Aegis BMD Overview to the National Defense Industrial Association
Shared by: yaofenjin
-
Stats
- views:
- 37
- posted:
- 8/26/2011
- language:
- English
- pages:
- 17
Document Sample


Approved for Public Release 10-MDA-5695 (17 AUG 10)
Aegis BMD
Aegis BMD Overview to the
National Defense Industrial Association
RDML Joe Horn
Aegis BMD Program Executive
13 July 2010
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 1
Approved for Public Release 10-MDA-5695 (17 AUG 10)
Aegis BMD: Who We Are
Aegis BMD
We Are:
• The BMD Hybrid Program Directorate
located on NSWC Dahlgren
US / International Fleets
– 239 Government Employees • Ship Modernization
• Design, Engineer
– 70 Navy Billets / 169 MDA Billets • Construct, Install
• Test / Trial
• The team that engineered and Coordination
PEO IWS, Ships Navy Field
conducted the satellite shoot down & Navy IPO Activity
with 45 days notice
• The team that achieved the first
operationally certified BMD system out
of the MDA
• The team that delivered the Aegis BMD
Aegis BMD
Weapon System and SM-3 missiles
ahead of schedule
• The team that has adapted 30 years
of technological advances to the
evolving demands of Air & Ballistic Lockheed Martin Raytheon
New Jersey Arizona
Missile Defense
\\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 2
Approved for Public Release 10-MDA-5695 (17 AUG 10)
Aegis BMD Program
Aegis BMD
Launch on Remote (Aegis BMD) 2006 SM-3
Launch on Remote (BMD Sensors) 2008
Engage on Remote 2015+
Link 16
AN/SPY-1D(V)
(4 Array Faces)
Aegis Ashore Deckhouse Aegis Ballistic Missile
Defense Signal
Processor (BSP)
Aegis Upgrade 2010
Weapon
System (Testing)
VLS
3 modules;
8 cells each
Blk I / IA / IB Blk IIA Blk IIB
Aegis Ashore Radar System 2004/2006/2013 2015+ 2020
2015+ AN/SPY-1
Hawaii Test Site SM-2 TBD
2013 Open
Architecture
2012 Sea-
Based
Terminal
Quantities
PB10 PB11
Thru 2015 Thru 2015
5 9
22 28 Vertical Launching
System Mark 41 Blk IV 2018
2008 Far
212 292 Near Term
Term
2 3
\\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 3
Approved for Public Release 10-MDA-5540 (07 Jun
Approved for Public Release 10-MDA-5695 (17 AUG 10)
Aegis BMD’s Role In The BMDS
Aegis BMD
SRBM
Midcourse Engagement Limited Terminal Defense
Capability with SM-3 Capability Defeats Short
Defeats Short, Medium & Range Ballistic Missiles
Some Intermediate
Range Ballistic Missiles MRBM
IRBM
Long Range Surveillance &Track
Future Capability Detects and Tracks in Early
Adding Early Ascent Phase Providing Forward
Intercept Capability Based BMDS Sensor Support
Anti-ICBM w/SM-3 Blk IIB
Proven Against Single Salvo,
Dual Salvo & Separating Targets
\\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 4
Approved for Public Release 10-MDA-5695 (17 AUG 10)
Aegis BMD Fleet Today
(June 2010)
Aegis BMD
SM-2 Blk IV Deliveries (75)
FTM-14 (2)
SM-3 Blk I Deliveries Stellar Daggers XXX Norfolk BMD Ships
CY04 FM-7 CY05
VELLA GULF
XXX XX FM-8 X XXXXX MONTEREY
PB 08
SM-3 Blk IA Deliveries RAMAGE
CY06 Key STOUT
X FTM-10 Delivered
Procured
FTM-11 SDGO BMD Ships Mayport Based BMD Ship
CY07 FTM-11a
XXXXXX FTM-12 DECATUR THE SULLIVANS
FTM-13 (2)
Burnt Frost BENFOLD
CY08
MILIUS
HIGGINS
JOHN PAUL JONES
CY09 FTM-17
X Total Missiles
Available = 61 PHBR BMD Ships
CY10
YOKO BMD Ships LAKE ERIE
First SM-3
Blk IB SHILOH PORT ROYAL
STETHEM RUSSELL
CURTIS WILBUR O’KANE
JOHN S. MCCAIN PAUL HAMILTON
FITZGERALD HOPPER
\\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 5
Approved for Public Release 10-MDA-5695 (17 AUG 10)
Aegis BMD PB-11 Capability and Capacity
Aegis BMD
Program of Record
PAA Phase I PAA Phase II PAA Phase III
Aegis BMD 3.6.1 Aegis BMD 4.0.1 Aegis BMD 5.0 Aegis BMD 5.1 Aegis BMD 5.2
Deployed Now 2012 Certified for Initial Use 2014 Certified for Initial Use 2016 Certified for Initial Use 2018 Certified for Initial Use
• SRBM, MRBM, Limited IRBM Defense • SRBM, MRBM, Limited IRBM • SRBM, MRBM, Limited IRBM • SRBM, MRBM, Enhanced IRBM & • SRBM, MRBM, Enhanced IRBM & Some
& LRS&T Defense & LRS&T Defense & LRS&T Some Limited ICBM Defense Limited ICBM Defense
• Initial LOR • Enhanced LOR • LOR • Engage on Remote – SM-3 Blk IIA • Engage on Remote
• SM-3 Blk IA Engage Capability • WILDCAT • WILDCAT • Sea Based Terminal
• Sea-Based Terminal • SM-3 Blk IB
SM-3 SM-2 SM-3 SM-3 SM-3 SM-3 SM-3 SM-3 SM-3 SM-3 SM-3 SM-3 Sea Based
BLK IA BLK IV BLK IA BLK IB BLK IA BLK IB BLK IA BLK IB BLK IIA BLK IA BLK IB BLK IIA Terminal
Improved Fleet BMD Improved 2-Tier Third Generation
Initial 2-Tier Fleet BMD Capability - No Terminal “In Stride Fleet BMD” Third Generation Fleet BMD (Adds Back Terminal)
Deployed Now OTE Assessment 2014* OTE Assessment 2016* OTE Assessment 2018* OTE Assessment 2020*
OTE Assessment 2008
* Final Dates Pending Negotiation with DOTE
PBR-11 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18
SM-3 Blk IA 80 106 112 112 112 112 112 112 112
SM-3 Blk IB 1 4 16 42 108 180 252 324 324
Total Cumulative
81 110 128 154 220 292 364 436 436
Deliveries SM-3
PB-11 Aegis BMD Ship Capacity Profile Includes Navy Transferred Funding Contribution
Aegis BMD Ships *** FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18
3.6.1 20 21 23 23 19 16 11 9 6
4.0.1 0 2 4 6 9 7 7 7 6
5.0 0 0 1 3 8 14 20 22 25
Total 20 23** 28** 32 36 37 38 38 37
+ USN New Construction 38 41
Aegis Ashore Sites (24 SM-3) 1 1 1 2
*CG 70 Not BMD Certified Until 3rd Qtr 2011 ***Cumulative
**Includes Navy Transferred Funding Contribution AB20105CC001
3 Ships in FY11 (One Upgrade), 1 Ship in FY12 As of 4 May 2010
\\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 6
Approved for Public Release 10-MDA-5695 (17 AUG 10)
PB-11 w/ Additional Navy Funding
Aegis BMD
Aegis BMD Ship Fielding Plan
FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18
59 59
60 60 59 60
59
60
59
60
59
60
59
60
59
60
59
60
59
60
61 61 61 61 61 61 61 61 61 61
62 62 62 62 62 62 62 62 62 62
63 63 63 63 63 63 63 63 63 63
64 64 64 64 64 64 64 64 64 64
CG
65 65 65 65 65 65 65 65 65 65
66 66 66 66 66 66 66 66 66 66
67 67 67 67 67 67 67 67 67 67
68 68 68 68 68 68 68 68 68 68
69 69 69 69 69 69 69 69 69 69
70 70 70 70 70 70 70 70 70 70
71 71 71 71 71 71 71 71 71 71
72 72 72 72 72 72 72 72 72 72
73 73 73 73 73 73 73 73 73 73
51 51 51 51 51 51 51 51 51 51
52 52 52 52 52 52 52 52 52 52
53 53 53 53 53 53 53 53 53 53
54 54 54 54 54 54 54 54 54 54
55 55 55 55 55 55 55 55 55 55
56 56 56 56 56 56 56 56 56 56
57 57 57 57 57 57 57 57 57 57
58 58 58 58 58 58 58 58 58 58
59 59 59 59 59 59 59 59 59 59
60 60 60 60 60 60 60 60 60 60
61 61 61 61 61 61 61 61 61 61
62 62 62 62 62 62 62 62 62 62
63 63 63 63 63 63 63 63 63 63
DDG
64 64 64 64 64 64 64 64 64 64
65 65 65 65 65 65 65 65 65 65
66 66 66 66 66 66 66 66 66 66
67 67 67 67 67 67 67 67 67 67
68 68 68 68 68 68 68 68 68 68
69 69 69 69 69 69 69 69 69 69
70 70 70 70 70 70 70 70 70 70
71 71 71 71 71 71 71 71 71 71
72 72 72 72 72 72 72 72 72 72
73 73 73 73 73 73 73 73 73 73
74 74 74 74 74 74 74 74 74 74
75 75 75 75 75 75 75 75 75 75
76 76 76 76 76 76 76 76 76 76
77 77 77 77 77 77 77 77 77 77
78 78 78 78 78 78 78 78 78 78
18 20 23** 28** 32 36 37 38 38 37
NON 3.6.1 4.0.1 EDM 5.x Additional Funds Sec Def MDA
4.0.1
BMD Sourced by Navy FY10(+6) PB11
*CG 70 Not BMD Certified Until 3rd Qtr 2011
**Includes Navy Transferred Funding Contribution
3 Ships in FY11 (One Upgrade), 1 Ship in FY12
FOR OFFICIAL USE ONLY
\\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 7
Approved for Public Release 10-MDA-5695 (17 AUG 10)
Aegis BMD Firing Operations
Aegis BMD
Foreign Military Sales Terminal Defense
30 Jul 09
17 Dec 07 19 Nov 08 27 Oct 09 5 June 08 26 Mar 09 FTM 17
JFTM 1 JFTM 2 JFTM 3 FTM 14 Stellar Daggers
1 Nov 08
PACBLITZ 08
20 Feb 08
Satellite
Intercept
• First Firing from • First Japanese • Engage Separating 6 Nov 07
Japanese Destroyer No-Notice Launch Warhead with SM-3 • Engage SRBM w/
• Separating Target Blk IA SM-2 Blk IV • Simultaneous FTM 13
BMD/ AAW
Engagement 22 Jun 07
FTM 12 • First Fleet
Homeland Defense SM-3 Firing
26 Apr 07
GT-180 Glory Boost IFT-9/10 PAC EX I, II, III
FTM 11 Event 4 • First Launch on Remote
Operation
7 Dec 06
FTM 11 • Engage Dual
22 Jun 06 SRBMs
FTM 10
PAC 17 Nov 05
First ICBM Tracking:
19 Sep 02 EX IV FTM 04-2(FM-8)
• Simultaneous BMD/AAW Engagements
24 Feb 05 • Auto-BMD
FTM 04-1(FM-7) • Pulse DACS
11 Dec 03
FM-6
• SM-3 BLK IA
17 Jun 03
• Aegis 3.6
21 Nov 02 FM-5 • Separating • First Coalition Test
FM-4 Warhead
13 Jun 02 • No Notice Firing
Oct 2008 COMOPTEVFOR Found:
FM-3
25 Jan 02
• Aim Point Adjust “The Aegis BMD System is Operationally
FM-2
Effective and Operationally Suitable”
• Ascent Phase
Intercept
Aegis BMD Firings Successes
• First Intercept
17 for 20 SM-3 3 for 3 SM-2
\\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 8
Approved for Public Release 10-MDA-5695 (17 AUG 10)
Aegis BMD Engagement Mode
Exploit Organic and Off Board Sensors
Aegis BMD
Organic and Cued – BMD 3.6.1
Organic and Cued – BMD 3.6.1 Cued on Remote (LoR) – BMD 3.6.1
Launch on Remote (LoR) – BMD 3.6.1
Launch
Ship-to-Ship
Ship-to-Ship
Cued
Organic
Firing Ship Launches SM-3 Using Remote
Firing Ship Acquires Target Using Organic or Cued Data and Acquires with Cued Search Prior
Search Prior to Launching SM-3, Demonstrated thru to Intercept
Flight Test Program • SM-3 Engage on AN/SPY-1
• SM-3 Engage on AN/SPY-1 • SM-3 Launch on Remote AN/SPY-1
Cued on Remote (LoR) – BMD 4.0.1
Launch on Remote (LoR) – BMD 4.0.1
Launch Cued on Remote (EoR) – BMD 5.1
Engage on Remote (EoR) – BMD 5.1
Engage
TPY-2 // Other-to-Ship
TPY-2 Other-to-Ship
Firing Ship Launches SM-3 Using Remote Data and
Acquires with Cued Search Prior to Intercept Firing Ship Launches SM-3 and Intercepts
• SM-3 Engage on AN/SPY-1 Mod 1 (BSP) Target Using
• SM-3 Launch on Remote AN/SPY-1 Mod 1 (BSP) • SM-3 Engage on Remote AN/SPY-1
• SM-3 Launch on AN/TPY-2 • SM-3 Engage on AN/TPY-2
\\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 9
Approved for Public Release 10-MDA-5695 (17 AUG 10)
Aegis BMD 3.6.1 & SM-3 Block IA
Aegis BMD
Currently Fielded System
Aegis BMD 3.6.1 Computer Program and Equipment System: SM-3 Block IA Missile:
Approach: Modify Existing Ship Systems Approach: Add 3rd Stage & Kill Vehicle to
Existing SM-2 Blk IV Booster Stack
Threats: Short to Intermediate Range
Ballistic Missiles Battle Space: Above the Atmosphere
Initial Launch on Remote Threats: Short to Some Intermediate Range
Ballistic Missiles
Operational: Retain Multi Mission Capability
Cost: $9-10M Each
Cost: $10-15M per Ship
Quantity: 61 (as of 4/10)
Quantity: 19 (as of 3/10)
Provider: Raytheon, Arizona & Navy Field
Provider: Lockheed Martin, NJ & Navy Field Activities/Labs
Activities/Labs
Organic
Initial
Launch on
Engage on Remote
Remote
(Not Available)
\\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 10
Approved for Public Release 10-MDA-5695 (17 AUG 10)
SM-3 Block IA Flight Test History
Aegis BMD
FTM -11A FTM-11 (Redo) FTM-12
FTM-10 June 2006 Summer 2006 (Classified) April 2007 June 2007
HIT HIT No Fire HIT HIT
FTM -11 Nov 2006
(Failed Launch – Logic Error
on Ship)
FTM -13 Nov 2007
(Dual Salvo/Dual BMD Skills)
JFTM-1 Dec 2007 Burnt Frost Feb 2008 JFTM-2 Nov 2008 FTM-17 Jul 2009 JFTM-3 Oct 2009
HIT HIT HIT HIT HIT HIT HIT
HIT
SM-3 Block IA is 10/11 in Flight Tests.
Aegis BMD 3.6/SM-3 Block IA Overall is 10/12
NOTE: FTM-15 is FOTE Conducted by PACOM
\\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 11
Approved for Public Release 10-MDA-5695 (17 AUG 10)
Aegis BMD 4.0.1 & SM-3 Block IB
Aegis BMD
2nd Generation System
Aegis BMD 4.0.1 Computer Program and Equipment System: SM-3 Block IB Missile:
Approach: Improve Shipboard Signal & Data Processing Approach: Improve SM-3 Kill Vehicle Seeker
& Engine
Threats: More Sophisticated Short to
Intermediate Range Ballistic Missiles Battle Space: Above the Atmosphere
Threats: More Sophisticated Short to Intermediate
Launch on Remote Range Ballistic Missiles
Operational: - Increased Raid Density Cost: $12-$15M (est.)
- Flexible Firing Doctrine Quantity: >300 Planned, Test Rounds Being
Fabricated
Cost: $45-$55M
Provider: Raytheon, Arizona & Navy Field
Quantity: 1 Test Ship
Activities/Labs
Provider: Lockheed Martin, NJ & Navy Field Activities/Labs
Status: First Flight Early CY2011
Status: Initial At-Sea Testing Underway, Available Late 2011 IOC 2013
Organic
Launch on
Remote
Engage on Remote
(Not Available)
\\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 12
Approved for Public Release 10-MDA-5695 (17 AUG 10)
Aegis BMD 5.1 & SM-3 Block IIA
Aegis BMD
3rd Generation System
Aegis BMD 5.1 Computer Program and Equipment System: : SM-3 Block IIA Missile:
Approach: Modify Existing Systems to Fly SM-3 Blk IIA & Approach: Increased Reach & Velocity
Use Off Board Sensors for Engagement Biggest Missile Compatible w/Mk41 VLS
Threats: More Sophisticated Short to Intermediate Range Battle Space: Above the Atmosphere
Ballistic Missiles plus Some ICBMs
Threats: More Sophisticated Short to Some
Intermediate Range Ballistic Missiles,
Engage on Remote Plus Some ICBMs
Operational: Flexible Firing Doctrine Cost: ~$15M
Cost: $23M Quantity: TBD
Quantity: TBD
Provider: Joint U.S. & Japan
Provider: Lockheed Martin, NJ & Navy
Field Activities/Labs Status: Development, 1st Flight Late 2014
Status: Development, IOC 2016/17
Organic
Launch on
Remote
Engage on Remote
\\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 13
Approved for Public Release 10-MDA-5695 (17 AUG 10)
Aegis Ashore Configuration
Aegis BMD
Aegis Display System Mark 8 Mod 1 Command & Decision System Mark 3 Mod 6
• ACB12 Computer Program • ACB12 Computer Program
• Three screen variant provides • Joint Tactical Terminal
additional display area • Integrated Mission Planner
• Video wall
Radar System AN/SPY-1D(V)
Weapon Control System Mark 9 Mod 6
• ACB12 Computer Program
• ACB12 Computer Program • Multi Mission Signal Processor
(MMSP)
• SM-3 Launch on Remote (AN/SPY-1,
AN/TPY-2, ABIR, Space Assets) • Integrated Satellite System
Calibration Computer
• SM-3 Block IB
STSS
Intercept
Aegis Combat Training
Kill Assessment System System Mark 51 Mod 4
• Uses FCS Mark 99 Mod 8 • Supports BMD Training
• System Receives Kinetic (Uplink /
Downlink)
C2BMC /
Warhead Downlink KDRE Cabinet KDRE Cabinet
AN/TPY-2
(FBM)
Operational Readiness
Gigabit Ethernet Switch Gigabit Ethernet Switch
• Supports Kill Blank
Blank
Blank
Blank
System Monitor
VME Chassis
Test Simulator Chassis
Test Simulator Chassis
Blank
Blank
Blank
Blank
System Monitor
VME Chassis
Test Simulator Chassis
Test Simulator Chassis
Assessment
Receiver& Bit Sync Receiver& Bit Sync
SATCOM
Test System
Receiver& Bit Sync Receiver& Bit Sync
RF Signal
RF Signal Cond.
Cond.
Receiver& Bit Sync
RF Signal
RF Signal Cond.
Cond.
Receiver& Bit Sync
Aegis
Ashore
Receiver& Bit Sync Receiver& Bit Sync
Test Simulator Chassis Test Simulator Chassis
Blank
Blank
Blank
Blank
Blank
Blank
THAAD Deckhouse Threat
Blank
System Monitor
Blank
System Monitor
VLS Launch
• Supports BMD
VME Chassis VME Chassis
Gigabit Ethernet Switch Gigabit Ethernet Switch
BMD KDRE BMD KDRE
Defended Aegis Ashore
Area Equipment
• Supports All In-
Standard Missile (SM-3) OPCON/TACON Node Aegis BMD Afloat Service Equipment
Block IB
• 2 Color Seeker Tactical Data Links
• Throttleable Divert/Attitude Control System (TDACS) Deckhouse • Common Data Link Management
• Houses Aegis Combat System System (CDLMS) 3.7.1
Vertical Launching System (VLS) • Relocatable • Upgrade to Support Joint Range
Extension (JRE)
Mark 41 Mod 2
• Supports any SM-3 Missile – Any Cell Green – Common with DDG 113
• Relocatable AB201006CC006
\\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 14
Approved for Public Release 10-MDA-5695 (17 AUG 10)
Strengthening International Cooperation
Aegis BMD
• Added BMD Capability to 3 Kongo
Class Ships on Schedule
– 4th Ship Complete this Fall
– Total FMS Value $1.3B
• Testing with Maritime Allies
– HNLMS TROMP December 2006
– SPS MENDEZ NUNEZ June 2007
\\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 15
Approved for Public Release 10-MDA-5695 (17 AUG 10)
Top Management Focus Areas
Aegis BMD
• Adequate Aegis BMD Ships and SM-3 Rounds to Meet Demand
• Successful Development of “Second Generation” Aegis BMD System
• Transition from SM-3 Block IA to SM-3 Block IB Manufacturing
• Successfully Navigate Complex Technical and Managerial Challenges
Associated with Multiple Development, Production, Installation and
Operational Transition Activities
– Migration to Open Architecture
– SM-3 Block IIA Cooperative Development Project
– Fire Control Using Netted, Off Board Sensors
– Phased Adaptive Approach Phase One
\\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 16
Approved for Public Release 10-MDA-5695 (17 AUG 10)
Aegis Ballistic Missile Defense
Aegis BMD
Forward…At Sea…On Patrol
Enabling Capabilities, Providing Options for U.S. and Allies
\\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE Slide 17
Get documents about "