					State of California - Department of Transportation EXTRA WORK BILL (SHORT FORM) Date Performed :d: WEEK ENDING 10/07/07 /15-16 WORK PERFORMED BY : Elijah Electric DESCRIPTION OF WORK: #204109 16 reg. hours EQUIPMENT Equip No. EQUIPMENT CLASS/MAKE Code Hours/ Units Hrly/Dly Rate Delay Factor Extended Amount P.R. No. RICH MEZA LABOR LABORERS, FOREMANS, etc. Hours Reg 16 O.T. Hourly Rate Reg $72.43 O.T. Extended Amount $1,158.88 Date of Report : 10/16/07 Cont. Job No.: Contract No. Cont. RPT NO. CCO NO.

Equipment Sub-Total
MATERIAL and/or WORK done by specialists Description Units Unt Cst Total Labor Surcharge Subsistence Reg. 17%

Sub-Total
O.T. 16%

$1,158.88
$197.01

Travel Expense Other Total Cost of Labor Total Cost of Equipment Total Cost of Material Markup on Labor Cost (27%) Markup on Equipment (15%) $366.09 $1,355.89

Material & Specialist Sub-Total

Markup on Material (15%)

Total This Report

$1,721.98

f54b8bf5-5660-433f-857a-6289d673c037.xlsForce Account Analysis

8/3/20098:34 AM

Sheet1

DATE LAB DRILLER HELPER LABORER DRIL. RIG. TRUCK TRUCK WATER TANK PIPE $35.95 $30.83 $30.83 $100.00 $6.67 $11.61 $2.82 $0.75

10/18/1996 10/21/1996 10/22/1996 10/23/1996 10/24/1996 10/25/1996 10/26/1996 11/2/1996 11/5/1996 11/6/1996 11/7/1996 11/12/1996 10 11 3 3 3 3 3 3 0 8 8 8 8 8 8 6 6 6 6 3 3 3 3 3 3 300 7 7 9.5 9.5 6.5 6.5 10 10

TOTAL 85 86 6 85 11 85 67 6000

EQUIPMENT

10 11 10

8 8

8 8 8 0

8 8 8 0

6 6 6 450

6 6 6 1500

7 7 7 600

9.5 9.5 9.5 0

6.5 6.5 6.5 600

10 10 10 1800

MATERIAL

250

500