									                                                                                                                    CCR SEQUENCE NUMBER

        CONFIGURATION CHANGE REQUEST (CCR) Part A                                                                                 37


1. BASIS FOR CCR                                     2. SUBMITTING AUTHORITY (Name & Org Code)

          ___ CORRECTIVE                             Michael A Palecki, NCDC
                                                     3. PHONE NUMBER                                      4. SUBMISSION DATE
          ___ PROBLEM PREVENTION
                                                     828-271-4340                                         7/17/09
          _X__ IMPROVEMENT

5. COGNIZANT TECHNICAL INDIVIDUAL                                                                      6. PHONE NUMBER
Mark Hall, ATDD                                                                                        865-576-0366
7. TITLE OF CHANGE

Transmit calculated 5-minute temperature and precipitation.

Install new data logger subroutines that produce calculated 5-minute temperature and precipitation observations for the one hour period prior to
transmission, AKA “the rolling 12”, and add them to the normal transmission data stream.

8. TYPE OF CHANGE                                                              9. EFFECTIVITY

         _X__ HARDWARE             _X__ SOFTWARE                                           _X__ SYSTEM

         ___ DOCUMENTATION ONLY                                                            ___ SPECIFIC SITE

10. STATEMENT OF REQUIREMENT, PROBLEM, OR DEFICIENCY

The current transmission strategy is hourly, and only raw data are transmitted. Real time users of USCRN data make ad hoc decisions regarding
interpretation of the raw data, and often receive the data well after the hour in question has ended.

11. KNOWN OR PROPOSED SOLUTION

The production of calculated temperature and precipitation values in the data logger will allow the National Weather Service and other groups
accessing the GOES transmitted data in raw form to have values calculated based on USCRN program algorithms. In addition, the values will be
calculated for the latest 12 five-minute observation periods, up to five minutes before transmission, instead of stopping at the end of the previous hour as
is current practice. The additional fields are added to the end of the normal three-hour data stream. This will improve the consistency and quality of the
observations being used in real time and reduce latency for real time data users compared to the current system.

The algorithms for these calculations are appended to this document, entitled “CRN-CCR-37 Site 5-minute T and P Calculations”.

12. REQUIRED CHANGE DATE                         13. RATIONALE FOR REQUIRED CHANGE DATE

 July 21, 2009

14. RISK FACTOR FOR CHANGE                                            15. DECISION AUTHORITY LEVEL

     _X__ LOW        ___ MEDIUM           ___ HIGH                      ___ FAST TRACK (* e.g.; correct documentation)

                                                                        _X__ USCRN CCB ONLY                      ___ PMC

16. USCRN CCB DISPOSITION                                     16. AUTHORIZING SIGNATURE

          ___ APPROVED

          ___ DISAPPROVED                                     18. DISPOSITON DATE

          ___ RECOMMEND APPROVAL

19. PMC DISPOSITION                                           20. AUTHORIZING SIGNATURE

       ___ APPROVED




                                                                      CCRForm 222
                                                                       Page 1 of 4
___ DISAPPROVED   21. DISPOSITION DATE




                        CCRForm 222
                         Page 2 of 4
                                                                                                          CCR SEQUENCE NUMBER

CONFIGURATION CHANGE REQUEST (CCR) Part B                                                                         37


1. APPROVED SOLUTION


2. WORK AUTHORIZATION NUMBER                               3. ASSIGNED ACTION ENGINEER



FUNDING INFORMATION                                                                           FUNDING SOURCE            COST DATA


  4.                 DEVELOPMENT COSTS                                                     Completed

  5.                OPERATIONAL TEST AND EVALUATION COSTS                                  Completed

  6.                PRODUCTION COSTS                                                       CRN Base Budget

  7.                COMMUNICATION SERVICE/CIRCUIT COSTS                                    None

  8.                IMPLEMENTATION SUPPORT COSTS                                           CRN Base Budget

  9.                LIFE CYCLE SUPPORT COSTS                                               CRN Base Budget

  10.                                    TOTAL ESTIMATED COSTS                                                      Incorporated in AMV

SUPPORT INFORMATION AND SCHEDULES

11. DEVELOPMENT SCHEDULE & STATUS                                           12. PROCUREMENT SCHEDULE & STATUS

Development has been completed.                                             None.


13. IMPLEMENT/RETROFIT SCHEDULE & STATUS                                    14. REQUIRED CLEARANCES/WAIVERS/LICENSES

Installation is ongoing with stations receiving new data loggers, and was   None.
completed in the Alabama HCN-M station network.

15. PHYSICAL ITEMS & DOCUMENTS AFFECTED                                     16. LOGISTICS IMPACTS

None.                                                                       Minor

17. OPERATIONS IMPACTS                                                      18. STAFF RESOURCES IMPACTS
Minor                                                                       Minor

IMPLEMENTATION

19. PLANNED IMPLEMENTATION DATE                                             20. CHANGE NOTICE NUMBER
July 21, 2009                                                               CRN-CCR37

21. CHANGE NOTICE ISSUE DATE                                                22. CHANGE COMPLETION DATE




                                                                      CCRForm 222
                                                                       Page 3 of 4
                      CRN-CRR-37 Site 5-minute T and P Calculations

Temperature
Copy the last 5-minute average temperature for each sensor, T1, T2, T3

If the average Fan speed for associated T sensor is less than 90, set T= -9999

Logic is designed to report the median T of T1, T2, T3

If T1>=T2 and T2 > T3 Then T=T2
If T1>=T3 and T3 > T2 Then T=T3
If T3>=T1 and T1 > T2 Then T=T1
If T3 >=T2 and T2 > T1 Then T=T2
If T2 >=T3 and T3 > T1 Then T=T3
If T2 >=T1 and T1 > T3 Then T=T1

If more than one fan is less than 90, the median will report as –9999

Precipitation
Calculate the average depth of the three sensors Depth = (mm1 + mm2 + mm3)/3

For the first pass in the program set LastLevel = Depth

At the end of each 5 minute period:

Rain = Depth – Lastlevel

If Rain < 0 Then Rain = 0 and Lastlevel = Depth

If Rain < .25 Then Precip = 0

If Rain > .25 Then Precip = Rain and Lastlevel = Depth

If mm1 < -50 Then Precip = -999
If mm2 < -50 Then Precip = -999
If mm3 < -50 Then Precip = -999

If Wetness Sensor 1 > 500 Then Precip = 0

If the Door is open in 5 minute period then Precip = 0

Multiply T and Precip by 100 to scale for binary transmission