Docstoc

LIPS model at LiU

Document Sample
LIPS model at LiU Powered By Docstoc
					Using a Project Model for Assessment
                        of CDIO skills

       Tomas Svensson, Svante Gunnarsson
                       Linköping University
                                  Sweden
                                  June 8 2005
CDIO SKILLS

 CDIO skills - Personal, interpersonal, and product and
  system building skills.

2.X Personal and professional skills and attributes
3.X Interpersonal skills: Teamwork and communication
4.X Conceiving, designing, implementing and operating
  systems in the enterprise and societal context.

 How do we assess the CDIO skills?
PROJECT MODEL

Three main reasons for using a project model in
 engineering education:

 Tool for execution of projects

 Project work under industry like conditions

 A tool for assessment of various CDIO skills
     PROJECT MODEL


         Before                                   During                                 After
     0        1             2        3              4                           5                      6

             1              2        3      4 .   . m   .   .   .    .          n          .   . s Final report


Assignment                                                                                          Evaluation

       What?
    Requirements                                                                         Delivery
                    How?
                    Plans
                                                                                    System test

     x   Tollgate           Design                                         Integration

     x   Milestone
                                   Code                                Test
                                 Diagrams                           Debugging
                                    etc.
THE BEFORE PHASE


                                            Before
               Idea          TG0        Prestudy          TG1   Preparation       TG2


                                                                Agreed
                                      Requirement               requirement
        Project directive
                                      specification             specification
                                      from the customer
                                                                System drawing
                                         Preliminary
                                         project plan              Project plan
                                                        MS1
                            minutes
                                                                   Contract

                                                                                  MS2
                       report
   Product document
   Project document
ASSESSMENT IN THE BEFORE PHASE
Results:
 4.3.1 Setting system goals and requirements
 4.3.2 Defining function, concepts and architecture
 4.3.3 Development project management
 4.4.2 The design process phasing and requirements
Process:
 3.1.1 Forming effective teams
 3.1.2 Team operation
 3.1.3 Leadership
 3.1.5 Technical teaming
 3.2.3 Written communication
Assessment tools:
 Requirement specification
 Project and time plan
 System drawing
 Time and status reports
DURING PHASE


                                             During
                                             Implemen -             System
  From Before          Design          TG3                   TG4                   TG5
                                               tation                 test

                           ..
                 Design spec                   System              Reference
                                                      .
                                              test spec.           handbook
                             .
                      Test spec.                Technical            User
                      Integration            documentation          manual
                                .
                        test spec.                Test               System test
                        Project plan            protocol              protocol
                       new version

                                       MS3         MS        MS                    MS
   Product document
   Project document
ASSESSMENT IN THE DURING PHASE
Results:
 4.4.1 The design process
 4.4.2 The design process phasing approaches
 4.4.3 Utilization of knowledge in design
 4.5.1 Designing the implementation process
 4.5.3-4.5.4 Implementation in hardware and software.
 4.5.5. Test, verification and validation
Process:
 3.1.2 Team operation
 3.2.3 Written communication
Assessment tools:
 Design and test specification
 Test protocol
 Time and status reports
 The technical result is checked against the requirement specification
 Technical documentation
AFTER PHASE


                                                After
  from During           Installation         Error correction   Evaluation         DP6

                            Acceptance test


                       Installation-          Approval of         Project
                        documents             delivery            reflections
                             Acceptance        Rest list            Final report
                             test protocol
                                                                                MSn




    Product dokument
    Project document
ASSESSMENT IN THE AFTER PHASE
Process:
 3.1.2 Team operation
 3.1.3 Team growth and evolution
 3.2.4 Electronic/Multimedia communication
 3.2.6 Oral presentation

Assessment tools:
 Time and status reports
 Presentation
 Project reflection
CONCLUSIONS

 The project model provides a structure for assessment of
  CDIO skills.
 The model enables continuous assessment.
 The model and assessment can be used at different
  levels of complexity.

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:5
posted:8/13/2011
language:Swedish
pages:11