projects
Document Sample


Project ID Main ID Seed Name Description Total Cost Donor Sector Gifts/Grants
1 true
ALB-ENE-G-CHE 01 Description: Distribution Project (PTDP)
Power Transmission and Switzerland finances two(CH) on
componentstruea non-reimbursable gr
13950009 Switzerland Energy
3 false
ALB-ENE-G-JAP 01 Description: The objective is to improve the safety truethe hydropower dams,
95000 Japan Energy APL5
Energy Community of South Eastern Europe(JP) Energy of
4 true
ALB-ENE-G-SPA 01 the use of Installation in Albania
50000 Spain (ESP)Energy true
Promotion ofDescription:solar energyof a photovoltaic system at the Politechnic University
5 true
ALB-ENE-L-WB 01 Description: The project consists Programme - APL 5 for (1) physical SAF
32510880 World Bank (WB) Energy false
Energy Community of South East Europe APLof two main components:Albania DAMinfras
6 false
ALB-ENE-L-WB 02 of the Power Distribution World Bank (WB) (OSSH) to the Risk Guarantee
56019000 System Operator Energy false
Privatization Description: This operation is expected to be similarPartial previous Bank PR
7 true
ALB-MUN-G-AUT 01 Description: Developing the Quark Shkodra, TA infrastructure
3500000 Austria
Regional Development Programme Shkodra (AUT) true
Municipal for regional administration a
8 true
ALB-SOC-G-UNDP 01 The project aims to establish a and Equal Opportunities to monitor within the
27584 United Nations Development Programme the Natio
Social sectors
true
Support to Ministry of Social Affairs, Labour,Monitoring and Evaluation Capacity (UNDP)
9 false
ALB-MUN-G-UNDP 02 Description: Rehabilitation and/or reconstruction oftrue Programme (UNDP) in
168715 United Nations Development community public
Kukes Regional Development Initiative Phase 2 Municipal infrastructure small
10 true
ALB-MUN-G-UNDP 03 Description: Rehabilitation and/or reconstruction oftrue Programme (UNDP) in
24882 United Nations Development community public
Kukes Regional Development Initiative Phase 3 Municipal infrastructure small
11 true
ALB-MUN-G-UNDP 01 Description: This278018 United designed to directly support mine/ERW surv
programme is Nations Development Programme (UNDP)
Municipal infrastructure
Support for social and economic reintegration of mine ERW survivors true
12 true
ALB-MUN-L-CEB 01 Description: The proposed programme combines infrastructure rehabilitation
14380000 Council of Works Programme 3rd Phase.
Municipal infrastructure
true
Albanian Development Fund (ADF) - CommunityEurope Development Bank (CEB)
13 true
ALB-MUN-L-EIB 01 Description: Loan Lending
20000000 European Investment Bank (EIB)
Municipal infrastructure
false
TB Loan for SMEs and Priority for financing SME projects, infrastructure projects promote
14 true
ALB-PSD-L-GER 01 Description: The goal of this
3400000 Germany (GER) sustainable improvement of acce
is the false
Credit for SMEs i.rural a.urban regions measure Private sector development
15 true
ALB-SOC-G-AUT 01 Description: 400000 Austria (AUT) Social sectors 11
at
Economic School ProjectModernization of economic education true secondary vocationa
16 true
ALB-SOC-G-AUT 02 in the district of Puka Austria (AUT)
73000 Social sectors
true
Mobile ClinicDescription: Establishemnt and operation of a mobile clinic in the district of P
17 ALB-SOC-G-CAN 01
true Description: Early Childhood Curriculum
Early Childhood Curriculum Project Canada (CAN) Project (ECCP) is based on Québec
534999 true
Social sectors
18 true
ALB-SOC-G-CAN 02 of paraplegic and Tetraplegics invalids. Thesectors
projects addresses theSocial legal framework.
of
Social statusDescription: The 247666 Canada (CAN) problems truePara and Tetraplegics
19 true
ALB-SOC-G-CAN 03 Description: The project will focus(CAN) following true
Support to Pre-School Education 73190 Canada on the Social sectorsareas: (i) furnishing the kin
20 true
ALB-SOC-G-CHE 01 Description: The project aims Section at thesectors
2921520 Switzerland (CH) University life of the handicape
Social true
Development of the Specialised Pedagogyat improving the quality ofof Vlora (DSPS) (PH
21 true
ALB-SOC-G-CHE 02 Description: The overall goal is to improve the quality of health
1075368 Switzerland (CH) sectors
Social true
Programme to build up the professional Development System (PDS/CCE) care services
22 true
ALB-SOC-G-CHE 03 Description: The 200019 aims at improving sectors
project Switzerland (CH)
Social true
Rehabilitation of the elementary school in Kalur, Lezhe the access and the quality of educ
23 false
ALB-SOC-G-EC 01 consumer protection against zoonotic Project 18 (EC)
5700000 European Commission true
diseases
Improving of Other projects references: IPA 2008 - Social sectors
24 true
ALB-SOC-G-EC 02 Description: Support for construction and rehabilitation of VET schools/works
8000000 European Commission (EC)
Social sectors
Strengthening the Vocational Education and Training in Albania true
25 true
ALB-SOC-G-EC 03 Description: system
3300000 project regards the sectors
Social provision
true
Assistance to the Justice The present European Commission (EC) of technical assistance
26 true
ALB-SOC-G-EC 04 Description: This project European Commission (EC)
Infrastructure further improvement of existing capac
Support to the Penitentiary10000000 will serve theSocial sectors true
27 true
ALB-SOC-G-EC 05 Description: This project will (IPA 2008)
6500000 European Commission outlined objectives by build
Social sectors
Support to the Penitentiary Infrastructure partially address the(EC) true
28 true
ALB-SOC-G-EC 06 This is the contribution to the EC's Commission (EC)
Social sectors
true
Tempus, Erasmus Mundus 2000000 Europeanstudent and education mobility programm
29 true
ALB-SOC-G-GER 01 Description: 300000 Germany (GER) health
Social true
Health Sector Reform TC for capacity development of sectorsinsurance instituteObjecti
30 true
ALB-SOC-G-GER 02 Description: The 200000 focusses its activities on the pilot regions Korca, Shk
Support to handicapped children Social
project Germany (GER) sectors true
31 true
ALB-SOC-G-GER 03 Description: The key issue is the constitutionsectors
1000000 Germany (GER) Social of a university of cooperative ed
Sustainable economic development through vocational education true
32 true
ALB-SOC-G-GER 04 Description: TC for improving vocational training intrue East Albania. In a f
VT in North Eastern Albania1800000 Germany (GER) sectorsSocial North
33 true
ALB-SOC-G-GRE 01 of Elementary School31280 of Elementary School true
ConstructionDescription: ConstructionGreece (GR)Social sectors
34 true
ALB-SOC-G-GRE 02 of Elementary School 7750 of Elementary SchoolObjectives: Issues: Other pro
ConstructionDescription: ConstructionGreece (GR)Social sectors true
35 true
ALB-SOC-G-GRE 03 Description: Modernization of emergency treatment
100000 Greece hospital of Gjirocastra
true
Modernization of emergency treatment unit of (GR)Social sectors unit of hospital of Gjiroka
36 true
ALB-SOC-G-GRE 04 Description: Prevention of genetical diseases in Albania
8903 Greece
Prevention of genetical diseases in Albania (GR)Social sectors true
37 true
ALB-SOC-G-GRE 05 Description: school in Korca
1500000 Greece (GR)Social in Korca
Rehabilitation of 'Seferis' Rehabilitation of 'Seferis' schoolsectorstrue
38 true
ALB-SOC-G-GRE 06 Description: Treatment Greece (GR)Social sectors
8956
Treatment gyneacological cancer gyneacological cancer true
39 true
ALB-SOC-G-ITA 01 569481 Italy (IT) Social sectors
true
Defense of the rights of persons affected by chronical mental diseases: realization of a se
40 true
ALB-SOC-G-ITA 02 390000 Italy (IT) Social sectors
Development of the transfusional medicine towards European standards true
41 true
ALB-SOC-G-ITA 03 803888 Italy (IT)
Diagnosis and social integration of umpaired minors true
Social sectors
42 true
ALB-SOC-G-ITA 04 793000 Italy (IT) system: Studytrue
Italian support to the reform of the Albanian healthSocial sectors and Technical Assistan
43 true
ALB-SOC-G-ITA 05 879410 Italy (IT) drug sectors true
Nothern Albania: integrated community service forSocialand alcohol addicted
44 true
ALB-SOC-G-ITA 06 1004930 Italy (IT) Social services
true
Nothern Albania: strenghtening of education ann training sectors of the professional cen
45 true
ALB-SOC-G-ITA 07 therapy in the Northern and Center regions of Albania
Prevention, care and physical829966 Italy (IT) true
Social sectors
48 true
ALB-SOC-G-ITA 10 891604 Italy the Social sectors Shkoder
Strengtening the emergency aid system in (IT) regional hospitaltrue of
50 true
ALB-SOC-G-ITA 12 188000 Italy (IT)
Support to the National Institute of Public Health Social sectors true
52 true
ALB-SOC-G-NLD 01 Description: Develop an Netherlands Social sectors the
(NL) in
UNICEF CLEEN TIR 16569 1593280 environmental curriculum true Albanian primary sc
53 true
ALB-SOC-G-SPA 01 Description: The through the strengthening ofconditions of children who are in
project Spain improve life Albaniantrue
Increasing human capacities 960010 aims to(ESP)Social sectors and Kosovar Educatio
54 true
ALB-SOC-G-SPA 02 retention and high drop-out rates in primary sectors in the region environmen
goal of Spain (ESP)Social school true
Reduction ofDescription: The 255155 the project is to upgrade the educational of Skhoder
55 true
ALB-SOC-G-SPA 03 the high drop-out rate in Spain (ESP)Social sectors
project primary school and improving the quality of the edu
true
Reduction ofDescription: The 298396 consists of rehabilitation of schools, training for teac
56 true
ALB-SOC-G-SPA 04 the high drop-out rate in Spain improveand Velipoje (Shkodra)
project school in Dajc educational true
Reduction ofDescription: The 347424 tries to (ESP)Social sectors environment in two prim
57 ALB-SOC-G-SPA 05
true Maternity and Children´s Health Services
Description: This multilateral project, coordinated by
Support of the reform of the 1400000 Spain (ESP)Social sectors WHO, aims to improve
true
58 true
ALB-SOC-G-SWE 01 Description: The goal is Sweden (SW) HIV epidemics in the Western Balk
HIV/AIDS Phase II the
Western Balkans Fight against67150to slow down Social sectors true
59 true
ALB-SOC-G-TUR 01 of Blood Bank project Turkey (TR) Social of a Blood Bank in Vlora is being
ConstructionDescription: The 340000 for the construction sectors true
60 true
ALB-SOC-G-TUR 02 Description: Equipment Mental Disordered People in Berat
29991 Turkey (TR) Social sectors
Equipment support for the Center forsupport for this center. true
61 ALB-SOC-G-TUR 03
true Description: The Mustafa Kemal Atatürk in sectors of the chreche were cha
Reconstraction of the chrechewindows the doors and the Orikum in Vlora city
7580 Turkey (TR) Social parquet true
62 ALB-SOC-G-TUR 04
true 30000 iner and outer Atatürk parts
Description: Some of the Turkey Kemalphysical in true Zall-Herr
Reconstraction of the primary school Mustafa(TR) Social sectors of the school were rec
63 true
ALB-SOC-G-TUR 05 Description: Support given for the Elezi. ?n Zall-Mner
25923 Turkey (TR) Social sectors true
Reconstraction of the primary school Sulejman reconstruction of the physical parts of the
64 ALB-SOC-G-TUR 06
true Description: Support Mustafa Kemal Atatürk, in Vlora
Reconstruction of the high school for the reconstruction of the school.
30940 Turkey (TR) Social sectors true
65 true
ALB-SOC-G-TUR 07 Description: The computer in Gjirokastra equipped
11006 Turkey (TR) was true
Supporting the high school Hoca Tahsinlaboratory Social sectors with the necessary mat
66 true
ALB-SOC-G-TUR 08 Description: The reconstruction of some Surrel the school was done.
8541 in the (TR) Social sectors
Supporting the high school Ymer LalaTurkeyvillage ofparts ofin true Dajti
67 ALB-SOC-G-TUR 09
true 119500 Turkey (TR) in Berat
Description: primary school of the 2, Social sectors
The reconstruction of theRe-constructionÇlirimi primary school true building and its surroindin
68 false
ALB-SOC-L-CEB 01 Description: Completion of Hospital Europe Development and services comp
10500000 Council of - 3rd of departments Bank (CEB)
Social sectors
Rehabilitation for the Regional Shkodra the realization Phase true
69 true
ALB-SOC-L-WB 01 Description: It is envisaged that Bank (WB) sectors
3982475 World the additional financing would include; (i) dev
Social Service Delivery Project Additional Financing Social false
71 ALB-TRA-G-EC 01
true Albanian Maritime Sector– construction of the new quay and
Improving of Description: To 3600000the Rehabilitation of Shengjini Port the operating s
Transport true
support European Commission (EC)
72 true
ALB-TRA-G-EC 02 Description: To 2500000 Europeanimproving the standard of the road system
contribute towards inTransport true
Albania
Pre-feasibility/feasibility studies - highway routesCommission (EC)
73 true
ALB-TRA-G-EC 03 Description: Civil Works local roads Reconstruction of
8880000 European - Transport true
IPA 2008
Reconstruction of the secondary and contracts 1Commission (EC) the rural road Antigon
74 true
ALB-TRA-G-EC 04 There are three main Components Europe Development Bank (CEB)
49000000 the project:(i)the
Improvement of rural roads in AlbaniaCouncil of in Transport true improvement of priorit
75 true
ALB-TRA-G-EC 05 Description: ComponentsEuropean Commission true
1000000 of the project: Trainings in:
Management Systems
Support/Twinning to Albanian Civil Aviation Safety Transport (EC)(1) Implementing EC R
76 true
ALB-TRA-G-EC 06 Description: To 1000000 European Commission (EC) Directorates and the
enhance the Works, Transport true
of the MPWTT,
Technical Assistance to Ministry of Publiccapacity Transport and Telecommunications In
77 true
ALB-TRA-G-GRE 01 of Sagiada-Konispol-Saranda road
23896000 of Sagiada-Konispol-Saranda
ConstructionDescription: ConstructionGreece (GR)Transport true road
78 true
ALB-TRA-G-GRE 02 Description: Rehabilitationarea of Korca in market area
market of pavements
Rehabilitation of pavements in 21950 Greece (GR)Transport true of Korca
79 true
ALB-TRA-G-KUW 01 Description: Interchange Kuwait (KW)Transport true
6000006 Project on the Durre-Vore road
Durres Bypass and Vora The project consist of land acquisition, consultancy services, an
80 true
ALB-TRA-G-NLD 01 Government concerningNetherlands vessels
31128500 coastguard Transport true
(NL)
ORET DutchDescription: This grant will facilitate the manufacturing of four offshore patrol
81 true
ALB-TRA-G-SPA 01 Description: The 100000 Spain (ESP)Transport true
Maritime Administration
Strengthening of the Albanianproject supports MPWTT in its task of strengthening the Ma
83 true
ALB-TRA-L-EIB 02 Road Project 64260000 European Investmentthe false
support
Levan-Vlore Description: The proposed project willTransportBank (EIB) construction of a 24km roa
84 true
ALB-TRA-L-EBRD 02 Port of Durres 40000000 European Bank for Reconstruction and Developme
Transport true
Description: The project will increase the capacity of the ferry passenger term
85 false
ALB-TRA-L-EBRD 03 Description: 22600000 European Bank for Reconstruction and Developme
Transport following: i) extension of th
Tirana Airport - Phase B Phase B development consists of the false
86 false
ALB-TRA-L-EBRD 04 Ring Road 39975000 European Bank for Reconstruction and Developme
providing false
Tirana OuterDescription: The EBRD is consideringTransport up to EUR 24 million for the
87 true
ALB-TRA-L-EIB 01 64000000 European Investment Bank (EIB)
Transport false
Fier Bypass Description: The project involves the construction of a 19.5 km bypass expre
89 true
ALB-TRA-L-EBRD 05 The project is part of a wider
133000000 European Bank of Reconstruction and Developme
Transport true
Secondary and Local Roads Programme programme forregional and local road rehabilita
90 true
ALB-TRA-L-WB 01 Description: -42728000 World Bank Transport false
Phase I
Albania Transport ProjectThe Project includes four(WB) components: (i) Construction o f the 26
91 false
ALB-TRA-L-WB 02 Description: Improvement
25427480 World Bank (WB)Transport false
Secondary and Local Roads - Phase II of priority sections of secondary and local roads, a
92 true
ALB-WAE-G-AUT 01 Description: Institutional support (AUT)
200000 Austria Water and Environment
true
Building Capacity to Access Carbon Finance in Albania for capacity building and impleme
93 true
ALB-WAE-G-AUT 02 Description: The 303224 will help (AUT)
project Austria the Government of Albania to
Water true
Building Capacity to Access Carbon Finance in Albania and Environment develop its pu
94 true
ALB-WAE-G-AUT 03 Description: Further Lake Protection Shkodra Environment
1900000 Austria (AUT) Water and true
Water Supply and Environmentalrehabilitation of the water supply and sewerage systems
95 true
ALB-WAE-G-CAN 01 Description: To in Environmental(CAN) Assessments/Strategic Environme
24000 Canada Impact institutions introduce formal mechanism
true
Ensuring Public Participationsupport relevant GoA Water and Environment
96 true
ALB-WAE-G-CHE 01 Description: The overall project is contributing toEnvironment improvement o
Pogradec Water Supply Project Water true
11299996 Switzerland (CH) and the regional
97 true
ALB-WAE-G-CHE 02 Description: The objective of the Project is toand Environment condition of t
Shkodra Water Supply Project Water true
9299985 Switzerland (CH) improve the living
98 true
ALB-WAE-G-CHE 03 Description: The through Switzerland Water Shared establishing mechanism
project the Management
Shkodra alke : Natural
true
Trans-boundary Cooperation 124000 is focused at(CH) ofand EnvironmentResources
99 ALB-WAE-G-CZE 01
true for Oil Industry, Kuçova
Description: Oil 1000000Albania Republicthe and Environment Region, Alban
Implementation of New Environmental TechnologyWater serious threat for local habitants
fields in Czech present (CZ) true
100 true
ALB-WAE-G-EC 01 Description: Improvement of environmental and Environment
2000000 European Commission quality
Water Albania true
Consolidation of the Environmental Monitoring system indata (EC) through expansion a
101 true
ALB-WAE-G-EC 02 Description: The and Sewerage Systems in and (EC)
25500000 European Commission following: Upgrade the dispo
Water as Environment
Improvement of Water Supplyoverall project purposes areAlbania true
102 true
ALB-WAE-G-EC 03 Description: The purpose of the project stems from the
Environment Promotion Water and Environment
true
Kukes Region Tourism and 1137000 European Commission (EC) Region?s geographic
103 true
ALB-WAE-G-EC 04 Description: The project aims at theCommission (EC) rehabilitation of the s
48970000 European construction Environment
Support for water supply and sewerage infrastructure true
Water and and/or
104 true
ALB-WAE-G-GER 01 Description: TC for betterGermany (GER) and Environment
330000 supply of drinking
Support to the decentralisation in the water sector Water water true & basic sanitary serv. The
106 true
ALB-WAE-G-ITA 02 Description: Institutional Support to the Albanian Ministry
2215190 Italy (IT) Water and Environment Use and for
Sustainable
Institutional Support to the Albanian Ministry of Environment fortrue of Environment Con
107 true
ALB-WAE-G-NLD 01 Description: Building Sustainability: Strategies, Methodologies, on good en
84416 Netherlands Water and Environment
(NL) true
Course for Good Governance andcapacities of national and local stakeholderPolicies ans
108 true
ALB-WAE-G-NLD 02 Environmental Local Governance Performance TIR of environmental mana
467281 Netherlands Water and Environment
(NL)
EmpoweringDescription: Strengthen local governance in the area 18995 true
109 true
ALB-WAE-G-NLD 03 and prioritization of Environmental Hotspots the Environment
1299688 Netherlands (NL) in Albania
assist true
IdentificationDescription: The proposed project willWater and Albanian Government to car
110 true
ALB-WAE-G-NLD 04 and prioritization of 'environmental hotspots'and Environment
1299688 Netherlands Water in Albania TIR 17168
(NL) true
IdentificationDescription: This project aims at identification, assesment, developing a web
111 true
ALB-WAE-G-NLD 05 Description: Providing information and(NL) and Environment
100000 Netherlands Water the
Impl. CLRTAP & Protocols (Air Pollution) QE 15723developing truenecessary skills for im
112 true
ALB-WAE-G-NLD 06 Description: To promote democratic, participatory, true and transparent gov
283000 Netherlands Water and Environment
Joining Forces Green Agenda BEL 15797 (NL) open
113 true
ALB-WAE-G-NLD 07 Description: To 4178360 Netherlands Watercooperationthat aims at
implement a programme of and Environment
(NL) true
NEWEN (Netherlands and Western Balkans Environmental Network) QE 18507 establish
114 true
ALB-WAE-G-NLD 08 Description: (Netherlands and Western Balkans Environmental Network) QE
758 Netherlands (NL)
of cooperationthat aims
true
NEWEN Inception phaseTo develop a programmeWater and Environment at establishing
115 true
ALB-WAE-G-NLD 09 Government concerningNetherlands (NL) Vloratrue
13788500 finance part Infrastructure
of the
ORET DutchDescription: This grant wilVlora WaterWater and Environment infrastructure Rehabilitati
116 true
ALB-WAE-G-NLD 10 Description: Support NGOs and local authorities Environment
(NL) true
REC trustfund II TIR 17114 1000000 Netherlands Water and with funds for the implemen
117 true
ALB-WAE-G-NLD 11 Description: Strengthening an Improved SocietyEnvironment
669530 Netherlands Water and for an Improved
(NL) true
Strengthening Albanian Civil Society for Albanian CivilEnvironment TIR 17208 Environme
118 true
ALB-WAE-G-NLD 12 Description: in the western balkans countries to address cross-border enviro
1565002 Netherlands effectively Environment
(NL) true
Strengthening capacities This programme aims to Water andmitigate environmental prob
119 true
ALB-WAE-G-NLD 13 Description: in 2118837 Netherlands Water and Environment
part of Balkans to Balkans regional programme, UNDP Cou
(NL) true
Strengthening capacities Aswesternthe Westernaddress environmental Hotspots - Bajza
120 true
ALB-WAE-G-NLD 14 Description: Establishment of - Agency for Environment and Forests TIR 870
1505380 Netherlands Water Environment and
(NL) true
Twinning project Oranjewoud Consultancy the Agency forand Environment Forests and th
121 ALB-WAE-G-SPA 01
true 180000 and restoration of and Communities
Description: Environmental restoration through reforestation. affected by t
Post-Gërdec: environmental recovery Spain (ESP)WaterthoseEnvironmentImproving publi
true
122 true
ALB-WAE-G-SPA 02 Description: The 145000 will support the implementation of Local Environmen
project Spain lake for the and Environment
true
Support to the local communities of Shkoder(ESP)Water implementation of Action Plans
123 true
ALB-WAE-G-SWE 01 Description: Bridging project between previous Albanian Forestry Project and
41243 Sweden (SW) true
Support to National forest association, phase 2 Water and Environment
124 true
ALB-WAE-G-TUR 01 of water transmission line in the line Water construction to serve 6 villages
220000 Turkey village of Kryevidh in Kavaja
true
ConstructionDescription: Water transmission (TR)is underand Environment
125 true
ALB-WAE-G-TUR 02 Description: Clearance beach in Shengjin.
22285 Shengjin true
Project for protection of the seaside ofTurkey (TR) Water and Environment
127 false
ALB-WAE-L-GER 01 The Ohrid, Water Supply Pogradec and Environmental
11900000 Germany (GER) and Environment of the
Water expansion
Programme Lakeproject includes the repair, reorganization andtrue Protection producti
129 false
ALB-WAE-L-GER 03 The measure should contribute to (GER) improvement of living conditions of the
Sector Programme Water II 1785000 Germanythe Water and Environment false
130 true
ALB-WAE-L-GER 04 In the framework of this project a storm water overflow will be constructed, th
Sewerage Korca IV Water
19100000 Germany (GER) and Environment true
131 false
ALB-WAE-L-GER 05 The environmental protection programme and Environment
6740000 Lake Ohrid,Water Sewerage Pogradec to
false
Environmental Protection ProgrammeGermany (GER) Ohrid Lake aims II protect the lak
132 false
ALB-WAE-L-GER 06 Description: The project "Environmental Protectionfalse Shkodra lake" com
Sewerage Shkodra Water
7500000 Germany (GER) and Environment of the
133 false
ALB-WAE-L-WB 01 Other projects references: WB projectWater and false
1067954 World Bank (WB) number: P085089
Albania Butrint Global Biodiversity and Heritage ConservationEnvironment
135 false
ALB-WAE-L-WB 03 Description: TheAdaptation Project Water and Environment
first phase is designed to false
Disaster Risk Mitigation and6609300 World Bank (WB)consolidate and upgrade Albania?
136 false
BIH-ENE-G-EC 01 of small hydro power plant Cijevna Commission (EC)
50000000 European IIIEnergy true
ConstructionDescription: The final goal of the initiative of ZP ?Elektro Doboj? a.d. is the c
137 false
BIH-ENE-G-EC 02 Description: Power sector: The meetEnergy
2500000 European Commission (EC) meeting the requirem
the requirements
true
Support to Bosnia and Herzegovina (BiH) to project will assist BiH in of the Energy Comm
139 false
BIH-ENE-G-NLD 01 Rehabilitation of the media infrastructure in Srebrenica
Electrification of Kvarc (NL)
75047 Netherlands Energy true
140 false
BIH-ENE-G-NLD 02 Description: Reconstruction of HV and(NL)networktrue
in larger Srebrenica Energy
LV in Zepa of Zepa
Support to sustainable return 268871 Netherlands region - Electrificationwhere some 50 fa
141 false
BIH-ENE-G-NOR 01 Energy Efficiency 188543 Norway (NOR) Energy true
142 false
BIH-ENE-G-SPA 01 Description: The 204000 seeks to strengthen energy
project Spain (ESP)Energy true
Support to the development of renewable energies: Solar the capacities of the departmen
143 false
BIH-ENE-G-USA 01 Description: REAP aims to help States of America its energy sector into the r
4873380 United Energy
Regulatory and Energy Assistance Project BiH fully integrate true (USA)
144 false
BIH-ENE-L-EBRD 01 Reconstruction of power distributionBank for Reconstruction and Developme
20000000 European network and facilities and upgrade of me
Electrokrajina Power Distribution Project Energy false
145 false
BIH-ENE-L-EBRD 02 Construction of new 40km highpressured natural gas transport pipeline to en
24703000 Energy false
Gasification of Central Bosnia CantonEuropean Bank for Reconstruction and Developme
146 false
BIH-ENE-L-EBRD 03 Supply and installation of European Bank for Reconstruction and Developme
272000000 a SCADA/EMS system for the electricity transmissi
ISO & TRANSCO Loan Novation Project Energy false
147 false
BIH-ENE-L-EIB 01 and Hydro is expected to compriseInvestment Bank (EIB) 130 MW), and f
275790000 European three wind farms (about
Mostar WindThe project Energy Energy false
148 false
BIH-ENE-L-GER 01 Rehabilitation 25800000 generators and
of Energy false
Rehabilitation of HPP Rama turbines,Germany (GER) transformers. Extension of switch y
149 false
BIH-ENE-L-GER 02 A windpark 78000000 Germany (GER) Energy false
Wind Farm Mesihovina with a capacity of 44MW and a yearly output of approx. 128 GWh
150 false
BIH-MUN-G-EC 01 Description: BiH authoritiesInfrastructure facilities (schools, kindergartens, he
Technical acquire the capacities true
Municipal (EC)to effectively
Reconstruction of Social and 500000 European Commissioninfrastructure fulfil their role
151 false
BIH-MUN-G-FRA 01 Description: There are currently (F) Municipalities true
34000 network of Municipal between French and Bosnia
involved in
Building a decentralised co-operation France 10 partnershipsinfrastructure partnerships w
152 false
BIH-MUN-G-ITA 01 Description: 60350 Italy the Municipal infrastructure
true
Urban design in Mostar The main goal of (IT) project is to contribute to the valorization o
153 false
BIH-MUN-G-SWE 01 Description: Project aims to facilitate the
Municipal infrastructure
true
Municipal Training System 2502400 Sweden (SW) development of a competent and pr
154 false
BIH-MUN-L-CEB 01 Description: Partial financing of investment Developmentpartial (CEB)
20000000 Council Municipalitiesinfrastructure financing of c
Municipal through Bank
false
Project for the benefit of Bosnian-Herzegovinaof Europe sub-projects undertaken by Bosn
155 false
BIH-MUN-L-EIB 01 for SME & Credit line for financingInvestment Bankprojects of small and me
50000000 European of limited-scale (EIB)
IRBRS LoanDescription:Priority Projects false
Municipal infrastructure
156 false
BIH-MUN-L-EIB 02 Description: Credit line for financingInvestment Bankprojects of small and me
HAA Group BiH GL II Municipal infrastructure
false
300000000 European of limited scale (EIB)
157 false
BIH-PSD-L-EIB 03 Description: Loan operation for the Investment small (EIB)medium
50000000 European Private sector and false
INTESA Loan for SMEs and Priority Projects financing of Bankdevelopment scale proj
158 false
BIH-MUN-L-EIB 04 Description: Credit line for financing of limited scale (EIB)
GL Municipal infrastructure
false
Unicredit Bank Banja Luka50000000 European Investment Bankprojects of small and me
159 false
BIH-MUN-L-EIB 03 Description: Loan operation for
80000000 European Investment of small and
Municipal infrastructure
false
RLBH Loan for SMEs and Priority Projects lease-financing Bank (EIB) medium scale p
160 false
BIH-PSD-L-EIB 04 Description: Credit line for
30000000 European Investment Bankscale projects
Private sector (EIB)
false
UCL Loan for SMEs & Priority Projects lease-financing of limited development of small a
161 false
BIH-PSD-L-EIB 05 UPI Banka GL 50000000 European of limitedsector development
Private scale (EIB)
false
Description: Credit line for financingInvestment Bankprojects of small and me
162 false
BIH-PSD-L-GER 01 Credit guarantee fund forGermany (GER) and setting up businesses.
Credit Guarantee Fund Private false
12828381 promotion of SME sector development
163 false
BIH-PSD-L-GER 02 The EFBH Fund is Herzegowina (EFBH)
and administared by KfW. Private sector development
false
European Fund for Bosnia 18384000 Germany (GER)A funding agreement has been sign
164 true
BIH-PSD-L-GER 03 Loan EE-Finance (Promotional Loan) measures from KfW Entwicklungsbank
9000000 Germany (GER) false
Raiffeisen Bosnia for refinancing energy efficiency Private sector development
165 false
BIH-PSD-L-GER 04 Loan Energy Efficiency Germany (GER)
6000000 measures from KfW Entwicklungsbank
false
Raiffeisen Bosnia for refinancing energy efficiency Private sector development
166 false
BIH-MUN-L-WB 01 The proposed additional financing
4687500 World Bank (WB) Municipal infrastructure
false
Community Development Additional Financing credit for Bosnia and Herzegovina is to he
167 false
BIH-MUN-L-WB 02 The objective of the
25327980 World Bank (WB) Municipal infrastructure
false
Sarajevo Waste Water Project Sarajevo Waste Water Project for Bosnia and Herzegov
168 false
BIH-SOC-G-CAN 01 Description: project Canada (CAN) Social sectors
true
Prison System Reform This287780 will promote the professionalization and harmonizat
169 true
BIH-SOC-G-EC 01 Description: The purpose of the project is to sectors the
Social prepare true
Efficient Prison Management 600000 European Commission (EC) necessary precondi
170 false
BIH-SOC-G-EC 02 Description: To 1300000 European minority and vulnerable groups concerns
further support the Commission (EC)
Social Childrentrue
Enhancing the Social Protection and Inclusion System forsectors in Bosnia and Herzego
171 false
BIH-SOC-G-EC 03 Description: Provide the BiH judiciary Social sectors to of a Case Manageme
836394 European Commission (EC)
with the ability
true
Increasing the Efficiency of the Judiciary through the Establishment utilize Information and
172 false
BIH-SOC-G-EC 04 Description: The 500000 European Commission (EC)
Social Sector review Social further true
purpose of the project is to sectorssupport the minority and
173 false
BIH-SOC-G-EC 05 Description: To establish European CommissionIII true
500000 and and Herzegovina (EC)
Social sectors
Strengthening Higher Education in Bosnia strengthen state level institutions which effectiv
174 false
BIH-SOC-G-EC 06 Description: To 1500000 European Social sectors health functions in B&H
strengthen in capacity of the public
Strengthening of Public Health Institutesthe BIH Commission (EC) true
175 false
BIH-SOC-G-EC 30 Description: To provide relevant B&H Social sectors
500000 Laboratorieslaboratories true
in B&H with
Supply of Equipment for Microbiology European Commission (EC) equipment needed fo
176 false
BIH-SOC-G-EC 31 Description: TheSchools objective Commission (EC)
specific Social sectors true
Supply of Equipment to VET1300000 Europeanis to support reform of VET system in BiH
177 false
BIH-SOC-G-EC 32 The first service contract European Commission (EC)
2875000 will Care System sectors
Social true
Support for the development of the Healthprovide technical assistance, to implement a sy
180 false
BIH-SOC-G-EC 35 Description: Increase academic mobility of within B&H
Education Social sectors true
Support to Reform of Higher1100000 European Commission (EC) and abroad and mobil
181 false
BIH-SOC-G-EC 36 Description: Project purpose: The development (EC)
2144000 Institutions in BiH sectors
Social the
Support to State and Entity Statistical European Commissionof trueinstitutional capacities
182 false
BIH-SOC-G-EC 37 Description: The aid co-ordination andSocial sectors
purpose of the projectEuropean integration and Entities? Mi
is to assisttrue
the
Support to strategy planning, 800000 European Commission (EC) State capacities in the
183 false
BIH-SOC-G-EC 38 Description: IT 1400000 European Commission (EC) indicative maximum am
equipment for supplySocial sectors
contract (fortrue
an
Support to the HJPC andImplementation: 1the Judicial Institutions in BiH
184 false
BIH-SOC-G-GER 01 Description: Creating european standards for job training for adolescents (ap
Help to Self-Help Social
104000 Germany (GER) sectors true
185 false
BIH-SOC-G-GER 02 Description: The plannedGermany (GER) prevention among on the
1000000 project and Social sectors
HIV by
Support to the sexual and reproductive health can be upgradedtruebuildingyouth existing
186 false
BIH-SOC-G-ITA 01 Description: Starting fromItaly (IT) ?The war inside the house?, written by Lu
A Like Srebrenica 12000 the book Social sectors true
187 false
BIH-SOC-G-ITA 02 Description: The European Regional Master's Programme in Democracy
Democracy (IT) Social sectors true
European Regional Master in415831 Italy and Human Rights for South East Europe and
188 false
BIH-SOC-G-ITA 03 Description: When approaching problems linked to mental health within the p
607747 Italy (IT) Social sectors true
Support to Protection and Promotion of Mental Health in Republika Srpska
189 false
BIH-SOC-G-NLD 01 Zene 2007-2010797239 for NGO Snaga Zene in true to enable it to provid
(NL)
NGO Snaga Description: Core fundingNetherlands Social sectors order
190 false
BIH-SOC-G-NOR 01 Description: The main aim of
24973 Norway (NOR) Social sectors true
Religious Studies: CIPS MA programme the project is to educate and train post-graduat
191 false
BIH-SOC-G-NOR 02 17443
Teaching Exchange - Relig. Studies Norway (NOR) Social sectors true
192 false
BIH-SOC-G-UNDP 01 Description: A National United Nations Development BiH currently exists,
33858 Social (NAIP) true
Avian Influenza Response Project Avian Influenza Plan sectors in Programme (UNDP) b
193 false
BIH-SOC-G-UNDP 02 Description: Further strengthening of Social sectors
1912290 United Nations Development Bosnia and Herzegov
and Herzegovinatrue
Further strengthening of DOTS strategy in Bosnia DOTS strategy inProgramme (UNDP)
194 false
BIH-SOC-L-WB 01 Description: The ProjectWorld Bank (WB) sectors
4768889 Social false
Avian Influenza Preparednessproject would finance activities under five components: (i) S
195 false
BIH-SOC-L-WB 02 Description: The proposed Social Protection Project
10965000 World Bank Social false
Social Safety Nets & Employment Support Project (WB) sectors would provide support in
197 false
BIH-TRA-G-EC 02 Description: Implementation of the B&H Law on Railways, in particular the pa
1000000 European Commission (EC)
Transport true
Provision of technical assistance to railway authorities in Bosnia and Herzegovina in harm
199 false
BIH-TRA-G-JAP 01 Description: In order to maintain roads Machinery
4757090 Construction in BH properly,
The Project for Procurement of Road Japan (JP) Transport true road maintenance equ
200 false
BIH-TRA-L-EBRD 01 605000000 of new priority for Reconstruction of the main north
Transport
Corridor Vc Description: ConstructionEuropean Bankmotorwayfalse sections and Developme
201 true
BIH-TRA-L-EBRD 02 Description: 35000000 of the Mahovljani Reconstruction and located on
Transport true
Mahovljani Interchange ConstructionEuropean Bank forinterchange, which is Developme
202 false
BIH-TRA-L-EBRD 03 Description: The
230500000 European Bank for Reconstruction and Developme
project is bring
Road Rehabilitation Project main purpose of this Transport to false the primary road net
203 false
BIH-TRA-L-EBRD 04 Description: The
31900000 finance an extension of the passenger Developme
Transport false
Sarajevo International Airport loan willEuropean Bank for Reconstruction and terminal, tog
204 false
BIH-TRA-L-EIB 01 - First phase 158390000 European Investment Bank (EIB)
- North Transport false
Corridor VC The project concerns a new motorway section adjacent to those already und
205 false
BIH-TRA-L-EIB 02 - Second phase339620000 European Investment Bank (EIB)
Transport false
Corridor VC The project concerns a new motorway section adjacent to those already und
206 false
BIH-TRA-L-WB 01 The objectives20618190 World Bank (WB)
of project Transport false
Road infrastructure and safetythe Road Infrastructure and Safety Project for Bosnia and H
208 false
BIH-WAE-G-EC 01 of Sewage The purposeZiviniceproject is to and Environment
1500000 of this Water protect the
true
ConstructionDescription: Collectors in European Commission (EC) environment from th
209 false
BIH-WAE-G-EC 02 The intervention for IPA European Commission (EC)collection Component I
169900000 water divided into and Environment
and sewerage true
Rehabilitation and construction of the2009 issupplyWater three components. infrastructure
211 false
BIH-WAE-G-EC 04 Description: The project European Commission (EC)
Water and Environment
true
Support to BiH Water Policy1000000 will further support the development and implementa
212 false
BIH-WAE-G-EC 05 Description: The Delegation of Pollution Prevention and is planning to prov
1200000 European Commission Environment
Water Commission
true
Support to implementation of the Integrated the Europeanand (EC) Control Directive
213 false
BIH-WAE-G-ITA 01 2859860 Italy (IT) Water and Environment
true
Safety, recovery and naturalization, environment monitoring of Sidje garbage dump in BiH
214 false
BIH-WAE-G-NLD 01 Education Project for the practical way the Education for Sustainable Develo
287362 Western Balkans(NL) true
Green Pack Description: Support in a Netherlands Water and Environment
215 false
BIH-WAE-G-NLD 02 Description: Implementation of Convention CLRTAP Air its Protocols; Impro
100000 Netherlands Water and Environment
(NL) true
Implementation of the Convention on Long-RangeTransboundary and Pollution and its Pro
216 false
BIH-WAE-G-NLD 03 Description: To promote Netherlands Water and Environment
283000 the Western(NL) Balkans open
Joining Forces for a Green Agenda indemocratic, participatory, true and transparent gov
217 false
BIH-WAE-G-NLD 04 Description: in BiH Objective: (i) Remediation of two environmental hot spot
1565000 Netherlands Water problems through
(NL) true
Strengthening capacities Projectto address environmentaland Environment remediation
218 false
BIH-WAE-G-NOR 01 Description: 249726 Norway (NOR) Water
Environmental protection Implementing Agency: WWF and Environment true
219 false
BIH-WAE-G-SPA 01 Description: The 146146 will try to solve the problematic of the conservation
project Spain (ESP)Water at Environment
true
Evaluations of the ictiofauna and impact of exotic speciesandHutovo-Blato Natural Park o
220 false
BIH-WAE-G-SPA 02 Description: The 470000 will cooperate with the Bosna Basin
project Spain (ESP)Water and Environment
true
Support to the elaboration of a Hydrologic Plan for the River future River Bosna Water Ag
221 false
BIH-WAE-G-SWE 01 Description: Support to five municipalities in and Environment Local environm
587833 Sweden (SW) II)
Local Environmental Action Plans, Phase II (LEAPWater BiH intrue developing
222 false
BIH-WAE-G-UNDP 01 Project National 121554 United Nations Development Programme effective a
Capacity for Sustainable Environmental to ensure (UNDP)
this proposal was Management
true
Support for Building Objective: The primary goal ofWater and Environment
223 false
BIH-WAE-L-WB 06 The project focuses on improving(FMPAP)
6638500 Project the Water
management effectiveness of four exis
Forest and Mountain Protected Areas World Bank (WB) and Environment true
224 false
BIH-WAE-L-EBRD 03 Description: The proposed project concerns and Environment cost of const
11500000 European Bank for a loanfalse
Bijeljina Waste Water Collection System towards and
Water Reconstructionthe Developme
225 false
BIH-WAE-L-EIB 01 The project consists of European Investment Bank (EIB)
35300000 Water and Environment
false
Banja Luka Municipal Infrastructure two components : development of the solid waste ma
226 false
BIH-WAE-L-EIB 02 The project concerns the European Investment Bank
121300000 implementation of a country-wide
Water and Environment
true
Water and Sanitation Federation Bosnia and Herzegovina (BiH) (EIB) investment progr
227 false
BIH-WAE-L-EIB 03 The project concerns the European Investment Bank (EIB) water supply and
100000000 constructionWater and Environment
Water and Sanitation Republika Srpska true
and rehabilitation of
230 false
BIH-WAE-L-WB 01 The overall development objective of (WB) and Solid Waste
33984400 Water false
Second Waste Management Project World Bank the SecondEnvironment Management
231 false
BIH-WAE-L-WB 02 Description: Component 1. Institutional Strengthening; Component 2. Urban
4210035 World Water
Urban Infrastructure Additional Financing Bank (WB) and Environment false
232 false
CRO-ENE-G-EC 01 Description: To 1095000 national system of administrative registers on energ
set up a European Commission (EC)
Energy Administrative Data Management Energy true
233 false
CRO-ENE-G-EC 02 Description: To establish national system for monitoring methodologies, indic
Vulnerability of Energy Supply System
Energy true
Monitoring Dependence and1100000 European Commission (EC) with the Scope on Se
234 false
CRO-ENE-L-EIB 01 Description: The
475400000 European Investment Bank (EIB)
- 2011) false
PLINACRO Gas Pipelines II second phase (2007Energy of investment programme for t
235 false
CRO-ENE-L-GER 01 climate change Croatia Germany (GER)
56000000 Energy false
Mitigation of Description: KfW?s involvement through the Climate Protection Programme
236 false
CRO-ENE-L-GER 02 Energy Efficiency and Renewable (GER)
26000000 Germany Energy Energy
Promotion ofDescription: The programme aims to contribute to false the promotion of energy e
238 false
CRO-PSD-L-EIB 01 Description: Priority Lending
40000000 European Investment Bankdevelopment
Private sector (EIB)
false
ESB Loan for SMEs and EIB financing will be made available to SMEs and private and pu
239 false
CRO-MUN-L-EIB 02 200000000 European of limited scale (EIB)
Municipal infrastructure
false
HBOR GL II Description: Credit line for financingInvestment Bankprojects of small and me
240 false
CRO-MUN-L-EIB 03 for SMEs and Mid-Cap European Investment infrastructure
250000000 a Mid-cap tranche for
false
HBOR Loan Description: Credit line for SMEs with Municipal Bank (EIB) financing SME a
241 false
CRO-MUN-L-EIB 04 Description: Credit line for leasing or Medium and Long Term financing of SM
Privedna Banka GL II Municipal infrastructure
120000000 European Investment Bank (EIB)false
242 false
CRO-MUN-L-EIB 05 SMEs & Priority Lending European Investment Bank (EIB)
40000000 Municipal infrastructure
false
SB Loan for Description: Loan for financing SME projects, infrastructure projects promote
243 false
CRO-MUN-L-EIB 06 Description: Priority lending
100000000 European Investment Bank (EIB)
Municipal infrastructure
and
ULC Loan for SMEs and Credit line for lease-financing of smallfalse medium-scale projec
244 false
CRO-MUN-L-EIB 01 Description: Credit line for SME projects, infrastructure projects promoted by
Unicredit Zagrebacka Banka GL Municipal infrastructure
false
80000000 European Investment Bank (EIB)
246 false
CRO-SOC-L-WB 01 Description: The project includes two (WB) sectors Development of
103742925 World Bank components:false
Social (i)
Development of the Emergency Medical Services and Investment Planning Project Emerg
247 false
CRO-SOC-L-WB 02 Description: The tentative scope comprises (indicative cost for each compon
Justice Sector Support Project Social
29079080 World Bank (WB) sectors false
249 false
CRO-TRA-G-EC 02 Description: 3 to Dugo Selo Section ?Transport true
135000000 Novoselec Dugo Selo: 27.1
Line Rehabilitation Novska phases: (i) European Commission (EC) km (ii) Kutina ? Novo
250 false
CRO-TRA-G-EC 03 Description: Upgrading and construction of signalling,
38500000 European Transport true
Line Rehabilitation Oku?ani to Novska section Commission (EC) telecommunications an
251 false
CRO-TRA-G-EC 04 Description: Marof - Zapresic SectionTransport true
25000000 track overhaul of the 7.5 km
Line rehabilitation Savski Activities: (i) European Commission (EC) double track line with r
252 false
CRO-TRA-G-EC 05 Description:Phase 1) Infrastructure: Vertical key (EC)
of Vukovar - New port East
Transport true
Reconstruction of the Port 40000000 European Commission wall 700m, Reconstruction o
253 false
CRO-TRA-G-EC 06 Description: Activities: (i) European Commission (EC)
40000000 Sava River Transport true
Waterway
Rehabilitation and Improvement of theExecute dredging works to improve Sava fairway de
254 false
CRO-TRA-G-EC 07 Station Signalling and Interlocking System
17900000 European Commission (EC)
Transport true
Zagreb MainDescription: The project aims at adjusting railway station technical paramete
255 false
CRO-TRA-L-EBRD 03 Storage Project70000000 European Bank for Reconstruction and Developme
be used
Plinacro GasDescription: The proposed project willTransportfor falsethe acquisition of Podzem
256 false
CRO-TRA-L-EBRD 02 15000000 European Bank for Reconstruction and Developme
Transport false
Sibenik Port Description: Extension and reconfiguring of the passenger wharves at Quay
257 false
CRO-TRA-L-EIB 01 Description: Construction of a new Investment Bank (EIB)
250000000 Transport false
Airport Passenger Terminal Zagreb European passenger terminal, including apron, taxiw
258 false
CRO-TRA-L-EIB 02 Zadar New Port 200500000 European Investment Bank of a
Transport false
Description: The project will concern the construction (EIB)new ferry port in Z
259 false
CRO-TRA-L-GER 01 Port of Zadar Project 236000000 Germany (GER) Transport false
260 false
CRO-TRA-L-WB 01 Description: The Project includes three components: (i) Port Terminal Develo
Rijeka Gateway II 95074165 World Bank (WB) Transport false
261 false
CRO-TRA-L-WB 02 Description: The financing
42564500 World Bank (WB) Transport false
Rijeka Gateway II - Additional proposed additional loan for Rijeka Gateway project for Cro
262 true
CRO-WAE-G-EC 01 Description: To 1900000 setting up the national chemical safety system acco
Chemical safety Water and Environment
assist in European Commission (EC) true
264 false
CRO-WAE-G-EC 03 Main activities: (i) Construction of newWater and (EC)
64000000 for County of WMC (ii) Environment
Zadar true
Regional Waste Management Centre European Commission Construction of transfer stati
265 false
CRO-WAE-G-EC 04 Description: Main activities: (i) Construction of newtrue
45000000 for the County of Istria Environment
Water and RWMC-Ka?tijun including
Regional Waste Management Centre European Commission (EC)
266 false
CRO-WAE-G-EC 05 Description: Construction for an integral centre in Environment
55700000 of the County of Split which
Water and Dalmatia
true
Regional Waste Management Centre European Commission?(EC) municipal and non-ha
267 false
CRO-WAE-G-EC 06 Description: (i)40672400 bridge and waste registration
Weighing Mariscina Water and Environment
true
Regional Waste Management Centre European Commission (EC) at the Centre?s entra
268 false
CRO-WAE-G-EC 07 and closing down of the European Commission (EC)
25000000 Sovjak pit, County of disposal/treatment of
Water and Environment
true
RemediationDescription: Main activities: (i) Excavation and Primorje-Gorski Kotarhazardo
269 false
CRO-WAE-G-EC 08 Description: The construction of waste management
16000000 European Commission Environment
Water and true
Waste Management Centre for County of Brodsko-Posavska (EC)centre and other facilitie
270 false
CRO-WAE-G-EC 09 Description: The construction of waste management centre and other facilitie
14000000 European Commission (EC)
Water and Environment
Waste Management Centre for County of Virovitica-Podravina true
271 false
CRO-WAE-G-EC 10 Description: The construction of waste management
16000000 European Water and Environment
true
Waste Management Centre for Karlovac CountyCommission (EC)centre and other facilitie
272 false
CRO-WAE-G-EC 11 Description: The construction of waste
53100000 European Commission (EC)
Water and Environment
true
Waste Management Centre for North-West Croatia management centre and other facilitie
273 false
CRO-WAE-G-EC 12 Description: The construction of waste management
21000000 European County and Environment
Water true
Waste Management Centre for Sisak-MoslavinaCommission (EC)centre and other facilitie
274 false
CRO-WAE-G-EC 13 Description: The construction of Dubrovnik- and (EC)
24800000 European Commission Environment
Water Neretvatrue
Waste Management Centre for the Countyof waste management centre and other facilitie
275 false
CRO-WAE-G-EC 14 treatment and water supply for Knin -Water and (EC)
16399999 European Commission Environment
Drni? true
Waste waterDescription: Improvement and rehabilitation of sewer network and water sup
276 false
CRO-WAE-G-EC 15 treatment and water supply central waste Brod (EC)
27000000 of for Slavonski water Environment
Water and true
Waste waterDescription: ConstructionEuropean Commission treatment plant for 80.000 P
277 false
CRO-WAE-G-EC 16 treatment for 16500000 of central waste water (EC)
Djakovo Water and Environment
true
Waste waterDescription: ConstructionEuropean Commission treatment plant for 20.000 P
278 false
CRO-WAE-G-EC 17 treatment for 14800000 of central wastewater (EC)
Dugo Selo Water and Environment
true
Waste waterDescription: ConstructionEuropean Commissiontreatment plant for 50.000 PE
279 false
CRO-WAE-G-EC 18 treatment for Krapina
5800000 of central waste water (EC)
Water and Environment
true
Waste waterDescription: ConstructionEuropean Commission treatment plant for 20.000 P
280 false
CRO-WAE-G-EC 19 treatment for 10000000 of central waste water (EC)
Nova Gradiska Water and Environment
true
Waste waterDescription: ConstructionEuropean Commission treatment plant for 26.000 P
281 false
CRO-WAE-G-EC 20 treatment for 23000000 of central waste water (EC)
Osijek Water and Environment
true
Waste waterDescription: ConstructionEuropean Commission treatment plant for up to 250
282 false
CRO-WAE-G-EC 21 treatment for 10000000 of central wastewater (EC)
Samobor Water and Environment
true
Waste waterDescription: ConstructionEuropean Commissiontreatment plant for 40.000 PE
283 false
CRO-WAE-G-EC 22 treatment for 31000000 of central waste water (EC)
Sisak Water and Environment
true
Waste waterDescription: ConstructionEuropean Commission treatment plant for 74.000 P
284 false
CRO-WAE-G-EC 23 treatment for Velika Gorica
5500000 European Commission (EC)
Water and Environment
true
Waste waterDescription: Reconstruction and upgrade of existing wastewater treatment pl
285 false
CRO-WAE-G-EC 24 treatment for Vrbovec of central waste water (EC)
6000000 Water and Environment
true
Waste waterDescription: ConstructionEuropean Commission treatment plant for 20.400 P
286 false
CRO-WAE-G-EC 25 treatment for 19000000 of central waste water (EC)
Vukovar Water and Environment
true
Waste waterDescription: ConstructionEuropean Commission treatment plant for 84.000 P
287 false
CRO-WAE-G-EC 26 Description: Construction of the regional water supply
55000000 Water and Environment
true
Water supply for Bjelovar-Bilogora European Commission (EC) facilities (pipelines, sto
288 false
CRO-WAE-G-EC 27 Description: Construction of the regional water supply
52000000 Water and Environment
true
Water supply for Koprivnica-Krizevci European Commission (EC) facilities (pipelines, sto
290 false
CRO-WAE-L-EBRD 01 Description: Construction of new regional solid waste disposal Developme
30000000 Water Reconstruction and
false
Istria Regional Waste Management European Bank for and Environment facility compri
291 CRO-WAE-L-EBRD 02
false 30300000 European Bank for Reconstruction and and extend
Description: The proposed provide finance to upgrade
Sisak Wastewater Management Projectproject willWater and Environment Developme
true
292 false
CRO-WAE-L-EIB 01 Description: The project concerns the Water andof false
100000000 European Investment Bank (EIB)
Island and Coastal Infrastructure Facility multi-sectoral
financing Environment investment s
293 false
CRO-WAE-L-GER 01 Necessary and Sewerage II
15000000 Germany the area of municipal drinking water and
Water
Municipal Water Supplyinvestment measures in(GER) and Environment false
295 false
CRO-WAE-L-WB 01 Description: The Project will have the (WB) threeEnvironment as APL1: Wa
129579275 World Bank Water and components
Coastal Cities Pollution Control Project (IBRD Loan) same false
297 false
CRO-WAE-L-WB 03 Description: 103517680 World Bank (WB) and Environment
Water
Inland Waters Project Component I: Technical Assistance tofalse Hrvatske Vode (HV) and
298 false
CRO-WAE-L-WB 04 Description: The Integration Project Water three components that mutual
24358076 World Bank to have
European Union Natura 2000 project is envisioned(WB) and Environment false
299 false
CRO-WAE-L-EBRD 03 Description: The investments are Project expected to include Developme
Sewer Investment currently Reconstruction and
Water false
Zagreb Holding Water and 60000000 European Bank for and Environment water and wa
300 true
KOS-ENE-G-EC 01 Description: Component 1 - Promoting Energy Efficiency and Renewable En
17000000 European Energy Community
Energy
Further Support for Kosovo's Participation in theCommission (EC) of SEEtrue
301 true
KOS-ENE-G-EC 02 Description: the Energy sector
3000000 European Commission (EC)
following true
Meeting EU Standards inAssistance will cover the Energy mutually reinforcing areas:1.
302 true
KOS-ENE-G-EC 03 Description: The project will be implemented in two activities. Activity 1 includ
15000000 European Commission (EC)
Support to transport and energy Energy true
303 true
KOS-ENE-G-WB 01 Description: The additional grant would
4522612 World Bank (WB) Energy false
Kosovo Energy Sector Clean-up of Gasification Site assist the beneficiary (KEK, the publi
304 true
KOS-ENE-G-WB 02 Description: The original estimated budget for these
1477978 World Bank (WB) Energy false
Lignite Power Technical Assistance Project Additional Financing two consultancies was U
305 false
KOS-ENE-L-GER 01 Energy Sector Kosovo the project is to
22740000 Energy false
Promotion ofThe envisaged impact of Germany (GER)contribute to the stabilisation of the
306 true
KOS-MUN-G-EC 01 Description: Activity 1: Detailed Design, review and supervision
15400000 European Municipal (EC) true
Municipal Social and Economic Infrastructure Commissioninfrastructure of projectsTh
309 false
KOS-PSD-L-GER 01 Loan for refinancing energy efficiency Private sector development
10000000 Germany Kosovo
Energy Efficiency Credit Line to Raiffeisen Bank(GER) false
measures that allows the local bank to
310 true
KOS-SOC-G-EC 01 Description: Component 1 ? Implementation sectors
Education and Employment Social of a sector-wide approach in ed
11700000 European Commission (EC) true
311 true
KOS-SOC-G-EC 02 Kosovo: Inter-culturalismEuropeanlegal advice to(EC)
1550000 and the Commission reform primary, secondary
Social sectors
Education in Description: Capacity building and Bologna Process true
312 true
KOS-SOC-G-EC 03 The purpose of 6000000 (GTAF) & Programme (EC)
the General TechnicalSocial sectors
Assistance true
Facility
General Technical Assistance FacilityEuropean Commission Reserve (GTAF) is to allow
313 true
KOS-SOC-G-EC 04 Description: Priority infrastructure projects identified and prepared for financi
IPF Kosovo Window Social sectors
61000000 European Commission (EC) true
314 true
KOS-SOC-G-EC 05 Description: Component 1
10900000 European Commission(i) true
training : (EC)
Support to employment and education - Teacher'sSocial sectors Training of in-service teac
315 true
KOS-SOC-G-EC 06 Description: 1500000 European Commission (EC)Health: feasibility study
Social sectors
Support to Health Sector Component 1: Sector Wide Approachtrue in
316 true
KOS-SOC-G-EC 07 Description: The project aims
1500000 European Commission (EC)
Social sectors true
Support to the Statistical Office of Kosovo to support SOK in finalizing the preparation of
317 true
KOS-SOC-G-EC 08 Description: Activity - Further institution building support to the Ministry of L
14900000 European Commission (EC)
Supporting local government and1decentralisation Social sectors true
318 true
KOS-SOC-G-GER 01 Components (i) Consultancy services Social sectors
to the true
Reform of Basic Education 2600000 Germany (GER) Ministry of Education, Science a
319 true
KOS-SOC-G-GER 02 Description: Drop-outs basic education sectors
2000000 Social true
Reform of Non-Formal Education of Germany (GER) are of high concern to the Ministry.
320 true
KOS-SOC-L-WB 02 Description: for proposed Project (WB) sectors
8989200 World Bank Social false
Institutional DevelopmentThe Education project would support four key elements of the go
321 true
KOS-SOC-L-WB 01 Description: The components of the project sectors Response Project
Human Pandemic Preparedness and
Social false
Avian Influenza Control and 2304147 World Bank (WB) are: public awareness and inform
322 true
KOS-TRA-G-EC 01 Description: Reconstruction of five Commission (EC)
10500000 Transport true
Reconstruction of roads and bridges European bridges on the M2 Pristina to Blace borde
323 true
KOS-TRA-G-EC 02 Description: (a) 1000000 European Commission Aviation staff
Capacity building for the CARO (EC)
Common true
Support for Kosovo's Participation in the EuropeanTransport technical Area in the following
324 true
KOS-WAE-G-EC 01 Activity 1: Construction ofEuropean plant in Vucitrn. This activity comprises o
24000000 treatment in Kosovo Environment
Water and true
Further support to water and environment sectorCommission (EC)
325 true
KOS-WAE-G-EC 02 Description: Component European institutional (EC)
5700000 Water and Environment
true
Support to the environment sector 1 - FurtherCommissionsupport to the Environment S
326 false
KOS-WAE-L-GER 01 The project concerns the rehabilitation of
Sanitation Prishtina (Kosovo VII) true
Water water supply system and the se
Municipal Water Supply and8000000 Germany (GER) theand Environment
327 true
MAC-ENE-G-EC 01 Description: The project consists of Commission (EC) (i)
2000000 European two components:
Energy true
Energy Regulatory Commission and Insurance Supervisory Agency Support to the Energ
328 true
MAC-ENE-G-ITA 01 Centre for implementation of low-costEnergy
40000 Italy (IT) technologies for sollar cells in Macedo
true
Establishing Description: The project is supported through the CEI KEP - Know-how Exch
329 true
MAC-ENE-G-SWE 01 sustainable agricultural practices,of the efficiency and usage of renewable
overall Sweden energyEnergy true
Promotion ofDescription: The 457004 objective (SW) project is to support Government of
330 true
MAC-ENE-L-EBRD 01 Description: The investment programme for be focused on and Developme
70000000 European Energy false
ESM II: Distribution Grid Efficiency Investment Bank will Reconstructionfour main areas:
331 true
MAC-MUN-G-CHE 01 Description: The purposeSwitzerland (CH) strenghtening of the Association o
1499970 Units of Local Municipal infrastructure
true
Strenghtening of the Association of theof this project isSelf-Government (ZELS)
332 true
MAC-MUN-G-CHE 02 Description: The 748720 in the Area of conducting thematic evaluation of 5 pr
project Switzerland (CH)Social Service Delivery
true
Thematic Evaluation of Five Projects is focused onMunicipal infrastructure
333 true
MAC-MUN-G-EC 01 Description: Component 1 - Implementation
8700000 European Commissioninfrastructure
Municipal (EC) true
Local infrastructure for Social and Economic Cohesion of small-scale infrastructure proj
334 false
MAC-PSD-L-EIB 01 for credit line is intended to support SME projectsfalse any size industrial inv
100000000 European Investment Bankdevelopment
MBDP Loan TheSMEs and Priority Lending Private sectorand (EIB)
336 true
MAC-MUN-L-WB 01 Description: Component I: Sub-loans (WB)
19896550 World Bank to municipalities for investments in: (i) r
Municipal Services Improvement Project false
Municipal infrastructure
337 true
MAC-SOC-G-AUT 01 Description: Supporting Tourism (AUT) in the country in the area of Curricu
265000 Austria Schools
Tour Reg - Support to Tourism Schools Social sectors true
338 true
MAC-SOC-G-CHE 01 Description: The project Switzerland (CH) to thetrue
2000000 Social
School Rehabilitation in Macedonia aims at contributing sectors reinforcement of equal ed
339 true
MAC-SOC-G-EC 01 Description: The 648000 European Commission (EC)
Operating structure createdsectors
Social for true
Administration of the operational programme implementation the OP management will be
340 true
MAC-SOC-G-EC 02 Description: The project purpose is Commission (EC)
2000000 European to Social sectors true
Capacity Building for the Management of EU fundshelp the government institutions to ma
341 true
MAC-SOC-G-EC 03 Description: The project European to Social sectors
judiciary support the implementation of an inves
Further strengthening of the 1800000 purpose is Commission (EC) true
342 true
MAC-SOC-G-EC 04 evaluation, The 486000 European Commission (EC)
assistance relates toSocial
the organisation
true
Information, Description:monitoring and control activities sectors and technical support
343 true
MAC-SOC-G-EC 05 Description: The project purpose is Commission (EC)
Judicial Reform support the implementation of the Judi
1100000 European to Social sectors true
344 true
MAC-SOC-G-EC 06 This measure complements the previous
2106000 European Commission (EC)
Social sectorstrue
Preparation of investment projects and programmes measures, which are mostly oriente
345 true
MAC-SOC-G-EC 07 Description: The Project Preparation and Support Facility will support the pre
3022000 European Commission (EC)
Project Preparation and Support Facility Social sectorstrue
346 true
MAC-SOC-G-EC 08 Description: The main purpose of the Social sectors
Audit and Evaluation Project Preparation Facility (PPF) is to
Project Preparation Facility, 3000000 European Commission (EC) true
347 true
MAC-SOC-G-EC 09 Description: The 2000000 European to Social sectors
contribute totrue
a
Public Administration Reform project purpose is Commission (EC)professional public adm
348 true
MAC-SOC-G-EC 10 Description: 2070000 European Commission (EC)
to contributetrue
State Statistical Office The project purposes areSocial sectorsto a professional manage
349 true
MAC-SOC-G-EC 11 Description: The the institutions to Commissionimplement Human Resource
1600000 European will be and (EC)
Social sectorstrue
Strengthening the capacity of following activitiesmanageimplemented: a) the Operational P
350 true
MAC-SOC-G-EC 12 Support to the Agency forThe purposeEuropean Commission (EC) Agency for Supervis
Description: Supervision of the project is to sectors the
1000000 Fully Funded Pensiontrue
Social provide Insurance
351 true
MAC-SOC-G-GBR 01 the circle! Establishing United for PET (UK) true Collection in High sy
728477 model for primary PET and
Social sectors
We are all inDescription:Establishing aaModelKingdom Selectionselection and collectingSc
352 true
MAC-SOC-G-JAP 01 Description: The overal Japan (JP) focused upon communities of rural M
school girls and boys in multi-ethnic
true
Informal education for primary 38455project goal isSocial sectors capacity building of prim
353 true
MAC-SOC-G-JAP 02 Description: of a sub school in(JP) Social sectors down the building, and a
43563 Japan assistance to take
Project for reconstructionProvision -of financialDrenovo village true
354 true
MAC-SOC-G-JAP 03 Description: The grant in Japan donor village used true
51660 Romanovce will be for
Reconstruction of a primary school from the (JP) Social sectors the purchase of the pro
355 true
MAC-SOC-G-JAP 04 Description: The puropose of Municipality is Brvenica
55394 the this project of sectors true
Refurbishment of a Primary School in Japan (JP) Socialreconstruction of a primary schoo
356 true
MAC-SOC-G-JAP 05 Description: The overall objective of the project is focused on capacity buildin
14142 Japan (JP) Social sectors true
The project for Building the capacity of the JZU Zdravstven dom - Bitola for Mobile Medic
357 true
MAC-SOC-G-JAP 06 The project of the building of extension of sectors Delcev" - Ilinden, Skopj
51448 Japan (JP) School "Goce true
The project for extensiongoal is focused onPrimarySocialthe building of primary school.
358 true
MAC-SOC-G-JAP 07 The project is focused onJapan (JP) SocialCentra;-School "Goce Delcev" in
51638 reconstruction of sectors Bitola
The project for reconstruction of Central School "Goce Delcev" true
359 true
MAC-SOC-G-JAP 08 Description: The overall roof of the the project is focused on School
of the Japan (JP) Social sectors true
The project for Reconstruction 56481 objective ofSande Shterjoski Primary providing supp
360 true
MAC-SOC-G-JAP 09 Description: Renovation of the primary tabanovce true
33941 Japan (JP) Social sectors village
The project for refurbishment of a primary school in school in Tabanovce village
361 true
MAC-SOC-G-NLD 01 Description: The overall objective of the project action was focused
9500 Netherlands pupils sectors
(NL) true
Campaign for senzibilization and accepting Roma Social by non-Roma parents on aware
362 true
MAC-SOC-G-NLD 02 Description: The project Netherlands Social sectors
99650 to social integration 2
(NL)
Through education and emancipationis aimed at supporting thetrue capacity building of organ
363 true
MAC-SOC-G-NLD 03 Description: Vocational training for Inspectorate Staff
99650 Netherlands Social Administrative Inspectorate Staf
State true
Vocational Training for the State Administrative the(NL) sectors TF054139
364 true
MAC-SOC-G-NOR 01 Description: of schools rehabilitation and sectors
460000 Social true
Project for reconstructionCarrying out Norway (NOR) refurbishment activities in six sch
365 true
MAC-SOC-G-NOR 02 Description: The 247500 activities are Social sectors
project 2007 (Project aimed at reconstruction of schools as c
Reconstruction of schools of ProgramNorway (NOR) No. 2070282) true
366 true
MAC-SOC-G-NOR 03 European Macedonia-2060293 (NOR)
project Norway Social sectorstrue
Together for Description: The 490950 will provide educational opportunities and access to
367 true
MAC-SOC-G-NOR 04 Description: The 210000 Norway (NOR)
III (project no.2070258) sectors
Social true
Youth Entrepreneurial ServiceYouth Entrepreneurial Service (YES) project seeks to devel
368 true
MAC-SOC-G-SWE 01 The overall objectives of Sweden (SW)
in Macedonia 2007-2010 sectors
Social true
Chemicals Risk Management729260 the project are: Contribution to the minimization of a
369 true
MAC-SOC-G-UNDP 01 Prevalence Low in Macedonia: Nations Development Programme (UNDP) n
2895040 seeks to further developtrue focus Macedonia?s
Social sectors and
Keeping HIVDescription: The programUnited Scalling-up and Focusing Interventions
370 true
MAC-SOC-G-USA 01 Description: The project foresees the Social sectors
2497 United States of Americatrue
instalation of (USA)
computer labs in every pr
Project for Installation of Servers in Primary and Secondary Schools in Macedonia
371 true
MAC-SOC-G-USA 02 Description: In12334300 with States of Americatrue
accordance Social sectors (USA)
Strategic Medical Re-supply Program United the Agreement of Cooperation between Mini
372 true
MAC-SOC-L-CEB 01 of physical Co-finance the cost of Europe Development and related
14300000 Council Social sectors PEFs
30
ConstructionDescription: education facilities of construction of false Bank (CEB) elem
373 false
MAC-SOC-L-CEB 02 Description: Proposed Council of Europe sectors construction of 37
50700000 co-finance the
false
Housing for low-income persons project aims toSocialDevelopment Bank (CEB) build
374 false
MAC-SOC-L-WB 01 Description: The first component of the project is enhancing the human capit
18895151 Social
Conditional Cash Transfers Project World Bank (WB) sectors false
375 true
MAC-TRA-G-EC 01 of new carriage way and rehabilitation of newsection motorway section on -
300000000 of a completely the 28 km
Transport true
ConstructionDescription: ConstructionEuropean Commission (EC)Demir Kapija - Udovoth
376 true
MAC-TRA-G-EC 02 Description: The network European single-trackedCore Regional Network
2824560 the South East Europe true
Transport and
Improving the Rail Infrastructure alongis entirely Commission (EC) all at 1.435 mm stand
377 true
MAC-TRA-G-EC 03 Description: Concerning road infrastructure Europe Core Regional present on
1218240 European Commission Corridor VIII, at Network
East along true
Improving the Road Infrastructure along the SouthTransport (EC)
378 true
MAC-TRA-G-GRE 01 Completion of Corridor X 50000000 Greece (GR)Transport true
379 false
MAC-TRA-L-EBRD 01 Description: MaintenanceEuropean Bank for Reconstruction and Developme
132900000 Transport true
Regional and Local Roads Programmeand rehabilitation of regional and local roads in the
381 false
MAC-TRA-L-WB 01 Description: Component World Bank (WB)
Program Transport false
Regional and Local Roads 68271749 I: Rehabilitation and periodic maintenance of region
382 false
MAC-TRA-L-WB 02 Description: The project will Project (WB)
20348212 World Bank Transport
Second Trade and Transport Facilitation include (i)upgrading tofalse motorway standards o f th
383 true
MAC-WAE-G-AUT 01 Description: The 116619 project (AUT)
overall Austria Water and Environment
true
National Environmental Investment Strategy goal is aimed upon development of National
384 true
MAC-WAE-G-AUT 02 Water Supply in Lipkovo 1250000 Austria (AUT) true
Water and Environment
385 true
MAC-WAE-G-CHE 01 contract: ImplementationSwitzerland for WWTP Environment
49690 of the consulting and intrue
Water Kumanovo
Consultancy Description: The objectiveAssistance (CH) services to be provided is to assi
386 true
MAC-WAE-G-CHE 02 Education on environmental issues- a spareand our planet
189296 don?t have (CH) planet")
Water
OXO- Environmental Education ("We Switzerlandhow to save Environment true
387 true
MAC-WAE-G-CHE 03 Description: Pelister National Park ManagementEnvironment
aim of Switzerland Waterto support Plan Implementation
true
Project for Support to theThe 286647this project is (CH) and the realisation of the main a
388 true
MAC-WAE-G-EC 01 of the waste water collection activities are: system for Municipality sewerag
13000000 European Commission (EC)
Water and Environment
true
ConstructionDescription: The main project and treatment (i) upgrading of existing of Prilep
389 true
MAC-WAE-G-EC 02 of an Integrated and Financially Self-sustainable (EC) Management System
2030400 European Commission Environment
Water and Waste
true
Establishing Description: Within the framework of this operational programme, the IPA all
390 true
MAC-WAE-G-EC 03 Description: and local level capacitiesassist and Environment
3100000 European to Water central and management
for environmental
true
Strengthening the centralThe project purpose is Commission (EC) local level governme
391 true
MAC-WAE-G-GBR 01 is Changing So Must We! - awareness on (UK) true the climate change
43547 United Kingdom the effect of Raising
Water Awareness
Our Climate Description: To raise public Climate Change and Environment Caravan an
392 true
MAC-WAE-G-GBR 02 Description: To Audit Scheme in Municipality
12038 Department Water and Environment
for (UK) true
Environmental Management establish United KingdomSustainable Development in the Mu
393 true
MAC-WAE-G-GBR 03 Description: To set up a pilot Kingdom (UK) Environment waste (HCW)
53248 Water and health-care
Healthcare Waste Training System of United training system ontrue
394 true
MAC-WAE-G-GER 01 Description: Formation ofGermanyframework directive
200000 a water (GER) and Environment
Water in the
Support to the implementation of the EU reponsible departmenttrue Ministry for Environ
395 false
MAC-WAE-G-ITA 01 Description: of Environment and Sustainable Development
aim of Italy (IT) to assist the true Ministry
local
Co-operation in the Field The 200000this project is Water and Environment in the field o
396 true
MAC-WAE-G-JAP 01 Description: The study area is city of Water andEnvironment cover the follo
1245090 Skopje in the Republic the study will
Study on wastewater management in Japan (JP) Skopje,and oftrue Macedonia
397 true
MAC-WAE-G-NLD 01 Description: in the Western Balkan countriesand Environment
1578240 Netherlands Water hot spots environmental of Ma
(NL) true
Strengthening capacities The project resolves a part of theto addressin the Republic probl
398 true
MAC-WAE-G-NOR 01 Description: for aimJegunovce Municipality and Environment
of Norway (NOR) Water (Project No.2060256)
true
Macedonia-Water SupplyThe the 625the project is to improve the water supply conditions
399 true
MAC-WAE-G-SWE 01 Description: Bilateral municipal waste Water of thetrue 804 MK, working in
of institutional (SW) Macedonia (IP
in administration
Improved system for collection23040 Swedenassistance and Environment dnr 122-826
400 true
MAC-WAE-G-UNDP 01 Description: The project United Nations Development Programme (UNDP)
Institutional and is long-term conservation of Protected Ar
Water and Environment
true
Strenghtening the Ecological,745156 objective Financial Sustainability of theMacedonia?s
401 false
MAC-WAE-L-EIB 01 Description: The project concerns the Water and Environment
100000000 European Investment Bank (EIB)
Water Supply and Wastewater Collection capital
promoter?s false investment program
402 false
MAC-WAE-L-GER 01 The programme should increase agricultural output and productivity in a sus
21500000 Germany (GER) Water
Irrigation Programme Southern Vardar Valley Phase II and Environment false
403 true
MAC-WAE-L-GER 02 Biosphere Reserve Prespa
1530000 Germany (GER) and Environment
Water false
Transbound.This measure is structured as an open programme in which two neighbourin
404 false
MAC-WAE-L-GER 03 Two phases are foreseen for this (GER) and order to qualify
12700000 Germany Water true
Water and Sewerage Programme Macedonia programme. In Environment for the prog
405 false
MTN-ENE-G-EC 01 Description: The project Energy specific aims. The
1500000 European Commission (EC)
Energy true
Supporting the implementation of the has two Community Treaty first is to build the capaci
406 false
MTN-ENE-G-GER 01 Description: It is Efficiency of three levels:
composed Energy true
Advisory Services to Energy1900000 Germany (GER) implementation of pilot measures
407 false
MTN-ENE-L-GER 01 1
4-E-Hydro Power Plant Piva6000000 Germany (GER) Energy false
408 false
MTN-ENE-L-WB 01 Description: It 12890600 World Bank Montenegro false
will consist of APL 3 - (WB)
Energy Project
Energy Community of South East Europethree components. Component 1, telecommunic
409 false
MTN-ENE-L-WB 02 Description: Energy efficiency improvements
7341400 Energy false
Energy Efficiency in Public Buildings World Bank (WB) in selected public buildings suc
410 false
MTN-MUN-L-EIB 01 Description: Credit line operation for financing small and medium-scale proje
HAA Group Montenegro GL Municipal infrastructure
60000000 European Investment Bank (EIB) false
411 false
MTN-PSD-L-EIB 01 Loan for SMEs 100000000 European of limitedsector development
Private scale (EIB)
false
Montenegro Description: Credit line for financingInvestment Bankprojects of small and me
412 false
MTN-PSD-L-GER 03 Financial contribution to Germany Montenegro for initial capitalization.
2500000
Deposit Protection Fund Montenegro the DPF in(GER) true
Private sector development
413 false
MTN-PSD-L-GER 04 Loan for 15000000 Germany (GER) Private sector investments
false
Loan for SME to CKBrefinancing Medium and Small Enterprises developmentin Monteneg
414 false
MTN-PSD-L-GER 05 Loan to refinance SME subloans in Montenegro. false
Loan to AgroInvest for SME 5000000 Germany (GER) Private sector development
415 false
MTN-PSD-L-GER 06 Modus Micro 5000000 Germany Montenegro. false
Loan to AlterLoan to refinance SME subloans in(GER) Private sector development
416 false
MTN-ENE-L-GER 05 for EE 12000000 Germany (GER)
Loan to CKBLoan for refinancing energy efficiency Energy false
measures that allows the local bank to
417 false
MTN-SOC-G-EC 01 Description: To 2000000 European Commission oftrue Montenegrin judiciary
Judiciary Reform Social sectors
ensure effective implementation (EC) the
418 false
MTN-SOC-G-EC 02 Description: Component 1 - InstitutionSocial sectors
1800000 European Commission (EC)
Labour Market Reform and Workforce Development true
BuildingComponent 2 - Active labour m
419 false
MTN-SOC-G-EC 03 Description: The 800000 European Commission Assessments of the state o
principal statistical office sectors
Social true
Strengthening institutional capacities ofactivities will include (i)(EC)
420 false
MTN-SOC-G-EC 04 National Qualification Framework and Quality Assurance in Education
1550000 of the project is two-fold:true
Social sectors(i)
Support to a Description: The purposeEuropean Commission (EC) to support the establish
421 false
MTN-SOC-G-EC 05 Description: Project purpose is to improve the local government capacity to f
6050000
Support to Local Government ReformEuropean Commission (EC) true
Social sectors
422 false
MTN-SOC-G-EC 06 Description: The main purpose of the Social sectors
1220500 European CommissionAssistance and Project Prep
Technical (EC)
true
Technical Assistance and Project Preparation Facility and Programme Reserve
423 false
MTN-SOC-L-WB 01 Description: The Project Development Objective isfalse
6777100 World Bank Social
Health System Improvement Additional Financing (WB) sectors supported through three c
424 false
MTN-TRA-G-EC 01 Description: Activity 1 - Support to Commission Sector:
23400000 Transport true
Development of the Transport Sector EuropeantheTransport (EC) (i) to enhance institu
425 false
MTN-TRA-L-EBRD 01 Description: Completion of priority track rehabilitation programmeDevelopme
17900000 European Bank for Reconstruction and on the mai
Rail Infrastructure Emer Rehab Project II Transport false
426 false
MTN-TRA-L-EBRD 02 Description: The ProjectEuropean Bank for Reconstruction and Developme
30000000 consist of false
Rail Infrastructure Emergencyproposed project willTransport two components: (i) implem
427 false
MTN-TRA-L-EIB 01 Railways II 68070000 European Investment Bank (EIB)
Transport false
Montenegro Description: The proposed project consists of the rehabilitation of railway infr
428 false
MTN-WAE-G-EC 01 Description: Management
1000000 European Commission (EC)
Water and Environment
true
Support to EnvironmentalStrengthening the capacity of the Environmental Protection Agen
429 false
MTN-WAE-G-EC 02 Environmental project includes three major elements: Construction of the N
12400000 European Commission (EC)
Upgrading ofDescription: Theinfrastructure true
Water and Environment
430 false
MTN-WAE-L-EBRD 01 Description: The proposed project is for afor and Environment scheme that
Regional Water Supply Project Water Reconstruction and
water
52463400 European Bank regional true supply Developme
431 false
MTN-WAE-L-EIB 01 Solid Waste 54000000 national Investment Bank (EIB)
Water sustainable waste
false
Montenegro Description: Creation of aEuropeansystem of and Environment managemen
433 false
MTN-WAE-L-GER 02 This project aims at a substantial (GER) and Environment
25000000 Germany Water false
Water and Sanitation Adriatic Coast Phase IV improvement of the sewerage disposal alon
434 false
MTN-WAE-L-WB 01 Description: The project has three components summarized below:Compone
32109400 World Bank (WB) Water
Sustainable Tourism Development Project (Montenegro) and Environment false
435 false
REG-ENE-G-GER 01 Description: The sub-measures coordinated by the
6000000 Germany (GER) Energy true
Open Regional Fund for South-East Europe - Energy Efficiency ORF-E promote initiatives
439 false
REG-ENE-L-GER 01 15000000 Germany (GER)
Filters Pljevlja and Substations Energy false
440 false
REG-ENE-L-GER 02 Objectives: Promotion of Germany (GER) and energy efficiency in Southea
8500000 renewable energy
Reg. Renew.Energies+Energy Efficiency Energy false
441 false
REG-PSD-L-EIB 02 Description: Credit loan European of limited scale (EIB)
20000000 Municipal infrastructure
false
Raiffeisen Bank Kosovo Global line for financingInvestment Bankprojects of small and me
446 false
REG-WAE-L-CEB 01 Description: The project shall comprise four infrastructure sub-projects:
105880000 Council of Europe and Environment
the Municipal Window
true
Water and sanitation investments with KfW under WaterDevelopment Bank (CEB) two i
447 false
SER-ENE-G-CHE 01 Description: General objective: The most important project objective is for TP
8500000 Switzerland (CH) Energy
Replacement of unit B2 control system at TPP Nikola Tesla B true
448 false
SER-ENE-G-EC 01 Description: The purposeEnergyproject is twofold: true
6000000 of the Community Treaty
Energy firstly
Supporting the Implementation of the European Commission (EC) to strengthen the ca
449 false
SER-ENE-G-GER 01 Description: energy efficiency
1500000 Germany (GER) Energy true
Assistance in the area of The project is aimed at creating regulatory mechanisms to reduc
450 false
SER-ENE-G-NOR 01 Mining Norway (NOR) Energy true
Assistance for the Ministry of 400000and Energy for the Harmonization of the Serbian ele
452 false
SER-ENE-G-NOR 03 Description: Serbia for introduction of Energy energy efficiency policy and es
aim of Norway (NOR) newthe true
Norwegian assistance to The 160000the project is transfer of competence and knowledge
453 false
SER-ENE-G-NOR 04 Description: General objectives of theEnergy A true
1500000 Norway (NOR) projects
Reconstruction of ash and slag handling system - Kolubara are: (i) Fulfilment of legal requ
456 false
SER-ENE-G-UNDP 01 existing and adoptingof United Nations prevent the utilization of inadequate,
goal of new JUS is Energy
to Development Programme construct
true
Innovation ofDescription: The 300000 the projectstandards which refer to design (UNDP)
457 SER-ENE-L-EBRD 02
false 150000000 of (a) construction Reconstruction and Developme
Srbijagas The project is comprised European Bank for a second underground gas stora
Energy false
458 false
SER-ENE-L-EIB 01 Description: Design, supply, construction, and Bank (EIB)
49580000 Energy false
EMS Electricity Network Upgrading European Investmentoperation of six power substat
459 false
SER-ENE-L-GER 01 The programme consistsGermany (GER)
56800000 of two components: false
Environmental Measures in Thermal Power PlantsEnergy the rehabilitation of lignite mills
460 false
SER-ENE-L-WB 01 Description: Additional includes:
23437500 World Bank (WB)Energy of the
Energy Efficiency Project The projectFinancing (a) rehabilitationfalse heat supply system
461 false
SER-MUN-G-EC 01 Description: (i)55400000 European Commissioninfrastructure
To improve institutional and regulatory framework for municip
Municipal Infrastructure Support Programme Municipal (EC)true
462 false
SER-MUN-G-EC 02 Description: The specific Europeanof this programme is to improve the capac
Municipal Support Programme Municipal (EC)true
22000000 objective Commissioninfrastructure
463 false
SER-MUN-G-NOR 01 Description: The social the project is Municipal infrastructure
1283540 Norway to true
Building local mechanisms forgoal of inclusion(NOR) strengthen capacity and mechanism
464 false
SER-MUN-G-NOR 02 Description: The 250000 Norway (NOR)
general goal of in project Local true the
Municipal improve
Communities
Improvement of the Human Security Situationthe Serbianis toinfrastructure human security
465 false
SER-MUN-G-NOR 03 Description: The 439704 the project to enable the selected
goal of Norway (NOR) true
Tools and Mechanisms for Local Development is Municipal infrastructuremunicipalities (t
466 SER-MUN-L-CEB 01
false 174
2006 Landslides houses/apartment in
Description: Component A: Construction of aroundfalse in Bank
31250000 Council of Europe Development Serbia
2nd Phase for rehabilitation works after the SpringMunicipal infrastructure (CEB)
467 false
SER-PSD-L-EIB 01 Description: The Apex Loan for SMEsPrivate sector development SME proje
APEX Loan for SMEs is intended for financing of
false
250000000 European Investment Bank (EIB)
468 false
SER-MUN-L-EIB 01 SMEs and Priority line for
50000000 European small and Bank (EIB)
Municipal infrastructure
false
EB Loan for Description: CreditProjectsfinancingInvestmentmedium-sized projects promo
469 false
SER-PSD-L-EIB 02 Description: Credit line for
50000000 European Investment Bankdevelopment
Private sector (EIB)
false
EFG Bank and Leasing Loan for SMEs SME projects, infrastructure projects promoted by
470 false
SER-PSD-L-EIB 03 Description: Credit line operation for lease-financing small and medium-scale
Priority projects Private sector (EIB)
HAALS Loan for SME and 50000000 European Investment Bankdevelopmentfalse
471 false
SER-MUN-L-EIB 02 SMEs and Credit projects
20000000 European SME projects,false
Municipal infrastructure
infrastructure projects pro
KBC loan forDescription:priority line for financingInvestment Bank (EIB)
472 SER-MUN-L-EIB 03
false different
financing of false
Description: The project European Investment infrastructure
Municipal and Regional Infrastructureconcerns the Municipal Bank (EIB) multi-sector inves
200060000 Loan
473 false
SER-MUN-L-EIB 04 SMEs and Priority Projects
40000000 European Investment Bank (EIB)
Municipal infrastructure
false
PB Loan for Description: Loan for financing small and medium-sized projects promoted b
474 false
SER-PSD-L-EIB 04 Description: Credit line for leasing or Medium sector development
40000000 European Investment Bank (EIB)
Raiffeisen Beograd SMEs Priority Loans false
Private and Long Term financing of SM
475 false
SER-PSD-L-EIB 05 Description: Credit line European Investment projects, infrastructure proje
20000000 Private sector (EIB)
false
Sogelease Srbija Loan for SMEs for lease-financing SMEBankdevelopment
476 false
SER-PSD-L-EIB 06 Description: Credit line for
40000000 European Investment projects, infrastructure proje
Private sector (EIB)
false
Unicredit Leasing Srbija Loan for SMEslease-financing SMEBankdevelopment
477 false
SER-ENE-L-GER 02 Loan for refinancing energy efficiency Energy
5000000 Germany (GER)
Energy Efficiency Loan Programme Cacanska Banka false
measures from KfW Entwicklungsbank
478 false
SER-PSD-L-GER 03 Loan for refinancing
20000000 Germany (GER) portfolio development
loan false
SME Loan for ProCredit Serbia ProCredit Bank's Private sector in Serbia's rural area. Th
480 false
SER-ENE-L-GER 03 Loan for refinancing energy efficiency Energy
15000000 Germany (GER)
Energy Efficiency Loan Programme ProCredit Leasing false
measures that allows ProCredit Leasin
481 false
SER-ENE-L-GER 04 Loan for refinancing energy efficiency Energy
15000000 Germany (GER)
Energy Efficiency Loan Programme Raiffeisen Bank false
measures that allows Raiffeisen Bank
482 false
SER-ENE-L-GER 05 Loan for refinancing energy efficiency Energy
10000000 Germany
Energy Efficiency Loan Programme Volksbank (GER) false
measures that allows Volksbank Serbi
483 false
SER-PSD-L-GER 04 Securitisation by Serbia Germany (GER)
50000000 Private European Investment
false
Securitisation ProCredit Bank KfW in cooperation with the sector development Funds (E
484 false
SER-MUN-L-WB 01 Description: Component I: Making Fiscal Decentralization Work.; Componen
Services World
Delivery of Improved Local36238400Project Bank (WB) false
Municipal infrastructure
486 false
SER-SOC-G-EC 01 Description: (i) To include children from vulnerabletrue for Children from Ro
3000000 European Quality of Education (predominantly M
Social sectors
Education for All - Increasing the Availability andCommission (EC) groups
487 false
SER-SOC-G-EC 02 Description: To carry Medical Services
10000000 European Commission (EC)
Social sectorstrue
Health Sector Reform Emergency forward Health Sector reforms by improving the capabi
488 false
SER-SOC-G-EC 03 Description: Continue theEuropean Commission (EC)
7500000 system Social sectorstrue
Implementation of Hospital Informationimprovement of the Electronic Health Record deve
489 false
SER-SOC-G-EC 04 Description: 1) 3000000 Europeanof Judiciary System of connected court
and Transparency Commission (EC)
integrated system
Improvement and EfficiencyEstablish a unified andSocial sectors true
490 false
SER-SOC-G-EC 05 Description: Improvement of prison conditions for the
System Social sectorstrue
Improvement of the Penalty 9000000 European Commission (EC) inmates by constructio
491 false
SER-SOC-G-EC 06 Description: To 4500000 European Commission (EC) of the prosecutorial a
contribute to improvement of and penal system)
Social efficiency
Improvement of transparency and efficiency (prosecutorssectors true
492 false
SER-SOC-G-EC 07 Description: The project aims at completing the upgrading of SORS infrastru
2000000 European Commission (EC)
Improving Capacity of Statistical Office Social sectorstrue
493 false
SER-SOC-G-EC 08 Description: Efficient and Europeanpreparation andtrue
4000000 effective Commission (EC)
Social sectors implementation of infrastr
Modernisation of the vocational education and training system in Serbia
494 false
SER-SOC-G-EC 09 Description: Supporttechnical assistance facilities true
and the European Commission (EC)
Social sectors meeting the demands of I
Project preparation facilities 6000000 Serbian Administration infor the reinforcements of a
495 true
SER-SOC-G-EC 10 Description: Preparation European Commission (EC)
Social sectors
Project Preparation Facility 5000000 of technical specificationstrue supply contracts Prepara
496 false
SER-PSD-G-EC 02 Description: (i)21000000 European Commission (EC)
Assistance to Regional Policy sector development
Regional Socio-Economic Development Programme true
Private Development at National Level
497 false
SER-SOC-G-EC 12 Description: Education and Appropriate training (practical and theoretical) pr
2000000 European Commission (EC)
Social sectorstrue
Standardised System for Component 1 - Training of Judges and Prosecutors
498 false
SER-SOC-G-EC 13 Description: Support the developmentSocial and(EC)
4000000 European Commission secondary education exam
and implementation of a Quality Assur
Support for Quality Assurance within the national primarysectors true
499 false
SER-SOC-G-EC 14 Description: IndependentEuropean Commissioncare
1500000 assessment of health (EC) true
Support to the Health Care Accreditation Agency Social sectors quality standards is an e
500 false
SER-SOC-G-EC 15 Description: Service Contract tasks:Commission a situation analysis (Second
7500000 European (i) Conduct (EC)
Social sectorstrue
Systemic Development of Elementary, Practice Based Adult Education in Serbia of the sta
501 false
SER-SOC-G-EC 16 Healthcare To 6000000 infectious healthcare waste management in 35 heal
Treatment ofDescription: Waste Social sectors
improve European Commission (EC) true
502 false
SER-SOC-G-GER 01 Description: Within in scope
3000000 Germany (GER) sectors
Social true
Reform of Vocational Education theSerbia of the project five new educational profiles hav
503 false
SER-SOC-G-GER 02 Description: governance in Serbia Social sectors
3000000 aims at providing true
Strengthening of local selfThe project Germany (GER) selected municipalities assistance
504 false
SER-SOC-G-JAP 01 Description: Overall
200000 Japan (JP) Social sectors
Hospital Financial Management Goal: The hospitals which hadtrue Japanese Grant Aid Assi
505 false
SER-SOC-G-JAP 02 Description: Main objectives: (i) (JP) Social sectors
391374 Japan Improving of of ITtrue deparment - Faculty of Ph
Improvement of Japanese Language Learning Equipmenttechnical conditions for studding
506 false
SER-SOC-G-JAP 03 Description: Providing of Japan (JP) Social sectors
43117 needed the gym hall the process of education "Br
of
Reconstruction of the school building roof andconditions forrooftruethe Primary Schoolin th
507 false
SER-SOC-G-NOR 01 Description: Objective: By Children Environment and rate of children from
108600 Norway (NOR) reduced morbidity
true
Capacity building for implementation of 2015, 15% Social sectors Health National Action
508 false
SER-SOC-G-NOR 02 Description: General goal: The improvementsectors
950000 Norway (NOR) Social in Health Monitoring reporting
true
Capacity building of the Institute of Public Health of Serbiaof the monitoring and and Repo
509 false
SER-SOC-L-CEB 01 The mortgages and medium-income groups sectors
60000000 Council of Europe Development
Social in Serbia
purchase of (CEB)
Housing Programme for low will be used to partially finance thefalse Bank primary resid
510 false
SER-SOC-L-EIB 01 Description: The operation concerns the financing false
Facilities Social sectors (EIB)
of
Modernisation of Judiciary 91440000 European Investment Bank an investment program
511 false
SER-SOC-L-WB 01 Description: The additional loan will finance sectors
10546875 Social false
Serbia Health Additional Financing World Bank (WB) activities started under the Serbi
512 false
SER-TRA-G-EC 01 Description: (i)11000000 the
Enhance European Commission (EC)
Transport true
Danube River Information System (RIS) traffic safety by monitoring and managing the tra
513 false
SER-TRA-G-EC 02 Description: To 2000000 European Commission (EC)
establish the Transport true
Facilitating Intermodal Transport in Serbiainstitutional framework for development of inter
514 false
SER-TRA-G-EC 03 Description: Harmonization of SerbianTransport legislation with the EU Acqu
1500000 European Commission (EC)
transport true
Harmonization with Acquis Communautaire in the Field of Transport
515 false
SER-TRA-G-EC 04 Description: TA2000000 European Align Serbian (EC)
and Equipment to: Commission transport/aviation legislation
Implementation of the European Common Aviation Area Transport true
516 false
SER-TRA-G-EC 05 Description: (i) To assureEuropean Commissionsupervision of motorway con
3500000 efficient and effective (EC)
Supervision of Belgrade City Road By-Pass, Section B Transport true
517 false
SER-TRA-G-EC 06 Description: To 3000000 and introduceTransport (EC)
develop European Commission true
System for the Analysis of Track Conditions a track infrastructure survey and inform
518 false
SER-TRA-G-EC 07 Description: Efficient and Europeanpreparation andtrue
4000000 effective Commission (EC)
Transport
TA to Support Implementation of Infrastructure Projects in Serbia implementation of infrastr
519 false
SER-TRA-G-NLD 01 Description: Objectives: Netherlands Transport true and legal framework f
of intermodal transport in institutional
(NL)
Institutional capacity building 300000 (i) To recommendthe Ministry of infrastructure
520 false
SER-TRA-L-EBRD 01 Description: The project is
285600000 European Bank for Reconstruction Gazela Bridge a
Transport true
Belgrade Highway and Bypass Project for the urgent rehabilitation of the and Developme
521 false
SER-TRA-L-EBRD 02 Description: Modernisation of a metropolitan-wide false
88500000 Transport suburban and Developme
Belgrade Rail Modernisation Project European Bank for Reconstruction rail transit system
522 false
SER-TRA-L-EBRD 03 795300000 of a new Bank for road false
Transport Corridor and Developme
Corridor 10 Description: ConstructionEuropean section ofReconstructionX from Nis to Dim
523 false
SER-TRA-L-EBRD 04 Description: 221000000 European Bank for 25up to Reconstruction and Developme
false
Serbia Railways EMUs The EBRD would financeTransporttwo or three car sets of Electr
524 false
SER-TRA-L-EIB 01 Description: The project concerns the TransportBank (EIB) of bypass roads
Belgrade bypass constructionfalse km
361180000 European Investment of 47
525 false
SER-TRA-L-EIB 02 Description: Construction of a new Investment Bank (EIB)
391200000 Transport false
Corridor X (E80) Motorway Phase I European approximately 85-km section of motorway
527 false
SER-TRA-L-EIB 04 Description: The77070000 European Investment Bank (EIB)
Transport false
Gazela bridge rehabilitation project concerns (i) the rehabilitation of the Gazela bridge o
528 false
SER-TRA-L-WB 01 Description: Component 1 - TheBank road to FYR Macedonia (E-75) ? Corrid
Corridor X Highway Project 318028480 World M-1 (WB) Transport false
529 false
SER-TRA-L-WB 02 Description: (i)43679700 World Bank (WB)
rolling Financing Transport the ongoing performance-
Transport Rehabilitation Additionalover and extending in scope false
530 false
SER-WAE-G-EC 01 Description: The project focuses onCommission (EC)
1600000 European four parallel Environment
Agency true
Assistance to the Serbian Environment Protection Water and activities that should result i
531 false
SER-WAE-G-EC 02 Description: 1500000 European Commission (EC)
Water and Environment laboratory equ
Chemicals Management One twinning contract and one supplytrue contract for
532 false
SER-WAE-G-EC 03 Description: The project European Commission (EC)
the Nikola Tesla thermal power plants
Water and Environment
true
Emissions reductions from 12000000 involves the reconstruction of two electrostatic preci
533 false
SER-WAE-G-EC 04 Description: at the ESP Europeanof Serbia
new Electric Power Commission Environment
installed at TPP
true
Environmental ProtectionA 17000000 procured andWater and (EC) Nikola Tesla B Unit B
534 false
SER-WAE-G-EC 05 Description: (i) National Plans for specific hazardous waste streams (ii) Syste
Hazardous Waste Water and Environment
1500000 European Commission (EC) true
535 false
SER-WAE-G-EC 06 Description: Develop a Strategic WastewaterWest true
3000000 European Commission Environment Basin
Water Master Morava River
Sewerage and Wastewater Strategic Master Plan for the and (EC)Strategy and Implemen
536 false
SER-WAE-G-EC 07 Description: The subject of to Twinning Airand istrue
1000000 European Commission Environment
Water Quality Management System
to
Strengthening Administrative CapacitiesthisImplementproject (EC) strengthen the institutio
537 false
SER-WAE-G-EC 08 Description: This project will establish the conditions for a nature protection m
1000000 European Commission Environment
Natural Areastrue
Strengthening Administrative Capacities to ProtectWater and (EC)(Natura 2000)
538 false
SER-WAE-G-EC 09 Description: Development of an of Commission (EC)
2000000 European Environment Environment Strategy
Water and in designing
true
Technical Assistance for Support the MinistryEnvironmental Approximationand developing
539 false
SER-WAE-G-JAP 01 Description: Project purpose: Improved public awareness climate change
400000 activities related to mitigation of and
false
Capacity Building in order to promote Japan (JP) Water and Environment built capacities
541 false
SER-WAE-G-NOR 01 Description: General aim: Strategy for incorporation Kyoto Protocol in the R
121080 Norway (NOR) Water and Environment
true
Assistance for development of National Efficient implementation ofof the Republic of Serb
542 false
SER-WAE-G-NOR 02 Description: of environmental investments and Environment
800000 Norway (NOR) enhance the environmental investm
to true
Assistance in preparationOverall Project Objective Waterprojects with support to waste ma
544 false
SER-WAE-G-NOR 04 Description: on1500000 Norway (NOR) forest capable of adapting to climate
the objective: To make true
Impact of climate changeOverall forest biodiversityWater and Environment
545 false
SER-WAE-G-NOR 05 Description: To create a separate(NOR)
241799 Norway cadastre II
Water and Environment
true
Institutional support to Law Enforcement (ISLE) - phase reporting system that should prov
546 false
SER-WAE-G-NOR 06 for Serbia ? Green objective: Contributes toand Environment
3330000 for protection of
Water aforestation
true
Million TreesDescription: Overall belts Norway (NOR) environment and biodiversity pro
548 false
SER-WAE-G-NOR 08 Description: Overall Project Objective:Water and permitting process in Serbia
400000 Prevention and Environmental pollution
true
Twinning light for Integrated Pollution Norway (NOR) Control Environment decrease acc
549 false
SER-WAE-L-EBRD 01 Description: The proposed project is for the construction of the regional solid
Duboko Solid Waste Water Reconstruction and
true
16200000 European Bank for and Environment Developme
550 false
SER-WAE-L-EIB 01 Description: The
300000000 European Investment Bank (EIB) investment schem
financing Environment
Integrated Solid Waste Serbiaproject concerns the Water andof false different
551 false
SER-WAE-L-GER 01 The programme is open for participation of up to Environment
58600000 Germany (GER) and 8false
Water
Water and Sewerage Programme in Medium-sized Municipalities medium-sized municipalit
552 false
SER-WAE-L-WB 01 Description: Component World Bank (WB) and Environment
Project Water false
Bor Regional Development31338916 I: Environmental Management and Remediation: (i)
553 false
SER-WAE-L-WB 02 Description: The largest World Bank (WB) Financing
46447687 Project Additional and Environment
Water false
Irrigation and Drainage Rehabilitationsingle basin effort covered by the Additional Financin
559 false
CRO-SOC-G-EC 02 Overall Objective:To Proceedings Commission efficiency of pre-trial crimina
2225000 European Social sectors
Support to the Reform of Criminalenhance effectiveness and (EC) true
560 false
CRO-SOC-G-EC 03 Overall Objective:To reduce Croatia Social sectors
1800000 European Commission (EC) and
Development of the Probation Services inthe prison population true increase the efficiency
561 false
CRO-SOC-G-EC 04 Overall Objective:To support the Procedures Act(EC)
1666667 European Commission true
Social sectors
Implementation of the General Administrative Croatian state in developing a client-oriente
562 false
CRO-SOC-G-EC 05 Civil Society Overall Objective:
theoverall objective of this component of IPA ismonitorin
The European Commission (EC)
3508773 capacities of the civil society sector for the to foster
Facility - Enhancing Social sectors true
563 CRO-SOC-G-EC 06
false 3333330 European facilitate sectorsand
Overall Objective:
III
To
Roma Support Project – Phase
enhance and Commission (EC) full participation of th
Social active true
564 false
CRO-PSD-G-EC 02 2.1 Overall Objective:TheEuropean Commission (EC) is: to provide statisti
1112000 overall objective the project
Private statistics
true
Technical assistance in development of selected areas of sector development
565 false
CRO-SOC-G-EC 17 Overall ObjectiveTo support alignment with EU standards in food and Sanita
5303000 European the Veterinary,true
Social sectors
Continued Support to Capacity Strengthening of Commission (EC) Phytosanitary safety, vete
566 false
CRO-SOC-G-EC 08 To improve the 4120000 Animal Diseases insectors
animal health situation in Republic true
Social Croatia of
Support for the Control/Eradication of European Commission (EC)Croatia as regards cert
567 false
CRO-SOC-G-EC 09 Overall Objective:To supportthe Croatian Croatia in Sector
2155600 of RepublicSocial sectorsstrengthening the market
of Fisheriestrue
Strengthening the Market ComponentEuropean Commission (EC)
568 false
CRO-TRA-G-EC 01 Improvement Controlsafety and strengthening the true
road System for Roadside Inspections
Transport capacities of the Ministry o
Efficient Functioning of theof2200000 European Commission (EC) and Checks of the D
569 false
CRO-ENE-G-EC 03 To harmonize legislation and of Energy Supply acquis with the Scope the e
Vulnerability to implement the System
Energy true
Monitoring Dependence and1100000 European Commission (EC) communataire inon Se
570 false
CRO-SOC-G-EC 10 To strengthen the capacities of the Commission (EC)
1000000 Market Training Centre true
Social Employment Service to become
Croatian Employment Service Labour European Croatian sectors
571 false
CRO-SOC-G-EC 11 The overall objective of this project is Social sectors
4323977 European Commission Structural Instruments in C
to contributetrue
to
Support to the Management, Monitoring and Evaluation of the(EC)effective implementatio
572 CRO-SOC-G-EC 12
false Blue Border Surveillance – phase II European Commission (EC)
4600000 Social sectors order to fulfil the require
To further strengthen the overall capacities of MoI truein
573 true
CRO-WAE-G-EC 28 of the new Environmental Protection Water and Environment legislation in c
1100000 protection inAct harmonized the EU
Croatia through
true
EnforcementSupport to environmentalEuropean Commission (EC) with enforcement of pr
574 CRO-SOC-G-EC 13
false 3769914 of Croatia's preparationstrue
To improve effectivenessEuropean Commission (EC) Capacity for
Facility for Project Preparation and Reinforcement Social sectors EU accession and to e
of Administrative
576 false
CRO-SOC-G-EC 18 development of more efficient functioning of sectors bodies in the Republic o
judicial European Commission (EC)
Social judicialtrue
Professional To contribute to1186000advisors and future judges and state attorneys throu
577 false
CRO-SOC-G-EC 15 To further enhance the capacity of of the Croatian true
2365000 European Commission (EC)
misdemeanour judiciary and developmen
Further improvement of institutional functioning all Social sectors courtssystem.Project p
578 false
CRO-SOC-G-EC 16 Enhancing Field of Fight European Commission (EC)and exploitation and se
1613000 against Sexual Exploitation
fight sectors sexual
Capacity Building in the the law enforcement in theSocialagainsttrue Sexual Abuse of Ch
579 false
CRO-SOC-G-EC 21 a comprehensive systemEuropean Commissionefficient and effective system
800000 for anti-discrimination protection
Social an (EC)
Establishing This Twinning supports the establishment of sectors true
580 false
CRO-SOC-G-EC 22 The overall objectivethetoEuropeanthe of Civil Society Organizations (CSOs)
and is improve Commission (EC)
environment true
Enhancing the Sustainability3125000 DevelopmentSocial sectorsconducive to developmen
581 false
CRO-PSD-G-EC 03 The overall objective of the project is to provide statistics to the Government
889000 European Commission (EC)
Technical assistance in business statistics1 true
Private sector development
582 CRO-MUN-G-EC 01
false Economic revitalization and development of Vrana of Vrana Settlement
Reconstruction of Maškovića Han and Economic Revitalizationtrue
Municipal (EC)
2437777 European CommissioninfrastructuresettlementProject purpose
583 false
CRO-SOC-G-EC 24 The overall objective of this Project Commission (EC) administrativecapacit
1000000 European is Social sectors the
to strengthen true
Strengthening the administrative capacity of competent authorities and implementation ag
584 false
CRO-SOC-G-EC 25 four selected long-term veterinary and phytosanitary border inspection posts
8592000 European Commission (EC)
Social sectors true
Upgrading ofTo support alignment with EU standards in food safety, veterinary and phytos
585 false
CRO-TRA-G-EC 08 To support the Croatian aviation authorities in meeting the demands to impro
1467000 European Commission true
capacity with a
Reinforcement of the administrative and technical Transport (EC)view to ensuring efficien
586 false
CRO-SOC-G-EC 26 for eCTD and implementation of medicines network based on sharing curre
1240000 European Commission (EC)
Social sectors true
PreparationsCroatian participation in Europeandigital archival information system
587 false
CRO-SOC-G-EC 27 To strengthen the Croatian Tax Administration hereinafter (CTA) functions of
1000000 European Commission (EC)audit
Social sectors
Enhancement of the administrative capacity of CTA in the field true of
588 false
CRO-SOC-G-EC 28 To further Border ControlEuropean Commission (EC)
1483000 Social sectors true
Modernization of State contribute to the development of an efficient and strengthened Cro
589 false
CRO-SOC-G-EC 29 equipment for police stations
2000000 European capacities of MoI
Social sectors true
Supply of IT Further strengthening of the overall Commission (EC) in order to fulfil therequ
590 false
CRO-SOC-G-EC 30 Preservation of 1950000biodiversity Commission (EC)
existing European plans and strengthening Ensuring sust
CroatiaProject
true
Capacity building for preparation of managementinSocial sectors purpose:of nature prote
591 false
CRO-WAE-G-EC 29 Contribution to the further harmonization andand (EC) by certain dangerous s
1137000 European Commission Environment
Water caused true
Capacity building for implementation Directive on pollutionimplementation of the EU Wate
592 CRO-WAE-G-EC 02
false 2840000 capacities and implementation of the
Support to strengthening European Commission Environment environmenta
Water and aquistrue
Capacity building for the implementation of the environmental(EC) in the areas of waste
593 false
CRO-SOC-G-EC 31 Increasing the availability, for Blood, Social sectors
2400000 European Commission (EC)
safety of blood,
Cells
Strengthening the Institutional Capacityquality and Tissues and truetissue and cells for hum
594 CRO-SOC-G-EC 32
false 6507411 of Croatia's preparationstrue
To improve effectivenessEuropean Commission (EC) Capacity for
Facility for Project Preparation and Reinforcement Social sectors EU accession and to e
of Administrative
596 CRO-SOC-G-EC 19
false is
Social sectors to
The overall objective of the preparatory Youth in (EC) programmes
Preparatory measures for the LifelongEuropean and measures true improve and monitor
3350000 Learning Commission Action
597 false
BIH-SOC-G-EC 57 First phase of the police European Commission (EC)
process process completed according to legisla
Support to the Police reform2000000 restructuring Social sectors true
598 BiH-SOC-G-EC 34
false of BiH to (EC)
7573000 build OfficeSocial sectors
The overall objective is toEuropean Commissionfight War Crimes and Organ
Support to the State Court and Prosecutor’s sustainable institutional capacity at State leve
true
599 true
BiH-SOC-G-EC 33 The overall objective is tohigh-security Prison of Bosnia and Herzegovina
of a State strengthen the rule in (EC)
Social sectors true
Support to the construction18850000 European Commissionlaw in Bosnia and Herzegovi
600 false
BiH-SOC-G-EC 12 The overall objective of European Commission (EC)
Social sectors true
Project Preparation Facility 1500000the Project Preparation Facility (PPF) is to improve th
601 BiH-SOC-G-EC 07
false Social government actors remain supp
To ensure that BiH’s public, civil society and sectors
EU Awareness II 2140000 European Commission (EC) true
602 BiH-SOC-G-EC 08
false 1955555 combat social exclusion in
The overall objective is toEuropean Commission true
Support for Vulnerable Groups in Bosnia and Herzegovina (EC)Bosnia and Herzegovin
Social sectors
604 false
BiH-SOC-G-EC 29 Strengthening the BiH public financial Social sectors especially in view of cap
1500000 European Commission (DIS)
management,
Further Support to the Decentralised Implementation System (EC) true
605 false
BiH-SOC-G-EC 09 The overall 3904783 contribute to democratictrue
Social sectors
Support to civil society objective is toEuropean Commission (EC) stabilisation, conciliation a
606 false
BiH-SOC-G-EC 10 Fulfillment of Bosnia and European Commission (EC)
2200000 HerzegovinaSocial sectors
Support to Mine Action Activities Bosnia and Herzegovina true
obligations regarding Ottawa Convent
607 false
BiH-SOC-G-EC 11 To enhance the2875000 European care services(EC)
of the Health Care Systemssectors Bosnia and Herzegovina
Social in in true
Support for the Developmentefficiency of health CommissionBosnia and Herzegovina
608 false
BiH-MUN-G-EC 02 The overall objective Developmenteconomic growth and employment throug
9903800 generate and other selected economic sectors in
Municipal (EC)
Support to Economic and Tourismis toEuropean Commissioninfrastructure true
609 BiH-SOC-G-EC 13
false To build Reform in B&H effective Commission (EC)
Support to Education and efficient andEuropean quality education system in Bosnia and H
3000000 Social sectors true
610 BiH-PSD-G-EC 05
false 4335000 promote Commission (EC)
The overall objective is building and development true
Support to trade policy and capacity toEuropean Bosnia and Herzegovina’s integration into
of Infrastructure
Private sector development of Metrolo
611 false
BiH-SOC-G-EC 15 Development of4807677 Europeanpolicy and preparations for BiH's forestry
a and food safety Commission (EC)
Social sectors true
Capacity building in agriculture sustainable, competitive and dynamic agriculture, access t
612 false
BiH-SOC-G-EC 16 To improve the 1857320 European Commission (EC)Herzegovina as regards
or Eradication of animal Bosnia and
Social sectors
Support for the Control and /animal health situation in diseases true Rabies and Classical Swin
613 false
BIH-TRA-G-EC 03 Integration of the civil building of BiH Transport (EC)
1000000 European Commission true
civil aviation Herzegovina into EU civil
Twinning Assistance in institutionalaviation sector in Bosnia andauthority related to Europ
614 false
BiH-SOC-G-EC 17 To strengthen Statistical European Commission the
3819207 Institutions Social sectors true
Support to State and Entity the BiH statistical system, improve(EC) production of harmonis
615 false
BiH-WAE-G-EC 07 Updated and reliable land use two Commission (EC) information is availabl
for BiH - European Digital Orthophoto
Water and Environment
Spatial information services 3300000 phaseand land administration Mapstrue
616 false
BiH-SOC-G-EC 18 The overall objective of the project is to improve migration management capa
2000000 European Commission (EC)
Assistance in Asylum Reception Centre Construction Social sectors true
617 false
BiH-SOC-G-EC 19 Strengthening the CIPS Protection System -sectorsregistry
2250000 European as the central true
Social CIPSstate
Consolidation of Citizen IdentificationDirectorate Commission (EC) institution in the area
619 false
BiH-ENE-G-EC 03 The overall objective of this project is Energy
11750000 European Commission the reform of the energy se
to the requirements of the Energy Com
Support to Bosnia and Herzegovina (BiH) in meeting assist in (EC) true
620 false
BiH-PSD-G-EC 12 To implement an effective and efficient border management system in Bosni
4000000 BiH Integrated Border (EC)
Private sector development
true
Support for the implementation of the European CommissionManagement (IBM) Strategy
621 false
BiH-SOC-G-EC 21 Integration of BiH Programme (FP7)wide for sectors
1500000 European and activites true
Social Competitiveness and Innovation
and
Entry ticket for 7th Framework Institution into EUCommission (EC) networksProject purpo
622 false
BiH-PSD-G-EC 06 To of the ECB/Eurosystem Recommendations forBankCentral Bank of Bosni
1100000 European Commission (EC) of Bosnia
the Central true
the
Implementation strengthen institutional capacity of Private sector development and Herzeg
624 false
BiH-PSD-G-EC 07 The overall medium is toEuropean the sectorsectoradevelopment
3500000 promote Commission (EC)market economy in Bos
Private and Deposit Insurance Schem
Support to the small andobjective sized enterprises transition totrue
625 false
BIH-TRA-G-EC 01 The EC grants78200000 European core network current
contribute to the alleviation of the in Bosnia and Herzegovina
Transport true
Improvement of regional transport infrastructure Commission (EC) financial and econo
626 false
BiH-SOC-G-EC 24 The overall objective is toEuropean Socialof public and animal health prote
4442639 ensure high level sectors
Support to veterinary and phytosanitary servicesCommission (EC) true
627 BiH-SOC-G-EC 25
false BiH to Community Programmes
BiH participation is implementing EU policies related to research and culture in accordanc
Social sectors
3300000 European Commission (EC) true
628 false
BiH-SOC-G-EC 26 The development and strengthening of the BiH agricultural information struct
3400000 European Commission (EC)
sector
Support to the Agriculture and Rural Development Social sectors true
629 false
BiH-SOC-G-EC 27 To Equipment for Population and Housing Census in 2011 by providing IT a
2000000 European Commission (EC)
Procurement of prepare for the the 2011 BiH Census Social sectors true
630 BiH-PSD-G-EC 08
false The overall objective is to enhance Commission (EC) of the
Single Market Integration 4255000 European the integration true markets of BiH with
Private sector development
631 BiH-PSD-G-EC 09
false 2000000 European Commission (EC) Bosnia and Herzegovin
Enhance the Fiscal of public Private sectorin
Support to Economic and quality Policy finance managementtrue development
632 false
SER-SOC-G-EC 17 To improve the 9000000 European Commission (EC)
public administration system sectors
Social in thetrue
Support to implementation of Public Administration Reform process Republic of Serbia in acco
633 false
SER-SOC-G-EC 18 Building capacity in the Serbian
5000000 European Commission the context of EU pre-acces
Social sectors
Support to preparation of IPA component III administration in (EC) true
634 SER-MUN-G-EC 03
false Municipal Infrastructure Support programme – MISP 2010 infrastructure
41120000 contribute to the decentralization process and to pr
Municipal true
The overall objective is toEuropean Commission (EC)
635 false
SER-SOC-G-EC 19 The overall objective - the project is to improve the efficiency, effectiveness
2000000 European Commission (EC)
Social sectorstrue
Support to the Ministry of Finance ofTreasury Administration capacity building
636 false
SER-SOC-G-EC 20 Prevention and 2265000 European Commission (EC)
control of Terrorism Financing in Serbia
Social sectorstrue
Project against Money Laundering andmoney laundering and terrorist financing in Serbia
637 false
SER-SOC-G-EC 21 Establishment system of Europeanof Serbia sectors standards and strengthe
5500000 Republic Commission (EC)
Social with EUtrue
Further Alignment of Penal of an efficient system for re-socialization and professional edu
638 false
SER-SOC-G-EC 22 To Society 2220000 European Commission (EC)
Social in the true
EU
Support to Civil enable active participation of civil society sectors integration process by
639 false
SER-SOC-G-EC 23 Support the developmentEuropean Commission (EC)
25000000 of knowledge sectors
Social true
Higher Education Teaching InfrastructureaProgramme based economy in Serbia that resp
640 SER-PSD-G-EC 01
false 15000000 contribute Programme stability and socio-econom
The overall objective is toEuropean Commission -true
European South and South West Serbia Support to enhanced(EC) ESSWeSP
Private sector development
641 false
SER-SOC-G-EC 24 To Palliative to4100000 EuropeanRepublic of services
improving the the Commission (EC)
Social sectorstrue
Development ofcontribute Care Services in quality of health Serbia in the health care sys
642 false
SER-SOC-G-EC 25 To of Strategy for fight against of health and security of component
the protection drugs - supply reduction
Social sectorstrue
Implementation contribute to4000000 European Commission (EC) the population by imp
643 false
SER-PSD-G-EC 03 Increased competitiveness and
3000000 European Commission in Serbia, through strength
Private sector development
Integrated Innovation Support Programme economic growth(EC) true
644 false
SER-WAE-G-EC 10 Develop the full3800000 European the Danube (EC)
potential and the competitiveness true
Water and Environment inland waterwa
Removal of Unexploded ordinances (UXO) fromCommission River of Serbia's
645 false
SER-WAE-G-EC 11 To contribute to2000000 European river training and
documentation for creation and Environment works on on t
Water of safe and swift
true
Preparation of the necessarythe restoration and Commission (EC)dredgingnavigation sele
646 SER-TRA-G-EC 08
false To contribute to the works on the of traffic flows (EC)
Supervision of road construction enhancementCorridor X (Grdelica – Vladicin Han and Pi
Transport true
10000000 European Commission on Euro Corridor X and to im
647 SER-SOC-G-EC 27
false 13750000 switchover in to information
Successfully maintain citizens’ accessSocial sectors
Assistance to the digital broadcasting European Commission (EC)after the switch off of an
Serbia true
648 SER-SOC-G-EC 28
false Contribute to the establishing migration management and reintegration of R
Capacity building of institutions involved in of Migration Management Mechanism in the re
Social sectors
2000000 European Commission (EC) true
649 false
SER-SOC-G-EC 29 To contribute to5000000 European andand fight against organized crime on
the efficient prevention Suppression
Social sectorstrue
Establishment of Efficient System for PreventionCommission (EC) of Illegal Migrations wit
650 false
SER-PSD-G-EC 07 To contribute to2850000 surveillance system consumers and food products
market European Commission (EC)
Private sector development
true
Strengthening of the Serbian reduction of the exposure of for non-foodin Serbia to unsafe
651 false
SER-SOC-G-EC 31 Contribute to a modern, sustainableCommission Rural
3000000 European and efficient agricultural sector in Serbi
Social sectorstrue
Institutional Capacity Building and Support to Agriculture and (EC) Developmentand prom
652 false
SER-SOC-G-EC 32 The overall objective of the Project Preparation Facility (PPF) is to improve th
2006679 European Commission IPA
Social sectors
CRIS Number: 2009/021-765 the Project Preparation Facility (EC)2010 true
653 false
SER-ENE-G-EC 02 Contribute to Componentdevelopment in Strategy true
2500000 of the National Serbia by enhancing capacities in t
Energy for
Implementation of Energy sustainable European Commission (EC) Sustainable Developm
654 false
SER-ENE-G-EC 03 of Substation 28000000 European & Energy
400/110 Kv an electricity market (EC)
Leskovac-2 true
ConstructionTo assist in the creation of Vranje-4 Commissionin Serbia in conformity with th
655 SER-ENE-G-EC 04
false To ensure the implementation
Follow up technical assistance to Srbijagas of commitments undertaken in the framework
Energy
1500000 European Commission (EC) true
656 false
SER-SOC-G-EC 40 To improve the 2500000 European Commission and Stakeholders
quality of the Inspectorate and Relevant
Social sectorstrue
Strengthening the Serbian Environmental natural environment(EC) the health of the popul
657 false
SER-SOC-G-EC 33 To contribute to6500000 and capacity building of Serbian National Referent
sustainable and confident food (EC)
Social sectorstrue
Equipment and courier service supplyEuropean Commissionchain laboratory network cap
658 SER-PSD-G-EC 04
false To contribute to2200000 reliable agricultural statistics
Establishment of the SerbianSerbia’s European Commission (EC) and efficient administra
Private sector development
Farm Accountancy Data Networktrue (FADN)
660 false
SER-SOC-G-EC 36 To contribute to2500000 European Commission (EC)
democracy and the rule of law by suppressing the system of
Social sectorstrue
Capacity building of the Directorate for Confiscated Property and improving organized crim
661 false
SER-SOC-G-EC 37 To contribute to resolvingEuropean Commission (EC)
13541000 the problems of enhancement of refugees and Int
Social sectorstrue
Supporting access to rights, employment and livelihoodrefugees and IDPs in the Republic
662 SER-SOC-G-EC 38
false The Overall
Support to Civil Society Objective is to support the active involvement of civil society in S
Social sectors
2156000 European Commission (EC) true
663 false
MTN-SOC-G-EC 07 Improving the safety and European Commission (EC)
2650000 security of border management, criminal intelligen
Social sectors
Strengthening the police Directorate in integratedthe citizens of trueMontenegro in accordanc
664 false
MTN-SOC-G-EC 08 To reduce corruption anti conflict of interest levels action plan
737000 corruption strategy and true
Social sectors in
Support the implementation of the andEuropean Commission (EC)MontenegroProject purp
666 false
MTN-SOC-G-EC 09 To strengthen the capacity of local Commission (EC)and provision of grants
3940000 implementation of the for
Social sectorstrue
Support to Local Self-Government for European governmentsNTSefficient and effective ma
667 MTN-TRA-G-EC 02
false Increase the Main Railway performance and reliability of railway transport in
Major rehabilitation of the attractiveness,Line Bar-Vrbnica (Miatovo kolo- Mojkovac) sectio
Transport true
12000000 European Commission (EC)
668 MTN-WAE-G-EC 03
false To enhance Montenegro’s ecological developmenttrue by
Upgrading the Pljevlja waste water treatment Commission (EC) ensuring that economi
11000000 European Water and Environment
669 false
MTN-WAE-G-EC 04 To establish effective sustainable forest
1000000 European Commission (EC)
Water and Environment
true
Support for Capacity Building in the Forestry Sector management and effective governan
670 false
MTN-SOC-G-EC 10 Protect Montenegro against the
770000 European Commission (EC)
caused by introduction and spread ofp
Strengthening the Phytosanitary Directorate harm Social sectors true
671 false
MTN-WAE-G-EC 05 To contribute to the protection and sustainability oftrue
Raising environmental awareness 500000 European Commission (EC) Montenegro’s environmen
Water and Environment
672 SER-PSD-L-EBRD 01
false The EBRD and Corporate Credit a total of Reconstruction Alpha Bank (AB
Alpha Bank Serbia-SMEhas signed loans worthLine for €200 million for and Developme
50000000 European Bank false
Private sector development
673 false
BiH-WAE-G-EC 03 The Bosnia and Herzegovina contribute to environmentally sustainable econ
12900000 European Commission Environment
Water Institutions, preparation for pre-
Strengthening of overall objective will be toEnvironmental and (EC) true
674 BiH-MUN-G-NLD 01
false socio-economic recovery of
Regional Development Programme (NL) multiethnic communities with str
Upper Drina To promote the7594912 Netherlands Municipal infrastructure
true
675 false
REG-WAE-L-WB 01 Trebisnjica River and global environmental and Environment
16611870 World Bank Water Project false
Neretva and The development Basin Management (WB) objective of the Neretva and Tre
676 false
SER-SOC-G-EC 39 Strengthening vine-growing to Renewal of Viticulture Zoning and Control of
1200000 European Commission (EC)
Social sectorstrue
Capacity Building and Technical Supportand wine-producing sector in Serbia through harP
677 false
SER-PSD-L-EBRD 03 The EBRD -230000000 European Bank of Reconstruction with Eurobank
Senior Loan Private sector development
false
Eurobank EFG Beogradhas signed loans worth a totalfor EUR 230 millionand Developme
678 SER-PSD-L-EBRD 04
false 20000000 a participation for risk sharing framework with Cré
Serbia WHRThe EBRD is consideringEuropean Bankin a Reconstruction and Developme
- Credit Agricole false
Private sector development
679 SER-PSD-L-EBRD 05
false 20000000 European Private sectorEUR
The Banka Srbija SME Credit Line worth a Reconstruction million with Soc
Societe GeneraleEBRD has signed investments Bank fortotal offalse 215and Developme
development
680 SER-PSD-L-EBRD 06
false 44400000 a
- Societe Generale Serbia participation for risk sharing framework with Soc
Serbia WHRThe EBRD is consideringEuropean Bankin a Reconstruction and Developme
false
Private sector development
681 SER-TRA-L-EBRD 05
false The Corridor considering providing a sovereign guaranteed and of €100 mill
Serbian RailwaysEBRD is296400000 European Bank for Reconstruction loan Developme
X Transport false
682 false
SER-ENE-L-EBRD 01 E 80050000 European Bank for Reconstruction and Developme
Energy up
EPS Metering BRD is providing a sovereign guaranteed loan of trueto EUR 40,000,000, to
683 SER-PSD-L-EBRD 07
false The EBRD is considering a EUR 30 million 5 year SME loan with a two year
30000000 Private sector development
false
Komercijalna banka SME Credit Line European Bank for Reconstruction and Developme
685 false
BIH-SOC-L-EBRD 01 The 11000000 European up investmentfalse Hayat,Developme
Social Reconstruction and the only loc
Natron Hayat II EBRD is implementing a followBank for sectors Natron
686 BIH-WAE-L-EBRD 01
false 35000000 providing Water Reconstruction and Developme
The Water and Wastewater Projecta senior and of up to €30
Sarajevo Canton EBRD is consideringEuropean Bank for loan Environment million to the C
false
687 BIH-WAE-L-EBRD 02
false The - Wastewater Treatment Plant Bank for and Environment Developme
Bijeljina Phase 2 EBRD, EU and the Swedish International Development Agency (SIDA) a
true
21000000 European Water Reconstruction and
688 MTN-SOC-L-EBRD 01
false 10700000 providing a €8.5 million sovereign and to the Repu
CGCO (Port consideringEuropean Bank for Reconstruction loan Developme
Montenegro The EBRD isof Bar) Pre-privatisation Projectsectors
Social false
689 KOS-SOC-G-EC 09
true all of sectors
Overall Objective: To environment forSocialKosovo’s communities
Developing an enabling economic develop an enabling environment for private sector dev
11500000 European Commission (EC) true
690 KOS-SOC-G-EC 10
true Overall Development
Trade and Regional Objective: To promote Kosovo’s integration into the world economy a
Social sectors
8000000 European Commission (EC) true
691 CRO-MUN-L-EBRD 01
false The 50000000 European Bank for of Zeljezara Split post-privatisat
Zeljezara Split EBRD loan will finance the restructuring Reconstruction and Developme
false
Municipal infrastructure
693 CRO-TRA-L-EBRD 01
false 9500000 making a loan for Reconstruction and million to Za
The EBRD is consideringEuropean Bankof approximately EUR 9 Developme
Velika Gorica Urban Transport Transport false
695 false
CRO-PSD-L-EBRD 02 The Line 50000000 making a senior loan of updevelopmentDevelopme
Private sector to EUR 50
false
PBZ SME Credit EBRD is consideringEuropean Bank for Reconstruction andmillion in the
696 false
CRO-PSD-L-EBRD 01 banka SME Credit line (Unicredit Group) for Reconstruction and Developme
making investments worth Private sector development
false
Zagrebacka The EBRD is432400000 European Banka total of EUR 432.4 million to UniC
699 MTN-ENE-L-EBRD 01
false up to
43000000 European ofEnergyReconstruction and Developme
EBRD is providing a corporate loan Bank for €38 million to Elektroprivreda Cr
EPCG Metering and Distribution Project false
700 MTN-PSD-L-EBRD 01
false 30000000 providing a EUR 30 million standby credit
The Deposit consideringEuropean Bank for sector development line fully
Credit Line to theEBRD is Protection Fund of MontenegroReconstruction and Developme
Private false
701 false
REG-PSD-L-EIB 01 EFSE aims to 30000000 European Investment Bankdevelopment
complement financial support sector by the
Private false
Investment in senior A tranche of regional A&B sub-fund provided(EIB) local financial se
702 false
BIH-SOC-L-WB 03 The objectives84027000 World Bank (WB) sectors
of Social false
Public Expenditure Crisis DPL the First Programmatic Public Expenditure Development P
704 false
BIH-PSD-L-WB 01 The project to 51248400 objective of Private
Finance the Enhancing Small and Medium Ente
Enhancing SME Access development World Bank (WB) sector development false
707 false
CRO-SOC-L-WB 03 The objective of the Fiscal, Social, and Financial Sector
204460750 World Bank (WB) sectors
Social false
Fiscal, Social and Financial Sector Development Policy Loan (DPL) Development Policy
708 false
CRO-PSD-L-WB 01 The objective of the Export Finance Intermediationfalse
94476180 Private development
Export Finance Intermediation Loan World Bank (WB) sectorLoan Project for Croatia i
711 false
SER-PSD-L-WB 01 This program document presents the (WB) in the development
67052200 World Bank Private 2 false
second
Programmatic Private Financial Development Policy Loan sector series of three Programm
712 false
BIH-PSD-L-EIB 01 Credit line for financing of limited scale projectsBankdevelopment
Volksbank BH DD Global loan Private sector (EIB)
small
40000000 European Investment of false and medium enterpr
713 false
BIH-PSD-L-EIB 02 LOK Loan for20000000 European Investment Bankdevelopment
SMEs Private sector (EIB)
false
MicrofinanceProjects undertaken by small and very small businesses, in the sectors of ag
715 true
KOS-SOC-G-EC 11 Overall Objective: The overall objective of this intervention is to support the G
4000000 European Commission (EC)
Support to Agency for European Integration Social sectorstrue
716 true
KOS-SOC-G-EC 12 Overall Objective: The creation of a climate for inter-ethnic tolerance, sustain
Kosovo Social sectors
Return and Reintegration in 5100000 European Commission (EC) true
717 true
KOS-SOC-G-EC 13 Overall Objective: Ensure the long-term sustainability of Cultural Heritage site
3675000 European Commission (EC)
Rehabilitation of Cultural Heritage in Kosovo Social sectorstrue
718 true
KOS-ENE-G-EC 04 The and Minerals SectorEuropean Commission (EC) the Kosovo economy th
1000000 in Kosovo revitalisationtrue
Support to Minesoverall objective of this project is Energy of
719 KOS-SOC-G-EC 14
true To develop an enabling environment for for all sector development and II
Developing an enabling socio-economic environmentprivateof Kosovo’s communities job
Social sectors
6900000 European Commission (EC) true
720 true
KOS-SOC-G-EC 15 Overall and Taxation Administrations Social sectors
3000000 European Commission (EC) true
Support to Customs Objective: Creating a business friendly environment in Kosovo, clear
722 false
CRO-ENE-L-GER 03 1500000 Germany (GER)
Programme for the Promotion of Energy EfficiencyEnergy false
723 false
CRO-ENE-L-GER 04 600000 Germany (GER)
Climate Protection Programme Croatia Energy false
729 false
BIH-WAE-L-GER 04 Sewerage Bihac Water
17500000 Germany (GER) and Environment true
732 false
MTN-ENE-L-GER 02 3500000 Germany (GER)
Renewable Energy and Energy Facility Montenegro Energy false
733 false
MTN-PSD-L-GER 01 Loan for refinancing Medium and Small Enterprises developmentin Monteneg
Erste Bank Montenegro SME 13000000 Germany (GER) false
Private sector investments
734 false
MTN-PSD-L-GER 02 Loan for refinancing
14000000 Germany (GER) Private sector investments
false
NLB Montenegro SME-Finance Medium and Small Enterprises developmentin Monteneg
735 false
MTN-ENE-L-GER 03 Loan for refinancing energy efficiency Energy
Erste Bank Energy Efficiency 2000000 Germany (GER) false
measures that allows the local bank to
736 false
MTN-ENE-L-GER 04 Efficiency 2000000 Germany (GER)
NLB Energy Loan for refinancing energy efficiency Energy false
measures that allows the local bank to
742 false
BIH-ENE-L-GER 06 TA for Bosnia Herzegovina III
European Fund to AMFI and15000 Germany (GER) false
Private sector development
743 false
MTN-WAE-L-GER 03 The project and Sanitation Adriatic(GER) III & IV truedevelopment accompa
2000000 Germany Coast capacity
Water
Training Measure Water concerns consulting services for and Environment
746 false
SER-SOC-L-GER 01 Loan line for Volksbank Serbia to (GER) sectors
7000000 Social false
Promotional CreditVolksbank HousingGermany fund private individual housing loans, refu
749 false
SER-PSD-L-GER 02 Credit line for 31600000 Germany private sector housing loans,
Municipal Finance Private true
Loan to Banca Intesa 2009Banca Intesa to fund (GER) individualdevelopment refurbish
750 false
ALB-ENE-L-GER 01 The extension50000000 Germany (GER)
of the Energy false
110-kV-Circuit Line South Albania110kV transmission network in South Albania comprise
751 false
ALB-ENE-L-GER 02 Albania-Kosovo 51400000 transmission line
Energy false
400 kV Line Construction of a 400 kV Germany (GER) from Tirana to the border of Koso
752 false
KOS-ENE-L-GER 02 Construction 39900000 transmission line
Albania-Kosovo Energy false
400 kV Transmission Lineof a 400 kV Germany (GER) from Prishtina to the border of Alb
754 false
KOS-WAE-L-GER 02 The project concerns the Germany (GER) the water supply system and the se
17500000 rehabilitation of true
Municipal Water Supply and Sanitation Prishtina II Water and Environment
755 false
KOS-MUN-L-GER 04 The 2008 used to finance two (GER)
Municipal infrastructure
true
IPF-MW Kosovo funds are 42700000 Germany projects: a) water supply and sanitation Pr
756 MAC-ENE-G-EC 02
true has created a framework for renewable energy generation a
– Windpark Development
Pilot Project The Energy Law 250000 European Commission (EC)
Energy true
757 true
MTN-ENE-G-EC 02 The aim of the project is to support Montenegrin Electric Enterprise in identify
1850000 European Energy
Electricity Network Development Programme Commission (EC) true
758 true
SER-ENE-G-EC 05 The project network upgrade of the existing network
500000 European Commission operation
Energy true
Uprating of transmission of 400kV in Western Serbia to 400kV(EC) in Western Serbia is ce
759 MAC-ENE-G-EC 03
true 100000 electro
of OHL 400kV FYROM-Serbia transmission system
ConstructionThe business activities ofEuropean Commission (EC) operator, transmission
Energy true
760 KOS-ENE-G-EC 05
false In 2005, a Heating Phase 2 - CHP Commission (EC)
Improvement of DistrictSlovenian engineering company IBE prepared a detailed Feasibilit
300000 European Energy true
761 true
KOS-ENE-G-EC 06 Co-financing is in Public European Commission (EC)
600000 Buildings
Energy Efficiency Measures envisaged from KfW Energy true
762 true
SER-ENE-G-EC 06 The planned bi-directional high pressure gas transmission pipeline between
1000000 European Pipeline
Energy
Interconnection with Bulgaria Gas Transmission Commission (EC) true
763 true
BiH-WAE-G-EC 08 The project aims600000 European Commission (EC) present and future nee
to provide a secure and sufficienttrue
Plava Voda Regional Water Supply Project for
Water and Environment
764 true
MTN-WAE-G-EC 06 The Infrastructure Project
300000 European and expansion of
Water and Environment
true
Podgorica Water project concerned rehabilitationCommission (EC) water and wastewater
765 true
MTN-WAE-G-EC 07 Wastewater The town of Berane is situated in the mountainoustrue
treatment plant Berane European Commission (EC)
150000 north-eastern part of Mon
Water and Environment
766 true
BiH-WAE-G-EC 06 The losses in the networks in networks are recognised
distribution the municipalities connected to issue in the dri
Water and Environment
true
Reconstruction of distribution 300000 European Commission (EC) as keyPlava Voda Reg
767 true
KOS-WAE-G-EC 03 co-financing is envisaged for Waste Water Treatment
1750000 from KfW Water and Environment
true
Project preparation Feasibility StudiesEuropean Commission (EC) Plants in Kosovo
768 true
MTN-WAE-G-EC 08 treatment plant and network in Rozaje
200000 European Commission (EC)
Water and Environment
true
Wastewater Rozaje Municipality is in the northern eastern part of Montenegro, located in
769 true
MTN-WAE-G-EC 09 treatment Danilovgrad Municipality Commission Environment
200000 European states the need for
Water true
Wastewater IPF TA forplant and network in Danilovgrad and (EC) development of a wa
770 true
MTN-WAE-G-EC 10 treatment plant and is located Kolasin
200000 European Commission (EC) Montenegro, surrounde
Water and Environment
Wastewater Kolasin Municipality network inin the central regiontrue of
771 true
MTN-WAE-G-EC 11 of Regional is envisagedEuropean Commission Environment
150000 from EIB Water
Contsructionco-financing Landfills in Plijevlja and Zablijakand (EC)true
772 true
MTN-WAE-G-EC 12 of Regional is envisagedEuropean Commission Environment
750000 from EIB
Constructionco-financing Landfills in Montenegro Water and (EC) true
773 SER-WAE-G-EC 12
true 1000000 financing Commission Environment
The project concerns the European of an investment programme managed d
Municipal Water - Nis and Novi Sad Municipalities Water and (EC) true
774 MAC-SOC-G-EC 13
true The project consists FYR Macedonia and new construction works at four ins
Idrizovo Prison Reform Project in of refurbishment Social sectors
500000 European Commission (EC) true
775 MTN-SOC-G-EC 11
true Center for Elderly – Pljevlja 150000 European Commission (EC)
Social sectorstrue
776 true
SER-SOC-L-EIB 02 Following the150000000
establishment of a PMUSocial sectors
(Project Management Unit) as a struc
Municipal and Regional Infrastructure European Commission (EC) true
777 CRO-SOC-G-EC 01
false ConstructionThe Prison Service of Croatia operates fourteen establishments which are m
800000 European Sibenik sectors
Social
of a penitentiary/prison complex in Commission (EC) true
778 true
MAC-SOC-G-EC 14 The Ministry of Finance European Commission (EC)
2000000 Social sectorstrue
Health Provider Institutions (HPIs) has structured a comprehensive reform of the health
779 SER-SOC-G-EC 35
true The political 90ies
70000 Balkan region in the late true
Social Housing - Serbia crises in the European Commission (EC) faced Serbia with str
Social sectors
780 SER-SOC-G-EC 34
true The Prison Facilities-Providing the penal institutions in System
Modernization of poor physical conditions in Human and Safe (EC) the Serbia are eviden
Social sectors
700000 European Commission Prison true
781 SER-SOC-G-EC 26
true Social have true
In the last 50 Facilities European facilities sectors been
Modernization of Judiciaryyears current judiciaryCommission (EC) poorly renovated wh
720000
782 false
SER-SOC-G-EC 11 co-financing is envisagedEuropean Social sectors
600000 from Research and Development Infrastructure Ini
Building the knowledge economy of Serbia, EIB Commission (EC) true
783 BIH-SOC-L-CEB 02
true of and number of prisons across (EC)
The existing type a Maximum Security State sectors
Support to the construction38600000 European Commission B&H have, for many years ,b
Social Prison true
784 true
BIH-SOC-L-CEB 01 39600000 Council Social sectorstrue
State Prison Project in Bosnia&Hercegovina of Europe Development Bank (CEB)
785 ALB-TRA-G-EC 07
true 1500000 signalling and in the centre
Tirana track renewal andEuropean Commission (EC) of Albania in the whole
Feasibility study for area (Qark/Prefecture) is located communication systemsand includes
Transport true
786 BIH-TRA-G-EC 04
true of the Trans-European Network of inla
B&H’s Motorway in Corridor Vc is partTransport true
Corridor Vc – second phase 500000 European Commission (EC)
787 true
BIH-TRA-G-EC 05 of Main Road Foca(BrodEuropean CommissionFoca in the Republica Srpsk
700000 na the road between (EC)
ConstructionThe project seeks to upgradeDrini)-Hum Transport true
788 true
BIH-TRA-G-EC 06 The section Podlugovi-Sarajevo is Commission line
the railway true
Railway Sarajevo-Podlugovi 600000 Europeanon Transport (EC)from Ploce to Budapes
789 SER-TRA-G-EC 09
true 500000 European over 100
The project deals Presevo-Macedonia border years old
Reconstruction of the line Nis- with a railway lineCommission (EC) that has not had any
Transport true
790 KOS-TRA-G-EC 03
true 25000 comprises 333 km of single
The Kosovo Rail networkEuropean Commission (EC) track. The network in
Rehabilitation of Railway Route 10 (Leshak – Mitrovicë – Fushë Kosovë – Ferizaj – Hani i
Transport true
791 true
MTN-TRA-G-EC 03 This project represents the Phase Road, Phase 1true
700000 European of the Feasibility
Transport Feasibility Study
Improvement of the Scepan Polje-Pluzine Main1Commission (EC)study for improvement
792 true
ALB-WAE-G-CEB 05 co-financing envisaged from KfW/CEB Water and Environment
true
FS & DD Regional landfillis30000000 Council of Europe Development Bank (CEB)
793 true
ALB-TRA-G-EBRD 01 co-financing is Durres Railway Section and Reconstruction and Developme
1250000 from EBRD Transport true
Detailed Design for Tirana- envisagedEuropean Bank foreconomic financial appraisal for w
794 true
ALB-TRA-L-EIB 04 co-financing is envisagedEuropean Investment Bank (EIB)
Tirana-Elbasan Road 300000000 from EIB Transport false
795 true
SER-SOC-L-EIB 03 100000000 European Investment Bank (EIB)
TA for School modernization Programme Social sectorstrue
796 true
SER-TRA-L-EIB 05 Belgrade City Sava Bridge Transport true
404900000 European Investment Bank (EIB)
797 true
SER-TRA-G-EBRD 01 co-financing is79750000 Procurement, Implementation Support Developme
envisaged from EBRD Transport true
Belgrade Rail Modernisation Project - European Bank for Reconstruction and and Contrac
798 true
SER-TRA-L-EIB 06 Co finaced Motorway European Transport true
969300000
Corridor X Serbia (E 75)envisaged from EBRD? Investment Bank (EIB)
799 true
SER-TRA-G-EIB 02 co-financing is envisaged from EIB Transport true
TA for Railways infrastructure800000 European Investment Bank (EIB)
800 true
SER-TRA-G-EBRD 03 co-financing is envisagedEuropean BankFYROM
1040000 from EBRD to for Reconstruction and Developme
Documentation for Modernization of Railaway NIS Transport true
801 true
SER-TRA-L-EIB 08 168700000 European Investment Bank (EIB)
TA for Railways rehabilitation II Transport true
802 false
BIH-TRA-L-EIB 03 co-financing is envisagedEuropean Investment Bank (EIB)
Corridor Vc Motorway 150400000 from EIB Transport false
803 KOS-ENE-G-EC 07
true In 2005, a heating Pristina
Improvement of Distric Slovenian engineering company IBE prepared a detailed Feasibilit
Energy
14000000 European Commission (EC) true
805 ALB-ENE-G-EC 01
true The study identified bottlenecks in Albania’s electricity transmission system a
Upgrade of Transmission System Energy
180000 European Commission (EC) true
806 ALB-ENE-G-EC 02
true Tirana of new SubstationEuropean Commissioncapacity for reinforcement of
FS for construction area (Qark/Prefecture) is located in the centre of Albania and includes
120MVA (EC)
577605 Tirana3 withEnergy true
807 true
ALB-ENE-G-EC 03 Tirana the Construction of 220/110 Commission (EC)
577000 European double circuit true
Energy Albania, is located in the
Feasibility Study forregion, the most densely populated area in line - Tirana 2 (Razhbull) c
810 true
SER-WAE-G-EC 13 Development of Long Term and Treatment and (EC) for waste water collec
250000 European Commission Environment
Investment Plan
true
Feasibility Study for Collection, transport Strategic Waterof Waste Waters in Municipality
811 ALB-WAE-G-EC 05
true Upgrading ofKavaja municipality and Golemi commune are located in the western part of
350000 European Commission (EC)
Water and Environment
true
Kavaja Waste Water Treatment Plant and completion of the sewerage netw
812 ALB-WAE-G-EC 06
true of Kamza Kamza Water and Environment
The Municipality 450000 European Commission (EC)
Project of Water Supply & Sewerage of is located in the Greater Tirana Region and includ
true
813 ALB-WAE-G-EC 07
true sanitation of located in Environment
Waste waterThe towns in Lezha and Shengjin are Water and North western Albania along
180000 European Commission (EC) true
814 ALB-WAE-G-EC 08
true Design for Improvement flood Environment Infrastructure
In Albania, the rivers constitute the Commission risk
Feasibility Study and Detailed400000 European highestofand (EC)affecting near 130,000 h
true
Water Flood Protection
815 true
ALB-WAE-G-EC 09 Elbasani, one of 500000 sewerage systems for population of
biggest European Commission (EC)
Water and Environment
true
Detailed Design for water supply and cities of Albania with a Elbasan city near 100,000 in
816 ALB-SOC-G-EC 07
true and
1500000 from CEB/EIB Rehabilitation of Tirana Schools –
Education, Excellence and Equity Project (EEE-P) Social sectors
co-financing is envisagedEuropean Commission (EC) true
817 true
ALB-SOC-G-EC 08 The Hospital Centre Reform Programme in Albania- 2nd Phase
500000 European Commission (EC)
Social sectorsand
Tirana University project, initiated by the Albanian Government true supported by CEB, aim
818 true
ALB-WAE-G-EC 11 Pogradec 3500000 European Commission (EC)
Water and Environment
Wastewater eventual co-financing is envisaged from CEB/KfW true
819 true
ALB-WAE-G-EC 12 eventual co-financing is envisaged Commission (EC)
4500000 Fier Water and Environment
Water Supply & Sewage, Gjirokastra, European from ceb/KFW true
820 true
ALB-WAE-G-EC 13 eventual co-financing is envisaged from CEB/KfW true
Kamza Water and Sanitation Water and Environment
5500000 European Commission (EC)
822 true
BIH-WAE-G-EC 10 eventual System Project European Commission Environment
3000000 - Phase II Water and true
Bijeljina Waste Waterco-financing is envisaged from EBRD (EC)
825 false
SER-TRA-L-EIB 07 120000000 European Investment Bank (EIB)
Belgrade City integrated transport Transport true
826 false
MTN-WAE-G-EC 14 Co-financing envisaged from EIB Commission Environment
5000000 European water infrastructure in North
Rehabilitation and construction of water and wasteWater and (EC) true
827 false
CRO-PSD-G-EC 01 Enhance the competition European Commission aid policy through
2000000 environmentPolicies (EC)
and state true
Implementing Croatian Competition and State Aid Private sector development continuou
828 false
CRO-PSD-G-EC 04 Further CTA administrative and institutional capacity
800000 European Commission (CTA) with EU procedures
Private sector development
true
Enhancement of the alignment of Croatian Tax Administration(EC)in the field of applicatio
829 false
MTN-PSD-G-EC 02 To Quality trade and thein Montenegro of goodstrue
2330000 free movement Private sectorwith development
Development offacilitateInfrastructure European Commission (EC) a view to improve the
830 false
MTN-PSD-G-EC 03 To create conditions Supervisory economic stability and growth
1200000 European Commission (EC) Regulators
Private Financial
true
Strengthening the Regulatory andfor long term Capacity ofsector developmentby strengthe
831 false
MTN-PSD-G-EC 04 Modernization Customs Administration
1120000 European Commission (EC)
Private sector development
true
Technical assistance to theof the Customs System of Montenegro in full compliance with
832 false
MTN-PSD-G-EC 05 Overall objective of the project is to ensure National Development Plan
1300000 (2010-2015)Private sector development socio-eco
and the long-term balanced
Development Strategy of Montenegro European Commission (EC) true
833 false
MTN-PSD-G-EC 06 Harmonization of statistical
1300000 European Commission (EC) European
Montenegro truewith
Improving Statistical information system system of Private sector development statistical s
834 false
BIH-PSD-G-EC 01 The overall objective andconsolidate Private already
4000000 SME Developmentsector development
efforts true
EU Support to Regional Economicis toEuropean Commission (EC)made to stimulate econ
835 false
BIH-PDS-G-EC 02 To improve Bosnia and Herzegovina's balance of trade and to Improve the c
1500000 European Commission (EC)
Private sector development
true
Building in the capacity to promote exports and develop the export base in Bosnia and He
836 false
BiH-PSD-G-EC 10 The the BiH Metrology toEuropean Commission (EC)
1700000 further Private quality infrastructure
true
Strengthening of overall objective is system develop the sector development in the BiH
837 false
BIH-PDS-G-EC 03 The overall objective is to generate economic growth
9903800 Social sectors true
Economic and Tourism Development European Commission (EC) and employment throug
838 false
BiH-PSD-G-EC 11 To further develop the customs Indirect Taxation Authority
2750000 European taxation sector in
Private sector development
true
Strengthening the customs sector within the andCommission (EC) Bosnia and Herzegovin
839 SER-PSD-G-EC 06
false 3500000 and Export development development
The overall objective is toEuropean Commission (EC)
Support to Enterprise Competitivenesssupport the Private sector of a market economy and
Promotion true
840 false
SER-PSD-G-EC 08 Implement the Common European Administration truethe full implementation
1500000 Customs Commission (EC)
Private sector development
for
Administrative capacity building of theTransit Procedure by building the capacity of the Se
841 false
SER-PSD-G-EC 05 competitiveness of and Innovation Commission (EC)
3000000 European Private sector development
true
Improved SME Competitivenessnew and existing businesses.Project purpose:Componen
842 false
SER-PSD-G-EC 09 To Aids 1500000 European CommissionSerbia through more efficien
Private in (EC)true
Control of State reduce disparities in regional growth rates sector development
843 SER-PSD-G-EC 10
false sustainable macroeconomic and financial system stability by
To contribute to2500000 European Commission (EC)
Private Bank development
true
Strengthening of the institutional capacities of the Nationalsector of Serbia (NBS)
844 false
BIH-PDS-G-EC 04 SME Support 3666600 generate economicsector development
Private growth true
The overall objective is toEuropean Commission (EC) and employment by str
845 false
MTN-SOC-G-EC 16 High effectiveness in the fight against Social sectors
1130000 Criminal Commission (EC)
corruption, organized
true
Support to implementation of the new EuropeanProcedure Code (CPC) crime and other
846 false
MTN-SOC-G-EC 17 institutional capacity in accordance Commission (EC)
2400000 administration Social sectors true
Strengthening the capacities of police European with the Stabilization and Association pro
847 false
MTN-SOC-G-EC 18 To align the Centre for Asylum Seekersasylum (EC)
780000 migration and Social sectors true
Support to the ReceptionMontenegrin European Commissionpolicy with EU policy, through
848 false
MTN-SOC-G-EC 19 To of Personal 1200000 of the fundamental sectors protection of personal da
Data Protection Strategy
Social right of
Implementation ensure the realization European Commission (EC) true
849 MTN-WAE-G-EC 15
false
•
The overall objective of the project is
Alignment of waste management sys
14155648 European Commission Environment
Water
Environmental Alignment and Solid Waste Management and (EC) true
850 false
MTN-SOC-G-EC 20 To ensure the efficient and effectiveCommission (EC)
2300000 European use of EU financial
Social sectors financial assistance and p
Strengthening the management and control systems for the EUtrue assistance in Monte
851 MTN-SOC-G-EC 21
false To support development European Public Broadcasting and
Support to the Digitalisation 2695000 of the information societytrue audio – visual media
Social sectors
of the Montenegrin Commission (EC)
852 false
MTN-SOC-G-EC 22 The overall objective Preparation Facility improve true
1535679 European Commission (EC)
Social sectors the
Technical Assistance and Project of the TA&PPF is to (TA&PPF) planning, programmin
853 false
MTN-SOC-G-EC 23 The overall objective
620000 European Commission (EC)
improve the true
Support Measures Facility (SMF) of the SMF is to Social sectors impact, the quality and the
854 false
MTN-SOC-G-EC 24 More stable the Tax Administration Commission (EC)
667000 European Social sectors true
Upgrading IT capacity of budgetary revenues in Montenegro through better fiscal planning
855 false
CRO-SOC-G-EC 38 To promote and maintainEuropeanAgency
4200000 efficient Commission (EC)
sustainable true
Reinforcement of Croatian TelecommunicationandSocial sectors competition in the telecom
856 false
CRO-SOC-G-EC 39 Creation of safe environment and Commission (EC)
4000000 European Social sectors true
De-mining Programme in War Affected Areas setting of security pre-conditions for sustai
857 false
CRO-SOC-G-EC 40 Support to the efficient and effective Land - sectors
6200000 European Commission (EC)
Social ILAS implementation
true
Integrated Land Administration System ImplementationAdministrationSystemProject purp
858 false
CRO-SOC-G-EC 41 Further alignment of the European Commission (EC)
System system with true
the
Support to the National Visa1340000 national visa Social sectors EU visa systemProject
859 false
SER-SOC-G-EC 49 Building durable solutions in SerbiaCommission (EC)
Further Support to Refugees and IDPs to address the IDP/Refugee Challenge
10000000 European Social sectors true
Project pu
860 false
SER-SOC-G-EC 50 Support of human rights standards and minority protection in Serbia minority
1500000 European Commission (EC)
Social sectors true
Implementation of priorities in the area of human rights and protection of national and alig
861 false
SER-SOC-G-EC 51 The 5800000 European Commission (EC)
Social sectors true
Social Inclusion project contributes to the objective of improving social inclusion and redu
862 SER-SOC-G-EC 52
false National Strategy
Implementation of against sectors
The National Strategy for the Fight Commission Abuse
Implementing theSuccessful1500000 EuropeantheSocial Drug(EC) for the Fight against
true
863 false
SER-SOC-G-EC 53 To contribute to6200000 European Commission (EC)
resolving the problems of (IDPs) true
Social sectors
Support to Refugees and Internally Displaced Persons refugees and IDPs in Serbia while
864 false
SER-SOC-G-EC 54 To preschool education European Commission (EC)
social inclusion and poverty sectors
Social reduction
true
Improvement ofcontribute to5000000 in Serbia (IMPRES project) by improving preschoo
865 false
SER-SOC-G-EC 55 To of the National screening programme for sectorswellbeing of and breast c
the improvement of the health and
Social colorectal,
true
Implementation contribute to6600000 European Commission (EC) cervical the populatio
866 false
CRO-SOC-G-EC 42 Development the effective system of the occupational health and safety at
Social sectors
Health and Safety at Work of2660000 European Commission (EC) true
867 MTN-SOC-G-EC 25
false refugees and
a durable solution Commission (EC)
To contribute to1500000 Europeanfor Social sectors disbursed persons throu
Durable Solutions for Refugees and Displaced Persons in Montenegro true
868 MTN-SOC-G-EC 26
false The Social integrity,
Gender Equality status of women – reflected in personal sectors economic advancemen
778000 European Commission (EC) true
869 false
MTN-SOC-G-EC 27 A modern system for blood transfusion harmonized with
3000000 European Commission true
Social sectors
Implementation of the European Blood Transfusion System (EC) the EU standards in
870 false
MTN-SOC-G-EC 28 Social Child Care education system has facilitated inclusion of
3335000 European Commission (EC)
Social sectors true
Social Welfare and welfare andSystem Reform: Enhancing Social Inclusion the vulnerabl
871 false
SER-SOC-G-EC 56 Corruption 2500000 European Commission (EC)
Social sectors true
Fight againstTo promote good governance and strengthen institutions in the Republic of S
872 false
SER-SOC-G-EC 57 Assist the Affairs
1000000 force in meeting EU standards
Social sectors true
Police Reform: InternalSerbian Police European Commission (EC) of professionalism a
873 false
MTN-SOC-G-EC 29 organised objective corruption organised sectors
3600000 combat Social crimetrue and
Fight againstThe overall crime andis toEuropean Commission (EC) corruption by improvi
874 false
MTN-PSD-G-EC 01 Internal Market 1250000 system of Montenegro (EC)the Internal
Private sector true
Accession toAligning of the regulatory European Commission withdevelopmentMarker acq
875 false
MTN-PSD-G-EC 07 The overall approximating project is the in statisticsdevelopment
800000 European Commission (EC)advisory support to the
Private sector
Assisting Montenegro in objective of theEU standards provisiontrue of
876 false
CRO-SOC-G-EC 43 Strengthening of the rule of law in Croatia, throughtrue
USKOK Social sectors an
Strengthening Capacities of 1270000 European Commission (EC) increased investigation
877 false
CRO-SOC-G-EC 44 Strengthening of the rule European Commission (EC)more effective impleme
2550000 of law in Croatia, sectors
Social
Improving Anti-Corruption Inter-Agency Co-operation throughtrue a
878 CRO-SOC-G-EC 45
false To strengthen the ability of MoI in fight against organized crime in the field of
2200000 European Commission (EC)
Combating Drugs Trafficking and Abuse Social sectorstrue
879 false
CRO-SOC-G-EC 46 Improvement of the Enforcement system of efficient and effective Enforcement system
Support to the development in the Republic sectors
Social of Croatia
1600000 European Commission (EC) true
P
880 false
CRO-SOC-G-EC 47 Social the Croatia
of the judiciary in the Republic of judiciary
To improve efficiency and professionalism insectors
Strengthening the efficiency 2600000 European Commission (EC) true Project purpose:
T
881 true
KOS-SOC-G-EC 16 Overall Objective: The creation of aCommission (EC)
10250000 European climate sectors
Social true
Return, Reintegration and Cultural Heritage in Kosovo for inter-ethnic tolerance, sustain
882 true
KOS-SOC-G-EC 17 Overall Objective: To contribute to theSocial sectors the socio-economic situ
Support to Communities stabilisationtrue
3135000 European Commission (EC) of
883 true
KOS-SOC-G-EC 18 Overall Objective: Contribute to strengthen the social
24500000 Social sectorstrue
Support to Culture, Youth and Sport European Commission (EC) cohesion & solidarity in
884 KOS-SOC-G-EC 19
true Communities and Education6462000 European and Reintegration in Kosovo (phase III)
Overall objective
Activity 1: Return Commission (EC)
Social sectorstrue
T
885 KOS-SOC-G-EC 20
true Overall Objective:
Strengthening the Rule of Law To strengthen the rule of law in Kosovo, including increase
Social sectors
7400000 European Commission (EC) true
886 true
KOS-SOC-G-EC 21 2.1 Overall Objective:To strengthenCommission (EC)
14225000 European the capacity of Kosovo's institutions to p
Strengthening the Rule of Law in Kosovo Social sectorstrue
887 true
KOS-SOC-G-EC 22 2.1 Overall Objective:To strengthen Sector of lawtrue
25000000 European the rule sectors
Social
Upgrade of the Infrastructure in the Rule of Law Commission (EC) sector in Kosovo2.2 Proje
888 false
KOS-SOC-G-EC 23 2.1 Overall Objective:To strengthenCommission (EC)Kosovo through further
Strengthening the Rule of Law Social sectors
15350000 European the rule of lawtrue in
889 true
KOS-SOC-G-EC 24 2.1 Overall objective:Support the efforts of Kosovotrue
Strengthening the rule of law Social sectors
15552000 European Commission (EC) authorities to enforce the
890 true
KOS-SOC-G-EC 25 2.1 Overall Objective:Economic regeneration, job creation and infrastructure
Regional economic development Social sectors
20955000 European Commission (EC) true
891 true
ALB-SOC-G-EC 09 2.1 Overall ObjectiveThe European Commission project is to have improved
3300000 overall Social the (EC)
Human Resources Development in Albania objective of sectors true
892 true
ALB-SOC-G-EC 10 5518790 main goal ofSocial sectorsis
PAMECA IIItrue
PAMECA III 2.1 Overall objective:The European Commission (EC) to bring the Albanian S
893 true
ALB-SOC-G-EC 11 2.1 Overall Objective:To European Commission (EC)
2130000 democracy and true
Project against Corruption in Albania contribute to Social sectors the rule of law through
894 true
ALB-SOC-G-EC 12 2.1 Overall ObjectiveCrime reduction through reinforcing strengthening of the
1500000 European Crime Investigations Structures
Social sectors
Support to Anti-Money Laundering and FinancialCommission (EC) true
895 ALB-SOC-G-EC 13
true
To
and logistical capacities Albanian true
2.1 operational1050000 ensure that the of Witness and
Enhancement ofOverall Objective
European Commission (EC) Special Persons Pro
Social sectorsCriminal Justice System is
896 ALB-SOC-G-EC 14
true Support to the Penitentiary21250000 Europeanobjective of thetraining and accommodatio
2.1 Overall Objective:
The
overall Commission true project is to have in place
Social sectors
Infrastructure and improvement of(EC)
897 true
ALB-SOC-G-EC 15 2.1. the Albanian Justice improve the Social sectors
3530000 system efficiency, (EC)
true
Modernisation of Overall Objective:To European Commission transparency and quality of
898 true
ALB-SOC-G-EC 16 2.1 Overall Objective:Maintain sustainable growth and increase competitiven
3400000 European Commission (EC) providing
Private sector by
true
Supporting SMEs to become more competitive in the EU Market developmenthigh quality
899 ALB-SOC-G-EC 17
true Support for the General Objective:
ofEuropean Commission (EC)
2500000 assist Albania
2.1 Overall DirectorateTo Tax of the Government of Albania in strengthening
true
Private sector development
900 ALB-SOC-G-EC 18
true Private Statistics
2850000 European Albaniansector development
2.1 Overall Albanian Improving theEU standards true
Support for alignment ofObjective:Statistics with Commission (EC) in order to meet the E
901 true
ALB-SOC-G-EC 19 2.1 Overall ObjectiveTo support
1500000 European Commission (EC)
Social sectorstrue
Support for Public Procurement in Albania Albania approximate to EU standards as req
902 true
ALB-SOC-G-EC 20 2.1 Overall Objective:Assist the Government of Albania in aligning the Albani
3500000 European Commission (EC)
Social Standards
Support to the alignment of Customs Procedures with EUsectors true
903 true
ALB-SOC-G-EC 21 2.1 Overall Objective:TheEuropean Commissioncontribute to the reduction of
3400000 overall Metrology to (EC)
Social
Centralised National Programme in support toobjective issectors true
904 true
ALB-SOC-G-EC 22 2.1 Overall Competition Authority Commissioncontribute toward ensuring a
1500000 overall objective is Aid (EC)
Social to Department
Support for the AlbanianObjective:TheEuropeanand State sectors true
905 ALB-SOC-G-EC 23
true Strengthening the institutional capacity of the Albanianfulfillment of the Copenhagen econ
To the Central true
2.1 Overall objective
contribute to Social sectors Bank
1240000 European Commission (EC) particularly in the are
906 true
ALB-SOC-G-EC 24 2.1 Overall Objective:To contribute to Private
800000 European Commission (EC) intellectual
the protection of
true
Centralised National programmes Support to Copyrights sector development property in
907 true
ALB-SOC-G-EC 25 2.1 Overall Objective:TheEuropean Commission project
1100000 overall objective of sector development
Private the true
Developing the Industrial Property Rights System in Albania (EC) is to align the IP reg
908 true
MAC-SOC-G-EC 15 Preparatory measures for the LifelongEuropean and of the preparatory measures is to imp
Overall Objective
The
overall objective Youth in Action
Social sectorstrue
1000000 Learning Commission (EC) programmes
909 true
MAC-SOC-G-EC 16 1300000 European Commission process promote an active
Support the participation of the
overall in decision making(EC) is to and in providing so
Overall Objective
The sector objective of the project
civil Social sectorstrue
910 true
MAC-TRA-G-EC 04 Overall Objective:The overall objective is to
8700000 European Commission (EC)
Transport true
Local infrastructure for Social and Economic Cohesion stimulate social and economic co
911 MAC-PSD-G-EC 01
true 3200000 European Commission (EC) is to achieve
Overall Objective
The
of overall objective of Strategy
Support to the implementation
the Customs Reform thesector development further alig
Private project
true
912 true
MAC-PSD-G-EC 02 Overall ObjectiveThe overall objectivePrivate project development the perform
Support to Tax Reform of the sector is
true
2132000 European Commission (EC) to improve
913 true
MAC-PSD-G-EC 03 Overall ObjectiveThe overall objectivePrivate TAM/BAS
2830000 European of the sector development
true
Implementation of the TAM/BAS Programme Commission (EC) Programme is to prom
914 true
MAC-PSD-G-EC 04 Overall ObjectiveThe overall objectivePrivate project is to contribute
2900000 European Commission (EC)
of the true
Support to free movement of goods - quality infrastructuresector development to free m
915 REG-SOC-G-EC 01
true
Overall Objective:
To strengthen Window sectors
Youth in Action Programme 1250000 Europeandemocracy andtrue society in the Wester
Social
- Western Balkans Commission (EC) civil
916 REG-SOC-G-EC 02
true 6000000 European Commission (EC) Mundus External Co
Overall Objective:
The
overall objective of the Erasmus
Erasmus Mundus – External Cooperation WindowSocial sectors true
917 REG-SOC-G-EC 03
true 4000000 Window
Erasmus Mundus – Western Balkans European Commission (EC) higher education by fo
Social sectors
Overall Objective:To enhance the quality of European true
918 true
REG-SOC-G-EC 04 Overall Objective:The overall objective is and Social the coordination of the
2222000 European Commission (EC)
Social sectorstrue
Regional Programme for Social Security Coordination to enhance Protection reforms in So
919 true
REG-SOC-G-EC 05 Social Inclusion: Regional support toproject aims to contribute to the increased legal and
Overall Objective:
This European Commission (EC)
Social sectors
1250000 the marginalised communities true
920 REG-SOC-G-EC 06
true
overall objective Assistance,
14675000 European Commission (EC) civil 2 People Progra
Facility – HorizontalThe
Civil Society Overall Objective:
Activities (Technicalis tosectors People society within a
Social strengthen
true
921 true
REG-SOC-G-EC 07 Overall Objective:Foster and in the Commission (EC)
1000000 European Western Balkans
durable, sustainable solutions, namely
Regional Programme for Refugee Return enhanceSocial sectors true
922 REG-SOC-G-EC 08
true
To Social and civil
Overall Objective:
strengthen democracysectors
Youth in Action Programme 1875000 European Commission (EC) society in the Western
true
923 REG-SOC-G-EC 09
true WesternTempus
Overall Objective:
Social will (EC)
The European Commission pursue a series of overall ob
Tempus Programme in the20685000Balkans programme sectors true
924 true
REG-SOC-G-EC 10 Overall ObjectiveFoster and enhance Social sectors
3125000 European Commission (EC)
durable and true
sustainable solutions, nam
Regional Programme for refugee return and provision of durable solutions for refugees an
925 true
REG-SOC-G-EC 11 Civil Society Overall Objective
strengthen civil societysectorsa participative democracy
To
Social withintrue
Facility 12500000 European Commission (EC)
926 true
REG-SOC-G-EC 12 17277775 European Commission (EC) development (applyin
Social economic
Tempus IV Overall Objective:To contribute to social andsectors true
927 REG-SOC-G-EC 13
true – Western Balkans Commission (EC)
Youth in Action Programme 1875000 European Window sectors and social inclusion in t
Social
Overall ObjectiveStrengthen democracy, civil society true
928 true
REG-SOC-G-EC 14 Overall ObjectiveIncrease the benefitsWestern Balkans
2222222 European Commission (EC)
of temporarytrue
Migration and socio-economic development in the Social sectors labour migration on the s
929 true
REG-SOC-G-EC 15
To
Overall Objective:
contribute to Commission (EC)
Regional Initiative for Roma 3333333 European the integration true
Integration of
Social sectors minority groups in the W
930 true
REG-SOC-G-EC 17 12825000 European Commission (EC) civil society within a
Civil Society Overall Objective:
Facility
overall objective is tosectors
The Social strengthen
true
931 REG-SOC-G-EC 18
true – Western Balkans Social sectors
Youth in Action Programme 1875000 European Commission (EC)and social inclusion in t
Overall ObjectiveStrengthen democracy, civil society true
932 true
REG-SOC-G-EC 19 15333331 European Commission (EC) development (applyin
Social economic
Tempus IV Overall Objective:To contribute to social andsectors true
933 true
REG-SOC-G-EC 20 organised crime, in particular illicit Commission (EC) prevent and combat or
2500000 European drug traffickingtrue
Social sectorsto
Fight againstOverall Objective:Improve Beneficiaries' capacities and the prevention of terr
934 true
REG-SOC-G-EC 21 1500000 European Commission (EC) law enforcement capac
Regional support to strengthen
Southeast European Cooperative Initiative (SECI)
Overall Objective:
Improve regional and international
the Social sectors true
935 true
REG-SOC-G-EC 22 Overall ObjectiveStrengthen cooperation and Terrorism (WINPRO)
4210526 European Commission (EC)
Social sectors true
Witness Protection in the Fight against Serious Crime to support the fight against serious
936 true
REG-SOC-G-EC 23 Overall ObjectiveImproveEuropean Commission (EC)prevent and against
2777778 Beneficiaries' capacities true
Social sectors to
Regional Cooperation in Criminal Justice: Strengthening capacities in the fight combat cy
937 false
REG-SOC-G-EC 24 organised crime and corruption: Strengthening (EC) judicial Network
5263158 cross-border and international
Social sectors true
Fight againstOverall ObjectiveImproveEuropean Commission the Prosecutors'cooperation
938 false
BIH-SOC-G-EC 42 The to Kotor Varos Municipality
556000 European Commission (EC)
Social sectors true
Support to return overall objective of the Return Programme is to support the implementat
939 false
BIH-SOC-G-EC 43 To introduce active in Bosnia and Herzegovina (EC)
1200000 European Commission true
Social sectors
Improving active labour markets labour market policy development in the B&H
940 false
BIH-SOC-G-EC 44 To obtain Rights 250000 European Commission (EC)
Ombudsman of BiH Social sectors true
Support to the Human reformed, streamlined, harmonized, effective, transparent and serv
941 false
BIH-SOC-G-EC 45 First phase of the police European Commission (EC)
process process completed according to legisla
Support to the Police reform2000000 restructuring Social sectors true
942 false
BIH-SOC-G-EC 46 To support Bosnia and Herzegovina'sSocial sectors
4000000 Herzegovina judicial reform.Totrue
Support to the judiciary in Bosnia and European Commission (EC) strengthen capacitie
943 false
BIH-SOC-G-EC 47 To strengthen the BiH institutions to combatsectors
500000 European institutions to prevent corruption
Social and enforce accountability and
Strengthening the capacities ofcapacities of BiH Commission (EC) true
944 false
BIH-SOC-G-EC 48 Strengthening the humanEuropean capacities and true
5167491 resource Commission (EC)
Promoting labour market competitiveness Social sectors making labour market wor
945 BIH-SOC-G-EC 49
false establishment of a and Inclusion System forsectors and sustainable socia
Enhancing the Social Protectionharmonized, well-targeted,vulnerable groups – Phase III
Social efficient
1650000 European Commission (EC) true
946 false
BIH-SOC-G-EC 50 To contribute to a more European Commission (EC)
Social sectors true
Strengthening the Judiciary 5300000effective, efficient and transparent provision of justice
947 false
BIH-SOC-G-EC 51 To of the Anti-CorruptionEuropean Commission (EC)
2000000 in Bosnia and Herzegovina
Social sectors
Implementation support the institutionsStrategy and Action Plantrueto effectively implemen
948 false
BIH-SOC-G-EC 52 of a High Security State EuropeanBosnia and Herzegovina providing
5150000 law in in Commission (EC)
Social sectors true
ConstructionTo strengthen the rule of Prison Bosnia and Herzegovina by - Phase II the app
949 true
REG-PSD-G-EC 01 1125000 European in Private increase in trade relations and
Regional Programme on Trade
overall objective is an sector development
Overall Objective:
The Investment Commission (EC)
and Balkans
the Western true
950 true
REG-PSD-G-EC 02 Overall ObjectiveTo contribute to the stabilization of development
735450000 Package Private sector financial markets and ec
IPA Multi-Beneficiary Crisis ResponseEuropean Commission (EC) true
951 true
REG-PSD-G-EC 03 Overall ObjectiveThis Centre
2000000 European Commission (EC)
Private foundations for a more develop
true
Regional Entrepreneurial Learning project shall create the sector development
952 BIH-SOC-G-EC 53
false 1110000 European of missing (EC)
Overall Objective: Justice: SupportCommissionpersons is a crucial political
Science in Service of Truth andResolving the fateto ICMP’s Forensic Sciences Departmen
Social sectors true
953 BIH-SOC-G-EC 54
false of SIPA Financial Intelligence Unit and improve the capabilities Prosecutors
Joint trainingThe overall objective of the project is to Crime Investigation Unit,of law enforc
Social sectors
400000 European Commission (EC) true
954 false
BIH-SOC-G-EC 55 To support Science Department of the International Commission on Missing
15548316 European Commission (EC)
Social sectors true
Support to the Forensic Bosnia and Herzegovina efforts to address the issue oflarge num
955 false
BIH-SOC-G-EC 56 The economic and capacity of Social Social sectors Social Partners (SP) Pro
500000 European Commission (EC)
Dialogue and true
Improving the development regeneration of B&HThe development of effective and active i
957 false
BIH-SOC-L-WB 04 The objective of the Additional Financing for the Health Sector Enhancement
16581600 World Bank (WB)Social
Health Sector Enhancement Project Additional Financingsectors false
958 false
CRO-PSD-L-WB 02 Project Development Policy Loan Recovery Development Policy
143498100 World Bank (WB) Private false
Economic Recovery Description: The Economic(ERDPL) sector development Loan for C
959 false
MTN-MUN-L-WB 01 The objective of the Additional Financing for Montenegro Areas Project Mon
5382090 World Bank (WB)Municipal infrastructure
Tourist
Additional Financing for Montenegro Environmentally Sensitive false Environmentally Se
961 false
MTN-PSD-L-WB 01 The Land Administration World Bank (WB) Projectfalse
25181600 and Management sectorfor Montenegro are to imp
Land Administration and Management Project Montenegro Private development
962 false
MTN-PSD-L-WB 02 Institutional DevelopmentWorld Bank (WB) Development and Agriculture S
15348100 and Agriculture Strengthening (MIDAS)
Private false
Montenegro The development objective of the Institutionalsector development Montenegr
963 false
SER-SOC-L-WB 02 The objective 68000000 World Bank (WB) sectors
Social false
Public Expenditure DPL of the Second Public Expenditure Development Policy Loan Pr
964 false
SER-PSD-L-WB 02 The objective of the Private andBank (WB) sector development
292800000 World Financial Sector false
Private
Private and Financial Sector Policy Based Guarantee Serbia Policy Based Guarantee (P
965 false
BIH-PSD-L-EIB 06 Credit Global 75000000 European Investment of false and medium enterpr
Loan Private sector (EIB)
small
HAA Group Bosnia line for financing of limited scale projectsBankdevelopment
966 false
CRO-PSD-L-EIB 02 FOR SMES 100000000 European Investment Bankdevelopment
& PRIORITY Bank (EIB)Private sector 100
is false
ZABA LOANThe European Investment PROJECTS lending EUR(EIB)million to Zagreba
967 SER-PSD-L-EIB 07
false The project, with an estimated investment
PUBLIC SECTOR RESEARCH AND DEVELOPMENT cost of EUR 420 million, concerns
Private sector (EIB)
false
200000000 European Investment Bankdevelopment
968 CRO-PSD-L-EIB 03
false Private projects and
The loan of EUR 250 million will finance SMEsector (EIB) medium-sized com
AND MID-CAP II
HBOR LOAN FOR SMES250000000 European Investment Bankdevelopment false
969 false
CRO-WAE-L-EIB 02 EU project will support European Investment Bank (EIB)
2007-2011 Water and Environment Strategic Coh
Cofinancing TheIPA ISPA200000000eligible investments under false the Croatian
970 false
BIH-SOC-G-EC 58 To advance the1100000 European Commission (EC)
reform the education system which true
EU support to reform of Higher Education in B&H Social sectors does not respond to the
973 REG-PSD-L-EIB 03
false For Member States Projects
PCH Loan for SMEs and Priority and Western Balkans: Loan for financing small and med
Private sector (EIB)
false
40000000 European Investment Bankdevelopment
974 false
CRO-PSD-L-EIB 05 Financing Border Global European Investment Bankdevelopment
10000000 Loan Private sector (EIB)
false
RLB Steiermark Cross of projects of limited scale in the fields of infrastructure, environme
975 SER-PSD-L-EIB 08
false AND SMEs II is
FOR SMES 150000000 European Investment Bankof SME projects, small a
APEX LOANThe Apex Loan for MID-CAP IIintended for financing development
false
Private sector (EIB)
976 true
SER-WAE-G-EC 14 The project relates to feasibility study Water of Waste of sewerage Municip
250000 European Commission Environment
for development
true
Feasibility Study for Collection, Transport and Treatment and (EC) Waters in theinfrastruc
977 false
BIH-WEA-G-CHE 01 Project in Municipal Water and authorities and of truepopulation to improve
Governance •Increase the capacities of localEnvironmental Development
Water the
4240110 Switzerland (CH) and Environment
978 false
BiH-SOC-G-CHE 01 EstablishmentPrevention and reduction of causes (CH)effects of social exclusion
Enhan
•
the Social Inclusion Foundation and sectors
of 1565954 Switzerland Social true
•
979 BiH-SOC-G-CHE 02
false •
Enhancement of genderSwitzerland (CH) sectors
Gender Equality Agency 370494 equality and gender mainstreaming
Ensure susta
Social true
•
980 BiH-SOC-G-CHE 03
false •
Juvenile Justice Juvenile Switzerland (CH) sectors
Support to the1040676 Justice Reform
Strengthening of children's rights
Social•
true
981 BiH-SOC-L-CHE 01
false Improvement working Switzerland (CH) professional
Support to the Judiciary of2758122 methods andSocial sectors capacities of prosecuto
false
982 false
BIH-PSD-G-CHE 01 •
Improvement 1259679 Switzerland (CH) entrants into development
Youth Employment Project of employability of newPrivate sector labour market
Improve
true •
983 BIH-PSD-G-CHE 02
false Skills for Job•
1556074 Switzerland (CH) innovations with a manifest pot
Institutional, organizational and commercial sector development
Private true
984 BIH-PSD-G-CHE 03
false national and local Private
• Support Competitiveness Project governments in development
IFC/FIAS Sub-nationalto both401368 Switzerland (CH) sector Bosnia and Serbia to imp
true
985 BIH-PSD-G-CHE 04
false •
3354288 Switzerland Private sectorBalkans which practice co
Reaching a critical the
Corporate Governance Program mass of SMEs in(CH)Westerntrue development
986 BiH-SOC-L-CHE 02
false Mental HealthImprovement of generalSwitzerland (CH) population
Improvement of adm
• 3913239 mental health of sectors
•
Social false
987 BiH-SOC-L-CHE 03
false delivery for Nurses (CH) sectors
Contribute to the214227 of effective solutions for true
Additional Training in Family MedicineSwitzerland in Republika the most important health
Social Srpska
988 false
SER-PSD-G-CHE 01 • Improving competitiveness and market access of standards (agriculture)
Implementation of (CH) sectorproducers
Private
Trade Cooperation Program -498108 SwitzerlandGLOBALGAPtrue development
•
989 SER-PSD-G-CHE 02
false Private define the needs for
• Assessment of gaps and market analysis to sector development export enh
Export Switzerland (CH)
Trade Cooperation Program -526924 Promotion for Innovative Products true
990 SER-PSD-G-CHE 03
false Simplifying rules 765687 Switzerland procedures for SMEs at local
Sub-national•Competitiveness and administrative (CH) sector development level
In
Private true
•
991 false
SER-PSD-G-CHE 04 •
1523142 Switzerland Business advisory services
Making markets in Southwest Serbia •
Private
Support to SMEs at local level work for the poor
(CH) sector development
Clusterin
true •
992 SER-PSD-G-CHE 05
false Support to SMEs at local level work for the poor
(CH) sector development
Clusterin
•
•
Making markets in South Serbia
Business advisory services
362260 Switzerland Private true •
993 SER-SOC-G-CHE 02
false – PROGRES
citizens’ Switzerland better
• Strengthening3108033 demands for Social sectors true
European Support to South and Southwest Serbia(CH) governance
Assistance to mun
•
994 SER-SOC-G-CHE 03
false judiciary etc to design, coo
• Strengthening capacity in the Ministry of Justice, true
Justice Reform Social
493992 Switzerland (CH) sectors
995 SER-SOC-G-CHE 04
false capacity
• Strengthening2054126 Switzerland (CH) sectors
Support to Improve Social Inclusion of the Government to coordinate, implement and m
Social true
996 SER-PSD-G-CHE 06
false Support to Professional development Switzerland (CH) development of in-service teach
System
• Institutional and capacity building
Social sectors Education
2387628 and European Initiatives in true
997 false
SER-PSD-G-CHE 07 4116600 Switzerland (CH) youth through Education
• Support and and Marginalized Groups Inclusion true adults into the educat
Joint Programme on Roma Integration of Roma children, sectors
Social and
998 SER-ENE-G-CHE 02
false Upgrade/rehabilitation of the monitoring and control system of the Nikola T
Nikola Tesla•Thermal Plant B 87207192 Switzerland (CH) Energy true
999 SER-SOC-G-CHE 07
false •
• access to public services (health, social assistance, registration)
educatio
Migration in South Serbia Social
823320 Switzerland (CH) sectors true
1000 false
SER-SOC-G-CHE 05 •
Support to in VojvodinaSwitzerland (CH) sectors
Social Inclusion of Romabasic housing infrastructure (hygiene,true and electricity)
Pr
296395 Social water
•
1006 CRO-TRA-L-EBRD 05
false The EBRD Project facility
considering providing a €60.7 Reconstruction and Developme
Corridor Vc Completion is166300000 European Bank formillionfalse to Croatian Motorw
Transport
1010 MTN-TRA-L-EBRD 03
false ZPCg Rolling 16000000 providing funds to Reconstruction and Developme
Montenegro:The EBRD is consideringEuropean Bank for finance priority upgrade of the p
Stock Renewal Project Transport false
1011 MTN-MUN-L-EBRD 01
false Municipal loan of up to
6000000 providing a sovereign infrastructure€5.35 million to
Danilovgrad The EBRD is consideringEuropean Bank for Reconstruction and Developme
Municipal Infrastructure Project false
1015 BiH-SOC-G-TR 01
false 449375 Turkey (TR) Faculty of theDžemal Bijedić Universit
Premises of the the Civil Engineering Social of thetrue
Reconstruction of the Civil Engineering Faculty Premises sectors DžemalBijedić University
1016 false
BiH-SOC-G-TR 02 of the pre-school Sultan Turkey Novi Travnik. Construction work was comple
240728 Fatih in Novi Travnik
ConstructionA pre-school was constructed in (TR) Social sectors true
1017 false
BiH-SOC-G-TR 03 6 village schools 614765 Turkey (TR) Cantonsectors
and Central Bosnia Social true
Reconstruction of 7 schools in the 1 vocational school located in the Central Bosnia Canto
1018 false
BiH-SOC-G-TR 04 The Konjic Hospital which has been severely damaged during the war was re
Hospital
Reconstruction of the Konjic1047292 Turkey (TR) Social sectors true
1019 v false 2 BHC's constructed by Clinics
Health local NGO Social sectors true
Equipment Support for 2 Basic82539aTurkey (TR)were supported by TIKA. All the necess
1020 false
BiH-SOC-G-TR 06 Establishment of129502 Turkey (TR) Social sectors
the technical infrastructure of thetrue
Development of the Bosnian e-Justice System Bosnian e-Justice System
1021 false
BiH-SOC-G-TR 07 90 07 431400 Turkey (TR) Social Bosnian true
BiH-SOC-G-TRhouses located in Gorazde that belong to sectors war victims were recon
1022 false
BiH-SOC-G-TR 08 Restoration of 1743516 Turkey (TR) Social sectors
Konjic Bridge true
Restoration of the historicalthe historical Konjic Bridge -which was built in 1682 and dama
1023 false
MTN-SOC-G-TR 01 Pavle Rovinski Primary Pavle located in Podgorica
school Turkey (TR) Social Stari true
Reconstruction of the primary184834School Rovinskiin thesectors Aerodrom, Podgorica was
1024 false
MTN-SOC-G-TR 02 of the primary for the Sukriye Mecidovic Primary School
164779 Turkey (TR) Social sectors true
ConstructionA new premise school Sukriye Mecidovic in Bijelo Polje in a Bosnian village
1025 MTN-SOC-G-TR 03
false 193320 History of the University of
The Annex of Institute of Turkey (TR) of the sectors Montenegro was
Reconstruction of the Annex of Institute of History Social University of Montenegro recons
true
1026 false
MTN-SOC-G-TR 04 Medical equipment was donated (TR) ENT sectors
140816 Turkey to the Ulcinj Hospital
Medical equipment support for the Ulcinj Hospital -SocialClinic true - ENT Clinic by TIKA.
1027 MTN-SOC-G-TR 05
false 127876 Turkey (TR) State sectors
The Gynaecology Clinic of the RožajeSocial Hospital was
Reconstruction of the Gynaecology Clinic of the Rožaje State Hospital reconstructed by T
true
1028 false
MTN-TRA-G-TR 01 A 300m of village road connecting
196633 Turkey (TR) Transport true
Rehabititation of a 300m village road in PetnicaPetnica to Berane was rehabilitated by TIK
1029 false
SER-SOC-G-TR 01 735775 Turkey of Pazar is beingtrue
The Annex of the University of Novi Novi Pazar
Reconstruction of the Annex of the University(TR) Social sectors reconstructed by TİKA. (2
1030 false
SER-SOC-G-TR 02 Vrbas High School located in Novi Sad Novisectors
182974 Turkey (TR) Social Sad true
Reconstruction of the techincal high school Vrbas inwas reconstructed by TIKA. (2010-20
1031 false
SER-WAE-G-TR 01 Replacing the water pipelines with asbestos and ones (2009)
true
Tutin Water Pipeline Project 750000 Turkey (TR) Water free Environment
1032 true
SER-PSD-G-TR 01 Projects of the Tutin Industrial Zone was prepared true by TIKA. (2009-2010)
Tutin Industrial Zone Project1464484 Turkey (TR) Private sector development
1033 MTN-ENE-G-GER 02
false •
1900000 Government relating to legal
Advisory services to theGermany (GER)
Advisory Services for Energy Efficiency & Renewable Energiestrue framework conditions
Energy
1034 MTN-SOC-G-GER 01
false GIZ Project ―Job promotion by VET Reform‖ supports
Vocational Education and Training, Montenegro(GER) sectors the Government in imp
2500000 Germany Social true
1035 MTN-SOC-G-GER 02
false GIZ fund: Dissemination Germany (GER) sectors
Study and expertProject ―Dissemination of innovative training methods in labor-intensive s
Social true
250000 of innovative training methods in labor-intensive se
1036 false
BIH-SOC-G-SPA 01 120000 Spain (ESP)Social sectors true
Improvement of BaH Roma Community citizenship participation through strategies of labo
1037 false
BIH-ENE-G-SPA 02 Overall BaH Electric System Operator (ISO Herzegovina in the path/progres
100000 Spain (ESP)Energy in the
Strengthening of theObjective: Strengthening Bosnia andB&H) true handling of electricit
1038 false
BiH-PSD-G-SPA 01 249800 Spain (ESP)Private sector development
the
Support to the economic development of Herzegovina through truepromotion of the SMEs
1039 BiH-PSD-G-SPA 02
false Overall development of the city of Mostar throughtrue improvement in the to
Support to economicObjective : Support to the economic development of the city of Mosta
185000 Spain (ESP)Private sectorthe development
1040 false
BIH-SOC-G-SPA 02 Registry of strengtheningSpain (ESP)Social sectors the state Prosecution O
1000000 II the judicial Court and the at
Sectoral support for the Sections I and of of the Stateinstitutionstrue Generallevel (
1041 false
BIH-SOC-G-SPA 03 50000 Spain (ESP)Social sectors true
Support to the Food Safety Agency for ist adaptation to European standards
1042 false
BIH-SOC-G-SPA 04 136000 of Bosnia and Herzegovina
Strengthening the criminology centresSpain (ESP)Social sectors true
1043 false
BiH-PSD-G-SPA 03 Overall Objective: of Bosnia to (ESP)Private sector development
266069 Spain the sustainable socioeconomic growth and th
Ecodevelopment in rural areas Contributeand Herzegovina andtrue Serbia
1045 false
BIH-SOC-G-SPA 05 150000 Spain (ESP)Social sectors true
Strengthening the Association of Public Prosecutors of BaH to articulate the participation
1046 false
BIH-ENE-G-SPA 03 100000 Spain institutions in true
Support to Bosnia and Herzegovina relevant(ESP)Energy the field of energy, for the tran
1047 false
BIH-SOC-G-SPA 06 Forces Spain (ESP)Social sectors true
Support to the State Security 190000 of Bosnia and Herzegovina in the fight against organ
1048 false
BIH-SOC-G-SPA 07 118000 Spain (ESP)Social sectors true
Strengthening the Rule of Law in Bosnia and Herzegovina through the strengthening of p
1049 false
BIH-SOC-G-SPA 08 80000 Spain of planification and true
Development of strategic plans and capacity(ESP)Social sectors strategic management b
1050 false
BIH-WEA-G-SPA 03 Plan for sustainable management of the river Neretva River Neretva basin i
516000 Spain (ESP)Water and of the
Creation of aOverall Objective: Comprehensive management Environment true
1051 false
BiH-PSD-G-SPA 05 Overall Objective: Support the (ESP)Private sector development Developm
315000 Centre at the Sarajevo Economic Region
true
Creation of an Employment GuidanceSpaineconomic development of Herzegovina throug
1052 false
BiH-PSD-G-SPA 04 Overall Objective: Support the economic development of Herzegovina throug
Bosnia Spain (ESP)Private sector development
true
Strengthening the capacity in 143000 and Herzegovina to create and promote the establis
1053 false
BiH-PSD-G-SPA 06 Overall Objective: socioeconomic revitalization in rural areas of BaH Herzeg
157815 Spain (ESP)Private sector development
true
Support to the process of local Strengthen the Local Administration of Bosnia andconsolid
1054 false
BIH-SOC-G-SPA 09 strategy of the Justice Sector
Implementation of the reform 400000 Spain (ESP)Social sectors true
1055 false
SER-SOC-G-SPA 01 assistance in Serbia and sectors true
Institutionalization of free legal 50000 Spain (ESP)Socialin particular in Vojvodina
1056 SER-ENE-G-SPA 01
false : Promotion of the use of renewable
Overall Objective utilisation and promotion of
Capacity development for the223000 Spain (ESP)Energy solar true energies in Serbia. Sp
energy in Serbia
1057 false
SER-SOC-G-SPA 02 Overall Objective: Strengthen the Rule strengthening
of Serbia through the of Law andtrue capacities of Serbia in the
Support to the forensic police180000 Spain (ESP)Social sectors of the toxicology labora
1058 false
SER-SOC-G-SPA 03 Overall objective:Serbia Spainthe the fight againsttrue
Consolidate (ESP)Social sectors computer crime
Strengthening the capacity of100000 regarding Rule of Law through the fight against orga
1059 false
SER-SOC-G-SPA 04 100000 Spain against corruption true
Capacity strengthening of Serbia in the fight (ESP)Social sectors
1061 SER-SOC-G-SPA 05
false Promotion and Protection of human
Overall Objective: 83900 Serbia and of Belgrade true rights, in particular of
Support project to the Ombudsman ofSpain (ESP)Social sectors
1062 BIH-SOC-G-SPA 10
false Social Inclusion and Improvement
Overall Objective: 86000 Spain (ESP)Social sectors of Socioeconomic Statu
true
Improvement of BaH Roma Community citizenship participation through strategies of labo
1063 CRO-ENE-G-EC 04
true The connection for LNGRV is a new supply route of natural gas into the Rep
Energy
LNG Regasification Vessel 1000000 European Commission (EC) true
1064 CRO-ENE-G-EC 05
true 180000 pipelines Commission (EC)
true •
The LNG evacuation gas European project consists of:
main gas pipeline O
Evacuation Pipeline Omisalj Zlobin Rupa Energy
1065 CRO-ENE-G-EC 06
true HEP OIE, in Split-Dalmatian County Energy
Wind and Solar Projectis developing two combined wind and solar projects in Splitsko-da
500000 European Commission (EC) true
1066 CRO-ENE-G-EC 07
true (HEP -
izvori energije d.o.o. Energy Renewable Energy Sources Ltd
Small Hydro HEP - Obnovljivi 500000 European Commission (EC)
Power Plant Ozalj true
1067 true
BiH-ENE-G-EC 04 This project, to be implemented by JPEnergy
Wind Farm Poklecani Elektroprivreda
true
380000 European Commission (EC) HZ HB d.d. Mostar (EP
1068 true
BIH-WAE-G-EC 11 The Municipality 400000 is a regionalWater and Environment
of for the Municipalitycentre with about
of Tuzla true
Water Leakage Reduction Plan Tuzla European Commission (EC) 175,000 inhabitants
1069 true
BIH-WAE-G-EC 12 Srpska European Commission (EC)
The Republic of the Republic of Srpska Water and Environment underdevelope
Flood Risk Management for 2500000suffered serious damagestrue caused by
1070 BIH-SOC-G-EC 59
true As part of the Research European Commission (EC)
Designing Medical Faculty,construction and equipping of the Medical Faculty in Banja Luk
Social
3000000 Center and School sectors true
1071 BIH-TRA-G-EC 07
true Project of
Corridor Vc Railways modernisation and rehabilitation of railway infrastructure on corrido
Transport true
1000000 European Commission (EC)
1072 MTN-ENE-G-EC 03
false 2500000 European ―City‖) is situated
The City of Pljevlja (―Pljevlja― or the Commission (EC)in the north west of Mo
Pljevlja renewable energy heating Energy true
1073 false
BIH-WAE-G-EC 13 wastewater treatment in Cazin
of Cazin is situated in the north-west
Water and Environment
true
Sewage andThe Municipality 700000 European Commission (EC) part of Bosnia and Her
1074 SER-ENE-G-EC 07
false and - Phasetrue
Heating European SerbiaEnergy has
In several projects, Ministry of Mining Energy
Rehabilitation of the District 1512000Systems in Commission (EC) encouraged the mode
IV
Loans EnvironmentProject Status
Own Revenue Aspect Status Date Priority
Approval Date Initiative Other Info
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
true true false Approved 01.01.2008 01.01.2008 false Environmental aspects: As
true false false Approved 01.01.2009 01.01.2009 false Environmental aspects: Th
false false true Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
true false false 09.05.2011
Under implementation 15.06.2007 false
true false false Approved 01.01.2009 01.01.2009 false
true false true Appraisal 01.01.2005 01.01.2005 false
false false false Approved 01.01.2009 01.01.2009 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false true Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 17.10.2008 17.10.2008 false
false true true Approved 01.01.2008 01.01.2008 false Environmental aspects: Th
false false true Appraisal 16.10.2009 16.10.2009 false
false false true Approved 01.01.2007 01.01.2007 false Environmental aspects: A
false true true Approved 01.01.2008 01.01.2008 false Environmental aspects: Th
false false true Appraisal 16.10.2009 16.10.2009 false Financed through IPA 09 M
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false true Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2009 01.01.2009 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
true true true 09.05.2011
Under implementation 13.11.2007 false Environmental aspects: Va
true false true Approved 01.01.2009 01.01.2009 false
false true true Approved 01.01.2008 01.01.2008 false Environmental aspects: Th
false false true Approved 01.01.2008 01.01.2008 false Environmental aspects: Th
false true true Approved 01.01.2008 01.01.2008 false Environmental aspects: Th
true false false Approved 16.10.2009 16.10.2009 false The overall length of the ro
false false true Approved 01.01.2008 01.01.2008 false
false false true Approved 01.01.2008 01.01.2008 false
false false true Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false true Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
true true true Approved 01.01.2007 01.01.2007 false Environmental aspects: Th
true true true Approved 01.01.2007 01.01.2007 false Environmental aspects: Th
true false true Approved 01.01.2008 01.01.2008 false Environmental aspects: Th
true true false Appraisal 01.01.2009 01.01.2009 false Environmental aspects: Th
true true true Appraisal 01.01.2008 01.01.2008 false Environmental aspects: Th
true false true Appraisal 07.10.2009 07.10.2009 true Environmental aspects: Fr
WBIF (Western Balkans Investment Th
true true false Approved 01.01.2007 01.01.2007 false Environmental aspects: Th
true true true Approved 01.01.2008 01.01.2008 false Environmental aspects: An
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false true Approved 01.01.2008 01.01.2008 false
false true true Approved 01.01.2007 01.01.2007 false Environmental aspects: En
false false false Approved 01.01.2008 01.01.2008 false Environmental aspects: Th
false true true Approved 16.10.2009 16.10.2009 false
false false false Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false true Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false Environmental aspects: Ap
false false false Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
true false false Approved 03.05.2005 03.05.2005 false
true false true Approved 23.12.2008 23.12.2008 false
true false true Approved 08.10.2008 08.10.2008 false Environmental aspects: Th
true true true Approved 06.02.2007 06.02.2007 false Environmental aspects: Th
true false true Approved 01.01.2007 01.01.2007 false Environmental aspects: Th
true true false Approved 01.01.2007 01.01.2007 false Environmental aspects: Th
true true true Approved 19.06.2008 19.06.2008 false Environmental aspects: W
true true true Appraisal 01.01.2009 01.01.2009 false
false false true Approved 30.12.2007 30.12.2007 true SECT (Support to ECT)
false false false Approved 01.08.2007 01.08.2007 false
false false false Approved 15.06.2007 15.06.2007 false
false false true Approved 01.01.2007 01.01.2007 false
false false false Approved 21.03.2007 21.03.2007 false
false false false Approved 12.03.2007 12.03.2007 false
true true true Approved 03.06.2009 03.06.2009 false
true false true Approved 21.10.2009 21.10.2009 false
true true true Approved 20.11.2007 20.11.2007 false
true false true Approved 21.10.2009 21.10.2009 false
true true true Approved 23.06.2008 23.06.2008 false
true true true Approved 23.02.2010 23.02.2010 false
false false true Approved 30.12.2007 30.12.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 06.06.2007 06.06.2007 false
false false false Approved 01.11.2007 01.11.2007 false
true false true 10.05.2011
Under implementation 09.10.2007 false
true false true Approved 22.04.2009 22.04.2009 false
true false true Approved 18.12.2008 18.12.2008 false
true false true Appraisal 01.01.2009 01.01.2009 false
true false true Approved 03.06.2008 03.06.2008 false
true false true Appraisal 01.01.2009 01.01.2009 false
true false true Appraisal 01.01.2008 01.01.2008 false
true false true Approved 25.01.2008 25.01.2008 false
true false false Approved 01.06.2001 01.06.2001 false
true false false Approved 11.12.2006 11.12.2006 false
true false true Approved 29.12.2008 29.12.2008 false
true false true Approved 29.12.2008 29.12.2008 false
true true true Approved 09.01.2007 09.01.2007 false
true true true Appraisal 22.12.2009 22.12.2009 true PEIP (Priority Environmental Investmen
false false false Approved 01.03.2007 01.03.2007 false
false false true Approved 30.12.2007 30.12.2007 false
false false true Approved 30.12.2007 30.12.2007 false
false false true Approved 30.12.2007 30.12.2007 false
false false true Approved 30.12.2007 30.12.2007 false
false false true Approved 30.12.2007 30.12.2007 false
false false true Approved 30.12.2007 30.12.2007 false
false false true Approved 30.12.2007 30.12.2007 false
false false true Approved 30.12.2007 30.12.2007 false
false true true Approved 30.12.2008 30.12.2008 false
false false true Approved 30.11.2007 30.11.2007 false
false true true Approved 30.12.2008 30.12.2008 false
false false true Approved 30.12.2007 30.12.2007 false
false false true Approved 30.12.2008 30.12.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 06.01.2007 06.01.2007 false
false false false Approved 01.11.2007 01.11.2007 false
false false false Approved 14.06.2007 14.06.2007 false
false false false Approved 01.10.2007 01.10.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.10.2007 01.10.2007 false
true true true Approved 20.06.2007 20.06.2007 false
true false false Appraisal 25.02.2010 25.02.2010 false
false false true Approved 30.12.2007 30.12.2007 false
false false false Approved 01.04.2007 01.04.2007 false
true true false Approved 16.03.2008 16.03.2008 true SEETO (South East European Transpo
true true false Appraisal 01.01.2009 08.12.2009 true WBIF (Western Balkans Investment Fr
true true false Approved 10.07.2007 10.07.2007 false Environmental aspects: Th
true false true Appraisal 01.01.2009 01.01.2009 false
true false true Approved 18.12.2008 18.12.2008 true SEETO (South East European Transpo
true false false Appraisal 01.01.2008 01.01.2008 false
true true true Approved 13.12.2007 13.12.2007 false
false false true Approved 30.12.2007 30.12.2007 false
true true true Appraisal 01.01.2009 01.01.2009 true PEIP (Priority Environmental Investmen
false false true Approved 30.12.2007 30.12.2007 true PEIP (Priority Environmental Investmen
false false true Approved 30.12.2007 30.12.2007 false
false false false Approved 15.06.2007 15.06.2007 false
false false false Approved 01.12.2007 01.12.2007 false
false false false Approved 01.11.2007 01.11.2007 false
false false false Approved 09.02.2007 09.02.2007 false
false false false Approved 01.10.2007 01.10.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 31.12.2007 31.12.2007 false
false false false Approved 09.08.2007 09.08.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
true true true Approved 29.05.2008 29.05.2008 false
true true false Approved 10.07.2007 10.07.2007 true Environmental aspects: En
PEIP (Priority Environmental Investmen
true true true Approved 04.12.2007 04.12.2007 true PEIP (Priority Environmental Investmen
true false true 18.08.2008
Under implementation 18.08.2008 true WBIF (Western Balkans Investment Fr
true false true 22.09.2010
Under implementation 22.09.2010 false
true true true Approved 23.11.2008 23.11.2008 false
true true true Approved 19.06.2007 19.06.2007 true PEIP (Priority Environmental Investmen
false true true Approved 20.11.2007 20.11.2007 false
false true true Approved 05.12.2008 05.12.2008 false
true false true Approved 31.07.2007 31.07.2007 false
true false true Approved 17.12.2008 17.12.2008 false
true false true Approved 08.11.2007 08.11.2007 false
true false true Approved 19.11.2008 19.11.2008 false
true false true Approved 16.10.2007 16.10.2007 false
true false true Approved 24.03.2009 24.03.2009 false
true false true Approved 02.06.2008 02.06.2008 false
true false true Approved 18.09.2009 18.09.2009 false
true false true Approved 18.12.2008 18.12.2008 false
true false true Approved 26.06.2009 26.06.2009 false
true true true Approved 27.03.2008 27.03.2008 false Currency: USDExchange r
true true false Appraisal 04.06.2009 04.06.2009 false
false true false Approved 07.12.2007 07.12.2007 true Preparation or timing: Star
SEETO (South East European Transpo
false true true Approved 07.12.2007 07.12.2007 true Preparation or timing: Star
SEETO (South East European Transpo
false true true Approved 07.12.2007 07.12.2007 true Preparation or timing: Star
SEETO (South East European Transpo
false true true Approved 07.12.2007 07.12.2007 false
false true true Approved 07.12.2007 07.12.2007 true Preparation or timing: Star
SEETO (South East European Transpo
false true true Approved 07.12.2007 07.12.2007 true SEETO (South East European Transpo
true false true Approved 06.05.2009 06.05.2009 false Environmental aspects: Us
true false true Appraisal 15.12.2009 15.12.2009 false Environmental aspects: Th
true false true Appraisal 02.04.2008 02.04.2008 true SEETO (South East European Transpo
true false true Approved 07.09.2007 07.09.2007 false
true false false Approved 07.09.2007 07.09.2007 false
true true true Approved 11.12.2008 11.12.2008 false
true true true Approved 30.05.2007 30.05.2007 false
false true true Approved 20.12.2007 20.12.2007 false
false false true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
true true true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false true true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false true true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false true true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false false true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false true true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false false true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false true true Approved 29.11.2007 29.11.2007 true Preparation or timing: The
PEIP (Priority Environmental Investmen
false true true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false true true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false false true Approved 29.11.2007 29.11.2007 false
false false true Approved 29.11.2007 29.11.2007 false
false false true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false false true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false false true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false false true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false false true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false false true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false false true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false false true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false false true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false false true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false false true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
false false true Approved 29.11.2007 29.11.2007 true PEIP (Priority Environmental Investmen
true false false Appraisal 25.05.2010 25.05.2010 true Environmental aspects: Th
PEIP (Priority Environmental Investmen
true true true Approved 30.06.2009 30.06.2009 true Environmental aspects: Th
PEIP (Priority Environmental Investmen
true false true Appraisal 07.09.2009 07.09.2009 false
true false true Approved 16.12.2008 16.12.2008 false
true true true Approved 11.12.2008 11.12.2008 false
true true true Approved 30.05.2007 30.05.2007 true PEIP (Priority Environmental Investmen
true true true Appraisal 15.02.2011 15.02.2011 false
true false true Approved 06.11.2007 06.11.2007 false
false true true Approved 01.01.2008 01.01.2008 false Environmental aspects: Th
false false true Approved 01.01.2007 01.01.2007 false Environmental aspects: Th
false false true Approved 01.01.2009 01.01.2009 false Environmental aspects: En
true false true Approved 01.01.2007 01.01.2007 false Environmental aspects: T
true false true Approved 01.01.2007 01.01.2007 false
true false true Approved 04.07.2006 04.07.2006 false
false true true Approved 01.01.2008 01.01.2008 false Environmental aspects: Th
true false true Approved 16.12.2008 16.12.2008 false Environmental aspects: En
false true true Approved 01.01.2008 01.01.2008 false Environmental aspects: Th
false false true Approved 01.01.2007 01.01.2007 false Environmental aspects: Th
false false true Approved 01.01.2007 01.01.2007 false
false true true Approved 01.01.2008 01.01.2008 false Environmental aspects: W
false true true Approved 01.01.2009 01.01.2009 false Environmental aspects: Be
false false true Approved 01.01.2008 01.01.2008 false Environmental aspects: Th
false false true Approved 01.01.2008 01.01.2008 false
false true true Approved 01.01.2007 01.01.2007 false Environmental aspects: Th
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
true true true Approved 13.12.2007 13.12.2007 false Environmental aspects: Th
true false true Approved 01.02.2007 01.02.2007 false Environmental aspects: Ac
false true true Approved 01.01.2007 01.01.2007 false Environmental aspects: Th
false false true Approved 01.01.2008 01.01.2008 false Environmental aspects: Th
false true true Approved 01.01.2008 01.01.2008 false Environmental aspects: Th
false true true Approved 01.01.2009 01.01.2009 false Environmental aspects: Re
false false true Approved 06.11.2008 06.11.2008 false Environmental aspects: By
false false true Approved 01.01.2007 01.01.2007 false Environmental aspects: Th
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
true false true Approved 01.01.2007 01.01.2007 false Environmental aspects: Th
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false true true Approved 01.01.2007 01.01.2007 false Environmental aspects: Th
true false false Approved 01.01.2009 01.01.2009 false Environmental aspects: Fi
true false true Approved 01.01.2009 01.01.2009 false Environmental aspects: Th
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false true false Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2007 01.01.2007 false
false true true Approved 01.01.2008 01.01.2008 false Environmental aspects: Th
false true false Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2007 01.01.2007 false
false true true Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false Preparation or timing: At th
false false true Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2007 01.01.2007 false Environmental aspects: Th
false true true Approved 01.01.2007 01.01.2007 false Environmental aspects: Th
false false true Approved 01.01.2008 01.01.2008 false Environmental aspects: Th
false false true Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2009 01.01.2009 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
true true true 09.12.2010
Under implementation 18.09.2007 false
true true true 01.01.2009
Under implementation 01.01.2009 false Environmental aspects: Bo
true true true Approved 16.06.2009 16.06.2009 false
true true true Approved 01.01.2007 01.01.2007 true SEETO (South East European Transpo
false true true Approved 01.01.2007 01.01.2007 false
false true true Approved 01.01.2007 01.01.2007 false
false false true Approved 19.02.2009 19.02.2009 false
true true true Approved 01.01.2009 01.01.2009 false Environmental aspects: Th
true false true Approved 13.05.2008 13.05.2008 false The project will consist ma
true true false Approved 29.05.2007 29.05.2007 false Environmental aspects: Co
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2007 01.01.2007 true Environmental aspects: Th
PEIP (Priority Environmental Investmen
false false true Approved 01.01.2007 01.01.2007 true Environmental aspects: Th
PEIP (Priority Environmental Investmen
false false true Approved 01.01.2008 01.01.2008 false Environmental aspects: Th
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 16.10.2008 16.10.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2007 01.01.2007 false
true false true Appraisal 01.01.2009 01.01.2009 false Environmental aspects: Th
true true true Approved 01.04.2011 01.04.2011 false Environmental aspects: Th
true false true Approved 04.04.2007 04.04.2007 false
true true true Approved 04.12.2009 04.12.2009 false Environmental aspects: Th
false false true Approved 14.11.2007 14.11.2007 true SECT (Support to ECT)
false false false Approved 13.12.2007 13.12.2007 false
true false false Approved 28.12.2007 28.12.2007 false
true true true Approved 06.07.2007 06.07.2007 true SECT (Support to ECT)
true false true Approved 09.12.2008 09.12.2008 false
true false true Approved 01.01.2008 01.01.2008 false
true false true Approved 24.07.2009 24.07.2009 false
false false false Approved 04.01.2007 04.01.2007 false
true false true Approved 10.11.2008 10.11.2008 false
true false false Approved 19.09.2008 19.09.2008 false
true false false Approved 15.12.2008 15.12.2008 false
true false true Approved 10.11.2008 10.11.2008 false
false false true Approved 14.11.2007 14.11.2007 false
false false true Approved 30.12.2008 30.12.2008 false
false false true Approved 14.11.2007 14.11.2007 false
false true true Approved 14.11.2007 14.11.2007 false
false true false Approved 30.12.2008 30.12.2008 false
false false true Approved 14.11.2007 14.11.2007 false
true true true Approved 03.11.2009 03.11.2009 false
true true true Approved 14.11.2007 14.11.2007 false
true true true Appraisal 08.12.2009 08.12.2009 false
true false true Approved 23.10.2007 23.10.2007 true SEETO (South East European Transpo
true false true Approved 30.09.2008 30.09.2008 false
false false true Approved 30.12.2008 30.12.2008 false
true true true Approved 30.12.2008 30.12.2008 true PEIP (Priority Environmental Investmen
true true true Approved 23.10.2007 23.10.2007 true PEIP (Priority Environmental Investmen
true false true Approved 16.06.2009 16.06.2009 true PEIP (Priority Environmental Investmen
true false true Approved 29.12.2009 29.12.2009 false
true true true Approved 12.06.2007 12.06.2007 false
false false true Approved 10.07.2008 10.07.2008 false
true false false Approved 11.12.2008 11.12.2008 false
true false false Approved 11.12.2008 11.12.2008 false
true false false Approved 01.01.2007 01.01.2007 false Environmental aspects: Th
true false true 30.05.2009
Under implementation 12.06.2009 false
false false false Appraisal 01.01.2007 01.01.2007 false
false false true Approved 30.12.2007 30.12.2007 true SECT (Support to ECT)
false false false Appraisal 01.01.2007 01.01.2007 false
false false false Approved 17.10.2008 17.10.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Appraisal 01.01.2007 01.01.2007 false
false false false Appraisal 01.01.2007 01.01.2007 false
true false true Approved 22.03.2011 18.02.2010 false
true true true Approved 12.06.2009 12.06.2009 false
true true false Approved 02.01.2008 02.01.2008 false
true true true Approved 20.06.2007 20.06.2007 false
false true true Approved 30.12.2008 30.12.2008 false
false false false Approved 30.12.2007 30.12.2007 false
false false false Appraisal 01.01.2007 01.01.2007 false
false false false Appraisal 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
true true true 09.05.2011
Under implementation 19.09.2007 false
true false true Approved 12.03.2009 12.03.2009 false
true false true Approved 28.08.2009 28.08.2009 false
true false true Approved 12.06.2009 12.06.2009 false
true false true Approved 11.12.2008 11.12.2008 false
true false true Approved 16.06.2009 16.06.2009 false
true false true Approved 12.12.2008 12.12.2008 false
true false true Approved 28.08.2009 28.08.2009 false
true false true Approved 26.05.2009 26.05.2009 false
true false true Approved 26.06.2009 26.06.2009 false
true false true Approved 10.06.2009 10.06.2009 false
true false true Approved 28.11.2008 28.11.2008 false
true false false Approved 23.03.2007 23.03.2007 false
true false true Approved 19.12.2008 19.12.2008 false
true false true Approved 19.12.2008 19.12.2008 false
true false true Approved 19.12.2008 19.12.2008 false
true false false Approved 08.07.2008 08.07.2008 false
true false true Approved 18.03.2008 18.03.2008 false
false false true Approved 30.12.2008 30.12.2008 false
false false true Approved 30.12.2007 30.12.2007 false
false false true Approved 30.12.2008 30.12.2008 false
false false true Approved 30.12.2007 30.12.2007 false
false false true Approved 30.12.2007 30.12.2007 false
false false true Approved 01.01.2008 01.01.2008 false
false false true Approved 30.12.2007 30.12.2007 false
false false true Approved 30.12.2007 30.12.2007 false
false false true Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2008 01.01.2008 false
false false true Approved 01.01.2007 01.01.2007 false
false false true Approved 19.10.2007 19.10.2007 false
false true true Approved 01.01.2008 01.01.2008 false
false false true Approved 01.01.2008 01.01.2008 false
false true true Approved 01.01.2008 01.01.2008 false
false false true Approved 01.01.2008 01.01.2008 false
false false false Approved 17.10.2008 17.10.2008 false
false false false Approved 17.10.2008 17.10.2008 false
false false true Appraisal 01.01.2007 01.01.2007 false
false false false Appraisal 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Appraisal 01.01.2007 01.01.2007 false
true true false 10.05.2011
Under implementation 19.09.2007 false
true false true Appraisal 04.08.2009 04.08.2009 false
true false false Approved 19.03.2009 19.03.2009 false
false false true Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2008 01.01.2008 false
false false true Approved 01.01.2008 01.01.2008 false
false false true Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2007 01.01.2007 true SEETO (South East European Transpo
false false true Approved 01.01.2008 01.01.2008 false
false false true Approved 01.01.2008 01.01.2008 false
false false false Appraisal 01.01.2007 01.01.2007 false
true true true Approved 09.10.2007 09.10.2007 true SEETO (South East European Transpo
true false true Appraisal 09.03.2009 09.03.2009 false
true true true Approved 29.07.2009 29.07.2009 false
true false true Approved 06.05.2009 06.05.2009 false
true false false Approved 19.10.2007 19.10.2007 false
true false true Appraisal 01.01.2009 01.01.2009 true SEETO (South East European Transpo
true false true Approved 16.07.2007 16.07.2007 false
true true true Approved 09.06.2009 09.06.2009 true SEETO (South East European Transpo
true true true Approved 20.06.2007 20.06.2007 false
false false true Approved 01.01.2008 01.01.2008 false
false false true Approved 01.01.2008 01.01.2008 false
false false true Approved 01.01.2007 01.01.2007 false
false true true Approved 01.01.2008 01.01.2008 true PEIP (Priority Environmental Investmen
false false true Approved 01.01.2008 01.01.2008 false
false false true Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2007 01.01.2007 false
false false true Approved 01.01.2007 01.01.2007 false
true false false Appraisal 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Appraisal 01.01.2007 01.01.2007 false
false false false Appraisal 01.01.2007 01.01.2007 false
false false false Appraisal 01.01.2007 01.01.2007 false
false false true Appraisal 01.01.2007 01.01.2007 false
false false false Appraisal 01.01.2007 01.01.2007 false
true true true Approved 23.10.2007 23.10.2007 false
true false true Appraisal 25.09.2009 25.09.2009 false
true false true Approved 18.05.2007 18.05.2007 false
true false true Approved 20.07.2007 20.07.2007 false
true true true Approved 20.06.2007 20.06.2007 false
false true true Approved 05.06.2009 05.06.2009 false
false true true Approved 05.06.2009 05.06.2009 false
false true true Approved 05.06.2009 05.06.2009 false
false true true Approved 05.06.2009 05.06.2009 false
false true true Approved 05.06.2009 05.06.2009 false
false true true Approved 05.06.2009 05.06.2009 false
false true true Approved 05.06.2009 05.06.2009 false
false true true Approved 05.06.2009 05.06.2009 false
false true true Approved 05.06.2009 05.06.2009 false
false true true Approved 05.06.2009 05.06.2009 false
false true true Approved 05.06.2009 05.06.2009 false
false true true Approved 05.06.2009 05.06.2009 false
false true true Approved 05.06.2010 05.06.2010 false
false true true Approved 05.06.2009 05.06.2009 false
false true true Approved 05.06.2009 05.06.2009 false
false true true Approved 05.06.2009 05.06.2009 false
false true true Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false true false Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false true false Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false true true Approved 05.05.2010 05.05.2010 false
false false true Approved 09.10.2008 09.10.2008 false
false true true Approved 09.10.2008 09.10.2008 false
true true false Approved 09.10.2008 09.10.2008 false
false false true Approved 09.10.2008 09.10.2008 false
false true true Approved 09.10.2008 09.10.2008 false
false true true Approved 09.10.2008 09.10.2008 false
false false false Approved 09.10.2008 09.10.2008 false
false true true Approved 09.10.2008 09.10.2008 false
false false false Approved 09.10.2008 09.10.2008 false
false false false Approved 09.10.2008 09.10.2008 false
false true true Approved 09.10.2008 09.10.2008 false
false false false Approved 09.10.2008 09.10.2008 false
false true true Approved 09.10.2008 09.10.2008 false
false true true Approved 09.10.2008 09.10.2008 false
false true true Approved 09.10.2008 09.10.2008 false
false false true Approved 09.10.2008 09.10.2008 false
false true true Approved 09.10.2008 09.10.2008 false
false true false Approved 09.10.2008 09.10.2008 false
false true false Approved 09.10.2008 09.10.2008 false
false true true Approved 09.10.2008 09.10.2008 false
true false true Approved 09.10.2008 09.10.2008 false
false true true Approved 09.10.2008 09.10.2008 false
false true false Approved 09.10.2008 09.10.2008 false
false true true Approved 09.10.2008 09.10.2008 false
false true true Approved 09.10.2008 09.10.2008 false
true false false Approved 09.10.2008 09.10.2008 true SEETO (South East European Transpo
false true true Approved 09.10.2008 09.10.2008 false
false true false Approved 09.10.2008 09.10.2008 false
false false false Approved 09.10.2008 09.10.2008 false
false false false Approved 09.10.2008 09.10.2008 false
false true true Approved 09.10.2008 09.10.2008 false
false false false Approved 09.10.2008 09.10.2008 false
false true false Approved 03.01.2011 03.01.2011 false
false false true Approved 15.07.2010 15.07.2009 false
false true false Approved 15.10.2010 15.10.2010 false
false false false Approved 15.10.2010 15.10.2010 false
false true false Approved 15.10.2010 15.10.2010 false
false false false Approved 15.10.2010 15.10.2010 false
false true false Approved 15.10.2010 15.10.2010 false
false false false Approved 15.10.2010 15.10.2010 false
false true false Approved 15.10.2010 15.10.2010 false
false true false Approved 15.10.2010 15.10.2010 false
false false false Approved 15.10.2010 15.10.2010 false
false false false Approved 15.10.2010 15.10.2010 false
false false true Approved 15.10.2010 15.10.2010 false
false false false Approved 15.10.2010 15.10.2010 false
false false false Approved 15.10.2010 15.10.2010 false
false true false Approved 15.10.2010 15.10.2010 false
false false false Approved 15.10.2010 15.10.2010 false
false false false Approved 15.10.2010 15.10.2010 false
false true false Approved 15.10.2010 15.10.2010 false
false true false Approved 15.10.2010 15.10.2010 false
false false false Approved 15.10.2010 15.10.2010 false
false false false Approved 15.10.2010 15.10.2010 false
false true false Approved 15.10.2010 15.10.2010 false
false false false Approved 15.10.2010 15.10.2010 false
false false false Approved 15.10.2010 15.10.2010 false
false false false Approved 15.10.2010 15.10.2010 false
false false false Approved 15.10.2010 15.10.2010 false
false false false Approved 16.10.2009 16.10.2009 false
false true false Approved 16.10.2009 16.10.2009 false
false true false Approved 16.10.2009 16.10.2009 false
false true false Approved 15.10.2010 15.10.2010 false
false true false Approved 15.10.2010 15.10.2010 false
false true false Approved 15.10.2010 15.10.2010 false
true false false Approved 15.10.2010 15.10.2010 false This project will be delivere
true true false Approved 15.10.2010 15.10.2010 false
false true true Approved 15.10.2010 15.10.2010 false
false true false Approved 15.10.2010 15.10.2010 false
false false false Approved 15.10.2010 15.10.2010 false
true false false Approved 20.06.2010 20.06.2010 false
true true true Approved 01.01.2009 01.01.2009 false
false true false Completed 01.02.2006 01.02.2006 false
true true true Approved 29.05.2008 23.05.2008 false
false false false Approved 17.10.2008 17.10.2008 false
true false true Approved 20.06.2010 20.06.2010 false
true false true Approved 10.11.2010 10.11.2010 false
true false true Approved 29.07.2009 29.07.2009 false
true false true Approved 22.06.2010 22.06.2010 false
true false true Approved 01.09.2010 01.09.2010 false
true false false Approved 20.06.2010 20.06.2010 false
true false true Approved 30.09.2009 30.09.2009 false
true false true Approved 21.02.2011 01.09.2010 false
true false true Approved 29.09.2010 29.09.2010 false
true false true Approved 22.06.2010 22.06.2010 true WBIF (Western Balkans Investment Fr
true false true Appraisal 02.11.2010 02.11.2010 false
false true true Approved 01.01.2007 01.01.2007 false
false true false Approved 01.01.2010 01.01.2010 false
true false true Approved 19.02.2008 19.02.2008 false
true false true Approved 28.10.2008 28.10.2008 false
true false true Approved 21.04.2009 21.04.2009 false
true false true Approved 06.05.2009 06.05.2009 false
true false true Appraisal 26.09.2009 26.09.2009 false
true false true Appraisal 01.09.2010 01.09.2010 false
true false false Approved 09.07.2010 09.07.2010 false Part of EFSE
true false false Approved 08.04.2010 08.04.2010 false
true false false Approved 15.12.2009 15.12.2009 false
true false false Approved 12.01.2010 12.01.2010 false
true false false Approved 04.08.2009 04.08.2009 false
true false false Approved 17.11.2009 17.11.2009 false
true false true Approved 08.01.2010 08.01.2010 false
true false true Approved 23.10.2009 23.10.2009 false
false false true Approved 17.10.2008 17.10.2008 false From IPA 2008
false true true Approved 19.10.2007 19.10.2007 false
false true true Approved 17.10.2008 17.10.2008 false
false false true Approved 17.10.2008 17.10.2008 false
false true true Approved 17.10.2008 17.10.2008 false From IPA 2008
false false true Approved 17.10.2008 17.10.2008 false
true false true Approved 05.03.2009 05.03.2009 false
true false true Approved 03.02.2009 03.02.2009 false
true false true Approved 09.12.2009 09.12.2009 false
true false true Approved 24.06.2009 24.06.2009 false
true false false Approved 24.06.2009 24.06.2009 false
true false false Approved 26.10.2009 26.10.2009 false
true false true Approved 24.06.2009 24.06.2009 false
true false false Approved 26.10.2009 26.10.2009 false
true false false Approved 10.06.2010 10.06.2010 false
false false false Approved 01.09.2009 01.09.2009 false
true false false Approved 07.12.2009 07.12.2009 false
true false false Approved 29.12.2009 29.12.2009 false
true false false Approved 04.01.2010 04.01.2010 false
true true true Approved 04.01.2010 04.01.2010 false
true true true Approved 28.12.2009 28.12.2009 false
true true true Approved 07.09.2010 07.09.2010 false
true true true Approved 07.09.2010 07.09.2010 false
false false true 30.04.2009
Under implementation 30.04.2009 true WBIF (Western Balkans Investment Fr
false false false Completed 30.01.2009 30.01.2009 true WBIF (Western Balkans Investment Fr
false false false 30.09.2009
Under implementation 30.09.2009 true WBIF (Western Balkans Investment Fr
false false true Approved 30.09.2009 30.09.2009 true WBIF (Western Balkans Investment Fr
false false true Approved 30.06.2010 30.06.2010 true WBIF (Western Balkans Investment Fr
false false false Approved 30.01.2011 30.01.2011 true WBIF (Western Balkans Investment Fr
false false true Appraisal 30.03.2011 30.03.2011 true WBIF (Western Balkans Investment Fr
false false true 30.11.2008
Under implementation 30.11.2008 true WBIF (Western Balkans Investment Fr
false false true Completed 30.07.2009 30.07.2009 true WBIF (Western Balkans Investment Fr
false false true Approved 28.02.2010 28.02.2010 true WBIF (Western Balkans Investment Fr
false false false Appraisal 28.02.2011 28.02.2011 true WBIF (Western Balkans Investment Fr
false false false Appraisal 28.02.2011 28.02.2011 true WBIF (Western Balkans Investment Fr
false false true 30.01.2011
Preparation phase 30.01.2011 true WBIF (Western Balkans Investment Fr
false false false Put on hold 08.12.2009 08.12.2009 true WBIF (Western Balkans Investment Fr
false false true 15.10.2010
Under implementation 15.10.2010 true WBIF (Western Balkans Investment Fr
false false true Approved 30.11.2010 30.11.2010 true WBIF (Western Balkans Investment Fr
false false true Approved 30.11.2010 30.11.2010 true WBIF (Western Balkans Investment Fr
false false true Approved 30.11.2010 30.11.2010 true WBIF (Western Balkans Investment Fr
false false false 30.08.2008
Under implementation 30.08.2008 true WBIF (Western Balkans Investment Fr
false false false Approved 30.10.2010 30.10.2010 true WBIF (Western Balkans Investment Fr
true false false 30.11.2009
Under implementation 30.11.2009 true WBIF (Western Balkans Investment Fr
false false false Approved 30.09.2009 30.09.2009 true WBIF (Western Balkans Investment Fr
false false false Approved 30.01.2011 30.01.2011 true WBIF (Western Balkans Investment Fr
false false false Approved 30.06.2010 30.06.2010 true WBIF (Western Balkans Investment Fr
false false false Approved 30.03.2010 30.03.2010 true WBIF (Western Balkans Investment Fr
false false false 01.01.2010
Preparation phase 01.01.2010 true WBIF (Western Balkans Investment Fr
false false false Approved 30.06.2010 30.06.2010 true WBIF (Western Balkans Investment Fr
true false false Approved 30.08.2008 30.08.2008 true WBIF (Western Balkans Investment Fr
true false true 30.10.2008
Under implementation 30.10.2008 true WBIF (Western Balkans Investment Fr
false false false Approved 28.02.2011 28.02.2011 true WBIF (Western Balkans Investment Fr
false false false Approved 30.12.2009 30.12.2009 true WBIF (Western Balkans Investment Fr
false false false Approved 30.10.2009 30.10.2009 true WBIF (Western Balkans Investment Fr
false false false Appraisal 28.02.2011 28.02.2011 true WBIF (Western Balkans Investment Fr
false false false 30.11.2009
Under implementation 30.11.2009 true WBIF (Western Balkans Investment Fr
false false false Approved 30.04.2010 30.04.2010 true WBIF (Western Balkans Investment Fr
false false false 30.09.2009
Under implementation 30.09.2009 true WBIF (Western Balkans Investment Fr
true true true Appraisal 10.05.2011 10.05.2011 true WBIF (Western Balkans Investment Fr
false false false Appraisal 30.12.2010 30.12.2010 true WBIF (Western Balkans Investment Fr
true false false Appraisal 30.12.2010 30.12.2010 true WBIF (Western Balkans Investment Fr
true false false 30.06.2010
Under implementation 30.06.2010 true WBIF (Western Balkans Investment Fr
true false false 30.12.2009
Under implementation 30.12.2009 true WBIF (Western Balkans Investment Fr
false false false Appraisal 30.12.2010 30.12.2010 true WBIF (Western Balkans Investment Fr
true false false 30.12.2009
Under implementation 30.12.2009 true WBIF (Western Balkans Investment Fr
false false false Appraisal 30.12.2010 30.11.2010 true WBIF (Western Balkans Investment Fr
false false false Appraisal 30.12.2010 30.12.2010 true WBIF (Western Balkans Investment Fr
true false false 30.12.2010
Under implementation 31.12.2010 false
true false false Appraisal 01.05.2011 01.05.2011 true WBIF (Western Balkans Investment Fr
false false false Approved 30.05.2010 30.05.2010 true WBIF (Western Balkans Investment Fr
false false false Completed 30.01.2010 30.01.2010 true WBIF (Western Balkans Investment Fr
false false false Appraisal 28.02.2011 28.02.2011 true WBIF (Western Balkans Investment Fr
false false false Completed 30.07.2010 30.07.2010 true WBIF (Western Balkans Investment Fr
false false true Completed 30.09.2009 30.09.2009 true WBIF (Western Balkans Investment Fr
false false false Completed 30.03.2010 30.03.2010 true WBIF (Western Balkans Investment Fr
false false false Completed 30.04.2010 30.04.2010 true WBIF (Western Balkans Investment Fr
false false false Appraisal 20.03.2009 20.03.2009 true WBIF (Western Balkans Investment Fr
false false false Appraisal 28.02.2011 28.02.2011 true WBIF (Western Balkans Investment Fr
false false false Appraisal 30.01.2011 30.01.2011 true WBIF (Western Balkans Investment Fr
false false false 30.11.2009
Under implementation 30.11.2009 true WBIF (Western Balkans Investment Fr
false false false Completed 30.03.2010 30.03.2010 true WBIF (Western Balkans Investment Fr
false false false 30.08.2009
Preparation phase 30.08.2009 true WBIF (Western Balkans Investment Fr
false false false 30.08.2009
Preparation phase 30.08.2009 true WBIF (Western Balkans Investment Fr
false false false 30.08.2009
Preparation phase 30.08.2009 true WBIF (Western Balkans Investment Fr
false false false 30.12.2010
Preparation phase 30.12.2010 true WBIF (Western Balkans Investment Fr
true false false 30.11.2009
Under implementation 30.11.2009 true WBIF (Western Balkans Investment Fr
false false false 30.11.2009
Preparation phase 30.11.2009 true WBIF (Western Balkans Investment Fr
false false false 30.09.2009
Under implementation 30.09.2009 false
false true false Approved 30.12.2010 30.12.2010 false
false true false Approved 30.12.2009 30.12.2009 false
false false false Approved 30.12.2008 30.12.2008 false
false true false Approved 30.12.2008 30.12.2008 false
false true false Approved 30.12.2008 30.12.2008 false
false true false Approved 30.12.2010 30.12.2010 false
false false false Approved 31.07.2008 31.07.2008 false
false false false Approved 31.07.2008 31.07.2008 false
false false true Approved 31.07.2008 31.07.2008 false
false true true Approved 31.12.2009 31.12.2009 false
false true true Appraisal 30.12.2010 30.12.2010 false
false false false Approved 04.04.2008 04.04.2008 false
false false false Approved 04.04.2008 04.04.2008 false
false false true Approved 01.04.2009 01.04.2009 false
false false false Approved 01.04.2008 01.04.2008 false
false false false Approved 01.04.2009 01.04.2009 false To contribute to sustainab
false true false Appraisal 30.12.2010 30.12.2010 false
false true false Approved 30.10.2010 30.12.2010 false
false true false Approved 30.12.2010 30.12.2010 false
false true false Approved 30.12.2010 30.12.2010 false
false true false Approved 30.12.2010 30.12.2010 false
false true true Approved 30.12.2010 30.12.2010 false
false true false Approved 30.12.2010 30.12.2010 false
false true false Approved 30.12.2010 30.12.2010 false
false false false Approved 30.12.2010 30.12.2010 false
false false false Approved 30.12.2010 30.12.2010 false
false true false Approved 08.11.2010 08.11.2010 false
false true false Approved 20.12.2007 20.12.2007 false
false true false Appraisal 30.12.2010 30.10.2010 false
false true false Appraisal 30.12.2010 30.12.2010 false
false true false Appraisal 30.12.2010 30.12.2010 false
false false false Approved 04.04.2008 04.04.2008 false
false false false Approved 04.04.2008 04.04.2008 false
false true false Approved 01.04.2009 01.04.2009 false
false false false Approved 04.04.2008 04.04.2008 false
false true false Approved 01.04.2009 01.04.2009 false
false true false Approved 14.09.2009 14.09.2009 false
false false false Approved 14.09.2009 14.09.2009 false
false true false Approved 30.05.2008 30.05.2008 false
false false false Approved 10.07.2009 10.07.2009 false
false true false Approved 30.12.2010 30.12.2010 false
false true false Approved 30.12.2010 30.12.2010 false
false true false Approved 30.12.2010 30.12.2010 false
false false false Approved 01.04.2009 01.04.2009 false
false false false Approved 04.04.2008 04.04.2008 false
false true false Completed 30.12.2007 30.12.2007 false
false true false Approved 30.12.2010 30.12.2010 false
false false false Approved 30.10.2007 30.12.2007 false
false true false Approved 30.06.2008 30.06.2008 false
false true false Approved 30.06.2007 30.06.2007 false
false true false Approved 30.06.2007 30.06.2007 false
false true false Appraisal 30.10.2010 30.10.2010 false
false true false Appraisal 30.10.2010 30.10.2010 false
false true true Approved 30.06.2007 30.06.2007 false
false true true Approved 31.03.2010 31.03.2010 false
false true true Approved 31.12.2009 31.12.2009 false
false true false Approved 01.01.2011 01.01.2011 false
false true false Completed 30.09.2008 30.09.2008 false
false true false Approved 30.09.2009 30.09.2009 false
false false false Approved 31.12.2010 31.12.2010 false
false true false Approved 30.06.2010 30.06.2010 false
false true false Approved 01.04.2011 01.04.2011 false
false true false Approved 31.03.2011 31.03.2011 false
false true false Approved 31.03.2011 31.03.2011 false
false false false Approved 31.03.2008 31.03.2008 false
false true false Approved 31.03.2009 31.03.2009 false
false false false Approved 01.04.2011 01.04.2011 false
false true false Approved 31.12.2010 31.12.2010 false
false true false Approved 31.03.2010 31.03.2010 false
false true false Approved 01.04.2011 01.04.2011 false
false false false Completed 31.03.2008 31.03.2008 false
false false false Completed 31.03.2008 31.03.2008 false
false false false Completed 30.06.2008 30.06.2008 false
false false false Approved 31.03.2010 31.03.2010 false
false false false Approved 31.03.2010 31.03.2010 false
false true false Approved 31.03.2009 31.03.2009 false
false false false Approved 30.06.2009 30.06.2009 false
false true false Approved 31.03.2010 31.03.2010 false
false false false Completed 30.06.2009 30.06.2009 false
false true false Approved 31.12.2010 31.12.2010 false
false true false Completed 31.03.2008 31.03.2008 false
false true false Approved 30.06.2010 30.06.2010 false
false true false Approved 30.09.2008 30.09.2008 false
false true false Completed 30.09.2007 30.09.2007 false
false true false Completed 31.12.2007 31.12.2007 false
false true false Approved 31.12.2009 31.12.2009 false
false true false Approved 31.03.2010 31.03.2010 false
false true false Completed 01.12.2007 01.12.2007 false
false false true Approved 31.12.2008 31.12.2008 false
false false false Approved 31.12.2008 31.12.2008 false
false true true Completed 31.12.2007 31.12.2007 false
false true false Approved 30.06.2009 30.06.2009 false
false true false Approved 31.12.2009 31.12.2009 false
false false false Completed 30.06.2008 30.06.2008 false
false true false Approved 01.09.2008 01.09.2008 false
false true false Approved 31.03.2009 31.03.2009 false
false true false Approved 30.06.2009 30.06.2009 false
false true false Approved 31.12.2009 31.12.2009 false
false true false Approved 31.03.2010 31.03.2010 false
false true false Approved 01.09.2009 01.09.2009 false
false true false Approved 28.02.2010 28.02.2010 false
false true false Approved 30.06.2010 30.06.2010 false
false true false Approved 30.06.2010 30.06.2010 false
false true false Approved 01.09.2010 01.09.2010 false
false true false Approved 30.06.2010 30.06.2010 false
false false false Approved 30.06.2009 30.06.2009 false
false false false Approved 30.06.2009 30.06.2009 false
false true false Approved 31.12.2009 31.12.2009 false
false true false Approved 30.09.2010 30.09.2010 false
false true false Approved 30.09.2010 30.09.2010 false
false true false Approved 31.07.2008 31.07.2008 false
false false false Approved 31.07.2008 31.07.2008 false
false false false Approved 31.07.2008 31.07.2008 false
false false false Approved 28.04.2011 31.12.2009 false
false false false Appraisal 31.12.2010 31.12.2010 false
false false false Appraisal 31.12.2010 31.12.2010 false
false true false Appraisal 31.12.2010 31.12.2010 false
false true false Appraisal 30.12.2010 30.12.2010 false
false true false Appraisal 30.12.2010 30.12.2010 false
false false false Appraisal 30.12.2010 30.12.2010 false
false false false Appraisal 30.12.2010 30.12.2010 false
false true false Completed 30.09.2010 30.09.2010 false
false true false Approved 30.11.2009 30.11.2009 false
false true false Approved 31.10.2009 31.10.2009 false
false true false Approved 31.07.2008 31.07.2008 false
false false false Approved 31.07.2008 31.07.2008 false
false true false Appraisal 30.12.2010 30.12.2010 false
false false false Approved 31.07.2008 31.07.2008 false
true true true Approved 22.03.2011 22.03.2011 false
true false false Approved 05.05.2011 05.05.2011 false
true true true Approved 20.12.2010 20.12.2010 false
true true true 09.12.2008
Under implementation 09.12.2008 false
true true true Approved 21.04.2009 21.04.2009 false
true false false Approved 28.04.2011 28.04.2011 false
true false false Approved 10.02.2011 10.02.2011 false
true false true Approved 19.02.2007 19.02.2007 false
true false true Approved 19.12.2009 19.12.2009 false
true false false Approved 04.03.2010 04.03.2010 false
true false true Approved 15.04.2010 15.04.2010 false
true false false Approved 30.09.2010 30.09.2010 false
false false false Approved 30.04.2007 30.04.2007 false
true false false Approved 19.04.2011 19.04.2011 false
true false false Approved 02.05.2011 02.05.2011 false
true false false Approved 16.05.2011 16.05.2011 false
false false true Completed 11.11.2010 30.09.2009 true WBIF (Western Balkans Investment Fr
false false true 01.01.2010
Under implementation 01.01.2010 false
false false false 01.02.2009
Under implementation 01.02.2009 false
false false false 01.12.2009
Under implementation 01.12.2009 false
false false false 15.12.2009
Under implementation 15.12.2009 false
true false false 01.03.2010
Under implementation 01.03.2010 false
false false false 01.10.2008
Under implementation 01.10.2008 false
false false false 15.03.2010
Under implementation 15.03.2010 false
false false false 01.01.2007
Under implementation 01.01.2007 false
false false false 01.01.2006
Under implementation 01.01.2006 false
true false false 05.06.2009
Under implementation 05.06.2009 false
false false false 01.01.2011
Under implementation 01.01.2011 false
false false false 01.01.2009
Under implementation 01.01.2009 false
false false false Approved 01.06.2011 01.06.2011 false
false false false 01.01.2007
Under implementation 01.01.2007 false
false false false 01.01.2009
Under implementation 01.01.2009 false
false false false 01.01.2010
Under implementation 01.01.2010 false
false false false 01.01.2010
Under implementation 01.01.2010 false
false false false 01.01.2008
Under implementation 01.01.2008 false
false false false 01.01.2009
Under implementation 01.01.2009 false
false false false 01.01.2010
Under implementation 01.01.2010 false
false false false 01.01.2009
Under implementation 01.01.2009 false
false false false 01.01.2009
Under implementation 01.01.2009 false
false false false Approved 01.01.2009 01.01.2009 false
false false false 01.01.2010
Under implementation 01.01.2010 false
true false true Approved 26.08.2010 26.08.2010 false
true false false Approved 26.08.2010 26.08.2010 false
true false true Approved 17.08.2010 17.08.2010 false
false false false Completed 30.11.2008 30.11.2008 false
false false false Completed 30.03.2010 30.03.2010 false
false false false Completed 30.03.2010 30.03.2010 false
false false false Completed 30.03.2009 30.03.2009 false
false false false Completed 28.02.2009 28.02.2009 false
false false false Completed 30.03.2009 30.09.2009 false
false false false Completed 30.03.2009 30.03.2009 false
false false false Completed 30.05.2007 30.05.2007 false
false false false Completed 30.01.2009 30.01.2009 false
false false false Completed 30.05.2009 30.05.2009 false
false false false Completed 30.06.2011 30.06.2010 false
false false false Completed 30.08.2010 30.08.2010 false
false false false Completed 30.10.2009 30.10.2009 false
false false false Completed 30.06.2010 30.06.2010 false
false false false 30.06.2010
Under implementation 30.06.2010 false
false false false Completed 30.07.2009 30.07.2009 false
false false false 30.09.2009
Under implementation 30.09.2009 false
false false false Completed 30.06.2009 30.06.2009 false
false false false 30.04.2008
Under implementation 30.04.2008 false
false false false 30.01.2008
Under implementation 30.01.2008 false
false false false 30.03.2010
Under implementation 30.03.2010 false
false false false Approved 30.01.2007 30.01.2007 false
false false false Approved 20.02.2008 20.02.2008 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 28.12.2007 28.12.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 30.11.2006 30.11.2006 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false false false Approved 01.01.2008 01.01.2008 false
false true false Approved 28.05.2009 08.05.2009 false
false true false Approved 03.06.2009 03.06.2009 false
false false false Approved 19.06.2009 19.06.2009 false
false false false Approved 01.09.2009 01.09.2009 false
false false false Approved 30.01.2010 30.01.2010 false
false false false Approved 01.01.2007 01.01.2007 false
false false false Approved 30.11.2008 30.11.2008 false
false false false Approved 30.12.2008 30.12.2008 false
false false false Approved 30.01.2009 30.01.2009 false
false false false Approved 01.01.2009 01.01.2009 false
false false false Approved 01.05.2009 01.05.2009 false
false false false Approved 01.01.2008 01.01.2008 false
false false true Appraisal 24.06.2011 24.06.2011 true WBIF (Western Balkans Investment Fr
false false true Appraisal 24.06.2011 24.06.2011 true WBIF (Western Balkans Investment Fr
false false true Appraisal 24.06.2011 24.06.2011 true WBIF (Western Balkans Investment Fr
false false true Appraisal 24.06.2011 24.06.2011 true WBIF (Western Balkans Investment Fr
false false true Appraisal 24.06.2011 24.06.2011 true WBIF (Western Balkans Investment Fr
false false true Appraisal 24.06.2011 24.06.2011 true WBIF (Western Balkans Investment Fr
false false true Appraisal 24.06.2011 24.06.2011 true WBIF (Western Balkans Investment Fr
false false true Appraisal 24.06.2011 24.06.2011 true WBIF (Western Balkans Investment Fr
false false true Appraisal 24.06.2011 24.06.2011 true WBIF (Western Balkans Investment Fr
false false false Appraisal 16.06.2011 26.06.2011 true WBIF (Western Balkans Investment Fr
false false true Appraisal 26.06.2011 26.06.2011 true WBIF (Western Balkans Investment Fr
false false false Appraisal 26.06.2011 26.06.2011 true WBIF (Western Balkans Investment Fr
Effective Source
Expected Completion CompletionCheck Validation Validation Date
Source Check Date Check User
Validation Contact Created at
20.01.2009 false false 30.09.2010
Zoran Nikolovski
31.03.2008 false false 30.09.2010
Zoran Nikolovski
01.03.2009 false false 30.09.2010
Florent Bakija
Albania and World
Environmental aspects: As the objective of the project is to safeguard the hydroelectric plants of
Rowland - improve their operational effic
true 24.11.2010 true 30.09.2010
30.04.2011 Alexander Claire Chretien Bank
true 08.02.2011 true 29.04.2011 Alexander Rowland - World Bank
Alexander Rowland
30.09.2010
Environmental aspects: The Partial Risk Guarantee does not cover any physical works, therefore this is an Environmental Category C proje
01.01.2011 false false 30.09.2010
Florent Bakija
01.04.2010 true 18.12.2010 false 30.09.2010
Zoran Nikolovski
30.10.2008 false false 30.09.2010
Zoran Nikolovski
01.10.2008 false false 30.09.2010
Zoran Nikolovski
31.12.2009 false false 30.09.2010
Zoran Nikolovski
30.09.2011 false true Claire Smith 30.09.2010
06.05.2011 CEB - - Council of Europe Development Bank
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Zoran Nikolovski
01.11.2011 false false 30.09.2010
Florent Bakija
01.06.2009 false false 30.09.2010
Florent Bakija
01.06.2009 false false 30.09.2010
01.03.2008 false false 30.09.2010
Zoran Nikolovski
01.04.2008 false false 30.09.2010
Florent Bakija
31.12.2009 31.12.2009 true 18.12.2010 false 30.09.2010
Zoran Nikolovski
30.06.2010 30.06.2010 true 18.12.2010 false 30.09.2010
Zoran Nikolovski
30.11.2009 false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
01.07.2010 true 09.11.2010 false 30.09.2010
Zoran Nikolovski
true 18.12.2010 false 30.09.2010
01.04.2012 true 18.12.2010 false 30.09.2010
Zoran Nikolovski
01.04.2011 true 09.11.2010 false 30.09.2010
Zoran Nikolovski
false
Financed through IPA 09 Multibeneficiary programme false 30.09.2010
31.12.2009 false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
31.12.2010 false false 30.09.2010
Zoran Nikolovski
01.01.2010 false false 30.09.2010
Florent Bakija
01.09.2009 false false 30.09.2010
Florent Bakija
07.06.2009 false false 30.09.2010
Florent Bakija
31.12.2008 false false 30.09.2010
Florent Bakija
01.12.2009 false false 30.09.2010
Florent Bakija
31.12.2008 false false 30.09.2010
Florent Bakija
false false 30.09.2010
Florent Bakija
false false 30.09.2010
Florent Bakija
false false 30.09.2010
Florent Bakija
false false 30.09.2010
Florent Bakija
false false 30.09.2010
Florent Bakija
false false 30.09.2010
Florent Bakija
false false 30.09.2010
Florent Bakija
false false 30.09.2010
Florent Bakija
false false 30.09.2010
Florent Bakija
31.07.2010 false false 30.09.2010
Florent Bakija
30.06.2009 false false 30.09.2010
Florent Bakija
15.11.2009 false false 30.09.2010
Florent Bakija
01.04.2010 false false 30.09.2010
Florent Bakija
31.12.2010 false false 30.09.2010
Florent Bakija
31.12.2009 false false Florent Bakija30.09.2010
31.12.2010 false false 30.09.2010
Zoran Nikolovski
31.12.2009 false false Florent Bakija30.09.2010
29.07.2008 false false Florent Bakija30.09.2010
12.04.2007 false false Florent Bakija30.09.2010
25.07.2007 false false Florent Bakija30.09.2010
25.11.2008 false false Florent Bakija30.09.2010
17.04.2008 false false Florent Bakija30.09.2010
22.12.2008 false false Florent Bakija30.09.2010
07.06.2008 false false Florent Bakija30.09.2010
false false Florent Bakija30.09.2010
31.08.2012 false true Claire Smith 30.09.2010
06.05.2011 CEB - - Council of Europe Development Bank
false true Alexander Rowland
30.09.2010
03.05.2011 Alexander Rowland - World Bank
31.12.2011 true 09.11.2010 false 30.09.2010
Zoran Nikolovski
31.12.2011 false false 30.09.2010
Zoran Nikolovski
31.03.2011 true 09.11.2010 false 30.09.2010
Claire Chretien
in Albania is about 15,000 km.The network comprises 3,412 km of national, or primary, roads admini
The overall length of the road networkfalse false 30.09.2010
Claire Chretien
30.09.2010 false false 30.09.2010
Zoran Nikolovski
30.09.2011 false false 30.09.2010
Zoran Nikolovski
01.03.2011 false false Florent Bakija30.09.2010
01.12.2008 false false Florent Bakija30.09.2010
false false Florent Bakija30.09.2010
false false Florent Bakija30.09.2010
false false Florent Bakija30.09.2010
true 09.11.2010 false Claire Vlore 30.09.2010 River Vjosa
Environmental aspects: The project involves construction of a new 24.2 km road with 4-lanes from Levan toChretien crossing the
true ferry terminal and Rafael Bravo30.09.2010
Corrales
Environmental aspects: The construction of a new 21.10.2010 false rehabilitation of Quays 7 and 8 are anticipated to have limited environm
false
Environmental aspects: The project has been screened as B/1 false Zoran Nikolovski
30.09.2010
requiring an environmental analysis and review of the environmental status a
located for the most partfalse urban setting and has thereforeZoran Nikolovskion the biological enviro
Environmental aspects: The Project isfalse in an 30.09.2010
limited impacts
false false Claire Chretienenvironmental concerns a
Environmental aspects: The Bank?s services will take particular care to ensure that proper attention is given to all30.09.2010
30.12.2012 true 21.02.2011 false Corrales
Rafael Bravo30.09.2010
31.03.2011 false false 30.09.2010
Claire Chretien
31.12.2012 true 10.11.2010 false 30.09.2010
Claire Chretien
03.01.2009 false false 30.09.2010
Zoran Nikolovski
12.01.2009 false false Florent Bakija30.09.2010
12.01.2010 false false Florent Bakija30.09.2010
04.01.2009 false false Florent Bakija30.09.2010
false false Florent Bakija30.09.2010
false false Florent Bakija30.09.2010
02.01.2009 false false Florent Bakija30.09.2010
false false Florent Bakija30.09.2010
false false 30.09.2010
Zoran Nikolovski
30.06.2012 true 09.11.2010 false Zoran Nikolovski
30.09.2010
Environmental aspects: Environmentally sensitive areas located downstream the waterways will have less pressure from demographic and
31.03.2010 true 18.12.2010 false 30.09.2010
Zoran Nikolovski
true 09.11.2010 false 30.09.2010
31.12.2009 false false 30.09.2010
Zoran Nikolovski
false false Florent Bakija30.09.2010
false false Florent Bakija30.09.2010
false false Florent Bakija30.09.2010
01.01.2010 false false 30.09.2010
Zoran Nikolovski
false false Florent Bakija30.09.2010
false false Florent Bakija30.09.2010
false false Florent Bakija30.09.2010
false false 30.09.2010
Florent Bakija
false false 30.09.2010
Florent Bakija
false false 30.09.2010
Florent Bakija
false false 30.09.2010
Florent Bakija
false false 30.09.2010
Florent Bakija
03.01.2010 false false Completion 30.09.2010
Environmental aspects: Approval date: 2007.0Preparation or timing: ongoing Start date: 01/10/2007 -Florent Bakija date: 01/03/2010Currency
04.01.2010 false false 30.09.2010
Florent Bakija
false false 30.09.2010
Florent Bakija
31.12.2009 false false 30.09.2010
Florent Bakija
false false 30.09.2010
Florent Bakija
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Florent Bakija
06.07.2007 false false 30.09.2010
Florent Bakija
31.12.2007 31.12.2007 false false 30.09.2010
Katja Kottmann
false false 30.09.2010
Katja Kottmann
31.12.2012 false false 30.09.2010
Katja Kottmann
31.12.2009 31.12.2010 false false 30.09.2010
Katja Kottmann
false false 30.09.2010
Environmental aspects: The measures of this project contribute significantly to the protection of Lake Shkodra and the water resources of th
30.09.2010 likely no 05.05.2011 Alexander Alexander Rowland 30.09.2010
Environmental aspects: The project isfalse to have minimal or trueadverse environmental impacts. Rowland - World Bank
31.03.2012 true trigger the true 05.05.2011 Alexander Rowland - for technical
Claire Chretien
30.09.2010
Environmental aspects: While the project does not 16.02.2011Bank Safeguard Policies, Terms of References World Bank assistance suppo
false false 30.09.2010
Zoran Nikolovski
30.03.2011 false false 30.09.2010
Zoran Nikolovski
31.12.2008 false false 30.09.2010
Jelena Festini
14.06.2008 false false 30.09.2010
Zoran Nikolovski
31.12.2007 false false 30.09.2010
Zoran Nikolovski
20.03.2009 false false 30.09.2010
Zoran Nikolovski
11.02.2011 false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Jelena Festini
false false Ian Brown 30.09.2010
false false 30.09.2010
false false 30.09.2010
Claire Chretien
31.12.2014 false false 30.09.2010
Katja Kottmann
31.12.2014 false false 30.09.2010
Katja Kottmann
30.09.2009 false false 30.09.2010
Zoran Nikolovski
31.12.2009 false false 30.09.2010
Zoran Nikolovski
30.12.2008 false false 30.09.2010
Zoran Nikolovski
01.11.2010 false false 30.09.2010
Zoran Nikolovski
31.12.2010 false true Claire Chretien
30.09.2010
06.05.2011 CEB - - Council of Europe Development Bank
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Katja Kottmann
false false 30.09.2010
Katja Kottmann
false false 30.09.2010
Katja Kottmann
31.12.2015 false false 30.09.2010
Katja Kottmann
false true Alexander Rowland
30.09.2010
06.05.2011 Alexander Rowland - World Bank
ty Environmental Investment Programme)true 14.02.2011 true Alexander Rowland
30.09.2010
06.05.2011 Alexander Rowland - World Bank
30.12.2008 false false 30.09.2010
Zoran Nikolovski
30.06.2010 false false 30.09.2010
Zoran Nikolovski
30.03.2009 false false 30.09.2010
Zoran Nikolovski
30.03.2009 false false 30.09.2010
Zoran Nikolovski
30.06.2009 false false 30.09.2010
Zoran Nikolovski
30.12.2009 false false 30.09.2010
30.06.2010 false false 30.09.2010
30.06.2010 false false 30.09.2010
Jelena Festini
30.09.2009 false false 30.09.2010
Jelena Festini
false false 30.09.2010
Jelena Festini
30.09.2010 false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Jelena Festini
30.09.2010 false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
31.08.2008 false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
31.12.2007 false false 30.09.2010
Zoran Nikolovski
30.10.2010 false false 30.09.2010
Jelena Festini
31.03.2011 false false 30.09.2010
Jelena Festini
30.09.2010 false false 30.09.2010
Zoran Nikolovski
31.12.2007 false false 30.09.2010
Zoran Nikolovski
31.12.2007 false false 30.09.2010
Zoran Nikolovski
31.12.2007 false false 30.09.2010
Zoran Nikolovski
30.09.2009 false false 30.09.2010
Zoran Nikolovski
30.12.2010 true 14.02.2011 true Alexander Rowland
06.05.2011 Alexander Rowland - World Bank30.09.2010
true 14.02.2011 false 30.09.2010
Claire Chretien
30.06.2009 false false 30.09.2010
Zoran Nikolovski
15.10.2008 false false 30.09.2010
Zoran Nikolovski
false
uth East European Transport Observatory) false Corrales
Rafael Bravo30.09.2010
tern Balkans Investment Framework) false false Corrales
Rafael Bravo30.09.2010
false false the scope of the investment programm
Corrales
Environmental aspects: The proposed project has been screened IEE, requiring a site visit to review Rafael Bravo30.09.2010
false false 30.09.2010
Zoran Nikolovski
false
uth East European Transport Observatory) false 30.09.2010
Claire Chretien
false false 30.09.2010
Claire Chretien
30.12.2011 true 14.02.2011 true Alexander Rowland
06.05.2011 Alexander Rowland - World Bank30.09.2010
30.03.2011 false false 30.09.2010
Zoran Nikolovski
false
ty Environmental Investment Programme) false 30.09.2010
Zoran Nikolovski
30.09.2010 false false 30.09.2010
Zoran Nikolovski
30.09.2010 false false 30.09.2010
Zoran Nikolovski
15.06.2010 false false 30.09.2010
Zoran Nikolovski
31.12.2009 false false 30.09.2010
Zoran Nikolovski
31.12.2009 false false 30.09.2010
Zoran Nikolovski
01.08.2011 false false 30.09.2010
Zoran Nikolovski
31.03.2010 false false 30.09.2010
Jelena Festini
31.12.2007 false false 30.09.2010
Zoran Nikolovski
30.06.2009 false false 30.09.2010
Jelena Festini
08.02.2010 false false 30.09.2010
Zoran Nikolovski
30.04.2011 false false 30.09.2010
Zoran Nikolovski
31.12.2008 true 22.02.2011 false 30.09.2010
Zoran Nikolovski
30.12.2012 true 14.02.2011 true Claire Chretien
10.05.2011 Alexander Rowland - World Bank30.09.2010
false false Jelena Festini
30.09.2010
Environmental aspects: Environmental due diligence needs to be carried out to identify current environmental conditions and to predict pote
false
ty Environmental Investment Programme) false 30.09.2010
Claire Chretien
30.09.2012 false false 30.09.2010
Claire Chretien
30.12.2012 false false 30.09.2010
Claire Chretien
30.03.2014 false true Claire Chretien
30.09.2010
06.05.2011 Alexander Rowland - World Bank
30.12.2010 true 15.02.2011 true Alexander Rowland
30.09.2010
06.05.2011 Alexander Rowland - World Bank
31.12.2009 false false 30.09.2010
Zoran Nikolovski
30.09.2011 false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Claire Chretien
false false 30.09.2010
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Claire Chretien
30.12.2012 false true Alexander Rowland
30.09.2010
10.05.2011 Alexander Rowland - World Bank
true 15.02.2011 true Alexander Rowland
30.09.2010
10.05.2011 Alexander Rowland - World Bank
30.12.2013 false false 30.09.2010
Zoran Nikolovski
30.06.2011 false false 30.09.2010
Zoran Nikolovski
30.09.2013 false false 30.09.2010
Zoran Nikolovski
31.03.2012 false false 30.09.2010
Zoran Nikolovski
30.06.2010 false false 30.09.2010
Zoran Nikolovski
30.12.2010 false false 30.09.2010
Zoran Nikolovski
false a major expansion and/or modernisation of the existing Okoli gas storage fa
Environmental aspects: Use of proceeds is not associated withfalse Jelena Festini30.09.2010
false false Zoran Nikolovski
30.09.2010
Environmental aspects: The Project has been screened as B/1. An Environmental Impact Assessment (EIA) for this project was carried out
false
uth East European Transport Observatory) false 30.09.2010
Claire Chretien
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Zoran Nikolovski
30.09.2014 true 14.02.2011 true Alexander Rowland
30.09.2010
10.05.2011 Alexander Rowland - World Bank
30.12.2010 false true Alexander Rowland
30.09.2010
10.05.2011 Alexander Rowland - World Bank
30.06.2010 false false 30.09.2010
Zoran Nikolovski
false
ty Environmental Investment Programme) false Jelena Festini30.09.2010
30.12.2011 false false 30.09.2010
Zoran Nikolovski
30.09.2011 false false 30.09.2010
Zoran Nikolovski
30.12.2010 false false 30.09.2010
Zoran Nikolovski
false
ty Environmental Investment Programme) false 30.09.2010
Zoran Nikolovski
30.12.2009 false false 30.09.2010
Zoran Nikolovski
false
ty Environmental Investment Programme) false 30.09.2010
Zoran Nikolovski
false
ty Environmental Investment Programme) false 30.09.2010
Zoran Nikolovski
MoFA false
Preparation or timing: The Norwegianfalse technical assistance project has been completed. 30.09.2010
Zoran Nikolovski
false
ty Environmental Investment Programme) false 30.09.2010
Zoran Nikolovski
false
ty Environmental Investment Programme) false 30.09.2010
Zoran Nikolovski
30.12.2009 false false 30.09.2010
Zoran Nikolovski
30.12.2010 false false Jelena Festini30.09.2010
30.12.2010 false false 30.09.2010
Zoran Nikolovski
30.12.2012 false false Jelena Festini30.09.2010
30.12.2012 false false 30.09.2010
Zoran Nikolovski
30.12.2012 false false 30.09.2010
Zoran Nikolovski
30.12.2011 false false 30.09.2010
Zoran Nikolovski
false
ty Environmental Investment Programme) false 30.09.2010
Zoran Nikolovski
30.12.2012 false false 30.09.2010
Zoran Nikolovski
30.12.2011 false false 30.09.2010
Zoran Nikolovski
30.12.2011 false false 30.09.2010
Zoran Nikolovski
30.12.2012 false false 30.09.2010
Zoran Nikolovski
30.12.2013 false false 30.09.2010
Zoran Nikolovski
31.12.2013 false false 30.09.2010
Zoran Nikolovski
false false Zoran Nikolovski
30.09.2010
Environmental aspects: This project presents significant environmental opportunities to enhance waste management and improve waste dis
false false Zoran Nikolovski
30.09.2010
Environmental aspects: The environmental due diligence is being carried out by Consultants as part of the feasibility study and project prepa
false false 30.09.2010
Claire Chretien
false false Katja Kottmann30.09.2010
true 15.02.2011 true Alexander Rowland
30.09.2010
10.05.2011 Alfred Olli - ALB - Ministry of Interior
30.12.2012 false false 30.09.2010
true 15.02.2011 true Alexander Rowland
30.09.2010
10.05.2011 Alexander Rowland - World Bank
false false Corrales
Rafael Bravo30.09.2010
31.12.2012 true 09.11.2010 false 30.09.2010
Zoran Nikolovski
true 18.12.2010 false Zoran Nikolovski
30.09.2010
Environmental aspects: The Energy Community Treaty includes the requirement that acquis on the Environment is complied with. Previous
31.12.2013 true 18.12.2010 be part Zoran Nikolovski
Activity 1. Environmental
Environmental aspects: Environmental impact assessment will false of design phase for the actions included in 30.09.2010
31.12.2010 true 14.02.2011 false 30.09.2010
31.12.2009 true 14.02.2011 false 30.09.2010
31.12.2011 false false Katja Kottmann30.09.2010
31.12.2012 true 09.11.2010 false 30.09.2010
Zoran Nikolovski
31.12.2012 false false Katja Kottmann30.09.2010
30.06.2012 false false 30.09.2010
Zoran Nikolovski
31.12.2010 false false 30.09.2010
Zoran Nikolovski
31.12.2010 false false 30.09.2010
Zoran Nikolovski
31.12.2015 false false 30.09.2010
Zoran Nikolovski
31.12.2012 true 09.11.2010 false 30.09.2010
Zoran Nikolovski
30.06.2012 false false 30.09.2010
Zoran Nikolovski
31.12.2011 true 18.12.2010 false 30.09.2010
Zoran Nikolovski
31.12.2011 true 09.11.2010 false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
30.06.2012 true 14.02.2011 true Alexander Rowland
30.09.2010
10.05.2011 Alexander Rowland - World Bank
31.12.2010 true 14.02.2011 true Alexander Rowland
30.09.2010
10.05.2011 Alexander Rowland - World Bank
31.12.2010 true 09.11.2010 false 30.09.2010
Zoran Nikolovski
upgraded legislation on Civil Aviation must take in consideration all the requirements of the Commissi
Environmental aspects: The new and true 18.12.2010 false 30.09.2010
Zoran Nikolovski
30.06.2012 true 09.11.2010 false 30.09.2010
Zoran Nikolovski
31.12.2012 true 09.11.2010 false 30.09.2010
Zoran Nikolovski
31.12.2013 false false Katja Kottmann30.09.2010
beneficiary to implement an ?internal e
Environmental aspects: The support to the institutions will include a specific component to assist the Zoran Nikolovski
true 18.12.2010 false 30.09.2010
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false Rafael Bravo30.09.2010
Corrales
Environmental aspects: The project involves the provision of funds for investments at an electricity distribution company. In line with the Ban
31.12.2010 false false Florent Bakija30.09.2010
31.12.2008 false false Florent Bakija30.09.2010
31.12.2012 true 09.11.2010 false 30.09.2010
Zoran Nikolovski
false comply Claire Chretien appropriate.
as
Environmental aspects: Final beneficiaries will be requested to false with applicable national and EU legislation,30.09.2010
31.12.2015 false false 30.09.2010
31.12.2009 false false Florent Bakija30.09.2010
false false 30.09.2010
false false 30.09.2010
Zoran Nikolovski
31.12.2010 true 18.12.2010 false 30.09.2010
Zoran Nikolovski
has a longstanding
Environmental aspects: The European Community09.11.2010 false commitment to address environmental concerns in its assistance pro
true 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
31.12.2010 true 18.12.2010 false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
true 18.12.2010 false Zoran Nikolovskicontracts.
Preparation or timing: At this stage it is not possible to identify the precise implementing schedule of the individual30.09.2010But clearly the
true 18.12.2010 false 30.09.2010
Zoran Nikolovski
31.12.2010 true 18.12.2010 false 30.09.2010
Zoran Nikolovski
31.12.2010 true 09.11.2010 false 30.09.2010
Zoran Nikolovski
true 18.12.2010 false Zoran Nikolovski
30.09.2010
Environmental aspects: The training activities will include a specific component to train beneficiary staff in the different aspects of mainstrea
31.03.2012 true 18.12.2010 false 30.09.2010
Zoran Nikolovski
false false Florent Bakija 30.09.2010
false false 30.09.2010
Zoran Nikolovski
false false Florent Bakija 30.09.2010
false false Florent Bakija 30.09.2010
false false Florent Bakija 30.09.2010
false false Florent Bakija 30.09.2010
false false Florent Bakija 30.09.2010
false false Florent Bakija 30.09.2010
false false Florent Bakija 30.09.2010
false false Florent Bakija 30.09.2010
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false Florent Bakija 30.09.2010
false false 30.09.2010
Zoran Nikolovski
false false Florent Bakija 30.09.2010
false false Florent Bakija 30.09.2010
false false 30.09.2010
Zoran Nikolovski
11.01.2011 false false 30.09.2010
Zoran Nikolovski
31.12.2013 false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false true Claire Smith 30.09.2010
09.05.2011 CEB - - Council of Europe Development Bank
31.12.2012 false true Claire Smith 30.09.2010
09.05.2011 CEB - - Council of Europe Development Bank
31.03.2014 true 14.02.2011 true Alexander Rowland
30.09.2010
10.05.2011 Alexander Rowland - World Bank
31.12.2011 false false Claire Chretien30.09.2010
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
false false Rafael Bravo30.09.2010
Corrales
Environmental aspects: The project will consist mainly of road rehabilitation and potential environmental impacts will be temporary and will c
31.03.2013 true 14.02.2011 false 30.09.2010
31.12.2011 true 14.02.2011 false 30.09.2010
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
false false Florent Bakija 30.09.2010
false false Florent Bakija 30.09.2010
31.12.2012 false false 30.09.2010
Zoran Nikolovski
Environmental aspects: The project isfalse false
directly related and contributes to environmental improvement.Zoran Nikolovski30.09.2010
31.12.2012 true 18.12.2010 false 30.09.2010
Zoran Nikolovski
false false Florent Bakija 30.09.2010
false false 30.09.2010
Zoran Nikolovski
false false Florent Bakija 30.09.2010
false false 30.09.2010
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Florent Bakija
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false providing betterdrinking water to the p
30.09.2010
Environmental aspects: The project will generally benefit the environment and public health, either byClaire Chretien
31.12.2015 false false 30.09.2010
Katja Kottmann
31.12.2012 false false 30.09.2010
Katja Kottmann
31.12.2013 false false 30.09.2010
Katja Kottmann
30.12.2009 false false 30.09.2010
Zoran Nikolovski
03.01.2011 false false 30.09.2010
false false 30.09.2010
Jelena Festini
31.12.2011 false true Alexander Rowland
30.09.2010
10.05.2011 Alexander Rowland - World Bank
30.12.2012 false true Alexander Rowland
30.09.2010
10.05.2011 Alexander Rowland - World Bank
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Katja Kottmann
31.12.2015 false false 30.09.2010
Katja Kottmann
31.12.2015 false false 30.09.2010
Katja Kottmann
31.12.2015 false false 30.09.2010
Katja Kottmann
31.12.2015 false false 30.09.2010
Katja Kottmann
30.03.2010 false false 30.09.2010
Zoran Nikolovski
30.06.2012 false false 30.09.2010
Zoran Nikolovski
30.09.2010 false false 30.09.2010
Zoran Nikolovski
30.06.2010 false false 30.09.2010
Zoran Nikolovski
30.03.2012 false false 30.09.2010
Zoran Nikolovski
30.12.2009 false false 30.09.2010
Zoran Nikolovski
true 15.02.2011 true Alexander Rowland
30.09.2010
10.05.2011 Alexander Rowland - World Bank
30.09.2010 false false 30.09.2010
Claire Chretien
false false Corrales
Rafael Bravo30.09.2010
false
uth East European Transport Observatory) false Corrales
Rafael Bravo30.09.2010
false false 30.09.2010
Claire Chretien
30.06.2011 false false 30.09.2010
Zoran Nikolovski
30.03.2011 false false 30.09.2010
Zoran Nikolovski
ty Environmental Investment Programme)false false Corrales
Rafael Bravo30.09.2010
ty Environmental Investment Programme)false false 30.09.2010
Claire Chretien
31.12.2014 false false 30.09.2010
Katja Kottmann
30.09.2011 false true Alexander Rowland
30.09.2010
10.05.2011 Alexander Rowland - World Bank
false false 30.09.2010
false false 30.09.2010
false false 30.09.2010
Zoran Nikolovski
false false Claire Chretien
30.09.2010
Environmental aspects: The financial intermediaries will be requested to ensure compliance of the sub-projects with relevant national and E
31.12.2015 false true Claire Smith 30.09.2010
09.05.2011 CEB - - Council of Europe Development Bank
false false 30.09.2010
Zoran Nikolovski
30.12.2013 false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
false false 30.09.2010
Jelena Festini
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false true Ian Brown 30.09.2010
22.03.2011 Ian Brown - European Bank for Reconstruction and
false false 30.09.2010
Claire Chretien
31.12.2012 false false 30.09.2010
Claire Chretien
30.06.2010 false true Alexander Rowland
30.09.2010
10.05.2011 Alexander Rowland - World Bank
30.12.2014 false false 30.09.2010
Zoran Nikolovski
30.12.2011 false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false Jelena Festini30.09.2010
31.12.2011 false true Claire Smith 30.09.2010
09.05.2011 CEB - - Council of Europe Development Bank
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Claire Chretien
31.12.2013 false false Katja Kottmann30.09.2010
31.12.2012 false false Katja Kottmann30.09.2010
31.12.2012 false false Katja Kottmann30.09.2010
31.12.2015 false false Katja Kottmann30.09.2010
31.12.2015 false false Katja Kottmann30.09.2010
31.12.2022 false false Katja Kottmann30.09.2010
30.12.2012 false true Claire Chretien
30.09.2010
10.05.2011 Alexander Rowland - World Bank
30.12.2012 false false 30.09.2010
30.12.2010 false false 30.09.2010
30.12.2013 false false 30.09.2010
30.12.2013 false false 30.09.2010
30.12.2011 false false 30.09.2010
31.12.2013 false false 30.09.2010
30.12.2010 false false 30.09.2010
30.12.2010 false false 30.09.2010
30.12.2010 false false 30.09.2010
30.12.2010 false false 30.09.2010
30.12.2010 false false 30.09.2010
Zoran Nikolovski
30.12.2010 false false 30.09.2010
30.12.2012 false false 30.09.2010
30.12.2011 false false Jelena Festini30.09.2010
30.12.2014 true 02.02.2011 false 30.09.2010
Zoran Nikolovski
31.12.2013 false false 30.09.2010
false false 30.09.2010
false false 30.09.2010
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false Jelena Festini30.09.2010
false false Jelena Festini30.09.2010
false false 30.09.2010
Zoran Nikolovski
31.12.2011 false true Claire Smith 30.09.2010
09.05.2011 CEB - - Council of Europe Development Bank
false false 30.09.2010
Claire Chretien
30.12.2011 false true Alexander Rowland
30.09.2010
10.05.2011 Alexander Rowland - World Bank
30.12.2010 false false 30.09.2010
30.12.2012 false false 30.09.2010
30.12.2012 false false 30.09.2010
30.12.2010 false false 30.09.2010
30.12.2012 false false 30.09.2010
Jelena Festini
31.12.2013 false false 30.09.2010
31.12.2013 false false 30.09.2010
Jelena Festini
false false 30.09.2010
Zoran Nikolovski
false
uth East European Transport Observatory) false Corrales
Rafael Bravo30.09.2010
false false 30.09.2010
Zoran Nikolovski
false false Corrales
Rafael Bravo30.09.2010
false false 30.09.2010
false false 30.09.2010
Claire Chretien
false
uth East European Transport Observatory) false 30.09.2010
Claire Chretien
false false 30.09.2010
Claire Chretien
30.09.2015 true 15.02.2011 false 30.09.2010
30.06.2011 false true Alexander Rowland
30.09.2010
10.05.2011 Alexander Rowland - World Bank
30.12.2012 false false 30.09.2010
Zoran Nikolovski
30.12.2012 false false 30.09.2010
Zoran Nikolovski
30.12.2011 false false 30.09.2010
Zoran Nikolovski
30.12.2012 false false 30.09.2010
Zoran Nikolovski
30.12.2012 false false 30.09.2010
Zoran Nikolovski
30.12.2010 false false 30.09.2010
Zoran Nikolovski
30.11.2011 false false 30.09.2010
Zoran Nikolovski
30.12.2011 false false 30.09.2010
Zoran Nikolovski
30.12.2013 false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Jelena Festini
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false 30.09.2010
Zoran Nikolovski
false false Corrales
Rafael Bravo30.09.2010
false false 30.09.2010
Claire Chretien
false false 30.09.2010
Katja Kottmann
30.09.2012 false false 30.09.2010
true 14.02.2011 true Alexander Rowland
30.09.2010
10.05.2011 Alexander Rowland - World Bank
30.09.2012 false false 21.10.2010
30.03.2012 false false 21.10.2010
Zoran Nikolovski
30.09.2011 false false 21.10.2010
Zoran Nikolovski
30.09.2011 false false 21.10.2010
Zoran Nikolovski
30.09.2010 true 21.10.2010 false 21.10.2010
Zoran Nikolovski
30.09.2011 true 21.10.2010 false 21.10.2010
Jelena Festini
30.03.2010 true 21.10.2010 false 21.10.2010
Zoran Nikolovski
30.06.2012 true 21.10.2010 false 21.10.2010
Zoran Nikolovski
30.06.2012 true 21.10.2010 false 21.10.2010
Zoran Nikolovski
30.09.2011 true 21.10.2010 false 21.10.2010
Zoran Nikolovski
30.09.2011 true 21.10.2010 false 21.10.2010
Zoran Nikolovski
30.12.2012 true 21.10.2010 false 21.10.2010
Zoran Nikolovski
30.10.2010 true 21.10.2010 false 21.10.2010
Zoran Nikolovski
30.12.2010 true 21.10.2010 false 21.10.2010
Zoran Nikolovski
30.12.2011 true 21.10.2010 false 21.10.2010
Zoran Nikolovski
30.12.2013 true 21.10.2010 false 21.10.2010
Zoran Nikolovski
30.09.2012 true 22.10.2010 false 22.10.2010
Zoran Nikolovski
30.09.2012 true 22.10.2010 false 22.10.2010
Zoran Nikolovski
30.12.2012 true 22.10.2010 false 22.10.2010
Zoran Nikolovski
30.03.2013 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.12.2012 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.09.2012 true 24.10.2010 false 24.10.2010
Jelena Festini
30.12.2013 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.09.2012 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.09.2012 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.06.2012 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.03.2013 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.12.2012 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.12.2011 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.12.2011 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.06.2012 true 25.01.1900 false 24.10.2010
Zoran Nikolovski
30.03.2012 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.12.2011 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.12.2012 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.12.2013 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.03.2012 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.03.2011 true 24.10.2010 false 24.10.2010
Jelena Festini
30.06.2010 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.12.2010 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.06.2011 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.09.2011 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.09.2011 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.12.2011 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.09.2011 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.12.2011 true 24.10.2010 false 24.10.2010
Zoran Nikolovski
30.06.2011 true 25.10.2010 false 25.10.2010
Zoran Nikolovski
30.12.2012 true 25.10.2010 false 25.10.2010
Zoran Nikolovski
30.03.2012 true 25.10.2010 false 25.10.2010
Jelena Festini
30.03.2012 true 25.10.2010 false 25.10.2010
Zoran Nikolovski
30.03.2012 true 25.10.2010 false 25.10.2010
Zoran Nikolovski
30.12.2011 true 25.10.2010 false 25.10.2010
Zoran Nikolovski
30.12.2012 true 25.10.2010 false 25.10.2010
Zoran Nikolovski
30.06.2011 true 25.10.2010 false 25.10.2010
Zoran Nikolovski
30.12.2012 true 25.10.2010 false 25.10.2010
Zoran Nikolovski
30.03.2010 true 25.10.2010 false 25.10.2010
30.03.2012 true 25.10.2010 false 25.10.2010
Zoran Nikolovski
30.12.2012 true 25.10.2010 false 25.10.2010
Jelena Festini
30.03.2011 true 25.10.2010 false 25.10.2010
Zoran Nikolovski
30.06.2012 true 25.10.2010 false 25.10.2010
Jelena Festini
30.12.2013 true 25.10.2010 false 25.10.2010
Jelena Festini
30.09.2012 true 25.10.2010 false 25.10.2010
Zoran Nikolovski
30.03.2012 true 25.10.2010 false 25.10.2010
Zoran Nikolovski
30.12.2012 true 25.10.2010 false 25.10.2010
Zoran Nikolovski
30.06.2012 true 25.10.2010 false 25.10.2010
Zoran Nikolovski
30.06.2011 true 25.10.2010 false 25.10.2010
Zoran Nikolovski
30.01.2013 true 26.10.2010 false 26.10.2010
Jelena Festini
30.09.2012 true 26.10.2010 false 26.10.2010
Jelena Festini
true 02.02.2011 false 26.10.2010
true 26.10.2010 false 26.10.2010
true 26.10.2010 false 26.10.2010
true 26.10.2010 false 26.10.2010
true 26.10.2010 false 26.10.2010
true 27.10.2010 false 27.10.2010
true 27.10.2010 false 27.10.2010
true 27.10.2010 false 27.10.2010
true 27.10.2010 false 27.10.2010
Zoran Nikolovski
true 27.10.2010 false 27.10.2010
true 27.10.2010 false 27.10.2010
Jelena Festini
true 27.10.2010 false 27.10.2010
Zoran Nikolovski
true 27.10.2010 false 27.10.2010
true 27.10.2010 false 27.10.2010
true 27.10.2010 false 27.10.2010
true 27.10.2010 false 27.10.2010
true 28.10.2010 false 28.10.2010
true 28.10.2010 false 28.10.2010
true 28.10.2010 false 28.10.2010
Jelena Festini
true 29.01.1900 false 28.10.2010
true 28.10.2010 false 28.10.2010
true 28.10.2010 false 28.10.2010
true 28.10.2010 false 28.10.2010
true 28.10.2010 false 28.10.2010
true 28.10.2010 false 28.10.2010
true 29.01.1900 false 28.10.2010
Zoran Nikolovski
true 28.10.2010 false 28.10.2010
Zoran Nikolovski
true 28.10.2010 false 28.10.2010
true 28.10.2010 false 28.10.2010
Jelena Festini
true 28.10.2010 false 28.10.2010
30.09.2012 true 30.10.2010 false 30.10.2010
Zoran Nikolovski
30.03.2011 true 30.10.2010 false 30.10.2010
30.06.2013 true 30.10.2010 false 30.10.2010
30.12.2013 true 31.10.2010 false 31.10.2010
30.12.2013 true 31.10.2010 false 31.10.2010
Zoran Nikolovski
30.09.2012 true 31.10.2010 false 31.10.2010
30.06.2012 true 31.10.2010 false 31.10.2010
30.06.2012 true 31.10.2010 false 31.10.2010
true 31.10.2010 false 31.10.2010
Jelena Festini
30.09.2012 true 01.11.2010 false 01.11.2010
17.12.2009 false false 01.11.2010
Zoran Nikolovski
30.12.2013 true 01.11.2010 true Zoran Nikolovski
01.11.2010
10.05.2011 Alexander Rowland - World Bank
true 01.11.2010 false 01.11.2010
true 01.11.2010 false 01.11.2010
Zoran Nikolovski
true 01.11.2010 false 01.11.2010
Jelena Festini
true 02.11.2010 false 02.11.2010
Jelena Festini
true 02.11.2010 false 02.11.2010
Zoran Nikolovski
true 02.11.2010 false 02.11.2010
Zoran Nikolovski
31.03.2014 true 02.11.2010 true Rafael Bravo02.11.2010
Corrales
23.03.2011 Ian Brown - European Bank for Reconstruction and
true 02.11.2010 false 02.11.2010
Zoran Nikolovski
25.06.2018 true 02.11.2010 false Corrales
Rafael Bravo02.11.2010
true 02.11.2010 false 02.11.2010
Zoran Nikolovski
30.12.2010 true 02.11.2010 false 02.11.2010
Jelena Festini
true 02.11.2010 false 02.11.2010
Zoran Nikolovski
true 02.11.2010 false 02.11.2010
Zoran Nikolovski
true 02.11.2010 false 02.11.2010
Zoran Nikolovski
true 04.11.2010 false 04.11.2010
Zoran Nikolovski
true 06.01.1900 false 05.11.2010
Jelena Festini
true 05.11.2010 false 05.11.2010
Zoran Nikolovski
true 05.11.2010 false 05.11.2010
Zoran Nikolovski
31.12.2014 true 05.11.2010 true 23.03.2011 Ian Brown 05.11.2010
Ian Brown - European Bank for Reconstruction and
true 05.11.2010 false 05.11.2010
Zoran Nikolovski
Part of EFSE true 05.11.2010 false 05.11.2010
Zoran Nikolovski
true 07.11.2010 true 06.05.2011 Alexander Rowland
07.11.2010
Alexander Rowland - World Bank
true 07.11.2010 true 06.05.2011 Alexander Rowland
07.11.2010
Alexander Rowland - World Bank
true 07.11.2010 true 10.05.2011 Alexander Rowland
07.11.2010
Alexander Rowland - World Bank
13.08.2013 true 14.02.2011 true 10.05.2011 Alexander Rowland
07.11.2010
Alexander Rowland - World Bank
true 15.02.2011 false 07.11.2010
true 10.11.2010 false 10.11.2010
Claire Chretien
true 10.11.2010 false 10.11.2010
Claire Chretien
From IPA 2008 true 12.11.2010 false 12.11.2010
false false 12.11.2010
false false 12.11.2010
true 12.11.2010 false 12.11.2010
From IPA 2008 true 12.11.2010 false 12.11.2010
true 12.11.2010 false 12.11.2010
false false 30.11.2010
Zoran Nikolovski
false false 30.11.2010
Zoran Nikolovski
false false 30.11.2010
Katja Kottmann
false false 30.11.2010
Jelena Festini
false false 30.11.2010
Katja Kottmann
31.12.2015 false false 30.11.2010
Katja Kottmann
31.12.2015 false false 30.11.2010
Katja Kottmann
31.12.2015 false false 30.11.2010
Katja Kottmann
false false 07.01.2011
Katja Kottmann
31.12.2012 false false 08.01.2011
Katja Kottmann
false false 08.01.2011
Katja Kottmann
false false 08.01.2011
Katja Kottmann
31.12.2014 false false 14.01.2011
Katja Kottmann
31.12.2013 false false 14.01.2011
Katja Kottmann
31.12.2013 false false 14.01.2011
Katja Kottmann
false false 14.01.2011
Katja Kottmann
31.12.2014 false false 14.01.2011
Katja Kottmann
30.12.2010 true 31.01.2011 false 31.01.2011
Zoran Nikolovski
30.12.2010 true 31.01.2011 false 31.01.2011
Jelena Festini
30.06.2011 false false 31.01.2011
Jelena Festini
30.12.2010 true 31.01.2011 false 31.01.2011
Zoran Nikolovski
tern Balkans Investment Framework) false false 31.01.2011
Jelena Festini
30.12.2011 false false 31.01.2011
Jelena Festini
30.12.2011 false false 31.01.2011
Jelena Festini
tern Balkans Investment Framework) false false 31.01.2011
Jelena Festini
28.02.2010 false false 31.01.2011
Jelena Festini
30.12.2010 false false 31.01.2011
Jelena Festini
30.09.2011 true 31.01.2011 false 31.01.2011
Zoran Nikolovski
30.07.2012 true 31.01.2011 false Jelena Festini31.01.2011
30.03.2012 false false 31.01.2011
Zoran Nikolovski
30.09.2011 true 31.01.2011 false 31.01.2011
Claire Chretien
28.02.2011 false false Jelena Festini31.01.2011
30.12.2010 false false Jelena Festini31.01.2011
30.12.2010 true 31.01.2011 false Jelena Festini31.01.2011
30.12.2010 true 31.01.2011 false Jelena Festini31.01.2011
30.08.2011 false false Jelena Festini02.02.2011
30.05.2012 false false Jelena Festini02.02.2011
28.02.2011 false false Jelena Festini02.02.2011
30.12.2012 false false 02.02.2011
Zoran Nikolovski
30.12.2012 false false 02.02.2011
Zoran Nikolovski
30.12.2010 false false 02.02.2011
Zoran Nikolovski
30.12.2012 false false 02.02.2011
Zoran Nikolovski
30.12.2010 false false 02.02.2011
Zoran Nikolovski
30.11.2010 false false 02.02.2011
Zoran Nikolovski
30.04.2011 false false Jelena Festini02.02.2011
30.05.2010 false true Claire Smith 02.02.2011
06.05.2011 CEB - - Council of Europe Development Bank
30.10.2011 false false Jelena Festini04.02.2011
30.12.2012 false false Jelena Festini04.02.2011
30.05.2011 false false Jelena Festini04.02.2011
30.08.2011 false false Jelena Festini04.02.2011
30.12.2010 false false Jelena Festini04.02.2011
30.10.2010 false false Jelena Festini04.02.2011
30.04.2011 false false Jelena Festini04.02.2011
tern Balkans Investment Framework) false true Claire Chretien
04.02.2011
06.05.2011 CEB - - Council of Europe Development Bank
30.12.2010 false false 04.02.2011
Claire Chretien
30.12.2012 false false 04.02.2011
Claire Chretien
30.12.2012 false false Jelena Festini04.02.2011
30.12.2012 false false 04.02.2011
Claire Chretien
30.12.2010 false false Jelena Festini04.02.2011
30.12.2014 false false 04.02.2011
Claire Chretien
30.12.2012 false false 04.02.2011
Claire Chretien
30.12.2010 false false Jelena Festini04.02.2011
30.12.2013 false false 04.02.2011
Claire Chretien
30.12.2014 false false 04.02.2011
Claire Chretien
30.12.2010 false false Jelena Festini04.02.2011
30.12.2010 false false 06.02.2011
Zoran Nikolovski
30.10.2011 false false Jelena Festini06.02.2011
30.12.2010 false false Jelena Festini06.02.2011
30.12.2010 false false 06.02.2011
Claire Chretien
30.12.2010 false false Jelena Festini06.02.2011
30.11.2010 false false Jelena Festini06.02.2011
30.08.2012 false false 06.02.2011
Claire Chretien
30.11.2011 false false Jelena Festini06.02.2011
30.08.2011 false false Jelena Festini06.02.2011
30.11.2011 false false Jelena Festini06.02.2011
30.12.2012 false false Jelena Festini06.02.2011
30.12.2010 false false Jelena Festini07.02.2011
30.12.2010 false false Jelena Festini07.02.2011
30.12.2010 false false Jelena Festini07.02.2011
30.12.2010 false false 08.02.2011
Jelena Festini
30.12.2010 false false 08.02.2011
Claire Chretien
30.12.2010 false false 08.02.2011
Jelena Festini
30.12.2010 false false 27.03.2011
Jelena Festini
30.12.2013 false false 27.03.2011
Jelena Festini
30.06.2010 false false 28.03.2011
Jelena Festini
30.06.2011 false false 28.03.2011
Jelena Festini
30.06.2011 false false 28.03.2011
Jelena Festini
30.09.2011 false false 28.03.2011
Jelena Festini
30.09.2013 false false 28.03.2011
Jelena Festini
30.12.2010 false false 29.03.2011
Jelena Festini
30.03.2010 false false 29.03.2011
Jelena Festini
30.12.2009 false false 29.03.2011
Jelena Festini
30.06.2011 false false 29.03.2011
Jelena Festini
31.12.2012 false false 29.03.2011
Jelena Festini
false false 29.03.2011
Jelena Festini
false false 29.03.2011
Jelena Festini
false false 29.03.2011
Jelena Festini
false false 29.03.2011
Jelena Festini
Bank Festini
To contribute to sustainable macroeconomic and financial system stability by supporting the NationalJelenaof Serbia in fulfilling in the most e
false false 29.03.2011
30.09.2012 false false 29.03.2011
Jelena Festini
30.09.2011 false false 06.04.2011
Jelena Festini
30.09.2012 false false 06.04.2011
Jelena Festini
30.06.2011 false false 06.04.2011
Jelena Festini
30.09.2012 false false 06.04.2011
Jelena Festini
30.06.2011 false false 06.04.2011
Jelena Festini
30.06.2012 false false 06.04.2011
Jelena Festini
30.03.2011 false false 06.04.2011
Jelena Festini
30.06.2012 false false 06.04.2011
Jelena Festini
30.12.2012 false false 06.04.2011
Jelena Festini
30.06.2012 false false 07.04.2011
Jelena Festini
30.09.2010 false false 10.04.2011
Jelena Festini
30.12.2013 false false 10.04.2011
Jelena Festini
30.12.2013 false false 10.04.2011
Jelena Festini
30.12.2012 false false 10.04.2011
Jelena Festini
30.09.2010 false false 10.04.2011
Jelena Festini
30.06.2010 false false 10.04.2011
Jelena Festini
30.12.2011 false false 10.04.2011
Jelena Festini
30.06.2010 false false 10.04.2011
Jelena Festini
30.03.2013 false false 10.04.2011
Jelena Festini
30.03.2013 false false 10.04.2011
Jelena Festini
30.09.2012 false false 10.04.2011
Jelena Festini
30.06.2010 false false 10.04.2011
Jelena Festini
30.03.2011 false false 10.04.2011
Jelena Festini
30.09.2013 false false 10.04.2011
Jelena Festini
30.09.2012 false false 10.04.2011
Jelena Festini
30.09.2013 false false 10.04.2011
Jelena Festini
30.06.2012 false false 11.04.2011
Jelena Festini
30.06.2010 false false 11.04.2011
Jelena Festini
30.03.2010 false false 11.04.2011
Jelena Festini
30.06.2011 false false 11.04.2011
Jelena Festini
30.09.2010 false false 12.04.2011
Jelena Festini
30.12.2010 false false 12.04.2011
Jelena Festini
30.09.2010 false false 12.04.2011
Jelena Festini
30.09.2010 false false 12.04.2011
Jelena Festini
30.09.2013 false false 13.04.2011
Jelena Festini
30.09.2013 false false 13.04.2011
Jelena Festini
30.06.2012 false false 19.04.2011
Florent Bakija
31.12.2011 false false 19.04.2011
Florent Bakija
30.09.2012 false false 19.04.2011
Florent Bakija
31.03.2014 false false 19.04.2011
Florent Bakija
30.09.2008 31.03.2010 false false 21.04.2011
Florent Bakija
30.09.2010 false false 21.04.2011
Florent Bakija
31.12.2014 false false 21.04.2011
Florent Bakija
30.09.2012 false false 21.04.2011
Florent Bakija
30.09.2014 false false 21.04.2011
Florent Bakija
31.12.2014 false false 21.04.2011
Florent Bakija
false false 21.04.2011
Florent Bakija
30.04.2011 false false 21.04.2011
Florent Bakija
31.03.2012 false false 21.04.2011
Florent Bakija
31.03.2012 false false 21.04.2011
Florent Bakija
30.06.2012 false false 21.04.2011
Florent Bakija
31.12.2014 false false 21.04.2011
Florent Bakija
31.12.2014 false false 21.04.2011
Florent Bakija
31.03.2011 false false 21.04.2011
Florent Bakija
31.03.2011 false false 21.04.2011
Florent Bakija
31.12.2010 false false 21.04.2011
Florent Bakija
31.03.2012 false false 21.04.2011
Florent Bakija
31.12.2011 false false 21.04.2011
Florent Bakija
30.06.2011 false false 21.04.2011
Florent Bakija
30.09.2012 false false 21.04.2011
Florent Bakija
31.12.2011 false false 21.04.2011
Florent Bakija
30.06.2010 false false 21.04.2011
Florent Bakija
31.12.2012 false false 21.04.2011
Florent Bakija
false false 25.04.2011
Florent Bakija
30.06.2012 false false 25.04.2011
Florent Bakija
30.11.2012 false false 25.04.2011
Florent Bakija
false false 25.04.2011
Florent Bakija
false false 25.04.2011
Florent Bakija
30.09.2012 false false 25.04.2011
Florent Bakija
31.12.2012 false false 25.04.2011
Florent Bakija
false false 25.04.2011
Florent Bakija
31.12.2010 false false 25.04.2011
Florent Bakija
31.12.2010 false false 25.04.2011
Florent Bakija
false false 25.04.2011
Florent Bakija
31.12.2010 false false 25.04.2011
Florent Bakija
31.12.2012 false false 25.04.2011
Florent Bakija
false false 25.04.2011
Florent Bakija
30.06.2010 false false 25.04.2011
Florent Bakija
31.12.2012 false false 25.04.2011
Florent Bakija
31.12.2011 false false 25.04.2011
Florent Bakija
30.09.2012 false false 25.04.2011
Florent Bakija
31.12.2013 false false 25.04.2011
Florent Bakija
31.10.2011 false false 25.04.2011
Florent Bakija
30.09.2012 false false 25.04.2011
Florent Bakija
30.09.2013 false false 27.04.2011
Florent Bakija
30.09.2013 false false 27.04.2011
Florent Bakija
30.10.2012 false false 27.04.2011
Florent Bakija
31.12.2010 false false 27.04.2011
Florent Bakija
31.12.2011 false false 27.04.2011
Florent Bakija
30.09.2011 false false 27.04.2011
Florent Bakija
31.12.2012 false false 27.04.2011
Florent Bakija
31.03.2013 false false 27.04.2011
Florent Bakija
30.06.2013 false false 27.04.2011
Florent Bakija
30.09.2010 false false 28.04.2011
Jelena Festini
30.06.2010 false false 28.04.2011
Jelena Festini
30.03.2009 false false 28.04.2011
Jelena Festini
30.03.2011 false false 28.04.2011
Jelena Festini
30.12.2012 false false 28.04.2011
Jelena Festini
30.12.2011 false false 28.04.2011
Jelena Festini
30.06.2013 false false 28.04.2011
Jelena Festini
30.12.2011 false false 28.04.2011
Jelena Festini
30.12.2013 false false 28.04.2011
Jelena Festini
30.09.2013 false false 28.04.2011
Jelena Festini
30.03.2014 false false 28.04.2011
Jelena Festini
false false 29.04.2011
Florent Bakija
30.11.2015 false false 29.04.2011
Florent Bakija
31.12.2012 false false 29.04.2011
Florent Bakija
30.03.2009 false false 01.05.2011
Jelena Festini
30.06.2009 false false 01.05.2011
Jelena Festini
30.03.2013 false false 01.05.2011
Jelena Festini
30.06.2010 false false 01.05.2011
Jelena Festini
false false 23.05.2011
Jelena Festini
false false 23.05.2011
Jelena Festini
false false 23.05.2011
Jelena Festini
30.04.2014 false false 24.05.2011
Jelena Festini
30.06.2014 false false 24.05.2011
Jelena Festini
31.12.2011 false false 24.05.2011
Jelena Festini
false false 24.05.2011
Jelena Festini
false false 26.05.2011
Jelena Festini
false false 26.05.2011
Jelena Festini
false false 26.05.2011
Jelena Festini
false false 26.05.2011
Jelena Festini
false false 26.05.2011
Jelena Festini
30.09.2010 false false 26.05.2011
Jelena Festini
false false 09.06.2011
Jelena Festini
false false 09.06.2011
Jelena Festini
false false 09.06.2011
Jelena Festini
11.11.2010
tern Balkans Investment Framework) false false 15.06.2011
Claire Chretien
30.12.2012 false false 20.06.2011
Jelena Festini
28.02.2013 false false 20.06.2011
Jelena Festini
31.12.2011 false false 20.06.2011
Jelena Festini
15.12.2012 false false 20.06.2011
Jelena Festini
30.03.2014 false false 20.06.2011
Jelena Festini
30.09.2011 false false 20.06.2011
Jelena Festini
30.09.2012 false false 20.06.2011
Jelena Festini
30.12.2010 false false 20.06.2011
Jelena Festini
30.12.2011 false false 20.06.2011
Jelena Festini
30.05.2013 false false 20.06.2011
Jelena Festini
31.12.2011 false false 20.06.2011
Jelena Festini
31.12.2012 false false 20.06.2011
Jelena Festini
30.12.2014 false false 20.06.2011
Jelena Festini
30.12.2010 false false 20.06.2011
Jelena Festini
30.12.2012 false false 20.06.2011
Jelena Festini
30.12.2011 false false 20.06.2011
Jelena Festini
30.12.2013 false false 20.06.2011
Jelena Festini
30.12.2011 false false 20.06.2011
Jelena Festini
30.12.2012 false false 20.06.2011
Jelena Festini
30.12.2013 false false 20.06.2011
Jelena Festini
30.12.2011 false false 20.06.2011
Jelena Festini
30.12.2013 false false 20.06.2011
Jelena Festini
30.12.2011 false false 20.06.2011
Jelena Festini
30.12.2011 false false 20.06.2011
Jelena Festini
false false 28.06.2011
Jelena Festini
false false 29.06.2011
Jelena Festini
false false 29.06.2011
Jelena Festini
30.09.2010 false false 20.07.2011
Jelena Festini
30.09.2010 false false 20.07.2011
Jelena Festini
30.09.2010 false false 20.07.2011
Jelena Festini
30.11.2010 false false 20.07.2011
Jelena Festini
30.04.2009 false false 20.07.2011
Jelena Festini
30.05.2009 false false 20.07.2011
Jelena Festini
30.11.2009 false false 20.07.2011
Jelena Festini
30.06.2010 false false 20.07.2011
Jelena Festini
30.05.2009 false false 20.07.2011
Jelena Festini
30.11.2009 false false 20.07.2011
Jelena Festini
30.08.2010 false false 20.07.2011
Jelena Festini
30.08.2010 false false 20.07.2011
Jelena Festini
30.04.2010 false false 20.07.2011
Jelena Festini
30.08.2010 false false 20.07.2011
Jelena Festini
30.11.2010 false false 20.07.2011
Jelena Festini
30.06.2010 false false 22.07.2011
Jelena Festini
30.12.2009 false false 22.07.2011
Jelena Festini
30.05.2010 false false 22.07.2011
Jelena Festini
30.03.2013 false false 26.07.2011
Jelena Festini
30.12.2011 false false 26.07.2011
Jelena Festini
30.12.2011 false false 26.07.2011
Jelena Festini
30.12.2007 false false 26.07.2011
Jelena Festini
20.08.2009 false false 26.07.2011
Jelena Festini
30.12.2011 false false 28.07.2011
Jelena Festini
28.12.2009 false false 28.07.2011
Jelena Festini
30.12.2011 false false 28.07.2011
Jelena Festini
30.12.2011 false false 28.07.2011
Jelena Festini
30.12.2011 false false 28.07.2011
Jelena Festini
false false 28.07.2011
Jelena Festini
30.12.2011 false false 28.07.2011
Jelena Festini
30.12.2011 false false 28.07.2011
Jelena Festini
30.12.2011 false false 28.07.2011
Jelena Festini
30.12.2011 false false 28.07.2011
Jelena Festini
30.12.2011 false false 28.07.2011
Jelena Festini
false false 28.07.2011
Jelena Festini
02.04.2011 false false 28.07.2011
Jelena Festini
18.06.2010 false false 08.08.2011
Jelena Festini
30.11.2010 false false 08.08.2011
Jelena Festini
30.12.2010 false false 08.08.2011
Jelena Festini
30.12.2007 false false 08.08.2011
Jelena Festini
30.09.2010 false false 08.08.2011
Jelena Festini
30.05.2010 false false 08.08.2011
Jelena Festini
30.12.2009 false false 08.08.2011
Jelena Festini
30.12.2009 false false 08.08.2011
Jelena Festini
30.10.2010 false false 08.08.2011
Jelena Festini
30.12.2008 false false 08.08.2011
Jelena Festini
30.12.2012 false false 08.08.2011
Jelena Festini
30.12.2011 false false 22.08.2011
Jelena Festini
30.12.2011 false false 22.08.2011
Jelena Festini
30.12.2011 false false 22.08.2011
Jelena Festini
30.12.2011 false false 24.08.2011
Jelena Festini
30.12.2011 false false 24.08.2011
Jelena Festini
30.12.2011 false false 24.08.2011
Jelena Festini
30.12.2011 false false 24.08.2011
Jelena Festini
30.12.2011 false false 24.08.2011
Jelena Festini
30.12.2011 false false 29.08.2011
Jelena Festini
30.12.2011 false false 29.08.2011
Jelena Festini
30.12.2011 false false 29.08.2011
Jelena Festini
Updated at
10.02.2011
26.01.2011
26.01.2011
03.05.2011
29.04.2011
26.01.2011
15.02.2011
26.01.2011
26.01.2011
15.02.2011
10.05.2011
13.05.2011
15.02.2011
26.01.2011
26.01.2011
07.02.2011
09.05.2011
26.01.2011
26.01.2011
26.01.2011
09.05.2011
23.02.2011
26.01.2011
09.02.2011
26.01.2011
26.01.2011
23.02.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
09.05.2011
03.05.2011
26.01.2011
15.02.2011
01.06.2011
17.06.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
01.06.2011
03.06.2011
26.01.2011
23.02.2011
13.05.2011
03.06.2011
01.06.2011
01.06.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
09.05.2011
09.02.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
10.05.2011
10.05.2011
10.05.2011
10.05.2011
14.02.2011
06.05.2011
12.05.2011
23.02.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
23.03.2011
07.02.2011
13.05.2011
14.04.2011
14.04.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
31.05.2011
13.05.2011
13.05.2011
13.05.2011
13.05.2011
13.05.2011
13.05.2011
13.05.2011
14.04.2011
14.04.2011
14.04.2011
09.05.2011
09.05.2011
09.05.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
09.02.2011
09.02.2011
26.01.2011
26.01.2011
26.01.2011
23.02.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
24.08.2011
24.08.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
09.05.2011
12.05.2011
26.01.2011
26.01.2011
03.06.2011
03.06.2011
02.06.2011
23.02.2011
13.05.2011
13.05.2011
09.05.2011
26.01.2011
23.02.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
08.08.2011
26.01.2011
26.01.2011
23.02.2011
12.05.2011
26.01.2011
13.05.2011
13.05.2011
13.05.2011
12.05.2011
10.05.2011
26.01.2011
26.01.2011
13.05.2011
26.01.2011
26.01.2011
13.05.2011
13.05.2011
13.05.2011
13.05.2011
08.02.2011
13.05.2011
13.05.2011
10.05.2011
10.05.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
23.02.2011
13.05.2011
13.05.2011
26.01.2011
10.05.2011
10.05.2011
26.01.2011
26.01.2011
15.02.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
15.02.2011
15.02.2011
26.02.2011
15.02.2011
15.02.2011
26.01.2011
26.01.2011
15.02.2011
26.01.2011
15.02.2011
15.02.2011
15.02.2011
15.02.2011
15.02.2011
26.01.2011
15.02.2011
15.02.2011
15.02.2011
26.01.2011
23.02.2011
26.01.2011
13.05.2011
10.05.2011
10.05.2011
14.02.2011
10.05.2011
03.06.2011
26.01.2011
26.01.2011
26.01.2011
14.02.2011
14.02.2011
14.04.2011
26.01.2011
09.05.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
10.05.2011
10.05.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
10.05.2011
26.02.2011
26.01.2011
26.01.2011
03.06.2011
26.01.2011
26.01.2011
26.01.2011
13.05.2011
14.02.2011
26.01.2011
09.02.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
15.02.2011
26.01.2011
26.01.2011
09.05.2011
09.05.2011
10.05.2011
24.06.2011
26.01.2011
26.01.2011
23.02.2011
03.06.2011
14.02.2011
16.02.2011
26.01.2011
26.01.2011
09.02.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
04.03.2011
26.01.2011
23.02.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
13.05.2011
14.04.2011
14.04.2011
10.05.2011
15.02.2011
23.02.2011
26.01.2011
10.05.2011
10.05.2011
13.05.2011
13.05.2011
09.05.2011
09.05.2011
09.05.2011
09.05.2011
09.05.2011
15.02.2011
15.02.2011
15.02.2011
26.01.2011
26.01.2011
26.01.2011
10.05.2011
11.08.2011
03.06.2011
02.06.2011
13.05.2011
15.02.2011
15.02.2011
03.06.2011
13.05.2011
10.05.2011
10.05.2011
23.02.2011
08.02.2011
26.01.2011
13.05.2011
10.05.2011
23.02.2011
23.02.2011
23.02.2011
23.02.2011
26.01.2011
23.02.2011
23.02.2011
22.03.2011
13.05.2011
04.04.2011
10.05.2011
26.01.2011
15.02.2011
23.02.2011
23.02.2011
26.01.2011
09.05.2011
13.05.2011
15.02.2011
15.02.2011
13.05.2011
13.05.2011
13.05.2011
15.02.2011
13.05.2011
15.02.2011
13.05.2011
10.05.2011
10.05.2011
10.05.2011
10.05.2011
10.05.2011
10.05.2011
12.05.2011
02.02.2011
02.02.2011
02.02.2011
02.02.2011
02.02.2011
02.02.2011
03.02.2011
02.02.2011
02.02.2011
02.02.2011
26.02.2011
03.02.2011
02.02.2011
10.04.2011
08.02.2011
02.02.2011
23.02.2011
23.02.2011
23.02.2011
23.02.2011
26.01.2011
26.01.2011
23.02.2011
10.05.2011
13.05.2011
10.05.2011
03.02.2011
03.02.2011
03.02.2011
03.02.2011
26.01.2011
03.02.2011
26.01.2011
23.02.2011
03.06.2011
23.02.2011
03.06.2011
11.02.2011
13.05.2011
13.05.2011
13.05.2011
15.02.2011
10.05.2011
15.02.2011
15.02.2011
15.02.2011
15.02.2011
15.02.2011
15.02.2011
15.02.2011
26.01.2011
15.02.2011
23.02.2011
26.01.2011
23.02.2011
23.02.2011
23.02.2011
23.02.2011
23.02.2011
03.06.2011
13.05.2011
10.05.2011
07.02.2011
10.05.2011
03.02.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
11.04.2011
15.02.2011
26.01.2011
26.01.2011
15.02.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
11.04.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
15.02.2011
26.01.2011
26.01.2011
15.02.2011
01.05.2011
15.02.2011
15.02.2011
15.02.2011
15.02.2011
15.02.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
01.05.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
29.01.2011
26.01.2011
04.02.2011
26.01.2011
01.05.2011
26.01.2011
01.05.2011
01.05.2011
26.02.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
01.05.2011
01.05.2011
03.02.2011
17.02.2011
03.02.2011
03.02.2011
03.02.2011
03.02.2011
03.02.2011
03.02.2011
15.02.2011
03.02.2011
10.04.2011
15.02.2011
03.02.2011
23.02.2011
03.02.2011
03.02.2011
03.02.2011
03.02.2011
13.04.2011
03.02.2011
08.02.2011
03.02.2011
03.02.2011
03.02.2011
03.02.2011
26.02.2011
15.02.2011
03.02.2011
10.04.2011
03.02.2011
26.02.2011
03.02.2011
03.02.2011
03.02.2011
08.02.2011
03.02.2011
04.02.2011
03.02.2011
08.03.2011
17.02.2011
26.02.2011
16.05.2011
03.02.2011
15.02.2011
08.03.2011
08.03.2011
15.02.2011
26.01.2011
03.06.2011
15.02.2011
11.04.2011
26.01.2011
13.02.2011
23.02.2011
26.01.2011
26.01.2011
26.01.2011
26.01.2011
15.02.2011
15.02.2011
23.03.2011
15.02.2011
15.02.2011
09.05.2011
09.05.2011
10.05.2011
10.05.2011
16.02.2011
13.05.2011
13.05.2011
03.02.2011
03.02.2011
03.02.2011
03.02.2011
03.02.2011
03.02.2011
15.02.2011
15.02.2011
10.05.2011
26.01.2011
09.05.2011
09.05.2011
09.05.2011
09.05.2011
14.04.2011
10.05.2011
10.05.2011
10.05.2011
31.03.2011
14.04.2011
14.04.2011
09.05.2011
10.05.2011
26.02.2011
06.02.2011
06.02.2011
26.02.2011
31.01.2011
06.02.2011
06.02.2011
06.02.2011
06.02.2011
06.02.2011
15.02.2011
06.02.2011
23.02.2011
15.06.2011
06.02.2011
06.02.2011
06.02.2011
06.02.2011
06.02.2011
06.02.2011
06.02.2011
15.02.2011
15.02.2011
15.02.2011
15.02.2011
15.02.2011
15.02.2011
06.02.2011
09.05.2011
06.02.2011
06.02.2011
06.02.2011
06.02.2011
06.02.2011
06.02.2011
06.02.2011
13.05.2011
01.06.2011
13.05.2011
06.02.2011
13.05.2011
06.02.2011
13.05.2011
13.05.2011
08.03.2011
18.05.2011
19.05.2011
08.03.2011
20.03.2011
06.02.2011
06.02.2011
15.06.2011
06.02.2011
06.02.2011
15.06.2011
06.02.2011
06.02.2011
06.02.2011
06.02.2011
08.03.2011
08.03.2011
08.03.2011
08.03.2011
13.05.2011
08.03.2011
27.03.2011
11.04.2011
11.04.2011
11.04.2011
11.04.2011
11.04.2011
11.04.2011
29.03.2011
29.03.2011
01.05.2011
29.03.2011
01.05.2011
11.04.2011
13.04.2011
11.04.2011
13.04.2011
13.04.2011
29.03.2011
06.04.2011
06.04.2011
06.04.2011
06.04.2011
06.04.2011
06.04.2011
06.04.2011
06.04.2011
06.04.2011
07.04.2011
10.04.2011
10.04.2011
10.04.2011
10.04.2011
10.04.2011
10.04.2011
10.04.2011
10.04.2011
10.04.2011
10.04.2011
10.04.2011
10.04.2011
10.04.2011
10.04.2011
10.04.2011
10.04.2011
11.04.2011
11.04.2011
11.04.2011
11.04.2011
12.04.2011
12.04.2011
12.04.2011
12.04.2011
13.04.2011
13.04.2011
19.04.2011
19.04.2011
19.04.2011
19.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
21.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
25.04.2011
27.04.2011
27.04.2011
27.04.2011
27.04.2011
27.04.2011
27.04.2011
27.04.2011
27.04.2011
27.04.2011
28.04.2011
28.04.2011
28.04.2011
28.04.2011
28.04.2011
28.04.2011
28.04.2011
28.04.2011
28.04.2011
28.04.2011
28.04.2011
29.04.2011
29.04.2011
29.04.2011
01.05.2011
01.05.2011
01.05.2011
01.05.2011
26.05.2011
26.05.2011
26.05.2011
09.06.2011
26.05.2011
26.05.2011
09.06.2011
09.06.2011
26.05.2011
26.05.2011
26.05.2011
26.05.2011
26.05.2011
09.06.2011
09.06.2011
09.06.2011
15.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
20.06.2011
28.06.2011
29.06.2011
29.06.2011
20.07.2011
20.07.2011
20.07.2011
20.07.2011
20.07.2011
20.07.2011
20.07.2011
20.07.2011
20.07.2011
20.07.2011
20.07.2011
20.07.2011
20.07.2011
20.07.2011
22.07.2011
22.07.2011
22.07.2011
22.07.2011
26.07.2011
26.07.2011
26.07.2011
08.08.2011
08.08.2011
28.07.2011
08.08.2011
28.07.2011
28.07.2011
28.07.2011
08.08.2011
28.07.2011
28.07.2011
28.07.2011
28.07.2011
28.07.2011
28.07.2011
28.07.2011
08.08.2011
08.08.2011
08.08.2011
08.08.2011
08.08.2011
08.08.2011
08.08.2011
08.08.2011
08.08.2011
08.08.2011
22.08.2011
22.08.2011
22.08.2011
22.08.2011
24.08.2011
24.08.2011
24.08.2011
24.08.2011
24.08.2011
29.08.2011
29.08.2011
29.08.2011
Get documents about "