Docstoc

RTS Progress Report - NESTRANS

Document Sample
RTS Progress Report - NESTRANS Powered By Docstoc
					  8/12/2011                                                            Regional Transport Strategy                                                      nestrans
                                                                            Progress Report




Sub Strategy 1: The external connections strategy                                                                                                ® = MTS project
Strategy RTS actions       Current Actions/ Progress                                                         Future Actions/ Progress                    Status

                           Project/ Action    Progress                                          Target       To be done                 Target
EC1       Rail Links and Services
EC1a      Reducing       Rail Utilisation   Introduce semi-fast Dundee to Edinburgh and Dec 08 timetable
          journey times to Strategy           alter Fife timetable to increase Aberdeen   recast
          Edinburgh and                       journey times .
          Glasgow, and                        Response to Scotland RUS, response to
          further south.                      ECML RUS approved at Aug Board meeting
                                              and has been submitted. Meeting held 4/10                                                                    ↑
                                              with Scotrail. Nestrans currently assessing
                                              impact of the provisional and currently
                                              confidential re-timetabling.

                           Strategic       Assessment of existing network and gaps near                                                 STPR due to
                           Transport       complete. Consultation meeting with SE held                                                  report 2008
                           Projects
                           Review
                                           14/8. Option generation and sifting by
                                           Transport Scotland's consultant - Jacobs is
                                                                                                                                                           ↑
                                           underway.
                           Scottish        Statement issued by Scottish Executive July
                           Executive High 2007
                           Level Output                                                                                                                   ↔
                           Statement
                           Joint RTP       Paper 1: High Speed Surface Transport
                           Chairs position Paper 2: Electrification of rail lines in Scotland
                           papers          Paper 3 : Equity of rail fares across Scotland
                                           Paper 4: Support for major rail schemes in
                                           Scotland
                                           Paper 5: New multi modal crossing of the Forth
                                           Paper 9: Rail Freight
                                           Paper 15: Remote area connectivity                                                                              ↑
                                           First draft of Papers 1 and 5 received and
                                           being reviewed, Receipt of other papers
                                           rescheduled.




EC1a
(contd)
                                                                                                                                                    Page 1 of 26
  8/12/2011                                                             Regional Transport Strategy                                                        nestrans
                                                                             Progress Report



Strategy RTS actions        Current Actions/ Progress                                                          Future Actions/ Progress                     Status

                            Project/ Action Progress                                          Target           To be done                 Target
                            East Coast         Aberdeen as a destination part of the          NEXCLtd take Report to October Board on     ECML
EC1a                        Main               franchise. ECML Franchise awarded to           over from        XCountry franchise.        franchise runs
(contd)                     Line/Cross         NEXCLtd a subsidiary of National Express.      GNER on 9 Dec                               to 31/3/15 and

                                                                                                                                                              ↑
                            Country            Cross Country franchise awarded to Arriva.     07 and Arriva to                            XCountry
                            Franchises                                                        take over from                              franchise runs
                                                                                              Virgin on 11                                to 21/3/16
                                                                                              Nov 07

            Improved train Rail Utilisation
EC1b
           capacity, comfort Strategy
                                               Extended platforms at Insch and Elgin to
                                               permit 6 carriage trains
                                                                                              by Scotrail in
                                                                                              2009                                                           ↔
           and reliability.  East Coast        See EC1a
                             Main Line
                             Franchise
EC1c        Support for     Joint RTP         See EC1a
           High Speed Rail Chairs position
           connections to    papers
           London, which     East Coast        See EC1a
           benefit the north Main Line
           east.             Franchise
EC2       Strategic Roads
EC2a      Overcoming         Aberdeen          Side road orders published 11/9, compulsory                     PLI                        Spring 08
          constraints on the Western           purchase orders to be published 25/9 and                        Start construction         2010
          network that have Peripheral         updated environmental statement. Line orders                    Complete construction      2012
          a direct impact on Route ®
          travel to/from the
                                               republished. Exhibitions held from 1-5 Oct                                                                     ↑
                                               with consultation period ending 26 Oct.
          north east, such                     Councillor briefings being arranged
          as the A90

                                                                                                                                                              ↑
          through Dundee. Balmedie to          Aim to complete preparation (incl Public                        Complete construction      2012/13
                             Tipperty ®        Local Inquiry) by early 2009
                             A90 Access        Study to identify improvements and P&R site.   Report due Dec
                             from the South    Stakeholder consultation raised many options   07
                             study ®           for consideration. Short and medium term
                                               option testing completed and long term                                                                         ↑
                                               option testing commenced.

EC2a
(contd)

                                                                                                                                                      Page 2 of 26
         travel to/from the
         north east, such
         as the A90
         through Dundee.
  8/12/2011                                                            Regional Transport Strategy                                                         nestrans
                                                                            Progress Report



Strategy RTS actions          Current Actions/ Progress                                                 Future Actions/ Progress                            Status

                              Project/ Action Progress                                         Target   To be done                         Target
                              Joint RTP       Paper 5: New multi modal crossing of the Forth
EC2a
                              Chairs position Paper 7: Road links to England
(contd)
                              papers          Paper 11: Road User Charging/ Demand
                                              Management
                                              Paper 15: Remote area connectivity
                                              First draft of Papers 5 and 11 received and
                                                                                                                                                              ↑
                                              being reviewed, Receipt of other papers
                                              rescheduled.

                              Laurencekirk                                                              Discussion with Transport
                              Flyover                                                                   Scotland
                              Movement                                                                  STPR will identify shortfalls in   STPR due 2008
                              around Dundee                                                             the strategic networks
                                                                                                        nationally.
                                                                                                                                                             ↔
                              New Forth       Consultation ended 7 Sept. Responses will                 Ministers to decide on             Report due in
                              Crossing        be reported for consideration along with
                                              the technical information.
                                                                                                        crossing.                          Autumn 07          ↑
EC3       Inter-regional Bus and Coach travel
EC3a      Support further     Bus Action Plan Preparing a brief for Action Plan development Dec-07      Implement projects and actions As per priorities
          development of
          inter-regional bus
                                              following scoping from 21st century report.               identified in Bus Action Plan  in plan               ↔
          and coach travel Joint RTP          Paper 15: Remote area connectivity
          between the
          north east and
                              Chairs position Receipt of first draft of this paper
                              papers          rescheduled.
                                                                                                                                                              ↑
          other Scottish      Quality Bus     Nestrans formally invited to join the Quality             Report to October Board.
          towns and cities Partnership        Bus Partnership (formed by Aberdeen City

                                                                                                                                                              ↑
          and further afield.                 and Aberdeenshire Councils, First
          Explore possible                    Aberdeen and Stagecoach Bluebird and
          links to Park and                   renewed in 2005)
          Ride sites.




                                                                                                                                                      Page 3 of 26
  8/12/2011                                                           Regional Transport Strategy                                                              nestrans
                                                                           Progress Report



Strategy RTS actions        Current Actions/ Progress                                                           Future Actions/ Progress                        Status

                            Project/ Action Progress                                         Target             To be done                      Target
EC4       Connections by sea
EC4a      Closer joint                       A North East Ports Forum established.                              Second North East Ports         By Spring 08
          working through                    Harbour Board meeting and tour took place                          Forum meeting to be arranged.

                                                                                                                                                                  ↑
          North East Ports                   on 6 Sept. Ongoing discussions with                                Meeting held at Zettrans 1/10 -
          Forum.                             Harbour Board and Zettrans.                                        report to October Board.



                                                                                                                                                                  ↑
EC4b                        Guild Street     Construction underway (see IC5a)
                            interchange ®
                            Ferry shuttle    Aberdeen City Council issued a tender 1/10 to   Tender return
                            bus              operate a service to connect with ferries.      23 October &
          Improved access
          to ports and
                                             Once budgetary implications are known,
                                             options for funding any shortfall can be
                                                                                             report to future
                                                                                             Board & ACC                                                          ↑
                                             considered.                                     Cttee.
          interchange with
          passenger
                           Peterhead         Port authority working on detailed cost                            Work to deepen part of bay to
          ferries.
                           Harbour           analysis for £32M plans for new 650ft quay                         33ft for project to start.    Aug 2008

                                                                                                                                                                  ↑
                                             at the Smith Embankment and a new 328ft
                                             breakwater at the Albert Quay and working                          New breakwater and quay to Early 2009
                                             with marine directorate on application for                         commence
                                             £5M government funding.
EC4c      Development of    Support to                                                       Complete           Continued AC involvement with
          new freight and   maritime links                                                                      NMC 2 project through to
          passenger
          services.
                                                                                                                March 2008. Bid to Interreg4
                                                                                                                Programme being                                   ↑
                                                                                                                considered. Report to
                                                                                                                October Board.
EC4c
(contd)




                                                                                                                                                          Page 4 of 26
  8/12/2011                                                            Regional Transport Strategy                                                             nestrans
                                                                            Progress Report
EC4c     Development of
         new freight and
         passenger
Strategy RTS actions
         services.           Current Actions/ Progress                                                           Future Actions/ Progress                        Status

                             Project/ Action Progress                                         Target             To be done                       Target
EC4c                         Joint RTP       Paper 6: International connectivity by air and
(contd)                      Chairs position sea
                             papers          Paper 13: Lifeline ferry services
                                             Paper 14: Inland waterway and coastal freight
                                             Paper 15: Remote area connectivity
                                             First draft of Paper 13 received and being
                                                                                                                                                                   ↑
                                             reviewed, Receipt of other papers
                                             rescheduled.

EC5       Connections by Air
EC5a      Support           AWPR ®           By providing better access to airport increasing Road open 2012
          expansion of                       potential passenger numbers
          direct                             Also see EC2a
          destinations from Airport Access - Study awarded through North East Term            Final report due   Local area Paramics model to
          Aberdeen and      Dyce Dr/Argyll   Commission to Sias. Inception meeting            Mar 08.            be developed for evaluating
          frequency of      Rd Junction
          popular services. study
                                             held 19/9. Traffic surveys undertaken 2/10.
                                             Consultation underway with stakeholders
                                                                                                                 short term options
                                                                                                                                                                   ↑
                                             to identify problems and issues for
                                             consideration in the study.
                             Joint RTP       Paper 6: International connectivity by air and
                             Chairs position sea
                             papers          Receipt of first draft of this paper                                                                                  ↑
                                             rescheduled.
                             Joint RTP       Paper 15: Remote area connectivity
                             Chairs position Receipt of first draft of this paper
                             papers          rescheduled.
                                                                                                                                                                   ↑
EC5b      Support runway                     Planning permission granted                                         Extension to runway will be      Phase 1
          extension to                                                                                           combined with essential          2008/09
          facilitate wider                                                                                       resurfacing works, first phase
          range of
          destinations and
                                                                                                                 likely 2008/09. Second phase
                                                                                                                 part of Airport masterplan to
                                                                                                                                                                  ↔
          more efficient,                                                                                        2025.
          modern aircraft.




                                                                                                                                                            Page 5 of 26
  8/12/2011                                             Regional Transport Strategy                                          nestrans
                                                             Progress Report



Strategy RTS actions        Current Actions/ Progress                                 Future Actions/ Progress                 Status

                            Project/ Action Progress                        Target    To be done                 Target
EC5c    Ensure protection
        of slots for
        Aberdeen
        services at key
        hubs such as                                                                                                            ↔
        London
        Heathrow.




                                                                                                                          Page 6 of 26
  8/12/2011                                                          Regional Transport Strategy                                                    nestrans
                                                                          Progress Report




Sub Strategy 2: The internal connections strategy                                                                                            ® = MTS project
Strategy RTS actions     Current Actions/ Progress                                                   Future Actions/ Progress                        Status

                         Project/ Action Progress                                           Target   To be done                     Target
IC1     Rail
IC1a    Increased        Crossrail ®        CrossRail STAG2 report being finalised.                  Rail Action Plan to be
        frequency of                        Meeting held with TS 9/8/07                              prepared. Individual
        services between
        Inverurie-
                                                                                                     components of Crossrail to
                                                                                                     be investigated for                               ↑
        Aberdeen-                                                                                    incremental implementation.
        Stonehaven
        through          Inverurie town     This project has been delayed. Technical                 A follow up progress meeting
        Aberdeen         interchange ®      issues have to be resolved with NetworkRail              will take place in early
        Crossrail and                       and Freight companies as well as land                    November. Transport
        improved                            purchase agreements with NetworkRail.                    Scotland are being kept
        services to                         Aberdeenshire officers met with Network Rail             informed of developments.
        Inverness.
                                                                                                                                                       ↑
                                            officials on 22 August 2007 to discuss
                                            progress, procedures and programme for the
                                            work on the sidings at Inverurie Station. The
                                            meeting was positive and phasing options
                                            for delivery of the interchange and
                                            associated new roads and junctions are
                                            being explored.
                         Rail Utilisation   See EC1a
                         Strategy




                                                                                                                                                Page 7 of 26
  8/12/2011                                                            Regional Transport Strategy                                                               nestrans
                                                                            Progress Report



Strategy RTS actions        Current Actions/ Progress                                                          Future Actions/ Progress                            Status

                            Project/ Action Progress                                          Target           To be done                         Target
IC1b      New station      Laurencekirk        Implementation agreement signed between                         Construction start                 Begin Apr 08
          openings in the  Station ®           Transport Scotland and NetworkRail                              Construction complete              Oct 08
          City and                             Funding agreement to be signed between         Following
          Aberdeenshire as                     Transport Scotland, Scottish Executive and     signing          Car park design and planning       Dec 07
          part of Aberdeen                     Nestrans                                       Implementation   permission by AC
          Crossrail.                           Monthly progress meetings with Network         agreement.       Contractor to be appointed         Jan 08
                                               Rail and Transport Scotland started 11/9.                       Car park construction by AC        Spring 08
                                               Design and build contract issued end Sept.                      Station open                       Dec 08             ↑
                                               Heritage bid by NR for station building
                                               design and construction being progressed.                       Some funding proposals to
                                               Delay to construction has budget                                be considered at October
                                               implications, but some expenditure                              Board.
                                               possible this financial year on car park and
                                               options being progressed.

                            Kintore Station Meeting held with Scotrail 4/10. Scotrail to                       Some funding proposals to
                            ®               assess (4 wk timescale) possibility of                             be considered at October
                                            stopping trains within Dec 08 timetable
                                            recast. Preliminary discussions held with
                                                                                                               Board.
                                                                                                                                                                     ↑
                                            TS Director for rail. Invitation to site
                                            meeting has been issued.
                            Aberdeen North                                                                     As part of Crossrail discussions
                                                                                                                                                                    ↔
                            Aberdeen
                            South
                                                                                                               As part of Crossrail discussions
                                                                                                                                                                    ↔
                            Stonehaven         Meeting held 3/10 with Scotrail and AC
                            Station            officers. Scotrail to submit a planning
                                               application to extend the car park by                                                                                 ↑
                                               around 35 spaces
IC2       Road Improvements
IC2a      Strategic Roads Route action on      A944 Mossat to Westhill minor                                   Detailed design.                   end Oct
          Capacity
          improvements – in
                             strategic roads   improvement works as identified in earlier
                                               Route Action Study. Site investigation         Mid Oct 08
                                                                                                               Issue tender
                                                                                                               Contract award.
                                                                                                                                                  mid Nov
                                                                                                                                                  mid Dec            ↑
          tackling           Aberdeenshire     works ongoing.                                                  Construction.                      Mar 08
IC2a      constraints at     ®
(contd)   A90 Ellon -
          Peterhead, A96
          west of Inverurie,
          Haudagain
                                                                                                                                                              Page 8 of 26
          junction, Access
          to Aberdeen from
          the south, and at
  8/12/2011                                                        Regional Transport Strategy                                                            nestrans
                                                                        Progress Report


IC2a      Strategic Roads   Route action on
Strategy RTS actions
         Capacity           Current Actions/ Progress
                            strategic roads                                                              Future Actions/ Progress                           Status
          improvements –    in
          tackling          Project/ Action Progress
                            Aberdeenshire                                                Target          To be done                       Target
IC2a      constraints at     ®            B9170/A947 right turn stacking lane at                         Contract award.                  mid Oct.
(contd)   A90 Ellon -
          Peterhead, A96
                                          Darra junction south of Turriff. Detailed                      Construction.                    early Dec.          ↑
                                          design complete. Tender issued 6 Sept.
          west of Inverurie,              A920 Riverside Rd/South Rd Ellon Traffic                       Stakeholder Consultation.        mid Oct.
          Haudagain
          junction, Access
                                          signalisation. Detailed design undertaken
                                          last financial year. Tender to be issued Oct
                                                                                                         Contract award.
                                                                                                         Construction.
                                                                                                                                          Early Dec.
                                                                                                                                          Mar 08.             ↑
          to Aberdeen from                07.
          the south, and at               A98 Gowanhill Junction - widening of U19L                      Tender issue                     5 Oct
          other junctions
          serving
                                          junction bell mouth to allow two way traffic
                                          for vehicles entering minor road. Detailed
                                                                                                         Contract award
                                                                                                         Construction
                                                                                                                                          5 Nov
                                                                                                                                          29 Feb 08           ↑
          Aberdeenshire                   design complete.
          towns.                          A947 Bends at King Edward Survey and                           Complete survey.                 28 Dec
                                          design for bend straightening scheme at                        Feasibility, design and          29 Feb 08           ↑
                                          localised accident spot.                                       estimates
                            Allocation to A98 Longmanhill Footway. Link footway                          Construction to commence         3/14/2008
                            Aberdeenshire (80m). Contract won by Council's
                            Council for
                                                                                                                                                              ↑
                                          Operations 18/9.
                            smaller scale Torphins Footway. Design and tender                            Tender issue                     early Nov
                            transport
                            projects ®
                                          documents being prepared by Faber                                                                                   ↑
                                          Maunsell.
                                          Additional contribution to Peterhead
                                          Cycleway see IC6c below.
                            Allocation to Upgrade Culter pelican to puffin and                           Works to be carried out as
                            Aberdeen City Advisory cycle lanes + advance stop lines
                            Council for   Mannofield - Culter design complete
                                                                                                         part of A93 resurfacing prog -
                                                                                                         IC2d.                                                ↑
                            smaller scale
                            transport     E North St/ King St - Castle St/King St        report due by
                            projects ®    technology Imps. Draft brief being prepared.   30/11
                                          Term Consultant to undertake feasibility
                                          study for public transport improvements at
                                                                                                                                                              ↑
                                          junction.
                                          Lighting BK R/b to Pizzahut - Materials now    Complete by
                                          delivered and will be installed during
                                          October
                                                                                         end Oct                                                              ↑
IC2a
(contd)

                                                                                                                                                       Page 9 of 26
                       Aberdeen City
                       Council for
                       smaller scale
  8/12/2011            transport                                Regional Transport Strategy                                                             nestrans
                       projects ®                                    Progress Report



Strategy RTS actions   Current Actions/ Progress                                                         Future Actions/ Progress                         Status

                       Project/ Action Progress                                      Target              To be done                       Target
                                       F/p link A944 to Crematorium, contractor                          Marked up on site and
IC2a                                   appointed 22/8.                                                   construction to start mid Oct.                     ↑
(contd)
                                                                                                                                                            ↑
                                       H/Head R/b to Queens Rd R/b cycle lane.                           Appoint contractor               end Oct
                                       Detailed design commenced.                                        Complete                         end Dec
                                       Footpath upgrade: Dyce railway station -                          Complete legal agreement.        end Oct
                                       Farburn Terr/heli pad. Airport, landowner,                        Detailed design.                 mid Nov
                                       railway reps and Council Committee have
                                       agreed change of route. Consultation to be
                                                                                                         Complete construction            31/3/08
                                                                                                                                                            ↑
                                       complete by end Oct.

                                       Kingswells-Bucksburn - design off-road                            route alignment study            early Nov
                                       pedestrian,cycle, equestrian route. Initial                       preferred route consultation     end Nov
                                       stakeholder consultation to be complete by                        preliminary design               early Feb         ↑
                                       end Oct.                                                          detailed design                  end March

                       Haudagain       STAG2 underway. Public consultation           Report due by       Transport Minister
                       Study           postponed to allow testing of options         10/2007 will be     announced SE commitment
                                       without Third Don Crossing. Sensitivity
                                       testing underway. Links to Middlefield
                                                                                     delayed
                                                                                     pending
                                                                                                         towards an improvement at
                                                                                                         meeting on 31 Aug.                                 ↑
                                       Regeneration Masterplanning.                  sensitivity tests

                       Access from     See EC2a
                       the South ®
                       A90 Balmedie    See EC2a
                       to Tipperty ®
                       AWPR ®          See EC2a
                       Strategic       See EC1a
                       Transport
                       Projects
                       Review



IC2a
(contd)




                                                                                                                                                    Page 10 of 26
  8/12/2011                                                            Regional Transport Strategy                                                         nestrans
                                                                            Progress Report



Strategy RTS actions        Current Actions/ Progress                                                       Future Actions/ Progress                         Status

                            Project/ Action Progress                                        Target          To be done                     Target
                            Berryden           ACC to investigate transportation
                            Corridor           improvements along the Berryden corridor
IC2a                                           from Gt Northern Rd (south of Don St)                                                                           ↑
(contd)                                        through Berryden to the Skene Sq junction
                                               with Maberley St.
                            Capacity
                            improvements
IC2b      Strategic Roads   Safety             NESJPSG Road Safety Forum on 02/07/07       Dec-07           Next meeting of Road Safety    10/9/2007
          Safety            improvements       agreed to take forward a single Safety                       Forum 9 October.
          improvements –                       Plan.Sub-Group meeting August to October to
          alignment and                        progress and report back to the NESJPSG.
          junction
          improvements on
          A90 south.

                                                                                                                                                               ↑
          Overtaking,
          junction and
          alignment
          improvements on
          A90 north and
          A96. Route
          Action on A92,
          A93, A944, A947

IC2c      Car share lanes – Locking in the     SIAS/Faber Maunsell appointed. Workshop     Final report -   Report to December Board for   12/20/2007
          trialling priority AWPR benefits     held 26 June and range of measures          Autumn 07.       approval.
          lanes for cars
          with multiple
                                               discussed. Draft report prepared.
                                               Comments have been fed back to
                                                                                                                                                               ↑
          occupancy.                           consultants.
                             Car share lanes   Meeting held to discuss role of HOV lanes -
                             trial             agreed to progress as part of ACC LTS.
                                               Proposal to vire money within existing
                                               budget for HOV/LVL study to be considered                                                                       ↑
                                               at October Board.




                                                                                                                                                       Page 11 of 26
  8/12/2011                                                               Regional Transport Strategy                                                nestrans
                                                                               Progress Report



Strategy RTS actions            Current Actions/ Progress                                                 Future Actions/ Progress                    Status

                                Project/ Action Progress                                         Target   To be done                  Target
IC2d      Prioritised           Enhanced        Bervie Bridge design preparatory works for                Supervision of the design    Mar-08
          maintenance for       maintenance     phases of reconstruction in 08/09 and in later            commission, preparation of
          strategic routes,     on strategic    years. Competitive quotes for detailed                    the tender documents for the
          with particular
          benefits for public
                                roads in
                                Aberdeenshire
                                                design of Cathodic Protection system                      main contract,                                ↑
                                                obtained and commission awarded in Sept                   assessment of tenders and
          transport and                         to Structural Healthcare Ltd                              award of contract.
          sustainable
          modes.                Enhanced
                                maintenance
                                                A93 North Deeside Road. Tender issue 16/11                Contract award
                                                                                                          Construction complete
                                                                                                                                      22/11
                                                                                                                                      Mid March 08      ↑
                                on strategic    Riverside Dr. Tender issued 3/10. Works will              Contract award              Oct 07
                                roads in        be carried out in tandem with Water                       Construction complete       Dec 07
                                Aberdeen City   Service's essential sewer maintenance in                                                                ↑
                                                area thus minimising disruption to road
                                                network.
                          Prioritised
                          maintenance
IC3       Bus Improvements
IC3a      Quality bus     Bus Action Plan       See EC3a
          corridor
          improvements to A947 Aberdeen        Design and tender documents being                          Tender issue                Oct 07
          services and    - Oldmeldrum         prepared by Faber Maunsell for a range of                  Construction start          Nov 07
          facilities.     (Aberdeenshire       raised kerbs, new shelters, bus stop flags,                Completion                  Feb 08
                          )                    timetables and marking as appropriate at                                                                 ↑
                                               various locations along the A947 (incl
                                               Whiterashes, Hattoncrook, Newmachar and
                                               Oldmeldrum).
                                A96 Aberdeen - Design and tender documents being                          Tender issue                Oct 07
                                Inverurie      prepared by Faber Maunsell for a range of                  Construction start          Nov 07
                                (Aberdeenshire raised kerbs, new shelters, bus stop flags,
                                )              timetables and marking as appropriate at
                                                                                                          Completion                  Feb 08
                                                                                                                                                        ↑
                                               various locations within Inverurie.

IC3a
(contd)




                                                                                                                                                Page 12 of 26
          facilities.


  8/12/2011                                                             Regional Transport Strategy                                           nestrans
                                                                             Progress Report



Strategy RTS actions       Current Actions/ Progress                                                  Future Actions/ Progress                  Status

                           Project/ Action Progress                                         Target    To be done                 Target
                           A93 North       Public Transport infrastructure improvements
IC3a
(contd)
                           Deeside Road to be included within the A93 resurfacing
                           (Aberdeen City) contract (see IC2d above) and Technology                                                               ↑
                                           improvements contract.
                                           Technology Improvements: Tender issue in
                                           early October.
                                                                                                      Contractor appointed.
                                                                                                      Construction from
                                                                                                                                 Oct 07
                                                                                                                                 end Nov 07       ↑
                           City 'Red'      Letter drop residents 24/08. To be awarded Complete by
                           Routes (Bus
                           services 1/2)
                                           in-house to Contracting Services to install 3 end Nov 07
                                           No bus shelters previously purchased.                                                                  ↑
                           Upgrading          Works complete. This is contract retention
                           traffic signals in monies.
                           Aberdeen City
                           on strategic
                           routes to                                                                                                             ↔
                           enable bus
                           priority.

                            Joint RTP         Paper 8: Bus issues (Quality contracts)
                            Chairs position
                            papers
                                              Receipt of first draft of this paper
                                              rescheduled.
                                                                                                                                                  ↑
                            Quality           See EC3a
                            corridors/
                            priority
                            measures
IC3b      Extend bus        Locking in the    See IC2c
          priority measures AWPR benefits
          on key routes to
          enable buses to Bus Action Plan     See EC3a
          beat congestion.
IC3c      Explore Mass      Bus Action Plan   See EC3a
          Transit options
          such as guided    Mass Transit      See EC3a
          busways and the Option
IC3c      Super Bus
(contd)   concept.



                                                                                                                                          Page 13 of 26
  8/12/2011                                                             Regional Transport Strategy                                                          nestrans
                                                                             Progress Report


IC3c      Explore Mass
Strategy RTS actions
         Transit options    Current Actions/ Progress                                                           Future Actions/ Progress                       Status
          such as guided
          busways and the Project/ Action     Progress                                        Target            To be done                      Target
IC3c      Super Bus       City Centre         City centre shuttle bus report received and     Report to future RTS Bus Action Plan to be
(contd)   concept.        Shuttle Bus &
                          Micro Tram
                                              being considered.                               Board.           brought forward in conjunction
                                                                                                               with partners by Dec 2007.
                                                                                                                                                                ↔
IC3d      Expand Park and Access from         See EC2a
          Ride provision  the South ®
          linked to the   A96 & A947       A96: ACC review of site location in terms of  A96 & A947 due
          development of P&R sites ®       layout, previous planning permission and      by end Dec 2007
          the AWPR.                        impact by AWPR ongoing
                                           A947 revised layout to be prepared following
                                                                                                                                                                 ↑
                                           AWPR order publication.
                            Bridge of Don ACC investigating the relocation of the
                            P&R            existing site to an area north of the Science
                                           and Energy Park close to the A90/B999                                                                                 ↑
                                           Pitmedden Rd junction.
                            Banchory P&R Information leaflet drafted
                            & interchange Report to Committee                            Nov 07
                            ®
                            Inverurie town See IC1a
                            interchange ®
IC3e      Further develop   Aberdeenshire Twenty three interactive Information points    Nov-07          Expanded Real Time
          real-time                        installed and due to go live in Nov 07.                       Information - To be considered
          information                                                                                    as part of Bus Action Plan.
          systems to
          expand coverage
                                                                                                                                                                 ↑
          across Aberdeen
          City and Shire.
IC4       Demand Responsive Transport
IC4a      Support             Aberdeenshire   Two 7 passenger seat taxis ordered.             Delivery by end
          extension of ‘Dial- Dial a bus
          a-Bus’ and
                                              New service introduced in July 2007 in the
                                              Inverurie area. Further service options under
                                                                                              Dec 07 and
                                                                                              ready for use                                                      ↑
          similar services                    consideration.                                  by Feb 08
IC4a      to serve those
(contd)   unable to access
          conventional
          buses and to link
          with scheduled
          bus services.

                                                                                                                                                         Page 14 of 26
  8/12/2011                                                           Regional Transport Strategy                                                           nestrans
                                                                           Progress Report


IC4a      Support
         extension of
Strategy RTS actions‘Dial- Current Actions/ Progress                                                         Future Actions/ Progress                        Status
          a-Bus’ and
          similar services Project/ Action   Progress                                      Target            To be done                    Target
IC4a      to serve those    Enhanced DRT     Scottish Executive proposals for an enhanced 11/2007
(contd)   unable to access budget            budget subject to Comprehensive Spending
          conventional                       Review.
          buses and to link
          with scheduled
                                             Scottish Executive proposal to transfer budgets More detailed
                                             from Local Authorities to RTP's from 04/2008. report Dec 07.
                                                                                                                                                               ↑
          bus services.                      RTPs meeting with Scottish Gov 18/10

                            Joint RTP       Paper 10: Sustainable transport (global
                            Chairs position warming)
                            papers          Receipt of first draft of this paper                                                                               ↑
                                            rescheduled.
                            Health and      JMP Consultants appointed. Inception        Final report -
                            Transport       meeting held. Ongoing meetings being        Feb 08.
                            Action Plan     held with health professionals. Health and
                                            Equalities Impact Assessment of RTS by                                                                             ↑
                                            NHS Grampian ongoing and will inform
                                            Action Plan.
                            Accessibility   Model to be developed as part of Health and                      Meeting to be arranged with
                            modelling       Transport Action Plan.                                           AC/ACC to discuss details.                        ↑
IC4b      Support           Enhanced DRT     See IC4a
          community         budget
          transport         Supporting       See IC4a. Meeting arranged with                                 Consideration of enhanced     winter 2007/08
          providers and
          encourage
                            Community
                            Transport
                                             Community Transport Association for
                                             12/10.
                                                                                                             budget                                            ↑
IC4c      Seek to ensure    Joint            Project completed June 2007 and             Mar-08
          that taxis are    procurement      implementation being examined by both Local
          provided in an    project          Authorities.
          efficient and
          effective way,
                                             Comcab now included in Airport licensing
                                             zone.                                                                                                             ↑
          which meets the
          needs of
          customers




                                                                                                                                                     Page 15 of 26
  8/12/2011                                                            Regional Transport Strategy                                             nestrans
                                                                            Progress Report



Strategy RTS actions      Current Actions/ Progress                                                    Future Actions/ Progress                  Status

                          Project/ Action Progress                                            Target   To be done                 Target
IC5     Transport interchange
IC5a    Maximising         Union Square       Under construction. New bus station due
        interchange        ®                  to open Nov 07. Contribution to integrated
        potential of Guild
        Street
                                              information boards approved by Board.                                                                ↑
                                              Further details included in Oct 07 Board
        development and                       meeting.
        link with Union    Linkages from      SEG commissioned study into improving
        Street and
        support
                           Guild St to
                           Union St
                                              pedestrian linkage is integral with ongoing
                                              work on Green Townscape Heritage                                                                     ↑
        enhancement of                        Initiative.
        other interchange Union Street        See IC6a
        points in
        Aberdeen.
                           pedestrianisatio
                           n®
                                                                                                                                                   ↑
IC5b    Implement city     Shuttle Bus        See IC3c
        centre shuttle bus report
        and explore
        potential for
        future ‘Micro-
        Light’ tram.
IC5c    Support further    Inverurie ®        See IC1a
        improvements to Banchory ®            See IC3d
        interchange        Peterhead ®        Completed. Opened July 07.
        facilities in      Transport
        Aberdeenshire      Interchanges
IC5d    Work with                             Initial meeting held summer 2006. Part of Bus
        operators to                          Action Plan and future QP work.
        develop
        integrated
        ticketing across                                                                                                                          ↔
        services and
        operators in the
        north east.




                                                                                                                                           Page 16 of 26
  8/12/2011                                                              Regional Transport Strategy                                                          nestrans
                                                                              Progress Report



Strategy RTS actions        Current Actions/ Progress                                                            Future Actions/ Progress                       Status

                            Project/ Action Progress                                             Target          To be done                      Target
IC6       Walking and Cycling
IC6a      Support            Union St           Timetable for pedestrianisation under review - Timetable under   Detailed design and cost
          investment in      pedestrianisatio   appropriate preliminary and enabling projects review             estimate for South College St
          measures to
          increase safety
                             n®                 continuing on programme. VMS car parking
                                                guidance system operational and preferred
                                                                                                                 corridor improvement to be
                                                                                                                 progressed.                                      ↑
          and security of                       option agreed in principle for South College
          walking and in                        St corridor
          particular to      Inverurie          See IC1a
          facilitate         interchange ®
          interchange        Peterhead          See IC5c
          between different interchange ®
          modes of           Banchory           See IC3d
          transport. Urban interchange ®
          realm              Pedestrian
          improvements to Environment/
          improve the        Urban Realm
IC6b      Support the        ACC Road           See IC2b
          extension of low Safety Plan
          speed zones,       AC Road            See IC2b
          particularly where Safety Plan
          it improves the    AC                 Implementation of PT 20 at schools and school Mar-08             Low Speed Zones - Proposals
          environment for
          pedestrians and
                                                travel plans on target.                                          to be developed from combined
                                                                                                                 Safety Plan
                                                                                                                                                                 ↔
IC6c      Continued          Westhill -         Tenders returned and to be awarded once                          14 week contract specified
          development of Kingswells -           confirmation received that Members are not                       once construction starts.
          cycle routes on    Aberdeen cycle
          key routes within route - Phase 1
                                                considering a travellers transit site in this                    Develop and implement further
                                                                                                                 phases
                                                                                                                                                                  ↓
                                                area.
          Aberdeenshire,
          into Aberdeen      Peterhead          Further work to deliver 3m wide cycle and                        Award contract.                 Oct
          and on routes      Peripheral
          through the City. Road cycleway
                                                walking route around Peterhead. Further
                                                phase of delivery - link at Waterside Section.
                                                                                                                 Construction
                                                                                                                 Future expansion of network
                                                                                                                                                 Feb 08
                                                                                                                                                                  ↑
                                                Tender issue in Sept.
IC6c
(contd)




                                                                                                                                                          Page 17 of 26
IC6c      Continued
   8/12/2011
          development of                                               Regional Transport Strategy                                                   nestrans
          cycle routes on                                                   Progress Report
          key routes within
          Aberdeenshire,
          into Aberdeen
          and actions
Strategy RTSon routes       Current Actions/ Progress                                                     Future Actions/ Progress                     Status
          through the City.
                            Project/ Action Progress                                       Target         To be done                    Target
IC6c                       Fraserburgh     Development of 3m wide cycle/footway - part                    Construction to commence      19 Oct
(contd)                    cycle network   of town network in Fraserburgh. Further phase
                                           of delivery. Contract awarded 18/7 to Colin
                                                                                                          Complete
                                                                                                          Future expansion of network
                                                                                                                                        Dec 07
                                                                                                                                                         ↑
                                           Smith Contractor Ltd.
                           Riverside Drive Trial holes adjacent to Duthie Park
                           cycle route,    complete. Detailed design progressing.                                                                        ↑
                           Aberdeen        Victoria Br - QEII design nearing             Aim to appoint   Construction complete         end Jan 08
                                           completion. Planning permission for tree      in-house
                                           work applied for.                             Contractor                                                      ↑
                                                                                         Services by
                                                                                         2/11
                           West Cults      Legal issues have arisen over right of
                           Cycle /         access to the unadopted road beneath
                           Pedestrian      bridge. ACC have requested some funding
                           Bridge as part to ensure progress, with remainder next
                           of Deeside line financial year and have submitted bid to                                                                      ↓
                                           Sustrans for their previously committed
                                           part-funding to deliver bridge next year too
                                           .
                           Continued       Both Local Authorities have submitted bids
                           development of to Sustrans for 2008-10.
                           proposals with
                           Local
                           Authorities and
                                                                                                                                                         ↑
                           cycling groups.

IC7       Airport Surface Connections
IC7a      Facilitate an     Bus Action Plan   See EC3a
          Express Bus
          Service to        Airport surface   See EC5a
          provide a
          dedicated, high-
                            access            Airport Surface Access Strategy being
                                              prepared by BAA. Draft received and                                                                        ↑
          frequency service                   comments returned.
          between                                                                                         To be considered as part of
          Aberdeen City                                                                                   Bus Action Plan




                                                                                                                                                 Page 18 of 26
  8/12/2011                                                               Regional Transport Strategy                                                           nestrans
                                                                               Progress Report



Strategy RTS actions           Current Actions/ Progress                                                        Future Actions/ Progress                         Status

                               Project/ Action Progress                                        Target           To be done                    Target
IC7b      Support a shuttle Airport - Dyce      Stakeholders meeting held at Airport Thistle                    Report tender returns to      Dec 07
          bus between         Station Shuttle   Hotel 28 June.                                                  Board.
          Dyce station and Bus
          the airport
                                                Aberdeen City Council issued tender for
                                                shuttle bus 1/10.
                                                                                               Tender to be     Implement Service.            Spring 08            ↑
                                                                                               returned by 23
          terminal.                                                                            Oct
IC7c      In the longer       Fixed Link
          term, explore a     Airport to City
          fixed link from     Centre
          Aberdeen City
          Centre to the
          airport, providing
          fast, reliable                                                                                                                                          ↔
          journey times,
          either as an
          addition to
          Crossrail or as a
          guided bus route.
IC8       Port Surface Connections
IC8a      Support             North east        A North East Ports Forum has been                               Second North East Ports       Being
          measures to         ports forum       established and will act as a vehicle for                       Forum meeting to be arranged. considered as
          improve access
          to port facilities.
                                                developing maritime policy and pursuing
                                                common objectives
                                                                                                                                              part of Freight
                                                                                                                                              Action Plan         ↔
                                                                                                                                              development
                                                                                                                                              consultation.
IC8b      Facilitate           Ferry shuttle    See EC4b
          improved             bus
          interchange          Union Square     See EC4b
          between the          ®
IC9       Freight
IC9a      Support the          Rail Freight     Aberdeen to Mossend construction complete -                     To be formally opened         by end 07
          development of
          modern
                               Guage
                               enhancement
                                                currently in testing phase
                                                                                                                                                                   ↑
          intermodal freight   ®
IC9a      terminals to
(contd)   provide future
          capacity for rail
          freight expansion.

                                                                                                                                                          Page 19 of 26
  8/12/2011                                                                   Regional Transport Strategy                                                            nestrans
                                                                                   Progress Report


IC9a      Support the
Strategy RTS actions of
         development             Current Actions/ Progress                                                           Future Actions/ Progress                         Status
          modern
          intermodal freight Project/ Action         Progress                                       Target           To be done                    Target
IC9a      terminals to       NESRFDG                 Financial support from Nestrans.                                Consider future financial     Being
(contd)   provide future                             NESRFDG Management Team met on 21                               support                       considered as
          capacity for rail
          freight expansion.
                                                     Sept.                                                                                         part of Freight
                                                                                                                                                   Action Plan          ↑
                                                                                                                                                   development
                                                                                                                                                   consultation.
                                 Raiths Farm ® Under construction
                                 Craiginches ® Under construction
                                 Intermodal                                                                          To be considered in Freight
                                 Freight Terminals                                                                   Action Plan

                                 Port Elphinstone                                                                    Possible future development

IC9b      Investigate            Locking in          See IC2c
          potential for          AWPR benefits
          measures to            Freight Action      Brief to be developed and tendered.            Action Plan by
          provide more           Plan                                                               Dec 07
          reliable journey       HGV Priority/       See IC2c
          times for HGVs         Port access
          and identify a trial   Lorry Parking       Lorry park facility at Altens is leased and    ACC Resources To be considered in Freight
          route for                                  was closed by tenant in April. Report is       Management     Action Plan
          implementation of
                                                                                                                                                                        ↑
                                                     going to ACC Committee and Nestrans            Committee on 9
          priority measures.                         responded to draft report consultation         Oct.
                                                     supporting the case for retaining a lorry
                                                     parking facility on the south side of City.
IC10      Powered two-wheelers
IC10a     Support measures
                         ACC Road                    See IC6b
          to improve safety
                         Safety Plan
          for users of   AC Road                     See IC6b
          motorcycles andSafety Plan
          other powered 2-
                         Local Transport             Projects to be developed where possible from
          wheelers and
                         strategies                  LTS. Liaison meetings arranged with
          provide approp.
          parking facilities.                        Aberdeen City Council                                                                                              ↑



                                                                                                                                                             Page 20 of 26
  8/12/2011                                                         Regional Transport Strategy                                                    nestrans
                                                                         Progress Report




Sub Strategy 3: The Strategic Policy Framework                                                                                              ® = MTS project
Strategy RTS actions       Current Actions/ Progress                                               Future Actions/ Progress                         Status

                        Project/ Action Progress                                          Target   To be done                      Target
TRAVEL BEHAVIOUR
TB1    Promoting Travel Planning and Travel Awareness
TB1a   Implementation TMO support       Financial allocation within budget. Action Plan   Dec-07   Further progress expected
       and future                       to be prepared                                             when TE (travel plan) post
       development of Other             Financial allocation within budget. Action Plan   Dec-07   filled.
       Nestrans’ Travel
       Planning
                                        to be prepared
                        Travel Planning Travel Planning Strategy to be reviewed and       Dec-07
                                                                                                                                                     ↔
       Strategy.        strategy &      updated and submitted to Scottish Executive
                        Action Plan
                        Joint RTP       Paper 10: Sustainable transport (global
                        Chairs position warming)
                        papers          Receipt of first draft of this paper                                                                          ↑
                                        rescheduled.
                        Health and      See IC4a
                        Transport
                        Action Plan
TB1b   Continue to      Sustainable     Financial allocation within budget. Two
       provide support travel grant     applications submitted and considered by
       through the      scheme          STOLG. Grant of £2,375 awarded to RGU
       Sustainable
       Travel Grants
                                        as 50% contribution to cycle lockers.                                                                         ↑
                                        Application from Royal Deeside for a
       Scheme                           community bus referred to DRT budget.

TB1c      Encourage        Carshare       Nestranscarshare.com operating well.                     Give consideration to
          increased up-
          take of car-
                           website        Advertise widely. Cost from within allocated
                                          budget.
                                                                                                   development of City Car Club.
                                                                                                   Future reports to Board
                                                                                                                                                      ↑
          sharing         Car share lanes See IC2c
                          trial
TB2       Promoting Active Travel
TB2a      Encourage more Travel Planning Travel Planning Strategy to be reviewed and               Further progress expected
          people to walk
          and cycle more
                          strategy &
                          Action Plan
                                          updated and submitted to Scottish Executive              when TE (travel plan) post
                                                                                                   filled.
                                                                                                                                                     ↔
TB2a      often.
(contd)



                                                                                                                                              Page 21 of 26
  8/12/2011                                                                 Regional Transport Strategy                                           nestrans
                                                                                 Progress Report




Strategy RTS actions
TB2a     Encourage more        Current Actions/ Progress                                                  Future Actions/ Progress                  Status
          people to walk
          and cycle more       Project/ Action Progress                                          Target   To be done                 Target
TB2a      often.               Westhill -      See IC6c
(contd)                        Kingswells -
                               Aberdeen cycle
                               route - Phase 1
                               Peterhead       See IC6c
                               Peripheral
                               Road cycleway
                               Fraserburgh        See IC6c
                               cycle network
                               Riverside Drive    See IC6c
                               cycle route,
                               Aberdeen
                               West Cults         See IC6c
                               Cycle/Ped
                               Bridge as part
                               of Deeside line
                               Inverurie          See IC1a
                               interchange ®
                               Peterhead          See IC5c
                               interchange ®
                               Banchory           See IC3d
                               interchange ®
                               Union St           See IC5a
                               pedestrianisatio
                               n®
TB2b      Work with NHS        Health &           See IC4a
          Grampian and         Transport
          Community            Action Plan
          Planning
          Partnerships to
                               Community
                               Planning
                                                  Nestrans are statutory partners, contribute
                                                  financially and attend appropriate meetings.                                                       ↔
TB2b      promote the
(contd)   benefits of active
          travel and
          achieve
          objectives for a
          healthier


                                                                                                                                              Page 22 of 26
  8/12/2011                                                        Regional Transport Strategy                                                         nestrans
                                                                        Progress Report

TB2b     Work with NHS
         Grampian and
Strategy RTS actions
         Community           Current Actions/ Progress                                                       Future Actions/ Progress                    Status
         Planning
         Partnerships to     Project/ Action Progress                                      Target            To be done                   Target
TB2b     promote the         Structure Plan Nestrans attended consultation meeting on 19   Report to Oct
(contd)  benefits of active                  Sept. Further meetings to be held as          Board on
         travel and
         achieve
                                             appropriate.                                  consultation on
                                                                                           Strategic Dev                                                   ↑
         objectives for a                                                                  Planning
         healthier                                                                         Authorities
TB3      Improving Safety
TB3a     Work with the       ACC Road        See IC 6b
         Councils,           Safety Plan
         Emergency           AC Road         See IC 6b
         Services and        Safety Plan
         others to promote Community         See TB2b
         road safety as      Planning

                                                                                                                                                          ↔
         part of a           Improve safety                                                                  Develop projects from Road
         comprehensive                                                                                       Safety Plans, STPR etc.
TB3b     Improve security Bus Action Plan See EC3a
         for users of public
         transport services
         and
         interchanges.
INCENTIVES AND ENFORCEMENT
IE1      Changing Choices through Incentives & Partnerships
IE1a     Work with           Bus Action Plan See EC3a
         operators to
         identify possible
         fare incentives to
         encourage
         increased bus
         use, particularly
         where this
         enables access
         to employment or
         training




                                                                                                                                                   Page 23 of 26
  8/12/2011                                                             Regional Transport Strategy                                             nestrans
                                                                             Progress Report




Strategy RTS actions       Current Actions/ Progress                                                    Future Actions/ Progress                  Status

                           Project/ Action Progress                                            Target   To be done                 Target
IE1b    Through the         LABOF              Nestrans are a member of LABOF and attend
        Local                                  meetings. Action Plan to be developed from
        Authorities/Bus                        Bus Action Plan.
        Operators Forum
        (LABOF)                                Nestrans formally invited to join the Quality            Report to October Board.
        continue to                            Bus Partnership
        develop the
        Quality
        Partnership for
                                                                                                                                                    ↑
        Public Transport
        and consider
        introducing
        Punctuality
        Improvement
        Partnerships.
IE1c    Support             Alternative Fuel   Aberdeenshire Council to look to submit bid to Mar-08
        measures which Bid                     Scottish Executive for project trial. Bid
        encourage                              supported in Nestrans budget.
        uptake of
        alternative fuels,
        particularly by
        public transport                                                                                                                           ↔
        providers, to build
        on the north
        east’s role as an
        energy hub.




                                                                                                                                            Page 24 of 26
  8/12/2011                                                   Regional Transport Strategy                                            nestrans
                                                                   Progress Report




Strategy RTS actions   Current Actions/ Progress                                             Future Actions/ Progress                  Status

                       Project/ Action Progress                                     Target   To be done                 Target
IE2     Using Enforcement
IE2a    Support                       AQMA declared in Aberdeen City Centre. ACC
        enforcement of                have an action plan in place to address.
        vehicle emission              Health and Transport Action Plan will
        standards to                  consider issue of public health caused by
        improve air
        quality, in
                                      poor air quality.
                                                                                                                                         ↑
        Aberdeen City
        Centre and towns
        across the north
        east.
IE2b    Support                       To be taken up through the next Road Safety
        measures to                   Forum.
        enforce speed
        limits to improve
        road safety and
        reduce carbon
        emissions.
        Promote the
        establishment of
        a Casualty                                                                                                                      ↔
        Reduction
        Partnership to
        support
        NESCAMP’s
        activities and
        support the trial
        of average speed
        cameras.




                                                                                                                                 Page 25 of 26
  8/12/2011                                                            Regional Transport Strategy                                                      nestrans
                                                                            Progress Report




Strategy RTS actions       Current Actions/ Progress                                                        Future Actions/ Progress                      Status

                           Project/ Action Progress                                         Target          To be done                     Target
IE3     Parking
IE3a    Develop a           Parking           Nestrans to convene a meeting with Local      End autumn 07
        Regional Parking Strategy             Authorities (a Parking Strategy Group) to
        Strategy to                           discuss potential ways forward.
        ensure a
        coherent
        approach to                                                                                                                                        ↔
        parking controls
        and standards
        across the north
        east.
IE3b    Support             Bus Action Plan   See EC3a
        enforcement of
        parking
        restrictions,
        particularly where
        these exist to
        support strategic
        traffic
        movements, bus /
        pedestrian priority
        and road safety.

IE3c    Investigate the                                                                                     To be considered as part of
        potential for                                                                                       Parking Strategy development
        parking
        incentives to
        encourage use of                                                                                                                                   ↔
        small or multi-
        occupancy
        vehicles.




                                                                                                                                                    Page 26 of 26

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:6
posted:8/12/2011
language:English
pages:26