PRINCIPAL LEVELS (meters)


(a)    Nalla Bed Level                     -   ---------
(b)    Lowest supply Level (LSL)           -   350.00 M.
(c)    Full Reservoir Level (FRL)          -   356.75 M.
(d)    Maximum Water Level (MWL)           -   NA
(e)    Top Bund Level (TBL)                -   NA

(14)   CANAL
       Main Canal and Distributaries
(a)    Head Discharge (Cusecs)             -   44.00 Cusecs (Required)
(b)    Length of Canal (RBC)               -   9.96 K.M.
                         (LBC)             -   6.72 K.M.
(c)    Length of Distributaries and Minors -   -------------
(d)    No. Of Structures                   -   90 Nos.
(15)   AERA PROPOSED UNDER IRRIGATION

(a)    perennial                           -   Nil
(b)    Kharif                              -   250 Hact.
(c)    Rabi                                -   810 Hect.
(d)    Annual Irrigation                   -   1060 Hect.
(e)    Net area to be Irrigated            -   1060 Hect.
(f)    Irrigation Intensity                -   -------------%

(16)   PRESENT IRRIGATION (If any)

(a)    Kharif                              -   Nil
(b)    Rabi                                -   Nil



                                                                         Page 33 of 34
(17)   FINANCIAL ASPECT (Rs. In Lakhs)
                                                    AA           RAA
(a)    Updated total Cost                       -   593.06       1451.36 (Proposed)
(b)    Cost/Hact. Of CCA Rs.                    -   0.97         1.369
(c)    Expenditure as on 28th Feb 2010          -   597.82
(d)    Balance cost as on March 2010            -   853.54
(e)    Balance amount proposed for AIBP
       Assistance (lakhs)                       -   Nil


(18)   Period required for completion (month)   -   18 Months
(19)   Budget allocated during current year     -   Lakhs (421.49)
(20)   Economics of the Project


(a)    B.C. Ratio                               -   1.73%
(b)    Economic Rate of Umaria                  -   0.86%


(21)   Employment Generation

(a)    Non Recurring (Man Days)                 -   148295
(b)    Recurring (Man Days)                     -   135644




      Sub Divisional Officer                              Executive Engineer
Water Resources Sub Division No. 1                  Water Resources Division Umaria
    District-Umaria (M.P.)                              District-Umaria (M.P.)




                                                                            Page 34 of 34

								