DAS005 Three Point Estimate

Document Sample
DAS005 Three Point Estimate Powered By Docstoc
					Three Point Estimate
Instructions:
Enter the a,m, and b values for each Task into columns C,D and E. The E and SD values for each task will be calculated and displayed in
columns F and G. A task estimate with at least 95% confidence and the required task booking value is calculated and displayed in columns H
and J.

Based on the individual task estimates the E value and SD for the project will be calculated and displayed as will the overall work estimate for
the project with at least 95% confidence levels.




          Project Code/Name:              DAS005 Email for Life

          Project Start Date

          Estimate Date                   25th May 2010

          Project Stage                   Plan

          Estimate Reference

          Notes and Assumptions

          The bulk group change facility is being delivered and billed as part of ITS029 and is therefore not included in this estimate (as per
          discussion with Bill Lee 31.05.10 - Richard Good's feedback to Bill).

          This estimate assumes that Aluminati will provide appropriate data encryption to recognised standards (SSL).



          Estmate Contributors
          Role                                        Name                              Signature
          Project Manager                             Lorraine Samson
          UNIX                                        Graeme Wood
          Dev Team                                    Bill Lee
          Dev Tech                                    Iain Fiddes
          Production Management                       David Smyth
Project: Email for Life - DAS005                                     Three Point Estimate                                                            Date:31.05.10
Project Stage: Plan

                                                                                                                                                        Task
                                                               Team(s), Role(s) or                                                                     Estimate
                                                            Individual(s) Responsible      Best Case    Most Likely   Worst Case              SD         95%
Stage      Task                                               for Execution of Task        Estimate a   Estimate m    Estimate b   E Value   Value    Confidence

           Project Management                                   Lorraine Samson                                                      0.0      0.0        0.0

           Training                                                                                                                  0.0      0.0        0.0

           Quality Assurance                                           All                    1.0           1.0          1.0         1.0      0.0        1.0

Initiate   Project proposal                                     Alex Hyde-Parker                                                     0.0      0.0        0.0

Plan       Request project code & set up new website             Project Manager              0.5           1.0          2.0         1.1      0.3        1.7
           Draft project brief                                   Project Manager              0.5           1.0          2.0         1.1      0.3        1.7

Do it      Business analysis & BRD                               Project Manager              0.5           1.0           1.5        1.0      0.2         1.4
           UNIX development (IS Other)                           IS ITI / Aluminati           8.0          10.0          15.0       10.5      1.2        12.9
           Provide advice and support to Aluminati during   Dev Team / Prod Man / Serv
           channel development                                           Man                  1.0           2.0          3.0         2.0      0.4        2.8
           Bulk Group Change facility development                    Dev Team                 0.5           0.5          0.5         0.5      0.0        0.5
           Update architecture documentation                         Dev Tech                 0.5           0.5          1.0         0.6      0.1        0.8

Check it UAT                                                 D&A or Aluminati (TBC)                                                  0.0      0.0        0.0
         UAT Support                                               Dev Tech                   1.0           1.0          2.0         1.2      0.2        1.6

Release Test and publish channels                              Prod Man / Serv Man             1             1            2          1.2      0.2        1.6
        Implementation to Live                                      Prod Man                  1.5           2.0          3.0         2.1      0.3        2.7

Close      Closure                                               Project Manager              0.5           0.5          1.0         0.6      0.1        0.8


           Totals                                                                                                                    23                   30

           E (Project Work)                                                                   23
           SD (Project Work)                                                                   1
           Project Estimate > 95% Confidence                                                  30


           Update architecture documentation - Dev Tech:
           added 0.5 day but this will be accounted for
           under original estimate of 29 days.



                                                                             Page 2 of 2

				