                   1 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                              Description                                 Unit   QTY   Unit Rate   Total

1         Preliminary works prior to the construction of the new floor

*         The contractor shall, when pricing the rates of this bill, take
          into consideration to include and allow for the costs or
          expenses of all requirements stipulated herein below or in
          the preambles, drawings and the specification of the
          tender.
*         The contractor should visit the site to verify the amount of work
          and consider all other works for the proper construction of the
          new floor.
*         The disposal& demolished materials shall be carried out from
          the construction zones through special arrangements to external
          hospital yards to avoid disturbances/ noises or dust spreading
          down the floors or neighboring areas. the contractor is
          responsible for the disposal of all demolished and removed
          materials from the site to a dump site approved by the
          municipality.
*         The contractor should coordinate with the client for any possible
          material or elements that need to be preserved and handed over
          to the client stores.
*         The preserved elements such as steel doors& widows, steel
          grills, steel hand rails, steel steps and metal protections for fans
          shafts& service openings shall be re installed for the new
          construction as directed by the engineer. while the other
          materials should be handed over to the client stores.

*         The contractor should take all measures to protect the hospital
          belongings from any damage or disturbance to it’s functioning
          systems and to ensure the safety of the hospital users during
          the construction stage,
          The contractor shall protect the underneath floors from leakage
          or penetration of rain water from the roof above which the new
          floor will be constructed.
          Therefore, special arrangement and prtection zone shall be
          erected in full coordination with the hospital directorate and the
          engineer.
*         The contractor should also protect all existing mechanical,
          drainage systems and electrical networks . This include the
          conduct of any necessary arrangements to ensure continuous
          functioning of these systems during construction stage.

*         The contractor should also take all necessary shoring measures
          to protect the existing building elements during all stages of
          work until safely completing all new construction work.

*         The contractor should submit a clear methodology for the
          proposed stages of work and protection and shoring methods
          for the Engineers approval prior to commencement of works.

*         Careful demolishing and reinstatement of existing structural
          elements for proper construction of the new floor works; all as
          sown in the demolishing plan and in accordance with the
          engineer's instructions. The work includes but not limited to :
1.1       Demolishing and removal of all elements covering the steel             LS      1
          reinforcement for the columns starters on the existing roof, such
          concrete, blocks, stone, filling materials....etc, including the
          preserving and cleaning of steel reinforcement for proper
          erection of the new columns (this is true for all existing columns
          including perimeter columns).




                                                    2 out of   62
                                               Tulkarem Hospital
                                                    -BOQ-



Section                              Description                                Unit   QTY   Unit Rate   Total

1.2       Demolishing the existing concrete roof slab for the machinery         M2     250
          room located on the existing roof. The unit price shall include
          dismantling and removal all the utilities and finishing layers
          above the slab including the sloped light weight concrete, water
          proofing layers. All as directed by the Engineer.

1.3       Demolish concrete slabs of the existing staircases, including         M2     60
          protection and preservation of the existing finishing works such
          as, staircase steps, landings, tilling, steel doors, handrails
          aluminum windows, walls finish and all other electrical&
          mechanical utilities, fittings and equipments. …etc. the voids for
          the staircases shall be protected by rigid and safe formwork or
          scaffolding through out the construction stage.


1.4       Demolish and removal of concrete roof slabs for existing              M2     100
          elevators shafts (roof& floor) including the protection and
          preservation of all existing finishing works, steel doors, steel
          steps& handrails, grills--etc, and all other electrical& mechanical
          utilities, fittings and equipments, machines. …etc. the work also
          includes cuttings/ making new openings for elevators doors
          through the existing concrete walls to match the new proposed
          locations of the elevators and perform concrete filling/
          patching/adjustment of the existing doors openings at the roof.
          the voids for the elevators shall be protected by rigid formwork
          or scaffolding through out the construction stage.


1.4       Demolishing and removal of the existing concrete or block             M2     500
          partitions, or external stone walls, this shall include demolishing
          of the other wall finshes in the machinery room at the existing
          roof level. The unit price shall include dismantling and
          preserving the existing windows and doors . All as directed by
          the Engineer.

1.5       Demolishing and removal the finishing layers on top of the            M2     300
          existing roof slabs including the sloped light weight concrete,
          and machine foundations. All as directed by the Engineer.
          (provisional)

1.6       Careful dismantle and preserve the doors of staircases at the         LS      1
          existing roof level, windows, steel hand rails& landing,
          machinery protections& coverings, shafts sheets covering…etc.
          the price includes re- installtion of the same dismantled units or
          structures. Hence all parts and elements shall be preserved and
          maintained in good condition. All as directed by the Engineer.




                                                   3 out of   62
                                              Tulkarem Hospital
                                                   -BOQ-



Section                             Description                               Unit   QTY   Unit Rate   Total

1.7       Careful dismantle, demolish and removal of the existing sky light   L.S     1
          structure (between grids10-13&H-J) including all elements that
          blocks the construction of new design layout. The price includes
          the re-installtion of the same dismantled sky light and the steel
          structure at the new roof level. Hence all parts and elements of
          the sky light such as transparent sheets, metal sections&
          profiles, plates, anchors, sheets, flashing.......etc should be
          carefully dismantled and reserved in good condition. the void for
          the sky light shall be protected by rigid and safe formwork or
          scaffolding throughout the construction stage. The price shall
          include also cuttings in concrete walls for new windows
          openings and treming the concrete wall to fit the details as
          shown in drawings.

1.8       Dismantle and demolish parts of the existing stone roof parapet,    M2     100
          circular parts and parts of the chimney walls, including the
          preservation of stone courses.

1.9       Careful removal of existing coping for the stone parapet and        MR     245
          preservation for use in the construction of new stone parapet.
          All as directed by the Engineer.




          Total of preliminary works carried to summary sheet


                                                  4 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                              Description                                 Unit   QTY    Unit Rate   Total

2         Concrete Works
          The contractor shall, when pricing the rates of this bill, take into
          consideration including and allow for the costs or expenses of all
          requirements stipulated in the preambles, drawings and
          technical specification of the tender.
          All concrete works includes the supply of ready mix concrete,
          placing& casting, formwork & supports, reproping, shuttering,
          vibration, curing, testing and whatever needed for the
          completion of the works all in accordance to the standards,
          codes, specifications and as details shown in drawings.

2.1       Supply and cast reinforced concrete B300 for columns of                M3     70
          various dimensions and locations, maximum size of aggregate
          20mm as shown on drawings.
2.2       Supply & cast concrete B300 for 31cm thick ribbed slabs                M2     1700
          including Light weight block "EYTONG" and drop beams as
          shown on drawings. The rate includes casting the slab in stages
          by providing several construction joints in order to allow for
          lifting the existing chillers, machines and equipments before
          completing the work. the rate also includes the special
          treatments of the construction joints in accordance to the
          construction codes and standards.

2.3       Ditto, but for 49cm thick ribbed slabs.                                M2     200
2.4       Ditto, but for 15 cm thick solid slabs.                                M2      95
2.5       Ditto, but for 18 cm thick solid slabs.                                M2      95
2.6       Supply and cast reinforced concrete B300 for staircase flights,        M3      25
          steps, landings and machine foundations of various sections.

2.7       Supply and cast reinforced concrete B300 for walls of various          M3     145
          thickness, dimensions and different locations.

2.8       Supply and cast concrete B300 behind stone walls for backing           M3     200
          the stone work and for windows and door lintels and where
          needed; all in accordance with the engineer instructions.

2.9       Deformed high yield steel bar reinforcement of various                 TON    130
          diameters, characteristic strength FY=420N/mm2 for concrete
          reinforcement, as shown on drawings and according to
          specifications.




          Total of Concrete Works carried to civil summary


                                                    5 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                              Description                                 Unit   QTY   Unit Rate   Total

3          Stone Works
          The contractor shall, when pricing the rates of this bill, take into
          consideration including and allow for the costs and expenses of
          all requirements stipulated in the preambles, drawings and
          technical specification of the contract. The price includes
          scaffolding, formworks, supports, cutting, trimming, chamfering,
          galvanized anchors& pins, angles as specified and flush
          pointing works composed of white cement and sand (1/2) with
          approve additive for better workability, tightness and water
          proofing. The stone finishing and dressing for the new stone
          works shall be similar to that rendered at the lower floors of the
          existing hospital building. The unite rate shall also include cost
          of all required stone pieces, (such as windows and doors
          jambs, sills, lintels, corners, key stones, any other special stone
          pieces etc..); all as per the stone works rendered in the lower
          floors of the existing hospital and to the engineer instructions.
          Accordingly, no separate cost allowance for the stone pieces.
          The unit rate shall also include the cost of pointing the stone
          work.

3.1       Supply and install 5 cm thick 25 cm wide Taltish stone courses         M2     950
          from first quality Jama'en as shown on drawings. The unit rate
          shall include cost of 10cm hollow concrete blocks and anchors
          for the stone walls as per drawings.

3.2       Ditto, but 4 cm thick stone cladding. The rate includes cost of        M2     40
          B200 concrete backing, anchors and 6 mm steel mesh. The rate
          includes all anchoring details as shown on drawings.

3.4       Supply and install 8 cm thick stone coping , 36 cm wide a stone        MR     100
          roof parapet copping made from Jama'en stone . The price
          includes stone pointing.

3.5       Re-install stone copping which was dismanteled and preserved           MR     150
          from the existing parapet.




          Total of Stone Works carried to civil summary


                                                    6 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                              Description                                 Unit   QTY    Unit Rate   Total

4         Block Work:
          The contractor shall, when pricing the rates of this bill, take into
          consideration including and allow for the costs or expenses of all
          requirements stipulated in the preambles, drawings and
          technical specification of the contract.
4.1       Supply and construct 10cm hollow concrete block in cement and          M2     2200
          sand mortar (1:4) for internal portion walls, the price includes
          cost of cutting, anchors, bonding, jointing, utilities openings
          complete as per drawings, specifications and as directed by the
          engineer.

4.2       Ditto, but 20 cm hollow concrete block .                               M2     1050

4.3       Ditto, but 7 cm hollow concrete block around column starters on        M2     100
          the new roof including sand cement mortar fill.
          Supply and cast B300 concrete lintels or griddles above block          M3      40
          works at door or window level across the whole length of block
          walls and in places as directed by the engineer. The price
          including shuttering and the supply & installation of steel
          reinforcement 4nos of 12mm dia. and with stirrups 8mm @ 20
          cm c/c
4.4       Supply and install 3 cm "Randopan" extruded polystyrene                M2     930
          boards for external stone walls, of density 24 kg/m3 as shown
          on drawings.




          Total of Block Works Carried to Summary Sheet


                                                     7 out of   62
                                                 Tulkarem Hospital
                                                      -BOQ-



Section                               Description                                Unit   QTY    Unit Rate   Total

5         Plastering Works:
          The contractor shall, when pricing the rates of this bill, take into
          consideration including and allow for the costs or expenses of all
          requirements stipulated in the preambles, drawings and
          technical specification of the contract.
5.1       Supply and install internal plastering for walls, columns, arches      M2     5200
          drop beams, softies of slabs & beams, shaft walls etc
          ,composed of 3 coats, a bond coat 1:1, base coat 1:4, and finish
          coat 1:5 as specified. The price includes the corner beads,
          casing beads, metal lath, scaffoldings, shuttering, bonding
          agents and the requirements as specified .

5.2       Ditto, but supply and install internal plastering for ceiling          M2     900

5.3       Ditto but supply and install external plastering for parapet wall,     M2     800
          external walls or shafts and wherever needed composed of 3
          coats a bond coat 1:1, a base coat 1:4 and a finish coat 1:2 with
          water proofing materials all as specified.




          Total of Plastering Works carried to Summary


                                                     8 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                              Description                                 Unit   QTY    Unit Rate   Total

6         Flooring and Covering Works:
          The contractor shall, when pricing the rates of this bill, take into
          consideration including and allow for the costs or expenses of all
          requirements stipulated in the preambles, drawings and
          technical specification of the contract.
6.1       Supply and install 30x30x3cm Terrazzo floor tiles similar to           M2     890
          Halonim # 75 or equally approved. Rate includes 30cm x 10cm x
          1 cm skirting, 3 cm cement sand mortar (1:3 ), sand fill
          materials, cuttings, fittings, trims, grouting with white cement
          and polishing, all in accordance with the specifications and
          applicable Standards.

6.2       Supply and install 20x20cm glazed ceramic class (A) tiles for          M2     900
          walls cladding of different colours. The tiles shall be laid and
          fixed to the walls in patterns, style and forms of grouting&
          jointing as directed by engineer using approved adhesive
          materials. The price also includes the cost of surface
          preparation to receive tiles, which shall include two coats of
          cement plaster (scratch and float coat), approved adhesive
          materials, grouting, aluminum protection angles as approved by
          the engineer.

6.3       Ditto, but 30x30cm ceramic tiles class (A) "Negev" model #             M2     1500
          9001 or equivalent for walls cladding of different colours. The
          tiles shall be laid and fixed to the walls in patterns, style and
          forms of grouting& jointing as directed by the engineer using
          approved adhesive materials. Price includes the cost of surface
          preparation to receive tiles, which shall include two coats of
          cement plaster (scratch and float coat), approved adhesive
          materials, grouting, protection angles as approved by the
          engineer.

6.4       Ditto, but anti bacteria ceramic 20x20cm class (A) closured wall       M2     130
          tiles for surgery& sterile stores using special adhesive materials
          and anti fungus grouting materials as per manufacturer
          instructions and in accordance with the MOH requirements and
          related Standards.
6.5       Supply and install non slip ceramic floor tiles class (A)              M2     200
          20x20*0.8cm of different colours, the price includes the mortar
          (1:3) with water proofing materials, the sand cement fill,
          cutting& trimming around floor utilities and pointing as specified.
          the tiles shall be laid and fixed in patterns, style and forms of
          grouting& jointing as directed by the Engineer.

6.6       Ditto, but 30*30*0.8 cm granite porcelain floor tiles of different     M2     900
          colours as made by TAU ceramic, Matt finish or equivalent, the
          tiles shall be laid and fixed in patterns, style and forms of
          grouting& jointing as directed by the Engineer.
6.7       Ditto but 2cm thick Perlato marble for elevator walls, the rate        M2     50
          include cuttings, recesses for utilities, cut pieces, rounding,
          jointing& polishing, anchoring& all fixing accessories. The work
          covers the cladding of elevator door sides and lintels.

6.8       Supply and install 3cm thick, 10.5 cm wide local polished cut          MR     120
          stone for window thresholds with mitered edge as shown on
          drawings.




                                                    9 out of   62
                                                 Tulkarem Hospital
                                                      -BOQ-



Section                               Description                            Unit   QTY   Unit Rate   Total

6.10      Supply and install 3cm thick "Perlato" marble for stair            No.    75
          treads(155*34*3 cm) polished one face & edge with chamfered
          edges matching the existing material . The treads should be
          bedded on 3cm mortar (1:3), a sand bed and pointing works.
          The rate includes an edge piece for water stop.

6.11      Ditto but 2cm thick riser(155*14 cm).                              No.    74
6.12      Ditto but 3 cm thick 30 cm wide for staircase landing.             M2     50
6.13      Ditto but 2cm thick for steps skirting.                            No.     75
6.14      Ditto but 1cm thick 7cm high for landing skirting.                 MR     75
6.15      Supply and install Anti static PVC flooring type "Teraclean",      M2     200
          2mm thick or equivalent for surgery room, sterile stores and as
          directed by the engineer. The price includes the installation of
          skirting and copper mesh under tiles every 30cm using 1cm
          wide copper strip. This mesh should be connected with the earth
          system of the building. The pvc flooring should be fixed using
          conductive adhesive and complete seal of joints all in
          accordance to manufacturer instructions and MOH regulations
          standards. The Installations for pvc flooring, skirting,
          terminations with walls/outer& inner corners shall be strictly
          implemented by professional and in accordance to the
          manufacturer's recommendation.

6.16      Ditto, for sterile area but with out copper strips.                M2     100

6.17      Supply and install VINYL Anti static flooring type Armstrong       M2     30
          2mm thick or equivalent for surgery rooms, sterile stores and as
          directed. The price includes the installation of skirting and
          copper mesh under tiles every 30cm using 1cm wide copper
          strip . This mesh should be connected with the earth system of
          the building. The pvc flooring should be fixed using conductive
          adhesive and complete seal of joints all in accordance to
          manufacturer instructions and MOH standards.

6.18      Ditto, for sterile area but with out copper strips.                M2     30




          Total of wall and floor cladding Works carried to Summary
          Sheet

                                                     10 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                              Description                                 Unit   QTY    Unit Rate   Total

7         Water Proofing
          The contractor shall, when pricing the rates of this bill, take into
          consideration including and allow for the costs or expenses of all
          requirements stipulated in the preambles, drawings and
          technical specification of the contract.
7.1       Supply and install roof water proofing membrane 5mm thick              M2     2300
          covered with quartz granules, Pazkar or equivalent, for main
          roof, machines roofs, stairs roofs, parapet walls and where
          required the price includes the application of primer coat GS474
          at a rate of 25 kg /m2, installation of 15*15cm angle fillet,
          grooves, groove sealant, groove cover, joints over lapping,
          backing sheets or pieces all around external& internal corners,
          roof drains, machines foundations or up stands, roof door
          thresholds and silver paints along the joints and all necessary
          material and workmanship to complete the works as shown in
          the drawings and as per manufacturer instructions and codes of
          practice.
7.2       Supply and apply three coats of bitumen (25/75) at rate of             M2     270
          500g/m2 for each layer with two layers of fiberglass in opposite
          directions including primer coat GS474. The price includes
          5*5cm angle fillet with smooth sand cement mortar(1:3) and
          5cm thick sand cement screed with water proofing agent as
          surface layer before applying the water proofing coats.

7.3       Supply and install a sloped light weight foam concrete of density      M2     2050
          1000kg/m3 on the roof ( the thickness to meet the level and
          slopes shown on drawings). The rate includes cost of applying
          2 cm cement screed layer above the light weight concrete.




          Total of Water Proofing carried to summary Sheet


                                                   11 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                              Description                                 Unit   QTY   Unit Rate   Total

8         Carpentry Works
          The contractor shall, when pricing the rates of this bill, take into
          consideration including and allow for the costs or expenses of all
          requirements stipulated in the preambles, drawings and
          technical specification of the contract.
8.1       Fabricate, supply and install the following wooden doors
          complete with the metal frames, all necessary fixing
          accessories, glazing, heavy duty roller hinges, stoppers,
          louvers, grills, the required hydraulic closures, hardware,
          protection panels and ironmongery , painting of the frame and
          the exposed wooden surfaces of the door panels, the unit rate
          shall also include all the works described herein below:

*         The wooden door leaf shall be 45mm thick with required filling, 5
          mm thick class A plywood facing on each side, the exposed
          surfaces of the door panel shall be hard wood "Zan" 52*35 mm
          tongued and grooved in the internal wooden fillings, sealing
          strips around door panel, and door closure German made where
          shown and required on the drawings, all as shown on the
          drawings.
*         Supply and install of heavy duty hinges, locks, cylinders are
          "Yardini" or equivalent. locks to toilets-vacant/ occupied "Yardini
          " type 7008 all doors shall be provided with master key system.
          The hierarchy shall be specified before the supply of lock sets.

*         Door handles shall be steel handles similar to Hewi type
          zg1113bb and type fbg 1113 or equivalent. The colour to be
          selected by the Engineer.
*         Supply and installation of formed galvanized steel frame 1.5mm
          thick of required width according to the wall thickness, buckets
          for cylinders& locks, recess for hinges with backing plates ,
          rubber knobs, side anchoring& bottom bracing and concrete
          filling as specified in drawings. The frames shall be fabricated
          and assembled by specialized manufacturer with all required
          accessories.
*         Door protection 2mm stainless steel U shape for the both sides
          as shown on drawings.
*         Door protection where needed as per drawings of 2mm
          "Decosheet" (SPM ) or equivalent including all necessary
          fittings & fixings complete as per manufacture
          recommendations, the colour will be as per Eng. approval.
*         Supply and installation of PVC inflammable 'Taraflex' or
          equivelant 2mm thick cladding on both sides of the door panels.

*         All exposed edges , louvers and door frames are" Zan" wood
          and should be painted with 3 coats of liquor paint. the metal
          doors frames shall be painted with primer coat of meginol
          special gray 270-004 and two coats of polyour matt oil. the
          colour shall be selected by the engineer.
*         Door filling material should not be less than 80%.
*         Rate for smoke proof doors include 100% filling , sealing strips
          around door panel including the bottom of panel.
8.1.1     D01 ( 1.20 * 2.10 m)                                                   No.    23
8.1.2     Ditto, but D01G ( 1.20 * 2.10 m) with grills                           No.     3
8.1.3     D02 ( 1.10 * 2.10 m)                                                   No.     3
8.1.4     D03 ( 0.95 * 2.15 m)                                                   No.    21
8.1.5     D04 ( 0.95 * 2.10 m)                                                   No.    12

                                                   12 out of   62
                                                    Tulkarem Hospital
                                                         -BOQ-



Section                               Description                              Unit   QTY   Unit Rate   Total

8.1.6     Ditto, but D04G ( 0.85 * 2.10 m) with grills                         No.     7
8.1.7     D05 ( 0.95 * 2.15 m)                                                 No.     2
8.1.8     D06 ( 0.85* 2.15 m)                                                  No.     9
8.1.10    D07 ( 0.85 * 2.15 m)                                                 No.     3
8.1.11    D08 ( 1.60 * 2.10 m) operate electrically and manually with inter-   No.     3
          come system
8.1.12    D09 ( 1.70 * 2.10 m)                                                 No.     1
8.1.13    D10 ( 1.70 * 2.10 m) operate electrically and manually with inter    No.     2
          come system
8.1.14    D11 ( 270 * 2.10 m) operate electrically and manually with inter     No.     1
          come system
8.1.15    D12 ( 1.60 * 2.10 m) located in the Children day room                No.     1
8.2       Nurse station , desks and cabinets
          Fabricate, supply and install the following units, as in drawings
          with all fixing accessories, drawers, shelves, hardware, and
          ironmongery with a master key and made of:
          18mm thick plywood for wall hung and lower cabinets, plastic
          laminated " top quality from outside and laminated with regular
          Formica from inside, 12mm thick sandwich panel for shelves
          laminated with regular Formica. For dimensions refer to detailed
          drawings.
8.2.1     kitchen lower and upper cabinets ( 120 cm length) Room No. 72        No.     1
           including granite counter top "Tiger eye" with top& bottom
          skirting, beads, polishing, routings, jointing…etc and all
          preparatory woks for the installation of the required sink and
          sanitary fixtures.
8.2.2     Ditto, but 125cm length for Room No. 28                              No.     1
8.2.3     Ditto, but 130cm length for Room No. 22,32 and 65.                   No.     3
8.2.4     Ditto, but 135cm length for Room No. 59                              No.     1
8.2.5     Room No. 31 working station, lower& upper cabinets.                  No.     1
8.2.6     Room No.37 working station, lower& upper cabinets.                   No.     1
8.2.7     Room No. 64 working station, lower& upper cabinets.                  No.     1
8.2.8     Room No. 97 utility working station, lower& upper cabinets.          No.     1
8.2.9     Nurse station C1                                                     No.     1
8.2.10    Nurse station C2                                                     No.     1
8.2.11    Nurse station C3                                                     No.     1
8.2.12    Nurse station C4                                                     No.     1
8.2.13    Electrical cabinets of different sizes.                              No.     5




          Total of Carpentry Works Carried to Summary Sheet


                                                      13 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                              Description                                 Unit   QTY   Unit Rate   Total

9         Suspended ceiling
          The contractor shall, when pricing the rates of this bill, take into
          consideration including and allow for the costs or expenses of all
          requirements stipulated in the preambles, drawings and
          technical specification of the contract. Rates for all suspended
          ceilings works includes suspension system with anchors to the
          structure, L& Z, main& main profiles, omega profiles. clips,
          gaskets and all necessary fittings in accordance to the
          manufacture technical data and related standards covering this
          type of works, The rate includes also cutting and preparation for
          installing lighting fixtures, ceiling recess, maintenance
          openings, grills, ceiling utilities... etc.

9.1       Supply and install suspended ceiling for bathroom, utilities and       M2     200
          wet areas made from 30cm non perforated formed galvanized
          metal trays of 0.6mm thick and 45mm high. The trays should be
          supplied pre painted and oven cured. The unit rate shall also
          include acoustic rock wool mats, 25mm thick and 25kg/m3
          density, wrapped in black non inflammable dust proof sags in
          accordance with specifications and the related Standards.

9.2       Ditto, but perforated sheets(12%-20%) perforation and of 40cm          M2     600
          wide. The unit rate shall include cost of the of 25mm thick rock
          wool.
9.3       Ditto, but 60*60cm perforated sheets for the waiting area with         M2     220
          approved acoustic material "Soundex " or equivalent in
          accordance to the related safety standards, rules and
          regulations.
9.4       Supply and install 60*60cm suspended ceiling for operating             M2     150
          room, ECOPHONE HYGINE Type Protect "A" (non perforated).
          The price should include galvanized suspension system with
          anchors to the structure, bacterial resistant, moisture resistant,
          with standing relative humidity up to 95% at 30c fire resistant
          tiles, including access panels, fittings, fixing, installation of a
          closed cell gasket between the grid and panel including
          retention clips to insure good seal , complete all as
          specifications and drawings.

9.5       Ditto, but for clean room areas type "Clima Plus USG" class            M2     300
          100 ceilings or equivalent.
9.6       Ditto, but 60x60cm acoustic tiles suspended ceiling, type              M2     100
          Armstrong Georgian drop type or equivalent.

9.7       Supply and install vertical and horizontal gypsum boards 12mm          M2     250
          thick for walls and ceiling cladding and for other decorative
          works. The price shall include all decorative beams, edges,
          recessed slab, squares, cuts, suspension& structural profiles--
          etc to any shape and patterns to complete the works as
          approved by the engineer.




          Total of Suspended Ceiling Works carried to Summary
          Sheet

                                                   14 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                              Description                                 Unit   QTY    Unit Rate   Total

10        Painting Works:
          The contractor shall, when pricing the rates of this bill, take into
          consideration including and allow for the costs or expenses of all
          requirements stipulated in the preambles, drawings and
          technical specification of the contract.
          Type of paint shall be in accordance with the specification and
          the applicable Standards. The contractor should allow in his
          pricing that the engineer will use as many different colours or
          combination of colours to meet an approved colour scheme.

          All paint works should conform to manufacturer instruction
          regarding number of coats , rate of application or drying time
10.1      Supply and apply cement sand filling layer to the ceiling and          M2     500
          walls above false ceiling level. (provisional)
10.2      Supply and apply emulsion paint on plastered walls composed            M2     2100
          of two coats of putty and 3 coats of " supercryel " emulsion
          paint.

10.3      Supply and apply polysid paint.                                        M2     830
10.4      Supply and apply oil paint for walls composed of two coats of          M2     600
          putty, one coat of under coat and 2 coats of " polyour".
10.5      Supply and apply oil paint for metallic surfaces "Superlac" of         M2     80
          including surface preparation.




          Total of Painting Works carried to Summary Sheet


                                                   15 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                              Description                                 Unit   QTY   Unit Rate   Total

11        Metal Works:
          The contractor shall, when pricing the rates of this bill, take into
          consideration including and allow for the costs or expenses of all
          requirements stipulated in the preambles, drawings and
          technical specification of the contract.
11.1      Aluminum Works
          Fabricate supply and install the following powder coated
          aluminum doors & windows Napco or equivalent, complete
          with double glazing ,sekurit, silicone, handles, locks and oplite
          fly screen. Shop drawings must be submitted. All as shown in
          drawings and approved by the Engineer .

11.1.3    W1(1.56 * 0.90 m)                                                      No.    40
11.1.4    W2 (1.30 * 0.90 m)                                                     No.     4
11.1.5    W3 (1.56 *1.00 m)                                                      No.     3
11.1.6    W4 (0.90 *1.82 m)                                                      No.     4
11.1.7    W5 (1.56 *4.13 m)                                                      No.     1
11.1.8    W6 (1.56 *3.05 m)                                                      No.     2
11.1.9    W7 (1.56 *1.00 m)                                                      No.     3
11.1.10   W8 (1.04 * 0.60 m)                                                     No.     3
11.1.11   W9 (0.87 * 3.00 m)                                                     No.     3
11.1.12   W10 (0.87 * 2.00 m)                                                    No.     2
11.1.13   Wooden glass windows for the Children day room and                     MR     20
          Incubators, the price shall include 6mm glass, the Ironmongery
          and carpentry works as per drawings.

11.2      Steel Works
          Fabricate supply and install the following steel doors complete
          with all accessories such as heavy duty roller hinges, water
          flushing, master key, Yale cylinder locks, approved handles,
          glazing and all fixing accessories. Door frames are made of
          RHS profiles 80/40/32 mm cladded with two 1.5 mm metal
          sheets. The price includes steel frame made of bent steel sheet
          2mm thick and the required louvers made of 15mm thick bent
          sheet metal. Shop drawings must be submitted and approved
          before fabrication.

11.2.1    D12 ( 1.10 * 2.10 m) multi lock smoke proof doors similar to "         No.     3
          Raf Barih" or equally approved
11.2.2    Ditto, but D13 ( 0.90 * 2.10 m)                                        No.     1
11.2.3    D14 (1.00 * 2.10 m)                                                    No.     4
11.2.4    D15 (1.35 * 2.10 m)                                                    No.     1
11.2.5    D16 (0.80 * 2.10 m)                                                    No.     1
11.2.6    D17 (1.50 * 2.10 m)                                                    No.     2
11.2.7    D17 (2.20 * 2.10 m)                                                    No.     1
11.3      Fabricate supply and install steel handrails, similar to the           MR     45
          existing handrail in the staircase and as shown on drawings,
          including fixing accessories, matching the . The rate includes
          panting the hand rails with 2 coats of anti rust primer and oil
          paint.




          Total of Metal works carried to summary sheet


                                                   16 out of   62
                                                 Tulkarem Hospital
                                                      -BOQ-



Section                               Description                                Unit   QTY   Unit Rate   Total

12        Other Works
          The contractor shall, when pricing the rates of this bill, take into
          consideration including and allow for the costs or expenses of all
          requirements stipulated in the preambles, drawings and
          technical specification of the contract.

12.1      Supply and install Avis curtain rail as per detailed drawing,          Mr.    295
          complete with all fixing accessories, Aluminum carrier main
          profile and locks.

12.2      Supply and install wall guard rail similar to the existing rails       Mr.    100
          rendered at the second floor or equivalent with all fixing
          accessories. The rate includes the stop ends and external
          corners, colour to be selected by the Engineer.

12.3      Corner protection similar to the existing rendered at the second       No.    150
          floor or equivalent(2.10 m) height.

12.4      Supply& install 2mm "Decosheet" panel wall protections at the          M2     50
          beds level cut to size according to the site requirements as
          made by (SPM ) or equivalent, including all necessary fittings &
          fixings complete as per manufacture recommendations, the
          colour will be as per Eng. approval.

12.5      Supply and install a wooden wall guards for corridors with all         Mr.    300
          fixing accessories as per the detailed drawings and engineer
          instructions. colour to be selected by the Engineer.

12.6      Supply& install 2mm "Decosheet" hand plates protections                No.    20
          around door handles according to the site requirements as
          made by (SPM ) or equivalent including all necessary fittings &
          fixings complete as per manufacture recommendations, the
          colour will be as per Eng. approval.




          Total of Other Works carried to Summary Sheet


                                                    17 out of   62
                                                  Tulkarem Hospital
                                                       -BOQ-



Section                                Description                                  Unit   QTY   Unit Rate   Total

13.0      Important Notes: All materials and accessories to be used shall
          be according to the Approved Manufacturer List attached to the
          electrical specifications (see attachent # 1)
          Sec. 13.1) - Electrical Points.
          The electrical power supply from electrical switchboard to first
          point in circuit shall be included in the unit price of that point (by
          means of wires, cables or leads in self extinguishing conduits
          and cables). All as per specifications and as required.

13.1.1    Supply, install and connect standard lighting point internal or     Comp.        354
          external, in slab or over false ceiling, to include a 16 mm
          diameter conduit, 1.5 or 2.5 sq.mm cross-section leads or cable,
          and, as required single , double, two way or push button lighting
          switch , and outlet for luminaries with junction box and terminals.

13.1.2    Ditto but for emergency lighting point                                   Comp.   80

13.1.3    Supply, install and connect a 16A wall socket point - to include a Comp.         65
          16 mm dia. Conduit, (3x2.5) sq.mm cross-section leads or
          cables, and as required 16 A wall socket .
13.1.4    Ditto as item 13.1.3 but double socket.                                  Comp.   36
13.1.5    Ditto as item 13.1.3 but with water proof socket.                        Comp.   66
13.1.6    Ditto as item 13.1.4 but with water proof cover.                         Comp.   13
13.1.7    Supply, install and connect a three-phase (5x16) A, single-circuit Comp.          1
          wall socket point, to include a 23 mm diameter conduit, (5x2.5)
          sq.mm cross section leads or cables and a (5x16) single-circuit
          wall socket accessory .
13.1.8    Supply, install and connect Intercom connection point (Price Comp.               36
          includes 16 mm diameter conduit with a standard Intercom
          cable, leading from point to the Intercom section in LV box).

13.1.9    Supply, install and connect Public Address System connection Comp.               11
          point (Price includes 16 mm diameter conduit with cable,
          leading from point to the LV box or to the nearest point).

13.1.10   Supply, install and connect Fire Alarm connection point (Price Comp.             105
          includes 16 mm diameter conduit with cable, leading from point
          to the LV box or to the nearest point).
13.1.11   Supply, install and connect TV connection point (Price includes Comp.            19
          23 mm diameter conduit with cable, boxes , and the socket
          outlet leading from point to the LV box).

13.1.12   Supply, install and connect SAT connection point (Price includes Comp.           19
           23 mm diameter conduit with cable, boxes , and the socket
          outlet leading from point to the LV box).

13.1.13   Supply, install and connect Nurse Call connection point (Price Comp.             125
          includes 16 mm diameter conduit with cable, leading from point
          to the nurse call station).

13.1.14   Supply, install and connect Computer outlet connection point Comp.               10
          (Price includes 16 mm diameter conduit with 4 pairs shielded
          cable and socket, leading from point to the nearest HUB in the
          nearest LV box).




                                                     18 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                               Description                                Unit   QTY   Unit Rate   Total

13.1.15   Supply, install and connect Telephone socket point in a 23 mm         Comp.   19
          conduit - to include a 23 mm diameter conduit from nearest
          telephone cabinet to accessory output in junction box, standard
          socket telephone accessory, and standard 2x2x.5mm2-
          telephone lead, inserted from cabinet to accessory including
          connection at both ends.
13.1.16   Supply, install and connect point for thermostat to include a 16      Comp.   40
          mm diameter conduit installed on one side near socket for fan
          coils and termination with a suitable box on other side at
          thermostat output. 3 mm thick Nylon draw-string shall be
          inserted inside conduit.
13.1.17   Supply, install and connect 6 sq. mm grounding point - to         Comp.       20
          include a 16 mm diameter conduit, connect at one end to
          grounding bus-bar in nearest switchboard, and at other end to
          grounded element (air-conditioning ducts, acoustic ceiling, alum.
          partitions etc.
13.1.18   Supply, install and connect Emergency push-button point, to       Comp.        5
          include a 16 mm diameter conduit, (3x1.5) sq.mm cross-section
          leads, and a dual contact emergency push-button installed in a
          box with frame, transparent plastic cover to be broken in case of
          emergency, and engraved bakelite "sandwich" type sign, per
          plan (box such as TELEMENIA model ZAS-E25).
13.1.19   Supply, install and connect power point for bed head units, the No.           160
          price to include 3x2.5mm2 NYY cable and 23mm dia conduit
          from electrical switchboard to BHU junction box with all required
          accessories and materials.
13.1.20   Supply, install and connect point as above, but by a 3x1.5            No.     190
          sq.mm NYY cable and16mm dia conduit.
13.1.21   Supply, install and connect point as above, but by a 6 sq.mm          No.     61
          cross-section grounding lead and 23 mm diameter conduit.
13.1.22   Supply, install and connect point as above, but for                   No.     50
          communication, by a 23 mm conduit diameter conduit.
13.1.23   Supply, install and connect point as above, but for telephone in No.          50
          B.H.U, by a 23 mm conduit and standard 2x2x.5mm2- telephone
          lead.
13.1.24   Supply, install and connect point as above, but for data, by a 23 No.         61
          mm conduit and standard CAT 6 lead.
13.1.25   Supply, install and connect lighting point for the suspended          No.      9
          lighting fixtures in the delivery rooms, the price shall include 16
          mm dia. conduit and 3*2.5 sq.mm cable or lead.
13.1.26   Ditto as item 13.1.25, but with 5*4 sq. mm cable or lead and          No.      4
          23mm dia. conduit for the operating lighting fixtures.
13.1.27   Supply, install and connect a 16A Power Point including 16A        No.        40
          (1PH) isolator switch, conduits, boxes and cables for the fan coil
          units , the works all according to drawings, specifications and
          Engineer instructions.
13.1.28   Ditto as item 13.1.27 but for the Exhaust fans on the roof.        No.         9
13.1.29   Ditto as item 13.1.27 but for Booster Pumps.                          No.     10
13.1.30   Ditto as item 13.1.27 but 16A ( 3PH) for Booster Pumps.               No.      4
13.1.31   Supply, install and connect a 25A Power Point including 25A           No.      1
          (3PH) isolator switch, conduits, boxes, cables for the Package
          Unit, the works according to drawings, specifications and
          Engineer instructions.
          Total Sec. 13.1)- Points….carried to summary.


                                                    19 out of   62
                                               Tulkarem Hospital
                                                    -BOQ-



Section                             Description                                Unit   QTY   Unit Rate   Total

          13.2 - Conduit, Rigid Piping and
          Excavation Works
          Supply, install and connect Self-extinguishing type plastic
          conduit, processed over or under plaster or inside castings,
          including junction boxes, unions, connectors, etc. including
          excavation , backfilling , sand , tape , manholes and covers and
          galvanized draw-strings, ready for use (for works not included in
          points works).

13.2.1    23 mm diameter.                                                     ML      50
13.2.2    29 mm diameter.                                                     ML      50
13.2.3    36 mm diameter.                                                     ML      50
13.2.4    50 mm diameter.                                                     ML      50
13.2.5    4" diameter.                                                        ML      50
13.2.6    6" diameter.                                                        ML      50




          Total sec. 13.2) - Conduit, Rigid Piping and Excv…..carried
          to summary
                                                  20 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                              Description                               Unit   QTY   Unit Rate   Total

          Sec. 13.3) - Cables

          Supply, install and connect XLPE non-armored type
          thermoplastic copper cables, including insertion into conduit or
          attachment to structural elements or laying in ductwork,
          including all associated materials, insulation materials, unions,
          and connection of cable at both ends.

13.3.1    3x400+200mm2+200mm2 cable                                           M.L.    40
13.3.2    3x240+120sq. mm+120sq.mm Cu.                                        M.L.    150
13.3.3    3x185+90mm2+90mm2 cable                                             M.L.    150
13.3.4    3x70+35mm2+35mm2 cable                                              M.L.    50
13.3.5    3x50+25mm2+25mm2 cable                                              M.L.    50
13.3.6    5x16 sq.mm cross section.                                           M.L.    50
13.3.7    5x10 sq.mm cross section.                                           M.L.    210
13.3.8    5x6 sq.mm cross section.                                            M.L.    100
13.3.9    5x4 sq.mm cross section.                                            M.L.    100
13.3.10   3x2.5 sq.mm cross section.                                          M.L.    50
13.3.11   3x1.5 sq.mm cross section.                                          M.L.    50




          Total Sec. 13.3) - Cables ……carried to summary


                                                   21 out of   62
                                               Tulkarem Hospital
                                                    -BOQ-



Section                              Description                                 Unit   QTY   Unit Rate   Total


          Sec. 13.4) - Structural Elements, Cabinets and Ductwork

          Supply, install and connect Prefabricated ductwork . mounted on
          walls or attached to ceilings. Price to include all reinforcing and
          attaching hardware, structural elements, brackets, hangers etc,
          also price to include all required covers and stands for trunks
          fixed on roof or out site.
13.4.1    10/7 cm.                                                              M.L.    150
13.4.2    20/7 cm.                                                              M.L.    150
13.4.3    40/7 cm.                                                              M.L.    150




          Total 13.4) Structural Elements, Cabinets….. carried to
          summary

                                                   22 out of   62
                                              Tulkarem Hospital
                                                   -BOQ-



Section                             Description                              Unit   QTY   Unit Rate   Total


          Sec .13.5 ) Grounding Systems
          Sec. 13.5.1) - Lightning System
13.5.1    Supply, install and connect Complete lightning system (using L.S           1
          pulsars system) including all required materials and accessories,
          all according to drawings and specifications and Engineer
          instructions.(The contractor is requested to make the required
          calculation for the system and take the Engineer approval).

          Sec. 13.5.2) - Operational Theaters Grounding
13.5.2    Supply, install and connect a complete earthing system L.S                 1
          (separated from the general earthing system) for the operation
          theaters (4-op.th.) including pits, rods& all required materials
          and accessories, all according to drawings and specifications
          and Engineer instructions .

          Sec. 13.5.3) - Building Grounding (Provisional Item)
13.5.3    Supply, install, connect and test the earthing system including   L.S      1
          cables , rods , pits ,checking boxes ,main earthing box with
          equipotential bus bars ,and connecting to the existing foundation
          earthing ready for operation according to specifications,
          drawings and engineers instructions .




          Total sec. 13.5) - Grounding …..carried to summary


                                                  23 out of   62
                                                 Tulkarem Hospital
                                                      -BOQ-



Section                                Description                                 Unit   QTY   Unit Rate   Total


          Sec. 13.6) - Electrical Switchboards
a.        Supply, install and connect the electrical switchboards to the
          site, including all associated materials and labor, as described in
          the technical specifications.
b.        Cabinets with no access from the rear, made up of transparent
          polycarbonate cells, or sheet-metal cabinets with a 25% surplus
          space.
c.        The switchboards are to be placed on the floor, in a niche
          against the wall.
d.        Main supply lines enter from the switchboard bottom, top or
          side, while outgoing lines exit the switchboard from both its
          bottom and top sides.
e.        Price to include all structural elements required in order to install
          the switchboard, including bus-bars, terminals, wiring, bolts,
          clamps, etc. and for the equipment listed below.

f.        The switchboards shall contain accessories shall be according
          to the approved manufacturer list.
g.        Prices for supply, installation and connection of various
          accessories including all associated labor and materials such as
          bus-bars, terminals, wiring reinforcements, mounts, engraved
          "sandwich" type identification plates, etc. including connection to
          mains supply - complete ready for use.

h.        The price shall include connection of the distribution board to the
          existing MDB.

13.6.1    P31                                                                     Unit     1
13.6.2    P32                                                                     Unit     1
13.6.3    P33                                                                     Unit     1
13.6.4    P34                                                                     Unit     1
13.6.5    POP                                                                     Unit     1
13.6.6    MCC                                                                     Unit     1
13.6.7    P-Lift ( Provisional Item)                                              Unit     1
13.6.8    MCCB 320 A inside the existing MDB (Provisional)                        Unit     1
13.6.9    MCCB 250 A inside the existing MDB (Provisional)                        Unit     1




          Total sec. 13.6) Electrical Switchboards…..carried to
          summary.

                                                     24 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                              Description                                 Unit   QTY   Unit Rate   Total


          Sec. 13.7- Luminaries Supply and Installation
a.        Supply and installation of lighting fixtures as described below,
          including all necessary accessories, required in order to light it
          with lamps and electronic rapid starter, complete, according to
          the approved manufacturer list.
b.        All lamps shall be of the energy-saving type (18,36, 58 Watts).

13.7.1    Type (A) 2x36W fluorescent light fixture Prismatic type.             Unit     43

13.7.2    Type (AE) Ditto as A but with emergency charger.                     Unit     18

13.7.3    Type (B) Down light, with reflector lamp recessed in false ceiling Unit       61
          40W, IP44 die cast aluminum and stainless steel safety glass
          reflector of pure anodized aluminum.
13.7.4    Type (C)18W fluorescent light fixture with polycarbonate body        Unit     31
          white and opal diffuser, wall mounted, IP54.
13.7.5    Type (E) 1 x 8W fluorescent emergency exit sign luminaries           Unit     12
          with white steel body, for maintained emergency lighting of 3
          hour duration, legend panels (3) included (down, left and right).

13.7.6    Type) 5W Recessed night light corrosion proof IP65.                  Unit     18
13.7.7    Type) Ceiling mounted lighting 2XPL-L 11 lamp compact                Unit     10
          fluorescent with opal diffuser controller IP20.

13.7.8    Type (JE) Ditto as J but with emergency charger.                     Unit      4

13.7.9    Type (O1) 2x34W sealed fluorescent lighting fixture , recessed       Unit      8
          in false ceiling, with prismatic diffuser, IP65.

13.7.10   Type (EO1) Ditto as O1 but with emergency charger..                  Unit      2

13.7.11   Type (O2) 4x18W sealed fluorescent lighting fixture , recessed       Unit     60
          in false ceiling, with prismatic diffuser, IP65.

13.7.12   Type (EO2) Ditto as O2 but with emergency charger.                   Unit     16

13.7.13   Type (K) 2x36W, fluorescent lighting fixture, ceiling mounted        Unit     60
          with prismatic diffuser ( Internal primes) IP20.
13.7.14   Type (KE) Ditto as K but with emergency charger.                     Unit     19

13.7.15   Type (L) Down light, recessed in false ceiling, with PL-C 13 W       Unit     19
          compact fluorescent energy saving lamp, cast aluminum cover
          and ring silver ( frosted) aluminum reflector, IP20.
13.7.16   Type (M) 2x36W, fluorescent lighting fixture, ceiling / pendant.     Unit      4
          Body of grey fiber-glass reinforced polyester, prismatic
          polycarbonate diffuser, IP54.
13.7.17   Type (ME) Ditto as M but with emergency charger.                     Unit      2

13.7.18   Type (P) 4x18W, fluorescent lighting fixture, recessed in false      Unit     18
          ceiling, with prismatic diffuser ( Internal primes), IP20.
13.7.19   Type (QE) Ditto as P but with emergency charger.                     Unit      2

13.7.20   Type (Q) 4x18W, fluorescent lighting fixture, recessed in false      Unit     10
          ceiling, with double parabolic reflector and louvers, IP20.

13.7.21   Type (QE) Ditto as Q but with emergency charger.                     Unit      9

          Total sec. 13.7 )Luminaries Supply…carried to summary


                                                   25 out of   62
                                                 Tulkarem Hospital
                                                      -BOQ-



Section                              Description                               Unit   QTY   Unit Rate   Total


          Sec 13.8- Nurse Calling System
          Note: All equipment items for the nurse- calling system shall be
          according to the approved manufacturer list.. The work to
          include the supply of the equipment specified, installation of
          same, connection, wiring, commissioning and all other details,
          as specified in the technical specification and drawings.

13.8.1    Master station 30- call master.                                    Unit      1
13.8.1    Master station 20- call master.                                    Unit      1
13.8.2    Reset button.                                                      Unit     17
13.8.3    Bedside call switch.                                               Unit     65
13.8.4    NBY-1A metal jack.                                                 Unit     65
13.8.5    Corridor lamp.                                                     Unit     34
13.8.6    Call button.                                                       Unit      2
13.8.7    Ceiling mount 180mm O(7-1/8"O) NB-L                                Unit     17
13.8.8    Moisture resistant pull cord switch.                               Unit     17
13.8.9    Power supply.                                                      Unit      2




          Total Sec.13.8) Nurse Calling System Carried to Summary


                                                   26 out of   62
                                                 Tulkarem Hospital
                                                      -BOQ-



Section                                Description                           Unit   QTY   Unit Rate   Total


          Sec 13.9-Fire Alarm System
          Supply install and connect complete in place and in an operable
          manner the fire alarm system. The work is to include the supply
          of the equipment specified, installation of same connection,
          wiring, cables, commissioning and all of the details and
          connecting to the existing system as specified in the technical
          specifications and drawing type shall be according to the
          approved manufacturer list.
13.9.1    (Provisional Item) Main addressable fire alarm control panel for Unit      1
          500 addressable points, expandable up to 1000 points with
          batteries and charger.

13.9.2    Manually operated alarm call point .                             Unit     13
13.9.3    Indoor fire alarm siren .                                        Unit      4
13.9.4    Ionization smoke detector.                                       Unit     78
13.9.5    Intelligent heat detector.                                       Unit      1
13.9.6    (Provisional Item) Automatic telephone dialer.                   Unit      1
13.9.7    24v DC Magnetic Door Holder for fire doors                       Unit      3




          Total Sec. 13.9) Fire Alarm System Carried to Summary


                                                     27 out of   62
                                              Tulkarem Hospital
                                                   -BOQ-



Section                             Description                                Unit   QTY   Unit Rate   Total


          Sec 13.10 - Intercom System
          Note: All equipment items for the intercom system shall be
          according to the approved manufacturer list.. Work is to include
          the supply of the equipment specified installation of same,
          connection, wiring, commissioning and all other details, as
          specified in the technical specifications and drawings.

13.10.1   Hands free master station.                                         Unit      6
13.10.2   Power supply adaptor.                                              Unit      6
13.10.3   Door phone adaptor.                                                Unit      6
13.10.4   Door station .                                                     Unit      6
13.10.5   Power supply adaptor.                                              Unit      6
13.10.6   Door release.                                                      Unit      6
13.10.7   AC transformer for door release .                                  Unit      6
13.10.8   Digital keypad                                                     Unit      6
13.10.9   12V AC power supply transformer                                    Unit      6




          Total of Sec 13.10) Intercom System carried to summary


                                                  28 out of   62
                                             Tulkarem Hospital
                                                  -BOQ-



Section                             Description                              Unit   QTY   Unit Rate   Total


          Sec 13.11- Public Address System
          Supply, install, test and commission a public address system,
          the system shall be according to the approved manufacturer list,
          including all required connections with the existing system of
          the Hospital including all required cables and conduits complete
          ready for work.
13.11.1   9/6 watt ceiling loudspeaker, 8” round with metal grille, screw  Unit     11
          mount.




          Total of Sec 13.11) Public Address System carried to
          summary

                                                  29 out of   62
                                            Tulkarem Hospital
                                                 -BOQ-



Section                            Description                            Unit   QTY   Unit Rate   Total


          Sec-13.12- Telephone System
13.12.1   Supply install and connect main telephone cables from the low Job       1
          voltage boxes to the main low voltage box in the proposed floor
          and from the main low voltage box to the telephone exchange
          of the Hospital. Rate to include 2 NO's. 36 pair cables, conduits,
          terminal blocks and all accessories as specified in the technical
          specification and drawings.




          Total of Sec 13.12) Telephone System carried to summary


                                                 30 out of   62
                                           Tulkarem Hospital
                                                -BOQ-



Section                           Description                             Unit   QTY   Unit Rate   Total


          Sec- 13.13- LV Boxes
          Supply install and connect the following LV boxes. Rate to
          include all required materials, condiuts, wires, cables and
          accessories manufacturing from galvanized sheet metal sheets
          , painted with the same color of the switch boards all as
          specified in the technical specification and drawings.

13.13.1   LVM Approximate dim.3 (80x60x25) cm                            No.      1
13.13.2   LVB Approximate dim.( 60x60x25) cm                             No.      4




          Total of Sec-13.13) LV Boxes carried to summary


                                                31 out of   62
                                               Tulkarem Hospital
                                                    -BOQ-



Section                             Description                                Unit   QTY   Unit Rate   Total


          Sec- 13.14- UPS System Boxes ( Provesional)

13.14.1   Supply install and connect 30KVA uninterruptible power supply       No.      1
          (U.P.S.) system, consisting of a charger/rectifier unit, a solid-
          state inverter unit, and a static bypass transfer switch, Power
          and control connecting cables between the U.P.S. system and
          the battery bank, including protective devices, all in accordance
          with the technical specifications .The UPS System back up time
          15 min.
          (Complete and ready for work, including all required materials
          and connections)




          Total of Sec-13.14) UPS System carried to summary




                                                  32 out of   62
                                                  Tulkarem Hospital
                                                       -BOQ-



Section                                Description                     Unit   QTY   Unit Rate   Total

          Mechanical Works Bill
           PREAMBLE
            1 - include for excavation to any depth and width
             necessary to provide working spaces planking
             and strutting keeping excavations free from water,
             trimming bottom to required levels, stockpiling all
             suitable excavated materials for backfill and fill on
             site for careful backfilling and well consolidating
             excavated material and for disposal of the
             surplus material as directed , all as specified .

          2 - Rates for plumbing work and sanitary
              installations shall include for :

             a - Bends, elbows, tees, junctions, branches
                 and the like .

             b - Joints, union, flanges and couplings in
                 the running lengths of pipes .

             c - Nipples , air chambers , cleaning eyes and
                 access doors .

             d - Holderbats, brackets, pipe clip and support,
                 hangers and piers .

             e - Pipes sleeves and escutcheons .

             f - Cutting and pinning ends of supports
                 for pipes equipments, appliances, fixtures,
                 fittings and all the like .

             g - Flushing and testing as specified .

             h - All cuttings, borings, making holes and the
                 like including making good .

             i - Conduit, conduit fittings, wiring and the like.
             j - Hoisting, lifting and fixing in position .

             k - Painting as specified .
             l - Protection of all sanitary installations .

          3 - Rates for all heating installations shall include :

             a - Assembling and jointing .

             b - Factory priming paint .

             c - Fixing, including nails, bolts , nuts, screws,
                 plugs and the like .


             d - Cutting and pinning including all making good.

             e - Plugging and screwing .
             f - Testing all installations in accordance with a
                 selected International standard by the
                engineer including, providing equipment and


                                                      33 out of   62
                                                 Tulkarem Hospital
                                                      -BOQ-



Section                               Description                    Unit   QTY   Unit Rate   Total

                personnel necessary for testing .

             g - Protection of all works .

          4 - Rates for all items of equipment and materials
              shall be inclusive of all certificates samples test,
              supply of all information and data , supply of
              catalogues, charts, curves, submittals certified
              drawings , and all other information services
              called for in the specifications and fully
              connected up in good working order .

          5 - Rates shall also include for :

             a - Marking positions of holes,mortices chases,
                 and the like etc..

             b - Cutting and forming holes, chases, etc,
                 including pipe sleeves and making good
                 all works.

             c - Cutting and pinning ends of supports to
                 structure.



             d - Painting as specified .

             e - Protection and maintaining the works in
                good order .

             f - Electrical installations including panels,
                 controls wiring, conduits, conduit fittings etc.

             g - Preparation of plans or diagrams , working
                 drawings , as-built drawings , schedules,
                 instruction manuals, etc.

             h - Insulation as required .

             i - Tags, nameplates, belt guard and all
                 accessories and appurtenances described in
                 the specifications dealing with each item
                 or equipment.

              j - Any necessary motors , starters and
                  necessary wiring on the equipment having
                  electrical goods together with such items
                  as insulation , piping instruments, controls
                  and all other items mentioned or implied in
                  specifications and drawings as being
                  supplied with the equipment and not
                  separately measured and enumerated in
                  the Bills of Quantities .
          6 - Equivalent materials and equipments are
              considered so , only when they are up to the
              specified standard quality,price,and, moreover,
              they have reliable local agent, who can provide
              the after sales services.
              Priority is given to high quality local products,
              all according to the Engineers' judgement.

                                                    34 out of   62
                                                 Tulkarem Hospital
                                                      -BOQ-



Section                               Description                                  Unit   QTY   Unit Rate   Total


          7 - See specifications for taking over supply item.

          8 - Jointing of PVC pipes by heating is not allowed.

           9 - If any item is stipulated in more than one section and has
          been priced differently in each section, then the lowest priced
          unit rate will be considered for all the quantities of the item in the
          various sections.

          10 - The price of all items in the bill includes Supplying,
          Installing, Testing and Commissioning.

          11- Over-all understanding of the electrical wiring and cabling in
          the mechanical works section is that the mechanical sub-
          contractor has the responsibility for the supply and installation of
          all the electrical works within his work limits. Others (main or
          electrical contractor) will have the responsibility of providing
          power to the electro-mechanical power and control boards. This
          implies the following criteria:
          - The supply and installation of all power and control cables and
          wires (including rigid conduits, hangers, supports, clips, glands,
          flexible conduits, cable trays, earthing …etc) from equipment
          (all kind of equipment) to the designated sub or main power
          and/or control board, as well as the power and control wires and
          cables between any inter-related equipment, should all be
          included in the respective equipment unit rate. This applies to all
          wiring and cabling works, regardless to where their respective
          electric panels are described and included;

          whether in the mechanical or electrical works sections.
           - Wherever two or more similar equipment are specified to
          serve the same purpose, alternating mode should be applied in
          the control scheme.
          - Any equipment, regardless to its type, power consumption and
          location, should be supplied with compatible and suitable power
          isolating switch for maintenance purposes.
          - All power and control panels serving the mechanical works,
          and are included in the mechanical bill, should be priced in full.
          The price should cover the panels and all related gadgets -such
          as but not limited to relays, contactors, breakers, isolating
          switches, selector switches, lights, meters, buss-bars, terminals,
          etc- according to the power and control scheme requirements.

          - Essential equipment are always energized by the primary and
          the stand-by power sources, while non-essential equipment are
          energized by the primary power source. Experienced contractors
          should be able to differentiate between both types, and should
          be able to envisage an acceptable control scheme if such
          scheme is not already defined in the tender documents,
          which should subsequently give them the ability to price the works
          accurately.




                                                    35 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                               Description                                 Unit   QTY   Unit Rate   Total

           - All related electro-mechanical sub-equipment and gadgets,
          whether control, sensing, protective, alarming, or On-Off,
          installed on the main equipment should be wired to meet a
          reasonable control scheme, while the price of such wiring should
          be included in the unit rate of the main equipment, or of the
          gadget if it is specified in a separate bill item. This includes, but
          not limited to, pressure switches, flow switches, cut-outs, shunt
          pumps, motorized valves, thermostats (both duct and wall
          mounted), float switches, etc.




                                                    36 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                              Description                                Unit   QTY   Unit Rate   Total

   14      Waste and drainage system:


           The Contractor shall, when pricing the rates of this bill,
           take into consideration including and allow for the costs or
           expenses of all requirements stipulated in the preambles,
           drawings and technical specification of the contract.

           The following notes should be considered when pricing:

           1- The price shall include all required digging or excavation
           backfilling and cement covering as specified.

           2- The price shall include all connections to existing drainage
           cast iron pipes.

           3- The contractor must consider keeping the system running
           during the whole construction period.

   14.1    Supply and install (S & I) PVC pipes (UAP, Royal, or equally
           approved (E.A)) for air conditioning drainage network. Price
           includes all kinds of digging in concrete slabs and walls,
           supports, hangers and all rubber joints and sealants, syphone
           and connection to floor drain and flexible connections and all
           types of fittings. All done according to drawings, specifications
           and approval of the Engineer.

  14.1.1   2"                                                                   Lm     250

  14.1.2   11/2"                                                                Lm     23

  14.1.3   11/4"                                                                Lm     70

   14.2    S & I cast iron type Dukar or E.A 4" waste or stand pipes,           Lm     28
           running exposed along partitions, false ceiling, walls, shafts,
           under tiles or laid in walls. Price include all type of fittings,
           supports, hooks, connection to existing manholes, stainless
           steel fasteners and all excavation and quarrying, all done
           according to drawings specifications and the approval of the
           Engineer.

   14.3    S & I HDPE as made by Costline or E.A waste or stand pipes,
           running exposed along partitions, false ceiling, walls, shafts,
           under tiles or laid in walls. Price include all type of fittings,
           supports, hooks, connection to existing sewage and drainage
           system, stainless steel fasteners and all excavation and
           quarrying, HDPE connections to be done according to
           specifications, all done according to drawings, specifications and
           the approval of the Engineer.


  14.3.1   6" pipe                                                              Lm     10

  14.3.2   4" pipe                                                              Lm     490

  14.3.3   3" pipe                                                              Lm     15

  14.3.4   2" pipe                                                              Lm     320




                                                   37 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                               Description                                Unit   QTY   Unit Rate   Total

   14.4    S & I Floor drain 4" threaded 15x15cm chrome plated cover             No     50
           multi inlet adjustable with trap. All complete with floor clean out
           plug, HDPE syphone and all types of fittings. The rate shall
           include excavation and backfilling for all connections with drain
           pipes and fixtures. All done according to drawings, specifications
           and approval of the Engineer.


  14.4.1   Ditto, but connection box 4"/2" type Lipski or E.A, all done          No     10
           according to drawings, specifications and approval of the
           Engineer.

   14.5    S & I heavy duty non adjustable 11x11 cm floor clean out with         No     40
           HDPE body, with gas and water tight ABS plug and frame,
           complete with all needed elbow and all types of fittings, all done
           according to drawings, specifications and the approval of the
           Engineer.




           Total of waste and drainage systems Carried to Summary
           Sheet

                                                    38 out of   62
                                                 Tulkarem Hospital
                                                      -BOQ-



Section                               Description                               Unit   QTY   Unit Rate   Total

   15      Roof drain system:
           The Contractor shall, when pricing the rates of this bill,
           take into consideration including and allow for the costs or
           expenses of all requirements stipulated in the preambles,
           drawings and technical specification of the contract. All
           removed pieces from the existing roof should be submitted
           to the engineer of the hospital.

   15.1    S & I HDPE pipe and fittings as made by Costline or E.A. The
           rate shall include all needed connections to existing rain water
           pipes and all types of fittings, all done according to drawings,
           specifications and the approval of the Engineer.

  15.1.1   4" pipe                                                              LM     60

  15.1.2   3" pipe                                                              LM     15

   15.2    S & I Polypropelyne (PP) Roof rain water drain size 4" with          No     10
           cover of 20x20 plastic mesh (REDI make or E.A) to be
           connected to rain water vertical pipes with all required fittings,
           price shall include the piping works until the connection to the
           vertical rain pipe, all done according to drawings, specifications
           and the approval of the Engineer.

   15.3    S & I REDI or E.A. 4" roof vent with screened cap for vent           No     34
           stacks including connection to the vent pipe by solvent welding.
           The rate include all needed connection accessories, all done
           according to drawings, specifications and the approval of the
           Engineer.




           Total of Roof drain system Carried to Summary Sheet


                                                    39 out of   62
                                                 Tulkarem Hospital
                                                      -BOQ-



Section                               Description                                 Unit   QTY   Unit Rate   Total

   16      Sanitary fixture and their accessories:
           The Contractor shall, when pricing the rates of this bill,
           take into consideration including and allow for the costs or
           expenses of all requirements stipulated in the preambles,
           drawings and technical specification of the contract.


   16.1    S & I Porcelain wall hung Semi pedestal wash basin for patient         No.    31
           toilets type SAN-REMO Ideal Standard (IS) or E.A of size
           600x490 mm model A7460. The rate shall include Fixing
           galvanized screws, White Color syphone" heavy duty" and all
           the needed accessories to complete the job as per drawings,
           specifications and the approval of the Engineer.


  16.1.1   Ditto, But of size 550x450 Model A7450 or E.A.                         No.    11

   16.2    S & I Chrome plated gear mixer type CERADISC (IS) model                No.    42
           A5390 or E.A complete with all the needed fixing accessories,
           sockets, copper adaptors and 3"/8" angle valves type (Giacomini
           or E.A.) to connection with water pipes. All to be done as per
           drawings, specifications and the approval of the Engineer.


   16.3    S & I Porcelain floor monted W.C white color size 670x355              No.    29
           European type SANREMO (IS) S-trap model G6401 or E.A.
           Price shall include all fixation and hanging bracket, 9-lt capacity
           cistern, valves, fittings, hard solid seat and 13mm stop angle
           valves, chrome plated 13mm hose, and accessories, side l m
           length 13mm Chrome plated hand shower for wc (heavy duty)
           with spring nozzle outlet and all other required materials,
           including connection to drainage system and water system
           including 3/8" Angle valve (type Giacomini or E.A.). All to be
           done as per drawings, specifications and the approval of the
           Engineer.

   16.4    S & I stainless steel paper holder type BOBRICK model B-6699           No.    29
           or E.A for single roll fixed to wall with all needed fixing
           accessories, all to be done as per drawings, specifications and
           the approval of the Engineer.

   16.5    S & I stainless steel sink for kitchens of size 40x50 cm (single       No.     9
           bowl) like (Rocca or E.A ) of thickness 18/10 Price shall include
           connecting to drain of system by 2" HDPE pipes inside sanitary
           blocks, also propper fixation to marble, all to be done as per
           drawings, specifications and the approval of the Engineer.


   16.6    S & I chrome plated mixer type Cerlaman (IS) A5396. With steel         No.     9
           wire mesh, and connection to water supply with 3/8" Angle valve
           type Giacomini or E.A.), including all the required fittings, all to
           be done as per drawings, specifications and the approval of the
           Engineer.

   16.7    Supply and install 316 stainless steel gauge 12 sluice sink            No.     1
           complete with chrome plated swivel - spout mixer type (IS)
           A5396 or E.A. with steel wire mesh. Price includes connection to
           water supply with 3"/8" angle valve type (Giacomini or E.A.),
           including all the required fittings, all to be done as per drawings,
           specifications and the approval of the Engineer.


                                                    40 out of   62
                                                  Tulkarem Hospital
                                                       -BOQ-



Section                                Description                                  Unit   QTY   Unit Rate   Total

   16.8    Heavy duty soap dispenser type BOBRICK model B2111or EA.                 No      9
           with all fixing accessories needed. All to be done as per
           drawings, specifications and the approval of the Engineer.

   16.9    Heavy duty towel paper holder type 304 st st BOBRICK model B-            No      4
            6699 for single roll to be fixed at wall with all fixing accessories
           needed. All to be done as per drawings, specifications and the
           approval of the Engineer.

  16.10    S & I Porcelain floor mounted janitor closet type (IS) model             No      1
           R3852or EA. The rate includes grilled cover, fixing screws,
           rubber and all needed fixing accessories. The rate shall include
           S & I of 11/2" Flush valve type (IS) and Chrome plated single
           tap for cold water. All to be done as per drawings, specifications
           and the approval of the Engineer.

  16.11    S & I Chrome plated shower gear mixer type CERADISC (IS)                 No     26
           model A5394 or E.A and for the connecting rod model A3052 or
           E.A, compete with hand shower, flexible hose 150mm length,
           fixing anchor and all needed accessories, All to be done as per
           drawings, specifications and the approval of the Engineer. And
           S & I the following:

 16.11.1   Shower syphone heavy duty type Lipski or E.A. with round cover           No     26
           of 4" size.

 16.11.2   Folding shower seat, padded seat, right hand seat type                   No      5
           BOBRICK model B517 or E.A.

 16.11.3   Single robe/clothes hook with concealed mounting type                    No     26
           BOBRICK model B2116 or E.A.

 16.11.4   Recessed soap dish type BOBRICK model B6607 or E.A.                      No     26

 16.11.5   Horizontal two way grab bar for handicapped shower 914x1372              No     26
           mm type BOBRICK model B-5837 or E.A. The rate shall include
           for fixing the bar at wall using special mortar mix.


  16.12    S & I mirror aluminum frame suitable to be used for hospitals            No     45
           with different sizes. The rate shall include fixing the mirror to wall
           and according to provided drawings.




           Sanitary fixture and their           accessories.     Carried    to
           mechanical summery sheet

                                                     41 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                               Description                                Unit   QTY   Unit Rate   Total

   17      Domestic hot and cold water system:
           The Contractor shall, when pricing the rates of this bill,
           take into consideration including and allow for the costs or
           expenses of all requirements stipulated in the preambles,
           drawings and technical specification of the contract.


   17.1    Supply and install galvanized Sch-40 pipes for domestic cold
           and hot water. The work includes all fittings, valves, required
           flow direction signs, TOLGO type hangers, all required fittings,
           connection to existing system and all needed accessories.


  17.1.1   1/2"                                                                  LM     90

  17.1.2   3/4"                                                                  LM     270

  17.1.3   1"                                                                    LM     200

  17.1.4   11/4"                                                                 LM     155

  17.1.5   11/2"                                                                 LM     140

  17.1.6   2"                                                                    LM     105

  17.1.7   3"                                                                    LM     30

   17.2    Supply and install 13mm thick insulation for domestic hot water
           and circulation pipes type ANAVID or E.A. The work includes
           insulating all fittings, valves, non-return valve … etc., and
           wrapping with 10cm plastic wrap, also required flow direction
           signs,.

  17.2.1   1/2"                                                                  LM     90

  17.2.2   3/4"                                                                  LM     270

  17.2.3   1"                                                                    LM     200

  17.2.4   11/4"                                                                 LM     155

  17.2.5   11/2"                                                                 LM     140

  17.2.6   2"                                                                    LM     105

  17.2.7   3"                                                                    LM     30

  17.2.8   Ditto but 6 mm thick insulation for cold water supply pipes           LM     140
           inside the wall. The work includes insulating all fittings, valves,
           and wrapping with 10cm plastic wrap.

   17.3    Supply and install 0.5mm Galvanized sheet cladding for
           protection of exposed pipes for hot and air conditioning and
           heating systems including all screws and fittings needed. The
           work also includes covering all valves, strainer, unions, nipples,
           fittings, hangers and all other needed accessories and marks to
           protect the pipes along thier paths.

  17.3.1   11/4"                                                                 LM     67

  17.3.2   11/2"                                                                 LM     70


                                                    42 out of   62
                                                 Tulkarem Hospital
                                                      -BOQ-



Section                               Description                                 Unit   QTY    Unit Rate   Total

  17.3.3   2"                                                                     LM     120

  17.3.4   21/2"                                                                  LM     50

  17.3.5   3"                                                                     LM     110

   17.4    Supply and install hot and cold water collectors type GIACOMINI
           or E.A. The collectors are installed above the ceiling of
           bathroom with all required hangers (type GIACOMINI) and
           support, air vents, shut-off valves on the collectors outlets, shut-
           off valves on the collectors inlets, record valves, and all required
           accessories to complete the job.


  17.4.1   3/4"                                                                   Eye    240

  17.4.2   1"                                                                     Eye    30

   17.5    S & I crossed linked PE pipe 16mm pipe with 25 mm sleeve               Lm     1300
           type Aquapex or E.A. The rate shall include all fittings eg:
           copper elbow inside walls (type GIACOMINI), 1/2" male and
           female adaptors and all needed accessories for connection
           between copper collectors to fixtures.

           Domestic hot water system:

   17.6    S & I Heat exchanger of copper coil type cap. 180000 Kcal/hr of        L.S     1
           manufacturer (zilmat or E.A) price includes all necessary fittings
           and all pipes fittings and all control system (including Electrical
           Control Board), thermostate and differential (Honeywell or E.A )
           and all the required materials and gadgets to complete the job,
           according to drawings, specifications, and approval of the
           Engineer.

   17.7    S & I In line centrifugal water pump (in alternating mode) for
           circulating domestic hot water as made by Grundfos, Armstrong
           or E.A. The rate includes all fixing accessories , mounting base,
           flexible connection , pressure gage at suction and discharge,
           strainer, complete insulation, water proof power switch,
           aluminum cover to protect the pump from rain, concrete base,
           rubber isolators, flow direction signs, supply and return headers
           as shown on drawings, electrical controlers and electrical control
           boards with all required electrical connections, and all needed
           parts to complete the job according to drawings and
           specifications and the approval of the Engineer.


  17.7.1   Q=8.14L/s , H=16.6m (PUMP- S.P-1)                                      No.     2

  17.7.2   Q=6.4L/s , H=21m (PUMP- H.W.P-2)                                       No.     2

  17.7.3   Q=3.8L/s , H=20m (PUMP - H.W.R.P-3)                                    No.     2

  17.7.4   Q=1.4L/s , H=5m (PUMP - S.P-4)                                         No.     2




                                                    43 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                              Description                                Unit   QTY   Unit Rate   Total

   17.8   S & I expansion vessel of size 400 L, closed vertical diaphragm       L.S     1
          type, operating conditions: 10 bar, 110 °C The unit price shall
          include isolating, pressure regulating, drain, relief, double check
          and automatic air vent valves, pressure gauge, gas filling
          connection, base frame and all works and accessories required
          to complete the work as shown on the drawings and as per the
          supervision engineer's requirements.

   17.9   S & I domestic hot water calorifiers, vertical shell & tube storage   L.S     1
          type of size 200 L, 8 bar working pressure, hydrostatically tested
          for 1-1/2 times the working pressure. The unit price shall include
          a thermometer, an ASME rated pressure and temperature relief
          valve, isolating valves, drain valves, check valve on cold water
          make-up line, automatic air vent, support, insulation with 1-1/2"
          foam insulation and protected with 0.7mm GI sheet cladding, all
          as required as on drawings and as per supervision engineer's
          requirements.




          Total of Domestic hot and cold water Carried to Summary
          Sheet

                                                   44 out of   62
                                                  Tulkarem Hospital
                                                       -BOQ-



Section                                Description                             Unit   QTY   Unit Rate   Total

   18      Fire Fighting system:
           The contractor shall, when pricing the rates of this bill take
           into consideration including and allow for the cost
           expenses of all requirements stipulated in the preambles,
           drawings and technical specifications of the contract.


           Supply, install, and test the following items complete with
           necsseray fixing accessories as specified and as shown on
           drawings:

   18.1     Wall mounted fire cabinet 120x80x30 cm equiped with 1"             No.     5
           swinging hose reel 25 m polystrene hose 1" aluminum nozzle, 1"
            ball valve, 12 kg powder extinguisher, 2" linen hose (2 x 15 m)
           with quick coupling, 2" nozzle, 2" landing valve, 2" ball valve,
           and all required fittings and valves.

   18.2    6 kg automatic fire extinguisher dry chemical powder to be          No.     5
           installed in existing boiler room at high level with all required
           mounting accessories.

   18.3    Supply and install black steel Sch40 pipes jointed by welding for
           diameters above 2" and by threads for 2" pipesand below, all as
           made by MODGAL or E.A. The work also include all valves,
           strainer, unions, nipples, fittings, hangers and all needed other
           accessories including painting with the final red color paint
           according to specifications and the approval of the Engineer.

  18.3.1   3"                                                                  LM     20

  18.3.2   21/2"                                                               LM     13

  18.3.3   2"                                                                  LM     95




           Total of Fire Fighting System carried to mechanical
           summary sheet

                                                     45 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                               Description                                Unit   QTY   Unit Rate   Total

   19      HVAC system:
           The contractor shall, when pricing the rates of this bill take
           into consideration including and allow for the cost
           expenses of all requirements stipulated in the preambles,
           drawings and technical specifications of the contract. Also
           the contractor must consider the fact that this project is a
           running complex and must be kept as so during the whole
           period of construction.

   19.1    S & I of an air cooled chiller of capacity 152 Ton as made by        L.S      1
           Daikin (Japan), Carrier (France), York (USA) or EA.The chiller is
           a heat pump type operating with friendly to nature refrigerant
           (R407-C) and runs with hermatic scroll type compressor, leaving
           water Temperature = 7.2 C and inlet water Temperature = 12 C,
           all in accordance with the prevailing climate conditions of the city
           of Tulkarem. The unit shall be equipped with direct drive
           condenser propeller, condenser fan motor, heat exchanger, high
           and low pressure switch, anti freez sensor, braided flexible
           connections, outlet water temperature sensor, return water
           temperature sensor, ambient temperature sensor, crank case
           heater, supply and return headers as shown on drawings,
           double regulating valves, filter drier, sight glass, service valves,
           water flow switch and pressure gage (high & low), electrical
           controlers and electrical control board with all required electrical
           connections,. The work includes but not limited to concrete base
           and all requirements for proper installation and operation, all
           done according to drawings specifications and approval of the Engi

   19.2    S & I fan coil unit with forwad curved fans as made by Daikin
           (Japan), Carrier (France), York (USA) or EA. The unit shall be
           with a single coil, stainless steel drain pan, and with all parts
           such as 3-way valve, inlet & outlet ball valves type GIACOMINI
           or E.A, strainer, inlet and outlet rubber flexible connections with
           braided steel, test point valves, washable flat filter, multi speed
           electric motor and room thermostat with three speed switch (wall
           mounted type installed inside lockable protection box). The rate
           includes connecting the unit to piping including S & I of the
           following:

  19.2.1   Cooling Load = 6.55 kw                                                No.     1

  19.2.2   Cooling Load = 8.48 kw                                                No.     9

  19.2.3   Cooling Load = 10.2 kw                                                No.     4

  19.2.4   Cooling Load = 11.7 kw                                                No.     8

  19.2.5   Cooling Load = 11.73 kw                                               No.     1

  19.2.6   Cooling Load = 12.9 kw                                                No.     9

  19.2.7   Cooling Load = 14.8 kw                                                No.     2

  19.2.8   Cooling Load = 16.0 kw                                                No.     1

  19.2.9   Cooling Load = 18.7 kw                                                No.     5




                                                    46 out of   62
                                                 Tulkarem Hospital
                                                      -BOQ-



Section                               Description                                 Unit   QTY   Unit Rate   Total

   19.3    S&I aluminum supply air ceiling diffusers as made by cooling           No.    88
           industries or E.A, four-way square type with removable core, key
           operated opposed-blade volume damper and equalizing grid,
           suitable for mounting flush with false ceiling. The unit price shall
           include connection to duct with flexible insulated duct of
           compatible diameter and of maximum 1 meter in length , and all
           accessories and works required to complete the work, all done
           according to drawings, specifications and approval of the
           Engineer. Size 12"X12"


   19.4    S&I aluminum supply air wall mounted diffusers (grill type) as
           made by cooling industries or E.A, key operated opposed-blade
           volume damper and equalizing grid, suitable for mounting flush
           with the wall. The unit price shall include connection to duct with
           flexible insulated duct of compatible diameter and of maximum 1
           meter in length , and all accessories and works required to
           complete the work, all done according to drawings,
           specifications and approval of the Engineer.


  19.4.1   size 10"X6"                                                            No.     5

  19.4.2   size 10"X8"                                                            No.    70

   19.5    S & I exhaust air aluminum grills made by cooling industries or
           E.A, fixed 45-degree blades, double deflection, 1" thick frame,
           3/4" spacing. The unit price shall include connection to duct, and
           all accessories and works required to complete the work, alll
           done according to drawings specifications and approval of the
           Engineer.

  19.5.1   6"X6"                                                                  No.    45

  19.5.2   9"X9"                                                                  No.    14

  19.5.3   12"X12"                                                                No.    28

  19.5.4   16"X8"                                                                 No.    21

  19.5.5   18"X12"                                                                No.     2

   19.6    Supply and install perforated aluminum ceiling diffusers for the       No.     4
           operating theatres of size 18"X18", ceiling module with neck size
           as shown on the drawings, flush face, adjustable 4-way
           deflectors, with integral or field fabricated plenum box, key
           operated opposed-blade volume damper and equalizing grid
           with plazma filter. The unit price shall include connection to duct
           via flexible connection not exceeding i meter in length, and all
           accessories and works required to complete the work as shown
           on the drawings and as per the specifications and supervision
           engineer's instructions.




                                                    47 out of   62
                                                 Tulkarem Hospital
                                                      -BOQ-



Section                                Description                                 Unit   QTY   Unit Rate   Total

   19.7    S & I modular, weather proof type 100% fresh air packaged unit
           constructed from aluminum penta post with double skin panels
           and insulated with injected polyurethane 2" thick as made by
           Daikin (Japan), Carrier (France), York (USA) or EA of capacity
           6.5 Ton. The unit shall be equipped with scroll type
           compressor(s) and shall run by friendly to environment
           refrigerant. The rate includes built-in electrical heating battery of
           18KW capacity made of stainless steel finned tube heating
           elements covering all the face area of the air flow and including
           all protection gadgets such as air flow switch, automatic and
           manual reset thermal cut-outs, and controlled via 4 stages
           controller. It should also include a built-in plate heat exchanger
           for energy recovery between the return (exhausted) air and the
           fresh air supply.
           The unit shall be supplied with backward curved propeller fans          No.     1
           (supply and exhaust) suitable for external static pressure of 1.5"
           each, installed on vibration isolators, dampers for fresh and
           supply air, aluminium washable type pre-filter, V-type bag filter,
           and 99.997% HEPA filter. An audiable and visual alarm should
           be built-in also for the HEPA filter maintenance purposes, all
           including the needed fixing accessories and electrical controlers
           and electrical control board with all required power and control
           connections to the unit, as well as, air temperature sensors,
           where all shall be rendered according to drawings, specifications
           and the approval of the Engineer. Packaged Unit: P.R.C/H -
           OP.TH


   19.8    Supply and install minimum two stage cooling and four stage             No.     1
           heating thermostat for the packaged unit made by Honeywell or
           EA.

   19.9    S&I exhaust and fresh air fans as manufactured by Vortice or
           E.A, all of sturdy industrial structure, galvanized steel parts and
           aluminum impellers, directly driven by IP 65 electric motors,
           powered by 380V/3phase/50Hz electric power supply. Price
           shall include all materials needed for complete Installation,
           electrical controllers and electrical control boards with all
           required electrical connections from the main electrical boards,
           including cables, wires, cable trays, steel stands and
           protections, as well as, weather proof disconnet switch for
           maintenance needs, where all shall be done as per detailed
           drawings, specifications, and Engineer's instructions.

  19.9.1   Exhaust: 600 CFM (model c35/4m)                                         No.     1

  19.9.2   Exhaust: 690 CFM (model c35/4m)                                         No.     1

  19.9.3   Fresh Air: 690 CFM (model c35/4m)                                       No.     1

  19.9.4   Exhaust: 1000 CFM (model c37/4m)                                        No.     3

  19.9.5   Exhaust: 1235 CFM (model c40/4m)                                        No.     1

  19.9.6   Fresh Air: 1235 CFM for fresh air (model c40/4m)                        No.     1

  19.9.7   Exhaust: 1364 CFM (model c40/4m)                                        No.     1

  19.9.8   Fresh Air: 1364 CFM (model c40/4m)                                      No.     1
  19.9.9   Exhaust: 1400 CFM (model c40/4m)                                        No.     2


                                                     48 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                               Description                               Unit   QTY   Unit Rate   Total

  19.10    Supply and install single skin galvanized steel duct made            M2     940
           according to SMACNA standard and requirements vis-a-vis
           support, sizing, branching, air tightening, jointing, etc, with 2"
           thick, 12kg/m3 density glass wool insulation wrapped with
           reinforced aluminum foil, which shall be confined in place by
           aluminium adhesive tape at the joints and spirally wound
           aluminium wire all around and along.The rate shall include all
           required hangers, supports, isolators, splitting dampers, canvas
           type flexible connections at units inlets and outlets, and all
           required accessories needed as shown on drawings, according
           to specifications, and to the Engineer's instructions.


 19.10.1   Ditto, but with 0.6mm galvanized metal sheet cladding for            M2     40
           protection of exposed duct work on roof including all screws and
           fittings needed, excluding the spirally wound aluminium wires,
           where the job shall be rendered according to SMACNA , all in
           accordance with the drawings, specifications and the approval of
           the Engineer.

  19.11    Supply and install galvanized steel duct for exhaust system          M2     380
           made according to SMACNA. The rate shall include all required
           hangers, supports, plitting dampers, canvas flexible connections
           and all required accessories made as shown drawings,
           according to specifications, and to the approval of the Engineer.


  19.12    Supply and install black steel Sch.40 pipes for the A/C network
           with 19mm insulation and nylon wrapping. The work also
           includes all unions, nipples, tees, elbows, hangers, required flow
           direction signs, and all other needed accessories to lay the pipe
           along its path, all done according to drawings specifications and
           approval of the Engineer.


 19.12.1   3"                                                                   LM     26

 19.12.2   21/2"                                                                LM     117

 19.12.3   2"                                                                   LM     100

 19.12.4   11/2"                                                                LM     110

 19.12.5   11/4"                                                                LM     45

 19.12.6   1"                                                                   LM     125

 19.12.7   3/4"                                                                 LM     45

  19.13    Supply and install isolation ball type valves as made by
           Giacomini for the A/C piping network, as follows:

 19.13.1   3"                                                                   No.     4

 19.13.2   21/2"                                                                No.     6

 19.13.3   2"                                                                   No.     6

 19.13.4   11/2"                                                                No.     6

 19.13.5   11/4"                                                                No.     6

                                                    49 out of   62
                                                 Tulkarem Hospital
                                                      -BOQ-



Section                               Description                                 Unit   QTY   Unit Rate   Total


 19.13.6   1"                                                                     No.     8

 19.13.7   3/4"                                                                   No.    10

  19.14    S & I circulating chilled water pumps (in alternating mode) as
           made by Grundfos, Armstrong or E.A. The rate includes all fixing
           accessories , concrete mounting base and neoprene pads,
           flexible connections at inlets and outlets, pressure gages at
           inlets and outlests, strainers at inlets, Globe valves at inlets and
           outlets, complete insulation for the related fittings, galvanized
           sheet metal shelter to protect the pumps from rain, flow direction
           signs. The price shall include also the electrical controlers and
           electrical power and control sub-board where needed, with all
           required electrical connections including cable, wires, cable
           trays, and all needed parts to complete the job according to
           drawings, specifications and the approval of the Engineer.


 19.14.1   Q=8.7L/s , H=16m (NORTH N.C.H.P.-1 PUMP )                              No.     2

 19.14.2   Q=9.7L/s , H=16m (SOUTH S.C.H.P.-2 PUMP )                              No.     2

 19.14.3   Q=0.695L/s , H=7m (HITING P.R.H.P.-3 PUMP )                            No.     2

  19.15    S & I 8" diameter headers at the pumps inlets & outlets as             No.     2
           shown on drawings. The headers shall include all needed
           outlets (with 2" extra clogged outlets on each for future
           expasion), ball valves (Giacomini or equivalent), pressure
           gauges, thermometers, convexed abd end caps, 24kg/m3
           fiberglass insulation, 0.7 galvanized metal steel sheet claddings,
           and steel supports.

  19.16    S & I and connect motor starter panel with all necessary MCC           L.S     1
           breakers, starter controllers, protective deivces for pumps,
           chillers, air handling units, and all the equipment on the roof.
           The price shall include (power cables control wires - galvanized
           cable tray, flexible connections ... etc.) from panels to equipment
           and all electrical connections for fresh and extract fans on roof,
           all done according to drawings specifications and approval of
           the Engineer.

  19.17    S & I and connect all needed power and control gadgets into the        L.S     1
           existing electrical panel in boiler room to serve the proposed
           boiler. Price shall include MCCB's, relays, power cables, control
           wires, indication lights,protective and safety devices, … etc.




           Total of HVAC System carried to Mechanical Summary
           Sheet

                                                    50 out of   62
                                               Tulkarem Hospital
                                                    -BOQ-



Section                              Description                              Unit   QTY   Unit Rate   Total

    20     Medical Systems:
   20.1    Supply and Installation of Medical gas copper piping as per
           HTM02.01:

   20.1    Degreased medical oxygen compatible seam-less copper pipes
           type L. The pipes must be cleaned and treated for medical gas
           usage including capping the ends of each pipe at ex-works, to
           ensure that no foreign bodies, dust or vapors infiltrate the the
           pipes during transpiortation, handling, and installation. The
           copper pipes must meet the international standard of
           ASTM B-819 and to be cleaned for medical usage (degreased)
           in accordance with CE 0473.
           Each pipe must be pre-factory marked continuously with:_
            OXY/MED ASTM B-819
           Pipeline network must be welded and hanged according to the
           latest welding and hanging methods of health care technical
           memorandum HTM 02.01, ASTM B819 and G-01
           Price includes proper isolation for piping under plastering and
           wall penetrations , hangers, brackets, fasteners, etc.., as well
           as, the various fittings and accessories needed to complete the
           works as shown on drawings and as per the set specifications.
           Price also includes proper flushing of the entire piping network
           prior to commissioning the Works, using purified Nitrogen or
           Medical Compressed Air.


  20.1.1   1/2” inch O.D.                                                     LM     385

  20.1.2   5/8” inch O.D.                                                     LM     435

  20.1.3   7/8” inch O.D.                                                     LM     305

  20.1.4   1 1/8” inch O.D.                                                   LM     80

  20.1.5   1 3/8” inch O.D.                                                   LM     100

  20.1.6   1 5/8” inch O.D.                                                   LM     100

  20.1.7   2 1/8” inch O.D.                                                   LM     95




                                                   51 out of   62
                                              Tulkarem Hospital
                                                   -BOQ-



Section                             Description                             Unit   QTY   Unit Rate   Total

   20.2    Supply and Installation of Area Valves Control Boxes as per
           Silbermann or E.A:

  20.2.1   Recessed area valve control box for medical oxygen and           Unit    5
           vacuum, including 2 full-port 3-parts NIBCO shut off valves
           which controls the supply of gases or vacuum through the
           pipelines, and line pressure and vacuum gauges. The valves
           diameter varies between 15 up to 35 mm, as per drawings.
           The area valves control boxes should also include an
           emergency external supply port, equipped with disk and clutch
           mechanism for quick plug-in connection of the emergency
           external supply source.
           As per SILBERMANN model 7210-000 or EA. The front should
           be made of labeled transparent polycarbonate flexible
           unbreakable cover for easy access in emergency cases.



  20.2.2   Same as Item No. 20.2.1 but for medical oxygen, medical          Unit    1
           compressed air and vacuum. As per SILBERMANN
            model 7214-000 or E.A


  20.2.3   Same as Item No. 20.2.1 but for medical oxygen, nitrous-oxide,   Unit    2
           medical compressed air and vacuum. As per SILBERMANN
           model 7204-000 or E.A




   20.3    Supply and installation of Local Area Pressure and Vacuum
           Alarm Boxes as per Silbermann or E.A:

  20.3.1   Local audio-visual pressure alarm box for medical oxygen and     Unit    5
           vacuum to indicate pressure and vacuum failures by means of
           green LED, red LED, audio buzzer and pressure or vacuum
           gauge for each gas, as well as shut-off valves for each gas or
           vacuum, operated by means of one central PC card
           (microprocessor card) and pressure/vacuum switches for each
           gas, recessed type with anodized aluminum panel.

           As per SILBERMANN model 7176-110 or E.A



  20.3.2   Same as .Item No. 20.3.1 but for medical oxygen, medical         Unit    1
           compressed air and vacuum As per SILBERMANN model 7177-
           1100 or E.A

  20.3.3   Same as Item No. 20.3.1 but for medical oxygen, nitrous-oxide,   Unit    2
           medical compressed air and vacuum as per SILBERMANN
           model 7178-110 or E.A




                                                  52 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                               Description                                Unit   QTY   Unit Rate   Total

   20.5    Supply and Installation of Fully-automatic Electronically
           controlled Oxygen local Back-Up stations, According to CE-
           0473, EN-46001, ISO-9001 as per Silbermann or E.A:


  20.5.1   Fully automatic electronically controlled gaseous medical oxygen      Unit    0
           local Back-Up station consisting of 4 high pressure oxygen
           manifolds with high pressure valves, stainless steel pigtails, and
           common regulators with in/out gauges, connected to the
           automatic control switch-over cabinet of 80 CMH capacity.
           Automatic control cabinet for continuous supply and smooth
           automatic bank switchover by means of pneumatic shuttle valve,
           complete with line pressure regulators, line pressure gauges
           and indicators, with by-pass valves for manual operation in case
           of malfunction with stand-by working pressure regulator with by-
           pass, and electronic microprocessor control board, complete
           with alarm panel with pilot lamps indicating reserve in-use and
           low-press. Main supply, with mutable alarm for local alarm, with
           mute switch and lamp test switch, with facility for displaying
           alarms on two separate remote alarm panels and data loggers
           for stage computer interface to connect between the automatic
           change over unit indication and the distance alarm from one
           side and with the BMS computer system from the
           other side as per SILBERMANN model LEO-EM 7086-815



   20.6    Supply and installation of diamond service wall outlets for
           oxygen and vacuum as per Silbermann or E.A:

  20.6.1   Recessed type, chrome plated, color and pin coded die-cast            Unit    8
           front assembly, primary check inlet/outlet valve with decorative
           frame for two different codes of Oxygen and Vacuum, a hanging
           slide for 2 liters vacuum collecting bottle must be included as per
           SILBERMANN model 3236016 or E.A



  20.6.2   Same as Item No. 20.6.1 but for Oxygen, Nitrous Oxide,                Unit    1
           Compressed Air and Vacuum as per SILBERMANN model
           3236019 or E.A




                                                    53 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                               Description                                Unit   QTY   Unit Rate   Total

   20.7    Supply and Installation of :
           Factory-preassembled Bed head unit for one bed,
           according to CE-0473, EN-46001, ISO 9001 as per
           Silbermann or E.A:

  20.7.1   Encompassing extruded aluminum duct system, with four                 Unit   34
           cavities, three of which are directly accessed using snap-on
           covers. Supplying electrical and lighting service, as well as
           medical gas service. The gas outlets should be installed in a
           separate compartment. The number of electrical circuits, apart
           of the low voltage circuit, should be three : main line power
           circuit, UPS power circuit, and lighting circuit, each connected to
           a separate terminal at the main special electrical connection
           compound in the bed-head unit.

           The bed head unit is equipped with the following services :
           • One oxygen outlet
           • One compressed air outlet
           • One vacuum outlet
           • 2 electrical sockets, Main line
           • 2 electrical sockets, coded-UPS line
           • one potential grounding socket
           • indirect light
           • direct light (2 PL BIAX lamps)
           • cut-off switch for direct / indirect lights
           • one telephone socket
           • preparation for nurse call socket

           The Price should include complete interior wiring, cabling,
           piping, insulating, etc , for complete installation.


  20.7.2   Same as Item No. 20.7.1 but for two beds                              Unit    4

  20.7.3   Same as Item No. 20.7.1 but for three beds                            Unit    3

  20.7.4   Same as Item No. 20.7.1 but for four beds                             Unit    5
           As per SILBERMANN modular system model 2000-000, or EA.




                                                    54 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                               Description                                Unit   QTY   Unit Rate   Total

   20.8    Supply and Installation of Vital Life Support Column for one
           Emergency bed, according to EN-793 and EN-60601-1-2 as
           per Silbermann or E.A:

  20.8.1   Vertical column surface made of medical high pressure laminate        Unit    6
           decorative Trespa, electro-polished anodized 2000 mm x 600
           mm x 250 mm. Aluminum. structure
           Horizontal hanging rail and vertical anodized Aluminum tracks
           provides three-dimensional hanging of various type of
           equipment, complete with two medical oxygen outlets, two
           medical compressed air outlets, two vacuum outlets, four
           essential electrical sockets and four UPS coded sockets, each
           socket is equipped with built-in normal-power on LED indication
           connected to independent electrical circuit and marked terminals
           for each socket, with two potential equalization grounding
           sockets connected to main grounding line by two separate
           grounding bridges
           as per SILBERMANN model FreeStand 2000 or E.A




   20.9    Supply and installation of AGSS outlet as per silbermann
           or E.A:

  20.9.1   Anesthesia gas scavenging system with on-off switching                Unit    6
           indicator, to remove surplus anesthetic gas and explosive gas
           mixtures from operating theatres and anesthesia rooms,
           recessed type, with 22 mm. evacuation port to DIN standard as
           per SILBERMANN model 3212700


  20.10    Integrated Combinational Ceiling-suspended System for
           the Operating Theatre as per KLS MARTIN or E.A:

 20.10.1   Central Ceiling-suspended system for the OR, comprising               Unit    1
           prismatic cool operating light, with 130,000 lux light intensity at
           1m distance, with day-light color temperature of 4,300 K, with
           automatic switch-over standby lamp, electronic intensity and
           focus control, with power module and emergency relay, as per
           Martin-Germany marLux H5 Plus, and tandem ceiling pendant
           with double boom arms, drop tube, modular service head, and
           medical rail with pneumatic control, including : two medical
           oxygen outlets, two medical compressed air outlets, two nitrous-
           oxide outlets, two vacuum outlets, one AGSS outlet, one air
           motor outlet, with four electrical sockets for main power wired to
           two separate electrical circuits, with two electrical sockets for
           UPS power wired to a separate electrical circuit, and two
           potential equalization sockets, as per Martin-Germany
           Independant 300, both suspended from central ceiling flange,
           interface plate, and ceiling canopy, all in accordance with
           93/42/EEC conformity.




                                                    55 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                               Description                                Unit   QTY   Unit Rate   Total

  20.11    Delivery, Labor, Preparation Room Lights as per KLS
           MARTIN or E.A:

 20.11.1   Ceiling-mounted Labor, Preparation, and Examination Rooms             Unit    3
           Lights as per Martin - Germany ML301D KLS MARTIN
           examination light for ceiling mounting, of 300 mm diameter with
           40,000. lux intensity at 1m distance, complies with Protection
           class I according to IEC The hermetically sealed aluminum light
           housing is dust- and fracture-proof. The light housing has been
           plastic-coated for fast and easy cleaning.
           The powerful halogen lighting system ensures the optimum
           illumination of the operating field. Special filter components
           guarantee cool, white light free from any deep shadows. The
           high-quality reflector technology ensures a uniform light field and
           first-rate color rendering properties.
           The light exit surface consists of hardened safety glass that is
           highly resistant to mechanical and chemical influences, with
           spring regulated arm for easy height adjustment.


  20.12    Baby Bath Tubs as per SOEMA or E.A:

 20.12.1   Baby Bath Tub as per Soema model Lido Baby/01 and shall               Unit    3
           comprise of:
           • Acrylic Ceramic
           • Bath tub & washing sink
           • Hand shower
           • Electronic water tab
           • Thermostatic water mixer
           • Transformer
  20.13    Electronic hand washing scrub sinks, SOEMA or E.A:

 20.13.1   Stain-less steel suspended electronic hand washing units with         Unit    1
           channel type tank and paneling under basin, two electronic taps,
           one electronic soap dispenser and thermostatic mixer.
           Made of AISI 316 stainless steel , size 120x55x110 cm.
           overflow-proof tank (35 cm deep) with rounded inner edges and
           inclined front part to prevent water from spraying outside
           Cat. No. # C618MXSR


  20.14    Supply and installation of Ceiling Column, rigid, according
           to EN 737, 793, 12218 as per Silbermann or E.A:


 20.14.1   Ceiling column surface is made of Trespa, polished anodized or        Unit    1
           painted Aluminum.
           Horizontal hanging rail and vertical anodized Aluminum tracks
           provide for hanging various type of equipment, complete with
           two medical oxygen outlets, two medical compressed air outlets,
           two nitrous-oxide outlets, two vacuum outlets, one AGSS
           outlets, one air motor outlet, four electrical sockets for mains
           power, connected in two separate electrical circuits, and two
           electrical sockets for UPS power, connected in a separate
           electrical circuit, with two potential equalization sockets.




           Total of Medical Systems carried to summary sheet



                                                    56 out of   62
                                             Tulkarem Hospital
                                                  -BOQ-



Section                            Description                             Unit   QTY   Unit Rate   Total

   21     Lifts:
          The contractor shall, when pricing the rates of this bill take
          into consideration including and allow for the cost
          expenses of all requirements stipulated in the preambles,
          bill of quantities, drawings and technical specifications of
          the contract.
          The described work shall include moving all the parts from
          the existing machine room to the new location.
          Additionally, price of installation shall include, but not
          limited to the following essential parts, workmanship,
          erection equipment and tools, labor, as well as any
          required accessories, metal cutting and paint:

          Detailed description of required parts and materials is as
          follows:
    -     PIT CABLE FOR LSP ELEVATORS.
    -     TRAVEL CABLE 24x0.75
    -     DHG -161 PCB - (Di+Si) NO AEG02C376.
    -     MICRO PUSH BOTTON NO.2R23914- VANDAL.
    -     HALL INDICATOR (VID-M422, Di) NO.AEN38C231*N.
    -     HALL PUSH BUTTON PANEL 2 P/B+2 IND TYPE "VID-M422T"
          NO.: 3W09884.
    -     Narrow land door frame1300mm st.st.h.l-DAV.
    -     Land door panel side 1300 st.st.h.l.DAV.
    -     Land door hanger side opening 1300 DAV.
    -     Land door sill side opening 1300 DAV.
    -     STEEL CABLES 13MM- WITH FIBER CORE .
    -     LIFT ROPING CABLE 8MM- WITH FIBER CORE.
    -     DANGER LIFE HALL PLATE 100X100.
    -     INFORMATION PLATE UP THE CAR 100X100MM "ARABIC".

    -     SHELTER PLATE NO.3R69234A.
    -     BRACKET FOR RAIL 70 - 120x100x250 NO.2.
    -     GUIDE RAIL BRAKETS FOR R90*75*16 DIM (260*150*6MM L,
          SHAPE FOR WALL).
    -     RAIL CLIPS M-12 FOR GUID RAIL 70.
    -     GUIDE RAIL(18K) - 144x89x16 NO.AEA10C613*C.
    -     SOFTWARE.
    -     GUIDE RAIL(7K)- 96x88x19 NO.3R52870C.
    -     GUIDE RAIL 125#82#16.
    -     GUIDE RAIL(18K) - 144x89x16 NO.AEA10C613*C.
    -     GUIDE RAIL BRAKETS FOR R90*75*16 DIM (260*150*6MM L,
          SHAPE FOR WALL).
    -     ELECTRIC JUNCTION WIRE 3.25 MM .
    -     SHELTER PLATE NO.3R69234A.
          Price shall include also the following accessories:
    -     FIRE EXTINGUISHERS 6 KG.
    -     Trash Can.
    -     RECHARGEABLE LIGHT - 20W DURATION 10 HOURS.
    -     COMPLETE NEON LAMP-DOUBLE 36 W.
    -     SOCKET FOR INSPECTION BOX.
    -     LAMP 230V - 75W.
    -     CABLE 5x1.5 .
    -     GLOBE NORMAL LAMP.
    -     SOLID ELECTRIC TUBES 3#4.
    -     PET SWITCH .
    -     LADDER.
    -     BEAM LENGTH 3M.
    -     PROPER LIQUID BABBIT METAL 1KG- NO.: 8GT10030.
    -     BRACKET FOR RAIL 70 - 120x100x250 NO.2.


                                                 57 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                              Description                                Unit   QTY   Unit Rate   Total

    -     EXTERNAL BOX -24 SAFTY KEYS.

   21.1   Remove all the parts of the elevators from the existing machine       L.S.    1
          rooms to new locations as shown on drawing including the
          electric switchboard and all electrical and mechanical works
          needed (and labor). The price should include also all iron
          structure(material and labor) needed to complete and fix the
          new location in the room as per drawings, specifications and the
          approval of the Engineer.

   21.2   Supply and install stainless steel sheet 2 mm thick door posts        Unit    3
          same as the existing, complete with side and up panels and all
          the required electrical and mechanical works needed to
          complete the job as per the preamble drawings, specifications
          and the approval of the Engineer.


   21.3   Supply and install all the required parts inside the elevator shaft   Unit    3
          that are needed to complete the extension process to the next
          floor. Price includes all the required electrical and mechanical
          works needed to complete the job as per the preamble
          drawings, specifications and the approval of the Engineer.




          Total of Lifts carried to summary sheet


                                                   58 out of   62
                                                  Tulkarem Hospital
                                                       -BOQ-



Section                              Description                               Unit   QTY   Unit Rate   Total

   22      Removing Existing HVAC Equipment and Accessories to
           New Roof:
           The contractor shall, when pricing the rates of this bill, take
           into consideration including and allow for the cost
           expenses of all requirements stipulated in the preambles,
           drawings and technical specifications of the contract.
           Before the removal of the existing parts, the contractor
           shall submit a detailed report about the quantity of the
           parts, units and machines that have to be relocated on the
           future roof. The contractor afterwards shall examine and
           present a detailed report about the status and the
           conditions of all the parts, units, machines, and inform of
           any damaged existing part or machine, prior to
           disassembling the system.


           The contractor then has to submit his methodology for
           relocating all the existing units to the future roof, and sould
           take into consideration that in all stages work shall be done
           in conjunction with the various work activities on site. This
           implies propper planning with UNDP and MoH authorized
           personel, to ensure smooth relocation of equipment and
           minimal HVAC interruption time inside the hospital
           building. When disassembling, the contractor has to
           maintain all the disassembled parts in good condition and
           take full responsibility for the intactness of all the
           disassembled parts.


           Damaged or broken parts on the existing system should be
           noted prior to disassembling the system and shall be paid
           for upon replacement according to the offered unit rate.
           Any damage done to the parts during the relocation shall
           be covered by the contractor.
           The price shall include Dismantling all existing electrical
           installations, panel boards and all accessories from
           existing mechanical A.C. room on the roof and reinstalling
           and reconnecting all electrical needs in the new mechanical
           room and changing all cables if required. The contractor
           must protect the panel boards and all accessories to install
           them in the new mechanical room on the roof as per the
           engineers instructions.


   22.1    Removing all existing vent caps at roof and re-instalation on       No.    18
           future roof where required as shown in drawings. The work shall
           include all piping works, openings in concrete for the existing
           slab, and all required labor, materials and fitting equipment
           according to the instruction of engineer. Price also includes the
           replacement of any of the following damaged parts with new
           (same in size, capacity and quality) part:


  22.1.1   Vent Cap as existing.                                               No.     1

  22.1.2   Vent Pipes 4" Cast Iron as existing.                                LM     10

  22.1.3   Vent Pipes 4" PVC as existing.                                      LM     10




                                                    59 out of   62
                                                Tulkarem Hospital
                                                     -BOQ-



Section                                Description                               Unit   QTY   Unit Rate   Total

   22.2    Removing all existing domestic hot and cold water units and           LS      1
           pipes at roof and re-instalation on future roof as shown in
           drawings. The work shall include all piping from main riser to the
           units, pumps, valves, strainers, and galvanized ducts, booster
           pumps, openings in concrete for the existing slab, electrical
           panel and all required labor, materials and fitting equipment
           according to the instruction of engineer. Price also includes the
           replacement of any of the following damaged parts with new
           (same in size, capacity and quality) part:


  22.2.1   Insulated 3" Sch-40 galvanized steel pipe as existing.                LM     10

  22.2.2   Insulated 21/2" Sch-40 galvanized steel pipe as existing.             LM     10

  22.2.3   Insulated 2" Sch-40 galvanized steel pipe as existing.                LM     10

  22.2.4   Insulated 1" Sch-40 galvanized steel pipe as existing.                LM     10

  22.2.5   Shut-off valve 3" as existing.                                        No      1

  22.2.6   Shut-off valve 21/2" as existing.                                     No      1

  22.2.7   Shut-off valve 2" as existing.                                        No      1

  22.2.8   Shut-off valve 1" as existing.                                        No      1

  22.2.9   3" flange as existing.                                                No      1
   22.3    Removing all existing AHUs at roof and re-instalation on future       No.     7
           roof as shown in drawings. The work shall include all piping from
           main riser to the units, pumps, valves, strainers, and galvanized
           ducts, openings in concrete for the existing slab, electrical panel
           and all required labor, materials, conduits and electrical wiring
           and fitting equipment according to the instruction of engineer.
           Price also includes the replacement of any of the following
           damaged parts with new (same in size, capacity and quality)
           part:

  22.3.1   Insulated 4" Sch-40 black steel pipe as existing.                     LM     10

  22.3.2   Insulated 3" Sch-40 black steel pipe as existing.                     LM     10

  22.3.3   Insulated 21/2" Sch-40 black steel pipe as existing.                  LM     10

  22.3.4   Insulated 2" Sch-40 black steel pipe as existing.                     LM     10

  22.3.5   Butterfly valve 4" as existing.                                       No      1

  22.3.6   Butterflyvalve 3" as existing.                                        No      1

  22.3.7   Butterfly valve 21/2" as existing.                                    No      1

  22.3.8   4" flange as existing.                                                No      1

  22.3.9   3" flange as existing.                                                No      1

 22.3.10   21/2" flange as existing.                                             No      1

 22.3.11   4" strainer as existing.                                              No      1

 22.3.12   3" strainer as existing.                                              No      1

                                                     60 out of   62
                                                 Tulkarem Hospital
                                                      -BOQ-



Section                                Description                               Unit   QTY   Unit Rate   Total


 22.3.13   Flow switch as existing.                                              No      1

 22.3.14   Temperature gauge as existing.                                        No      1

 22.3.15   Pressure gauge as existing.                                           No      1

 22.3.16   4" flexible connection as existing.                                   No      1

 22.3.17   3" flexible connection as existing.                                   No      1

 22.3.18   4" non-return valve as existing.                                      No      1

 22.3.19   3" non-return valve as existing.                                      No      1

 22.3.20   Duct Works as existing.                                               M2     10

 22.3.21   Metal Stand as existing                                               No      1

 22.3.22   Double Regulating valve 4" as existing.                               No      1

 22.3.23   Double Regulating valve 3" as existing.                               No      1

 22.3.24   Double Regulating valve 21/2" as existing.                            No      1

   22.4    Removing all existing exhaust fans at roof and re-instalation on      No      8
           future top roof as shown in drawings. The work shall include
           galvanized ducts, PVC piping, openings in concrete for the
           existing slab, connection to existing electrical panel and all
           required labor, conduits and electrical wiring, materials and
           lifting equipment all made according to the instruction of the
           engineer. Price also includes the replacement of any of the
           following damaged parts with new (same in size, capacity and
           quality) part:

  22.4.1   Duct Works as existing.                                               M2     100

  22.4.2   Metal Stand as existing                                               No      1

   22.5    Removing all existing chillers at roof and re-instalation on future   No      2
           roof as shown in drawings. The work shall include piping
           connections, pumps, heat exchanger, valves, foundation
           isolation, all existing equipment, electrical connections and all
           required labor, conduits and electrical wiring, materials and
           lifting equipment, all must be made according to the instruction
           of the engineer. Price also includes the replacement of any of
           the following damaged parts with new (same in size, capacity
           and quality) part:
  22.5.1   Insulated 4" Sch-40 black steel pipe as existing.                     LM     10

  22.5.2   Insulated 3" Sch-40 black steel pipe as existing.                     LM     10

  22.5.3   Insulated 21/2" Sch-40 black steel pipe as existing.                  LM     10

  22.5.4   Insulated 2" Sch-40 black steel pipe as existing.                     LM     10

  22.5.5   Butterfly valve 4" as existing.                                       No      1

  22.5.6   Butterfly valve 3" as existing.                                       No      1

  22.5.7   Butterfly valve 21/2" as existing.                                    No      1

                                                     61 out of   62
                                                 Tulkarem Hospital
                                                      -BOQ-



Section                                Description                    Unit   QTY   Unit Rate   Total


  22.5.8   4" flange as existing.                                     No      1

  22.5.9   3" flange as existing.                                     No      1

 22.5.10   21/2" flange as existing.                                  No      1

 22.5.11   4" strainer as existing.                                   No      1

 22.5.12   3" strainer as existing.                                   No      1

 22.5.13   Flow switch as existing.                                   No      1

 22.5.14   Temperature gauge as existing.                             No      1

 22.5.15   Pressure gauge as existing.                                No      1

 22.5.16   4" flexible connection as existing.                        No      1

 22.5.17   3" flexible connection as existing.                        No      1

 22.5.18   4" non-return valve as existing.                           No      1

 22.5.19   3" non-return valve as existing.                           No      1

 22.5.20   Duct Works as existing.                                    M2     10

 22.5.21   Metal Stand as existing                                    No      1

 22.5.22   Double Regulating valve 4" as existing.                    No      1

 22.5.23   Double Regulating valve 3" as existing.                    No      1

 22.5.24   Double Regulating valve 21/2" as existing.                 No      1




           Total of Removing Existing HVAC Equipment and
           Accessories to New Roof carried to mechanical summary
           sheet

                                                     62 out of   62
            Project: Tulkarem Hospital




                                                  Civil works Summary



Sec.                                           Description              Amount

       1       1) Total of Preliminary Works



       2       2) Total of Concrete Works



       3       3) Total of Stone Works



       4       4) Total of Block Works



       5       5) Total of Plastering Works



       6       6) Total of Flooring and Covering Works



       7       7) Total of Water Proofing Works



       8       8) Total of Carpentry Works



       9       9) Total of Suspended Ceiling Works



       10      10) Total of Painting Works



       11      11) Total of Metal Works



       12      12) Total of Other Works



               Total of the Civil Works..carried to main summary
Project: Tulkarem Hospital




                                                 Electrical Summary




Sec.                                           Description            Amount


       13.1 Total for Sec. 13.1) - Electrical Points.


       13.2 Total for Sec.13.2) Conduit, piping, and excavations


       13.3 Total for Sec.13.3) Cables


       13.4 Total for Sec.13.4) Structural elelement cabinet


       13.5 Total for Sec.13.5) Grounding


       13.6 Total for Sec.13.6) Electrical Switchboards


       13.7 Total for Sec.13.7 ) Lumenaire supply and Installation.


       13.8 Total for Sec.13.8) Nurse call System


       13.9 Total for Sec.13.9) Fire alarm system.


   13.10 Total for Sec.13.10) Intercome system.


   13.11 Total for Sec.13.11) Public adress system


   13.12 Total for Sec.13.12 ) Telephone system


   13.13 Total for Sec.13.13 ) LV Boxes


   13.14 Total for Sec.13.14 ) UPS System


Bill 13     Total for Electrical Works..carried to main summary
Project: Tulkarem Hospital




                                         Mechanical works Summary




Sec.                                        Description                             Amount


   14
            Total of waste and drainage works:



   15
            Total of roof drain works:



   16
            Total of Sanitary fixtures and their accessories works:



   17
            Total of Domestic Cold and Hot Water system works:



   18
            Total of Fire Fighting system works:



   19
            Total of HVAC System works:



   20
            Total of Medical Systems works:



   21
            Total of Lifts works


            Total of Removing Existing HVAC Equipment and Accessories to New Roof
   22
            works:




         Total of the Mechanical works ..carried to main summary
Project: Tulkarem Hospital



                                                Main Summary



 Bill No.                                    Description          Total



 Bill # 1   Civil Works Summary



 Bill # 2   Electrical Works Summary



 Bill # 3   Mechanical Works Summary



            Total of All Works



            Percentage % discount or addition

            Amount of discount or addition

            Net Grand Total



            The sum of ________________________________________




            Contractor:




            Signature:
            Date:

				