					Software Process Improvement

            Software quality and process
             improvement with ISO-9000 and SEI
             CMM

            Kemerer-1997, Paulk-1996


Ali Arya, 2003       Software Project Management, Process Improvement   Slide 1
Software Development Process
            Process: A set of partially ordered steps intended
             to reach a goal with supporting inputs, outputs,
             constraints and resources (agents and tools), and
             possibly multiple levels of abstraction.
            Software development process goals
                 •   High quality
                 •   Low cost
                 •   On-time delivery
                 •   Other political/technological or market considerations
            IEEE 1074, ISO 12207, and IEEE/EIA 12207

Ali Arya, 2003                   Software Project Management, Process Improvement   Slide 2
Ideal Software Process
            Predictable
                 •   Consistency in cost/schedule estimates
                 •   Meeting quality and functionality requirements
            Defined/Standardized
                 •   Independent of individuals
                 •   Repeatable
            Statistically Controlled
                 •   Measurement
                 •   Insight
                 •   Optimization



Ali Arya, 2003                   Software Project Management, Process Improvement   Slide 3
Quality and Process Standards
            ISO 9000 (general)
                 •   Family of Quality Management standards from International
                     Standardization Organization
            TQM (general)
                 •   Total Quality Management
                 •   Canada's CAE, Europe's BEA, and USA's MBNQA
            SEI CMM (software-specific)
                 •   Software Engineering Institute set of Capability Maturity Models
            ISO 15504, SPICE (unofficial, software-specific)
                 •   Common base for process improvement models like CMM
            Others (software-specific)
                 •   Trillium, Bootstrap, …



Ali Arya, 2003                    Software Project Management, Process Improvement   Slide 4
ISO 9000 Principles
            Customer focus
            Leadership
            Involvement of people
            Process approach
            System approach to management
            Continual improvement
            Factual approach to decision making
            Mutually beneficial supplier relationships

Ali Arya, 2003            Software Project Management, Process Improvement   Slide 5
ISO 9000 Family
            ISO 9000
                 •   Fundamentals and vocabulary
            ISO 9001
                 •   Requirements
                 •   The only standard in the ISO 9000 family against which third-party
                     certification can be carried.
            ISO 9002
                 •   Models for quality assurance in production, installation, and servicing
            ISO 9003
                 •   Models for quality assurance in final specification and test
            ISO 9004
                 •   Guidelines for performance improvements



Ali Arya, 2003                     Software Project Management, Process Improvement   Slide 6
ISO 9000-3: Software
            Guidelines for the application of ISO 9001 to
             development, supply, and maintenance of
             software
                 •   ISO 9000-1 is the basic concepts
                 •   ISO 9000-2 is Guidelines for application of 9001/2/3
            Translating ISO 9001 guidelines to software
             development with specific considerations
            Sections do not always correspond to ISO 9001
             in a one-to-one way but cross references are
             available


Ali Arya, 2003                   Software Project Management, Process Improvement   Slide 7
ISO 9000-3 Outline
    4. Framework                                 5. Life-cycle Activities
    Management responsibility                    Contract
    Quality system                               Planning
    Internal quality audits                      Design and development
    Corrective actions                           Testing and acceptance
                                                 Maintenance
      6. Supporting Activities
      QA, Document Control                        1. Scope

      Training, Tools                             2. References

      Measurement, Purchasing                     3. Definitions

Ali Arya, 2003                Software Project Management, Process Improvement   Slide 8
ISO 9000-3 Excerpts
            5.4.2.1 Development Phases
                 •   The development plan should define a disciplined process or
                     methodology for transforming the purchaser’s requirements
                     specification into a software product. …
            5.6.2 Design
                 •   In addition to the requirements common to all the development
                     phases, the following aspects inherent to the design activities
                     should be examined:
                      »   Identification of design considerations, …
                      »   Design methodology, …
                      »   Use of past design experiences, …
                      »   Subsequent processes, …


Ali Arya, 2003                      Software Project Management, Process Improvement   Slide 9
Total Quality Management
            Started in 80s and became popular in 90s
            Considered a superset of ISO 9001 with a process
             model/approach
            Total
                 •   Quality involves everyone and all activities in the company.
            Quality
                 •   Conformance to Requirements (meeting customer requirements).
            Management
                 •   Quality can and must be managed.
            TQM
                 •   A process for managing quality; a philosophy of perpetual
                     improvement in everything organization does.


Ali Arya, 2003                     Software Project Management, Process Improvement   Slide 10
TQM Principles
            Quality can and must be managed.
            Everyone has a customer and is a supplier.
            Processes, not people are the problem.
            Every employee is responsible for quality.
            Problems must be prevented, not just fixed.
            Quality must be measured.
            Quality improvements must be continuous.
            Life cycle costs, not front end costs.
            Management must be involved and lead.
            Plan and organize for quality improvement.


Ali Arya, 2003              Software Project Management, Process Improvement   Slide 11
CMM History
            1982, US DoD joint task force to review the software
             problems
            One of the resulting initiatives was the Software
             Engineering Institute (SEI)
            1984, SEI was established at Carnegie Mellon University
                 •   Its purpose; to address the need for improved software in DoD
                     operations
            SEI developed the Software Process Maturity Model for
             DoD and industry
            1991, the Capability Maturity Model (CMM) was created



Ali Arya, 2003                    Software Project Management, Process Improvement   Slide 12
CMM/TQM Alignment




Ali Arya, 2003   Software Project Management, Process Improvement   Slide 13
Deming Chain Reaction




Ali Arya, 2003   Software Project Management, Process Improvement   Slide 14
Capability Maturity Models
            CMMI, Capability Maturity Model Integration
            SW-CMM, Capability Maturity Model for Software
            P-CMM, People Capability Maturity Model
            SA-CMM, Software Acquisition Capability Maturity
             Model
            SE-CMM, Systems Engineering Capability Maturity
             Model
            IPD-CMM, Integrated Product Development Capability
             Maturity Model



Ali Arya, 2003            Software Project Management, Process Improvement   Slide 15
Maturity Concepts
            Software process
                 •   a set of activities, methods, practices, and transformations that people
                     use to develop and maintain software and the associated products
            Software process capability
                 •   the range of expected results that can be achieved by following a
                     software process
            Software process performance
                 •   the actual results achieved by following a software process.
            Software process maturity
                 •   the extent to which a specific process is explicitly defined, managed,
                     measured, controlled, and effective (implies a potential for growth in
                     capability and indicates both the richness of process and the
                     consistency with which it is applied



Ali Arya, 2003                     Software Project Management, Process Improvement    Slide 16
Institutionalization
            As a software organization gains in software
             process maturity, it institutionalizes its software
             process via policies, standards, and organizational
             structures.
            Institutionalization entails building an
             infrastructure and a corporate culture that
             supports the methods, practices, and procedures
             of the business so that they endure after those
             who originally defined them have gone.


Ali Arya, 2003            Software Project Management, Process Improvement   Slide 17
SW-CMM Levels

    Software
    Process
    Maturity
    Levels




Ali Arya, 2003   Software Project Management, Process Improvement   Slide 18
SW-CMM Levels
            Initial
                 •   The software process is characterized as ad hoc, and occasionally even
                     chaotic. Few processes are defined, and success depends on individual
                     effort and heroics.
            Repeatable
                 •   Basic project management processes are established to track cost,
                     schedule, and functionality. The necessary process discipline is in
                     place to repeat earlier successes on projects with similar applications.
            Defined
                 •   Management and engineering activities are documented, standardized,
                     and integrated into a family of standard software processes for the
                     organization. Projects use a tailored version of the organization’s
                     standard software processes for developing and maintaining software.




Ali Arya, 2003                     Software Project Management, Process Improvement    Slide 19
SW-CMM Levels
            Managed
                 •   Detailed measures of the software process and product quality
                     are collected. Software processes and products are
                     quantitatively understood and controlled.
            Optimizing
                 •   Continuous process improvement is facilitated by quantitative
                     feedback from the process and from piloting innovative ideas
                     and technologies.
            Level 4 and 5 are usually considered “high
             maturity” levels
                 •   9% in SEI database of 1012 organizations, as of March 2001.



Ali Arya, 2003                   Software Project Management, Process Improvement   Slide 20
Process Capability vs. Maturity




Ali Arya, 2003   Software Project Management, Process Improvement   Slide 21
Key Process Areas




Ali Arya, 2003   Software Project Management, Process Improvement   Slide 22
CMM Structure




Ali Arya, 2003   Software Project Management, Process Improvement   Slide 23
KPA Goals
            L-2, requirements management
                 •   Controlled requirements as baseline for activities
                 •   Consistent plans, procedures, and activities
            L-2, project planning
                 •   Documented estimates
                 •   Planned activities
                 •   Agreed commitments
            L-2, software tracking and oversight
                 •   Results tracked against plans
                 •   Corrective actions
                 •   Agreed changes to commitments



Ali Arya, 2003                   Software Project Management, Process Improvement   Slide 24
KPA Goals
            L-2, subcontract management
                  •   Qualified subcontractors selected by prime contractor
                  •   Agreed commitments
                  •   Ongoing communications
                  •   Performance tracking
            L-2, quality assurance
                  •   Planned QA activities
                  •   Verified adherence to procedures
                  •   Informed groups and individuals
                  •   Noncompliant issues addressed by project members or senior management
            L-2, configuration management
                  •   CM activities planned
                  •   Identified, controlled, and available items
                  •   Change control
                  •   Groups informed of status and content of baselines


Ali Arya, 2003                   Software Project Management, Process Improvement    Slide 25
KPA Goals
            L-3, organization process definition
                 •   Standard software process
                 •   Available information
            L-3, organization process focus
                 •   Coordinated development and improvement activities
                 •   Process standard used to identify strengths and weaknesses
                 •   Planned organization-level improvement activities
            L-3, Training
                 •   Planned training activities
                 •   Necessary trainings received



Ali Arya, 2003                   Software Project Management, Process Improvement   Slide 26
KPA Goals
            L-3, integrated software management
                 •   Tailored process for each project
                 •   Projects planned and managed based on their process
            L-3, software product engineering
                 •   Defined and integrated tasks
                 •   Consistent work products
            L-3, inter-group coordination
                 •   Agreed customer's requirements
                 •   Agreed commitments
                 •   Identified, tracked, and resolved inter-group issues.
            L-3, peer review
                 •   Planned activities
                 •   Identified and removed defects


Ali Arya, 2003                     Software Project Management, Process Improvement   Slide 27
KPA Goals
            L-4, quantitative process management
                 •   Planned activities
                 •   Quantitative performance control for project processes
                 •   Quantitative identification of standard process capabilities
            L-4, software quality management
                 •   Planned activities
                 •   Measurable quality goals
                 •   Quantified and managed progress




Ali Arya, 2003                    Software Project Management, Process Improvement   Slide 28
KPA Goals
            L-5, defect prevention
                 •   Planned activities
                 •   Identified common causes of defects
                 •   Prioritized and removed causes
            L-5, technology change management
                 •   Planned activities
                 •   Evaluated effect on quality
                 •   Transferred into normal practice if appropriate
            L-5, process change management
                 •   Planned activities
                 •   Organization wide participation in process improvement
                 •   Standard and project processes continuously improved




Ali Arya, 2003                     Software Project Management, Process Improvement   Slide 29
KPA Common Features
            Commitment to perform
                 •   Senior management policies
            Ability to perform
                 •   Training, special skills & tools
            Activities performed
                 •   Plans and procedures
            Monitoring
                 •   Measurement and analysis
            Verification
                 •   Reviews and audits



Ali Arya, 2003                    Software Project Management, Process Improvement   Slide 30
Examining Maturity Level
            CMM Assessment
                 •   Voluntary and confidential
                 •   Inspects the organization-wide capability/maturity
                 •   Done by senior professionals and one or two coach
                      » Coaches are from SEI or an SEI-licensed assessment vendor

            CMM Evaluation
                 •   Open to external inspecting body
                 •   Usually for getting a contract
                 •   Done by external contractor
                 •   Very judgemental and stressful



Ali Arya, 2003                    Software Project Management, Process Improvement   Slide 31
CMM Assessment
            Procedure
                 •   Obtain commitment of organization
                 •   Preparation
                 •   Assessment conduct (interview, data collection, analysis)
                      » Usually in 3 or 4 days
                 •   Briefing and reporting
                 •   Action plan development
                 •   Follow-up
            Teams/Personnel
                 •   Assessment team
                 •   Senior management
                 •   Software project managers (SPMs)
                 •   Functional area representatives (FARs)
                      » Developers, QA and CM engineers, members of Software Engineering
                        Process Group (SEPG)

Ali Arya, 2003                     Software Project Management, Process Improvement   Slide 32
Maturity Levels in Industry
            Late 90s, US software sites
                 •   75% at level 1
                 •   15% at level 2
                 •   9% at level 3
                 •   1% at levels 4 or 5
            Oct. 2002 SEI list (# sites at level 4/5)
                 •   Australia, 2/0
                 •   Canada, 0/1
                 •   China, 0/2
                 •   India, 27/50
                 •   USA, 39/20
                 •   …


Ali Arya, 2003                    Software Project Management, Process Improvement   Slide 33
CMM Criticism
            Subjective, binary, and intrusive evaluation
            Different approached for different organizations
                 •   Answer: CMM does not specify methods, just criteria
            No proper integration with TQM
            Unrealistic and skewed levels
            Cost of moving from one level to another
            Large companies with traditional process model
                 •   See CMM-XP paper !




Ali Arya, 2003                   Software Project Management, Process Improvement   Slide 34
Quality Assurance Techniques
            Audits, evaluations, and corrective actions by
             SQA (CMM L-2)
            Error detection and defect removal via testing and
             peer reviews (CMM L-3)
            Fault tolerance and error recovery (CMM L-3)
                 •   Repeatable and effective software engineering processes
            Measurement, and defect prevention (CMM L-4
             and L-5)
                 •   Analysis of defect trends for needed improvements



Ali Arya, 2003                   Software Project Management, Process Improvement   Slide 35
Software Review
            Data shows that it is much more efficient to find defects
             in reviews than in testing
                 •   Unit test: ~ 2 to 4 defects / hour
                 •   Code review: ~ 10 defects / hour
                 •   Experienced reviewers: can yield 70% or more
            Typical time to find and fix defects
                 •   Integration & test: 10 to 40 hrs / defect
                 •   Inspection: typically less than 1 hr / defect
            Review does not have to be inspection
                 •   Informal vs. formal
            Record time, defects found, and material reviewed
                 •   Metrics: defect density, detection rate, average time, …



Ali Arya, 2003                     Software Project Management, Process Improvement   Slide 36
CMM and ISO-9000
            Different structure but strong correlation
            CMM emphasizes on continuous process
             improvement.
            ISO 9000 defines minimum requirement for an
             acceptable quality system.
            Documentation and meeting quality requirements
             are important similarities.
            Cross references exist.
                 •   See comparison article !




Ali Arya, 2003                   Software Project Management, Process Improvement   Slide 37
CMM and Extreme Programming
            Extreme Programming (XP) is a methodology
             based on the concept of evolutionary software
             development.
            XP is mainly initiated and used for the high-
             speed, volatile world of Internet and Web
             software development.
            XP is used in arguments against “rigorous”
             software process improvement models like
             CMM.

Ali Arya, 2003           Software Project Management, Process Improvement   Slide 38
XP Basics
            Small to medium-sized teams
                 •   Fewer than 10
            Vague and/or rapidly changing requirements
            Iterative life cycle with short cycles
                 •   Activities: coding, testing, listening, and designing.
            Delivery of very small increments of functionality, a.k.a
             “stories”
            continual communication
                 •   With the customer and within the team;
            Simplicity (minimalist solutions)


Ali Arya, 2003                     Software Project Management, Process Improvement   Slide 39
XP Practices
            Planning game
            Small releases
            Metaphor
                 •   simple shared view of system
            Simple design
            Continuous integration and testing
            Refactoring
                 •   Restructure the system without changing its behavior
            Pair programming and Coding standards
            Collective ownership
            Onsite customer

Ali Arya, 2003                    Software Project Management, Process Improvement   Slide 40
XP and Level-2 KPAs
            Largely addressed by XP
                 •   Requirement management (stories, on-site customer, and
                     continuous integration)
                 •   Planning (planning game and small releases)
                 •   Tracking and oversight (project velocity and small releases)
            Partially addressed by XP
                 •   Quality assurance (pair programming)
                 •   Configuration management (collective ownership, small
                     releases, and continuous integration)
            Not addressed by XP
                 •   Subcontracting


Ali Arya, 2003                   Software Project Management, Process Improvement   Slide 41
XP and Level-3 KPAs
            Largely addressed by XP
                 •   Software product engineering (metaphor, simple design,
                     refactoring, coding standards, and testing)
                 •   Intergroup coordination (on-site customer, pair programming)
                 •   Peer reviews (pair programming)
            Partially addressed by XP
                 •   Organization process focus (team level)
                 •   Organization process definition (life cycle)
            Not addressed by XP
                 •   Training program
                 •   Integrated software management



Ali Arya, 2003                    Software Project Management, Process Improvement   Slide 42
XP-CMM Interplay
            XP is complementary to CMM concepts, even if
             they do not completely address them.
                 •   CMM: what-to-do in general terms,
                 •   XP: how-to for some specific cases
            XP generally focuses on technical work, whereas
             the CMM generally focuses on management
             issues.
            Lack of “institutionalization” in XP
            XP is hard to implement when project size grows.


Ali Arya, 2003                   Software Project Management, Process Improvement   Slide 43

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:5
posted:8/10/2011
language:English
pages:43
Description: Sei Cmm Certification Received Company document sample