professional documents
home
Upload
docsters
Upload
Yucca Mountain Project Green Language in Request for Proposal for Office Products February 2006 Contact Delane Fitzpatrick-Maul, Pollution Prevention Program Coordinator Tel. 702-295-4973 E-Mail: delane_fitzpatrick-maul@ymp.gov Background Yucca Mountain Project has drastically reduced what may be procured in an effort to reduce office supply costs. The Request for Proposal contains a very limited list of 200 or so items that may be ordered. The biobased and Energy Star opportunities were considered. Yucca Mountain Project added these generically to a general requirement the vendor must comply with. As requirements change, they can be incorporated into the vendor's contract during contract extensions and renewals. Although the list of Recycled Products below may contain a few extra non-designated items, these are in general what Yucca Mountain Project purchases and includes in the annual RCRA 6002/EO 13101 report. Green Language in Request for Proposal BUYER must be notified if there exists recycled, energy efficient, or other environmentally preferable products in place of items listed that are within the government's guidelines of reasonable cost. Reporting Requirement The vendor must supply at the end of each fiscal year a report listing specific items (or everything that was purchased) and if the items are manufactured with recycled materials, dollar amount, unit, quantity, and page or item number for reference. This information is incorporated into a federal "green" purchasing report that is developed by the Environmental Compliance organization. Recycled Products The following are products that the U.S. Environmental Protection Agency, per a federal regulation, designates as recycled-content products. These products, when purchased, must contain a percentage of recycled materials. The vendor should identify all the recycled-content products that it can supply, particularly, the EPA required recycled-content products listed below. binders clip portfolios file folders wallets expanding files clipboards plastic desktop accessories envelopes presentation folders trash bags liners printer ribbons recycling containers waste receptacles tissue general purpose wipes towels paper napkins packaging products cartons storage boxes padded mailers toner cartridges printing and writing papers envelopes forms index card stock transparencies planner appointment books calendar post-its self-stick notes writing pads
flag this doc
25
0
not rated
0
7/9/2008
English
Preview

RFP for Office Supplies YMP - Contracts/Agreements

NuclearSafety 7/9/2008 | 19 | 0 | 0 | legal
Preview

National Nuclear Security Administration NNSA

OPM 6/18/2008 | 38 | 0 | 0 | legal
Preview

Infrastructure Plan for the NNSA Nuclear Complex

NuclearSafety 7/9/2008 | 53 | 0 | 0 | legal
Preview

Linton Brooks Assumes Post as Deputy Administrator for NNSA Defense Nuclear Nonproliferation Office

NuclearSafety 7/9/2008 | 26 | 0 | 0 | legal
Preview

Linton Brooks Assumes Post as Deputy Administrator for NNSA Defense Nuclear Nonproliferation Office - 2001

NuclearSafety 7/9/2008 | 17 | 0 | 0 | legal
Preview

National Nuclear Security Administration NNSA - Site Map

OPM 6/18/2008 | 16 | 1 | 0 | legal
Preview

NNSA Dismantles Last Nuclear Artillery Shell

NuclearSafety 7/9/2008 | 47 | 0 | 0 | legal
Preview

Infrastructure Plan for the NNSA Nuclear Complex - 2004 - 2002

NuclearSafety 7/9/2008 | 27 | 0 | 0 | legal
Preview

NNSA Forms New Task to Address Nuclear and Radiological Threats

NuclearSafety 7/9/2008 | 38 | 0 | 0 | legal
Preview

NNSA Dismantles Last Nuclear Artillery Shell - 2003

NuclearSafety 7/9/2008 | 32 | 0 | 0 | legal
Preview

Report to Congress on the Plan for Organizing the National Nuclear Security Administration

NuclearSafety 7/9/2008 | 43 | 0 | 0 | legal
Preview

RFP for Office Supplies YMP

DeptEnergy 7/11/2008 | 47 | 0 | 0 | legal
Preview

Paul Longsworth Sworn in as NNSA Deputy Administrator for Defense Nuclear Nonproliferation

NuclearSafety 7/9/2008 | 38 | 0 | 0 | legal
Preview

Paul Longsworth Sworn in as NNSA Deputy Administrator for Defense Nuclear Nonproliferation - 2003

NuclearSafety 7/9/2008 | 25 | 0 | 0 | legal
Preview

NNSA Cites Los Alamos National Laboratory For Nuclear Safety Violations

NuclearSafety 7/9/2008 | 31 | 0 | 0 | legal
Preview

Startup Management Self Assessment - Achieving Readiness

NuclearSafety 7/9/2008 | 45 | 0 | 0 | legal
Preview

Operational Readiness Program Plan - Achieving Readiness

NuclearSafety 7/9/2008 | 47 | 0 | 0 | legal
Preview

Proposed ORR Training Workshop - Training Curriculum

NuclearSafety 7/9/2008 | 37 | 0 | 0 | legal
Preview

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

NuclearSafety 7/9/2008 | 49 | 1 | 0 | legal
Preview

Recommended Training Classes in Support of Readiness Review Processes - Training Curriculum

NuclearSafety 7/9/2008 | 41 | 0 | 0 | legal
Preview

ORR RA Team Member Training Outline - Training Curriculum

NuclearSafety 7/9/2008 | 39 | 0 | 0 | legal
Preview

Startup Testing Program Plan - Achieving Readiness

NuclearSafety 7/9/2008 | 39 | 0 | 0 | legal
Preview

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

NuclearSafety 7/9/2008 | 42 | 0 | 0 | legal
Preview

Controlled Hydrogen Fleet and Infrastructure Demonstration and Validation Project

NuclearSafety 7/9/2008 | 40 | 0 | 0 | legal
Preview

System-Level Analysis of Hydrogen Storage Options

NuclearSafety 7/9/2008 | 38 | 0 | 0 | legal
 
review this doc