Documents
Resources
Learning Center
Upload
Plans & pricing Sign in
Sign Out

Short Business Proposals

VIEWS: 3 PAGES: 2

Short Business Proposals document sample

More Info
									      2011 PUGET SOUND MARITIME EMISSIONS INVENTORY DEVELOPMENT
                        REQUEST FOR PROPOSALS
                     ATTACHMENT D – PRICING SHEET

The cost proposal shall be completed and submitted, as an appendix, with the Firm’s proposal.
Specify any additional fees, charges, and reimbursable expenses that are, or may be, billable to
the Port for each task as an attachment to this form.


NO.                           DESCRIPTION                                EXTENDED AMOUNT

TASK A:
    Summarize the methodology used in the 2005 PSEI and
 A1 recommend revisions as needed.
TASK B:
    Finalize 2011 emission calculation methodology and data collection
 B1 procedures.
TASK C:
Table 1:
 C1 Ocean Going Vessel Activity Data
      Cargo & Cruise vessels calling Participating Ports / At Berth,
      Transit & Maneuvering
      Tankers
      At Berth, Transit & Maneuvering
 C4 Rail Locomotive Activity Data
      Rail-short haul-Participating Ports
      Rail-transit in Puget Sound air basin-BN/UP
 C5 Heavy-Duty Trucks Activity Data
      Drayage trucks traveling regionally
                                                   SUBTOTAL TABLE 1:          $0.00
Table 2:
 C1 Ocean Going Vessel Activity Data
      Cargo vessels calling Non-Participating Ports
      Fishing vessels calling Non-participating Ports
 C2 Harbor Crafts Activity Data
      Non-WA State Ferries
      Tugs, bunker, barge, serving Non-Participating Ports
      Non-OGV fishing fleets regional
      Marinas, pleasure boats
 C3 Cargo Handling Equipment Activity Data
      CHE operated on terminals at Non-Participating Ports
 C4 Rail Locomotive Activity Data
      Short haul Non-Participating Ports
 C6 Regional Air District Supporting Information
      Non-Participating Ports Air Districts
 C7 Other Equipment Activity Data
      Dredging operations Non-Participating Ports
      Dredging operations Puget Sound Region
                                                   SUBTOTAL TABLE 2:          $0.00
Table 3:
 C1 Ocean Going Vessel Activity Data
      Fishing vessels calling Participating Ports
 C2 Harbor Crafts Activity Data
      WA State Ferries
      Tugs, bunker, barge, serving Participating Ports
      Non-OGV fishing fleet at Participating Ports
 C3 Cargo Handling Equipment Activity Data
      CHE operated on terminals at Participating Ports
      CHE used at on-dock railyard
      Non-terminal CHE at Participating Ports
 C4 Rail Locomotive Activity Data
      Switching locomotives
 C5 Heavy-Duty Trucks Activity Data
      Drayage trucks inside Port boundary
      Non-drayage port trucks
 C6 Regional Air District Supporting Information
      Non-Maritime Emissions
 C7 Other Equipment Activity Data
      Light-duty vehicles as auto business or cruise shuttles
      Construction equipment -Port development - Participating Ports
      Dredging operations by Participating Ports
                                                   SUBTOTAL TABLE 3:       $0.00
                                                         ‘C’ SUBTOTAL:     $0.00
TASK D:

 D1 Data Review
TASK E:

 E1 Meetings (10)
TASK F:

 F1 Draft and Finalize Report
Additional work:
      Cost estimate for 14 additional hard copies (bound, color, double-
      sided) of the final PSEI report.


                                           PROPOSAL TOTAL:                 $0.00

Contract No. 069206

								
To top