                                 SECTION 11 70 00
                                MEDICAL EQUIPMENT

PART 1 - GENERAL
1.1 DESCRIPTION
   A. This section specifies equipment as follows:
     1. Washer/Disinfectors.
     2. Ultrasonic Cleaner.
     3. Water Treatment Unit
     4. Pass Thru Window
     5. Conveyor
     6. Workstation
     7. SS Table
     8. Loading Station
     9. Unloading Station
    10. Trim Units
    11. Condensate Cool Down Kit
1.2 RELATED WORK
   A. Plumbing Connections: Section 22 11 00, FACILITY WATER DISTRIBUTION and
      Section 22 13 00, FACILITY SANITARY SEWERAGE.
   B. Connections to Compressed Air System: Section 22 15 00, GENERAL SERVICE
      COMPRESSED-AIR SYSTEMS.
   C. Electrical Connections: Section 26 05 11, REQUIREMENTS FOR ELECTRICAL
      INSTALLATIONS.
1.3 PERFORMANCE REQUIREMENTS
   A. Provide units that are designed to use the following utility services:
      1. Steam Service: 345 to 552 kPa (50 to 80 psig).
      2. Cold-Water Service: 207 to 345 kPa (30 to 50 psig).
1.4 QUALITY CONTROL
   A. Manufacturer Qualifications: Manufacturer regularly and presently
      manufactures sterilizers.
   B. Installer Qualifications: Installer is authorized representative of
      sterilizer manufacturer and employs factory-trained personnel to install
      sterilizers.
   C. Steam Sterilizers: Comply with ANSI/AAMI ST8.
   D. Ethylene-Oxide Sterilizers: Comply with ANSI/AAMI ST24.
   E. Electrical Components and Devices: UL listed and labeled for intended
      use.
1.5 SUBMITTALS
   A. Submit in accordance with specification Section 01 33 23, SHOP DRAWINGS,
      PRODUCT DATA, AND SAMPLES.


                                      688-326
                                   11 70 00 - 1
                                                                              05-09


   B. Manufacturer's Literature and Data: Include the following:
      1. Illustrations and descriptions of sterilizers.
      2. Optional auxiliary equipment and controls that will be included for
         project.
   C. Shop Drawings: Show details of fabrication, installation, adjoining
      construction, coordination with mechanical and electrical work,
      anchorage, and other work required for complete installation.
   D. Field Test Reports: Indicate dates and times of tests and certify test
      results.
   E. Operating Instructions: Comply with requirements in specification
      Section 01 00 00, GENERAL REQUIREMENTS.
1.6 APPLICABLE PUBLICATIONS
   A. The publications listed below form a part of this specification to the
      extent referenced. The publications are referenced in the text by the
      basic designation only.
   B. American National Standards Institute/Association for the Advancement of
      Medical Instrumentation (ANSI/AAMI):
      ST8-2001................Hospital Steam Sterilizers, 3rd edition
      ST24-1999 (R2005).......Automatic, General-Purpose Ethylene Oxide
                                 Sterilizers and Ethylene Oxide Sterilant Sources
                                 Intended for Use in Health Care Facilities
   C. National Association of Architectural Metal Manufacturers (NAAMM):
      AMP 500-505-1988........Metal Finishes Manual
1.7 WARRANTY
      Comply with FAR clause 52.246-21, except warranty period shall be two
      years.
1.8 GUARANTEE PERIOD SERVICES
   A. Engage factory-trained authorized representatives of sterilizer
      manufacturers to perform maintenance service on sterilizers during
      guarantee period.
      1. Maintenance Service:
         a. Inspection of sterilizers at six-month intervals.
         b. Testing, cleaning, adjusting, repairing, and furnishing and
               installing replacement components as required to maintain
               sterilizers in reliable working condition.
      2. Maintenance service does not include cleaning, adjusting, repairing,
         and furnishing and installing replacement components required because
         of improper use.




                                       688-326
                                    11 70 00 - 2
                                                                                                   05-09


1.9 ORDER ACKNOWLEDGEMENT
     A. After receipt by Getinge of a hard copy purchase order, Getinge will
       send     an    Acknowledgement        of   the    order     to   Customer,       listing     the
       equipment being purchased, indicating an approximate shipping date,
       and detailing any special instructions that relate to the transaction.
       Getinge’s       Acknowledgement       is   based     upon    these    General      Terms     and
       Conditions. Getinge rejects any and all other terms and conditions of
       sale proposed by Customer or discussed by the parties in connection
       with the transaction. The Acknowledgement, these General Terms and
       Conditions,       Getinge’s    Limited      Equipment       Warranty,   the      Installation
       Terms and Conditions and the other documents referenced herein shall
       constitute a firm contract of sale between Getinge and Customer unless
       Customer objects to any term, in writing, promptly upon receipt of the
       Acknowledgement.         If a firm contract of sale is cancelled by Customer,
       a ten percent (10%) cancellation fee will be charged to Customer,
       except in the case of custom-built products which will be subject to a
       cancellation fee equal to costs incurred plus a reasonable allowance
       for Getinge’s overhead and profit on those costs. Customer’s requested
       date of delivery has been considered in the equipment pricing.                         It is
       imperative that Customer accepts delivery, according to the shipping
       dates indicated in Getinge’s Acknowledgement.                        Delivery delayed by
       Customer       beyond   the   indicated     shipping      date(s)    will     necessitate      a
       price increase at the rate of one and one-half percent (1½%) per each
       month (or part thereof) of delay.                 For some complex projects and for
       custom-built       products,     Getinge      will   provide      post-order       submittals
       and/or shop drawings to finalize and confirm equipment details.                            These
       submittals must be reviewed and approved by the Customer to initiate
       manufacturing.          If for any reason the order is cancelled and the
       production has been started or the items ship to the customer site and
       are returned, the customer must pay all associated costs.                           In cases
       where Getinge is at fault, there will be no additional cost.

PART 2 – PRODUCTS – CONTRACTOR IS RESPONSIBLE FOR PURCHASE, DELIVERY AND
INSTALLATION OF ALL ITEMS LISTED HEREIN.
2.1 WASHER / DISINFECTOR (9100) – QUANTITY (SEE QUANTITY NEXT TO EACH ITEM)
 1     The Getinge 9100 Washer/Disinfectors are a series of fully automatic,
       large capacity, floor loading hydro-spray mechanical washers designed
       for hot water detergent solution cleaning, rinsing, low-level thermal
       disinfection and drying of transport carts, containers, tote-bins,
       bowls,        basins    and   other    bulk      items    reprocessed       in    Healthcare
       decontamination departments. Units can be recessed in a shallow 6-


                                                688-326
                                             11 70 00 - 3
                                                                                               05-09


    inch (150mm) pit for level floor loading or mounted directly on the
    floor with ramp for loading and unloading. The 9100 are standard with
    an exclusive full-view, power sliding glass door for pass-through
    loading    and     unloading       operations.     All    models    feature      vertically
    mounted,       lateral-sweeping,       jet-spray    manifold system mounted along
    both    walls     of   the    chamber,    level-walkable      flooring,       programmable
    power floor tilt and integrated hot air drying.                           Circulation and
    heating system are packaged on one side of the machine and includes
    two peristaltic chemical dosing pumps, enclosed steam heat exchanger,
    main wash pump, drain pump, self-cleaning filter and effluent drain
    cool-down tank.           Seismic design is standard with all models.                     Can
    process up to four cycles per hour, including drying.
            78 inch chamber
            Floor-mounted
            With power tilt
    Catalog#: H0D!@~$NS&CNNPN
1   Floor Mounted Barrier Panels & Service Side Enclosure, 3-Walls (9100)
    Catalog#: 9100FLR-SSE
1   Connection Kit, Steam/HW/CW Strainer, Shutoff, Gauge, NPT
    Catalog#: GW61301605775
2   36 in. W x 6 in. H x 4-Ft. Long Loading Ramp, Single Ramp, Order 2
       Total From 3ft or 4ft
    Catalog#: GW501898600
1   INSTALLATION: Includes one pre-install walk thru by installation team
       for     site    requirements       review,      uncrating/moving       equipment       from
       contiguous on site location to point of installation (rigging is
       included for 833 sterilizer only), set in place, reassembly if
       necessary,          level/lag     to   floor,     remove   associated         debris     to
       customer        provided        receptacle    and     perform     final       operational
       checkout       of    equipment.        Seismic      anchoring     is    not     included.
       Pricing is contingent on a site review by Getinge.                              Any work
       requested beyond this scope definition or not defined in Getinge
       Terms and Conditions will be an additional charge.                        Requests must
       be     in    writing      and   proposal   signed     before    additional      work   can
       begin.
    Catalog#: 6764-I-9120


1   MP 3000 - 126 Condensate cool down kit
    Catalog#: XX2349



                                            688-326
                                         11 70 00 - 4
                                                                                                05-09


2.2 WASHER / DISINFECTOR (8666) – QUANTITY (SEE QUANTITY NEXT TO EACH ITEM)
 1    The Getinge Model 8666 is intended for the cleaning and disinfection
         of reusable surgical instruments and utensils in centralized and
         decentralized decontamination work areas of hospitals, surgical
         suites and ambulatory surgery centers.                    All Models feature 10.9
         cu-ft of chamber volume, dual interlocking vertical sliding glass
         doors, programmable microcomputer controls, three chemical dosing
         pumps, safe-to-handle thermal disinfection, drain cool-down and
         dual-action        drying.      The    power     door   pass-through        Model    8666
         enhances      productivity      and    ergonomics       of   installations      with    a
         barrier wall to separate the soiled work area from the clean prep
         & pack work area.            Double power door models can be equipped with
         automated loading and unloading options.
              With Drying
              Vented Exhaust
              Double Power Doors
              Steam Sump Heater
              For Automation
      Catalog#: 8666SDAT@V&$>~+=
 1    INSTALLATION: Includes one pre-install walk thru by installation team
         for    site   requirements       review,       uncrating/moving       equipment      from
         contiguous on site location to point of installation (rigging is
         included for 833 sterilizer only), set in place, reassembly if
         necessary,         level/lag    to    floor,     remove      associated     debris     to
         customer      provided       receptacle    and      perform      final      operational
         checkout      of    equipment.        Seismic     anchoring      is   not     included.
         Pricing is contingent on a site review by Getinge.                            Any work
         requested beyond this scope definition or not defined in Getinge
         Terms and Conditions will be an additional charge.                       Requests must
         be    in   writing    and    proposal   signed     before     additional      work   can
         begin.
      Catalog#: 6612-I-8666
 2    Recess Trim for One Side of One 86-Series Washer
      Catalog#: KY980115
 3    Manual Transfer/Load Trolley (with and without drain assembly)
      Catalog#: D010345
 1    3-Level Wash Cart, Manual and All Automation
      Catalog#: V498781904
 1    4-Level Wash Cart, Manual and All Automation



                                            688-326
                                         11 70 00 - 5
                                                                                                05-09


      Catalog#: V498676209
 1    Tubular Instrument Rack with One Ramp
      Catalog#: V499395600


2.3 ULTRASONIC CLEANER – QUANTITY (1)
 1    The Model 2460RD is a companion product to the 2460UC Ultrasonic
         Cleaner,      that    is     designed    to    pressure    spray      rinse    and     dry
         instruments following sonic cleaning, when a washer/disinfector is
         not     available      to    remove     process      residue,    final       rinse     and
         subsequently dry loads.              This product features "hands-free" toe
         switch operation, a powered instrument tray elevator and a lid
         that opens and closes automatically.
      Catalog#: KR2460RD@$+~
 1    INSTALLATION: Includes one pre-install walk thru by installation team
         for    site   requirements        review,      uncrating/moving       equipment       from
         contiguous on site location to point of installation (rigging is
         included for 833 sterilizer only), set in place, reassembly if
         necessary,         level/lag    to    floor,      remove   associated        debris     to
         customer      provided       receptacle       and    perform     final       operational
         checkout      of     equipment.         Seismic     anchoring    is    not     included.
         Pricing is contingent on a site review by Getinge.                             Any work
         requested beyond this scope definition or not defined in Getinge
         Terms and Conditions will be an additional charge.                       Requests must
         be    in   writing     and   proposal     signed    before     additional      work   can
         begin.
      Catalog#: 6608-I-2460RD
2.4 WATER TREATMENT UNIT – QUANTITY (1)
 1    Watts HS-Series provides spot-free rinse water and reduces electric
         boiler scaling, extending heating element life.                       Installation and
         the first year’s supply of replacement filters are included.
              2,400 Gallons in Output per Day
              Up to 2,400 gallons per day
              Flotation Tank
      Catalog#: 61301604725


2.5 PASS THRU WINDOW – QUANTITY (1)
 1    Pass Thru Window
      Catalog#: D990100
 1    INSTALLATION: Includes one pre-install walk thru by installation team



                                            688-326
                                         11 70 00 - 6
                                                                                                         05-09


            for    site   requirements        review,       uncrating/moving           equipment        from
            contiguous on site location to point of installation (rigging is
            included for 833 sterilizer only), set in place, reassembly if
            necessary,         level/lag    to    floor,         remove     associated       debris       to
            customer      provided        receptacle        and     perform       final      operational
            checkout      of    equipment.          Seismic       anchoring       is   not     included.
            Pricing is contingent on a site review by Getinge.                                   Any work
            requested beyond this scope definition or not defined in Getinge
            Terms and Conditions will be an additional charge.                            Requests must
            be    in   writing    and     proposal     signed       before      additional       work   can
            begin.
      Catalog#: 15615-I-PTWIN


2.6 CONVEYOR – QUANTITY (1)
 1    The       Free-Standing      Conveyor      is    an    automated       transport       system      for
            washer loading equipment that allows transfer of carts from the
            clean side back to the soiled side.                           It is usually installed
            through the barrier wall and comes standard with an integrated
            pass-thru     window     to    minimize        air    cross-contamination.             It    can
            accomodate any of the carts from the 8666 or 8668 washers and                                 is
            available     in     lengths     from      4    carts    to    11    carts     for    optimum
            department design.
      Catalog#: FSC05WIN
 1    Install FRC
      Catalog#: X3XXr5ins


2.7 SS WORKSTATION – QUANTITY (2)
 2    Custom stainless steel workstation complete with 3 integral sinks, a
            hot/cold water mixing faucet with rigid swing nozzle and spray
            hose assembly, a 4” high backsplash and 1/8” countertop drain bead
            to retain liquid spillage.                Each sink measures 24”L x 17”W x 20”D
            and includes cup strainer and tailpiece.                      Optional side splash and
            other fixtures are available.                  Specify sink and fixture locations
            to accommodate workflow direction.
                 10 Feet Long
      Catalog#: PW - Custom


2.8 SS WORK TABLE – QUANTITY (4)
 4    6725 table for use in clean work areas as an accumulation, sorting,
            preparation and packing station. Table is constructed of welded


                                               688-326
                                            11 70 00 - 7
                                                                                              05-09


          stainless steel.
               With Shelf Understructure


       Catalog#: PW67250S1


2.9 LOADING STATION – QUANTITY (3)


  3           Automatic Single-rack Loading Station
              Catalog#: V499925201


2.10 UNLOADING STATION – QUANTITY (2)
  2           Automatic Two-rack Unloading Station
              Catalog#: V499925100


2.11 RECESSED TRIM FOR WASHER – QUANTITY (4)
  4           Recess Trim for One Side of One 86-Series Washer
              Catalog#: KY980115


2.12 COOL DOWN KITS – QUANTITY (3)
  3           Condensate cool down kits
              Catalog#: COND8666


2.13 WASHER DISINFECTOR – QUANTITY (2)
  2 Install 86-Series Washer Disinfector with Load/Unload and Remove Existing
              Washer
      CatalCatalog#: 6615-IR-8666Auto
PART 3 – EXECUTION
3.1 INSTALLATION
   Getinge will provide specifications, rough-in drawings, or construction cut
       sheets for review by contractor and for use by the necessary trades
       performing      the   installation   of   the    equipment.    Installation       of    the
       equipment by Getinge is an additional charge and is not included in the
       price of the equipment (unless otherwise specified in the equipment
       Proposal).        Getinge’s     installation      services    are    offered      on    the
       Installation      Terms   and   Conditions      attached   hereto    and   made   a    part
       hereof.      In no event will Getinge be responsible for providing for
       structural      in-wall   and   above-ceiling      supports    for    wall-mounted        or
       ceiling-mounted equipment.
   If installation is not performed by an authorized Getinge representative:



                                           688-326
                                        11 70 00 - 8
                                                                               05-09


      1) Contractor will be responsible for all costs related to receiving,
        accepting, unloading, moving into place, uncrating, installing,
        connecting to the necessary service lines, final connections and start-
        up. See Getinge’s Limited Equipment Warranty.
      2) Various components (piping and valving, etc.) may be removed prior to or
        during shipment for safety reasons; Contractor will be responsible for
        labor expense involved in the reassembly or reconnection of those
        components at the job site.
      3) Getinge will not be responsible for damage to components or equipment as
        a result of improper storage, installation, accidents, misuse,
        alteration, incorrect utility hook-up or start-up.     Getinge will not be
        responsible for any cosmetic damage to components or equipment.
      4) Contractor must engage Getinge to perform a final checkout before the
        equipment warranty is activated. Checkout services and any installation
        changes or equipment adjustments made by Getinge during the final
        checkout, are billable to Contractor at Getinge’s then generally
        available hourly service rates and minimum charge for service time,
        travel and waiting time.   Failure to engage Getinge to perform final
        checkout services is considered an agreement by Contractor to hold
        Getinge harmless from and against any property damage, personal injury
        or death related to the equipment, its use or operation.
      5) If Contractor does not engage Getinge to perform a final checkout of the
        equipment, the equipment warranty is voided and Getinge will not be
        responsible for equipment performance limitations or failure of the
        equipment to meet published performance specifications.
      For any quotation including T-DOC software, please review the Terms and
        Conditions for Software Installation, as well as Minimum Hardware
        Specifications, which are incorporated herein by reference, and
        available online at: www.getingeusa.com/t-doc.
3.2      DELIVERY
        This proposal is based upon delivery to the receiving dock of your
        facility, F.O.B. shipping point (manufacturer).      Shipping and handling
        charges will be prepaid and added to the invoice.     Fuel surcharge will
        be billed at time of shipment according to the market rate for that
        particular week as set by the Department of Transportation and our
        freight carriers.   If a 3rd party freight company or freight collect
        methods are required, Getinge will charge a $50.00 handling fee per
        shipment.   Any additional expense for providing hydraulic lift gate for
        truck delivery, inside delivery, refused shipments, storage, redelivery,
        etc., will be an additional charge to Customer.     It is Customer’s



                                         688-326
                                      11 70 00 - 9
                                                                               05-09


      responsibility to store the delivered equipment, if necessary, at no
      expense to Getinge.     Should the job conditions or construction progress
      prevent delivery of equipment into the building and it is necessary for
      Getinge to strip equipment to reduce overall size, there will be
      additional charges for reassembly.     Delivery dates for custom-built
      products are based upon the prompt return (within 10 days) of approved
      submittals and/or shop drawings.     60 days advance notice is required in
      any case where shipment is being delayed over 30 days due to reasons
      outside of Getinge’s control.    Any storage charges incurred shall be
      paid by the customer.
3.3 PROTECTING AND CLEANING
   A. Protect equipment from dirt, water, and chemical or mechanical injury
      during the remainder of the construction period.
   B. At the completion of work, clean equipment as required to produce ready-
      for-use condition.
3.4 INSTRUCTIONS
      Instruct personnel and transmit operating instructions in accordance
      with requirements in specification Section 01 00 00, GENERAL
      REQUIREMENTS as well as that contained herein
                                 - - - E N D - - -