					                          INVITATION FOR BIDS
           AMERICAN RECOVERY AND REINVESTMENT ACT PROJECT
             ADA BUS STOP IMPROVEMENTS PHASE II ZONES 1 - 3

IFB No.: 2011-FC-05                                           Date Issued: April 4, 2011

Sealed bids will be received at the offices of the Corpus Christi Regional
Transportation Authority, hereinafter called the "RTA", at 5658 Bear Lane, Corpus
Christi, Texas 78405, until 2:00 PM, Monday, April 18, 2011 for the ADA Bus Stop
Improvement Phase II Zones 1 - 3. Bid prices shall be good for one hundred twenty
(120) calendar days from the due date. It is the responsibility of the Bidder to ensure
that the bid is delivered prior to the deadline. Bids received after the deadline will not be
accepted and will be returned to the Bidder unopened.

Bidders are encouraged to attend a pre-bid meeting scheduled for 3:00 PM,
Monday, April 11, 2011, at the RTA Offices located at 5658 Bear Lane, Corpus
Christi, Texas. The purpose of this meeting is to provide an overview of the
requirements of the project and to answer any questions bidders may have concerning
this procurement.      Although attendance is not mandatory, it is highly
recommended.

The bids will be publicly opened and read aloud at the RTA Offices, 5658 Bear Lane,
Corpus Christi, Texas immediately following the deadline. All interested parties are
invited to attend. The RTA may or may not award additive (alternative) bids.

Specifications for this proposal and information may be obtained from the RTA’s
Contracts Department located at 5658 Bear Lane, Corpus Christi, TX 78405 or from the
RTA’s website (http://ccrta.org/rta-business/.). Further information can be obtained
from Martha King, Buyer, or Twila Mouttet, Contracts and Grants Manager at (361) 289-
2712. Bid documents may be examined at the RTA offices, Associated General
Contractors, and Associated Builders and Contractors.

Bidders are advised that the RTA has a Disadvantaged Business Enterprise (DBE)
program. The RTA’s overall goal is 22% DBE participation. For additional information,
please contact Lamont Taylor at (361) 289-2712. Bidders that are certified DBE’s are
eligible to participate in the bonding and lending program. Contact the RTA’s DBE
office for more details.



                                   IFB NO. 2011-FC-05
                 ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                      Page 1 of 241
Bidders should note that this procurement is subject to a financial assistance contract
between the RTA and the Federal Transit Administration of the United States
Department of Transportation (DOT) for 100% of the Contract amount. The successful
Bidder is required to comply with, in addition to other provisions of the Request for
Qualifications, the conditions required by applicable federal regulations, including the
following:

       Equal Employment Opportunity: CONTRACTOR will be required to comply with
       applicable Equal Employment Opportunity laws and regulations;

       Title VI Assurance: CONTRACTORS and subcontractors will be required to
       comply with all requirements imposed by Title VI of the Civil Rights Act of 1964
       (49 U.S.C. S2000d), the Regulations of DOT issued thereunder (49 C.F.R. Part
       21), and the Assurances by the RTA pursuant thereto;

       Ineligible Firms: All Bidders will be required to certify they are not on the
       Comptroller General's List of Ineligible Contractors; and

       Disadvantaged Business Enterprise: The RTA hereby notifies all Bidders that it
       will affirmatively ensure that the contract entered into pursuant to this
       advertisement will be awarded to the most responsive and responsible Firm
       without discrimination on the grounds of race, color, religion, national origin,
       handicap, age, or sex; and further, it will affirmatively ensure that in any contract
       entered into pursuant to this advertisement, disadvantaged businesses will be
       afforded full opportunity to submit statements in response to this request and will
       not be discriminated against on the grounds of race, color, religion, national
       origin, handicap, age, or sex in consideration for an award.

       As the RTA is using American Recovery and Reinvestment Act (ARRA)
       Federal Funds to pay for this procurement, contractor will be required to
       complete the ARRA reporting form-Appendix H to capture the required
       information. The ARRA reporting forms-Appendix H is due on a weekly basis.
       Please read the form in its entirety, complete and send it in on a weekly
       basis to the attention of ARRA representative- Mr. Lamont Taylor, Corpus
       Christi RTA, 5658 Bear Lane, Corpus Christi, Texas 78405. An original is
       attached; please make copies of the form. You may also submit the form
       electronically to ltaylor@ccrta.org.

       For additional information regarding these federal requirements, please contact
       Lamont Taylor at (361) 289-2712.

For the purposes of this procurement, the following documents are applicable:

      Invitation for Bids,
      Instructions to Bidders,

                                   IFB NO. 2011-FC-05
                 ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                      Page 2 of 241
      General Instructions,
      Special Conditions,
      Wage Rates,
      Standard Service Terms and Conditions,
      Federal Supplemental Conditions (Construction Contracts),
      Special Provisions Concerning Disadvantaged Business Enterprises (DBEs),
      Price Schedule (Appendix A) ,
      Certification Form (Appendix B),
      Certification and Statement of Qualifications (Appendix C)
      Disclosure of Interests Certification (Appendix D)
      Buy America (Appendix E)
      Certification of Restrictions on Lobbying (Appendix F)
      DBE Participation Form (Appendix G )
      ARRA Reporting Requirements Form (Appendix H)
      References (Appendix I)

    Construction Drawing (Exhibit A).
    Technical Specifications (Exhibit B).

The RTA shall select the bid that in the RTA’s opinion constitutes the most
advantageous quote to the RTA, price and other factors being considered. Bids will be
evaluated based on the Evaluation Factors described in paragraph 10 of the Instruction
to Bidders.

All Bidders must submit a Price Schedule (Appendix A), certification forms
(Appendix B thru I), and Bid Bond (or Cashiers Check 5%). See General
Instructions No. 19 for further instructions. Failure to provide this information
may deem your bid to be non-responsive.

The Bidder is required to supply a list of pertinent references with this bid.




                                   IFB NO. 2011-FC-05
                 ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                      Page 3 of 241
                              INSTRUCTIONS TO BIDDERS

1.   GENERAL.

     The following instructions by the RTA are intended to afford bidders an equal opportunity
     to participate in the RTA’s contracts.

2.   EXPLANATIONS AND COMMUNICATIONS.

     2.1    Any explanation desired by a bidder regarding the meaning or interpretation of
     these Instructions or any other bid documents must be requested in writing to the RTA's
     Contracts Department with sufficient time allowed for a reply to reach bidders before the
     submission of their bids.

     2.2    Oral explanations or instructions will not be binding. Any information given to a
     prospective bidder concerning an invitation will be furnished to all prospective bidders as
     an amendment to the invitation if such information is necessary to bidders in submitting
     bids on the invitation or if the lack of such information would be prejudicial to uninformed
     bidders.

     2.3    All communications regarding this solicitation need to be made directly to the
     Contracts Department. - written, faxed (361-289-3060), or e-mailed to Twila Mouttet,
     Contract & Grants Manager, (tmouttet@ccrta.org) - Any violation may be grounds for
     disqualification.

3.   SPECIFICATIONS.

     3.1.    Bidders are expected to examine the specifications, any drawings, standard
     provisions and all instructions. Failure to do so will be at the bidder’s risk. Bids which
     are submitted on other than authorized forms or with different terms or provisions may
     not be considered as responsive bids.

     3.2.    The apparent silence of the specifications as to any detail, or the apparent
     omission from it of a detailed description concerning any point, shall be regarded as
     meaning that only the best commercial practice is to prevail and that only material and
     workmanship of the finest quality are to be used. All interpretations of the specifications
     shall be made on the basis of this statement.

4.   INFORMATION REQUIRED.

     4.1.   Each bidder shall furnish the information required by the bid documents. The
     bidder shall sign the Price Schedule and, when appropriate, the specifications, which
     documents shall collectively constitute the bidder’s offer. Erasures or other changes
     must be initialed by the person signing the documents. Bids signed by an agent are to
     be accompanied by evidence of his authority unless such evidence has been previously
     furnished to the RTA.

     4.2.    The bidder should quote its lowest and best price. If delivery and shipping
     quantities affect a unit bid price, multiple bids may be made so as to indicate “price

                                  IFB NO. 2011-FC-05
                ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                     Page 4 of 241
     break” quantities in order for the RTA to determine maximum economic benefits. Pricing
     should include packaging and transportation unless otherwise specified. All prices shall
     be entered on the Price Schedule in ink or be typewritten. Totals shall be entered in the
     “Total Price” column of the Price Schedule, and in case of discrepancy between the unit
     price and the extended total price, the unit price will be presumed to be correct.

     4.3.   Bids must be firm. If the bidder believes it necessary to include in its price a
     price adjustment, however, such a bid may be considered but only as an alternate bid.

     4.4.    Bids on items should be quoted F.O.B. destination. If the quoted price does not
     include transportation charges, such charges must be itemized separately; provided,
     however, that the RTA shall have the right to designate what method of transportation
     shall be used to ship the goods.

     4.5.   The RTA does not have to pay federal excise taxes or state and local sales and
     use taxes, except for contracts for improvements to real property.

     4.6.    Time of delivery is part of the bid and very important. The required delivery date
     indicated is at point of destination, and if stated as a number of days, will include
     Saturdays, Sundays, and holidays. If the indicated date cannot be met or a date is not
     indicated in the specifications, the bidder shall state its best delivery time.

5.   SUBMISSION OF BIDS.

     Sealed Bids should be submitted in an envelope marked on the outside containing the
     bidder’s name and address and bid description addressed to:

            Regional Transportation Authority
            Attn: Contracts Department
            5658 Bear Lane
            Corpus Christi, TX 78405
            Bid For: ARRA-ADA Bus Stop Improvements Phase II
            IFB 2011-FC-05
            Bid Due Date: Monday, April 18, 2011 @ 2:00 PM

     Bids must be submitted in sufficient time to be received and time-stamped at the above
     location on or before the published bid date and time shown on the Bid Invitation. Bids
     received after the published time and date cannot be considered. Any bids which are
     mislabeled or do not indicate the bidder’s name or address as required above may be
     opened by the RTA solely for the purpose of identifying the bidder for return of the bid.

6.   MODIFICATION OR WITHDRAWAL OF BIDS.

     Bids may be modified or withdrawn by written or telegraphic notice received by the RTA
     prior to the exact hour and date specified for receipt of bids. A bid may also be
     withdrawn in person by a bidder or an authorized representative prior to the bid deadline;
     provided the bidder’s identity is made known and he or she signs a receipt for the bid.



                                 IFB NO. 2011-FC-05
               ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                    Page 5 of 241
7. OPENING BIDS.

     All bids shall be opened by the RTA as soon after the bid deadline as is reasonably
     practicable. Any bids which were received prior to the deadline but were not opened with
     the other bids due to inadvertence by the RTA shall be opened at a time designated by the
     RTA and announced to all bidders present at the bid opening who provided their names and
     phone numbers on the attendance list. Trade secrets and confidential information contained
     in bids shall not be open for public inspection if identified in writing at the time the bid is
     submitted.

8.   REFERENCES.

        The RTA is requiring that bidders supply a list of pertinent references (See Appendix I).

9.   EVALUATION FACTORS.

        9.1     RTA will award contracts based upon the lowest responsible bid, price and other
        factors considered. Contracts may be awarded on a lump sum basis or on a unit price
        basis, provided that in the event a contract specifies a unit price basis, the compensation
        paid by the RTA shall be based upon the actual quantities supplied.

        9.2      In determining the “lowest responsible” bid, the RTA may consider, in addition to
        price, other factors such as compliance with the bid documents, delivery requirements,
        costs of maintenance and operations, training requirements, warranties, availability of
        repairs or other services, the financial or other qualifications and abilities of the bidder,
        past performance of the bidder, other factors contributing to the overall costs, both direct
        and indirect, related to an item, and compliance with the RTA’s Affirmative Action
        policies and goals. A record of poor performance or nonperformance on prior work may
        disqualify a bidder.

10. RESERVATION 0F RIGHTS.

        The RTA expressly reserves the right to:

         10.1 Reject or cancel any or all bids;

         10.2 Waive any defect, irregularity or informality in any bid or bidding procedure;

         10.3 Waive as an informality, minor deviations from specifications at a lower price than
              other bids meeting all aspects of the specifications if it is determined that total
              cost is lower and the overall function is improved or not impaired;

         10.4   Extend the bid opening time and date;

         10.5   Reissue a bid invitation;

         10.6   Consider and accept an alternate bid as provided herein when most
                advantageous to the RTA; and


                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 6 of 241
       10.7 Procure any item or services by other means.

       10.8 To award to more than one bidder dependent on the price range of bids.

       10.9 Award separate contracts to one or more bidders for the three different zones
            based on amounts of jobs that will be created by each bidder.

11. ACCEPTANCE.

      Acceptance of a bidder’s offer in some instances will be in the form of purchase orders
      issued by the RTA. Otherwise, acceptance of a bidder’s offer will be by acceptance
      letters issued by the RTA. Subsequent purchase orders and release orders may be
      issued as appropriate. Unless the bidder specifies otherwise in the bid, the RTA may
      award the contract for any item or group of items shown on the Bid Invitation.

12. BID PROTESTS.

      In the event that a bidder desires to protest any bidding procedure, the bidder should
      present such protest, in writing, to the RTA Chief Executive Officer within three (3)
      business days following the bid date. The protest shall state the name and address of
      the protestor, refer to the project number and description of the solicitation, and contain
      a statement of the grounds for protest and any supporting documentation. For federally-
      assisted contracts, certain additional bid protest procedures apply and may be found in
      the Supplemental Conditions contained within the bid documents.

13. EQUAL OPPORTUNITY.

      Bidders are expected to comply with the Affirmative Action Programs of the RTA with
      respect to its provisions concerning contractors. The RTA expressly reserves the right
      to consider such compliance in determining the lowest responsible bidder.

14. SINGLE BID.

      In the event a single bid is received, the RTA will, at its option, either conduct a price
      comparison of the bid and make the award or reject the bid and re-advertise. A price
      analysis is the process of examining the bid and evaluating a prospective price without
      evaluating the separate cost elements. Price analysis shall be performed by comparison
      of the price quotations, with published price lists, or other established or competitive
      prices. The comparison shall be made to a purchase of similar quantity and involving
      similar specifications.

15. SALES TAX EXEMPTION FOR CONSTRUCTION PROJECTS.

      Contracts for improvements to real property awarded by the RTA qualify for exemptions
      of Sales, Excise, and Use Taxes under the Texas Tax Code for construction projects
      with political subdivisions of the State of Texas.




                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 7 of 241
16. PREVAILING WAGE RATES FOR CONSTRUCTION PROJECTS.

     16.1 Contracts for improvements to real property awarded by the RTA are “public
     works” projects as defined under Chapter 2258, Texas Government Code, as amended.
     The RTA has ascertained the general prevailing rate of wages in the locality for each
     craft or type or worker or mechanic needed to execute the work under the contract
     documents, and the prevailing wage rates are attached to these contract documents (if
     this is a construction contract).

     16.2 It shall be mandatory upon the Contractor and any subcontractor on the project
     to pay not less than the specified rates to all laborers, workers, and mechanics
     employed by them in the execution of the work under the contract documents.
     Contractor shall forfeit as a penalty to the RTA the sum of $60.00 for each laborer,
     worker or mechanic employed for each calendar day, or portion thereof, such person is
     paid less than the stated prevailing wage rates for any work done under the contract
     documents by the Contractor or any subcontractor.

     16.3 The wage rates schedule shall be posted at the work site in an accessible place
     where it can be seen easily by the workers.

     16.4 One and one-half times the specified hourly wage shall be paid for all hours
     worked as overtime or legal holiday work.




                                 IFB NO. 2011-FC-05
               ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                    Page 8 of 241
                         GENERAL INSTRUCTIONS

1.   DESCRIPTION OF PROJECT

     1.1. The RTA is seeking bids from qualified bidders or individuals interested in
     a contract to provide ADA Bus Stop Improvements at various bus stop locations
     to be completed within 120 days after a letter to proceed is issued. Bidders shall
     quote their best price. An award, if any, shall be made to the most responsive
     and responsible Bidder/s. This project is being funded with American Recovery
     and Reinvestment funds with the intent of creating more jobs in the community.

     1.2. Bids will only be accepted from established contractors with experience in
     this type of work. Bidder will provide all necessary labor, materials, equipment,
     and supervision as required.

     1.3. These specifications are written to explain what to do not how to do it. It is
     assumed and will be required that all workmanship shall be “first class” and in
     compliance with the current approved standards for the particular phase of the
     work as prescribed by the manufacturer. No careless or slovenly work of any
     form will be accepted.

2.   PROJECT MANAGER

     Whenever the word “Project Manager” is used in this Contract it is understood as
     referring to the RTA’s authorized representative – AG/CM.

3.   TIME OF COMPLETION AND FAILURE TO COMPLETE IN TIME

      The term of the contract will be to complete the project within 120 days after a
     letter to proceed is issued. Liquidated damages will be charged for work that
     exceeds the time frame.

     3.1. The working time for the completion on each project shall be as
     described above. The Bidder agrees that he/she will commence work within three
     (3) working days after receiving a contract from the RTA, discussing an appropriate
     contract time with the Engineer, and receiving a letter to proceed. The whole work
     will be performed and the premises cleaned up in accordance with the Contract
     Documents on or before the provided time for the completion of this project.

     3.2. For each working day that any work remains uncompleted after the time
     specified in the Contract for completion of the work, or after such time period as
     extended pursuant to other provisions of the Contract, a sum of One Hundred Fifty
     and no/100 Dollars ($150.00) per day will be assessed against the Bidder as
     reasonable liquidated damages. Said liquidated damages are not imposed as
     penalty but as an estimate of the damages that the RTA will sustain from delay in

                                 IFB NO. 2011-FC-05
               ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                    Page 9 of 241
     completion of the work, which damages by their nature are not capable of precise
     proof. The RTA may withhold the amount of liquidated damages from monies
     otherwise due to the Contractor.

4.   CONDITIONS OF WORK

     Each Bidder must inform himself/herself fully of the conditions relating to the
     construction of the project and the employment of labor thereon. Failure to do so
     will not relieve a successful Bidder of his/her obligation to furnish all material and
     labor necessary to carry out the provisions of this contract. Insofar as possible,
     the Bidder, in carrying out his/her work, must employ such methods or means as
     will not cause any interruption of or interference with the work of any other
     contractor.

5.   SPECIFICATIONS

     Titles to divisions and paragraphs in these Contract Documents are introduced
     merely for convenience and are not to be taken as a part of the specifications
     and are, furthermore, not to be taken as a correct or complete segregation of the
     several units of material and labor. The RTA for omissions or duplications
     assumes no responsibility, either direct or implied, by the Bidder or his
     subcontractor, due to real or alleged error in arrangement of matter in these
     Contract Documents.

6.   GUARANTY

     Neither the final payment nor any provision in the Contract documents, no partial
     or entire occupancy of the premises by the RTA shall constitute an acceptance of
     work not done in accordance with the Contract documents or relieve the Bidder
     of liability in respect to any express warranties or responsibility for faulty
     materials or workmanship. Bidder shall remedy any defects in materials or
     workmanship, which shall appear within a period of one (1) year from the date of
     final acceptance of work unless a longer period is specified. The RTA will give
     notice of observed defects with reasonable promptness. The Bidder shall have
     his Performance Bond, if required, so written that the one (1) year period is
     covered by the Performance Bond.

7.   ACCIDENT PREVENTION

     7.1. Bidder shall comply with all of the RTA’s safety regulations and shall
     observe the requirements of the Occupational Safety and Health Act. The Bidder
     shall comply with all procedures prescribed by the RTA for control and safety of
     persons visiting the job site. It is the Bidder’s responsibility to take whatever
     steps necessary to assure the safety of individuals working on or visiting the site.


                                 IFB NO. 2011-FC-05
               ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                    Page 10 of 241
      7.2. The RTA calls the Bidder’s attention to the necessity for his/her proper
      storage, use, and disposal of all materials; proper use and storage of tools and
      devices; and proper control of construction procedures to assure the health and
      safety of workmen and of others having access to the job site. It is the Bidder’s
      responsibility to obtain from the manufacturers and sellers or distributors of
      materials, tools, and devices all requirements for proper and safe usage, storage
      and disposal, and to follow these requirements and recommendations carefully.
      Particular attention is called to the use of paints, thinners, solvents, caulking or
      patching materials, chemical grouts, and surface treatment materials.

      For first aid instructions contact a physician or the Poison Control Center: Corpus
      Christi (Memorial Medical Center), 361-881-4559.

8.    SUPERINTENDENCE BY CONTRACTOR

      8.1. At all times during performance and until the work is completed and
      accepted, the Bidder shall directly superintend the work of this Contract or assign
      and have on the work site a competent superintendent who is satisfactory to the
      Project Manager and has authority to act for the Bidder.

      8.2. Bidder shall watch over the concrete until the concrete has cured enough
      so that no graffiti or damage can occur to the surface of the concrete. Project
      Manager shall not accept any concrete, which has been damaged due to
      CONTRACTOR’s lack of protection to the concrete while it is curing.

9.    LITIGATION RESPONSIBILITIES

      The RTA will give the Bidder prompt notice in writing of the institution of any suit
      of proceeding and permit the Bidder to defend same, and will give all needed
      information to do so. Bidder shall similarly give the RTA immediate notice of any
      suit or action filed or prompt notice of any claim arising out of performance of the
      Contract. Bidder shall furnish immediately to the RTA copies of all pertinent
      papers received by the Bidder.

10.   INSURANCE REQUIREMENTS

      Bidder shall maintain at all times during the term of this Contract at its sole cost
      and expense each of the following insurance coverages listed below having
      policy limits not less than the dollar amounts set forth:

      A. Commercial general liability insurance with minimum policy limits of
         $1,000,000.




                                  IFB NO. 2011-FC-05
                ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                     Page 11 of 241
      B. Automobile liability insurance with a combined single limit of $1,000,000. (In
         the event motor vehicles will be used by Contractor to perform the services
         specified)

      C. Workers Compensation with policy limits of $300,000 containing a waiver of
         subrogation endorsement waiving any right of recovery under subrogation or
         otherwise against the RTA to the extent employees are not covered under B.

      See Standard Service Terms and Conditions (Page 28).

11.   INDEMNIFICATION

       Bidder shall indemnify and hold harmless the RTA, its officer, employees,
      agents, attorneys, representatives, successors and assigns from any and all
      claims, demands, costs, expenses, liabilities and losses of whatsoever kind or
      character arising out of Bidder or its officers, employees or agents, during the
      term of the Contract. Bidder shall assume on behalf of the RTA and the
      indemnified parties described above, and conduct with due diligence and in good
      faith, the defense of any and all such claims, whether or not the RTA is joined
      therein, even if such claims be groundless, false, or fraudulent.

12.   TERMINATION

       The RTA shall have the right to terminate for default all or any part of its contract
      if Bidder breaches any of the terms hereof or if the Bidder becomes insolvent or
      files any petition in bankruptcy. Such right of termination is in addition to and not
      in lieu of any other remedies which the RTA may have in law or equity,
      specifically including, but not limited to, the right to sue for damages or demand
      specific performance. The RTA additionally has the right to terminate the
      Contract without cause by delivery to the Contractor of a Notice of Termination:
      specifying the extent to which performance hereunder is terminated and the date
      upon which such termination becomes effective.

13.   ABSENCE OF LIEN

      Under the laws of Texas, neither the Bidder nor any subcontractor, mechanic,
      material man, or laborer are entitled to acquire or attempt to acquire or contract
      for any lien upon the improvements covered by the Contract or the land upon
      which they are situated.

14.   RTA’S DBE PROGRAM

      Bidder shall be required to comply with the RTA's Disadvantaged Business
      Enterprise Program. The RTA goal for DBE participation is 22%. The successful
      Firm is required to complete a DBE Participation Form and return it with the Price

                                  IFB NO. 2011-FC-05
                ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                     Page 12 of 241
      Schedule. A “good faith” effort to include DBE participation is required and
      should be listed. If a firm is unable to provide any DBE participation, the form
      must still be completed documenting “None” in the proper space and sending
      “good faith” effort documentation with the form. Please refer to the "Special
      Provisions Concerning DBEs” contained in this IFB for more information.

15.   Lessons Learned from Phase I – Contractor Directives

      15.1    Contractors shall provide a better effort in clean-up at each site after
              concrete work is complete and formwork removed. The contractor should
              write this directive into General Notes and acknowledge as a line item in
              the contract. Use sandy loam and not large, excavated clay.

      15.2    Contractors shall provide a preliminary schedule of work at the Pre-
              Construction meeting how they intend to implement work through
              completion. Contractors will be required to update this schedule on a
              monthly basis and send to AG/CM with pay application.

      15.3    Contractors shall provide a list of stops requesting RTA to remove
              shelters, trashcans, signs, etc with two weeks lead time of the work. This
              list should show order and approximate date when removal is required.

      15.4    Contractors shall provide Applications for Payment with quantitative
              breakdown of work at each stop for that month. This will be field verified
              with AG/CM as a mandatory requirement for payment.

16.   Contractors shall not receive payment for individual sites until final completion
      has been achieved including restoration and cleanup.

17.   If the right of way goes into private property, AG/CM will determine if a survey is
      needed. Any bus stops that seem to encroach on private property will be
      adjusted to the City ROW.

18.   If there are duplications of sites between zones that were not identified before
      hand, then AG/CM and the RTA will determine what is to be done if that situation
      occurs.

19.   BONDING.

      19.1.  A bid guarantee is required from each bidder equivalent to five percent of
      the bid price. The "bid guarantee" shall consist of a firm commitment such as a
      bid bond, certified check, or other negotiable instrument accompanying a bid as
      assurance that the bidder will, upon acceptance of its bid, execute such
      contractual documents as may be required within the time specified.


                                   IFB NO. 2011-FC-05
                 ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                      Page 13 of 241
19.2 A payment bond is required on the part of Contractor for 100 percent of
the Contract price. A "payment bond" is one executed in connection with a
contract to assure payment as required by law of all persons supplying labor
and material in the execution of the work provided for in the Contract.

19.3 For contracts exceeding $100,000, a performance bond is required on the
part of Contractor for 100 percent of the Contract price. A "performance bond" is
one executed in connection with a contract to secure fulfillment of all Contractor's
obligations under such Contract.

19.4 All of the above-mentioned bonds shall be issued by a surety company
licensed to do business in Texas acceptable to the RTA. The attorney-in-fact
who executed the bond on behalf of the surety shall affix to the bond an original
or certified current copy of his or her power of attorney, indicating the monetary
limit of such power.




                            IFB NO. 2011-FC-05
          ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                               Page 14 of 241
                                SPECIAL CONDITIONS



1.0   EXISTING UTILITIES AND MAINTENANCE OF SERVICES

      1.1    Contractor shall take all precautions in protecting existing utilities, both
      above and below ground. If the Contractor encounters utility services along the
      line of this work, it shall be their responsibility to maintain the services in
      continuous operation at the Contractor's expense. Repairs and all labor and
      materials connected with maintaining services in operation are considered
      subsidiary. Therefore, no separate or direct payment will be made.

      1.2   The location of the underground utilities at each site is unknown. The
      Contractor shall be responsible for verifying the exact location of utilities prior to
      any construction. To locate utilities call in advance to the Texas One Call
      System, 1-800-245-4545 and Lone Star notification, 1-800-669-8344.

      1.3    Contractor shall preserve in operating condition all active utilities
      traversing or adjoining the construction site.    Utilities or appurtenances,
      driveways, drainage structures, roadways, or other improvements that are
      damaged by the Contractor shall be replaced to original condition at no cost to
      the RTA.

2.0   TEMPORARY UTILITIES

      2.1    WATER: The responsibility shall be upon the Contractor to provide and
      maintain, at his/her expense, an adequate supply of water for his/her use for
      construction and domestic consumption, and to install and maintain necessary
      supply connections and piping for same, but only at such locations and in such
      manner as may be approved by the RTA. Before final acceptance, temporary
      connections and piping installed by the Contractor shall be removed in a manner
      satisfactory to the RTA.

      2.2    ELECTRICAL: All electric current required by the Contractor shall be
      furnished by the Contractor shall be furnished by the Contractor. All temporary
      connections for electricity shall be subject to approval of the RTA. All temporary
      lines will be furnished, installed, connected, and maintained by the Contractor in
      a workmanlike manner satisfactory to the RTA and in compliance with the
      requirements of the National Electrical Code and all local ordinances. They shall
      be removed by the Contractor in like manner at his/her expense prior to
      completion of the construction.




                                  IFB NO. 2011-FC-05
                ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                     Page 15 of 241
3.0   WORKMANSHIP AND QUALITY OF MATERIALS

      Workmanship shall be of the highest quality and shall be performed by workers
      skilled in their trade. Articles, materials, and equipment to be incorporated into
      the work under this Contract shall be new and unused.

4.0   MATERIALS TESTING

      The RTA shall supply and pay the services of an independent testing laboratory
      for initial testing necessary under these specifications. Additional testing required
      as a result of failure shall be at the contractor’s expense. The RTA’s Project
      Manager and the Contractor’s supervisor shall coordinate testing.

5.0   CONTRACTOR USE OF THE PREMISES

      5.1    Careful staging of the construction must be planned by the Contractor to
      insure safety of RTA bus passengers. Temporary relocation of stops shall be
      determined by the RTA.

      5.2    Careful staging of the construction must be planned by the Contractor to
      insure safety of RTA bus passengers.

      5.3    Unimpeded access and visibility shall be maintained to fire hydrants,
      police boxes, traffic control devices, and similar terms.

      5.4   Contractor shall protect adjacent property from damage due to the
      progress of work. Contractor shall practice good housekeeping at the site. Any
      damage to public or private property adjacent to the work shall be repaired or
      replaced by the Contractor at their expense.

      5.5    Upon completion of the work and before acceptance and final payment,
      Contractor shall remove rubbish, unused materials, and temporary structures
      from the limits of the project and restore, in a manner acceptable to the RTA, all
      property both public and private that has been damaged during the execution of
      the work. Contractor shall level and grade all portions of the work where the
      surface of the natural ground or street surface has been disturbed during
      construction and shall leave the site of the work in a neat and presentable
      condition, free from ruts or holes.

6.0   ACCESS TO THE WORK AND INSPECTIONS

      Contractor shall obtain the RTA Project Manager’s approval at least 24 hours
      before work is started at the location so arrangements can be made to relocate
      bus passengers.

                                  IFB NO. 2011-FC-05
                ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                     Page 16 of 241
      The Contractor shall provide for access to the work at all times for the RTA and
      its authorized representatives.    He/she shall provide facilities for proper
      inspection by the above persons and shall exclude no portion of the work from
      such inspection.

7.0   PERMITS

      7.1    In the execution of the work, Contractor shall comply with all permit
      conditions and lawful instructions and requirements of the federal and state
      agencies having jurisdiction in the areas involved. Such permit conditions and
      lawful instructions addressed to the RTA that relate to the construction work
      included in the Contract shall be complied with.

      7.2    The Contractor shall be responsible for obtaining any and all permits
      required in the locations where the improvements are being constructed and the
      cost for such permits, if any, shall be borne by the Contractor. The Contractor
      shall also call upon the proper authorities for compliance inspections and assume
      the fees for same. All permits shall be obtained by the Contractor prior to
      start of construction.

      7.3    City permits are to be obtained at Engineering Traffic Div., 880-3550, if
      required.

         Traffic Control Plan City’s Permit

         Public Right-of-Way Blockage City’s permit

8.0   COOPERATION WITH OTHER AGENCIES

      Contractor shall cooperate with all public and private agencies and utilities
      operating within the limits of each project site. Contractor shall provide 48-hour
      notice to any applicable agency when work is anticipated to proceed in the
      vicinity of any facility or affected utility. The Contractor shall make necessary
      arrangements with the Owner for access and storage provisions at each site.
      For the Contractors convenience, the following telephone numbers are listed:

      Regional Transportation Authority (Project Manager)       361-289-2712
      Traffic Engineer, City of CC                              361-826-3540
      Water Division                                            361-826-1881
      Wastewater Services Division                              361-826-1800
      Gas Division                                              361-885-6910
      AT&T (buried cable locator)                               800-545-6005
      APE (underground locates)                                 800-245-4545
      Texas Department of Transportation (Engineer’s office)    361-808-2500

                                  IFB NO. 2011-FC-05
                ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                     Page 17 of 241
9.0    CONSTRUCTION STAKING

       Field staking for construction shall be the Contractor’s responsibility. In addition,
       all alignments shown on the construction drawings are based on information
       obtained from another sources and the Contractor may expect to find slight
       variances during construction. No Separate or direct payment will be made for
       adjustments of these variances. During the construction period, the Project
       Manager may review the alignment of construction items and have the
       opportunity to make minor modifications as may be determined in the field prior
       to excavation or concrete pouring to ensure the avoidance of conflicts with
       existing structures.

10.0   DISPOSAL/SALVAGE OF MATERIALS

       Unwanted material shall become the property of the Contractor who shall remove
       it from the site within twenty-four (24) hours. The cost of hauling shall be
       considered subsidiary to the bid items of this Contract; and therefore, no
       separate or direct payment shall be made. All excess material excavated from
       the site shall be removed and disposed of immediately by the Contractor.
       Contractor will not be paid until all excess material is removed and is walk away.

11.0   ACCIDENT PREVENTION

       11.1 Contractor shall comply with all of the RTA’s safety regulations and shall
       observe the requirements of the Occupational Safety and Health Act. Contractor
       shall comply with all procedures prescribed by the RTA for control and safety of
       persons visiting the job site. It is the Contractors responsibility to take whatever
       steps necessary to ensure the safety of individuals working on or visiting the site.

       11.2 The RTA calls the Contractors attention to the necessity for its proper
       storage, use and disposal of all materials, proper use and storage of tools and
       devices, and proper control of construction procedures to assure the health and
       safety of workers and of others having access to the job site. It is the
       Contractors responsibility to obtain from the manufacturers, sellers, and/or
       distributors of materials, tools, and devices all requirements for proper and safe
       usage, storage, and disposal and to follow these requirements and
       recommendations carefully. Particular attention is called to the use of paints,
       thinners, solvents, caulking and patching materials, chemical grouts, and surface
       treatment materials.



                                   IFB NO. 2011-FC-05
                 ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                      Page 18 of 241
12.0   GUARANTY

       Neither the final certificate of payment or occupancy of the premises by the RTA
       shall constitute an acceptance of the work not done in accordance with the
       project documents or relieve the Contractor of liability in respect to any express
       warranties or responsibilities for faulty materials or workmanship. Contractor
       shall remedy any defects in materials or workmanship that shall appear within a
       period of one year from the date of final acceptance of the work.

13.0   TRAFFIC CONTROL PLAN

        The Contractor shall comply with the City of Corpus Christi's Uniform Barricading
       Standards and Practices as adopted by the City. Copies of this document are
       available through the City's Traffic Engineering Division. The Contractor is
       responsible for preparing a Traffic Control Plan for the site and for securing the
       City's approval of this plan. To obtain the City's permit, submit the Traffic Control
       Plan to the City's Traffic Engineering Division.

       The Contractor is responsible for ensuring the safety of the pedestrians and all
       vehicular traffic from construction-related activities during the course of this project.
       No construction shall commence without the City's approved traffic control
       plan in place.

14.0   SPRINKLER SYSTEM

       THE EXACT LOCATION OF EXISTING SPRINKLER SYSTEMS AT EACH SITE
       IS UNKNOWN. The exact location shall be determined by the Contractor prior to
       any excavation and he/she shall assume the cost for any damages caused to
       existing sprinkler systems due to negligence. Whenever a sprinkler system is
       present at the construction site, the Contractor shall be responsible for rerouting the
       system as necessary using a Sprinkler Company selected by the affected Owner or
       the RTA. Cost for sprinkler system rerouting due to construction improvements
       shall be covered as described in the Price Schedule.

15.0   ALLOWANCES

       A maximum allowance of Five Thousand Dollars ($5,000) has been set aside to
       cover the cost for Irrigation System Adjustment due to the construction of
       improvements. BIDDERS should include the irrigation system adjustment in their
       bid price. Receipts for these items should be submitted to the Project Manager in
       order to be reimbursed. The Contractor will only be paid for actual expenses
       incurred. A final change order will be issued at the completion of the project to
       adjust this item and the Contract to the actual cost.



                                   IFB NO. 2011-FC-05
                 ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                      Page 19 of 241
16.0   DEFINITION OF BID ITEMS

        In completing the Price Schedule, the CONTRACTOR will make sure to allow in
       the unit price enough cost to cover the work outlined as follows:

       Concrete Slab: Shall include, but is not limited to, the following items.

       *      Staking of lines and grades
       *      Excavation/base preparation, including grade beams
       *      Placing sand bedding
       *      Providing and placing steel reinforcing
       *      Doweling into existing concrete
       *      Construction of expansion/control joints
       *      Providing, placing and removing formwork
       *      Providing, placing, finishing, and curing concrete
       *      Disposing of excess materials and site clean-up

       New Concrete Sidewalk: Shall include, but is not limited to, the following items.

       *      Staking of lines and grades
       *      Excavation/base preparation
       *      Sand bedding
       *      Providing and placing steel reinforcement
       *      Doweling into existing concrete
       *      Providing, placing and removing formwork
       *      Providing, placing, finishing, and curing concrete
       *      Disposing of excess materials and site clean-up

       Concrete Sidewalk Replacement: Shall include, but is not limited to, the following
       items.

       *      Removing and disposing of existing concrete sidewalk
       *      Constructing new sidewalk, as in accordance with the "New Concrete
              Sidewalk” requirements

       Access Ramps: Shall include, but is not limited to, the following items.

       *      Staking of lines and grades
       *      Removing and disposing of existing concrete
       *      Excavation/base preparation
       *      Sand bedding
       *      Doweling into existing concrete
       *      Providing, placing and removing formwork
       *      Providing, placing, finishing, and curing concrete


                                   IFB NO. 2011-FC-05
                 ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                      Page 20 of 241
Curb and Gutter Replacement: Shall include, but is not limited to, the following
items.

*      Removing and disposing of existing curb and gutter
*      Excavation/base preparation
*      Providing, placing and removing formwork
*      Doweling into existing curb and gutter
*      Providing, placing, finishing, and curing concrete
*      Pavement repair
*      Disposing of excess materials and site clean-up




                            IFB NO. 2011-FC-05
          ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                               Page 21 of 241
                TECHNICAL SPECIFICATIONS

                                  FOR

     ARRA ADA BUS STOP IMPROVEMENTS PHASE II
                    ZONES 1 - 3

The Technical Specifications will need to be picked up with
 the drawings at the Contracts & Grants Department, 5658
          Bear Lane, Corpus Christi, TX 78405.
 A bid deposit of $100 is required for a copy of the specifications.




                             IFB NO. 2011-FC-05
           ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                Page 22 of 241
               WAGE RATES




                  IFB NO. 2011-FC-05
ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                     Page 23 of 241
                                     WAGE RATES
GENERAL DECISION: TX20100118 03/12/2010 TX118

Date: March 12, 2010
General Decision Number: TX20100118 03/12/2010

Superseded General Decision Number: TX20080118

State: Texas

Construction Types: Heavy and Highway

Counties: Nueces, San Patricio and Victoria Counties in Texas.

HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building
structures in rest area projects & railroad construction;
bascule, suspension & spandrel arch bridges designed for
commercial navigation, bridges involving marine construction;
and other major bridges).

Modification Number     Publication Date
           0             03/12/2010

*   SUTX2005-007 11/09/2004

                                     Rates         Fringes

Asphalt Distributor Operator.....$ 12.42              0.00

Asphalt paving machine
operator.........................$ 11.57              0.00

Asphalt Raker....................$   9.36             0.00

Bulldozer operator...............$ 10.90              0.00

CARPENTER........................$ 10.71              0.00

Concrete Finisher, Paving........$ 12.18              0.00

Concrete Finisher, Structures....$ 11.16              0.00

Concrete Rubber..................$ 10.50              0.00

Crane, Clamshell, Backhoe,
Derrick, Dragline, Shovel
Operator.........................$ 12.55              0.00

Flagger..........................$   7.25             0.00

Form Builder/Setter,
Structures.......................$ 11.47              0.00

Form Setter, Paving & Curb.......$   9.65             0.00

Foundation Drill Operator,


                                  IFB NO. 2011-FC-05
                ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                     Page 24 of 241
Truck Mounted....................$ 15.32             0.00

Front End Loader Operator........$ 10.05             0.00

Laborer, common..................$   8.35            0.00

Laborer, Utility.................$   9.09            0.00

MECHANIC.........................$ 13.17             0.00

Motor Grader Operator, Fine
Grade............................$ 13.78             0.00

Motor Grader Operator, Rough.....$ 15.00             0.00

Pipelayer........................$   9.00            0.00

Roller Operator, Pneumatic,
Self-Propelled...................$   8.57            0.00

Roller Operator, Steel Wheel,
Flat Wheel/Tamping...............$   8.57            0.00

Roller Operator, Steel Wheel,
Plant Mix Pavement...............$   9.49            0.00

Scraper Operator.................$   9.67            0.00

Servicer.........................$ 10.75             0.00

Structural Steel Worker..........$ 14.00             0.00

Truck driver, lowboy-Float.......$ 14.15             0.00

Truck driver, Single Axle,
Heavy............................$ 11.39             0.00

Truck driver, Single Axle,
Light............................$   9.00            0.00

Truck Driver, Tandem Axle,
Semi-Trailer.....................$   9.39            0.00

WELDER...........................$ 18.00             0.00

Work Zone Barricade Servicer.....$ 8.97              0.00
----------------------------------------------------------------

WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
========================================================

Unlisted classifications needed for work not included within
the scope of the
classifications listed may be added after award only as
provided in the labor
standards contract clauses (29 CFR 5.5(a)(1)(ii)).


                                 IFB NO. 2011-FC-05
               ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                    Page 25 of 241
----------------------------------------------------------------
--

In the listing above, the "SU" designation means that rates
listed under the
identifier do not reflect collectively bargained wage and
fringe benefit
rates. Other designations indicate unions whose rates have
been determined
to be prevailing.

----------------------------------------------------------------
--

            WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can
be:

* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on
a wage
   determination matter
* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including   requests
for summaries
of surveys, should be with the Wage and Hour Regional   Office
for the area in
which the survey was conducted because those Regional   Offices
have
responsibility for the Davis-Bacon survey program. If   the
response from this
initial contact is not satisfactory, then the process   described
in 2.) and
3.) should be followed.

With regard to any other matter not yet ripe for the formal
process
described here, initial contact should be with the Branch of
Construction
Wage Determinations. Write to:

        Branch of Construction Wage Determinations
        Wage and Hour Division
        U.S. Department of Labor
        200 Constitution Avenue, N.W.
        Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an
interested party
(those affected by the action) can request review and
reconsideration from
the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR
Part 7).
Write to:


                                 IFB NO. 2011-FC-05
               ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                    Page 26 of 241
        Wage and Hour Administrator
        U.S. Department of Labor
        200 Constitution Avenue, N.W.
        Washington, DC 20210

The request should be accompanied by a full statement of the
interested
party's position and by any information (wage payment data,
project
description, area practice material, etc.) that the requestor
considers
relevant to the issue.

3.) If the decision of the Administrator is not favorable, an
interested
party may appeal directly to the Administrative Review Board
(formerly the
Wage Appeals Board). Write to:

        Administrative Review Board
        U.S. Department of Labor
        200 Constitution Avenue, N.W.
        Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.




                                 IFB NO. 2011-FC-05
               ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                    Page 27 of 241
                STANDARD SERVICE TERMS AND CONDITIONS


1.   SERVICE STANDARDS.

     Contractor shall perform all work set forth in the specifications in a “first class”
     manner, consistent with all applicable regulations and industry standards. All
     work shall be performed to the reasonable satisfaction of the RTA, and any
     defective or substandard performance shall be promptly remedied.

2.   INVOICES AND PAYMENTS.

     Contractor shall submit separate invoices, in duplicate, on a monthly basis or as
     otherwise specified in the contract documents to RTA, Attn: Accounts Payable,
     5658 Bear Lane, Corpus Christi, Texas 78405. Invoices shall indicate the
     contract number and shall be itemized in accordance with the different
     components of work set forth in the Price Schedule. Payment shall not be due
     until thirty (30) days after the date the above instruments are submitted or the
     work is actually performed, whichever is later. In the event payment has not
     been made by the due date, Contractor shall submit a reminder invoice marked
     “overdue.” The RTA reserves the right to review all of Contractor’s invoices after
     payment and recover any overcharges resulting from such review.

3.   TOOLS, EQUIPMENT AND SUPPLIES.

     Contractor shall provide such tools, equipment, supplies, materials, employees,
     management, and any other items or services as may be necessary in order to
     enable Contractor to provide the services required under the terms of this
     Contract.

4.   ESTIMATED QUANTITIES.

     The estimated quantities for services, supplies or work to be performed noted in
     the Price Schedule are approximate. These quantities are to be used only for the
     comparison of bids and the award of this Contract and are based on past and
     projected usage. Contractor agrees and understands that the actual quantities to
     be utilized are within the sole and absolute discretion of the RTA. Should the
     actual quantities be greater or lesser than the estimates contained in the Price
     Schedule, Contractor agrees that, regardless of the amount of such variance, it
     shall not be the basis for deviating from the quoted unit prices. Further,
     Contractor agrees to honor quoted unit prices for the duration of this Contract.




                                 IFB NO. 2011-FC-05
               ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                    Page 28 of 241
5.   LIABILITY INSURANCE COVERAGE.

     Contractor shall maintain at all times during the term of this Contract at its sole
     cost and expense each of the following insurance coverages listed below having
     policy limits not less than the dollar amounts set forth:

     Combined commercial general liability insurance with minimum policy limits of
     $1,000,000.

     (In the event motor vehicles will be used by Contractor to perform the services
     specified) Automobile liability insurance with a combined single limit of
     $1,000,000.

     Contractual liability insurance covering Contractors’ indemnification obligations
     contained in this Contract.

     Each of such insurance policies shall be issued by insurance companies licensed
     to do business in the State of Texas and rated A- or better by the A. M. Best
     insurance rating guide. Each such policy shall name the RTA as an additional
     insured, and a certificate of insurance evidencing such coverages shall be
     furnished to the RTA prior to the commencement of work and maintained
     throughout the term of the Contract. Such insurance policies shall not be
     cancelled, materially changed, or not renewed, without thirty (30) days’ prior
     written notice to the RTA, and the certificate of such insurance coverage shall
     reflect the foregoing cancellation provision. Copies of the insurance policies shall
     be promptly furnished to the RTA upon its written request.

6.   WORKERS’ COMPENSATION.

     Contractor shall maintain at all times during the term of this Contract at its sole
     cost and expense workers’ compensation as required by statute and employer’s
     liability insurance with policy limits of $300,000 containing a waiver of
     subrogation endorsement waiving any right of recovery under subrogation or
     otherwise against the RTA.

     (In the event this Contract covers construction services, Section 6.1 through 6.11
     shall apply.)

     6.1   The following definitions shall apply:

     Certificate of coverage (“certificate”) – A copy of a certificate of insurance, a
     certificate of authority to self-insure issued by the commission, or a coverage
     agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory


                                 IFB NO. 2011-FC-05
               ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                    Page 29 of 241
workers’ compensation insurance coverage for the person’s or entity’s
employees providing services on a project, for the duration of the project.

Duration of the project – includes the time from the beginning of the work on the
project until Contractor’s work on the project has been completed and accepted
by the RTA.

Persons providing services on the project (“subcontractor” in §406.096) –
includes all persons or entities performing all or part of the services Contractor
has undertaken to perform on the project, regardless of whether that person
contracted directly with the contractor and regardless of whether that person has
employees.        This includes, without limitation, independent contractors,
subcontractors, leasing companies, motor carriers, owner-operators, employees
of any such entity, or employees of any entity which furnishes persons to provide
services on the project. “Services” includes, without limitation, providing, hauling,
or delivering equipment or materials, or providing labor, transportation, or other
service related to a project. “Services” does not include activities unrelated to the
project, such as food/beverage vendors, office supply deliveries, and delivery of
portable toilets.

6.2     Contractor shall provide coverage, based on proper reporting of
classification codes and payroll amounts and filing of any coverage agreements,
which meets the statutory requirements of Texas Labor Code, §401.011(44) for
all employees of Contractor providing services on the project, for the duration of
the project.

6.3   Contractor shall provide a certificate of coverage to the RTA prior to being
awarded the contract.

6.4   If the coverage period shown on Contractor’s current certificate of
coverage ends during the duration of the project, Contractor must, prior to the
end of the coverage period, file a new certificate of coverage with the RTA
showing that coverage has been extended.

6.5    Contractor shall obtain from each person providing services on a project
and furnish RTA:

       6.5.1 a certificate of coverage, prior to that person beginning work on the
       project, so the RTA will have on file certificates of coverage showing
       coverage for all persons providing services on the project; and

       6.5.2 no later than seven days after receipt by Contractor, a new
       certificate of coverage showing extension of coverage, if the coverage
       period shown on the current certificate ends during the duration of the
       project.

                            IFB NO. 2011-FC-05
          ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                               Page 30 of 241
6.6    Contractor shall retain all required certificates of coverage for the duration
of the project and for one year thereafter.

6.7    Contractor shall notify the RTA in writing by certified mail or personal
delivery, within 10 days after Contractor knew or should have known, of any
change that materially affects the provision of coverage of any person providing
services on the project.

6.8     Contractor shall post on each project site a notice, in the text, form and
manner prescribed by the Texas Workers’ Compensation Commission, informing
all persons providing services on the project that they are required to be covered,
and stating how a person may verify coverage and report lack of coverage.

6.9    Contractor shall contractually require each person with whom it contracts
to provide services on a project, to:

       6.9.1 provide coverage, based on proper reporting of classification codes
       and payroll amounts and filing of any coverage agreements, which meets
       the statutory requirements of Texas Labor Code, §401.011(44) for all of its
       employees providing services on the project, for the duration of the
       project;

       6.9.2 provide to Contractor, prior to that person beginning work on the
       project, a certificate of coverage showing that coverage is being provided
       for all employees of the person providing services on the project, for the
       duration of the project;

       6.9.3 provide Contractor, prior to the end of the coverage period, a new
       certificate of coverage showing extension of coverage, if the coverage
       period shown on the current certificate of coverage ends during the
       duration of the project;

       6.9.4 obtain from each other person with whom it contracts, and provide
       to Contractor:

       a certificate of coverage, prior to the other person beginning work on the
       project; and

       a new certificate of coverage showing extension of coverage, prior to the
       end of the coverage period, if the coverage period shown on the current
       certificate of coverage ends during the duration of the project;

       6.9.5 retain all required certificates of coverage on file for the duration of
       the project and for one year thereafter;

                            IFB NO. 2011-FC-05
          ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                               Page 31 of 241
           6.9.6 notify the RTA in writing by certified mail or personal delivery, within
           10 days after the person knew or should have known, of any change that
           materially affects the provision of coverage of any person providing
           services on the project; and

           6.9.7 contractually require each person with whom it contracts, to
           perform as required by this subsection, with the certificates of coverage to
           be provided to the person for whom they are providing services.

     6.10 By signing this Contract or providing a certificate of coverage, Contractor is
     representing to the RTA that all employees of Contractor who will provide service
     on the project will be covered by workers’ compensation coverage for the
     duration of the project, that the coverage will be based on proper reporting of
     classification codes and payroll amounts, and that all coverage agreements will
     be filed with the appropriate insurance carrier or, in the case of a self-insured,
     with the Commission’s Division of Self-Insurance Regulation. Providing false or
     misleading information may subject Contractor to administrative penalties,
     criminal penalties, civil penalties, or other civil actions.

     6.11 Contractor’s failure to comply with any of these provisions is a breach of
     contract by Contractor which entitles the RTA to declare the Contract void if
     Contractor does not remedy the breach within 10 days after receipt of notice of
     breach from the RTA.

7.   INDEMNIFICATION.

     Contractor shall indemnify and hold harmless the RTA, its officers, employees,
     agents, attorneys, representatives, successors and assigns from any and all
     claims, demands, costs, expenses (including attorney’s fees and expert witness
     fees), liabilities and losses of whatsoever kind or character arising out of or in
     connection with any act or omission of Contractor or its officers, employees or
     agents, during the term of this Contract. Contractor shall assume on behalf of
     the RTA and the indemnified parties described above, and conduct with due
     diligence and in good faith, the defense of any and all such claims, whether or
     not the RTA is joined therein, even if such claims be groundless, false or
     fraudulent.

8.   INDEPENDENT CONTRACTOR.

     At all times during the term of this Contract, Contractor shall be an independent
     contractor to the RTA, and Contractor shall not in any event be deemed an
     employee or other representative of the RTA. Any persons employed by
     Contractor shall at all times hereunder be deemed to be the employees of
     Contractor, and Contractor shall be solely liable for the payment of all wages and

                                 IFB NO. 2011-FC-05
               ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                    Page 32 of 241
      other benefits made available to such employees in connection with their employ.
      Contractor shall remain solely responsible for the supervision and performance of
      any such employees in completing its obligations under this Contract. Contractor
      warrants that any such employees shall be fully covered by workers’
      compensation insurance and that each of such employees has been carefully
      screened as to character and fitness for the performance of his or her job.

9.    ASSIGNMENT.

      Contractor shall not assign or subcontract any of its rights, duties or obligations
      under this Contract without prior written consent of the RTA. Contractor shall be
      entitled to assign, pledge or encumber its right to receive payments under this
      Contract pursuant to security interests created in conformity with the Uniform
      Commercial Code so long as the RTA shall never be obligated to negotiate with
      any such third party in respect to compliance with the terms and conditions of this
      Contract. Any such assignment, pledge or encumbrance shall be limited by any
      rights of offset by the RTA for damages or claims arising under this Contract or
      any other obligation owed by Contractor to the RTA.

10.   AMENDMENTS.

      No amendments, modifications or other changes to this Contract shall be valid or
      effective absent the written agreement of both parties hereto.

11.   TERMINATION.

      The RTA shall have the right to terminate for default all or any part of its Contract
      if Contractor breaches any of the terms hereof or if Contractor becomes insolvent
      or files any petition in bankruptcy. Such right of termination is in addition to and
      not in lieu of any other remedies which the RTA may have in law or equity,
      specifically including, but not limited to, the right to sue for damages or demand
      specific performance. The RTA additionally has the right to terminate this
      Contract without cause by delivery to Contractor of a “Notice of Termination”
      specifying the extent to which performance hereunder is terminated and the date
      upon which such termination becomes effective.

12.   ADVERTISING.

      Contractor shall not advertise or publish, without the RTA’s prior consent, the fact
      that it has entered into this Contract, except to the extent necessary to comply
      with proper requests for information from an authorized representative of the
      federal, state or local authorities.




                                  IFB NO. 2011-FC-05
                ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                     Page 33 of 241
13.   GRATUITIES.

      No gratuities in the form of entertainment, gifts, or otherwise, shall be offered or
      given by Contractor, or any agent or representative of Contractor, to any officer
      or employee of the RTA with a view toward securing a contract or securing
      favorable treatment with respect to a contract.

14.   EQUAL OPPORTUNITY.

      Contractor agrees that during the performance of this Contract it will:

      14.1 Treat all applicants and employees without discrimination as to race, color,
      religion, sex, national origin, martial status, age or handicap.

      14.2 Identify itself as an “Equal Opportunity Employer” in all help wanted
      advertising or requests.

      Contractor shall be advised of any complaints filed with the RTA alleging that
      Contractor is not an equal opportunity employer. The RTA reserves the right to
      consider such complaints in determining whether or not to terminate any portion
      of this Contract for which the services have not yet been performed; however,
      Contractor is specifically advised that no equal opportunity employment
      complaint will be the basis for denial of payment for any services already
      completed.

15.   ENFORCEABILITY.

      This Contract shall be interpreted, construed, and governed by the laws of the
      United States and the State of Texas and shall be enforceable in any state court
      of competent jurisdiction in Nueces County, Texas. Contractor shall comply with
      all applicable laws and regulations in performing under this contract.

16.   NOTICES.

      Notices shall be given to the parties by delivering or mailing such notice to the
      addresses set forth in the Contract documents, or at such other addresses as the
      parties may designate to each other in writing.




                                  IFB NO. 2011-FC-05
                ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                     Page 34 of 241
17.   INTERPRETATION.

      This writing is intended by the parties as a final expression of their agreement
      and is intended also as a complete and exclusive statement of the terms thereof.
      No course of prior dealings between the parties and no usage of the trade shall
      be relevant to supplement or explain any term used herein, and acceptance of a
      course of performance rendered under this Contract shall not be relevant to
      determine the meaning of this Contract even though the accepting party has
      knowledge of the performance and opportunity for objection.




                                 IFB NO. 2011-FC-05
               ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                    Page 35 of 241
                                   FEDERAL SUPPLEMENTAL CONDITIONS
                                       (CONSTRUCTION CONTRACTS)

                                               TABLE OF CONTENTS


1.    EQUAL EMPLOYMENT OPPORTUNITY. ................................................................... 39

2.    STANDARD FEDERAL EQUAL EMPLOYMENT OPPORTUNITY CONSTRUC-
      TION CONTRACT SPECIFICATIONS (EXECUTIVE ORDER 11246). ........................ 40

3.    NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE
      EQUAL EMPLOYMENT OPPORTUNITY (EXECUTIVE ORDER 11246). ................... 45

4.    LABOR PROVISIONS. ................................................................................................ 45

5.    TITLE VI COMPLIANCE. .............................................................................................. 52

6.    DISADVANTAGED BUSINESS ENTERPRISES (DBEs). ............................................. 53

7.    ENERGY CONSERVATION. ........................................................................................ 54

8.    MITIGATION OF ADVERSE ENVIRONMENTAL EFFECTS. ....................................... 54

9.    USE OF FLY ASH IN CEMENT AND CONCRETE....................................................... 54

10.   CLEAN AIR ACT ..............................................................................................................54

11.   CLEAN WATER ACT. ................................................................................................... 55

12.   PATENT RIGHTS. ........................................................................................................ 55

13.   RIGHTS IN DATA. ........................................................................................................ 56

14.   PRIVACY. .................................................................................................................... 57

15.   AUDIT AND INSPECTION OF RECORDS. .................................................................. 58

16.   BUY AMERICA PROVISION. ....................................................................................... 58

17.   CARGO PREFERENCE. .............................................................................................. 58

18.   FLY AMERICA..................................................................................................................59

19.   DRUG-FREE WORKPLACE COMPLIANCE AND TESTING. ...................................... 59

20.   INTEREST OF MEMBERS OF, OR DELEGATES TO, CONGRESS............................ 60

21.   POLITICAL ACTIVITY: LOBBYING. ............................................................................ 60

                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                          Page 36 of 241
22.   CONFLICT OF INTEREST. .......................................................................................... 60

23.   SECTARIAN INVOLVEMENT PROHIBITED. ............................................................... 61

24.   DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION. ....... 61

25.   BONDING. ................................................................................................................... 62

26.   BID PROTEST PROCEDURES.................................................................................... 62

27.   TERMINATION............................................................................................................. 63

28.   GENERAL REMEDIES/SANCTIONS FOR BREACH OF CONTRACT......................... 64

29.   LIQUIDATED DAMAGES. ............................................................................................ 65

30.   PROJECT SIGNS......................................................................................................... 65

31.   LEGAL AUTHORITY. ................................................................................................... 65

32.   INDEPENDENT CONTRACTOR. ................................................................................. 65

33.   COMMUNICATIONS. ................................................................................................... 65

34.   AMERICANS WITH DISABILITIES ACT COMPLIANCE. ............................................. 65

35.   PREFERENCES FOR RECYCLED PRODUCTS. ........................................................ 66

36.   SEISMIC SAFETY REQUIREMENTS. ......................................................................... 66

37.   HAZARDOUS MATERIALS. ......................................................................................... 66

38.   ENTIRE AGREEMENT. ................................................................................................ 67

39.   CONTINGENT ON FUNDING. ..................................................................................... 67

40.   NO GOVERNMENT OBLIGATION TO THIRD PARTIES. ........................................... 67

41.   PROGRAM FRAUD AND FALSE OR FRAUDULENT STATEMENTS AND
      RELATED ACTS. ........................................................................................................ 67

42.   FEDERAL CHANGES. ................................................................................................ 68

43.   FEDERAL TRANSIT ADMINISTRATION NATIONAL ITS ARCHITECTURE POLICY.. 68

44.   SENSITIVE SECURITY INFORMATION………………..………….………………….……69

45.   SEAT BELT USE….…………………………………………………………….…………….69

                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                          Page 37 of 241
46.   ACCESS FOR INDIVIDUALS WITH DISABILITIES…………………………….… …..... 69

47.   DISPUTES, BREACHES, DEFAULTS, OR OTHER LITIGATION.................................. 70

48.   EMPLOYEE PROTECTIONS ....................................................................................... 71

49.   INCORPORATION OF FEDERAL TRANSIT ADMINISTRATION TERMS......................72

50.   SCHOOL AND CHARTER BUS REQUIREMENTS ........................................................72

51.   ROLLING STOCK ASSIGNABILITY CLAUSE .. .............................................................73

52.   SPECIAL NOTIFICATION REQUIREMENTS FOR STATES..........................................73

53.   TEXTING WHILE DRIVING AND DISTRACTED DRIVING.............................................74




                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                          Page 38 of 241
                             FEDERAL SUPPLEMENTAL CONDITIONS
                                (CONSTRUCTION CONTRACTS)

           As used in these Supplemental Conditions, the term "RTA" shall refer to
           the Regional Transportation Authority in Corpus Christi, Texas, the term
           "Contractor" shall refer to the contractor named in the Contract to which
           these Supplemental Conditions are attached, and the term "FTA" shall refer
           to the Federal Transit Administration.

1.   EQUAL EMPLOYMENT OPPORTUNITY.

     During the performance of the Contract, Contractor agrees as follows:

     1.1 Contractor will not discriminate against any employee or applicant for employment
because of race, color, religion, sex, disability, age, or national origin. Contractor will take affir-
mative action to ensure that applicants are employed, and that employees are treated during
employment without regard to their race, color, religion, sex, disability, age, or national origin.
Such action shall include, but not be limited to the following: employment, upgrading, demotion,
or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other
forms of compensation; and selection for training, including apprenticeship. Contractor agrees to
post in conspicuous places, available to employees and applicants for employment, notices to
be provided setting forth the provisions of this nondiscrimination clause.

     1.2 Contractor will, in all solicitations or advertisements for employees placed by or on
behalf of Contractor, state that all qualified applicants will receive consideration for employment
without regard to race, color, religion, sex, disability, age, or national origin.

     1.3. Contractor will send to each labor union or representative of workers with which it has
a collective bargaining agreement or other contract understanding, a notice to be provided
advising the said labor union or workers' representatives of Contractor's commitments under
this Section 202 of Executive Order 11246 of September 24, 1965, and shall post copies of the
notice in conspicuous places available to employees and applicants for employment.

    1.4. Contractor will comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.

     1.5. Contractor will furnish all information and reports required by Executive Order 11246
of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor pursuant
thereto, and will permit access to its books, records and accounts by the RTA, FTA and by the
Secretary of Labor for purposes of investigation to ascertain compliance with such rules,
regulations, and orders.

     1.6. In the event of Contractor's noncompliance with the nondiscrimination clauses of the
Contract or with any of the said rules, regulations or orders, the Contract may be canceled,
terminated, or suspended in whole or in part and Contractor may be declared ineligible for
further government contracts or federally-assisted construction contracts in accordance with
procedures authorized in Executive Order 11246 of September 24, 1965, as amended, and
such other sanctions may be imposed and remedies invoked as provided in Executive Order


                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 39 of 241
11246 of September 24, 1965, or by rule, regulation, or order of the Secretary of Labor, or as
otherwise provided by law.

     1.7. Contractor will include a citation to 41 C.F.R. Section 60-1.4(b)(1) and Section 60-
1.4(c) and the provisions of subsections 1.1 through 1.7 in every subcontract or purchase order
unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to
Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions shall be
binding upon each subcontractor or vendor. Contractor will take such action with respect to any
subcontract or purchase order as the RTA or FTA may direct as a means of enforcing such
provisions, including sanctions for noncompliance; provided, however, that in the event a
contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor
as a result of such direction by the RTA or FTA, Contractor may request the United States to
enter into such litigation to protect the interests of the United States.

     Each of the above subsections 1.1 through 1.7 shall be included by Contractor in each of
its nonexempt contracts with any subcontractors.

2.   STANDARD FEDERAL EQUAL EMPLOYMENT OPPORTUNITY CONSTRUCTION
     CONTRACT SPECIFICATIONS (EXECUTIVE ORDER 11246).

     2.1. AS USED IN THESE SPECIFICATIONS:

    2.1.1. "Covered area" means the geographical areas described in the solicitation from
which the Contract resulted;

   2.1.2. "Director" means Director, Office of Federal Contract Compliance Programs, U.S.
Department of Labor, or any person to whom the Director delegates authority;

     2.1.3. "Employer identification number" means the federal Social Security Number used on
the employer's quarterly federal tax return, U.S. Treasury Department Form 941;

     2.1.4. "Minority" includes:

    2.1.4.1. Black (all persons having origins in any of the Black African racial groups not of
Hispanic origin);

     2.1.4.2. Hispanic (all persons of Mexican, Puerto Rican, Cuban, Central or South American
or other Spanish culture or origin, regardless of race);

     2.1.4.3. Asian and Pacific Islander (all persons having origins in any of the original Peoples
of the Far East, Southeast Asia, the Indian Subcontinent, or the Pacific Islands); and

     2.1.4.4. American Indian or Alaskan Native (all persons having origins in any of the original
Peoples of North America and maintaining tribal affiliations through membership and
participation or community identification).

     2.2. Whenever Contractor, or any subcontractor at any tier, subcontracts a portion of the
work involving any construction trade, it shall physically include on each subcontract in excess
of $10,000 the provisions of these specifications and the notice which contains the applicable

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 40 of 241
goals for minority and female participation and which is set forth in the solicitations from which
the Contract resulted.

     2.3. If Contractor is participating (pursuant to 41 C.F.R. Section 60-4.5) in a hometown
plan approved by the U.S. Department of Labor in the covered area, either individually or
through an association, its affirmative action obligations for all work in the plan area (including
goals and timetables) shall be in accordance with that plan for those trades which have unions
participating in the plan. Contractors must be able to demonstrate their participation in and
compliance with the provisions of any such hometown plan. Each Contractor or subcontractor
participating in an approved plan is individually required to comply with its obligations under the
EEO clause, and to make a good faith effort to achieve each goal under the plan in each trade
in which it has employees. The overall good faith performance by other contractors or
subcontractors toward a goal in an approved plan does not excuse any covered contractors or
subcontractor's failure to make good faith efforts to achieve the plan goals and timetables.

     2.4. Contractor shall implement the specific affirmative action standards provided in
subsections 2.7.1 through 2.7.16 of these specifications. The goals set forth in the solicitation
from which the Contract resulted are expressed as percentages of the total hours of
employment and training of minority and female utilization Contractor should reasonably be able
to achieve in each construction trade in which it has employees in the covered area. Covered
construction contractors performing construction work in geographical areas where they do not
have a federal or federally-assisted construction contract shall apply the minority and female
goals established for the geographical area where the work is being performed. Goals are
published periodically in the Federal Register in notice form, and such notices may be obtained
from any Office of Federal Contract Compliance Programs office or from federal procurement
contracting officers. Contractor is expected to make substantially uniform progress toward its
goal in each craft during the period specified.

    2.5. Neither the provisions of any collective bargaining agreement, nor the failure by a
union with whom Contractor has a collective bargaining agreement, to refer either minorities or
women shall excuse Contractor's obligations under these specifications, Executive Order
11246, or the regulations promulgated pursuant thereto.

      2.6. In order for the non-working training hours of apprentices and trainees to be counted
in meeting the goals, such apprentices and trainees must be employed by Contractor during the
training period, and Contractor must have made a commitment to employ the apprentices and
trainees at the completion of their training, subject to the availability of employment
opportunities. Trainees must be trained pursuant to training programs approved by the U. S.
Department of Labor.

     2.7 Contractor shall take specific affirmative actions to ensure equal employment
opportunity. The evaluation of Contractor's compliance with these specifications shall be based
upon its effort to achieve maximum results from its actions. Contractor shall document these
efforts fully, and shall implement affirmative action steps at least as extensive as the following:

    2.7.1.    Ensure and maintain a working environment free of harassment, intimidation, and
coercion at   all sites, and in all facilities at which Contractor's employees are assigned to work.
Contractor,   where possible, will assign two or more women to each construction project.
Contractor    shall specifically ensure that all foremen, superintendents, and other on-site

                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 41 of 241
supervisory personnel are aware of and carry out Contractor's obligation to maintain such a
working environment, with specific attention to minority or female individuals working at such
sites or in such facilities.

     2.7.2. Establish and maintain a current list of minority and female recruitment sources, pro-
vide written notice to minority and female recruitment sources and to community organizations
when Contractor or its unions have employment opportunities available, and maintain a record
of the organizations' responses.

     2.7.3. Maintain a current file of the names, addresses and telephone numbers of each
minority and female off-the-street applicant and minority or female referral from a union, a
recruitment source or community organization and of what action was taken with respect to
each such individual. If such individual was sent to the union hiring hall for referral and was not
referred back to Contractor by the union or, if referred, not employed by Contractor, this shall be
documented in the file with the reason therefore, along with whatever additional actions
Contractor may have taken.

    2.7.4. Provide immediate written notification to the director when the union or unions with
which Contractor has a collective bargaining agreement has not referred to Contractor a
minority person or woman sent by Contractor, or when Contractor has other information that the
union referral process has impeded Contractor's efforts to meet its obligations.

     2.7.5. Develop on-the-job training opportunities and/or participate in training programs for
the area which expressly include minorities and women, including upgrading programs and
apprenticeship and trainee programs relevant to Contractor's employment needs, especially
those programs funded or approved by the Department of Labor. Contractor shall provide
notice of these programs to the sources compiled under subsection 2.7.2 above.

      2.7.6. Disseminate Contractor's EEO policy by providing notice of the policy to unions and
training programs and requesting their cooperation in assisting Contractor in meeting its EEO
obligations; by including it in any policy manual and collective bargaining agreement; by
publicizing it in the company newspaper, annual report, etc.; by specific review of the policy with
all management personnel and with all minority and female employees at least once a year; and
by posting the company EEO policy on bulletin boards accessible to all employees at each
location where construction work is performed.

     2.7.7. Review, at least annually, Contractor’s EEO policy and affirmative action obligations
under these specifications with all employees having responsibility for hiring, assignment, layoff,
termination or other employment decisions including specific review of these items with on-site
supervisory personnel such as superintendents, general foreman, etc., prior to the initiation of
construction work at any job site. A written record shall be made and maintained identifying the
time and place of these meetings, persons attending, subject matter discussed, and disposition
of the subject matter.

      2.7.8. Disseminate Contractor's EEO policy externally by including it in any advertising in
the news media, specifically including minority and female news media, and providing written
notification to and discussing Contractor's EEO policy with other contractors and subcontractors
with whom Contractor does or anticipates doing business.


                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 42 of 241
      2.7.9. Direct its recruitment efforts, both oral and written, to minority, female and com-
munity organizations, to schools with minority and female students and to minority and female
recruitment and training organizations serving Contractor's recruitment area and employment
needs. Not later than one month prior to the date for the acceptance of applications for
apprenticeship or other training by any recruitment source, Contractor shall send written
notification to organizations such as the above, describing the openings, screening procedures,
and tests to be used in the selection process.

    2.7.10. Encourage present minority and female employees to recruit other minority persons
and women and, where reasonable, provide after school, summer and vacation employment to
minority and female youth on the site and in other areas of Contractor's workforce.

    2.7.11. Validate all tests and other selection requirements where there is an obligation to
do so under 41 C.F.R. Section 60.3.

    2.7.12. Conduct, at least annually, an inventory and evaluation at least of all minority and
female personnel for promotional opportunities and encourage these employees to seek or to
prepare for, through appropriate training, etc., such opportunities.

    2.7.13. Ensure that seniority practices, job classifications, work assignments and other
personnel practices do not have a discriminatory effect by continually monitoring all personnel
and employment related activities to ensure that the EEO policy and Contractor's obligations
under these specifications are being carried out.

     2.7.14. Ensure that all facilities and company activities are non-segregated except that
separate or single user toilet and necessary changing facilities shall be provided to assure
privacy between sexes.

    2.7.15. Document and maintain a record of all solicitations of offers for subcontractors and
suppliers, including circulation of solicitations to minority and female contractor associations and
other business associations.

   2.7.16. Conduct a review, at least annually, of all supervisors' adherence to and perfor-
mance under Contractor's EEO policy and affirmative action obligations.

       2.8. Contractors are encouraged to participate in voluntary associations which assist in
fulfilling one or more of their affirmative action obligations set forth in subsections 2.7.1 through
2.7.16. The efforts of a contractor association, joint contractor-union, contractor community, or
other similar group of which Contractor is a member and participant, may be asserted as
fulfilling any one or more of its obligations under subsections 2.7.1 through 2.7.16 of these
specifications, provided that Contractor actively participates in the group, makes every effort to
assure that the group has a positive impact on the employment of minorities and women in the
industry, ensures that the concrete benefits of the program are reflected in Contractor's minority
and female workforce participation, makes a good faith effort to meet its individual goals and
timetables, and can provide access to documentation which demonstrates the effectiveness of
actions taken on behalf of Contractor. The obligation to comply, however, is Contractor's and
failure of such a group to fulfill an obligation shall not be a defense for Contractor's noncompli-
ance.


                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 43 of 241
      2.9. A single goal for minorities and a separate single goal for women have been
established. Contractor, however, is required to provide equal employment opportunity and to
take affirmative action for all minority groups, both male and female, and all women, both
minority and non-minority. Consequently, Contractor may be in violation of the Executive Order
if a particular group is employed in a substantially disparate manner (for example, even though
Contractor has achieved its goal for women generally, Contractor may be in violation of the
Executive Order if a specific minority group of women is underutilized).

     2.10. Contractor shall not use the goals and timetables of affirmative action standards to
discriminate against any person because of race, color, religion, sex, disability, age, or national
origin.

    2.11. Contractor shall not enter into any subcontract with any person or firm debarred from
government contracts pursuant to Executive Order 11246.

     2.12. Contractor shall carry out such sanctions and penalties for violation of these specifi-
cations and of the equal opportunity clause, including suspension, termination and cancellation
of existing subcontracts as may be imposed or ordered pursuant to Executive Order 11246, as
amended, and its implementing regulations, by the Office of Federal Contract Compliance
Programs. Any contractor who fails to carry out such sanctions and penalties shall be in
violation of these specifications and Executive Order 11246, as amended.

    2.13. Contractor, in fulfilling its obligations under these specifications, shall implement
specific affirmative action steps, at least as extensive as those standards prescribed in
subsection 2.7 of these specifications, so as to achieve maximum results from its efforts to
ensure equal employment opportunity. If Contractor fails to comply with the requirements of the
Executive Order, the implementing regulations, or these specifications, the director shall
proceed in accordance with 41 C.F.R. Section 60-4.8.

     2.14. Contractor shall designate a responsible official to monitor all employment related
activity to ensure that the company EEO policy is being carried out, to submit reports relating to
the provisions hereof as may be required by the FTA and to keep records. Records shall at
least include for each employee the name, address, telephone numbers, construction trade,
union affiliation, if any, employee identification number when assigned, Social Security Number,
race, sex, status (e.g., mechanic, apprentice, trainee, helper, or laborer), dates of changes in
status, hours worked per week in the indicated trade, rate of pay, and locations at which the
work was performed. Records shall be maintained in an easily understandable and retrievable
form; however, to the degree that existing records satisfy this requirement, contractors shall not
be required to maintain separate records.

    2.15. Nothing herein provided shall be construed as a limitation upon the application of
other laws which establish different standards of compliance or upon the application of
requirements for the hiring of local or other area residents (e.g., those under the Public Works
Employment Act of 1977 and the Community Development Block Grant Program).




                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 44 of 241
3.   NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EM-
     PLOYMENT OPPORTUNITY (EXECUTIVE ORDER 11246).

    3.1. Contractor's attention is called to the "Equal Opportunity clause" and the "Standard
Federal Equal Employment Opportunity Construction Contract Specifications" set forth herein.

     3.2. Goals and Timetables.

    3.2.1. The goals and the timetables for minority and female participation, expressed in per-
centage terms for Contractor's aggregate workforce in each trade on all construction work in the
covered area, are as follows:

GOALS FOR MINORITYGOALS FOR FEMALE
PARTICIPATION IN  PARTICIPATION IN
EACH TRADE            EACH TRADE

41.7%                                   6.9%

     3.2.2. These goals are applicable to all Contractor's construction work (whether or not it is
federal or federally assisted) performed in the covered area. If Contractor performs construction
work in a geographical area located outside of the covered area, it shall apply the goals
established for such geographical area where the work is actually performed. With regard to
this second area, Contractor also is subject to the goals for both its federally involved and non-
federally involved construction.

      3.2.3. Contractor's compliance with the Executive Order and the regulations in 41 C.F.R.
Part 60-4 shall be based on its implementation of the equal opportunity clause, specific
affirmative action obligations required by the specifications set forth in 41 C.F.R. Section 60-
4.3(a), and its efforts to meet the goals. The hours of minority and female employment and
training must be substantially uniform throughout each trade, and Contractor shall make a good
faith effort to employ minorities and women evenly on each of its projects. The transfer of
minority or female employees or trainees from contractor to contractor or from project to project
for the sole purpose of meeting Contractor's goals shall be a violation of the Contract, the
Executive Order, and the regulations in 41 C.F.R. Part 60-4. Compliance with the goals will be
measured against the total work hours performed.

     3.3. Contractor shall provide written notification to the RTA within 10 working days of award
of any construction subcontract in excess of $10,000 at any tier for construction work under the
Contract resulting from this solicitation. The notification shall list the name, address and
telephone number of the subcontractor; employer identification number of the subcontractor;
estimated dollar amount of the subcontract; estimated starting and completion dates of the
subcontract; and the geographical area in which the subcontract is to be performed.

    3.4. As used in this notice, and in the Contract resulting from this solicitation, the "covered
area" is the City of Corpus Christi, Nueces County, Texas.

4.   LABOR PROVISIONS.

     4.1. Minimum Wages.

                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 45 of 241
           4.1.1. All laborers and mechanics employed or working upon the site of the work (or
under the United States Housing Act of 1937 or under the Housing Act of 1949 in the con-
struction or development of the Project), will be paid unconditionally and not less often than
once a week, and without subsequent deduction or rebate on any account (except such payroll
deductions as are permitted by regulations issued by the Secretary of Labor under the
Copeland Act, 29 C.F.R. Part 3), the full amount of wages and bona fide fringe benefits (or cash
equivalents thereof) due at the time of payment computed at rates not less than those contained
in the wage determination of the Secretary of Labor which is attached hereto and made a part
hereof, regardless of any contractual relationship which may be alleged to exist between
Contractor and such laborers and mechanics. Contributions made or costs reasonably
anticipated for bona fide fringe benefits under Section 1(b)(2) of the Davis-Bacon Act on behalf
of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to
the provisions of 29 C.F.R. Section 5.5(a)(1)(iv); also, regular contributions made or costs
incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or
programs which cover the particular weekly period, are deemed to be constructively made or
incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate
wage rate and fringe benefits on the wage determination for the classification of work actually
performed, without regard to skill, except as provided in 29 C.F.R. Section 5.5(a)(4). Laborers
or mechanics performing work in more than one classification may be compensated at the rate
specified for each classification for the time actually worked therein; provided, that the
employer's payroll records accurately set forth the time spent in each classification in which
work is performed. The wage determination, including any additional classification and wage
rates conformed under 29 C.F.R. Section 5.5(a)(1)(ii) and the Davis-Bacon Poster (WH-1321),
shall be posted at all times by Contractor and its subcontractors at the site of the work in a
prominent and accessible place where it can be easily seen by the workers.

    4.2. Classifications.

      4.2.1. The contracting officer shall require that any class of laborers or mechanics which is
not listed in the wage determination and which is to be employed under the Contract shall be
classified in conformance with the wage determination. The contracting officer shall approve an
additional classification and wage rate and fringe benefits therefore only when the following
criteria have been met:

     4.2.2. The work to be performed by the classification requested is not performed by a
classification in the wage determination; and

    4.2.3. The classification is utilized in the area by the construction industry; and

      4.2.4. The proposed wage rate, including any bona fide fringe benefits, bears a reasonable
relationship to the wage rates contained in the wage determination.

     4.2.5. If Contractor and the laborers and mechanics to be employed in the classification (if
known), or their representatives, and the contracting officer agree on the classification and wage
rate (including the amount designated for fringe benefits where appropriate), a report of the
action taken shall be sent by the contracting officer to the Administrator of the Wage and Hour
Division, Employment Standards Administration, U.S. Department of Labor, Washington, D.C.
20210. The Administrator, or an authorized representative, will approve, modify, or disapprove

                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 46 of 241
every additional classification action within 30 days of receipt and so advise the contracting
officer or will notify the contracting officer within the 30-day period that additional time is neces-
sary.

     4.2.6. In the event Contractor, laborers or mechanics to be employed in the classification
or their representatives, and the contracting officer do not agree on the proposed classification
and wage rate (including the amount designated for fringe benefits, where appropriate), the
contracting officer shall refer the questions, including the views of all interested parties and the
recommendation of the contracting officer, to the Administrator for determination. The
Administrator, or an authorized representative, will issue a determination within 30 days of
receipt and so advise the contracting officer or will notify the contracting officer within the 30-day
period that additional time is necessary.

     4.2.7. The wage rate (including fringe benefits where appropriate) determined pursuant to
29 C.F.R. Section 5.5(a)(i)(1)(B) or Section 5.5(a)(i)(1)(C), shall be paid to all workers per-
forming work in the classification under the Contract from the first day on which work is
performed in the classification.

     4.2.8 . Whenever the minimum wage rate prescribed in the Contract for a class of laborers
or mechanics includes a fringe benefit which is not expressed as an hourly rate, Contractor shall
either pay the benefit as stated in the wage determination or shall pay another bona fide fringe
benefit or an hourly cash equivalent thereof.

     4.2.9. If Contractor does not make payments to a trustee or other third person, Contractor
may consider as part of the wages of any laborer or mechanic the amount of any costs reason-
ably anticipated in providing bona fide fringe benefits under a plan or program, provided, that
the Secretary of Labor has found, upon the written request of Contractor, that the applicable
standards of the Davis-Bacon Act have been met. The Secretary of Labor may require
Contractor to set aside in a separate account assets for the meeting of obligations under the
plan or program.

    4.3. Withholding.

DOT shall upon its own action or upon written request of an authorized representative of the
Department of Labor withhold or cause to be withheld from Contractor, under the Contract or
any other federal contract with the same contractor or any other federally-assisted contract
subject to Davis-Bacon prevailing wage requirements, which is held by the same prime
Contractor, so much of the accrued payments or advances as may be considered necessary to
pay laborers and mechanics, including apprentices, trainees, and helpers, employed by
Contractor or any subcontractor the full amount of wages required by the Contract. In the event
of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed
or working on the site of the work (or under the United States Housing Act of 1937 or under the
Housing Act of 1949 in the construction or development of the Project), all or part of the wages
required by the Contract, RTA or FTA may, after written notice to Contractor, sponsor, applicant,
or owner, take such action as may be necessary to cause the suspension of any further
payment, advance, or guarantee of funds until such violations have ceased.

    4.4. Payrolls and Basic Records.


                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 47 of 241
      4.4.1. Payrolls and basic records relating thereto shall be maintained by Contractor during
the course of the work and preserved for a period of three years thereafter for all laborers and
mechanics working at the site of the work (or under the United States Housing Act of 1937, or
under the Housing Act of 1949, in the construction or development of the Project). Such
records shall contain the name, address, and Social Security Number of each such worker, his
or her correct classification, hourly rates of wages paid (including rates of contributions or costs
anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in
Section 1(b)(2)(B) of the Davis-Bacon Act), daily and weekly number of hours worked,
deductions made and actual wages paid. Whenever the Secretary of Labor has found under
29 C.F.R. Section 5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of
any costs reasonably anticipated in providing benefits under a plan or program described in
Section 1(b)(2)(B) of the Davis-Bacon Act, Contractor shall maintain records which show that
the commitment to provide such benefits is enforceable, that the plan or program is financially
responsible, and that the plan or program has been communicated in writing to the laborers or
mechanics affected, and records which show the costs anticipated or the actual costs incurred
in providing such benefits. Contractors employing apprentices or trainees under approved
programs shall maintain written evidence of the registration of apprenticeship programs and
certification of trainee programs, the registration of the apprentices and trainees, and the ratios
and wage rates prescribed in the applicable programs.

    4.5. Submission of Records.

     4.5.1. Contractor shall submit weekly for each week in which any Contract work is per-
formed a copy of all payrolls to FTA if FTA is a party to the Contract; but if FTA is not such a
party, Contractor will submit the payrolls to the applicant, sponsor, or owner, as the case may
be (the RTA), for transmission to FTA. The payrolls submitted shall set out accurately and
completely all of the information required to be maintained under 29 C.F.R. Section 5.5(a)(3)(i).
This information may be submitted in any form desired. Optional form WH-347 is available for
this purpose and may be purchased from the Superintendent of Documents (Federal Stock No.
029-005-000014-1), U.S. Government Printing Office, Washington, D.C. 20402. The Prime
Contractor is responsible for the submission of copies of payrolls by all subcontractors.

     4.5.2. Each payroll submitted shall be accompanied by a "Statement of Compliance,"
signed by Contractor or subcontractor or his or her agent who pays or supervises the payment
of the persons employed under the Contract and shall certify the following:

     4.5.3. That the payroll for the payroll period contains the information required to be main-
tained under 29 C.F.R. Section 5.5(a)(3)(i) and that such information is correct and complete;

     4.5.4. That each laborer or mechanic (including each helper, apprentice, and trainee) em-
ployed on the Contract during the payroll period has been paid the full weekly wages earned,
without rebate, either directly or indirectly, and that no deductions have been made either direct-
ly or indirectly from the full wages earned, other than the permissible deductions set forth at 29
C.F.R. Part 3;

      4.5.5. That each laborer or mechanic has been paid not less than the applicable wage
rates and fringe benefits or cash equivalents for the classification of work performed, as speci-
fied in the applicable wage determination incorporated into the Contract.


                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 48 of 241
     4.5.6. The weekly submission of a properly executed certification set forth on the reverse
side of optional form WH-347 shall satisfy the requirement for submission of the "Statement of
Compliance" required by 29 C.F.R. Section 5.5(a)(3)(ii)(B).

     4.5.7. The falsification of any of the above certifications may subject Contractor or sub-
contractor to civil or criminal prosecution under 18 U.S.C. Section 1001 and 31 U.S.C.
Section 3729.

     4.5.8. Contractor or subcontractor shall make the records required under 29 C.F.R.
Section 5.5(a)(3)(ii) available for inspection, copying, or transcription by authorized
representatives of FTA or the Department of Labor, and shall permit such representatives to
interview employees during working hours on the job. If Contractor or subcontractor fails to
submit the required records or make them available, FTA may, after written notice to Contractor,
sponsor, applicant, or owner, take such action as may be necessary to cause the suspension of
any further payment, advance, or guarantee of funds. Furthermore, failure to submit the
required records upon request or make such records available may be grounds for debarment
action pursuant to 29 C.F.R. Section 5.12.

    4.6. Apprentices and Trainees.

      4.6.1. Apprentices. Apprentices will be permitted to work at less than the predetermined
rate for the work they performed when they are employed pursuant to and individually registered
in a bona fide apprenticeship program registered with the U.S. Department of Labor,
Employment and Training Administration, Bureau of Apprenticeship and Training, or with a state
apprenticeship agency recognized by the Bureau, or if a person is employed in his or her first 90
days of probationary employment as an apprentice in such an apprenticeship program, who is
not individually registered in the program, but who has been certified by the Bureau of
Apprenticeship and Training or a state apprenticeship agency (where appropriate) to be eligible
for probationary employment as an apprentice. The allowable ratio of apprentices to journey-
men on the job site in any craft classification shall not be greater than the ratio permitted to
Contractor as to the entire workforce under the registered program. Any worker listed on a
payroll at an apprentice wage rate, who is not registered or otherwise employed as stated
above, shall be paid not less than the applicable wage on the wage determination for the
classification of work actually performed. In addition, any apprentice performing work on the job
site in excess of the ratio permitted under the registered program shall be paid not less than the
applicable wage rate on the wage determination for the work actually performed. Where a
contractor is performing construction on a project in a locality other than that in which its
program is registered, the ratios and wage rates (expressed in percentages of the journeyman's
hourly rate) specified in Contractor's or subcontractors registered program shall be observed.
Every apprentice must be paid at not less than the rate specified in the registered program for
the apprentice's level of progress, expressed as a percentage of the journeyman hourly rate
specified in the applicable wage determination. Apprentices shall be paid fringe benefits in
accordance with the provisions of the apprenticeship program. If the apprenticeship program
does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits
listed on the wage determination for the applicable classification. If the Administrator
determines that a different practice prevails for the applicable apprentice classification, fringe
benefits shall be paid in accordance with that determination. In the event the Bureau of
Apprenticeship and Training, or a state apprenticeship agency recognized by the Bureau,
withdraws approval of an apprenticeship program, Contractor will no longer be permitted to

                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 49 of 241
utilize apprentices at less than the applicable predetermined rate for the work performed until an
acceptable program is approved.

     4.6.2. Trainees. Except as provided in 29 C.F.R Section 5.16, trainees will not be
permitted to work at less than the predetermined rate for the work performed unless they are
employed pursuant to and individually registered in a program which has received prior
approval, evidenced by formal certification by the U.S. Department of Labor, Employment and
Training Administration. The ratio of trainees to journeymen on the job site shall not be greater
than permitted under the plan approved by the Employment and Training Administration. Every
trainee must be paid at not less than the rate specified in the approved program for the trainee's
level of progress, expressed as a percentage of the journeyman hourly rate specified in the
applicable wage determination. Trainees shall be paid fringe benefits in accordance with the
provisions of the trainee program. If the trainee program does not mention fringe benefits,
trainees shall be paid the full amount of fringe benefits listed on the wage determination unless
the Administrator of the Wage and Hour Division determines that there is an apprenticeship
program associated with the corresponding journeyman wage rate on the wage determination,
which provides for less than full fringe benefits for apprentices. Any employee listed on the
payroll at a trainee rate that is not registered and participating in a training plan approved by the
Employment and Training Administration shall be paid not less than the applicable wage rate on
the wage determination for the classification of work actually performed. In addition, any trainee
performing work on the job site in excess of the ratio permitted under the registered program
shall be paid not less than the applicable wage rate on the wage determination for the work
actually performed. In the event the Employment and Training Administration withdraws
approval of a training program, Contractor will no longer be permitted to utilize trainees at less
than the applicable predetermined rate for the work performed until an acceptable program is
approved.

     4.6.3. Equal Employment Opportunity. The utilization of apprentices, trainees, and
journeymen under this part shall be in conformity with the equal employment opportunity
requirements of Executive Order 11246, as amended, and 29 C.F.R. Part 30.

     4.6.4 . Compliance With Copeland Act Requirements. Contractor shall comply with the re-
quirements of 29 C.F.R. Part 3, which are incorporated herein by reference.

    4.6.5. Contract Termination: Debarment. A breach of the contract clauses in 29 C.F.R.
Section 5.5 may be grounds for termination of the Contract, and for debarment as a Contractor
and a subcontractor as provided in 29 C.F.R. Section 5.12.

     4.6.6 Compliance with Davis-Bacon and Related Act Requirements. All rulings and
interpretations of the Davis-Bacon and related acts contained in 29 C.F.R. Parts 1, 3, and 5 are
incorporated herein by reference.

     4.6.7. Disputes Concerning Labor Standards. Disputes arising out of the labor standards
provisions of the Contract shall not be subject to the general disputes clause of the Contract.
Such disputes shall be resolved in accordance with the procedures of the Department of Labor
set forth in 29 C.F.R. Parts 5, 6, and 7. Disputes within the meaning of this clause include
disputes between Contractor (or any of its subcontractors) and the contracting agency, the U.S.
Department of Labor, or the employees or their representatives.


                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 50 of 241
     4.7. Certification of Eligibility.

      4.7.1. By entering into a third-party contract financed under this Project, Contractor
certifies that neither it (nor he or she) nor any person or firm that has an interest in Contractor's
firm is a person or firm ineligible to be awarded government contracts by virtue of section 3(a) of
the Davis-Bacon Act or 29 C.F.R. Section 5.12(a)(1).

    4.7.2. No part of the Contract shall be subcontracted to any person or firm ineligible for
award of a government contract by virtue of Section 3(a) of the Davis-Bacon Act or 29 C.F.R
Section 5.12(a)(1).

    4.7.3. The penalty for making false statements is prescribed in the U.S. Criminal Code,
18 U.S.C. Section 1001.

     4.8. Overtime Requirements. No contractor or subcontractor contracting for any part of the
Contract work which may require or involve the employment of laborers or mechanics shall
require or permit any such laborer or mechanic in any work week in which he or she is
employed on such work to work in excess of forty hours in the work week unless such laborer or
mechanic received compensation at a rate not less than one and one-half times the basic rate
of pay for all hours worked in excess of forty hours in such work week.

     4.9. Violation; Liability for Unpaid Wages; Liquidated Damages. In the event of any
violation of the requirements of 29 C.F.R. Section 5.5(b)(1), Contractor and any subcontractor
responsible therefore shall be liable for the unpaid wages. In addition, such contractor and
subcontractor shall be liable to the United States (in the case of work done under Contract for
the District of Columbia or a territory, to such district or to such territory) for liquidated damages.
Such liquidated damages shall be computed with respect to each individual laborer or
mechanic, including watchmen and guards, employed in violation of 29 C.F.R. Section 5.5(b)(1)
in the sum of $10 for each calendar day on which such individual was required or permitted to
work in excess of the standard work week of forty hours without payment of the overtime wages
required by 29 C.F.R. Section 5.5(b)(1).

     4.10. Withholding For Unpaid Wages And Liquidated Damages. FTA or the RTA shall
upon its own action or upon written request of an authorized representative of the Department of
Labor withhold or cause to be withheld, from any monies payable on account of work performed
by Contractor or subcontractor under any such contract or any other federal contract with the
same prime contractor, or any other federally-assisted contract subject to the Contract Work
Hours and Safety Standards Act, which is held by the same prime contractor, such sums as
may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor
for unpaid wages and liquidated damages as provided in the clause set forth at 29 C.F.R.
Section 5.5(b)(2).

     4.11. Subcontracts. Contractor or any subcontractor shall insert in any subcontracts the
clauses set forth in subsections 4.1 through 4.12 of this section and also a clause requiring the
subcontractors to include these clauses in any lower tier subcontracts. Contractor shall be
responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set
forth in subsections 4.1 through 4.12 of this section.



                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 51 of 241
5.   TITLE VI COMPLIANCE.

      During the performance of the Contract, Contractor, for itself, its assignees and successors
in interest, agrees as follows:

     5.1. Compliance with Regulations. Contractor shall comply with the regulations relative to
nondiscrimination in federally-assisted programs of the U.S. Department of Transportation
(hereinafter "USDOT") Title 49 C.F.R. Part 21, as they may be amended from time to time
(hereinafter referred to as the "Regulations"), which are herein incorporated by reference and
made a part of the Contract.

     5.2. Nondiscrimination. Contractor, with regard to the work performed by it during the Con-
tract, shall not discriminate on the grounds of race, religion, color, sex, disability, age, or
national origin in the selection and retention of subcontractors, including procurements of
materials and leases of equipment. Contractor shall not participate either directly or indirectly in
the discrimination prohibited by Section 21.5 of the Regulations, including employment practices
when the contract covers a program set forth in Appendix B of the Regulations.

     5.3. Solicitation for Subcontracts, Including Procurement of Materials and Equipment. In
all solicitations either by competitive bidding or negotiation made by Contractor for work to be
performed under a subcontract, including procurements of materials or leases of equipment,
each potential subcontractor or supplier shall be notified by Contractor of Contractor's
obligations under the Contract and the Regulations relative to nondiscrimination on the grounds
of race, religion, color, sex, disability, age, or national origin.

     5.4. Information and Reports. Contractor shall provide all information and reports
required by the Regulations or directives issued pursuant thereto, and shall permit access to its
books, records, accounts, other sources of information, and its facilities as may be determined
by the RTA or FTA to be pertinent to ascertain compliance with such Regulations, orders and
instructions. Where any information is required or a contractor is in the exclusive possession of
another who fails or refuses to furnish this information, Contractor shall so certify to the RTA or
FTA, as appropriate, and shall set forth what efforts it has made to obtain the information.

    5.5. Sanctions for Noncompliance. In the event of Contractor's noncompliance with the
nondiscrimination provisions of the Contract, the RTA shall impose such contract sanctions as it
or FTA may determine to be appropriate, including, but not limited to:

    5.5.1. Withholding of payments to Contractor under the Contract until Contractor complies,
and/or

     5.5.2. Cancellation, termination or suspension of the Contract, in whole or in part.

      5.6. Incorporation of Provisions. Contractor shall include the provisions of subsections
5.1 through 5.5 of this section in every subcontract, including procurements of materials and
leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto.
Contractor shall take such action with respect to any subcontract or procurement as the RTA or
FTA may direct as a means of enforcing such provisions including sanctions for noncompliance;
provided, however, that, in the event a Contractor becomes involved in, or is threatened with,
litigation with a subcontractor or supplier as a result of such direction, Contractor may request

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 52 of 241
the RTA to enter into such litigation to protect the interests of the RTA, and, in addition,
Contractor may request the services of the U.S. Attorney General in such litigation to protect the
interests of the United States.

6.   DISADVANTAGED BUSINESS ENTERPRISES (DBEs).

     6.1. Policy. It is the policy of USDOT and the RTA that disadvantaged business
enterprises as defined in 49 C.F.R. Part 26 shall have the maximum opportunity to participate in
the performance of contracts financed in whole or in part with federal funds under the Contract.
Consequently, the DBE requirements of 49 C.F.R. Part 26 applies to the Contract.

     6.2. DBE Obligation. The RTA and Contractor agree to ensure that DBE contractors and
subcontractors as defined in 49 C.F.R. Part 26 have the maximum opportunity to participate in
the performance of contracts and subcontracts financed in whole or in part with federal funds
provided under the Contract. In this regard, the RTA and Contractor shall take all necessary
and reasonable steps in accordance with 49 C.F.R. Part 26 and this provision to ensure that
DBEs have the maximum opportunity to compete for and perform contracts. Neither the RTA
nor its Contractor shall discriminate on the basis of race, creed, color, national origin, disability,
age, or sex in the award and performance of USDOT-assisted contracts.

      6.3. All determinations of compliance or noncompliance shall be made by the RTA as
provided herein. All such determinations shall be final and binding, except that an appeal from
an adverse decision by the RTA may be taken by the affected DBE contractor to USDOT to the
extent provided under 49 C.F.R. Section 26.89. Nothing hereby shall be construed to diminish
the legal responsibility or authority of the RTA. Failure to carry out the requirements set forth in
49 C.F.R. Part 26 and in this provision shall constitute a breach of the Contract, and, after
notification to USDOT, may result in termination of the Contract or such other remedies as the
RTA deems appropriate.

     6.4. For all contracts for which contract goals have been established, the apparent
successful competitor will be required to submit DBE participation information to the RTA, and
the award of the contract will be conditioned upon satisfaction of the requirements established
by the RTA pursuant to this subsection. The apparent successful competitor's submission shall
include the following information:

     6.4.1. The names and addresses of DBE firms that will participate in the Contract;

     6.4.2. A description of the work each named DBE firm will perform;

     6.4.3. The dollar amount of participation by each named DBE firm.

     6.5. Prompt Payment of Subcontractors.

       6.5.1. Contractor shall pay each of its subcontractors for satisfactory performance of its
subcontract no less than twenty (20) days from the date of receipt of each payment made by
RTA to Contractor. Contractor also shall promptly return retainage payments from Contractor to
each of its subcontractors within twenty (20) days after the subcontractor’s work is satisfactorily
completed.


                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 53 of 241
     6.5.2. Failure to comply with the requirements of this provision may result in the levy of a
penalty by the RTA in the amount of four percent (4%) of the late payment. Delays in payment
may take place upon a showing of good cause, which good cause must be approved in writing
by the RTA in advance.

    6.5.3. Contractor agrees to include in its subcontracts language providing for alternative
dispute resolution to resolve payment disputes through the Nueces County Dispute Resolution
Services or alternative means acceptable to the RTA.

     6.5.4. Contractor shall not be reimbursed for any work performed by subcontractors unless
and until Contractor ensures that the subcontractors are promptly paid for the work they have
performed.

    6.5.5. Contractor shall include the substance of this clause in any subcontract with a party
which may be using a subcontractor for the performance of any of the work under this Contract.

7.   ENERGY CONSERVATION.

     Contractor shall recognize mandatory standards and policies relating to energy efficiency
which are contained in the State energy conservation plan issued in compliance with the Energy
Policy and Conservation Act, 42 U.S.C. Section 6321, et seq.

8.   MITIGATION OF ADVERSE ENVIRONMENTAL EFFECTS.

     Should the proposed Project cause adverse environmental effects, Contractor shall take all
responsible steps to minimize such effects pursuant to 49 U.S.C. Section 303, 49 U.S.C.
Section 5303, other applicable statutes, and the procedures set forth in 23 C.F.R. Part 771.
Contractor shall undertake all environmental mitigation measures that may be identified in
applicable environmental documents such as environmental assessments, environmental
impact statements, memoranda of agreements, Section 4(f) statements, and with any conditions
imposed by FTA as part of a finding of no significant impact or a record of decision; all such
mitigation measures are incorporated in and made part of the Contract by reference. Such
mitigation measures may not be modified or withdrawn without the express written approval of
the RTA and FTA.

9.   USE OF FLY ASH IN CEMENT AND CONCRETE.

                   Contractor shall make all appropriate efforts to foster the use of fly ash in
cement and concrete, in carrying out the Project, substantially in compliance with EPA
Guidelines set forth at 40 C.F.R. Part 247. Should Contractor make a determination that the use
of fly ash is inappropriate in a particular procurement of cement or concrete, Contractor shall
provide the RTA and FTA a written justification to support that decision.

10. CLEAN AIR ACT.

     Except to the extent the Federal Government determines otherwise in writing, the
Contractor agrees to comply with all applicable Federal laws and regulations and follow
applicable Federal directives implementing the Clean air Act, as amended, 42 U.S.C. Section
7401 through 7671q. Specifically:

                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 54 of 241
     10.1 The Contractor agrees to comply with the applicable requirements of subsection
176(c) of the Clean air Act, 42 U.S.C. Section 7506 (c); to comply with U.S. EPA regulations,
“Determining Conformity of Federal Actions to State or Federal Implementation Plans,” 40
C.F.R. Part 93, Subpart A; and to comply with any other applicable Federal conformity
regulations that may be promulgated at a later date. To Support the requisite air quality
conformity finding for the Project, the Contractor agrees to implement each air quality mitigation
or control measure incorporated in the applicable documents accompanying approval of the
Project. The Contractor further agrees that any Project identified in an applicable State
Implementation Plan (SIP) as a Transportation control Measure will be wholly consistent with
the design concept and scope of the Project described in the SIP.

     10.2 U.S. EPA also imposes requirements implementing the Clean Air Act, as amended,
which may apply to public transportation operators, particularly operators of large public
transportation bus fleets. Accordingly, to the extent they apply to the Project, the Contractor
agrees to comply with U.S. EPA regulations, “Control of air Pollution from New and In-Use
Motor Vehicles and New and In-Use Motor Vehicle Engines,” 40 C.F.R. Part 86; and U.S. EPA
regulations “Fuel Economy of Motor Vehicles,” 40 C.F.R. Part 600, and any revisions thereto.

     10.3 The Contractor agrees to comply with the notice of violating facility provisions of
section 306 of the Clean Air Act, as amended, 42 U.S.C. Section 7414, and facilitate
compliance with Executive Order No. 11738, “Administration of the Clean air Act and the
Federal Water Pollution control Act with Respect to Federal Contracts, Grants, or Loans, “ 42
U.S.C. Section 7606 note.

11. CLEAN WATER ACT

     Except to the extent the Federal Government determines otherwise in writing, the
Contractor agrees to comply with all applicable Federal laws and regulations and follow
applicable Federal directives implementing the Clean Water Act, as amended, 33 U.
S.C. Section 1251 through 1377. Specifically:

     11.1 The Contractor agrees to protect underground sources of drinking water in compliance
with the Safe Drinking Water Act of 1974, as amended, 42 U.S.C. Section 300f through 300j-6.

     11.2 The Contractor agrees to comply with the notice of violating facility provisions of
section 508 of the Clean Water Act, as amended, 33 U.S.C. Section 1368, and facilitate
compliance with Executive Order No. 11738, “Administration of the Clean Air Act and the
Federal Water Pollution control Act with Respect to Federal Contracts, Grants, or Loans,” 42
U.S.C. Section 7606 note.

12. PATENT RIGHTS.

     If any invention, improvement, or discovery of Contractor is conceived or first actually
reduced to practice in the course of or under this Project, which invention, improvement, or
discovery may be patentable under the laws of the United States of America or any foreign
country, Contractor shall immediately notify the RTA and FTA and provide a detailed report.
The rights and responsibilities of Contractor, the RTA and FTA with respect to such invention,


                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 55 of 241
improvement, or discovery will be determined in accordance with applicable federal laws,
regulations, policies, and any waiver thereof.

13. RIGHTS IN DATA.

     13.1. The term "subject data" as used herein means recorded information, whether or not
copyrighted, that is delivered or specified to be delivered under the Contract. The term includes
graphic or pictorial delineations in media such as drawings or photographs; text in specifications
or related performance or design-type documents; machine forms such as punched cards,
magnetic tape, or computer memory printouts; and information retained in computer memory.
Examples include, but are not limited to: computer software, engineering drawings and associ-
ated lists, specifications, standards, process sheets, manuals, technical reports, catalog item
identifications, and related information. The term does not include financial reports, costs
analyses, and similar information incidental to Contract administration.

     13.2. All "subject data" first produced in the performance of the Contract shall be the sole
property of the RTA and FTA. Contractor agrees not to assert any rights at common law or
equity and agrees not to establish any claim to statutory copyright in such data. Except for its
own internal use, Contractor shall neither publish nor reproduce such data in whole or in part, or
in any manner or form, nor authorize others to do so, without the written consent of the RTA and
FTA until such time as the RTA and FTA may have released such data to the public; this
restriction, however, does not apply to contracts with academic institutions.

     13.3. Contractor agrees to grant and does hereby grant to the RTA and FTA and to their
officers, agents, and employees acting within the scope of their official duties, a royalty-free,
nonexclusive, irrevocable license throughout the world:

    13.3.1. To publish, translate, reproduce, deliver, perform, use and dispose of, in any
manner, any and all data not first produced or composed in the performance of the Contract but
which is incorporated in the work furnished under the Contract; and

    13.3.2. To authorize others so to do.

     13.4. Contractor shall indemnify, save and hold harmless the RTA and FTA, their officers,
agents, and employees acting within the scope of their official duties against any liability,
including costs and expenses, resulting from any willful or intentional violation by the RTA or
FTA of proprietary rights, copyrights, or right of privacy, arising out of the publication,
translation, reproduction, delivery, performance, use, or disposition of any data furnished under
the Contract.

     13.5. Nothing contained in this clause shall imply a license to the RTA or FTA under any
patent or be construed as affecting the scope of any license or other right otherwise granted to
the RTA or FTA under any patent.

     13.6. Subsections 12.3 and 12.4 above of the Contract are not applicable to material
furnished to Contractor by the RTA or FTA and incorporated in the work furnished under the
Contract; provided that such incorporated material is identified by the RTA at the time of delivery
of such work.


                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 56 of 241
     13.7. In the event that the Project, which is the subject of the Contract, is not completed,
for any reason whatsoever, all data generated for the Project shall become subject data as
defined in Section 12.1 of the Contract and shall be delivered as the RTA and FTA may direct.

14. PRIVACY.

    14.1. Contractor agrees:

     14.1.1. To comply with the Privacy Act of 1974, 5 U.S.C. Section 552a (the “Privacy Act”)
and regulations there under, when performance under the Contract involves the design,
development, or operation of any system of records on individuals to be operated by Contract or
its employees to accomplish a governmental function;

     14.1.2. To notify the RTA and FTA when Contractor anticipates operating a system of re-
cords on behalf of the RTA in order to accomplish the requirements of the Contract, if such
system contains information about individuals, which information will be retrieved by the
individual's name or other identifier assigned to the individual. A system of records subject to
the Privacy Act may not be employed in the performance of the Contract until the necessary
approval and publication requirements applicable to the system have been carried out. Con-
tractor agrees to correct, maintain, disseminate, and use such records in accordance with the
requirements of the Privacy Act, and to comply with all applicable requirements of the Privacy
Act;

     14.1.3. To include the Privacy Act Notification contained in the Contract in every third party
contract solicitation and in every third party contract when the performance of work under that
proposed third party contract may involve the design, development, or operation of a system of
records on individuals to be operated under the contract to accomplish a governmental function;
and

    14.1.4. To include this clause, including this subsection, in all third party contracts under
which work for the Contract is performed or which is awarded pursuant to the Contract or which
may involve the design, development, or operation of such a system of records on behalf of the
RTA.

In addition, failure to comply with the provisions of the Privacy Act or of this clause will make the
Contract subject to termination.

    14.2. The terms used in this clause have the following meanings:

    14.2.1. "Operation of a system of records" means performance of any of the activities
associated with maintaining the system of records on behalf of the RTA, including collection,
use and dissemination of records.

     14.2.2. "Record" means any item, collection, or grouping of information about an individual
that is maintained by Contractor on behalf of the RTA, including, but not limited to, his
education, financial transactions, medical history, and criminal or employment history and that
contains his name, or the identifying number, symbol, or other identifying particular assigned to
the individual, such as a finger or voice print or a photograph.


                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 57 of 241
     14.2.3. "System of records" on individuals means a group of any records under the control
of Contractor on behalf of the RTA from which information is retrieved by the name of the indi-
vidual or by some identifying number, symbol or other identifying particular assigned to the
individual.

15. AUDIT AND INSPECTION OF RECORDS.

      Contractor agrees that the RTA, FTA, the Comptroller General of the United States, or any
of their duly authorized representatives, shall, for the purpose of audit and examination, be
permitted to inspect all work, materials, payrolls, and other data and records with regard to the
Project, and to audit the books, records and accounts with regard to the Contract. Further,
Contractor agrees to maintain all required records for at least three years after grantees make
final payments and all other pending matters are closed.

     Contractor agrees to require, and assures that its subcontractors require, their third party
contractors and third party subcontractors at each tier to provide to the U.S. Secretary of
Transportation and the Comptroller General of the United States or their duly authorized
representatives, access to all third party contract records as required by 49 U.S.C. Section
5325(g). the Contractor further agrees to require and assures that its subcontractors require,
their third party contractors and third party subcontractors, at each tier, to provide sufficient
access to third party procurement records as needed for compliance with Federal laws and
regulations or to assure proper Project management as determined by FTA.

16. BUY AMERICA PROVISION. (Required for contracts over $100,000.)

     The Contract is subject to the Federal Transit Administration Buy America Requirements in
49 C.F.R. 661. A Buy America Certificate, as per the following format, must be completed and
submitted with the bid for all bids with a value greater than $100,000 for construction or
manufactured goods. A bid which does not include the certificate will be considered non-
responsive. A waiver from the Buy America Provision may be sought by the RTA if grounds for
the waiver exist. Section 165(a) of the Surface Transportation Assistance Act of 1982 permits
FTA participation on the Contract only if steel, cement, and manufactured products used in the
contract are produced in the United States.

17. CARGO PREFERENCE.

       To the extent applicable, the Contractor agrees to comply with 46 U.S.C. and 55305 and
U. S. Maritime Administration Regulations, “Cargo Preference-U.S.-Flag Vessels,” 46 C. F. R.
Part 381.

Use of United States-Flag Vessels: (Applies to contracts involving equipment,
materials, or commodities which may be transported by ocean vessels).

       Contractor agrees:

    17.1. To utilize privately owned United States-flag commercial vessels to ship at least 50
percent of the gross tonnage (computed separately for dry bulk carriers, dry cargo liners, and
tankers) involved, whenever shipping any equipment, materials, or commodities pursuant to this


                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 58 of 241
section, to the extent such vessels are available at fair and reasonable rates for United States-
flag commercial vessels.

     17.2. To furnish one legible copy of a rated on-board ocean bill of lading for each shipment
to both (i) the RTA and (ii) the Office of Cargo Preference, Maritime Administration (MAR-590),
400 Seventh Street, SW, Washington, DC 20590. Subcontractor bills of lading shall be
submitted through Contractor. Contractor shall furnish these bill of lading copies (i) within 20
working days of the date of loading for shipments originating in the United States, or (ii) within
30 working days for shipments originating outside the United States. Each bill of lading copy
shall contain the following information: (A) Sponsoring U.S. Government agency. (B) Name of
vessel. (C) Vessel flag of registry. (D) Date of loading. (E) Port of loading. (F) Port of final
discharge. (G) Description of commodity. (H) Gross weight in pounds and cubic feet if available.
(I) Total ocean freight revenue in U.S. dollars.

      17.3. To insert the substance of the provisions of this clause in all subcontracts issued
             pursuant to the Contract.

18.    FLY AMERICA.

The contractor understands and agrees that the Federal Government will not participate in the
costs of international air transportation of any individuals involved in or property acquired for the
Project unless that air transportation is provided by U.S.-flag air carriers to the extent such
service is available, in compliance with section 5 of the International Air Transportation Fair
Competitive Practices Act of 1974, as amended, 49 U.S.C. Section 40118, and U.S. GSA
regulations, “Use of United States Flag Air Carriers,” 41 C.F.R. Section 301-10.131 through
301-10.143.

19. DRUG-FREE WORKPLACE COMPLIANCE AND TESTING.

     19.1. (This subsection only applies to contracts in excess of $25,000). Contractor agrees
to comply with the Drug-Free Workplace Act and certifies as follows:

    19.1.1. Contractor has published a statement notifying employees that the unlawful
manufacture, distribution, dispensation, possession, or use of a controlled substance is
prohibited in the workplace, and specifying the consequences of any such employee violation.

     19.1.2. Contractor has established a drug-free awareness program to inform employees of
the dangers of drug abuse in the workplace, Contractor's policy of maintaining a drug-free
workplace, the availability of counseling, rehabilitation and employee assistance programs, and
the penalties which may be imposed for drug abuse violation.

    19.1.3. Contractor has given a copy of the policy statement to each of Contractor's
employees engaged in the performance of the Contract.

     19.1.4. Contractor has notified the employees in such statement that, as a condition for
employment under the Contract, the employee will abide by the terms of the statement and
notify Contractor of any conviction or violation of a criminal drug statute in the workplace no later
than 5 days after the conviction.


                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 59 of 241
     19.1.5. Contractor shall notify the RTA within 10 days after receipt of notice of a conviction
of an employee.

     19.1.6. Contractor agrees to take disciplinary action against any employee convicted for
violation of any criminal drug statute in the workplace or require such employee's participation in
a drug abuse assistance or rehabilitation program.

    19.1.7.   Contractor shall make a good faith effort to continue to maintain a drug-free
workplace.

    19.2. Contractor shall comply with the requirements of the drug and alcohol testing of
employees engaged in safety sensitive functions, 49 C.F.R. Part 655.

20. INTEREST OF MEMBERS OF, OR DELEGATES TO, CONGRESS.

     In accordance with 18 U.S.C. Section 431, no member of, or delegates to, the Congress of
the United States shall be admitted to a share or part of the Contract or to any benefit arising
there from.

21. POLITICAL ACTIVITY: LOBBYING. (Required for contracts over $100,000.)

No funds provided under this Contract may be used in any way for influencing or attempting to
influence in any manner an officer or employee of any agency, state or local legislatures, a
Member of Congress or their employees, or an officer or employee of Congress in connection
with the awarding of any Federal contract, the making of any Federal grant, the making of any
Federal loan, the entering into of any cooperative agreement, and the extension, continuation,
renewal, amendment, or modification of any Federal contract, grant, load, or cooperative
agreement. If any funds other than Federal appropriated funds have been paid or will be paid
for such activities, Contractor or any subcontractor at any tier of a project expending such funds
shall complete and submit Standard Form-LLL “Disclosure Form to Report Lobbying” in
accordance with its instructions. Contractor shall comply with requirements of “New Restrictions
on Lobbying”: Certification and Disclosure Requirements imposed by 49 C.F.R. Part 20.

22.    CONFLICTS OF INTEREST.

    22.1. General. No employee, officer, board member, or agent of RTA shall participate in
selection or in the award or administration of the Contract if a conflict of interest, real or
apparent, would be involved. Such conflict would arise when any one of the following parties
has a substantial interest in the Contract:

               An RTA employee, officer, or board member;

       Any relative of one of the above who is a Spouse, father, mother, brother, sister, son,
       daughter, spouse's children, father-in-law, mother-in-law, brother-in-law, sister-in-law,
       son-in-law, daughter-in-law, with adoptive relationships and step-parents, step-siblings
       and step-children being treated the same as natural relationships; and

       Any corporation, firm or other organization which employs, or is about to employ any of
       the above persons.

                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 60 of 241
                        ..................................................................................................................
   22.2. Gratuities. RTA’s officers, employees, board members or agents shall neither solicit
nor accept gratuities, favors or anything of monetary value from contractors, potential
contractors, or parties to subcontracts.

    22.3. Organizational Conflicts. RTA awards contracts only to contractors who do not give
rise to a potential organizational conflict of interest as defined in its procurement policy and the
definition below, which states:

          "An 'organizational conflict of interest' exists when the nature of the work to be
          performed under a proposed RTA contract may, without some form of restriction
          on future activities, (a) result in an unfair competitive advantage to Contractor or
          (b) impair Contractor's objectivity in performing the contract work."

                   22.3.1. Contractor agrees to notify RTA, in writing, within five (5) working days
          after it becomes aware of any potential or actual organizational conflict of interest
          pursuant to the above. Contractor has the responsibility of formulating and forwarding a
          proposed mitigation plan to the Contracting Officer for review and consideration.

                  22.3.2. Contractor agrees to notify RTA, in writing within thirty (30) calendar days
          of the effective date of any corporate mergers, acquisitions, and/or divestures that may
          affect this provision.

                  22.3.3. Contractor’s misrepresentation of facts in connection with a conflict of
          interest reported or a Contractor’s failure to disclose a conflict of interest as required
          shall be a basis for default termination of the Contract.

    22.4. Use of Information. Contractor may have access to confidential and/or sensitive RTA
information in the course of Contract performance. Additionally, Contractor may be provided
access to proprietary information obtained from other contracted entities during Contract
performance. To the extent that Contractor either (1) uses confidential and/or sensitive RTA
information, or proprietary information obtained from other RTA contractors, to develop any form
of document, report, or concept plan that is determined by the Contracting Officer to be the
basis, in whole or in part, of any subsequent competitive solicitation issued by RTA, or (2)
develops written specifications that are used in any subsequent competitive solicitation issued
by RTA, Contractor agrees that it shall not be eligible to compete for such subsequent
competitive solicitation(s) as a prime contractor or first-tier subcontractor, or as part of any
teaming arrangement, unless the Contracting Officer provides, in writing, a specific waiver of
this restriction.

23. SECTARIAN INVOLVEMENT PROHIBITED.

     Contractor shall ensure that no funds under the Contract are used directly or indirectly in
the support of any religious or anti-religious activity, worship or instruction.

24. DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION.

     The Contractor agrees to comply, and assures the compliance of each subcontractor,
lessee, third party contractor, or other participant at any tier of the Project, with Executive

                                            IFB NO. 2011-FC-05
                          ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                               Page 61 of 241
Orders Nos 12549 and 12689, “Debarment and Suspension,” 31 U.S.C. Section 6101 note, and
U.S. DOT regulations, “Nonprocurement Suspension and Debarment,” 2 C.F.R. Part 1200,
which adopts and supplements the provisions of U. S. Office of Management and Budget (U.S.
OMB) “Guidelines to Agencies on Governmentwide Debarment and Suspension
(Nonprocurement),” 2 C.F.R. Part 180. The Contractor agrees to, and assures that its
subcontractors, lessees, third party contractors, and other participants at any tier of the Project
will, review the “Excluded Parties Listing System” at http://epls.gov/ before entering into any
subagreement, lease, third party contract, or other arrangement in connection with the Project.

25. BONDING.

    (These provisions are applicable if the total contract amount exceeds $25,000.)

     25.1. A bid guarantee is required from each bidder equivalent to five percent of the bid
price. The "bid guarantee" shall consist of a firm commitment such as a bid bond, certified
check, or other negotiable instrument accompanying a bid as assurance that the bidder will,
upon acceptance of its bid, execute such contractual documents as may be required within the
time specified.

      25.2. A payment bond is required on the part of Contractor for 100 percent of the Contract
price. A "payment bond" is one executed in connection with a contract to assure payment as
required by law of all persons supplying labor and material in the execution of the work provided
for in the Contract.

    25.3. For contracts exceeding $100,000, a performance bond is required on the part of
Contractor for 100 percent of the Contract price. A "performance bond" is one executed in
connection with a contract to secure fulfillment of all Contractor's obligations under such
Contract.

    25.4. All of the above-mentioned bonds shall be issued by a surety company licensed to do
business in Texas acceptable to the RTA. The attorney-in-fact who executed the bond on
behalf of the surety shall affix to the bond an original or certified, current copy of his or her
power of attorney, indicating the monetary limit of such power.

26. BID PROTEST PROCEDURES.

      26.1. An appeal of any decision made by the RTA under its bidding procedures may be
made by notifying the RTA's Chief Executive Officer, in writing, within five (5) business days fol-
lowing the action being appealed. The appeal shall state the name and address of the protes-
tor, refer to the Project number and description of the solicitation, and contain a statement of the
grounds for protest and any supporting documentation. Any appeals received by the RTA later
than five (5) business days after the appealed action will not be considered. The RTA's Chief
Executive Officer shall respond in writing to any such appeal within five (5) business days from
the date the protest is submitted.

     26.2. The RTA shall not award any Contract during the five-day period following its
decision on a bid protest provided in subsection 24.3 below except in accordance with the
provisions and limitations of Circular 4220.1F. After the five-day period, the RTA shall confirm
with FTA that FTA has not received a protest on the contract in question.

                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 62 of 241
     26.3. In the event a bidder should be dissatisfied with the RTA's decision, an appeal may
be made to FTA. Such appeal shall be filed in writing with the FTA Regional Office no later than
five (5) days after the final determination by the RTA, and a copy of any such appeal must be
concurrently sent to the RTA. Please note that the five (5) days allowed in this subsection refer
to working days of the federal government. The appeal filed with FTA shall include:

    the name and address of the protestor;

    the name of the RTA, the Project number and the number of the solicitation;

    a statement of the grounds for the protest and any supporting documentation (this
    statement should detail the alleged failure to follow proper contracting or protest proce-
    dures or the alleged failure to have protest procedures and be fully supported to the extent
    possible); and

    a copy of the protest filed with the RTA, and a copy of the RTA's decision.

     26.4. Upon appeal to FTA under these procedures, the RTA shall either (a) suspend all
proceedings under the solicitation documents and give notice that the bid date, bid opening, or
contract award (whichever is applicable) has been rescheduled or indefinitely postponed
pending FTA action on the protest, or (b) continue the contracting proceedings as scheduled if
any of the following elements are present: the items to be procured are urgently required,
delivery or performance will be unduly delayed by failure to make the award promptly, or failure
to promptly award will otherwise cause undue harm to the RTA or FTA. In the event the RTA
determines that the contracting procedures should be continued as scheduled during the
pendency of the appeal, the RTA will notify FTA of such decision prior to making such award.

    26.5. Any review, by an entity other than FTA, of the RTA's decision on a bid protest shall
be based upon the substantial evidence rule. The sole criteria to be used in determining
whether or not the RTA's decision should be upheld shall be whether or not substantial
evidence can be shown to support the RTA's decision.

     26.6. Upon request, the RTA will provide a bidder with a copy of the bid protest procedures
issued by FTA to all federal grantees under Circular 4220.1F.

27. TERMINATION.

     27.1. Termination for Convenience. The RTA may terminate the Contract, in whole or in
part, at any time by written notice to Contractor. Contractor shall be paid its costs, including
Contract close-out costs, and profit on work performed up to the time of termination. Contractor
shall promptly submit its termination claim to RTA to be paid. If Contractor has any property in
its possession belonging to the Authority, Contractor will account for the same, and dispose of it
in the manner the Authority directs.

    27.2. Termination for Default. If Contractor does not deliver supplies in accordance with
the Contract delivery schedule, or, if the Contract is for services, Contractor fails to perform in
the manner called for in the Contract, or if Contractor fails to comply with the other provisions of
the Contract, the RTA may terminate the Contract for default. Termination shall be effected by

                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 63 of 241
serving a notice of termination on Contractor setting forth the manner in which Contractor is in
default. Contractor will only be paid Contractor price for supplies delivered and accepted, or
services performed in accordance with the manner of performance set forth in the Contract.

     If it is later determined by the RTA that Contractor had an excusable reason for not
performing, such as a strike, fire, flood, or events which are not the fault of or are beyond the
control of Contractor, the RTA, after setting up a new delivery of performance schedule, may
allow Contractor to continue work, or treat the termination as a termination for convenience.

     27.3. Termination for Cost-Type Contracts. The RTA may terminate cost-type contracts, or
any portions of same, by serving a notice of termination on Contractor. The notice shall state
whether the termination is for convenience of the RTA or for the default of Contractor. If the
termination is for default, the notice shall state the manner in which Contractor has failed to
perform the requirements of the Contract. Contractor shall account for any property in its
possession paid from funds received from the RTA or property supplied to Contractor by the
RTA. If the termination is for default, the RTA may fix the fee, if the Contract provides for a fee,
to be paid Contractor in proportion to the value, if any, of work performed up to the time of
termination. Contractor shall promptly submit its termination claim to the RTA.

     If the termination is for the convenience of the RTA, Contractor shall be paid its Contract
close-out costs, and a fee, if the Contract provided for payment of a fee, in proportion of the
work performed up to the time of termination.

      If after serving a notice of termination for default, the RTA determines that Contractor has
an excusable reason for not performing, such as strike, fire, flood, or events which are not the
fault of and are beyond the control of Contractor, the RTA, after setting up a new work schedule,
may allow Contractor to continue work, or treat the termination as a termination for
convenience.

28. GENERAL REMEDIES/SANCTIONS FOR BREACH OF CONTRACT

         In the event of any default under the Contract, the RTA may take whatever action at law
or in equity as may appear necessary or desirable to enforce performance and observance of
any obligations, agreement, or covenant of Contractor under the Contract. No remedy herein
conferred upon or reserved to the RTA is intended to be exclusive of any other available remedy
or remedies, but each and every such remedy shall be cumulative and shall be in addition to
every other remedy given under the Contract or now or hereafter existing at law or in equity or
by statute. No delay or omission to exercise any right or power accruing upon default shall
impair any such right or power or shall be construed to be a waiver thereof, but any such right or
power may be exercised from time to time and as often as may be deemed expedient. In order
to entitle the RTA to exercise any remedy reserved to it in this section, it shall not be necessary
to give any notice other than such notice as may be herein expressly required. In the event any
provision, covenant, or agreement contained in the Contract should be breached by Contractor
and thereafter waived by the RTA, such waiver shall be limited to the particular breach so
waived and shall not be deemed to waive any other breach hereunder.




                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 64 of 241
29. LIQUIDATED DAMAGES

     The time of completion is the essence of the Contract. For each day that any work shall
remain uncompleted after the time specified in the Contract, or any increase in time granted by
the RTA or due to additions to the work, the sum specified in the Bid Documents per day will be
deducted from the monies due Contractor, not as a penalty but as liquidated damages. Such
sum of money so deducted for such delay, failure or non-completion shall be treated as
reasonable liquidated damages since it would be impracticable and extremely difficult to fix an
amount of actual damages suffered by the RTA. Any such amount of liquidated damages shall
be deducted from any amounts owing to Contractor.

30. PROJECT SIGNS.

     Contractor shall erect at the site of construction, and maintain during construction, signs
satisfactory to US DOT identifying the Project and indicating that FTA is participating in the
development of the Project.

31. LEGAL AUTHORITY.

       Contractor assures and guarantees that it possesses the legal authority to enter into the
Contract, to receive the funds authorized by the Contract, and to perform the services
Contractor has obligated itself to perform under the Contract. The person signing the Contract
on behalf of Contractor hereby warrants that he/she has been fully authorized by Contractor to
execute the Contract on behalf of Contractor and to validly and legally bind Contractor to all the
terms, performances and provisions herein set forth.

32. INDEPENDENT CONTRACTOR.

        It is expressly understood and agreed by both parties that the RTA is contracting with
Contractor as an independent contractor. No provision of the Contract or act of the RTA in
performance of the Contract shall be construed as making Contractor the agent, servant or
employee of the RTA; employees of Contractor are not employees of the RTA; and Contractor
is solely responsible for employee payrolls and claims arising there from.

33.    COMMUNICATIONS.

        All notices and requests given to or made upon the parties hereto shall, except as
otherwise specified herein, be in writing and shall be delivered or mailed to such party at the
notice addresses specified in the Contract. The parties hereto may change their notice
addresses upon five (5) days notice to the other party. Any notices or requests shall be deemed
given upon actual delivery or depositing the same with the U.S. mail, properly addressed,
postage prepaid, certified mail, return receipt requested.

34. AMERICANS WITH DISABILITIES ACT COMPLIANCE.

     Contractor, with regard to compliance with the plans and specifications        and the work
performed by it during the contract, shall comply with the regulations relative     to the access
requirements for persons with disabilities in federally-assisted programs of        the US DOT,
Americans with Disabilities Act of 1990 (ADA), 42 U.S.C. Section 12101, as          amended and

                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 65 of 241
Section 504 of the Rehabilitation Act of 1973, as amended, which are herein incorporated by
reference and made a part of the Contract.

35. PREFERENCES FOR RECYCLED PRODUCTS.

(Applies to all contracts for items designated by the EPA, when procurement is made of
$10,000 or more of one of these items during a fiscal year, using Federal funds). The
Contractor agrees to comply with all the requirements of Section 6002 of the Resource
Conservation and Recovery Act (RCRA), as amended (42 U.S.C. 6962), including but not
limited to the regulatory provisions of 40 CFR Part 247, and Executive Order 12873, as they
apply to the procurement of the items designated in Subpart B of 40 CFR Part 247.

36.    SEISMIC SAFETY REQUIREMENTS.

Contractor agrees that any new building or addition to an existing building will be designed and
constructed in accordance with the standards for Seismic Safety required in Department of
Transportation Seismic Regulations 49 C.F.R. Part 41 and will certify to compliance to the
extent required by the regulations. Contractor also agrees to ensure that all work performed
under the Contract including work performed by a subcontractor is in compliance with the
standards required by the Seismic Safety Regulations and the certification of compliance issued
on the project.

37. HAZARDOUS MATERIALS

    37.1.      Hazardous material, as used in this clause, includes any material defined as
hazardous under the latest version of Federal Standard No. 313 (including revisions adopted
during the term of the contract).

    37.2.      Contractor must list any hazardous material, as defined in paragraph 35.1 of this
clause, to be delivered under the Contract. The hazardous material shall be properly identified
and include any applicable identification number, such as National Stock Number or Special
Item Number. This information shall also be included on the Material Safety Data Sheet
submitted under the Contract.

    37.3. This list must be updated during performance of the Contract whenever Contractor
determines that any other material to be delivered under the Contract is hazardous.

      37.4. Contractor agrees to submit, for each item as required under the Contract, a Material
Safety Data Sheet, meeting the requirements of 29 C.F.R. 1910.1200(g) and the latest version
of Federal Standard No. 313, for all hazardous material identified in paragraph 35.2 of this
clause. Data shall be submitted in accordance with Federal Standard No. 313, whether or not
Contractor is the actual manufacturer of these items. Failure to submit the Material Safety Data
Sheet prior to Contract award may result in the bid being considered non-responsible and
ineligible for award.

          37.5. If, after award, there is a change in the composition of the item(s) or a revision
to Federal Standard No. 313, which renders incomplete or inaccurate the data submitted under
paragraph 37.4 of this clause, Contractor shall promptly notify the RTA and resubmit the data.



                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 66 of 241
     37.6. Neither the requirements of this clause nor any act or failure to act by the RTA shall
relieve Contractor of any responsibility or liability for the safety of RTA, Contractor, or
subcontractor personnel or property.

     37.7. Nothing contained in this clause shall relieve Contractor from complying with
applicable Federal, State, and local laws, codes, ordinances, and regulations (including the
obtaining of licenses and permits) in connection with hazardous material.

     37.8. The RTA’s rights in data furnished under the Contract with respect to hazardous
material are as follows: (1) To use, duplicate and disclose any data to which this clause is
applicable. The purposes of this right are to-- (i) Apprise personnel of the hazards to which they
may be exposed in using, handling, packaging, transporting, or disposing of hazardous
materials; (ii) Obtain medical treatment for those affected by the material; and (iii) Have others
use, duplicate, and disclose the data for the RTA for these purposes. (2) To use, duplicate, and
disclose data furnished under this clause, in accordance with subparagraph (1) of this clause, in
precedence over any other clause of the Contract providing for rights in data. (3) The RTA is not
precluded from using similar or identical data acquired from other sources.

38. ENTIRE AGREEMENT.

    All oral or written agreements between the parties hereto to the subject matter of the
Contract made prior to the execution of the Contract have been incorporated herein.

39. CONTINGENT ON FUNDING.

    The RTA's obligation hereunder are contingent upon the availability of funds from which
payment for the Contract can be made. No legal liability on the part of the RTA for payment of
any money shall arise unless and until funds are appropriated and made available to the RTA.

40. NO GOVERNMENT OBLIGATION TO THIRD PARTIES.

        40.1. Contractor acknowledges and agrees that, notwithstanding any concurrence by
the Federal Government in or approval of the solicitation or award of the underlying contract,
absent the express written consent by the Federal Government, the Federal Government is not
a party to this Contract and shall not be subject to any obligations or liabilities to Contractor or
any other party (whether or not a party to the Contract) pertaining to any matter resulting from
the Contract.

     40.2. Contractor agrees to include the above clause in each subcontract financed in whole
or in part with Federal assistance provided by FTA. It is further agreed that the clause shall not
be modified, except to identify the subcontractor who will be subject to its provisions.

41. PROGRAM FRAUD AND FALSE OR FRAUDULENT STATEMENTS AND RELATED ACT




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 67 of 241
       41.1 Contractor acknowledges that the provisions of the Program Fraud Civil Remedies Act of
1986, as amended, 31 U.S.C §§ 3801 et seq and U.S. DOT regulations, “Program Fraud Civil
Remedies”, 49 C.F.R. Part 31, apply to its actions pertaining to this Contract. Upon execution of the
Contract, Contractor certifies or affirms the truthfulness and accuracy of any statement it has made,
it makes, it may make, or causes to be made, pertaining to the Contract or the FTA assisted project
for which this Contract work is being performed. In addition to other penalties that may be
applicable, Contractor further acknowledges that if it makes, or causes to be made, a false,
fictitious, or fraudulent claim, statement, submission, or certification, the Federal Government
reserves the right to impose the penalties of the Program Government deems appropriate.

       41.2. Contractor also acknowledges that if it makes, or causes to be made, a false,
       fictitious, or fraudulent claim, statement, submission, or certification, the Federal
       Government under a contract connected with a project that is financed in whole or in part
       with Federal assistance originally awarded by FTA under the authority of 49 U.S.C. § 5307,
       the Government reserves the right to impose the penalties of 18 U.S.C. § 1001 and 49
       U.S.C. § 5323 (l) on Contractor, to the extent the Federal Government deems appropriate.

       41.3. Contractor agrees to include the above two clauses in each subcontract financed in
       whole or in part with Federal assistance provided by FTA . It is further agreed that the
       clauses shall not be modified, except to identify the subcontractor who will be subject to the
       provisions.

42. FEDERAL CHANGES.

    Contractor shall at all times comply with all applicable FTA regulations, policies, procedures
and directives, including without limitation those listed directly or by reference in the Agreement
(Form FTA MA(16) dated October, 2009) between Purchaser and the FTA, as they may be
amended or promulgated from time to time during the term of this contract. Contractor's failure to
so comply shall constitute a material breach of this contract.

43. FEDERAL TRANSIT ADMINISTRATION NATIONAL ITS ARCHITECTURE POLICY

43.1 The Contractor who works on ITS projects shall conform to the Federal Transit Administration
National ITS Architecture and standards in accordance with the requirements contained in Part IV
of the National ITS Architecture Policy. Conformance with the National ITS Architecture is
interpreted to mean the use of the National ITS Architecture to develop a regional ITS architecture
in support of integration and the subsequent adherence of all ITS projects to that regional ITS
architecture. Development of the regional ITS architecture should be consistent with the
transportation planning process for Statewide and Metropolitan Transportation Planning (49 CFR
Part 613).

43.2 Intelligent Transportation Systems (ITS) means electronics, communications or information
processing used singly or in combination to improve the efficiency or safety of a surface
transportation system. ITS project means any project that in whole or in part funds the acquisition
of technologies or systems of technologies that provide or significantly contribute to the provision of
one or more ITS user services as defined in the National ITS Architecture. Major ITS project means
any ITS project that implements part of a regional ITS initiative that is multi-jurisdictional, multi-
modal, or otherwise affects regional integration of ITS systems. National ITS Architecture (also

                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 68 of 241
``national architecture'') means a common framework for ITS interoperability. The National ITS
Architecture comprises the logical architecture and physical architecture, which satisfy a defined set
of user services.

44. SENSITIVE SECURITY INFORMATION

Each Contractor must protect, and take measures to ensure that its subcontractors at each tier
protect, “sensitive security information” made available during the administration of a contract or
subcontract with the RTA to ensure compliance with 49 U.S.C. Section 40119(b) and implementing
DOT regulations, “Protection of Sensitive Security Information,” 49 CFR Part 1520.

45. SEAT BELT USE

In compliance with Federal Executive Order No. 13043, “Increasing Seat Belt Use in the United
States,” April 16, 1997, 23 U.S.C. Section 402 note, the Federal Transit Administration encourages
each Contractor to adopt and promote on-the-job seat belt use policies and programs for its
employees and other personnel that operate company-owned, rented or personally operated
vehicles, and to include this provision in any subcontracts, involving this project.

46. ACCESS FOR INDIVIDUALS WITH DISABILITIES

The Contractor agrees to comply with 49 U.S.C. § 5301(d), which states the Federal policy that
elderly individuals and individuals with disabilities have the same right as other individuals to use
public transportation services and facilities, and that special efforts shall be made in planning and
designing those services and facilities to implement transportation accessibility rights for elderly
individuals and individuals with disabilities. The Contractor also agrees to comply with all applicable
provisions of section 504 of the Rehabilitation Act of 1973, as amended, with 29 U.S.C. § 794,
which prohibits discrimination on the basis of disability; with the Americans with Disabilities Act of
1990 (ADA), as amended, 42 U.S.C. §§ 12101 et seq., which requires that accessible facilities and
services be made available to individuals with disabilities; and with the Architectural Barriers Act
of 1968, as amended, 42 U.S.C. §§ 4151 et seq., which requires that buildings and public
accommodations be accessible to individuals with disabilities, and any subsequent amendments to
these laws. In addition, the Contractor agrees to comply with applicable implementing Federal
regulations and directives and any subsequent amendments thereto, as follows:

   (1) U.S. DOT regulations, "Transportation Services for Individuals with Disabilities (ADA),"
49 C.F.R. Part 37;

    (2) U.S. DOT regulations, "Nondiscrimination on the Basis of Handicap in Programs and
Activities Receiving or Benefiting from Federal Financial Assistance," 49 C.F.R. Part 27;

   (3) Joint U.S. Architectural and Transportation Barriers Compliance Board (U.S. ATBCB)/U.S.
DOT regulations, "Americans With Disabilities (ADA) Accessibility Specifications for Transportation
Vehicles," 36 C.F.R. Part 1192 and 49 C.F.R. Part 38;

   (4) U.S. DOJ regulations, "Nondiscrimination on the Basis of Disability in State and Local
Government Services," 28 C.F.R. Part 35;


                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 69 of 241
   (5) U.S. DOJ regulations, "Nondiscrimination on the Basis of Disability by Public
Accommodations and in Commercial Facilities," 28 C.F.R. Part 36;

   (6) U.S. General Services Administration (U.S. GSA) regulations, "Accommodations for the
Physically Handicapped," 41 C.F.R. Subpart 101-19;

    (7) U.S. EEOC, "Regulations to Implement the Equal Employment Provisions of the Americans
with Disabilities Act," 29 C.F.R. Part 1630;

   (8) U.S. Federal Communications Commission regulations, "Telecommunications Relay
Services and Related Customer Premises Equipment for the Hearing and Speech Disabled,"
47 C.F.R. Part 64, Subpart F; and

   (9) U.S. ATBCB regulations, “Electronic and Information Technology Accessibility Standards,”
36 C.F.R. Part 1194;

   (10) FTA regulations, "Transportation for Elderly and Handicapped Persons," 49 C.F.R.
Part 609; and

   (11) Federal civil rights and nondiscrimination directives implementing the foregoing regulations,
        except to the extent the Federal Government determines otherwise in writing.

47. DISPUTES, BREACHES, DEFAULTS, or OTHER LITIGATION.

The Contractor agrees that FTA has a vested interest in the settlement of any dispute, breach,
default, or litigation involving the Project. Accordingly:

a. Notification to FTA. The Contractor agrees to notify FTA in writing of any current or prospective
major dispute, breach, default, or litigation that may affect the Federal Government's interests in the
Project or the Federal Government's administration or enforcement of Federal laws or regulations.
If the Contractor seeks to name the Federal Government as a party to litigation for any reason, in
any forum, the Contractor agrees to inform FTA in writing before doing so. Each notice to FTA
under this Section shall be sent, at a minimum, to the FTA Regional Counsel within whose Region
the Contractor operates its public transportation system or implements the Project.

b. Federal Interest in Recovery. The Federal Government retains the right to a proportionate
share, based on the percentage of the Federal share awarded for the Project, of proceeds derived
from any third party recovery, except that the Contractor may return any liquidated damages
recovered to its Project Account in lieu of returning the Federal share to the Federal Government.

c. Enforcement. The Contractor agrees to pursue all legal rights provided within any third party
contract.

d. FTA Concurrence. FTA reserves the right to concur in any compromise or settlement of any
claim involving the Project and the Contractor.

e. Alternative Dispute Resolution. FTA encourages the Contractor to use alternative dispute
resolution procedures, as may be appropriate.

                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 70 of 241
48. EMPLOYEE PROTECTIONS.

a. Construction Activities. The Contractor agrees to comply, and assures the compliance of each
third party contractor and each subcontractor at any tier of the Project, with the following laws and
regulations providing protections for construction employees:

    (1) Davis-Bacon Act, as amended, 40 U.S.C. §§ 3141 et seq., pursuant to FTA enabling
legislation requiring compliance with the Davis-Bacon Act at 49 U.S.C. § 5333(a), and implementing
U.S. DOL regulations, "Labor Standards Provisions Applicable to Contracts Governing Federally
Financed and Assisted Construction (also Labor Standards Provisions Applicable to Non-
construction Contracts Subject to the Contract Work Hours and Safety Standards Act)," 29 C.F.R.
Part 5;

    (2) Contract Work Hours and Safety Standards Act, as amended, 40 U.S.C. §§ 3701 et seq.,
specifically, the wage and hour requirements of section 102 of that Act at 40 U.S.C. § 3702, and
implementing U.S. DOL regulations, "Labor Standards Provisions Applicable to Contracts
Governing Federally Financed and Assisted Construction (also Labor Standards Provisions
Applicable to Non-construction Contracts Subject to the Contract Work Hours and Safety Standards
Act)," 29 C.F.R. Part 5; and the safety requirements of section 107 of that Act at 40 U.S.C. § 3704,
and implementing U.S. DOL regulations, "Safety and Health Regulations for Construction,"
29 C.F.R. Part 1926; and

    (3) Copeland "Anti-Kickback" Act, as amended, 18 U.S.C. § 874, and implementing U.S. DOL
regulations, "Contractors and Subcontractors on Public Building or Public Work Financed in Whole
or in part by Loans or Grants from the United States," 29 C.F.R. Part 3.

b. Activities Not Involving Construction. The Contractor agrees to comply, and assures the
compliance of each third party contractor and each subcontractor at any tier of the Project, with the
employee protection requirements for non-construction employees of the Contract Work Hours and
Safety Standards Act, as amended, 40 U.S.C. §§ 3701 et seq., in particular with the wage and hour
requirements of section 102 of that Act at 40 U.S.C. § 3702, and with U.S. DOL regulations, "Labor
Standards Provisions Applicable to Contracts Governing Federally Financed and Assisted
Construction (also Labor Standards Provisions Applicable to Non-construction Contracts Subject to
the Contract Work Hours and Safety Standards Act)," 29 C.F.R. Part 5.

c. Activities Involving Commerce. The Contractor agrees that the Fair Labor Standards Act,
29 U.S.C. §§ 201 et seq., applies to employees performing Project work involving commerce.

d. Public Transportation Employee Protective Arrangements. If the Grant Agreement or
Cooperative Agreement for the Project indicates that public transportation employee protective
arrangements required by U.S. DOL apply to public transportation operations performed in
connection with the Project, the Contractor agrees to comply with the applicable requirements for its
Project as follows:

               (1.) Standard Public Transportation Employee Protective Arrangements. To the
extent that the Project involves public transportation operations and as required by Federal law,
Contractor agrees to implement the Project in accordance with the terms and conditions that the

                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 71 of 241
U.S. Secretary of Labor has determined to be fair and equitable to protect the interests of any
employees affected by the Project and that comply with the requirements of 49 U.S.C. § 5333(b),
and with the U.S. DOL guidelines, "Section 5333(b), Federal Transit Law," 29 C.F.R. Part 215 and
any amendments thereto. These terms and conditions are identified in U.S. DOL's certification of
public transportation employee protective arrangements to FTA. Contractor agrees to implement
the Project in accordance with the conditions stated in that U.S. DOL certification. That certification
and any documents cited therein are incorporated by reference and made part of the Contract. The
requirements of this subsection do not apply to Projects for elderly individuals or individuals with
disabilities that are authorized by 49 U.S.C. § 5310(a)(2) or subsection 3012(b) of SAFETEA-LU, or
to Projects for nonurbanized areas authorized by 49 U.S.C. § 5311; separate requirements for
those Projects are contained in Subsections 40.2 and 40.3, respectively, of the Contract.

                (2.)   Public Transportation Employee Protective Arrangements for Elderly
Individuals and Individuals with Disabilities for the Elderly Individuals and Individuals with
Disabilities Formula Program and Pilot Program. To the extent that the U.S. Secretary of
Transportation has determined or determines in the future that employee protective arrangements
required by 49 U.S.C. § 5333(b) are necessary or appropriate for a governmental authority
subcontractor participating a Project authorized by 49 U.S.C. § 5310(b)(2) or subsection 3012(b) of
SAFETEA-LU, 49 U.S.C. § 5310 note, Contractor agrees to carry out the Project in compliance with
the terms and conditions determined by the U.S. Secretary of Labor necessary to comply with the
requirements of 49 U.S.C. § 5333(b), and the U.S. DOL guidelines, "Section 5333(b), Federal
Transit Law," at 29 C.F.R. Part 215, and any amendments thereto. These terms and conditions are
identified in the U.S. DOL's certification of public transportation employee protective arrangements
to FTA. Contractor agrees to implement the Project in compliance with the conditions stated in that
U.S. DOL certification.    That U.S. DOL certification and any documents cited therein are
incorporated by reference and made part of the Contract.

               (3.) Public Transportation Employee Protective Arrangements for Projects in Non-
urbanized Areas Authorized by 49 U.S.C. § 5311. Contractor agrees to comply with the terms and
conditions of the Special Warranty for the Non-urbanized Area Program agreed to by the
U.S. Secretaries of Transportation and Labor, dated May 31, 1979, U.S. DOL implementing
procedures, and any revisions thereto.

49. INCORPORATION OF FEDERAL TRANSIT ADMINISTRATION TERMS

The preceding provisions include, in part, certain Standard Terms and Conditions required by DOT,
whether or not expressly set forth in the preceding contract provisions. All contractual provisions
required by DOT, as set forth in FTA Circular 4220.1F, dated November 1, 2008, and are hereby
incorporated by reference. Anything to the contrary herein notwithstanding, all FTA mandated
terms shall be deemed to control in the event of a conflict with other provisions contained in this
Agreement. The Contractor shall not perform any act, fail to perform any act, or refuse to comply
with any RTA requests which would cause RTA to be in violation of the FTA terms and conditions.

50. SCHOOL AND CHARTER BUS REQUIREMENTS (Applies to operational service
    contracts).

      50.1 Charter Service Operations: Contractor agrees to comply with 49 U.S.C. 5323(d)
and 49 CFR Part 604, which provides that contractors and subcontractors of FTA assistance

                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 72 of 241
(including Contractor) are prohibited from providing charter service using federally funded
equipment or facilities if there is at least one private charter operator willing and able to provide the
service, except under one of the exceptions at 49 CFR 604.9. Any charter service provided under
one of the exceptions must be "incidental," i.e., it must not interfere with or detract from the
provision of mass transportation.

        50.2 School Bus Operations: Contractor agrees to comply with 49 U.S.C. 5323(f) and 49
CFR Part 605, which provides that contractors and subcontractors of FTA assistance (including
Contractor) may not engage in school bus operations exclusively for the transportation of students
and school personnel in competition with private school bus operators unless qualified under
specified exemptions. When and if operating exclusive school bus service under an allowable
exemption, Contractor may not use federally funded equipment, vehicles, or facilities.

51. ROLLING STOCK ASSIGNABILITY CLAUSE.

        51.1 Method of Acquisition. In compliance with 49 U.S.C. Section 5325(f), the contractor
agrees that any third party contract award it makes for rolling stock will be based on initial capital
costs, or on performance, standardization, life cycle costs, and other factors, or on a competitive
procurement process.

        51.2 Multi-year Options. In accordance with 49 U.S.C. Section 5325 (e) (1), a contractor
procuring rolling stock financed with Federal assistance under 49 U.S.C. Chapter 53 may not enter
into a multi-year contract to purchase additional rolling stock and replacement parts with options
exceeding five (5) years after the date of the original contract.


        51.3 Pre-Award and Post Delivery Requirements. The contractor agrees to comply with
the requirements of 49 U.S.C. Section 5323 (m) and FTA regulations, “Pre-Award and Post-
Delivery Audits of Rolling Stock Purchases,” 49 C.F.R. Part 663 and any amendments thereto.

        51.4 Bus Testing. To the extent applicable, the contractor agrees to comply with the
requirements of 49 U.S. C. Section 5318(e) and FTA regulations. “Bus Testing,” 49 C.F.R. Part 665,
and any amendments to those regulations that may be promulgated.

52. SPECIAL NOTIFICATION REQUIREMENTS FOR STATES.

To the extent required by Federal law, the State agrees that, in administering any Federal
assistance Program or Project supported by the underlying Grant Agreement or Cooperative
Agreement, any request for proposals, solicitation, grant application, form, notification, press
release, or other publication involving the distribution of FTA assistance for the Program or the
Project shall indicate that FTA is the Federal agency that is providing the Federal assistance, the
Catalog of Federal Domestic Assistance Number of the program from which the Federal
Assistance is authorized, as may be applicable, and the amount of Federal assistance FTA
provided.




                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                          Page 73 of 241
53. TEXTING WHILE DRIVING AND DISTRACTED DRIVING

        Consistent with Executive Order No. 13513, “Federal Leadership on Reducing Text
Messaging While Driving,” October 1, 2009, 23 U.S.C. Section 402 note, and DOT Order 3902.10,
“Text Messaging While Driving,” December 30, 2009, FTA encourages each third party contractor
to promote policies and initiatives for its employees and other personnel that adopt and promote
safety policies that to decrease crashes by distracted drivers, including policies to ban text
messaging while driving, and to include this provision in each third party subcontract involving the
project.




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 74 of 241
                         SPECIAL PROVISIONS CONCERNING
                      DISADVANTAGED BUSINESS ENTERPRISES
                             (Federally-Funded Project)

        As used in these Special Provisions, the term “RTA” shall refer to the Regional
        Transportation Authority in Corpus Christi, Texas, the term “Contractor” shall
        refer to the bidders and successful contractor named in the Contract to which
        these Special Provisions are attached, and the term “FTA” shall refer to the
        Federal Transit Administration.

1.     DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION.

This project is subject to Title 49, C.F.R. Part 26 entitled “Participation by Minority Business
Enterprises in Department of Transportation Programs.” Portions of the Regulations (which
are incorporated in their entirety by this reference) are set forth in these Special
Instructions.

2.     DEFINITIONS.

For purposes of these instructions:

       2.1    “Disadvantaged Business Enterprise (DBE)” means a for-profit small business
       concern which is at least 51 percent owned by one or more individuals who are both
       socially and economically disadvantaged, or in the case a corporation in which at
       least 51 percent of the stock of which is owned by one or more such individuals; and
       whose management and daily business operations are controlled by one or more of
       the socially and economically disadvantaged individuals who own it.

       2.2     “Small business concern” means a small business as defined in Section 3 of
       the Small Business Act (15 U.S.C. Section 632) and Small Business Administration
       regulations implementing it (13 C.F.R. Part 121) that also does not exceed $22.41
       million in average gross receipts over the previous three fiscal years.

       2.3    “Socially and economically disadvantaged individuals” are presumed to
       include United States citizen (or lawfully admitted permanent resident) who the RTA
       determines to be a socially and economically disadvantaged individual on a case-by-
       case basis or any members of the following groups which are rebuttably presumed
       to be socially and economically disadvantaged:          Black Americans, Hispanic
       Americans, Native Americans (Indians, Eskimos, Aleuts or Native Hawaiians),
       Asian-Pacific Americans, Subcontinent Asian Americans, women or any individuals
       found to be disadvantaged by the Small Business Administration pursuant to Section
       8(a) of the Small Business Act.



                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 75 of 241
3.    DBE PARTICIPATION.

The DBE participation goal for this Contract is that percentage of the total Contract Price
set forth in the Bid Documents.

4.    DBE PARTICIPATION CRITERIA.

      4.1    DBE participation includes contracts (other than employee contracts) with
      DBEs for any goods or services specifically required for the completion of the work
      under this Contract. A DBE may participate as a prime contractor, subcontractor,
      joint venture partner with a prime subcontractor, vendor of material or supplies
      incorporated or expended in the work, or a supplier of other services such as
      shipping, transportation, testing, equipment rental, insurance services and other
      support services necessary to fulfill the requirements of this Contract.

      4.2    A DBE joint venture partner must be responsible for a clearly defined portion
      of the work to be performed in addition to satisfying requirements for ownership and
      control. The DBE joint venturer must submit information for determining joint
      venture eligibility.

      4.3     A DBE must perform a commercially useful function, i.e., must be responsible
      for the execution of a distinct element of work and must carry out its responsibility by
      actually performing, managing and supervising the work.

      4.4    DBE participants will be counted toward meeting the goal set herein as
      follows:

             4.4.1 The total dollar value of that portion of the work under the Contract that
             is performed by the Contractor’s own forces if the Contractor is DBE. If the
             Contractor is a joint venture, only the proportionate interest of the DBE in the
             joint venture will be counted toward the goal.

             4.4.2 The dollar value of all DBE subcontracts for work or services under the
             Contract.

             4.4.3 The dollar value of material or supplies purchased from a DBE
             manufacturer for such material or supplies.

             4.4.4 Sixty percent of the dollar value of material or supplies purchased from
             a DBE regular dealer. A regular dealer is a firm that owns, operates, or
             maintains a store, warehouse or other establishment in which the material or
             supplies required for the performance of the Contract are brought, kept in
             stock, and regularly sold to the public in the usual course of business. To be
             a regular dealer, the firm must engage in, as its principal business, and in its

                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 76 of 241
           own name, the purchase and sale of the products in question. A regular
           dealer in such bulk items as steel, cement, stone, gravel and petroleum
           products need not keep such products in stock if it owns or operates
           distribution equipment. Brokers and packagers shall not be regarded as
           manufacturers or regular dealers.

           4.4.5 Fees or commissions charged for providing a bona fide service and
           assistance in the procurement of essential personnel, facilities, equipment,
           material or supplies required for performance of the Contract, delivery of
           material and supplies required on a job site, or for providing any bonds or
           insurance specifically required for the performance of the Contract, provided
           that such fees or commissions are reasonable and not excessive as
           compared with fees or commissions customarily allowed for similar services.

5.   DBE INFORMATION.

     5.1     The following information shall also be submitted pursuant to the Contract,
     within five (5) business days following the written notice:

           5.1.1 A completed Schedule A – Application for Certification for each
           business not currently certified by the RTA as a DBE.

           5.1.2 A completed Schedule B – Joint Venture Eligibility Form for each DBE
           joint venture.

           5.1.3 A completed Schedule C - DBE participation Form, with the names of
           DBEs to be used and a description of the work, services or supplies to be
           provided by each and the dollar value of each DBE transaction. (Note: DBEs
           listed on the DBE Participation Form may also be required to be listed in the
           designation of subcontractors form if both forms are required by the Contract
           documents).

     5.2     Sample forms can be obtained from the RTA’s Department of Contract
     Compliance located at 5658 Bear Lane, Corpus Christi, Texas 78405, telephone
     (361) 289-2712. Businesses not meeting the definitions set out in Section 2 and the
     criteria for participation in Section 4 will not be counted toward meeting the goal.

     5.3     A Contractor whose Schedule C – DBE Participation Form indicates that the
     DBE goal has not been met, must submit a written report with supporting
     documentation covering all actions listed in Section 6 taken by the Contractor prior
     to bid submission to meet the goal.

     5.4   The RTA may request additional information following its review, which shall
     be submitted by the Contractor within five days of the request.

                                  IFB NO. 2011-FC-05
                ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                     Page 77 of 241
      5.5    CONTRACTOR IS WARNED that failure to comply with the requirements of
      this Section within the times prescribed may, unless a later time is authorized by the
      RTA, result in rejection of a bid or termination of the Contract.

6.    GOOD FAITH EFFORTS TO MEET THE DBE GOAL.

Good faith efforts are those that, given all relevant circumstances, a Contractor actively and
aggressively seeking to meet the goal would make. Contractor is encouraged to attend any
pre-bid meeting listed in the Notice to Bidder scheduled by the RTA to inform DBEs of
subcontracting opportunities for the DBE program requirements for the Contract. Any
Contractor who does not attend the pre-bid meeting assumes responsibility to be fully
informed as to the DBE program requirements pertaining to the Contract. In determining
whether sufficient good faith efforts have been made, the RTA will consider on the basis of
documentation submitted by the Contractor whether the following actions have been taken:

      6.1     Advertisements soliciting sub-bids on this Contract from DBEs in the Corpus
      Christi Caller Times and local minority and women trade association publications.

      6.2     Solicitation of interest in this Contract from DBEs evidenced by copies of
      registered or certified letters to relevant listed DBEs or to a reasonable number of
      certifiable DBEs in sufficient time to allow the DBEs to participate effectively;

      6.3    Follow-up of initial solicitation of DBE interest;

      6.4     Identification of portions of work to be performed by DBEs in order to increase
      the likelihood of meeting the goals (including, where appropriate, breaking down the
      work into economically feasible units to facilitate DBE participation);

      6.5   Records of responses, proposals and/or bids received from DBEs for specific
      sub-bids including:

             6.5.1 The names, addresses and telephone numbers of all DBEs contacted:

             6.5.2 A description of the information provided to DBEs regarding the plans
             and specification for portions for the work to be performed;

             6.5.3 The reasons for rejection of any DBE sub-bids submitted to Contractor;

             6.5.4 A description of the investigation conducted of any DBEs rejected as
             unqualified.

      6.6    Description of assistance provided to DBEs relative to obtaining plans,
      specifications, and required bonding or insurance;

                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 78 of 241
      6.7    Description of the use made by Contractor of the services of available
      minority community organizations, minority contractors groups, and information
      services such as those provided by the RTA through the Department of Contract
      Compliance, telephone (361) 289-2712, concerning available certifiable DBEs for
      work under the Contract. Contractor’s efforts may be deemed insufficient by the
      RTA if Contractor has failed to make any of the foregoing efforts or has rejected
      DBE sub-bids without adequate reasons. Price alone will not be considered an
      adequate reason. Contractor shall also include in the report submitted under this
      Section any other efforts made not listed above which are relevant to meeting the
      DBE goals.

7.    CERTIFICATION REVIEW COMMITTEE.

Article I.     The RTA has established a DBE Certification Review Committee consisting of
the following persons for the purpose of hearing appeals or challenges concerning the
certification of DBEs under the program:

      DBE Officer (Chair);
      Director of Capital Projects and Facilities Maintenance;
      Contracts & Grants Manager;
      General Legal Counsel.

8.    HEARING ON GOOD FAITH EFFORTS DETERMINATION.

If it appears to the RTA that Contractor has neither achieved the indicated percentage of
DBE participation nor made sufficient good faith efforts to meet the goal, Contractor will be
notified that this Contract will be recommended for termination and the reasons therefore.
Within five days of such notification, Contractor may request a hearing. Such hearing will
be held at the convenience of the RTA but no later than ten days after receipt of the
request and in accordance with the RTA’s Hearing Procedures, copies of which are
available upon request. At such hearing Contractor shall bear the burden of demonstrating:

      8.1    Achievement of the percentage goal for DBE participation, or

      8.2   Good faith effort that, given all relevant circumstances, could have been
      expected to produce a level of DBE participation to meet the Contract goal.

9.    CHALLENGE PROCEDURE.

To challenge the eligibility of a firm that the RTA has certified as a DBE, a third party may
present evidence that the firm’s owners are not truly socially and/or economically
disadvantaged, even though they are members of one of the presumptive groups. The
Challenge Procedure is as follows:

                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 79 of 241
9.1     Any third party may challenge the socially and economically disadvantaged
status of any individual (except an individual who has current 8(a) certification from
the Small Business Administration) presumed to be socially and economically
disadvantaged if that individual is an owner of a firm certified by or seeking
certification from the RTA as a disadvantaged business. The challenge shall be
made in writing to the RTA. With its letter, the challenging party shall include all
information available to it relevant to a determination of whether the challenged party
is in fact socially and economically disadvantaged.

9.2    The RTA shall determine, on the basis of the information provided by the
challenging party, whether there is reason to believe that the challenged party is in
fact not socially and economically disadvantaged. In implementing this challenge
procedure, the DBE Certification Review Committee identified herein will review
information and make the determination of the social and economic disadvantage of
the challenged party on behalf of the RTA. If the RTA determines that there is no
reason to believe that the challenged party is not socially and economically
disadvantaged, the RTA shall so inform the challenging party in writing. This finding
terminates the proceeding. If the RTA determines that there is reason to believe that
the challenged party is not socially and economically disadvantaged, the RTA shall
begin a proceeding as provided in the following subsections.

9.3    The RTA shall notify the challenged party in writing that his or her status as a
socially and economically disadvantaged individual has been challenged. The
notice shall identify the challenging party and summarize the grounds for the
challenge. The notice shall also require the challenged party to provide the RTA
within a reasonable time information sufficient to permit it to evaluate his or her
status as a socially and economically disadvantaged individual.

9.4    The RTA shall evaluate the information available to it and make a proposed
determination of the social and economic disadvantage of the challenged party. The
RTA shall notify both parties of this proposed determination, in writing, setting forth
the reasons for its proposal. The RTA shall provide an opportunity to the parties for
an informal hearing, at which they can respond to this proposed determination in
writing and in person.

9.5   Following the informal hearing, the RTA shall make a final determination. The
RTA shall inform the parties in writing of the final determination, setting forth the
reasons for its decision.

9.6     During the pendency of a challenge under this attachment, the presumption
that the challenged party is a socially and economically disadvantaged individual
shall remain in effect.


                             IFB NO. 2011-FC-05
           ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                Page 80 of 241
      9.7    The final determination of the RTA may be appealed to the Department of
      Transportation by the adversely affected party under the procedures of 49 CFR
      23.55.

      10.    APPEALS.

      10.1 Any firm which believes that it has been wrongly denied certification as a DBE
      or joint venture by the RTA may file an appeal in writing, signed and dated, with the
      Department of Transportation. The appeal shall be filed no later than 180 days after
      the date of denial of certification. The Secretary of Transportation may extend the
      time for filing or waive the time limit in the interest of justice, specifying in writing the
      reasons for so doing. Third parties who have reason to believe that another firm has
      been wrongly denied or granted certification as a DBE or joint venture may advise
      the Secretary. This information is not considered an appeal pursuant to this Section.

      10.2 The Secretary shall insure that a prompt investigation is made pursuant to
      prescribed DOT Title VI investigation procedures. The Secretary may at his/her
      discretion deny the DBE or joint venture in question eligibility to participate as a DBE
      in DOT-assisted contracts let during the pendency of the investigation after providing
      the DBE or joint venture in question an opportunity to show cause by written
      statement to the Secretary why this temporary denial by the Secretary should not
      occur. All parties shall cooperate fully with the investigation. Failure or refusal to
      furnish requested information or other failure to cooperate is a violation of this
      procedure.

      10.3 The Secretary shall make one of the following determinations and inform the
      DBE or joint venture in writing of the reasons for the determination:

             10.3.1 The DBE or joint venture is certified, or

             10.3.2 The DBE or joint venture is not eligible and is denied eligibility to
             participate as a DBE in any contract until a new application for certification is
             approved by the RTA.

11.   SUBSTITUTION OF DBE SUBCONTRACTORS OR SUPPLIERS.

Should substitution of any DBE listed on the DBE Participation Form become necessary,
Contractor shall make good faith efforts, in cooperation with the RTA’s staff, to replace the
affected DBE with another DBE.

12.   CHANGE ORDERS.

Contractor shall make good faith efforts to meet the DBE percentage goal set out herein in
the performance of work under any change orders that may be issued under this Contract.

                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 81 of 241
13.    DBE RECORDS.

Contractor shall maintain sufficient records to verify DBE participation. Such records shall
show the name and business address of each DBE participating in the Contract and the
total dollar amount actually paid each DBE and the date of payment. A quarterly report
based on these records and certified to be correct by Contractor shall be submitted with the
appropriate monthly invoice required under the Contract. RTA reserves the right to
withhold any invoice for payment unless the current report has been furnished.

14.    NONCOMPLIANCE.

Failure to comply with the requirements of these provisions shall be grounds for termination
of the Contract in whole or in part, for withholding payments due Contractor during the
period of noncompliance, or for assessing liquidated damages as provided herein.

15.    LIQUIDATED DAMAGES.

Article II.    In the event Contractor fails to achieve the DBE participation goals set forth
herein, the RTA may assess, as liquidated damages and not as a penalty, an amount equal
to the difference in the final DBE percentage goal multiplied by the total Contract price from
the actual dollar amount of documented DBE participation in the Contract. The above
liquidated damages may be assessed since the calculation of actual damages to the RTA
would be difficult to determine due to the potential loss of all or part of any federal funding
available to the RTA and the costs and expenses incurred in administering the RTA’s DBE
program.

16.    INCORPORATION INTO CONTRACT.

The terms and conditions of these Special Provisions are incorporated into the Contract as
part of the Contract Documents and upon acceptance of the Contractor’s proposal shall be
fully binding upon the Contractor.




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 82 of 241
                                          Appendix A
                                       PRICE SCHEDULE

IFB NO.: 2011-FC-05                       FIRM: __________________________
ARRA ADA Bus Stop Improvements Phase II Zone 1 – 3

INSTRUCTIONS:

1)      Refer to "General Instructions" before completing Price Schedule and quote your
        best price.

2)      Submit one (1) signed original and Three (3) copies of this Price Schedule to
        5658 Bear Lane, Corpus Christi, Texas 78405.

3)      Sealed Bids should be submitted in an envelope marked on the outside containing
        the bidder’s name and address and bid description addressed as required in the
        “Instructions to Bidders”, Section 5.0.

        Bids must be submitted in sufficient time to be received and time-stamped at the
        above location on or before the published due date and time shown on the Invitation
        for Bids. Bids received after the published time and date cannot be considered. Any
        bids which are mislabeled or do not indicate the BIDDER’s name or address as
        required above may be opened by the RTA solely for the purpose of identifying the
        BIDDER for return of the bid.

     4) The bids will be publicly opened and read aloud at the RTA Offices, 5658 Bear
        Lane, Corpus Christi, Texas immediately following the deadline. All interested
        parties are invited to attend. Once bids have been read aloud publicly,
        information related to tabulations/prices will not be given via phone, fax or any
        other communication until after the recommendation is approved by the Board
        of Directors.

     5) Bid items that contain a “zero dollars” notation for unit price and total price do not
        apply to this project.

     6) “Utility Box Adjustment” includes any utility box that has to be adjusted to
        accommodate the proposed concrete surface elevation.

     7) “Demolition of Existing Sidewalk” quantity includes existing bus stop concrete area.

     8) Pricing for crosswalk striping shall include removal of old striping and installation of
        new quantities.


                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 83 of 241
The undersigned BIDDER proposes and agrees, if this Bid is accepted, to contract with the
Owner to furnish all work in accordance with the attached specification and drawing,
according to the following unit prices:

                               BASE BID – ZONE 1 (RVE)
                                    APPENDIX A
                                  PRICE SCHEDULE

                                        BASE BID

1.     2,037 SF            NEW RAMP SECTION, (including excavation, backfill, bedding,
                           expansion joints, dowels, truncated dome detectable surface and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

2.     1,953 SF            NEW LANDING SECTION, (including excavation, backfill,
                           bedding, expansion joints, dowels, truncated dome detectable
                           surface and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

3.     7,655 SF            NEW CONCRETE SHELTER PAD, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 84 of 241
4.    9,752 SF             NEW SIDEWALK SECTION, (including excavation, backfill,
                           bedding, dowels, and reinforcement), as shown on the plans and
                           as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


5.     1,595 LF            NEW CURB & GUTTER, (including backfill, bedding, expansion
                           joints, dowels, and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


6.     0      SF           NEW DRIVEWAY, (including excavation, backfill, bedding,
                           expansion joints, dowels, concrete, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


7.     16,270 SF           DEMOLITION OF EXISTING SIDEWALK, (including demolition
                           and removal, protection of the public), as shown on the plans and
                           as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)             Total Price (Figures in Written Words)



                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 85 of 241
8.     1,595 LF     DEMOLITION OF EXISTING CURB & GUTTER, (including demolition
and removal, protection of the public), as shown on the plans and as outlined in the
specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


9.     0      LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


10.    1,595 LF            SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


11.    3,190 SF            PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                           shown on the plans and as outlined in the specifications, complete
                           in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 86 of 241
12.    381    LF           6” HEADER CURB, (including excavation, backfill, bedding,
                           expansion joints, dowels, and reinforcement), as shown on the
                           plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


13.      0    EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


14.      0    EA           WATER METER ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


15.      8    EA           UTILITY BOX ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 87 of 241
16.        9      EA           SIGN POST RELOCATION, as shown on the plans, complete in
                               place.

$                              $
Unit Price (Figures)           Unit Price (Figures in Written Words)

$                              $
Total Price (Figures)          Total Price (Figures in Written Words)


17.        0 LF                12” WHITE STRIPING, as shown on the plans and as outlined in
                               the specifications, complete in place.

$      0                       $      Zero dollars
Unit Price (Figures)           Unit Price (Figures in Written Words)

$      0                       $      Zero dollars
Total Price (Figures)          Total Price (Figures in Written Words)


18.        0 LF                24” WHITE STRIPING, as shown on the plans and as outlined in
                               the specifications, complete in place.

$      0                       $      Zero dollars
Unit Price (Figures)           Unit Price (Figures in Written Words)

$      0                       $      Zero dollars
Total Price (Figures)          Total Price (Figures in Written Words)


19.    0       SF              NEW CONCRETE BUS PAD, (including excavation, backfill,
                               bedding, expansion joints, dowels, and reinforcement), as shown
                               on the plans and as outlined in the specifications, complete in
                               place.

$      0                       $      Zero dollars
Unit Price (Figures)           Unit Price (Figures in Written Words)

$      0                       $      Zero dollars
Total Price (Figures)          Total Price (Figures in Written Words)




                                         IFB NO. 2011-FC-05
                       ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                            Page 88 of 241
20.    0       LF           NEW THICKENED EDGE SIDEWALK SECTION, (including
                            excavation, backfill, bedding, dowels, and reinforcement), as
                            shown on the plans and as outlined in the specifications, complete
                            in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


21.    0       LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.
$      0                    $       Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


22.    0       LF           NEW SIDEWALK DRAIN CROSSING, (including dowels, metal
                            hot dipped galvanized diamond plate, slope no less than (1%) and
                            reinforcement)as shown on the plans and as outlined in the
                            specifications, complete in place.
$      0                    $       Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


23.        0   LF           NEW 1' HEADER CURB (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.
$      0                    $       Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 89 of 241
24.    0   SF                DEMOLITION OF PAVEMENT, (including demolition, removal,
                             protection of the public, removal of base,) as shown on the plans
                             and as outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)

25.    0        SF           DEMOLITION OF EXISTING CONCRETE SHELTER PAD,
                             (including demolition and removal, protection of the public
                             concrete over 5" thick with thickened edge or beam only at plan
                             specified locations), as shown on the plans and as outlined in the
                             specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)

26.    0 EA                  RELOCATE EXISTING FIRE HYDRANT ASSEMBLY, (including
                             removal, plug on existing line, all additional fittings as outlined in
                             the city specs, and reinstallation), as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)               Total Price (Figures in Written Words)

27.    0        EA           REMOVE AND DISPOSE OF EXISTING FIRE HYDRANT
                             ASSEMBLY, INSTALL NEW FIRE HYDRANT ASSEMBLY
                             (including removal, plug on existing line, all additional fittings as
                             outlined in the city specs, and reinstallation), as shown on the
                             plans and as outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)

                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                          Page 90 of 241
28.    0       LS           METAL FENCING ADJUSTMENT, (including removal, and
                            reinstallation), as shown on the plans and as outlined in the
                            specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


29.        1   LS           TRAFFIC CONTROL PLAN, as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


30.        1   LS           IRRIGATION SYSTEM ADJUSTMENT, as shown on the plans
                            and as outlined in the specifications, complete in place.

$ 5,000                     $      Five Thousand Dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$ 5,000                     $      Five Thousand Dollars
Total Price (Figures)       Total Price (Figures in Written Words)


31.        1   LS           BETTERMENT FUND, as outlined in the specifications.

$ 10,000                    $      Ten Thousand Dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$ 10,000                    $      Ten Thousand Dollars
Total Price (Figures)              Total Price (Figures in Written Words




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 91 of 241
                    TOTAL BASE BID PRICE, Items 1 through 31

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)

THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE BASE BID WITHIN 120
CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.


               ADDITIVE BID ITEM NO. 1 (SHEET 34) - NOT IN CONTRACT


               ADDITIVE BID ITEM NO. 2 (SHEET 35) - NOT IN CONTRACT

                           ADDITIVE BID ITEM NO. 3 (SHEET 36)

1.     150     SF           NEW RAMP SECTION, (including excavation, backfill, bedding,
                            expansion joints, dowels, truncated dome detectable surface and
                            reinforcement), as shown on the plans and as outlined in the
                            specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)

2.     76      SF           NEW LANDING SECTION, (including excavation, backfill,
                            bedding, expansion joints, dowels, and reinforcement), as shown
                            on the plans and as outlined in the specifications, complete in
                            place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 92 of 241
3.     150    SF            NEW CONCRETE SHELTER PAD, (including excavation,
                            backfill, bedding, expansion joints, beams, dowels, and
                            reinforcement), as shown on the plans and as outlined in the
                            specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)              Total Price (Figures in Written Words)


4.    350          SF       NEW SIDEWALK SECTION, (including excavation, backfill,
                            bedding, dowels, and reinforcement), as shown on the plans and
                            as outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


5.     105    LF            NEW CURB & GUTTER, (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.
$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


6.     0      SF            NEW DRIVEWAY, (including excavation, backfill, bedding,
                            expansion joints, dowels, concrete, and reinforcement), as shown
                            on the plans and as outlined in the specifications, complete in
                            place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)

                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 93 of 241
7.     746    SF           DEMOLITION OF EXISTING SIDEWALK, (including demolition
                           and removal, protection of the public), as shown on the plans and
                           as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

8.     105    LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


9.     0      LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)             Total Price (Figures in Written Words)

10.    105    LF           SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 94 of 241
11.    210      SF           PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                             shown on the plans and as outlined in the specifications, complete
                             in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


12.    15       LF           6” HEADER CURB, (including excavation, backfill, bedding,
                             expansion joints, dowels, and reinforcement), as shown on the
                             plans and as outlined in the specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)               Total Price (Figures in Written Words)


13.         0   EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)


14.         0   EA           WATER METER ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)




                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                          Page 95 of 241
15.        0 EA             UTILITY BOX ADJUSTMENT, as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


16.        0   EA           SIGN POST RELOCATION, as shown on the plans, complete in
                            place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


17.        0   LF           12” WHITE STRIPING, as shown on the plans and as outlined in
                            the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


18.        0   LF           24” WHITE STRIPING, as shown on the plans and as outlined in
                            the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


19.    0       SF           CONCRETE SHELTER PAD TYPE II, (including excavation,
                            backfill, bedding, expansion joints, beams, dowels, Slope in any
                            direction (0.5% to 1.8%) and reinforcement), as shown on the
                            plans and as outlined in the specifications, complete in place.

                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 96 of 241
$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


20.    0       LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                            joints, dowels, slope no less than (0.3%) and reinforcement), as
                            shown on the plans and as outlined in the specifications, complete
                            in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


21.    0       LF           HANDRAILS, as shown on the plans and as outlined in the
                            specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


22.        0   LF           8" RETAINING WALL (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 97 of 241
23.    0          SF        DEMOLITION OF FOUNDATION (including demolition, removal,
                            and protection of the public) as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)



24.    0 EA                 ADJUSTING EXISTING FIRE HYDRANT ASSEMBLY, (including
                            removal, and reinstallation), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


25.        1 LS             TRAFFIC CONTROL PLAN, as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)



      TOTAL ADDITIVE BID ITEM NO. 3 (SHEET 36), Items 1 through 25

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)

THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 98 of 241
                         ADDITIVE BID ITEM NO. 4 (SHEET 37)


1.     77     SF           NEW RAMP SECTION, (including excavation, backfill, bedding,
                           expansion joints, dowels, truncated dome detectable surface and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


2.     60     SF           NEW LANDING SECTION, (including excavation, backfill,
                           bedding, expansion joints, dowels, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


3.     150    SF           NEW CONCRETE SHELTER PAD, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 99 of 241
4.    139          SF       NEW SIDEWALK SECTION, (including excavation, backfill,
                            bedding, dowels, and reinforcement), as shown on the plans and
                            as outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


5.     59     LF            NEW CURB & GUTTER, (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)

6.     0      SF            NEW DRIVEWAY, (including excavation, backfill, bedding,
                            expansion joints, dowels, concrete, and reinforcement), as shown
                            on the plans and as outlined in the specifications, complete in
                            place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)

7.     494    SF            DEMOLITION OF EXISTING SIDEWALK, (including demolition
                            and removal, protection of the public), as shown on the plans and
                            as outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 100 of 241
8.     59     LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


9.     0      LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


10.    59     LF           SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

11.    118    SF           PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                           shown on the plans and as outlined in the specifications, complete
                           in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 101 of 241
12.    10       LF           6” HEADER CURB, (including excavation, backfill, bedding,
                             expansion joints, dowels, and reinforcement), as shown on the
                             plans and as outlined in the specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


13.         0   EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)



14.         0   EA           WATER METER ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)


15.         0   EA           UTILITY BOX ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)




                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 102 of 241
16.        1   EA           SIGN POST RELOCATION, as shown on the plans, complete in
                            place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


17.        0   LF           12” WHITE STRIPING, as shown on the plans and as outlined in
                            the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


18.        0   LF           24” WHITE STRIPING, as shown on the plans and as outlined in
                            the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


19.    0       SF           CONCRETE SHELTER PAD TYPE II, (including excavation,
                            backfill, bedding, expansion joints, beams, dowels, Slope in any
                            direction (0.5% to 1.8%) and reinforcement), as shown on the
                            plans and as outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 103 of 241
20.    0       LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                            joints, dowels, slope no less than (0.3%) and reinforcement), as
                            shown on the plans and as outlined in the specifications, complete
                            in place.
$      0                    $       Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


21.    0       LF           HANDRAILS, as shown on the plans and as outlined in the
                            specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)

22.        0   LF           8" RETAINING WALL (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)

23.    0        SF          DEMOLITION OF FOUNDATION (including demolition, removal,
                            and protection of the public) as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 104 of 241
24.    0 EA                 ADJUSTING EXISTING FIRE HYDRANT ASSEMBLY, (including
                            removal, and reinstallation), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


25.      1 LS               TRAFFIC CONTROL PLAN, as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


      TOTAL ADDITIVE BID ITEM NO. 4 (SHEET 37), Items 1 through 25
$
Total Price (In Figures)

$
Total Price (Figures in Written Words)

THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.




                ADDITIVE BID ITEM NO. 5 (SHEET 38) - NOT IN CONTRACT




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 105 of 241
                         ADDITIVE BID ITEM NO. 6 (SHEET 39)

1.     0      SF           NEW RAMP SECTION, (including excavation, backfill, bedding,
                           expansion joints, dowels, truncated dome detectable surface and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

2.     0      SF           NEW LANDING SECTION, (including excavation, backfill,
                           bedding, expansion joints, dowels, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

3.     270    SF           NEW CONCRETE SHELTER PAD, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

4.    388        SF        NEW SIDEWALK SECTION, (including excavation, backfill,
                           bedding, dowels, and reinforcement), as shown on the plans and
                           as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)
$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 106 of 241
5.     0      LF           NEW CURB & GUTTER, (including backfill, bedding, expansion
                           joints, dowels, and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


6.     0      SF           NEW DRIVEWAY, (including excavation, backfill, bedding,
                           expansion joints, dowels, concrete, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


7.     508    SF           DEMOLITION OF EXISTING SIDEWALK, (including demolition
                           and removal, protection of the public), as shown on the plans and
                           as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



8.     0      LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 107 of 241
9.     0      LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


10.    0      LF           SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.
$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


11.    0      SF           PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                           shown on the plans and as outlined in the specifications, complete
                           in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


12.    0      LF           6” HEADER CURB, (including excavation, backfill, bedding,
                           expansion joints, dowels, and reinforcement), as shown on the
                           plans and as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 108 of 241
13.      0    EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

14.      0    EA           WATER METER ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

15.      0 EA              UTILITY BOX ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

16.      0    EA           SIGN POST RELOCATION, as shown on the plans, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

17.      0    LF           12” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 109 of 241
18.        0   LF           24” WHITE STRIPING, as shown on the plans and as outlined in
                            the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


19.    0       SF           CONCRETE SHELTER PAD TYPE II, (including excavation,
                            backfill, bedding, expansion joints, beams, dowels, Slope in any
                            direction (0.5% to 1.8%) and reinforcement), as shown on the
                            plans and as outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


20.    0       LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                            joints, dowels, slope no less than (0.3%) and reinforcement), as
                            shown on the plans and as outlined in the specifications, complete
                            in place.
$      0                    $       Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


21.    0       LF           HANDRAILS, as shown on the plans and as outlined in the
                            specifications, complete in place.
$      0                    $       Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 110 of 241
22.        0   LF           8" RETAINING WALL (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)

23.    0        SF          DEMOLITION OF FOUNDATION (including demolition, removal,
                            and protection of the public) as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


24.    0       EA           ADJUSTING EXISTING FIRE HYDRANT ASSEMBLY, (including
                            removal, and reinstallation), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)

25.        1   LS           TRAFFIC CONTROL PLAN, as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 111 of 241
      TOTAL ADDITIVE BID ITEM NO. 6 (SHEET 39), Items 1 through 25

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)

THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.




                           ADDITIVE BID ITEM NO. 7 (SHEET 40)

1.     0       SF           NEW RAMP SECTION, (including excavation, backfill, bedding,
                            expansion joints, dowels, truncated dome detectable surface and
                            reinforcement), as shown on the plans and as outlined in the
                            specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)

2.     0       SF           NEW LANDING SECTION, (including excavation, backfill,
                            bedding, expansion joints, dowels, and reinforcement), as shown
                            on the plans and as outlined in the specifications, complete in
                            place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 112 of 241
3.     135    SF            NEW CONCRETE SHELTER PAD, (including excavation,
                            backfill, bedding, expansion joints, beams, dowels, and
                            reinforcement), as shown on the plans and as outlined in the
                            specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)

4.    241          SF       NEW SIDEWALK SECTION, (including excavation, backfill,
                            bedding, dowels, and reinforcement), as shown on the plans and
                            as outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)
$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


5.     0      LF            NEW CURB & GUTTER, (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)

6.     0      SF            NEW DRIVEWAY, (including excavation, backfill, bedding,
                            expansion joints, dowels, concrete, and reinforcement), as shown
                            on the plans and as outlined in the specifications, complete in
                            place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 113 of 241
7.     302    SF           DEMOLITION OF EXISTING SIDEWALK, (including demolition
                           and removal, protection of the public), as shown on the plans and
                           as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

8.     0      LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

9.     0      LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


10.    0      LF           SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.
$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 114 of 241
11.    0       SF           PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                            shown on the plans and as outlined in the specifications, complete
                            in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


12.    0       LF           6” HEADER CURB, (including excavation, backfill, bedding,
                            expansion joints, dowels, and reinforcement), as shown on the
                            plans and as outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)




13.        0   EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)

14.        0   EA           WATER METER ADJUSTMENT, as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 115 of 241
15.      0 EA              UTILITY BOX ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


16.      2    EA           SIGN POST RELOCATION, as shown on the plans, complete in
                           place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



17.      0    LF           12” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



18.      0    LF           24” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 116 of 241
19.    0       SF           CONCRETE SHELTER PAD TYPE II, (including excavation,
                            backfill, bedding, expansion joints, beams, dowels, Slope in any
                            direction (0.5% to 1.8%) and reinforcement), as shown on the
                            plans and as outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


20.    0       LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                            joints, dowels, slope no less than (0.3%) and reinforcement), as
                            shown on the plans and as outlined in the specifications, complete
                            in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


21.    0       LF           HANDRAILS, as shown on the plans and as outlined in the
                            specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)

22.        0   LF           8" RETAINING WALL (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.
$      0                    $       Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)



                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 117 of 241
23.    0        SF          DEMOLITION OF FOUNDATION (including demolition, removal,
                            and protection of the public) as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)

24.    0       EA           ADJUSTING EXISTING FIRE HYDRANT ASSEMBLY, (including
                            removal, and reinstallation), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)

25.        1   LS           TRAFFIC CONTROL PLAN, as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)



      TOTAL ADDITIVE BID ITEM NO. 7 (SHEET 40), Items 1 through 25

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)

THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 118 of 241
                          ADDITIVE BID ITEM NO. 8 (SHEET 41)

1.     89     SF            NEW RAMP SECTION, (including excavation, backfill, bedding,
                            expansion joints, dowels, truncated dome detectable surface and
                            reinforcement), as shown on the plans and as outlined in the
                            specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)

2.     50     SF            NEW LANDING SECTION, (including excavation, backfill,
                            bedding, expansion joints, dowels, and reinforcement), as shown
                            on the plans and as outlined in the specifications, complete in
                            place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)

3.     150    SF            NEW CONCRETE SHELTER PAD, (including excavation,
                            backfill, bedding, expansion joints, beams, dowels, and
                            reinforcement), as shown on the plans and as outlined in the
                            specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)

4.    40       SF           NEW SIDEWALK SECTION, (including excavation, backfill,
                            bedding, dowels, and reinforcement), as shown on the plans and
                            as outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)
$                           $
Total Price (Figures)       Total Price (Figures in Written Words)

                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 119 of 241
5.     72     LF           NEW CURB & GUTTER, (including backfill, bedding, expansion
                           joints, dowels, and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

6.     0      SF           NEW DRIVEWAY, (including excavation, backfill, bedding,
                           expansion joints, dowels, concrete, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

7.     318    SF           DEMOLITION OF EXISTING SIDEWALK, (including demolition
                           and removal, protection of the public), as shown on the plans and
                           as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

8.     74     LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 120 of 241
9.     0        LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                             on the plans and as outlined in the specifications, complete in
                             place.
$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)

10.    74       LF           SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                             the plans and as outlined in the specifications, complete in place.
$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)

11.    148      SF           PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                             shown on the plans and as outlined in the specifications, complete
                             in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)               Total Price (Figures in Written Words)

12.    0        LF           6” HEADER CURB, (including excavation, backfill, bedding,
                             expansion joints, dowels, and reinforcement), as shown on the
                             plans and as outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)

13.         0   EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)
$      0                     $      Zero dollars
Total Price (Figures)               Total Price (Figures in Written Words)

                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 121 of 241
14.      0    EA           WATER METER ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

15.      0    EA           UTILITY BOX ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

16.      0    EA           SIGN POST RELOCATION, as shown on the plans, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

17.      0    LF           12” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

18.      0 LF              24” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)
$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 122 of 241
19.    0       SF           CONCRETE SHELTER PAD TYPE II, (including excavation,
                            backfill, bedding, expansion joints, beams, dowels, Slope in any
                            direction (0.5% to 1.8%) and reinforcement), as shown on the
                            plans and as outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


20.    0       LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                            joints, dowels, slope no less than (0.3%) and reinforcement), as
                            shown on the plans and as outlined in the specifications, complete
                            in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)

21.    0       LF           HANDRAILS, as shown on the plans and as outlined in the
                            specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)

22.        0   LF           8" RETAINING WALL (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)



                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 123 of 241
23.    0          SF        DEMOLITION OF FOUNDATION (including demolition, removal,
                            and protection of the public) as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)              Total Price (Figures in Written Words)

24.    0 EA                 ADJUSTING EXISTING FIRE HYDRANT ASSEMBLY, (including
                            removal, and reinstallation), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


25.        1 LS             TRAFFIC CONTROL PLAN, as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


      TOTAL ADDITIVE BID ITEM NO. 8 (SHEET 41), Items 1 through 25

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 124 of 241
                                         BID SUMMARY

                    TOTAL BASE BID PRICE, Items 1 through 31
$
Total Price (In Figures)
$
Total Price (Figures in Written Words)

               TOTAL ADDITIVE BID ITEM NO. 1 (SHEET 34) - NOT IN CONTRACT

               TOTAL ADDITIVE BID ITEM NO. 2 (SHEET 35) - NOT IN CONTRACT

                TOTAL ADDITIVE BID ITEM NO. 3 (SHEET 36), Items 1 through 25

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)


                TOTAL ADDITIVE BID ITEM NO. 4 (SHEET 37), Items 1 through 25

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)


               TOTAL ADDITIVE BID ITEM NO. 5 (SHEET 38) - NOT IN CONTRACT

                TOTAL ADDITIVE BID ITEM NO. 6 (SHEET 39), Items 1 through 25

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)

                TOTAL ADDITIVE BID ITEM NO. 7 (SHEET 40), Items 1 through 25

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 125 of 241
                TOTAL ADDITIVE BID ITEM NO. 8 (SHEET 41), Items 1 through 25

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)


THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.

Signed by: _________________________________
             Print Name

Signature: _________________________________

Date:_____________________________________




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 126 of 241
The undersigned BIDDER proposes and agrees, if this Bid is accepted, to contract with the
Owner to furnish all work in accordance with the attached specification and drawing,
according to the following unit prices:
                               BASE BID – ZONE 2 (Naismith)
                                      APPENDIX A
                                     PRICE SCHEDULE


                                        BASE BID


1.     860    SF           NEW RAMP SECTION, (including excavation, backfill, bedding,
                           expansion joints, dowels, truncated dome detectable surface and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

2.     1,270 SF            NEW LANDING SECTION, (including excavation, backfill,
                           bedding, expansion joints, dowels, truncated dome detectable
                           surface and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

3.     5,690 SF            NEW CONCRETE SHELTER PAD, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)             Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 127 of 241
4.    5,900 SF             NEW SIDEWALK SECTION, (including excavation, backfill,
                           bedding, dowels, and reinforcement), as shown on the plans and
                           as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


5.     770    LF           NEW CURB & GUTTER, (including backfill, bedding, expansion
                           joints, dowels, and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


6.     0      SF           NEW DRIVEWAY, (including excavation, backfill, bedding,
                           expansion joints, dowels, concrete, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


7.     7,570 SF            DEMOLITION OF EXISTING SIDEWALK, (including demolition
                           and removal, protection of the public), as shown on the plans and
                           as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 128 of 241
8.     920    LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


9.     500    LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


10.    1,235 LF            SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


11.    3,030 SF            PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                           shown on the plans and as outlined in the specifications, complete
                           in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 129 of 241
12.    140    LF           6” HEADER CURB, (including excavation, backfill, bedding,
                           expansion joints, dowels, and reinforcement), as shown on the
                           plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


13.      0    EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


14.      0    EA           WATER METER ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


15.      0    EA           UTILITY BOX ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 130 of 241
16.      11   EA           SIGN POST RELOCATION, as shown on the plans, complete in
                           place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


17.      90 LF             12” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


18.      100 LF            24” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


19.    910    SF           NEW CONCRETE BUS PAD, (including excavation, backfill,
                           bedding, expansion joints, dowels, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 131 of 241
20.    80        LF           NEW THICKENED EDGE SIDEWALK SECTION, (including
                              excavation, backfill, bedding, dowels, and reinforcement), as
                              shown on the plans and as outlined in the specifications, complete
                              in place.

$                             $
Unit Price (Figures)          Unit Price (Figures in Written Words)

$                             $
Total Price (Figures)         Total Price (Figures in Written Words)


21.    250       LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                              joints, dowels, and reinforcement), as shown on the plans and as
                              outlined in the specifications, complete in place.
$                             $
Unit Price (Figures)          Unit Price (Figures in Written Words)

$                             $
Total Price (Figures)         Total Price (Figures in Written Words)


22.    10        LF           NEW SIDEWALK DRAIN CROSSING, (including dowels, metal
                              hot dipped galvanized diamond plate, slope no less than (1%) and
                              reinforcement)as shown on the plans and as outlined in the
                              specifications, complete in place.
$                             $
Unit Price (Figures)          Unit Price (Figures in Written Words)

$                             $
Total Price (Figures)         Total Price (Figures in Written Words)

23.         45    LF          NEW 1' HEADER CURB (including backfill, bedding, expansion
                              joints, dowels, and reinforcement), as shown on the plans and as
                              outlined in the specifications, complete in place.
$                             $
Unit Price (Figures)          Unit Price (Figures in Written Words)

$                             $
Total Price (Figures)         Total Price (Figures in Written Words)



                                        IFB NO. 2011-FC-05
                      ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                          Page 132 of 241
24.    320   SF            DEMOLITION OF PAVEMENT (Sheet 28), (including demolition,
                           removal, protection of the public, removal of base,) as shown on
                           the plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



25.    720 SF              DEMOLITION OF EXISTING CONCRETE SHELTER PAD,
                           (including demolition and removal, protection of the public
                           concrete over 5" thick with thickened edge or beam only at plan
                           specified locations), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



26.    1 EA                RELOCATE EXISTING FIRE HYDRANT ASSEMBLY, (including
                           removal, plug on existing line, all additional fittings as outlined in
                           the city specs, and reinstallation), as shown on the plans and as
                           outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 133 of 241
27.    1       EA           REMOVE AND DISPOSE OF EXISTING FIRE HYDRANT
                            ASSEMBLY, INSTALL NEW FIRE HYDRANT ASSEMBLY
                            (including removal, plug on existing line, all additional fittings as
                            outlined in the city specs, and reinstallation), as shown on the
                            plans and as outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


28.    1       LS           METAL FENCING ADJUSTMENT, (including removal, and
                            reinstallation), as shown on the plans and as outlined in the
                            specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


29.        1   LS           TRAFFIC CONTROL PLAN, as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)



30.        1   LS           IRRIGATION SYSTEM ADJUSTMENT, as shown on the plans
                            and as outlined in the specifications, complete in place.

$ 5,000                     $      Five Thousand Dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$ 5,000                     $      Five Thousand Dollars
Total Price (Figures)       Total Price (Figures in Written Words)



                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 134 of 241
31.      1     LS              BETTERMENT FUND, as outlined in the specifications.

$ 10,000                       $      Ten Thousand Dollars
Unit Price (Figures)           Unit Price (Figures in Written Words)

$ 10,000                       $      Ten Thousand Dollars
Total Price (Figures)          Total Price (Figures in Written Words)



                           TOTAL BASE BID PRICE, Items 1 through 31

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)

THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE BASE BID WITHIN 120
CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 135 of 241
                             ADDITIVE BID A (SHEET 30A)

1.     35     SF           NEW RAMP SECTION, (including excavation, backfill, bedding,
                           expansion joints, dowels, truncated dome detectable surface and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



2.     27     SF           NEW LANDING SECTION, (including excavation, backfill,
                           bedding, expansion joints, dowels, truncated dome detectable
                           surface and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



3.     0      SF           NEW CONCRETE SHELTER PAD, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 136 of 241
4.    0       SF           NEW SIDEWALK SECTION, (including excavation, backfill,
                           bedding, dowels, and reinforcement), as shown on the plans and
                           as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



5.     0      LF           NEW CURB & GUTTER, (including backfill, bedding, expansion
                           joints, dowels, and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


6.     0      SF           NEW DRIVEWAY, (including excavation, backfill, bedding,
                           expansion joints, dowels, concrete, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


7.     0      SF           DEMOLITION OF EXISTING SIDEWALK, (including demolition
                           and removal, protection of the public), as shown on the plans and
                           as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 137 of 241
8.     0      LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



9.     0      LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


10.    51     LF           SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

11.    94     SF           PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                           shown on the plans and as outlined in the specifications, complete
                           in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 138 of 241
12.    50       LF           6” HEADER CURB, (including excavation, backfill, bedding,
                             expansion joints, dowels, and reinforcement), as shown on the
                             plans and as outlined in the specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


13.         0   EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)



14.         0   EA           WATER METER ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)


15.         0   EA           UTILITY BOX ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)


                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 139 of 241
16.      1    EA           SIGN POST RELOCATION, as shown on the plans, complete in
                           place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

17.      0    LF           12” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

18.      0    LF           24” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


19.    310    SF           CONCRETE SHELTER PAD TYPE II, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, Slope in any
                           direction (0.5% to 1.8%) and reinforcement), as shown on the
                           plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 140 of 241
20.    42       LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                             joints, dowels, slope no less than (0.3%) and reinforcement), as
                             shown on the plans and as outlined in the specifications, complete
                             in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


21.    50       LF           HANDRAILS, as shown on the plans and as outlined in the
                             specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)

22.         0   LF           8" RETAINING WALL (including backfill, bedding, expansion
                             joints, dowels, and reinforcement), as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)

23.    0         SF          DEMOLITION OF FOUNDATION (including demolition, removal,
                             and protection of the public) as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)




                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 141 of 241
24.    0 EA                 ADJUSTING EXISTING FIRE HYDRANT ASSEMBLY, (including
                            removal, and reinstallation), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


25.      1 LS               TRAFFIC CONTROL PLAN, as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)




                 TOTAL ADDITIVE BID A (SHEET 30A), Items 1 through 25

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)

THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 142 of 241
                             ADDITIVE BID B (SHEET 31A)

1.     190    SF           NEW RAMP SECTION, (including excavation, backfill, bedding,
                           expansion joints, dowels, truncated dome detectable surface and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



2.     205    SF           NEW LANDING SECTION, (including excavation, backfill,
                           bedding, expansion joints, dowels, truncated dome detectable
                           surface and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



3.     240    SF           NEW CONCRETE SHELTER PAD, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 143 of 241
4.    570          SF       NEW SIDEWALK SECTION, (including excavation, backfill,
                            bedding, dowels, and reinforcement), as shown on the plans and
                            as outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)



5.     120    LF            NEW CURB & GUTTER, (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.
$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


6.     0      SF            NEW DRIVEWAY, (including excavation, backfill, bedding,
                            expansion joints, dowels, concrete, and reinforcement), as shown
                            on the plans and as outlined in the specifications, complete in
                            place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


7.     1,156 SF             DEMOLITION OF EXISTING SIDEWALK, (including demolition
                            and removal, protection of the public), as shown on the plans and
                            as outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 144 of 241
8.     120    LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



9.     135    LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



10.    140    LF           SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



11.    257    SF           PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                           shown on the plans and as outlined in the specifications, complete
                           in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 145 of 241
12.    110    LF           6” HEADER CURB, (including excavation, backfill, bedding,
                           expansion joints, dowels, and reinforcement), as shown on the
                           plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



13.      0    EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



14.      0    EA           WATER METER ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



15.      0 EA              UTILITY BOX ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 146 of 241
16.        0 EA            SIGN POST RELOCATION, as shown on the plans, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

17.        0 LF            12” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

18.        0 LF            24” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


19.    0      SF           CONCRETE SHELTER PAD TYPE II, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, Slope in any
                           direction (0.5% to 1.8%) and reinforcement), as shown on the
                           plans and as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 147 of 241
20.      0        LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                               joints, dowels, slope no less than (0.3%) and reinforcement), as
                               shown on the plans and as outlined in the specifications, complete
                               in place.

$      0                       $      Zero dollars
Unit Price (Figures)           Unit Price (Figures in Written Words)

$      0                       $      Zero dollars
Total Price (Figures)          Total Price (Figures in Written Words)


21.      65       LF           HANDRAILS, as shown on the plans and as outlined in the
                               specifications, complete in place.

$                              $
Unit Price (Figures)           Unit Price (Figures in Written Words)

$                              $
Total Price (Figures)          Total Price (Figures in Written Words)

22.      24        LF          8" RETAINING WALL (including backfill, bedding, expansion
                               joints, dowels, and reinforcement), as shown on the plans and as
                               outlined in the specifications, complete in place.

$                              $
Unit Price (Figures)           Unit Price (Figures in Written Words)

$                              $
Total Price (Figures)          Total Price (Figures in Written Words)

23.          75    SF          DEMOLITION OF FOUNDATION (including demolition, removal,
                               and protection of the public) as shown on the plans and as
                               outlined in the specifications, complete in place.

$                              $
Unit Price (Figures)           Unit Price (Figures in Written Words)

$                              $
Total Price (Figures)          Total Price (Figures in Written Words)




                                         IFB NO. 2011-FC-05
                       ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                           Page 148 of 241
24.    1       EA           ADJUSTING EXISTING FIRE HYDRANT ASSEMBLY, (including
                            removal, and reinstallation), as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


25.        1   LS           TRAFFIC CONTROL PLAN, as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)




                 TOTAL ADDITIVE BID B (SHEET 31A), Items 1 through 25

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)

THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 149 of 241
                             ADDITIVE BID C (SHEET 32A)

1.     36     SF           NEW RAMP SECTION, (including excavation, backfill, bedding,
                           expansion joints, dowels, truncated dome detectable surface and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



2.     25     SF           NEW LANDING SECTION, (including excavation, backfill,
                           bedding, expansion joints, dowels, truncated dome detectable
                           surface and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



3.     0      SF           NEW CONCRETE SHELTER PAD, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 150 of 241
4.    0       SF           NEW SIDEWALK SECTION, (including excavation, backfill,
                           bedding, dowels, and reinforcement), as shown on the plans and
                           as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



5.     0      LF           NEW CURB & GUTTER, (including backfill, bedding, expansion
                           joints, dowels, and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.
$      0                   $       Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


6.     0      SF           NEW DRIVEWAY, (including excavation, backfill, bedding,
                           expansion joints, dowels, concrete, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 151 of 241
7.     0      SF           DEMOLITION OF EXISTING SIDEWALK, (including demolition
                           and removal, protection of the public), as shown on the plans and
                           as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)             Total Price (Figures in Written Words)


8.     0      LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



9.     0      LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


10.    52     LF           SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 152 of 241
11.    95       SF           PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                             shown on the plans and as outlined in the specifications, complete
                             in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)



12.    50       LF           6” HEADER CURB, (including excavation, backfill, bedding,
                             expansion joints, dowels, and reinforcement), as shown on the
                             plans and as outlined in the specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)



13.         0   EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)


14.         0   EA           WATER METER ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)


                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 153 of 241
15.      0 EA              UTILITY BOX ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

16.      1    EA           SIGN POST RELOCATION, as shown on the plans, complete in
                           place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

17.      0    LF           12” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

18.      0    LF           24” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 154 of 241
19.    310    SF           CONCRETE SHELTER PAD TYPE II, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, Slope in any
                           direction (0.5% to 1.8%) and reinforcement), as shown on the
                           plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


20.    42     LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                           joints, dowels, slope no less than (0.3%) and reinforcement), as
                           shown on the plans and as outlined in the specifications, complete
                           in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


21.    50     LF           HANDRAILS, as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 155 of 241
22.        0      LF           8" RETAINING WALL (including backfill, bedding, expansion
                               joints, dowels, and reinforcement), as shown on the plans and as
                               outlined in the specifications, complete in place.

$      0                       $      Zero dollars
Unit Price (Figures)           Unit Price (Figures in Written Words)

$      0                       $      Zero dollars
Total Price (Figures)          Total Price (Figures in Written Words)

23.    0          SF           DEMOLITION OF FOUNDATION (including demolition, removal,
                               and protection of the public) as shown on the plans and as
                               outlined in the specifications, complete in place.

$      0                       $      Zero dollars
Unit Price (Figures)           Unit Price (Figures in Written Words)

$      0                       $      Zero dollars
Total Price (Figures)          Total Price (Figures in Written Words)


24.    0 EA                    ADJUSTING EXISTING FIRE HYDRANT ASSEMBLY, (including
                               removal, and reinstallation), as shown on the plans and as
                               outlined in the specifications, complete in place.

$      0                       $      Zero dollars
Unit Price (Figures)           Unit Price (Figures in Written Words)

$      0                       $      Zero dollars
Total Price (Figures)          Total Price (Figures in Written Words)


25.        1 LS                TRAFFIC CONTROL PLAN, as shown on the plans and as
                               outlined in the specifications, complete in place.

$                              $
Unit Price (Figures)           Unit Price (Figures in Written Words)

$                              $
Total Price (Figures)          Total Price (Figures in Written Words)




                                         IFB NO. 2011-FC-05
                       ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                           Page 156 of 241
                 TOTAL ADDITIVE BID C (SHEET 32A), Items 1 through 25

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)

THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.




                                ADDITIVE BID D (SHEET 33A)

1.     35      SF           NEW RAMP SECTION, (including excavation, backfill, bedding,
                            expansion joints, dowels, truncated dome detectable surface and
                            reinforcement), as shown on the plans and as outlined in the
                            specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


2.     25      SF           NEW LANDING SECTION, (including excavation, backfill,
                            bedding, expansion joints, dowels, truncated dome detectable
                            surface and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)              Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 157 of 241
3.     0      SF           NEW CONCRETE SHELTER PAD, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


4.    0       SF           NEW SIDEWALK SECTION, (including excavation, backfill,
                           bedding, dowels, and reinforcement), as shown on the plans and
                           as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


5.     0      LF           NEW CURB & GUTTER, (including backfill, bedding, expansion
                           joints, dowels, and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


6.     0      SF           NEW DRIVEWAY, (including excavation, backfill, bedding,
                           expansion joints, dowels, concrete, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 158 of 241
7.     0      SF           DEMOLITION OF EXISTING SIDEWALK, (including demolition
                           and removal, protection of the public), as shown on the plans and
                           as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


8.     0      LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



9.     0      LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



10.    40     LF           SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 159 of 241
11.    125      SF           PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                             shown on the plans and as outlined in the specifications, complete
                             in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)



12.    30       LF           6” HEADER CURB, (including excavation, backfill, bedding,
                             expansion joints, dowels, and reinforcement), as shown on the
                             plans and as outlined in the specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)



13.         0   EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)



14.         0   EA           WATER METER ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)

                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 160 of 241
15.      0    EA           UTILITY BOX ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

16.      1    EA           SIGN POST RELOCATION, as shown on the plans, complete in
                           place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

17.      0    LF           12” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

18.      0    LF           24” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 161 of 241
19.    130      SF           CONCRETE SHELTER PAD TYPE II, (including excavation,
                             backfill, bedding, expansion joints, beams, dowels, Slope in any
                             direction (0.5% to 1.8%) and reinforcement), as shown on the
                             plans and as outlined in the specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


20.    26       LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                             joints, dowels, slope no less than (0.3%) and reinforcement), as
                             shown on the plans and as outlined in the specifications, complete
                             in place.
$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


21.    29       LF           HANDRAILS, as shown on the plans and as outlined in the
                             specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)

22.         0   LF           8" RETAINING WALL (including backfill, bedding, expansion
                             joints, dowels, and reinforcement), as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)



                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 162 of 241
23.    0          SF        DEMOLITION OF FOUNDATION (including demolition, removal,
                            and protection of the public) as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


24.    0 EA                 ADJUSTING EXISTING FIRE HYDRANT ASSEMBLY, (including
                            removal, and reinstallation), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


25.        1 LS             TRAFFIC CONTROL PLAN, as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


                  TOTAL ADDITIVE BID D (SHEET 33A), Items 1 through 25

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)

THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.



                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 163 of 241
                             ADDITIVE BID E (SHEET 34A)

1.     35     SF           NEW RAMP SECTION, (including excavation, backfill, bedding,
                           expansion joints, dowels, truncated dome detectable surface and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



2.     27     SF           NEW LANDING SECTION, (including excavation, backfill,
                           bedding, expansion joints, dowels, truncated dome detectable
                           surface and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



3.     0      SF           NEW CONCRETE SHELTER PAD, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 164 of 241
4.    0       SF           NEW SIDEWALK SECTION, (including excavation, backfill,
                           bedding, dowels, and reinforcement), as shown on the plans and
                           as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



5.     0      LF           NEW CURB & GUTTER, (including backfill, bedding, expansion
                           joints, dowels, and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


6.     0      SF           NEW DRIVEWAY, (including excavation, backfill, bedding,
                           expansion joints, dowels, concrete, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


7.     0      SF           DEMOLITION OF EXISTING SIDEWALK, (including demolition
                           and removal, protection of the public), as shown on the plans and
                           as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 165 of 241
8.     0      LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



9.     0      LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


10.    58     LF           SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


11.    235    SF           PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                           shown on the plans and as outlined in the specifications, complete
                           in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 166 of 241
12.    49       LF           6” HEADER CURB, (including excavation, backfill, bedding,
                             expansion joints, dowels, and reinforcement), as shown on the
                             plans and as outlined in the specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


13.         0   EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)               Total Price (Figures in Written Words)

14.         0   EA           WATER METER ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)



15.         0 EA             UTILITY BOX ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)



                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 167 of 241
16.      1    EA           SIGN POST RELOCATION, as shown on the plans, complete in
                           place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

17.      0    LF           12” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)




18.      0    LF           24” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


19.    310    SF           CONCRETE SHELTER PAD TYPE II, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, Slope in any
                           direction (0.5% to 1.8%) and reinforcement), as shown on the
                           plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 168 of 241
20.    42       LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                             joints, dowels, slope no less than (0.3%) and reinforcement), as
                             shown on the plans and as outlined in the specifications, complete
                             in place.
$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


21.    48       LF           HANDRAILS, as shown on the plans and as outlined in the
                             specifications, complete in place.
$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


22.         0   LF           8" RETAINING WALL (including backfill, bedding, expansion
                             joints, dowels, and reinforcement), as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)



23.    0         SF          DEMOLITION OF FOUNDATION (including demolition, removal,
                             and protection of the public) as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)




                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 169 of 241
24.    0       EA           ADJUSTING EXISTING FIRE HYDRANT ASSEMBLY, (including
                            removal, and reinstallation), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


25.        1   LS           TRAFFIC CONTROL PLAN, as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)




                 TOTAL ADDITIVE BID E (SHEET 34A), Items 1 through 25

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)

THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 170 of 241
                               ADDITIVE BID F (SHEET 35A)

1.     36     SF           NEW RAMP SECTION, (including excavation, backfill, bedding,
                           expansion joints, dowels, truncated dome detectable surface and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

2.     27     SF           NEW LANDING SECTION, (including excavation, backfill,
                           bedding, expansion joints, dowels, truncated dome detectable
                           surface and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

3.     0      SF           NEW CONCRETE SHELTER PAD, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

4.    0       SF           NEW SIDEWALK SECTION, (including excavation, backfill,
                           bedding, dowels, and reinforcement), as shown on the plans and
                           as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)             Total Price (Figures in Written Words

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 171 of 241
5.     0      LF           NEW CURB & GUTTER, (including backfill, bedding, expansion
                           joints, dowels, and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


6.     0      SF           NEW DRIVEWAY, (including excavation, backfill, bedding,
                           expansion joints, dowels, concrete, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


7.     0      SF           DEMOLITION OF EXISTING SIDEWALK, (including demolition
                           and removal, protection of the public), as shown on the plans and
                           as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


8.     0      LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 172 of 241
9.     0      LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


10.    56     LF           SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



11.    166    SF           PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                           shown on the plans and as outlined in the specifications, complete
                           in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


12.    50     LF           6” HEADER CURB, (including excavation, backfill, bedding,
                           expansion joints, dowels, and reinforcement), as shown on the
                           plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 173 of 241
13.      0    EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


14.      0    EA           WATER METER ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



15.      0 EA              UTILITY BOX ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

16.      1    EA           SIGN POST RELOCATION, as shown on the plans, complete in
                           place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 174 of 241
17.         0   LF           12” WHITE STRIPING, as shown on the plans and as outlined in
                             the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)


18.         0   LF           24” WHITE STRIPING, as shown on the plans and as outlined in
                             the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)


19.    310      SF           CONCRETE SHELTER PAD TYPE II, (including excavation,
                             backfill, bedding, expansion joints, beams, dowels, Slope in any
                             direction (0.5% to 1.8%) and reinforcement), as shown on the
                             plans and as outlined in the specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


20.    42       LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                             joints, dowels, slope no less than (0.3%) and reinforcement), as
                             shown on the plans and as outlined in the specifications, complete
                             in place.
$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)




                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 175 of 241
21.    50       LF           HANDRAILS, as shown on the plans and as outlined in the
                             specifications, complete in place.
$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)




22.         0   LF           8" RETAINING WALL (including backfill, bedding, expansion
                             joints, dowels, and reinforcement), as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)

23.    0         SF          DEMOLITION OF FOUNDATION (including demolition, removal,
                             and protection of the public) as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)


24.    0        EA           ADJUSTING EXISTING FIRE HYDRANT ASSEMBLY, (including
                             removal, and reinstallation), as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)




                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 176 of 241
25.         1   LS           TRAFFIC CONTROL PLAN, as shown on the plans and as
                             outlined in the specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)

                 TOTAL ADDITIVE BID F (SHEET 35A), Items 1 through 25

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)

THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.


                                 ADDITIVE BID G (SHEET 36A)

1.     36       SF           NEW RAMP SECTION, (including excavation, backfill, bedding,
                             expansion joints, dowels, truncated dome detectable surface and
                             reinforcement), as shown on the plans and as outlined in the
                             specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)

2.     27       SF           NEW LANDING SECTION, (including excavation, backfill,
                             bedding, expansion joints, dowels, truncated dome detectable
                             surface and reinforcement), as shown on the plans and as
                             outlined in the specifications, complete in place.
$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)               Total Price (Figures in Written Words)

                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 177 of 241
3.     0      SF           NEW CONCRETE SHELTER PAD, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


4.    0       SF           NEW SIDEWALK SECTION, (including excavation, backfill,
                           bedding, dowels, and reinforcement), as shown on the plans and
                           as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


5.     0      LF           NEW CURB & GUTTER, (including backfill, bedding, expansion
                           joints, dowels, and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

6.     0      SF           NEW DRIVEWAY, (including excavation, backfill, bedding,
                           expansion joints, dowels, concrete, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)             Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 178 of 241
7.     0      SF           DEMOLITION OF EXISTING SIDEWALK, (including demolition
                           and removal, protection of the public), as shown on the plans and
                           as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



8.     0      LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



9.     0      LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



10.    52     LF           SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 179 of 241
11.    95       SF           PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                             shown on the plans and as outlined in the specifications, complete
                             in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)



12.    50       LF           6” HEADER CURB, (including excavation, backfill, bedding,
                             expansion joints, dowels, and reinforcement), as shown on the
                             plans and as outlined in the specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)



13.         0   EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)


14.         0   EA           WATER METER ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)               Total Price (Figures in Written Words)

                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 180 of 241
15.      0 EA              UTILITY BOX ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

16.      1    EA           SIGN POST RELOCATION, as shown on the plans, complete in
                           place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

17.      0    LF           12” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

18.      0    LF           24” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 181 of 241
19.    310      SF           CONCRETE SHELTER PAD TYPE II, (including excavation,
                             backfill, bedding, expansion joints, beams, dowels, Slope in any
                             direction (0.5% to 1.8%) and reinforcement), as shown on the
                             plans and as outlined in the specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


20.    53       LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                             joints, dowels, slope no less than (0.3%) and reinforcement), as
                             shown on the plans and as outlined in the specifications, complete
                             in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


21.    50       LF           HANDRAILS, as shown on the plans and as outlined in the
                             specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)

22.         0   LF           8" RETAINING WALL (including backfill, bedding, expansion
                             joints, dowels, and reinforcement), as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)


                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 182 of 241
23.    0         SF         DEMOLITION OF FOUNDATION (including demolition, removal,
                            and protection of the public) as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)



24.    0       EA           ADJUSTING EXISTING FIRE HYDRANT ASSEMBLY, (including
                            removal, and reinstallation), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


25.        1   LS           TRAFFIC CONTROL PLAN, as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


                TOTAL ADDITIVE BID G (SHEET 36A), Items 1 through 25

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)

THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.


                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 183 of 241
                             ADDITIVE BID H (SHEET 37A)

1.     36     SF           NEW RAMP SECTION, (including excavation, backfill, bedding,
                           expansion joints, dowels, truncated dome detectable surface and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



2.     27     SF           NEW LANDING SECTION, (including excavation, backfill,
                           bedding, expansion joints, dowels, truncated dome detectable
                           surface and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



3.     0      SF           NEW CONCRETE SHELTER PAD, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 184 of 241
4.    0       SF           NEW SIDEWALK SECTION, (including excavation, backfill,
                           bedding, dowels, and reinforcement), as shown on the plans and
                           as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)             Total Price (Figures in Written Words)

5.     0      LF           NEW CURB & GUTTER, (including backfill, bedding, expansion
                           joints, dowels, and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.
$      0                   $       Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


6.     0      SF           NEW DRIVEWAY, (including excavation, backfill, bedding,
                           expansion joints, dowels, concrete, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


7.     0      SF           DEMOLITION OF EXISTING SIDEWALK, (including demolition
                           and removal, protection of the public), as shown on the plans and
                           as outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 185 of 241
8.     0      LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.
$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



9.     0      LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.
$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)



10.    56     LF           SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



11.    185    SF           PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                           shown on the plans and as outlined in the specifications, complete
                           in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 186 of 241
12.    50       LF           6” HEADER CURB, (including excavation, backfill, bedding,
                             expansion joints, dowels, and reinforcement), as shown on the
                             plans and as outlined in the specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)



13.         0   EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)



14.         0   EA           WATER METER ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)


15.         0   EA           UTILITY BOX ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)




                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 187 of 241
16.      0    EA           SIGN POST RELOCATION, as shown on the plans, complete in
                           place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

17.      0    LF           12” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)

18.      0 LF              24” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)


19.    310    SF           CONCRETE SHELTER PAD TYPE II, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, Slope in any
                           direction (0.5% to 1.8%) and reinforcement), as shown on the
                           plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 188 of 241
20.    41       LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                             joints, dowels, slope no less than (0.3%) and reinforcement), as
                             shown on the plans and as outlined in the specifications, complete
                             in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


21.    50       LF           HANDRAILS, as shown on the plans and as outlined in the
                             specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)

22.         0   LF           8" RETAINING WALL (including backfill, bedding, expansion
                             joints, dowels, and reinforcement), as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)

23.    0         SF          DEMOLITION OF FOUNDATION (including demolition, removal,
                             and protection of the public) as shown on the plans and as
                             outlined in the specifications, complete in place.


$      0                     $      Zero dollars
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      Zero dollars
Total Price (Figures)        Total Price (Figures in Written Words)




                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 189 of 241
24.    0 EA                 ADJUSTING EXISTING FIRE HYDRANT ASSEMBLY, (including
                            removal, and reinstallation), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      Zero dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      Zero dollars
Total Price (Figures)       Total Price (Figures in Written Words)


25.      1 LS               TRAFFIC CONTROL PLAN, as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)




                 TOTAL ADDITIVE BID H (SHEET 37A), Items 1 through 25

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)

THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 190 of 241
                                         BID SUMMARY

                       TOTAL BASE BID PRICE, Items 1 through 31

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)

                TOTAL ADDITIVE BID A (SHEET 30A), Items 1 through 25

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)

                TOTAL ADDITIVE BID B (SHEET 31A), Items 1 through 25

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)

                TOTAL ADDITIVE BID C (SHEET 32A), Items 1 through 25

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)

                TOTAL ADDITIVE BID D (SHEET 33A), Items 1 through 25

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)

                TOTAL ADDITIVE BID E (SHEET 34A), Items 1 through 25

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 191 of 241
                TOTAL ADDITIVE BID F (SHEET 35A), Items 1 through 25

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)

                TOTAL ADDITIVE BID G (SHEET 36A), Items 1 through 25

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)

                TOTAL ADDITIVE BID H (SHEET 37A), Items 1 through 25

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)



THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.

Signed by: _________________________________
             Print Name
Signature: _________________________________

Date: _____________________________________




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 192 of 241
The undersigned BIDDER proposes and agrees, if this Bid is accepted, to contract with the
Owner to furnish all work in accordance with the attached specification and drawing,
according to the following unit prices:


                               BASE BID – ZONE 3 (LNV)
                                    APPENDIX A
                                  PRICE SCHEDULE

                                        BASE BID

1.     1,440 SF            NEW RAMP SECTION, (including excavation, backfill, bedding,
                           expansion joints, dowels, truncated dome detectable surface and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)             Total Price (Figures in Written Words)

2.     1,288 SF            NEW LANDING SECTION, (including excavation, backfill,
                           bedding, expansion joints, dowels, truncated dome detectable
                           surface and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

3.     7,633 SF            NEW CONCRETE SHELTER PAD, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 193 of 241
4.    6,197 SF             NEW SIDEWALK SECTION, (including excavation, backfill,
                           bedding, dowels, and reinforcement), as shown on the plans and
                           as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


5.   1,043    LF           NEW CURB & GUTTER, (including backfill, bedding, expansion
                           joints, dowels, and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


6.     338    SF           NEW DRIVEWAY, (including excavation, backfill, bedding,
                           expansion joints, dowels, concrete, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


7.   11,568 SF             DEMOLITION OF EXISTING SIDEWALK, (including demolition
                           and removal, protection of the public), as shown on the plans and
                           as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 194 of 241
8.     1,043 LF            DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


9.     595    LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


10.    1,316 LF            SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.
$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


11.    2,459 SF            PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                           shown on the plans and as outlined in the specifications, complete
                           in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 195 of 241
12.    249   LF            6” HEADER CURB, (including excavation, backfill, bedding,
                           expansion joints, dowels, and reinforcement), as shown on the
                           plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



13.      2    EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

14.      6    EA           WATER METER ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

15.      0    EA           UTILITY BOX ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      Zero dollars
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      Zero dollars
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 196 of 241
16.        5    EA           SIGN POST RELOCATION, as shown on the plans, complete in
                             place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


17.        75   LF           12” WHITE STRIPING, as shown on the plans and as outlined in
                             the specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)



18.        72   LF           24” WHITE STRIPING, as shown on the plans and as outlined in
                             the specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


19.    0        SF           NEW CONCRETE BUS PAD, (including excavation, backfill,
                             bedding, expansion joints, dowels, and reinforcement), as shown
                             on the plans and as outlined in the specifications, complete in
                             place.

$      0                     $      ZERO DOLLARS
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      ZERO DOLLARS
Total Price (Figures)        Total Price (Figures in Written Words)




                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 197 of 241
20.    0       LF           NEW THICKENED EDGE SIDEWALK SECTION, (including
                            excavation, backfill, bedding, dowels, and reinforcement), as
                            shown on the plans and as outlined in the specifications, complete
                            in place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)


21.    0       LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.
$      0                    $       ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)


22.    0       LF           NEW SIDEWALK DRAIN CROSSING, (including dowels, metal
                            hot dipped galvanized diamond plate, slope no less than (1%) and
                            reinforcement)as shown on the plans and as outlined in the
                            specifications, complete in place.
$      0                    $       ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)

23.        0   LF           NEW 1' HEADER CURB (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.
$      0                    $       ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 198 of 241
24.    0   SF                DEMOLITION OF PAVEMENT (Sheet 28), (including demolition,
                             removal, protection of the public, removal of base,) as shown on
                             the plans and as outlined in the specifications, complete in place.

$      0                     $      ZERO DOLLARS
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      ZERO DOLLARS
Total Price (Figures)        Total Price (Figures in Written Words)

25.    0   SF                DEMOLITION OF EXISTING CONCRETE SHELTER PAD,
                             (including demolition and removal, protection of the public
                             concrete over 5" thick with thickened edge or beam only at plan
                             specified locations), as shown on the plans and as outlined in the
                             specifications, complete in place.

$      0                     $      ZERO DOLLARS
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      ZERO DOLLARS
Total Price (Figures)        Total Price (Figures in Written Words)

26.    0 EA                  RELOCATE EXISTING FIRE HYDRANT ASSEMBLY, (including
                             removal, plug on existing line, all additional fittings as outlined in
                             the city specs, and reinstallation), as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      ZERO DOLLARS
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      ZERO DOLLARS
Total Price (Figures)        Total Price (Figures in Written Words)

27.    0        EA           REMOVE AND DISPOSE OF EXISTING FIRE HYDRANT
                             ASSEMBLY, INSTALL NEW FIRE HYDRANT ASSEMBLY
                             (including removal, plug on existing line, all additional fittings as
                             outlined in the city specs, and reinstallation), as shown on the
                             plans and as outlined in the specifications, complete in place.

$      0                     $      ZERO DOLLARS
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      ZERO DOLLARS
Total Price (Figures)        Total Price (Figures in Written Words)

                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 199 of 241
28.    0       LS           METAL FENCING ADJUSTMENT, (including removal, and
                            reinstallation), as shown on the plans and as outlined in the
                            specifications, complete in place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)


29.        1   LS           TRAFFIC CONTROL PLAN, as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)



30.        1   LS           IRRIGATION SYSTEM ADJUSTMENT, as shown on the plans
                            and as outlined in the specifications, complete in place.

$ 5,000                     $      Five Thousand Dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$ 5,000                     $      Five Thousand Dollars
Total Price (Figures)       Total Price (Figures in Written Words)


31.        1   LS           BETTERMENT FUND, as outlined in the specifications.

$ 10,000                    $      Ten Thousand Dollars
Unit Price (Figures)        Unit Price (Figures in Written Words)

$ 10,000                    $      Ten Thousand Dollars
Total Price (Figures)       Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 200 of 241
                           TOTAL BASE BID PRICE, Items 1 through 31

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)

THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE BASE BID WITHIN 120
CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.

                                         ADDITIVE BID A

1.     147     SF              NEW RAMP SECTION, (including excavation, backfill, bedding,
                               expansion joints, dowels, truncated dome detectable surface and
                               reinforcement), as shown on the plans and as outlined in the
                               specifications, complete in place.

$                              $
Unit Price (Figures)           Unit Price (Figures in Written Words)

$                              $
Total Price (Figures)          Total Price (Figures in Written Words)



2.     139     SF              NEW LANDING SECTION, (including excavation, backfill,
                               bedding, expansion joints, dowels, truncated dome detectable
                               surface and reinforcement), as shown on the plans and as
                               outlined in the specifications, complete in place.

$                              $
Unit Price (Figures)           Unit Price (Figures in Written Words)

$                              $
Total Price (Figures)          Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 201 of 241
3.     225    SF            NEW CONCRETE SHELTER PAD, (including excavation,
                            backfill, bedding, expansion joints, beams, dowels, and
                            reinforcement), as shown on the plans and as outlined in the
                            specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


4.    165          SF       NEW SIDEWALK SECTION, (including excavation, backfill,
                            bedding, dowels, and reinforcement), as shown on the plans and
                            as outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


5.     95     LF            NEW CURB & GUTTER, (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)

6.     0      SF            NEW DRIVEWAY, (including excavation, backfill, bedding,
                            expansion joints, dowels, concrete, and reinforcement), as shown
                            on the plans and as outlined in the specifications, complete in
                            place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)


                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 202 of 241
7.     374    SF           DEMOLITION OF EXISTING SIDEWALK, (including demolition
                           and removal, protection of the public), as shown on the plans and
                           as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



8.     95     LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



9.     34     LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


10.    112    LF           SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 203 of 241
11.    196      SF           PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                             shown on the plans and as outlined in the specifications, complete
                             in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)

12.    38       LF           6” HEADER CURB, (including excavation, backfill, bedding,
                             expansion joints, dowels, and reinforcement), as shown on the
                             plans and as outlined in the specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


13.         0   EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      ZERO DOLLARS
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      ZERO DOLLARS
Total Price (Figures)        Total Price (Figures in Written Words)



14.         0   EA           WATER METER ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      ZERO DOLLARS
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      ZERO DOLLARS
Total Price (Figures)        Total Price (Figures in Written Words)




                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 204 of 241
15.      0    EA           UTILITY BOX ADJUSTMENT, as shown on the plans and as
                           outlined in the specifications, complete in place.

$      0                   $      ZERO DOLLARS
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      ZERO DOLLARS
Total Price (Figures)      Total Price (Figures in Written Words)



16.      1    EA           SIGN POST RELOCATION, as shown on the plans, complete in
                           place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


17.      0    LF           12” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      ZERO DOLLARS
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      ZERO DOLLARS
Total Price (Figures)      Total Price (Figures in Written Words)



18.      0    LF           24” WHITE STRIPING, as shown on the plans and as outlined in
                           the specifications, complete in place.

$      0                   $      ZERO DOLLARS
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      ZERO DOLLARS
Total Price (Figures)      Total Price (Figures in Written Words)




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 205 of 241
19.    0      SF           NEW CONCRETE BUS PAD, (including excavation, backfill,
                           bedding, expansion joints, dowels, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      ZERO DOLLARS
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      ZERO DOLLARS
Total Price (Figures)      Total Price (Figures in Written Words)



20.    0      LF           NEW THICKENED EDGE SIDEWALK SECTION, (including
                           excavation, backfill, bedding, dowels, and reinforcement), as
                           shown on the plans and as outlined in the specifications, complete
                           in place.

$      0                   $      ZERO DOLLARS
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      ZERO DOLLARS
Total Price (Figures)      Total Price (Figures in Written Words)


21.    0      LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                           joints, dowels, and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.
$      0                   $       ZERO DOLLARS
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      ZERO DOLLARS
Total Price (Figures)      Total Price (Figures in Written Words)


22.    0      LF           NEW SIDEWALK DRAIN CROSSING, (including dowels, metal
                           hot dipped galvanized diamond plate, slope no less than (1%) and
                           reinforcement)as shown on the plans and as outlined in the
                           specifications, complete in place.
$      0                   $       ZERO DOLLARS
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      ZERO DOLLARS
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 206 of 241
23.        0        LF           NEW 1' HEADER CURB (including backfill, bedding, expansion
                                 joints, dowels, and reinforcement), as shown on the plans and as
                                 outlined in the specifications, complete in place.
$      0                         $       ZERO DOLLARS
Unit Price (Figures)             Unit Price (Figures in Written Words)

$      0                         $      ZERO DOLLARS
Total Price (Figures)            Total Price (Figures in Written Words)

24.    0       SF                DEMOLITION OF PAVEMENT (Sheet 28), (including demolition,
                                 removal, protection of the public, removal of base,) as shown on
                                 the plans and as outlined in the specifications, complete in place.

$      0                         $      ZERO DOLLARS
Unit Price (Figures)             Unit Price (Figures in Written Words)

$      0                         $      ZERO DOLLARS
Total Price (Figures)            Total Price (Figures in Written Words)


25.    0       SF                DEMOLITION OF EXISTING CONCRETE SHELTER PAD,
                                 (including demolition and removal, protection of the public
                                 concrete over 5" thick with thickened edge or beam only at plan
                                 specified locations), as shown on the plans and as outlined in the
                                 specifications, complete in place.

$      0                         $      ZERO DOLLARS
Unit Price (Figures)             Unit Price (Figures in Written Words)

$      0                         $      ZERO DOLLARS
Total Price (Figures)                   Total Price (Figures in Written Words)

26.    0 EA                      RELOCATE EXISTING FIRE HYDRANT ASSEMBLY, (including
                                 removal, plug on existing line, all additional fittings as outlined in
                                 the city specs, and reinstallation), as shown on the plans and as
                                 outlined in the specifications, complete in place.

$      0                         $      ZERO DOLLARS
Unit Price (Figures)             Unit Price (Figures in Written Words)

$      0                         $      ZERO DOLLARS
Total Price (Figures)                   Total Price (Figures in Written Words)

                                           IFB NO. 2011-FC-05
                         ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                             Page 207 of 241
27.    0       EA             REMOVE AND DISPOSE OF EXISTING FIRE HYDRANT
                              ASSEMBLY, INSTALL NEW FIRE HYDRANT ASSEMBLY
                              (including removal, plug on existing line, all additional fittings as
                              outlined in the city specs, and reinstallation), as shown on the
                              plans and as outlined in the specifications, complete in place.

$      0                      $      ZERO DOLLARS
Unit Price (Figures)          Unit Price (Figures in Written Words)

$      0                      $      ZERO DOLLARS
Total Price (Figures)         Total Price (Figures in Written Words)


28.    0       LS             METAL FENCING ADJUSTMENT, (including removal, and
                              reinstallation), as shown on the plans and as outlined in the
                              specifications, complete in place.

$      0                      $      ZERO DOLLARS
Unit Price (Figures)          Unit Price (Figures in Written Words)

$      0                      $      ZERO DOLLARS
Total Price (Figures)         Total Price (Figures in Written Words)


29.        1   LS             TRAFFIC CONTROL PLAN, as shown on the plans and as
                              outlined in the specifications, complete in place.

$                             $
Unit Price (Figures)          Unit Price (Figures in Written Words)

$                             $
Total Price (Figures)         Total Price (Figures in Written Words)

                           TOTAL ADDITIVE BID A, Items 1 through 29

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)



                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 208 of 241
THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.


                                    ADDITIVE BID B

1.     317    SF           NEW RAMP SECTION, (including excavation, backfill, bedding,
                           expansion joints, dowels, truncated dome detectable surface and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



2.     216    SF           NEW LANDING SECTION, (including excavation, backfill,
                           bedding, expansion joints, dowels, truncated dome detectable
                           surface and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



3.     0      SF           NEW CONCRETE SHELTER PAD, (including excavation,
                           backfill, bedding, expansion joints, beams, dowels, and
                           reinforcement), as shown on the plans and as outlined in the
                           specifications, complete in place.

$      0                   $      ZERO DOLLARS
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      ZERO DOLLARS
Total Price (Figures)      Total Price (Figures in Written Words)



                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 209 of 241
4.    384          SF       NEW SIDEWALK SECTION, (including excavation, backfill,
                            bedding, dowels, and reinforcement), as shown on the plans and
                            as outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


5.     72     LF            NEW CURB & GUTTER, (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


6.     0      SF            NEW DRIVEWAY, (including excavation, backfill, bedding,
                            expansion joints, dowels, concrete, and reinforcement), as shown
                            on the plans and as outlined in the specifications, complete in
                            place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)


7.     692    SF            DEMOLITION OF EXISTING SIDEWALK, (including demolition
                            and removal, protection of the public), as shown on the plans and
                            as outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)

                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 210 of 241
8.     72     LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



9.     60     LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)


10.    114    LF           SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                           the plans and as outlined in the specifications, complete in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)

11.    158    SF           PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                           shown on the plans and as outlined in the specifications, complete
                           in place.

$                          $
Unit Price (Figures)       Unit Price (Figures in Written Words)

$                          $
Total Price (Figures)      Total Price (Figures in Written Words)



                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 211 of 241
12.    0       LF           6” HEADER CURB, (including excavation, backfill, bedding,
                            expansion joints, dowels, and reinforcement), as shown on the
                            plans and as outlined in the specifications, complete in place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)


13.        0   EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)



14.        0   EA           WATER METER ADJUSTMENT, as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)


15.        0   EA           UTILITY BOX ADJUSTMENT, as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 212 of 241
16.        0   EA           SIGN POST RELOCATION, as shown on the plans, complete in
                            place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)

17.    303     LF           12” WHITE STRIPING, as shown on the plans and as outlined in
                            the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)

18.        264 LF           24” WHITE STRIPING, as shown on the plans and as outlined in
                            the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)


19.    0       SF           NEW CONCRETE BUS PAD, (including excavation, backfill,
                            bedding, expansion joints, dowels, and reinforcement), as shown
                            on the plans and as outlined in the specifications, complete in
                            place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 213 of 241
20.    0       LF           NEW THICKENED EDGE SIDEWALK SECTION, (including
                            excavation, backfill, bedding, dowels, and reinforcement), as
                            shown on the plans and as outlined in the specifications, complete
                            in place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)


21.    0       LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.
$      0                    $       ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)


22.    0       LF           NEW SIDEWALK DRAIN CROSSING, (including dowels, metal
                            hot dipped galvanized diamond plate, slope no less than (1%) and
                            reinforcement)as shown on the plans and as outlined in the
                            specifications, complete in place.
$      0                    $       ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)

23.        0   LF           NEW 1' HEADER CURB (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.
$      0                    $       ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 214 of 241
24.    0   SF                DEMOLITION OF PAVEMENT (Sheet 28), (including demolition,
                             removal, protection of the public, removal of base,) as shown on
                             the plans and as outlined in the specifications, complete in place.

$      0                     $      ZERO DOLLARS
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      ZERO DOLLARS
Total Price (Figures)        Total Price (Figures in Written Words)

25.    0   SF                DEMOLITION OF EXISTING CONCRETE SHELTER PAD,
                             (including demolition and removal, protection of the public
                             concrete over 5" thick with thickened edge or beam only at plan
                             specified locations), as shown on the plans and as outlined in the
                             specifications, complete in place.

$      0                     $      ZERO DOLLARS
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      ZERO DOLLARS
Total Price (Figures)        Total Price (Figures in Written Words)

26.    0 EA                  RELOCATE EXISTING FIRE HYDRANT ASSEMBLY, (including
                             removal, plug on existing line, all additional fittings as outlined in
                             the city specs, and reinstallation), as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      ZERO DOLLARS
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      ZERO DOLLARS
Total Price (Figures)               Total Price (Figures in Written Words)

27.    0        EA           REMOVE AND DISPOSE OF EXISTING FIRE HYDRANT
                             ASSEMBLY, INSTALL NEW FIRE HYDRANT ASSEMBLY
                             (including removal, plug on existing line, all additional fittings as
                             outlined in the city specs, and reinstallation), as shown on the
                             plans and as outlined in the specifications, complete in place.

$      0                     $      ZERO DOLLARS
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      ZERO DOLLARS
Total Price (Figures)        Total Price (Figures in Written Words)

                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 215 of 241
28.    0       LS             METAL FENCING ADJUSTMENT, (including removal, and
                              reinstallation), as shown on the plans and as outlined in the
                              specifications, complete in place.

$      0                      $      ZERO DOLLARS
Unit Price (Figures)          Unit Price (Figures in Written Words)

$      0                      $      ZERO DOLLARS
Total Price (Figures)         Total Price (Figures in Written Words)


29.        1   LS             TRAFFIC CONTROL PLAN, as shown on the plans and as
                              outlined in the specifications, complete in place.

$                             $
Unit Price (Figures)          Unit Price (Figures in Written Words)

$                             $
Total Price (Figures)         Total Price (Figures in Written Words)

                           TOTAL ADDITIVE BID B, Items 1 through 29

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)

THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.
                                         ADDITIVE BID C

1.     0       SF             NEW RAMP SECTION, (including excavation, backfill, bedding,
                              expansion joints, dowels, truncated dome detectable surface and
                              reinforcement), as shown on the plans and as outlined in the
                              specifications, complete in place.

$      0                      $      ZERO DOLLARS
Unit Price (Figures)          Unit Price (Figures in Written Words)

$      0                      $      ZERO DOLLARS
Total Price (Figures)         Total Price (Figures in Written Words)
                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 216 of 241
2.     0      SF            NEW LANDING SECTION, (including excavation, backfill,
                            bedding, expansion joints, dowels, truncated dome detectable
                            surface and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)

3.     309    SF            NEW CONCRETE SHELTER PAD, (including excavation,
                            backfill, bedding, expansion joints, beams, dowels, and
                            reinforcement), as shown on the plans and as outlined in the
                            specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)

4.    76       SF           NEW SIDEWALK SECTION, (including excavation, backfill,
                            bedding, dowels, and reinforcement), as shown on the plans and
                            as outlined in the specifications, complete in place.

$                           $
Unit Price (Figures)        Unit Price (Figures in Written Words)

$                           $
Total Price (Figures)       Total Price (Figures in Written Words)

5.     0      LF            NEW CURB & GUTTER, (including backfill, bedding, expansion
                            joints, dowels, and reinforcement), as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)

                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 217 of 241
6.     0      SF           NEW DRIVEWAY, (including excavation, backfill, bedding,
                           expansion joints, dowels, concrete, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      ZERO DOLLARS
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      ZERO DOLLARS
Total Price (Figures)      Total Price (Figures in Written Words)


7.     0      SF           DEMOLITION OF EXISTING SIDEWALK, (including demolition
                           and removal, protection of the public), as shown on the plans and
                           as outlined in the specifications, complete in place.

$      0                   $      ZERO DOLLARS
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      ZERO DOLLARS
Total Price (Figures)      Total Price (Figures in Written Words)


8.     0      LF           DEMOLITION OF EXISTING CURB & GUTTER, (including
                           demolition and removal, protection of the public), as shown on the
                           plans and as outlined in the specifications, complete in place.

$      0                   $      ZERO DOLLARS
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      ZERO DOLLARS
Total Price (Figures)      Total Price (Figures in Written Words)

9.     0      LF           SAW CUT CONCRETE PAVEMENT (FULL DEPTH), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      ZERO DOLLARS
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      ZERO DOLLARS
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 218 of 241
10.    0        LF           SAW CUT ASPHALT PAVEMENT (FULL DEPTH), as shown on
                             the plans and as outlined in the specifications, complete in place.

$       0                    $       ZERO DOLLARS
Unit Price (Figures)         Unit Price (Figures in Written Words)

$       0                    $       ZERO DOLLARS
Total Price (Figures)        Total Price (Figures in Written Words)


11.    0        SF           PAVEMENT REPAIR, (including HMAC, base material, etc.), as
                             shown on the plans and as outlined in the specifications, complete
                             in place.

$       0                    $       ZERO DOLLARS
Unit Price (Figures)         Unit Price (Figures in Written Words)

$       0                    $       ZERO DOLLARS
Total Price (Figures)        Total Price (Figures in Written Words)



12.    55       LF           6” HEADER CURB, (including excavation, backfill, bedding,
                             expansion joints, dowels, and reinforcement), as shown on the
                             plans and as outlined in the specifications, complete in place.

$                            $
Unit Price (Figures)         Unit Price (Figures in Written Words)

$                            $
Total Price (Figures)        Total Price (Figures in Written Words)


13.         0   EA           WATER VALVE ADJUSTMENT, as shown on the plans and as
                             outlined in the specifications, complete in place.

$      0                     $      ZERO DOLLARS
Unit Price (Figures)         Unit Price (Figures in Written Words)

$      0                     $      ZERO DOLLARS
Total Price (Figures)        Total Price (Figures in Written Words)


                                       IFB NO. 2011-FC-05
                     ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                         Page 219 of 241
14.        0   EA           WATER METER ADJUSTMENT, as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)

15.        0   EA           UTILITY BOX ADJUSTMENT, as shown on the plans and as
                            outlined in the specifications, complete in place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)

16.        0   EA           SIGN POST RELOCATION, as shown on the plans, complete in
                            place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)

17.    0       LF           12” WHITE STRIPING, as shown on the plans and as outlined in
                            the specifications, complete in place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)

18.        0   LF           24” WHITE STRIPING, as shown on the plans and as outlined in
                            the specifications, complete in place.

$      0                    $      ZERO DOLLARS
Unit Price (Figures)        Unit Price (Figures in Written Words)

$      0                    $      ZERO DOLLARS
Total Price (Figures)       Total Price (Figures in Written Words)

                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 220 of 241
19.    0      SF           NEW CONCRETE BUS PAD, (including excavation, backfill,
                           bedding, expansion joints, dowels, and reinforcement), as shown
                           on the plans and as outlined in the specifications, complete in
                           place.

$      0                   $      ZERO DOLLARS
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      ZERO DOLLARS
Total Price (Figures)      Total Price (Figures in Written Words)

20.    0      LF           NEW THICKENED EDGE SIDEWALK SECTION, (including
                           excavation, backfill, bedding, dowels, and reinforcement), as
                           shown on the plans and as outlined in the specifications, complete
                           in place.

$      0                   $      ZERO DOLLARS
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      ZERO DOLLARS
Total Price (Figures)      Total Price (Figures in Written Words)


21.    0      LF           NEW CURB TYPE II, (including backfill, bedding, expansion
                           joints, dowels, and reinforcement), as shown on the plans and as
                           outlined in the specifications, complete in place.
$      0                   $       ZERO DOLLARS
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      ZERO DOLLARS
Total Price (Figures)      Total Price (Figures in Written Words)


22.    0      LF           NEW SIDEWALK DRAIN CROSSING, (including dowels, metal
                           hot dipped galvanized diamond plate, slope no less than (1%) and
                           reinforcement)as shown on the plans and as outlined in the
                           specifications, complete in place.
$      0                   $       ZERO DOLLARS
Unit Price (Figures)       Unit Price (Figures in Written Words)

$      0                   $      ZERO DOLLARS
Total Price (Figures)      Total Price (Figures in Written Words)

                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 221 of 241
23.        0        LF           NEW 1' HEADER CURB (including backfill, bedding, expansion
                                 joints, dowels, and reinforcement), as shown on the plans and as
                                 outlined in the specifications, complete in place.
$      0                         $       ZERO DOLLARS
Unit Price (Figures)             Unit Price (Figures in Written Words)

$      0                         $      ZERO DOLLARS
Total Price (Figures)            Total Price (Figures in Written Words)

24.    0       SF                DEMOLITION OF PAVEMENT (Sheet 28), (including demolition,
                                 removal, protection of the public, removal of base,) as shown on
                                 the plans and as outlined in the specifications, complete in place.

$      0                         $      ZERO DOLLARS
Unit Price (Figures)             Unit Price (Figures in Written Words)

$      0                         $      ZERO DOLLARS
Total Price (Figures)            Total Price (Figures in Written Words)


25.    0       SF                DEMOLITION OF EXISTING CONCRETE SHELTER PAD,
                                 (including demolition and removal, protection of the public
                                 concrete over 5" thick with thickened edge or beam only at plan
                                 specified locations), as shown on the plans and as outlined in the
                                 specifications, complete in place.

$      0                         $      ZERO DOLLARS
Unit Price (Figures)             Unit Price (Figures in Written Words)

$      0                         $      ZERO DOLLARS
Total Price (Figures)            Total Price (Figures in Written Words)


26.    0 EA                      RELOCATE EXISTING FIRE HYDRANT ASSEMBLY, (including
                                 removal, plug on existing line, all additional fittings as outlined in
                                 the city specs, and reinstallation), as shown on the plans and as
                                 outlined in the specifications, complete in place.

$      0                         $      ZERO DOLLARS
Unit Price (Figures)             Unit Price (Figures in Written Words)

$      0                         $      ZERO DOLLARS
Total Price (Figures)            Total Price (Figures in Written Words)

                                           IFB NO. 2011-FC-05
                         ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                             Page 222 of 241
27.    0       EA             REMOVE AND DISPOSE OF EXISTING FIRE HYDRANT
                              ASSEMBLY, INSTALL NEW FIRE HYDRANT ASSEMBLY
                              (including removal, plug on existing line, all additional fittings as
                              outlined in the city specs, and reinstallation), as shown on the
                              plans and as outlined in the specifications, complete in place.

$      0                      $      ZERO DOLLARS
Unit Price (Figures)          Unit Price (Figures in Written Words)

$      0                      $      ZERO DOLLARS
Total Price (Figures)         Total Price (Figures in Written Words)


28.    0       LS             METAL FENCING ADJUSTMENT, (including removal, and
                              reinstallation), as shown on the plans and as outlined in the
                              specifications, complete in place.

$      0                      $      ZERO DOLLARS
Unit Price (Figures)          Unit Price (Figures in Written Words)

$      0                      $      ZERO DOLLARS
Total Price (Figures)         Total Price (Figures in Written Words)


29.        1   LS             TRAFFIC CONTROL PLAN, as shown on the plans and as
                              outlined in the specifications, complete in place.

$                             $
Unit Price (Figures)          Unit Price (Figures in Written Words)

$                             $
Total Price (Figures)         Total Price (Figures in Written Words)


                           TOTAL ADDITIVE BID C, Items 1 through 29

$
Total Price (In Figures)

$
Total Price (Figures in Written Words)




                                      IFB NO. 2011-FC-05
                    ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                        Page 223 of 241
                                  BID ZONE 3 SUMMARY

                       TOTAL BASE BID PRICE, Items 1 through 31

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)

                       TOTAL ADDITIVE BID A, Items 1 through 29

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)

                       TOTAL ADDITIVE BID B, Items 1 through 29

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)


                       TOTAL ADDITIVE BID C, Items 1 through 29

$
Total Price (In Figures)
$
Total Price (Figures in Written Words)


THE BIDDER AGREES TO COMPLETE ALL WORK FOR THE ADDITIVE BID WITHIN
120 CALENDAR DAYS, AFTER RECEIPT OF NOTICE TO PROCEED.

Signed by: _________________________________
             Print Name
Signature: _________________________________

Date: _____________________________________




                                     IFB NO. 2011-FC-05
                   ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                       Page 224 of 241
             CERTIFICATION FORMS




Please fill out and sign the following forms and return with your signed
contract.




                                IFB NO. 2011-FC-05
              ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                  Page 225 of 241
                                                      APPENDIX B
                                                 CERTIFICATION FORM

In submitting this proposal, the undersigned certifies on behalf of its firm and any proposed subcontractors as follows:

(1)       Bid Validity Certification: If this offer is accepted within one hundred twenty (120) calendar days from the due
          date, to furnish any or all services upon which prices are offered at the designated point within the time specified;

(2)       Non-Collusion Certification: Has made this proposal independently, without consultation, communication, or
          agreement for the purpose of restricting competition as to any matter relating to this Request for Proposals with
          any other FIRM or with any other competitor,

(3)       Affirmative Action/DBE Certification: Is in compliance with the Common Grant Rules affirmative action and
          and Department of Transportation’s Disadvantaged Business Enterprise requirements.

(4)       Non-Conflict Certification: Represents and warrants that no employee, official, or member of the Regional
          Transportation Authority's Board of Directors is or will be pecuniarily benefited directly or indirectly in this
          Contract,

(5)       Non-Inducement Certification: The undersigned hereby certifies that neither it nor any of its employees,
          representatives, or agents have offered or given gratuities (in the form of entertainment, gifts, or otherwise) to
          any director, officer, or employee of the Regional Transportation Authority with the view toward securing favorable
          treatment in the awarding, amending, or the making of any determination with respect to the performance of this
          Contract.

(6)       Non-Debarment Certification: Certifies that it is not included on the U. S. Comptroller General’s Consolidated
          List of Persons or Firms currently debarred for violations of various contracts incorporating labor standards
          provisions, and from Federal programs under DOT regulations 2CFR Parts 180 and 1200, or under the FAR at
          48 CFR Chapter 1, Part 9.4

(7)       Integrity and Ethics: Has a satisfactory record of integrity and business ethics, in compliance with 49 U.S.C.
          Section 5325(j)(2)(A)

(8)       Public Policy: Is in compliance with the public policies of the Federal Government, as required by 49 U.S.C.
          Section 5325(j)(2)(B)

(9)       Administrative and Technical Capacity: Has the necessary organization, experience, accounting, and
          operational controls, and technical skills, or the ability to obtain them, in compliance with 49 U.S.C. Section
          5325(j)(2)(D)

(10)      Licensing and Taxes: Is in compliance with applicable licensing and tax laws and regulations

(11)      Financial Resources: Has, or can obtain, sufficient financial resources to perform the contract, as required by
          49 U. S. C. Section 5325 (j)(2)(D)

(12)      Production Capability: Has, or can obtain, the necessary production, construction, and technical equipment
          and facilities.

(13)      Timeliness: Is able to comply with the required delivery or performance schedule, taking into consideration all
          existing commercial and governmental business commitments.

(14)      Performance Record: Is able to provide a satisfactory current and past performance record.


Signature                                                         Printed Name

Title                                                             Date
Certification forms revised 02/11/2011


                                              IFB NO. 2011-FC-05
                            ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                                Page 226 of 241
                                              APPENDIX C

                         CERTIFICATION AND STATEMENT OF QUALIFICATIONS

The undersigned BIDDER hereby further certifies that she/he has read all of the documents and agrees to
abide by the terms, certifications, and conditions thereof.

Signature:      ___________________________________________________________

Printed Name: ________________________________________________________________

Title:          ____________________________             Date:   _____________________

Firm Name:      ___________________________________________________________

Business
Address:        ___________________________________________________________

Telephone:      Office: ______________________ Fax: _________________________

Firm Owner:     ____________________________ Firm CEO: ____________________

Taxpayer Identification Number:____________________________________________

Number of years in contracting business under present name: ___________________

Type of work performed by your company: ___________________________________

         Section 2.01 Have you ever failed to complete any work awarded to you?
         _____________________
Have you ever defaulted on a Contract? _____________________________________

Taxpayer ID#: ________________________ Date Organized: ___________________

Date Incorporated: _____________________

Is your firm considered a disadvantaged business enterprise (DBE)? ______________

If you answered yes to the DBE question, explain type. ____________________

                ADDENDA ACKNOWLEDGMENT
Receipt of the following addenda is acknowledged (list addenda number):

_______________________________________________________________




DUNS # _____________________________(Required) A DUNS number may be obtained from
D & B by telephone (currently at 866-705-5711) or the internet (currently at http://fedgov.dnb.com/webform).


                                        IFB NO. 2011-FC-05
                      ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                          Page 227 of 241
                                       APPENDIX D

                   Corpus Christi Regional Transportation Authority
                  DISCLOSURE OF INTERESTS CERTIFICATION


FIRM NAME:_____________________________________________________________

STREET:___________________________CITY:_________________ZIP:____________

FIRM is:     1. Corporation ______ 2. Partnership_____ 3. Sole Owner ______
             4. Association ______ 5. Other ____________________

                               DISCLOSURE QUESTIONS

If additional space is necessary, please use the reverse side of this page or attach separate
sheets.

1.    State the names of each “employee” of the Regional Transportation Authority having
      an “ownership interest” constituting 3% or more of the ownership in the above
      named “firm”.

NAME                                 JOB TITLE AND DEPARTMENT (IF KNOWN)
__________________________           __________________________________________

__________________________            __________________________________________

2.    State the names of each “official” of the Regional Transportation Authority having an
      “ownership interest” constituting 3% or more of the ownership in the above named
      “firm”.

NAME                                     TITLE
__________________________               ________________________________________

__________________________               ________________________________________

3.   State the names of each “board member” of the Regional Transportation Authority
     having an “ownership interest” constituting 3% or more of the ownership in the
     above named “firm”.
NAME                                 BOARD, COMMISSION OR COMMITTEE

__________________________               ________________________________________

__________________________               ________________________________________


                                    IFB NO. 2011-FC-05
                  ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                      Page 228 of 241
4.    State the names of each employee or officer of a “consultant” for the Regional
Transportation Authority who worked on any matter related to the subject of this contract and has
an “ownership interest” constituting 3% or more of the ownership in the above named “firm”

       NAME
       CONSULTANT___________________________________________________________
       ___________________________________________________

                                              CERTIFICATE

       I certify that all information provided is true and correct as of the date of this statement,
       that I have not knowingly withheld disclosure of any information requested; and that
       supplemental statements will be promptly submitted to the Regional Transportation
       Authority, Texas as changes occur.

                      Certifying Person: _________________________________

                       Title:              _________________________________
                                          (Type or Print)

       Signature of Certifying Person: _______________________

                                   Date:_______________________




                                        IFB NO. 2011-FC-05
                      ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                          Page 229 of 241
                                 APPENDIX E

                           Buy America Certificate

Certification required for procurement of steel, iron, or manufactured products
(required for contracts over $100,000).

                  Certificate of Compliance with 49 C.F.R. 661

The bidder or offeror hereby certifies that it will meet the requirements of Section
165(a) of the Surface Transportation Assistance Act of 1982 and the regulations of
49 C.F.R. 661.

Date ___________________________________________________________

Signature _______________________________________________________

Printed Name: ___________________________________________________

Title ___________________________________________________________

Company Name __________________________________________________


                                       or

                Certificate of Non-Compliance with 49 C.F.R. 661

The bidder or offeror hereby certifies that it cannot comply with the requirements of
Section 165(a) of the Surface Transportation Assistance Act of 1982 and the
regulations of 49 C.F.R. 661.7.
Date ___________________________________________________________

Signature _______________________________________________________

Printed Name: ___________________________________________________

Title ___________________________________________________________

Company Name __________________________________________________




                               IFB NO. 2011-FC-05
             ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                 Page 230 of 241
                                             APPENDIX F

                                            CERTIFICATION
                                                   OF
                                   RESTRICTIONS ON LOBBYING
                                 (Required for contracts over $100,000.)

I, ________________________, _______________________, hereby certify on behalf of
        (Name)                    (Title)
the _________________________________________, that:
                   (Company Name)

   (1) No federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned,
       to any person for influencing or attempting to influence an officer or employee of any Federal
       agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member
       of Congress, regarding the award of Federal assistance, or the extension, continuation, renewal,
       amendment, or modification of any Federal assistance agreement, contract, grant, loan, or
       cooperative agreement.

   (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for
       influencing or attempting to influence an officer or employee of any Federal agency, a Member of
       Congress, an officer or employee of Congress, or an employee of a Member of Congress in
       connection with any application for Federal assistance, federal contract, grant, loan, or cooperative
       agreement, the undersigned shall complete and submit Standard Form-LLL: “Disclosure of Form
       to Report Lobbying,” including information required by the instructions accompanying the form,
       which form may be amended to omit such information as authorized by 49 CFR Part 20.110.

   (3) The undersigned shall require that the language of this certification be included in the award
       documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under
       grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose
       accordingly.

      The undersigned understands that this certification is a material representation of fact upon which
      reliance is placed and that submission of this certification is a prerequisite for providing Federal
      assistance for a transaction covered by 49 CFR Part 20.110. Any person who fails to file the
      required certification shall be subject to a civil penalty of not less than $10,000 and not more than
      $100,000 for each such failure.

      Executed this ________ day of __________________, 2010.

      Signed:                ___________________________________

      Printed Name:          ___________________________________

      Company Name:          ___________________________________




                                         IFB NO. 2011-FC-05
                       ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                           Page 231 of 241
                                                 APPENDIX G

     Forms 1, 2, 3, & 4


FORM 1: DISADVANTAGED BUSINESS ENTERPRISE (DBE) PARTICIPATION FORM

                                 Article III. DBE PARTICIPATION FORM
                             (RTA Disadvantaged Business Enterprises Program)

Purchase Order/IFB/RFP/RFQ No. ___________________________

Project Name: _____________________________

Name of Contractor: ____________________________


                                                                                     Dollar Amount
   Name of DBE                                      Type of Work or Contract             and/or
    Participant                   Address            Items or Parts Provided         Percentage (%)




Please complete this DBE form per FTA Guideline 49 CFR 26.53. A good faith effort to include DBE participation
is required and should be listed and returned to the RTA.
If “None” a good faith effort documentation must be provided with this form.

Contractors are advised to view the RTA's Certified DBE Listing - http://www.tucp.org/ or
http://www.dot.state.tx.us/business/tucpinfo.htm for DBE Opportunities for this contract.

The undersigned Contractor hereby further certifies that she/he has read all of the attached Federal Supplemental
Conditions and agrees to abide by the terms, certifications, and conditions thereof.

The undersigned will enter into a formal agreement with the DBE Participants for work listed in this Schedule upon
execution of a contract with the Regional Transportation Authority.

NOTE: Any business listed above must be certified as a Disadvantaged Business Enterprise (DBE) or will be provided
an opportunity to be certified by the RTA.

Date: ______________________                   __________________________________
                                                            Name of Firm
                                               By:________________________________

                                               Name: _____________________________

                                               Title: ________________________________


                                            IFB NO. 2011-FC-05
                          ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                              Page 232 of 241
Form 2
DETERMINATION OF GOOD FAITH EFFORT
Consultant/Contractor:


Vendor Identification Number: ________________________________________________

Address:_________________________________________________________________


Phone: ____________________ Fax:__________________ e-mail: __________________


In making a determination that a Good-faith effort has been made, RTA requires the Consultant/Contractor to
complete a checklist and submit supporting documentation explaining in what ways the Consultant/Contractor has
made a Good-Faith effort according to each requirement with a copy of notice, or solicitation or letter of justification.
The Consultant/Contractor will respond to the following and provide supporting documentation as requested.


Please answer “yes” or “no.” Were you able to meet the Contract Goal in selecting Disadvantaged
Businesses as part of your bid or proposal submission?

         Yes _______ No _______

         If you answered “yes,” you are not required to answer the remaining questions below. If
         you answered “no,” please respond as requested below.

         In an effort to document my Good-faith efforts to meet the Contract Goals
         regarding Disadvantaged Business participation, I am able to present
         evidence of:

           Yes _______ No _____ Attendance at a pre bid meeting, if any, scheduled by RTA to Inform
                                DBEs of subcontracting opportunities under a given solicitation.

           Yes _______ No _____ Review of the list of RTA certified firms, and
                                firms certified through the Texas Unified
                                Certification Program to determine potential
                                subcontractors

           Yes _______ No _____ Advertisement in general circulation media, trade association
                                publications, and other media for at least 15 days before bids or
                                proposals are due.

           Yes _______ No _____ Written notification to Disadvantaged Businesses that their interest in
                                the contract is solicited. The notice included a description of the
                                subcontracting opportunities and identified the contact person within
                                my office. The notice was sent to at least five (5) businesses in the
                                current RTA or TUCP directory of certified DBE entities that perform
                                the type of work required.



                                             IFB NO. 2011-FC-05
                           ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                               Page 233 of 241
  Yes _______ No _____ Efforts made to select portions of the work proposed to be performed
                       by Disadvantaged Businesses in order to increase the likelihood of
                       achieving the stated goal and, to the extent feasible and consistent
                       with prudent industry practice, efforts to divide the contract work in
                       reasonable lots.

Yes _______ No _____       Efforts to provide interested DBEs with adequate information about
                           the plans, specifications, and requirements of the contract in a timely
                           manner to assist them in responding to the solicitation.

Yes _______ No _____       Negotiating in good faith with interested with DBEs, including: a) The
                           names, addresses, and telephone numbers of DBEs that were
                           contacted;

                         b) A description of the information provided to DBEs regarding the
                            plans and specifications for portions of the work to be performed;
                            and

                         c) A statement of why additional agreements with
                            DBEs were not reached.

Yes _______ No _______ Not rejecting DBEs as being unqualified without sound reasons based
                       on a thorough investigation of their capabilities. Concerning each
                       Disadvantaged Business the Proposer contacted but rejected as
                       unqualified, the reasons for the Proposer’s exclusion.

Yes _______ No _______ Efforts made to assist the Disadvantaged Business contacted that
                       needed assistance in obtaining bonding or insurance required by the
                       Proposer or RTA.

Yes _______ No _______ Efforts made to assist interested DBEs in obtaining
                       Necessary equipment, supplies, materials or related
                       assistance or services.

Yes _______ No _______ Efforts made to utilize the services of available disadvantaged
                       business organizations i.e. chamber of commerce’s, small
                       business development centers, that provide assistance in the
                       recruitment and placement of DBEs.

NOTE: If the prime contractor is unable to meet the solicitation goal or if any of the above items
are answered “no,” the Proposer/Consultant must attach supporting documentation or a letter
of justification. The attachments submitted by the Proposer/Contractor will be reviewed by the
RTA and a written notice of acceptance or deficiency of Good-Faith effort will be issued. This
form is due at time of proposal submission.


Signature of Proposer/Consultant:______________________________________________
Title:__________________________________________________________
Date: __________________________________________




                                  IFB NO. 2011-FC-05
                ARRA ADA BUS STOP IMPROVEMENTS PHASE II – ZONES 1 – 3
                                    Page 234 of 241
FORM 3: Disadvantaged Business Enterprise – LETTER OF INTENT

Solicitation No.: ______________________________

PLEASE SUBMIT SEPARATE FORMS FOR EACH SUBCONTRACTOR\SUPPLIER
For use by submitters to identify subcontractors and suppliers.

Submitter Name: _______________________________

Address: ________________________________________________

City: _____________________________ State: _______ Zip: ______

Phone Number: ____________________________           Fax Number:      ____________________________

Project Title: ______________________________________________

Time Period Covered: ______________________________________

Percentage/Dollar Amount of contract with disadvantaged business enterprise subcontractor\supplier: _________

Name of Disadvantaged Business enterprise firm: ________________________________________

Address: _________________________________________________

City: ________________________________State: _______ Zip: _____

Telephone: ___________________

Description of proposed materials or services to be performed under agreement with disadvantaged
business enterprise for amount indicated above:

-----------------------------------------------------------

-----------------------------------------------------------

-----------------------------------------------------------

-----------------------------------------------------------

Affirmation

The above-named DBE firm affirms that it will perform the portion of the contract for the estimated dollar value as
stated above.

By __________________________________________________________
     (Signature)                (Title)

If the bidder/offeror does not receive award of the prime contract, any and all representations in this Letter of
Intent and Affirmation shall be null and void.

(Submit this page for each DBE subcontractor.)




                             ADA BUS STOP IMPROVEMENT PHASE II ZONES 1– 3
                                       IFB NO. 2011-FC-05
                                          Page 235 of 242
           . Form 4
           CONTRACTOR ULTILIZATION PLAN FORM Proposer presents the following participants in this solicitation and any resulting Contract. All
           Proposers, including disadvantaged business enterprises bidding as prime contractors, are required to demonstrate good faith efforts to include
           eligible DBE businesses in their submissions as subcontractors and/or suppliers.

                                                             Type of Work to be Performed or Materials Supplied                    Indicate      Percent of Contract
                                                                                                                                   if Small      Effort
                     CONTRACTOR                                                                                                                                             Price
                                                                                                                                   Business
                                                                                                                                     Y/N
                                                                                                                                 DBE                   DBE
Name of Business

Business Address

Telephone No.
Contact Person


                    SUBCONTRACTOR

Name of Business

Business Address

Telephone No.
Contact Person


Name of Business

Business Address

Telephone No.
Contact Person

                                                             Counts for 100% toward dbe business goal when purchased from dbe business manufacturer and 60% when purchased from dbes
                    SUPPLIERS                                regular dealer (see Instructions To Bidders/Proposers).

Name of Business

Business Address

Telephone No.
Contact Person


Name of Business

Business Address

Telephone No.
Contact Person

                                                                                                          Total amount of
Submitted by:                                                Business Name:                                       contract                     TOTAL         $_______________________
                    Signature of Owner/Officer of Business                                                to be performed    Contractor:                     $_______________________
Address:                                                                                                               by:   SubContractor(s):             $______________________
                                                                                                                                            Supplier(s):     $_______________________
Telephone/Fax:                                               Date:




                                                     ADA BUS STOP IMPROVEMENT PHASE II ZONES 1– 3
                                                               IFB NO. 2011-FC-05
                                                                  Page 236 of 242
                                          APPENDIX H




                        AMERICAN RECOVERY AND REINVESTMENT ACT
                           CONTRACT REPORTING REQUIREMENTS


   Project#____________________                     Date:______________________

   Vendor Legal Name:___________________________ DUN’s #______________
        Address:_____________________________City/State/Zip:__________________

1. Please indicate the number of new jobs that have been created and any existing filled positions that
   were retained to support or carry out Recovery Act projects for the past week.
   FTE Jobs Created or Jobs Retained:____________
   (For example, two full-time employees and one part-time employee working half
   days would be reported as 2.5 FTE. “Jobs or positions retained” means those
   previously existing filled positions that are retained as a result of Recovery Act
   funding. Must also report jobs of sub awards/sub contracts.)

2. Please indicate the types of new jobs that were created/retained this week and reported
   above. (For example, this description may rely on job titles, broader labor categories as long as
   the terms used are widely understood and describe the general nature of the work. Please attach a
   separate sheet to list titles/descriptions, if needed.)
   ____________________________________________________________________
   ____________________________________________________________________
   ____________________________________________________________________
   ____________________________________________________________________

3. Report the expenditures of any subcontracts that you have utilized with ARRA funding for the past
   weekly reporting period that was over $25,000.

   Name/Dun’s #/Zip Code               Service/Product         Expenditure Amt.

   ______________________________________________________________________
   ______________________________________________________________________
   ______________________________________________________________________
   ______________________________________________________________________


4. For the five most highly compensated officers of the entity: Provide the names and total
   compensation if:
   (1) the recipient in its preceding fiscal year received—(a) 80 percent or more of its
       annual gross revenues in Federal awards; and (b) $25,000,000 or more in annual
                       ADA BUS STOP IMPROVEMENT PHASE II ZONES 1– 3
                                 IFB NO. 2011-FC-05
                                    Page 237 of 242
       gross revenues from Federal awards; and
   (2) the public does not have access to information about the compensation of the
       senior executives of the entity through periodic reports filed under section 13(a) or   15(d) of the
   Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or
      section 6104 of the Internal Revenue Code1986 [26 USC Sec.6104].

     ``Total compensation'' means the cash and noncash dollar value earned by the
      executive during the past fiscal year of the following (for more information see 17
      CFR 229.402(c)(2)): (i). Salary and bonus. (ii). Awards of stock, stock options,
      and stock appreciation rights. Use the dollar amount recognized for financial
     statement reporting purposes with respect to the fiscal year in accordance with FAS 123R.
      (iii). Earnings for services under non-equity incentive plans. Does not include
     group life health, hospitalization or medical reimbursement plans that do not
     discriminate in favor of executives, and are available generally to all salaried
     employees.
       (iv). Change in pension value. This is the change in present value of defined
     benefit and actuarial pension plans. (v). Above-market earnings on deferred
     compensation which are not tax-qualified. (vi). Other compensation. For example,
     severance, termination payments, value of life insurance paid on behalf of the
     employee, perquisites or property if the value for the executive exceeds $10,000.


   Name:____________________________ Yearly Salary:____________________
   Name:____________________________ Yearly Salary:____________________
   Name:____________________________ Yearly Salary:____________________
   Name:____________________________ Yearly Salary:____________________
   Name:____________________________ Yearly Salary:____________________


5. The American Recovery and Reinvestment Act of 2009 (ARRA) requires that every contractor that
   receives ARRA funds must post a notice of rights and remedies available to whistleblowers. (Title
   XV, Subtitle A, Section 1553(e)). Contact the Department of Transportation Office of Inspector
   General’s office (OIG) if you have questions.
   (Poster Attached)




                        ADA BUS STOP IMPROVEMENT PHASE II ZONES 1– 3
                                  IFB NO. 2011-FC-05
                                     Page 238 of 242
                                   U.S. DEPARTMENT OF TRANSPORTATION
                                       OFFICE OF INSPECTOR GENERAL

                                   WHISTLE BLOWERS KNOW YOUR RIGHTS

On January 6, 2009 the American Recovery and Reinvestment Act (ARRA) was signed into law by President Obama
to improve public welfare. If you protect America’s interests by reporting fraud, abuse, or mismanagement of ARRA
funds at your workplace, and are retaliated against as a result, know that America is here for you.

        American Recovery and Reinvestment Act of 2009, Pub. L. No. 111-5, Section 1553




    DMINISTRATIVE REVIEW:
You have the right to file a complaint with the Office of Inspector General and receive a timely investigation and response.



     EPRISAL-FREE:
You have the right to be free from discharge, demotion, or discrimination as a result of disclosing:

       Gross mismanagement of a stimulus-funded project.
       Gross waste of stimulus funds.
       Danger to public health and safety related to a stimulus-funded project.
       Violation of the law relating to stimulus funds or a stimulus-funded project.
       Abuse of authority related to the implementation of stimulus funds.



     EMEDIES:
You have the right to receive remedies if the Office of Inspector General determines you were subjected to an unlawful
reprisal. Your employer may be ordered to abate the reprisal, reinstate your employment, and you may receive
compensation to reimburse you for your attorney fees and other financial suffering experienced as a result of the reprisal.



        LTERNATIVES:

You have the right to take action against your employer in civil district court if the Office of Inspector General does not
respond within 210 days or determines that there was not an unlawful reprisal.


                           www.oig.dot.gov/recovery/whistleblower_protections.jsp

                         Phone: 1-800-424-9071 Email: hotline@oig.dot.gov          Fax: 1-540-373-2090
                                 Mail: USDOT/OIG, P.O. Box 708, Fredericksburg, VA 22404
                              ADA BUS STOP IMPROVEMENT PHASE II ZONES 1– 3
                                          IFB NO. 2011-FC-05
                                             Page 239 of 242
                                       APPENDIX I


     REFERENCES: The Bidder must supply a list of five (5) similar projects which
     he/she has completed within the last five (5) years.

1.    Company:    ________________________________________________
      Owner:      ________________________ Contact: _______________
      Address:    ________________________________________________
      Telephone No.:   ___________________________________________
      Project:    ________________________________________________
      Date Completed:   ___________________ Cost: _________________

2.    Company:    ________________________________________________
      Owner:      ________________________ Contact: _______________
      Address:    ________________________________________________
      Telephone No.:   ___________________________________________
      Project:    ________________________________________________
      Date Completed:   ___________________ Cost: _________________

3.    Company:    ________________________________________________
      Owner:      ________________________ Contact: _______________
      Address:    ________________________________________________
      Telephone No.:   ___________________________________________
      Project:    ________________________________________________
      Date Completed:   ___________________ Cost: _________________

4.    Company:    ________________________________________________
      Owner:      ________________________ Contact: _______________
      Address:    ________________________________________________
      Telephone No.:   ___________________________________________
      Project:    ________________________________________________
      Date Completed:   ___________________ Cost: _________________

5.    Company:    ________________________________________________
      Owner:      ________________________ Contact: _______________
      Address:    ________________________________________________
      Telephone No.:   ___________________________________________
      Project:    ________________________________________________
      Date Completed:   ___________________ Cost: _________________

CONTRACTS ON HAND: The Bidder must provide a list of contracts that the firm is currently
in process: ________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________
__________________________________________________________________________



                        ADA BUS STOP IMPROVEMENT PHASE II ZONES 1– 3
                                  IFB NO. 2011-FC-05
                                     Page 240 of 242
     SUBCONTRACTORS: The Bidder must provide a tentative list of subcontractors proposed
     to assist in the performance of this contract. Bidder must also note the portion
     (percentage) of work to be performed by each.

       Subcontractor: __________________________________% of work:__________

       Subcontractor: __________________________________% of work:__________

       Subcontractor: __________________________________% of work:__________

       Subcontractor: __________________________________% of work:__________

       Subcontractor: __________________________________% of work:__________


The undersigned hereby authorizes and requests any person, firm, or corporation to furnish
any information requested by the RTA in verification of the recitals comprising this Certification
and Statement of Qualification.

Executed this _________ day of _____________

By: ____________________________________

Printed Name: ___________________________

Title: ___________________________________




                         ADA BUS STOP IMPROVEMENT PHASE II ZONES 1– 3
                                   IFB NO. 2011-FC-05
                                      Page 241 of 242

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:29
posted:8/19/2011
language:English
pages:241