Mythos Grinder Pre-Installation Checklist by sandeshbhat

VIEWS: 22 PAGES: 1

More Info
									Nuova Distribution USA, LLC
6940 Salashan Parkway Building A • Ferndale WA 98248 www.nuovadistribution.com • (p) 360.366.2226 • (f) 360.366.4015

Plus/Mythos Grinder Pre-Installation Checklist
Power Requirements
• • • • Volts: 110 (voltage range of 110–125) Watts: 800 Amp draw: 8 Receptical: Nema 5-15

Nema 5-15

Counter-Space Requirements
• • • 25 inches (height) 20 inches (depth) 8 inches (width) Counter-Top 8” 20”

(Front)

NSF/ANSI Std.8
20 inches

8 inc

hes

I the customer understand that these requirements must be in when the installer arrives. Failure to have the site ready will result in additional service and travel charges, and may cause further delays in installation. Customer Name: ____________________________________ Signature: ________________________________________

Company Name: ________________________________________________________________________________________ Phone: __________________________ Fax: __________________________ E-mail: __________________________
Version 2.2

25 inches


								
To top