					                                               RP968
World Bank Financed Project
                                               V1




Qiantang River Basin Small Towns Environment Project

                    Resettlement Action Plan




                       (Consolidated Report)




                              June 5, 2010
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



                                      Foreword
1. The objective of Resettlement Action Plan
As been shown by the past experience of World Bank(WB), the involuntary
resettlements in develop programs are yet get relieved, but also lead to severe
economical, social and environmental crisis, such as the desegregation of production
system, the miss of production capital or income resource, threaten of poverty; the
movement to the environment where the productive skills may not available and the
competitions of resources aggravated; the power of communities and social net-work
may be weaken; family bone may be drifted apart; culture identity, custom authority
and mutual aid face the risk of impairing and disappearing.
This Resettlement Action Plan (RAPRAP) is formulated on the basis of the laws,
regulations and policies of the People‘s Republic of China, and Local Government as
well as the Guidelines of the World Bank (Operational Directive for Involuntary
Resettlement OP 4.12). The purpose of this document is to set out an Action plan for
the Resettlement and Rehabilitation of the Affected persons (APs) to ensure that they
will benefit from the project and their standards of living will be improved or at least be
restored after the project impact.
2. The aim of Resettlement Action Plan
To setting out an Action plan for the Resettlement and Rehabilitation of the APs to
ensure that they will gain the compensation and their standards of living will be
improved or at least be restored after the project impact; to have the affected
productiveness wealth (including business stores, corporations and institutes), public
wealth, infrastructure and culture heritage improved or at least restored to the present
standards.
3. The range of this general Resettlement Action Plan
The main content of this RAP is the resettlement affection inducing by the land acquisition
and house demolishing of the project construction and the Rehabilitation Reconstruction
Plan.
The detailed projects include water supply, waste-water treatment service and solid
waste disposal as well as cultural heritage protection project financed by WB in city
standard, county standard and township standard of Hangzhou, Shaoxing, Jinhua and
Quzhou, and the accompanying establishments of pipeline network beyond the WB
fund and the affected area and people of accompanying projects will not be covered.
4. Definition of Relative Terms in this General Resettlement Action Plan
4.1 Affected persons (APs)
1 Criteria for Eligibility, Affected persons may be classified in one of the following three
groups:
    A.      those who have formal legal rights to land (including customary and
            traditional rights recognized under the laws of the country);
    B.      those who do not have formal legal rights to land at the time the census
            begins but have a claim to such land or assets—provided that such
            claims are recognized under the laws of the country or become
            recognized through a process identified in the Resettlement Action Plan;
            and
    C.      Those who have no recognizable legal right or claim to the land they are
            occupying.


                                             I
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

2 Persons covered under 1(A) and 1(B) are provided compensation for the land they
lose and other assistances. Persons covered under 1(C) are provided resettlement
assistances in lieu of compensation for land they occupy and other assistances, as
necessary, to achieve objectives set out in this policy, if they occupy the project area
prior to a cut-off date established by the borrower and acceptable to the World Bank1 .
Those who encroach on this area after cut-off date are not entitled to the
compensation or any other resettlement assistance. All persons included in 1(A), 1(B)
and 1(C) are provided compensation for loss of assets other than land.

4.2 Compensation and Resettlement Measures
3 In order to address the impacts caused by land acquisition resulting in (i) relocating
or loss of shelter; (ii) lost of assets or access to assets; (iii) loss of income source or
means of livelihood, whether or not the APs must move to another location, an RAP or
Resettlement Policy Framework (RAPF) should be prepared that covers the following:
     A. The Resettlement Action Plan or resettlement policy framework includes
        measures to ensure APs are
          (i)        Informed about their options and rights pertaining to resettlement;
           (ii)      Consulted on, offered choices among, and provided with technically
                     and economically feasible resettlement alternatives; and
           (iii)     Provided prompt and effective compensation at replacement cost2 for
                     losses of assets attributable directly to the project.
     B. if the impacts include physical relocation, the resettlement or resettlement
        policy framework should include measure to ensure that the displaced persons
        are
          (i)           provided assistances (such as moving allowance) during the
                        resettlement and rehabilitation;
          (ii)          provided with houses, or housing sitehousing sites, as required,
                        agricultural sites for which a combination of productive potential,
                        location advantages, and other factors is at least equivalent to the
                        advantages of the old site.
     C. Where necessary to achieve the objectives of the policy, the Resettlement
        Action Plan or resettlement policy framework also include measures to ensure
        that displaced persons are
          (i)           offered support after displacement, for a transition period, based
                        on a reasonable estimate of the time likely to be needed to restore
                        their livelihood and standards of living;
          (ii)          Provided with development assistance in addition to compensation
                        measures described in paragraph 3A (iii), such as land preparation,
                        credit facilities, training, or job opportunities.




1
  Normally, the cut-off date is the date the census begins. The cut-off date could also be the date the
project area was delineated, prior to the census, provided that there has been an effective public
dissemination of information on the area delineated and systematic and continuous dissemination
subsequent to the delineation to prevent further population influx.
2
  Replacement Cost means the method of valuing assets to replace the loss at market value plus any
transaction costs. When this method is adopted, the depreciation of construction and property is left out of
account.

                                                     II
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

4 Cut-off date: the date in this project refers to the date that bulletin of land
acquisition and house demolition is issued. APs are not allowed to build new house,
expand the building, rebuild, change the usage of house and land, lease land, or
rent/bargain the house. Besides, persons moving into project areas after this date are
not entitled to be compensated.
4.3 Vulnerable Groups
The vulnerable groups in this project refers to the poorest, five-guarantees families,
HHs living on subsistence allowances , women, the disabled or those unable to work
and the ethnic minorities. The project will pay special attention to these groups.




                                            III
          Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                    — Financed by World Bank

                                                                Content

_Toc263325736Foreword ....................................................................................................... I

Content ......................................................................................................................................... I

1       Basic Situations of the Project ............................................................................................ 1

    1.1         Background of the Project and the Object of the Construction ···························· 1
    1.2         Overview for the Composition of Project and the Impact of Resettlement ··············1
        1.2.1        The Composition of project .................................................................................... 1
        1.2.2        Overview for the Resettlement Impact ................................................................... 2
    1.3         Benefit and Affected Areas of the Project ·······················································6
        1.3.1        Benefit areas of the project .................................................................................... 6
        1.3.2        The Afffected Scope .............................................................................................. 9
    1.4         The process of the projects ·········································································9
    1.5         Measures Taken to Decrease Impacts ························································ 13
        1.5.1        Project planning period ........................................................................................ 13
        1.5.2        Construction Period ............................................................................................. 16
        1.5.3        Resettlement Action Planning and Implementation Period ............................. 16
    1.6         Identification of the Linkage Projects ··························································· 16

2       Project Impacts ................................................................................................................. 21

    2.1         Project Impact Survey ············································································· 21
    2.2         Project Impact Scope ·············································································· 22
    2.3         Project impacts ······················································································ 23
        2.3.1        Affected Population ............................................................................................ 23
        2.3.2        Permanent Land Acquisition .............................................................................. 25
        2.3.3        Temporary Land Occupation ............................................................................... 27
        2.3.4        Permanent State-owned Land Occupation .......................................................... 27
        2.3.5        The Rural Residential House Demolition .......................................................... 28
        2.3.6        Affected Enterprises and Public Infrastructures ............................................... 28
        2.3.7        Vulnerable Group and Floating Population .......................................................... 29
        2.3.8        Affected Ground Attachments .............................................................................. 29

3       Social and Economic Survey Results ............................................................................... 32

    3.1         Social and Economic Survey Results of Zhejiang Province ······························ 32
    3.2         Socio-economic Profile of Pprefecture-leveleded City Affected by the Project ······ 33
        3.2.1        Hangzhou ............................................................................................................ 33
        3.2.2        Shaoxing.............................................................................................................. 33
        3.2.3        Jinhua .................................................................................................................. 34
        3.2.4        Quzhou ................................................................................................................ 34
    3.3         Socio-economic Conditions of counties(cities,districts) Affected by the Project ··· 35
                                                                         I
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

    3.4       Socio-economic Background of Townships / Districts Affected by the Project ······ 38
    3.5       Socio-economic Background of Villages/ Communities ··································· 43

4     Legal Framework and Policy ............................................................................................ 53

    4.1       Policy Framework and Their Main Clauses ··················································· 53
    4.2       Major Principles ····················································································· 62
    4.3       Summary of Resettlement policies in this Project ··········································· 62
      4.3.1      Policy of Collective-owned Land Compensation and Labor Settle ................. 62
      4.3.2      Policy of Collective-owned Land Temporary Occupation ................................ 64
      4.3.3      Policy of State-owned land Permanent Acquisation ........................................ 65
      4.3.4      Rural Residental House Demolition and Compensation Policy........................... 65
      4.3.5      The Affected Enterprises Demolition and Compensation Policy ......................... 70
      4.3.6      Resettlement policy for vulnerable groups ........................................................... 70
      4.3.7      Special Facilities and Ground Attachments ......................................................... 72

5     Compensation Standard ................................................................................................... 73

    5.1       Compensation Standard for Rural Collective-owned Land Acquisition ················ 73
    5.2       Compensation Standard for TLO of Collective-owned Land ····························· 74
    5.3       Compensation Standard for PLA of state-owned land ····································· 74
    5.4       Compensation Standard for Rural House Demolition ······································ 74
    5.5       Demolition compensation standard for affected enterprises ····························· 84
    5.6       Compensation Standard for Affected infrastructure and Ground Attachment ········ 85
    5.7       Standard of other fees ············································································· 86

6     Production and Livelihood Rehabilitation Plan ................................................................. 88

    6.1       Permanent Acquisition of Collective-owned land ··········································· 88
      6.1.1      Land acquisition Impact analysis ......................................................................... 88
      6.1.2      Summary of Resettlement and Rehabilitation Measures for Land Acquisition
                 91
    6.2       Prohibition and reconstruction of rural house ·············································· 102
      6.2.1      6.2.1 Demolition Impacts .................................................................................. 102
      6.2.2      6.2.2 Resettlement Plan ................................................................................... 102
    6.3       Resettlement for Enterprises ··································································· 108
    6.4       Recovery Plan for the Affected Vulnerable Groups ······································ 108
    6.5       Security for Women's Rights ··································································· 110
    6.6       Affected Infrastructures and Ground Attachments ········································ 110

7     Institutional Arrangement and Implementation Schedule ............................................... 112

    7.1       Institutes ····························································································· 112
    7.2       Implementation Schedule ······································································· 116

8     Budget and Capital Resource ......................................................................................... 119

                                                               II
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

     8.1          Capital Budget ····················································································· 119
     8.2          Annual Investment Plan ········································································· 122
     8.3          Capital Resource ·················································································· 122
     8.4          Capital Allocation And Management ························································· 122
          8.4.1      Resettlement Capital Allocation ......................................................................... 122
          8.4.2      Resettlement Capital Management ................................................................... 123

9         Public Participation, Consultation and Grievance and Complaint Procedure ................. 124

     9.1          Public Participation ··············································································· 124
     9.2          Effect Assessment ················································································ 143
     9.3          Grievance and Complaint Procedure ························································ 145

10        Monitoring and Evaluation .............................................................................................. 146

     10.1         Internal Monitoring ················································································ 146
          10.1.1 Implementation Procedures ............................................................................... 146
          10.1.2 Monitoring Content ............................................................................................. 146
          10.1.3 Internal monitoring report ................................................................................... 146
     10.2         External Monitoring ··············································································· 147
          10.2.1 External Independent Monitoring Institute ......................................................... 147
          10.2.2 Monitoring Procedure and Contents .................................................................. 147
          10.2.3 Monitoring Indicator ........................................................................................... 147
          10.2.4 Post Evaluation .................................................................................................. 148

11        Entitlement Matrix ........................................................................................................... 150

Annex 1              Resettlement Policy Framework ........................................................................ 157

Annex 2              Each Subprojects‘ APs Social Security Related Policy ..................................... 165

Annex 3 Linkage Project .......................................................................................................... 184

     1.           Longyou North Waster Water and SPN Project ··········································· 184
     2.           Waste water pipeline network project in Jiangnan township of Tonglu ·············· 188
     3.           WWTP in Youbu Township of Lanxi and Ancient Town Infrastructure Project in
     Youbu town···································································································· 189
     4.           Wastewater Pipeline Network Project in Yunshan District of Anwen Township of
     Pan‘an County ································································································ 189
     5.           Environment Improvement Project in Shenze of Pan‘an County ······················ 190
     6.           Tangxi Water Plant and Water Supply Network Project in Wucheng District of Jinhua
                  192
     7.           Water Plant and Supported Pipeline Network in Qingshan of Zhuji ·················· 193
     8.           The WWTP phase II and supported pipeline network project in the east district of
     Jiande 196
     9.           WWTP phase 1 of Jianshan in Pan‘an County ············································ 199

                                                                     III
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

  10.     Waste-water Treatment Plant and Main&Branch Pipeline of the East Area of Quzhou
  phase I 202




                                            IV
          Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                    — Financed by World Bank

                                                                  Table
Table 1-1 Composition of Subprojects ................................................................................................. 1
Table 1-2 Project Component and the Major Resettlement Impacts ............................................... 2
Table 1-3 Summary of Mainly Resettlement Impact........................................................................... 4
Table 1-4 Social Effect of the Project ................................................................................................... 8
Table 1-5 Process of projects .............................................................................................................. 10
Table 1-6 Status of land pre-examination of subprojects ................................................................ 12
Table 1-7 Optimization Measures to Reduce the Impacts ............................................................... 14
Table 1-8 Identification of the linkage projects .................................................................................. 18
Table 2-1 Research Groups of Project Physical Impacts Survey.................................................. 21
Table 2-2 Project impact scopes ......................................................................................................... 22
Table 2-3        Affected population ........................................................................................................... 24
Table 2-4 Permanent Collective-owned Land Acquisition ........................................................... 26
Table 2-5        Temporary Land Occupation of the Project .................................................................. 27
Table 2-6 Affected State-owned Land ................................................................................................ 27
Table 2-7 Rural Residential House Demolition ................................................................................. 28
Table 2-8 Affected Enterprises in Tonglu ........................................................................................... 28
Table 2-9 Vulnerable Group and Floating Population ...................................................................... 29
Table 2-10 Affected Ground Attachments of the Project ................................................................. 30
Table 3-1 The Socio-economic Background of Affected Cities(2008) ........................................... 35
Table 3-2 The Socio-economic Background of Affected Counties ................................................. 36
Table 3-3 Socio-economic Background of Townships / districts .................................................... 41
Table 3-4 Socio-economic Survey Results of Townships / districts ............................................... 42
Table 3-6 Socio-economic Conditions of Xiaya Village ................................................................... 44
Table 3-7 The Socio-economic Conditions of Fengjikun and Jujia village .................................... 45
Table 3-8 Socio-economic Conditions of Nnashandi and Miaojia Village ..................................... 47
Table 3-9 The Socio-economic Conditions of Lingshangban and Yangjialou Village ................. 48
Table 3-10 The Socio-economic Conditions of Affected Villages in Pan’an Jianshan ................ 49
Table 3-11 The Socio-economic Conditions of Affected Villages in Tonglu ................................. 50
Table 4-1 References of Policy Framework ....................................................................................... 54
Table 4-2 Main Provisions of Relevant Resettlement Policy ........................................................... 58
Table 5-1Compensation Standards of Rural Collective-owned Land Acquisition ........................ 73
Table 5-2 Compensation Standard for Rural Residential House Demolition ................................ 76
Table 5-3 Cost Analysis of One-floor Brick and Concrete Structured Houses ............................. 83
Table 5-4 Cost Analysis of One-floor Brick and Wood Houses ...................................................... 83
Table 5-5 Cost Analysis of One-floor Earth and Wood House........................................................ 84
Table 5-6 Compensation Standard for Affected Infrastructures and Ground Attachments ........ 85
Table 5-7 Standard for Resettlement Expenses of Taxation .......................................................... 86
Table 5-8 Project related tax standards ............................................................................................. 87
Table 6-1 Analysis for the Cultivated Land Acquisition Impact ....................................................... 89
                                                                       V
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

Table 6-2 Compensation cost analysis for the permanent collective-owned land acquisition
        ........................................................................................................................................................ 90
Table 6-3 The Resettlement Action Plan of collective-owned land acquisition ...................... 91
Table 6-6-4 Usage mode of compensation fee for land acquisition ............................................. 92
Table 6-5 insured policy for land-lost farmers of different ages in project area............................ 95
Table 6-6 Collative land acquisition and social security policies .................................................... 97
Table 6-7 The capital composition of the land-lost farmers insurance in the counties
       (districts, municipalities) of this project ................................................................................ 101
Table 6-8 The alternative Resettlement Action Plans of rural house ........................................... 102
Table 6-9 The situation of vulnerable groups .................................................................................. 109
Table 7-1 Resettlement institutes and responsibilities ................................................................... 113
Table 7-2 Resume of stuff of resettlement institute ........................................................................ 115
Table 7-3 Detailed implementing times and plans of LAHD in each subprojects ...................... 116
Table 7-4 Detailed implementing times and plans of LAHD in each subprojects ...................... 117
Table 8-1 Budget for resettlement compensation ........................................................................... 120
Table 8-2 Annual Capital Utilizing Plan Sheet ................................................................................. 122
Table 9-1 Public participation at preparation stage ........................................................................ 124
Table 9-2 Public opinion survey......................................................................................................... 130
Table 9-3 Public Participation Plan for APs ..................................................................................... 133
Table 9-4 Policy Disclosure Process ................................................................................................ 142
Table 10-1 The arrangement of monitoring and evaluation .......................................................... 148




                                                                              VI
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank




                             Abbreviation and Acronyms
 RAP                    Resettlement Action Plan
 APs                    Affected Persons
 WB                     World Bank
 DPs                    Displaced Persons
 LA&HD                  land acquisition and house demolition
 PPMO                   Zhejiang Provincial Project Management Office
 HDMO                   House Demolishment Management Office
 CPMO                   County Project Management Office
 WWTP                   Wastewater Treatment Project
 PNP                    Pipeline Network Project
 WSP                    Water Supplement Project
 M&E                    Monitoring and Evaluation
 VCs                    Village Committees
 PLA                    Permanent Land Acquisition
 TLO                    Temporary Land Occupation
 LAR                    Land Acquisition and Resettlement
 HH                     Household
 RCL                    rural collective-owned land




                                            VII
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


                     1 Basic Situations of the Project
1.1 Background of the Project and the Object of the Construction
The total area of Qiantang River basin is about 55,558 square kilometers which
includes 187 cities and towns and some big mega polis such as Hangzhou. Point
source pollution are mainly comes from the urban waste-water and rural living
waste-water whose discharge account for half of the total pollution load of the whole
basin. In addition, the non-point source pollution from the rural area and circumfluence
pollution also occupy half of the total pollution load. Although, 123 towns in the total
187 towns still yet have the waste-water disposal facilities, in which circumstances the
waste-water is discharged directly into the branches of the Qiantang River. The
non-point source pollution of Qiantang River has not get the general control yet,
especially in the rainy season.
The rapid urbanization and economic growth of Zhejiang has caused considerable
pressure on the environment. Zhejiang Qiantang River own 30% population of
ZheJiang province and produces 30% of the province's gross domestic product.
However, compared with the other cities in ZheJiang province, Qiantang River basin is
the less developed region in terms of economic and environmental protection,
particularly in the supply of urban environmental infrastructure services. For example:
currently only 64 towns in the 187 town of Qiantang River have built waste-water
treatment facilities; only about 29% of towns can ensure the water supply and only
16% solid disposal waste get innocuity disposal (2007 data). These challenges are
caused by the institutional reform of small towns introducing urban infrastructure at an
early stage, specifically, the corporations of solid waste treatment have not transferred
to corporate entities , and the provision of waste-water services is still in a
decentralized manner. Additionally, fee income sometimes is not enough to pay the
costs of operating and maintenance.
Zhejiang Provincial Government has fully recognized these challenges and introduced
a variety of regulations and policies, to improve the urban environmental infrastructure,
such as the Qiantang River Eleventh Five-Year (2006 ~ 2010) plan, eco-province
construction planning and "811" Action Plan (2008 ~ 2010). Generally speaking, the
Zhejiang Government will give priority to the Environmental protection of Qiantang
River. For instance: the provincial government proposed a object that " the pollution
control goals of Qiantang River Basin will be higher than other regions, progress will be
faster than other regions and the effect will be better than other regions of the goal." A
specific request made in environmental protection plan is that the 123 townships in
Qiantang River Basin are required to build waste-water treatment facilities, which have
not yet built thosefacilities
The development objective of Qiantang River basin small-town environment of
comprehensive treatment project financed by World Bank is to help those towns to
improve urban environmental infrastructure, to provide sustainable services of
waste-water treatment, water supply and solid waste treatment and to establish a
range of ‗demonstration project‘ which can be extended to other cities of Zhejiang
Province through institutional and sect oral reforms.
1.2 Overview for the Composition of Project and the Impact of
Resettlement

1.2.1 The Composition of project

The majority of subprojects of Qiantang River basin small-town environment project

                                            1
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

financed by World Bank are located in the upper reaches of Qiantang River of the
economically less developed county-level cities, districts or townships. 11 sub-items
distributed in eight counties (districts) of four sub-prefecture-leveled cities (Hangzhou,
Shaoxing, Jinhua, Quzhou). The total investment is 1.434 billion yuan, Including 100
million U.S. dollars financed by World Bank.
Details of the subprojects are in Table 1-1.




                                               2
                                       Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank



                                                         Table 1-1 Composition of Subprojects
                                                                                                                                              Total        WB
                 Project
                                                                                                                                              Investment   Financing
      No.        County/    Location         Sector   Project Name & Description of Project Content
                                                                                                                                              (USD         (USD
                 City
                                                                                                                                              millions)    millions)
1     Component 1: Water Supply Component
                                                      Qingshan Water Supply Project: Construction of (i) a raw water pumping station of
                                                      44,000 m3/d in existing power room, and 0.50 km x DN800 steel raw water
1.1   Shaoxing   zhuji      Zhuji            WS*      transmission main, (ii) a 40,000 m3/d Qingshan water treatment plant; and (iii) 59.5    18.67        10.57
                                                      km x DN300 ~ DN800 ductile CI water distribution pipeline and a pumping station of
                                                               3
                                                      15,000 m /d.
                                                      Wucheng District Water Supply Project:
                                                      Part 1: Construction of (i) a 0.50 km x DN800 steel gravity main from Xinfan
                                                      reservoir, (ii) a 50,000 m3/d Tangxi water treatment plant; (iii) a 12.7 km x DN800 ~
                                             WS
1.2   Jinhua     wucheng    wucheng                   DN900 clear water main,                                                                 17.31        8.91
                                                      Part 2: construction of (i) 3.2km clear water pipe and a 1,500 m3 Dongmenshan
                                                      high level clear water tank ; and (ii) 15.21km DN110-DN600 secondary pipe in
                                                      Tangxi town and (iii) 24.38km DN110-DN315 secondary pipes in Jiangtang town
2     Component 2: Wastewater Treatement Component
                                                      Jiande City Sewerage and Waste-water Treatment Project: Supply, installation and
                 Jiande                               commissioning of 24 km of sewerage system and the 19,000 m3/d expansion of
2.1   Hangzhou              Jiande City      WW*                                                                                              17.04        8.50
                 City                                 Chendong WWTP (from 30,000 m3/d to 49,000 m3/d) and a 4,500m3/d lifting
                                                      pumping station.
                                                      Qujiang District Sewerage and Waste-water Treatment Project:
                                                      Part 1: (i) construction of about 9.6 km of sewers with DN300 ~ DN1200, 10.5 km
                 Qujiang    Qujiang                   of storm water, and Chengdong wastewater treatment plant with a capacity of
2.2   Quzhou                                 WW                                                                                               25.52        14.75
                 District   Distrcit                  20,000 m3/d and a 1km discharge pipe and (ii) construction of 30.8 km of sewerage
                                                      and 22 km of storm water networks in built up area to the west of Xiafei Road .
                                                      Part 2: (i) 4.2km ww pipes and 3.0km storm pipes in zhengxing/tongjiang road




                                                                                1
                                             Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


                                                                                                                                                      Total        WB
                     Project
                                                                                                                                                      Investment   Financing
        No.          County/      Location         Sector     Project Name & Description of Project Content
                                                                                                                                                      (USD         (USD
                     City
                                                                                                                                                      millions)    millions)
                                                              (1) Panan County New Urban District (Shenzhe) Sewerage Project: Construction of
                                                              (i) 2.30 km Cuxi river enbankment and 2 x 2.3km waste-water pipes on the two
                                                                                                                                                      24.13        11.81
                                                              sides of Cuixi river, (ii) 4.3 km of Panjin road expansion and associated waste-water
                                  Shenzhe ,
                     Panan                                    and storm water pipelines, and (iii) 2 x 5 km of main sewers from Shenzhe to
2.3     Jinhua             1      and Yushan       WW
                     County                                   existing Anwen WWTP.
                                  Districts
                                                              (2) Panan County Anwen town Yunshan Tourist Resort Sewerage Project:
                                                                                                                                                      8.63         4.52
                                                              Construction of a pumping station with capacity of 2,000 m3/d, of Yunshan tourist
                                                              resort area; (ii) 17.1 km DN200 ~ 500 sewerage.
                                                              (3) Jianshan Town wastewater collection and treatment project: Construction of
                     Panan        Jianshan                    (i) 4.75 km of sewerage system of Jianshan Town; (ii) three pumping stations with
2.4     Jinhua                                     WW                                                                                                 7.61         4.83
                     County       Town                        capacities 3,500 m3/d, 2,000 m3/d and 3,000 m3/d; and (iii) Jianshan town
                                                              wastewater treatment plant with a capacity of 6,000 m3/d.


                                                         Longyou Chengbei Sewerage and water distribution project:
                                                         Part I: Construction of (i) 7.272 km road with associated sewers, storm water
                                                         pipelines, industrial water pipeline and drinking water pipeline. (ii) 1.7km of effluent
                     Longyou      Longyou
2.5     Quzhou                                     WW/WS discharge outlet; (iii) 1.42km of water supply pipes, 1.465km of sewerage pipes and          44.15        10.44
                     County       County
                                                         1.445km of discharge pipes to connect surrounding villages.
                                                         Part II: Construction of 11.81km road with associated sewers, storm water
                                                         pipelines, industrial water pipeline and drinking water pipeline.




1
    Two individual RPs are prepared for the two projects. So there are 11 RPs.




                                                                                        2
                                            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


                                                                                                                                                   Total        WB
                  Project
                                                                                                                                                   Investment   Financing
      No.         County/        Location         Sector   Project Name & Description of Project Content
                                                                                                                                                   (USD         (USD
                  City
                                                                                                                                                   millions)    millions)


                                                           Jiangnan Township Sewerage Project:
                  Tonglu         Jiangnan                  Construction of (i) 5 km of road; (ii) 13 km DN300 ~ DN1400 wastewater pipelines
2.6   Hangzhou                                    WW                                                                                               19.69        8.80
                  County         Township                  and 13km storm water pipelines; and (iii) two pumping stations with capacity equal
                                                           to 6,000 m3/d and 6,000 m3/d (long term 12,000 m3/d) and 4.1km convey pipes



                                                           Youbu Town Road, Drainage and Sewerage Upgrading, and River Rehabilitation
                                                           Project:
                                                           Construction of (i) 13km x DN300-DN800 sewer in new area; (ii) 5,000 m3/d
2.7   Jinhua      Lanxi City     Youbu Town       WW       waste water treatment plant; (iii) upgrading of 1.90 km of ancient roads, storm water   11.67        6.21
                                                           pipelines, and sewerage of DN300 ~ DN600 in old town center; (iv) 0.90 km new
                                                           roads with storm water pipelines and sewerage; and (v) the rehabilitation of 0.73 km
                                                           of river

3     Component 3: Solid Waste Management Component
                                                           Meichen Town Solid Waste Management Project:
                                                           Construction of the first phase (210,000 m3 capacity) of a sanitary landfill
3.1   Hangzhou    jiande         meicheng         SW*                                                                                              20.25        11.14
                                                           (610,000 m3 capacity); closure of three existing dump site; the construction of
                                                           tertiary leachate treatment plant; and upgrading of garbage collection fleet.
      Total Project Investment                                                                                                                     214.62       100.34




                                                                                      3
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank




                           Chart 1-1 the Project Distribution




                                            1
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

    1.2.2     Overview for the Resettlement Impact
According to the APs investigations, the construction of this project involves permanent
land acquisition (PLA) and allocation of state-owned land (SOL), temporary land
occupation (TLO), housing demolition (HD) and other impact of resettlement, as well
as surface appendages and the relocation and reconstruction for special facilities.
The construction content of each sub-project and the main types of resettlement
impact are shown in Table 1-2. Generally, Longyou‘s subproject, Wucheng‘s water
supply project is related to the TLO which has less impact.
              Table 1-2 Project Component and the Major Resettlement Impacts

             NO.                           Name                                     Typy

              1     Landfill Subproject of Jiande                              PLA;HD; TLO

              2     Wastewater Subproject of Jiande                            PLA;HD;TLO

              3     Wastewater Subproject of Tonglu                            PLA;TLO;HD

              4     water supply Subproject of Zhuji                              PLA;TLO

              5     Wastewater Subproject of Quzhou                            PLA;HD;TLO

              6     Subproject of Longyou                                      PLA;HD;TLO

              7     Subproject of Youbu in Lanxi                               PLA;HD;TLO

              8     Subproject of Wucheng in Jinhua                                 TLO

              9     Pan‘an Shenze project                                      PLA;HD;TLO

              10    Pan‘an Yunshan project                                        PLA;TLO

              11    Wastewater Subproject of Jianshan of Pan‘an                   PLA;TLO



The land acquisition and house demolition in this project is mainly related to 23 villages
/ communities of 11 townships/ streets in eight counties and cities of four
prefecture-leveled cities (Shaoxing, Hangzhou, Quzhou and Jinhua)1. The total area of
permanent acqisation of rural collective-owned land(RCL) is approximately 1483.478
mu, in which there is about 34.776 mu of basic farmland and 50,221.5 m2 of demolition
homes in rural areas , 1,300 m2 demolition homes of enterprises and institutions; 1.35
mu of state-owned land(SOL) allocated without compensation, approximately 510.41
mu of the temporary RCL occupation, 720.15 of the temporary SOL occupation; and
2379 APs in 696 household affected by land acquisition and relocation plus 2642 APs




1
    The affected towns, districts and villagescommunities are mainly refer to the collective land acquisition,
house demolition and other affected areas, while the towns ,districts and villages, communities affected in
short-term due to the laying of pipe network have not fully included in the statistics.


                                                       2
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

in 711 household affected by the TLO1. The summary of mainly resettlement impact
can be seen in Table 1-3.




1
    Part of the subproject pipeline network will be combined with road construction, therefore the Aps of
temporary land occupation have not been considered.


                                                      3
                                                Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
 — Financed by World Bank




                                                            Table 1-3 Summary of Mainly Resettlement Impact
                                                                                       2
                                        PLA(mu)                                   HD(m )                 Impact of LA and
                                                                                                                                     TLO(mu)              Impact of TLO
                                 RCL                                                  Brick                    HD
                                                                                      colum
                                                                        Brick and       n
       Name              Prime                                       Concrete(timbe   earth
                                                   SOL    Subtotal                            Subtotal          Populatio                                       Populatio
                        Farmland       Other                          r) structured    and               HH                  SOL      RCL      Subtotal   HH
                                                                                                                   n                                               n
                                                                         houses       wood
                                                                                      house
                                                                                        s


 Landfill Project in
Meicheng township          0            260          0      260          12220        1175    13395       47      166         0       14.09     14.09     26       92
    of Jiande


WWTP and SPNP
 in the east district     33.6          21.6       1.35     56.55        7841.5       519     8360.5      81      326        10.5      0        10.5      0        0
      of Jiande
    The pipeline
 network of WWTP         1.176     182.082           0     183.258       18706        1330    20036      142      499       31.85      60       91.85     52      182
  of Tonglu county
WWTP and SPNP
 in the east district      0            55.5         0      55.5          400          0        400       44      154       171.66    2.52     174.18     2        8
     of Quzhou
The water supply
and drain in the
                           0           712.64        0     712.64        5630          0       5630       74      260         0       42.55     42.55     86      302
north district of
Longyou county
  project in Youbu
                           0           40.36         0      40.36          0           0         0        25       90         0       21.75     21.75     56      201
 township of Lanxi
 Water plant and
supported pipeline
network project in         0             0           0       0             0           0         0        0        0          0      347.45    347.45     418     1672
Wucheng district of
     Jinhua

                                                                                       4
                                               Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
 — Financed by World Bank



                                                                                      2
                                       PLA(mu)                                   HD(m )                 Impact of LA and
                                                                                                                                    TLO(mu)              Impact of TLO
                                RCL                                                  Brick                    HD
                                                                                     colum
                                                                       Brick and       n
      Name             Prime                                        Concrete(timbe   earth
                                                  SOL    Subtotal                            Subtotal          Populatio                                       Populatio
                      Farmland        Other                          r) structured    and               HH                  SOL      RCL      Subtotal   HH
                                                                                                                  n                                               n
                                                                        houses       wood
                                                                                     house
                                                                                       s
    Waste water
  pipeline network
project in Yunshan
                         0              1           0       1             0           0         0        0        0         37       1.35      38.35     0        0
  district of Anwen
township in Pan‘an
        County
   Environmental
 treatment project
                         0            116.26        0     116.26        1870         530      2400      192      548         0       20.7      20.7      71      185
    in Shenze of
   Pan‘an county
 WWTP and SPNP
   of Jianshan in
                         0            31.05         0      31.05          0           0         0        52      177       9.975      0        9.98      0        0
Jianshan of Pan‘an
        county
Water plant and
supported pipeline
                         0            28.21         0      28.21          0           0         0        39      159       459.16     0       459.16     0        0
network project in
Qinshan of Zhuji
         Tatal         34.776     1448.702        1.35   1484.828      46667.5       3554    50221.5    696      2379      720.15   510.41   11230.56    711     2642




                                                                                      5
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

1.3 Benefit and Affected Areas of the Project
The impact area and services scope of this project is almost in the Qiantang River in
Zhejiang Province, which is mainly in 8 counties of 4 prefecture-leveledcities like
Hangzhou, Shaoxing, Jinhua and Quzhou which apply for the World Bank financed
subprojects.
Qiantang River Basin has a total area of 55,558 square kilometers, including 187 towns
and some large cities and Hangzhou is among them. The people living in Qiantang
River basin account for 30% of the tatal population in Zhejiang and accounted for 30%
of the province's gross domestic product.
1.3.1     Benefit areas of the project
The services area of Landfill Project in Meicheng township of Jiande include six
towns/streets such as MeiCheng Dayang, Sandu, Yangcun bridge, Xiaya and yangxi
with a current population of about 18.07 million people, and about 283,000 people in
the long-term (2020) Planning.
The services area of the expend project of WWTP phase IIin the east district of Jiande
stands in the urban area of Jiande City, including three streets of Geng buildings,
Xin'an river and yangxi with about 154,000 people in planning of 2010.
The services area of wastewater pipeline network in Qingshan of Zhuji include narrow
streams Jiangnan Township of Tonglu county, Jinjiang Village, Hengshan bucun and
sochuan Village where has been incorporated into Phoenix River – Jiangnan new town
plan. The laying of pipeline network and road construction will serve as infrastructure of
the new city in older to bring enormous economic and social benefits.
The services area of Water plant and supported pipeline network project in Qinshan of
Zhuji include Caota, Datang and Wangjiajing town in south city, Paitou, Anhua and
other towns. Among them, the current population in project‘s ervices area is about
190,722 people and the region covers an area of 337.1 square kilometers. According
to drinking water tested doing by water bloc of Zhuji City, Zhuji City, there will be 135
villages with 31,212 HHs and 87,524 people can benefit from access to tap water.
The services area of WWTP and SPNP in the east district of Quzhou include urban
area in Quzhou, Qujiang open economic zone, logistics development zone and ait.
The services area of Longyou County North water supply and drain project, expend
project of WWTP phase II n the North district of Longyou County range from Longyou
Industrial Park phase II(open Economic zone) with Planning area of about 7km2 and
surrounded by farmers points (Fengjikun Village, Jujia Village,Hulong village and
Baima village). The long term planning area includes the surrounding towns and
townships (Xiaonanhai Town, Tasgi town and Mohuan village). There are three villages
(centralized residential area) in industrial Zone phase II which is to be retained. The
services area of water treatment is mainly industrial phase II.
The services area of Youbu Town Road, Drainage and Sewerage Upgrading, and
River Rehabilitation Project: include 2 communities and 5 administrative villages such
as Youbu village, Meiping village, Langjia village, Niqiao village, Liaoxiqiao
village,Youbu community and Langjia community.
The services area of Jinhua Wucheng tangxi water plant and supported pipeline
network project include four towns and a village supported water by Xifan water plant
after the completion of Tangxi water palnt, namely, Tangxi Town, Luobu town, Yangbu
town, Jiangtang Town, and the Shenfan village, as well as Jiufeng and Jinxi open
zone.
The services area of Pan'an County Shenze envrionmental management project and
SPNP in Yunshan district include the new City of Shenze distirict and Yunshan Tourist
Resort Area, as well as all the residential and the industrial park.
                                            6
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

The services area of Panan Jianshan wastewater treatment plant and supported
pipeline network project include 20 administrative villages such as Pan'an, Zhejiang
Industrial Park (current), and the Jianshan of Jianshan town, Shuige, Hutian, Li Ling,
Xinlou (all are Pan industrial park planning horizon). The service area is about 14km2,
and the recent beneficiary population is about 3 million people and long-term (2030)
beneficiary population is 10 million.
Overall, after the implementation of the projects there will be an additional water supply
capacity of 90000 m3 / d, waste-water treatment capacity of 55,000 m3 / d, waste
disposal capacity of 210,000 m3. The total range of services area is 897km2, serve
population is (recent) 8.448 million people. The social benefits of the project are shown
in Table 1-4.




                                            7
                                            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
   — Financed by World Bank


                                                                  Table 1-4 Social Effect of the Project
                                                                                                          Wastes
                                                                            Water         Waster water
                                                                                                          disposal              Main and
                                                          Service           supply         treatment                 Pumping
                                                                                                           ability               branch    Road       Flood
              Name                      Sevice area             (
                                                       population 10     ability(10        ability(10                 station
                                                                                                            (10                   pipe     (NO.)   Levees(Km)
                                                        thousand)         thousand          thousand                 (NO.)
                                                                             3                 3/        thousand               (km)
                                                                           m /d)              m d)           3
                                                                                                            m )
                                                                                  Hangzhou
   Landfill Project in Meicheng        Six townships
                                                           18.07                                            21
        township of Jiande
   WWTP and SPNP in the east           Three streets
                                                           15.4                                2                        1         24
         district of Jiande
 The pipeline network of WWTP of       One townships
                                                           4.95                                                         3        34.12      7
           Tonglu county
                                                                                  Shaoxing
Water plant and supported pipeline
                                        5 townships        19.07             4                                                    45
network project in Qinshan of Zhuji
                                                                                  Quzhou
   WWTP and SPNP in the east            One street
                                                           4.29                                2                                 39.21
        district of Quzhou
The pipeline network of WWTP and
WSP in the north district of Longyou
               county
  The water plant expansion and        Industry park                        2.5                                                  135.35     17
  water supply pipeline network
   project in the north district of
          Longyou county
                                                                                   Jinhua
 Youbu Town Road, Drainage and
 Sewerage Upgrading, and River         one townships        4.3                                1                                 13.99      3
      Rehabilitation Project:
Water plant and supported pipeline          Five
network project in Wucheng district      townships         12.43             5                                                    12.7
             of Jinhua
WWTP and SPNP of Pan‘an county         Two districts       4.65                                                         1         55.2      1         2.3
 WWTP and SPNP of Jianshan in          onetownships
                                                           1.32                               0.6                       3         4.75
          Pan‘an county



                                                                                      8
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank




In addition, after the completion of two sub-projects in Lanxi Youbu, 0.73km of touring
and river regulation and landscape creation will countribute the water quality
restoration Youbu River and the utilization of the ancient river channels in a positive
way.
    1.3.2     The Afffected Scope
The resettlement impact of this project involves permanent land acquisition(PLA),
temporary land occupation(TLO), housing demolition(HD) and other impact of
resettlement, as well as surface appendages and the relocation and reconstruction for
special facilities.
The impact of PLA and HD involves 23 administrative villages of 11 townships/streets
in 7 counties including Jiande, Tonglu, Quzhou, Zhuji, Lanxi, and Pan‘an with 2379
people of 696 HHs. In addition, two companies were affected in LA&HD of Tonglu
project.
Short-term impact 1 TLO of the project involves 37 administrative village of 9
townships/streets in 8 counties including Zhuji, Jiande, Tonglu, Quzhou, Longyou,
Wu-City, Lanxi, and Pan‘an.
The details can be seen in table 2-2.
1.4 The process of the projects
The progress of sub-items of the project can be seen in Table 1-5.




1
    Part of the subproject pipeline project is combined with road construction, so no statistics covering TLO.


                                                       9
                                        Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank




                                                                  Table 1-5 Process of projects
                                Items                          Feasibility study                  Environmental assessment              Resettlement Action Plan
     Name
                    Process          Institutes         Process            Institutes          Process           Institutes          Process          Institutes
                                  Urban and Rural                     Urban and Rural                        Zhe Jiang Bohua
                                                                                                                                     October
 Jiande landfill                   Planning and        December    Planning and Design            In          Environmental                        NRCR of Hohai
                   April 2009                                                                                                       2009 first
   subproject                    Design Institute of     2009       Institute of Zhejiang     publication       Technology                           University
                                                                                                                                      draft
                                 Zhejiang Province                         Province                        Engineering Co., Ltd.
                                  Urban and Rural                     Urban and Rural
                                                                                                              Environmental          October
                    Augest         Planning and                    Planning and Design                                                             NRCR of Hohai
 Jiande WWTP                                           Completed                              Completed    Engineering Co., Ltd.    2009 first
                     2009        Design Institute of                Institute of Zhejiang                                                            University
                                                                                                           of Zhejiang Province       draft
                                 Zhejiang Province                         Province
                                                                      Hangzhou Urban                        The Environmental       December
                                                                                                                                                   NRCR of Hohai
 Tonglu WWTP         2009                 /            Completed  Construction Design &       Completed    Protection Co., Ltd.of    2009first
                                                                                                                                                     University
                                                                     Research Institute                     Zhejiang Huanlong          draft
                                  Urban and Rural                     Urban and Rural
                                                                                                                                     October
                                   Planning and         Augest     Planning and Design                                                             NRCR of Hohai
Quzhou WWTP        June 2009                                                                      /                  /              2009 first
                                 Design Institute of     2009       Institute of Zhejiang                                                            University
                                                                                                                                      draft
                                 Zhejiang Province                         Province
                                                                                                                  Zhejiang
                                                                       Hangzhou Urban                          Environmental        November
    Longyou                                            September                                June                                               NRCR of Hohai
                       /                  /                          Construction Design &                   Protection Science     2009 first
   subproject                                            2009                                   2006                                                 University
                                                                      Research Institute                       and Design &           draft
                                                                                                             Research Institute
                                  Urban and Rural                       Urban and Rural
                                                                                                                                     October
 Pan‘an Shenze                     Planning and         Augest        Planning and Design                                                          NRCR of Hohai
                   June 2009                                                                  Completed              /              2009.10
     project                     Design Institute of     2009         Institute of Zhejiang                                                          University
                                                                                                                                    first draft
                                 Zhejiang Province                           Province
                                  Urban and Rural                       Urban and Rural
                                                                                                                                     October
Pan‘an Yunshan                     Planning and         Augest        Planning and Design                                                          NRCR of Hohai
                   June 2009                                                                  Completed              /              2009.10
    project                      Design Institute of     2009         Institute of Zhejiang                                                          University
                                                                                                                                    first draft
                                 Zhejiang Province                           Province
                                                                                                            Hangzhou Hongda
                                Urban Planning and                    Urban Planning and                       Environmental        December
Pan‘an Jianshan     February                           Feburary                                                                                    NRCR of Hohai
                                Design Academy of                     Design Academy of       April 2009   Protection Technology     2009first
  subproject          2009                              2009.2                                                                                       University
                                   Yiwu in China                         Yiwu in China                      Consulting Services        draft
                                                                                                                    Ltd.
Jinhua Wucheng                  Urban Planning and                      Jinhua Municipal                                            October        NRCR of Hohai
                                                       July 2008                                  /                  /
   subproject                   Design Academy of                       Design Co., Ltd.                                            2009first        University


                                                                                 10
                                        Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank



                                Items                             Feasibility study                Environmental assessment              Resettlement Action Plan
     Name
                     Process         Institutes         Process               Institutes        Process           Institutes          Process          Institutes
                                   Yiwu in China                                                                                       draft
                                  Urban and Rural                        Urban and Rural
                                                                                                            Sanda Environmental      November
   Zhuji water      September      Planning and                        Planning and Design       July                                               NRCR of Hohai
                                                       Completed                                            Protection Co., Ltd.of   2009 first
supply subproject     2006       Design Institute of                   Institute of Zhejiang     2009                                                 University
                                                                                                                  Zhejiang             draft
                                 Zhejiang Province                            Province



                                 Zhejiang Taining                                                            Zhejiang Industrial
                                                                                                                                     November
  Lanxi Youbu                      Construction                       Huajiang Development                  Environmental Design                    NRCR of Hohai
                    Completed                          Completed                               Completed                             2009 first
   subproject                     Management                            Planning Institute                     and Research                           University
                                                                                                                                       draft
                                Consulting Co., Ltd.                                                               Institute




                                                                                    11
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

The land pre-examination of each subproject are shown in Table 1-6.

               Table 1-6 Status of land pre-examination of subprojects
                                                                        The process of
                                                          PLA
 No.                      Name                                          appraisal of land
                                                        (Yes/No)
                                                                        use right
  1        Waste Water pipeline network project           Yes                 Fnished
          in Jiangnan township of Tonglu county
  2         Landfill Project phaseIin Meicheng            Yes                 Fnished
                     township of Jiande
  3       The WWTP phase IIin the east district           Yes                 Fnished
                           of Jiande
  4         Water plant and supported pipeline            Yes                 Fnished
                  network project of Zhuji
          WWTP and supported pipeline network
            project(SPNP) in the east district of         Yes                 Finished
  5                         Quzhou
             Wastewater (rain) water pipeline
           network reconstruction project in the          No                  Fnished
                    west of Xiafei Avenue
  6       Wastewater (rain) Treatment in Youbu            Yes                 Finished
                      township of Lanxi
           Tangxi water plant and Water supply
  7        pipeline network project in Wucheng            Yes                 Finished
                       district of Jinhua
  8       Environmental management project in             Yes                Unfinished
                 Shenze of Pan‘an county
          Wastewater pipeline network project in
  9       Yunshan district of Anwen township of           Yes                 Finished
                        Pan‘an county
 10          WWTP and SPNP of Jianshan in                 Yes                 Finished
                        Pan‘an county
 11        Qingshan Water plant and supported             Yes                 Finished
              pipeline network project in Zhuji




                                            12
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


1.5 Measures Taken to Decrease Impacts
1.5.1     Project planning period
In the period of project planning and designing, in order to decrease the
socio-economic impactsinduced by the project; some effective measures are taken by
designing agencis and project owners:
A. In the period of project planning, while choosing and comparing optimized plans,
they were likely to decrease the area of land acqisation and house demolition and tried
best to minimize the adverse local socio-economic impacts , and took it as key factor
for comparing optimized plans;
B. In the process of arrangement and location of engineering layout, the design
institutes should analyse the exposure of lines to make sure that the pipeline network is
laid in the middle or at the edge of the road, and optimized the construction methods to
minimize the quantities of house demolition.
C.Optimize designing to acquire wasteland and state owned land as possible to
decreas plowland acquisition.
The optimized measures and the results of each subprojects at the planning and
design stage are shown in Table 1-7.




                                            13
                                      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


                                                 Table 1-7 Optimization Measures to Reduce the Impacts
     NO.                     Name                                   optimization measures                                                   Evaluation
                                                                             Hangzhou
                                                                                                                  The project lead less impact on the surrounding residents
                                                                                                                  for the high mountains between Qingshan village and
                                                   Site optimization : IQiujiawu of Jianshan village;
                  Landfill Project in Meicheng                                                                    policies are easier to actualize. The site is near the main
      1                                            IIKejiawu which in the west of Qingshan village. And the
                      township of Jiande                                                                          entrance which is conducive to be implemented in phases.
                                                   final option is II
                                                                                                                  70 HHs escape from demolition and 126 mu land escape
                                                                                                                  from acquisition.
                                                                                                                        Is located in rural areas, the project is located in rural
                                                       Site Optimization: Iexpanding on original site of          area and has a small amount demolition. There are
                  WWTP and SPNP in the east        WWTP in Xin'anjiang; IIon the east of yangxi open              prospects for expansion in line with the city's planning, and
      2
                      district of Jiande           economic Zone and the west of the estuary of north             low-lying groud facilitate the collection of waste-water, and
                                                   shore Xin'anjiang River, And the final option is II            the project is near the riverside, which will help tail-water
                                                                                                                  discharge. The transportation is convenient.
                                                        Optimization of pipeline network construction
                                                                                                                       To decrease the house demolition and reduce the
                The pipeline network of WWTP of    method: taking the method of digging roads and along
      3                                                                                                           impact of future road construction plus the number of APs
                          Tonglu county            the planning way and developing the distinction and
                                                                                                                  and temporary land occupation
                                                   width of the road.
                                                                               Shaoxing
                                                        Optimization of site and pump station: Ithe program
                                                   site is located under a dam, in north of the village;               The area of pumping stations is small, transforming
                   Water plant and supported
                                                   IIbeside the dam.program one is; pumping station               from a reservoir near the abandoned plant, the site do not
      4            pipeline network project in
                                                   program as a self-flowing water + bottled water                need to be re-located and avoid demolition and reduce the
                        Qinshan of Zhuji
                                                   pressure; the program two is full artesian water pressure      amount of earth excavation
                                                   + self-flowing wate. And the final option is II
                                                                                 Jinhua
                                                         Pipeline distiction optimization, the pipes is laid as
                                                                                                                      Reducing the impact of land acquisition and house
                   Water plant and SPNP in         far as possible along the embankments, fields or roads
      5                                                                                                           demolition and special facilities, reducing the area of earth
                   Wucheng district of Jinhua      paved. high selection pool choose the acqisated land as
                                                                                                                  excavation and temporary
                                                   far as possible and use gravity flow water supply
                                                        Pipeline and road distinction optimization, the pipes
                  Environmental management                                                                            Reducing the impact of land acquisition and house
                                                   are laid as far as possible along the embankments,
      6           project in Shenze of Pan‘an                                                                     demolition, reducing the area of earth excavation and
                                                   fields or along roads paved and trying to avoid
                             county                                                                               temporary
                                                   demolition
                  Wastewater pipeline network           Pipeline distinction optimization, the pipes are laid         Reducing the impact of land acquisition and house
      7           project in Yunshan district of   as far as possible along the embankments, fields or            demolition, reducing the area of earth excavation and
                Anwen township of Pan‘an county    along roads paved                                              temporary
      8         WWTP and SPNP of Jianshan in       Site Optimization: Program 1 is located in the Xiangkeng           The current site is cultivated land and mountains which


                                                                                  14
                                      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


     NO.                      Name                                   optimization measures                                                  Evaluation
                           Pan‘an county            under the Jianshan town (Ring Road south-east block);          has a health protection distance from the residential
                                                    Program II is located in the Xiangtou Village of Jianshan      buildings. The project has little influence on the surrounding
                                                    town. And the final option is 1.                               environment; the traffic conditions are good; the existing
                                                                                                                   pipeline network convergence are smooth, reducing the
                                                                                                                   investment in pipeline network
      9                                             site Optimization: Program 1 is located in Sitabei of          Avoiding the occupation of basic farmland, avoiding the
                 Wastewater (rain) Treatment
                                                    Langjia village; program 2 is located in the road of the       demolition of housing and ground adjunct and the traffic
               phaseI in Youbu township of Lanxi
                                                    old riverbank of Langjia village. The final Option is 1        impact
                                                                                Quzhou


                Regional Water and drain project                                                                     Reducing the impact of land acquisition and house
                                                    Pipeline distinction optimization, the pipes are laid as far
     10          in the north district of Longyou                                                                  demolition and special facilities, reducing the area of earth
                                                    as possible along the planning road
                              county                                                                               excavation and temporary


                                                    site Optimization: Program 1 is located in the north of
                                                    320 national road and the west of Shangxi; program 2 is
                                                                                                                   The project decreases the cultivated land occupation and
                                                    located in the north of program 1 and next to Qujiang;
                                                                                                                   fully take advantage of wasteland, beach, and avoid the
                 WWTP and SPNP in the east          program 3 is located in the west-south of the cross of
     11                                                                                                            demolition.The relatively large distance from the building
                    district of Quzhou              Qujiang and Xiashanxi plus the north of former 320
                                                                                                                   countribute the less noise, smell among the surrounding
                                                    national road. The final Option is 1.The reconstruction of
                                                                                                                   environment.
                                                    Pipeline road is combined with planning roads.




                                                                                   15
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank



1.5.2     Construction Period
A. measures to alleviate dust pollution
The soil excavated of the construction is piled at the roadside which would lead to a
huge cloud of dust in the dry season and then affect nearby residents and factories. In
order to reduce the impact on the surrounding environment, the construction team
should water the surface of the mound during the sunny and windy weather. The solid
should be disposed with planning and escaped to be overload during transportation.
Besides, the solid attached in the wheels of the vehicles should be flushed to ensure
the solid dose not sprinkle from the loader vehicle along the way, thereby affecting the
environment. At the meantime, a cleaning system should be carried out by construction
departments which do the cleaning work on time.
B, control of the noiseThe construction noise comprise excavation, bray of vehicles,
engine sound, concrete mixing sound, as well as avoiding soil noise caused by roller.
In order to reduce the impact on the surrounding residents, it is forbidden to work
during 23:00 to the next 6:00 within 200 meters away from residential area and give
priority to low-noise machine when choosing the construction equipment and
construction methods. It should also take measure to minimize the noise when working
at night, or build up a temporary cauntion barrier to ensure sound environmental quality
in residential areas.
C, the waste disposal of on-site area
Project developers and project construction departments should promptly contact with
local sanitation and timely clean up the living wastes at the construction site to ensure
that the construction area on-site clean to prevent dust generated due to the long-term
stacking.
D. to reduce the impact of pipeline excavation
In the pipeline construction process, the work surface should be in a certain degree of
by watering and reduce dust by fence. Building materials and construction waste
should be removed and transported in time. Bewaring the trucks are overloaded and
trying to take measures of cover and obturate to reduce the chance of spilling along the
way, and cleaning the soil and dust on the road in time.
1.5.3     Resettlement Action Planning and Implementation Period
In the period of Resettlement Action Plan and implementation, once land acquisition
and house demolition cannot be avoided, following measures should be taken to
decrease affects on local community:
A. To strengthen collection of basic information, and make further analysis of local
socio-economic conditions actuality and future development, and formulate feasible
Resettlement Action Plan combining with local real condition, so it can guarantee APs
don‘t make a loss due to project.
B. To encourage public participation and accept the supervision from the mass.
C. To emphasize internal and external M&E, and set up effective and smooth feedback
mechanism and channel, try all best to shorten the period of information treatment, in
order to safeguard all kinds of issues, emerging in construction implementation, would
be sovled timely.
1.6 Identification of the Linkage Projects
Linkage projects are the other projects that have direct connection with the project‘s
construction function or benefit in the preparation and implementation process.


                                            16
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

Totally there are 5 linkage projects. Among them, there are 2 linkage projects finished
the resettlement activities before the WB identification mission, and these projects
need project appraisal. Othere 3 linkage projects will implement resettlement activities,
and they need to prepare the RAP if need. Identification of linkage projects can be
seen in table 1-8, as detailed in Annex 2.




                                            17
                                      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
 — Financed by World Bank


                                                    Table 1-8 Identification of the linkage projects
                                                                                                           Timetable of the   If linkage      Action
   Location                 Name                                  Related projects
                                                                                                          resettlement Work     project      required
                    Landfill Project in
Jiande Mei city    Meicheng township of                                  x
                         Jiande
                                              East district Waste water treatment plant project phase I       April 2007          X
                   The expend project of              Xin'anjiang Waste water treatment plant                Before 2002          X
    Jiande         WWTP phase II in the
                                                    Constructed pipeline network in urban area            Before Sep.2009         X
                   east district of Jiande
                                                                  Meicheng landfill                       Project conponent       X
                   Waste Water pipeline                Tonglu Waste water treatment plant;                 September 2006         X
                     network project in                                                                                                    Resettlement
Tonglu Jiangnan                                  Road construction matching the pipeline network;                                √
                   Jiangnan township of                                                                                                      planning
                       Tonglu county                         Fengchuan pump station                         January 2007          X
                   Qingshan Water plant                         Qingshan reservoir                                                X
                                                                                                          Before September
Shaoxing Zhuji     and supported pipeline
                                                                Finished water pipe                             2007              X
                  network project of Zhuji
                  Water plant and SPNP in                        Shenfan reservoir;                                               X
Jinhua Wucheng      Wucheng district of                                                                     Before 2007
                           Jinhua                               Finished water pipe;                                              X
                                                       Pan'an Waste water treatment plant;                Before July 2005        X
                      Environmental                           Anwen pump station;                         Before June 2006        X
Pan‘an Shenze      management project in
                  Shenze of Pan‘an county                                                                                                  Resettlement
                                                  Reconstruction project of 42 provincal highway                                 √
                                                                                                                                             planning
                    Wastewater pipeline
                                                       Pan'an Waste water treatment plant;                Before July 2005        X
                     network project in
Pan‘an Yunshan      Yunshan district of
                    Anwen township of                          Anwen pump station;                        Before June 2006        X
                      Pan‘an county
                    WWTP and SPNP of                                                                                                       Resettlement
Pan‘an Jianshan                                           Landfill in East-north of Pan'an;               September 2008         √
                    Jianshan in Pan‘an                                                                                                      appraisal



                                                                             18
                                        Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
 — Financed by World Bank


                                                                                                               Timetable of the    If linkage      Action
   Location                 Name                                    Related projects
                                                                                                              resettlement Work      project      required
                            county                                                                            Before September
                                                               Finished waste water pipe                                               X
                                                                                                                     2007
                                                                      Lanxi landfill;                       Before November 2006       X
                 WWTP phase I in Youbu
 Lianxi Youbu
                   township of Lanxi
                                                           Youbu finished waste water pipe                      Before 2007            X

                 WWTP and SPNP in the                                                                                                           Resettlement
                                                     Planned road combined with pipeline network;                                     √
                 east district of Quzhou                                                                                                          planning
Quzhou Qujiang    Wastewater (rain) water
                      pipeline network
                                                                     Quzhou landfill                           December 2005           X
                  reconstruction project in
                 the west of Xiafei Avenue
                                                                                                                                                Resettlement
                                                        WWTP in the north district of Longyou;                September 2009          √
                                                                                                                                                 appraisal
                 Regional Water and drain
Quzhou Longyou   project in the north district    water purification plant phase II in the north district       Before 2004            X
                     of Longyou county
                                                            Water plant of Longyou county                       Before 2004            X




                                                                                19
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank




                                            20
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


                                 2 Project Impacts
2.1 Project Impact Survey
According to requirements of World Bank and the project agency of Zhejiang Province,
relevant institutes of each subproject carried out a 100% of detailed investigation on
the scope of land requisition, temporary land occupation, relocation HHs, and the
amount of enterprises, institutions and shops cooperating with House Demolition
Headquarter (HDH), the Land Resources Bureau (LRB), Housing Demolition
Management Offices(HDMO) and NRCR of Hohai University during September, 2009
~ March, 2010, and held a survey on the socio-economic conditions of affected villages,
streets and communities during the same time. All APs had been involved in the
investigation when carried out the indicator survey of Land Acquisition and House
Demolition. Additionally, the opinions on land acquisition and resettlement of residents,
enterprises and institutions are taken into consideration and wide discussion is carried
out also.
The mode of combination of investigating HHs one by one and field survey are adopted
in the indicators investingation(PII) and thje mode of sample survey is adopted in the
socio-economic surveys targeted to the affected township (town), village and APs
which involved a total of 265 HHs (the sample proportion is 38.07%). The project
research groups are shown in Table 2-1.
          Table 2-1 Research Groups of Project Physical Impacts Survey
NO.         Mane             Time                   Method                    Organization
                                                                          Government of
                           September,   one by one indoor survey, field
                                                                          Meicheng
 1    Landfill of Jiande    2009 and     survey and socio-economic
                                                                          Township, Hohai
                           March,2010    survey by 20%
                                                                          University
                           September,   one by one indoor survey, field   Government of
 2    WWTP of Jiande        2009 and    survey and socio-economic         Xiaya Township,
                           March,2010   survey by 16.05%                  Hohai University
                           September,   one by one indoor survey, field   Government of
 3    SPNP of Tonglu        2009 and    survey and socio-economic         JiangnanTownship,
                           March,2010   survey by 10.39%                  Hohai University
                                        one by one indoor survey, field   Zhuji Water
      Subproject of         October
 4                                      survey and socio-economic         Group , Hohai
      Zhuji                  2009
                                        survey by 27.78%                  University
                                                                          Construction
                                        one by one indoor survey, field
      Subproject of        September                                      bureau, Zhangtan
 5                                      survey and socio-economic
      Quzhou                2009.9                                        street, Hohai
                                        survey by 60%
                                                                          University
                             October    one by one indoor survey, field       Indestry park
 6    Longyou project       2009 and    survey and socio-economic            Committee of
                           March,2010   survey by 30%                           Longyou,
                                        one by one indoor survey, field      Government of
      Lanxi Youbu           October
 7                                      survey and socio-economic           Mohuan village,
      project                2009
                                        survey by 19.3%                     Hohai University
                                        one by one indoor survey, field
      Jinhua Wucheng        October
 8                                      survey   and    socio-economic    Government of
       project               2009
                                        survey by 13.16%                  Youbu
                                        one by one indoor survey, field   Township,Hohai
      Pan'an Yunshan        October
 9                                      survey and socio-economic         University
      project                2009
                                        survey by 100%
                           September,   one by one indoor survey, field
      Pan'an Shenze                                                       Project Agency、
10                          2009 and    survey and socio-economic
      project                                                             Hohai University
                           March,2010   survey by12.5%


                                              21
            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
      — Financed by World Bank


      NO.          Mane                 Time                    Method                        Organization
                                                                                           Indestry park
                                                   one by one indoor survey, field
            Subproject of           December                                               Committee of
      11                                           survey and socio-economic
            Pan‘an Jianshan           2009                                                 Pan‘an , Hohai
                                                   survey by 27.78%
                                                                                           University


      In addition, a part of pipeline network of water supply subprojects and wastewater
      subprojects will be placed under the existing or planned roads according to the
      engineering design of each sub-project. Therefore, Zhejiang Urban Environment
      Project Office has drawn up a "Resettlement Policy Framework" (see Annex 2) aiming
      at those unidentified resettlement impacts. Once the identification of the resettlement
      activities involving land acquisition and housing demolition are get clear, a
      Resettlement Action Plan (RAP) in line with the Resettlement Policy Framework should
      be prepared and submitted to WB for evaluation and approval. The RAP needed to be
      approved by the World Bank before the start of the project civil works.
      2.2 Project Impact Scope
      According to characteristics of the project, the major impacts of Qiantang Basin
      Environmental Comprehensive Treatment Project Resettlement Action Plan— Funded
      By World Bank are caused by those constructions of wastewater plant, water
      purification plant, landfill and ancient town infrastructure project. Project impact scope
      includes the AL & HD area and residential area affected by project construction. The
      impact of AL & HD in this stage is based on the recommended program determined by
      project feasibility study. According to statistics, the project involves 46 villages and
      communities of the 13 townships / districtsdistricts in eight counties (cities, districts) of
      four prefecture-leveled city. In addition, there are two affected companies in Tonglu
      project and their conditions are in Table 2-8. Among them, the PLA and HD affected 23
      villages / communities, the TLO affected 37 villages / communities in which 14 villages
      both experience the impact of PLA and TLO. The project impact scopes of the
      resettlement are shown in Table 2-2.


                                        Table 2-2 Project impact scopes
                      District (city,     Village, township               Affected villages and communities
NO.         Name
                        county)                (street)           LA           DH        LA&DH             TLO
       Landfill of
 1     Jiande             Jiande               Meicheng                               jiangshan        jiangshan
       project
       WWTP of
 2     Jiande             Jiande                Xiaya                                   Xiaya
       project
       Waste water
                                                                                                    Zhaixi,Jinjiang,
       project of
 3                        Tonglu               Jiangnan        Jinjiang                 Zhaixi       Hengshanbu,
       Tonglu
                                                                                                      Shechuan
       Jiangnan
       Water
       supply                                   Caota          Shangyu,
 4                         Zhuji
       project of                               Paito          Changtan
       Zhuji
       Waste water
 5     project of         Qujiang              Zhangtan         Miaojia              Nanshandi          Miaojia
       Quzhou
       Longyou                                                                       Fengjikun,H       Fengjikun,
 6                        Longyou              Mohuan           Baima
       project                                                                         ulong       Jujia,Baima,Long




                                                          22
            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
      — Financed by World Bank

                           District (city,   Village, township              Affected villages and communities
NO.          Name
                             county)              (street)             LA        DH        LA&DH             TLO
                                                                                                        hu,Lantang
          Jinhua
                                                                                                                    1
 7        Wucheng            Longyou          Tangxi,Xinfan                                            15 villages
          project
                                                                   Langjia,You
          Lanxi Youbu                             Tangxi                                                 Langjia,
 8                          Wucheng                                 bu'Niqiao,
           project                               Shenfan                                                  Youbu
                                                                     Meiping

                                                                                      Jingou,Shan
          Pan'an                                                                                     Jingou,Shanghe
                                                                                      ghengtang,L
 9        Shenze              Pan'an             Shengze                                             ngtang,Shengyi,
                                                                                      uojia,Shengy
          project                                                                                        Sheng'er
                                                                                       i,Sheng'er

                                                                                                     Shangmashi;zho
          Pan'an
                                                                   Shangshim                         ngtian;Shuangke
10        Yunshan             Pan'an              Anwen
                                                                       a                             ng;Shangge;Xiay
          project
                                                                                                            ing
          Pan'an
                                                                    Xianzhai
11        Jianshan            Pan'an            Jianshan
                                                                   Louxiazhai
          subproject



      2.3 Project impacts
      According to the analysis of PII, the major types of project impact include: (1) the
      impact of land acquisition or occupation; (2) the impact of house and attachments
      demolition; (3) the impact of ancillary facilities and so on ;( 4) enterprise house
      demolition and land acquisition .
          2.3.1        Affected Population
      Totally 2379 persons are directly affected 2 in this project, among which 492 are in
      Jiande , 499 are Tonglu,159 are in Zhuji,                      90
                                               154 are in Qujiang, are in Lanxi,  725 are
      in Pan‘an and 260 in Longyou.
      In the view impact types, 513 HHs,71729 persons are affected by LA affected
      (accounting for 72.98% of the total affected population); 83 HHs, 285 persons
      are affected by both LA&DH (of the total affected population, 12.03%); 100 HHs,
      365 are only affected by HD (accounting for 14.99% of the total affected
      population).The project only involves the direct impact of LA&DH in rural areas
      aparting from the demolition of urban housing, commercial shops,enterprises
      and public institutions(in Table 2-8). Affected population is shown in Table 2-3.




      1
        15 affected villages of TLO impacts by the WPNP in Wucheng: Tangxi Town, Shenfan village, Xingli
      Village, Daliyuan Village, Fangjia Village, Zhu village, Hengtoushan village, Cao sector, tShangyingtou
      Village, Shangye Village, Shatou Village, Shiyang Village, SiPing Village, Shangtang Village, Zhaikou
      village,and Xiateng village.
      2
         The directly affected population refers to the APs of PLA and HD, excluding the population of TLO and
      that in the two companies in Tonglu.



                                                              23
           Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
     — Financed by World Bank


                                    Table 2-3   Affected population
                               Impact of LA       Impact of HD     Impact of LA &HD      Subtotal
NO.            Name
                               HH     People      HH      People     HH       People   HH     People
        Landfill of Jiande
 1                              /         /        5       18        42       148      47      166
        project
        WWTP of Jiande
 2                             50        204      22       89         9        33      81      326
        project
        Waste water project
 3                             75        264      58       203        9        32      142     499
        of Tonglu Jiangnan
        Water supply project
 4                             39        159       /        /         /         /      39      159
        of Zhuji
        Waste water project
 5                             43        149       1        5         /         /      44      154
        of Quzhou
 6      Longyou project        56        194      14       50         4        16      74      260
        Jinhua Wucheng
 7                              /         /        /        /         /         /       /       /
        project
        Pan'an Shenze
 8                             173       492       /        /        19        56      192     548
        project
        Pan'an Yunshan
 9                              /         /        /        /         /         /       /       /
        project
        Pan'an Jianshan
10                             52        177       /        /         /         /      52      177
        subproject
             Lanxi Youbu
11                             25        90        /        /         /         /      25       90
              Subproject
            Total              513      1729      100      365       83       285      696     2379




                                                   24
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


    2.3.2    Permanent Land Acquisition
A total of 1483.478 mu collective-owned landcollective-owned land with 596 HHs, 2014
people 1 in 23 villages and communities of 11 townships / districts are occupied
permanently. Among them, 315.2 mu is in Jiande, about 183.285 mu is in Tonglu,
28.21 mu is in Zhuji, 55.5 mu is in Quzhou , 40.36 mu is in Lanxi, Pan mu is in 148.31
and 712.64 mu in Lpngyou.
Among the the collective-owned land, irrigable land is 508.068 mu; dry land is 17.59
mu; vegetable field is 1.75 mu; orchard is 643.4 mu; woodland is 183.53 mu; water is
45.78 mu; other land is 88.7 mu; unused land is 5.75 mu. Project permanent
acquisition of collective-owned land is shown in Table 2-4.
According to the requirement of project construction, the temporary land occupation is
used for piling up the engineering materials, construction machinery, and construction
of temporary shed and so on. According to project design, the whole project is
distributed into a linear shape in older to releasing a big block of land after the
implementation of land acquisition and house demolition. These blanks can be used for
the stacking of materials and the erection of temporary sheds to build the on-site office
and materials yard. In this way, the impact of the temporary land occupation can be
reduced.




1
    83 households with 285 people are affected by house demolition.



                                                   25
                                              Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
     — Financed by World Bank




                                                    Table 2-4 Permanent Collective-owned Land Acquisition

                                                                                Land acquisition(mu)                                                 APs

NO.                Name              irrigable                Vegetable                                       Unused                         househol
                                                   Dry land                Orchard        Woodland   Water                Other   Subtotal                 people
                                       land                     field                                          land                             d

 1      Landfill of Jiande project      70          15.5                                   174.5                                    260        42           148

 2      WWTP of Jiande project         55.2                                                                                         55.2       59           237
        Waste water project of
 3      Tonglu Jiangnan              95.808                                                                               87.45   183.258      84           296
        Water supply project of
 4      Zhuji                         20.68                     1.75                                   4       1.78                23.53       39           159
        Waste water project of
 5      Quzhou                         55.5                                                                                         55.5       43           149

 6      Longyou project               27.06                                631.15           8.68     41.78     3.97                712.64      60           210

 7      Jinhua Wucheng project

 8      Lanxi Youbu project           39.11                                                                                1.25    40.36       25           90

 9      Pan'an Shenze project        116.26                                                                                        116.26      192          548

10      Pan'an Yunshan project          1
        Pan'an Jianshan
11      subproject                    27.45                                 3.25            0.35                                   31.05       52           177

        Percentage (%)                  34          1.19        0.12        42.93          12.42      3.1      0.39        5.85     100

               Total                 508.068        15.5        1.75        634.4          183.53    45.78     5.75        88.7   1483.478     596         2014




                                                                                     26
            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
      — Financed by World Bank


       2.3.3       Temporary Land Occupation
      The project temporarily occupies a total of 1230.56 mu of land, including 720.15 mu of
      state-owned land, accounting for 58.52% of the temporarily occupied land; and
      510.41mu of collective-owned land, accounting for 41.48% of the temporarily occupied
      land. The temporary occupation land mainly related to the current state-owned roads,
      the state planning roads, the state-owned river bank protection, collective path and
      collective-owned farmland. The temporary land occupation of the project is shown in
      Table 2-5.
      A total of 510.41 acres of collective-owned land with 711 HHs, 2642 people in 37
      villages and communities of 9 townships / districts of seven counties(cities,districts) is
      temporarily occupated in the project. Among them, 14.09 mu is in Jiande, 60 mu is in
      Tonglu , 2.52 mu is in Quzhou , 42.55 mu is in Longyou , 21.75 mu is in Lanxi , 347.45
      mu is in Wucheng , and 22.05 mu is in Pan‘an .
      A total of 720.15 acres of state-owned land is temporarily occupied in the project
      involving Jiande, Tonglu, Quzhou,Pan‘an, and Lanx, in which 10.5 mu is in Jiande ,
      31.85 mu is in Tonglu , 46.98 mu is in Pan‘an, 459.16 mu in Zhuji and 171.66 mu in
      Qujiang district.
                       Table 2-5     Temporary Land Occupation of the Project
                                                 Temporary land occupation(mu)                           Total
NO.             Name                                               collective-own                        area
                                     state-owned land     Pro.                              Pro.        (mu)
                                                                       ed land
 1    Landfill of Jiande project             /               /          14.09               1.15        14.09
 2    WWTP of Jiande project                10.5          0.85             /                  /          10.5
 3    Waste water project of
                                           31.85           2.52          60                 4.88         91.85
      Tonglu Jiangnan
 4    Water supply project of
                                           459.16         37.38              /               /          459.16
      Zhuji
 5    Waste water project of
                                           171.66         13.95         2.52                0.2         174.18
      Quzhou
6     Longyou project                        /               /         42.55                3.46        42.55
7     Jinhua Wucheng project                 /               /         347.45              28.23        347.45
8     Lanxi Youbu project                    /               /         21.75                1.77        21.75
9     Pan'an Shenze project                  /               /          20.7                1.68         20.7
10    Pan'an Yunshan project                37             3.01         1.35                0.11        38.35
11    Pan'an Jianshan
                                            9.98           0.81              /               /           9.98
      subproject
         Percentage                               58.52                          41.48                    100
          Total (mu)                             720.15                          510.41                 1230.56
       2.3.4     Permanent State-owned Land Occupation
      A total of 1.35 mu state-owned land is permanently occupated by the WWTP in Jiande ,
      in which the land is transferred freely.
      The situation of affected State-owned land is shown in Table 2-6.
                                   Table 2-6 Affected State-owned Land
                                                          State-owned land
          No                        Name                                                  Remarks
                                                               (mu)
           1                WWTP of Jiande                      1.35               transferred freely
                           Total                                1.35




                                                     27
                Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
          — Financed by World Bank


              2.3.5     The Rural Residential House Demolition
          The project only involves the rural house demolition, and the total area of house
          demolition is 50,221.5 m2 with 183 HHs, 650 people1, in which the area of Brick and
          Concrete structured(wood) houses is 46667.5 m2, accounting for 92.92%; and the area
          of Earth and wood house(simple houses )is 3554 m2, accounting for 7.08%.
          The impact of rural house demolition is shown in table 2-7.
                                   Table 2-7 Rural Residential House Demolition
                                                                                         2
                                                          Rural house demolition m                          Affected situation
                                                    Brick and     Earth and
                                                    Concrete        wood
    NO.                   Name
                                                    structured     houses;      Subtotal                 Household     Population
                                                     houses        Simple
                                                      (wood)        house
     1        Landfill of Jiande project             12220            1175             13395                47            166
     2        WWTP of Jiande project                 7841.5            519             8360.5               31            122
              Waste water project of
     3                                               18706            1330             20036                67            235
              Tonglu Jiangnan
     4        Water supply project of Zhuji             /                 /                  /                /            /
              Waste water project of
     5                                                400                 /              400                 1             5
              Quzhou
     6        Longyou project                         5630                /             5630                18            66
     7        Jinhua Wucheng project                    /                 /               /                  /             /
     8        Lanxi Youbu project                       /                 /               /                  /             /
     9        Pan'an Shenze project                   1870               530            2400                19            56
    10        Pan'an Yunshan subproject                 /                 /               /                  /             /
    11        Pan'an Jianshan subproject
                    Percentage                       92.92            7.08               100                 /             /
                    Total (mu)                      46667.5           3554             50221.5              183           650
              2.3.6     Affected Enterprises and Public Infrastructures
             Only is Tonglu subproject involved with enterprise land acquisition and house
          demolition and the situation of affected companies are in Table 2-8.
                                       Table 2-8 Affected Enterprises in Tonglu

                                                                                                     2
                          Employee                           Area of demolition house(m )
                                                                                                            land
No.
           Name                               Work              Brick          Brick                     Acquisition     Usability
                                                                                                               2
                       Total   Female                           and             and     Subtotal          (m )
                                                              Concrete         wood
         Tonglu                          Private sector,
                                                                                                                       Factory,
         Mingfa                          the main
1                       150      120                           1300              /       1300                20
         Knitting                        knitting                                                                      office
         Co., Ltd.                       sweaters
                                         Private sector,
                                         mainly sale
         Narrow
                                         gas, stoves
2        River LPG       3        1                              /               /               /          384                 /
                                         and
         station
                                         accessories
                                         retail
         Total          153      121            /              1300              /       1300               404                 /




          1
              83 households with 285 people will be affected by land acquisition and house demolition bothly.



                                                                 28
           Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
     — Financed by World Bank




      2.3.7     Vulnerable Group and Floating Population
     There are 5 vulnerable HHs of 12 persons in this project including three sub-projects
     (accounting for 0.5% of the total affected population). The situation of the vulnerable
     groups is shown in Table 2-9.
                      Table 2-9 Vulnerable Group and Floating Population
                                       Vulnerable Group                                 Resettlement
NO.               Name                                         Type        Difficulty
                                     Hosehold     people                                preferences
                                                              elderly                   Resident and
 1      Landfill of Jiande project      1              1   person of no    in want          living
                                                              family                    allowances
                                                             disabled                       living
 2      WWTP of Jiande project          1              4                   in want
                                                              people                    allowances
        Waste water project of
 3
        Tonglu Jiangnan
        Water supply project of
 4
        Zhuji
        Waste water project of
 5
        Quzhou
 6      Longyou project
 7      Jinhua Wucheng project
 8      Lanxi Youbu project
                                                              disabled
                                                            people with                     living
 9      Pan'an Shenze project           3              7                   in want
                                                            subsistence                 allowances
                                                            allowances
        Pan'an Yunshan
10
        subproject
        Pan'an Jianshan
11
        subproject
             Total                      5          12



      2.3.8     Affected Ground Attachments
          There are 16 ground attachments affected by the project, including concrete
     terrace, trees and bounding wall. See details in table 2-10.




                                                  29
                                        Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank




                                                  Table 2-10 Affected Ground Attachments of the Project
                                                      Subproject
                                                                                                                                       WWTP
                                 Landfill   WWTP           of      WSP     WWTP                       WSPt of     WWTP       WWTP
                                                                                      Subproject of                                       of
        Type             Unit       of         of      Jiangnan     of       of                        Jinhua     of Lanxi     of                Total
                                                                                        Longyou                                        Pan‘an
                                 Jiande     Jiande     township    Zhuji   Quzhou                     Wucheng      Youbu     Pan‘an
                                                                                                                                      Jianshan
                                                       in Tonglu
Telegraph Poles          No.                  4                                                                                                    4
orange tree              No.                                                1980                                                                 1980
Communication Cable       m                  800                                                                                                  800
Strawberry                   2
                         m                   400                                                                                                 400
Greenhouse
Irrigation Ditch          m                  150                                                                                                 150
10kv electric pole       No.       15          6         80                                                          22       30                 159
380kv electric pole      No.                  10                                                         195                                     205
Simple rural electric
                         No.                             20                                                                                       20
pole
transformer              No.                  1                                                                                                    1
                           2
bounding wall            M                                                                               30                   500                530
Grave                    No.                                                                              2                              6         8
Pond                     mu                                                                                          11                           11
Poplar forest            mu                                                                                         0.73                          11
Cotton                   mu                                                                                         0.52                         0.73
Vegetable                mu                                                               450                                                    0.52
primiparity orange                                                                        450                                                    450
abundant orange          No.                                                              650                                                    650
―5 centimetre trees      No.                                        21                    250                                 180                271
5-10 centimetre trees    No.                                        87                    200                                 120                467
11-20 centimetre trees   No.                                        97                    150                                                    367
Restore of cement            2
                         m                   120                                                        1090                  900                2110
concrete pavement
Restore of asphalt           2
                         m                                                                                                   8943                8943
paving
3-6 centimetre trees     No.                             530                                                                                     530



                                                                             30
                                       Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank




                                                    Subproject
                                                                                                                                      WWTP
                                Landfill   WWTP          of       WSP     WWTP                       WSPt of     WWTP       WWTP
                                                                                     Subproject of                                       of
        Type             Unit      of         of     Jiangnan      of       of                        Jinhua     of Lanxi     of                Total
                                                                                       Longyou                                        Pan‘an
                                Jiande     Jiande    township     Zhuji   Quzhou                     Wucheng      Youbu     Pan‘an
                                                                                                                                     Jianshan
                                                     in Tonglu
6-12 centimeter trees    No.                            250                                                                                      250
Over 12 centimetre
                         No.                           300                                                                                       300
trees
Scattered trees          No.     165                                                                    195        120                           480
talltrees                No.                 30                                                                                                   30
saplings                 No.                 80                                                                                                   80
cement road               m                                                                                       2635                          2635
First grade tea garden
                         mu                                                             137.49                                                  137.49
Second grade tea
                         mu                                                             211.37                                                  211.37
garden
Third grade tea garden   mu                                                             302.45                                                  302.45




                                                                            31
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

                3 Social and Economic Survey Results
3.1 Social and Economic Survey Results of Zhejiang Province
                                                  Zhejiang Province stands at the
                                             southern wing of Yangtze River Delta located
                                             in the south-east of China's coastal. Zhejiang
                                             is on the west of the East China Sea, on the
                                             north of Fujian province and the earth of
                                             Jiangxi and Anhui province, connected to the
                                             south of Shanghai and Jiangsu border. The
                                             largest river in the territory, the Qiantang
                                             River, is named as Zhe Revior , abbreviated
                                             as ‗zhe‘.The provincial capital is Hangzhou.
                                             The average straight-line distance from
                                             East-West to North-South of Zhejiang is 450
                                             kilometers, and the land area of Zhejiang is
101.8 thousand square kilometers, accounting for 1.06% of the whole country, which
represents the smallest provinces in China.
There are 11 provinces cities is Zhejiang province , containing over 90 counties (cities,
districts) with 22 county-level cities, 36 counties, 32 municipal districts. Until November
2008, there are a total of 1518 towns and subdistrict offices and 754 towns.
In 2008, the province's gross domestic product is 2.14869 trillion yuan which increased
by 10.1% compared with last year, and the growth rate is 4.6% lower than that of
previous year which is 1.1% higher than the national level, in which the added value of
first industrial is 109.54 billion yuan, which increased by 3.9 % compared with last year,
and the growth rate is 1.6 % lower than that of previous year; the added value of
secondary industry is 1.15803 trillion yuan, which increased by 9.4% compared with
last year, and the growth rate is 6.1% lower than that of previous year; the added value
of tertiary industry is 881.12 billion yuan, which increased by 11.8% compared with last
year, and the growth rate is 3.6 % lower than that of previous year. The proportion of
three industries is 5.1:53.9:41, and the proportion of tertiary industry rose 0.3% over
the previous year, the added value of first and second production decreased by 0.2%
and 0.1%.
Per capita GDP is 42,214 yuan which increase by 8.6% and equal with 6078 U.S.
dollars accoeding to the annual average exchange rates. In 2008, the total fixed asset
investment is 930 billion yuan which increase by 10.4%. Total imports and exports is
211.15 billion U.S. dollars, increasing by 19.4% compared with last year, in which
imports owned 56.86 billion U.S. dollars which increase by 17.0%, and exports owned
154.29 billion U.S. dollars which increase by 20.3% . the per capita GDP of 2008
exceeded 6000 U.S. dollars. At the same time, the province's fiscal general budget
revenue is 373.01 billion yuan which increase by 15.1% compared with last year, of
which the local general budget revenue is 193.34 billion yuan which increase by 17.2%
or by 15.3% on comparable basis. The general budgetary expenditure is 220.83 billion
yuan, which increase by 22.2%.The urban residents per capita disposable income is
22,727 yuan which increase by 10.5%, and the per capita net income of rural residents
is 9258 yuan which increase by 12%. The actual growth rates were 5.4% and 6.2%
excluding price factors.
The residential population is 51.16 million in Zhejiang Province at 12:00 on the
November 1, 2008, including 53 ethnic minorities like She, Hui, Zhuang, Miao and
other. The population of Zhejiang is mainly Han, accounting for 99.64%. There were
only 26 million minority population, but contain the whole 55 ethnic minorities and the
Hui is the most populous, accounting for 52% of the total population. Other ethnic

                                            32
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

minorities which have more than 10000 people include Miao, Mongolian, Manchu,
Turkey family.
3.2 Socio-economic Profile of Pprefecture-leveleded City Affected by the
Project
3.2.1     Hangzhou
Hangzhou is located in northern part of China's southeast coast, is the provincial
capital of Zhejiang and a sub-provincial cities, which is also the second largest
economy cities in the Yangtze River Delta, as well the economy, finance, logistics, and
cultural center of Zhejiang Province, plus a major transportation center in southeast
China.
Hangzhou own a name of "Qiantang is prosperous from ancient" for its developed
economic. In 2008, the GDP is 478.116 billion yuan and the per capita GDP is 70,832
yuan (base on the registed population in the end of 2008), which stood at the second
place in the national capital cities. The comprehensive strength is sixth of the country in
year 2008. The city covers 15984 square kilometers, of which 3451 square kilometers
is owned by municipal districts. By the end of 2008, the city's permanent population is
7.966 million, of which the registered population is 6.7764 million. In the registered
population, agricultural population is 3.3688 million people, while the non-agricultural
population is 3.4076 million. There are over eight urban districts, two counties and
three county-level cities in Hangzhou, including a total of 57 streets, 110 towns, 39
townships (including one nationality townships), 678 communities, 65 residential areas,
3666 administrative villages.
Hangzhou is a mixed habitat for both Han ethnic group and ethnic minorities. The city
has 27 kinds of ethnic minorities like Han, She, Hui, Manchu, Mongolian, Zhuang, Miao,
Korean, Dong, Tujia, Buyi, mountains, Dai, Yao, Yi, Wa, water, Uygur, white, Daur,
Tibetan, Li, Tatar, Lisu, Naxi, Xibe, Russia and others with 13,383 people.
3.2.2     Shaoxing
Shaoxing is located between the Southern border of the Yangtze River Delta and the
north-central of Zhejiang expressway, which is also the hometown of renowed writer
Mr. Lu Xun. Shaoxing covers an area of 8256 square kilometers with 4.3706 million
people(in 2008). The urban district covers an area of 339 square kilometers with
640,000 peopleguanxia , dominating over six counties (districts, municipalities), 98
towns and 20 district offices.
The GDP of Shaoxing increased by 9.0% on the basis of comparable prices, reaching
222.295 billion yuan in 2008. The economic aggregate ranked No. 8 in Yangtze River
Delta and maintain No. 4 in Zhejiang province. Per-capita GDP excess 50 thousand
yuan, reaching 50,909 Yuan (based on reiterated population), and Per-capita GDP
exceed 7000 U.S. dollars to $7330 by 2008 according to the average exchange rate.
Annual total revenue is 27.465 billion yuan which increased by15.8% compared with
previous year, of which the local fiscal revenue is 14.36 billion yuan which incresded by
17.6%. The total industrial added value is 120 billion yuan last year which incresded by
9.9%.In 2008, the fixed assets investement of Shaoxing stood at 91.334 billion yuan ,
up by 8.3% over the previous year. And the retail aggregate of social consumer goods
stood at 61.889 billion yuan, rasing by 20.1%, hitting its highest level in the nearly
decade. The total import and export in 2008 was 23.827 billion U.S. dollars, up 23.5%
over the same period last year. Of which that of imports was 6.332 billion U.S. dollars,
up 15.5% and self-exports was 17.495 billion U.S. dollars, up 26.6%. By the end of
2008, the city had accumulatively approved over1.668 billion U.S. dollars of contractual
foreign capital and 7.72 billion U.S. dollars of paid-in foreign capital. The registrated
population was 4.3706 millionend at the end of the year, of which the male is 2.201

                                            33
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

million while the female is 2.1696 million, accounting for 50.4% and 49.6% respectively;
the city's non-agricultural population is 1.3997 million which increased by 0.8% over
the previous year, accounting for 32.0% of the total population; the city's transient
population at the end of year(temporary residence for more than a month) was 1.3417
million, up 33.9%. The city's per capita disposable income of urban residents was
24,646 yuan, up 12.2%; while the city's per capita net income of rural residents was
10.95 thousand yuan, up 12.5%.
3.2.3     Jinhua
Jinhua is located in the middle of Zhejiang, dominating over 9 counties (districts,
municipalities). In 2008 the city's gross domestic product (GDP) was 1681.85 billion
yuan, up by 10.6% over the previous year according to the comparable prices. In which
of that the added value of first industy was 8.961 billion yuan, up by 5.2%; and the
added value of secondary industry was 90.307 billion yuan, up by 10.0%; plus the
added value of tertiary industry was 68.917 billion yuan, up by 12.1%. The city's per
capita GDP reached 36,538 yuan (the average exchange rate was 5261 U.S. dollars in
2008), up by 10.1%.In 2008, the fixed assets investement of Jinhua stood at 58.693
billion yuan , up by 8.6% over the previous year. And the retail aggregate of social
consumer goods stood at 67.566 billion yuan, rasing by 20.0%. The total import and
export in 2008 was 9.548 billion U.S. dollars, up 19.9% over the same period last year.
Of which that of imports was 8.969 billion U.S. dollars, up 18.9% and self-exports was
579 million U.S. dollars, up 39.3%. The revenue of central governments totaled 9.924
billion yuan, up by 16.2% over the previous year. The revenue of local governments
totaled 11.97 billion yuan, up by 17.4% over the previous year. The born population
was 46620 in 2008, the birth rate was 10.13 ‰, and the natural population growth rate
was 3.19 ‰. The total population at the end of the year was 4.6141 million, of which
the urban population was 923.8; non-agricultural population was 1.0531 million (314.8
thousand people in urban area). The average population was 2.55 persons per
household. Urban per capita disposable income of urban residents was 21,408 yuan,
up by 7.8%; while the city's per capita net income of rural residents was 8264 yuan, up
by 12.5%.
3.2.4     Quzhou
Quzhou is located in the west of Zhejiang Province, besides the headwater of Qiantang
River and the west of Jinqu basin, borders on Fujian Nanping in south, connects with
Shangrao and Jingdezhen in west, nears the Huangshan of Anhui in north and lies on
Jinhua, Lishui, Hangzhou. Besides, Quzhou is the central city of Fujian, Zhejiang,
Jiangxi and Anhui, the Eco-city of western Zhejiang, the state historical and cultural city
as well as the state chemical industrial base. Quzhou has dominated over six counties
(cities, districts), a total of 13 streets, 47 towns, 46 townships, 72 community
committees, 2599 administrative villages.
In 2008, the city's GDP was 58.005 billion yuan, up by 13.0% according to comparable
prices. Of which the added value of first industry was 6.171 billion yuan, up by 8.0%;
the added value of secondary industry was 31.785 billion yuan, aup by15.2%; the
added value of tertiary industry was 20.049 billion yuan, up by 11.6%. In the tertiary
industry, the added value of transportation, storage and postal grew by 8.0%, the
added value of wholesale and retail grew by 13.6%, added value of accommodation
and catering grew by 6.3%, the added value of financial grew by 10.3%, the added
value of real estate value-added decreased by 1.0%. The structure of the three
industries‘ added value was adjusted from 11.0:53.0:36.0 of the previous year to
10.6:54.8:34.6The per capita GDP was 23,362 yuan according to registered population
(is 26,076 yuan based on residential population), or 3360 U.S. dollars, up by 12.5%.
The total value-added of the industrial sector was 26.562 billion yuan throughout the
year, up by 17.0% according to comparable prices. Total profits of large state-owned
                                            34
                  Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
            — Financed by World Bank

            industrial enterprises and large non state-owned industrial enterprises reached 76.879
            billion yuan, up by 36% ; and the completed investment in fixed assets was 36.117
            billion yuan, up by 13.9%. Limit investment in fixed assets was 32.633 billion yuan, up
            by14.2%. A full-year total retail sale of social consumer goods was 21.561 billion yuan,
            up by 20.2%. The total annual imports and exports was 1.325 billion U.S. dollars, up by
            24.9%. Of which: exports was 899 million U.S. dollars, up by 24.6% and imports was
            426 million U.S. dollars, up by 25.7%.Total financial revenue of the year was 5.73
            billion yuan, up by 17.1%, of which local revenue was 3.439 billion yuan, up by 17.2%.
            The registrated population was 2.4885 million at the end of 2008, of which the male
            was1.289 million and the female was 1.1995 million, accounting for 51.8% and 48.2%
            respectively. The per capita disposable income of urban residents was 18,069 yuan,
            up by10.3% and the per capita net income of rural residents was 6843 yuan, up
            by12.7%.The socio-economic background of affected cities in Zhejiang Province is
            inTable 3-1.
                     Table 3-1 The Socio-economic Background of Affected Cities(2008)
                                                              Zhejiang   Huangzhou                        Quzhou
NO.                    Index                       Unit                              Shaoxing   Jinhua
                                                              provence      city
                                                 10,000                                                   248.85
1             Registered population                            5116       677.64      437.06    461.41
                                                 people
            In which:non-agricultural             10,000                                                    /
                                                                 /        340.76      139.97    105.31
                    population                   people
                                                100 million                                               580.05
2                              GDP                            21486.9     4781.16    2222.95    1681.85
                                                  yuan
                                                100 million                                               61.71
2.1               primary industry                             1095.4     178.64        /        89.61
                                                  yuan
                                                100 million                                               317.85
2.2              secondary industry                           11580.3     2389.38       /       903.07
                                                  yuan
                                                100 million                                               265.62
2.2.1   In which:Industrial added value                          /           /        1200         /
                                                  yuan
                                                100 million                                               200.49
2.3                tertiary industry                           8811.2     2213.14       /       689.17
                                                  yuan
          National    investment in fixed       100 million                                               326.33
3                                                              9300       1882.29     913.34    586.93
                       assets                     yuan
                                                100 million                                               768.79
4       sales volume of industry                                 /        9204.97       /          /
                                                  yuan
        the total volume of retail sales of     100 million                                               215.61
5                                                                /        1558.38     618.89    675.66
        consumption goods                         yuan
                                                100 million                                                8.99
6       Above-scale export value                               1542.9     336.14      174.95     89.69
                                                  USD
                                                100 million                                                 /
7       the actually utilized foreign capital                    /         33.12       7.72        /
                                                  USD
        Fiscal revenue of local                 100 million                                               34.39
8                                                              1933.4     455.35      143.60    119.70
        governments                               yuan
        The per capita disposable income                                                                  18069
9                                                 Yuan         22727     24103.58     24646     21408
        of urban residents
        The per capita disposable income                                                                   6843
10                                                Yuan         9258        10692      10950      8264
        of rural residents

            3.3 Socio-economic Conditions of counties(cities,districts) Affected by
            the Project
            The affected cities of the project include Jiande City of Hangzhou, Tonglu County, Zhuji
            City of Shaoxing, Qujiang District of Quzhou, Longyou County, Wucheng District of
            Jinhua, Lanxi City, and Pan'an county, involving four prefecture-leveled cities and 8
            counties (cities, district), its main socio-economic indicators are in Table 3-2.




                                                                 35
                                         Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank




                                           Table 3-2 The Socio-economic Background of Affected Counties
                                                                        Tonglu                   Qujiang     Longyou      Wucheng                Pan‘an
NO.                Index                       Unit         Jiande                     Zhuji                                           Lanxi
                                                                        county                   district     county       district              county
 1        Registered population              Person        510424       398241        1064200    400261      401717       617647      658245     209285
        In which:non-agricultural
                                             Person        125462       110545        157500      40319       63798       284651      124000     28878
                population
 2                      GDP               10,000 yuan      1377046      1412426       4958900    532112       741131      2184700     1273938    379266
2.1           primary industry            10,000 yuan      167648       121498        302100     115496       140448      111900      119424     56737
2.2         secondary industry            10,000 yuan      820963       902889        3042900    247789          /        976100      802574     210845
        In which:Industrial added
                                           10,000 yuan     505362       844836        2791700    200789       350764      880000      757300     173235
2.3                 value
2.3            tertiary industry           10,000 yuan     388435       388039        1613900    168827          /        1096600     351900     111684
      National investment in fixed
                                           10,000 yuan     508845       685031        2048263    315893       526921      349792      515346     189822
 3                 assets
 4    sales volume of industry             10,000 yuan     3734786      2518936       2791700    370600       802536      9903101        /         /
      the total volume of retail sales
                                           10,000 yuan     286272       367695        1241600    154512       381839      726287      436904     114415
 5    of consumption goods
                                                                                      353605                                           30319
                                                                                        (10                                             (10
      Above-scale export value             10,000 yuan     761212        42860                    9265        15164        42005                 11973
                                                                                      thousand                                        thousand
 6                                                                                    USD)                                            USD)
      the actually utilized foreign
                                           10,000 USD       33460         6548         20510       300         671          4555       4613       818
 7    capital
      Fiscal revenue of local
                                           10,000 yuan     168006        66815        265200      20926       40495        28000      138268     25286
 8    governments
      The per capita disposable
 9                                            Yuan          17300        18179         25678      16388       13263        19855       14365     15240
      income of urban residents
      The per capita disposable
                                              Yuan          7139          8465         11612      5761         6350         6658       5807       5090
10    income of rural residents




                                                                                 36
                                    Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank



Annotate:The data is quoted from the Statistical Yearbook of year 2007 and 2008 of the relevant counties (cities, districts).




                                                                          37
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


3.4 Socio-economic Background of Townships / Districts Affected by the
Project
12 towns / districts offices are affected by the eight sub-projects in this project. The
percentage of their GDP in secondary and tertiary industries occupied a significant
share and the per capita net income is about 5000 ~ 8000 yuan which shows a good
socio-economic situation.
Landfill subproject in Meicheng of Jiande
Meicheng township is located in the east of Jiande City, covering a total area of 152.4k
㎡ with 43546 people in over 13 administrative villages, five communities and one
neighborhood. The supporting infrastructure of the township is getting more perfect
along with the development and construction of five blocks Ma Chautown in Hangzhou
Hi-Tech Industrial Park. Meicheng township 1000 cities and towns have gained several
honorary titles like the strong town of the state 1000, central town of Zhejiang Province,
Green Small Town of Zhejiang Province, Zhejiang Province town of Health, Zhejiang
Province town of ecological and other. Until 2007, the total number of HHs of meicheng
is 16881 with 43725 people, including 17631 of non-agricultural population. The GDP
was1.80039 billion yuan, of which the primary industry contributed 142.06 million yuan,
the secondary industry contributed 1.37482 billion yuan and the tertiary industry
contributed 283.5 million yuan. Industrial output value was 6.45028 billion yuan, up by
24%, and Above-scale export delivery value was 1.69747 billion yuan, up by 33.3%;
the Investment was 141.1 million yuan. The fiscal revenue was 20.01 million yuan.
Wastewater treatment plant subproject in the east district of Jiande
Xiaya township consists residential areas and 26 administrative villages. Until 2007,
the the total number of HHs were 8494 with 26218 people, including 1094 of
non-agricultural population. The GDP was 596.35 million yuan, of which the primary
industry contributed 197.69 million yuan, the secondary industry contributed 298.97
million yuan and the tertiary industry contributed 99.69 million yuan. Industrial output
value was 1.36428 billion yuan, up by 34.5%; Above-scale export delivery value was
119.23 million yuan, up by 77.8%; Investment was 67 million yuan; and the fiscal
revenue was 6.7 million yuan.
Regional water and drain subproject in the north district of Longyou
Mohuan Township is located in northern part of Longyou County and is12 km south to
the county, consisiting over 23 administrative villages within 77.5km2, administrative
divisions of the total area of 73295 mu. Until 2008, the total number of HHs was 9580,
with a total population of 29054, including 557 of non-agricultural population person
and18355 labor forces and 6317migrant labor forces. The total rural revenue was
369.86 million yuan , including 113.82 million yuan in agriculture, 2.45 million yuan in
forestry, 103.145 million yuan in livestock , 31.01 million yuan in fishery, 34.9 million
yuan in industry. Rural per capita net income was 6766 yuan.
Wastewater (rainwater) subproject in Youbu of Lanxi, Infrustracture subproject
Wastewater subproject
Youbu Township is located in the southwest of Lanxi City, standing at the junction of
Lanxi, Jinhua, Longyou and 18 km away from the Lanxi. The total area is 63.5 square
kilometers, covering over 48 administrative villages, two communities with 43000
people. in 2008 the industrial output value was 990 million yuan and the total financial
income was 24 million yuan, plus 4979 yuan of per capita income of farmers. With the
advantage of historical water carriage, the town is an important agricultural distribution
center and a commercial port city for its well-developed business and industry, known
as ―important town of Guxi ". lanxi Town is deeply rooted in history and culture with
multitutes of historic sites and folk art, kownd as "lion of the town." Lanxi was named as
"sports village" by People's Government of Zhejiang Province In 1984 and was
                                            38
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

included in the national key towns by six ministries in 2004, as well as"central town of
foster project" by Zhejiang Provincial Government in 2007.
Wastewater treatment plant subproject in Jianshan of Pan’an
Jianshan township is located in northeast of the Pan County and is 56km west of
Pan‘an County, and borded on Dongyang, Xinchang and Tiantai. Jianshan town is the
birthplace of China's plastic hose industry,and also is the largest production base of
plastic hose for home appliances. After 20 years of development, Jianshan Township
has formed a complete industrial chain. In recent years, according to the guidance of
the industrial development ideas, the industries like Auto plastic, gardening plastic,
fitness plastics, medical plastics, ware plastic, hard plastic and other achieved a health
development basing on the production of home appliances plastic hose. Until 2008, the
totalHHs of Jianshan Township were 5167 with 13197 people, including 746 of
non-agricultural population and 7055 of rural labor forces. Jianshan Township has over
22 villages (neighborhood committees) and a total of 114 village groups within the
domain of 37km2. The town has a total land area of 40 thousands mu. in 2008, the rural
economy of Jianshan township was 959.16 million yuan, among which the industrial
income was 906.5 million yuan, agricultural income was 41.795 million yuan,Income of
peasant migrant workers was 18.8 million yuan, state taxes was 25.21 million yuan, the
total incomes of farmers was 62.5325 million yuan, and per capita incomes was 5026
yuan.
Wastewater pipe net-work subproject in Jiangnan of Tonglun
Jiangnan Township is located in the east of Tonglu County and the sounth Shore of
Fuchun River and it is 70 km away from Hangzhou. The 320 National Highway and
Hangqian high-speed travels the whole town which offers an advantageous location
and convenient transportation. Original the town was combined by Shen‘ao township,
Shibu township and Zhaixi township, covering a total area of 78 square kilometers with
over 20 administrative villages and a neighborhood population of 49500.In 2008 the
industrial sales output value was 2.86 billion yuan, of which the scale industrial sales
output value was 1.77 billion which essentially flat with a year earlier; the whole society
investment in fixed assets was 450 million yuan to complete the annual target of 111%;
industrial investment was 4 billion yuan to complete the annual targets 121%, up by
53%. The added value of tertiary industry was 145 million, agricultural output value
was138 million yuan, rural per capita net income was 8744 yuan and fiscal revenue
was 66.53 million yuan.
Water supply subproject of Wucheng
Tangxi Township is located in the west of the Jinhua and is the provincial center town
as well as one of the first batches of five central towns. The town covers a total area of
106.82 square kilometers, including 70 administrative villages and a neighborhood with
population of 48000 (by the end of 2008).
There are 274 industrial enterprises in Tangxi Township in which 18 enterprises‘
annual output value is more than 5 million containing four major industries such as the
chemical industry, papermaking, no textile chemical fiber and snack food . In 2007, the
Gross industrial production was 1.76 billion yuan and the total assets of enterprises
were 1.36 billion, contributed by 5742 employees.
Shenfan Township belongs to Tangxin Township and is located in the south mountain
of Jinhua, 45 km away from the Jinhua. The town is in the west Donglin village, in the
north of Tashi village, in the east of Longyou County and in the south of Tangxi
Township. The administrative region is 65.59 square kilometers, consisiting of 14
administrative villages with a total population of 6,300. The township has rich
vegetation resources with 82118 mu forest area, and the forest coverage rate is over
80%. In 2006, the industrial and agricultural output value of township was 55.41 million
yuan, in which agricultural output was 28.19 million yuan and farmers‘ per capita net
                                            39
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

income was 2520 yuan. There is a Xinfan reservoir with a total storage capacity of
37.12 million m3 in the town.
Water supply subproject of Zhuji
Caota township is one of the three ancient towns of Zhuji City which is 10 km from the
city center. Caota Township covers an area of 81 square kilometers of 23582 of mu
arable land, 19806 mu of paddy field and 7 thousand mu of forest land. Town has over
18 administrative villages and a community neighborhood committee. Until 2008, the
total population of the town was 44539 people within 22122 female and the male to
female ratio is basically balanced. In the total population, the urban household
registration population was 2927 in which major is agricultural population of 41612
people. The rural labor force was 23127, but only 1011 people engaged in agricultural
production and most of them engaged in secondary and tertiary industries.
In 2008, the total industrial and agricultural output value was 9.913 billion yuan; annual
production value was 2.247 billion yuan, of which the secondary industry output value
reached to 1.887 billion yuan. The GDP per capita was 54,007 yuan, rural per capita
net income was 17,044 yuan, and in-budget financial revenue was 129 million.
Light industry in the main economic pillars of Caota Township. In 2008 the town had
5732 town‘s enterprises and individual enterprises, of which the industrial enterprises
were 3684 and enterprises with annual sales beyond 500 million yuan were 59, forming
the industrybased on sock, springs and construction, of which only socks enterprises
reached to 3,500. Agriculture occupied a small proportion of the town‘s economy, the
output in 2008 was only 132 million yuan, forming a agricultural economyin based on
the three major economic of bamboo, chestnuts, apples and other southern crops, in
addition to small amounts of food crops and family farming.
Paitou Town is located in the southwest and Zhuji and is 14.5 km south of Zhuji, and is
only 48 km north from Yiwu China Commodity City. Paitou Township is the south gate
of Zhuji, which is known as "the important gate of Wu-Yue ". The town covers an area
of 87.65 square kilometers, having over 27 administrative villages and a
community.The total population in 2008 was 47,792, of which the agricultural
population was 43880.2008. The GDP of the town was 2.19397 billion yuan, of which
the GDP of primary industry was153.59 million yuan, the GDP of first secondary
industry was 1.60235 billion yuan and that of the tertiary industry was438.03 million
yuan. Rural per capita net income reached 139.06 million yuan, and revenue budget
reached 152.56 million yuan. The total amount of fixed asset investment was 853.08
million yuan, while the comprehensive strength was among the "Top Six City in Zhuji,
the 18th City in Shaoxing, and the 61th City in Zhejiang" . Paitou Township owen
31,900 mu of existing cultivated land, of which: paddy field was 27,582. The natural
resource of land is rich and the township is an agricultural town.

Pan’an Shenze Environment Management Project and the Pan’an Anwen Town
district waste water pipeline network Project
Shenze County is located in the southwest of Pan‘an County and is the new city of
Pan‘an planning. Shenze County has over 21 villages and a total of 131 groups of
villagers. At the end of 2008, the total number of people of Shenze was 13,619 in 5,166
HHs, including 523 of non-agricultural population people, 8,235 of rural labor force.
Township covers an area of 44km2. In the year 2008, the township agricultural output
value was 43.65 million yuan, and rural per capita net income was 4416 yuan.
Socio-economic Survey Results of townships / districts affected by the project are
shown in Table 3-3 and Table 3-4.




                                            40
                                         Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank




                                                Table 3-3 Socio-economic Background of Townships / districts
                                                                                                            Water
                                                                Landfill of   Wastewater of   Wastewater               Wastewater of     Longyou
                       Name                                                                                supply of
                                                                 Jiande         Jiande         ofTonglu                  Quzhou
 NO.                                                  Unit                                                   zhuji
                                                                                                                         Zhangtan
         Villages and towns/districts offices                   Meicheng         Xiaya         Jiangnan     Caota                      Mohuan village
                                                                                                                          street
  1            Registered population                Person       43725           26218          49548       44539         25513            29054
        In which:non-agricultural population        Person       17631            1094          2524         2927         18988             557
  2                         GDP                   10,000 yuan    180039          59635         420161      224733            /               /
 2.1              primary industry                10,000 yuan    14206           19769         11396       13167           5917              /
 2.2             secondary industry               10,000 yuan    137482          29897         294737      188725            /               /
 2.3      In which:Industrial added value         10,000 yuan       /               /          44570       182385            /               /
 2.3                 tertiary industry            10,000 yuan    28350            9969         114028      22841             /               /
  3     National investment in fixed assets       10,000 yuan       /               /          45000       118368          7830              /
  4     sales volume of industry                  10,000 yuan    629405          133297        290697         /              /               /
        the total volume of retail sales of
  5                                               10,000 yuan        /                /           /            /             /               /
        consumption goods
  6     Above-scale export value                  10,000 yuan    169747          11923            /         11883            /               /
  7     the actually utilized foreign capital     10,000 USD     14110            6700            /          725             /               /
  8     Fiscal revenue of local governments       10,000 yuan     2001             670          6653        12926            /               /
        The per capita disposable income of
  9                                                  Yuan            /                /           /            /             /               /
        urban residents
        The per capita disposable income of
 10                                                  Yuan         7123            6358          8744        17044          5239            6766
        rural residents




                                                                                 41
                                      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank



                                           Table 3-4 Socio-economic Survey Results of Townships / districts
                                                                                         Jianshan
                    Name                                                  Youbu                          Wucheng of Jinhua          WWTP of Pan‘an
                                                                                         of Pan‘an
NO.                                                   Unit
                                                                                         Jianshan       Tangxin        Shenfan     Anwen     Shenze
       Villages and towns/street offices                             Youbu township
                                                                                         township      township         village   township   village
 1          Registered population                   Person                38208            13197         44659           6378       36326    13619
      In which:non-agricultural
                                                    Person                5210              746          3387            89        21799       523
      population
 2                       GDP                      10,000 yuan            113000              /            /               /          /          /
2.1            primary industry                   10,000 yuan            12627             4572         13602           3065       4803       4365
2.2           secondary industry                  10,000 yuan               /                /         176142           4104         /          /
2.3   In which:Industrial added value             10,000 yuan               /                /            /               /          /          /
2.3              tertiary industry                10,000 yuan                /               /             /              /          /          /
        National investment in fixed
 3                                                10,000 yuan             1100               /             /              /          /          /
                     assets
 4    sales volume of industry                  10 thousand yuan          99000           83420            /              /          /          /
      the total volume of retail sales of
 5                                                10,000 yuan                /               /             /              /          /          /
      consumption goods
 6    Above-scale export value                    10,000 yuan                /               /             /              /          /          /
      the actually utilized foreign
 7                                              10 thousand USD            387              220            /              /          /          /
      capital
      Fiscal revenue of local
 8                                                10,000 yuan             1697               /             /              /          /          /
      governments
      The per capita disposable
 9                                                   Yuan                    /               /             /              /          /          /
      income of urban residents
      The per capita disposable
10                                                   Yuan                 4788             5026          4400           4180       4925       4416
      income of rural residents




                                                                           42
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


3.5 Socio-economic Background of Villages/ Communities
The project involves 51 villages and communities of 12 townships/districts offices in 8
counties of 4 prefecture-leveled cities.
Landfill subproject in Meicheng of Jiande
Jiangshan Village covers a area of 17.11km2 with 3178 people of 924 HHs in 36
villagers' groups. The total land area is 22372 mu, of which 2710 mu is cultivated land,
1401mu is garden and 15849 mu is forest land, 604 mu is water surface, 1809 mu is
the other land. The total workers of Jiang Village are 2045, of which there are 620
people engaged in family-run, accounting for 30.32% of the total workforce; of which
there are 600 people engaged in the primary industry, accounting for 29.34% of the
total workforce; of which there are 1425 working as migrant workers, accounting for
69.68%, of which there are 1380 people working out of the villages all year round,
accounting for 67.48% of the total workforce. The net income of whole village is
10.8298 million yuan, of which 8.6482 million yuan is income of migrant workers, and
the per capita net income is 6129 yuan.
The socio-economic conditions of Jiangshan Village are shown in Table 3-5.
               Table 3-5 Socio-economic Conditions of Jiangshan Village
                           Index                                   Jiangshan Village
                      Total HHs(household)                                924
                      Total Population (people)                          3178
                      In which:
Population
                      Male
                      agricultural population(people)                    3178
                      non-agricultural population(people)                  /
                      Labour force (people)                              2045
                      Enterprise                                            /
Labour force          migrant workers                                    1425
                      individuals                                          20
                      Agriculture                                         600
                      Farmland area(mu)                                  2710
                      Rice yield(Km/mu)                                   600
                      Garden(mu)                                         1401
Land situation
                      Woodland(mu)                                      15849
                      Water surface(mu)                                   604
                      Other land(mu)                                     1808
Net income            net income per peasant(yuan)                       6129

Waste water treatment subproject in east district of Jiande
There are 767 hosegolds with 2514 people in Xiaya Village. There are a total of 1,700
labor forces, of which there are 985 people working in enterprises, accounting for
57.9% of the total workforce; of which there are 235 people working outside the village,
accounting for 13.8%; of which there are 108 people working in individual operators,
accounting for 6.4%; of which there are 372 people being engaged in agricultural
production, accounting for 21.9%. The per capita income of the village in 2007 was
7651 yuan, and the characteristic agricultural products of the villages are mainly citrus
cultivation and Strawberry.

                                            43
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

The socio-economic conditions of Xiaya Village are shown in Table 3-6.


               Table 3-6 Socio-economic Conditions of Xiaya Village
                                                                 Affected villages
                      Main index
                                                      Xiaya village      Xiashang village
               Total HHs(household)                       767                    287

               Total Population (people)                 2514                  878

               In which:
Population
               Male                                      1536                  581
               agricultural population(people)           2145                  792

               non-agricultural population(people)        369                  86

               Labour force (people)                     1700                  632
               Enterprise                                 985                  283
Labour force   migrant workers                            235                  165
               individuals                                108                   18
               Agriculture                                372                  166
               Farmland area(mu)                         1262                  173

               Rice yield(Km/mu)                          480                  500
Land                                                      628                  155
               Garden(mu)
situation
               Woodland(mu)                              5990                 1606

               Water surface(mu)                           10                   6

Net income     net income per peasant(yuan)              7651                 7340

Wastewater (rainwater) subproject in Youbu of Lanxi, Infrustracture subproject
Wastewater subproject
The residential population of Youbu village in 2008 was 1038, and the per capita
income was 7370 yuan, up by 3.18% compared with 2007. There are 8 villager groups,
and the total income of rural economy was 30.3 million yuan. The total number of labor
resources in rural areas was 755, and the total number of employees was 680. An area
of 10 mu of freshwater is used for aquaculture with aquatic products output of 2 tons.
Cotton-growing area is 50 mu with a total output of 4 tons.
The residential population of Langjia Village in 2008 was 1322, and per capita income
was 4457 yuan, up by 4.80% compared with 2007. There are15 villager groups and the
total income of rural economy was 26.33 million yuan. The total number of labor
resources in rural areas was 890, and the total employees were 853. An area of 27 mu
of freshwater is used for aquaculture with aquatic products output of 7.5 tons.
Cotton-growing area is 245 mu with a total output of 17.2 tons.
The residential population of Niqiao Village in 2008 was 735, and per capita income
was 4519 yuan, up by 0.04% compared with 2007. There are 7 villager groups and the
total income of rural economy was 46.83 million yuan. The total number of labor
resources in rural areas was 520, and the total employees were 520. An area of 270
mu of freshwater is used for aquaculture with aquatic products output of 63 tons.
Cotton-growing area is 150 mu with a total output of 10.5 tons.
The residential population of Meiping Village in 2008 was 1094, and per capita income
was 4350 yuan, up by 5.05% compared with 2007. There are 8 villager groups and the
total income of rural economy was 47 million yuan. The total number of labor resources
                                            44
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

in rural areas was 720, and the total employee is 695. An area of 105 mu of freshwater
is used for aquaculture with aquatic products output of 88 tons. Cotton-growing area is
1240 mu with a total output of 28.8 tons.
Regional water and drain subproject in the north district of Longyou
There are 335 HHs with 1038 people of 4 villager‘s group of Fengjikun village. The total
land area is 3752 mu, of which 1732 mu is cultivated land, 630 mu is garden, 1050 mu
is woodland, 290 mu is water surface and 50 mu is other land. A total of village labor
force is 655 people, in which 435 people engaged in family-run, accounting for 66.41%
of the total workforce, 382 people engaged in in the primary industry, accounting for
58.32%; 220 people working as perennial migrant workers , accounting for 33.59%.
Village net income is 7.012 million yuan, income of migrant workers was 2.40 million,
and the per capita net income is 6129 yuan.
There are 502 HHs with 1373 people of 6 villager‘s group of Jujia village. The total land
area is 1885 mu, of which 1582 mu is cultivated land, 195 mu is garden, 26 mu is
woodland, and 82 mu is water surface. A total of village labor force is 986 people, in
which 544 people engaged in family-run, , accounting for 55.17% of the total workforce,
302 people engaged in in the primary industry, accounting for 30.63%; 442 people
working as perennial migrant workers , accounting for 44.83%. Village net income is
9.35 million yuan, income of migrant workers was 4.35 million, and the per capita net
income is 6810 yuan.
The socio-economic conditions of Fengjikun and Jujia village are shown in Table 3-7.
     Table 3-7 The Socio-economic Conditions of Fengjikun and Jujia village
                   Index                             Fengjikun                Jujia
                      Total HHs(household)             335                    502
                      Total
                                                       1038                  1373
                      Population (people)
                      In which:
Population
                            Male                         /                      /
                      agricultural population
                                                       1038                  1373
                      (people)
                      non-agricultural
                                                         /                      /
                      population(people)
                      Labour force (people)            655                    986
Labour force          Enterprise                         /                     /
                      migrant workers                  220                    442
                      individuals                      381                    302
                      Agriculture                       54                    242
                      Farmland area(mu)                3752                  1885
                      Rice yield(Km/mu)                1732                  1582
                             Garden(mu)                630                    195
Land situation
                             Woodland(mu)              1050                    26
                             Water surface
                                                       290                     82
                      (mu)
                             Other land(mu)             50                      /
Net income            net     income     per
                                                       6129                  6810
                      peasant(yuan)


                                                45
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

Pan’an Shenze Environment Management Project and the Pan’an Anwen Town
district waste water pipeline network Project
New City zone is located in southwest hilly area of Pan County which is a combination
of low mountains, hills and valleys. The region's total area is 17.6 square kilometers, of
which total area of Shenze village is 7square kilometers.
New City zone consisits two parts of Shenze and Xinwo, of which Shenze stretch from
Luojia Village at its north, Senwu village at its south, Shangheng village at its east and
Daoshi‘ao village at its west. Shenze Area, based on the Zhu Yong Expressway and
the new city administrative center, undertake functions of live recreation, administrative
offices, trade finance, education and production and processing.
At the end of 2008, there are 15 administrative villages in Shenze Area, including
Luojia village, Shenze first village, Shenze second village, Shenze third village, Shenze
fourth village, Jingou village, Daoshi‘ao village, Nanwu village, Liuchong village, Houli
village, Shangheng village, Senwu village, Shangchan village,Shanghengtang village
and Mataoshan and so on. There were 103 villagers groups with 4052 residential
population of 10556 people, including 6247 of labor force, 12,000 of mobile population
at the end of year. Rural per capita income was 4416 yuan.
At the end of 2008, Shenze Area had accomplished industrial output value of 377
million yuan and sales output value of 373 million yuan; in which the finished local
financial revenue was 4.5 million yuan, up by 33%; the finished tax was 7.96 million
yuan, up by 11%; the finished export delivery value was 80 million yuan. Yunshan
tourist resort in the area was formally established in March 2009, mainly involved three
administrative villages of Shangmashi, Zhongtian and Shangge and was originally
belongs to Anwen Town (currently is the location of Panan county). County resort area
is located in the west of county with longitude of 120 ° 26 ' and latitude of 29 ° 03'.
Yunshan tourist resort areas (county-wide Yunshan Planning Area) are located in the
southeast direction of Anwen Area, which is main hub of Anwen Area, Huaxi Scenic
Area, scenic lake Baizhang.
Yunshan tourist resort is surrounded by mountains; Yuxi River and Golden Toad River
flow though the area from south to east respectively and converged as Wen River. Two
river runs through the entire Yunshan block, and stream width is about 15 ~ 30 meters.
Junction of two rivers in the central part is the location of Shangmashi and Zhongtian
village. The area is flat and open, surrounded by mountains, with clear water, towering
trees and simple residents. The region's total area is 39 square kilometers.
Yunshan tourist resort is a newly established administrative region of this year, and its
socio-economic situation is mainly referced to Anwen Township. By the end of 2008,
there are 8 neighborhood committees and 29 administrative villages in Anwen
Township with 12980 HHs of 35847 people, of which agricultural population is14992,
labor forces are 9740; the non-agricultural population is 20807. Rural per capita
income is 4925 yuan, up by 6.8% compared last year.
Waste water treatment subproject in the east of Quzhou
There are 466 HHs with 1376 people in Nanshandi village. The total labor force of the
village is 750, including 40 people engaged in local enterprises, accounting for 5.0% of
the total workforce; 146 people working outside the home, accounting for 18.2% of the
total workforce; 210 people engaged in individual businesses, accounting for 26.1% of
the total workforce; 408 people engaged in agricultural production, accounting for
50.7% of the total workforce. The per capita income of the village in 2008 was 5060
yuan, and the villages‘ specialized industries are citrus cultivation.
There are 540 HHs with 1849 people in Miaojia village. The total labor force of the
village is 1345, including 40 people engaged in local enterprises, accounting for 3.0%

                                            46
        Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
  — Financed by World Bank

  of the total workforce; 216 people working outside the home, accounting for 16.1% of
  the total workforce; 1089 people engaged in agricultural production, accounting for
  81.0% of the total workforce. The per capita income of the village in 2008 was 4520
  yuan, and the villages‘ specialized industries are citrus cultivation.
  The socio-economic conditions of Nnashandi and Miaojia village are shown in Table
  3-8.




            Table 3-8 Socio-economic Conditions of Nnashandi and Miaojia Village
                                                                Affected villages
                         Index
                                                         Nnashandi              Miaojia
                  Total HHs(household)                      466                   540
                  Total Population (people)                1376                   1849
Population        In which:
                  Male                                      656                   884
                  agricultural population(people)          1376                   1849
                  non-agricultural population(people)        0                     0
                  Labour force (people)                     804                   1345
Labour force      Enterprise                                 40                     40
                  migrant workers                           146                    216
                  individuals                               210                      0
                  Agriculture                               408                   1089
                  Farmland area(mu)                        1095                   1413
                  Rice yield(Km/mu)                         700                   700
Land
situation         Garden(mu)                                 0                    390
                  Woodland(mu)                              100                    0
                  Water surface(mu)                          0                     0
Net income
                  net income per peasant(yuan)             5060                   4520



  Water supply subproject of Wucheng
  Shangye Village has 650 mu of cultivated land with a total of 146 HHs of 600 people,
  who are agricultural population. There are a total of 335 labor forces, including workers
  affected by the project who accounting for 26.74% of the total population and people
  who are both engaged in agricultural and production, accounting for 27.91% of the total
  population. Village household annual gross income is 35.18 thousand yuan, the per
  capita total income is 8590.47 yuan, the average family net income is 32,002.85 yuan,
  the per capita annual net income is 7652.5079 yuan; household average annual total
  expenditure is 28,547 yuan, of which food expenditure (including the staple food and
  non-staple food expenditure) accounted for the highest proportion and the water costs
  accounted for the minimum proportion of cost.
  Hengshantou Village has 350 mu of cultivated land with a total of 141 HHs of 376
  people, who are agricultural population. There are a total of 150 labor forces, including
  migrant workers, who accounting for 15.09% of the total population and people who
  are both engaged in agricultural and production, accounting for 28.30% of the total
                                                47
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

population. Village household annual gross income is 28952.67 yuan, the per capita
total income is 8194.15 yuan, the average family net income is 27594 yuan, the per
capita annual net income is 7707.67 yuan; household average annual total expenditure
is 21501.3 yuan, of which food expenditure (including the staple food and non-staple
food expenditure) accounted for the highest proportion and the water costs accounted
for the minimum proportion of cost.
Shatou Village has 315 mu of cultivated land with a total of 79 HHs of 248 people, who
are agricultural population. There are a total of 160 labour forces, including industrial
labor forces of 27 people and aricultural labour force of 88 people. Of which migrant
workers account for 18.75% of the total population and people who are both engaged
in agricultural and production account for 25% of the total population. Village
household annual gross income is 45281.43 yuan, the per capita total income
is9905.31yuan, the average family net income is 41535.74 yuan, the per capita annual
net income is 9085.94yuan; household average annual total expenditure is 35518.6
yuan, of which food expenditure (including the staple food and non-staple food
expenditure) accounted for the highest proportion and the water costs accounted for
the minimum proportion of cost.
Fangjia Village has 459 mu of cultivated land with a total of 196 HHs of 575 people, of
which male is 312 and female is 263 and both of them are agricultural population. The
migrant workers account for 17.86% of the total population and people who are both
engaged in agricultural and production account for 19.64% of the total population.
Village household annual gross income is 30740 yuan, the per capita total income is
6587.14 yuan, the average family net income is 28342.92 yuan, the per capita annual
net income is 6567.71yuan; household average annual total expenditure is 31991.1
yuan, of which food expenditure (including the staple food and non-staple food
expenditure) accounted for the highest proportion and the water costs accounted for
the minimum proportion of cost.
Water supply subproject of Zhuji
There are 1031 HHs of 2693 people in 16 villager‘s group of Shangyu village. The total
land area is 3553 mu, of which 1742 mu is cultivated land, 542 mu is garden, 272 mu is
woodland, and 1015 mu is water surface. A total of village labor force is 1485 people, in
which 1034 people engaged in family-run, accounting for 70% of the total workforce, 51
people engaged in the primary industry, accounting for 3%; 541 people works outside
the villages, accounting for 36% and 220 people working as perennial migrant workers,
accounting for 33.59%. Village net income is 313.811 million yuan, in which agricultural
income is 2.4237 million, accounting for 0.77% of total revenue, industrial revenue is
2.994452 billion yuan, accounting for 95.42%, and the per capita net income is 15656
yuan.
The socio-economic conditions of Lingshangban and Yangjialou village of Shangyu
village are shown in Table 3-9.
 Table 3-9 The Socio-economic Conditions of Lingshangban and Yangjialou Village
                           Index                                Shangyu       Yangjialou
                            Total HHs(household)                  1013          1472
                          Total Population (people)               2693          3976
   Population
                                   In which:                      1420          1985
                                      Male                        2693          3976
                        agricultural population(people)             /              /
                             Labor force (people)                 1485           222
   Labor force
                              family management                   1034          1865

                                            48
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

                           Index                                     Shangyu      Yangjialou
                                farm labor force                        51            64
                                migrant workers                        541           326
                             Farmland area(mu)                        1742             2739
                                  Garden(mu)                           542             260
  Land situation                  Woodland(mu)                         272              94
                              Water surface(mu)                       1015              40
                                  Other land(mu)                        /                /
                      Total economic income of the village            31381         20650
     Income         Agricultural income (ten thousand yuan)            24.2          61.8
                     Industry revenues (ten thousand yuan)           29944.5       20487.2
               net income per peasant(yuan)
                                                                      15656         21961



Waste water project of Pan’an Jianshan
There are 615 HHs of 1540 people in 18 villager‘s group of Louxiazhai village until the
end of 2008. The total of village labor force is 700 people and the total land area is
985.9 mu, of which 577 mu is paddy fields, 408.9 mu is dry land, 4997 mu is woodland,
and 547 mu is tea garden. The per capita net income is 5300 yuan in the year 2008.
There are 940 HHs of 2622 people in 18 villager‘s group of Louxiazhai village until the
end of 2008. The total of village labor force is 1400 people and the total land area is
1535.7 mu, of which 865.6 mu is paddy fields, 671.1 mu is dry land, 6355 mu is
woodland, and 700 mu is tea garden. The per capita net income is 4500 yuan in the
year 2008.
The socio-economic conditions of affected villages are shown in Table 3-10.
Table 3-10 The Socio-economic Conditions of Affected Villages in Pan’an Jianshan

                          Index                               Xinzhai          Louxiazhai

                            Total HHs(household)               940                615

                          Total Population (people)            2622              1540

                                    In which:
     Population
                                        Male                     /                 /

                        agricultural population(people)        2622              1540

                      non-agricultural population(people)        /                 /
    Labor force
                             Labor force (people)              1400               700

                             Farmland area(mu)                1536.7             985.9

                         In which:paddy fields(mu)            865.6               577
   Land situation
                                     dry land(mu)             671.1              408.9

                                    tea garden(mu)             700                547

                                            49
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


                                    woodland(mu)                   6355             4997
    Net income
                           net income per peasant(yuan)            4500             5300

Waste water pipeline network project of Tonglu
There are 2256 HHs of 6852 people in 41 villager‘s group of Shangyu village. The total
land area is 5009 mu, of which 3719 mu is cultivated land, and 1290 mu is woodland. A
total of village labor force is 3624 people, in which 1205 people engaged in family-run,
accounting for 33.25% of the total workforce, 937 people engaged in the primary
industry, accounting for 25.85%; 351 people working as perennial migrant workers,
accounting for 9.68% . Village net income is 75.66 million yuan, in which incomes of
migrant workers is 3.62 million yuan and the per capita net income is 8854 yuan.
There are 1281 HHs of 4246 people in 33 villager‘s group of Shangyu village. The total
land area is 4896 mu, of which 2980 mu is cultivated land, and 1916 mu is woodland. A
total of village labor force is 2726 people, in which 963 people engaged in family-run,
accounting for 35.32% of the total workforce, 820people engaged in the primary
industry, accounting for 25.85%; 443 people working as perennial migrant workers,
accounting for 16.25% . Village net income is 49.96 million yuan, in which incomes of
migrant workers is 3.02 milloin yuan and the per capita net income is 8620 yuan.
There are 330 HHs of 1092 people in 9 villager‘s group of Shangyu village. The total
land area is 1026 mu, of which 599 mu is cultivated land, and 427 mu is woodland. A
total of village labor force is 699 people, in which 336 people engaged in family-run,
accounting for 40.62% of the total workforce, 134 people engaged in the primary
industry, accounting for 19.17%; 443 people working as perennial migrant workers,
accounting for 16.25%. Village net income is 11.13 million yuan, in which incomes of
migrant workers is 0.44 milloin yuan and the per capita net income is 8727 yuan.
There are 385 HHs of 265 people in 8 villager‘s group of Shangyu village. The total
land area is 1953 mu, of which 372 mu is cultivated land, and 1581 mu is woodland. A
total of village labor force is 762 people, in which 227 people engaged in family-run,
accounting for 29.79% of the total workforce, 194 people engaged in the primary
industry, accounting for 25.45%; 55 people working as perennial migrant workers,
accounting for 7.21%. Village net income is 12.35 million yuan, in which incomes of
migrant workers is 0.71 milloin yuan and the per capita net income is 8506 yuan.
The socio-economic conditions of affected villages are shown in Table3-11.
    Table 3-11 The Socio-economic Conditions of Affected Villages in Tonglu
                   Index                        Zhaixi     Jinjiang       Hengshanbu       Shuchuan
                 Total HHs(household)               2256    1281             330             385
              Total Population (people)             6852    4246             1092            1265
Population
                       In which:
                          Male                      6852    4246             1092            1265
             agricultural population(people)         /        /               /               /
                 Labour force (people)              3624    2726             699             762

 Labour                In which:
  force      family management(people)              1205     963             336             227
               migrant workers(people)              351      443             134              55
                   Total area(mu)                   5009    4896             1026            1953
  Land
                                    (mu)
             In which : Farmland area   )           3719    2980             599             372
                                               50
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

                    Garden(mu)                    /        /            /               /
                   Woodland(mu)                  1290    1916          427             1581
                 Water surface(mu)                /        /            /               /
                   Other land(mu)                 /        /            /               /
   Net
 income     net income per peasant(yuan)         8854    8620         8727             8506



In summary, the net income per capita of farmers ranging between 4500-22000 yuan
and mostly concentrated in the 6000-8000 yuan in the project area with developed
non-agricultural industries. Since per capita arable land area is less, the agricultural
income only accounts for very small part of income and land acquisition had little effect
on the income of the farmers. Accounding to the sample survey, only 23% villagers
disagree with the project construction, but most of them worried about the quality of
construction instead of land acquisition. They feared that the quality of the construction
could not meet the design requirements and had bad influence on the environment.
Surveys shew that young people (20-40 years old) mostly approved of the project for
the project can bring more employment opportunities. Most of the respondents hoped
that the Government can provide more professional skills training. Project construction
sites and industrial parks are mostly located in towns and industrial parks which have
more non-agricultural employment opportunities. Therefore, the local government
should actively provide more guidance and help to the villagers so that more
non-agricultural labor forces are able to have jobs and steady income. At the same
time, most project areas have characteristic and competitive industries, such as
planting strawberries which can bring higher income. So it is recommended that the
local government should offer technology, capital and sales assistance to affected
villagers to increase their income.
Pan’an Shenze Environment Management Project
Shenyi village had six groups of villagers with 334 HHs of 864 people, including 550
workers. The area of cultivated land in the village was 154.37 mu and the forest area
was 838 mu. The village's per capita income was 4,699 yuan by the end of 2009.
Shen‘er village had six groups of villagers with 242 HHs of 711 people, including 442
workers. The area of cultivated land in the village was 169.90 mu and the forest area
was 1299 mu. The village's per capita income was 4,510 yuan by the end of 2009.
Luojia village had four groups of villagers with 130 HHs of 338 people, including 222
workers. The area of cultivated land in the village was 117.11 mu and the forest area
was 1033 mu. The village's per capita income was 5,144 yuan by the end of 2009.
Jingou village had four groups of villagers with 216 HHs of 562 people, including 350
workers. The area of cultivated land in the village was 151.7 mu and the forest area
was 237 mu. The village's per capita income was 4,993 yuan by the end of 2009.
Shanghengtang village had seven groups of villagers with 246 HHs of 658 people,
including 426 workers. The area of cultivated land in the village was 56.47 mu and the
forest area was 650 mu. The village's per capita income was 5,081 yuan by the end of
2009.
Several adiministration villages involved Shenze project located in the rural-urban
fringe of new urban areas in Pan‘an County. With the construction and development of
new urban areas, most arable land in those villages was acquired. The majority of
eligible land-lost farmers participated in social security, and people who meet the
minimal needs conditions could also apply for minimum living security. As the location
is near downtown, there are numerous employment opportunities. Therefore, for many
                                            51
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

years farmers go out of town for work besides will be engaged in agricultural
production. According to the survey, the majority of income per capita is sourced from
non-agricultural production, and through interviews, farmers generally want their land
to be leveled. Although the subject levies the arable land of affected village, the impact
on income per capita of farmers is very small.




                                            52
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

                      4 Legal Framework and Policy
In order to finish the land acquisition and house demolition as well as resettlement
work of Qiantang Basin Environmental Comprehensive Treatment Project
Resettlement Action Plan Funded By World Bank, to protect the legitimate rights and
interests of APs and institutes and ensure the smooth implementation of the project,
policies of this project is formulated according to laws and regulations on land
acquisition and house demolition of The People's Republic of China, government of
Zhejiang Province and its cities and the Involuntary Resettlement Policy OP4.12 of
World Bank.
The implementation of resettlement work in this project will be developed in strict
accordance with the relevant policies of Resettlement Action Plan, and if there were
some changes in the implementation process, it would be required according to the
consent of World Bank.
4.1 Policy Framework and Their Main Clauses
    The details of policy framework of this project are in Table 4-1.




                                             53
                                   Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


                                                   Table 4-1 References of Policy Framework
                                                                        Policies                                                       Effective Date
                 The Land Administration Law of P.R.C.                                                                                   2004-8-28
                 The Implementation Regulations on the P.R.C Land Administration Law(SC No.256)                                         1998-12-27
                 The Notice on the Further Reformation of the Land Administration by the State Council (GF[2004] No.28)                 2004-10-21
    Nation       Guidelines on Improving the Institutions for Compensation and Resettlement of Land Acquisition (MLR [2004]No.238,
                                                                                                                                        2004-11-3
                 November 3, 2004)
                 The Notice on the strengthening of the related issues of   Land control by the State Council (GF [2006] No.31)         2006-8-31
                 Regulations on Urban House Demolition(SD NO.305)                                                                       2001-11-1

                 The Implementation of ― The Land Administration Law of P.R.C.‖ in Zhejiang Provence                                     2000-6-1
                 Regulations on Urban House Demolition of Zhejiang Provence                                                             2007-3-29
                 ―Zhejiang urban road management practices‖(Zhejiang People's Government No. 145)                                       2002-10-1
                 The Notice on relevant issues of Road occupation of urban roads, and excavation fees (JPF[2007]NO.136)                  2007-6-1
                 The Notice on Zhejiang restoration costs of urban road excavation ZCU[1993] NO.410                                     1993-11-1
                 ―Approach of land reclamation in Zhejiang Province‖(Zhejiang People's Government NO.33)                                 1993-6-9

   Zhejiang      ―Zhejiang urban state-owned land use right transfer and the transfer of implementation methods‖(Zhejiang People's
   province                                                                                                                             1992-3-12
                 Government NO.33)

                 Zhejiang People's Government's opinions on the establishment of urban and rural social pension insurance scheme         2010-1-1
                 (ZG [2009] NO.62)


                 Approach of compensation and the basic livelihood guarantee for farmers in Zhejiang whose land is requisitioned         2010-1-1
                 (Zhejiang People's Government NO.264)


                 The Notice on regulations residential housing demolition, compensation and resettlement of collective-owned land in
Longyou county
                 Longyou Economic Development Zone(LG[2004]NO.37



                                                                            54
                                   Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


                                                                       Policies                                                           Effective Date

                 Notice of Opinions on the Implementation of the participation of the basic livelihood guarantee by farmers in Longyou
                 County whose land is requisitioned (LG[2005]NO.68)
                 Longyou County People's Government of the Office of the issuance of "regional film Longyou comprehensive
                 compensation levy to implement the views of notice" (Long ZF〔2009〕NO.44)
                 "Operation advice on further improve the Longyou County farmers whose land is requisitioned the views of the basic
                 livelihood guarantee system for notification" (Long ZF [2008] NO.128),
                 " Operation advice on further improve the Longyou County farmers whose land is requisitioned the views of the basic
                                                                                                                                            2008-6-16
                 livelihood guarantee system for notification" (Long ZF [2008] NO.128),

                 "Quzhou Municipal People's Government on the reorientation of the urban areas tablets comprehensive compensation
                 levy a standard notice" (Qu ZF 〔2009〕NO.34)
    Quzhou
                 Quzhou Quzhou Municipal People's Government on the issuance of demolition of urban housing collective-owned land
                 acquisition compensation and resettlement Interim Provisions of the notice "( Qu ZF〔2002〕NO. 68 )

                 "The implementation of Pan County Area Planning Area land requisition compensation film integrated price notification"
                                                                                                                                           2003-12-10
                 (Pan ZF [2003] No. 147)
 Pan‘an county
                 "Adjustment of urban road Panan road occupation, excavation fees related issues notice" (Pan County Development
                                                                                                                                            2008-8-1
                 and Reform Bureau)

                 "Jiande City, East New District acquisition collectively owned land and housing demolition resettlement Interim
                                                                                                                                            2006-9-1
                 Provisions"
                 "Notice on the disclosure of Jiande City, comprehensive compensation standard of land aquisation " (JZ letter (2009)
                                                                                                                                            2009-3-27
    Jiande       29)
                 "Adjustment of Jiande City, housing assistance for needy people in rural areas the standard notice" (JZ letter [2009]
                                                                                                                                            2007-4-20
                 No. 102)
                 Jiande City Farmers whose land is requisitioned Rules for the Implementation of basic old-age security"                    2009-7-30

                 Zhuji City People's Government on the issuance of the notice required under the collective-owned land acquisition
                 The views of Zhuji Municipal People's Government on improving the endowment insurance system for farmers whose
     Zhuji       land is requisitioned
                 Zhuji City, Zhuji City People's Government on the issuance of the notice required under the minimum livelihood
                 guarantee system for Zhuji City urban and rural residents Implementation Measures

                                                                          55
                                     Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


                                                                          Policies                                                        Effective Date
                   Zhuji City, Zhuji City People's Government office on the issuance of the notice required under Zhuji City pension
                   insurance the farmers whose land is requisitioned the implementation details
                   Zhuji City, Zhuji City People's Government office on the issuance of the notice required under the implementation of
                   pension insurance will cover all the farmers whose land is requisitioned
                   The views of Zhuji Municipal People's Government on a new social assistance system to further improve

                   The notice of Jinhua Wucheng District People's Government of the Office on the issuance of land requisition
Wucheng district                                                                                                                            2009-4-20
                   compensation standards

                   The notice of Lanxi Municipal People's Government the Office of the issuance of "land acquisition compensation and
                                                                                                                                            2003-8-1
                   resettlement Lanxi Interim Measures"
     Lanxi
                   The Regulations on the collective-owned land compensation and resettlement Provisional house demolition in Lanxi
                                                                                                                                            2005-11-7
                   City

                   the notice with regard to the issuance of "whose land is requisitioned Tonglu Implementation Measures of basic
                   old-age security,"
                   (Tong ZF [2005] No. 49)
                   " The notice of Tonglu County People's Government on the disclosure of Tonglu updated results of the benchmark
                   premium "
 Tonglu county
                   (Tong ZF [2008] No. 79)
                   The notice of Tonglu County People's Government on adjustment of regional film Tonglu sign a comprehensive price
                   (Tong ZF [2009] No. 64)
                   The notice with regard to the issuance of "expropriation of collectively owned land Tonglu Implementation Measures"
                   (Tong ZF [2001] No. 76)

                                                                                                                                            2002-1-1
                   OP/BP4.12
  World Bank




                                                                            56
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


To this project, " The Land Administration Law of P.R.C." is the principal policy for this
project, Ministry of Land Resources, Zhejiang Province and the affected cities and
counties have also enacted the corresponding requirements and policy documents that
is listed in Table 4-1. The main provisions of relevant resettlement policy are shown in
Table 4-2.




                                            57
                                     Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


                                            Table 4-2 Main Provisions of Relevant Resettlement Policy

        Content                                                         Descriptions of provision                                                       Index
                           The needs of the public interest, in accordance with the law of the powers and procedures of
                           collective-owned land may be levied and units, individual housing and other real estate.
                           Imposed collectively owned land, shall be paid in full accordance with the law of land compensation fees,
                           resettlement subsidies, fees, ground attachments and standing crops standing crops compensation fees,
                           costs, arrangements for the farmers whose land is requisitioned the cost of social security to protect the
                           lives of the farmers whose land is requisitioned, safeguarding the farmers whose land is requisitioned
                           legitimate rights and interests.                                                                                     "Property Law"
                           Collection units, individual housing and other real estate, relocation compensation shall be given according         section of Article
                           to law, safeguard the legitimate rights and interests of expropriation ; imposition of a personal residence          42,43
1 Change of ownership
                           should also be imposed to protect people's living conditions.
                           No unit or individual shall not be corruption, embezzlement, embezzle, retain, and compensate for arrears
                           collection fees and so on.
                           Of arable land under special state protection, strictly limited agricultural land into construction land , control
                           the total land for construction. Shall not violate the law of the authority and procedures for collection of land
                           collectively owned.
                           National law system carry the Requirement of paid use of state-owned land exception of state-owned land              ―The Land
                           use right which the state within the limits prescribed by law allocated                                              Administration Law
                                                                                                                                                of P.R.C.‖Article 2
                                Actual construction projects required to determine overall land use planning of urban construction land
                           within the state-owned construction land, according to the following procedure:
                           (1) When demonstrate construction project feasibility study, construction project sites to review matters
                                                                                                                                                ―The
                           related to proposed construction projects by the land administrative departments, then put forward land use
                                                                                                                                                Implementation
                           pre-trial report; feasibility study report for approval must be accompanied by the land administrative
                                                                                                                                                Regulations on the
                           departments of land for construction projects issu ed by pre-trial report.
                                                                                                                                                P.R.C Land
                           (2) The construction unit holders of unit construction project approval documents related to the city and
                                                                                                                                                Administration
                           county people's government land administrative department of land for construction application, from the
2 Handling procedures                                                                                                                           Law‖Article 22
                           city and county people's government department in charge of land administration, land available for
for land use of
                           development programs, reported that the city and county people's government for approval ; be higher
construction projects
                           people's approval, should be reported to higher level government for approval .
                           (3) After the program for approval, city and county people's government awarded land to the construction
                           unit of ratification. ... ... Allocate the use of state -owned land; the municipal or county people's government
                           land administration departments to t he land users in the subjective state -owned land allocation issued a
                           written decision.
                           (4) Land users should apply for land registration in accordance with law.
                           Actual construction projects required to determine the overall planning of land use of state -owned unused
                           land, and permission to apply for examination and approval according to the following:


                                                                                58
                                       Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank



         Content                                                              Descriptions of provision                                                               Index
                            Less than one hectare,the county administrative domain, the county government for approval ;
                            administrative area in the city area, the city divided into distri cts by the government for approval.
                            land use right transfer is approved by the people's governments above the county level according to the
                            law, After the land users to pay compensation, placement fee, the piece of land to deliver its use, or the                        ―Urban Real Estate
3 Land use right transfer   delivery of land use right without compensation to the land -users behavior.                                                      Management
                            In accordance with this provision in order to obtain land use right transfe r, in addition to laws and                            Law‖Article 22
                            administrative regulations as otherwise provided, there is no lifetime limit .
                            Urban infrastructure and public welfare land land land -use rights which are indeed necessary could be
                                                                                                                                                              ―Urban Real Estate
                            approved to the allocation by the people's governments above the county level according to the law.
                                                                                                                                                              Management
4 basis of Land use right   Line directory of land for construction projects, by the construction unit to apply the right of approval by the
                                                                                                                                                              Law‖Article 23
transfer in this project    People's Government with the approval of party may provide the land use right transfer, ... ... (C) urban
                                                                                                                                                              ―catalog of
                            infrastructure land ... ... 5. Sanitation facilities: including rainwater treatment facilities, waste-water
                                                                                                                                                              transferred land‖
                            treatment plants, garbage (waste) dis posal facilities, and other sanitation facilities.
                            For the public interest so requires, the use of land by the relevant government departme nt in charge of land                     ―The Land
5 recover the right of
                            administration reported to the site of the original approval of the People's Government or have the right of                      Administration Law
state-owned land
                            approval of the government for approval, you can recover the state -owned land use right.                                         of P.R.C‖Article 58
                            Levied farmers collectively owned land, it should be paid in full accordance with the law of land compensation fees,
                            resettlement subsidies, fees, ground attachments and standing crops standing crops compensation fees and so on
                            (hereinafter collectively referred to as land acquisition compensation fee), Arrangements for social security of farmers
                            whose land costs, to protect the basic livelihood of farmers whose land is to safeguard the legitimate rights and interests
                            of farmers whose land is requisitioned. Farmers whose land is requisitioned in accordance with the provisions
                            participating in the basic livelihood protection, and their basic livelihood guarantee the gold standard should be no less
                            than the local minimum living standard for urban residents. Security funds and the risk of social security should be              ―The compensation of
                            extracted from the reserve is not implemented, shall not authorize land acquisition. The city and county people's                 land acquisitions and
6 aquisation                government should be approved by the financial department of human resources and social security departments                      basic living insurance
compensation and            should provide the basic subsistence farmers whose land is requisitioned shall plan to use on a regular basis will                for farmers who lose
guarantee the Basic         guarantee the basic livelihood of farmers whose land is requisitioned funds assigned to the basic livelihood of farmers           their land in Zhejiang
subsistence of farmers      whose land is requisitioned household expenditure on social security to ensure that farmers whose land is requisitioned           Provence‖
whose land is               the basic living security fund timely and in full. Farmers whose land is requisitioned ability to pay the basic living security   relative articles
requisitioned               fund less than 2 months, by the people's governments at risk through the social security payments and timely manner,
                            the reserve to be added to ensure the basic livelihood of farmers whose land is requisitioned the timely and full payment         Execute on January
                            of protection money. Farmers collectively owned land has been levied, in accordance with the amount of land                       1st, 2010
                            expropriation and the corresponding personnel, to determine the objects participating in the basic living guarantee.
                            Under 16 years of age have been distributed to land-lost farmers should get a one-time land compensation fees and
                            resettlement fees, not included in the basic living guarantee. Participated in the basic livelihood guarantee for the
                            farmers whose land is requisitioned, since women are 55 years of age, men over 60 years old next month, the monthly
                            payment to receive the basic living guarantee. Participated in the basic livelihood guarantee for the farmers whose land
                            is requisitioned by the employment after training failed to employment, livelihood is indeed difficult, and their city or


                                                                                      59
                                      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank



        Content                                                            Descriptions of provision                                                           Index
                           county governments shall provide certain standards of living subsidies. The standard of living subsidy, paid release time
                           as well as specific measures, the municipal and county governments to develop. City, county and provincial people's
                           government should be in accordance with the relevant provisions of the State will comply with the conditions of farmers
                           whose land is included in the basic old-age insurance of workers.




                           National implementation of real estate price evaluation system. Real estate appraisal, it should be just, fair
                           and open principles, technical standards in accordance with national regulations and assessment
                           procedures to the benchmark land prices and land demarcation of types of housing replacement cost basis,                     ―The People's
                           taking into account the local market price for evaluation.                                                                   Republic of China
                           Urban Housing Demolition should follow the following procedure: to conduct the demolition project                            Law on Urban Real
7 Assessment               evaluation, and removal to the hou se demolition management department to apply for housing demolition                       Estate
procedures of housing      permits, house demolition management department issued demolition notices have been relocated with the                       Management‖Article
demolition                 demolition man demolition man and the person or persons have been relocated and the H ousing tenant                          33
                           enter into a written demolition compensation and resettlement agreement, in accordance with demolition
                           compensation and resettlement compensation and resettlement agreement, the implementation of housing
                           demolition.
                           The amount of monetary compensation, according to demolition of houses by location, use, construction
                           area and other factors in order to determine the price of the real estate market evaluation.

                           Attached to a variety of urban road-building pipelines, pipes and other facilities, and shall be subject to administrative
                           departments of public works approval from the building.
                           Due to special circumstances require the temporary occupation of urban roads, and shall be subject to administrative
                           departments of public works and public security traffic management department for approval, before occupancy in
                           accordance with regulations. Approved the temporary occupation of urban roads, and not damage to urban roads;
8 The temporary                                                                                                                                         ―Urban Road
                           occupancy after the expiration shall be promptly occupied the site clean-up and restore the status quo ante urban
occupation of urban                                                                                                                                     Management
                           roads; damage to urban roads should be repaired or compensated.
roads                                                                                                                                                   Bill‖Article29,31,33
                           A result of urban road construction projects require the dredging, it shall hold the Town Planning Department for
                           approval to issue documents and related design documents, to the administrative departments of public works and
                           public security traffic management department examination and approval procedures before excavation in accordance
                           with regulations. New, expansion or reconstruction of the urban road delivery after 5 years, overhaul the city three years
                           after completion of the road shall not be mining; due to special circumstances require excavation, and shall be subject
                           to approval of city people's governments above the county level.



                                                                                   60
                                      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank



         Content                                                      Descriptions of provision                                                   Index
                            Who has census registration with the province, over 16 years of age (except full-time school students), and
                            has not participate in basic pension insurance for workers and rural residents, but workers in state organs,
                            institutions, social groups, can enjoy urban and rural social pension insurance in the place where his
                                                                                                                                           ―Zhejiang People's
                            residence is registered. Urban and rural social pension insurance fund mainly consist of individual
                                                                                                                                           Government's
                            contributions, collective grants and government subsidies. Who participate in Urban and rural social
                                                                                                                                           opinions on the
                            pension insurance should be required to pay the pension according to rules. The standard of basic pension
                                                                                                                                           establishment of
9. Urban and rural social   should not be less than 60yuan each person. The monthly pension for the individual account is divided by
                                                                                                                                           urban and rural
pension insurance           the total storage volume 139 (the same with the calculated coefficient of current company basic pens ion
                                                                                                                                           social pension
                            insurance). The monthly pension by payment years is issued by paying the fees section according to the
                                                                                                                                           insurance
                            principle of" longer pay the more get".Now tentatively scheduled for: who pays person less than5 years
                                                                                                                                           scheme‖Relevant
                            (including 5 years), his monthly pension by pa yment years is counted by 1yuan/ year; who pays person
                                                                                                                                           articles.
                            more than 6years and less than10years (including 10 years), his monthly pension by payment years is
                            counted by 2 yuan / year from the 6th year; who pays person more than 11years, his monthly pension by
                            payment years is counted by 3 yuan/ year from the 11th year.




                                                                              61
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

4.2 Major Principles
     Based on this policy framework and the principal terms, the objective of
resettlement policies in this project is to try to avoid the negative impact of land
acquisition and house demolition. The person's property of those who are negatively
affected by the project is compensated in accordance with replacement price and they
will obtain assistance to insure that they have enough opportunities to restore or
exceed the original standard of living. The main principles are as follows:
      Taking measures to minimize the negative impact on APs as far as possible;
      Making sure that the compensation and Resettlement Action Plan can improve
         the living standards of APs, or at least allow them to return to the previous levels;
      Processing serious negotiations with the APs, so that they have the opportunity to
         fully participate in the Resettlement Action Planning and implementation;
      All of the affected property will be compensated according to all the replacement
         cost;
      Trying to take ‗first built and then demolish‘ principle. Prior to the land acquisition
         and house demolition, the Dps should obtain full compensation for their loss,
         which means the acquisition of land or related property can be carried out only
         after the payment of compensation or the provision of resettlement sites and
         relocation subsidies;
      The borrowers are responsible for raising the compensation for resettlement,
         including the resettlement of unforeseen costs;
      Identification the status for APs. The time standard of APs‘ qualification is based
         on the date of issue of LA$HD announcement. After this date, APs‘ can not build,
         expand, renovate their houses; they can not change the use of housing and land;
         they can not lease land or leasing and sale their housing. And the people who
         come into this area after this date do not have the eligible for resettlement
         compensation;
      Housing compensation fees is in accordance with housing assessing price, and if
         the standard of the housing assessing price is lower than that of Resettlement
         Action Planning report , the price will be execute according to Resettlement Action
         Planning.
4.3 Summary of Resettlement policies in this Project
4.3.1    Policy of Collective-owned Land Compensation and Labor
        Settle
The principles of project land acquisition compensation and resettlement
compensation, compensation standards, land acquisition procedures and monitoring
mechanisms are mainly based on " The Land Administration Law of P.R.C.", " The
Notice on the Further Reformation of the Land Administration by the State Council
(GF[2004] No.28), " Guidelines on Improving the Institutions for Compensation and
Resettlement of Land Acquisition (MLR [2004]No.238, November 3, 2004), ―The
Implementation Regulations on the P.R.C Land Administration Law in Zhejiang
Province‖ , " Zhejiang People's Government's opinions on the establishment of urban
and rural social pension insurance scheme" (ZG [2009] NO.62), "Approach of
compensation and the basic livelihood guarantee for farmers in Zhejiang whose land is
requisitioned " (Zhejiang People's Government NO.264) and relevant policies in
various cities and counties.

There are 10 subprojects in the total 13 need to impose the collective-owned land,
involving 7 counties (cities, districts) of Jiande, Longyou,Tonglu, Qujiang, Zhuji, Lanxi,
and Pan‘an and other. The collective-owned land acquisition and labor resettlement
policies of this project are shown in Table 6-5.

                                             62
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

Zhejiang province announced the approach of compensation and the basic livelihood
guarantee for farmers in Zhejiang whose land is requisitioned (Zhejiang People's
Government NO.264) which will be implemented since Jan 1st, 2010.The approach
indicates that the age of farmers whose land is requisitioned to participate in the basic
livelihood guarantee is 16 or more than 16, and men over 60 can enjoy pension and
women is over 55. Because the project countries have not drew up relevant
enforcement regulations, this report temporarily is written according to existing policies
of the project areas, and when implementation it will be implemented by the approval
and relevant enforcement regulations.
Zhejiang People's Government's opinion on the establishment of urban and rural social
pension insurance scheme (ZG [2009] NO.62) was announced in 2009. Who has
census registration with the province, over 16 years of age (except full-time school
students), and has not participate in basic pension insurance for workers and rural
residents, but workers in state organs, institutions, social groups, can enjoy urban and
rural social pension insurance in the place where his residence is registered. The
condition for enjoying urban and rural residents social pension insurance conditions is
that one who has census registration and whose age is over 60 has not enjoy
treatment for retirees of the state organs, institutions and social groups, and the
treatment of basic pension. The opinion is implemented since 1st, Jan, 2010. Because
the project countries have not drew up relevant enforcement regulations, this report
temporarily is written according to existing policies of the project areas, and when
implementation it will be implemented by the opinion and relevant enforcement
regulations.
"Opinions" also provides that after the implementation of urban and rural residents
social pension insurance system, who takes part in the urban and rural residents social
pension insurance is eligible to participate in the basic livelihood guarantee for farmers
whose land is requisitioned, he can also participate in the basic livelihood guarantee.
After the implementation of urban and rural residents social pension insurance system,
who takes part in the basic livelihood guarantee for farmers in whose land is
requisitioned wanted to participate in urban and rural residents social pension
insurance, his individual funds and socially pooled funds of the basic livelihood
guarantee should be added to individual funds of urban and rural residents social
pension insurance, and his payment years will be calculated by the local average
payment of urban and rural residents social pension insurance that year, he will enjoy
the treatment for social pension insurance.
The combination of urban and rural social pension insurance in Zhejiang Province and
other security system:
1. Combination with old rural social pension insurance. when implementation of urban
and rural social pension insurance, all who takes part in old rural social pension
insurance and has got pension of old rural social pension insurance when over 60 will
enjoy the basic pension of urban and rural social pension insurance while continuing to
get old rural social pension insurance. Who takes part in old rural social pension
insurance but has not got pension of old rural social pension insurance or whose age
under 60, his individual funds of old rural social pension insurance should be added to
individual funds of urban and rural residents social pension insurance, and his payment
years will be calculated by the local average payment of urban and rural residents
social pension insurance the year it is implemented.
2. Combination with the system of basic old-age insurance for enterprise employees.
After the implementation of urban and rural residents social pension insurance system,
who takes part in the basic old-age insurance for enterprise employees, if he stops
payment due to changes in employment so that he pays less than 15 years, his
relationship of the basic old-age insurance for enterprise employees can be transferred
to the basic pension insurance where his residence is registered. His individual funds
                                            63
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

of the basic old-age insurance for enterprise employees should be added to individual
funds of urban and rural residents‘ social pension insurance, and his payment years
will be calculated by the local average payment of urban and rural residents social
pension insurance that year, he will enjoy the treatment for social pension insurance.
After the implementation of urban and rural residents social pension insurance system,
who takes part in urban and rural residents social pension insurance and the basic
old-age insurance for enterprise employees because of employment, when his
relationship of pension insurance is transferred, his payment years for individual funds
of the rural residents social pension insurance will be calculated according to policies
of the basic old-age insurance for enterprise employees and he can continue to paying.
When he reaches retirement age, if he meets conditions to receive basic pension
monthly, he will enjoy the treatment for the basic old-age pension insurance. Otherwise,
his individual funds for basic old-age insurance is converted to individual accounts of
urban and rural residents social pension insurance, and his payment years will be
calculated by the local average payment of urban and rural residents social pension
insurance that year, he will enjoy the treatment for social pension insurance.
3. Combination with the basic livelihood guarantee for farmers whose land is
requisitioned .After the implementation of urban and rural residents social pension
insurance system, who takes part in the urban and rural residents social pension
insurance is eligible to participate in the basic livelihood guarantee for farmers whose
land is requisitioned, he can also participate in the basic livelihood guarantee.
After the implementation of urban and rural residents social pension insurance system,
who takes part in the basic livelihood guarantee for farmers in whose land is
requisitioned wanted to participate in urban and rural residents social pension
insurance, his individual funds and socially pooled funds of the basic livelihood
guarantee should be added to individual funds of urban and rural residents social
pension insurance, and his payment years will be calculated by the local average
payment of urban and rural residents social pension insurance that year, he will enjoy
the treatment for social pension insurance.
4. Combination with other guarantees treatment. who conforms to the conditions to join
in urban and rural residents social pension insurance, meanwhile meets the conditions
to enjoy the basic livelihood guarantee for farmers whose land is requisitioned,
Reservoir Resettlement policy, subsistence allowance, family planning incentives,
community special care, rural "five guarantees" and support for of the "three no " staffs
in the towns, streamlining staff and dependents living allowance and other
treatment ,may also enjoy these treatments superimposably.
5. Inter-regional transfer. If one participates in urban and rural social pension insurance
transfers inter-regionally, his relations and personal accounts of urban and rural social
pension insurance will be transferred to new insured place, he can continue to paying
and enjoy the relevant treatment according to policies of new insured place.
If there are new policies for the above regulations, they will be implemented according
to new ones.
4.3.2     Policy of Collective-owned Land Temporary Occupation
There are 10 subprojects in the total 13 need to impose the collective-owned land,
involving 7 counties (cities, districts) of Jiande, Longyou,Tonglu, Qujiang, Zhuji, Lanxi,
and Pan‘an and other.
The counties (cities, districts) involve temporary use of collective-owned land need
approvals of the land administrative departments of local people's governments. Land
users should signed the temporary land occupation contract with land administrative
departments or rural collective economic organizations, and the village committees
basing on land ownership, and pay temporary land occupation compensation in
                                            64
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

accordance with the contract .
The land users should maintain the utility of land in accordance with the temporary land
use contract, and escape the construction of permanent structures. The temporary
land-use institutions are responsible for the restoration of the original land condition
when The term of temporary use of land has expired; and they should take
responsibility of the corresponding economic compensation if the land could not
recover the original condition.
The term for the temporary use of land shall not usually exceed two years.
4.3.3     Policy of State-owned land Permanent Acquisation
Only the WWTP in east district of Jiande is related to the permanent occupation of
state-owned land, which is noncompensatory use of land.
4.3.4     Rural Residental House Demolition and Compensation Policy
The project only involves the compensation of rural house demolition, there are 6
ub-projects in the total 13 require demolition of residential buildings in rural areas,
including 5 areas (municipalities) like Jiande, Longyou, Pan‘an, Tonglu and Qujiang.
A Lanfill subproject in Meicheng of Jiande
The land acquisition and house demolition spot in this project is in the planning area of
Mmu-Nanfeng industrial zone. in accordance with "Jiande City Master Plan" and
"Mame Industrial Function Zone controlled detailed planning", the project plans to build
collective resettlement housing for the APs, and the resettlement housing is located at
(Planning), Wumazhou of meicheng township in Jiande City which is the the
resettlement places for the Wumazhou Industrial Park.
      Compensation and Resettlement policy
The land aquisation and house demolition and resettlement of this project adopt two
forms of monetary settlement and property exchange.
1, monetary settlement
It is a resettlement pattern that the demolished people consult with the demolisher and
the demolished people give up their property rights and obtain monetary compensation
of homes from the demolisher, aparting from resettlement place and the resettlement
housing.
      1) Reassessing the value of the demolished people‘s houses according to the
replacement cost.
      2) Considering the demolisher do not need to provide Housing sites finishing fee,
approval fee, matching fee and other costs if the demolished people choose monetary
compensation and those people could obtain 200 yuan / ㎡ of reward and
compensation according to the legal building area of their houses.
      3) The demolition of non-househouses will adopt monetary settlement.
.2, property exchange resettlement (substitute of building)
It is a resettlement pattern that demolishers offer the resettlement houses for the
demolished people and the compensation is the balance between replacement value
of demolished house and new resettlement house.
      1) The major of buildings are multi-storey apartment and terrace which are built by
the local government in accordance with unified planning, unified design, unified
construction, unified supporting, unified resettlement.
      2) The APs can choose apartment building or terrace. The hereditary house
property of non-agricultural residents has the only choice of resettlement apartment
buildings.
      3) The space area of the resettlement house is equal with the legal built-up area
and the balance between resettlement built-up area and regional built-area in
compensated with current money. The Modes of Settlement are as follows:

                                            65
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

     (1) To guide and encourage resettlement apartment buildings. People who choose
apartment building placement can enjoy a favourable price of 450 yuan / ㎡ if the area
of their resettlement houses in small than the demolition area; if not, the balance is
counted by the cost price and maximum extra area is 50 ㎡.
     (2) People who choose terrace, the price of resettlement house is 550 / ㎡ if the
area of their resettlement houses in small than the demolition area; if not, the balance
is counted by the cost price.
       Financial Aid Policy
     (1) The APs are resibansible for their transition and they can enjor the temporary
transition costs giving by the demolishers
     (2) The standard of transition fee: 100 yuan per person per month according to the
registed population of residence booklet .
     (3) The transitional period: people who choose monetary settlement obtain an
one-time temporary transitional costs for three month. People who choose property
rights exchange resettlement obtain transitional costs for three month begining with
replacement of regional house to the delivery of new house.
     (4) The standard of moving subsidy: 200 yuan per person per month according to
the registed population of residence booklet (only one person is count as two person),
and the people who need temporary transitional costs can obtain moving subsidy
twice.
B WWTP in the east district of Jiande
       Resettlement Policy
This project adopts monetary settlement, property rights exchange resettlement or
relocation resettlement, and APs can only select one type. The APs will also receive
moving subsidies, temporary excessive fees, and incentive fees. The APs could select
resettlement method according to their economic situation and individual needs.
1, monetary settlement
It is a resettlement that the demolied people obtain for monetary compensation
according the refers to the replacement value of their house and solve the rehousing
resettlement by themslves
     (1) Rural residential housing: People who select the monetary settlement can
receive compensation for homsteads and housing replacement costs:
     1)The price combined with replacement costs to form a new compensation value ;
     2)The compensation for on the demolition of coverage area of demolished house
in based on cultivated land compensation standards.
     (2) Non-residential buildings: Adopting monetary settlement in principle.
2, Relocation resettlement
It is a resettlement that the demolished people obtain monetary compensation based
on replacement costs of the demolition house and construct new houses in the
specified location by themselves according to the relevant process.
      (1) Adopting the principles of unified planning, unified design, unified package and
uniform regulation.
      (2) The area of housing sitess in based on the resettlement population and is
devided into three standards:
                       -3 person has a housing housing sites of no more than 90 ㎡;
                       -5 person has a housing housing sites of no more than 110 m;
                   th 6 or more person has a housing housing sites of no more than 120
㎡.
      (3) The local town governments and demolishers are responsible for the planning
of resettlement area and placement facilities.
      (4) The compensation standards refer to the cultivated land compensation when
                                            66
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

the area of demolished house is not equal with the that of the new house.
3, property rights exchange resettlement
It is a resettlement pattern that demolishers offer the resettlement houses for the
demolished people and the compensation is the balance between replacement value
of demolished house and new resettlement house.
     (1) Adopting the principles of unified planning, unified design, unified package and
uniform regulation.
     (2) The residential area is generally not less than the legal building area of
demolition houses.
     (3) If the area of resettlement house exceeds that of the original house, the extra
area is calculated with market price and the balance is paid by money to the rights and
benefits people.
     (4) The vulnerable groups like disabled and poor people who could not pay the
price differences of houses can obtain assistance in accordance with special
resettlement policies for them.
       Financial Aid Policy
    (1) Moving subsidy fee: 200 yuan / person and is the family has one peoson,
he/she can obtain double subsidy fees.
     (2) Temporary transitional subsidy costs: The transition period of relocation
resettlement is 6 months after delivery of the foundation; the subsidy costs of property
rights exchange resettlement is paid until the delivery of resettlement house and
double if over the transitional period; the transition period of monetary resettlement is 3
month and its standard is 80 yuan / person • months.
C WWTP and supported pipeline network project(SPNP) in the east district of
Quzhou
       Compensation and Resettlement Policy

This project adopts relocation resettlement. The village will give one whose house is
demolished a housing site from the collective construction land reserved .He can build
house according to planning requirements after getting compensation for demolition.
      Financial Aid Policy

     (1) Moving subsidy fee: 30 yuan each person who has census register
   (2) Temporary transitional subsidy costs: Turnover costs are calculated for 6
months, 40 yuan / person • month, single-person family 50 yuan / person • month
D Waste Water pipeline network project in Jiangnan township of Tonglu county
This project will compensate and resettle according to ―regulations about residential
housing demolition, compensation and resettlement of collective-owned land for the
villages within the city transformation project in Xialun village in the county town of
Tonglu County‖ and ―Tonglu County People‘s Government‘s Notice on standard of base
price for residential housing demolition, compensation and resettlement of
collective-owned land in the county town of Tonglu County‖.
      Compensation and Resettlement policy

This project adopt monetary settlement, property rights exchange resettlement or
relocation resettlement. Property rights exchange resettlement is a resettlement way
that demolishers offer the resettlement houses for the demolished people in the local
planning place, Relocation resettlement is a resettlement that the demolished people
construct new houses in the local residential area by themselves according to plan
after the relevant process. Monetary settlement is a resettlement that the APs get
monetary compensation for their house paid by demolishers and solves the rehousing
                                            67
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

resettlement themselves.
Property rights exchange resettlement: (1) areas and purchase prices depended on
resettlement population: The demolished people will be resettled by the standard of 60
㎡/person, they can buy the apartments with preferential price if they are defined as
resettlement population. Workers in government departments and institutions and
formal staffs of state-owned enterprises directly under state, province or city who do
not enjoy the housing reform policy can buy the apartments with cost price if they meet
the condition to be defined as resettlement population. The areas of departments
resettlement population buy is the basic resettlement area. (2)exchange areas and
purchase prices: The demolished people can buy the area of legitimate housing area
more than the basic resettlement area with integrative cost price, but no more than 30
㎡ per resettlement person.
Relocation resettlement: Resettlement relocation application will be made by the
demolished people and will be reported to land, construction and other departments for
approval after examination and approval by the villages and districtss. The demolished
family whose resettlement population is less than 3 (including 3), the standard of its
housing site area approvable should not be more than 80 ㎡ in the residential land
area. The demolished family whose resettlement population is 4 or 5, the standard of
its housing site area approvable l should not be more than 100 ㎡ in the residential
land area. The demolished family whose resettlement population is more than 6
(including 6), the standard of its housing site area approvable should not be more than
120 ㎡ in the residential land area. The demolished family can build house themselves
according to plan.
      Financial Aid Policy

Moving subsidy fee for demolished family is 500 yuan each person and moving subsidy
fee will be paid again if moving again because of temporary transition. The standard of
transitional subsidy costs for the demolished people solve temporary transitional
houses by themselves is 400yuan/person/month. Whose transition period over the
transition period provided by "Building Demolition Permit" for their own reasons, they
will get 200yuan/person/month since the time when over the transition period. The
demolished people really can not solve temporary transitional houses by themselves,
demolishers will provide them transitional houses by the standard of 20 ㎡/person but
temporary transitional subsidy costs will not be paid. Whose transition period over the
transition period provided by "Building Demolition Permit" for their own reasons, they
will get 200yuan/person/month since the time when over the transition period.
E Waste Water pipeline network project in Shenze Township of Pan’an County
The compensation policy for rural house demolition refers to " Interim Implementation
Ordinance for Demolition and Renovation in Shangchan Village Shenze District" and "
Pan‘an County Youth Motor Project Resettlement Ordinance."
     Compensation, Subsidy and Perineum for Houses and Outbuildings

    (1)Owners of demolished houses and assets will be compensated in cash; specific
amount of compensation will be assessed by real estate appraisal agencies on the
housing construction area, use area, building structure, built year, and decoration
usage.
    (2)The demolished people should solve temporary transitional houses by
themselves. Temporary transitional subsidy costs will be paid at the standard of 10yuan
per area demolished.
   (3)The demolished people moved in the prescribed time-limit will be gave
One-time moving allowance payments at the standard of 10yuan/㎡.

                                            68
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

        Resettlement Methods

1.Foundation Resettlement
The original floor area of demolished houses is 19.5m2 and more, and the resettlement
area does not exceed the limit, in accordance with the following approaches to
resettlement:
    (1)Ballot Resettlement
Terence foundation resettlement (except street outside room) will be implemented
according to the calibration ratio of map, the part more than the resettlement area will
counted according to the calibration price of the land and land premium price should be
paid.
    (2)Internal Tender Resettlement
It will be implemented according to the calibration ratio of plan map, the part more than
the resettlement area will counted according to the tender price of the land and land
premium price should be paid, there is not any other resettlement
2. Monetary settlement
    (1)If the original floor area of demolished houses or the floor area remained after
resettlement is less than 19.5m2, compensation will be paid at 600yuan/m2 and there is
not any other resettlement.
    (2)If the original floor area of demolished houses or the floor area remained after
resettlement is more than 19.5 ㎡, compensation at 600yuan/㎡ and premium at
500yuan/m2 will be paid and there is not any other resettlement.
3. Planar Resettlement
1 ㎡ legally area of the demolished house without the foundation resettlement will be
resettled with 3 ㎡ flat apartment in the new city area but no more than three sets
whose area is about 100m2per household. It is to be resettled specifically in the
following way;
    (1)If the resettlement area within the above provisions, it will be purchased by 700
yuan / m2.
     (2)The part over the proper resettlement area should be purchased by market
price assessed by qualified real estate appraisal agencies.
    (3)After planar resettlement, the sizes of their land use right certificates are
confirmed according to the actual area apportioned; the proportional parts whose
nature are state-owned land will be sold at cost price.; than market price to be part of
the resettlement area of settlement, the parts whose nature are state-owned
transferred land over the proportional resettled area will be sold at market price
   (4)If there is original demolition area remained after planar resettlement, monetary
compensation will be provided.
    (5)If the demolished families are defined as destitute household, their houses
whose area is 36 ㎡ or more will be resettled at 1:1.4 And price difference due to
property rights exchange will not paid each other. The property of resettlement houses
belong to demolished families, but700 yuan/㎡ for the resettlement area will be called
back if the resettlement houses are sold.
F SPNP of WWTP in the north district of Longyou county
This project will adopt policies for demolition according to ―regulations about residential
housing demolition, compensation and resettlement of collective-owned land in
Longyou Economic Development Zone", policies for demolition are described as
                                            69
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

following.
Relocation sites are provided by administrative villages or villages where demolitions
take place; the original housing sites would be recovered by administrative villages or
villages. If resettlement sites are adjusted due to planning factors, administrative
villages or villages would exchange them at the same size with Longyou Economic
Development Zone. Or if it takes up the land expropriated by Longyou Economic
Development Zone, it will be solved according to measures on land acquisition,
compensation and resettlement in Louyou Industrial Development Zone (Long ZF
[2003] NO.10). The housing owners should handle the housing site procedure and
approval procedure for house planning in accordance with relevant
provisions .Relocation land area will be determined by Standards by the planning and
land department. The material of the demolished houses belong to the house owners
who demolished by themselves after getting compensation and resettlement. After
demolition which is eligible by farmers in the limited time, the following subsidies and
premiums will be paid. Moving subsidy fee for demolished family is 100 yuan each
resident person. Temporary transitional subsidy costs is 150 yuan each resident
person. All who sign relocation agreements and demolish house in time in accordance
with government requirements on the demolished families, some premiums will be
gave at the standard by of 20 yuan per m2 of the demolition of houses (except
outbuildings).
4.3.5        The Affected Enterprises Demolition and Compensation Policy
Only Waste Water pipeline network project in Jiangnan Township of Tonglu County has
enterprises demolition. When demolishing non-househouses due to the construction of
municipal facilities, public facilities and utilities, there is no property rights exchange,
compensation in cash will be given at 1.5 times of replacement value of the demolition
houses. When demolishing non-househouses not due to the construction of municipal
facilities, public facilities and utilities, there is no property rights exchange,
compensation in cash will be given at 2 times of replacement value of the demolition
houses. The demolished people would rebuild by themselves if need after getting
compensation according to the above standard, demolishers are irresponsible for
moving subsidy fee, temporary transitional subsidy costs and transitional houses.
If it really needs relocation after demolishing non-househouses due to the construction
of municipal facilities, public facilities and utilities, demolishers can also pay
compensation combined in accordance with replacement price and moving subsidy fee,
demolished people will rebuild themselves. Demolishers will give appropriate economic
subsidies due to cessation of business. Property right also can be exchanged if the
nature of construction projects and source of houses permit. Price difference between
the part whose area equals to the original one and original one will be calculated by
replacement price and the subsidies for the part whose area less than the original one
original one and original one will be 3times of replacement price.
4.3.6        Resettlement policy for vulnerable groups
The APs of this project directly involved vulnerable groups with a total of five HHs of
twelve people, who mainly are disabled, elderly person of no family and guaranteeing
HHs, included a total of the three subprojects in Jiande and Pan‘an.
A Landfill subproject in Meicheng of Jiande
This subproject involves one elderly person of no family (guaranteeing HHs) according
to the survey.
According to related policy of housing assistance for needy people in rural areas of
Jiande City, the new construction area is calculated by the registered population which
is less than 40 m2 for one household and 20 m2 more for additional people, plus the

                                            70
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

maximum area is 100 m2. The area of repaired house refers to the current building
area. carried out according to the existing housing area. The area of replacement or
leasing house refers to the above standrads. The new financial aid is 320 yuan / m;
replacement subsidy is 160 yuan / m relief; repairs subsidy is according the 70% of
actual work, and the maximum is not more than 80 yuan / m2; Among them, The first
aid target who hold "The basic living subsidy claim tags of poverty-stricken disabled
people in Jiande City‖refer to the factor of 1.1. Financing of housing assistance is
based on the budget of cities and towns and is carried out according the method of "a
part from personal, a part from collective , and a part from Government ―. City
Department of Finance set up a special fund which is included in the financial
consolidated budget, and the fund of city, township and village (districts offices) are
taken on by 85% and 15% respectively; collective village can offer fund, materials or
job opportunities according to their own conditions .
B WWTP in the east district of Jiande
This subproject involves four disabled people in one household according to the
survey,.
According to related policy of housing assistance for needy people in rural areas of
Jiande City, the new construction area is calculated by the registered population which
is less than 40 m2 for one household and 20 m2more for additional people, plus the
maximum area is 100 m2. The area of repaired house refers to the current building
area. carried out according to the existing housing area. The area of replacement or
leasing house refers to the above standrads. The new financial aid is 320 yuan / m;
replacement subsidy is 160 yuan / m relief; repairs subsidy is according the 70% of
actual work, and the maximum is not more than 80 yuan / m2; Among them, The first
aid target who hold "The basic living subsidy claim tags of poverty-stricken disabled
people in Jiande City‖refer to the factor of 1.1. Financing of housing assistance is
based on the budget of cities and towns and is carried out according the method of "a
part from personal, a part from collective , and a part from Government ―. City
Department of Finance set up a special fund which is included in the financial
consolidated budget, and the fund of city, township and village (districts offices) are
taken on by 85% and 15% respectively; collective village can offer fund, materials or
job opportunities according to their own conditions .
C Waste Water pipeline network project in Shenze Township of Pan’an County
This subproject involves seven disabled people in three household (guaranteeing HHs)
according to the survey,.
According to " Notice on Provisional Measures of Business loans and interest
subsidies for Low-income farmers printed by Pan‘an People's Government Office
"[Pan‘an GF (2008) NO.47], the villagers who fit the conditions can apply for business
loans, and whose loan amount is less than 20000 yuan (inclusive) can credit loans in
principle; whose loan amount is more than 20000 yuan should provid the joint security
or guarantee. According to " Notice on executive method of medical assistance for
Low-income farmers printed by Pan‘an People's Government Office "[Pan‘an GB (2009)
NO.35], the villagers who fit the conditions and pay 2000 yuan can apply subsidy,
whose payment is between 2001 to 10000 can obtaion 35% subsidy, whose payment is
between 10001 to 20000 can obtaion 40% subsidy, whose payment is between 20001
to 35000 can obtaion 45% subsidy, whose payment is between 35001 to 50000 can
obtaion 50% subsidy, above 50000 yuan can obtain 60% subsidy. According to " Notice
On the improvement of minimum living standard " [Pan‘an M (2009)NO.52], the
minimum living standards of rural residents increased from original 150 yuan to 165
yuan which is determined based on four categories: the first is 165 yuan, the second is
130 yuan, the third is 80 yuan, and the fourth is 60.


                                            71
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

4.3.7     Special Facilities and Ground Attachments
All special facilities affected by the project will be reconstructed based on the
requirements of ―original function, original scale, and the original standard ". The
project implementation agencies will compensate the facilites or included the money in
the Project budget consulting with professional project authorities.
The compensation of ground attachments will be directly given to the owners in
accordance with the standards of replacement price.




                                            72
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

                              5 Compensation Standard
    The compensation standard is decided according to above legal framework and
actual conditions in the affected municipalities of Jejiang Province1.
5.1 Compensation Standard for Rural Collective-owned Land Acquisition
According to Land Administration Law of P.R.C, and Improve the land requisition
compensation and resettlement on the guidance system, combining with The
Implementation Regulations of Zhejiang Province on the P.R.C Land Administration
Law and related policies and regulations of the affected cities, land acquisition
compensation include land compensation fees, resettlement subsidy and standing
crops standing crops compensation fee. In addition, the permanent acquisition of
rural collective-owned land needs to be paid the associated costs in accordance with
regulations. The eight sub-items of the project with rural collective-owned land
acquisition involve 13 district offices and communities of 7 towns / villages 6 counties
(cities, districts) including Jiande, Qujiang, Tonglu, Zhuji, Lanxi, and Pan‘an.
The details of compensation standards of rural collective-owned land acquisition are
shown in the Table 5-1.
      Table 5-1Compensation Standards of Rural Collective-owned Land Acquisition
                                                                                 Unit:10,000 yuan/mu
                                            Qujia                     Zhu                   Pan‘     Long
                                  Jiande                 Tonglu                 Lanxi
                                             ng                        ji                    an       you
          Type            Grad       Grad   Grad     Grad    Grad     gra     gra    gra    Gra      Grad
                           e          e       e       e       e       de      de     de      de        e
                           5          3       4       3       5        5       3      4       3        4
1. land
    compensation
    feesof rural
    collective-owned
    land acquisition
1.1
comprehensive com
pensation
                                                     4.11                     3.8
       Paddy field          3.1      4.6     4.2                3     3.3            3.5      3        3
                                                       3                       5
                                                     4.11                     3.8
        Dry land            3.1      4.6     4.2                3     3.3            3.5      3        3
                                                       3                       5
                                                     4.11                     3.8
     Vegetable field                         4.2                3     3.3            3.5      3        3
                                                       3                       5
                                                     4.11                     3.8
        Orchard                      2.2     4.2                3     3.3            3.5      3       1.8
                                                       3                       5
                                                                      1.6     1.9    1.7
       Woodland             1.2      1.2              1.5     1.5                            1.5      1.5
                                                                       5      25      5
     Irrigation land                         4.2                      3.3                     3        3



1
    Assessment price is defined as the market price of Real Estate according to the location, use,
construction area and other factors of the demolition house to determine the amount of monetary
compensation. Assessment price of demolition house has been the market price of real estate, and is
assessed by real estate appraisal agencies with qualified. In the demolition process, if the price is higher
than the compensation standard proposed by this report, the assessment price will be taken.


                                                    73
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

                                        Qujia                   Zhu               Pan‘   Long
                              Jiande                 Tonglu             Lanxi
                                         ng                      ji                an     you
       Type            Grad      Grad   Grad    Grad     Grad   gra   gra   gra   Gra    Grad
                        e         e       e      e        e     de    de    de     de      e
                        5         3       4      3        5      5     3     4      3      4
                                                                1.6   1.9   1.7
    Unused land                                  1.5     1.5                      1.5    1.5
                                                                 5    25     5
        other                                                   3.3                3      3
1.2 Standing crops
compensation
                                                                      0.7
    Paddy field         0.1      0.1            1.54     1.54                     0.2    0.1
                                                                       5
                                                                      0.7
      Dry land          0.1      0.1            1.54     1.54                     0.2    0.1
                                                                       5
   Vegetable field      0.3      0.3             0.3     0.3          0.2   0.2   0.2    0.1
                                                                      0.2   0.2
      Orchard           0.4      0.4             0.4     0.4                      0.2
                                                                       5     5
                                                                      0.1   0.1
     Woodland           0.2      0.2             0.2     0.2
                                                                       6     6
   Irrigation land
    Unused land
        other                                                                     0.2
                          Asse Asse            Asse Asse
  Perciou cash crop        ss     ss            ss      ss
                          ment ment            ment ment
Instruction: comprehensive compensation standards for land acquisition of Jiande includes land
compensation fees, resettlement fees (including self-employment costs); area-chip
comprehensive standard of compensation of Qujiang include land compensation fees,
resettlement subsidy, standing crops standing crops and ground attachments compensation
(including fruit trees compensation fee); comprehensive compensation standards for land
acquisition of Tonglu include land compensation fees, resettlement subsidies; comprehensive
compensation standards for land acquisition of Lanxi includes land compensation fees and
resettlement subsidies; comprehensive compensation standards for land acquisition of Pan‘an
includes land compensation fees, resettlement compensation fees (including self-employment
fee)


5.2 Compensation Standard for TLO of Collective-owned Land
The temporary use of collective-owned land is approved by local land
administration of people's governments. Land users should sign a contract for
temporary land occupation with rural collectives and the village committee, plus pay
compensation in accordance with the contract.
The users of temporary land shall use the land in accordance with the contract and
escape any construction of permanent structures. The institutes and individuals who
have used the land should be responsible for restoring the original conditions and bear
the responsibility of the corresponding economic compensation for the unrecoverable
land.
Duration of TLO is generally not exceeded two years.
5.3 Compensation Standard for PLA of state-owned land
The PLA of the project is 1.35 mu using by WWTP of Jiande, in which the land is
transferred for free.
5.4 Compensation Standard for Rural House Demolition
The affected area of rural house demolition involves six subprojects, including WWTP
of Jande, WWTP of Quzhou, landfill project of Jiande Meicheng, WWTP of Tonglu
                                                74
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

Jiangnan, Longyou subproject and Pan‘an Shenze subproject in five counties (districts,
cities) of Jiande, Qujiang, Longyou, Pan‘an andTonglu.
The rural house demolition compensation of this project is calculated based on housing
construction area, including house demolition compensation payments, decoration
compensation payments, moving costs, transition costs and incentive fees for move
ahead, and attachments compensation fees.
According to "Implementation details of land acquisition and house demolition
compensation and resettlement of collective-owned land in Jiande City Mame -
Nanfeng tech Industrial Park ", "The notice on Issuance " Interim Provisions of land
acquisition and house demolition compensation and resettlement of collective-owned
land in east New District " (Jianzheng [2005] 60 No.), " Interim Provisions of
Compensation and resettlement for urban collective-owned land Housing demolition in
Quzhou by Quzhou Municipal People's Government on Quzhou " (Quzhou governance
〔2002〕 68), " Compensation and Resettlement Regulation for Residential Housing
on Collective-owned Land in the Economic Development Zone of Longyou ", and "
Resettlement Measures forPan youth Automobile Co., Ltd. Of Pan‘an " and so on,
developing the standard of compensation.Refering to " compensation and resettlement
implementation plan for Residential Housing on Collective-owned Land in‖ village in
the city‖ transform project of Xialun Village of Tonglu county " and " notice on basic
assessment price for Residential Housing demolition on Collective-owned Land of
Tonglu county announced by People of the Office of Tonglu"
and other local regulations, this project has formulated the compensation standard of
rural residential housing demolition. Details are in table 5-2.




                                            75
                                      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


                                    Table 5-2 Compensation Standard for Rural Residential House Demolition
Item          Building structures              Compensation             Remarks
                                                               2
                                               standard (yuan/m )

              The first level of Brick and                              Better Alloy doors and windows; good plaster walls; external wall tiled with face
                                                         550
              Concrete                                                  bricks; terrazzo floor; water, electronic and bathing facilitites are all in readiness.

              The second level of Brick and                             Common: Alloy doors and windows; good plaster walls; terrazzo floor; water,
                                                         480
              Concrete                                                  electronic and bathing facilities are all in readiness.

              The third level of Brick and                              Inferior: steel and wood doors and windows; internal and external walls with
                                                         400
              Concrete                                                  plaster ; concrete floor; and bathing facilities are all in readiness.

                                                                        Better: Good wood doors and windows; lath ceiling, better internal and external
              The first level of brick and
Landfill                                                 400            plastering walls; common floor; water, electronic and bathing facilities are set up by
              wood
                                                                        blocks (layer)
Subproject
              The second level of brick and                             Common: General wood doors and windows; lath ceiling, general internal and
                                                         350
Of            wood                                                      external plastering walls; wood floor; electricity, water is set by blocks (layer)

Jiande        The third level of brick and                              Inferior: Poor brick-wood structure; poor old wooden doors and windows; poor
                                                         300
              wood                                                      internal and external plastering walls; wood floor; Electric

              The first level of earth and                              Better Wooden doors and windows, mainly earth walls, better internal and external
                                                         280
              wood houses: First level                                  plastering walls; concrete floor; electricity, water,

              The second level of earth and                             Common: Wooden doors and windows, earth walls, internal and external plastering
                                                         230
              wood                                                      walls; concrete floor; Electric

                                                                        Simple structure; wood doors and windows; internal and external plastering walls;
              Simple structure                         50-100
                                                                        general ground; Electric

              Other compensation




                                                                           76
                                        Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


Item            Building structures              Compensation              Remarks
                                                                 2
                                                 standard (yuan/m )

                                                                           APs with Monetary resettlement have an one-time payment of transition costs for 3
                                                                           months . the transition period begins with the day APs moving away from the house
                transition costs                 100 yuan/month            until 9 months after the delivery of the foundation. The transition period of Property
                                                                           rights exchange resettlement begins with the day APs moving away from the house
                                                                           until 3 months after Closing date of the house.

                                                                           Counting the population according to the register population of household registers
                                                 200 yuan/person /one
                Moving subsidies                                           (only one person represents two) with 200 yuan per person. Affected HHs which
                                                 time
                                                                           required Moving subsidies will be paid twice.

                Note: The standard price is housing replacement price, without housing sitesthe costs of housing site. If the affected HHs select the currency
                resettlement, they can still receive compensation fees for the housing sites.

WWTP in the     House compensation
east district
of Jiande
                The first level of Brick and
                Concrete                                   450

                The second level of Brick and
                Concrete                                   400

                The first level of brick and                               without Compensation for house plot
                wood                                       350

                The second level of brick and
                wood                                       300

                The first level of earth and
                wood                                       200

                                                           170
                The second level of earth and


                                                                              77
                                     Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


Item          Building structures             Compensation             Remarks
                                                              2
                                              standard (yuan/m )

              wood

              The third level of earth and
              wood                                       80

              attachments compensation

              Cesspool                                  150

              Earth toilet                              200

              Brick toilet                              300

              Wells                                     600

              Cement floor ―10cm                         12

              Cement floor ―10cm                         20

              Brick wall                                 78

              Earth wall                                 30

              Laundry tray                               60

              Fixed-line telephone                      300

              Restore of road surface                   200

              Other compensation




                                                                          78
                                      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


Item          Building structures              Compensation               Remarks
                                                               2
                                               standard (yuan/m )

                                                                          The transition period of demolition and resettlement is 6 months after the delivery of
                                                                          foundation; property rights exchange resettlement is up to the delivery of
              Transition subsidy                          80
                                                                          accommodate room; the subsidy will be double if exceed the transitional period;
                                                                          money resettlement own a one-time temporary transitional fee for 3 months

              Moving subsidy                             200              only one person represents two

              Note: The standard price is housing replacement price, without the costs of housing sites. If the affected HHs select the cash resettlement, they
                                                         can still receive compensation fee for the housing sites.

Quzhou        House compensation

WWTP          The second level of Brick and                               without the costs of housing sites,and the housing sites costs is counted with land
                                                         450
              Concrete                                                    compensation

              Other compensation

              Moving subsidy                              30

              temporary transitional fee                  40              By 6- month term

Tonglu        House compensation

              The first level of Brick and
              Concrete                                   510

              The second level of Brick and                               Consultatng with the project owner, the reference compensation price of the item is
              Concrete                                   456              culculated by 80% of county compensation price.

              The third level of Brick and
              Concrete                                   410



                                                                             79
                                         Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


Item          Building structures                 Compensation             Remarks
                                                                  2
                                                  standard (yuan/m )

              Earth and wood houses                         410

              Simple structure house                        100

              attachments compensation

              Telephone                                     150

              close-circuit television                      250

              Washing machine                                65
                             3
              Cesspool ―4m                                 1500
                             3
              Cesspool‖4m                                  1100

              Cement floor                                   35

              Press Well                                   1200

               Brick wall                                    40

              Other compensation

              Transition subsidy                            400

              Moving subsidy                                500

              House compensation

                                                            450            Double or cell type, water, electricity, sanitation facilities are completed, function of
              The first level of Brick and                                 interior and exterior decoration is better, Crossbeam shouder the weight and some

                                                                              80
                                        Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


Item          Building structures                Compensation             Remarks
                                                                 2
                                                 standard (yuan/m )

              Concrete                                                    ground-floor is rencently made, the whole of housing is in new high degree

              The first level of Brick and                                Masonry walls, wooden pillars bearing the weight, having floor and window
                                                           350
              Wood                                                        dressing compartment. All of those are in good quality

              The first level of earth and
                                                           200
              wood houses: first level

                                                                          The height of eaves of the house is less than 2.2m, having brick, stone, sand, and
              Simple structure                            40-60           gray walls, and the roofs are single layer construction of cyan tiles, asbestos tile
                                                                          and glass tile.

              attachments compensation                      60

              Stove(single)                                 70

              Stove(double with tile)                      100

              Turning well                                 100

              Community Antenna
                                                           108
              Television

              Telephone                                    240

              ammeter                                      200

              Air condition                                200            Stuffing/unstufing fee

              Solar water heater                           100




                                                                             81
                                      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank


Item          Building structures              Compensation             Remarks
                                                               2
                                               standard (yuan/m )

Longyou       House compensation

              The first level of Brick and
                                                         550
              Concrete

              The first level of Brick and
                                                         400
              Wood

              attachments compensation

              Concrete yard                             15-30

              Brick wall                                  35

              Pressing well                              300

              Cesspool                                   100

              Launder pool                                50




                                                                           82
         Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
   — Financed by World Bank




   In older to making reasonable compensation standards for the APs having the
   equivalent compensation to the replacement price, while a detailed survey and
   analysis on the replacement of price of local Brick and Concrete structured houses,
   Brick and wood houses and earth and wood house is taken place in the procedures of
   index survey. And according to the house compensation standard of Zhejiang province
   and related projected, considering the difference of the material transport and material
   consumption of affected villages, analysis shows that average replacement price of
   Brick and Concrete structured houses is 406.22 yuan / m2, the replacement price of
   brick and wood houses 335.16 yuan / m2, and the replacement price of earth and wood
   house 167.77 yuan / m2.
   The replacement price of rural househouses are base on those of similar local house in
   2009, including the infrastructure access expenses of housing sites site preparation
   and electricity, radio and television, running water.



      Table 5-3 Cost Analysis of One-floor Brick and Concrete Structured Houses

                                   Consumption per Unit price Amount
            Item          Unit                                                  Remarks
                                      unit area   (Yuan/Unit (Yuan)
   Main materials                                               330.58
   1. Steel Bars          kg           11.904            3.7    44.04
                               3
   2.Timber               m            0.0396        1300       51.48
   3. Cement              kg            135.3            0.24   32.47
   4. Narrow brick       Block          285.7            0.45   128.57
                               3
   5. Carpolite           m            0.0238            30      0.71
                               3
   6.Sand                 m             0.476            30     14.28
   7. precast slab                      0.341            130     44.3
                               2
   8.Glass                m             0.182            26      4.73
   9.Steel window                                                10
                                                                         By a column of 5% per
   Other Materials                                              16.53
                                                                                 annum
   cost of labor                                                 35
                                                                                                  2
   Three supplies and                                                    one household of 150m
                                                                  5
   one leveling                                                               with 750 yuan
                                                                          by 5% of one to three
   reserve cost                                                 19.11
                                                                                 items
   Total                                                        406.22



                  Table 5-4 Cost Analysis of One-floor Brick and Wood Houses

                                   Consumption Unit price       Amount
       Item             Unit                                                      Remarks
                                   per unit area (Yuan/Unit     (Yuan)
  Main materials                                                266.13
                           3
1.Timber                 m           0.0856        1300         111.28
2. Cement                kg           30.8         0.24          7.29
3. Narrow brick         Block        285.7         0.45         128.57

                                                    83
         Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
   — Financed by World Bank

                                 Consumption Unit price     Amount
         Item           Unit                                                   Remarks
                                 per unit area (Yuan/Unit   (Yuan)
4. Carpolite            m3         0.0223         30         0.67
                            3
5.Sand                  m           0.453         30         13.59
6. precast slab         m2          0.182         26         4.73
                                                                        By a column of 5% per
Other Materials
                                                             13.31              annum
cost of labor                                                 35
                                                                                                2
Three supplies and                                                     one household of 150m
                                                              5
one leveling                                                                with 750 yuan
reserve cost                                                15.72     by 5% of one to three items
Total                                                       335.16



                  Table 5-5 Cost Analysis of One-floor Earth and Wood House

                                 Consumption Unit price     Amount
       Name             Unit                                                   Remarks
                                 per unit area (Yuan/Unit   (Yuan)
  Main materials                                             114.3
1.Timber                     3
                         m          0.0835       1300       108.55
2. Cement                kg          3.56        0.24        0.85
3. Narrow brick         Block
4. Carpolite                 3
                         m          0.0221         30        0.66
5.Sand                       3
                         m
6. precast slab              2
                         m          0.163          26        4.24
                                                                        By a column of 5% per
Other Materials
                                                             5.72               annum
cost of labor                                                 35
                                                                                                2
Three supplies and                                                     one household of 150m
                                                               5
one leveling                                                                with 750 yuan
reserve cost                                                 7.75     by 5% of one to three items
Total                                                       167.77


   As can be seen from above analysis, reference price of house demolition
   compensation shall meet the housing replacement cost according to the example of
   first level of Brick and Concrete structured houses, first level of brick and wood house,
   first level of earth and wood house.
   5.5 Demolition compensation standard for affected enterprises
   Only the Tonglu Jiangnan township waste water pipeline network subproject involved
   with enterprises demolition, and the compensation standards are as follows: the
   demolition of non-residental house caused by municipal public facilities and utilities
   construction projects do not need to exchange their property rights, and get a 1.5 times
   of compesation which combined with replacement price of demolition houses. The
   compensation of non-house demolition of this project is 2,000 yuan per square meter.




                                                  84
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
— Financed by World Bank

5.6 Compensation Standard for Affected infrastructure and Ground
Attachment
Compensation Standard for all kinds of attachments and infrastructures affected by
project is based on the replacement principles. The details are in Table 5-6.
          Table 5-6 Compensation Standard for Affected Infrastructures and Ground
                                     Attachments
                                                                             Standard
     Name                              Content                  Unit
                                                                            (yuan/unit)
Landfill Project     Telegraph Poles                            No.            500
in     Meicheng
township      of     Trees                                      No.              20
Jiande
                     Communication Cable                         M              3000
                                                                  2
                     Strawberry Greenhouse                      m               1000
                     Irrigation Ditch                            M               700
                     10kv electric pole                         No.              800
                     380kv electric pole                        No.              500
                     Big trees(radius‖10cm)                     No.               20
The WWTP        in   Big trees(radius‖10cm)                     No.               10
Jiande               sapling                                    No.                5
                     Scattered bamboo (mao bamboo)              No.               25
                     Scattered bamboo(cai/dan bamboo)           No.              10
                     Scattered fruit tree(two-three years)      No.              20
                     Scattered fruit tree(older than 3 years)   No.              100
                     Grave                                      No.                5
                     Pond                                       mu              27.4
                     Telegraph Poles                            No.               22
Lanxi       Youbu    Poplar forest                              mu                11
project              Scattered trees                            No.              120
                     Cotton                                     mu               7.2
                     Vegetable                                  mu               5.2
                     Cement road                                 m              2635
                     pomelo、orange(plantlet)                    No.               5
                     pomelo、orange(middle)                      No.              15
                     pomelo、orange(first production)            No.             30-50
                     pomelo、orange(frondent production)         No.            80-100
                     Other trees(radius 5-10cm)                 No.             5-10
                     Other trees(radius 11-20cm)                No.             10-20
Longyou Project
                     Other trees(radius 21-30cm)                No.             30-40
                     Other trees(radius ―31)                    No.            50-100
                     loquat、jujube(plantlet)                    No.               5
                     loquat、jujube(middle)                      No.              10
                     loquat、jujube(first production)            No.             20-40
                     loquat、jujube(frondent production)         No.             50-80
                                                                  2
Pan‘an(Shenze,       Restore of cement concrete pavement        m                200
                                                                  2
  Yunshan)           Restore of asphalt paving                  m                180
                                                                  2
    project          Restore of village pavement                m                200
                                                 85
            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
      — Financed by World Bank

                                                                                             Standard
           Name                            Content                        Unit
                                                                                            (yuan/unit)
                           trees(radius ―10cm)                             No.                   10
                           trees(radius ―10cm)                             No.                   15
      f Quzhou project     Scattered orange trees                          No.                   100
                                                                             2
                           Infrior road                                    m                      50
                           Low tension pole                                No.                    80
       Water supply                                                          2
                           Cement flooring                                 m                      50
        project in
                           Grave                                           No.                   500
       Wucheng city                                                          2
                           Village path                                    m                      50
                           Wall demolition                                  m                     30
      Subproject      of
                           Grave                                           No.                         10000
      Zhuji
                           Low tension pole                                No.                   1250
                           Simple rural pole                               No.                    500
     Tonglu Jiangnan       Scattered trees(radius 3-6cm)                   No.                     5
          project
                           Scattered trees(radius 6-12cm)                  No.                   10
                           Scattered trees(radius ―12cm)                   No.                   20



      5.7 Standard of other fees
      See the standard for resettlement expenses of taxation in Error! Reference source
      not found.Error! Reference source not found.5-7.
                       Table 5-7 Standard for Resettlement Expenses of Taxation

NO.            Item                  Standard                       Reference                 Reception object
                                                         " Interim Regulations on tax of
                                                         cultivated land occupation of
                              In accordance with                                             Finance Bureau
        Farmland       use                               The People's Republic of China
 1                            relevant       policies                                        Of Project District
        tax                                              " (The Ministry of Finance, the
                              national and Zhejiang
                                                         State Administration of Taxation
                                                         [2008] No. 49)
                                                         Notice on adjustment of             Extra-budgetary
                              In accordance with
        Plowland                                         Taxation on Cultivation Fee of       funds of districts
 2                            relevant       policies
        cultivation Fee                                  Zhejiang Government        (Zhe     /counties in the
                              national and Zhejiang
                                                         Zheng Fa [2008] No. 39)              project
                                                         Notice on the Policy Adjustion
        Compensation          In accordance with                                             Extra-budgetary
                                                         of Paid Used Newly Added
 3      for newly added       relevant       policies                                         funds of Jiande
                                                         Construction Land (Cai Zong
        construction land     national and Zhejiang                                           City
                                                         [2006] No.48)
        Management fee
                              4% of the total land
 4      of acquisitioned                                 /                                   /
                              acquisition fund
        land
        Fee             of
        reconnaissance,
                              1% of the total land
 5      design        and                                /                                   /
                              acquisition fund
        scientific
        research
        Management fee
                              2% of the total land
 6      of                                               /                                   /
                              acquisition fund
        implementation
        Technical             1% of the total land
 7                                                       /                                   /
        training fee          acquisition fund
 8      External     M&E      2% of the total land       /                                   /
                                                        86
                    Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
              — Financed by World Bank

        NO.             Item               Standard                        Reference            Reception object
                fee                 acquisition fund
                                    0.5% of the total land
         9      Internal M&E fee                              /                                 /
                                    acquisition fund
                Contingency         10% of the total land
        10                                                    /                                 /
                cost                acquisition fund

                  Tax standards of the related counties (districts, municipalities) are in table 5-8.

                                       Table 5-8 Project related tax standards
                                                                                 Tax
                                                                                                Tax Standards of
                                                                  Tax            Standards of
City            Title of tax                                                                    prime farmland
                                                                  Standards      arable land                 2
                                                                                           2         (Yuan/m )
                                                                                   (Yuan/m )
                Tax on The Occupancy of Cultivated Land                                45               67.5
Zhuji           Reclamation fee of Cultivated Land                                     28                43
                New construction compensated ues fee                   9               34
                Tax on The Occupancy of Cultivated Land                                35               52.5
                Reclamation fee of Cultivated Land                                   20 2                35
Tonglu          New construction compensated ues fee                  12               20
                Tax on The Occupancy of Cultivated Land                                35               52.5
                Reclamation fee of Cultivated Land                                     20                35
Jiande          New construction compensated ues fee                  12               20
                Tax on The Occupancy of Cultivated Land                                35               52.5
                Reclamation fee of Cultivated Land                                     20                35
Longyou         New construction compensated ues fee                  13               16
                Tax on The Occupancy of Cultivated Land                                50                75
                Reclamation fee of Cultivated Land                                     28                43
Qujiang         New construction compensated ues fee                  13               16
                Tax on The Occupancy of Cultivated Land                                25               37.5
                Reclamation fee of Cultivated Land                                     20                35
Pan‘an          New construction compensated ues fee                  14               14
                                                                                                                   2
                Tax on The Occupancy of Cultivated Land                                35           52.5 Yuan/m
                                                                                                               2
                Reclamation fee of Cultivated Land                                     20            35 Yuan/m
Lanxi
                New construction compensated ues fee                  11               24


              In addition to these taxes, the Pan‘an Shenze Environment Management Project,
              Cloud Mountain Resort sewer project needs to pay social security co-ordination
              land-lost farmers and land-lost farmers living fund risk pool fund, respectively, the total
              amount of land transfer 5% and 3%; Lanxi touring sub Farmers need to pay social
              security benefits, the standard of 12,000 yuan / mu; Zhuji subproject land adjustment
              payments required to pay 25,000 yuan / mu. In addition, some sub-projects involve
              land reclamation, and reclamation fee standard is 2000 yuan / mu.




                                                             87
            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                      — Financed by World Bank



                6 Production and Livelihood Rehabilitation Plan
It is essential to offer reasonable compensation and arrange proper resettlement to
ensure the resettlement of APs to resume or exceed the original production and
income standard level. According to the actual standard of living of APs, combined
with the host counties‘ (districts, municipalities) economic and social development
plan, analysising to determine the resettlement objectives are as the following:
(1) Basically ensure food self-sufficiency, in those areas who have less cultivated
land resources, through the adjustment of agricultural structure, fully tap the
potential of land;
(2) Actively taking measures to ensure that the annual per capita net income of APs
can be gradually restored to the level before resettlement;
(3) Public infrastructureS should be improved, schooling, medical care, social
welfare, environment and traffic conditions;
A. All of involuntary resettlement are treatedas an integral part of project
implementation, in order to provide adequate funding for resettlement, and try best
to make immigration benefit from the project as much as possible
B. APs gain assistance.in the process of relocation and resettlement
C.Families affected by house demolition will affect the price in accordance with
replacement cost for house demolition compensation, while providing affordable
housing and the low price commercial housing choice, improve their living conditions
through placement.
D.On corporate and commercial shops to minimize land acquisition and relocation to
their losses caused by such removal is unavoidable given in accordance with
replacement price of house demolition compensation, and compensation for loss of
stop production and business, and make proper arrangements for rehabilitation and
reconstruction companies to enable them to early resumption of production and
management levels.
E.On the temporary occupation of productive land of rural collective economic
organizations, to resume farming costs, and be restored after the occupation of
farming, as far as possible to restore and improve access to APs affected production
and business activities, employment opportunities and income.
F. In the preparation of Resettlement Action Plan and implementation process, to
encourage APs to participate. As for information disclosure, strengthen consultation.
G. Production levels and living standards of APs should be restored or increased to a
higher level before the resettlement.
6.1 Permanent Acquisition of Collective-owned land
There are 10 subprojects in the total 13 involves permanent collective-owned land
acquisition of 1483.478 mu, affecting 596 HHs, 20141 people. A total of 1.35 mu
state-owned land will be permanently occupied by 1 subproject.
    6.1.1      Land acquisition Impact analysis
The PAL of this is 1485.828 mu, which includes 1483.478 mu of collective-owned
land, accounting for 99.91% of total area of PAL; and 1.35 mu of state-owned land,
accounting for 0.09% of total area of PAL. The cultivated land of the affected land,
including collective arable land, collective vegetable land, basic farmland and fish
ponds and so on, which is about 1389.028 mu, accounting for 93.55%of the total


1
    83 households with 285 APs   are affected by house demolition at the same time.


                                                 88
            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                      — Financed by World Bank



    area.
    The State-owned land is basic construction land and is free transfer.
    The area of arable land of the collective-owned land is about 523.568 mu,
    accounting for about 35.31%. 18 of the 23 affected villages , the average acquisition
    rate of arable land in the 23 affected villages / communities(except for Jingou、
    Shanghengtang、Luojia、Shenyi、Shener) is among0.08%-4.37%, inducing little
    impact. The details are shown in Table 6-1.
                   Table 6-1 Analysis for the Cultivated Land Acquisition Impact
                                                                                              unit:mu
                                                                      Total area         Acquisition
            Affected villages /   Area of arable         per capita                     of arable land
  City                                                                  of land
               communities             land             arable land
                                                                      acquisition    Area      Impact rate
                Jiangshan             2710                 0.85          260         85.5        3.15%
 Jiande
                   Xiaya              1262                 0.50          55.2        55.2        4.37%
                Nanshandi             1095                 0.80           42          42         3.84%
Qujiang
                  Miaojia             1413                 0.77          13.5        13.5        0.96%

                 Jinjiang             2980                 0.70          2.27        2.27        0.08%
Tonglu
                  zhaixi              3719                 0.54        180.988      93.538       2.58%

 Zhuji      Shangyu/changtan          3484                 0.65         28.21        20.68        0.6%
                 Jingou              151.7                 0.27         29.98        29.98        19.76
             Shenghengtang           56.47                 0.09         37.82        37.82       66.97%
                 Luojia              117.11                0.35         21.81        21.81       18.62%
Pan‘an           Shenyi              154.37                0.18         18.65        18.65       12.08%
                Shener               169.9                 0.24            8            8        4.71%
                Xinzhai              1535.7                0.59          2.25         2.25       0.15%
               Louxiazhai            985.9                 0.64          28.8         25.2       2.56%
               Shangmashi            616.14                0.63           1           1          0.16%
 Lanxi           Langjia              4176                 0.71        40.36         39.11       3.75%
                Fengjikun             1732                 1.66        319.06        16.13       0.93%
Longyou          Hulong               1346                 1.18        354.5          9.37        0.7%
                  Baima               1949                 1.47         39.08        1.56        0.08%
 Total              23              29653.29                          1483.478      523.568      1.77%


    According to the field study, Pan Fukasawa Environment Management Project
    affected zone (including five villages such asJingou) is in the Pan new city, the
    economic conditions are better, less arable land per capita, and the soil is poor, in a
    positive rural-town transition period, the farmers‘ main income for many years is the
    non-agricultural income. Although the projects imposed part of paddy field and dry
    land, but gradually acquisition of land for years that farmers running out of land,
    agricultural income is not the main source for local farmers, in a long time, farmers
    receive income from the land less. Therefore, the project charge of the land for rural
    residents was less affected. For details, see sub-report: Pan (Fukasawa, Yunshan)
    Environment Management Project Resettlement Action Plan.
    The compensation cost of permanent acquisition of collective-owned land includes

                                                   89
                        Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                  — Financed by World Bank



             land compensation fees, resettlement subsidies and standing crops standing crops
             compensation fees as well as compensation for ground attachments. The total area
             of acquisition land in affected villages is 1483.478mu, which obtain 36.652 million
             yuan of compensation cost. So the average compensation is 24.7 thousand yuan per
             mu. In accordance with output value of the three years which is 1,500 yuan per year,
             the multiple of average compensation is 16.47 times, and the details are shown in
             Table 6-2.
                   Table 6-2 Compensation cost analysis for permanent collective-owned land acquisition

                                                                 compensation    Average
             Affected              land                                                      annual output
                                                                      cost     compensation                discount
 City        villages /         acquisition Household Population                             (ten thousand
                                                                 (ten thousand (ten thousand               multiple
           communities         area(mu)                                                         yuan)
                                                                    yuan)       yuan /mu)
                           1
           Jiangshan               260         42        148         517.9         1.99          0.10         20
Jiande
               Xiaya               55.2        59        237         236.5         4.28          0.10       30.57
           Jinjiang and
Tonglu                          183.257            84          296           566.34               3.09               0.15      20.6
              zhanxi
            Nanshandi              42              35          120
Qujiang                                                                       233.1               4.2                0.15       28
              Miaojia             13.5              8           29
             Shangyu
 Zhuji                            28.53            39          159            93.09               3.26               0.15      21.2
            Changtan
              Xinzhai             2.25             2            4
                                                                              98.77               3.29               0.2       16.5
            Louxiazhai            28.8             50          173
           Shangmashi               1
                 Jingou           29.98
Pan‘an
          Shanghengtang           37.82
                 Luojia           21.81          192           548           395.28               3.4                0.2        17
                 Shenyi           18.65
                 Shener             8
                 Langjia
 Lanxi           Youbu
                                  40.36            25          90             156.5               3.88               0.15       25
                 Niqiao
             Meiping
                 Baima            39.08            5           18
Longyou                                                                                                  2
            Fengjikun            319.06            26          91           1364.28               1.91               0.1       19.1
                 Hulong           354.5            29          101
 Total             18          1483.478      596           2014         3665.16            2.47               0.15            16.47




             1
                 The area of acquisition land in Jiangshan village is 260 mu, in whicn arable land is 85.5 mu and the other
             land is forest land which is calculated as 260 mu. The compensation standard is 20200 yuan/mu.




                                                                  90
        Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                  — Financed by World Bank




Among the compensation cost of permanent acquisition of collective-owned land,
the compensation fees and resettlement fees of the land-lost farmers go to the
special accounts of basic living security for farmers. The accounts are set up by the
local financial departments. Part of the arable land compensation fees and full of
unused land compensation and collective non-agricultural construction land
compensation fee is paid to the rural collective economic organizations; standing
crops standing crops compensation fee and ground attachments compensation fee
are paid to the owner.
6.1.2     Summary of Resettlement and Rehabilitation Measures for Land
         Acquisition
At present, on one hand, China has promised that no change on land contract would
be made for 30 years (most of the land contract of the project began in 1996 ~ 1998);
on the other hand, most of the village collectives do not have their own flexibly land
according to surveys. Based on objective reality, it is not considered to re-allocate
land to the land-lost farmers as compensation.
In the field survey, majority of affected farmers warmly welcome the proj ect and they
think the living and production environment is comparatively better and the danger of
pollution-relative disease will decrease. At the same time, majority of land
acquisition adopt monetary compensation which is simple and easy to operate. So
the farmers can freely recover production and life standards by using compensation
fees.
There are two programs on income restoration for this project after APs obtain the
land compensation; (1) the affected HHs use the compensation fees to engage in
other agricultural or non-agricultural income-generating production, such as
strawberries and other special cash crops cultivation, or sideline activities,
commodity business, etc.in the spare land; (2) the affected HHs who fit the
conditions of ―rural residents become urban residents ― will be booked in Urban
registration and can participate in the elderly support system of land-lost farmers or
basic livelihood guarantee for urban workers which would be the major resettlement
program for the project.
The Resettlement Action Plan of APs in the ten sub-projects who are related to
collective-owned land acquisition are in Table 6-3.


    Table 6-3 The Resettlement Action Plan of collective-owned land acquisition
                                                             Resettlement Action Plan
                                                agricultural
                                  APs                                    elderly support of
            Name                                resettlement or
                                (people)                                 land-lost farmers
                                                non-agricultural
                                                                         (people)
                                                resettlement(people)
      WWTP of Jiande                237                  145                         92
         LP of Jiande               148                  112                         36
      WSP of Quzhou                 149                   0                         149
        WSP of Zhuji                159                   0                         159
Project of Jianshan in Pan‘an       177                   92                         39
   Pan‘an Shenze project            548                  404                        144
      WWTP of Tonglu                296                   49                        247
  WWTP of Youbu in Lanxi            90                    48                         42
                                           91
          Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                    — Financed by World Bank



                                                                      Resettlement Action Plan
                                                         agricultural
                                         APs                                      elderly support of
               Name                                      resettlement or
                                       (people)                                   land-lost farmers
                                                         non-agricultural
                                                                                  (people)
                                                         resettlement(people)
     ACP of Youbu in Lanxi
      Longyou subproject                   210                    185                               25
             Total                        2014                    1045                             923

The distribution mode of compensation for land acquisition (land compensation fees
and resettlement subsidy) of each affected villages are in Table 6-4.


               Table 6-6-4 Usage mode of compensation fee for land acquisition
    Mane                                      Usage mode of compensation fee
  WWTP of
                     Land compensation fees and resettlement subsidies are paid in full to the APs
    Jiande
 LP of Jiande        Land compensation fees and resettlement subsidies are paid in full to the APs
   WSP of
                     Land compensation fees and resettlement subsidies are paid in full to the APs
   Quzhou
 WSP of Zhuji        Land compensation fees and resettlement subsidies are paid in full to the APs
  Project of
 Jianshan in         Land compensation fees and resettlement subsidies are paid in full to the APs
    Pan‘an
  WWTP of
                     Land compensation fees and resettlement subsidies are paid in full to the APs
    Tonglu
  WWTP of
                     Land compensation fees and resettlement subsidies are paid in full to the APs
Youbu in Lanxi
ACP of Youbu
                     Land compensation fees and resettlement subsidies are paid in full to the APs
   in Lanxi
   Longyou           Village reserve 3% -5% of land compensation fee for village renovation, but
    project          this need more than 2 / 3 villagers representatives agree with.
    Pan‘an           Village reserve 1.5% -3% of land compensation fee for village renovation, but
Shenze project       this need more than 2 / 3 villagers representatives agree with.
   Longyou           Village reserve about 5% of land compensation fee for village infrustructure,
  subproject         but this need more than 2 / 3 villagers representatives agree with.

            Agricultural resettlement or non-agricultural resettlement on spare land
Based on above use patterns of land compensation fees, land requisition
compensation fees shall be paid promptly to the affected HHs. APs can grow some
economic crops, do family farming business or engage in non-agricultural
productionwith the compensation fees. According to field survey, all HHs can use
this amount of money to do greenhouse production and achieve better economic
returns – demanding a one-time investment of about 20,000 yuan (including the
constructions of fences, airs, purchase seeds, fertilizer, etc.). The annual per -mu
yield value of cultivation of strawberries and other economic crops is about
40000-50000 yuan which is enough for the recovery of APs‘ income.
            Endowment insurance resettlement1


1
    The specific circumstances of social security for land-lost farmers of each sub-project are shown in Annex
3

                                                    92
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



The land-lost farmers in the 6 counties (districts, municipalities) where have rural
collective-owned land acquisition is open to pension insurance and enjoy the
corresponding subsidy policies when they meet the conditions. The basic princip les
of resettlement policies for old-age insurance are similar to the farmers in those
areas. For this project, all affected land-lost farmers of Zhuji was to be included in
the elderly support system of land-lost farmers or basic livelihood guarantee for
urban workers ; while the pension insurance policies of other cites are as follows:
Zhuji: conditions for participating in the insurance program is the population whose
land is approved and in accordance with the regulations " alterring rural residents to
urban residents " procedure placement of personnel, when the acquisition and
relocated under 16 years old and over 70 years old and the students who had
received college Admission tickets. Not including: land-lost farmers who have
participated in funds for urban eworkers‘ basic old-age insurance; workers who live
difficult  life and streamline subsidies for dependents according to national
regulations. Age limitation is over 60 years old for men and over 55 years old for
female.
Jiande: conditions for predicating in the insurance program is the registered
agricultural population who have the second-round of land contracting warrants and
their land has all been imposed in the land acquisition programs which are approved
by the Government after the implementation of monetary resettlement the villages
with less than 0.2 mu per capita arable land were to be implemented after the
withdrawal of the village administrative villages under construction, all units included
in the scope of the insured, in addition to the developing land for resettlement
outside the surplus remaining land nationalization. Range of participation is not
included: the completion of the land the people does not meet the working age (16
years of age)and the people who reach the age for employment or study after
graduation, as the town's new labor force participate in related social insurance ; and
people who enjoy urban workers‘            basic old-age insurance when complete
acquisition land. Age limitation is over 60 years old for men and over 50 year s old for
women.
Tonglu: conditions for predicating in the insurance is the registered agricultural
population who have finished the process of ―altering rural residents to urban
residents ‖and have less than 0.2 mu of arable land per capita. Range of
participation is not included: people who under 16 years old when land acquisition,
and who has enjoyed the endowment insurance, the insurance of government
organizations and institutions. IThe age regulated for male is 60 years, while for female
is 55 years.
Pan’an: till the second-round land contraction, due to urban construction, traffic,
industrial parks and industrial development and other functional areas of the state
approved construction land expropriated land. Conditions for participating in the
insurance program is the registered agricultural population (excluding full-time
students) who are 16 years old excess, including the special reasons urban
residents transferred from rural residents because of village revocation and
neighborhood committee construction.The Specials related to the ones who enjoy the
second round of land contract rights, not to be organs, institutions, state-run collective
enterprises recruited recruitment (except temporary) staff. Every 0.5 mu arable
land represents one resident taking the household as a unit and people whose land
is less than 0.15mu can participate in the security program.Range of participation is
not included: when complete the land acquistion people does not meet the working age
(16 years of age) who reach the age for employment or study after graduation, as the
town's new labor force to participate in related social insurance ; Agriculture accounts in
                                          93
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



the organs and institutions of employment; by the government focus on maintenance of
the three non-target, five guarantees; have access to government payment of
retirement (post) payment of pensions; retreat resort hosted Kong; to enjoy social
security subsidies. The age regulated is 60 years old for male, while 55 years old for
female.
Lanxi: conditions for participating in the insurance program is the registered
agricultural population whose total tax arable land had been expropriated by more
than 80%( to two round of contract farmers as a unit) after second round of land
contracting in the administrative regions, rural second round of land contracting has
been a result of urban development, road networks, industrial park development and
other construction is land and resources approved land acquisition. Range of
participation is not included: when land acquisition, the people who didn‘t meet the
working age(16 years old), and who have enjoyed the basic old-age insurance for
urban workers. Age limitation is 60 years old.
Longyou: conditions for participating in the insurance is the land-lost farmers whose
per capita arable land and is less than 0.2 mu, within the county as a whole and
scattered land acquisition the implementation of the household as the unit's
implementing regulations, by land users have to account for the units to land-lost
farmers basic life insurance. Not included in the scope of the insured: When land
acquisition under 16 years old ; employed by the state organs, state-owned
enterprises as staff in the compilation; have participated in basic pension insurance
for urban workers and has been enjoying a monthly basic pension insurance
benefits ; thatpeople because children go to school, recruitment, employment,
convenience and other reasons to account as the account is linked by land to move
into the village (group); other provisions not included in the insured according to the
scope of the conditions of persons to enjoy 60 years of age for men and women over
50 years of age and one-time payment of urban land-lost farmers.
Counties eligible to participate in the above item Farmers whose land was
expropriated for social security officers provided the insured reaches the age to
enjoy the treatment, will pay the insured formalities since the month after the
completion of Farmers receive monthly Social Security payments.
In 2009, Zhejiang Province issued a "land compensation and Zhejiang Province are
the basic living security for the land-lost farmers" (Zhejiang People's Government
Decree No. 264), the provisions shall come into force on January 1, 2010, the
"measures" will set , the insurand age of Zhejiang Province, to participate in Farmers
unified social security provisions on the age of 16 yearsold and over, enjoy the
treatment of men over the age of 60 years old, women over 55 years old However,
with the implementation details related to the host cities and counties ha ve not yet
finalized, this report temporarily prepay the existing project area for policy
formulation, project implementation will be in accordance with the "Procedures" and
the implementation of county and municipal implementation details.
In 2009, Zhejiang Provincial Government issued "Zhejiang People's Government on
the establishment of the social pension insurance system of urban and rural
residents in the implementation of views" (Zhejiang political [2009] 62), providing the
province with the household, the age of 16 years old (except full-time schools
students), non-state organs, institutions, social groups, workers, did not participate
in the basic pension insurance of workers and rural residents, both urban and rural
residents in the household to participate in the social pension insurance. Urban and
rural residents to enjoy the social pension insurance conditions for over 60 years old,
did not enjoy the state organs, institutions, social groups, retirees, former employees
of basic pension benefits and the treatment of urban and rural areas have household

                                         94
              Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                        — Financed by World Bank



        registration in the elderly. "Opinions" is equal to January 1, 2010 come into operation,
        but the implementation details related to the host cities and counties have not yet
        worked out, this report temporarily prepay the existing project area for policy
        formulation, project implementation will be in accordance with the "opinions" and
        related County Executive Regulations.
        According to the survey, the capital composition of the land-lost farmers insurance is
        different in the 7 counties (districts, municipalities) which involvs PLA. The land-lost
        farmers would enjoy different policies in different program, which are shown in table
        6-5 and Table 6-6.
             Table 6-5 insured policy for land-lost farmers of different ages in project area
Project                                                                                        Insured
             age        Insured case       age            Insured case     age
area                                                                                           case
                                                                           Male over
                        Not included,
             Under                         Male 16-60     Voluntary        60years old
                        one-time access                                                        Enjoy the
Tonglu       16 years                      Female         enrollment       Female
                        to land                                                                insurance
             old                           16-55          grade            over55years
                        compensation
                                                                           old
                        Not included,                                      Male over
             Under                         Male 16-60     Voluntary
                        one-time access                                    60years old         Enjoy the
jiande       16 years                      Female         enrollment
                        to land                                            Female over         insurance
             old                           16-50          grade
                        compensation                                       50 years old
                        Not included,                                      Male over
             Under                         Male 16-60     Voluntary
                        one-time access                                    60years old         Enjoy the
Longyou      16 years                      Female         enrollment
                        to land                                            Female over         insurance
             old                           16-50          grade
                        compensation                                       50 years old
                        Not included,                                      Male over
             Under                         Male 16-60     Voluntary
                        one-time access                                    60years old         Enjoy the
Qujiang      16 years                      Female         enrollment
                        to land                                            Female over         insurance
             old                           16-55          grade
                        compensation                                       55 years old
                        Not included,
             Under                                        Voluntary
                        one-time access                                    Over 60 years       Enjoy the
Lanxi        16 years                      16-60          enrollment
                        to land                                            old                 insurance
             old                                          grade
                        compensation
                        Not included,                                      Male over
             Under                         Male 16-60     Voluntary
                        one-time access                                    60years old         Enjoy the
Pan‘an       16 years                      Female         enrollment
                        to land                                            Female over         insurance
             old                           16-55          grade
                        compensation                                       55 years old
                                                                           Male over
             Under                         Male 16-60     Voluntary
                        Voluntary                                          60years old         Enjoy the
Zhuji        16 years                      Female         enrollment
                        enrollment grade                                   Female over         insurance
             old                           16-55          grade
                                                                           55 years old
        Counties and cities for more than farmers land-lost farmers in addition to age and social
        security number of standards, are not able to participate in basic pension stacking and
        other social insurance, but at the same time meet the requirements can apply for
        minimum subsistence. The project county (district, city) Farmers can choose the
        security policy and its detailed comparison of the carry-over and World Bank Qiantang
        River comprehensive management project small town environment of each sub report.
        "Zhejiang People's Government on the establishment of urban and rural social pension
        insurance scheme opinions" (Zhejiang political [2009] No. 62), an urban and rural social
        endowment insurance system after the implementation of urban and rural residents to
        participate in the rural social endowment insurance, such as land-lost and land-lost
        farmers eligible to participate in the basic living conditions, can also participate in the
        basic living of land-lost farmers. Urban and rural social pension insurance system is

                                                   95
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



implemented, have participated in the basic living of land-lost farmers residents asked
to participate in urban and rural social endowment insurance, which can be the basic
living of land-lost farmers and individuals to fund personal accounts for social
co-ordination to offset the urban and rural parts of pooling the individual contribution of
social pension insurance, the local urban and rural residents by the year the average
payment amount of social pension insurance discount payment period, according to the
provisions of urban and rural social pension insurance enjoy the same treatment.




                                          96
                                Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                          — Financed by World Bank



                                      Table 6-6 Collative land acquisition and social security policies
                                                                                                             Benefit     Providing
NO.   Name            city         Conditions                             Payment standards
                                                                                                             age         standards
1     LP of Jiande                                                                                                       First-class :250
                                   registered agricultural population
                                                                                                                         yuan/mounth;
                                   who have secend the round of land      First-class :25000yuan,                        Second-class 140
                                   contracting warrants and their land    Second-class:14000                             yuan/mounth.
                                   has all been imposed in the land       yuan,First-class : government                  Individuals whodo not
                                   acqisition programs which
      WWTP in the                                                         subsidy:8000 yuan,individual       Male: 60;   have the ability to
                      Jiande       areapproved by the Government
2     east district                                                       payment:17000yuan,                 Female:50   participate in the
                                   after monetary resettlement, except
      of Jiande                                                           Second-class: government                       insurance can enjoy a
                                   the teenagers who are under 16
                                                                          subsidy:5000 yuan,individual                   subsidy of 30
                                   years old and adults who have
                                                                          payment:9000 yuan                              yuan/mounth since the
                                   enjoyed the basic old-age
                                                                                                                         second month from
                                   insurance for urban workers.
                                                                                                                         finishing the process.
                                                                          There are three classes of
                                   the registered agricultural
                                                                          28,000 yuan ,22,000 yuan, and
                                   population who have finished the                                                      First-class :210
                                                                          17,000 yuan . 35% of the total
                                   process of ―rural residents become
                                                                          payment is paid by townships                   yuan/mounth;
                                   urban residents ‖and have less
                                                                          or counties (districtss) from                  Second-class 160
                                   than 0.2 mu of arable land per
      WWTP in                                                             land use right leasing fees and                yuan/mounth,
                                   capita with the age limination of                                         Male: 60;
3     Jiangnan of     Tonglu                                              commitment to transfer funds                   Third-class: 120
                                   16-60 years old for male and 16-55                                        Female:55
      Tonglu                                                              from the land in the designated                yuan/mounth.From the
                                   years old for female.People who
                                                                          payment; and 65% of the                        second year, the
                                   exceed the set age limination can
                                                                          payment is paid by the village                 payment is 5 yuan more
                                   choose a one-time money
                                                                          collective and individual, which               every month.
                                   monetary resettlement or basic
                                                                          is all credited to individual
                                   old-age security resettlement.
                                                                          accounts.
      WWTP in the                  land-lost farmers can participate in   The total amount is 27000                      278yuan/month of the
                      Qujiang                                                                                Male: 60;
4     east district                pension insuranceapproved by           yuan,in whicn the government                   class of 37000, 229
                                                                                                             Female:55
      of Quzhou                    district-level and above Land          supporting fund is 30%,                        yuan/month for the class




                                                                     97
                               Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                         — Financed by World Bank



                                                                                                            Benefit     Providing
NO.   Name            city        Conditions                               Payment standards
                                                                                                            age         standards
                                  Resources Department after               collective economic                          of 27000, and a growth of
                                  Collective land expropriation and        organization is 5%-40%,and                   25 yuan of the class 0f
                                  use,                                     individuals is 30-65%                        16200-27000 yuan every
                                                                                                                        month
                                  The land-lost farmers can                The parts of Individua payment               The standards are 150
                                  participate in pension insurance by                                                   yuan/month、200
                                                                           are 4000 yuan、7000 yuan、
                      Zhuji       the confirmation of district Land                                         Male: 60;
5     WSP in zhuji                                                         10000 yuan and 18000 yuan,                   yuan/month、250
                                  Resources Department after the                                            Female:55
                                  acqusition and use of                    and the government subsidy is                yuan/month、and 300
                                  collective-owned land                    15000 yuan/person                            yuan/month.
      WWTP in                                                                                                           The standards are 90
      Jianshan of                 the registered agricultural                                                           yuan/month、125
      Pan‘an                      population (excluding full-time                                                       yuan/month、160
                                  students)who are older tan 16                                                         yuan/month、195
6                                 years old, including the urban                                                        yuan/month and 230
                                  residents transferred from rural         There are five classes of 6000               yuan/month.The basic
                                  residents because of village             yuan,11000 yuan,16000                        pension is 5 yuan/month
                                                                                                            Male: 60;
                      Pan‘an      revocation and neighborhood              yuan,21000 yuan,26000                        more every two years
                                                                                                            Female:55
                      Lanxi       committee construction. Every 0.5        yuan,and the government                      since the second yearfor
                                  mu arable land represents one            subsidy is 6000 yuan/person                  first class,7.5yuan for
                                  resident taking the household as a                                                    second class,10yuan for
                                  unit and people whose land is less                                                    third class,12.5yuan for
      EMP in                      than 0.15mu can participate in the                                                    forth class,15yuan for fifth
7     Shenze of                   security program.                                                                     class.( Do not pay 2
      Pan‘an                                                                                                            yuan)



      Subproject in               the registered agricultural              There are five classes of 3000               The standards are 95
8                     Lanxi                                                                               60
      Youbu of                    population whose total tax arable        yuan, 6000 yuan,   12000 yuan,               yuan/month、120




                                                                      98
                                Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                          — Financed by World Bank



                                                                                                           Benefit          Providing
NO.   Name            city         Conditions                            Payment standards
                                                                                                           age              standards
      Lanxi                        land had been expropriated by         18000 yuan,26000 yuan,and                          yuan/month、170
                                   more than 80% after second round      the government subsidy is                          yuan/month、220
                                   of land contracting in the            12000 yuan/person                                  yuan/month and 290
                                   administrative regions, apartiong                                                        yuan/month.The basic
                                   from the teenagers who are under                                                         pension is 5 yuan/month
                                   16 years old and adults who have                                                         more every two years.
                                   enjoyed the basic old-age
                                   insurance for urban workers.
                                   The whole county area and                                                   Once         From July 1, 2008, the
                                   scattered land acquisition HHs                                          every two        standard of basic living
                                   produce less than 0.2 mu per                                            years to         allowance adjusted to
                                   capita arable land of the land-lost                                     adjust the       240 yuan, the basic living
                                   farmers,the approach to the                                             standard         subsidy adjust according
                                   household as the unit whose land                                        payment, the     to the proportion of
                                   was expropriated farmers must                                           adjustment       payment.
                                   account for the units to guarantee                                      according to     enrollment,before June
                                                                         From March 2002 to the end of
                                   the basic livelihood of land-lost                                       the county       30, 2005 basic monthly
                                                                         December 2003 insured the
                                   farmers (basic living allowance).                                       average          living allowance of 270
                                                                         payment standard: The
      Subproject in                After January 1, 2008 (distribution                                     wage of          yuan; enrollment from
9                     Longyou                                            average wage of workers
      Longyou                      of land compensation fee collection                                     workers and      July 1, 2005 to December
                                                                         throughout the province in 2000
                                   time) within the county as a whole                                      the urban        31, 2006 the insured on
                                                                         to 60% of base pay compared
                                   and scattered land acquisition,                                         minimum          the basic living allowance
                                                                         to 17%, period of 15 years.
                                   farmers whose land is requisitioned                                     living           of 255 yuan; enrollment
                                   cultivated land per capita is still                                     standard to      after January 1, 2007,
                                   over 0.2 mu, the implementation of                                      determine.       monthly basic living
                                   the insured person to the                                               Male :60         allowance of 240.
                                   corresponding method land-lost                                          Female:50        Standards of basic living
                                   HHs to determine the number of                                            Payment        subsidies paid by the
                                   insurance must participate in the                                       period must      proportion of
                                   basic living of land-lost farmers                                       be at least 15   synchronous adjustment




                                                                    99
                    Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                              — Financed by World Bank



                                                                                            Benefit          Providing
NO.   Name   city      Conditions                            Payment standards
                                                                                            age              standards
                       (basic living allowance).                                            years of staff   payment.
                                                                                            meet monthly
                                                                                            to receive the
                                                                                            basic
                                                                                            pension.




                                                       100
        Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                  — Financed by World Bank




From Table 6-6 we can see that the land-lost farmers get more protection when they
pay a one-time personal account.
The security enrollment process of land-lost farmers in each sub-project is basically
same, and the process is as
follows:
   Determine the                   Determine the objects                Application       Consideration
   number of people                who like to participate
   who like to                     in the insurance
   participate in the
   insurance

                                                   Enjoyment             Payment       examine and approve




The capital composition of the land-lost farmers insurance is different in the 6
counties (districts, municipalities) and the details are in Table 6-6.
Table 6-7 The capital composition of the land-lost farmers insurance in the counties
                       (districts, municipalities) of this project

            Districts
NO.                                                Source of social insurance fund
           (countie)
  1       Jiande        Government subsidies、land acquisition compensation fee paid by individual
                        Government subsidies, the village collective financing, land acquisition
  2       Tonglu
                        compensation fee paid by individuals
                        Government subsidies, the village collective financing, land acquisition
  3       Quzhou
                        compensation fee paid by individuals
                        Government subsidies, the village collective financing, land acquisition
  4       Zhuji
                        compensation fee paid by individuals, mediation fee of land
                        Government subsidy, land acquisition compensation fee paid by individuals,
  5       Pan‘an
                        Risk Protection Fund paid by land-lost farmers
                        Government subsidies, the village collective financing, land acquisition
  6       Lanxi
                        compensation fee paid by individuals, landacquisition grant
  7       Longyou       Government subsidies、land acquisition compensation fee paid by individuals


           Others
For the collective-owned land of village collectively, land acquisition compensation
fee will be reserved at the village collectively as a special financing for infrastructure
construction and public welfare undertakings, such as irrigation and water
conservancy facilities, roads and living subsidies for elders.
In addition, in the whole production recovery process, the implementing agencies
will try to give helps and supports for the APs, and key measures include:
       (1) In the he project construction period, the labor force of APs will be given
priority to work, which will bring in cash income to APs;
       (2) The Aps will be given priority to work in the affected counties which have
export of labor services;
     (3)The project designed a series of technical advice and training programs for
the APs, providing agricultural technical training which includes cash crops and other
                                                    101
         Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                   — Financed by World Bank



non-agricultural activities. At the same time, the project invited technical staff of the
agricultural sector and labor and social security departments to organize some
agriculture and farming trainings in the resettlement area, making sure every
affected household received at least more than once training. Through these
measures, the quality and yield of crops is increased, the income of the Aps is
improved and the livelihoods of APs are recovered. In addition, a part of
compensation belongs to village collective funds is used for land reclamation and
economic forest management, so as to restore the living standards of farmers.
6.2 Prohibition and reconstruction of rural house
This project only involves compensation of rural house demolition, including five
districts of Longyou, Tonglu, Jiande,Qujiang and Pan‘an affected by the subprojects.
6.2.1       6.2.1 Demolition Impacts
The total demolition area of rural house in this project is 50221.5m2,with 183 affected
HHs of 650 people1,in which the area of Brick and Concrete structured houses is
46667.5m2,accounting for 92.92%, and the area of Earth and wood houses is 3554m2,
accounting for 7.08%.
       The details of demolition impact are in Table 2-7.
6.2.2       6.2.2 Resettlement Plan
There are six subprojects involves rural residental house demolition in this project and
their Resettlement Action Plans are in Table 6-8.
              Table 6-8 The alternative Resettlement Action Plans of rural house

                                                                         Resettlement Action Plan
                                                   Demolition
                                      Affected                     Monetary
              Name                                   area                        Property   Relocation
                                        HHs             2          resettlem
                                                    (m )                        transfrom resettlement
                                                                      ent
        LP of Jiande                     47           13395            √            √
  The WWTP in the east
                                         31          8360.5              √        √            √
     district of Jiande
  The WWTP in the east
                                         1              400              √
     district of Quzhou
The EMP in Shenze of Pan‘an              19           2400               √        √            √
   Subproject in Longyou                 18           5630               √        √            √
    The WWP in Tonglu                    67           20036              √                     √
             Total                      183          50221.5


There are multiple choices of resettlement, but according to sample survey, rural
residents are more likely to choose relocation besides unified planning resettlement
communities, which redistrict the residential land of village collective with unified
housing planning, and constructed by the APs themselves.
The demolition and Resettlement Action Plan for each subproject are as follows:
LP of Jiande




1
    38 households with 115people are affected by the land acquisition.
                                                  102
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



The total area of rural house in Qingshan and Baigling which are in the scope of
environment protecting line(500m)is 13395m2 according to the requirement;and the
affected HHs are 47 with 166 people. The implement of demolition is based on the
willings of residents.
The APs can choose property transform resettlement or monetary resettlement. People
who choose property transform can have an equal residential area compared with the
regional legal construction area and have monetary compensation if the resettlement
area is less than the demolition area; people who choose monetary resettlement can
obtain a compensation based on the replacement price. Besides, the APs can obtain an
extra removement subsidy and an award (200 yuan per person according to the
registered population on the agreement and APs who tampary tramsfrom needs can
obtain double movement subsidy). The APs need to transform by themselves but they
can gain transform fees from the demolishers (100 yuan per person a month according
to the registered population). People who choose monetary resettlement can obtain an
one time transform fee for three month and people who choose property transform can
enjoy a transrorm period from moving from original houses to three months after
delivery the new houses. And the APs can obtain compensations for the telephones and
Community Antenna Television according the practice standards.
According to the ―General city planning of Jiande‖ and‖Regulatory plan of Mmu
industrial function area‖, the project plan to offer resettlement houses for APs which is
located in Mamazhou of Meicheng towship of Jiande. The resettlement area is current
water surface and planed to filled by soil. The resettlement area backs on the beautiful
Xin‘an river and faces to the mountains in south and east, while next to the Wumazhou
                        (Chart 6-2)the total area of which is 163392.83 ㎡
industry park in the west             ,                                      (Chart 6-1) .
The shape of the area is like a wedge with the length of 350 ㎡ at back, 40 ㎡ in south
part and 750 ㎡ from south to east. The transportation is convenient which can easily
strech to Lanxi though Baizhang line from the east and reach the 320 national roads
though the Wumazhou brige pf the planning. The environment is prefect and fitting for
resident and commercial. The majority of resettlement houses are low multilayer
apartments and terraces which are backing north and facing south. The house are built
bu the government basing on the principles of ―unit planning, unit design, unit
construction, uint supporting and unit resettlement‖. The resort parks, water supply and
drainage, electronic, transport; communication and CATV in the planning resettlement
area are designed basing on the planning. APs can select new house according on their
preference .People who choose the apartments can enjoy a preferential price of 450
yuan/m2 if their new houses area are less than the original ones; if not the extra area is
calculated by cost price and have a limitation of 50m2. People who choose the terraces
can enjoy a preferential price of 550 yuan/m2 if the area of their new houses area is less
than the original ones; if not the extra area is calculated by cost price. Therefore, the
APs have planty funds for the resettlement after they gain compensations. By
culculation, the total amout of housing compensation is 7.7103 million yuan.(the
demolition area is 12,295 m2 and the compensation standard is 576 yuan/ m2 which is
more than the price of resettlement house of 550 yuan/ m2) Therefore, the demolished
people have enough money for resettlement houses.


    Table 6-9 Principal Technical and Economic Indicators of the Planned Dwelling District
                                                                         2
      Area of Construction Land                           163392.83m
                                                                     2
        Overall Building Area                               96060m



                                           103
Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                          — Financed by World Bank


                                                             2
 Area of Building Land                              31220m
    Volume Fraction                                   0.59
    Building Density                                19.11%
      Green Land                                    33.50%
     HHs Planned                                      242

                                 305(includ. 63 ones built and supported by the
 Overall Parking Space
                                                    project)




           Chart 6-1 The location of planning resettlement area




            Chart 6-2 Status quo of planning resettlement area




                                   104
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank




              Chart    6-3 Effect pictures of planning resettlement houses
WWTP in the east district of Jiande
The total area of rural house in Dashimen village which is in the scope of environment
protecting line(500m) 8360.5 ㎡ according to the requirement;
                        is                                         and the affected HHs
are 31 with 122 people. The implement of demolition is based on the willings of
residents.
The APs can choose property transform resettlement or monetary resettlement. APs
can gain movement subsidy, temporary transform fee and award money, as well as the
compensations for the telephones and Community Antenna Television according the
practice standards.
This project has set a centralized resettlement area which located in the Chuangxin
road of new district in the east of city (chart 6-4). The area is 40 mu with flat land,
convenient transport and beautiful environment.
The demolition agencies will finisher the ground settlement and support consummate
public infrastructure before the construction of resettlement houses according the
principle of ―unit planning and unit management.
The APs can choose relocation resettlement and build new houses in their resettlement
area after drawing compensations. The process is that the villagers confirm their home
stands‘ locations after marking off the scope of land by village communities, and then
build the houses by themselves. The compensation will be a balance based on the
compensation standard of arable land if the area of demolished house is less than the
area of resettlement house. In addition, people can also choose collective construction
resettlement. A certain standard will be set according to the HHs type and the relative
regulations in Jiande. The house price is based on the cost price if the price is in the
standards, if not, the extra area will be in accordance with the market price.
It is found that the village collective and villagers basically agree the implementation of
the combination of two kinds of resettlement at present. In the 13 HHs in the research,
there are 7 HHs are prefer to the relocation resettlement and 6 HHs are prefer to the
collective construction resettlement. According to construction plans of the project, site
preparation and construction began in June 2010, and will be completed at least of
December 2010 the latest.




                                         105
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank




                 Chart 6-4 Planning resettlement area of Xiaya village
The house demolition involved in the project is adopted monetary resettlement. There
are only one resident housing which need to be demolished. In accordance with policies
and regulations, house owners in the register of agricultural accounts who choose
monetary resettlement can obtain triple compensation for the original residential
buildings. The village collective re-divided the housing sitehousing sites to the APs and
the APs will construct their own houses using the compensation.
The EGP in Shenze of Pan’an
Although Demolition of the project impact 19 rural HHs with 56 people, but 8 HHs with
24 people are only affected on miscellaneous ancillary rooms, there are only
11household with 32 people need to be relocates on the consultation of theXincheng
district management committee with the APs the project plan in line with the premise of
the new city will adopt a unified plan to provide housing sitehousing sites, by the way
the construction of the relocates self-placement.




          Chart 6-5 Planning resettlement area of Xincheng district(Shenze)
The demolition agencies will finish the ground settlement and support consummate
public infrastructure before the construction of resettlement houses according to the
principle of ―unit planning and unit management.

    (1) Tap water, electricity, CATV, telephone, can be accessed from neighboring
    backbone or the main line, the original compensation can meet the cost of new
    HHs;
    (2) the village committee will be responsible for the construction of settlement

                                         106
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



    roads

The APs can choose relocation resettlement and build new houses in their resettlement
area after drawing compensations. The process is that the villagers confirm their
housing sitess‘ locations after marking off the scope of land by village communities, and
then build the houses by themselves.

The wastes water project of Jiangnan town in Tonglu
The project involves the demolition of housing production will be transferred to
implement resettlement, relocationresettlement and monetary resettlement. According
to Jiangnan town planning, the Zhenxing West Road extension and market road
extension involving the demolition of the 13 residents will adjust capacity to implement
resettlement, the demolition of residential construction in the planning of settlements,
determined in accordance with resettlement of population resettlement area, the
demolition of housing area of more than the basic legal Some resettlement area, to
allow relocatees by comprehensive settlements replacement cost in the purchase, up to
a maximum of 30 basic placement of personnel per capita rice bag. The extension of
Zhaishi Road and Centre Avenue, related to the relocatees can choose their
resettlement way. Subsidies are relocatees moving standard 500 yuan per person, due
to be involved in the second move of the temporary transition, moving subsidy given by
the second. Demolition interim houses themselves, the transition cost standard of 400
yuan / person / month, due to the demolition causes the transition period of more than
"house demolition permit" provisions of the transitional period, starting from the late
issuance of the monthly 200 yuan / person / month; demolition really could not be
resolved by the transition houses, from demolition to provide not less than 20 square
meters / person transitional space, not entitled to interim payments. But the demolition
causes the transition period of more than "house demolition permit" provisions of the
transitional period, starting from the late distribution of monthly 200 yuan / person /
month.




 Chart 6-6 the status of Concentrated residential settlement after the demolition of the
                   extension of zhenxing west road ang market road
                  Effect pictures of concentrated resettlement houses
The project resettlement population will be in line with the rest of the Jiangnan town and
the Zhaixi Village unified planning under the premise of a unified plan to provide
housing sitehousing sites, by the way the construction of the relocates self-placement.
The demolition agencies will finish the ground settlement and support consummate
public infrastructure before the construction of resettlement houses according to the
principle of ―unit planning and unit management.
     (1) Tap water, electricity, CATV, telephone, can be accessed from neighboring
     backbone or the main line, the original compensation can meet the cost of new

                                         107
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



     HHs;
     (2) the village committee will be responsible for the construction of settlement
     roads
The APs can choose relocation resettlement and build new houses in their resettlement
area after drawing compensations. The process is that the villagers confirm their
housing sitess‘ locations after marking off the scope of land by village communities, and
then build the houses by themselves.
The subproject in Longyou
 According to "Economic Development Zone, Longyou removal of collective-owned land
compensation and resettlement requirements for residential housing", the project
involved demolish will resettled replacement, Construction of settlements in accordance
with unified planning and management principles. Housing Construction in the
settlement before the village committee will use the available infrastructure in the
affected compensation for doing site preparation work, and with good public
infrastructure, such as water, electricity and roads. The host villages offered the
relocation sites and take the original housing sites back.Planning factors to be adjusted
due to relocation resettlement sites, villages, or villages by the Economic Development
Zone with Longyou apply the replacement area, or occupy land Longyou Economic
Development Zone has been imposed, and click "Longyou County Industrial
Development Zone, land acquisition compensation resettlement measures "(Long
〔2003〕 government issued No. 10) file truncation. Non-agricultural population, land
resettlement and relocation housing area is less than the difference between the
implementation of resettlement area of all the premium, super-size part of the
construction area by 50 yuan per square meter charge. Housing for all housing sites are
in accordance with relevant provisions of the planning procedures and housing approval
process. Relocation Resettlement land area was affected families by planning, land
department standard. To compensate for all housing and resettlement, the original
housing from the landlord to disconnect, remove the materials owned by the original
homeowners. Relocation subsidies: the residential population, and each one-time grant
100. Temporary resettlement transition costs: The total residential population, per capita
lump-sum 150. Bonus: All of the affected families by the Government's work
requirements, arranging relocation agreements signed, demolition of houses, and give
some incentive, the Standard Award by the demolition of houses construction area of 20
yuan / m2 (excluding ancillary buildings).
6.3 Resettlement for Enterprises
According to the Jiangnan town planning, the project land acquisition affects two
companies. Tonglu Mingfa Knitting Co. left its plant in the existing reserve land, after
demolition can build plant in standby, won‘t affect its production and operation; Zhaixi
LPG stations exquisite, only a small part of its yard, not occupied the main office, sales
site, so little effect. Two companies don‘t need to move, and get the appropriate
compensation for demolition. The two companies will be located in main road next to
the Xincheng district, their production and operation conditions will be significantly
improved., after the competition of the Jiangnan town project.
6.4 Recovery Plan for the Affected Vulnerable Groups
In the affected population of this project, there are a vulnerable group of 5 HHs with 12
persons (accounting for 0.51% of the total affected population), involving three
sub-projects. The situation of vulnerable groups affected by the project is shown in
Table 6-10.


                                         108
           Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                     — Financed by World Bank



                             Table 6-10 The situation of vulnerable groups
                                     situation of vulnerable
                                                                                              Resettlement
NO.              Mane                        groups                Type        Difficulties
                                                                                                willings
                                       HHs         population
                                                                Elders who
                                                                                              Housing and
                                                                   do not
 1            LP of Jiande              1             1                         in want           living
                                                                    have
                                                                                              allowances
                                                                  families
           WWTP in the east                                      Disabled                         living
 2                                      1             4                         in want
           district of Jiande                                      person                     allowances
                                                                 Disabled
                                                                   person
           EGP in Shenze of                                                                       living
 3                                      3             7          who have       in want
               Pan‘an                                                                         allowances
                                                                basic living
                                                                allowances
              Total                     5             12


     LP of Jiande
     According to housing salvage policy for rural needy residents of Jiande: new building
     area in order to save the actual target population in the calculation of household
     registration book, one person HHs is generally not more than 40 square meters,
     increase 1 for each additional 20 square meters, each household in principle not more
     than 100 square meters. Repairs, carried out by the existing housing area.
     Replacement and leasing space is according to the standard control. The new relief
     funds by 320 yuan / square meter relief; replacement by 160 yuan / square meter relief;
     repairs according to the actual quantities of 70% relief, no more than 80 yuan / square
     meter; relief object which holds the first category have "basic living Jiande destitute
     disabled persons grant Jinling evidence" in the coefficient of aid by 1.1. Financing of
     housing assistance funds to cities and towns needed to budget for the main, the
     implementation of "individuals out of that group to help that Government to make some"
     way to rise. City Finance set up a special fund included in the fiscal year consolidated
     budget, city, towns and villages (districts offices) levels by 85% of the financial were
     15% and the proportion of commitment; village collective according to its own conditions,
     can be funded out of property or investment to help workers . Meet the minimal needs
     conditions; you can also apply for minimum living Jiande. In addition, the local
     government will integrate Mame - South Peak Industrial Park to provide employment
     opportunities to increase their income.
     WWTP in the east district of Jiande
     According to the survey, there is one household of 4 people of rural guaranteeing HHs
     the in the LA&HD of this project. According to the related policy of housing assistance
     for needy people in rural areas, new construction area is calculated by the actual
     population in the household registration book. The house area for one-person HHs is
     generally not more than 40 square meters and additional 20 square meters for each
     more person and each household does not exceed 100 square meters. House
     Repairment is carried out according to the existing housing area. The area of
     replacement and leasing is according to the above criteria. The financial aid for new
     house is 320 yuan / m2; financial aid for replacement is 160 yuan / m2; financial aid for
     repairs is 70% of the amount of actual work, and the maximum area is not more than 80
     yuan / m2; of which the first aid objects who hold the " basic living subsidy receiving
     evidence for poverty-stricken people with disabilities in Jiande " adopt the relief factor of
     1.1. The housing assistance funds is mainly based on city and township budget carried
                                                109
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



out the approach of "a part from personal, a part from collective and a part from
Government ". City Department of Finance set up a special fund included in the fiscal
year consolidated budget, and city as well as township (districts offices) take on the
fund by 85% and 15%, respectively. Village collective can find out of things or
increase the job opportunities to help the APs according to its own conditions.
Additionally, people who fit the situation can apply for the basic cost of living
allowances.
Pan’an Shenze Environmental Mnagement Project
Pan‘an Shenze environmental management project involves land acquisition and
relocation subsistence allowances HHs (disabled) 37. According to "the Notice of Pan
county government office on the issuance of low-income HHs Panan business loan and
discount Interim Measures " [Pan Municipal Government (2008) 47], matching objects,
can apply for business loans with amount of 20 thousand yuan (inclusive), in principle,
can credit; loan amount of 2 million yuan shall be provided or guaranteed by joint
guarantee or assurance. According to "the Notice of Pan county government office on
the issuance of urban and rural poor people Panan medical assistance measures for
implementation " [Pan Municipal Government (2009) 35], the object of eligible medical
expenses can own more than 2,000 yuan for relief, the deductible in 2001 yuan to
10,000 yuan can be between 35% relief, from 10,001 to 20,000 yuan by 40% between
the relief, from 20,001 to 35,000 yuan by 45% between the relief, between 35,001 to
50,000 yuan by 50%, more than 50,001 yuan assistance by 60%. According to "raise
the county on notice of the minimum living standard," [Pan Man (2009) 52], on the rural
minimum living standard of residents from 150 yuan to 165 yuan. Amount remaining on
the four categories identified: one 165, II 130 yuan, three 80, four 60. In the project's
construction process, the workers will have some employment opportunities, the
proposed new District Management Committee, under the same conditions, priority
vulnerable groups to enable them to benefit directly from the project.
6.5 Security for Women's Rights
A series of measures will be taken in each sub-project to ensure that women's rights are
protected in the preparation and implementation process of the project, mainly are as
follows:
     (1) Affected women have access to the information in the resettlement process,
and can participate in public consultation and resettlement. Compensation agreement
must be signed by both spouses.
     (2) The technical training should be given priority to affected women labor, in order
to ensure their economic status.
    (3) In the construction process of project, make ensure that a certain number of
women (at least 20% of the non-skilled labor) gain the non-skilled labor opportunities. In
addition, women will receive the same remuneration as men if they are doing the same
work;
    (4) In the running process of project, giving priority to cleaning, protection and
green jobs to project-affected women to ensure restoration of their income.
6.6 Affected Infrastructures and Ground Attachments
The affected infrastructure and ground attachments should be compensated to
ownership enterprises by project organizations and then reconstructed by the
ownership enterprises.
The rehabilitation measures on demolished facilities should be planned and disposed in
advance. And in the actual implementing, due to different conditions with different


                                         110
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



measures should be made for safety, high efficiency, being in time accurate to reduce
negative effect on the surrounding groups as much as possible.
As for the affected municipal public facilities, the demolishers should demolish
according to project‘s stakes map on the principle of no impact on project construction
to reduce movement as much as possible. As for movement of the affected pipelines,
demolishers should reconstruct (or remove) before demolish to ensure nature living of
residents along the lines including the residents who do not need to move.




                                         111
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



   7 Institutional Arrangement and Implementation Schedule
7.1 Institutes
The Construction Bureau of Zhejiang Province has established Zhejiang Provincial
Project Management Office(PPMO).The PPMO takes the responsibilities for directing
compilation of Resettlement Action Plan(RAP) and implementation management of land
acquisition and house demolition (LAHD) and communication with World Bank, etc. At
the same time, the County Project Management Office (CPMO) has been also
established in each county. The CPMO takes the responsiblities for compilation of RAP
of each subprojects and implementation management of LAHD and internal M&E, etc.
After the RAP of each subprojects are approved by WB, under the direction of Zhejiang
Provincial Project Management Office, each lmplementing institutes will choose house
demolition company with demolition qualification to implement house demolition and
responsible for implementation of house demolition. The land and Resources Bureau is
responsible for the implementation of the acquisition and resettlement of the rural
collective-owned land. Details are shown in Table 7-1




                                         112
                                  Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                            — Financed by World Bank



                                             Table 7-1 Resettlement institutes and responsibilities
            City/County                            Executing institutes                                           Implementing institutes
    No.
              District      Institutes           Responsibilities           Staff   Contact way             Institutes               Responsibilities
1         JIande                                                                                    Jiande WB project office
                                                                                                    Tonglu WB project office 、
2         Tonglu                                                                                    Jiangnan               Town
                                                                                                    andJiangnan new country
                                                                                                    constuction company
3         Zhuji                            Making      and    pursuing                              Zhuji WB project office       Implement the land
4         Qujiang                          resettlement          policy,                            Qujiang WB project office
                          Zhejiang                                                                                                cquisition and house
5         Longyou                          organizing compilation of                                Longyou WB project office
                          Provincial                                                                                              demolition and the
6         Wucheng                          RAP,                ensuring                             Wucheng WB project office
                          Project                                                                                                 resettlement
                                           implementation of RAP,
                          Management                                                                Panan WB project office、      according to      the
                                           appropriating           and
                          Office                                                                    ZHejiang Panan Industrial     RAP         which   is
7         Panan                            supervising the use of
                                                                                                    park   development    and     approved by WB.
                                           funds,and internal M&E, etc
                                                                                                    investment company ltd.
                                                                                                    Lanxi WB project office 、
8         Lanxi                                                                                     Youpu Town and Youpu
                                                                                                    infrastructure construction
                                                                                                    company ltd.




                                                                      113
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



In the implement of Zhejiang Qiantangjiang valley small town environment improvement
project by using WB loans, the planning, management, implement and monitoring
institutes of each city‘s subproject are divided into the following 8 types of institutes.
   Zhejiang Provincial Project Management Office
   County(district、city)WB project office
   Project lmplementing institute
   Government departments
   Demolition implementing institute
   Demolition evaluation institute
   Project design institute
   Hohai university NRCR
Zhejiang Provincial Project Management Office Responsible for directing the LAHD
and resettlement implementation, making policy, examining the RAP, and gathering the
internal M&E report to WB regularly.
County(district、city)WB project office Responsible for compilation of RAP,
implementation management of LAHD, management of resettlement funds,
organization and coordination, and implementation of internal M&E.
Project lmplementing institute Responsible for resettlement investigation, compilation
of RAP, implementation of LAHD.
Government departments Responsible for setting standard of the compensation of
LAHD and resettlement, transacting the LAHD procedure,
Demolition implementing institute Demolition implementing institute with demolition
qualification approved by governments and a high reputation and lots of experience,
accepts Project lmplementing institute‘s commission, and implements house demolition
including detailed real investigation, and negotiation with demolished people
representative of demolisher, and signing compensation agreements on LAHD, and
transacting house demolition procedure, and paying compensation funds, and
implementation of LAHD and resettlement.
Demolition evaluation institute Responsible for evaluation of price of land of
enterprise house, and evaluation of buildings and factory structures, and appraisement
of newness rate of attached buildings and evaluation of them.
Project design institute Responsible for design of the engineering projects, and
determining affected scale of LAHD.
Hohai university NRCR Responsible for providing technological assistance and
compilation of RAP.
To ensure smooth implementation of RAP, and strengthen prompt and effective
communication with Zhejiang project office and resettlement implementing institute and
WB, each subproject offices also have arranged professional staffs to responsible for
coordination and organization of resettlement and implementing of each subproject.
This staffs should have experiences to do the work related to LAHD. The resumes of
this stuff are shown in Table7-2.




                                         114
             Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                       — Financed by World Bank



                           Table 7-2 Resume of stuff of resettlement institute
                              Academic
City County
               Name           qualificati   Job experiences                                      contact way
District
                              ons

                                            1991.12-2007.12,    In   Jiande    construction
                              Undergra      bureau , real estate property transaction
                              duate    /    qualification management, and Meicheng Dam
                              real          management ; 2008.1 until now ,In Jiande             0571-64722
Jiande         Li Yinhua
                              estate        Committee of Development and Reform major            209
                              Economis      project office, government investment project
                              t             previous management, and major project
                                            inspection, and WB loan connection

Tonglu         Sheng          Undergra      Jiangnan Town Rural Construction              and    0571-64217
County         Chen           duate         Environmental Protection office                      877

                                            1981.09-1988.12 , Hefei Artillery Technology
                                            Instruction ,student、teacher;1989.01-2005.02,

Zhuji City     Chen Yulai
                              junior        Zhuji   Running-water    Company      Director 、     0575-87212
                              college                                                            018
                                            assistant manager、manager; 2005.03-2010.01,
                                            Zhuji Water Group engineering section ,section
                                            chief.

                                            2003.07-2004.06 In Qujiang construction
                                            bureau ,construction management section,
Qujiang                       Undergra      bidding office ; 2004.07-2006.12 In Qujiang          0570-36790
               Han Yong                     construction bureau engineering section ;
District                      duate                                                              32
                                            2007.01 until now,Qujiang construction bureau
                                            public utility,chief assistant、vice section chief.

                                            1992-2004     In Longyou Running-water
Longyou        Jiang          Undergra                                                           0570-72580
                                            Company;2004 until now In Long you industrial
County         Weiguo         duate                                                              03
                                            park management committee.

                                            1995.08-1999.12,In Jinhua Wucheng District
                                            Shenpan Reservoir Management Office ;
Wucheng        Sheng          Undergra      2000.01-2004.05 , In JinhuaJiufeng Reservoir 0579-82688
District       Yunzhong       duate         Construction Headquarters;2004.06 until now, 600
                                            Jinhua Wucheng District Shenpan Reservoir
                                            Management Office, party branch secretary.

Lanxi City                    junior        2000 until now,doing        town   and    country    0579-88889
               Lin Xuhui
                              college       management work                                      837
                                            1984.08-1990.06 , Panan People's Congress
                                            Office ; 1990.07-1991.12 , Panan County
                                            Fangqian Town Govenment;1991.01-1992.06, 0579-84666
Panan                         Undergra
County
               Hu Yongjin
                              duate         Panan      People's   Congress   Office ; 511
                                            1992.07-1996.01,Panan County Anwen Town
                                            demolition Headquarters ;1996.02 until now,
                                            Panan construction bureau.


                                                    115
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



7.2 Implementation Schedule
According to the schedule, Zhejiang Qiantangjiang valley small town environment
composite improvement project is to be finished from 2010 to 2015 by stages. The
schedule for resettlement goes with the schedule of each sub-project. The main work is
planned to begin in 2010.10 and end in 2015.12. The basic principles of connecting the
projects are as following: (1)LAHD should be finished one month before project
begins.So the APs have enough time to prepare the plan of production resettling and
income restoration,(2)In the resettlement progress, there should be opportunity for APs
to take part to the project.Before the beginning of the project, There should be an
announcement of the land occupation.and the resettlement propaganda manual shoud
be disseminated,and the public participation work shoud be did well.(3)All
compensation will be full-payout to property owners within 3 months,starting from the
land acquisition compensation and Resettlement Action Plan has been approved. Any
institute and person can not delegate them to use the property compensation.There
also should not be any discount in the payout progress for any reason.
According to the preparation and implementation progress, the overall schedule of
resettlement in each subprojects are drafted. Proper adjustment will be made due to
some little deviation from the plan. Detailed implementing times and plans are shown in
Table 7-3 and 7-4.
    Table 7-3 Detailed implementing times and plans of LAHD in each subprojects
                                                                         Progress sheet( a)
                                                      Tonglu                    Qujiang
     stage           mission         Jiande City                Zhuji City
                                                      County                    district
                 determine
                 affected scale      2009.11        2009.11    2009.11        2009.11
                 of LAHD
                 LAHD         real
                                     2009.12        2009.12    2009.12        2009.12
                 investigation
                 Initial    social
                 economic            2010.1         2010.1     2010.1         2010.1
                 survey
                 Negotiate the
preparation      Resettlement        2010.1         2010.1     2010.1         2010.1
stage            Action Plan
                 Compile       the
                 Resettlement        2010.1         2010.1     2010.1         2010.1
                 Action Plan
                 Announce the
                 Resettlement        2010.3         2010.3     2010.3         2010.3
                 Action Plan
                 Approve       the
                 Resettlement        2010.3         2010.3     2010.3         2010.3
                 Action Plan
                 Transact
                 approval
                                     2010.3         2010.3     2010.3         2010.3
                 procedures for
                 land acquisition
Implementation   Disclosure of
stage            policy       and    2010.3         2010.3     2010.3         2010.3
                 mobilisation
                 Issue         the
                                     2010.3         2010.3     2010.3         2010.3
                 announcement
                 Negotiate and       2010.3         2010.3     2010.3         2010.3
                                              116
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



                 sign         the
                 agreement
                 Relocate     the
                 houses      and     2010.3         2010.3       2010.3          2010.3
                 facilities
                 Delivery      of
                 construction        2010.4         2010.4       2010.4          2010.4
                 land
                 Relocating          2010.5~201     2010.5~201   2010.5~201      2010.5~201
                 housing built       1.4            1.4          1.4             1.4
                                     2011.10~20     2011.10~20   2011.10~20      2011.10~20
                 Movement
                                     11.11          11.11        11.11           11.11
                 Income
                                     2011.12        2011.12      2011.12         2011.12
                 restoring
Monitoring and   Monitoring and
                                     2010~2012      2010~2012    2010~2012       2010~2013
evaluation       evaluation



    Table 7-4 Detailed implementing times and plans of LAHD in each subprojects

                                                                           Progress sheet ( b)
                                      Longyou        Wucheng                       Panan
    Stage            Mission                                      Lanxi City
                                       County         district                     County
                 determine
                 affected scale      2009.11        2009.11      2009.11         2009.11
                 of LAHD
                 LAHD         real
                                     2009.12        2009.12      2009.12         2009.12
                 investigation
                 Initial    social
                 economic            2010.1         2010.1       2010.1          2010.1
                 survey
                 Negotiate the
Preparation      Resettlement        2010.1         2010.1       2010.1          2010.1
stage            Action Plan
                 Compile       the
                 Resettlement        2010.1         2010.1       2010.1          2010.1
                 Action Plan
                 Announce the
                 Resettlement        2010.3         2010.3       2010.3          2010.3
                 Action Plan
                 Approve       the
                 Resettlement        2010.3         2010.3       2010.3          2010.3
                 Action Plan
                 Transact
                 approval
                                     2010.3         2010.3       2010.3          2010.3
                 procedures for
                 land acquisition
                 Disclosure of
                 policy       and    2010.3         2010.3       2010.3          2010.3
Implementation
                 mobilisation
stage
                 Issue         the
                                     2010.3         2010.3       2010.3          2010.3
                 announcement
                 Negotiate and
                 sign          the   2010.3         2010.3       2010.3          2010.3
                 agreement
                 Relocate      the   2010.3         2010.3       2010.3          2010.3

                                              117
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



                 houses      and
                 facilities
                 Delivery      of
                 construction       2010.4         2010.4       2010.4       2010.4
                 land
                 Relocating         2010.5~201     2010.5~201   2010.5~201   2010.5~201
                 housing built      1.4            1.4          1.4          1.4
                                    2011.10~20     2011.10~20   2011.10~20   2011.10~20
                 Movement
                                    11.11          11.11        11.11        11.11
                 Income
                                    2011.12        2011.12      2011.12      2011.12
                 restoring
Monitoring and   Monitoring and
                                    2010-2015      2010-2015    2010-2012    2010-2015
evaluation       evaluation




                                             118
       Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                 — Financed by World Bank




                         8 Budget and Capital Resource
8.1 Capital Budget
The general budget1 includes the costcost of permanent land acquisition, the cost of
compensation for rural house demolition, the cost of compensation for infrastructures
and ground attachments, related tax fee and management fee.
Total cost of resettlement is 167.0099 million Yuan, accounting for 11.6% of total cost of
project, among which the direct fee is 82.103 million yuan (accounting for 49.16% of the
resettlement fee)
The project includes 13 subprojects. For the convenience, combine two of Quzhou
subproject to compile the Resettlement Action Plan, named Quzhou subproject;
combine Lanxi City Youbu own waste water treatment subproject and ancient town
infrastructure subproject to compile the Resettlement Action Plan, named Lanxi Youbu
subproject.
The resettlement fund will be included in the total project investment. The budget of
each subproject is shown in Table 8-1.




1
  The resettlement budget does not include the government provision social security fund for peasants
losing field.


                                                119
                                               Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                                         — Financed by World Bank



                                                                 Table 8-1 Budget of Resettlement Fund
                                                                                                                                             Module:104 Yuan
                                Jiande     Jiande     Panan       Panan       Quzhou                             Lanxi      Wucheng      Tonglu     Pan‘an
No.     Item                                                                             Longyou    Zhuji WS                                                   Subtotal
                                Landfill   WWTP       Shenze      Yunshan     WWTP                               Youpu      WSP          WS         Jianshan
       Permanent
1      collective-owned land      517.9      236.5      395.28       3.4        233.1     1364.28      93.09       156.5          0       566.34      98.77
       acquisition
       Compensation       for
2      rural           house     771.03     432.19      89.27         0         18.04      48.66       2.56          0            0       1508.08       0
       demolition
       Compensation       for
3      infrastructures   and       1.08     411.62       3.36       179.32       19.8      199.72       480        43.15        13.59        0       133.38
       ground attachments
       State-owned land use
4                                  1.41        0         4.14        2.74        0.3        4.2          0         2.18         174.2      1.12         0
       fee
Subtotal(1-4)                    1291.42    1080.31     492.05      185.46      271.24    1616.86     575.65      201.83        187.79    2075.54    232.15     8210.3
       Investigating     and
5      designing                  51.66      43.21      19.68        7.42       10.85      64.68       23.03       8.07          7.52      83.02      9.27
       expenditure 4%
       External         M&E
6                                 25.83      21.61       9.84        3.71        5.42      32.34       11.51       4.04          3.76      41.51      4.64
       expenditure 2%
       Internal         M&E
7      expenditure 0.5%            6.46       5.4        2.46        0.93        1.36       8.08       2.88        1.01          0.94      10.38      1.16

        Implementation
8       Management fee 2%          25.8      21.61       9.84        3.71        5.42      32.34       11.51       4.04          3.76      41.51      4.64

9       Training fee 1%           12.91      10.8        4.92        1.85        2.71      16.17       5.76        2.02          1.88      20.76      2.32
10      Prepared fee 10%         129.14     108.03      49.21       18.55       27.12      161.69      57.57       20.18        18.78     207.55      23.22
11      Related tax&fee          1122.94    358.26      508.86       4.34       340.65    3343.38      308.6       267.4          0       501.68     133.58
Subtotal(5-11)                   1374.74    568.92      604.81      40.51       393.53    3658.68     420.86      306.76        36.64     906.41     178.83     8490.69
Total                            2666.16    1649.23    1096.86      225.97      664.77    5275.54     996.51      508.59        224.43    2981.95    410.98    16700.99




                                                                                  120
                           Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                     — Financed by World Bank



Percentage(%)   15.96%   9.88%      6.57%       1.35%       3.98%     31.59%      5.97%       3.05%         1.34%   17.85%   2.46%   100%




                                                              121
              Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                        — Financed by World Bank



     8.2 Annual Investment Plan
     According to LAHD schedule of each subproject, annual capital utilizing plan is
     compiled. Details are shown in 8-2.
                             Table 8-2 Annual Capital Utilizing Plan Sheet
                                                                                               4
                                                                                Module:10 Yuan
    Item        2010          2011         2012          2013         2014          2015           Subtotal
Jiande
               1190.44      1358.94       116.78           /            /             /            2666.16
Landfill
Jiande
               1175.57       473.66          /             /            /             /            1649.23
WWTP
Tonglu WS      567.76        626.51       450.87         590.13      293.72        452.96          2981.95
Zhuji WS       398.6         498.26       99.65            /           /             /             996.51
Quzhou
               465.34        132.95        66.48           /            /             /             664.77
WWTP
Longyou        2013.67      1387.47       650.47         638.34      585.59           /            5275.54
Wucheng
               112.22         89.78        22.43           /            /             /             224.43
SPN
Lanxi
               305.15        152.58        50.86           /            /             /             508.59
Youpu
Panan
               109.69        219.37       219.37         219.37      219.37        109.69          1096.86
Shenze
Panan
                 22.6         45.2          45.2          45.2        45.17         22.6            225.97
Yunshan
Pan‘an
               266.85        132.58        11.55           /            /             /             410.98
Jianshan
Total          6627.89       5117.3       1733.66        1493        1143.9        585.25          16700.99
     8.3 Capital Resource
     The gross investment of this project is 1.434 billion yuan, in which 100.34 million dollars
     is loaned from World Bank (the exchage rate is 6.8)
     According to the schedule, the capital resource of each subprojects liclude financial aid,
     WB loan and self-financing and commercial bank loan, while the capital resource of
     resettlement includes government appropriation, self-financing and commercial bank
     loan.
     8.4 Capital Allocation And Management
      8.4.1      Resettlement Capital Allocation
     In this project, funds raised by oneself and commercial bank loan will be allocated to the
     demolished people or Land and Natural Resource Bureau by the project offices or the
     project owners. The government appropriation will be allocated to each subproject
     offices by Financial Bureau. In the Implementation progress, according the
     compensation policy and standard decided by the RAP, all kinds of compensation funds
     will be allocated to the demolisher or City/County Land and Natural Resource Bureau
     by each subproject offices or owners. The demolisher or City/County Land and Natural
     Resource Bureau allocate the LAHD expenditure to the affected institutes and people
     according to the agreement. Capital Allocation flow is shown in Figure 8-1.




                                                   122
        Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                  — Financed by World Bank




           Financial allocation of funds                         self-financing and commercial bank loan



                                                Project office of
                                              counties and cities



                                            Implementation agencies

                                            Of the

             Demolished         Affected             Land-lost         Attache         Aps of
             household          villages             APs               ment            TLO
                                of                                     and
                                collectiv                              property
                                e land                                 owner


               Chart 8-1 Process paragraph of resettlement fund allocation
8.4.2      Resettlement Capital Management
1) All the expenditure related to demolition and resettlement should be included in the
overall budgetary estimate of the project. The demolish and resettlement compensation
expenditure and other expenditure will to be allocated to the related institutes and
people by City Project Office through each subproject offices.
2) The house demolition compensation expenditure will be allocated to the displaced
persons (APs) before the implementation of demolition..
3) The factory and institute demolition and resettlement compensation expenditure will
be full allocated before the implementation of demolition, so the factory and institute can
rebuild or buy house.
4) To ensure land acquisition and resettlement of a smooth implementation, all kinds of
financial and supervising organizations should be established to ensure all funds on
position in time.




                                                     123
             Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                       — Financed by World Bank



            9 Public Participation, Consultation and Grievance and
                             Complaint Procedure
       9.1 Public Participation
       According to national, Zhejiang provincial and affected area policies and regulations
       about land acquisition and demolition, project should protect the legal rights of APss
       and enterprises reduce the discontent and dispute. So, at the rebuild and construction
       of project, displacement and resettlement policy and implementation rules,
       Resettlement Action Plan should be prepared well to achieve the goal of resettlement
       successfully and this project pays much attention to consult with APs and listen to their
       opinions on resettlement policy, plan and implementation.

       At present, each subproject is at preparation stage, the public participation at
       preparation stage is shown in Table 9-1.

                          Table 9-1 Public participation at preparation stage
                                                                                                    Main
 Project      Date           Organiser        Participator   Number      Purpose
                                                                                            suggestion/content
                                                                                           Introduce          the
                                                                                           project‘s background
                                           The affected               Project              and purpose;
                       The project office, people, the                proposal, spot       Site selection is to
           2009-6      Xiaya       Town country         50            check, Initial       decrease           the
                       Government,WWTP cadres, the                    affected scope       plowland acquisition;
                                           technicians                survey               Road selection is to
                                                                                           decrease           the
                                                                                           affected people
                                                                                           Assist the affected
                                                                                           scope survey;
                                                                                           The           resident
                                           The related                Prepare    the
Jiande                                                                                     delegates hstrongly
                       The project office, government                 RAP,
East                                                                                       expresses          the
           2009-9      Xiaya       Town departments 100               affected social
WWTP                                                                                       necessity of the
                       Government,WWTP and resident                   economic
                                                                                           project;
                                           delegates                  survey
                                                                                           Social      economic
                                                                                           survey and displced
                                                                                           persons suvey
                                                                      Publish        the   Publish            the
                                           Affected
                       The project office,                            RAP             or   compensation
                                           people and
           2009-12     Xiaya       Town               300             information          standard          and
                                           country
                       Government                                     handbook of          grievance         and
                                           cadres
                                                                      APss                 complaint procedure
                                                                      Publish        the
                       The    website    of
           2010-5                                                     first draft of the
                       county government
                                                                      RAP


                                                                      Inspect     the      From the statistics
                                                                      Shouchang            by    the       survey
                                         Affected
                       Meicheng    Town                               Landfill   and       team.80%             of
                                         people
Jiande                 Government,                                    make the APs         delegates said, after
           2009-9-26                     delegates   32
Landfill               Jiangshan Country                              to know the          inspect,     if    the
                                         and country
                       Committee                                      related              Meicheng        Landfill
                                         cadres
                                                                      technology           can be built as same
                                                                      and      make        as the Shouchang
                                                124
            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                      — Financed by World Bank



                                                                                               Main
 Project      Date          Organiser         Participator   Number      Purpose
                                                                                        suggestion/content
                                                                      them to dispel Landfill,they      will
                                                                      misgivings and approve            the
                                                                      change mind constuction of th
                                                                                       project
                                            The related               Prepare     the Assist the affected
                                            government                RAP 、 social scope survey , social
                      Hohai      University
           2009-9                           departments 100           economic         economic      survey
                      NRCR
                                            and resident              survey       for and         displced
                                            delegates                 affected scope persons survey
                      environmental
           2009-10    impact assessment
                      design institute
                                                                      Publish        the
                                                                                           Publish          the
                                                                      RAP and put
                                             Affected                                      compensation
                                                                      out
           2009-12    Project Owners         Country and 100                               standard        and
                                                                      information
                                             residents                                     grievance       and
                                                                      handbook of
                                                                                           complaint procedure
                                                                      APss
                                           The province               Publish        the
                      The    website    of
           2010-5                          project office             first draft of the
                      county government
                                           /WB                        RAP
                                                                                       No institute and
                      Lanxi Construction Affected                     Ask the APs person          proposed
           2008-7
                      Bureau             residents                    for advice       opposition to the
                                                                                       project
                      Youpu             Town Affected                 Ask the APs Most            residents
           2008-8
                      Government             Country                  for advice       approved the project
                                            The related               Prepare     the Assist the affected
                                            government                RAP 、 social scope survey , social
                      Hohai      University
           2009-10                          departments 100           economic         economic      survey
                      NRCR
                                            and resident              survey       for and         displced
                                            delegates                 affected scope persons survey
Lanxi
Youpu                 environmental
           2009-12    impact assessment
                      design institute
                                                                      Publish        the
                                                                                           Publish          the
                                                                      RAP and put
                                             Affected                                      compensation
                                                                      out
           2009-12    Project Owners         Country and 100                               standard        and
                                                                      information
                                             residents                                     grievance       and
                                                                      handbook of
                                                                                           complaint procedure
                                                                      APss
                                           The province               Publish        the
                      The    website    of
           2010-5                          project                    first draft of the
                      county government
                                           office/WB                  RAP


                                            The related               Prepare       the Assist the affected
                                            government                RAP , social      scope survey , social
                      Hohai      University
           2009-10                          departments 100           economic          economic      survey
                      NRCR
                                            and resident              survey      for   and         displced
Longyou
                                            delegates                 affected scope    persons survey
                      environmental
           2009-      impact assessment
                      design institute

                                                125
            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                      — Financed by World Bank



                                                                                                 Main
 Project      Date          Organiser        Participator    Number      Purpose
                                                                                           suggestion/content
                                                                      Publish        the
                                                                                           Publish          the
                                                                      RAP and put
                                             Affected                                      compensation
                                                                      out
           2009-12     Project Owners        Country and 100                               standard        and
                                                                      information
                                             residents                                     grievance       and
                                                                      handbook of
                                                                                           complaint procedure
                                                                      APs
                                            The province              Publish        the
                       The    website    of
           2010-5                           project                   first draft of the
                       county government
                                            office/WB                 RAP


                                            The related               Prepare        the Assist the affected
                                            government                RAP , social scope survey , social
                       Hohai     University
           2009-10                          departments 100           economic            economic      survey
                       NRCR
                                            and resident              survey          for and         displced
                                            delegates                 affected scope persons survey
                                                                      Publish        the
                                                                                          Publish           the
Panan                                                                 RAP and put
                                             Affected                                     compensation
                                                                      out
           2009-12     Project Owners        Country and 100                              standard         and
                                                                      information
                                             residents                                    grievance        and
                                                                      handbook of
                                                                                          complaint procedure
                                                                      APss
                                            The province              Publish        the
                       The    website    of
           2010-5                           project                   first draft of the
                       county government
                                            office/WB                 RAP


                                                                      Ask the APs
                                                                      that        they
                       Nanshandi Country                              agree          or Most       residents
           2004-11-5                         All residents
                       Miaojia Country                                disagree the approved the project
                                                                      construction of
                                                                      the project
                                                                                        In public notification
                                                                                        period, no institute
                       WWTP Preparatory Affected                      Project
           2005-3-26                                                                    and            people
                       Department       Country                       publicity
                                                                                        proposed           the
                                                                                        opposition
                                            The related               Prepare      the Assist the affected
                                            government                RAP 、 social scope survey , social
                       Hohai     University
           2009-9                           departments 100           economic          economic       survey
                       NRCR
Quzhou                                      and resident              survey        for and         displced
East                                        delegates                 affected scope persons survey
WWTP                                                                  Public       the
                                                                      environmental
                                                                      impact
                                             Affected                 assessment
           2009-11     Construction Bureau
                                             residents                report       and
                                                                      project
                                                                      proposal
                                                                      report
                                                                      Publish      the Publish             the
                                             Affected
                                                                      RAP and put compensation
           2009-12     Project Owners        Country and 100
                                                                      out               standard          and
                                             residents
                                                                      information       grievance         and

                                                126
            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                      — Financed by World Bank



                                                                                              Main
 Project      Date          Organiser       Participator   Number       Purpose
                                                                                        suggestion/content
                                                                    handbook        of complaint procedure
                                                                    APss
                                           The province             Publish        the
                      The    website    of
           2010-5                          project                  first draft of the
                      county government
                                           office/WB                RAP


                                            The related             Prepare        the    Assist the affected
                                            government              RAP 、 social          scope survey , social
                      Hohai      University
           2009-10                          departments 100         economic              economic      survey
                      NRCR
                                            and resident            survey          for   and         displced
                                            delegates               affected scope        persons survey
                                                                    Publish        the
Wucheng                                                                                   Publish          the
                                                                    RAP and put
SPN                                         Affected                                      compensation
                                                                    out
           2009-12    Project Owners        Country and 100                               standard        and
                                                                    information
                                            residents                                     grievance       and
                                                                    handbook of
                                                                                          complaint procedure
                                                                    APs
                                           The province             Publish        the
                      The    website    of
           2010-5                          project                  first draft of the
                      county government
                                           office/WB                RAP


                                                                    Ask the APs
                                        Land                        that        they
                      Caota        Town acquisition                 agree         or      All        residents
           2009-
                      Shangyu Country   affected                    disagree the          approved the project
                                        residents                   construction of
                                                                    the project
                                                                    Discuss and
                                                                    vote         the
                                                                    distribution
                                        Land
                                                                    and use plan
                      Caota        Town acquisition
           2009                                                     of the land           Reach an agreement
                      Shangyu Country   affected
                                                                    compensation
                                        residents
                                                                    fees         and
                                                                    resettlement
Zhuji                                                               fees
SPN                                                                 Prepare      the
                                            The related                                   Assist the affected
                                            government              RAP 、 social          scope survey , social
                      Hohai      University
           2009-9                           departments 100         economic              economic      survey
                      NRCR
                                            and resident            survey          for   and         displced
                                            delegates               affected scope        persons survey
                                                                    Publish        the
                                                                                          Publish          the
                                                                    RAP and put
                                            Affected                                      compensation
                                                                    out
           2009-12    Project Owners        Country and 100                               standard        and
                                                                    information
                                            residents                                     grievance       and
                                                                    handbook of
                                                                                          complaint procedure
                                                                    APs
                                           The province             Publish        the
                      The    website    of
           2010-5                          project                  first draft of the
                      county government
                                           office/WB                RAP


Panan      2009-12    Hohai      University The   related 100       Prepare       the Assist the affected

                                               127
            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                      — Financed by World Bank



                                                                                            Main
 Project      Date          Organiser        Participator   Number      Purpose
                                                                                      suggestion/content
WWTP                  NRCR                  government               RAP 、 social scope survey , social
                                            departments                              economic      survey
                                                                     economic
                                            and resident                             and         displced
                                                                     survey      for
                                            delegates                                persons survey
                                                                     affected scope
           2010-      environmental
                      impact assessment
                      design institute
           2010-                                                     Publish        the
                                                                                          Publish          the
                                                                     RAP and put
                                            Affected                                      compensation
                                                                     out
                      Project Owners        Country and 100                               standard        and
                                                                     information
                                            residents                                     grievance       and
                                                                     handbook of
                                                                                          complaint procedure
                                                                     APs
                                           The province              Publish        the
                      The    website    of
           2010-5                          project                   first draft of the
                      county government
                                           office/WB                 RAP


           2009-12                            The related            Prepare     the Assist the affected
                                              government             RAP 、 social scope survey , social
                      Hohai        University
                                              departments 100        economic         economic    survey
                      NRCR
                                              and resident           survey       for and       displced
                                              delegates              affected scope persons survey
           2009-      environmental
                      impact assessment
Tonglu                design institute
Jiangnan 2009-12                                                     Publish        the
WWTP                                                                                      Publish          the
                                                                     RAP and put
                                            Affected                                      compensation
                                                                     out
                      Project Owners        Country and 100                               standard        and
                                                                     information
                                            residents                                     grievance       and
                                                                     handbook of
                                                                                          complaint procedure
                                                                     APs
                                           The province              Publish        the
                      The    website    of
           2010-5                          project                   first draft of the
                      county government
                                           office/WB                 RAP
     In the implementation progress, the following progress and way will be used to
     encourage public participation and consultation:

     (1)The participation of APs

     The affected city/county will pick up delegates to assist related departments to widely
     ask the APss for advice and accept the reasonable advice and communicate the
     situations and answer the questions and seriously consider their advices and
     suggestions.

     In the implementation work such as LAHD detailed survey , make the compensation,
     demolition and resettlement agreement negotiation, construction and distribution of
     resettlement house and etc, the APs delegates will participate these work, so it can
     reflect the APs‘ benefit and suggestion and it also can assure the fairness, rationality
     and transparency of the resettlement work.

     (2)The property owners consult with the house-demolished people to make sure the
     resettlement method.
                                               128
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



Through the public participation, and make the property owners consult and
communicate with the house-demolished people. So the house-demolished people can
make reasonable suggestion about the resettlement method and location.

(3)Hold a consultation meeting

Before the demolition, Hold a consultation meeting which conclude the demolished
people, the company delegates, and women delegates (women delegates should
surpass 30%). In the meeting, introduce the situation of the project intensively to them,
and continue to listen their advices and suggestions, and make records so can consider
and concern them when the project is implementing.

(4)Hold a public meeting

Before the implementation of demolition, continue to explain the related policy and law,
the compensation standard and the implementation method. Make the public know it
earlier and prepare it earlier. The purpose is combining with the advice and suggestion
of the public and local concrete conditions, according to the WB policy and the country
policy, implement the project strictly.

(5)Report the demolition policy through a medium.

Through the TV station, newspaper, and broadcast, extensively publicize the related
policy and make sure the APs can know the information, On the other hand, distribute
the handbook to the APs extensively, and in some place can hold a living inquire
meeting.

(6)Publicize the demolition notice

The main contents of the notice are as following:the brief summary of the project, the
affected scale of LAHD, resettlement policy(include compensation standard), the
institute responsible for the implemtation of the resettlement, the house displacement
schedule, the right and responsibility of the APss, grievance and complaint, monitoring
and evaluation and so on.

(7)Publicize the RAP

 After the WB approved, The RAP will be publicized in each subprojects office so the
APss and governments can check it. At the same time, the copy will be sent to the office
or reference room of affected town, county and subdistrict so people can check it
convenience. The project office will publish a notice in local newspaper and mark the
RAP check point.

(8) Resettlement Information Handbook

Compile the main content of the RAP to the Information handbook of APss, and put out
it to the APss before the implementation.The main contents of the Information
handbook of APss are as following: the brief summary of the project, the affected scale
of the project, the compensation policy, the implementation institutes, the grievance and
complaint procedure. Through reading the Information, the APss can konw the whole
content of the project handbook of APss, and make reasonable suggestion about the
question and feedback to the project office.


                                         129
       Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                 — Financed by World Bank



2009.9-2009.12, in the social economic and Resettlement Action Plan survey of the
affected area, PPMO and each City/County project office company with Hohai
university organized a public opinion survey.
The public opinion survey included 214 samples of 8 County (City/District) of all LAHD
APs in 12 subprojects. Most people surveyed thought the construction of the project can
all benefit the country, city and person, and it mainly displays in the improvement of life
and the benefit of the body and mind. Most people said if their legitimate interest was
violated they would grievance and complaint, and most people acclaim protecting the
legitimate interest of the APs and making sure the transparency, justice and fairness of
the LAHD.
See the results of the survey in Table 9-2.
                               Table 9-2 Public opinion survey
                                                                     Results
     Questions                    Answer
                                                       (1)   (2)     (3)       (4)      (5)

   The affected type
                        1)HD    2)LA 3)LAHD
of the answerer                                              77%     23%

Do you know the
construction            1)          Do
                          Know 2) not know       3)
situation    of the     Completely do not know         52%   38%     10%
project

Do you agree with
the implementation      1)Yes    2)No    3) Careless
                                                       69%   23%     8%
of the project?

                        1 ) Improving         living
                        environment    2) Improving
What benefits do you
                        working environment     3)
think the project may
                        Solving the drinking water
brings(multiple                                        62%   15%               15%
choice)                 problem       4 ) Providing
                        employment opportunity and
                        income 5)Others

What        negative      Life
                        1) be affected 2)    work or
impacts do you think    production be affected 3)
the   project   may     The man-land relationship be
                                                       62%   15%     46%       31%
causes(multiple         more nervous     4)Income
choice)                 decline 5)Others

Do you know the
policies for land
                        1)Know 2)   Know some 3)
acquisition   and
                        Do not know              15%         46%     38%
resettlement
compensation?

                        1) Reduce demolition scale
What is your opinion
                        as many as possible       2)
and suggestion to
                        Reduce land aciquisition as    46%   54%     69%       69%
the project?
                        many as possible 3) Hire
                        local labor force as many as
                                           130
       Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                 — Financed by World Bank



                                                                       Results
     Questions                      Answer
                                                           (1)   (2)   (3)       (4)    (5)

                         possible     4) Use local
                         material as many as possible
                         5)Others

                         1) All distribute to the APs
                         and do not readjust the land
                         and finding job by themselves
                         2)The country get the land
                         compensation       and     the
What       is    your    resettlement           subsidy
requirement     about    distribute to the APs and take
the use of land          part in the APss social
compensation and         security 3) The country get all
resettlement                                               85%                   8%
                         the funds and readjust the
subsidy ?(ask land       land 4) The resettlement
aciquisition APs)        subsidy distribute to the APs,
                         the land compensation be
                         used to develop the factory
                         by the country and do not
                         readjust the land          5)
                         Others

Do you want to take
part in the APss
                          1)Yes     2)No
social security after                                      92%   8%
the land aciquisition?

 If you want to and it   1)Less than 5000 Yuan; 2)
needs you to pay
                         5001-10000 Yuan ; 3 )
some fees, how
much do you want to      10001-20000 Yuan;4)more 38%             8%    46%
pay?                     than 20001 Yuan

                         1)The fee paid by myself is
If you do no want to,    too much ; 2 ) The security
what is the main         level is too low;3)It will take
                                                                       8%
reason?                  too much time to enjoy;4)
                         Others(Please list )

                         1 ) Relocation in our own
                         country,    unified    arrange
Your house will be       housing          sites       to
demolished, which
                         reconstruction 2)Give cash
resettlement method
                         compensation, buy house by        8%                    15%
do you want?(ask
demolish APs)            our ownself 3)Supply the
                         reconstruction house       4)
                         Others


To deal correctly and timely the problems and requests of APs occurred in land
acquisition and house demolition, further consultation should be carried out so that all
problems can be solved before the implementation of RAP. Resettlement

                                              131
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



implementation institutes will arrange public participation meetings, so as to provide
APs with opportunity to consult with resettlement implementation institutes before
signing demolition compensation contract. The detail is shown in Table 9-3 and Table
9-4.




                                         132
                           Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                     — Financed by World Bank



                                            Table 9-3 Public Participation Plan for APs
  Project        Date       Place                    Participant                              Contents                          Memo

                                       Jiande WB loan project leading group, The social economics survey for
                                                                                                                     Project effect in social
            2009-9      Xiaya County   Xiaya LAHD office, the staff of survey resettlement ,      affected scope and
                                                                                                                     economic survey
                                       institute, the APs                     practicality survey

                                                                             Compensation         and       resettlement Initial   consultation
                                       Jiande WB loan project leading group,
            2010-10     Xiaya County                                         policies and       primary     resettlement about              the
                                       Xiaya LAHD office, the APs
                                                                             programming                                 compensation policies

                                                                                                                   Discussion about the
                                                                                                                   ultimate       income
Jiande                                                                                                             restoration plan and
                                       Jiande WB loan project leading group, Detemines the income restoration plan
            2009-11     Xiaya County                                                                               the use plan of the
                                       Xiaya LAHD office, the APs            and implement it
East                                                                                                               compensation funds by
                                                                                                                   holding a residents
WWTP                                                                                                               meeting

                                                                             1)Check deficiency,and detemine the
                                                                             ultimate affected scope; 2)List of the
                                       Jiande WB loan project leading group,
            2010-12     Xiaya County                                         occupancy land and property loss; 3)
                                       Xiaya LAHD office, the APs
                                                                             Prepare the compensation agreement
                                                                             prime contract;

                                                                                                                        Consulation       and
                                       Jiande WB loan project leading group,
            2010-1      Xiaya County                                         Choose the resettlement house              discussion by holding
                                       Xiaya LAHD office, the APs
                                                                                                                        residents meeting




                                                               133
                            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                      — Financed by World Bank



   Project        Date       Place                     Participant                               Contents                         Memo

                                                                                  1 ) The schedule and effect of
                                                                                                                         The           residents
                                                                                  displacement; 2 ) Compensantion
                                                                                                                         participate         the
             2010-2013   Xiaya County   The monitoring and evaulation institute   payment; 3)Information distribution; 4)monitoring         and
                                                                                  Income     restoration  and      house evaulation
                                                                                  reconstruction



                                        Jiande WB loan project leading group, The social economics survey for
                         Jianshan                                                                                        Project effect in social
             2009-9                     Meicheng LAHD office, the staff of survey resettlement ,      affected scope and
                         Village                                                                                         economic survey
                                        institute, the APs                        practicality survey

                                                                              Compensation          and      resettlement Initial   consultation
                         Jianshan       Jiande WB loan project leading group,
             2010-10                                                          policies and        primary    resettlement about              the
                         Village        Meicheng LAHD office, the APs
                                                                              programming                                 compensation policies
Jiande
                                                                                                                    Discussion about the
Meicheng                                                                                                            ultimate       income
                                                                                                                    restoration plan and
                         Jianshan       Jiande WB loan project leading group, Detemines the income restoration plan
Landfill     2009-11                                                                                                the use plan of the
                         Village        Meicheng LAHD office, the APs         and implement it
                                                                                                                    compensation funds by
                                                                                                                    holding a residents
                                                                                                                    meeting

                                                                              1)Check deficiency,and detemine the
                         Jianshan       Jiande WB loan project leading group,
             2010-12                                                          ultimate affected scope; 2)List of the
                         Village        Meicheng LAHD office, the APs
                                                                              occupancy land and property loss; 3)
                                                                              Prepare the compensation agreement




                                                                 134
                             Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                       — Financed by World Bank



   Project        Date       Place                      Participant                               Contents                         Memo

                                                                                  prime contract;

                                                                                                                          Consulation       and
                         Jianshan       Jiande WB loan project leading group,
             2010-1                                                           Choose the resettlement house               discussion by holding
                         Village        Meicheng LAHD office, the APs
                                                                                                                          residents meeting

                                                                                  1 ) The schedule and effect of
                                                                                                                         The            residents
                                                                                  displacement; 2 ) Compensantion
                         Jianshan                                                                                        participate          the
             2010-2013                  The monitoring and evaulation institute   payment; 3)Information distribution; 4)
                         Village                                                                                         monitoring          and
                                                                                  Income     restoration  and      house evaulation
                                                                                  reconstruction



                         The      project Jiande WB loan project leading group, Social       economic  survey          for
             2009-12                                                                                                       Project    effect   in
                         affected village Youpu Town, the APs                   resettlement, affected scope          and
                                                                                                                           socio-economic survey
                                                                                practicality survey
                                                                                                                         Primary negotiation in
                         The      project Jiande WB loan project leading group, Compensation          and   resettlement
             2010-1                                                                                                      preparation           for
                         affected village Youpu Town, the APs                   policies and        primary resettlement
                                                                                                                         Resettlement      Action
Lanxi                                                                           programming
                                                                                                                         Plan
Youpu                                                                                                                    Further negotiation of
                         The      project Jiande WB loan project leading group,                                          compensation policies
             2010-2                                                             Compensation        and     resettlement
                         affected village Youpu Town, the APs                                                            and rehabilitation plan
                                                                                policies and resettlement programming
                                                                                                                         in            amending
                                                                                                                         resettlement
                         The      project                                                                                Makeup negotiation for
                                          Jiande WB loan project leading group, Resettlement policies and particular
             2010-3      affected village                                                                                particular questions in
                                          Youpu Town, the APs                   questions of programming
                                                                                                                         final     version      of




                                                                 135
                       Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                 — Financed by World Bank



  Project   Date       Place                     Participant                              Contents                           Memo

                                                                                                                     resettlement


                   The      project Longyou WB loan project leading group, Publicize the land occupation area and Temporary occupation
                   affected village Mohuan Town, the APs                   compensation standard                  of land post

                                                                                                             The compensation of
                   The      project Longyou WB loan project leading group,
                                                                           The compensation fees and form of temporary occupation
                   affected village Mohuan Town, the APs
                                                                           payment                           of land post

                                                                           1)Check deficiency,and detemine the
                                                                           ultimate affected scope; 2)List of the
                   The      project Longyou WB loan project leading group,                                        Check      the     real
                   affected village Mohuan Town, the APs                   occupancy land and property loss; 3) investigation
                                                                           Prepare the compensation agreement
                                                                           prime contract.
Longyou
                                                                           Discussion about the ultimate income Detemine the income
                   The      project
                                    Longyou WB loan project leading group, restoraton plan and the use plan of the restoration   and
                   affected village
                                    Mohuan Town, the APs                   compensation funds                      implement it

                   The      project Longyou WB loan project leading group, Discussion    about   the      training
                                                                                                                     Training plan
                   affected village Mohuan Town, the APs                   acquirement and make a plan

                                                                           1 ) The schedule and effect of
                                                                           displacement; 2 ) Compensantion
                   The      project
                                    Longyou WB loan project leading group, payment; 3)Information distribution; 4)evaluation
                   affected village
                                    Mohuan Town, the APs                   Income     restoration  and      house
                                                                           reconstruction




                                                          136
                              Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                        — Financed by World Bank



  Project        Date         Place                      Participant                               Contents                          Memo



                                                                                    Social       economic   survey     for
                                         The staff of project office, the APs Hohai                                          Project effect in social
            2009.9      The      project                                            resettlement, affected scope and
                                         university NRCR project team                                                        economic survey
                        affected village                                            practicality survey
                                         The staff of county project office and
                                                                                                                             Primary negotiation in
                                         demolition office and the construction Compensation            and   resettlement
                        The      project                                                                                     preparation         for
            2009.10                      bureau and the Land and resources policies and primary resettlement
                        affected village                                                                                     Resettlement    Action
                                         bureau, the APs Hohai university NRCR programming
Panan                                    project team                                                                        Plan
                                                                                                                             Further negotiation of
                                                                                                                             compensation policies
                        The      project The county project office and the affected Compensation        and     resettlement
            2009.11                                                                                                          and rehabilitation plan
                        affected village people                                     policies and resettlement programming
                                                                                                                             in           amending
                                                                                                                             resettlement
                                                                                                                             Makeup negotiation for
                        The      project                                            Resettlement policies and particular particular questions in
            2009.11                      The county project office and the APs
                        affected village                                            questions of programming                 final    version      of
                                                                                                                             resettlement


                                                                                   Social       economic  survey         for
                        The      project                                                                                     Project    effect   in
Quzhou      2009-12                      The staff、the affected resident           resettlement, affected scope         and
                        affected village                                                                                     socio-economic survey
                                                                                   practicality survey
East                                                                                                                        Primary negotiation in
                                         Quzhou and qujiang district WWTP Compensation                 and     resettlement
                        The      project construction preparing leading group,                                              preparation         for
            2010-1                                                               policies and        primary   resettlement
WWTP                    affected village                                                                                    Resettlement    Action
                                         Zhangtan districts LAHD office, the APs programming
                                                                                                                            Plan
            2010-2      The       project Quzhou   and   qujiang   district WWTP Compensation          and     resettlement Further negotiation of




                                                                   137
                               Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                         — Financed by World Bank



  Project           Date        Place                      Participant                               Contents                          Memo

                           affected village construction preparing leading group, policies and resettlement programming compensation policies
                                            Zhangtan districts LAHD office , the                                        and rehabilitation plan
                                            affected people                                                             in           amending
                                                                                                                        resettlement
                                            Quzhou and qujiang district WWTP                                            Makeup negotiation for
                           The      project construction preparing leading group, Resettlement policies and particular particular questions in
            2010-3
                           affected village Zhangtan districts LAHD office , the questions of programming               final    version      of
                                            affected people                                                             resettlement


                           The      project                                           Social       economic  survey        for
            2009-9                          The staff、the affected resident                                                    Project    effect   in
                           affected village                                           resettlement, affected scope        and
                                                                                                                               socio-economic survey
                                                                                      practicality survey
                                            Jinghua City and Wucheng district WWTP                                             Primary negotiation in
                           The      project                                           Compensation       and      resettlement
Wucheng     2010-1                          construction preparing leading group, the                                          preparation          for
                           affected village                                           policies and     primary    resettlement
                                            affected people                                                                    Resettlement     Action
                                                                                      programming
Water                                                                                                                          Plan
                                                                                                                               Further negotiation of
Supply                                      Jinghua City and Wucheng district WWTP
                           The      project                                                                                    compensation policies
            2010-2                          construction preparing leading group, the Compensation        and     resettlement
                           affected village                                                                                    and rehabilitation plan
                                            affected people                           policies and resettlement programming
                                                                                                                               in           amending
                                                                                                                               resettlement
                                            Jinghua City and Wucheng district WWTP                                             Makeup negotiation for
                           The      project
            20104                           construction preparing leading group, the Resettlement policies and particular particular questions in
                           affected village
                                            affected people                           questions of programming                 final    version      of
                                                                                                                               resettlement




                                                                    138
                             Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                       — Financed by World Bank



   Project        Date        Place                      Participant                               Contents                         Memo

                                          Zhuji City WB loan project leading group, The social economics survey for
                         The      project                                                                                  Project effect in social
             2009-10                      the survey institute staff, the affected resettlement ,       affected scope and
                         affected village                                                                                  economic survey
                                          people                                    practicality survey

                                                                                   Compensation       and     resettlement Initial   consultation
                         The      project Zhuji City WB loan project leading group、
             2010-1                                                                policies and     primary   resettlement about              the
                         affected village Caota Town、 APs , the Water Group
                                                       the                         programming                             compensation policies

                                                                                                                         Discussion about the
                                                                                                                         ultimate       income
                                                                                                                         restoration plan and
                         The      project Zhuji City WB loan project leading group、Detemines the income restoration plan
Zhuji        2010-1                                                                                                      the use plan of the
                         affected village Caota Town、 APs , the Water Group and implement it
                                                       the                                                               compensation funds by
Water                                                                                                                    holding a residents
                                                                                                                         meeting
Supply
                                                                                   1)Check deficiency,and detemine the
                                                                                   ultimate affected scope; 2)List of the
                         The      project Zhuji City WB loan project leading group、
             2010-3
                         affected village Caota Town、 APs , the Water Group occupancy land and property loss; 3)
                                                       the                         Prepare the compensation agreement
                                                                                   prime contract;

                                                                                    1 ) The schedule and effect of
                                                                                                                           The           residents
                                                                                    displacement; 2 ) Compensantion
                         The      project                                                                                  participate         the
             2010-2013                    The monitoring and evaluation institute   payment; 3)Information distribution; 4)
                         affected village                                                                                  monitoring         and
                                                                                    Income     restoration  and      house evaulation
                                                                                    reconstruction




                                                                   139
                            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                      — Financed by World Bank



  Project        Date        Place                      Participant                               Contents                          Memo



                                                                                     The social economics survey for
                        The      project Panan WB loan project leading group, the                                           Project effect in social
            2009-12                                                                  resettlement ,      affected scope and
                        affected village survey institute staff, the affected people                                        economic survey
                                                                                     practicality survey

                                         Panan WB loan project leading group、 Compensation            and      resettlement Initial   consultation
                        The      project
            2010-1                                                   management policies and        primary    resettlement about              the
                        affected village Jianshan    Town,     the
                                         committee, the affected people         programming                                 compensation policies

                                                                                                                      Discussion about the
Panan                                                                                                                 ultimate       income
                                         Panan WB loan project leading group、                                         restoration plan and
                        The      project                                        Detemines the income restoration plan
            2010-1                                                                                                    the use plan of the
Jianshan                affected village Jianshan    Town,     the   management and implement it
                                         committee, the affected people                                               compensation funds by
                                                                                                                      holding a residents
WWTP
                                                                                                                      meeting

                                                                                1)Check deficiency,and detemine the
                                         Panan WB loan project leading group、 ultimate affected scope; 2)List of the
                        The      project
            2010-3                                                   management occupancy land and property loss; 3)
                        affected village Jianshan    Town,     the
                                         committee, the affected people         Prepare the compensation agreement
                                                                                prime contract;

                                                                                   1 ) The schedule and effect of The                     residents
                        The      project                                                                                  participate           the
            2010-2013                    The monitoring and evaluation institute   displacement; 2 ) Compensantion
                        affected village                                                                                  monitoring           and
                                                                                   payment; 3)Information distribution; 4)evaulation
                                                                                   Income    restoration   and      house




                                                                  140
                            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                      — Financed by World Bank



  Project        Date        Place                      Participant                                 Contents                       Memo

                                                                                   reconstruction



                                         Tonglu WB loan project leading group, The social economics survey for
                        The      project                                                                                 Project effect in social
            2009-12                      the survey institute staff, the affected resettlement ,      affected scope and
                        affected village                                                                                 economic survey
                                         people                                   practicality survey

                                                                                Compensation           and     resettlement Initial   consultation
                        The      project Tonglu WB loan project leading group,
            2010-1                                                              policies and         primary   resettlement about              the
                        affected village the Jiangnan Town, the affected people
                                                                                programming                                 compensation policies

                                                                                                                     Discussion about the
                                                                                                                     ultimate       income
                                                                                                                     restoration plan and
Tonglu                  The      project Tonglu WB loan project leading group, Detemines the income restoration plan
            2010-2                                                                                                   the use plan of the
                        affected village the Jiangnan Town, the affected people and implement it
                                                                                                                     compensation funds by
WS                                                                                                                   holding a residents
                                                                                                                     meeting

                                                                                1)Check deficiency,and detemine the
                                                                                ultimate affected scope; 2)List of the
                        The      project Tonglu WB loan project leading group,
            2010-3
                        affected village the Jiangnan Town, the affected people occupancy land and property loss; 3)
                                                                                Prepare the compensation agreement
                                                                                prime contract;

                        The      project                                           1 ) The schedule and effect of The                    residents
            2010-2013                    The monitoring and evaluation institute
                        affected village                                           displacement; 2 ) Compensantion participate                 the
                                                                                   payment; 3)Information distribution; 4)monitoring          and




                                                                  141
                                     Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                               — Financed by World Bank



   Project          Date             Place                        Participant                                Contents                            Memo

                                                                                              Income     restoration    and    house evaulation
                                                                                              reconstruction


                                                         Table 9-4 Policy Disclosure Process
                                                Publicizing Type and used
                 Documents                                                             Publicizing date                       Publicizing site
                                                         language

                                               Chinese, the website of
Project introdution on engineering                                     2009.9-2010.4
                                               project area government

introduction of information on land acquisition Chinese, the website of
                                                                        2009.12-2010.3
and house demolition                            project area government

                                               Chinese, the website of
LAHD policy                                                            2010.1
                                               project area government

                                                                                After checked & approved by
Notice on publishing RAP                       Chinese                                                      The affected town, districts and village
                                                                                WB

                                               Chinese, distribute to the After checked & approved by
Information handbook of APss                                                                          The affected town, districts and village
                                               APss                       WB

                                                                                After checked & approved by
Resettlement Action Plan report                Chinses, English                                             The affected town, districts and village
                                                                                WB




                                                                           142
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



9.2 Effect Assessment
In design and preparation stage of this project, Public Participation has received good
effects:

Landfill Project in Meicheng township of Jiande

Meicheng Town and Jiangshan Country have organized 32 APs delegates to discuss
and inspect Shouchang Town Landfill on the Sep 26th, 2009(Chart 9-1and Chart
9-2).This inspection has received a good effect. What‘s more, the modernization
treatment facilities and good surrounding environment left a deep impression for the
APs delegates. Before the inspection, most of the APs have doubt of this project. So
this inspection has reduced largely fear of the APs. And after it, most of the APs
delegates (85%) said if this Landfill could be built as same as the one of Shouchang,
they will accept it. In the selection process of demolition resettlement measures,
through the communication and consultation with the project owners and local
governments, the APs delegates intentionally selected to replace the resettlement land
in the industrial park of Wumazhou, Jiande. Because this land has convenient traffic,
complete Cultural heritage and many companies, it is great benefit for the APs to
recover income and improve life quality.




          Chart 9-1 forum of Landfill Project in Meicheng township of Jiande




                     Chart 9-2 the APs delegates inspect Landfill
Landfill Project in Jianshan of Pan’an


                                         143
       Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                 — Financed by World Bank



In the design stage of this subproject, the APs participated positively, and the public
participation has received a good effect. In the firstly location plan, because the land is
flat and has good output, it is benefit for constructing. The APs have raised reasonable
advice through positive inspection. According to the result, the designing unit has
adjusted the plan. At present, the scope of location is mostly mountain. Although the
difficult and the cost of construction increased, it has reduced to occupy the arable land.

WWTP in Shenze of Pan’an

In the design stage of this subproject, the APss participated positively, and the public
participation has won a good effect. In the process of road towards design, with the
communication and consultation with the project owners and local government, the APs
have adjusted the part of original road toward, so it caused that number of houses avoid
to being demolished and part of good quality arable land occupation has been redused.

Water supply project of Qingshan in Zhuji

Background: the original location plan of Qingshan water station in Zhuji is located in
Shangyu Village. And there are 10(30 points) determined graves within the station.
Moving grave is a sensitive problem in China. As long as it is dealt correctly, it will lead
to greater social conflicts.

Participation process:

(1) After the location plan is determined, the government will publish the information of
land acquisition for the APs, especially for the village which graves belong to. And it is
sure that the grave owners can get information in time. What‘s more, the government
will set time limit to request grave owners to register with the government.

(2) Though the registration and survey, the town government will determine the number
of graves and owners, and publish it in its villagevillage.

(3) The government will organize a forum to inform grave owner‘s policy and
compensation standard about moving graves. Meanwhile, the government will
determine the plan and fees of moving graves by consulting. With respectable principle,
the government fully listens to participants‘ advice.

Meeting result: most of graves belong to one clan of Loujiadi village, because of long
age( it can date back to the Qing Dynasty ) and deep emotion, the graves owners
believe that the graves are symbol of their clan. So they do not want to move away.

(4) Zhuji government, Caota town government, Water company and project design
office have discussed attitudes and opinions of graves owners, and try to find a solution
to substitute the original plan.

(5) In the forum, graves owners question whether they can let the location down so that
it can avoid to moving graves. After survey, they proof it is technically feasible, but it
need to occupy part of land in Shnagyu village. So the town government has organized
village meeting and raise this plan. The villagers agree with it.

Participation result:

(1) Avoiding to moving graves and leading to a greater social conflicts.

                                          144
       Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                 — Financed by World Bank



(2) Fully respecting the villagers of Shangyu Village and getting their agreements and
support, so it is benefit to go on this project.

(3) Forming a transparent and equitable treatment plan to deal with the events of land
acquisition. It can be extended to deal with other events.

9.3 Grievance and Complaint Procedure
As the APs have participated in the implementation of resettlement, it will not appear huge
controversy. But in the compilation and implementation of the RAP of Zhejiang
Qiantangjiang valley small town environment improvement project by using WB loans, for
protecting the APs have a channel to lodge grievance and complaint in each aspects about
the land acquisition and resettlement, The grievance mechanism was established. It has 4
phase:
        Phase 1: APs can appeal by verbal or paper way to village committee, the
demolition implementation institute. If by verbal way, disposal and written record are needed.
Village committee, the demolition implementation institute should solve it in 2 weeks;
       Phase 2:If APs are still unsatisfied with the decision of phrase 1, they can appeal
to each subproject offices/manage institutes; each subproject offices/manage institutes,
should make decision in 2 weeks;
        Phase 3:If APs are still unsatisfied with the decision of phrase 2,after get the
decision,according to the ―Administrative Procedure Law of PRC‖,they can appeal to
administration with jurisdiction progressively, and go to arbitration.
       Phase 4:If APs are still unsatisfied with the arbitration decision, they can sue at
law under civil procedures after receiving a decision notice.
The APss can sue on any aspect of the resettlement, include the compensation standard.
The above grievance approaches, will notify the APss through meeting and other methods,
so the APss can know they have the right of grievance. At the same time, the medium is
used to enforce report. All aspects of advice and suggestion about the resettlement will be
arrange to information clause, so resettlement institute at all levels can research and deal
with timely. All kinds of institute will reiceive the grievance and complain of APs for free. The
fees from this will be paid from the resettlemen.




                                            145
       Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                 — Financed by World Bank



                         10 Monitoring and Evaluation
To ensure a smooth implementation of RAP and achieve the aim of properly resettled,
according to the requirements of the World Bank Operational Policies OP4.12
―Involuntary Resettlement‖ and ―Resettlement Monitoring and Evaluation (M&E) of the
World Bank Loan Projects in China Business Guide‖; the project will monitor and
evaluate the implementation of land acquisition and house demolition and resettlement
activities regularly. Independent monitoring agencies have two parts: internal M&E and
independent external M&E. Monitoring and evaluation are from Jun. 2010 to Dec. 2015.
According to the processes of construction and resettlement of each subproject, the
project office will submit internal M&E report and external M&E report every a half year.
10.1     Internal Monitoring
The PPMO and CPMOs operate an internal M&E mechanism to detect resettlement
activities. The CPMO builds a basic database of LAHD and resettlement and uses it to
work out RAP, monitor all the resettled HHs and demolished agencies, and carry out
internal M&E on the whole preparation and implementation process.
10.1.1 Implementation Procedures
During Project Implementation, resettlement information will be gathered and recorded
by each WB loan projects leading groups according monitoring samples, which will be
timely pass to Zhejiang Qiantangjiang valley small town environment improvement
project leading group to keep consecutive monitoring record. Zhejiang Qiantangjiang
valley small town environment improvement project leading group will do regular
inspection on implementation.
Information tables of prescribed form will be used in above mentioned monitoring
operational mechanism to keep consecutive information current from related institutes
to Zhejiang Qiantangjiang valley small town environment improvement project leading
group. Regular checkup and verification should be done by each land and natural
resource bureau of project area and town/districts LAHD management office , which are
all important components of internal M&E system.
10.1.2 Monitoring Content
1) Action of rural AP2) Payment fund for APs
3) Labour resettlement
4) Compensation and resettlement for enterprises and institutions
5) Restoration and reconstruction of infrastructure
6) Staffing, training, working schedule and effectiveness of the institutions
7) Registration and disposal of complain and appeal from re-settlers
10.1.3 Internal monitoring report
According to each subproject schedule, the project implementing institute will compile
an internal M&E report and submit it to the WB loan project leading group of project
area. Each WB loan project leading group will gather the report and submit to Zhejiang
Qiantangjiang valley small town environment improvement project leading group and
WB.




                                          146
       Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                 — Financed by World Bank



10.2     External Monitoring
10.2.1 External Independent Monitoring Institute
Zhejiang Qiantangjiang valley small town environment improvement project leading
group will retain independent monitoring institute to carry out external M&E and
evaluation.
Independent monitoring institution will periodically monitor and evaluate the
implementation of RAP, including the progress, quality of resettlement, utilization of
funds. It will give advice and suggestions. After tracking monitoring APss‘ living
standard and production condition, the independent monitoring institution will submit
monitoring and evaluation reports to Zhejiang Qiantangjiang valley small town
environment improvement project leading group and WB
10.2.2 Monitoring Procedure and Contents
(1) To compile working outline for M&E
(2) To develop software of resettlement M&E information system
(3) To prepare survey outline, questionnaire forms, and recording card of APs, sampling
enterprises and institutions
(4) To design sampling-investigation scheme
Sampling scale: 10% of houses affected by demolition,
20% of enterprises and public institutions affected by the demolition.
(5) To run basement survey
A basement survey is carried out on the HHs and the enterprises and institutions
affected by land acquisition and house demolition, so as to obtain basement data about
their living standards and production condition (including living, business and income).
(6) To establish monitoring and evaluation information system
A monitoring and evaluation information system is established in which all the data are
classified and stored in different databasedatabase in computer for convenience to
analysis and tracking monitoring.

(7) To conduct M&E survey
a. Capacity evaluation to resettlement implementation institution: doing survey on its
working ability and efficiency
b. The progress, compensation standard and payment of resettlement, Monitoring key
residents affected by demolition: on allocation of residents‘ compensation fund, income
restoration, resettlement quality,recovery measure of vulnerable groups.
c. Public consultation: participation in compiling RAP and APs‘ participation during
implementation, monitoring effects of participation
d. Appeal of APs: monitoring registration and disposal of APs‘ appeal
(8) To design M&E data and to establish database
(9) To conduct comparing analysis
(10) To compile M&E report based on monitoring plan
10.2.3 Monitoring Indicator
a. Socio-economic indicator: rural income per capita, GDP, employment rate
                                          147
             Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                       — Financed by World Bank



      b. Institution indicator: staff composition, staff quality, regulations, equipment, efficiency
      c. APs affected by land acquisition and occupation: compensation fund appropriative
      rate, the number of participating various of life security、Non-farm income share of total
      income、   training(number、  content、  trainning funds、   trainning effect) income changing
      rate, employment rate, satisfaction level to resettlement
      d. Rural demolished residents: compensation fund appropriative rate, the schedule and
      quality of the resettlement house construction(co-ordination household), satisfaction
      level to resettlement
      e. Infrastructure: compensation fund appropriative rate, function restoration rate.
      f. Public participation: number, content, impact.
      10.2.4 Post Evaluation
      After completing the project, based on monitoring and evaluation, post-evaluation will
      be carried out on resettlement activities with the application of post evaluation theory
      and method. The experiences of success and the lessons to be drawn from land
      acquisition, resettlement etc. will be summed up to contribute to resettlement in the
      future. Post evaluation will be conducted by external independent monitoring and
      evaluation agency entrusted by WB Project Management Office of each subproject area.
      The independent monitoring and evaluation agency should compile working outline of
      post-evaluation and develop evaluation indicators. It will conduct socio-economic
      analysis survey, compile post-evaluation report on resettlement of each subproject, and
      submit it to Zhejiang Qiantangjiang valley small town environment improvement project
      leading group and WB.
      The arrangement of monitoring and evaluation report is shown in Table 10-1:
                        Table 10-1 The arrangement of monitoring and evaluation
                                                                                       Post-evaluation
                             Internal M&E                 External M&E
No.   Project                                                                          Report
                             Date             Report      Date               Report    Date        Report
                                              Every                          Every
                                                                                                   One
1     Jiande Landfill        2010.6-2011.12   half        2010.6-2011.12     half      2012.6
                                                                                                   Report
                                              year                           year
                                              Every                          Every
                                                                                                   One
2     Jiande WWTP            2010.6-2011.12   half        2010.6-2011.12     half      2012.6
                                                                                                   Report
                                              year                           year
                                              Every                          Every                 One
3     Tonglu SPN             2010.6-2014.6                2010.6-2014.6                2015.6
                                              year                           year                  Report
                                              Every                          Every
                                                                                                   One
4     Zhuji WS               2010.6-2011.12   half        2010.6-2011.12     half      2012.6
                                                                                                   Report
                                              year                           year
                                              Every                          Every
                                                                                                   One
5     Quzhou WWTP            2010.6-2012.12   half        2010.6-2012.12     half      2013.6
                                                                                                   Report
                                              year                           year
                                              Every                          Every                 One
6     Longyou                2010.6-2014.6                2010.6-2014.6                2015.6
                                              year                           year                  Report
                                              Every                          Every                 One
7     Wucheng WS             2010.6-2014.6                2010.6-2014.6                2015.6
                                              year                           year                  Report
                                              Every                          Every
                                                                                                   One
8     Lanxi Youpu            2010.6-2011.12   half        2010.6-2011.12     half      2012.6
                                                                                                   Report
                                              year                           year
      Panan       Shenze                      Every                          Every                 One
9                            2010.6-2014.6                2010.6-2014.12               2015.6
      WWTP                                    year                           year                  Report

                                                 148
             Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                       — Financed by World Bank




                                             Every                         Every              One
10   Panan Yunshan         2010.6-2014.6               2010.6-2014.6                 2015.6
                                             year                          year               Report

                                             Every                         Every
     Panan      Jianshan                                                                      One
11                         2010.6-2011.12    half      2010.6-2011.12      half      2012.6
     SPN                                                                                      Report
                                             year                          year


     Note: Combine two of subprojects in Quzhou to compile one report. Combine two of
     subjects in Lanxi Youpu to compile one report.




                                                149
                                           Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                                     — Financed by World Bank




                                                                   11 Entitlement Matrix
N    Types      of                                Affected
                     Project    Affected scope               Resettlement and compensation policy                                       Compensation standard
o.   affected                                     people
                                                                                                                                        Plow      land       composite
                                                             Composite land compensation fund paid to collective-owned                  compensation: 31000 Yuan/Mu;
                                Acquisition of
                                                             organizations and people who need to resettle for development of           Garden      land     composite
                                collective
                                                             production and resettlement villagers‘ living; get the compensation fund   compensation: 12000 Yuan/Mu;
                                owned      land   42HHs
                     Jiande                                  of ground attachments; get the training and employment opportunity;        Standing                 crops
                                85.5 mu and       148
                     Landfill                                measure be taken to make sure their income will not decrease; have         compensation:regular plow land
                                woodland 174.5    persons
                                mu                           the priority of employment by enterprise; enjoy partcipating APss‘         1000 Yuan/Mu;woodland 2000
                                                             social security if satisfy certain conditions                              Yuan/Mu


                                                             Composite land compensation fund paid to collective-owned                  Plow      land       composite
                                                             organizations and people who need to resettle for development of           compensation: 46000 Yuan/Mu;
                                Acquisition of               production and resettlement villagers‘ living; get the compensation fund   Garden      land     composite
     Permanent                                    59 HHs
                     Jiande     collective                   of ground attachments; get the training and employment opportunity;        compensation: 22000 Yuan/Mu;
     acquisition                                  237
                     WWTP       owned      land              measure be taken to make sure their income will not decrease; have         Standing                  crops
1    of collective                                persons
                                55.2Mu                       the priority of employment by enterprise; enjoy partcipating APss‘         compensation:regular plow land
     owned land
                                                             social security if satisfy certain conditions                              1000 Yuan/Mu;  garden land 3000
                                                                                                                                        Yuan/Mu
                                                             Composite land compensation fund paid to collective-owned
                                                             organizations and people who need to resettle for development of
                                                                                                                                        Land     compensation: 30000
                                Acquisition of               production and resettlement villagers‘ living; get the compensation fund
                                                  84HHs                                                                                 Yuan/Mu;
                     Tonglu     collective                   of ground attachments; get the training and employment opportunity;
                                                  296                                                                                   Standing                 crops
                     SPN        owned      land              measure be taken to make sure their income will not decrease; have
                                                  persons                                                                               compensation:regular plow land
                                183.528Mu                    the priority of employment by enterprise; enjoy partcipating APss‘
                                                                                                                                        1000 Yuan/Mu
                                                             social security if satisfy certain conditions

                                Acquisition of               Composite land compensation fund paid to collective-owned                  Plow       land      composite
                                                  39 HHs
                                collective                   organizations and people who need to resettle for development of           compensation: 33000 Yuan/Mu
                     Zhuji WS                     159
                                owned      land              production and resettlement villagers‘ living; get the compensation fund   Non-plowland         composite
                                                  persons
                                28.21Mu                      of ground attachments; get the training and employment opportunity;        compensation:16500 Yuan/Mu

                                                                                150
                                              Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                                        — Financed by World Bank



N    Types      of                                  Affected
                     Project    Affected scope                 Resettlement and compensation policy                                       Compensation standard
o.   affected                                       people
                                                               measure be taken to make sure their income will not decrease; have
                                                               the priority of employment by enterprise; enjoy partcipating APss‘
                                                               social security if satisfy certain conditions

                                                               Composite land compensation fund paid to collective-owned
                                                                                                                                          Plow      land        composite
                                                               organizations and people who need to resettle for development of
                                                                                                                                          compensation: 42000 Yuan/Mu
                                Acquisition of                 production and resettlement villagers‘ living; get the compensation fund   Garden      land      composite
                                                    43 HHs
                     Quzhou     collective                     of ground attachments; get the training and employment opportunity;        compensation: 22000 Yuan/Mu
                                                    149
                     WWTP       owned      land                measure be taken to make sure their income will not decrease; have
                                                    persons                                                                               ( composite       compensation
                                55.5 Mu                        the priority of employment by enterprise; enjoy partcipating APss‘         contains     standing    crops
                                                               social security if satisfy certain conditions                              compensation)
                                                                                                                                          Plow       land       composite
                                                               Composite land compensation fund paid to collective-owned                  compensation:three grade 38500
                                                               organizations and people who need to resettle for development of
                                                                                                                                          yuan/mu , four grade 35000
                                Acquisition of                 production and resettlement villagers‘ living; get the compensation fund
                                                    25 HHs                                                                                yuan/mu , woodland          and
                     Lanxi      collective                     of ground attachments; get the training and employment opportunity;
                                                    90                                                                                    non-plowland          composite
                     Youpu      owned      land                measure be taken to make sure their income will not decrease; have
                                                    persons                                                                               compensation: four grade 17500
                                40.36 Mu                       the priority of employment by enterprise; enjoy partcipating APss‘
                                                                                                                                          yuan/mu ; standing        crops
                                                               social security if satisfy certain conditions
                                                                                                                                          compensation:regular plow land
                                                                                                                                          1000 yuan/mu
                                                                                                                                          Plow       land       composite
                                                               Composite land compensation fund paid to collective-owned
                                                                                                                                          compensation:30000 yuan/mu ,
                                                               organizations and people who need to resettle for development of
                                                                                                                                          Garden       land     composite
                                Acquisition of                 production and resettlement villagers‘ living; get the compensation fund
                                                    52HHs                                                                                 compensation:30000 yuan/mu ,
                     Panan      collective                     of ground attachments; get the training and employment opportunity;
                                                    177pers                                                                               woodland    and    non-plowland
                     Jianshan   owned      land                measure be taken to make sure their income will not decrease; have
                                                    ons                                                                                   composite compensation:15000
                                31.05 Mu                       the priority of employment by enterprise; enjoy partcipating APss‘
                                                                                                                                          yuan/mu ; standing        crops
                                                               social security if satisfy certain conditions
                                                                                                                                          compensation: regular plow land
                                                                                                                                          and garden land 2000 yuan/mu
                     Panan      Acquisition    of   192 HHs    Composite    land   compensation    fund   paid   to   collective-owned    Plow       land      composite


                                                                                   151
                                                Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                                          — Financed by World Bank



N    Types        of                                   Affected
                       Project    Affected scope                   Resettlement and compensation policy                                       Compensation standard
o.   affected                                          people
                       Shenze     collective           548         organizations and people who need to resettle for development of           compensation:32000 yuan/mu ,
                                  owned         land   persons     production and resettlement villagers‘ living; get the compensation fund
                                                                                                                                              standing crops    compensation:
                                                                   of ground attachments; get the training and employment opportunity;
                                  116.26 Mu                        measure be taken to make sure their income will not decrease; have         regular plow land and garden
                                                                   the priority of employment by enterprise; enjoy partcipating APss‘
                                                                                                                                              land 2000 yuan/mu
                                                                   social security if satisfy certain conditions


                                                                                                                                              Plow       land       composite
                                  Acquisition     of   Collectiv
                                                                                                                                              compensation:32000 yuan/mu ,
                       Panan      collective           e
                                                                   land compensation fund paid to collective-owned villages                   standing crops    compensation:
                       Yunshan    owned land 1         reserved
                                                                                                                                              regular plow land and garden
                                  Mu                   land
                                                                                                                                              land 2000 yuan/mu


     Permanent                    Permanent
     acquisition       Jiande
2    of      state                acquisiting 1.35     none        Transferred for free
                       WWTP
     owned land                   mu


                       Tonglu     Demolition                       The demolition of nun-house caused by infrastructure and pubic
3    Corporate                                         none
                                           2                       benefit facilities dese not need to transfer the perproty rights and the
     house             WWTP       1300 m                                                                                                      Non-housing 2000 yuan/ m2
                                                                   demolished people can get a 1.5 times of compensation paid by
     demolition
                                                                   demolishers according to the replacement price.
                                                                   Compensated at replacement price, occurred expenditure on                  Brick-concrete structure 1 grade:
                                                                   attachment remove is compensated;                                          550 yuan/ ㎡ ; Brick-concrete
     Rural house                                       47 HHs
                       Jiande     Demolish                         Can choose with compensation as will: cash compensation, Optional
4    demolition                          2             166                                                                                    structure 2 grade :480 yuan/㎡,
                       Landfill   13395m                           property rights exchange resettlement;
                                                       persons                                                                                Brick-concrete structure 3 grade:
                                                                   APs need not pay any tax & fee, relative cost for transacting
                                                                   certificates for house, land etc. and right legal cost;                    400 yuan/㎡;   Mud-wood structure


                                                                                      152
                                           Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                                     — Financed by World Bank



N    Types      of                               Affected
                     Project   Affected scope               Resettlement and compensation policy                                Compensation standard
o.   affected                                    people
                                                            Compensated with movement subsidy, subsidy for temporary            1 grade : 280 yuan/㎡,
                                                            relocation, bonus for remove in advance, etc;
                                                            Can get Movement subsidy, temporary transition subsidy              Movement    subsidy     :    200
                                                                                                                                yuan/person

                                                                                                                                temporary transition subsidy:100
                                                                                                                                yuan/month·person
                                                                                                                                Brick-concrete structure 1 grade:
                                                                                                                                450 yuan/ ㎡ ; Brick-concrete
                                                            Compensated at replacement price, occurred expenditure on           structure 2 grade :400 yuan/㎡;
                                                            attachment remove is compensated;                                   Brick-wood structure 1 grade: 350
                                                            Can choose with compensation as will: cash compensation, Optional   yuan/㎡;Brick-wood structure 2
                                                 31 HHs     property rights exchange resettlement;                              grade :300 yuan/㎡; Mud-wood
                     Jiande    Demolish
                                       2         122        APs need not pay any tax & fee, relative cost for transacting       structure 1 grade :200 yuan/㎡,
                     WWTP      8360.5m
                                                 persons    certificates for house, land etc. and right legal cost;             Mud-wood structure 2 grade :170
                                                            Compensated with movement subsidy, subsidy for temporary            yuan/㎡,Mud-wood structure 3
                                                            relocation, bonus for remove in advance, etc;                       grade :80 yuan/ ㎡ , Movement
                                                            Can get Movement subsidy, temporary transition subsidy              subsidy : 200 元 /person ,
                                                                                                                                temporary transition subsidy :80
                                                                                                                                元/month·person

                                                            Compensated at replacement price, occurred expenditure on
                                                            attachment remove is compensated;                                   Brick-concrete structure 450 元/㎡
                                                            APs need not pay any tax & fee, relative cost for transacting       (according to the related policy,
                     Quzhou    Demolish          1 HHs 5
                     WWTP      400m
                                    2
                                                 persons    certificates for house, land etc. and right legal cost;             the actual compensation shoud
                                                            Compensated with movement subsidy, subsidy for temporary            no less than 3 times as much as
                                                            relocation, bonus for remove in advance, etc;                       the compensation standard)
                                                            Can get Movement subsidy, temporary transition subsidy

                     Longyou                     18   HHs   Compensated at replacement price, occurred expenditure on
                               Demolish                     attachment remove is compensated;                                   Brick-concrete   structure : 550
                                                 66
                                                            Can choose with compensation as will: cash compensation, Optional


                                                                              153
                                               Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                                         — Financed by World Bank



N    Types      of                                   Affected
                     Project   Affected scope                    Resettlement and compensation policy                                  Compensation standard
o.   affected                                        people
                                       2
                               5360m                 persons     property rights exchange resettlement;                                yuan/㎡,Brick-wood structure:
                                                                 APs need not pay any tax & fee, relative cost for transacting
                                                                 certificates for house, land etc. and right legal cost;               400 yuan/㎡,Movement subsidy:
                                                                 Compensated with movement subsidy, subsidy for temporary
                                                                 relocation, bonus for remove in advance, etc;                         100    元 /person , temporary
                                                                 Can get Movement subsidy, temporary transition subsidy
                                                                                                                                       transition   subsidy   :150   元
                                                                                                                                       /month·person Ahead movement
                                                                                                                                       award : 120 元 /household·day,
                                                                                                                                       within 20 days.




                                                                                                                                       Brick-concrete structure 1 grade:
                                                     19 HHs      Can choose with compensation as will: house compensation, ancillary   450 yuan/ ㎡ ;          Brick-wood
                     Panan     Demolish
                                     2               56          facilities compensation, Housing renovation compensation and          structure 1 grade : 350 yuan/
                     Shenze    2400m
                                                     persons     housing sites, Unified planning and independent construction
                                                                                                                                       ㎡;,simple house: 30-60 元/m
                                                                                                                                                                     2




                                                                 Compensated at replacement price, occurred expenditure on             Brick-concrete structure:510 元
                                                     67    HHs
                     Tong Lu   Demolish                          attachment remove is compensated;                                       2
                                                                                                                                       /m ,soil-wood structure:410 元
                                           2
                                                     235         Can choose with compensation as will: cash compensation, Optional
                     WWTP      20036m                                                                                                    2                               2
                                                     persons     property rights exchange resettlement;                                /m ,simple structure:100 元/m
                                                                 APs need not pay any tax & fee, relative cost for transacting
                                                                 certificates for house, land etc. and right legal cost;               Movement     subsidy : 500    元


                                                                                  154
                                            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                                      — Financed by World Bank



N    Types      of                                Affected
                     Project    Affected scope               Resettlement and compensation policy                                         Compensation standard
o.   affected                                     people
                                                             Compensated with movement subsidy, subsidy for temporary                     /person ; temporary     transition
                                                             relocation, bonus for remove in advance, etc;
                                                             Can get Movement subsidy, temporary transition subsidy                       subsidy:400 元/month·person,


                     Tonglu     Possessed                    Temporary possessed state-owned land should be approved by the
                                                  none       project located city/county land administrative departments.
                     WWTp       91.85 mu
                                                             Particularly, the temporary possessed land in the urban plan areas
                     QuZhou     Possessed                    should be approved by city planning administrative departments before
                                                  None                                                                                    The project temporary possessed
                     WWTP       171.66mu                     report. The land user should sign a temporary possessed land contract
                                                                                                                                          state-ownedland. The possessed
                                                             with the land administrative departments according to the allocation of
     Temporary       Panan      Possessed 9.97                                                                                            land       compensation         is
                                                  None       landownership and land use right, and pay the temporary possessed
     possessed       Jianshan   mu                                                                                                        absolved.The demolished ground
5                                                            land fees according to the contract. The temporary land user should
     state-owned                                                                                                                          attachments will be compensate
                                                             use the land according to the contract, and do not constrcuct
     land            Jiande     Possessed 10.5                                                                                            at    replacement      price    or
                                                  None       permanent buildings. At the expiry of temporary possess, the institutes
                     WWTP       mu                                                                                                        reconstruct as original standard
                                                             and persons who possessed the land responsible for the recovery of
                                                                                                                                          and scope by project institute.
                                                             the original use of the land.And if it is can‘t be recover, the institutes
                     Lanxi      Possessed 3.95               and persons should undertake the economic compensation
                                                  None
                     Youpu      mu                           responsibility.

                                                                                                                                          Standing crops compensation:
                                                             The project construction institute pay the land user compensation fees,
                                                                                                                                          regular plow land 1000 yuan/mu;
                                Temporary         510 HHs    and pay the land owners land reclamation fees so they can recover to
                     Tonglu                                                                                                               After completion of construction,
                                possesed          1806       plow, and pay the land contractor standing crops compensation
                     WWTP                                                                                                                 the project institutes responsible
                                253.48 mu         persons    according to the temporary possessed land compensation policy made
                                                                                                                                          for the recovery as original
     Temporary                                               by the local governments.
                                                                                                                                          standard and scope
     possessed                                                                                                                            The compensation is not exceed
6    collective                                              The project construction institute pay the land user compensation fees,
                                Temporary                                                                                                 12000 yuan/mu, After completion
     -owned                                                  and pay the land owners land reclamation fees so they can recover to
                     Quzhou     possesed                                                                                                  of construction, the project
     land                                                    plow, and pay the land contractor standing crops compensation
                     WWTP       collective-owne                                                                                           institutes responsible for the
                                                             according to the temporary possessed land compensation policy made
                                d land 2.52 mu                                                                                            recovery as original standard and
                                                             by the local governments.
                                                                                                                                          scope
                                Temporary         30 HHs     The project construction institute pays the land user compensation           Standing crops compensation:
                     Longyou
                                possesed 14.91    105        fees, and pays the land owners land reclamation fees so they can             regular plow land 1000 yuan/mu;


                                                                                155
                                            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                                                      — Financed by World Bank



N    Types      of                                Affected
                     Project    Affected scope               Resettlement and compensation policy                                   Compensation standard
o.   affected                                     people
                                mu                persons    recover to plow, and pay the land contractor standing crops            After completion of construction,
                                                             compensation according to the temporary possessed land                 the project institutes responsible
                                                             compensation policy made by the local governments.                     for the recovery as original
                                                                                                                                    standard and scope

                                                                                                                                    Standing crops compensation:
                                                             The project construction institute pays the land user compensation     food crops 667 yuan/mu,cash
                     Wuchen
                                Temporary         418 HHs    fees, and pays the land owners land reclamation fees so they can       crops 1334 元/mu;land loan fees
                                possesed          1672       recover to plow, and pay the land contractor standing crops            500 元/mu,After completion of
                     g WS
                                247.45 mu         persons    compensation according to the temporary possessed land                 construction, the project institutes
                                                             compensation policy made by the local governments.                     responsible for the recovery as
                                                                                                                                    original standard and scope
                                                                                                                                    Standing crops compensation:
                                                             The project construction institute pays the land user compensation
                                                                                                                                    regular plow land 1000 yuan/mu;
                                Temporary         56 HHs     fees, and pays the land owners land reclamation fees so they can
                     Lanxi                                                                                                          After completion of construction,
                                possesed 21.75    201        recover to plow, and pay the land contractor standing crops
                     Youpu                                                                                                          the project institutes responsible
                                mu                persons    compensation according to the temporary possessed land
                                                                                                                                    for the recovery as original
                                                             compensation policy made by the local governments.
                                                                                                                                    standard and scope
                                                                                                                                    Compensation fees: 800 元/mu
                                                             The project construction institute pays the land user compensation     within a year ; Standing crops
                                Temporary         9   HHs    fees, and pays the land owners land reclamation fees so they can       compensation: regular plow land
                     Panan                                                                                                          2000 yuan/mu; After completion
                                possesed 13.45    35         recover to plow, and pay the land contractor standing crops
                     WWTP                                                                                                           of construction, the project
                                mu                persons    compensation according to the temporary possessed land
                                                             compensation policy made by the local governments.                     institutes responsible for the
                                                                                                                                    recovery as original standard and
                                                                                                                                    scope
     Infrastructur   Each                                    The project institutes will compensate the ownership institutes of
     es       and    affected                                Infrastructures and ground attachments, and the ownership institutes
7                                                                                                                                   Pay at replacement price
     ground          subproje                                are responsible for reconstruction. Or the project institutes are
     attachments     cts                                     responsible for reconstruction as as original standard and scope




                                                                               156
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



Annex 1 Resettlement Policy Framework
A. Project Introduction
1. The purpose of Zhejiang Qiantangjiang valley small town environment improvement
project by using WB loans is helping the Qiantangjiang valley small town to improve
urban environmental infrastructure. The Clearly defined project objectives are for the
small cities and towns to provide sustainable waste-water, water and solid waste
services, and through institutional and sectoral reforms, to establish a range of
"demonstration projects" that can be extended to other parts of Zhejiang Province. The
implementation of the project will help to protect the public health, improve the
environment, and maintain the region's rapid and sustainable economic development.
The implementation of the project will improve the Qiantangjiang pollution in the status
quo. And has great significance of improving the Qiantangjiangr's water environment,
improving the location of the project area the socio-economic development
environment, maintaining ecological balance, improving people's quality of life,
completion the provinces and municipalities "Eleventh Five-Year" period of water
pollutant reduction goals, supporting the project area of economic and social and
environmental development.


2. This project impact scope involves 46 villages and communities of Tonglu, Jiande,
Longyou, Qujiang, Wuyuan Town, Lanxi, Pan‘an and Zhuji counties (districts, city),in
Hangzhou, Shaoxing, Jinhua, Quzhou. Impact types include permanent
collective-owned land acquisition, permanent state-owned land occupation, temporary
collective-owned land occupation, temporary state-owned land occupation, house
demolition, enterprises demolition, as well as surface appendages and the relocation
and reconstruction for special facilities. This project is expected to permanently occupy
a total approximately 1483.478 mu rural collective-owned land, including approximately
34.776 mu basic farmland. The total area of rural house demolition is 50221.5m2, The
total area of enterprises demolition is 1300 m2 and 0.606 mu enterprises land have
been occupied. The total of the noncompensatory use of state-owned land is 1.35 mu.
The project temporarily occupies a total of 510.41 mu collective-owned land and
720.15 mu state-owned land. In this project, permanent land acquisition and demolition
have affected 696 HHs, 2379 people; and temporary land occupation has affected 711
HHs, 2642 people and 2 companies. In addition, the project will partly affect surface
appendages and the relocation and reconstruction for special facilities.
According to the schedule and depth of the project feasibility study, in this project, part
of main waste-water pipe and branch waste-water pipe need to be laid in the road. Part
of the waste-water pipeline network need to be laid in the revetment of deposited
watercourse. Under current conditions, part of road reconstructions can not go on a
series of accurate and project-affected interviews and surveys such as physical
quantity indicator survey and socio-economic survey. The types of resettlement impact
mainly include permanent land acquisition and house demolition. In Tonglu subproject,
13 km waste-water pipeline network will be laid in the road, but the length of the road is
not accurate. In Qinan Shenze subproject, 10km waste-water pipeline network will be
laid in the road. In Quzhou subproject, 10.6km waste-water pipe and 10.5km storm
water pipe will be laid in the road. In Longyou subproject, length of the road and
waste-water pipeline network is not accurate. In Pan‘an Shenze subproject, the
accurate alignment of Qin-Jin road has not been determined by now. Therefore, for
some subprojects, detailed impact survey can not be implemented.
Each of these subprojects involves all or part land acquisition/occupation, house
demolition(including rural collective-owned land and urban state-owned land),
                                         157
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



non-house demolition( including enterprises , shops ,etc.) and cultural heritage.
Therefore, according to the Involuntary Resettlement Policy OP4.12 of World Bank, the
borrower has drafted Resettlement Policy Framework, major principles and policies to
guide the resettlement. Resettlement Policy Framework aims to ensure that the project
can conduct smoothly as scheduled. Nor for pipeline network of the road and part of
the road design lagging behind impact the implementation can not go on with the
schedule. What‘s more, it will supervise and guide the project to implement as the
requirement and policy of World Bank require. It will reduce influence of the project and
resettle involuntary resettlement   appropriately.
3 All the subprojects has been compiled Resettlement Action Plan to meet the
requirement of WB Operation policy (OP4.12 involuntary resettlement). The borrower
has prepared this Resettlement Policy Framework (RPF) to establish principles and
guidelines to be used in resettlement preparation and implementation due to design
alteration of the projects and supported pipeline network. If land acquisition or house
demolition causes due to project design alternation or supported pipeline network,
Resettlement Action Plans which in accordance with the RPF must be compiled before
WB evaluation and ratification. The RPF also covers the resettlement task for the
linkage project.
B. Objectives, Definitions and Key Principles
4 In World Bank-assisted projects, borrowers are expected to take all necessary
measures to mitigate adverse social impacts, including those associated with land
acquisition. World Bank Operational Policy 4.12, Involuntary Resettlement, provides
essential guidance on objectives and principles that are applicable in projects
generating land acquisition and resettlement-related impacts.
5 Every reasonable effort is to be made to avoid or minimize the need for land
acquisition, and to minimize all resettlement-related adverse impacts. If land
acquisition and associated adverse impacts cannot be avoided altogether, the principle
objective of the RPF is to ensure that all persons subjected to adverse impacts
(―displaced persons‖ as defined below) are compensated at replacement cost (as
defined below) for lost assets and otherwise provided with any rehabilitation measures
or other forms of assistance necessary to provide them with sufficient opportunity to
improve, or at least restore, their incomes and living standards.
6 . ―Affected persons‖ refers to all the people who, on account of the activities listed
above, would have their (1) standard of living adversely affected ; or (2)right, title,
interest in any house, land (including premises, agricultural and grazing land) or any
other fixed or movable asset acquired or possessed temporarily or permanently; (3)
access to productive assets adversely affected, temporarily or permanently; or
(4)business, occupation, work or place of residence or habitat adversely affected; and
―displaced person‖ means any of the displaced persons.
7. "Replacement cost" is defined as follows: For agricultural land, it is the pre-project
or pre-displacement, whichever is higher, market value of land of equal productive
potential or use located in the vicinity of the affected land, plus the cost of preparing the
land to levels similar to those of the affected land, plus the cost of any registration and
transfer taxes. For land in urban areas, it is the pre-displacement market value of land
of equal size and use, with similar or improved public infrastructure facilities and
services and located in the vicinity of the affected land, plus the cost of any registration
and transfer taxes. For houses and other structures, it is the market cost of the
materials to build a replacement structure with an area and quality similar to or better
than those of the affected structure, or to repair a partially affected structure, plus the
cost of transporting building materials to the construction site, plus the cost of any labor

                                          158
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



and contractors' fees, plus the cost of any registration and transfer taxes. In
determining the replacement cost, depreciation of the asset and the value of salvage
materials are not taken into account, nor is the value of benefits to be derived from the
project deducted from the valuation of an affected asset. Where domestic law does not
meet the standard of compensation at full replacement cost, compensation under
domestic law is supplemented by additional measures so as to meet the replacement
cost standard. Such additional assistance is distinct from resettlement measures to be
provided under other clauses in OP 4.12, para. 8. World Bank‘s OP 4.12 establishes
key principles to be followed in Resettlement Action Planning and implementation. Of
particular relevance for this RPF are the following: World Bank‘s OP 4.12 establishes
key principles to be followed in Resettlement Action Planning and implementation. Of
particular relevance for this RPF are the following:
(a)        Wherever possible, project designs and RAPs should be conceived as
development opportunities, so that displaced persons may        benefit from the
services and facilities created for, or by, project activities.
(b)         All displaced persons are entitled to compensation for lost assets, or to
alternative but equivalent forms of assistance in lieu of compensation; Lack of legal
rights to the assets lost will not bar displaced persons from entitlement to such
compensation or alternative forms of assistance
(c)           Compensation rates as established in an RAP refer to amounts to be paid
in full to the individual or collective owner of the lost asset, without deduction for any
purpose. In China, individual owners receive compensation for affected structures and
other fixed assets, and villages receive compensation for acquired land in rural areas.
(d)         When cultivated land is acquired, it often is preferable to arrange for
land-for-land replacement through collective-owned land redistribution. In some cases,
as when only small proportions of income are earned through agriculture, alternative
measures such as payment of cash or provision of employment are acceptable if
preferred by the persons losing agricultural land.
(e)          Replacement house plots, sites for relocating businesses, or redistributed
agricultural land should be of equivalent use value to the land that was lost.
(f)        The resettlement transition period should be minimized. Compensation for
assets should be paid prior to the time of impact, so that new houses can be
constructed, fixed assets can be removed or replaced, and other necessary measures
can be undertaken prior to initiation of construction activities.
(g)         Affected persons should be consulted during the process of RAP
preparation, so that their preferences regarding possible resettlement arrangements
are solicited and considered; RAPs is publicly disclosed in a manner accessible to
displaced persons.
(h)        The previous level of community services and access to resources will be
maintained or improved after resettlement.
(i)          The borrower is responsible for meeting costs associated with land
acquisition and resettlement. Financial and physical resources for resettlement and
rehabilitation will be made available as and when required.
(j)          Resettlement program will include adequate institutional arrangements to
ensure effective and timely design, planning and implementation of resettlement and
rehabilitation measures.
(k)       Adequate arrangements for effective internal and external M&E will be
made on implementation of all resettlement measures.
                                         159
       Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                 — Financed by World Bank



(l)        Methods by which displaced persons can pursue grievances will be
established as necessary, and information regarding these grievance procedures will
be provided to displaced persons.
C. Legal Framework
9. The primary purpose of this RPF is to ensure that Resettlement Action Planning
and implementation in activities identified in Para. 3 meet the requirements of World
Bank OP 4.12. Additionally, resettlement activities should be designed in accordance
with relevant laws, codes and decrees of the PRC, Zhejiang Province and relevant
districts or counties involved in this project.
D. Preparing and Approving RAPs
10. Responsibility for preparation and implementation of RAPs (including responsibility
for meeting all costs associated with resettlement) rests with the borrower. The agency
with overall responsibility in this project is the NingBo Government; executing agency
is Ningbo Urban Construction and Environmental Protection WB Project Office;
enforcement body is Ningbo Municipal Drainage Company Ltd.
11. Once it is determined that land acquisition is essential to complete any of the
activities identified in Para. 3, and once sitting criteria establish the land area to be
acquired, Resettlement Action Planning should begin. The borrower will carry out, or
cause to be carried out, a socioeconomic survey to determine the range and scope of
adverse impacts in the affected area as well as the identity and number of displaced
persons. The survey will determine whether a full RAP or an ―abbreviated‖ RAP (as
defined in OP 4.12, Annex A) is necessary. When the number of persons affected by
the component exceeds 200, a full RAP is necessary. Where impacts on the entire
affected population are minor, or fewer than 200 people are affected, an abbreviated
RAP may be prepared. Impacts are considered ―minor‖ if the APs are not physically
displaced and less than 10% of their productive assets are lost.
12. If a RAP is necessary, it will be prepared in accordance with the policy principles
and planning and implementation arrangements set forth in this RPF. The RAP is
based on accurate baseline census and socioeconomic survey information, and
establishes appropriate mitigation measures (e.g., compensation for assets,
transitional assistance, economic rehabilitation assistance) for all categories of
adverse impacts. Depending on the categories of impacts, the RAP specifically
addresses the following:
(a) Description of the activity causing land acquisition;
(b) Range and scope of potential adverse impacts;
(c) Socioeconomic studies and baseline census information;
(d) Review of relevant laws and regulations relating to land acquisition and
resettlement;
(e) Specific compensation rates (or alternative measures) for all categories of affected
assets;
(f) Other measures, if any, necessary to provide opportunities for economic
rehabilitation of displaced persons;
(g) Eligibility criteria for compensation and all other forms of assistance;
(h) Relocation arrangements, if necessary, including transitional support;
(i)   Site selection and site preparation, if necessary;
(j)   Restoration or replacement of community infrastructure and services;
                                          160
       Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                 — Financed by World Bank



(k) Organizational arrangements for implementation;
(l)   Consultation and disclosure arrangements;
(m) Resettlement implementation schedule;
(n) Costs and budget;
(o) Monitoring arrangements;
(p) Grievance procedures;
(q) Summary entitlements matrix
13. If an abbreviated RAP is to be prepared, it also must be based on principles and
planning and implementation arrangements established in this RPF. An abbreviated
RAP normally includes the following contents:
(a) A census survey of displaced persons and valuation of assets;
(b) Description of compensation and other resettlement assistance to be provided;
(c) Eligibility criteria;
(d) Consultation and disclosure arrangements;
(e) Organizational arrangements for implementation
(f) Timetable and budget;
(g)    Monitoring arrangements;
(h) Grievance procedures.
E. Eligibility Criteria
14. The purpose of Resettlement Action Planning is to ensure that displaced persons
have sufficient opportunity to replace assets they will lose, and to improve or at least
restore their incomes and living standards. To achieve these objectives, it is essential
to ensure that all displaced persons are identified, and to ensure that all displaced
persons are deemed eligible for mitigation measures included in the RAP. With regard
to major categories of impact (e.g., loss of land in rural areas, loss of structure, and
loss of income), the following measures normally apply:
15. Affected persons losing agricultural land will be entitled to the following types of
compensation and rehabilitation measures:
(a) Typically, collectively-owned cultivated land remaining after acquisition will be
reallocated among all members of the collectivity by the village committee. Under
these circumstances, all displaced persons are eligible for a share of reallocated land,
and to benefit from collective investment of land compensation.
(b) According to the Land Administration Law, in situations where land reallocation is
not possible, displaced persons losing agricultural land must be identified. In some
instances, they may be provided with employment with wages at least equivalent to
income lost. In other cases, they may be paid a resettlement subsidy normally
equivalent to at least six times the average annual production output value of the land
in the previous three years. If this is not sufficient to restore livelihoods, the subsidy
may be raised to as much as 15 times the average annual output value;
(c) If land compensation and resettlement subsidies paid are still insufficient, the
resettlement subsidies may be further increased upon approval by the municipal
government;


                                          161
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



(d) Land compensation and resettlement subsidies are paid to the village committees
whose land is affected and will be used for (i) increasing land areas under cultivation if
land is available; (ii) intensification of agriculture through provision of irrigation,
improved agricultural practices, etc.; and (iii) development of non-agriculture based
income generation activities. Individual displaced persons will be compensated at
replacement cost for the loss of standing crops , fruit or industrial trees, as well as any
fixed assets;
(e) Affected persons whose land is temporarily taken to facilitate project construction
will be compensated for their loss of income, standing crops and for the cost of soil
restoration and damaged infrastructures.
16. Affected persons losing house and auxiliary structures will be entitled to the
following compensation and rehabilitation measures:
(a) Provision of replacement housing of equivalent value; or
(b) Compensation at full replacement cost; and
(c) Compensation for replacement or restoration of all facilities and services (e.g.,
electricity, telephone, cable television, school enrollment fees); and
(d) Transitional allowances as necessary to move all belongings, or to obtain
temporary housing if necessary.
17. If partial acquisition would render a house or structure unsafe or no longer
functional, it should be acquired in its entirety.
18. A displaced person losing business income (or employment income) will be
entitled to the following rehabilitation measures::
(a) Mitigation measures for loss of business typically include: (i) the provision of
alternative business site of equal size and accessibility to customers; or (ii) cash
compensation to the owner for lost business structure reflecting full replacement cost
of the structure and all fixtures; and (iii) transitional payment for all moving-related
expenses and for loss of sales or income during the period in which the business
cannot operate.
(b) Mitigation measures for loss of employment typically include: (i) provision of
alternative employment at equivalent wages; or (ii) cash settlement equivalent to at
least three years of lost wages; and (iii) transitional payment for re-training, relocation
or other measures necessary for obtaining new employment.
G. Implementation Process
19. A detailed implementation schedule of all activities to be undertaken will be
included in the RAP. Payment of compensation and furnishing of other rehabilitation
entitlements (in cash or in-kind), and relocation if necessary, should be completed at
least one month prior to land acquisition. If it is not possible to make all compensation
payments, or to provide other necessary forms of assistance, prior to land acquisition,
additional transitional allowances may be required.


H. Funding Arrangement
20. As established in Para.10, Ningbo Urban Construction and Environmental
Protection WB Project Office and Ningbo Municipal Drainage Company Ltd bear
responsibility for meeting all costs associated with land acquisition and resettlement.
Any RAPs prepared in accordance with this RPF requires inclusion of estimated costs
and budgets. All persons adversely affected by land acquisition are entitled to
                                         162
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



compensation or other appropriate mitigation measures, regardless of whether these
persons have been identified at the time of Resettlement Action Planning, and
regardless of whether sufficient mitigation funds have been allocated. For these
reasons, the budget in the Resettlement Action Plan includes contingency funds,
typically 10% or more of the estimated total resettlement costs, to meet unanticipated
resettlement costs.
21. Compensation rates included in the RAP provide the basis for calculating
compensation amounts due to displaced persons. Compensation must be paid in full to
the individual or collective losing land or other assets. No deductions from
compensation will occur for any reason. The RAP should describe the procedures by
which compensation funds will flow from ZUDCO to the displaced persons. As a
general principle, the flow of funds should be as direct as possible, reducing the
number of intermediary agencies to a minimum.
I.   Consultation and Disclosure Arrangements
22. The RAP must describe measures taken, or to be taken, to consult with displaced
persons regarding proposed resettlement arrangements, and to foster their
participation in activities essential to improvement or restoration of incomes and living
standards. To ensure that opinions and preferences of displaced persons are
considered, consultations should begin prior to finalization of project designs and
mitigation measures. Consultations should continue throughout the period in which the
RAP is implemented through external M&E arrangements (see below).
23. The project office also discloses the RAP, in draft and final stages, to the displaced
persons and the general public in the project area, in a language and location
accessible to them. Disclosure of the draft RAP should occur at least one month prior
to Bank review. Disclosure of the final RAP occurs following Bank acceptance.
J.   Grievance Procedures
24. Since the resettlement work will be carried out in consultation with displaced
persons, major grievances are not likely to arise. However, to ensure that displaced
persons have avenues for redressing grievance related to any aspect of land
acquisition and resettlement, Resettlement Action Plan must give grievance
procedures in details which should be suitable for the local reality.
       Phase 1:APss can appeal by verbal or paper way to village committee, the
town government and the demolition implementation institute. If by verbal way,
disposal and written record are needed. Village committee, the town government and
the demolition implementation institute should solve it in 2 weeks;
         Phase 2:If APss are still unsatisfied with the decision of phrase 1, they can
appeal      to   each   subproject     offices/manage     institutes  in   their   own
counties(townships/cites) after getting the decision,; each subproject offices/manage
institutes, should make decision in 2 weeks;
       Phase 3:If APss are still unsatisfied with the decision of phrase 2, they can
appeal to each subproject offices/manage institutes after getting the decision, each
subproject offices/manage institutes, should make decision in 2 weeks;
        Phase 4: APss are still unsatisfied with the decision of phrase 3,after getting
                   If
the decision, according to the ―Administrative Procedure Law of PRC‖,    they can appeal
to administration with jurisdiction progressively, and go to arbitration. They can also
sue at law under civil procedures after receiving a decision notice.
K. External Monitoring

                                         163
     Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                               — Financed by World Bank



25.RAP implementation will be monitored by a qualified agency independent of the
project office. The RAP should establish the scope and frequency of monitoring
activities. External monitoring reports must be prepared for simultaneous submission
to the Ningbo Municipal Engineering Prophase Office and the World Bank.




                                        164
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



Annex 2 Each Subprojects‘ APs Social Security Related Policy
For this project, there are 10 subprojects need collective-owned land acquisition, involving
Zhuji, Qujiang, Jiande, Tonglu, Panan, Lanxi six counties (cities, districts). The principles of
APs social security policy of six places are basically the same, slightly different.

    The APs social security policy of all parts is as follows:

    Jiande City

    ―Enforcement regulation on APs basic security for the eldly of Jiande ―

    1. The scope and object

 (1) The agricultural workers should be in Jiande City administrative regions. And since the
implementation of monetary settlement, be in the government implemented a unified land
requisition land for the project which has been approved by the government with right, and
be requisitioned during the second round of land contracting warrants held by the family,
and have all been in the register consent of the land.

(2) Land outside the red line because of this project need to bring sign of land, by land and
resources bureau found to be reasonable; it may be included in the scope of the insured.

(3) When the land acquisition is completed ,the people does not meet the working age (16
years old or less), and have already enjoyed the basic old-age insurance for urban workers,
treatment staff, will be no longer listed as farmers whose land is requisitioned the basic
old-age security coverage and the insured object.

2. The number of eligible participants and qualification check

(1) The number of participants are charged by the number of people whose land are all
requisitioned, and in principle, determined by HHs.

(2) Implementation of "dual-field system" of administrative villages, should according to
―The People's Republic of China Rural Land Contracting Law‖ and its relevant provisions,
after the implementation of unified management of the land to the farmers, can transact
APs according to this enforcement regulation.

3. Payment standards and payment procedures for the handling of the insured

(1) Basic old-age security payment standards of farmers whose land is requisitioned are
divided into 25,000 yuan, 14,000 yuan Turret. Among that government-funded subsidy are
noless than 30% of the total funds to protect. Specifically, the one who choose payment of
25,000 yuan, government-afford payment is 8,000 yuan, and personal payment is 17,000
yuan; the one who choose payment of 14,000 yuan, government-afford payment is 5,000
yuan, and personal payment is 9,000 yuan. The insured individual who is incapable of
funding and enjoying the minimum living allowance or holding "Jiande needy families aid
certificate", the government subsidy standard is for 3,000 yuan.The insured object can
choose by themselves. The insured individual who is incapable of funding should approved
by Civil Affairs Departments.

4. Treatment

When the insured objects have reached the enjoyment of age (men over 60 years of age,
women over 50 years of age) or the insured objects had reached or exceeded the
treatment of age when participated the insurance, can enjoy the basic old-age security
                                            165
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



payments monthly from the next month of handling procedures for the treatment.
Standards of treatment according to their individual grade level of payment, is respectively
250 yuan per month, 140 yuan per month. Individual who is incapable of funding, can enjoy
30 yuan monthly subsidy of life from the next month of handling procedures.

5. Personal Account Management

(1) The basic old-age security benefits for farmers whose land is requisitioned monthly
enjoying will be paid start with individual accounts. If individual accounts can‘t afford ,it will
be paid from the government subsidy funds.

(2) The special account of basic old-age protection for farmers whose land is requisitioned
will not transfer off-site.

(4) To those college students who after graduating out of the field of employment with
household registration, and those active compulsory serviceman (not including volunteers)
who after the placementout of the field with household registration, their individual accounts
will be paid off themself; and those who back to their places of origin will be retained their
personal special account.

6. Relationship with other social old-age insurance

(1) To those land-lost farmers object participated in the basic old-age security who were
employed by various types of enterprises and institutions in the city, the employer must pay
the all the social costs.

(2) Land requisitioned farmers who is conform the conditions of freelance insured,
according to cities and towns freelance capacity of social insurance.

(3) The land requisitioned farmers who has participated the enterprise employees basic
pension insurance, can convert their total cost of the basic old-age security funds to
enterprise employees basic pension insurance years.

(4) If the land requisitioned farmers have not only participated the enterprise employees
basic pension insurance, but also participated the basic old-age security for land requisition
farmers, when they enjoy the treatment, the treatment will according the ‖only take one,
choose by themselves‖ principles. Those who choose enjoy the treatment of the enterprise
employees basic pension insurance will be returned their principal and interest from special
account of basic old-age security for land requisition farmers. Those who choose enjoy the
treatment of the basic old-age security for land requisition farmers will be returned their
principal and interest from special account of the enterprise employees basic pension
insurance.

(5) Those land requisitioned farmers who has participated rural social old-age insurance,
when they participated the social old-age security for land requisitioned farmers, the
principal and interest from special account of original rural social old-age insurance can be
offset the payment of social old-age security for land requisitioned farmers, and at the
same time close the relationship of rural social old-age insurance. If the objects do not want
to combine the account, they also can enjoy the two treatments of rural social old-age
insurance and social old-age security for land requisitioned farmers.

8. Others

(1) "Agricultural married woman" who according to the law to retain the right of land
contractual management , volunteers returning officers, returning college professional staff,
people who have moved into a small town and settled into, person who has subjected to
                                             166
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



reeducation in a reform school, have the right to participated the social old-age security for
land requisitioned farmers.

A. Jiande Landfill subproject

According to related resettlement policy in Jiande, the resettlement of landfill subproject
main uses currency resettlement, pension resettlement and job placement resettlement.

(1) Land acquisition compensation costs (including land compensation and resettlement
subsidy fee) will be fully paid to the affected HHs. After get the land acquisition
compensation, the affected HHs will voluntary participated social old-age security for land
requisitioned farmers or other social security (such as rural social old-age insurance ). The
ground attachments compensation and standing crops compensation are belong to the
owners.

(2) After collective-owned land expropriation and use, by district or above land and
resources regulatory approved, land requisitioned farmers can participated in old-age
insurance. After pay full the fees, and the insured objects have reached the enjoyment of
age (men over 60 years of age, women over 50 years of age), they can enjoy the treatment.
The social old-age security fund for land requisitioned farmers collection based on the
principles that the individuals and government afford together. The one who choose
payment of 25,000 yuan, government-afford payment is 8,000 yuan, and personal payment
is 17,000 yuan; the one who choose payment of 14,000 yuan, government-afford payment
is 5,000 yuan, and personal payment is 9,000 yuan. The insured individual who is
incapable of funding and enjoying the minimum living allowance or holding "Jiande needy
families aid certificate", the government subsidy standard is for 3,000 yuan.The insured
object can choose by them. At the same time, the standards of treatment as the level of
economic development will be adjusted accordingly to improve.

(3) Government establishes perfect labor service system to provide assistance to the
affected villagers, in order to help to provide various channels of employment of APs. Such
as free open job market, vocational and technical training, etc.

The insured objects have reached the enjoyment of age (men over 60 years of age, women
over 50 years of age) or the insured objects had reached or exceeded the treatment of age
when participated the insurance, can enjoy the basic old-age security payments monthly
from the next month of handling procedures for the treatment. Standards of treatment
according to their individual grade level of payment, is respectively 250 yuan per month,
140 yuan per month. Individual, who is incapable of funding, can enjoy 30 yuan monthly
subsidy of life from the next month of handling procedures.

The project APs will be in accordance with their wishes to participate in the social security
for land requisitioned farmers. The projects land acquisition are totally 80 mu, and 190 mu
of forest land. According to Jiande land acquisition region price the fifth standard , the
people affected by land requisition which include 26household and 77persons, except the
young crop compensation will receive the land acquisition compensation fee total 4.76
million yuan,every person about 61.6 thousand yuan. Even if the old-age security to the
highest standard of 25,000 yuan fee and deducted 8,000 yuan government subsidy, the
individual only pay 17,000 yuan, the affected person can withstand. According to survey
with 6 samples showed that 5 HHs (83%) willing to participate in the social security for land
requisitioned farmers, the only one not willing to participate is also not because could not
afford, but because feel that the low level of protection. After calculation, the project will
have 64 people into the social security of land requisitioned farmers.

In addition, the project-affected zone of the labor force engaged in agricultural work was
less, so the impact of the project land acquisition workforce have now largely been
                                           167
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



resolved the problem of employment. At the same time, Meicheng Town establish a perfect
labor service system to provide assistance to the affected villagers. Before the land
acquisition the related organizations to migration of labor service agencies were
established to provide employment for APs with the help of various channels. Such as
open job market free for people, free vocational and technical training for farmers , to
provide employment information and job opportunities, which for the land acquisition
affected the formation of a strong labor and employment promotion.

B. Jiande East WWTP Subproject

 According to resettlement policies in Jiande City, migrant labor resettlement mainly uses
old-age security and currency resettlement, etc..

(1) Land acquisition compensation costs (including land compensation and resettlement
subsidy fee) will be fully paid to the affected HHs. After get the land acquisition
compensation, the affected HHs will voluntary participated social old-age security for land
requisitioned farmers or other social security (such as rural social old-age insurance ). The
ground attachments compensation and standing crops compensation are belong to the
owners. The village collective-owned land acquisition compensation fee is unified managed
by the collective economic organizations for the collective public welfare undertakings.

  (2) After collective-owned land expropriation and use, by district or above land and
resources regulatory approved, land requisitioned farmers can participated in old-age
insurance. After pay full the fees, and the insured objects have reached the enjoyment of
age (men over 60 years of age, women over 50 years of age), they can enjoy the treatment.
The social old-age security fund for land requisitioned farmers collection is based on the
principles that the individuals and government afford together. The one who choose
payment of 25,000 yuan, government-afford payment is 8,000 yuan, and personal payment
is 17,000 yuan; the one who choose payment of 14,000 yuan, government-afford payment
is 5,000 yuan, and personal payment is 9,000 yuan. The insured individual who is
incapable of funding and enjoying the minimum living allowance or holding "Jiande needy
families aid certificate", the government subsidy standard is for 3,000 yuan.The insured
object can choose by themselves. At the same time, the standards of treatment as the level
of economic development will be adjusted accordingly to improve.

(3) Government establishes perfect labor service system to provide assistance to the
affected villagers, in order to help to provide various channels of employment of APs. Such
as free open job market, vocational and technical training, etc.

Land acquisition compensation costs (including land compensation and resettlement
subsidy fee) will be fully paid to the affected HHs. After get the land acquisition
compensation, the affected HHs will voluntary participated social old-age security for land
requisitioned farmers or other social security (such as rural social old-age insurance). The
ground attachments compensation and standing crops compensation are belonging to
the owners.

The insured objects have reached the enjoyment of age (men over 60 years of age, women
over 50 years of age) or the insured objects had reached or exceeded the treatment of age
when participated the insurance, can enjoy the basic old-age security payments monthly
from the next month of handling procedures for the treatment. Standards of treatment
according to their individual grade level of payment, is respectively 250 yuan per month,
140 yuan per month. Individual, who is incapable of funding, can enjoy 30 yuan monthly
subsidy of life from the next month of handling procedures.

The project APs will be in accordance with their wishes to participate in the social security
for land requisitioned farmers. The projects land acquisition is totally 45.75 mu. According
                                          168
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



to Jiande land acquisition region price the third standard , the people affected by land
requisition which include 59 household and 237 persons, except the standing crops
compensation will receive the land acquisition compensation fee total 2.1 million
yuan,every person about 9 thousand yuan. Corresponding to the above criteria, the APs
can afford a second type of social security standards. According to survey with13 samples
showed that 10 (77%) willing to participate in social security for land requisitioned
farmers.And 6 of them said they not only participate in social insurance, but also in the use
of land compensation fee based on the insured, they may still need to use family savings to
buy the first category of social security, that is, to pay 17,000 yuan. There are three
reluctant to participate in social insurance, its main reason is because they feel that the
level of protection is low, and of which two are ready to buy commercial old-age insurance.
Since commercial pension insurance although there is no government subsidy, but the
participants were relatively flexible. There is one houselold ready to buy a house into the
city to participate in old-age security for urban workers.

The study also found that the village collective and some farmers have already prepared
the way through the adjustment of agricultural structure to eliminate the land area of arable
land caused by erosion. For example, the Xiaya village has cultivation of strawberries
features and technical advantages, some farmers have been prepared to the imposition of
the remaining land into a garden for the cultivation of strawberries, so that although the
area is reduced, but revenue did not decline. Because locally grown crops income about
800 yuan/mu, while the normal year's harvest, the planting of strawberry about 8,000
yuan/mu. (20,000 yuan of gross revenue, net of greenhouse materials, plastic film,
chemical fertilizer, labor and other costs 13,000 yuan)

In addition, the project-affected zone of the labor force engaged in agricultural work was
less, so the impact of the project land acquisition workforce have now largely been
resolved the problem of employment. At the same time, Xiaya Town and Xiaya Village
organized skills training such as cultivation of strawberries for for farmers every year, and
to provide employment information and job opportunities, which was a promotion of
formation of a strong labor and employment for the land acquisition affected.

Zhuji City

―Zhuji Municipal People's Government‗s views of improving the endowment insurance
system for farmers whose land is requisitioned ―

1. Option

Any administrative area in the city, approved land, in accordance with regulations, " rural
residents become urban residents" procedures for placement of personnel can take part in
old-age insurance the farmers whose land is requisitioned.

2. Payment and treatment

The payment and treatment are divided into 4 levels. Farmers whose land is requisitioned
when the men reached the age of 60 years, women 55 years of age, from next month of it,
they can begin to enjoy monthly payment in tranches corresponding to enjoy the old-age
allowance.

               A               B                C              D               Units
Payment        4000            7000             10000          18000           Yuan
Treatment      150             200              250            300             yuan/month


                                          169
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



3. Funding

The farmers whose land is requisitioned by the insured pension insurance funds, will be the
objects, the village collective economic organizations and the Government to raise
co-financing, All the fund-raising and interest income will into the the land requisitioned
farmers‘ old-age insurance special fund.

(1)        Insured people according to the selected payment standard clock should pay
the fees, the municipal Land and Resources Bureau (City Development Committee or
Town, districtss) in the resettlement subsidy fee is offset the land acquisition, the lack of
part to be paid one-time in the procedures in handling the insured.

(2)        Village collective economic organizations subsidy fees, will be paid by Municipal
Land Resources Bureau (City Development Committee or Town, districtss) .The shortage
will be paid from accumulation of the village collective economic organizations, and should
be paid one-time clearance in handling the insured.

(3)        The establishment of land regulation of capital is government subsidies
earmarked for farmers whose land is old-age insurance fund. Land adjustment fund is
mainly income from land leasing and other financing, raising the standard as follows: within
the city, according to commercial land transfer 40,000 yuan per mu, other sites sell 15,000
yuan per mu, municipal finance, Municipal Land Resources Bureau (City Development
Commission) in the case of land clearing in the extract.

4. Procedure

Step1: Determine the number;

Step 2: Determine the object;

 Step 3: Application;

Step 4: Deliberation;

 Step 5: Approval;

 Step 6: Payment;

Step 7: Treatment

5. Relationship with other social old-age insurance

Relationship with urban enterprise workers basic old-age insurance.

The one who participate the social old-age insurance for land requisitioned farmers and
urban enterprise workers basic old-age insurance will be return the social old-age
insurance for land requisitioned farmers special account.

Relationship with rural social old-age insurance

The land requisitioned farmers who have participated rural social old-age insurance, when
they participate social security for land requisitioned farmers, they can be returned their
rural social old-age insurance paid fees according to the related rules, and at the same
time stop the relationship of rural social old-age insurance.

 Relationship with educated youth old-age insurance
                                          170
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



The land requisitioned farmers who have participated educated youth old-age insurance,
can choose one type from educated youth old-age insurance and social security for land
requisitioned farmers. The one who choose to participate social security for land
requisitioned farmers, can be returned paid fees or excess of educated youth old-age
insurance.

C. Zhuji Water Supplyment Subproject

According to resettlement policies in Zhuji City, resettlement of this project mainly uses the
currency resettlement, agricultural production resettlement, the old-age insurance
resettlement and job placement resettlement etc.

(1) Land requisition compensation costs (including land compensation and resettlement
subsidy fee) will be fully paid to the affected village collective. Through the holding of
village meetings by the affected village collective, jointly decided to land acquisition
compensation fee use and village land readjustment. After the affected HHs in access to
land compensation payments, the land requisitioned farmers in accordance with their
wishes to participate in social security or other social security (such as the rural social
old-age insurance). Compensation for ground attachments and standing crops standing
crops compensation fee owned ownership of persons.

(2) After collective-owned land expropriation and use, by district or above land and
resources regulatory approval, land farmers can participate in old-age insurance. In the pay
the full old-age security fee, men over 60 years of age, women over 55 years of age can
enjoy the pension. Pension protection fund for land requisitioned farmers in accordance
with the principle of individuals, government share the burden of raising. The selection of
payment is divided into fourth gear: 4000 yuan / person, 7,000 yuan / person, 10,000 yuan /
person, 18,000 yuan / person. Government offered each insured object for 15,000 yuan of
subsidy financing from land transfer fees.

(3) Governments establish perfect labor service system to provide assistance to the
affected villagers. And provide assistance to employment for APs through various channels.
About this project it has been considered the local socio-economic development and
production and living system affected by the land acquisition. The engineering design has
been constantly optimized,. The water pressure to the original program and site covers an
area of the program has been compared and selected to minimize the scope of land
requisition . So this project won‘t make devastating construction on local production and
life.

Shangyuling Shangban village started the implementation of second-round land contract in
1996 second-round land contract. The contract period was 30 years, would be end in 2026.
According to land-related legal provisions, in the land contract period the legitimate rights
and interests of the land contractors is protected.

The land of Shangyuling Shangban village affected by the project has not previously been
collected, so the villagers in the compensation and the allocation and use do not have
traditional practices can learn from. Learned in the interview, the Shangyuling Shangban
village holded a town meeting, and according to "The People's Republic of China Organic
Law of Villagers" to the provisions of 17, participated villagers were more than two-thirds of
village representatives of HHs and more than half of the representatives agreed that the
land requisition and compensation plans, identified land acquisition and compensation of
Qingshan water program.

In October 2009, the project resettlement investigation team discussed the Resettlement
Action Plan with the villages affected by LAHD in the convening of a forum, according to

                                           171
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



immigration advice and the actual situation of the project affected areas to determine the
overall planning of the resettlement program: currency compensation and land adjustment.

The project impact on the family land a small amount , so lost land per household only is a
small number and the original standard of living basically do not affect higher level. Local
economic development is in a higher level and can afford many employment opportunities,
therefore, the wishes of the affected HHs to participate in old-age insurance.for land
requisitioned farmers are very low.

1)Direct currency compensation

The collective-owned land acquisition compensation fee, including land compensation fees,
resettlement subsidies, compensation for standing crops standing crops and ground
attachments.According to the land acquisition region price, the Shangyuling Shangban
village fell into three categories, the compensation standard is 33,000 yuan per mu. On the
Shangyuling Shangbanvillage all the villagers discuss and decide: involving standing crops
standing crops compensation fee and ground attachments owned by individuals; the land
compensation fees and resettlement subsidy programs adopted by the villagers to vote on
distribution and use.

The plan is: the land compensation fees and resettlement subsidies are divided into two
ways to use it. According to the land contract period and second-round land contract has
15 years, according to 600 yuan per mu / year, one-time payment to the land acquisition
affected HHs (9,000 yuan / mu • HHs) The remaining funds will be as the development of
village collective funds for village public infrastructure. The use of funds will be in an open
and transparent manner. The each use of funds will be village publicity and accept the
supervision of the masses from time to time.

    2) Land adjustment

     During second-round land contract period, the village land don‘t adjust. To the end of
the second-round land contract (2026), in accordance with household registration in the
village the population was re-adjust the distribution of land. In accordance with the
population, the average distribution of land, land-lost people will be re-accessing to land.

    Qujiang District

     ―Basic scheme of basic living protection for land requisitioned persons in Qujiang
District‖ and Additional comments

     The one who meet the conditions to participate in the basic livelihood guarantee for
land is requisitioned persons, should be required to pay the basic living guarantee fee
which is co-financed by the government, the village (group) collective economic
organizations and individuals.The payment standard of the basic living security is 27000
million, of which the government has handled 30% of the insured persons matching
subsidies, from the land transfer fee and other government funds allocated. The village
(group) collective economic organizations take 5% -40%; personally liable for 65% -30%.
The object to receive social security payments are targeted at men aged 60 years old,
female aged 55 years whose land is requisitioned. In 2004 the guaranteeing basic living
standards of the monthly payment was 185 yuan, from 2005, the standard normally
increased 5 yuan per year. If the village (group) collective economic organizations and
individuals that really have difficulty to pay the full cost , the basic living subsidy can be
implemented. The basic living subsidy payment standards according to the Qujiang District
Administration issued〔2008〕8 document provides for the payment of 27,000 yuan for the
benchmark standards. The payment of District Finance handled for financial subsidies to
the insured persons 30% of supporting would be the same, the village (group) collective
                                           172
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



economic organizations and individuals shared some of not less than 30%. The one who
paid the fees according to the basic standard of living supplement, man over 60 years of
age, women over 55 years of age, can receive a monthly basic living subsidy. The village
(group) collective economic organizations and individuals who pay the basic living subsidy
according to the benchmark aforementioned 30% , in 2004 the basic living subsidy monthly
payment standard was 100 yuan. The village (group) collective economic organizations
and individuals increased the payment standard per 5% , the basic living subsidy monthly
treatment standard corresponding increased 10 yuan.

― Notification about adjust the initial basic living standards of treatment for land
requisitioned persons by Personnel Labor and Social Security Bureau of Qujiang District of
Quzhou, Finance Bureau of Qujiang District of Quzhou‖

From January 2008 onwards, the start of basic living for land requisitioned persons
standards of treatment was be appropriate adjusted. The basic payment of livelihood of
land security (benefits)and funding l proportion was the same. The treatment standards are
now starting to be adjusted accordingly.

    1. The treatment of basic living standard of 37,000 yuan payment was adjusted from
253 yuan to 278 yuan; the treatment of basic living standard of 27,000 yuan payment was
adjusted from 185 yuan to 229 yuan.

   2. The treatment of basic living standard of 16200-27000 yuan ( includes 16200)
payment was added 25 yuan from original standard.

D. Quzhou East WWTP Subproject

According to resettlement policies in Quzhou, resettlement mainly uses the currency
resettlement, the pension resettlement and job placement, etc..

1. After 2 / 3 villagers agreed, it shall give the land-lost farmers land compensation fees for
resettlement in order to protect their long-term stability of lives, but also can be used for the
welfare of all the villagers. The resettlement subsidy should be paid to labor force affected
by land acquisition. After get the resettlement subsidy fee ,they can continue current
employment, also can be used for the development of self-employed.

2. Governments established perfect labor service system to provide assistance to the
affected villagers, in order to provide assistance to the immigration through various
channels. Such as open job market freely and carry out vocational and technical training.

3. Basic subsistence

Land requisitioned persons can participate in basic livelihood protection.

1) The basic livelihood guarantee

The one who meet the conditions to participate in the basic livelihood guarantee for land is
requisitioned persons, should be required to pay the basic living guarantee fee which is
co-financed by the government, the village (group) collective economic organizations and
individuals.The payment standard of the basic living security is 27000 million, of which the
government has handled 30% of the insured persons matching subsidies, from the land
transfer fee and other government funds allocated. The village (group) collective economic
organizations take 5% -40%; personally liable for 65% -30%. The object to receive social
security payments are targeted at men aged 60 years old, female aged 55 years whose
land is requisitioned. In 2004 the guaranteeing basic living standards of the monthly
payment was 185 yuan. In 2008, the treatment of basic living standard of 37,000 yuan
                                            173
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



payment was adjusted from 253 yuan to 278 yuan; the treatment of basic living standard of
27,000 yuan payment was adjusted from 185 yuan to 229 yuan.

    2) The basic living subsidy

If the village (group) collective economic organizations and individuals that really have
difficulty to pay the full cost , the basic living subsidy can be implemented. The basic living
subsidy payment standards according to the Qujiang District Administration issued〔2008〕
8 document provides for the payment of 27,000 yuan for the benchmark standards. The
payment of District Finance handled for financial subsidies to the insured persons 30% of
supporting would be the same, the village (group) collective economic organizations and
individuals shared some of not less than 30%. The one who paid the fees according to the
basic standard of living supplement, man over 60 years of age, women over 55 years of
age, can receive a monthly basic living subsidy. The village (group) collective economic
organizations and individuals who pay the basic living subsidy according to the benchmark
aforementioned 30% , in 2004 the basic living subsidy monthly payment standard was 100
yuan. The village (group) collective economic organizations and individuals increased the
payment standard per 5%, the basic living subsidy monthly treatment standard
corresponding increased 10 yuan. The treatment of basic living standard of 16200-27000
yuan ( includes 16200) payment was added 25 yuan from original standard.

The project land acquisition compensation fee will be sufficient to compensate the farmers‘
land revenue within the contract period, and can meet the land-lost farmers the
requirements to pay pension insurance. The requisitioned land of the project is mainly
paddy fields. The annual output value of paddy field is 1100 yuan / mu.

    a) The net income per mu of paddy field was 1100 yuan / year • mu. According to the
PBOC benchmark deposit rate 3.87% (deposit period of five years or more) and
socio-economic survey, we can use the average net present value method to calculate the
opportunity cost of the future. The formula is

     (1  i) n  1
NPV=A i(1  i)
               n



(The NPV is net present value, A is annual production, I is Discount rate)

From calculation, we can get the net income of different contracts of land.

Remaining contract period      NPV                             (yuan)
n=30                           NPV=                            14055
n=20                           NPV=                            10998
n=10                           NPV=                            6531
b) The project land requisition compensation according to the comprehensive region land
price. The comprehensive compensation standard project involved a was 42,000 yuan / mu,
the village collective in general set-aside of about 1,000 yuan. Therefore, there is
remaining 41,000 yuan / mu for the village of disposable costs.
c) To consider one-time fee payment of remaining contract period of every mu of land are
as follows:
Remaining contract period                  one-time fee payment of every mu of land
n=30                                       26495
n=20                                       30002
n=10                                       34469


                                           174
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



So we can conclude from the analysis, land acquisition compensation fee can compensate
for the loss of the land net finished even after payment of insurance.

In addition, in the project construction process, the resettlement implementing institutes will
take some help and supporting measures, include:

a) During the project construction, the APs will be given priority to labor, which will bring
cash income of APs

b) All of the affected village, if there are export of labor services , the APs will be given
priority.

c) In the the whole recovery production process, we can organize technical training of staff
affected, such as the number of cash crops and aquaculture training. Invite technical staff
of the agricultural sector and labor and social security departments to the resettlement area
to make some training in agriculture and farming. To make sure that every affected HHs
received at least one or more time technical training in agricultural production and
non-agricultural production and technical training. Through these measure, crop quality
and yield can be improved in order to increase the economic income of the APs and to
restore affected people's livelihoods.

Tonglu County

With regard the issuance of the notice of‖Tonglu implementation measure of land
requisitioned persons basic old-age security‖ (Tong Government issued 〔2005〕No. 49 )

1. The scope and object

(1) The staff of this measure, includes the one involved in the framework of Tonglu
approval of land acquisition according to the law, or less than 0.2 mu per capita arable land,
and in the established " rural residents become urban residents " administrative villages
(economic cooperatives, village groups) registed agricultural personnel (including
active-duty conscripts serving person,person who sentenced into a prison or people
undergoing the education-through-labor), who has transacted the ―rural residents become
urban residents‖ procedures.

(2) The following persons were not included in land coverage of basic old-age pension.

a) Persons whose age under 16 years old at the time of land acquisition.

b) Employees who have participated in basic pension insurance and have access to basic
old-age monthly treatment.

c) Persons who have joined the agencies and institutions pension co-ordinating insurance.

2. The basic old-age security measures

Land requisitioned persons have been participating in the basic old-age security, the
standards should be required to pay the basic old-age security fees according to the
related standards. Land requisitioned persons, man aged 16 years old to 60 years of age,
women aged 16 years old to 55 years of age, should be implemented the basic old-age
security. Man reached the 60 years of age and women reached 55 years of age, may
choose a one-time monetary relocation or resettlement of basic old-age security. The new
land requisitined persons‘ age detemination according to the publish notice of the date on
land acquisition; the birth date according to the household registration of the public security
department.
                                           175
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



3. Fund raising and management

(1) The costs of basic old-age security payment is divided into 28,000 yuan and 22,000
yuan, 17,000 yuan third gear. When going through formalities insured, select one village as
a unit file,and no longer to change. The funds raised by the government, the village
collective and individual, of which 35% of the total payment raised by the county or town
(districts) , commitment to transfer funds from the land in the designated payment; 65%
paid by the village collective and individual, all recorded into individual accounts.

(2) The village collective and individual‘s commitment to a specific part of the sharing ratio
according to the actual village, according to villagers (members) Rules of procedure to be
discussed and decided.

(3) The part of the village collective and individual, will be collected by a unified
administrative villages, and be one-time paid into ―land requisitioned persons basic old-age
security fund" special account. The new land requisitioned persons‘ basic old-age security
personnel costs, will be accounted by the county land department in accordance with
enrollment numbers and payment standards, and then put into the county fund special
account from the land compensation fees and resettlement in the Social Insurance Office
directly.

(4)The Government has established the basic old-age security for land requisitioned
persons policy to cope with the future payment risk. According to the principle of "Who use
land, who is responsible for" raising, from the land of acquisition time transfer fund in
accordance with the proportion of 1% extract.

(5)The basic old-age security fund for land requisitioned persons implementing the pay and
expenditure management. The basic old-age security fund was set up financial accounts,
earmarking, no unit or individual shall not be misappropriated, retain, or crowding.
Establish and improve the supervision mechanism. County finance, land, labor and social
security departments should take effective measures to ensure the safety and the
achievement of increasing the value of the Fund, the audit department of special funds to
strengthen the verification and oversight.

4. Determination and distribution of the basic old-age security payments

(1) Treatment. The insured objects whose household registration in the county, starting
next month of man reached the age of 60 years women reached the age of 55 years of age,
according to the standard, can receive monthly fee of the corresponding grade of the basic
old-age security payments. The basic old-age security payments are from the foundation
formed to protect payments and annuity payment

Basic protect payments are according to the amount of contributions determined, pay the
amount of 28,000 yuan to enjoy the standard of 210 yuan / month; pay the amount of
22,000 yuan to enjoy the standard of 160 yuan / month; pay the amount of 17,000 yuan to
enjoy the standard of 120 yuan / month. The annuity payment is under the years of
payment decision, from the payment of the following year, the temporarily standard is
improving 5 yuan a month each year.

Calculation: Basic old-age security payments = basic protection payments + payment
annuity (payment number of years × 5 million). Payment number of years is calculated from
the first payment to enjoy the treatment in only, pay less than one year to be calculated as
one year. Monthly treatment to increasment adjustment will be in January of each year.

(2) If the one receiving the basic old-age security payments is death, sub-month will be
suspended the basic old-age security payments. Their relatives must ,within one month,
                                           176
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



with "Old-age Security Handbook" and cremation certification,go to the county social
insurance to run through the formalities, personal account balances will be refunded.

(3) If the one who enjoy the treatment of persons was sentenced in prison or re-education,
in the detention period, will be ceased to enjoy the basic old-age security benefits. When
expiration of his sentence or detention, they may enjoy the protection of treatment and the
treatment is no longer adjusted and replaced during the suspended period.

(4) If the one who enjoy of basic old-age security has been moved outside the county, will
no longer enjoy the treatment given, but will be allowed its withdrawal of funds of individual
accounts in accordance with the provisions.

(5) The basic old-age social security payments will be distributed socially.

E. Tonglu Jiangnan Waste Water Pipeline Network Subproject

Land compensation fees and resettlement subsidies should be implemented earmarking.
First, to ensure that land old-age security personnel costs can be able to meet the patment
of enjoyment of old-age security and the settlement payment, as well as land contract
rights and interests of land requisitioned farmers. If there are balances, belong to the
collective economic organizations to manage, mainly for the development of collective
economy and public welfare undertakings. Land acquisition compensation fee shall not be
divided equally among the home to the people, shall not be classified as debt debt
settlement funding the collective economy, can not lend, can not to provide financial
security for other units, shall not be paid for the issuance of cadres, and the payment of
hospitality expenses and other unproductive. The management of land compensation fee
use of the program must be approved by the villagers (representative) of the general
assembly discussed and voted on and approved by town governments (districts office) for
review and publicity before being implemented. Unit whose land is requisitioned must be
timely published income and expenditure of land compensation fee payments. to the
members of the collective economic organizations and consciously accept the town
governments‘ (districts offices) supervision.

After collective-owned land expropriation and the use, by district and above land resource
management department approved, the land requisitioned persons can participate in
pension insurance. When full paid old-age security fee, men over 60 years of age, women
over 50 years of age can enjoy the basic living security. Pension protection fund for
persons whose land is requisitioned is in accordance with the principle that individuals, the
government share the burden of rising. The costs of basic old-age security payment are
divided into 28,000 yuan and 22,000 yuan, 17,000 yuan third gear. It will be voluntary
determined by the insured object. Meanwhile, the standards of treatment will be
accordingly improved as the level of economic development.

The insured object who has reached the enjoyment of age (over 60 years old) or when the
insured had reached or exceeded the age of the treatment when participate the insurance.
From the next month of handling procedures for the treatment, workers can enjoy the basic
old-age security payments monthly. The standards of treatment according to their
individual grade level of payment per month respectively were 210 yuan, 160 yuan, and
120 yuan.

The project APs will be in accordance with their wishes to participate in the social security
of land-lost farmers. The total requisitioned land of project is 2.268 mu, in accordance with
regional price in Tonglu the fifth criteria, 4 HHs and 16 persons affected by land requisition,
except the standing crops compensation, will receive the land acquisition compensation
fee for total 68.04 thousand yuan, about 4.2 thousand yuan/person. According to the
survey, Jinjiang Village per capita arable land area is about 0.4 mu, 2 waste-water lifting
                                           177
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



pump station requisitioned land 2.268 mu. After the land acquisition, there would be 6
people to participate in social security for land-lost farmers. By depth investment to two
families, two people were willing to participate in the social security of land-lost farmers.

Moreover, Governments established perfect labor service system to provide assistance to
the affected villagers. Before the land acquisition the to established related organizations
for APs, in order to provide assistance to the immigration through various channels. Such
as open job market freely and carry out vocational and technical training.

Panan County

With regard the issuance of the notice of‖Panan implementation measure of land
requisitioned persons basic old-age security‖

The forth item: The farmers whose land is requisitioned land within the county due to urban
construction, traffic roads, industrial parks and industrial development and other functional
areas of the state approved. Land area begin to accrue from the second round.

The fifth item: The insured object is 16 years old and above (except for full-time school
students) in the volumes of agricultural staff, including those resulting from withdrawal of
the village to build Habitat and other special reason ―rural residents become urban
residents" residents.

The sixth item: The number of insured objects the household as a unit and per 0.5 acres of
land approved one person to calculate (per capita cultivated land of 0.15 acres in the
following families who meet the conditions can all be insured).

The seventh item: Individuals (including the village collective) payment is divided into five
gears: 6000 yuan, 11,000 yuan, 16,000 yuan, 21000 yuan, 26,000 yuan. Each gear free
choice by the insured object should be one-time paid.

The ninth item: The standard of government subsidy was 6000 yuan per person.

The twelfth item: Farmers whose land is requisitioned has Insured, the man reached the
age of 60 years of age, women over 55 years of age can apply to receive security
payments procedures, starting to receive monthly basic living security payments from next
month.

The thirteenth item: The basic livelihood guarantee payment is composited by monthly
basic protection fund and monthly protection fund of years of individual's contribution.

The fourteenth item: The standard of the basic protect fund according to an individual's
payment is divided into five different files, respectively, 90 yuan, 125 yuan, 160 yuan, 195
yuan, 230 yuan.

The fifteenth item: Monthly protection funds of years of individual‘s contribution are
multiplied by contribution years and standards for each file. Each payment on the standard
length of each file as follows: 1 files 1.5 yuan, 2 files 2 yuan, 3 files 3 yuan,4files 4 yuan, 5
files 5 yuan. Years of payment limit from the date of payment to 60 years old for male and
to 55 years of age for female (the same below), less than one-year part not be counted.

The sixteenth item: Meeting the insured conditions, the land requisitioned farmer who at 65
years of age or above, is allowed do not pay handling procedures and to receive fees from
the processing of the second month a monthly basis for security payments 50 yuan (HHs
provided by the focus on maintenance the three non-target and HHs enjoying five
guarantees are exception).
                                            178
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



The sventeenth item: From receiving the basic livelihood guarantee payments from
January 1 next year for basic security payments, 1 file 5 yuan, 2 file 7.5 yuan, 3 file 10 yuan,
4 file 12.5 yuan, 5 file 15 yuan (not pay 2 yuan ). Later that is increased once every two
years.

The nineteenth item: The land requisitioned farmers who already participated in the basic
old-age insurance for urban workers, but also comply with object of the present approach
of the provisions, can apply for government subsidies 4000 yuan, and its government
subsidy funds directly into employees basic old-age insurance fund, as the basic old-age
insurance pre-paid, after that will be deducted according to standard each year.

The twentieth item: The land requisitioned farmers who have joined the social pension
insurance, the principal and interest of rural social endowment insurance which has been
paid, are capable of reaching the individual part of basic subsistence for the land
requisitioned farmers.

The thirty-first item: The basic living security funds for the land requisitioned farmers should
be into the financial accounts, special storage, used for other purposes. And implementing
income and expenditure management, and no unit or individual shall not be removed to
use, misappropriation. If insufficient funds by the government responsible for raising.

F. Panan Jianshan WWTP subproject

According to resettlement policies in Panan County, resettlement of labor mainly uses
old-age security resettlement and currency resettlement, etc..

Land acquisition compensation costs (including land compensation and resettlement
subsidy fee) will be fully paid to the affected HHs. After get the land acquisition
compensation, the affected HHs will voluntary participated social old-age security for land
requisitioned farmers or other social security (such as rural social old-age insurance). The
ground attachments compensation and standing crops compensation are belonging to
the owners.

After the collection land has been requisitioned and use, following the approval by the
County Department of Social Insurance Office, land requisitioned farmers can participate in
the basic subsistence for land requisitioned farmers. When full paid old-age security fee,
men over 60 years of age, women over 55 years of age can enjoy the basic living security.
The basic livelihood guarantee payment is composited by monthly basic protection fund
and monthly protection fund of years of individual's contribution. The standard of the basic
protect fund according to an individual's payment is divided into five different files,
respectively, 90 yuan, 125 yuan, 160 yuan, 195 yuan, 230 yuan. Monthly protection funds
of years of individual‘s contribution are multiplied by contribution years and standards for
each file. Each payment on the standard length of each file as follows: 1 files 1.5 yuan, 2
files 2 yuan, 3 files 3 yuan, 4files 4 yuan, 5 files 5 yuan. Years of payment limit from the
date of payment to 60 years old for male and to 55 years of age for female (the same
below), less than one-year part not be counted. Meeting the insured conditions, the land
requisitioned farmer who at 65 years of age or above, is allowed do not pay handling
procedures and to receive fees from the processing of the second month a monthly basis
for security payments 50 yuan (HHs provided by the focus on maintenance the three
non-target and HHs enjoying five guarantees are exception). The land requisitioned
farmers who already participated in the basic old-age insurance for urban workers, but also
comply with object of the present approach of the provisions, can apply for government
subsidies 4000 yuan, and its government subsidy funds directly into employees basic
old-age insurance fund, as the basic old-age insurance pre-paid, after that will be deducted
according to standard each year. The land requisitioned farmers who have joined the social
pension insurance, the principal and interest of rural social endowment insurance which
                                            179
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



has been paid, are capable of reaching the individual part of basic subsistence for the land
requisitioned farmers. The Household of which income is less than the minimal needs
standards of urban and rural residents can enjoy the minimal needs standards of urban and
rural resident‘s policy. When land requisitioned farmers who have participated in the basic
livelihood guarantee, can be the approach of self-employed persons to participate in the
basic medical insurance or medical insurance for urban residents.

The project APs will be in accordance with their wishes to participate in the basic livelihood
security for land requisitioned farmers.The project totally permanent requisitioned
collective-owned land of xinzhai village and louxiazhai village 31.05 mu, of which 23.79 mu
of cultivated land, 2.2 mu of bamboo, 4.78 mu of tea garden, 0.28 mu of unused land. In
accordance with the Panan regional land price standards for level 3 price, land requisition
affected 34 HHs and 118 persons, except the standing crops compensation will receive
the land acquisition compensation fee total 894.3 thousand yuan, per capita of about 7.6
thousand yuan. According to a survey with10 samples showed that 9 (90%) willing to
participate in the basic livelihood for land requisitioned farmers, the only one not willing to
participate is also not because could not afford, but because they feel that the distance to
enjoy is too long. According to Panan‘s principles of using the household as a unit per 0.5
mu of cultivated land approved a levy quota of participants by calculation, the project will
have 26 people into the social security of land-lost farmers. The household as a unit even if
the basic livelihood guarantee payment to the highest standard of 26,000 yuan and net
6,000 yuan government subsidy, each family just have to pay 20,000 yuan, the affected
HHs can afford.

The local government will take positive and effective measures to seriously enforcement
the job of the employment of land requisitioned farmers. To aside a certain amount of
special funds to organized a planned, systematic pre-employment vocational skills training
of land-lost farmers to to enhance their professional skills and overall quality. To promote
vigorously the urban and rural employment, to broaden employment opportunities; To
develop actively community jobs, to place jobs for the land-lost farmers in various forms,
and multi-channel.

Lanxi City

―Lanxi City Lanxi City People's Government on the issuance of interim measures for basic
old-age security for the land requisitioned farmers notice‖(Lanxi government issue [2004]
25)

1. The scope and object

In the city administrative area, since the second round of rural land contracting, because of
the urban expansion, road network, construction of industrial park development and other
land acquisition has been approved by land and resources departments, the total tax
arable land had been expropriated 80% (Second round contracting HHs as a unit) of
agricultural population in the books can be insured. When the land acquisition occured, the
one did not meet the working age (16 years of age) and who have already enjoyed the
basic old-age insurance for urban workers, are not included in the present approach to the
scope of protection.

2. Fund-raising

(1) The basic old-age security fund for land requisitioned farmers in accordance with the
principle that individuals, groups and the government share the burden, that is a approach
of "government out of that, collectively make up a little, individuals pay a little" to raise.


                                           180
       Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                 — Financed by World Bank



(2) Government grants fund criteria: participants who meet the requirements of this
approach, the implementation of land requisition before the measures by the land subsidy
per unit of insured objects 12,000 yuan; the implementation of land requisition after this
approach by the land units and per mu grant funds to pay 12,000 yuan.

(3) Administrative villages (or economic organizations) should pay its members a certain
amount of basic old-age security payments for land requisitioned farmers, a minimum of
not less than 2,000 yuan per capita, from the land compensation fees shall be allocated.If
the land compensation fee is full (or part) paid to the farmers, the farmers should pay
themselves (or pro rata pay).

(4) The standard of Individuals to pay the basic old-age security is divided into five files: 1
file 26,000 yuan, 2 file 18,000 yuan, 3 file 12,000 yuan, 4 file 6,000 yuan , 5 file 3,000 yuan.
Insured staff can choose their own grades, and once selected, do not change.

3. Standard and condition of treatment

(1) Insured object from the next month at the age of 60 years old, can monthly access to
basic old-age security benefits; participants reached 60 years of age or above when
making payment, can access to the basic old-age security benefits the following month.

(2)The payment standard of monthly security benefit is divided into 5 files, 1 file 290 yuan,
2 file 220 yuan、3 file 170 yuan、4 file 120 yuan、5 file 95 yuan. The treatment is according
to the. The monthly will increase 5 yuan every two years temporarily.

File              1             2             3             4          5           unit
Payment           26000         18000         12000         6000       3000        Yuan
Benefit           290           220           170           120        95          Yuan/month
―Lanxi Municipal People's Government of the Office of the issuance of ― Lanxi land
acquisition compensation and resettlement interim measures‖ notice ―( Lanxi government
issue [2003] 75)

2. Land acquisition compensation standard

The sixth item: Land use unit or individual should pay the compensation to the City Land
Resources Bureau and the village economic cooperative. Cost of land requisition
compensation include land compensation fees, resettlement subsidies, as well as on the
ground attachments and standing crops standing crops compensation fee.

Land compensation fee belongs to the village co-operative economy, ground attachments
and standing crops standing crops compensation fee belongs to ground attachments and
standing crops standing crops owners, resettlement subsidies is used for the agricultural
population resettlement.

Land acquisition within of "District-chip integrated price" is applicated of "District-chip
integrated price". Land acquisition outside of "District film integrated price" still based upon
the combination of a multiple of annual output to compensate.

3. Resettlement subsidy approach

The twelfth item: The village whose land is requisitioned in accordance with their actual
economic co-operatives,to the agricultural population in need of resettlement, can choose
the following approach to resettlement or subsidies.

                                            181
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



(1)Land adjustment. If the requisitioned land of the villages are scattered and the village‘s
land is mobile, can swap the contracted land to resettle them. Generated by the swap of
land access, drainage and irrigation, and soil factors changes in the need for compensation,
the village may be given appropriate compensation.After the transfer , the resettlement
fees will not be otherwise distributed.

(2) Participate in the social old-age security system. Accordance with the number of
resettled agricultural population, according to the principle that government, collectives and
individuals tripartite funded, arising from the land transfer fee, land acquisition
compensation fee, etc.,the land requisitioned persons can participate in social security
system.

(3) Resettlement fees paid. If it is difficult to adopt the two above mentioned methods of
placement, the following methods resettlement fees paid can be choosed.

a) Generally it is used the approach of paying it to the one whose land is requisitioned. At
late period of land acquisition, resettlement subsidy will be disbursed to object who lose the
contract of land by period by batch.

b) Pay to the whole community by the proportion. If the land acquisition area is huge,
resettlement subsidy can be issued to all members of the cooperative relocation by the
proportion.

G. Lanxi Waste Water Subproject and Lanxi Youpu Ancient Town Protection

According to resettlement policies in Lanxi City, resettlement mainly uses the currency
resettlement, the pension resettlement and job placement resettlement, etc..

1. Land acquisition compensation costs (including land compensation and resettlement
subsidy fee) will be fully paid to the affected HHs. After get the land acquisition
compensation, the affected HHs will voluntary participated social old-age security for land
requisitioned farmers or other social security (such as rural social old-age insurance ). The
ground attachments compensation and standing crops compensation are belong to the
owners.

2. After collective-owned land expropriation and use, by district or above land and
resources regulatory approval, land farmers can participate in old-age insurance. In the pay
the full old-age security fee, men over 60 years of age, women over 55 years of age can
enjoy the pension. Pension protection fund for land requisitioned farmers in accordance
with the principle of individuals, government share the burden of raising. The selection of
payment is divided into 5 gear: 3000 yuan / person, 6,000 yuan / person, 12,000 yuan /
person, 18,000 yuan / person, 26,000 yuan / person . Government offered each insured
object for 12,000 yuan of subsidy financing from land transfer fees.

3. Government establishes perfect labor service system to provide assistance to the
affected villagers, in order to help to provide various channels of employment of APs. Such
as free open job market, vocational and technical training, etc.

After collective-owned land expropriation and use, by district or above land and resources
regulatory approval, land farmers can participate in old-age insurance. In the pay the full
old-age security fee, men over 60 years of age, women over 55 years of age can enjoy the
pension. Pension protection fund for land requisitioned farmers in accordance with the
principle of individuals, government share the burden of raising. The selection of payment
is divided into 5 gear: 3000 yuan / person, 6,000 yuan / person, 12,000 yuan / person,
18,000 yuan / person, 26,000 yuan / person . Government offered each insured object for
12,000 yuan of subsidy financing from land transfer fees.
                                           182
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



Insured object from the next month at the age of 60 years old, can monthly access to basic
old-age security benefits; participants reached 60 years of age or above when making
payment, can access to the basic old-age security benefits the following month. The
standards of treatment according to their individual grade level of payment per month,
respectively is 290 yuan, 95 yuan.

The project APs will be in accordance with their wishes to participate in the basic livelihood
security for land requisitioned farmers.The project totally permanent requisitioned
collective-owned land 52.3 mu, construction land 3.75 mu. According to the Lanxi City land
acquisition regional price the third and forth level standard, The HHs affected by land
acquisition 58 HHs 203 persons, except the standing crops compensation, can get the
land compensation totally 1.88 million yuan, 9.3 thousand yuan/person.

 Government establishes perfect labor service system to provide assistance to the affected
villagers, in order to help to provide various channels of employment of APs. Such as free
open job market, vocational and technical training, etc.




                                           183
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



                   Annex 3 Related and Linkage Project
1. Longyou North Waster Water and SPN Project
There are 3 related projects of this Project, which are (1) project of the waste-water
treatments plants for the north town of Longyou (2) the second stage of expansion project
of industrial water treatment plants for the north town of Longyou (3) the project of water
plants for Longyou.

Among these 3 projects, the first one finished resettlement activities in September 2009 It‘s
the linkage project and needs resettlement appraisal. Other two projects are not linkage
project.

Related project 1: Longyou North WWTP

1 Brief introduction of project

the waste-water treatments plants for the north town of Longyou with the scale of
80,000m3/d is used to deal with the swage form the industrial zone in Longyou. Its
construction is divided into 2 section, the former is about 40,000 m 3/d and is located in
Muhuan of Longyou town with the planed area of 4.11 hectare.


Development and Reform Commission of Zhejiang Province approved feasibility study
report on the waste-water treatment plant for north town of Longyou project in July,2008.
Scale of construction projects approved consent to 4 tons / day, supporting the
construction of waste-water pipe diameter DN300-1500 collection pipeline network 55km,
diameter of tail water discharge pipe DN1200 1.6km, water reuse scale 10000 tons / day.
The total land area is 4.11 hectares and the estimated total investment is 138.43 million
yuan. According to the plan, in short-term plan, waste-water treatment plant is mainly for
Longyou industrial zone and its surrounding who has access to waste-water plant, and the
long-term plan includes surrounding villages and towns (the xiao nanhai town, the Tashi
town, the Muhuan town, etc. ) waste-water treatment plant completed a BOT tender plant
parts in April 2009, Zhejiang Jiang Ronghuai Environmental Protection Technology Co.,
Ltd. won the bid, Longyou Industrial Zone signed agreement with Rong Huaigong who is
responsible for part of the waste-water treatment plant construction and operation. The
waste-water collection pipeline network and the tail water discharge pipe count into the
World Bank loan. Waste-water treatment plant is laid out according to the first stage, and
reserve enough field for the next stage construction which is in the first phase of the north
side. At present, the waste-water treatment plant is now under construction, ongoing field
level work.




                                            184
       Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                 — Financed by World Bank



          Annex picture: the location of the WWTP which is doing ground level job

2 The LAHD affected scope
The project began in 2008 and the land compensation and resettlement work completed in
September 2009.

The waste-water treatment plant in northern city which covers an area of 4.11 hectares
expropriated the 4.11 hectares (about 70.6 acres) land in Jujia Village of Mohuan town
which is the rural collective-owned land with land-level 4.

The project only involves the land expropriation of rural collective-owned land. The houses
within the site and health protection zone are not demolished.

3 Resettlement policy and implementation
3.1 Land compensation

Land compensation fee: Longyou County Land Resources Bureau and the Jujia Village
where the site located signed an agreement of expropriation on December 19, 2008.
According to the agreement, the area of expropriated land is 6.2039 hectares (including the
approaching road). Because Longyou didn‘t implement the new prices in 2008, the year
when the land compensation began, the standard they used for land compensation is
20,000 yuan / mu for cultivated land, 8000 yuan / mu for garden plot and 20,000 yuan / mu
for water surface. On December 23, 2008 Northern Longyou Economic Development
Corporation paid Jujia Village 1,831,290 yuan according to this compensation standard.
With the new prices of Longyou in 2009, the compensation standard is 30000 yuan / mu, so
they paid 745,116 yuan as additional compensation on December 17, 2009. The total land
compensation fee is 2,576,406 yuan.

Standing crops compensation fee: 220,409.5 yuan.

The total compensation is 2,796,815.5 yuan. Land compensation fee and standing crops
compensation fee were paid to the village collective accounts, then the Village collective
paid the fees to those APs directly.

3.2 Other fees

Apart from the land compensation fee, there are land reclamation fee, land management
fee and so on.

3.3 Resettlement

The land-lost farmers were volunteered for the Longyou basic living. The project totally
affected 54 families, 203 people.

3.3.1 Enrollment eligibility

Within the whole county, the land owner whose per-capita cultivated land is less than 0.2
acres must be grouped in the household unit when they participate the basic living
(subsidies) .

After January 1, 2008, the land owner whose per-capita cultivated land is more than 0.2
acres can participate the basic living according to the defined number of enrolled farmers.

3.3.2 Payment Standard

                                            185
        Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                  — Financed by World Bank




level               1                 2                  3                 4
Payment
                    18994             15550              11767             7985
Standard(yuan)
3.3.3 Enjoyment eligibility and standard

Enjoyment eligibility: Males reaching the age of 60 and females 50

Enjoyment standard:

level               1                 2                  3                 4
Payment
                    18994             15550              11767             7985
Standard(yuan)
Enjoyment           240               196.5              148.7             100.9
standard            yuan/month        yuan/month         yuan/month        yuan/month
In addition, the enjoyment standard for the land-lost farmers who paid 18,994 in lump-sum
yuan will increase by 5~7.5 per year from the next year and so on. Payment in accordance
with the other three standards will be adjusted according to the proportion of the
corresponding fee.

There was only one household (5 people) chose to participate in then basic living. Mainly
because the time before the enjoyment is too long and the affected farm income is only a
very small part of total income, the farmers prefer using land compensation for other
production and business activities.
3.4 Resettlement effect

Investigation team interviewed the land acquisition village, groups and immigrant HHs in
October 2009. Immigration were highly satisfied with the compensation and resettlement
policy, resettlement result and the form of compensation payment.
The project is located around the industrial park which is economically developed and has
many enterprises, so the non-farm employment is great. Most of the affected labors have
worked in the park before the land expropriation. They gave up agricultural production and
leased the contracting land to foreign labors. They worked in an enterprise and engaged in
commerce, services and other non-agricultural production activities. After the land
expropriation, the immigrant labor force used the resettlement fee for the production and
operation activities and got a higher income. The current income of migration is generally
higher than before, so they were highly satisfied with the compensation and resettlement
policy. The resettlement has achieved a good result.

Lated project 2: Longyou North Industrial Water Treatment Second Phase Expansion
Project

Through the efforts of the past six years, Longyou Industrial Park has been built into a
modern eco-industrial park emphasized on the special paper, hardware, machinery and
other high-tech industry. The construction of infrastructure in the initial area of park has
basically completed. The remising industrial land has been basically completed. The
development of Mohuan function area is undertaking. There is an original 25,000 tons / day
(planning for the 100,000 tons / day) water treatment plant in the northern city. With the
expansion of the Industrial Park, the enterprises in the park have been put into production
and the park residents have settled in the park gradually. So the existing water treatment
facilities have been unable to meet existing water demands. Water plant expansion has
become an urgent task in Longyou industrial park.
                                              186
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



To improve urban water supply facilities and the water supply capacity of the park, to
achieve sustainable economic development in Longyou, the county government decided to
expand the existing water treatment plant in northern city. The second phase of the water
treatment expansion includes Pumping Station, mechanical response horizontal flow
sedimentation tank, air and water backwash filter, chlorination tank, the sludge conditioning
tank, production and management and equipment installation. In this project, we need to
establish an additional 25,000 tons / day water treatment pond and the filter as well as the
corresponding subsidiary of additional treatment facilities to meet the needs of park water
supply.

According to the Longyou urban and industrial park planning and the current development
status, the scale of the short -term project (to 2015) is considered to be 50,000 tons/day
while the scale of long-term project (to 2020) is 100,000 tons/day. So the 25,000 tons/day
water treatment facility should be built in this project.

This project is the expansion of the original construction. The land was expropriated and
reserved in the first phase of the project and there is need to expropriate additional land.
Water treatment plant expansion project began in 2009 and was scheduled for completion
in the end of 2010.




Annex picture 2: The status of land of the second phase expansion of the water treatment
plant

Related project 3 : water plant in urban area of Longyou county

Water Supply Plant in Longyou County was built in the 1980s. The design of water supply
scale was 30,000 tons/day. The water plant got water from the Qu River. It‘s hard for tap
water to meet the drinking water standards due to the contaminated Qu River. As a result,
Longyou County started building a second water plant in 1996. For funding reasons, only
water pipes, regulating pond and other projects were completed in 1997. The system still
used the old water plant facilities with the replacement of water resources. The scale of the
urban water supply was still 30000 tons/day. In recent years, with the acceleration of the
pace of urban construction, urban area of Longyou is more than 10 square kilometers and
its population is nearly 90,000. The water supply network has been expanding. The
production and living water in the southern part of the industrial area depends on the water
plant supply, so the water demand is increasing sharply. Urban water consumption was up
to 28,000 tons/day in 2003 and 35,000 tons/day in 2005. The old water plant was unable to
meet the needs for the economic and social development of Longyou. Urban water supply
problem has increasingly become the bottleneck for further development. To speed up
construction of the second water plant is extremely urgent.

According to Longyou county plan, the county water consumption in 2010 and 2020 is

                                            187
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



expected to 80,000 tons/day and 140,000 tons/day, respectively. The construction of the
second water plant is one of the county practical projects in 2004. The water plant gets
water from She Yang and Hong Ban reservoirs. The entire production process is controlled
automatically. This water plant can solve the problems such as the insufficient water supply
capacity, the backward equipment and technological process, the low pressure of
discharge and so on. This project can meet the urban water demand and operate at peak
demand period. The second water plant covers an area of 50.34 acres. Its designed
capacity is 70,000 tons/day. Water supply of the first phase is 35,000 tons and the second
phase is 65,000 tons. The main water pipes are laid along National Highway 320. The
supporting construction of the second water plant has been fully carried out in 2004. The
policy processing has been put in place. The foundation construction of the main project
has been completed and put into operation in the first half of 2005.

2. Waste water pipeline network project in Jiangnan township of Tonglu
The project has three related projects: 1) Tonglu County waste-water treatment plant; 2)
Feng Chuan Zhen of Tonglu County pump; (3) planning roads matching the pipeline.

Both of the first and second one finished resettlement activities before September 2007,
and they are not linkage projects. The third are linkage project and required resettlement
planning.

Related project 1:WWTP in Tonglu county

Tonglu County which is in the center of Fuchun River---Xin'an River Scenic Spots has been
the absence of a sound sewer system and treatment facilities, the waste-water untreated
directly has dischargede into the Fuchun River. With Tonglu County economic has
developed, city size has continuously expanded, municipal domestic wastewater and
industrial waste water has increased year by year, which makes the basin water pollution
situation more and more serious, directly affects the improvement of people's health and
inhabited environment and poses a serious threat to the safety of drinking water and the
eco-environment clean of Hangzhou in downstream, water governance has increasingly
gained attention in all levels of government. Therefore, it is an important project that the
construction of waste-water treatment plant of Tonglu is to maintain and improve the
beautiful urban environment of Tonglu County, prevent the Fuchun River water pollution,
improve the living conditions.

At the first phase, the design scale of Tonglu waste-water treatment plant was 20,000 tons/
day, and the length of pipeline network is 50.5 km, covering Tonglu County District 6 square
kilometers. At the first phase, Tonglu Waste-water Treatment Plant used SBR-CAST (Cycle
Sequencing Batch Reactor) process, put into operation in January 2005, and at March
2006 inspected and accepted by the EIA, the actual processing capacity was 14,200
tons/day, sludge dewatering sent to Landfill. The total project investment was 58.04 million,
of which 28.38 million invested in waste-water treatment plants, pipeline network
construction expensed 29.66 million. At the second phase, Tonglu Waste-water Treatment
Plant project started in September 2006, completed at the end of 2007, and appended
waste-water treatment plant a new scale of 40,000 tons/day, located at the side of existing
site, used the SBR (CAST) technology. Sewerage area included Tonglu Economic
Development Zone、Qingshan Industrial Zone、Fengchuan Industrial Functional Zone (the
site the project located) and some villages and towns which were close to the industrial
zones as above-mentioned (including the Jiangnan towns where the project located at).

Related project 2:Pump station in Fengchuan township Tonglu county

With the completion and improvement of Feng Chuan Industrial Area, the requirement of
waste-water treatment was followed up. In order to deal with industrial and life waste-water
                                            188
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



better, Fengchuan waste-water pumping station was constructed and used in November
2007. the Pumping station used 1.06 acres land of Caibu Village, and the land
compensation money was completed paid in early 2007. The design of waste-water
pumping station area was 710 m2, which the structures area was 194.4 m2, its capacity
was 19,000 m3/d. Fengchuan waste-water pumping station had waste water of industrial
area send to waste-water treatment plant in Tonglu, which greatly eased the crisis of
environmental pollution Feng Chuan Industrial Area.

Related project 3: planning roads matching the pipeline.

13 kilometers pipelines will be constructed with the planning roads.



3. WWTP in Youbu Township of Lanxi and Ancient Town Infrastructure
Project in Youbu town
This project has two related projects: 1) Lanxi garbage landfill; 2) The existing sewer
network of YouFu Town. Both of them finished resettlement activities before September
2007, and they are not linkage projects.

Related project 1:Lanxi garbage landfill

The Lanxi City waste sanitary landfill is located in the soap village of HuangDian town, 12
kilometers away from the city. The project covers an area of 202 mu, with a total storage
capacity of 930,000 cubic meters, the scale of the design processing 240 tons/day, of
which 150 tons of urban waste, rural 90 tons of garbage, the use time is 11 years, and the
total investment is 57 million yuan. A storage capacity of 300,000 cubic meters project, it
had put into operation in November 2006.

Related project 2:The existing sewer network of YouFu Town

Currently the region of YouFu have‘t have a waste-water treatment factory, the rainwater
and waste-water have only one but incompleted drainage system. The waste-water
generally is not treated, and the stool waste is treated by simple septic tanks and into the
river nearly. And only a small amount of industrial wastewater discharged into the water
after simple treatment. The rest is directly discharged without any treatment, which resut to
the pollution of water body. And almost no drainage facilities in rural areas.

4. Wastewater Pipeline Network Project in Yunshan District of Anwen
Township of Pan’an County
This project has two related projects: 1) Pan‘an town Wastewater Treatment Plant; 2) An
existing pumping station in Anwen. Both of them finished resettlement activities before
September 2007, and they are not linkage projects.

Related project 1:Pan’an town Wastewater Treatment Plant

Pan‘an County Wastewater Treatment Plant (Ltd) is located in the Taikou villge of An-Wen,
it is operated by the Environmental Protection Group Co., Ltd, using a Sino-chang way to
invest in BOT water project. The Waste-water treatment plant covers an area of 75 acres,
Constructed in two phases, the project land acquisition was completed at once. The first
phase of the project covered an area of 45 acres, the waste-water treatment capacity of
30,000 tons/day, which started in July 2005, began operating in April 2007. it also was
responsible for life water and industrial wastewater of the old city, currently it treated about
4,000 tons per day of waste-water treatment, urban waste-water treatment plants Pan‘an is
                                              189
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



used the more advanced CAST technology, the effluent quality has achieved a B emission
standards, The construction and operation of the wastewater treatment plant has greatly
improved the water quality and the living environment of Pan'an county area.




                Annex picture 3 waste water treatment plant in Pan'an
Related project 2: existing pumping station in Anwen

Anwen Pan'an waste-water system including: one Pan‘an County wastewater treatment
plant; two waste-water pumping stations and the associated pipe lines.

Currently, two pumping stations of the waste-water system of Anwen Pan'an has been put
into operation.

AnwenI pumping station covers an area of 1200 m2, is located in Kangzhuang village of
Anwen, the pumping station started in June 2006, completed in April 2007, which the total
design is 20,000 m3/d, the scale of the first project is 10,000 m3/d;

AnwenII pumping station covers an area of the 2300 m2, is located in Hetang village of
Anwen, which started in June 2006, completed in April 2007, the total designed 30,000 m3 /
d, the scale of the first project is 15000 m3/d.

5. Environment Improvement Project in Shenze of Pan’an County
This project has three related projects: 1) Wastewater Treatment Plant in Pan‘an County; 2)
Existing pumping station in Anwen town; 3) Rebuilding of 42 provincial highway of Xikou -
Xinwo.

The third one is the linkage project and need resettlement planning. Other two finished
resettlement activities before September 2007, and they are not linkage projects.

Related project 1:Wastewater Treatment Plant in Pan‘an County

Pan'an wastewater treatment plant (Co., Ltd.) is located in Taikou Village of Anwen town.
It‘s invested and constructed by Zhongchang Environmental Protection Group Co., Ltd. by
BOT. The wastewater treatment plant covers an area of 75 mu. It is constructed in two
phases. The land expropriation was completed in one time. The first phase of the project
                                           190
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



with daily disposal capacity of 30,000 tons covers an area of 45 mu. The project started in
July 2005 and put into use in April 2007. This wastewater treatment plant disposed the
domestic and industrial wastewater from Pan‘an county. Its current daily disposal capacity
is 4,000 tons. It used advanced CAST technology so that the water quality achieves the B
emission standards. The construction of this plant has greatly improved the water quality of
the Pan'an county area and the living environment.




                    Annex picture 4 Pan‘an Waste Water Treatment Plant
Related project 2:Existing pumping station in Anwen town

Anwen waste-water system includes a wastewater treatment plant, two waste-water
pumping station and associated pipelines. The two pumping stations in Anwen waste-water
system have been built and put into use.
The No.1 pumping station covers an area of 1200 m2 and is located in the Kangzhuang
Village of Anwen town. The construction started in June 2006 and completed in April 2007.
The designed scale is 20,000 m3/d. The scale of the first phase of this project is 10,000
m3/d.
The No.2 pumping station covers an area of 2300 m2 and is located in the Hetang Village of
Anwen town. The construction started in June 2006 and completed in April 2007. The
designed scale is 30,000 m3/d. The scale of the first phase of this project is 15,000 m3/d.
Related project 3:Rebuilding of 42 provincial highway of Xikou - Xinwo42

No. 42 Provincial Highway is one of the main highways in the main area of Panan, which
connect the county with many south townships. It is also an important regional channel
between Jinhua and Lishui in Zhejiang Province.
The reconstruction segment of No. 42 Provincial Highway, with designed speed of 40km/h,
is a class-II highway according to the old road technical standards. Its roadbed width is
8.5m while the road width is 7m. The level of road services is low. As a result, the
development of villages and towns along the highway was limited and the highway can not
play the role of the main trunk road traffic artery. This situation will certainly affect the pace
of economic development of Panan County. In addition, No. 42 provincial highway is the
main channel which connects the villages and towns in Jinhua and Lishui. Economic
development requires the interaction between the surrounding counties, cities and other
economically developed areas and a good traffic environment to accept the economic
radiation. The reconstruction of No. 42 provincial highway will enhance the linkages with
                                               191
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



the external environment of Panan and improve its development.
In addition, because of the lower grad of this highway section and the complex terrain
conditions, the traffic accidents are frequent. In order to reduce traffic accidents and
facilitate travel for the residents, the reconstruction of No. 42 provincial conversion is
extremely urgent with the transport services spirit of "people first".
The route of this project: lines from the Shuangxikou of the Anwen village in Pan‘an County,
connects with the No. 40 provincial secondary highway, ranges westward along the
Shenze River via Dingbutou, Xiwen (tunnel) and Shenxi Hydropower Station, bypasses
residential areas after passing through Shenze tunnel along the east side of Shenzexi,
routes through Jingou and the planning region of Nanwu, and then connects the old road.
The total length is 15.816 km and the designed road grad is Grad-I. Its roadbed width is
23.0m. Part of the framing roadbed is 2 × 11.25m wide.
This project is expected to start in 2010 and will be completed by the end of 2012,
according to the capital construction procedure of key projects and the scale of this project.
By the above, the construction period of the reconstruction of No. 42 provincial highway is
consisted with the duration of the Environment Management Project. The laying of
wastewater transport pipes can combine the road rebuilding without the impact of
immigration.
6. Tangxi Water Plant and Water Supply Network Project in Wucheng
District of Jinhua
The related projects involved in this project mainly refer to the pipeline network in Luobu
town, Yangbu town and Shenfan town and the water reservoir in Xinban town. Both of them
finished resettlement activities before September 2007, and they are not linkage projects.

Related project 1:Shenfan reservoir

The Xinban water reservoir is located in the south of Daliyuan, Xinban town. It is a
medium-sized reservoir which is mainly used for irrigation, combining with flood control,
power generation, domestic water supply and other comprehensive utilization. It is a
controlling water project in the middle and upper reaches of Xinban River with the
catchment area of 49.4 square kilometers. The average annual rainfall within the basin is
1684.9 mm and the runoff depth is 1145mm. The mean annual inflow of the reservoir is
59.39 million m3 (45.95 million m3 in the driest year). The crest elevation is 150m.
The total reservoir storage capacity of Xinban reservoir is 37.12 million m3. The check flood
level is 147.67m and the design flood level is 145.81m. The normal storage capacity is
30.28 million m3 and the corresponding water level is 144m. The dead storage capacity is
10.039 million m3 and the corresponding water level is 130m. The reservoir is responsible
for the irrigation of 59,000 mu farmland. The main project of the reconstruction and
reinforcement has been completed. The culvert has been set up under the dam. The
culvert diameter is DN1200 (steel) and the elevation of the culvert center is 119.50m.
According to the analysis and conclusion of water balance in the ―water resources
assessment report of water intaking for water plant and water supply pipeline network in
Tangxi in Wu area of Jinhua (issued)‖, documented by Water Resources and Hydropower
Survey and Design Institute, Jinhua Co., Ltd., the reservoir can provide 14.33 million m3 (P
= 95%) water for living and industry annually, 31.05 million m3/year(P = 90%) water for
irrigation, 4.1million m3/year(P=90%) for ecology and 910,000 m3/year water for livestock.
Related project 2:water pipeline network construction

There are existing pipeline networks in Luobu town, Yangbu town and Xinban town. There
are two small water plants in Luobu town and Yangbu town. The water quality is not good
and the pipeline network is disrepair. The leakage rate is more than 50%. There is no
                                             192
          Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                    — Financed by World Bank



   booster pump station so residential water pressure is not sufficient. As a result, the two
   small water plants were discontinued in2007 and 2008, respectively. The original pipelines
   in Xinban town also have these problems. The diameter, coverage and water pressure are
   difficult to meet the needs. The water quality is poor and the leakage is high.

   Thus, there are several towns starting re-laying water supply network this year. The
   pipeline network in Luobu town has been completed in 2005-2009, with the pipe length of
   377,383 m, the coverage of 99% and the diameter of φ110-φ32. The pipeline network in
   Yangbu town has been completed in 2005-2009, with the pipe length of 169,659 m, the
   coverage of 100% and the diameter of φ90-φ32φ. The pipeline network in Xinban town has
   been completed in 2006-2009, with the pipe length of 16,800 m, the coverage of 100% and
   the diameter of φ90-φ32. The 60% of funds is raised by villagers while the left from the
   State. The current pipeline situations in different towns are showed in Schedule 1.

         Table 1 the current status of pipelines in water supply region of Tangxi water plant
Town             time          coverage         length        diameter        funds(from villagers)
Luobu         2005-2009          99%           377383         φ110-φ32                  60%
Yangbu        2005-2009         100%           169659          φ90-φ32                  60%
xinban        2006-2009         100%            16800          φ90-φ32                  60%



   7. Water Plant and Supported Pipeline Network in Qingshan of Zhuji
   There are two related projects in this project:1)Qinshan water reservoir; 2)existing water
   plants and pipelines.

   Both of them finished resettlement activities before September 2007, and they are not
   linkage projects.

   Related project 1:Qinshan water reservoir

   Qinshan Reservoir is located in the west of Zhuji City, 18 kilometers apart from the city.
   Dam site is located in the canyons between the Biandan mountain and Qingtan mountain.
   The main dam intercepts the Mai River, the tributary of Wuxie River, which belongs to the
   Puyang River System. The area of catchment above the dam site is 50 square kilometers.
   The mainstream is 11.3 kilometers long and gradient is 14.6‰. The time of concentration is
   3 hours. The upstream region is hilly and the main peak elevation is 641 meters above sea
   level. The total storage capacity is 17.31 million m3. The utilizable capacity is 9.25 million
   m3 (currently 7.8 million m3). The designed irrigation area is 12,000 mu. It is a
   medium-sized reservoir which is mainly used for irrigation, combining with flood control,
   power generation, fish, domestic water supply and other comprehensive utilization. It was
   built in November 1958 with the design height of 23 meters and total storage capacity of
   12.06 million m3 and utilizable capacity 5.29 million m3. The dam is closed in June
   1959. The height of dam was 20 meters and the dam began to store water to benefit by the
   end of 1959. The height of dam was 23 meters by the end of 1963. Thus, the main project
   had been completed. The whole project consisted of the main dam, second dam, spillway
   and water holes. The hydropower station behind the dam was built in 1972 New Year's
   Day, with a total installed capacity of 235 kilowatts. In 1977, according to No. 510 file in
   Zhejiang Provincial Department of Water Resources, the dam started expansion and
   protection. The main project was completed before 1984. The total storage capacity is up
   to 17.13 million m3 and utilizable capacity is 7.8 million m3 (9.25 million m3 design). The
   main projects are:4.50 m (0.5 m high) increasing of dam elevation; transposition and

                                                 193
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



reconstruction of the second dam with the dam crest elevation of 87.5 meters (Wusong
elevation, the same below), increasing from 78 m to 81 m of the spillway crest elevation,
cutting straight of the downstream to avoid the erosion, opening new water hole with the
length of 200 m, building new power plant with the total installed capacity of 600 kW.




                   Annex picture 5 Qinshan water reservoir of zhuji
Related project 2:existing water plants and pipelines
1)existing water plants
There are three Water Plants (Caota, Datang, Sandu) in water supply region. The Datang
water plant has shut down. The Caota (design capacity 15,000 m3/d), and Sandu(design
capacity 2,000 m3/d) water plant are responsible for the water supply of the whole region.
The water process is too simple, backward and the scale of these two plant is too small, so
the water quality is not good. The current water supply pipes are in the form of branching.
The water supply reliability is poor and water pressure can not meet the requirements in
some areas.
2)existing pipelines
The diameter of main water pipe is DN600 in Caota plant while DN500 in Qianyang village.
This DN500 pipeline continues westward to the Caota town and lays along the west side
and north side of the town. Then connects with the water supply network of Datang.
The main sources of water supply of Datang are Caota water plant and city area. The main
water supply pipe also comes from these two directions. The diameter of the pipe coming
from the city area is DN500. The diameter of the pipe coming from the town area is
DN100~DN300.




                                           194
        Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                  — Financed by World Bank




                         Annex picture 6 The existing pipelines


                          Table 2 The basic situation of Caota reservoir
Location                    Caota township
Reserve scope               Caota township and Datang
                            6000 ton/day(befog november,2005)
Water supply scope
                            15000 ton/day (now)
Location of water
                            Qingshan reservoir (reservoir capacity of 7.8 million m3)
resource
                            Gravity water supply, the hight of clean pool is 62.7m, and the
Method of water supply
                            depth is 4m
                            Reservoir source water → water cycle Clarifier Valve Filter →
                            → clear reservoir→ pipeline network
Technical process
                            Reservoir source water → integratied purification device →
                            clear reservoir → pipeline network
Medicine                    aluminium polychlorid,ClO2
Recent output               8000 ton/day
Price                       Table 2-5
The basic situation of      2.6 million ton in 2004
water supply in recent      2.8 million ton in 2004
three years                 1.16 million ton in the first half year of 2006




                                              195
        Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                  — Financed by World Bank



                          Table 3 The basic situation of Sandu reservoir

Location                    Sandu township

Reserve scope               Sandu township

Water supply scope          2000 ton /day
Location of water
                            Maozhuta reservoir(reservoir capacity of 1 millionm3)
resource
                            Gravity water supply, the hight of clean pool is 53m, and the
Method of water supply
                            depth is 3.2m
                            Reservoir source water → water cycle Clarifier Valve Filter →
Technical process
                            → clear reservoir→ pipenet work
Medicine                    aluminium polychlorid,ClO2
Recent output               2000 ton/day
Price                       Table 2-5
The basic situation of      56000 ton in 2004
water supply in recent      440000 ton in 2004
three years                 270000 ton in the first half year of 2006



8. The WWTP phase II and supported pipeline network project in the east
district of Jiande
This project has four related projects: 1) the first phase of the waste-water treatment plant
in northern Jiande; 2) Xin‘anjiang waste-water treatment plant; 3) existing waste-water
(rainfall) pipelines in Jiande; 4) landfill in Meicheng, Jiande.
The fourth one is the component of this Project, so a Resettlement Action Plan has been
prepared for this one. Others finished resettlement activities before September 2007, and
they are not linkage projects.

Related project 1:the first phase of the waste-water treatment plant in easten
Jiande
       The original waste-water disposal plant can not meet the demand of the growing
development of the city. Thereby, Jiande began to engage in project preparing to build
waste-water disposal plant in the eastern city ever since 2004. The secondary project of
waste-water disposal plant in the east of Jiande has been listed in the public debt project of
national primary drainage area where water demands handling and it is also the primary
project of province as well as Hangzhou. The first project of waste-water disposal plant in
the eastern city, which was named as the secondary project of waste-water disposal plant
in the east of Jiande, has a constructing scale of handling waste-water 30,000 ton per day
and servicing for Yangxi development zone of Jiande. It is located in Xishang of Xiaya
valley of Xiaya county of Jiande (in the east of Yangxi development zone, the northern bank
of Xin‘an River and the west estuary of Dazhouxi). It covers an area of 2.95 hectare with an
probably total investment of 79,824,300 Yuan. The entire project includes a secondary
waste-water disposal plant holding 30,000 m3/d water as well as accessory pipeline
network with its handling craftsmanship of oxidation ditch. The discharge outlet of

                                             196
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



waste-water is located in the northern bank of Xin‘an River and the west estuary of
Dazhouxi, 45 km away from the border section of lower reaches. Waste-water disposal
plant in the east of Jiande(first project) began to invite public bidding from the end of 2006
and finished distributing compensation fund due to land conscription. The project will come
to an end in the inception of 2009. Influenced by the lagging of waste-water pipeline
network, waste-water disposal plant in the eastern city has not put into operation till now.
22 HHs of rural residents have to be dismantled in the safe guard area of 100 meters of the
first project. However, for the waste-water disposal plant (first project) has not put into
operation, the 22 HHs of rural residents have not yet removed and have not got their
compensation fund. 9 HHs of rural residents have to be dismantled in the safe guard area
of the secondary project of the waste-water disposal plant in the eastern city. The total area
of houses of rural residents that have to be removed amounts to 8360.5 m2, including brick
concrete of 7410.5 m2 which stands for 88.7%, brick timber of 431 m2 which stands for
5.1%, cement timber of 519 m2 which stands for 6.2%, and relating to 31 HHs and 122
people. The dismantlement of total amount of related 31 HHs is completed and brought into
this project (the secondary project of waste-water disposal plant in the east of Jiande).




   Annex picture 7 The first phase of the waste-water treatment plant in easten Jiande

Related project 2:xin’anjiang waste-water treatment plant
The Xin'anjiang waste-water treatment plant was prepared in 2001 and started in 2002. It
was completed in 2004 and then put into operation. The Waste-water Treatment Plant is
located in the Qiaodong Road, Xitou village, Xin'anjiang town (the xin'anjiang districts now),
west of No. 320 State Road. The waste-water plant covers an area of 28 mu, with the
existing scale of 20,000 m3/d. The waste-water treatment process used the CAST-II
technology and executed the B standard of First Emission Standard. The treated water was
then discharged into Xin'anjiang. Currently, the inflow of the plant has been increasing
gradually. The highest daily amount of inflow in 2008 has reached 22,000 m3/d and the
average inflow from January to September of 2008 is about 15,000 m3/d.
Xin'anjiang waste-water treatment plant currently is running well and can satisfy the needs
of the present requirement according to the emission standard. The Xin‘anjiang
waste-water treatment plant will be closed after the completion of the second phase of the
waste-water treatment plant in the eastern city. The waste-water of Xin‘anjiang plant will be
transported to the east plant. The relevant issues of Xin‘anjiang plant will be in the charge
of local government.




                                             197
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank




                    Annex Picture 8 xin‘anjiang waste-water treatment plant

Related project 3:xisting waste-water (rainfall) pipelines in Jiande

There is a waste-water treatment plant - Xin'anjiang waste-water treatment plant in the
project service area (Jiande City (including Genglou, Xin'anjiang, Yangxi)). The Xin'anjiang
waste-water treatment plant is in charge of the domestic waste-water of the old city,
north to the Xin'anjiang, not the industrial waste-water. The service area is 4.25 km2, with a
population of 71560. The length of existing waste-water pipeline network is 16.292 km.

Jiande City is divided into four areas: Genglou area, Jiangnan area, Jiangbei area and
Yangxi area. The status of existing waste-water pipeline networks in different areas is
shown in schedule 4.

               Table 4 The completed waste water pipeline network of JIande city
    Waster water block                     Caliber                       Length km
          Genglou                      DN300 – DN500                           4
          Jiangnan                     DN400 – DN600                          7.1
          Jiangbei                     DN200 – DN800                          21
           Yangxi                     DN600 – DN1200                          9.5
            Total                                                             41.6



The sewerage systems in Jiangnan area and Jiangbei area are more developed. There are
waste-water pipelines under all the main roads. The waste-water pipelines in Genglou and
Yangxi area are seriously lagging behind. Most pipelines are used both for rainwater and
waste-water. Then the mixed flow is discharged directly into nearby water bodies.
Related project 4: landfill in Meicheng, Jiande
The project produces 20t / d sludge with the water content of 80%. Jiande City plans to
transport the sludge to the Sludge Treatment Centre. As the treatment center is still in
planning, therefore, the sludge can be transported to Meicheng landfill, before the
completion of the treatment center.

Meicheng Landfill Project, which is in the charge of Mencheng government, and this project
are both in the scale of the Qiantang River Environment Comprehensive Management

                                             198
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



Project. Jiande City Urban Management and Law Enforcement Bureau is the responsible
department. This project is the first phase of the landfill construction, including the leachate
treatment facilities and the approaching roads. The services area consists of Meicheng,
Dayang, Sandu, Yangcunqiao, Xiaya and Yangxi towns (districtss). The population in the
engineering services area is about 220,000 and the long-term (2020) planning population is
about 410,000. Meicheng landfill is located in Kejiawu, with the total storage capacity of
about 610,000 m3 and the first phase storage capacity of about 210,000 m3. The total
project investment is 11657 yuan. This program will be started in September 2010, and
completed at the end of 2010.
Landfill site and approaching road require the expropriation of the collective-owned land
(Jiangshan village, Meicheng town). The total area of rural collective-owned land is 14.544
ha (about 218 mu). The project of road widening and reconstruction needs to impose
Jiangshan Village 42 mu of rural collective-owned land. The total area of expropriated land
is 260 mu. According to the survey statistics, the total demolition area is 13,395 m 2,
including 12,220 m2 brick-concrete structures (accounting for 91.23%) and 1175 m2civil
engineering structures (accounting for 8.77%). The land acquisition of this project mainly
impacts the collective-owned land and house demolition. The total population of APs is 166.
There are 42 HHs (148 people)affected both by land expropriation and house demolition, 5
HHs (18 people) affected only by house demolition.




         Annex picture 9 The current situation of Landfill sit in Jiande Meicheng

The details of demolition compensation and resettlement are shown in the sub-project of
Qiantang River Environment Comprehensive Management Project—— resettlement of the
first phase of Meicheng landfill project.


9. WWTP phase 1 of Jianshan in Pan’an County
This project has two related projects: 1)landfill in the northeast terrace of Pan‘an town; 2)
existing (rainfall) water pipelines in Jianshan Pan‘an (industrial park).
The first one finished resettlement activities in September 2008 and it needs resettlement
examination, but the other one finished resettlement activities before September 2007, and
it‘s not linkage project.
Related project 1:landfill in the northeast terrace of Pan’an town
1 Brief introduction of project
The landfill of is located in Pan‘an town, Shui‘niu Mountain, 500 meters away from
Pan‘xin Line. The area of landfill involved the Jianshan town and Hu‘zhai town and six

                                              199
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



administrative villages. The total landfill area is 150 mu, of which the first phase covers
an area of 50 mu. The total storage capacity is 446,000 m3 with the designed daily
capacity of 100 tons. The total investment is 20.62 million yuan and the service life is
12 years. This project is the major construction project throughout the county in 2008.
In 2009, this project was included in the project of urban waste-water and garbage
treatment facilities in the central budget for investment in new programs and the
obtained 6 million yuan from the central budget funds. The project started the invitation
to tender in June 2008 tender and formally began construction in early 2009 and will be
completed by the end of 2010.This landfill services for three towns and three villages in
northeast of Pan‘an town. The completion of the project will meet the harmless
treatment requirements of six townships and 75,000 residents in Pan‘an and improve
the surrounding environment.




      Annex picture 10 Nearing completed Pan‘an Northeast mesa county landfill
2 The impacts of land acquisition and house demolition of the project

The land expropriation of this project was started in May 2008. The leaders started
measuring the land for the construction of landfill on May 7, 2008 and finished in
August 2008. The expropriated land includes Jianshann town, Jianshan village of
Huzhai town, Xinzhai town, Tangtou village,nShui‘jiao village, Ling‘zhuang village and
Heng‘lu village. The total area of rural collective-owned land is 150 mu.
The project only involves the land expropriation of rural collective-owned land. The
houses within the site and health protection zone are not demolished.
3 Resettlement policy and implementation
3.1 Land compensation
Land compensation fee: Pan‘an County Land Resources Bureau and the Village where
the site located signed an agreement of expropriation on December 19, 2008.
According to the agreement, the area of expropriated land is 150 mu (including the
approaching road). The compensation standard was executed according to the
relevant price policy. The total land compensation fee is 4 million yuan.
Standing crops compensation fee: 300,000 yuan.

                                           200
            Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                      — Financed by World Bank



     Land compensation fee and standing crops compensation fee were paid to the village
     collective accounts in September 2008, then the Village collective paid the fees to
     those APs directly.
     3.2 Other fees
     Apart from the land compensation fee, there are land reclamation fee, land management
     fee and so on.
     3.3 Resettlement
     The land-lost farmers were volunteered for the Pan‘an basic living. The project totally
     affected 104 families, 340 people.
     3.3.1 Enrollment eligibility
     Within the whole county, the enrolled people must reach the age of 16(full-time school
     students excluded) and must be the agricultural staff who was affected by the
     expropriated land which is used for the construction of urban, traffic, industrial parks
     and industrial functional area, including those who changed rural residenceship into
     urban residenceship resulting from withdrawal of village housing construction and any
     other special reasons. Area of land acquisition began cumulative calculation from the
     second round.The number of enrolled people is calculated by the unit of household.
     3.3.2 Payment Standard
   level                 1               2                 3               4                 5
   Payment
                         26000           21000             16000           11000             6000
   Standard(yuan)


     3.3.3 Enjoyment eligibility and standard
     Enjoyment eligibility: Males reaching the age of 60 and females 50
     Enjoyment standard:
Insurance level          First           Second                Third            Forth                Fifth
Payment
                        26000             21000                16000           11000                 6000
standards
                                                                            Basic security
                     Basic security    Basic security     Basic security   payments Basic        Basic security
                    payments 230      payments 193       payments 160          security          payments 90
                         yuan              yuan               yuan         payments 125              yuan
Treatment                                                                        yuan
standards             Number of         Number of          Number of          Number of           Number of
                       years on          years on           years on           years on            years on
(yuan/month)
                      individual        individual         individual         individual          individual
                     contributions     contributions      contributions      contributions       contributions
                       Security          Security           Security           Security            Security
                    payments of 5     payments of 4      payments of 3      payments of 2        payments of
                         yuan              yuan               yuan               yuan              1.5 yuan


     In addition, the enjoyment standard will increase from the first day of the next year. The
     fist level is 5 yuan. The second level is 7.5 yuan. The third level is 10 yuan. The fourth
     level is 12.5 yuan. The fifth level is 15 yuan. Then the standard will increase once
     every two years.
     There were 95 HHs (176 people) chose to participate in then basic living.
     3.4 Resettlement effect

                                                   201
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



According to the survey statistics, immigration were highly satisfied with the
compensation and resettlement policy, resettlement result and the form of
compensation payment.
The project is located around the industrial park which is economically developed and
has many enterprises, so the non-farm employment is great. Most of the affected
labors have worked in the park before the land expropriation. They gave up agricultural
production and leased the contracting land to foreign labors. They worked in an
enterprise and engaged in commerce, services and other non-agricultural production
activities. After the land expropriation, the immigrant labor force used the resettlement
fee for the production and operation activities and got a higher income. The current
income of migration is generally higher than before, so they were highly satisfied with
the compensation and resettlement policy. The resettlement has achieved a good
result.
Related project 2:The existing waste-water (rainfall) pipelines of Jianshan
(industrial park)

The Jianshan Industrial Park used the waste-water pipes to achieve the diversion
system of rain and waste-water drainage. Industrial waste-water is discharged into the
sewer after pretreatment, and eventually into a small stream in the park. Because of
the aged old town, its drainage system was essentially not systematic. The old town's
waste-water were generally not carried through trunk sewers and processed centrally.
The present waste-water mainly is discharged through the rainwater and waste-water
effluent pipe into the small river nearby.
The status of existing waste-water (rainfall) pipelines of Jianshan (industrial park) is
shown in the schedule 5.

                Table 5 The status of existing waste-water (rainfall) pipelines
                   waste-water pipelines
         Name                              rainfall pipelines(m)   Radius(mm)
                          (m)
           1                 /                     9934                D300

           2               3877                    1784                D400

           3               6295                    2106                D500

           4               3811                      /                 D600

           5               590                       /                 D800

           6               390                       /                D1000




10. Waste-water Treatment Plant and Main&Branch Pipeline of the East
Area of Quzhou phase I
This project has two related projects: 1) roads combined with the construction of
pipeline network; 2) Quzhou Municipal Solid Waste Landfill. The first one is the linkage
project and needs resettlement planning. The other one finished resettlement activities
before September 2007 and it‘s not linkage project.
Related project 1:roads combined with the construction of pipeline network

                                            202
      Qiantang Basin Environmental Comprehensive Treatment Project Resettlement Plan
                                — Financed by World Bank



The supporting waste-water pipeline network of this treatment plant is 10.6 km long
and the rainwater collection pipeline network is 10.5 km long. This project will be
combined with the road construction in the development region of Qujiang urban. The
planned roads and pipeline networks in Qujiang are shown in figure 11.




  Annex picture 11 The planned roads and pipeline networks in new town of Qujiang

Related project 2:Quzhou Municipal Solid Waste Landfill

Quzhou Municipal Solid Waste Landfill is located in the east of the Xubalong village of
Qujiang District, 11km away from urban areas, covering an area of 408 mu, of which
366 mu for construction and 42 mu for resettlement. Quzhou Municipal Solid Waste
Landfill was started in December 2005 and completed and put into operation by the
end of 2007 with the total investment of 122.95 million yuan. The total designed
capacity is 3.16 million cubic meters with the designed daily capacity of 300-1000
tones and can accept 2.85 million tons waste. The service life is about 20 years.
The landfill was constructed in accordance with national standards. The construction
includes land acquisition, landfill reservoir, horizontal anti-seepage, waste-water
storage tank and water sewer, the old landfill anti-seepage treatment and ancillary
supporting facilities. The landfill used the horizontal seepage control techniques and
HDPE film imported by Europe and the United States. The groundwater drainage
system was set under the film. The leachate and gas drainage systems were set on the
film. The leachate was discharged into city waste-water treatment plant after the
pretreatment. The project fully used the South Mountain Reservoir as the landfill and
was divided into A,B,C three parts. Currently, the Class III Grade III sanitary landfill has
been built with the waste disposal capacity of 500T / d. In the future, the Class III Grade
II sanitary landfill will be built with the waste disposal capacity of more than 1000T / d.
Currently, landfill has 14 people for operation and management. They handles about
350 tons of garbage and 10 tons mud per day.