                                                    PRICE SCHEDULE
NAME OF OFFEROR OR CONTRACTOR                                              SOLICITATION OR CONTRACT NUMBER          PAGE


                        Type Contractor Name Here                                         8-11-C025                        Section III
SCOPE OF WORK


The Contractor shall provide all services, labor, subcontractors, supervision and materials necessary to provide and conduct Legal
Services relating to the Dulles Corridor Metrorail Project, in accordance with the Statement of Work included at Attachement 01.
ITEM NO.   SUPPLIES/SERVICES                                               EST QTY      UNIT          UNIT PRICE    AMOUNT


                                                            BASE YEAR
    01     Partner (Including Lead Attorney)                                   300             HR
    02     Associate                                                           500             HR
    03     Paralegal                                                           150             HR
           Total - Base Year
           (Items 01 - 03)
                                                       OPTION YEAR ONE
    01     Partner (Including Lead Attorney)                                   100             HR
    02     Associate                                                           200             HR
    03     Paralegal                                                            50             HR
           Total - Option Year One
           (Items 01 - 03)
                                                       OPTION YEAR TWO
    01     Partner (Including Lead Attorney)                                    50             HR
    02     Associate                                                           150             HR
    03     Paralegal                                                            25             HR
           Total - Option Year Two
           (Items 01 - 03)
                                                      OPTION YEAR THREE
    01     Partner (Including Lead Attorney)                                    50             HR
    02     Associate                                                           125             HR
    03     Paralegal                                                            25             HR
           Total - Option Year Three
           (Items 01 - 03)
                                                      OPTION YEAR FOUR
    01     Partner (Including Lead Attorney)                                   100             HR
    02     Associate                                                           250             HR
    03     Paralegal                                                            75             HR
           Total - Option Year Four
           (Items 01 - 03)

           GRAND TOTAL
           (Base Year plus Four Option Years)                                  WARNING: PRICE SCHEDULE INCOMPLETE.
                                                                               Pricing must be provided for all of the above items.
NOTES:

ELECTRONIC SUBMISSION OF PRICE SCHEDULE: This Price Schedule must be submitted in both electronic and hard copy. The
electronic copy of the Price Schedule must be submitted in its original Microsoft Excel Format on either a CD-ROM or USB Flash Drive.
The structure of the schedule is protected and shall not be modified in any way. Modified schedules may be deemed non-conforming to
the RFP. In the event of a discrepancy between the hard copy and the Microsoft Excel file on CD-ROM or USB Flash Drive, the hard
copy will take precedence.
                                     Metropolitan Washington Airports Authority
                                                      PRICE SCHEDULE
NAME OF OFFEROR OR CONTRACTOR                                                 SOLICITATION OR CONTRACT NUMBER           PAGE


                        Type Contractor Name Here                                            8-11-C025                         Section III
SCOPE OF WORK


The Contractor shall provide all services, labor, subcontractors, supervision and materials necessary to provide and conduct Legal
Services relating to the Dulles Corridor Metrorail Project, in accordance with the Statement of Work included at Attachement 01.
ITEM NO.   SUPPLIES/SERVICES                                                  EST QTY      UNIT          UNIT PRICE     AMOUNT

BASIS OF EVALUATION AND AWARD: Price is only one of several criteria upon which proposals will be evaluated. See Section X,
Attachment 02 for the evaluation criteria, and for information required to be provided in connection with the criteria. Price evaluation will
be based on the lowest conforming, responsible Offeror for the Total Price.
HOURLY RATES: Shall reflect a single, blended hourly rate each for partners, associates and paralegals and shall exclude out-of-
pocket costs and other non-legal fees.

RATES FOR ADDITIONAL PROFESSIONAL SERVICES: If it shall become necessary for the Authority to request the Contractor to
render any additional services to either supplement the services requested in the Statement of Work or to perform additional work as a
result of specific and significant changes, such additional work shall be performed only if set forth in a modification to the contract
between the Authority and the Contractor. Any such additional work agreed to between the Authority and the Contractor shall be
performed at the same rates set forth in the Price Schedule.
NOTE: Every item of the Price Schedule must be completed or the proposal may be deemed non-conforming.

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:20
posted:8/24/2011
language:English
pages:2