Docstoc

Invitation

Document Sample
Invitation Powered By Docstoc
					High Pressure Technology for LDPE                                                                         Eligibility requirements                                                                  Global LDPE Maintenance Workshop
                                                                                                                                                                                                    High Pressure Technology for LDPE
                                                                                                                                                                                                            - Support for Your Successful Production

The advantage of working with Uhde HPT on a new LDPE project or on maintenance projects on                Registration fee: 500,- EUR
existing plants is the advantage of working with the market leader.                                       Full-fee registration includes:
We are the supplier who has the widest scope of equipment supply anywhere in the world, ranging           Free attendance at the presentation, workshop facilities, proceedings and CD, coffee
from reactors and vessels to pumps, valves and much more. Also, more than any other supplier, we          breaks, refreshments daily, lunches and conference dinner, taxes (16% VAT)
can count on broad experience from cooperation with all licensors and contractors in the business.        Welcome Reception, City Tour of Dortmund
                                                                                                          Transfers Airport - Hotel - Uhde HPT - Hotel - Airport

                                                                                                          Registration Form should be returned by March 31, 2006.

                                                                                                          Payment
Germany Football Crazy                                                                                    The fees shall be settled in Euro by Bank Transfer to
                                                                                                          Commerzbank AG Dortmund
                                                                                                          Bank Code: 440 400 37
                                                                                                          A/C: 3506409
                                                                                                          SWIFT Code: COBADEFF440,
The FIFA World Cup will rule Germany for about 4 weeks in summer 2006. Dortmund - located                 IBAN DE11 440400370350640900
near to Hagen - is one of sporting cities. Four qualifying group matches, a final-sixteen game and
                                                                                                          or by cheque.
                                                                                                                                                                                                                                                                                 C2H4
one of the two semi-finals will be held in the football-crazy city of Dortmund between the 9th of

                                                                                                          Accomodation
                                    June and the 9th of July, 2006. Intensive preparations for this
                                                      superlative sports event are already under
                                                              way. There will be a supporting pro-        Due to the FIFA World Cup taking place in June 2006 there are only a small number of
                                                                    gramme with an abundance of           rooms available. Therefore please make your reservation (with the registration form) in
                                                                        exciting entertainment. People    good time.

                                                                                                                                                                                                                                                             Invitation
                                                                           from all over the world,
                                                                               enthusiastic competition
                                                                                 atmosphere, party
                                                                                   around the clock.                                                                                                                                                              2006, June 12, 13
                                                                                                                                                                                                                                                                    Hagen, Germany




                                                                                                          Uhde High Pressure Technologies GmbH
                                                                                                          Buschmuehlenstr. 20
                                                                                                          58093 Hagen, Germany
                                                                                                          Fon: + 49 (0) 23 31 967- 0
                                                                                                          Fax: + 49 (0) 23 31 967- 370                                                                                                    A company of
                                                                                                                                                                                                                                          ThyssenKrupp
                                                                                                          info@uhde-hpt.com                                                                                                                Technologies
                                                                                                          www.uhde-hpt.com                                                                                                                                High Pressure Technologies
From:          info@uhde-hpt.com
To:            customer@ldpe.com
                                 Workshop
Attn:          LDPE Maintenance
               2006-01-30    10.30 a.m.
Date:
                                                                                Programme                                                                          Speakers

Dear Customer,                                                            l
                                                    d building specia
                                                                                Sunday, June 11      19.00   Welcome Reception in the Hotel Lobby

                                   en developing an
For 75 year   s Uhde HPT has be         applications. Al
                                                           ready for 50                              Focus on HP Pumps
                    ny high pressure                      re equipment
                                                                                                                                                                                                                                         Rainer Achatzi
equipment for ma                      g the high pressu
                                                                                Monday, June 12

                    en   manufacturin                    clave reactors,
years we have be                      tubular and auto
                                                                                                     09.00   Welcome and Introduction to Uhde HPT

                ts. This includes
                                                                                                                                                                                           Waldemar Hiller
for LDPE plan                                    at exchangers.
                               separators and he
                                                                                                     09.15   LDPE Overview and Market News                                                                                               Mechanical engineer,

valves,    catalyst pumps,                   s have supervised
                                                                   the
                           our site engineer
                                                                                                     09.35   Introduction to Catayst Injection Pumps                                                                                     worked for Uhde
                                                                        d a
                                                                                                                                                                   Christoph Lütge
 Duri ng these years,                    more than  50 plants. We ha
                                                                                                     10.30   Workshop Tour                                                                 Mechanical engineer,

                     our equipment in
                                                                                                                                                                                                                                         HPT between 1990
                                                                                                                                                                   PhD                                            Holger Werth
 installation of                                            d  incorpora-
                                         t plant sites an
                                                                                                     11.15   Latest Developments and Upgrade Options

                     from the differen
                                                                                                                                                                                           has been working for                          and 2003 as a

 lot of feedback                                              oducts as
                             in order to  customise our pr
                                                                                                                                                                                           Uhde HPT since                                mechanic for HP

 ted ma  ny new features                  l needs.
                                                                                                     12.00   Lunch

                       to the operationa
                                                                                                                                                                   Chemical engineer,      1994 as a design       Mechanical engineer,   pumps and other

 much as possible
                                                                                                                                                                   has been working        and materials spe-     worked for Uhde        LDPE components.
                                                                    ability
                                                                                                     13.00   Workshop Maintenance Practice:
                                                tenance and reli
                               fer to your main
                                                                                                                                                                   for Uhde since 1994     cialist. Since 2000    HPT between 1982       He has been working
                                                                                                             Parts Identification, Run-in Procedure
          would like to of                                                e
  Now we                                h and broade  n their knowledg
                                                                                                                                                                   (process, R&D, en-                             and 1990 as a

                      rkshop to refres
                                                                                                                                                                                           marketing manager                             since 2004 as a
                                                                   we want
  specialists a wo                         d practical sessio
                                                                ns
                                                                                                     15.00   Users’ Forum: Case Studies, Questions, Discussion

                        In theoretical an
                                                                                                                                                                   gineering) and for      for LDPE.              design engineer for    mechanical specia-

  on high pressure.                                               spection
                                 lopments, ma intenance and in
                                                                                                             We invite you to prepare your case study as a short   Uhde HPT since          Latest position:       HP pumps. He has       list for HP pumps

  to discus  s technical deve            as much at ex  perienced high
                                                                                                             PowerPoint presentation                               2001. Prior to Uhde                            been working since

                      rkshop is aimed
                                                                                                                                                                                           Sales & Market                                and autofrettage.
                                                                         t
  practice. The wo                                   engineers withou
                                   new maintenance
                                                                                                     17.00   Transfer to the Hotel                                 engaged in R&D on       Manager                1990 as a Sales and    Latest Position:

   pressure spec  ialists as at
                                                                                                                                                                   high pressure appli-                           Service Engineer for   Sales & Service
                          background.
   any high pressure
                                                                                                     19.00   Conference Dinner                                     cation of supercriti-                          HP pumps.              Engineer

                                                            are the key to
                                        motivated people
                                                                                                                                                                   cal fluids.                                    Latest position:

                     responsible and                                        e                        Focus on HP Valves and Tubes
   Knowledgeable,                                      of our Maintenanc
                                    n. The objective
                                                                                                                                                                   Latest position:                               Senior Sales

               and safe operatio
                                                                                Tuesday, June 13

   efficient                               e on high pressu   re technology
                        omote the knowledg
                                                                                                     09.00   Introduction to HP Valves in LDPE Plants              Managing Director                              Engineer

    Workshop is to pr
                         on plants.
                                                                                                     09.45   Presentation of New Let-Down Valve Controller

    for LDPE producti
                                                                                                     10.30   Workshop Maintenance Practice:
                                                                                                             Control Valve Testing and Settings

   Best regards,                                                                                     12.00   Lunch

   Waldemar Hiller
                                                                                                                                                                                           Peter Schütte
                   g Manager
   Sales & Marketin
                                                                                                     13.00   Fabrication and Inspection of HP Tubes                                                                                      Georgios
                                                                                                     14.00   Workshop Maintenance Practice:                                                                                              Logothetis
                                                                                                                                                                   Bernhard Druffel
                                                                                                             Re-Autofrettage and Eddy Current Inspection
                                                                                                                                                                                           Electrical engineer,
                                                                                                                                                                                           has been working
                                                                                                     15.30   Users’ Forum: Case Studies, Questions, Discussion
                                                                                                                                                                   Mechanical engineer,    for Uhde HPT since     Rolf Wink              Mechanical engineer,
                                                                                                     17.00   Transfer to the Hotel
                                                                                                                                                                   worked for Uhde         1970 in the instru-    PhD                    has been working for
                                                                                                                                                                   HPT between 1991        mentation depart-                             Uhde HPT since
                                                                                                     19.00   City Tour of Dortmund                                                         ment. Special know-    Mechanical engineer,   1991 in the fields of
                                                                                                                                                                   and 1997 as a Pro-
                                                                                                             Public Viewing: Brazil vs. Croatia                                            ledge and experien-    has been working for   heat exchangers and
                                                                                                                                                                   ject Engineer for HP
                                                                                                                                                                   valves and separa-      ce in hydraulic        Uhde HPT since         process engineering.
                                                                                Wednesday, June 14   09.00   Discussion of Client-Specific Topics                                          systems for LDPE       1987 as a design       Since 1998 speciali-
                                                                                                                                                                   tors. Since 1997
                                                                                                                                                                   specialisation on HP    plants.                and analysis specia-   sation on LDPE reac-
                                                                                                                                                                   valves for LDPE and     Latest position:       list.                  tors and piping
                                                                                                                                                                   Urea Plants.            Senior Instrumenta-    Latest position:       systems.
                                                                                                                                                                   Latest position:        tion Engineer          Chief Mechanical       Latest position:
                                                                                                                                                                   Senior Sales and                               Engineer               Senior Sales
                                                                                                                                                                   Project Engineer                                                      Engineer

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:25
posted:9/10/2011
language:English
pages:2