                                                           Portfolio    Project/                                                                                    Planned       Planned          Actual
Project                                                     Project     Lifetime                                                                                   Completion    Completion      Completion                                                      Tracking        Blue
 Set #    Project Set Title         Project Name          Sequence #   Tracking #    Manager   Product ID          Product         Product Type    In Portfolio?       Date         Date            Date        Status                    Comments               Change(s)       Chip
                              Characterization of Coal     P49.001      Q55327 Ladwig,          E223722 Ammoniated Ash -           Peer-        In Portfolio        6/30/2005                                   On Schedule                                                        N
                              Combustion Products                                 Kenneth J.              Effect on Metals Release Reviewed
                                                                                                                                   Literature
                              Characterization of Coal     P49.001      Q55327   Ladwig,        E222376    Mercury Flux to Air from   Peer-         In Portfolio    6/30/2006                                   On Schedule                                                        N
                              Combustion Products                                Kenneth J.                CCPs                       Reviewed
                                                                                                                                      Literature
                              Characterization of Coal     P49.001      Q55327   Ladwig,        1012578    Field Leachate             Technical     In Portfolio   12/30/2006                                   On Schedule                                                        N
                              Combustion Products                                Kenneth J.                Characterization           Report
                              Management of Coal           P49.002      058342   Ladwig,        E222377    MANAGES Database           Service       In Portfolio    11/1/2005                                   Superceded        Due to Program dynamics                          N
                              Combustion Products                                Kenneth J.                Management Software                                                                                                    following release of the
                                                                                                                                                                                                                                  portfolio, the originally
                                                                                                                                                                                                                                  specified deliverable was
                                                                                                                                                                                                                                  completed early and is
                                                                                                                                                                                                                                  included as part of the
                                                                                                                                                                                                                                  2005 Portfolio

                              Management of Coal           P49.002      058342   Ladwig,        1012580    Comanagement Site          Technical     In Portfolio    7/30/2006                                   On Schedule                                                        N
                              Combustion Products                                Kenneth J.                Report                     Report
                              Management of Coal           P49.002      058342   Ladwig,        1012582    Secondary Mineral          Technical     In Portfolio    9/30/2006                                   On Schedule                                                        N
                              Combustion Products                                Kenneth J.                Formation in Ash for       Report
                                                                                                           Metals Sequestration
                              Management of Coal           P49.002      058342   Ladwig,        1012581    MANAGES Database           Software      In Portfolio    3/30/2007                                   On Schedule                                                        Y
                              Combustion Products                                Kenneth J.                Management Software
                              Groundwater Assessment       P49.003      058343   Ladwig,        1012584    Groundwater                Tech Update   In Portfolio   10/30/2006                                   On Schedule                                                        N
                              and Remediation                                    Kenneth J.                Remediation                1-Informal
                                                                                                                                      Report
                              Groundwater Assessment       P49.003      058343   Ladwig,        1012583    Chemical Profile for       Technical     In Portfolio   11/30/2006                                   On Schedule                                                        N
                              and Remediation                                    Kenneth J.                Beryllium                  Report
                              Groundwater Assessment       P49.003      058343   Ladwig,        1012585    Metals Attenuation         Technical     In Portfolio   12/30/2006                                   On Schedule                                                        N
                              and Remediation                                    Kenneth J.                                           Report
                              Site Restoration at Power    P49.004      Q55328   Ladwig,        1012586    Coal Storage Sites         Technical     In Portfolio    3/30/2007                                   On Schedule                                                        N
                              Plant Facilities                                   Kenneth J.                                           Report




           Page 1 of 5                                                                                                                                                                                                                                  Update: 8/15/2011
                                          Customer Commitment Product Types

Description       Definition/Examples                                             Delivery Method
Assembled Package Collection or set of technical reports and/or other materials
                  such as slide presentations, graphics, etc., used to deliver
                  technical results.                                              Automatic hard copy to all funders.
Conferences/      Conferences and Workshops focus on technical issues in a Conference/workshop attendees automatically get results.
Workshops         particular field for a specific group of attendees. Use of this
                  Product Type implies that a transfer of money from the
                  customer to EPRI will take place for this activity. The cost
                  is not automatically included as part of the membership.

Hardware             Used for tangible products such as machinery prototypes
                     or computer hardware.
Peer Literature      Peer-Reviewed Literature are papers describing results of     Citations catalog is delivered as a spreadsheet via the
                     EPRI-sponsored research that are submitted to peer-           web.
                     reviewed scientific and/or technical publications. There is
                     a separate Peer Literature Database for these products.

Service              Services include conferences, workshops, training courses, Various
                     training workshops, user groups, hotlines, technical
                     support, troubleshooting, evaluations, inspection issues,
                     user group meetings. Use of this product type implies that
                     the product is provided as part of the membership and that
                     no extra cost is incurred by the customer.

Software             An electronic file that includes executable code. Software    Automatic distribution to all funders.
                     that becomes a web application is still considered to be
                     software.
Technical Report     A Technical Report presents the results of a project,         Automatic hard copy distribution to all funders in addition
                     technical research, case study or proceedings of              to electronic delivery via the web.
                     conferences or symposia. Consult the Technical
                     Publishing department for publishing guidelines and
                     template requirements.
Technical Update     A short, informal communication issued by the project    E-FTD notification to all funders; primary distribution is
                     manager that describes progress on a technical R&D area, electronic or via the web
                     contains an evaluation of technology, or addresses
                     regulatory issues. It is intended to address a specific
                     audience need such as Regulatory reports, notes to
                     conference attendees, etc. (Combines Technical Progress,
                     Technical Review/Technical Assessment, Regulatory
                     Analysis, Case Study, EMF or Climate Briefs, etc.)



                                                                                   Technical Update--1 Informal Report : An informal report
                                                                                   that describes continuing research, meetings, or topical
                                                                                   studies.
                                                                                   Technical Update--2 Resource Info : Precise technical
                                                                                   information and knowledge written for non-professionals.
                                                                                   8 or more pages.
                                                                                   Technical Update--3 Area Issue : Concise 2-page
                                                                                   summary of a program area issue that is important to
                                                                                   EPRI funders.
                                                                                   Technical Update--4 Tech Issue : A short 4-8 page
                                                                                   description of a technical project written for technical
                                                                                   experts to inform them of ongoing research and/or
                                                                                   developments in that field.
                                                                                   Technical Update--5 Newsletter : A collection of short
                                                                                   articles that provide updates and information to a
                                                                                   subscriber base who funded the project. Not available to
                                                                                   non-funders.




    8cf8126f-0704-45f9-91df-5f4309df1aaf.xls                      Page 2                                                       April 2002
                                    Customer Commitment Product Types

Description       Definition/Examples                      Delivery Method
                                                           Technical Update--6 Manual : Instructional manual for
                                                           commercial end-use users that inform them how to go
                                                           about assessing or applying a technology. For
                                                           commercial, end-users only. Not intended for Nuclear
                                                           subscription or other services or for use with software.




   8cf8126f-0704-45f9-91df-5f4309df1aaf.xls       Page 3                                              April 2002
Deliverable Status Terms/Definitions
                                                Standard Comment
                                                (provided for
                                                consistency—can be
Status           Status Definition              edited)                      Used
Proposed         Initial state of a             N/A                          Pre sign-off
                 Deliverable when it is
                 entered into the Sales
                 Item Hierarchy (SIH) from
                 the Portfolio.
Not-Sufficient   Deliverable lacks sufficient   Deliverable lacks sufficient Sign-off
Funds (NSF)      funding to go forward. If      funding to go forward. If
                 you are interested in          you are interested in
                 funding this deliverable,      funding this deliverable,
                 contact your Account Lead.     contact your Account Lead.

On Schedule      Deliverables that are      N/A                              Post sign-off
                 committed to be delivered
                 and are within the planned
                 completion date (PCD)

Anticipate       Deliverable may not be         Deliverable may not be       Post sign-off
Possible Delay   completed per planned          completed per planned
                 completion date (PCD).         completion date (PCD).
Delayed          Deliverable that has been      Varies                       Post sign-off
                 assigned a revised
                 planned completion date
                 (RPCD) or for which the
                 planned completion date
                 (PCD) has passed and no
                 actual completion date
                 (ACD) exists.
Deferred         Deliverable completion         Deliverable completion      Sign-off
                 date has been moved into       date has been moved into
                 a future delivery year due     a future delivery year due
                 to additional scope, and/or    to additional scope, and/or
                 advisory prioritization.       advisory prioritization.

Combined         Deliverable that will not be   Deliverable will not be      Sign-off; Post sign-
                 delivered because it has       delivered because it has     off
                 been combined with             been combined with
                 another committed              another committed
                 deliverable.                   deliverable.
Superceded       Due to Program dynamics      Due to Program dynamics Sign-off; Post sign-
                 following release of the     following release of the off
                 Portfolio, originally        Portfolio, originally
                 specified Deliverable in     specified Deliverable in
                 the Portfolio has been       the Portfolio has been
                 superceded by another        superceded by another
                 deliverable.                 deliverable.

No Longer        Due to Program dynamics      Due to Program dynamics Sign-off
Applicable       following release of the     following release of the
                 Portfolio, originally        Portfolio, originally
                 specified Deliverable in     specified Deliverable in
                 the Portfolio is no longer   the Portfolio is no longer
                 viable.                      viable.

Cancelled        Deliverable that will no     Varies                    Post sign-off
                 longer be delivered.
Completed (On-   Deliverable that is          N/A                       Post sign-off*
Time)            available to customers on
                 or before the planned
                 completion date (PCD).
Completed        Deliverable that is          N/A                       Post sign-off
                 available to customers
                 and for which an actual
                 completion date (ACD)
                 exists, but was completed
                 after the initial Planned
                 completion Date (PCD).

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:8
posted:8/15/2011
language:English
pages:5
Description: Corporate Formation Template document sample