Docstoc

Aegis BMD Overview to the National Defense Industrial Association

Document Sample
Aegis BMD Overview to the National Defense Industrial Association Powered By Docstoc
					                                                                                                                                     Approved for Public Release 10-MDA-5695 (17 AUG 10)




                              Aegis BMD




                                               Aegis BMD Overview to the
                                         National Defense Industrial Association
                                                                    RDML Joe Horn
                                                             Aegis BMD Program Executive
                                                                              13 July 2010
DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited.            \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE   Slide 1
                                                                                           Approved for Public Release 10-MDA-5695 (17 AUG 10)


                           Aegis BMD: Who We Are
              Aegis BMD



We Are:
• The BMD Hybrid Program Directorate
  located on NSWC Dahlgren
                                               US / International Fleets
    – 239 Government Employees             •         Ship Modernization
                                           •         Design, Engineer
    – 70 Navy Billets / 169 MDA Billets    •         Construct, Install
                                           •         Test / Trial
• The team that engineered and                                                        Coordination
                                                  PEO IWS, Ships                                                                      Navy Field
  conducted the satellite shoot down                & Navy IPO                                                                         Activity
  with 45 days notice
• The team that achieved the first
  operationally certified BMD system out
  of the MDA
• The team that delivered the Aegis BMD
                                                                                           Aegis BMD
  Weapon System and SM-3 missiles
  ahead of schedule
• The team that has adapted 30 years
  of technological advances to the
  evolving demands of Air & Ballistic             Lockheed Martin                                                                     Raytheon
                                                    New Jersey                                                                         Arizona
  Missile Defense

                                                   \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE   Slide 2
                                                                                                                Approved for Public Release 10-MDA-5695 (17 AUG 10)


                                                              Aegis BMD Program
                                   Aegis BMD

Launch on Remote (Aegis BMD) 2006                                                                                                                            SM-3
Launch on Remote (BMD Sensors) 2008
Engage on Remote 2015+
                                                    Link 16

           AN/SPY-1D(V)
          (4 Array Faces)


Aegis Ashore Deckhouse                                                               Aegis Ballistic Missile
                                                                                        Defense Signal
                                                                                       Processor (BSP)
 Aegis                                                                                  Upgrade 2010
Weapon
System                                                                                     (Testing)
                VLS
            3 modules;
            8 cells each
                                                                                                                                      Blk I / IA / IB                   Blk IIA Blk IIB
 Aegis Ashore                                                                  Radar System                                          2004/2006/2013                     2015+ 2020
    2015+                                                                        AN/SPY-1
Hawaii Test Site                                                                                                                                                         SM-2          TBD
     2013                      Open
                            Architecture
                               2012                                                                                                                     Sea-
                                                                                                                                                       Based
                                                                                                                                                      Terminal
                    Quantities
                              PB10               PB11
                            Thru 2015          Thru 2015

                               5                  9
                              22                 28                                                    Vertical Launching
                                                                                                        System Mark 41                                                  Blk IV         2018
                                                                                                                                                                        2008            Far
                             212                292                                                                                                                     Near           Term
                                                                                                                                                                        Term
                               2                  3
                                                                        \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE   Slide 3
                                                                                           Approved for Public Release 10-MDA-5540 (07 Jun
                                                                                          Approved for Public Release 10-MDA-5695 (17 AUG 10)


                            Aegis BMD’s Role In The BMDS
                  Aegis BMD



                                    SRBM

 Midcourse Engagement                                                                            Limited Terminal Defense
  Capability with SM-3                                                                           Capability Defeats Short
 Defeats Short, Medium &                                                                          Range Ballistic Missiles
    Some Intermediate
 Range Ballistic Missiles          MRBM
                                           IRBM




                                                                                 Long Range Surveillance &Track
         Future                                                                Capability Detects and Tracks in Early
      Adding Early                                                               Ascent Phase Providing Forward
  Intercept Capability                                                            Based BMDS Sensor Support

Anti-ICBM w/SM-3 Blk IIB




                               Proven Against Single Salvo,
                              Dual Salvo & Separating Targets
                                                  \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE   Slide 4
                                                                                                                                       Approved for Public Release 10-MDA-5695 (17 AUG 10)

                                                         Aegis BMD Fleet Today
                                                                               (June 2010)
                        Aegis BMD




                                                           SM-2 Blk IV Deliveries (75)
                                                           FTM-14 (2)
          SM-3 Blk I Deliveries                            Stellar Daggers   XXX                                                       Norfolk BMD Ships
CY04            FM-7    CY05
                                                                                                                                       VELLA GULF
       XXX XX FM-8                X XXXXX                                                                                              MONTEREY
                PB 08

         SM-3 Blk IA Deliveries                                                                                                        RAMAGE
CY06                                     Key                                                                                           STOUT
                X   FTM-10               Delivered
                                         Procured

                              FTM-11                                         SDGO BMD Ships                                            Mayport Based BMD Ship
CY07                          FTM-11a
               XXXXXX         FTM-12                                         DECATUR                                                    THE SULLIVANS
                              FTM-13 (2)
                              Burnt Frost                                    BENFOLD
CY08
                                                                             MILIUS
                                                                             HIGGINS
                                                                             JOHN PAUL JONES
CY09                         FTM-17
                    X                 Total Missiles
                                      Available = 61                                                                                                PHBR BMD Ships
CY10
                                                            YOKO BMD Ships                                                                          LAKE ERIE
                                            First SM-3
                                            Blk IB          SHILOH                                                                                  PORT ROYAL
                                                            STETHEM                                                                                 RUSSELL
                                                            CURTIS WILBUR                                                                           O’KANE
                                                            JOHN S. MCCAIN                                                                          PAUL HAMILTON
                                                            FITZGERALD                                                                              HOPPER



                                                                                               \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE   Slide 5
                                                                                                                                                          Approved for Public Release 10-MDA-5695 (17 AUG 10)

                           Aegis BMD PB-11 Capability and Capacity
                                   Aegis BMD
                                                                             Program of Record
            PAA Phase I                                                  PAA Phase II                                                                        PAA Phase III
          Aegis BMD 3.6.1                           Aegis BMD 4.0.1                      Aegis BMD 5.0                         Aegis BMD 5.1                                           Aegis BMD 5.2
  Deployed Now                             2012 Certified for Initial Use       2014 Certified for Initial Use      2016 Certified for Initial Use                    2018 Certified for Initial Use
  • SRBM, MRBM, Limited IRBM Defense       • SRBM, MRBM, Limited IRBM           • SRBM, MRBM, Limited IRBM          • SRBM, MRBM, Enhanced IRBM &                     • SRBM, MRBM, Enhanced IRBM & Some
    & LRS&T                                  Defense & LRS&T                      Defense & LRS&T                     Some Limited ICBM Defense                         Limited ICBM Defense
  • Initial LOR                            • Enhanced LOR                       • LOR                               • Engage on Remote – SM-3 Blk IIA                 • Engage on Remote
  • SM-3 Blk IA Engage Capability          • WILDCAT                            • WILDCAT                                                                             • Sea Based Terminal
  • Sea-Based Terminal                     • SM-3 Blk IB




             SM-3       SM-2                          SM-3     SM-3                        SM-3      SM-3                  SM-3         SM-3        SM-3                  SM-3        SM-3          SM-3          Sea Based
            BLK IA     BLK IV                        BLK IA BLK IB                        BLK IA    BLK IB                BLK IA       BLK IB      BLK IIA               BLK IA      BLK IB        BLK IIA        Terminal
                                                    Improved Fleet BMD                                                                                                       Improved 2-Tier Third Generation
     Initial 2-Tier Fleet BMD Capability               - No Terminal                     “In Stride Fleet BMD”             Third Generation Fleet BMD                             (Adds Back Terminal)

            Deployed Now                        OTE Assessment 2014*                   OTE Assessment 2016*                OTE Assessment 2018*                                   OTE Assessment 2020*
        OTE Assessment 2008
                                                                                                                                                                          * Final Dates Pending Negotiation with DOTE
               PBR-11                        FY10                FY11            FY12                FY13          FY14                    FY15                   FY16                    FY17                   FY18
             SM-3 Blk IA                       80                 106             112                 112           112                     112                    112                     112                    112
            SM-3 Blk IB                        1                   4               16                  42           108                     180                    252                     324                    324
          Total Cumulative
                                               81                 110             128                 154           220                     292                    364                     436                    436
          Deliveries SM-3

                                                                PB-11 Aegis BMD Ship Capacity Profile            Includes Navy Transferred Funding Contribution
          Aegis BMD Ships ***                  FY10              FY11            FY12                FY13          FY14                   FY15                    FY16                   FY17                    FY18
                 3.6.1                          20                21              23                  23            19                     16                      11                     9                       6
                   4.0.1                           0               2               4                   6              9                      7                       7                      7                       6
                5.0                               0                0               1                   3             8                      14                      20                     22                      25
               Total                             20               23**            28**                32             36                     37                      38                     38                      37
      + USN New Construction                                                                                                                38                      41
    Aegis Ashore Sites (24 SM-3)                                                                                                             1                      1                       1                       2
 *CG 70 Not BMD Certified Until 3rd Qtr 2011             ***Cumulative
**Includes Navy Transferred Funding Contribution                                                                                                                                                    AB20105CC001
  3 Ships in FY11 (One Upgrade), 1 Ship in FY12                                                                                                                                                   As of 4 May 2010

                                                                                                                  \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE   Slide 6
                                                                                                                                                  Approved for Public Release 10-MDA-5695 (17 AUG 10)


                                        PB-11 w/ Additional Navy Funding
                                  Aegis BMD
                                                         Aegis BMD Ship Fielding Plan
            FY09                FY10              FY11             FY12               FY13             FY14                  FY15                     FY16                 FY17                 FY18
      59                  59
                     60                 60 59            60
                                                              59
                                                                            60
                                                                                 59
                                                                                                 60
                                                                                                      59
                                                                                                                       60
                                                                                                                            59
                                                                                                                                            60
                                                                                                                                                 59
                                                                                                                                                                 60
                                                                                                                                                                      59
                                                                                                                                                                                      60
                                                                                                                                                                                           59
                                                                                                                                                                                                            60
      61                  61               61                 61                 61                   61                    61                   61                   61                   61
                     62                 62               62                 62                   62                    62                   62                   62                   62                    62
      63                  63               63                 63                 63                   63                    63                   63                   63                   63
                     64                 64               64                 64                   64                    64                   64                   64                   64                    64
CG




      65                  65               65                 65                 65                   65                    65                   65                   65                   65
                     66                 66               66                 66                   66                    66                   66                   66                   66                    66
      67                67                 67               67                67                    67                    67                   67                   67                   67
                     68                 68               68                68                    68                    68                   68                   68                   68                    68
      69                69                 69               69                69                    69                    69                   69                   69                   69
                     70                 70               70                70                    70                    70                   70                   70                   70                    70
      71                71                 71               71                71                    71                    71                   71                   71                   71
                     72                 72               72                72                    72                    72                   72                   72                   72                    72
      73                73                 73               73                73                    73                    73                   73                   73                   73
       51                  51                51                51                 51                   51                   51                    51                   51                   51
                     52                 52               52                52                    52                   52                   52                   52                    52                    52
       53                  53                53                53                 53                   53                   53                    53                   53                   53
                     54                 54               54                54                    54                   54                   54                   54                    54                    54
       55                  55                55                55                 55                   55                   55                    55                   55                   55
                     56                 56               56                56                    56                   56                   56                   56                    56                    56
       57                  57                57                57                 57                   57                   57                    57                   57                   57
                     58                 58               58                58                    58                   58                   58                   58                    58                    58
       59                  59                59                59                 59                   59                   59                    59                   59                   59
                     60                 60               60                60                    60                   60                   60                   60                    60                    60
       61                  61                61                61                 61                   61                   61                    61                   61                   61
                     62                 62               62                62                    62                   62                   62                   62                    62                    62
       63                  63                63                63                 63                   63                   63                    63                   63                   63
DDG




                     64                 64               64                64                    64                   64                   64                   64                    64                    64
       65                  65                65                65                 65                   65                   65                    65                   65                   65
                     66                 66               66                66                    66                   66                   66                   66                    66                    66
       67                 67                 67                67                 67                   67                   67                   67                    67                  67
                     68                 68               68                68                   68                    68                   68                   68                    68                    68
       69                 69                 69                69                 69                   69                   69                   69                    69                  69
                     70                 70               70                70                   70                    70                   70                   70                    70                    70
       71                 71                 71                71                 71                   71                   71                   71                    71                  71
                     72                 72               72                72                   72                    72                   72                   72                    72                    72
       73                 73                 73                73                 73                   73                   73                   73                    73                  73
                     74                 74               74                74                   74                    74                   74                   74                    74                    74
       75                 75                 75                75                 75                   75                   75                   75                    75                  75
                     76                 76               76                76                   76                    76                   76                   76                    76                    76
       77                 77                 77                77                 77                   77                   77                   77                    77                  77
                     78                 78               78                78                   78                    78                   78                   78                    78                    78


              18                 20               23**              28**               32                   36                   37                    38                   38                   37
                   NON          3.6.1        4.0.1 EDM                          5.x           Additional Funds                        Sec Def                    MDA
                                                                   4.0.1
                   BMD                                                                        Sourced by Navy                         FY10(+6)                   PB11
             *CG 70 Not BMD Certified Until 3rd Qtr 2011
            **Includes Navy Transferred Funding Contribution
              3 Ships in FY11 (One Upgrade), 1 Ship in FY12
                                                                           FOR OFFICIAL USE ONLY
                                                                                             \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE    Slide 7
                                                                                                                                                                         Approved for Public Release 10-MDA-5695 (17 AUG 10)


                                                           Aegis BMD Firing Operations
                                     Aegis BMD


                           Foreign Military Sales                                                     Terminal Defense
                                                                                                                                                                                                                                      30 Jul 09
       17 Dec 07                    19 Nov 08                       27 Oct 09                    5 June 08              26 Mar 09                                                                                                      FTM 17
        JFTM 1                       JFTM 2                          JFTM 3                       FTM 14             Stellar Daggers
                                                                                                                                                                                                                      1 Nov 08
                                                                                                                                                                                                                   PACBLITZ 08

                                                                                                                                                                                                     20 Feb 08
                                                                                                                                                                                                      Satellite
                                                                                                                                                                                                     Intercept
  • First Firing from            • First Japanese            • Engage Separating                                                                                                      6 Nov 07
    Japanese Destroyer             No-Notice Launch            Warhead with SM-3              • Engage SRBM w/
                                 • Separating Target           Blk IA                           SM-2 Blk IV         • Simultaneous                                                     FTM 13
                                                                                                                      BMD/ AAW
                                                                                                                      Engagement                                     22 Jun 07
                                                                                                                                                                      FTM 12                                              • First Fleet
                   Homeland Defense                                                                                                                                                                                         SM-3 Firing
                                                                                                                                                    26 Apr 07
GT-180 Glory Boost            IFT-9/10          PAC EX I, II, III
                                                                                                                                                FTM 11 Event 4                                          • First Launch on Remote
                                                                                                                                                                                                          Operation
                                                                                                                                  7 Dec 06
                                                                                                                                    FTM 11                                               • Engage Dual
                                                                                                                    22 Jun 06                                                              SRBMs
                                                                                                                     FTM 10
                                                     PAC                                            17 Nov 05
    First ICBM Tracking:
          19 Sep 02                                  EX IV                                       FTM 04-2(FM-8)
                                                                                                                                                      • Simultaneous BMD/AAW Engagements
                                                                                     24 Feb 05                                                        • Auto-BMD
                                                                                   FTM 04-1(FM-7)                                                     • Pulse DACS
                                                                       11 Dec 03
                                                                         FM-6
                                                                                                                      • SM-3 BLK IA
                                                      17 Jun 03
                                                                                                                      • Aegis 3.6
                                     21 Nov 02          FM-5                                         • Separating     • First Coalition Test
                                         FM-4                                                          Warhead
                        13 Jun 02                                                      • No Notice Firing
                                                                                                                                                Oct 2008 COMOPTEVFOR Found:
                          FM-3
      25 Jan 02
                                                                         • Aim Point Adjust                                                    “The Aegis BMD System is Operationally
         FM-2
                                                                                                                                                 Effective and Operationally Suitable”
                                         • Ascent Phase
                                           Intercept
                                                                                                    Aegis BMD Firings Successes
    • First Intercept
                                                                                               17 for 20 SM-3            3 for 3 SM-2
                                                                                                                                 \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE     Slide 8
                                                                                                   Approved for Public Release 10-MDA-5695 (17 AUG 10)


                                 Aegis BMD Engagement Mode
                            Exploit Organic and Off Board Sensors
                     Aegis BMD

Organic and Cued – BMD 3.6.1
Organic and Cued – BMD 3.6.1                         Cued on Remote (LoR) – BMD 3.6.1
                                                     Launch on Remote (LoR) – BMD 3.6.1
                                                      Launch
                                                     Ship-to-Ship
                                                     Ship-to-Ship



                                              Cued


                                      Organic

                                                      Firing Ship Launches SM-3 Using Remote
 Firing Ship Acquires Target Using Organic or Cued    Data and Acquires with Cued Search Prior
 Search Prior to Launching SM-3, Demonstrated thru    to Intercept
 Flight Test Program                                    • SM-3 Engage on AN/SPY-1
     • SM-3 Engage on AN/SPY-1                          • SM-3 Launch on Remote AN/SPY-1



Cued on Remote (LoR) – BMD 4.0.1
Launch on Remote (LoR) – BMD 4.0.1
Launch                                               Cued on Remote (EoR) – BMD 5.1
                                                     Engage on Remote (EoR) – BMD 5.1
                                                     Engage
TPY-2 // Other-to-Ship
TPY-2 Other-to-Ship




 Firing Ship Launches SM-3 Using Remote Data and
 Acquires with Cued Search Prior to Intercept         Firing Ship Launches SM-3 and Intercepts
     • SM-3 Engage on AN/SPY-1 Mod 1 (BSP)            Target Using
     • SM-3 Launch on Remote AN/SPY-1 Mod 1 (BSP)         • SM-3 Engage on Remote AN/SPY-1
     • SM-3 Launch on AN/TPY-2                            • SM-3 Engage on AN/TPY-2


                                                           \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE   Slide 9
                                                                                                           Approved for Public Release 10-MDA-5695 (17 AUG 10)


                              Aegis BMD 3.6.1 & SM-3 Block IA
                       Aegis BMD
                                               Currently Fielded System
Aegis BMD 3.6.1 Computer Program and Equipment System:                SM-3 Block IA Missile:
Approach:      Modify Existing Ship Systems                           Approach:                    Add 3rd Stage & Kill Vehicle to
                                                                                                   Existing SM-2 Blk IV Booster Stack
Threats:       Short to Intermediate Range
               Ballistic Missiles                                     Battle Space: Above the Atmosphere

                         Initial Launch on Remote                     Threats:                     Short to Some Intermediate Range
                                                                                                   Ballistic Missiles
Operational:   Retain Multi Mission Capability
                                                                      Cost:                        $9-10M Each
Cost:            $10-15M per Ship
                                                                      Quantity:                    61 (as of 4/10)
Quantity:        19 (as of 3/10)
                                                                      Provider:                    Raytheon, Arizona & Navy Field
Provider:        Lockheed Martin, NJ & Navy Field                                                  Activities/Labs
                 Activities/Labs




                                     Organic
                                                      Initial
                                                    Launch on
                                                                Engage on Remote
                                                     Remote
                                                                  (Not Available)




                                                                  \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE   Slide 10
                                                                                                                          Approved for Public Release 10-MDA-5695 (17 AUG 10)


                            SM-3 Block IA Flight Test History
                     Aegis BMD
                                        FTM -11A                                                                     FTM-11 (Redo)                                        FTM-12
    FTM-10 June 2006               Summer 2006 (Classified)                                                            April 2007                                        June 2007


                     HIT            HIT                            No Fire                                        HIT                                                                     HIT




                                                                        FTM -11 Nov 2006
                                                                  (Failed Launch – Logic Error
                                                                            on Ship)


         FTM -13 Nov 2007
    (Dual Salvo/Dual BMD Skills)

                                          JFTM-1 Dec 2007     Burnt Frost Feb 2008 JFTM-2 Nov 2008                           FTM-17 Jul 2009                        JFTM-3 Oct 2009

         HIT                HIT                    HIT                   HIT                              HIT                                   HIT                                      HIT
                                                                                                                                                                                         HIT




                              SM-3 Block IA is 10/11 in Flight Tests.
                           Aegis BMD 3.6/SM-3 Block IA Overall is 10/12
NOTE: FTM-15 is FOTE Conducted by PACOM
                                                                                 \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE   Slide 11
                                                                                                                 Approved for Public Release 10-MDA-5695 (17 AUG 10)


                               Aegis BMD 4.0.1 & SM-3 Block IB
                       Aegis BMD
                                                 2nd Generation System
Aegis BMD 4.0.1 Computer Program and Equipment System:                     SM-3 Block IB Missile:
Approach:      Improve Shipboard Signal & Data Processing                  Approach:                   Improve SM-3 Kill Vehicle Seeker
                                                                                                       & Engine
Threats:       More Sophisticated Short to
               Intermediate Range Ballistic Missiles                       Battle Space: Above the Atmosphere
                                                                           Threats:      More Sophisticated Short to                                            Intermediate
                          Launch on Remote                                    Range Ballistic Missiles
Operational:   - Increased Raid Density                                    Cost:                       $12-$15M (est.)
               - Flexible Firing Doctrine                                  Quantity:                   >300 Planned, Test Rounds Being
                                                                                                       Fabricated
Cost:            $45-$55M
                                                                           Provider:                   Raytheon, Arizona & Navy Field
Quantity:        1 Test Ship
                                                                                                       Activities/Labs
Provider:      Lockheed Martin, NJ & Navy Field Activities/Labs
                                                                           Status:                     First Flight Early CY2011
Status:        Initial At-Sea Testing Underway, Available Late 2011                                    IOC 2013




                                       Organic
                                                        Launch on
                                                         Remote
                                                                      Engage on Remote
                                                                        (Not Available)




                                                                        \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE   Slide 12
                                                                                                             Approved for Public Release 10-MDA-5695 (17 AUG 10)


                                Aegis BMD 5.1 & SM-3 Block IIA
                        Aegis BMD
                                                3rd Generation System
Aegis BMD 5.1 Computer Program and Equipment System: :                   SM-3 Block IIA Missile:
Approach:      Modify Existing Systems to Fly SM-3 Blk IIA &             Approach:                    Increased Reach & Velocity
               Use Off Board Sensors for Engagement                                                   Biggest Missile Compatible w/Mk41 VLS
Threats:       More Sophisticated Short to Intermediate    Range         Battle Space: Above the Atmosphere
   Ballistic Missiles plus Some ICBMs
                                                                         Threats:                     More Sophisticated Short to Some
                                                                                                      Intermediate Range Ballistic Missiles,
                          Engage on Remote                                                            Plus Some ICBMs
Operational:   Flexible Firing Doctrine                                  Cost:                        ~$15M
Cost:            $23M                                                    Quantity:                    TBD
Quantity:        TBD
                                                                         Provider:                    Joint U.S. & Japan
Provider:      Lockheed Martin, NJ & Navy
               Field Activities/Labs                                     Status:                      Development, 1st Flight Late 2014
Status:        Development, IOC 2016/17




                                    Organic
                                                      Launch on
                                                       Remote
                                                                   Engage on Remote




                                                                    \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE   Slide 13
                                                                                                                                                                                                                    Approved for Public Release 10-MDA-5695 (17 AUG 10)


                                                                                     Aegis Ashore Configuration
                                                 Aegis BMD


                                                              Aegis Display System Mark 8 Mod 1                                                                                       Command & Decision System Mark 3 Mod 6
                                                                             • ACB12 Computer Program                                                                                                         • ACB12 Computer Program
                                                                             • Three screen variant provides                                                                                                  • Joint Tactical Terminal
                                                                               additional display area                                                                                                        • Integrated Mission Planner
                                                                             • Video wall
                                                                                                                                                                                                                               Radar System AN/SPY-1D(V)
 Weapon Control System Mark 9 Mod 6
                                                                                                                                                                                                                                    • ACB12 Computer Program
             • ACB12 Computer Program                                                                                                                                                                                               • Multi Mission Signal Processor
                                                                                                                                                                                                                                      (MMSP)
             • SM-3 Launch on Remote (AN/SPY-1,
               AN/TPY-2, ABIR, Space Assets)                                                                                                                                                                                        • Integrated Satellite System
                                                                                                                                                                                                                                      Calibration Computer
             • SM-3 Block IB
                                                                                                                                                                                       STSS
                                                                                                                                                  Intercept
                                                                                                                                                                                                                                                 Aegis Combat Training
  Kill Assessment System                                                                                                                                                                                                                         System Mark 51 Mod 4
• Uses FCS Mark 99 Mod 8                                                                                                                                                                                                                          • Supports BMD Training
• System Receives Kinetic                                                                                                                      (Uplink /
                                                                                                                                              Downlink)
                                                                                                                                                                C2BMC /
  Warhead Downlink       KDRE Cabinet               KDRE Cabinet
                                                                                                                                                                AN/TPY-2
                                                                                                                                                                 (FBM)
                                                                                                                                                                                                                                                  Operational Readiness
                       Gigabit Ethernet Switch    Gigabit Ethernet Switch




• Supports Kill                 Blank
                                Blank
                                Blank
                                Blank
                             System Monitor

                            VME Chassis

                       Test Simulator Chassis
                       Test Simulator Chassis
                                                            Blank
                                                            Blank
                                                            Blank
                                                            Blank
                                                        System Monitor

                                                       VME Chassis

                                                   Test Simulator Chassis
                                                   Test Simulator Chassis




  Assessment
                         Receiver& Bit Sync         Receiver& Bit Sync


                                                                                                                SATCOM
                                                                                                                                                                                                                                                      Test System
                         Receiver& Bit Sync         Receiver& Bit Sync
                             RF Signal
                         RF Signal Cond.
                              Cond.

                         Receiver& Bit Sync
                                                        RF Signal
                                                    RF Signal Cond.
                                                         Cond.

                                                    Receiver& Bit Sync
                                                                                                                         Aegis
                                                                                                                         Ashore
                         Receiver& Bit Sync         Receiver& Bit Sync

                       Test Simulator Chassis      Test Simulator Chassis

                                 Blank
                                 Blank
                                 Blank
                                                            Blank
                                                            Blank
                                                            Blank
                                                                                                        THAAD            Deckhouse                                                            Threat
                                 Blank
                             System Monitor
                                                            Blank
                                                        System Monitor
                                                                                                                                        VLS                                                   Launch
                                                                                                                                                                                                                                                        • Supports BMD
                            VME Chassis                VME Chassis

                       Gigabit Ethernet Switch     Gigabit Ethernet Switch
                            BMD KDRE                    BMD KDRE




                                                                                        Defended                         Aegis Ashore
                                                                                          Area                                                                                                                                                            Equipment
                                                                                                                                                                                                                                                        • Supports All In-
  Standard Missile (SM-3)                                                                   OPCON/TACON Node                                     Aegis BMD Afloat                                                                                         Service Equipment

         Block IB
• 2 Color Seeker                                                                                                                                                                                                                         Tactical Data Links
• Throttleable Divert/Attitude Control System (TDACS)                                                                                            Deckhouse                                                                           • Common Data Link Management
                                                                                                                                                 • Houses Aegis Combat System                                                          System (CDLMS) 3.7.1
                   Vertical Launching System (VLS)                                                                                               • Relocatable                                                                       • Upgrade to Support Joint Range
                                                                                                                                                                                                                                       Extension (JRE)
                             Mark 41 Mod 2
                    • Supports any SM-3 Missile – Any Cell                                                                                                 Green – Common with DDG 113
                    • Relocatable                                                                                                                                                                                                                                       AB201006CC006

                                                                                                                                                                           \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE   Slide 14
                                                             Approved for Public Release 10-MDA-5695 (17 AUG 10)



Strengthening International Cooperation
 Aegis BMD




                         • Added BMD Capability to 3 Kongo
                           Class Ships on Schedule
                                       – 4th Ship Complete this Fall
                                       – Total FMS Value $1.3B
                         • Testing with Maritime Allies
                                       – HNLMS TROMP December 2006
                                       – SPS MENDEZ NUNEZ June 2007




                    \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE   Slide 15
                                                                                              Approved for Public Release 10-MDA-5695 (17 AUG 10)


                      Top Management Focus Areas
          Aegis BMD



• Adequate Aegis BMD Ships and SM-3 Rounds to Meet Demand
• Successful Development of “Second Generation” Aegis BMD System
• Transition from SM-3 Block IA to SM-3 Block IB Manufacturing
• Successfully Navigate Complex Technical and Managerial Challenges
  Associated with Multiple Development, Production, Installation and
  Operational Transition Activities
    – Migration to Open Architecture

    – SM-3 Block IIA Cooperative Development Project

    – Fire Control Using Netted, Off Board Sensors

    – Phased Adaptive Approach Phase One




                                                     \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE   Slide 16
                                                                           Approved for Public Release 10-MDA-5695 (17 AUG 10)



            Aegis Ballistic Missile Defense
    Aegis BMD




                Forward…At Sea…On Patrol

Enabling Capabilities, Providing Options for U.S. and Allies
                                  \\one.mda.mil\Public\AB\Graphics\Briefings\2010\201007\NDIA\NDIA Overview Brief_13 July FINAL PUBLIC RELEASE   Slide 17

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:37
posted:8/26/2011
language:English
pages:17