Session Plan on Principles of Management

W
Description

Session Plan on Principles of Management document sample

Shared by: llg16183
Categories
Tags
-
Stats
views:
29
posted:
8/12/2011
language:
English
pages:
6
Document Sample
scope of work template
							            Example QFD Workshop Session Plan                                                                                                               Page 1 of 6
            Session Plan                                                                                                                          Dates of event
 Time        Item/Desc.                         Durn./Page              Objective                    Inputs                       Process                   Outputs
This session plan is not intended to be something which a facilitator can simply pick up and use. Good facilitators know that each event is unique, and the session plan
needs to be developed to meet the specific needs and capabilities of the organisation. And a QFD workshop needs very good facilitation.
However, we provide this session plan purely as an example of the sorts of things that might be tackled in a QFD workshop by somebody who has read and understood
the ideas reflected in ‘Managing by Design’, and who will develop their own plan, but who would like to see some example of what has worked in the past.
             Start
  08.30      Introduction                       30 mins          To settle everybody into the   Flipcharts around      WS Owner introduces the
                                                                 workshop and agree a           the room               workshop by means of progress
                                WS Owner                   1-6
                                                                 common objective &                                    already made – and encourages
                                                                                                Champagne, OJ
                                                                 approach                                              people to walk round and look at
                                                                                                Objectives,            it & celebrate it. Then leads on
                                                                                                Agenda.                to the need to build on it, &
                                                                                                Groundrules            agrees the objectives and the
                                                                                                                       agenda …
  09.00      The challenge facing us            30 mins          To anchor this workshop in     Key outputs from       Present the main conclusions
                                                                 the context of any commit-     strategy work, and     from strategy work, and the role
                                WS Owner                   7-9
                                                                 ments or expectations from     implications for       that ‘Organisation’ is expected to
                                                                 the business context           ‘Organisation’         play within them. Ask for
                                                                                                                       comments, and work to agree
                                                                                                                       that our outcomes must feed into
                                                                                                                       this.
  09.30      Where are we against that:         45 mins          To review current              Post-it notes of key   A3 Handouts passed around,           Prioritised
             Current aspirations                                 perceptions of what we         points from vision     and a blow up of the main            vision in each
                                                            10
                                                                 want to achieve against the                           comments on aspirations (on          of the four
                                  Facilitator                                                   Large chart area
                                                                 expectations                                          Post-it notes) is talked through.    main areas.
                                                                                                for post-its and any
                                                                                                additions              Feedback is solicited from the
                                                                                                                       group, and where there are gaps
                                                                                                A3 Handouts
                                                                                                                       against expectations, new post-
                                                                                                Sticky dots            its are added.
                                                                                                                       Finally the key points, as
                                                                                                                       perceived by the group are
                                                                                                                       prioritised using sticky dots, and
                                                                                                                       agreed with WS Owner.


Tesseract Management Systems / 9CCA89CA-D5F1-43C9-867F-2C9685ECB9CA.DOC                                                                       Session Plan 12 August, 2011
          Event: Example QFD Workshop Session Plan                                                                                                            Page 2 of 6

 Time      Item/Desc.                           Durn./Page                 Objective                    Inputs                     Process                    Outputs
 10.15     Where are we against that:           30 mins              To understand the whole       A3 Handouts          People are referred to the            Understand-
           SWOT                                                      picture of current SWOT                            reverse side of the A3 sheet,         ing on the
                                                                11
                                                                     perceptions                                        and asked for any questions of        SWOT
                                  Facilitator
                                                                                                                        clarification. Explain that there     analysis
                                                                                                                        will be time in groups later on to
                                                                                                                        develop this further.
 10.45     Coffee                               15 mins
 11.00     A new vision for                     30 mins              To establish a clear set of   Proposal on bus.     WS Owner presents his proposal        Agreed
           ‘Organisation’ – business                                 parameters for our intended   objectives &         for the key business measure(s)       business
                                                           12,13
           performance                                               business success over the     measures             to drive ‘Organisation’ forward.      level
                                                                     next three years.                                  Where appropriate he links it to      performance
                         WS Owner (Intro)                                                          Clotheslines, pegs
                                                                                                                        the conclusions from the              measures
                                                                                                   and cards
                    Facilitator (Clothesline)                                                                           interviews. He then handles           and targets
                                                                                                                        feedback and reconciles that as       for 2004 &
                                                                                                                        appropriate. Finally, the target      2006
                                                                                                                        performance is set using the
                                                                                                                        clothesline approach for both 1 &
                                                                                                                        3 years.
 11.30     A new vision for                     90 mins              To establish a clear          Syndicate brief      Syndicates are appointed to           Clear vision
           ‘Organisation’ – customers,                               understanding of our vision                        each of the three areas and their     proposals
                                                (5 mins intro                                      Syndicate groups
           partners & people                                         in areas of customers,                             task explained. Each group then       and
           (objectives)                         45 mins synd         partners and staff, and to    Prioritised vision   reviews the prioritised post-its, &   measures for
                              Facilitator                            express these in clear        from 9.15 session    the general feedback, clarifies       each
                                                3x10 mins f/b
                                                                     measures.                                          the relationship to the business      supporting
                                                                                                   Expected output
                                                10 mins conc)                                                           goals, and proposes appropriate       area of the
                                                                                                   (quality check)
                                                                                                                        objectives & measures,                vision
                                                           14-18
                                                                                                   Walkround groups     Walkround groups are created
                                                                                                   Brief on walkround   with at least one member from
                                                                                                   process              each syndicate, these explain
                                                                                                                        the conclusions and take
                                                                                                   Post-it notes        feedback on post-it notes.
                                                                                                                        Syndicate groups re-meet to
                                                                                                                        consider the feedback and make
                                                                                                                        any required amendments.
 13.00     Lunch                                45 mins


Tesseract Management Systems / 9CCA89CA-D5F1-43C9-867F-2C9685ECB9CA.DOC                                                                        Session Plan 12 August, 2011
          Event: Example QFD Workshop Session Plan                                                                                                          Page 3 of 6

 Time      Item/Desc.                        Durn./Page               Objective                    Inputs                        Process                    Outputs
 13.45     A new vision for                  60 mins           To clarify the targets to be   Measures for each       Put up the clothesline, and take      Clear targets
           ‘Organisation’ – customers,                         achieved in 2004 and 2006      vision area             each measure in turn and use          for one and
                                                         19
           partners & people (targets)                         for each area of the vision                            the clothesline process to set the    three years
                                                                                              Clothesline
                              Facilitator                                                                             target. Where current
                                                                                              Cards                   performance, benchmarks or
                                                                                                                      expectations are known these
                                                                                                                      should be clipped up as well.
 14.45     Weighting the objectives          60 mins           To establish the relative      Objectives              Understand what would be              Relative
                             Facilitator                       importance of each of the                              average, excellent and poor           weighting of
                                                         20                                   Orthogonal array
                                                               objectives with regard to                              performance in each area of the       the
                                                               each other                                             vision – propose it to be target      objectives
                                                                                                                      exceeded, target 50% met, and
                                                                                                                      no progress, and check this is
                                                                                                                      okay.
                                                                                                                      Use orthogonal array to agree
                                                                                                                      relative weighting for the
                                                                                                                      objectives
 15.45     Tea                               15 mins
 16.00     Introduction to the work on       5 mins            To ensure that the group       Slide of process        Explain that this is the section in   Process
           Processes                                           has an overview of the         titles & ‘owners’       which we need their work on           post-its on
                                                         21
                               Facilitator                     whole set of processes and                             processes. Check that they            the wall
                                                                                              Post-it notes
                                                               have done their preparation                            have their post-its and get them
                                                                                                                      to stick them on the wall under
                                                                                                                      their process titles
 16.05     Agreeing Process Content          40 mins           To enable the group to         Large flat wall (test   Suggest that the processes they       Final process
                            Facilitator                        review each other’s outputs    it for post-it note     have developed independently          outlines –
                                                       22-23
                                                               and to develop an agreed       stickyness – or         may have some overlap or gaps.        things they
                                                               overall picture of the         cover w. flipcharts)    Get them to look at the columns       embrace
                                                               processes                                              and develop an overall picture.
                                                                                              Post it notes from
                                                                                              process owners          Then provide the opportunity for
                                                                                                                      the group to silent sort and add-
                                                                                              Process titles
                                                                                                                      in/remove post-its as required –
                                                                                                                      until it settles down. Check
                                                                                                                      there is overall agreement.



Tesseract Management Systems / 9CCA89CA-D5F1-43C9-867F-2C9685ECB9CA.DOC                                                                       Session Plan 12 August, 2011
          Event: Example QFD Workshop Session Plan                                                                                                Page 4 of 6

 Time      Item/Desc.                       Durn./Page            Objective                  Inputs                     Process                   Outputs
 16.45     Process for the QFD              5 mins         To ensure people know the     QFD voting          Recap briefly on what will be
                             Facilitator                   process of QFD                process             happening today, and ensure
                                                                                                             everybody has their voting cards
                                                                                         Voting cards
                                                                                                             for the QFD.
                                                                                         Scribe prepared
                                                                                                             Check that scribe is ready to
                                                                                                             scribe, and that each process
                                                                                                             will have a different set of
                                                                                                             sheets.
 16.50     Grid of the QFD row 1            40 mins        To clarify and agree the      Timing slide        Use the voting cards to develop      Scribe to
                              Facilitator                  potential for each process                        an initial picture of the strength   record each
                                                      24                                 Sheets of
                                                           to leverage each objective,                       of feeling for each cell.            process on a
                                                                                         processes
                                                           and to ensure a common                                                                 separate
                                                                                                             Get arguments from the
                                                           understanding of the          Sheets of                                                sheet
                                                                                                             extremes of view and seek other
                                                           conclusions                   objectives
                                                                                                             views as appropriate. Ensure all     QFD marked
                                                                                         Voting cards        arguments heard and                  up on the
                                                                                                             understood – then take the final     grid
                                                                                                             vote.
 17.30     Break                            5 mins
 17.35     Grid of the QFD row 2            40 mins        As per row 1                                      As per row 1
                             Facilitator
 18.15     Break                            5 mins
 18.20     Grid of the QFD row 3            40 mins        As per row 1                                      As per row 1
                             Facilitator
 19.00     Break for dinner                 90 mins
           Team building – go carts                        For fun and teambuilding in   Go cart materials   The teams are set and the rules
                             Facilitator                   the evening                                       are explained. Teams have one
                                                                                         Race area
                                                                                                             hour to prepare their cart




Tesseract Management Systems / 9CCA89CA-D5F1-43C9-867F-2C9685ECB9CA.DOC                                                             Session Plan 12 August, 2011
          Event: Example QFD Workshop Session Plan                                                                                                           Page 5 of 6

 Time      Item/Desc.                         Durn./Page               Objective                      Inputs                      Process                    Outputs

 08.00     Start of Day 2                     15 mins
 08.00     Introduction to Day 2              5 mins            To settle people back into       Objectives             Recap on what we achieved
                                                                the workshop                                            yesterday an agree the plan for
                              WS Owner                  25-26                                    Agenda
                                                                                                                        today
 08.05     Grid of the QFD row 4              40 mins     27    As per row 1                                            As per row 1
                            Facilitator
 08.45     Break
 08.50     Grid of the QFD row 5              40 mins           As per row 1                                            As per row 1
                            Facilitator
 09.30     Break                              5 mins
 09.35     Grid of the QFD row 6              40 mins           As per row 1                                            As per row 1                         Finish QFD
                            Facilitator
 10.15     Coffee                             15 mins
 10.30     Priority Processes                 30 mins           To conclude the final QFD        QFD spreadsheet        Recap and summarise all that         Final QFD
                                                                for ‘Organisation’ and to                               we have done to ensure               and process
                                Facilitator               28                                     Large QFD on the
                                                                clarify the priority areas for                          everyone is up to speed.             scores
                                                                                                 wall
                                                                work
                                                                                                                        Explain process prioritisation
                                                                                                                        and what it does (and does not)
                                                                                                                        mean.
                                                                                                                        Then use the weighting and
                                                                                                                        voting to agree priorities.
 11.00     General Principles of              60 mins           To ensure that the non-          Syndicate groups       Syndicate groups reconsider the      Principles of
           Approach: Remaining                                  process specific elements        for the areas of the   key elements of the SWOT that        approach
                                                        29-30
           elements of the SWOT                                 of the SWOT are                  SWOT                   have not been allocated directly
                                                                considered and used to                                  to processes, and develop
                                Facilitator
                                                                improve progress and                                    principles of approach for the
                                                                performance                                             process teams to use as they
                                                                                                                        pursue their work. The
                                                                                                                        principles are fed back briefly at
                                                                                                                        the end
 12.00     Lunch                              45 mins



Tesseract Management Systems / 9CCA89CA-D5F1-43C9-867F-2C9685ECB9CA.DOC                                                                        Session Plan 12 August, 2011
          Event: Example QFD Workshop Session Plan                                                                                                          Page 6 of 6

 Time      Item/Desc.                        Durn./Page                  Objective                    Inputs                      Process                   Outputs
 12.45     Flipchart warm-up                 15 mins              To raise the energy levels     Flipchart sheets
                                                                  as we move into the
                            WS Owner                         31
                                                                  afternoon
 13.00     Improvement Initiatives           90 mins              To clarify how each process    Existing and          A brief presentation is given on     Plan of
                                                                  will make progress against     planned initiatives   the order priorities of improvem’t   initiatives for
                            WS Owner         (5 mins intro
                                                                  the objectives in terms of a                         e.g. facts, plans, basics, flair…    each process
                                                                                                 Process
                                             60 mins synd         clear set of actions and
                                                                                                 syndicates (either    Syndicates consider the need of
                                                                  initiatives
                                             4x5 mins f/b                                        for multiple          each process for improvement,
                                                                                                 processes or for      and how existing initiatives might
                                             5 mins wrap)                                        priority processes)   deliver that, or whether new
                                                        32-37                                                          ones are required.
                                                                                                 Syndicate brief
                                                                                                                       They then develop these in to a
                                                                                                 Walkround groups
                                                                                                                       proposal/plan of the way forward
                                                                                                                       and what they require
                                                                                                                       Walkround feedback in mixed
                                                                                                                       groups containing a member of
                                                                                                                       each syndicate.
 14.30     Management Process                15 mins              To explain in brief outline    Quadrant Chart        The quadrant chart process is        Agreed way
                                                                  how progress will be           model                 presented and it is explained        forward on
                               Facilitator              38-44
                                                                  managed and maintained                               that it will be picked up again as   management
                                                                  going forward                                        things move forward in the           and reporting
                                                                                                                       management team
 14.45     Communication & Wrap up           45 mins              To agree how the               Objectives            Flipchart proposal for the main
                                                                  conclusions of the                                   elements of a communication
                            WS Owner                    45-47                                    Car Park
                                                                  workshop will be                                     plan from the workshop: Who;
                                                                  communicated, and to wrap                            What; When.
                                                                  up the workshop
                                                                                                                       Then clear the car park, review
                                                                                                                       the objectives, and undertake a
                                                                                                                       workshop review.
                                                                                                                       Finally, WS Owner closes out
                                                                                                                       the workshop.
 15.30     Close
 15.30     Tea                               15 mins


Tesseract Management Systems / 9CCA89CA-D5F1-43C9-867F-2C9685ECB9CA.DOC                                                                       Session Plan 12 August, 2011

						
Other docs by llg16183
Services Level Contract Isp
Views: 13  |  Downloads: 0
BSNUG
Views: 30  |  Downloads: 0
Session Musician Business Contracts - PDF
Views: 18  |  Downloads: 0
Sesame Contracts
Views: 10  |  Downloads: 0
Set Application Form
Views: 4  |  Downloads: 0
Services Rendere Contract
Views: 277  |  Downloads: 0
Services Contract Renewal Request Letter
Views: 123  |  Downloads: 0
Ses Provider Contract - PDF
Views: 9  |  Downloads: 0