Docstoc

Scheduling Order Wisconsin - DOC

Document Sample
Scheduling Order Wisconsin - DOC Powered By Docstoc
					                                                  -1-

                                         Bernardo Cantu Ortiz
                                               Resume




                                     bernardocantu@hotmail.com
                                         Saltillo, Coah. Mexico
                                      Celular : (844) 1-02-45-33

                                               STUDIES

                      Senior High School. Ateneo Fuente. Saltillo, Coah. 1973-1975
                      Senior High School. Orrville, Ohio. USA. 1975-1976
                      Mechanical Engineer Pr. Universidad Regiomontana.
                      Monterrey, N.L. 1976-1981

                      English 1 year in Orrville Ohio High School
                      English 1 month in Wausau Wisconsin High School
                      English certificate IMNRC Saltillo.
                      French 10% Alianza Francesa Saltillo

                      English 95%.
                      Age 53 years old.
                      Valid US-Visa and Mexican Passport.
                      Willing to travel and relocate.


                                             EXPERIENCE

                            Toditolaboral.com / Clasican.com / Toditoamigos.com
                                        Feb-2000 a la fecha (actual)
  Empresas de tecnologia Punto com
Saltillo, Coah. Tel: (844) 1-02-45-33
Propietario. Diseño, programación y administracion de los sitios en mi tiempo libre.
A continuación el nombre, giro y direccion web de los sitios:
Toditolaboral.com – Bolsa de Trabajo, Empleos y Curriculums: http://www.toditolaboral.com
Clasican.com – Anuncios Clasificados, Avisos de Ocasión: http://www.clasican.com
Toditoamigos.com – Dating, Amor y Amistad: http://www.toditoamigos.com


                                       Kidde de Mexico, S.A. de C.V.
                                          Mar-2005 to Jul-2005
 Dry chemical powder fire extinguishers factory.
Ave. Division del Golfo #3308. Fracc. Industrial La Libertad. Ph: (834) 3-18-75-00 y/o 3-18-75-02.
Ciudad Victoria, Tamps.
MRP Manufacturing Consultant. Implementation of the ERP/MRP Microsoft Business Solutions -
Solomon manufacturing system. Training company personnel until they can process the mrp by
themselves.




                                                  -1-
                                                   -2-


                                   JB Divisiones y Empaques de Carton
                                          Aug-1995 to Jan-2000
  Fabrica de divisiones y empaques de carton .
Calle 11B #561 x 66 y 68. Col. Residencial Pensiones. Merida, Yuc.
Propietario y Administrador General. Administracion, operaciones y finanzas, procesamiento de ordenes
de clientes, planeacion, programación y control de producción, planeacion, programación y compras a
proveedores, control de almacen e inventarios, reclutamiento y capacitacion de personal (30 operarios),
mantenimiento general, layout de piso de produccion, tiempos y movimientos, atención a clientes y
ventas al mayoreo a maquiladoras de divisiones, separadores y cajas de carton caple y corrugado.

                           Sammax International, S.A. (Tower International)
                                        Nov-1997 to Jan-1998
  Factory of: Thermostatos, thermoswitches and general switches.
km. 27. Carr. Merida-Tecoh. Tecoh, Yucatan. Ph. (995) 2-00-70
MRP Manufacturing Consultant. Implementation of the MRP-Alliance manufacturing system. Training
company personnel until they can process the mrp by themselves.


                                 Falco Electronics Mexico, S.A. (Falco USA)
                                           Feb-1995 to Sep-1996
  Factory of: Electronic transformers, balastros, PC-Boards, coils and similars. Calle 23 #311 x 46, Fracc.
Itzincab. Uman, Yucatan. Ph. (999) 9-46-18-8
Materials Manager and MRP Manufacturing Consultant. Customer order processing, receiving, receiving
inspection, purchasing, production planning and scheduling, vendor scheduling, inventory control,
shipping, warehouses, import, export, traffic and manufacturing engineering.
Design and develop the MRP-Fomicsi manufacturing system. Develop ISO-9000 procedures.


                                               L&b Card Shop
                                            Aug-1981 a Dec-1994
  Tiendas de papeleria y regalos varios (6 Tiendas).
Matriz: Plaza Soriana Local 21-A Saltillo, Coah.
Propietario y Administrador General. Administracion, operaciones y finanzas, planeacion, programación
y compras a proveedores, control de inventarios, reclutamiento y capacitacion de personal (7
empleadas), diseño y proyecto para la apertura de nuevas tiendas, atención a clientes y ventas al publico
en general de papeleria y regalos varios.


                              PEA Industrial, S.A. (ITT-SWF Autoelectric)
                             Jul-1990 to Feb-1991; Nov-1991 to Jan-1992
  Factory of: Automotive harnesses, switches and controls.
Carr. Mat.-Maz. Brecha 115. Rio Bravo, Tamaulipas. Ph. (893) 4-21-01
Materials Control Manager and MRP Manufacturing Consultant. Production planning and scheduling,
vendor scheduling, inventory control, warehouses, import, export, purchasing, receiving, shipping and
traffic.
Develop the MRP/ERP-CSI manufacturing system for the plants of Rio Bravo, Saltillo and Matamoros.




                                                   -2-
                                                   -3-

                                      Intertrim, S.A. (Lear Corporation)
                                            Jun-1989 to May-1990
  Factory of: Automotive seat covers.
Carr. ant. Arteaga km. 9.5. Saltillo, Coahuila. Ph. (844) 4-16-08-12
Materials Traffic and Scheduling Administrator and MRP Manufacturing Consultant. Customer order
processing, vendor scheduling, purchasing, production planning and scheduling, inventory control,
receiving, receiving inspection, shipping, import, export, government relations, warehouses and traffic.
Design and develop the MRP-SIM manufacturing system. Develop Q1 procedures.


                                     General Motors de Mexico, S.A.
                                         Jun-1982 to Jul-1985
  Factory of: Automotive engines.
Carr. Saltillo-Monterrey, km. 7.5. Ramos Arizpe, Coahuila. Ph. (844) 4-15-40-00
Production Planning and Inventory Control General Supervisor.
Customer order processing, production planning and scheduling, vendor scheduling, inventory control,
receiving and shipping for all Ramos Arizpe engine plant.
MRP/ERP-PSIC General Coordinator for the plants of Ramos Arizpe and Toluca. Develop the automatic
production planning and scheduling for all machining and assembly lines for all GM engine plants and
therefore for all vendor, receiving and shipping weekly releases.
Design and develop the in transit inventory control system for all GM plants. Annual physical inventory
general coordinator. Develop new programs, reports and procedures for the GM engine plants.
General audit, identification and resolution of any problem for all Ramos Arizpe and Toluca system users.
Develop procedures "In Case of Disaster" and others.


                                   Prolec, S.A. (Conductores Monterrey)
                                            Jul-1979 to Jul-1981
  Factory of: Electric transformers.
Carr. a Roma, km. 9.25. Apodaca, N.L. Ph. (81) 83-76-22-00
Materials Control and Scheduling. Warehouse and inventory control, materials planning, vendor
scheduling and material follow up.


                                  Motores US de Mexico, S.A. (Emerson)
                                          Sep-1978 to Jun-1979
  Factory of: Electric motors and motodevices.
Carr. a Roma, km. 9.5. Apodaca, N.L. Ph. (81) 83- 79-92-36
Manufacturing Engineer. Standard times and movements analysis, material costing, line balancing,
productivity studies, layouts, machinery capacity and efficiency studies.




                                                   -3-

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:26
posted:8/11/2011
language:English
pages:3
Description: Scheduling Order Wisconsin document sample