Docstoc

Startup Financing Agreement

Document Sample
Startup Financing Agreement Powered By Docstoc
					Product 6- Regional Resource   2009 Request for Offers
(Long-Term)                         Supply Resources
         Site Name:
    Street Address:
                City:
           Zip Code:
Form of Site Control:
ers
 es
Product 6- Regional Resource           2009 Request for Offers
(Long-Term)                                 Supply Resources
 Interconnection Substation:
        Balancing Authority:
         ISO Delivery Point:
           Path Description:
    Please include all transmission
 paths and firm transmission rights
      required to deliver product to
                  SDG&E's system.
ers
 es
Product 6- Regional Resource   2009 Request for Offers
(Long-Term)                         Supply Resources
Main Gas Line:
Physical Description:
Product 6- Regional Resource                                      2009 Request for Offers
(Long-Term)                                                            Supply Resources
Site Elevation, ft
                           Dry Bulb (F)   Wet Bulb (°F)   RH %
Yearly Maximum Condition
Guarantee Condition
Summer Average Condition
Annual Average Condition
Yearly Minimum Condition
Product 6- Regional Resource                                                                                                2009 Request for Offers
(Long-Term)                                                                                                                      Supply Resources
                                                                                    Number of Units
                                                                       Facility Maximum MW Output                                    MW
                                                                       Facility Minimum MW Output                                    MW
                                                  Facility Heat Rate (HHV) at Maximum MW Output                                      BTU/kWh
                                                  Facility Heat Rate (HHV) at Minimum MW Output                                      BTU/kWh
                                                                             Annual Operating Hours
                             (minimum of 2,600 hours exclusive of startup, shutdown, or maintenance time)                            hrs
                                                                       Maximum Number of Annual Starts
  List the maximum number of each type of start. If there is no difference between the types of start, then list the same
                                                                                   number starts for each type of start.
                      Maximum Number of Daily Starts                                                       Total Starts
                                                                                                            Cold Starts
                                                                                                          Warm Starts
                                                                                                             Hot Starts
                                                   Startup Time                        Cold Start to Synchronization                 min
                                                                                        Cold Start to Minimum Load                   min
                                                                                        Cold Start to 100% Capacity                  min
                                                                 Minimum Run Time Following a Start                                  min
                                                            Minimum Downtime Following a Shutdown                                    min
                                                  Ramp Rates              Initial Synchronization to Minimum Load                    MW/min
                   (Minimum load is minimum sustainable                                 Minimum Load to Maximum                      MW/min
                             load within emissions limits)                              Maximum Load to Minimum                      MW/min
                                              Startup Energy                      Start Initiation to Synchronization                BTU
                                                                                 Synchronization to Minimum Load                     BTU
                                                                                Startup Electrical Energy Required                   kWHr
                        Off-Line Energy Consumption                                          Assuming ready-to-start                 kW

                                                                          Annual Forced Outage Rate
                                                                              (NERC Standard)
                                                               2008
                                                               2007
                                                               2006
                                                               2005
                                                               2004



         Describe any limitations of operating
parameters not detailed above (such as limited
  hours due to air permits, future transmission
                                 changes, etc.)
Product 6- Regional Resource                                                               2009 Request for Offers
(Long-Term)                                                                                     Supply Resources
Bid Expiration Date:
Project Start Date:
Financing Secured:
Engineering Start:
Construction Start:
Commissioning Start:
Commercial Operation Date:

PERMITTING STATUS:*
                                                                              Date of
                                                                  Issuing   Application/    Date
REQUIRED PRIOR TO BEGINNING CONSTRUCTION                          Agency       Filing      Granted   Expiration
          AFC          Authorization for Construction             CEC
         APCP          Air Pollution Control Permit               APCD
          BBP          Bridge Building Permit                     DPLU
           BP          Building Permit                            DPLU
          GP           Grading Permit                             DPLU
          HP           Health Permit                              DEH
         MUP           Major Use Permit                           DPLU
                       National Pollutant Discharge Elimination
       NPDESP          System Permit                              SWRCB
         SPPE          Small Power Plant Exemption                 CEC

                                                                              Date of
                                                                  Issuing   Application/    Date
REQUIRED PRIOR TO COMPLETING CONSTRUCTION                         Agency       Filing      Granted   Expiration
           EP          Encroachment Permit                        CDOT
          SAA          Streambed Alteration Agreement             CDFG

                                                                              Date of
                                                       Issuing              Application/    Date
REQUIRED PRIOR TO HANDLING HAZARDOUS MATERIALS ON SITE Agency                  Filing      Granted   Expiration
           HMP               Hazardous Materials Permit            DEH

                                                                              Date of
                                                                  Issuing   Application/    Date
REQUIRED PRIOR TO COMMENCEMENT OF OPERATIONS                      Agency       Filing      Granted   Expiration
          CO          Certificate of Occupancy                    DPLU

                                                                              Date of
                                                                  Issuing   Application/    Date
REQUIRED PRIOR TO GENERATION OF ELECTRICITY                       Agency       Filing      Granted   Expiration
                       Order Granting Borrower Market-Based
                       Rate Authority and Accepting its
         MBR           Wholesale Power Sale Tariff                FERC

                                                                              Date of
                                                                  Issuing   Application/    Date
OTHER REQUIRED PERMITS:                                           Agency       Filing      Granted   Expiration
          ACRONYM                                                          AGENCY NAME
            APCD                                              Air Pollution Control District, San Diego
            CDFG                                                 California Dept. of Fish and Game
            CDOT                                                  California Dept. of Transportation
             CEC                                                   California Energy Commission
             DEH                                        Dept. of Environmental Health, County of San Diego
            DPLU                                          Dept. of Public Land Use, County of San Diego
            FERC                                              Federal Energy Regulatory Commission
           SWRCB                                         Storm Water Resource Control Board, San Diego
*This is a list of the most commonly issued permits that are required for plant
construction and operation. This is not intended to be a complete list of all
required permits. Power plant construction is considered on a case-by-case
basis and issues may arise during development, construction, and operation that
will require permits not listed here, or regulatory approvals from agencies not
listed on this sheet. Please list any other permits or required authorizations in
Product 6- Regional Resource                                                      2009 Request for Offers
(Long-Term)                                                                            Supply Resources
Routine Maintenance and Testing

Hours/year
                                  Major Maintenance:

                                                            Interval Before Activity
                                                              (years, months, or
             Activity              Duration (hours, days)      operating hours)
ers
 es
Product 6- Regional Resource                                                                  2009 Request for Offers
(Long-Term)                                                                                        Supply Resources
Prices and terms shall refer only to the proposed facility. Use duplicate copies of this form for pricing
options, if any.
Developer’s pricing shall include all costs except natural gas fuel, including necessary emission
compliance costs as well as emission allowances.

                               Capacity Payments:                $/kW-yr for first             Escalation Index (%
                                                                 12 months                     increase/yr)

                             Fixed O&M Payments:                 $/kW-yr for first             Escalation Index (%
                                                                 12 months                     increase/yr)

               Non-fuel Variable O&M Payments:                   $/kW-yr for first             Escalation Index (%
                                                                 12 months                     increase/yr)

                  Black Start Capacity Payments:                 $/kW-yr for first             Escalation Index (%
                                                                 12 months                     increase/yr)

  Black Start Non-fuel Variable O&M Payments:                    $/kW-yr for first             Escalation Index (%
                                                                 12 months                     increase/yr)


Additional Notes:
Product 6- Regional Resource                                              2009 Request for Offers
(Long-Term)                                                                    Supply Resources

        Year             Capacity Resource           Capacity Resource               Black Start
                     Plant Capacity ($/kW-year)   Fixed O&M ($/kW-year)      Plant Capacity ($/kW-year)
        2012
        2013
        2014
        2015
        2016
        2017
        2018
        2019
        2020
        2021
        2022
        2023
        2024
        2025
        2026
        2027
        2028
        2029
        2030
        2031
        2032
        2033
        2034
        2035
        2036
        2037
        2038
        2039
        2040
        2041
        2042
        2043
        2044
        2045
rs
es

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:8
posted:8/19/2011
language:English
pages:15
Description: Startup Financing Agreement document sample