					CONFIDENTIAL                                                                     AP/OCT2007/QSD131




                                 UNIVERSITI TEKNOLOGI MARA
                                     FINAL EXAMINATION




     COURSE                       :     MEASUREMENT OF CONSTRUCTION WORKS I
                                        (PAPER 2)
     COURSE CODE                  :     QSD131
     EXAMINATION                  :     OCTOBER 2007
     TIME                         :     3 HOURS




INSTRUCTIONS TO CANDIDATES

1.          This question paper consists of two (2) parts : PART A (3 Questions)
                                                            PART B (3 Questions)

2.        Answer Question 1 (compulsory) and any other one (1) question from PART A, and any
          two (2) questions from PART B, in separate Answer Booklets. Start each answer on a new
          page.

3.        All measurement shall be in strict accordance with the principles laid down in the Malaysian
          Standard Method of Measurement of Building Works (Second Edition) (SMM2). Marks will
          be given based on the correct principles and accuracy of the measurement, accurate and
          completeness of descriptions and understanding of construction principles.

4.        Do not bring any material into the examination room unless permission is given by the
          invigilator.

5.          Please check to make sure that this examination pack consists of:

               i)   the Question Paper
              ii)   a one-page Appendix 1
             iii)   two (2) Answer Booklets - provided by the Faculty
             iv)    The Malaysian Standard Method of Measurement of Building Works (Second
                    Edition) (SMM2) - provided by the Faculty
             v)     Traditional Dimension Papers - provided by the Faculty
             vi)    Drawing No. PUB/QSD131/OCT 2007/P2/1A - provided by the Faculty




                     DO NOT TURN THIS PAGE UNTIL YOU ARE TOLD TO DO SO
                            This examination paper consists of 4 printed pages
© Hak Cipta Universiti Teknologi MARA                                                CONFIDENTIAL
CONFIDENTIAL                                  2                      AP/OCT 2007/QSD131




PART A


QUESTION 1

The accompanying Drawing No. PUB/QSD131/OCT 2007/P2/1A shows works required for
site clearing.

Take off complete all works associated with site clearance.
                                                                              (25 marks)


QUESTION 2

a) List and explain five (5) benefits clients gained from engaging consultant quantity
   surveyors during pre-contract stage.
                                                                           (10 marks)

b) The Bills of Quantities is a comprehensive document prepared by the quantity surveyor.
   List and explain five (5) advantages of using bills of quantities in any construction
   projects.
                                                                              (15 marks)


QUESTION 3

Describe by using simple examples each of the following clauses in the Malaysian Standard
Method of Measurement of Building Works (Second Edition) (SMM2).

i)      Clause A.4.1
ii)     Clause A.7.1
iii)    Clause D.10
iv)     Clause D.12.3
v)      Clause G.2.2a
                                                                               (25 marks)




© Hak Cipta Universiti Teknologi MARA                                     CONFIDENTIAL
CONFIDENTIAL                                 3                       AP/OCT 2007/QSD131




PARTB

With reference to the data given in APPENDIX 1, analyse the unit rates of the items below.
You are allowed to make necessary assumptions of other cost of materials, plants and
labours that are not given. All assumptions made must be based on the current market
prices and must be well stated in your answers.


QUESTION 1

a) Explain the following components of prices that needs to be considered when building up
   a unit rate for any item in Bills of Quantities:

    i)       Material
    ii)      Labour
    iii)     Plant/ Machinery
                                                                                (9 marks)

b) Half brickwork in common bricks in cement lime mortar (1:1:6) in stretcher bond with
   brick reinforcement at every fourth course, non-load bearing - m2.
                                                                             (10 marks)

c) Excavate trench to receive foundation starting from reduced level maximum depth not
   exceeding 2.00 m. (by hand) - m3.
                                                                             (6 marks)


QUESTION 2

a) Explain the factors to be considered when deciding whether to buy or rent a plant/
   machine for construction.
                                                                           (6 marks)

b) Remove excavated material and deposit in heap 20 km distance - m3.
                                                                               (10 marks)

c) Filling to make up level average 100mm thick with hardcore of clean hard stones
   obtained off site - m3.
                                                                          (9 marks)




© Hak Cipta Universiti Teknologi MARA                                     CONFIDENTIAL
CONFIDENTIAL                                      4                    AP/OCT 2007/QSD131




QUESTION 3

a) Reinforced in-situ concrete Grade 25 in foundation in trench (by machine) - m3.
                                                                                (10 marks)

b) 113mm Wide horizontal damp proof course of single course hessian based bituminous
   felt lapped 100mm at joints and bedded in cement, lime and sand mortar (1:1:6)
   (measured net - no allowance made for laps) - m.
                                                                          (10 marks)

c) Filling to excavation with ordinary earth obtained off site - m3.
                                                                                (5 marks)




                                        END OF QUESTION PAPER




© Hak Cipta Universiti Teknologi MARA                                      CONFIDENTIAL
CONFIDENTIAL                                 APPENDIX 1   AP/OCT 2007/QSD131




MATERIAL COST

Cement                            RM 10.00 per bag
Lime                              RM 3.50 per bag
Sand                              RM 30.00 per m3
Aggregate                         RM 35.00 per m3
Brick reinforcement               RM 2.00 per m
Common bricks                     RM 0.23 per pieces
Cement bricks                     RM 0.17 per pieces
Facing bricks                     RM 0.49 per pieces
Hardcore                          RM 35.00 per m3
Imported earth                    RM 15.00 per m3
Damp proof course                 RM 5.00 per m2
Diesel                            RM 1.70 per litre
Lubrication oil                   RM 20.00 per litre


LABOUR COST

Skilled labour                    RM 70.00
Unskilled labour                  RM 40.00


PLANT/MACHINERY COST


Concrete mixer (7/5T (a) 2.25 m3 output)

Initial cost                      RM 15,000.00
Useful life                       4 years
Interest rate                     10% per annum
Scrap value at end of year        RM 2,000.00

Excavator (14 m3 bucket)

Initial cost                       RM125,000.00
Useful life                        5 years
Interest rate                      7% per annum
Scrap value at end of year         RM 45,000.00

Lorry ( 5 tonne @ 3.25 m3 capacity)

Hire charges                       RM250.00 per day

Plate vibrator (15 m2 output)

Hire charges                       RM60.00 per day




© Hak Cipta Universiti Teknologi MARA                          CONFIDENTIAL
                                                                                                                                                           AP/QSD131/OCT2007
                     10000                            30000                                                              40000                                      (PAPER 2)


          o
          o
          o
          o                                                                                           2000 mm High Hedges           1300mm
                                                                                                                                    girth Trees




                                                                                                                                                                o
                                                                                                                                                                o
                                                                                                                                                                o
                                                                                                                                                                o

                                                                         650 - 850mm girth Trees
                       200 - 250mm girth Trees




                                                               200 - 250mm girth Stump


                        1250 - 1450mm girth Trees                1500


                                                              2000 mm High Hedges


                                                    40000


NOTE :                                                                              PROJECT                 DRAWING TITLE :              DRAWN BY
                                                                                                                                         CHECKED BY          AHMAD NOORZALI
                                                                                                              GENERAL LANDSCAPING
YOU MAY MAKE ALL NECESSARY AND REASONABLE
ASSUMPTIONS WHERE APPLICABLE
                                                                                    PROPOSED DEVELOPMENT                                 SCALE               1 : 100
                                                                                    IN BAYAN HEIGHT                                      DATE                OKTOBER 2007
                                                                                                           ELEMENT
                                            UNIVERSITI TEKNOLOGI MARA                                                                    DRAWING NO.   :
                                                 CAWANGAN SARAWAK                                                  SITE CLEARANCE
CONFIDENTIAL                                                                                                                             PUB/QSD131/OCT 2007/P2/1A

				