									                                                                  Schedule of Proposed Action (SOPA)
                                                                                04/01/2010 to 06/30/2010
                                                                                Malheur National Forest
                              This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.

                                                                                                                                                      Expected
         Project Name                    Project Purpose                              Planning Status                          Decision            Implementation        Project Contact



Projects Occurring in more than one Region (excluding Nationwide)
Geothermal Leasing              - Regulations, Directives,                  In Progress:                                Expected:02/2010                 03/2010     Tracy Parker
Programmatic Environmental      Orders                                      FEIS NOA in Federal Register                                                             505-758-6310
Impact Statement                                                            10/24/2008                                                                               tparker03@fs.fed.us
EIS                            Description: The Bureau of Land Management and Forest Service are preparing a joint Programmatic Environmental Impac
                                            Statement to analyze the leasing of BLM and USFS administered lands with moderate to high potential for
                                            geothermal resources in 11 western states.
                               Web Link: http://www.blm.gov/wo/st/en/prog/energy/geothermal/geothermal_nationwide.html
                                Location:        UNIT - Coronado National Forest All Units, Gila National Forest All Units, Lincoln National Forest All Units, Boise
                                                 National Forest All Units, Bridger-Teton National Forest All Units, Clearwater National Forest All Units,
                                                 Beaverhead-Deerlodge National Forest All Units, Bitterroot National Forest All Units, Lewis And Clark National
                                                 Forest All Units, Medicine Bow-Routt National Forest All Units, San Juan National Forest All Units, White River
                                                 National Forest All Units, Carson National Forest All Units, Cibola National Forest All Units, Cleveland National
                                                 Forest All Units, Eldorado National Forest All Units, Lassen National Forest All Units, Los Padres National Forest
                                                 All Units, Mendocino National Forest All Units, Modoc National Forest All Units, San Bernardino National Forest All
                                                 Units, Sequoia National Forest All Units, Tahoe National Forest All Units, Gifford Pinchot National Forest All Units,
                                                 Malheur National Forest All Units, Mt Baker-Snoqualmie National Forest All Units, Rogue River-Siskiyou National
                                                 Forest All Units, Umpqua National Forest All Units, Wallowa-Whitman National Forest All Units, Okanogan-
                                                 Wenatchee National Forest All Units, Dixie National Forest All Units, Fishlake National Forest All Units, Payette
                                                 National Forest All Units, Salmon-Challis National Forest All Units, Sawtooth National Forest All Units, Humboldt-
                                                 Toiyabe National Forest All Units, R10 - Alaska Region All Units, Custer National Forest All Units, Gallatin
                                                 National Forest All Units, Helena National Forest All Units, Grand Mesa Uncompahgre and Gunnison National
                                                 Forest All Units, Santa Fe National Forest All Units, Angeles National Forest All Units, Plumas National Forest All
                                                 Units, Manti-Lasal National Forest All Units, Caribou-Targhee National Forest All Units, Shasta Trinity National
                                                 Forest All Units, Deschutes National Forest All Units, Mt. Hood National Forest All Units, Rio Grande National
                                                 Forest All Units, Apache-Sitgreaves National Forests All Units, Klamath National Forest All Units, Sierra National
                                                 Forest All Units, Ochoco National Forest All Units, Fremont-Winema National Forest All Units, Umatilla National
                                                 Forest All Units, Willamette National Forest All Units, Pike and San Isabel National Forests and Cimarron and
                                                 Comanche National Grasslands All Units, Washington Office (National Headquarter), Uinta-Wasatch-Cache All
                                                 Units, Lolo National Forest All Units, Nez Perce National Forest All Units, Arapaho and Roosevelt National Forests
                                                 All Units, Tonto National Forest All Units, Inyo National Forest All Units. STATE - Alaska, Arizona, California,
                                                 Colorado, District of Columbia, Idaho, Kansas, Montana, Nebraska, Nevada, New Mexico, North Dakota,
                                                 Oklahoma, Oregon, South Dakota, Texas, Utah, Washington, Wyoming. COUNTY - Aleutians East, La Paz,
                                                 Colusa, Denver, Douglas, Bonner, Columbia, Coos. 11 contiguous Western States (Arizona, California, Colorado,
                                                 Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming) and Alaska.

04/01/2010                                                            Page          1 of 17                                                                         Malheur National Forest
                                                                                                                            Expected
         Project Name                  Project Purpose                    Planning Status                Decision        Implementation        Project Contact

R6 - Pacific Northwest Region, Occurring in more than one Forest (excluding Regionwide)
Blue Mountains Forest Plan      - Land management planning        In Progress:                      Expected:03/2012           04/2012     Kathleen Countryman
Revision                                                          NOI in Federal Register                                                  541-523-1264
EIS                                                               03/29/2010                                                               kcountryman@fs.fed.us
                                                                  Est. DEIS NOA in Federal
                                                                  Register 03/2011
                                Description: Revision of Land Management Plans (Forest Plans) for the Malheur, Umatilla, & Wallowa-Whitman Forests.
                                             Forest Plans provide stategic, program-level guidance for future management of forests and their natural
                                             resources for the next 10-15 years.
                                Web Link: http://www.fs.fed.us/r6/uma/blue_mtn_planrevision/
                                Location:     UNIT - Malheur National Forest All Units, Wallowa Valley Ranger District, Eagle Cap Ranger District, La Grande
                                              Ranger District, Umatilla National Forest All Units, Whitman Ranger District. STATE - Oregon, Washington.
                                              COUNTY - Asotin, Columbia, Garfield, Walla Walla, Baker, Grant, Harney, Malheur, Morrow, Umatilla, Union,
                                              Wallowa, Wheeler. Forest-wide for Malheur, Umatilla, & Wallowa-Whitman (except for the HCNRA).



Malheur National Forest, Forestwide (excluding Projects occurring in more than one Forest)                                         R6 - Pacific Northwest Region
John Day Airport - Malheur      - Facility management             Completed                         Actual: 03/22/2010         04/2010     Greg Loper
National Forest Air Tanker Base                                                                                                            541-575-3377
CE                                                                                                                                         gloper@fs.fed.us
        *NEW LISTING*           Description: Relocate water, retardant tanks and pumps due to Airbase building construction.


                                Location:     UNIT - Malheur National Forest All Units. STATE - Oregon. COUNTY - Grant. LEGAL - T 14 R 31 sec. 27
                                              SE1/4 of SE. John Day- Grant County Airport.
Malheur National Forest         - Vegetation management           In Progress:                      Expected:04/2011           06/2011     Carole Holly
Invasive Plants Treatment       (other than forest products)      NOI in Federal Register                                                  541-575-3026
EIS                                                               03/31/2006                                                               cholly@fs.fed.us
                                                                  Est. DEIS NOA in Federal
                                                                  Register 10/2010
                                Description: Treatment of known and newly discovered invasive plants using herbicide, manual, mechanical, biological, and/or
                                             cultural methods.
                                Location:     UNIT - Malheur National Forest All Units. STATE - Oregon. COUNTY - Baker, Crook, Grant, Harney, Malheur.
                                              LEGAL - Forest wide. Forest wide.




04/01/2010                                                     Page     2 of 17                                                           Malheur National Forest
                                                                                                                               Expected
         Project Name                     Project Purpose                    Planning Status                 Decision       Implementation         Project Contact

Malheur National Forest, Occurring in more than one District (excluding Forestwide)                                                   R6 - Pacific Northwest Region
Blue Mountain Heritage Trail       - Recreation management          Cancelled                          N/A                         N/A        Shannon Winegar
CE                                                                                                                                            541-820-3863
                                                                                                                                              swinegar@fs.fed.us
                                  Description: Designation of a non-motorized trail between Baker City and Prairie City, Oregon.


                                   Location:    UNIT - Blue Mountain Ranger District, Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. Blue
                                                Mountain Ranger District. Route would follow existing open & closed roads on the Malheur National Forest from
                                                Wallowa Whitman National Forest Boundary to Prairie City Oregon.
Camp Creek, Reynolds Creek,   - Wildlife, Fish, Rare plants      In Progress:                        Expected:04/2010          07/2010       Ryan Falk
and North Fork Reynolds Creek                                    Scoping Start 07/06/2009                                                    541-820-3890
Culvert Replacement                                                                                                                          rfalk@fs.fed.us
CE                            Description: Replacement of six culverts to allow passage of all life stages of fish. Three culverts are located on Camp Creek,
        *NEW LISTING*                         one on Reynolds Creek, and two on North Fork Reynolds Creek.
                                   Location:    UNIT - Blue Mountain Ranger District, Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL
                                                - T11S R32E, section 28; T11S R32E, section 34; T12S R32E, section 2; T13S R35E, section 20; T13S R35E,
                                                section 20; and T13S R35E, section 8. Camp Creek is located within the Middle Camp Creek subwatershed; and
                                                Reynolds Creek and North Fork Reynolds Creek are located within the Reynolds Creek subwatershed.
Campground Tent Pad                - Recreation management          Developing Proposal                Expected:05/2010         06/2010       Ryan Falk
Maintenance                                                         Est. Scoping Start 04/2010                                                541-820-3890
CE                                                                                                                                            rfalk@fs.fed.us
        *NEW LISTING*             Description: Leveling and gravel surfacing of existing tent pad areas in Parish Cabin, Trout Farm, and Magone Campgrounds.


                                   Location:    UNIT - Blue Mountain Ranger District, Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL
                                                - T14S R34E, section 31; T32S R12E, section 6; and T16S R33E, section 16. Trout Farm, Magone, and Parish
                                                Cabin Campgrounds.
Cole Outfitter Guide Special       - Special use management         In Progress:                       Expected:09/2010         10/2010       Shannon Winegar
Use Permit                                                          Scoping Start 10/26/2009                                                  541-820-3863
CE                                                                                                                                            swinegar@fs.fed.us
                                  Description: Issuance of a special use permit to authorize outfitter guiding and camps for big game hunting of big horn sheep,
                                               muzzleloading, and rifle elk.
                                   Location:    UNIT - Blue Mountain Ranger District, Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL
                                                - Base camps would be located at T15S R28E section 3, T16S R331/2 E section 3, and T14S R27E section 11.
                                                Murders Creek Hunt Unit, West Murders Creek Hunt Unit, East Grant Hunt Unit, Beulah Hunt Unit.



04/01/2010                                                      Page       3 of 17                                                           Malheur National Forest
                                                                                                                                 Expected
         Project Name                   Project Purpose                     Planning Status                  Decision         Implementation        Project Contact

Malheur National Forest, Occurring in more than one District (excluding Forestwide)                                                    R6 - Pacific Northwest Region
SodaBear Project                - Fuels management                  Developing Proposal                 Expected:05/2011          06/2011       Daniel Hubbard
EA                                                                  Est. Scoping Start 06/2010                                                  530-279-8330
                                                                                                                                                dhubbard02@fs.fed.us
                                Description: Approximately 20,000 acres of thinning in timber stands to reduce fire hazard, insect and disease risk, improve old
                                             growth, identify / plan biomass stands, restore riparian aspen, restore mountain mahogany, and maintain wildlife
                                             habitat.
                                Location:     UNIT - Blue Mountain Ranger District, Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Grant,
                                              Harney. Lower Bear, Middle Bear, and Soda Valley Subwatersheds near Seneca, Oregon.



Malheur National Forest   Blue Mountain Ranger District (excluding Projects occurring in more than one District)                       R6 - Pacific Northwest Region
Abandoned Mine Closures         - Minerals and Geology              In Progress:                        Expected:10/2010          06/2011       Pamela Uebler
2010/2011                                                           Scoping Start 07/22/2009                                                    541-575-3462
CE                                                                                                                                              puebler@fs.fed.us
                                Description: Close abandoned mine hazards by filling in adits/trenches/shafts with earth and rock from existing mine spoil piles;
                                             and recontour slopes adjacent to work area. If bats are present, a bat gate structure may be installed rather than
                                             an earthen plug.
                                Location:     UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - Middlefork John Day
                                              River / Susanville area T. 10S. R.34E., Sec.30/31; T.10S., R.32E. Sec 12; etc. Specific mines may include 2010-
                                              986 shaft, Bell of the Hills shaft on road 2000-808, Stithum, Pacman, Blue Rock Telluride.
Camp Creek Road                 - Road management                   Developing Proposal                 Expected:02/2011          07/2011       Jessi James
Decommission Project                                                Est. Scoping Start 07/2010                                                  541-575-3058
EA                                                                                                                                              jjames@fs.fed.us
                                Description: Decommission 83 miles of road in the Camp Creek Watershed.


                                Location:     UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. Camp Creek Watershed.

Camp Creek Tributaries Culvert - Watershed management               In Progress:                        Expected:05/2010          07/2010       Mary Welby
Replacements                                                        Scoping Start 03/22/2010                                                    541-575-3368
CE                                                                                                                                              mwelby@fs.fed.us
                                Description: Replace 8 culverts that are full or partial barriers to fish passage at road crossings.


                                Location:     UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. Culverts are located on 6
                                              tributaries to Camp Creek in lower and middle Camp Creek subwatersheds.


04/01/2010                                                     Page       4 of 17                                                              Malheur National Forest
                                                                                                                                 Expected
         Project Name                     Project Purpose                    Planning Status                  Decision        Implementation          Project Contact

Malheur National Forest     Blue Mountain Ranger District (excluding Projects occurring in more than one District)                       R6 - Pacific Northwest Region
CenturyLink (aka CenturyTel)       - Special use management          Completed                           Actual: 03/26/2010        04/2010       Pamela Uebler
Continued Operation &                                                                                                                            541-575-3462
Maintenance of Buried Fiber                                                                                                                      puebler@fs.fed.us
Optic Telephone Cable             Description: Renewal of Special Use Permit to CenturyTel for continued operation and maintenance of buried fiber optic
CE                                             telephone cable and appurtenances thereto running a distance of 15.7 miles from Bates, OR on the Malheur N.F.
                                               to Road 1055075 on the W-W N.F
                                   Location:    UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T. 11 S., R. 35 E.; T. 11
                                                S., R. 351/2 E.. T. 10 S., R. 35 1/2 E., T. 10 S. R. 36 E. (multiple sections, follows portions of Idaho Power Line
                                                Corrider ROW). Buried fiber optic cable travels across both the Malheur and Wallowa Whitman National Forests
                                                from Bates, Or to north of Whitney, OR.
Closure of Upper Lemon Cabin - Minerals and Geology                In Progress:                     Expected:10/2010          06/2011        Pamela Uebler
Abandoned Mine Adit &                                              Scoping Start 11/19/2009                                                  541-575-3462
Removal of Granite Boulder Cr.                                                                                                               puebler@fs.fed.us
Bridge .                       Description: Close the Upper Lemon Cabin abandoned mine adit and remove the deteriorated Granite Boulder Cr. Bridge in
CE                                          order to protect public health and safety. The adit would be closed either by plugging the adit with earth or
                                            installation of a bat gate.
                                   Location:    UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T. 10 N., R. 34 E., SW
                                                1/4 Sec. 14 (adit) and T. 10 S., R. 34 E., NE1/4 Sec. 22 (bridge). Granite Boulder Creek area along FDR 4559 on
                                                the Blue Mt. Ranger District.
Damon                              - Forest products                 In Progress:                        Expected:05/2010          09/2010       Ryan Falk
EA                                  - Fuels management               Objection Period Legal Notice                                               541-820-3890
                                                                     03/17/2010                                                                  rfalk@fs.fed.us
                                  Description: Thinning timber stands to reduce fire hazard, insect and disease risk, and enhance old-growth; treat slash with
                                               mechanical and prescribed; restore riparian and stream function; reduce road and weeds impacts; within the WUI
                                               of Seneca, OR.
                                   Location:    UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. Located on approximately 20,000
                                                acres in Van Aspen and Shirttail Subwatersheds, near Seneca, Oregon.




04/01/2010                                                      Page       5 of 17                                                              Malheur National Forest
                                                                                                                               Expected
         Project Name                    Project Purpose                    Planning Status                 Decision        Implementation          Project Contact

Malheur National Forest    Blue Mountain Ranger District (excluding Projects occurring in more than one District)                    R6 - Pacific Northwest Region
Dixie Research Natural Area      - Special area management         Developing Proposal                 Expected:12/2010         02/2011         Michael Tatum
(RNA)                             - Research                       Est. Notice of Initiation 07/2010                                            541-575-3430
EA                                                                                                                                              mtatum@fs.fed.us
                                 Description: The project would formally establish the research natural area. The RNA was proposed in the 1990 Malheur Final
                                              EIS and Forest Plan.
                                 Location:     UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T.11 S., R. 34E.,
                                               Section 28. The RNA is located in the area surrounding Dixie Lookout, known as "Dixie Butte". It is lcoated north
                                               of Hwy 26.
Evaluation Plantation Thinning   - Fuels management                Completed                           Actual: 02/04/2010       07/2010         Amanda Lindsay
CE                                                                                                                                              541-575-3333
                                                                                                                                                alindsay@fs.fed.us
                                 Description: Precommercial thinning and fuels treatment of eight evaluation plantations. The purpose is to increase tree growth
                                              and vigor, reduce fire hazard, and move the plantations back into the general forest.
                                 Location:     UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T18S R32E S25,36;
                                               T16S R27E S15; T2S R33E S8-9; T15S R25E S24; T17S R29E S10; T15S R31E S27,34; T18S R29E S22; T17S
                                               R33E S4. Eight plantations throughout the southern portion of the Malheur NF.
Galena                           - Forest products                 In Progress:                        Expected:11/2010         03/2011         Eric Wunz
EIS                               - Vegetation management          NOI in Federal Register                                                      541-575-3000
                                 (other than forest products)      03/12/2009                                                                   ewunz@fs.fed.us
                                  - Fuels management               Est. DEIS NOA in Federal
                                                                   Register 06/2010
                                 Description: Reducing fire hazard and improving forest health at the landscape level.


                                 Location:     UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T10S, R34-35E; T11S,
                                               R34-35E; and T12S, R34-35E. Located in the Little Boulder/Deerhorn and Vinegar subwatersheds.
Mt. Vernon Fence Project         - Grazing management              Developing Proposal                 Expected:05/2010         07/2010         Nick Stiner
CE                                                                 Est. Scoping Start 04/2010                                                   541-575-3496
                                                                                                                                                nstiner@fs.fed.us
                                 Description: Construct approximately 6 miles of fence and install 3 cattleguards in the John Day allotment.


                                 Location:     UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. John Day allotment, Blue Mountain
                                               Ranger District.




04/01/2010                                                      Page      6 of 17                                                              Malheur National Forest
                                                                                                                             Expected
         Project Name                   Project Purpose                   Planning Status                 Decision        Implementation         Project Contact

Malheur National Forest   Blue Mountain Ranger District (excluding Projects occurring in more than one District)                    R6 - Pacific Northwest Region
Murderers Creek Fencing         - Wildlife, Fish, Rare plants      Developing Proposal               Expected:06/2010         07/2010       Kelly Ware
CE                               - Grazing management              Est. Scoping Start 05/2010                                               541-575-3432
                                                                                                                                            kware@fs.fed.us
                               Description: Erect fencing to enhance management of rangeland and riparian resources. The fencing would be located in
                                            several areas in the Murderers Creek drainage.
                                Location:     UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. South Fork of the John Day River
                                              watershed.
Murderers Creek Water           - Wildlife, Fish, Rare plants      Developing Proposal               Expected:06/2010         07/2010       Kelly Ware
Developments                     - Grazing management              Est. Scoping Start 05/2010                                               541-575-3432
CE                                                                                                                                          kware@fs.fed.us
                               Description: Construct water developments to enhance management of rangeland and riparian resources. The water
                                            developments would be located in several areas in the Murderers Creek drainage and the upper middle fork of the
                                            John Day River allotment.
                                Location:     UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. South Fork and Middle Fork of the
                                              John Day River watersheds.
Oregon Telephone Corporation    - Special use management           Completed                         Actual: 03/26/2010       04/2010       Pamela Uebler
Buried Fiber Optic Line                                                                                                                     541-575-3462
CE                                                                                                                                          puebler@fs.fed.us
                               Description: Renewal of permit for buried fiber-optic cable and which runs a distance of 19.9 miles from Malheur National
                                            Forest boundary (NW of Prairie City), to Unity, Oregon. Cable lies within the right of ways of both Highway 26 and
                                            OTEC powerline corridor.
                                Location:     UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T.12S., R34.&35&36E.,
                                              T.11S., R.35&351/2E., (Multiple sections). Buried fiber optic cable travels across both the Malheur and Wallowa
                                              Whitman National Forest from Prairie City to Unity, Oregon.
Oregon Telephone Corporation    - Special use management           Completed                         Actual: 03/22/2010       03/2010       Pamela Uebler
Buried Telephone                                                                                                                            541-575-3462
Communication Lines                                                                                                                         puebler@fs.fed.us
CE                             Description: Continued use of existing buried telephone cable and necessary appurtenances by Oregon Telephone Company.
                                            Special Use code 822 -Telephone lines are REA financed.
                                Location:     UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. Upper John Day and Upper Middle
                                              Fork John Day watersheds.




04/01/2010                                                      Page    7 of 17                                                            Malheur National Forest
                                                                                                                              Expected
         Project Name                   Project Purpose                    Planning Status                  Decision       Implementation         Project Contact

Malheur National Forest   Blue Mountain Ranger District (excluding Projects occurring in more than one District)                     R6 - Pacific Northwest Region
Plantation Maintenance Lower    - Fuels management                 In Progress:                      Expected:05/2010          08/2010        Amanda Lindsay
Middle Fork                                                        Scoping Start 01/15/2010                                                   541-575-3333
CE                                                                                                                                            alindsay@fs.fed.us
                               Description: Precommercial thinning plantations and areas burned by past wildfires to improve tree growth and vigor. Fuels
                                            treatments are proposed to reduce fire hazard.
                                Location:     UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T9S R32E S10-16, 21-
                                              28, 33-36; T9S R33E S7-3, 14-36; T1S R32E S1-5, 8-17, 21-24, 26-27; T1S R33E S1-18, 22-24, 27; T1S
                                              R34E S5-23, 27-33. Lower middle fork north of county road 20 in Granite Boulder, Big Boulder, Big and
                                              Bear/Mosquito Creek subwatersheds. Reed and Summit wildfire areas.
Starr HFRA Project              - Forest products                  Developing Proposal               Expected:10/2010          10/2010        Lori Stokes
EA                               - Fuels management                Est. Scoping Start 04/2010                                                 541-575-3331
                                                                                                                                              lstokes@fs.fed.us
                               Description: The project area will be treated to reduce fuel loading and improve forest health. This project area is within the
                                            Grant County Community Fire Protection Plan.
                                Location:     UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T15S, R29-31E, and
                                              T16S, R29-30E. Located on the north and west side of Bear Valley in the Starr Creek subwatershed.
Wickiup Fence Project           - Wildlife, Fish, Rare plants      In Progress:                      Expected:06/2010          07/2010        Kelly Ware
CE                               - Grazing management              Scoping Start 05/21/2009                                                   541-575-3432
                                                                                                                                              kware@fs.fed.us
                               Description: Construct approximately 3 miles of fence in the Sugarloaf Allotment.


                                Location:     UNIT - Blue Mountain Ranger District. STATE - Oregon. COUNTY - Grant. Wickiup Creek in the South Fork
                                              John Day watershed, Blue Mountain Ranger District.



Malheur National Forest   Emigrant Creek Ranger District (excluding Projects occurring in more than one District)                    R6 - Pacific Northwest Region
Allison Guard Station French    - Facility management              Completed                         Actual: 01/21/2010        05/2010        Lori Bailey
Drain Project                                                                                                                                 541-573-4300
CE                                                                                                                                            labailey@fs.fed.us
                               Description: Install french drains where needed around existing buildings.


                                Location:     UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Harney. LEGAL - T19S, R26E, section
                                              16. Allison guard Station.


04/01/2010                                                      Page     8 of 17                                                            Malheur National Forest
                                                                                                                                Expected
         Project Name                     Project Purpose                    Planning Status                 Decision        Implementation         Project Contact

Malheur National Forest      Emigrant Creek Ranger District (excluding Projects occurring in more than one District)                   R6 - Pacific Northwest Region
Allison Guard Station New          - Facility management             Completed                          Actual: 01/21/2010       05/2010        Lori Bailey
Power Generation Project                                                                                                                        541-573-4300
CE                                                                                                                                              labailey@fs.fed.us
                                  Description: Replace the existing power generation system with a new system which would be one of the following types,
                                               photovoltaic (solar), wind, hydro, fuel cell, or geothermal power generation.
                                   Location:    UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Harney. LEGAL - T19S, R26E, section
                                                16. Allison Guard Station.
Big Sagehen Fence Project          - Grazing management              Developing Proposal                Expected:05/2010         06/2010        Lori Bailey
CE                                  - Watershed management           Est. Scoping Start 04/2010                                                 541-573-4300
                                                                                                                                                labailey@fs.fed.us
                                  Description: Construction of 4-strand barbwire fence between Forest Service and private land on Sagehen Creek near the
                                               Silvies River.
                                   Location:    UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Harney. LEGAL - T. 19 S., R. 31 E.,
                                                Section 29. Sagehen Creek near the Silvies River.
Crow Flat Guard Station Water      - Facility management             Completed                          Actual: 01/21/2010       05/2010        Lori Bailey
System Project                                                                                                                                  541-573-4300
CE                                                                                                                                              labailey@fs.fed.us
                                  Description: Replace existing water system by drilling a new well and replacing existing pipe line from the new well to the
                                               bunkhouse.
                                   Location:    UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Harney. LEGAL - T.20S., R.31E.,
                                                Section 13. Crow Flat Guard Station.
Crystal Springs Gravel Pit         - Minerals and Geology            Completed                          Actual: 02/11/2010       05/2010        Lori Bailey
Expansion Project                                                                                                                               541-573-4300
CE                                                                                                                                              labailey@fs.fed.us
                                  Description: Develop (expand) existing borrow pit beyond the currently disturbed area, by widening the excavaion area to the
                                               north and west, adding approximately 2 acres.
                                   Location:    UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Harney. LEGAL - T19S, R28E Section
                                                15. Crystal Springs Gravel Pit.




04/01/2010                                                      Page       9 of 17                                                            Malheur National Forest
                                                                                                                             Expected
           Project Name                 Project Purpose                    Planning Status                Decision        Implementation        Project Contact

Malheur National Forest    Emigrant Creek Ranger District (excluding Projects occurring in more than one District)                  R6 - Pacific Northwest Region
Dairy EA                         - Forest products                In Progress:                       Expected:07/2010         12/2010       Lori Bailey
EA                                - Road management               Scoping Start 09/01/2003                                                  541-573-4300
                                                                  Est. 215 Comment Period Legal                                             labailey@fs.fed.us
                                                                  Notice 06/2010
                                Description: Timber harvest and road closures


                                 Location:    UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Crook, Harney. LEGAL - T10-22S
                                              R24-25E. Nicoll/ Dairy Creeks.
Dragon's Hump Plantation PCT    - Vegetation management            Developing Proposal               Expected:07/2010         08/2010        Lori Bailey
Project                         (other than forest products)       Est. Scoping Start 05/2010                                                541-573-4300
CE                               - Fuels management                                                                                          labailey@fs.fed.us
                                Description: Precommercial thinning of seedlings and saplings on up to 5000 acres of 10 to 20-year old pine plantations
                                              established in clearcuts and shelterwood harvest units.Created slash would be either pulled back, hand piled,
                                              grapple piled and burned.
                                 Location:    UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Grant, Harney. LEGAL - T18S, R29, 30,
                                              31, 33, 33.5E; T19S R29, 30, 31, 33, 33.5E; T19S R33.5E; T20S, R33E. Multiple locations on the old Burns
                                              Ranger District.
Fire Lookout Lightning           - Facility management            Completed                          Actual: 01/21/2010       05/2010       Lori Bailey
Protection Project                                                                                                                          541-573-4300
CE                                                                                                                                          labailey@fs.fed.us
                                Description: Update the lightning protection systems at six fire lookouts, Dry Mountian LO, Snow Mountain LO, Sugarloaf LO,
                                             King Mountain LO, Calamity LO, and West Myrtle LO.
                                 Location:    UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Grant, Harney. LEGAL - T22S, R26E
                                              SEC 11; T18S, R27E, SEC 25; T19S, R29E, SEC 21; T20S, R32E, SEC 27; T19S, R32E, SEC 19; T18S, R30E,
                                              SEC 31. Dry Mtn, Snow Mtn, Sugarloaf, King Mtn, Calamity and West Myrtle Lookouts.
Forest Road 2840 Culvert         - Road management                Developing Proposal                Expected:05/2010         06/2010       Lori Bailey
Extension Project                                                 Est. Scoping Start 04/2010                                                541-573-4300
CE                                                                                                                                          labailey@fs.fed.us
        *NEW LISTING*           Description: Lengthen an existing culvert on Forest Road 2840 and fill in to widen the roadbed.


                                 Location:    UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Harney. LEGAL - T. 19 S., R. 32 E.,
                                              section 17. Forest Road 2840.




04/01/2010                                                    Page     10 of 17                                                            Malheur National Forest
                                                                                                                            Expected
         Project Name                   Project Purpose                   Planning Status                 Decision       Implementation         Project Contact

Malheur National Forest    Emigrant Creek Ranger District (excluding Projects occurring in more than one District)                 R6 - Pacific Northwest Region
Forest Road 3130                 - Road management                In Progress:                      Expected:06/2010         07/2010        Lori Bailey
Reconstruction Project                                            Scoping Start 12/16/2009                                                  541-573-4300
CE                                                                                                                                          labailey@fs.fed.us
                                Description: Reroute Forest Road 3130 using two existing roads (3130242 and 3130129).


                                 Location:    UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Harney. LEGAL - T19S, R31E, section
                                              29. Forest Road 3130.
Grapple Fire Salvage             - Forest products                Developing Proposal               Expected:06/2010         07/2010        Lori Bailey
CE                                - Fuels management              Est. Scoping Start 05/2010                                                541-573-4300
                                                                                                                                            labailey@fs.fed.us
                                Description: Salvage less than 250 acres of trees weaken by the 2007 Grapple Fire and killed by beetles.


                                 Location:    UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T18S R32E section 1.
                                              The 2007 Grapple Fire.
Hines Compound Fuel Tank         - Facility management            Completed                         Actual: 01/21/2010       05/2010        Lori Bailey
Removal Project                                                                                                                             541-573-4300
CE                                                                                                                                          labailey@fs.fed.us
                                Description: Remove existing underground fuel (oil) tanks which are no longer needed and will not be replaced, at the Forest
                                             Service Compound in Hines Oregon. A soil inspection will be completed to determine the need or extent for any
                                             remediation.
                                 Location:    UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Harney. LEGAL - T23S, R30E, section
                                              25. Emigrant Creek Ranger Station in Hines, ORegon.
Jane Hazardous Fuel Reduction - Vegetation management             In Progress:                      Expected:05/2010         11/2010        Lori Bailey
Project                       (other than forest products)        Scoping Start 07/08/2009                                                  541-573-4300
EA                             - Fuels management                 Est. Objection Period Legal                                               labailey@fs.fed.us
                                                                  Notice 04/2010
                                Description: Reduce the fire hazard, create two fuel breaks, and reduce the impact and severity of the current Western spruce
                                             budworm outbreak within the Calamity subwatershed.
                                 Location:    UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Grant, Harney. LEGAL - T17S R33E
                                              sections 28-34; T18S R32E sections 1, 11-14, 23-26, 35-36; T18S R33E sections 3-10, 15-36; T19S R32E
                                              sections 1-2, 11-13; T19S R33E sections 2-11, 14-18, 20-22;. Calamity Subwatershed in Wolf Creek
                                              Watershed.




04/01/2010                                                    Page     11 of 17                                                            Malheur National Forest
                                                                                                                             Expected
         Project Name                  Project Purpose                    Planning Status                 Decision        Implementation          Project Contact

Malheur National Forest   Emigrant Creek Ranger District (excluding Projects occurring in more than one District)                    R6 - Pacific Northwest Region
Toilet Replacement in           - Recreation management           Completed                          Actual: 01/21/2010        05/2010       Lori Bailey
Campgrounds                                                                                                                                  541-573-4300
CE                                                                                                                                           labailey@fs.fed.us
                               Description: Replace remaining older toilets within the Falls, Rock Springs, Tip Top and Yellow Jacket campgrounds with new
                                            Cascadian CXT concrete buildings.
                                Location:    UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Grant, Harney. LEGAL - T20S R28E
                                             S7, T18S R32E S23, T19S R25E S30, T19S R29E S32. Falls, Rock Springs, Tip Top, and Yellow Jacket
                                             Campgrounds.
Yellowjacket Campground         - Recreation management           Completed                          Actual: 01/15/2010        06/2010       Lori Bailey
Solar Water System                                                                                                                           541-573-4300
CE                                                                                                                                           labailey@fs.fed.us
                               Description: Install a pre-constructed concrete building with internal water tank for potable water used by recreationists.
                                            Remove hand pump off existing well and install a solar pump, which will pump water into the new water tank.
                                Location:    UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Harney. LEGAL - T19S R29E section
                                             32. Yellow Jacket Campground.
Yellowjacket Juniper Project   - Vegetation management        Developing Proposal                 Expected:06/2010         07/2011         Lori Bailey
CE                             (other than forest products)   Est. Scoping Start 05/2010                                                   541-573-4300
                                - Fuels management                                                                                         labailey@fs.fed.us
                               Description: Juniper management. Juniper cutting, juniper slash removal through firewood cutting and/or piling and burning, and
                                             underburning.
                                Location:    UNIT - Emigrant Creek Ranger District. STATE - Oregon. COUNTY - Harney. LEGAL - T.19S. R.28 E.
                                             Sections 24, 26, 26, 35, 36, T. 19 S. R. 29 E. Sections 4-10, 16-20, 30, 31, T. 20 S. R. 28 E. Sections 1, 12. The
                                             area bounded by Forest Roads 3750 to the north, 3740 & 3745 to the east and 4700 to the west.



Malheur National Forest   Prairie City Ranger District (excluding Projects occurring in more than one District)                      R6 - Pacific Northwest Region




04/01/2010                                                   Page      12 of 17                                                             Malheur National Forest
                                                                                                                               Expected
         Project Name                    Project Purpose                    Planning Status                 Decision        Implementation         Project Contact

Malheur National Forest     Prairie City Ranger District (excluding Projects occurring in more than one District)                     R6 - Pacific Northwest Region
Austin 26 Fuels Reduction         - Fuels management                Cancelled                         N/A                         N/A         Ryan Falk
EA                                                                                                                                            541-820-3890
                                                                                                                                              rfalk@fs.fed.us
                                 Description: This project is proposed to reduce fuels and protect lives and property in the Austin Junction area. The area is
                                              identified in the Grant County Community Fire Protection Plan.
                                  Location:    UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T.11S, R.35E. Sections 28,
                                               29, 32, and 33. Unit - Prairie City; Clear Creek Subwatershed, in the vicinity of Austin Junction and the State
                                               Highway Maintenance Shop.
Big Creek Campground Water        - Recreation management           Completed                         Actual: 12/21/2009        06/2010       Lisa Weigum
System Replacement Project                                                                                                                    541-820-3800
CE                                                                                                                                            lweigum@fs.fed.us
                                 Description: Replacement of existing hand-pump water system with new solar-powered water system.


                                  Location:    UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T16S, R34E, Sec. 14.
                                               Project is located within Big Creek Campground.
Black Canyon Lodgepole           - Forest products                 In Progress:                     Expected:05/2010          09/2010     William Brendecke
Salvage and Sanitation            - Vegetation management          Scoping Start 10/20/2009                                               541-820-3840
CE                               (other than forest products)                                                                             wbrendecke@fs.fed.us
        *NEW LISTING*             - Road management
                                 Description: Cutting and removal of dead and dying lodgepole for post and pole, firewood, and biomass material. Cutting of
                                               danger trees along Forest Roads 1647, 1647446, 1647441, and 1450448.
                                  Location:    UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T17S 34E sections 2-4, 9-
                                               11. Project area is approximately 247 acres located within the Cliff Creek subwatershed.
Blue Bucket/Dollar Basin/Star     - Grazing management              Cancelled                         N/A                         N/A         Shannon Britt
Glade Grazing Authorization                                                                                                                   (541) 820-3865
Project                                                                                                                                       sbritt@fs.fed.us
EA                               Description: NEPA analysis of grazing authorizations on three existing allotments.


                                  Location:    UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant, Harney. LEGAL - T16 & 17, R33 &
                                               34E, W.M. The project analizes the following three grazing allotments in the Malheur River Drainage: Bluebucket,
                                               Dollar Basin and Star Glade.




04/01/2010                                                     Page      13 of 17                                                            Malheur National Forest
                                                                                                                              Expected
         Project Name                      Project Purpose                   Planning Status               Decision        Implementation        Project Contact

Malheur National Forest     Prairie City Ranger District (excluding Projects occurring in more than one District)                   R6 - Pacific Northwest Region
Crane Prairie Guard Station        - Facility management              Completed                       Actual: 12/21/2009       09/2010       Lisa Weigum
New Power Generation Project                                                                                                                 541-820-3800
CE                                                                                                                                           lweigum@fs.fed.us
                                  Description: Replace existing propane powered system with a new power generation system.


                                   Location:     UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T16S, R35E, Sec. 18.
                                                 Project is located at Crane Prairie Guard Station Administrative Site.
Logan Valley                       - Wildlife, Fish, Rare plants      In Progress:                    Expected:04/2010         06/2010       William Brendecke
Meadow/Grassland                                                      Scoping Start 10/20/2009                                               541-820-3840
Enhancement, Aspen                                                                                                                           wbrendecke@fs.fed.us
Restoration Project               Description: Cutting and removal of lodgepole pine encroaching in meadow and grassland areas. Restoration of aspen stands
CE                                             by removing conifers suppressing aspen regeneration and protection of aspen seedlings by fencing and arranging
                                               slash.
                                   Location:     UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T16S, R331/2 E, Sections
                                                 10 and 15. Lake Creek Subwatershed.
North Fork Lodgepole Salvage       - Forest products                  In Progress:                    Expected:05/2010         09/2010       William Brendecke
and Sanitation                      - Road management                 Scoping Start 10/20/2009                                               541-820-3840
CE                                                                                                                                           wbrendecke@fs.fed.us
        *NEW LISTING*             Description: Salvage of trees killed by bark beetles. Danger tree removal along Forest Road 13.


                                   Location:     UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T14S R351/2E sections 3,
                                                 10, 15. Project area is approximately 100 acres located in the Swamp Creek subwatershed. North of the Short
                                                 Creek Guard Station along Forest Road 13.
Plantation Thinning Upper      - Vegetation management           Developing Proposal              Expected:05/2010            08/2010         William Brendecke
Middle Fork and John Day River (other than forest products)      Est. Scoping Start 04/2010                                                   541-820-3840
CE                                                                                                                                            wbrendecke@fs.fed.us
         *NEW LISTING*         Description: Precommerical thinning plantations to improve tree growth and vigor, wildlife habitat diversity, and large tree
                                             development. Fuel treatments to reduce fire hazard.
                                   Location:     UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T11S R35E, T12S R35E,
                                                 T13S R35E, T12S R34E. Plantations are located in the upper Middle Fork John Day River and Upper John Day
                                                 River watersheds.




04/01/2010                                                         Page   14 of 17                                                          Malheur National Forest
                                                                                                                               Expected
         Project Name                    Project Purpose                    Planning Status                 Decision        Implementation         Project Contact

Malheur National Forest    Prairie City Ranger District (excluding Projects occurring in more than one District)                      R6 - Pacific Northwest Region
Plantation Thinning with        - Forest products                  Developing Proposal             Expected:09/2010          10/2010      William Brendecke
Biomass Removal                  - Vegetation management           Est. Scoping Start 05/2010                                             541-820-3840
CE                              (other than forest products)                                                                              wbrendecke@fs.fed.us
        *NEW LISTING*           Description: Precommercial thinning plantations to improve tree growth and vigor. Fuel treatments are proposed to reduce fire
                                              hazard, including use of equipment to remove biomass material.
                                 Location:     UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - Multiple sections in T12S
                                               R34E, T12S R35E, and T13S R35E. Upper Middle Fork John Day River and Upper John Day River watersheds.
Riparian Hardwood Planting       - Wildlife, Fish, Rare plants      Developing Proposal               Expected:09/2010          06/2011       William Wall
Restoration                                                         Est. Scoping Start 04/2010                                                928-339-4384
CE                                                                                                                                            wwall@fs.fed.us
        *NEW LISTING*           Description: Planting of hardwood cuttings along approximately 1.2 miles of Lake Creek and 2.5 miles of Big Creek to restore
                                             shade and cover.
                                 Location:     UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T16S R331/2E. Lake Creek
                                               and Big Creek within the Lake Creek subwatershed.
Savage Quarry Project            - Minerals and Geology             In Progress:                      Expected:07/2010          10/2010       Ryan Falk
EA                                - Special use management          215 Comment Period Legal                                                  541-820-3890
                                                                    Notice 09/16/2009                                                         rfalk@fs.fed.us
                                Description: PCRD is proposing to allow continued use and expansion of the Savage Quarry. The proposed project would
                                             allow expansion of the quarry area by approximately 5 acres. Development within the proposed expansion area
                                             would require the cutting of trees.
                                 Location:     UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - Township 11 South, Range
                                               35 ¿ East, Sections 28 & 33, Grant Co. Oregon. The quarry is located 4.6 miles east of Austin Junction on
                                               Highway 26 (MP 195.3).
South/Bear Creek Drift Fence     - Grazing management               Cancelled                         N/A                         N/A         Susan Burton
CE                                                                                                                                            541-575-3460 or 3000
                                                                                                                                              sburton@fs.fed.us
                                Description: Construct short drift fence(s) to prevent livestock from accessing Bear Creek in the south pasture of the Flag
                                             Prairie Grazing Allotment.
                                 Location:     UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T17S, R36E, Sec 4 and 5.
                                               Located approximately 40 miles south east of Prairie City, Oregon, in the south pasture of the Flag Prairie Grazing
                                               Allotment.




04/01/2010                                                       Page   15 of 17                                                             Malheur National Forest
                                                                                                                             Expected
         Project Name                   Project Purpose                   Planning Status                 Decision        Implementation        Project Contact

Malheur National Forest    Prairie City Ranger District (excluding Projects occurring in more than one District)                   R6 - Pacific Northwest Region
Strawberry Campground            - Recreation management          Completed                          Actual: 12/21/2009       06/2010       Lisa Weigum
Restoration Replacement                                                                                                                     541-820-3800
Project                                                                                                                                     lweigum@fs.fed.us
CE                              Description: Replacement of two existing restrooms at Strawberry Campground


                                 Location:    UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T14S, R34E, Sec. 30 and
                                              31. Project is located in Strawberry Campground.
Summit / Logan Valley Grazing    - Grazing management             In Progress:                       Expected:08/2010         01/2011       Susan Burton
Authorization Project                                             Scoping Start 10/07/2008                                                  541-575-3460 or 3000
EA                                                                Est. 215 Comment Period Legal                                             sburton@fs.fed.us
                                                                  Notice 06/2010
                                Description: NEPA analysis of grazing authorizations on four existing allotments.


                                 Location:    UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T16 and 17S, R33 1/2 and
                                              34E, Summit Prairie and Logan Valley Areas. This project analizes the following four grazing allotments: Logan
                                              Valley, McCoy, Summit Prairie, and Lake Creek.
Summit Prairie Lodgepole         - Forest products                In Progress:                       Expected:09/2010         10/2010       William Brendecke
Salvage Sanitation                - Road management               Scoping Start 10/20/2009                                                  541-820-3840
CE                                                                                                                                          wbrendecke@fs.fed.us
        *NEW LISTING*           Description: Salvage of bark beetle killed trees. Removal of danger trees along Forest Road 16 and nearby travel routes.


                                 Location:    UNIT - Prairie City Ranger District. STATE - Oregon. COUNTY - Grant. LEGAL - T16S R34E, sections 10, 11,
                                              14. The approximately 250 acre project area is located south and east of Prairie City within the Summit Creek
                                              subwatershed.




04/01/2010                                                    Page     16 of 17                                                            Malheur National Forest
                                                                                                                                                                         Expected
            Project Name                                 Project Purpose                                Planning Status                           Decision            Implementation                 Project Contact


 The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial
 status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited
 bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at
 (202) 720-2600 (voice and TDD).

 To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA
 is an equal opportunity provider and employer.

 This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.




04/01/2010                                                                             Page        17 of 17                                                                                  Malheur National Forest

								