Docstoc

System Outage Notice Template - PDF

Document Sample
System Outage Notice Template - PDF Powered By Docstoc
					                                                                                            20091125

                              SYSTEM OPERATIONS
                       TRANSMISSION OUTAGE REQUEST FORM

      REQUESTOR:
                                ELECTRIC:                       GAS:
       FACILITY:

 START DATE / TIME:             DATE:                  TIME:
      (MM/DD/YYY)
  END DATE / TIME:              DATE:                  TIME:
     (MM/DD/YYYY)
        DAILY /                 DAILY:                    CONTINUOUS:
     CONTINUOUS:
     TAG COLOR:                 RED:           BLUE:            GREEN:             NT-NC:
      CLEARANCE
       HOLDER:

CLEARANCE POINTS:



    WORK TO BE
    PERFORMED:
   EMER RESTORE:                           MIN:        HOURS:
    EMERGENCY                   NAME:              CONTACT NUMBERS:
     CONTACTS:
 All Transmission Outage Request Forms shall be submitted to System Operations within the time frames
   indicated in the Central Hudson Outage Scheduling Guidelines utilizing the following email address:
                                     ch.outage.coord@cenhud.com
The request form template and guidelines indicated above are located in the System Operations Homepage
                                    on the Central Hudson intranet.

Central Hudson System Operations shall be the only area to: 1 - Communicate and coordinate all
Transmission Outage Requests with the NYISO and other Transmission Owners / Transmission Operators
if applicable.
                             2 - Coordinate Transmission Outage Requests with Generator Operators ONLY
if expected to impact generation (e.g. maximum generation limit). NO Transmission facility designations
shall be provided to Generator Operators; only date and time of expected impact. Additional information
may be provided to Generator Operators ONLY following approval and posting of Transmission Outage
Request.
                             3 - Forward an Outage Notification notice to all interested parties following
approval and posting (if applicable) of Transmission Outage Request.
  This document may be subject to the FERC Standards of Conduct, and if so is intended for the exclusive use by
     Central Hudson employees performing electric transmission and reliability services, their supervisors, and
    persons specifically authorized to receive it. The information shall not be shared with employees of Central
  Hudson who purchase or sell electric energy or natural gas, nor anyone who is not a Central Hudson employee,
                          and this document shall not to be forwarded to any such person.
                                             BACK

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:164
posted:8/17/2011
language:English
pages:1
Description: System Outage Notice Template document sample