					                                                                                                                                                                          NOTE: "Blue Chip" products, highlighted in blue, are agreed to by Advisors as being the highest value products in


Products in Development in 2006 - Action Plan 41.13: Low Level Waste-Radiation Mangement
Barrier 41.13.03: Decommissioining Technology, Going Forward
                                                                                                                                                                                      Revised
                                                           Portfolio   Project/                                                                                          Planned      Planned          Actual
                                                            Project    Lifetime                                                                                        Completion    Completion      Completion                                                     Tracking        Blue
Barrier #      Barrier Title         Project Name         Sequence # Tracking #      Manager      Product ID          Product         Product Type     In Portfolio?       Date         Date            Date    Status                       Comments               Change(s)       Chip
BR41.13.    Decommissioning    Decommissioning and      P41.13.03.01.0 052386     Wood,            1013280 The EPRI DFDX Process- Technical          Post Portfolio     9/29/2006                     5/3/2006  Completed (On                                                        N
03          Technology         Technical Applications   1                         Christopher                -Final Report            Report                                                                    Time)
BR41.13.    Decommissioning    Decommissioning and      P41.13.03.01.0 052386     Bushart, Sean    1013165 Proceedings: 4th EPRI      Technical      Post Portfolio    9/30/2006                                On Schedule                                                           N
03          Technology         Technical Applications   1                         P.                         International            Report
                                                                                                             Decommissioning and
                                                                                                             Radioactive Waste
                                                                                                             Workshop
BR41.13.    Decommissioning    Decommissioning and      P41.13.03.01.0   052386   Wood,            1013510 Guide to Standardized      Technical      Post Portfolio    12/22/2006                                  On Schedule                                                        N
03          Technology         Technical Applications   1                         Christopher                Decommissioning Plans Report
BR41.13.    Decommissioning    Decommissioning and      P41.13.03.01.0   052386   Bushart, Sean    1013511 Summary of US              Technical      Post Portfolio    12/22/2006                                  On Schedule                                                        N
03          Technology         Technical Applications   1                         P.                         Decommissioning          Report
                                                                                                             Projects (Connecticut
                                                                                                             Yankee)
BR41.13. Decommissioning       Decommissioning and      P41.13.03.01.0   052386   Wood,            1013512 Recycling and Disposal Technical          Post Portfolio    12/22/2006                                  On Schedule                                                        N
03       Technology            Technical Applications   1                         Christopher                of Contaminated Material Report




             Page 1 of 5                                                                                                                                                                                                                                   Update: 8/17/2011
                                         Customer Commitment Product Types

Description       Definition/Examples                                             Delivery Method
Assembled Package Collection or set of technical reports and/or other materials
                  such as slide presentations, graphics, etc., used to deliver
                  technical results.                                              Automatic hard copy to all funders.
Conferences/      Conferences and Workshops focus on technical issues in a Conference/workshop attendees automatically get results.
Workshops         particular field for a specific group of attendees. Use of this
                  Product Type implies that a transfer of money from the
                  customer to EPRI will take place for this activity. The cost is
                  not automatically included as part of the membership.

Hardware             Used for tangible products such as machinery prototypes or
                     computer hardware.
Peer Literature      Peer-Reviewed Literature are papers describing results of Citations catalog is delivered as a spreadsheet via the
                     EPRI-sponsored research that are submitted to peer-           web.
                     reviewed scientific and/or technical publications. There is a
                     separate Peer Literature Database for these products.

Service              Services include conferences, workshops, training courses, Various
                     training workshops, user groups, hotlines, technical
                     support, troubleshooting, evaluations, inspection issues,
                     user group meetings. Use of this product type implies that
                     the product is provided as part of the membership and that
                     no extra cost is incurred by the customer.

Software             An electronic file that includes executable code. Software Automatic distribution to all funders.
                     that becomes a web application is still considered to be
                     software.
Technical Report     A Technical Report presents the results of a project,      Automatic hard copy distribution to all funders in addition
                     technical research, case study or proceedings of           to electronic delivery via the web.
                     conferences or symposia. Consult the Technical Publishing
                     department for publishing guidelines and template
                     requirements.
Technical Update     A short, informal communication issued by the project    E-FTD notification to all funders; primary distribution is
                     manager that describes progress on a technical R&D area, electronic or via the web
                     contains an evaluation of technology, or addresses
                     regulatory issues. It is intended to address a specific
                     audience need such as Regulatory reports, notes to
                     conference attendees, etc. (Combines Technical Progress,
                     Technical Review/Technical Assessment, Regulatory
                     Analysis, Case Study, EMF or Climate Briefs, etc.)


                                                                                  Technical Update--1 Informal Report : An informal report
                                                                                  that describes continuing research, meetings, or topical
                                                                                  studies.
                                                                                  Technical Update--2 Resource Info : Precise technical
                                                                                  information and knowledge written for non-professionals. 8
                                                                                  or more pages.
                                                                                  Technical Update--3 Area Issue : Concise 2-page
                                                                                  summary of a program area issue that is important to
                                                                                  EPRI funders.
                                                                                  Technical Update--4 Tech Issue : A short 4-8 page
                                                                                  description of a technical project written for technical
                                                                                  experts to inform them of ongoing research and/or
                                                                                  developments in that field.
                                                                                  Technical Update--5 Newsletter : A collection of short
                                                                                  articles that provide updates and information to a
                                                                                  subscriber base who funded the project. Not available to
                                                                                  non-funders.




    fa19444c-b69f-4874-92f8-1f9a37e1ad4b.xls                     Page 2                                                      April 2002
                                   Customer Commitment Product Types

Description      Definition/Examples                      Delivery Method
                                                          Technical Update--6 Manual : Instructional manual for
                                                          commercial end-use users that inform them how to go
                                                          about assessing or applying a technology. For
                                                          commercial, end-users only. Not intended for Nuclear
                                                          subscription or other services or for use with software.




   fa19444c-b69f-4874-92f8-1f9a37e1ad4b.xls      Page 3                                              April 2002
Deliverable Status Terms/Definitions
                                                  Standard Comment
                                                  (provided for
                                                  consistency—can be
Status             Status Definition              edited)                      Used
Proposed           Initial state of a Deliverable N/A                          Pre sign-off
                   when it is entered into the
                   Sales Item Hierarchy (SIH)
                   from the Portfolio.

Not-Sufficient     Deliverable lacks sufficient   Deliverable lacks sufficient Sign-off
Funds (NSF)        funding to go forward. If      funding to go forward. If
                   you are interested in          you are interested in
                   funding this deliverable,      funding this deliverable,
                   contact your Account Lead.     contact your Account Lead.

On Schedule        Deliverables that are      N/A                              Post sign-off
                   committed to be delivered
                   and are within the planned
                   completion date (PCD)

Anticipate Possible Deliverable may not be        Deliverable may not be       Post sign-off
Delay               completed per planned         completed per planned
                    completion date (PCD).        completion date (PCD).
Delayed             Deliverable that has been     Varies                       Post sign-off
                    assigned a revised planned
                    completion date (RPCD) or
                    for which the planned
                    completion date (PCD) has
                    passed and no actual
                    completion date (ACD)
                    exists.
Deferred            Deliverable completion        Deliverable completion      Sign-off
                    date has been moved into      date has been moved into
                    a future delivery year due    a future delivery year due
                    to additional scope, and/or   to additional scope, and/or
                    advisory prioritization.      advisory prioritization.

Combined           Deliverable that will not be   Deliverable will not be      Sign-off; Post sign-
                   delivered because it has       delivered because it has     off
                   been combined with             been combined with
                   another committed              another committed
                   deliverable.                   deliverable.
Superceded       Due to Program dynamics        Due to Program dynamics Sign-off; Post sign-
                 following release of the       following release of the     off
                 Portfolio, originally          Portfolio, originally
                 specified Deliverable in the   specified Deliverable in the
                 Portfolio has been             Portfolio has been
                 superceded by another          superceded by another
                 deliverable.                   deliverable.

No Longer        Due to Program dynamics        Due to Program dynamics Sign-off
Applicable       following release of the       following release of the
                 Portfolio, originally          Portfolio, originally
                 specified Deliverable in the   specified Deliverable in the
                 Portfolio is no longer         Portfolio is no longer
                 viable.                        viable.

Cancelled        Deliverable that will no      Varies                     Post sign-off
                 longer be delivered.
Completed (On-   Deliverable that is available N/A                        Post sign-off*
Time)            to customers on or before
                 the planned completion
                 date (PCD).
Completed        Deliverable that is available N/A                        Post sign-off
                 to customers and for which
                 an actual completion date
                 (ACD) exists, but was
                 completed after the initial
                 Planned completion Date
                 (PCD).

				