professional documents
home
Upload
docsters
Upload
Pollution Prevention Tracking and Reporting System (PPTRS) Josh Silverman EH-43 The Bottom Line • The PPTRS is changing from a numerical tracking system, designed to measure waste volumes, to a Performance Measure and OMB scorecard tracking system. – These measures are qualitative rather than quantitative – The reporting is more explicitly tied to activities identified in a site’s EMS 2 Recap: the existing system • Three separate databases, each created with different programming tools • Outdated and limited in functionality • Locked into this system to complete the 2005 waste reduction goals – We’re done (congratulations/thanks), it’s time to move on. 3 PPTRS: One System or Three? • The PPTRS is really three systems: – Waste Generation Reporting – Environmentally Preferred Purchasing Reporting – P2 Award Nominations • Initially, we considered replacing these with a brand new data system. – Too expensive for the uses of the system – Instead, we will modernize and align the three systems 4 Goals of the Redesign • Apply common look and feel • Improve consistency across the system • Make data entry easier (i.e., fewer logins, easier file uploads, etc.) • Improve analytical capabilities • Incorporate new Performance Measures • Improve administrative controls 5 EPP Entry Form 6 EPP Entry Form 7 Changes: EPP • EPP is the system that will see the fewest changes – New biobased products will be added • Optional in 2006, required in 2007 • Existing optional reporting for biobased products to change accordingly – Electronics purchasing will be added – Improved reporting capability 8 Waste Volume Reporting 9 Changes: Waste Generation • Waste volume reporting is no longer required by EH • Data no longer needed for EO 13148 reporting – Existing functionality will remain – PSO prerogative to instruct sites to enter data 10 Site Profile Entry Form 11 Changes: Site Profile • Expect major changes to ―site profile‖ section – Much of the new information will fall in this section – Most Performance Measures will be captured in this section. 12 Example: Reporting New Performance Measures Goal 1: Waste Prevention 1.a Has waste generation been identified as a significant impact in the site's EMS? Yes No If yes, continue to 1.b. If No, skip to 1.e. 1.b Has waste prevention been included as an objective and measurable target in the site EMS? Yes No If yes, continue to 1.c. If No, skip to 1.d. 1.c Have pollution prevention operational assessments of waste generating activities been included as objectives and measurable targets for waste prevention and P2 assessments? Yes No 1.d Were the resources needed to implement EMS objectives and targets for waste prevention and P2 assessments? 13 Yes No Accomplishments Reporting 14 Changes: Waste Generation (cont.) • Accomplishments reporting will see major changes – Open all year long; no need to wait until October to enter an accomplishment – Simplified (or eliminated) cost/benefit worksheet • Sites used the worksheet sporadically and inconsistently – Linked with Awards database 15 Changes: Waste Generation (cont.) • Certain reporting elements will come through the accomplishments section • Example: – 4.e Describe any notable application of the sustainable building design and development criteria during the reporting period – 5.e Describe notable post consumer recycling actions taken and/or P2 assessments conducted during the reporting period 16 P2 Award Entry Form 17 Changes: Awards Database • The Awards database will be completely rewritten – Awards a subset of the Accomplishments • Person doing data entry will select whether the Accomplishment will also be an award • If the award option is selected, the user will be taken to the appropriate screen • Maintain alignment with CTC process, but also support P2 Star awards – Improved file upload and handling capability 18 Where We Go From Here • Show me the money! • Pilot this summer, ready to roll for October data call • Volunteers for piloting new system – Thank you PPPL – Any others? • Continuous improvement—expect ongoing modifications as needed 19
flag this doc
21
0
not rated
0
7/11/2008
English
Preview

Pollution Prevention Tracking and Reporting System PPTRS

DeptEnergy 7/11/2008 | 21 | 0 | 0 | legal
Preview

The VALUE ADDED of the Department of Energy

DeptEnergy 7/11/2008 | 104 | 0 | 0 | legal
Preview

The VALUE ADDED of the Department of Energy

DeptEnergy 7/11/2008 | 59 | 1 | 0 | legal
Preview

The VALUE ADDED of the Department of Energy

DeptEnergy 7/11/2008 | 62 | 0 | 0 | legal
Preview

The VALUE ADDED of the Department of Energy

DeptEnergy 7/11/2008 | 64 | 0 | 0 | legal
Preview

The VALUE ADDED of the Department of Energy

DeptEnergy 7/11/2008 | 61 | 0 | 0 | legal
Preview

U.S. Department of Energy Office of Energy Efficiency and Renewable Energy - Tribal Energy Program

DeptEnergy 7/11/2008 | 75 | 1 | 0 | legal
Preview

Inter-Tribal Energy Network and U.S. Department of Energy Strategic Planning Session

DeptEnergy 7/11/2008 | 53 | 0 | 0 | legal
Preview

Green Power Initiatives at the U.S. Department of Energy

DeptEnergy 7/11/2008 | 54 | 1 | 0 | legal
Preview

U.S. Department of Energy Personal Property Loan Agreement

DeptEnergy 7/11/2008 | 47 | 0 | 0 | legal
Preview

Energy Department to Fund Tribes' `First Steps' In Developing Clean Energy

DeptEnergy 7/11/2008 | 27 | 0 | 0 | legal
Preview

Energy Department Awards Enable Tribes to Assess Renewable Energy Resources

DeptEnergy 7/11/2008 | 53 | 0 | 0 | legal
Preview

U.S. Department of Energy State Energy Program Fiscal Year 2005 Guidance to the States for SEP Formula Grants

DeptEnergy 7/11/2008 | 42 | 0 | 0 | legal
Preview

United States Department of Energy Office of General - Presentations

EIA 5/30/2008 | 20 | 0 | 0 | legal
Preview

A Highly Successful Holistic Approach to a Plant-Wide Energy Management System

DeptEnergy 7/11/2008 | 65 | 0 | 0 | legal
Preview

United States Industrial Electric Motor Systems Market Opportunities Assessment

DeptEnergy 7/11/2008 | 73 | 1 | 0 | legal
Preview

Industrial Assessment Center Case Study

DeptEnergy 7/11/2008 | 63 | 0 | 0 | legal
Preview

Modernizing Controls Reduces Steam Consumption at ExxonMobil Chemical Plant

DeptEnergy 7/11/2008 | 55 | 0 | 0 | legal
Preview

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

DeptEnergy 7/11/2008 | 61 | 0 | 0 | legal
Preview

Quick PEP Supplied Electricity Worksheet

DeptEnergy 7/11/2008 | 52 | 0 | 0 | legal
 
review this doc