									                                                      MENTIGA CORPORATION BERHAD
                                                  (Company No 10289 - K and its Subsidiaries)
                                               LIST OF MATERIAL LITIGATIONS OF THE GROUP AS AT 31 JULY, 2006 .

                                                  JUDGEMENT / SUMMONS ISSUED AGAINST MCB;


NO                     PLAINTIFF / LAWYER :           DEFENDEN / LAWYER:             AMOUNT CLAIM / COURT:                    REMARKS

 1   KEKWA KREATIF SDN.BHD.     /                                                  RM 5,549,625.00
     RAJADEVAN & ASSOC.                          MESSRS VENDARGON &
                                                 PARTNERS.                         KTN HIGH COURT CIVIL
     KEKWA CLAIM AGAINST MENTIGA IS FOR                                            SUIT NO; 22-5-2000
     THE BALANCE OF PAYMENT DUE FOR                                                                              THE COURT HAS POSTPONED FOR
     WORK DONE IN DEVELOPING "PUSAT                                                                              CONTINUED HEARING ON 02.10.2006
     PERANGINAN PULAU SIBU, MERSING "
     VIDE CONTRACT NO MCB/UP/SC/C.130
     YEAR 1996 PLUS INTEREST OF 4%
     PER ANNUM FROM THE DATE OF
     JUDGEMENT UNTIL REALIZATION.



 2   NORBIYATUN BT. MD. ALI /                    a) ASPA                           RM 150,000.00                 THE   MENTION DATE IS FIXED
     MAHINDAR & CO.                              b) MENTIGA CORP. BHD                                            ON    28.08. 2006.
                                                 c) ISHAK BIN JAAFAR               KTN HIGH COURT CIVIL
     THE PLAINTIFF CLAIM AGAINST MENTIGA         d) RADZI & ABDULLAH               SUIT NO; 22-43-1997
     IS IN RELATION TO AN AGREEMENT              (Sued as a firm)
     ENTERED INTO BY THE PLAINTIFF WITH          e)MAYBAN FINANCE BHD
      ASPA AS VENDOR AND MENTIGA AS
     MANAGERS AND AGENTS OF THE VENDOR           MESSRS VENDARGON &
     TO PURCHASE THE PROPERTY HELD               PARTNERS
     UNDER H.S(D) 13109/P.T. 5431 MUKIM
     SUNGAI KARANG,DAERAH KUANTAN,
     PAHANG DARUL MAKMUR FOR A PURCHASE
     PRICE OF RM 150,000.00.THE PLAINTIFF IS
     DISPUTING THE BOUNDARY BETWEEN LOT
     23 (PURCHASED BY PLAINTIFF) AND THE
     ADJACENT LOT 24 PURCHASED BY ISHAK
     BIN JAAFAR, A SURVEYOR ENGAGED BY
     ASPA.THE LOTS ARE AGRICULTURUL LOTS
     OF (1) ACRE EACH WITH A BUNGALOW
     HOUSE BUILT ON THE LAND.




                                                               Page 1 of 9
                                                                MENTIGA CORPORATION BERHAD
                                                            (Company No 10289 - K and its Subsidiaries)
                                                         LIST OF MATERIAL LITIGATIONS OF THE GROUP AS AT 31 JULY, 2006 .

                                                            JUDGEMENT / SUMMONS ISSUED AGAINST MCB;


NO                    PLAINTIFF / LAWYER :                      DEFENDEN / LAWYER:             AMOUNT CLAIM / COURT:                     REMARKS

 3   WAN SHEN TRADING SDN BHD    /                                                           RM 908,934.37                 THE TRIAL DATE IS FIXED
     LIN ASS. KTN                                         HARANAY, HISHAM,ANIKAH & ASS.                                    ON 11.10.2006
                                                                                             KTN HIGH COURT CIVIL
     WAN SHEN TRADING IS CLAIMING FOR THE                                                    SUIT NO; 22-36-2002.
     AMOUNT OF RM908,934.37 AS AT 16 MAY 2002
     AGAINST MENTIGA FOR GOODS SOLD AND
     DELIVERED. MENTIGA THROUGH ITS SOLICITORS
     HAD FILED THE STATEMENT OF DEFENCE ON
     21 JUNE 2002. WAN SHEN TRADING HOWEVER,
     HAD FILED ON APPLICATION FOR SUMMARY
     JUDGEMENT UNDER ORDER 14 OF THE RULES OF
     THE HIGH COURT (ORDER 14 APPLICATION) AND
     ON 29 NOVEMBER 2002, THE HIGH COURT SET
     ASIDE THE ORDER 14 APPLICATION.



 4   MALAYSIAN TIMBER COUNCIL (MTC) /                                                        RM 4,877,137.79               ON 22 JUNE 2002, THE CASE WAS WITH-
     TETUAN AZMAN,DAVIDSON & CO                            HARANAY, HISHAM, ANIKAH & ASS.                                  DRAWN BY MTC AND THE MATTER IS
                                                                                             K.LUMPUR HIGH COURT           CURRENTLY PENDING FOR SETTLE-
     MTC IS CLAIMING FOR FAILUR TO PAY THE PURCHASE                                          SUIT NO;53-22-753-2001        MENT.
     PRICE FOR GOODS PURCHASE FROM MTC. A JUDGEMENT                                                                        PAID RM1,000,000.00 IN JUNE 2004
     IN DEFAULT HAD BEEN OBTAINED AGAINST MENTIGA                                                                          BALANCE RM3,877,137.79
     ON 12 SEPTEMBER 2001. AN APPLICATION TO SET ASIDE
     THE JUDGMENT IN DEFAULT HAD BEEN FILED                                                                                THE FINAL SETTLEMENT WILL BE PAID ON
     ON 19 OCTOBER 2001.ON 24 JANUARY 2002 AN ORDER                                                                        8 AUGUST 2006.
     FOR STAY OF EXECUTION TO SET ASIDE THE JUDGEMENT
     IN DEFAULT WAS POSTPONED PENDING SETTLEMENT
     NEGOTIATION BETWEEN MTC AND MENTIGA.




 5   MALAYSIAN OXYGEN BERHAD/                                                               RM 39,606.82
     MESSR LEWIS & CO                                     HARANAY, HISHAM, ANIKAH & ASS.                                   MCB ACCEPTED THE PROPOSAL
                                                                                            K.LUMPUR SESSION               TO PAY RM15,000.00 AS FULL AND
     MALASIAN OXYGEN BERHAD IS CLAIMING                                                     COURT                          FINAL SETTLEMENT, PENDING
     THE SUM OF RM 39,606.82 FOR GOODS                                                      SUMMONS NO; 7-52-22069-2003    ISSUANCE A CONSENT LETTER
     SOLD AND DELIVERED TO MENTIGA                                                                                         FROM COURT.
     NAMELY, GAS CYLINDERS AND FOR
     RENTAL OF CYLINDERS AND FOR NO
     RETURN OF USED GAS CYLINDERS.




                                                                          Page 2 of 9
                                                                      MENTIGA CORPORATION BERHAD
                                                                  (Company No 10289 - K and its Subsidiaries)
                                                               LIST OF MATERIAL LITIGATIONS OF THE GROUP AS AT 31 JULY, 2006 .

                                                                  JUDGEMENT / SUMMONS ISSUED AGAINST MCB;


NO                    PLAINTIFF / LAWYER :                            DEFENDEN / LAWYER:             AMOUNT CLAIM / COURT:                     REMARKS

 6   CLAIMS FOR LATE DELIVERY OF HOUSES                                                            RM 34,144.68                  AS AT 19th JULY 2004 WE HAVE EIGHT
                                                                 MESSR SYED AZIMAL                                               CASES, AMOUNT CLAIMED RM34,144.68
     THERE ARE THIRTEEN (13) CASES OF PURCHASERS                                                                                 PAID RM13,995.64 O/S BAL. = RM20,149.04
     CLAIMING DAMAGED FOR LATE DELIVERY OF HOUSES
     IN RESPECT OF THE SUNGAI ISAP DAMAI PROJECT                                                                                 RECOMMEND FOR MCB TO SETTLE
     AND NADIKOTA PROJECTS.                                                                                                      FOR ALL CASES.



 7   SPECIFICATION CLAIMS/
     MESSR MURA RAJU                                             MESSR SYED AZIMAL                 RM 5,196,040.29               ALL THE CASES ARE FIXED
                                                                                                                                 FOR MENTION ON 14.08.2006.
     MENTIGA HAS BEEN SUED BY A TOTAL OF 170 HOUSE
     PURCHASERS CLAIMING THAT THE HOUSES HAVE NOT
     BEEN BUILT ACCORDING TO SPECIFICATIONS UNDER
     THE SUNGAI ISAP DAMAI PROJECT. THE TOTAL AMOUNT
     CLAIMED BY THE PURCHASERS IS RM5,196,040.29



 8   HO KOK HING t/a TRICO CONSTRUCTION CO.                      MESSR SYED AZIMAL                  RM26,169.20                  THE CASE IS FIXED FOR HEARING AT
                                                                                                                                 THE HIGH COURT KTN . ON 29.09.2006.
     THE PLAINTIFF IS A SUB-CONT. UNDER THE 'TAMAN MENTIGA
     JAYA' PROJECT AND HAS ON 08.02.1999 CLAIMED THE SUM OF
     RM26,169.20 AGAINST MENTIGA FOR WORK DONE. THE SUIT WAS
     DISMISSED BY THE SESSIONS COURT BUT THE PLAINTIFF HAS
     APPEALEDTO THE HIGH COURT.




                                                                                Page 3 of 9
                                                           MENTIGA CORPORATION BERHAD
                                                       (Company No 10289 - K and its Subsidiaries)
                                                    LIST OF MATERIAL LITIGATIONS OF THE GROUP AS AT 31 JULY, 2006 .

                                                       JUDGEMENT / SUMMONS ISSUED AGAINST MCB;


NO                     PLAINTIFF / LAWYER :                DEFENDEN / LAWYER:             AMOUNT CLAIM / COURT:                      REMARKS

 9   DR.PENNY TEVARAJ a/t KLINIK PEKAN/                                                 RM 68,643.00                   PAID ON 20.07.2004 = RM20,000.00
     MESSRS VENDARGON & PARTNERS                                                                                       PAID ON 04.10.2005 = RM3,000.00
                                                                                                                       ON 14.01.2006 PLANTIFF CONFIRMED THE
     THE PLAINTIF IS CLAIMING FOR THE SUM OF                                            KTN SESSIONS COURT             BALANCE WAS RM45,643
     RM 68,643.00 TOGETHER WITH INTEREST                                                SUMMONS NO;52-223-2003         DICOUNT 15% : THE BALANCE AFTER DISCOUNT
     FOR MEDICAL SERVICES RENDERED BY                                                                                  WAS RM38,796.55
     THE PLAINTIFF TO MENTIGA'S EMPLOYEES                                                                              PAID ON 16.01.2006 = RM2,000.00
     AND REPSENTATIVES WHICH REMAINS                                                                                   PAID ON 20.02.2006 = RM2,000.00
     OUTSTANDING. THE PLAINTIFF HAS ON 28                                                                              PAID ON 20.03.2006 = RM2,000.00
     MAY 2003 OBTAINED JUDGMENT FOR                                                                                    PAID ON 13.07.2006 - RM2,000.00
     RM 68,643.00 TOGETHER WITH INTEREST
     WITH AT EIGHT PER CENT (8%) PER ANNUM                                                                             THE O/S BALANCE    -   RM30,796.55
     FROM 25 FEBRUARY 2003 UNTIL FULL SETTLEMENT.
                                                                                                                        TO CONTINUE PAYMENT
                                                                                                                        RM2,000.00 PER MONTH.



10   WB SUPPLY CENTRE (M) SDN BHD/                                                      RM 81,829.50                  THE PLAINTIFF HAS NOT PROCEEDED
     MESSRS TAY & CHUA                                                                                                TO EXECUTE THE JUDGEMENT.
                                                                                                                      MENTIGA HAS RECEIVED A PROPOSAL FROM
     THE PLAINTIFF IS CLAIMING FOR THE SUM                                              KTN SESSIONS COURT            THE PLAINTIFF FOR A PAYMENT SCHEDULE.
     OF RM81,829.50 TOGETHER WITH INTEREST                                              SUIT NO;52-1018-2002
     BEING PAYMENT IN ARREARS FOR GOODS                                                                               PAID ON 16.05.2005 -    RM10,000.00
     SOLD TO MENTIGA. MENTIGA HAS BEEN SERVED                                                                         PAID ON 04.10.2005 -    RM2,000.00
     WITH THE WRIT OF SUMMONS ON 19 NOV., 2002.                                                                       PAID ON 21.11.2005 -    RM2,000.00
     ON 5 JUNE 2003, THE PLAINTIFF OBTAINED                                                                           PAID ON 16.01.2006 -    RM2,000.00
     JUDGEMENT AGAINST MENTIGA                                                                                        PAID ON 20.02.2006 -    RM2,000.00
     FOR RM 81,829.50 WITH INTEREST AT ONE POINT                                                                      PAID ON 20.03.2006 -    RM2,000.00
     FIVE PER CENT (1.5 %) PER MONTH FROM 1 MAY                                                                       PAID ON 13.07.2006  -   RM2,000.00
     2001 UNTIL FULL SETTLEMENT AND COST OF                                                                            THE O/S BALANCE      - RM59,829.50
     RM 1,413.00.                                                                                                      TO CONTINIUE PAYMENT
                                                                                                                       RM2,000.00 PER MONTH.




                                                                    Page 4 of 9
                                                             MENTIGA CORPORATION BERHAD
                                                         (Company No 10289 - K and its Subsidiaries)
                                                     LIST OF MATERIAL LITIGATIONS OF THE GROUP AS AT 31 JULY, 2006.

                                                               SUMMONS ISSUES BY MCB


NO                       PLAINTIFF / LAWYER :                   DEFENDEN / LAWYER:         AMOUNT CLAIM / COURT:                     REMARKS


 1   HARANAY, HISHAM, ANIKAH & ASS.                       SHABUDIN BIN MOHD LELA         RM 384,000.00                THE JUDGEMENT WAS SERVED ON
                                                                                                                      SHABUDIN ON 22 DEC.,2000 BUT WAS
                                                                                         KUANTAN HIGH COURT           RETURNED WITH NOTED 'SUDAH PINDAH'.
     MENTIGA IS CLAIMING FOR THE AMOUNT OF                                               SUIT NO; 22-3-2000
     RM 384,000.00 AS AT 20 MARCH 1999                                                                                THE LAWYER LETTER'S DATED 15.01.2001
     FROM SHABUDIN FOR BREACH OF THE
     SALE AND PURCHASE AGREEMENTS                                                                                     DISCUSSION WAS HELD WITH LAWYER,
     ENTERED INTO BY THE PARTIES ON 20                                                                                SINCE DEFENDANT CANNOT BE
     MARCH 1997 AND 21 MARCH 1997.                                                                                    LOCATED WE WERE ADVISED TO FILE
     JUDGEMENT IN DEFAULT HAS BEEN GRANTED                                                                            SUBSTITUTE BANKRUPTCY NOTICE
     BY THE HIGH COURT AGAINST SHABUDIN                                                                               AGAINST DEFENDANT.
     ON 20 OCTOBER 2000 FOR THE SUM OF
     RM 384,000.00 WITH AN INTEREST OF 10 %                                                                           MENTIGA'S SOLICITORS HAS FILED
     FROM 20 MARCH 1999 AND COST OF                                                                                   BANKRUPTCY PROCEEDINGS AGAINST
     RM 225.00.                                                                                                       SHABUDIN ON 29.12.2005.


 2   MENTIGA FOREST PRODUCTS SDN. BHD.(MFPSB). /          KAMALUDIN BIN ABDUL RAUF /     RM 24,395.89                 A CREDITORS PETITION WAS FILED
     HARANAY, HISHAM, ANIKAH & ASS.                       ABD. AZIZ & RAKAN-RAKAN                                     ON 29 JULY 1999 AND SERVED ON
                                                                                                                      KAMALUDDIN ON 21 FEBRUARY 2000.
     MFPSB IS THE MAIN CONTRACTOR OF A                                                                                HOWEVER, KAMALUDDIN SET ASIDE
     PROJECT TO BUILT 124 UNITS OF LOW COST                                              KUANTAN HIGH COURT           THE CREDITORS PETITION ON THE
     HOUSES FOR LEMBAGA KERAJAAN NEGERI                                                  BANKRUPTCY PETITION          GROUNDS THAT MENTIGA AGREED
     PAHANG FOR WHICH KAMALUDIN IS A                                                     NO; 29-574-1998              TO WITHDRAW THE ACTION AGAINST
     SUB CONTRACTOR. MFPSB HAS TERMINATED THE                                                                         HIM.
     SUB-CONTRACTOR ON THE GROUNDS THAT
     KAMALUDDIN DID NOT COMPLETE THE WORKS                                                                            MENTIGA LETTER'S DATED 19.01.2001
     ON TIME. KAMALUDDIN CLAIMED DAMAGED
     FOR WRONGFUL TERMINATION (BREACH OF                                                                              DISCUSSION WAS HELD ON 21.10.2005
     CONTRACT). MFPSB HOWEVER CLAIMED THAT                                                                            PARTY IS WILLING TO WITHDRAW THE
     KAMALUDDIN OWNED MFPSB THE SUM OF RM24,395.89                                                                    COUNTER CLAIM AGAINST MENTIGA.
     AS AT 22 DECEMBER 1998. JUDGEMENT AGAINST
     KAMALUDDIN HAS BEEN OBTAINED ON 26 JULY 1995.                                                                    PENDING LETTER FROM PARTY.
     BAKRUPTCY NOTICE AGAINST KAMALUDDIN HAD BEEN
     FILED ON 16 DECEMBER 1998 AND SERVED ON
     8 FEBRUARY 1999.




                                                                        Page 5 of 9
                                                                          MENTIGA CORPORATION BERHAD
                                                                      (Company No 10289 - K and its Subsidiaries)
                                                                  LIST OF MATERIAL LITIGATIONS OF THE GROUP AS AT 31 JULY, 2006.

                                                                            SUMMONS ISSUES BY MCB


NO                        PLAINTIFF / LAWYER :                               DEFENDEN / LAWYER:         AMOUNT CLAIM / COURT:                     REMARKS


 3   HARANAY, HISHAM, ANIKAH & ASS.                                    VC CONSTRUCTION SDN BHD /      RM 768,000.00             ON 07.11. 2002, THE JUDGEMENT WAS
                                                                       TUN AHMAD FADZIL.                                        SERVED ON VC WHO HAD THEN FAILED
                                                                                                      KTN. (H) COURTS           TO COMPLY WITH THE SAID JUDGEMENT.
                                                                                                      SUIT NO;22-39-2002
     MENTIGA IS CLAIMING FOR THE SUM OF                                                                                            ON 28 APRIL,2005 MENTIGA INSTRUCTED
     RM 768,000.00 AS AR 18 OCTOBER 2002 AGAINST                                                                                   MESSRS HARANAY TO PROCEED WITH
     VC FOR BREACH OF THE SALE AND PURCHASE                                                                                        WINDING UP.
     AGREEMENT ENTERED INTO BY THE PARTIES ON
     22 NOVEMBER 1996. JUDGEMENT IN DEFAULT                                                                                        CO. SEARCH RECEIVED FROM ROC
     WAS OBTAINED AGAINST VC ON 18 OCTOBER 2002.                                                                                   ON 17/08/05.
                                                                                                                                   SOLICITOR TO PROCEED FURTHER.


 4   MAHINDAR & CO                                                     KUMPULAN PENAMBANG             RM8,380,132.00               BASED ON THE FACTS AND DOCU-
                                                                       (JOHORE) SDN. BHD. /                                        MENTS PRESENTED, THE SOLICITORS
     MENTIGA IS CLAIMING FOR THE AMOUNT OF RM8,380,132.00               REGINALD VALLIPURAM & CO.                                  HANDLING THE CASE ARE OF THE
     IN RESPECT OF THE FOLLOWING;                                       (JOHOR BAHRU).                                              OPINION THAT MENTIGA HAS A GOOD
                                                                                                                                    CLAIM.
     a) BALANCE OF PROGRESS PAYMENT
         FOR WORK DONE IN CONSTRUCTING                                                                                             MAHINDAR & CO WAITING RESPOND FROM
         A RESORT IN PULAU SIBU                  RM1,744,606.14                                                                    'PERTUBUHAN ARKITEK MALAYSIA' ( PAM )
                                                                                                                                   - APPLICATION FOR APPOINTMENT OF
     b) RETENTION SUM                              RM1,292,532.96                                                                    ARBITRATOR.

     c) CLAIM FOR VARIATION ORDER         RM3,500,000.00                                                                           DISCUSSION WITH MENTIGA'S SOLICITORS
                                                                                                                                   WAS HELD ON 12.10.2005 AND ASK THEM
     d) BALANCE SUM FOR ADDITIONAL                                                                                                 TO FOLLOW UP.
        LANDSCAPE WORKS                          RM213,520.10
                                                                                                                                   PAM WROTE TO MAHINDAR & CO. ON
     e) CLAIM FOR RETURN OF MONEY                                                                                                  5.12.2005 FOR FURTHER INFORMATION.
         WRONGFULLY DEDUCTED FROM                                                                                                  MAHINDAR TO REPLY.
         THE PROGRESS CLAIMS                 RM429,652.80

     f) APPEAR FOR WAIVER OF LIQUIDATED
        AND ASCERTAINED DAMAGES            RM1,200,000.00




                                                                                     Page 6 of 9
Page 7 of 9
ASK THEM




           Page 8 of 9
                                                                 MENTIGA CORPORATION BERHAD
                                                             (Company No 10289 - K and its Subsidiaries)
                                                        LIST OF MATERIAL LITIGATIONS OF THE GROUP AS AT 31 JULY, 2006.

                                                             LETTER OF DEMAND ISSUE AGAINST MCB
     ADDITIONAL CASES;

NO                    PLAINTIFF / LAWYER :                          DEFENDEN / LAWYER:            AMOUNT CLAIM / COURT:                REMARKS


 1   SYARIKAT SAUNDER FOOTWEAR / SEE KWONG YAN                                                   RM9,372.60               REQUEST FOR MCB TO SETTLE.

     THE ABOVE CREDITOR, THROUGH ITS SOLICITORS HAS
     DEMANDED THE O/S. AMOUNT OF RM9,372.60 FOR
     GOODS SOLD AND DELIVERED TO MENTIGA BETWEEN
     SEPTEMBER 1999 TO JUNE 2001.



 2   KLINIK SULAIMAN / DAENG KHATIJAH & AMRAN                                                    RM193,084.00             NEGO WITH PARTY, WILLING TO
                                                                                                                          LESS 25% = RM144,813.00
     MENTIGA HAS RECEIVED A LETTER OF DEMAND FROM                                                                         PAID ON 2005 = RM30,000.00
     DAENG KHATIJAH & AMRAN ON 30 MAY 2003 ON THE                                                                         PAID ON 16.01.2006 = RM5,000.00
     O/S. BALANCE RM193,084.00 FOR MEDICAL SERVICES                                                                       PAID ON 20.02.2006 = RM5,000.00
     RENDERED TO MENTIGA'S EMPLOYEES AND WORKERS.                                                                         PAID ON 20.03.2006 = RM5,000.00
                                                                                                                          PAID ON 13.07.2006 = RM5,000.00
                                                                                                                          O/S BALANCE = RM94,813.00



 3   PEJABAT DAERAH AND TANAH PEKAN                                                              RM159,340.00             MENTIGA INTENDS TO SETTLE THE
                                                                                                                          OUTSTANDING SUM OF RM159,340.00
     PEJABAT DAERAH AND TANAH PEKAN HAS DEMANDED                                                                          BY THE THIRD QUARTER OF 2006
     AN O/S. SUM OF RM159,340.00 BEING THE ARREARS OF                                                                     USING PROCEEDS FROM THE PRO-
     QUIT RENT FOR THE PEKAN FACTORY LOTS AS AT                                                                           POSED DISPOSAL.
     27 JUNE 2003.



 4   MAJLIS DAERAH PEKAN ( MDP )                                                                 RM611,041.30             MENTIGA INTENDS TO SETTLE THE
                                                                                                                          OUTSTANDING SUM OF RM611,041.30
     MAJLIS DAERAH PEKAN HAS ON 23 NOVEMBER 2005                                                                          BY THE THIRD QUARTER OF 2006
     DEMANDED AN OUTSTANDING SUM OF RM611,041.30                                                                          USING PROCEEDS FROM THE PRO-
     BEING THE COMPANY'S TAX ASSESSMENT IN ARREARS                                                                        POSED DISPOSAL.
     AS AT 30 SEPTEMBER 2005.