					                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


        Capital Works Job Name/ Subdivision Name/ Maintenance Job Name

        Capital Works Job No/ OPW Application No/ Works Order No

        Pump Station No     (To be completed by SCRC)

        Street Address of Pump Station

        PUMP STATION ASSET COMPONENT LIST

        CIVIL ASSETS
        Building
        Siteworks & Landscaping
        Valves
        Valve pit
        Flowmeter Pit
        MECHANICAL ASSETS
        Crane Assembly
        Pump No 1
        Pump No 2
        Pump No 3
        Pump No 4
        Pump motors
        Emergency Power Supply
        Pressure Vessel
        ELECTRICAL ASSETS
        Switchboard & Electrical Equipment
        Flow Device (Flowmeter)
        Pump Starters
        Controller & Comms Devices (RTU/Radio)
        Pressure Device
        Compressor
        Wire guided radar and Controller Pressure Vessel
        Ventilation Equipment
        Only Complete the worksheets that are related to the assets contributed for the Pump Station As Constructed

        CONTRACT COSTS FOR THE PROJECT (SCRC USE ONLY)

        Total of all asset component costs                                                                          $0.00
        Total of Other Contract costs not included
        within the individual asset components                                                                      $0.00

        Total Cost of Project                                                                                       $0.00

                        We certify all as constructed information supplied is true and correct for the assets constructed within the Pump Station.

                                               Contractor/ Developer Signature

                                                                           Date
                                                          ONLY TO BE COMPLETED BY SCRC OFFICERS
                                                             CIVIL ASSETS                   MECHANICAL ASSETS                  ELECTRICAL ASSETS

             Officer Responsible for As Constructed

                                           Signature

                                                Date
                                                                          OFFICE USE ONLY
        AC Receiving Officer                                                            Date




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                             Page 1 of 1
                          SPECIFICATION SHEET FOR WPS AS CONSTRUCTED ASSET COMPONENT DATA SHEET

         1.0      Contractor/ Developer Responsibilties

                  1.1     The contractor/ developer shall supply the appropriate PS As Constructed Asset Component Data
                          Sheet in electronic Microsoft Excel format including one hard copy record of the Cover Sheet signed.

                  1.2     All attribute fields are to be filled out where required and use drop down value lists where available
                          within the PS As Constructed Asset Component Data Sheet. Only fill in sheets that are relevant to the
                          assets constructed.

                  1.3     The contractor/ developer is to ensure the sheet, 'Other Contract Costs' is filled out to include the
                          other costs incurred not directly related to the asset components listed in the sheets within the PS As
                          Constructed Asset Component Data Sheet.

                  1.4     The submission of the PS As Constructed Asset Component Data Sheet is to be submitted with draft
                          Operation & Maintenance manuals and as-constructed drawings prior to testing\commissioning. As
                          directed by the responsible SCRC officer.


         2.0      SCRC Officer Responsible for As Constructed Responsibilties

                  2.1     The SCRC officer shall ensure that all fields marked, '(To be completed by SCRC)' except for the New
                          Asset Equipment No field are to be filled out.

                  2.2     The SCRC officer is to ensure the Disused/ Disposed Assets table is filled out and a supporting
                          drawing completed (or included on the as-constructed drawings) to indicate the location of the disused
                          or disposed assets.

                  2.3     The SCRC officer is to ensure fields within the PS As Constructed Asset Component Data Sheet are
                          filled in correctly and complete.

                  2.4     The SCRC officer is to submit as constructed drawings, PS As Constructed Asset Component Data
                          Sheet in electronic format and hard copy of the Cover Sheet with Operations & Maintenance Manuals
                          and pump tests sheets (including pump curves) to the AC receiving officer. When he/she is satisfied
                          with the information received from the external contractor/ developer and the Pump Station is
                          commissioned.

                  2.5     If the as constructed is from a maintenance job the SCRC officer will ensure all fields within the
                          relevant asset component sheet are completed except for the New Asset Equipment No. field.

                  2.6     If the as constructed is from a maintenance job the SCRC officer will submit the relevant asset
                          component data sheet with the, 'Cover Sheet Asset Comp data' signed in hard copy format with
                          Operations & Maintenance Manuals and pump tests sheets (including pump curves) to the AC
                          receiving officer, if appropriate.

                  2.7     The field named, 'Specification Template' within each asset component sheet does not need to be
                          completed as the value is automated to the field form an entry being placed in the Failure class field.

                  2.8     The Pump Station No on the Cover Sheet Asset Comp data is to be entered as shown, 'SPS001' or
                          'WPS01'.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                            Page 2 of 40
DETAILED SUMMARY OF COSTS NOT INCLUDED WITHIN THE INDIVIDUAL ASSET COMPONENT COSTS



    Item                             Description              Unit         Quantity   Rate ($)   Amount ($)




TOTAL OF OTHER CONTRACT COSTS




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                      Page 3 of 40
     DISUSED/ DISPOSED ASSETS IDENTIFIED FROM THE AS CONSTRUCTED FOR THE WATER SUPPLY PUMP STATION
                                             (SCRC USE ONLY)


 ASSET EQUIPMENT NO                        ASSET DESCRIPTION                      DATE OF ASSET DISUSED/ DISPOSED




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                            Page 4 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Building

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                               #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)




                        ASSET ATTRIBUTE DESCRIPTION                                   VALUE

         CIVIL Door type

         CIVIL Door mat type

         CIVIL Roof mat type

         CIVIL Wall mat type




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 5 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS



         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Crane Assembly

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                           #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                  VALUE                 MEASURE UNIT

         LIFTGEAR Lift capacity                                                                        T,T.M

         LIFTGEAR Type

         LIFTGEAR Height of Chain                                                                      METRES

         LIFTGEAR Chain / Wire Length                                                                  METRES

         LIFTGEAR Wire Diameter                                                                        MM

         ELEC Motor Manufacturer

         ELEC Motor Serial Number

         ELEC Motor Model Number

         GEN Power Rating                                                                              KW

         ELEC Revs per min                                                                             RPM

         ELEC Voltage                                                                                  VOLTS

         ELEC Full Load Current                                                                        AMP

         ELEC Number of Phases




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 6 of 40
PLY PUMP STATION ASSETS




 ructed information. It is important that all
ater Supply and Sewerage system.




                   a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls   Page 7 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Siteworks & Landscaping

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE

         CIVIL Landscaping

         CIVIL Fencing

         CIVIL Access Road




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 8 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Switchboard & Electrical Equipment

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                             #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                    VALUE                    MEASURE UNIT

         SWITCH Board Type

         SWITCH Board Classification

         SWITCH Lock Type

         SWITCH Cubicle Material

         SWITCH Drawing Number (To be Completed by MSC)

         ELEC Number of Phases

         SWITCH Main Switch Amps                                                                            AMP

         SWITCH Consumer Main Size                                                                          MM2

         SWITCH Metering Type

         SWITCH Meter Number

         SWITCH Scada Yes/No

         SWITCH Distribution Phases




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 9 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS



         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Flow Device (Flowmeter)

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                              #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                    VALUE                    MEASURE UNIT

         FLOW Meter Type

         FLOW Primary Size                                                                                 MM

         FLOW Signal Output

         FLOW Inspection Period                                                                            MTHS

         FLOW Calibration Period                                                                           MTHS

         FLOW Scada Connection




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 10 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Valve

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                             #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)

         Asset ID reference from As Constructed Drawing



                      ASSET ATTRIBUTE DESCRIPTION                                   VALUE                   MEASURE UNIT

         VALVE Type

         VALVE Model

         VALVE Make

         VALVE Size                                                                                       MM

         VALVE Turned On/Off?

         VALVE Actuated?

         VALVE Actuater Type?

         VALVE Opening Rotation

         VALVE Maximum Flow                                                                               LTR/SEC

         Note:
         1. Please ensure a separate form is completed for each valve
         2. Please ensure Asset ID reference of valve asset from As Constructed drawing is shown on this data sheet and is unique




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 11 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Pump No 1

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)

         Asset ID reference from As Constructed Drawing


                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                 MEASURE UNIT

         GEN Pump Type

         GEN Pump Manufacturer

         GEN Pump Model

         GEN Manufact Date dd/mm/yyyy

         GEN Suction End rotation

         GEN Suction diameter                                                                            MM

         GEN Delivery Pipe diameter                                                                      MM

         GEN By Pass fitted ?

         GEN Gear Box fitted ?

         GEN Foot Valve Fitted ?

         GEN Measured Duty Head                                                                          METRES

         GEN Measured Duty Point                                                                         LTR/SEC

         GEN Impeller Type

         Note: Please ensure Asset ID reference of pump asset from As Constructed drawing is shown on this data sheet and is unique

         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 12 of 40
                          AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS




                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                 MEASURE UNIT

         GEN Impeller diameter                                                                           MM

         GEN Manufacturers Curve

         ELEC Motor manufacturer

         ELEC Motor Model Number

         ELEC Serial Number

         ELEC Power                                                                                      KW

         ELEC Voltage                                                                                    VOLTS

         ELEC Full Load Current                                                                          AMP

         ELEC Revs per min                                                                               RPM

         ELEC Number of Phases

         ELEC Power Factor

         ELEC Insulation Class

         ELEC IP Rating

         ELEC Variable Speed Drive

         ELEC Starter Type

         ELEC Motor Weight                                                                               KG

         ELEC Frame Size

         ELEC Drive Bearing

         ELEC Non Drive Bearing

         ELEC Cable Length                                                                               METRES

         MECH wear ring type

         MECH wear ring replace date

         MECH Seal Number




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 13 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Pump No 2

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)

         Asset ID reference from As Constructed Drawing


                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                   MEASURE UNIT

         GEN Pump Type

         GEN Pump Manufacturer

         GEN Pump Model

         GEN Manufact Date dd/mm/yyyy

         GEN Suction End rotation

         GEN Suction diameter                                                                            MM

         GEN Delivery Pipe diameter                                                                      MM

         GEN By Pass fitted ?

         GEN Gear Box fitted ?

         GEN Foot Valve Fitted ?

         GEN Measured Duty Head                                                                          METRES

         GEN Measured Duty Point                                                                         LTR/SEC

         GEN Impeller Type

         Note: Please ensure Asset ID reference of pump asset from As Constructed drawing is shown on this data sheet and is unique

         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 14 of 40
                           AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS




                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                   MEASURE UNIT

         GEN Impeller diameter                                                                           MM

         GEN Manufacturers Curve

         ELEC Motor manufacturer

         ELEC Motor Model Number

         ELEC Serial Number

         ELEC Power                                                                                      KW

         ELEC Voltage                                                                                    VOLTS

         ELEC Full Load Current                                                                          AMP

         ELEC Revs per min                                                                               RPM

         ELEC Number of Phases

         ELEC Power Factor

         ELEC Insulation Class

         ELEC IP Rating

         ELEC Variable Speed Drive

         ELEC Starter Type

         ELEC Motor Weight                                                                               KG

         ELEC Frame Size

         ELEC Drive Bearing

         ELEC Non Drive Bearing

         ELEC Cable Length                                                                               METRES

         MECH wear ring type

         MECH wear ring replace date

         MECH Seal Number




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 15 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Pump No 3

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)

         Asset ID reference from As Constructed Drawing


                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                   MEASURE UNIT

         GEN Pump Type

         GEN Pump Manufacturer

         GEN Pump Model

         GEN Manufact Date dd/mm/yyyy

         GEN Suction End rotation

         GEN Suction diameter                                                                            MM

         GEN Delivery Pipe diameter                                                                      MM

         GEN By Pass fitted ?

         GEN Gear Box fitted ?

         GEN Foot Valve Fitted ?

         GEN Measured Duty Head                                                                          METRES

         GEN Measured Duty Point                                                                         LTR/SEC

         GEN Impeller Type

         Note: Please ensure Asset ID reference of pump asset from As Constructed drawing is shown on this data sheet and is unique

         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 16 of 40
                           AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS




                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                   MEASURE UNIT

         GEN Impeller diameter                                                                           MM

         GEN Manufacturers Curve

         ELEC Motor manufacturer

         ELEC Motor Model Number

         ELEC Serial Number

         ELEC Power                                                                                      KW

         ELEC Voltage                                                                                    VOLTS

         ELEC Full Load Current                                                                          AMP

         ELEC Revs per min                                                                               RPM

         ELEC Number of Phases

         ELEC Power Factor

         ELEC Insulation Class

         ELEC IP Rating

         ELEC Variable Speed Drive

         ELEC Starter Type

         ELEC Motor Weight                                                                               KG

         ELEC Frame Size

         ELEC Drive Bearing

         ELEC Non Drive Bearing

         ELEC Cable Length                                                                               METRES

         MECH wear ring type

         MECH wear ring replace date

         MECH Seal Number




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 17 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Pump No 4

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)

         Asset ID reference from As Constructed Drawing


                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                   MEASURE UNIT

         GEN Pump Type

         GEN Pump Manufacturer

         GEN Pump Model

         GEN Manufact Date dd/mm/yyyy

         GEN Suction End rotation

         GEN Suction diameter                                                                            MM

         GEN Delivery Pipe diameter                                                                      MM

         GEN By Pass fitted ?

         GEN Gear Box fitted ?

         GEN Foot Valve Fitted ?

         GEN Measured Duty Head                                                                          METRES

         GEN Measured Duty Point                                                                         LTR/SEC

         GEN Impeller Type

         Note: Please ensure Asset ID reference of pump asset from As Constructed drawing is shown on this data sheet and is unique

         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 18 of 40
                          AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS




                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                   MEASURE UNIT

         GEN Impeller diameter                                                                           MM

         GEN Manufacturers Curve

         ELEC Motor manufacturer

         ELEC Motor Model Number

         ELEC Serial Number

         ELEC Power                                                                                      KW

         ELEC Voltage                                                                                    VOLTS

         ELEC Full Load Current                                                                          AMP

         ELEC Revs per min                                                                               RPM

         ELEC Number of Phases

         ELEC Power Factor

         ELEC Insulation Class

         ELEC IP Rating

         ELEC Variable Speed Drive

         ELEC Starter Type

         ELEC Motor Weight                                                                               KG

         ELEC Frame Size

         ELEC Drive Bearing

         ELEC Non Drive Bearing

         ELEC Cable Length                                                                               METRES

         MECH wear ring type

         MECH wear ring replace date

         MECH Seal Number




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 19 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Pump motor No 1

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                   MEASURE UNIT

         ELEC Motor manufacturer

         ELEC Motor Model Number

         ELEC Serial Number

         ELEC Power                                                                                      KW

         ELEC Voltage                                                                                    VOLTS

         ELEC Full Load Current                                                                          AMP

         ELEC Revs per min                                                                               RPM

         ELEC Number of Phases

         ELEC Power Factor

         ELEC Insulation Class

         ELEC IP Rating

         ELEC Variable Speed Drive

         ELEC Starter Type

         Note: Please ensure these fields are filled out for the pump motor within this data sheet and the associated Pump data sheet
              if the pump motor is a separate component to the pump.

         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 20 of 40
                           AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS




                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                   MEASURE UNIT

         ELEC Motor Weight                                                                               KG

         ELEC Frame Size

         ELEC Drive Bearing

         ELEC Non Drive Bearing

         ELEC Cable Length                                                                               METRES




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 21 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Pump motor No 2

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                   MEASURE UNIT

         ELEC Motor manufacturer

         ELEC Motor Model Number

         ELEC Serial Number

         ELEC Power                                                                                      KW

         ELEC Voltage                                                                                    VOLTS

         ELEC Full Load Current                                                                          AMP

         ELEC Revs per min                                                                               RPM

         ELEC Number of Phases

         ELEC Power Factor

         ELEC Insulation Class

         ELEC IP Rating

         ELEC Variable Speed Drive

         ELEC Starter Type

         Note: Please ensure these fields are filled out for the pump motor within this data sheet and the associated Pump data sheet
              if the pump motor is a separate component to the pump.

         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 22 of 40
                           AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS




                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                   MEASURE UNIT

         ELEC Motor Weight                                                                               KG

         ELEC Frame Size

         ELEC Drive Bearing

         ELEC Non Drive Bearing

         ELEC Cable Length                                                                               METRES




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 23 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Pump motor No 3

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                   MEASURE UNIT

         ELEC Motor manufacturer

         ELEC Motor Model Number

         ELEC Serial Number

         ELEC Power                                                                                      KW

         ELEC Voltage                                                                                    VOLTS

         ELEC Full Load Current                                                                          AMP

         ELEC Revs per min                                                                               RPM

         ELEC Number of Phases

         ELEC Power Factor

         ELEC Insulation Class

         ELEC IP Rating

         ELEC Variable Speed Drive

         ELEC Starter Type

         Note: Please ensure these fields are filled out for the pump motor within this data sheet and the associated Pump data sheet
              if the pump motor is a separate component to the pump.

         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 24 of 40
                           AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS




                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                   MEASURE UNIT

         ELEC Motor Weight                                                                               KG

         ELEC Frame Size

         ELEC Drive Bearing

         ELEC Non Drive Bearing

         ELEC Cable Length                                                                               METRES




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 25 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Pump motor No 4

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                   MEASURE UNIT

         ELEC Motor manufacturer

         ELEC Motor Model Number

         ELEC Serial Number

         ELEC Power                                                                                      KW

         ELEC Voltage                                                                                    VOLTS

         ELEC Full Load Current                                                                          AMP

         ELEC Revs per min                                                                               RPM

         ELEC Number of Phases

         ELEC Power Factor

         ELEC Insulation Class

         ELEC IP Rating

         ELEC Variable Speed Drive

         ELEC Starter Type

         Note: Please ensure these fields are filled out for the pump motor within this data sheet and the associated Pump data sheet
              if the pump motor is a separate component to the pump.

         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 26 of 40
                           AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS




                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                   MEASURE UNIT

         ELEC Motor Weight                                                                               KG

         ELEC Frame Size

         ELEC Drive Bearing

         ELEC Non Drive Bearing

         ELEC Cable Length                                                                               METRES




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 27 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Pump Starter No 1

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                  VALUE                   MEASURE UNIT

         ELEC Starter Type

         ELEC Motor Model Number

         ELEC Serial Number

         ELEC Power                                                                                     KW

         ELEC Full Load Current                                                                         AMP

         ELEC Number of Phases

         ELEC Conductor Size                                                                            MM2




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 28 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Pump Starter No 2

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                    MEASURE UNIT

         ELEC Starter Type

         ELEC Motor Model Number

         ELEC Serial Number

         ELEC Power                                                                                      KW

         ELEC Full Load Current                                                                          AMP

         ELEC Number of Phases

         ELEC Conductor Size                                                                             MM2




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 29 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Pump Starter No 3

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                    MEASURE UNIT

         ELEC Starter Type

         ELEC Motor Model Number

         ELEC Serial Number

         ELEC Power                                                                                      KW

         ELEC Full Load Current                                                                          AMP

         ELEC Number of Phases

         ELEC Conductor Size                                                                             MM2




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 30 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Pump Starter No 4

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                    MEASURE UNIT

         ELEC Starter Type

         ELEC Model

         ELEC Serial Number

         ELEC Power                                                                                      KW

         ELEC Full Load Current                                                                          AMP

         ELEC Number of Phases

         ELEC Conductor Size                                                                             MM2




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 31 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Valve pit

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                   MEASURE UNIT

         CIVIL Ladders

         CIVIL Ladder mat type

         CIVIL guide rail

         CIVIL guide rail mat type

         CIVIL lid mat type

         CIVIL handrail

         METALWK handrail material

         CIVIL extension arm for inlet valve

         CIVIL Holding Capacity                                                                          M3

         CIVIL Floor Material

         CIVIL Wall Material

         CIVIL Floor Lining




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 32 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Flowmeter Pit

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                               #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                  MEASURE UNIT

         CIVIL Ladders

         CIVIL Ladder mat type

         CIVIL guide rail

         CIVIL guide rail mat type

         CIVIL lid mat type

         CIVIL handrail

         METALWK handrail material

         CIVIL extension arm for inlet valve

         CIVIL Holding Capacity                                                                          M3

         CIVIL Floor Material

         CIVIL Wall Material

         CIVIL Floor Lining




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 33 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Pressure Vessel

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                  MEASURE UNIT

         PRESS_VSL Type

         PRESS_VSL Capacity                                                                              LITRES

         GEN Max design work press Kpa                                                                   KPA

         GEN Min design working press                                                                    KPA

         PRESS_VSL Bladder ?

         PRESS_VSL Compressor ?

         PRESS_VSL Max Pressure                                                                          KPA

         PRESS_VSL Re-Inspection Date




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 34 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Controller & Comms Devices (RTU/Radio)

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                                #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                      VALUE                     MEASURE UNIT

         SCADA Make

         CNTRL PDS Model Number

         CNTRL PDS Serial Number

         RADIO Make

         RADIO model number

         RADIO Aerial type

         RADIO Serial Number




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 35 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Pressure Device

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                   VALUE                    MEASURE UNIT

         INSTR Instrument Type

         INSTR Serial Number

         INSTR Model Number

         INSTR Measured Span Settings

         INSTR Primary Element

         INSTR Battery Type

         INSTR Auxilliary Equipment

         INSTR Instrument Depth                                                                          METRES

         INSTR Instrument Diameter                                                                       MM

         INSTR Instrument Pressure                                                                       KPA




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 36 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Compressor

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                    VALUE                 MEASURE UNIT

         GEN Blower Type

         GEN Blower Capacity                                                                             LTR/SEC

         GEN Max design work press Kpa                                                                   KPA

         GEN Min design working press                                                                    KPA

         GEN Gas Type

         GEN No of stages

         GEN Relief Valve

         GEN Relief valve setting                                                                        KPA

         ELEC Motor size                                                                                 KW

         ELEC Revs per min                                                                               RPM

         ELEC Power                                                                                      KW

         ELEC Full Load Current                                                                          AMP

         ELEC Number of Phases




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 37 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Wire guided radar and controller Pressure Vessel

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                                    #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                          VALUE                           MEASURE UNIT

         INSTR Instrument Type

         INSTR Serial Number

         INSTR Model Number

         INSTR Measured Span Settings

         INSTR Primary Element

         INSTR Battery Type

         INSTR Auxilliary Equipment

         INSTR Instrument Depth                                                                                           METRES

         INSTR Instrument Diameter                                                                                        MM

         INSTR Instrument Pressure                                                                                        KPA




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 38 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Ventilation Equipment

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                            #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                               MEASURE UNIT                  VALUE

         ELEC Power                                                                                    KW

         ELEC Full Load Current                                                                        AMP

         ELEC Voltage                                                                                  VOLTS

         ELEC Revs per min                                                                             RPM

         ELEC Number of Phases

         ELEC IP Rating

         GEN Airflow capacity                                                                          M3/HR

         GEN Fan diameter                                                                              MM




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 39 of 40
                             AS CONSTRUCTED ASSET RECORD FOR WATER SUPPLY PUMP STATION ASSETS


         New Asset Equipment No (To be Completed by SCRC)

         Asset Description                                             Emergency Power Supply

         Street Address of Pump Station

         Vendor of Asset Component

         Manufacturer of Asset component

         Warranty Expiry Date

         As Constructed Date

         Serial No

         Make

         Model

         Specfication Template (To be Completed by SCRC)                           #N/A

         Failure Class (To be Completed by SCRC)

         Asset Status

         Replaced Asset Equipment No (To be Completed by SCRC)

         PURCHASE & CONSTRUCT COST OF ASSET
         (Contract cost)

         VALUATION COST OF ASSET
         (Cost to Purchase and Construct Asset including overheads -
         To be Completed by SCRC)



                     ASSET ATTRIBUTE DESCRIPTION                                  VALUE                 MEASURE UNIT

         GEN Manufact Date dd/mm/yyyy

         GEN Manufacturer

         GENERATOR Engine Model

         GEN Power Rating                                                                              KW

         GEN Number of Cylinders

         GENERATOR Engine RPM                                                                          RPM

         GENERATOR Fuel Tank Capacity                                                                  LITRES

         GENERATOR Fuel Usage                                                                          LTR/HR

         GENERATOR Battery Voltage                                                                     VOLTS




         This form must have all fields completed before it will be accepted as valid as constructed information. It is important that all
         details are accurate for future use in planning, operation and maintenance of the Water Supply and Sewerage system.




a5fb6be6-6170-4926-b9dc-d57e3fd97d84.xls                                                                                                     Page 40 of 40

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:2
posted:8/17/2011
language:English
pages:40
Description: Subdivision Maintenance Contract document sample