Page High

Document Sample
Page High
Stats
views:
13
posted:
7/25/2009
language:
English
pages:
38
School Name: Page High School Guilford County Schools 2008-2011 School Improvement Plan Vision Statement

The vision of Walter Hines Page High School is to prepare Page students for the future by striving for academic excellence, and to see that they grow into responsible citizens who are engaged in a global community.



Self Assessment

Current AYP Status: Not Met Current ABC Status: Not Met



(Synthesized Narrative from Self-Assessment Exercises) PHS did not make AYP during the 2007-2008 school year. Although the pass rate of current Algebra I students enrolled in 2007 went from 35% to 54%, the banked scores from students who took Algebra 1 in Middle School were renormed to fit the new Algebra I test. Thus a number of students who previously passed Algebra I received a "no" for passing after renorming. This dropped our percent passing so we did not make AYP. PHS did not make ABC growth because our high students did not show sufficient growth. Attendance at PHS dropped from 92.6% in 2006-2007 to 91.9% in 2007-2008, a .7 drop. PHS had 159 students in 9th grade fail 2 or more classes during 2007-2008. This year we received a large number of students from the Newcomers School and created an English Language school within Page that operates on a block schedule, making us a modified traditional school. We currently have an ESOL subgroup but most of them are on NCCLAS. At this time, we have an EC subgroup, which includes Lifeskills and OCS. PHS is on the watch list from the state for the first time in Algebra 1. Our plans for addressing Algebra 1 composite scores are addressed in Smart Goal 3.



Goals, Strategies, Monitoring and Budget

Overall SMART Goal: 1 (Your overall goal will reflect a two to three year long-range goal) GOAL 1: By 2011, PHS will decrease the number of ninth grade students failing two or more classes by 50% from 126 to 63 as measured by credits earned.



Target SMART Goal/Measure:1 (Selection of a one year school wide goal based upon academic or operational need and supported by data. State clearly how academic goal will provide for accelerated learning for students at risk of not meeting standards or making AYP.) GOAL 1: By June 2009, the number of ninth grade students failing two or more classes will decrease by 15% from 126 to 107. By June 2010, the number of ninth grade students failing two or more classes will decrease by 15% from 107 to 88. By June 2011, the number of ninth grade students failing two or more classes will decrease by 20% from 88 to 63. Start 2009-126 2010-107 2011-88 Percentage Decrease -15% -15% -20% Total 107 88 63 Met (Y or N)



Supporting Data for SMART GOAL:1 Insert (or attach) data table to support the selection of the above stated overall SMART Goal and Target SMART Goal GOAL 1: Failures by Grade Level 2007-08 Student WM WF 9 14 5 10 3 3 11 4 1 12 2 1



AAM 64 24 27 4



AAF 32 11 17 3



HM 2 1 2 3



HF 2 2 2 0



OM 4 1 2 0



OF 3 1 1 0



Total 126 46 56 13



QUARTERLY ACTION PLAN Quarter 1

1. What does the data tell us? Ninth grade had the highest failure rate. 2. Not tell us? Consistency of grading practices between teachers, Pass rate for EOC 3. Celebration(s)? Twelfth grade pass rate 4. OFIs? Ninth grade failure rate

OFIs: Opportunities For Improvement



Quarter 2

Based on analysis from the previous quarter, adjust strategy and deployment plan as needed.

1. What does the data tell us?130 Ninth grade students failed 2 or more classes 2. Not tell us?Is a grading floor in place, If there are repeat ninth grade students who failed 2 or more classes, 3. Celebration(s)?N/A 4. OFIs?Decrease nd failures for 2 quarter



Quarter 3

Based on analysis from the previous quarter, adjust strategy and deployment plan as needed.

5. What does the data tell us?144 Ninth grade students failed 2 or more classes 6. Not tell us? How many are repeat ninth grade students who failed 2 or more classes? 7. Celebration(s)?N/A 8. OFIs?Decrease rd failures for 3 quarter



Quarter 4

Based on analysis from the previous quarter, adjust strategy and deployment plan as needed.

9. What does the data tell us?145 Ninth grade students failed 2 or more classes 10. Not tell us? How many are repeat ninth grade students who failed 2 or more classes? 11. Celebration(s)?N/A 12. OFIs?Decrease th failures for 4 quarter



Summer

Based on analysis from the previous quarter, adjust strategy and deployment plan as needed.



Study



Data analysis: (SWOT) analysis

SWOT: Strengths, Weaknesses, and Opportunities for improvement, Threats



5. Next step? (Identify key strategy or approach) Obtain and analyze retention data from the 07-08 school year to determine OFIs and develop next steps



5. Next step? (revise key strategy as needed to address identified OFIs) Continue ninth grade transition meetings to identify at-risk ninth grade students and development individual plans for improvement



5. Next step? (revise key strategy as needed to address identified OFIs) Continue ninth grade transition meetings to identify at-risk ninth grade students and development individual plans for improvement



Identify Key Strategy (Approach)



5. Next step? 5. Next step? (revise key (revise key strategy strategy as needed to as needed to address identified OFIs) address identified OFIs) Continue ninth grade transition meetings to identify at-risk ninth grade students and development individual plans for improvement, transition team is evaluating progress of the team and make recommendation for next year, investigate the possibility of study hall or freshmen seminar for 9th grade students, Review by content for exams, including Boot Camps and PLATO remediation 9th grade counselor, 9th grade teachers, 9th grade administrator (Mr. Dillard)



Plan



Person(s) Counselors Responsible for ensuring the strategy is deployed during the current quarter



9th grade counselor, 9th grade teachers, 9th grade administrator (Mr. Dillard)



9th grade counselor, 9th grade teachers, 9th grade administrator (Mr. Dillard)



Plan



Resources Available during 2007-2008 Retention the current quarter Data (include $ encumbered and name of budget) NA Resources Needed during the current quarter Professional Development during the current quarter (Indicate title, content and audience) Helping our Ninth Graders make the Transition to High School ½ day Staff Development-9/23/08 Entire Staff Notify parents of student progress at 4 ½ weeks and 9 weeks



1st Quarter Report Cards



2nd Quarter Report Cards



3rd Quarter Report Cards



Plan



Continued staff training on implementing SIP N/A



Continued staff training on implementing SIP N/A



Plan



NA



NA



Plan



Parent and Community (Stakeholder) Involvement during the current quarter Create the deployment plan For the current quarter



Plan



Notify parents of student progress at 4 ½ weeks and 9 weeks



Notify parents of student progress at 4 ½ weeks and 9 weeks



Notify parents of student progress at 4 ½ weeks and 9 weeks



Use the Quarter 1 deployment plan template below



Use the Quarter 2 deployment plan template below



Use the Quarter 3 deployment plan template below



Use the Quarter 4 deployment plan template below



Do



Evaluation: A. What data will you use to determine if the strategy was deployed? B. What data will you use to determine if the strategy was deployed with fidelity? C. What data will you use to determine if the strategy impacted the overall goal or target goal?



A. Retention data obtained, and shared with staff B. OFIs and next steps identified based on attendance rosters at staff development C. Quarter 1 Report Cards



A.1st quarter report card data shared with staff B. OFIs and next steps identified based on attendance rosters at staff meetings C. Quarter 2 Report Cards



A.2nd quarter report A. 3rd quarter card data shared with report card data staff shared with staff B. OFIs and next steps identified based on attendance rosters at staff meetings C. Quarter 3 Report Cards B. OFIs and next steps identified based on attendance rosters at staff meetings



A. B. C.



Study



C. Quarter 4 Report Cards



Report the data from the current quarter deployment plan and use the data questions to analyze the results



13. What does the data tell us?130 Ninth grade students failed 2 or more classes 14. Not tell us?Is a grading floor in place, If there are repeat ninth grade students who failed 2 or more classes, 15. Celebration(s)?N/A 16. OFIs?Decrease failures nd for 2 quarter



Study



What does the data tell us? 144 Ninth grade students failed 2 or more classes 2. Not tell us? How many are repeat ninth grade students 3. Celebration(s)?N/A 4. OFIs?Decrease rd failures for 3 nine weeks



1.



1. What does the data tell us? 2. Not tell us? 3. Celebration(s)? 4. OFIs



1. What does the data tell us? 145 Ninth grade students failed 2 or more classes 2. Not tell us? How many are repeat ninth grade students 3. Celebration(s)? N/A 4. OFIs? Decrease failures for 4th nine weeks



1. What does the data tell us? 2. Not tell us? 3. Celebration(s)? 4. OFIs?



YES If yes, change target goal in order to further impact the overall goal NO If no, check the appropriate action below:



YES If yes, change target goal in order to further impact the overall goal NO If no, check the appropriate action below: Continue current strategy and update deployment plan for next Qtr Continue current strategy, but make improvements to deployment plan Abandon current strategy and identify new strategy



YES If yes, change target goal in order to further impact the overall goal NO If no, check the appropriate action below: Continue current strategy and update deployment plan for next Qtr Continue current strategy, but make improvements to deployment plan Abandon current strategy and identify new strategy



YES If yes, change target goal in order to further impact the overall goal NO If no, check the appropriate action below: Continue current strategy and update deployment plan for next Qtr Continue current strategy, but make improvements to deployment plan Abandon current strategy and identify new strategy



YES If yes, change target goal in order to further impact the overall goal NO If no, check the appropriate action below: Continue current strategy and update deployment plan for next Qtr Continue current strategy, but make improvements to deployment plan Abandon current strategy and identify new strategy



Act/Plan



Target Goal Met?



Continue current strategy and update deployment plan for next Qtr Continue current strategy, but make improvements to deployment plan Abandon current strategy and identify new strategy



Steps #1



Quarter 1 Deployment Plan Collect and share 07-08 ninth grade retention data.



Person(s) Responsible Becky Hampton



Measure(s) Attendance rosters from staff development Database Attendance rosters from monthly meetings Chart Paper E-mail distribution



Action Step Completion Date 9/23/08



#2 #3



#4 #5 #6



Identify ninth grade teachers Teachers were informed that selected ninth grade teachers will meet the fourth Tuesday of the month to discuss at-risk ninth grade students Staff will identify strategies to increase success of ninth grade students during staff development Distribute summary of staff’s strategies to increase success of ninth grade students



Becky Hampton Becky Hampton, Stephanie Faison Becky Hampton Becky Hampton



9/08/08 9/23/08



9/23/08 10/31/08



Steps #1 #2



Quarter 2 Deployment Plan Collect and share 1st quarter report card data at staff meeting Ninth grade transition meetings in November, December and January



Person(s) Responsible Administrators Becky Hampton, Stephanie Faison, Teachers of chosen ninth grade students Becky Hampton, Stephanie Faison Ninth grade teachers of previously identified students Teachers of chosen ninth grade students



Measure(s) Attendance rosters from staff meeting Attendance rosters from monthly meetings



Action Step Completion Date 12/9/08 1/31/09



#3 #4



Identify ten students for each meeting to focus on Follow-up every other month on previously identified students



Agenda from meeting Attendance rosters from monthly meetings Attendance rosters from monthly meeting



Ongoing 1/23/09



#5



Develop strategies for individual success and share with teachers of chosen ninth grade students



1/31/09



#6 #7



Steps #1 #2



Quarter3 Deployment Plan Collect and share 2nd quarter report card data at staff meeting Ninth grade transition meetings in February and March



Person(s) Responsible Administrators Becky Hampton, Stephanie Faison, Teachers of chosen ninth grade students, Administrators Becky Hampton, Stephanie Faison Teachers, administrators, counselors Ninth grade teachers of previously identified students Teachers of chosen ninth grade students



Measure(s) Attendance rosters from staff meeting Attendance rosters from monthly meetings



Action Step Completion Date 2/10/09 3/26/09



#3 #4



Identify students with two or more Fs for each meeting to focus on Meet with students, teachers, parents, counselors and administrators of identified students Follow-up every other month on previously identified students Develop strategies for individual success and share with teachers of chosen ninth grade students



#5



#6



Agenda from meeting Counselor/Administ rator record of meeting Attendance rosters from monthly meetings Attendance rosters from monthly meeting



Ongoing 3/26/09



3/26/09



3/26/09



Steps #1 #2



Quarter 4 Deployment Plan Collect and share 3rd quarter report card data at staff meeting Ninth grade transition meetings in April



Person(s) Responsible Administrators Becky Hampton, Stephanie Faison, Teachers of chosen ninth grade students, Administrators



Measure(s) Attendance rosters from staff meeting Attendance rosters from monthly meeting



Action Step Completion Date 3/12/09 5/1/09



#3 #4



Identify students with two or more Fs for each meeting to focus on Follow-up every other month on previously identified students



#5



Develop strategies for individual success and share with teachers of chosen ninth grade students



Becky Hampton, Stephanie Faison Ninth grade teachers of previously identified students Teachers of chosen ninth grade students



Agenda from meeting Attendance rosters from monthly meetings Attendance rosters from monthly meeting



Ongoing 6/1/09



6/1/09



#6 #7 #8 #9 #10



Overall SMART Goal: 2 (Your overall goal will reflect a two to three year long-range goal) GOAL #2: By 2011, PHS will reduce the total number of students absent to class by 30% from 8.1% to 5.7%, as measured by the SIMS report of Daily Attendance. Target SMART Goal/Measure:2 (Selection of a one year school wide goal based upon academic or operational need and supported by data. State clearly how academic goal will provide for accelerated learning for students at risk of not meeting standards or making AYP.) GOAL 2: By 2009, PHS will reduce the total number of students absent by 10% from 8.1% to 7.3%, as measured by the SIMS report of Daily Attendance. By 2010, PHS will reduce the total number of students absent by 10% from 7.3% to 6.5%, as measured by the SIMS report of Daily Attendance. By 2011, PHS will reduce the total number of students absent by 10% from 6.5% to 5.7%, as measured by the SIMS report of Daily Attendance. Start % Reduced Total Met (Y or N) 2009-8.1% -10% 7.3% 2010-7.3% -10% 6.5% 2011-6.5% -10% 5.7%



Supporting Data for SMART GOAL:2 Insert (or attach) data table to support the selection of the above stated overall SMART Goal and Target SMART Goal GOAL #2 Enrollment by Grade and Ethnic Group Overall Asian African American Hispanic Multiracial 9 588 36 275 33 30 10 406 27 172 23 12 11 386 20 168 14 20 12 344 19 134 15 11



White 213 172 162 164



Average Daily Attendance by Percentage as measured by SIMS Overall Asian African American 9 90.4 92.4 88.3 10 92.4 91.5 90.1 11 91.5 91.8 89.1 12 93.1 92.8 92.0



Hispanic 87.2 90.5 92.2 90.6



Multiracial 88.1 89.2 91.5 90.8



White 94.1 95.5 94.0 94.4



QUARTERLY ACTION PLAN Quarter 1

5. What does the data tell us? Ninth grade students have the lowest overall attendance 6. Not tell us? Which group has the highest impact on overall daily attendance 7. Celebration(s)? 07-08 Seniors had the highest ADA 8. OFIs? Every ethnic group has a need for improvement



Quarter 2

Based on analysis from the previous quarter, adjust strategy and deployment plan as needed.

17. What does the data tell us? Attendance is up for all grade levels 18. Not tell us? attendance by subgroup 19. Celebration(s)? Improvement in all four grades 20. OFIs? Continue to increase attendance



Quarter 3

Based on analysis from the previous quarter, adjust strategy and deployment plan as needed. 21. What does the data tell us? The attendance for all grades went down slightly. (less than 1%) 22. Not tell us?attendance by subgroup 23. Celebrations?Ab out 500 students were able to exempt midterm exams based on attendance 24. OFIs?Continue to increase attendance



Quarter 4

Based on analysis from the previous quarter, adjust strategy and deployment plan as needed. 25. What does the data tell us? The attendance for all grades went down slightly. (less than 2%) 26. Not tell us?attendance by subgroup 27. Celebrations?St udents got rewarded for attendance by Buccaneer bucks OFIs?Continue to increase attendance



Summer

Based on analysis from the previous quarter, adjust strategy and deployment plan as needed.



Study



Data analysis: (SWOT) analysis

SWOT: Strengths, Weaknesses, and Opportunities for improvement, Threats



OFIs: Opportunities For Improvement



Identify Key Strategy (Approach)



9. Next step? (Identify key strategy or approach) Identify and implement strategies to increase ADA



5. Next step? (revise key strategy as needed to address identified OFIs) Continue with incentives to increase attendance



5. Next step? (revise key strategy as needed to address identified OFIs) We are instituting Buccaneer Bucks and a school store for incentives



5. Next step? (revise key strategy as needed to address identified OFIs) We have instituted Buccaneer Bucks and a school store for incentives



5. Next step? (revise key strategy as needed to address identified OFIs)



Plan



Person(s) Responsible for ensuring the strategy is deployed during the current quarter Resources Available during the current quarter (include $ encumbered and name of budget) Resources Needed during the current quarter Professional Development during the current quarter (Indicate title, content and audience)



AP in charge of attendance



Plan



Rick Edwards and attendance committee



Rick Edwards and attendance committee



Rick Edwards and attendance committee



SIMS Social Worker Attendance AP ConnectEd NA



Plan



SIMS Social Worker Attendance AP ConnectEd



SIMS Social Worker Attendance AP ConnectEd



SIMS Social Worker Attendance AP ConnectEd



Plan



Money for incentives



Money for incentives



Money for incentives



NA



NA



N/A



N/A



Plan



ConnectEd Parent and Community (Stakeholder) Involvement during the current quarter Create the deployment plan For the current quarter Evaluation: A. What data will you use to determine if the strategy was deployed? B. What data will you use to determine if the strategy was deployed with fidelity? C. What data will you use to determine if the strategy impacted the overall goal or target goal? Use the Quarter 1 deployment plan template below A. Attendance data obtained, analyzed and distributed to staff B. OFIs and next steps identified based on SWOT



ConnectEd



ConnectEd



ConnectEd



Plan



Use the Quarter 2 deployment plan template below A. Quarter 2 attendance data B. Administrators will analyze data C. Compare Quarter 2 ADA from 07-08 to 08-09



Use the Quarter 3 deployment plan template below A. Quarter 3 attendance data B. Administrators will analyze data C. Compare Quarter 3 ADA from 07-08 to 08-09



Use the Quarter 4 deployment plan template below A. Quarter 4 attendance data B. Administrators will analyze data C. Compare Quarter 4 ADA from 07-08 to 08-09 A. B. C.



Study



Do



C. Compare Quarter 1 ADA from 07-08 to 0809



Report the data from the current quarter deployment plan and use the data questions to analyze the results



28. What does the data tell us? Attendance is up for all grade levels 29. Not tell us? attendance by subgroup 30. Celebration(s)? Improvement in all four grades 31. OFIs? Continue to increase attendance



5. What does the data tell us? Attendance is down less than 1% for all grade levels 6. Not tell us? attendance in subgroup 7. Celebration(s)?about 500 students exempted mid-term exams based upon attendance 8. OFIs? continue to increase attendance YES If yes, change target goal in order to further impact the overall goal NO If no, check the appropriate action below: Continue current strategy and update deployment plan for next Qtr Continue current strategy, but make improvements to deployment plan Abandon current strategy and identify new strategy



5. What does the data tell us? 6. Not tell us? 7. Celebration(s)? 8. OFIs



5. What does the data tell us? Attendance is down less than 2% for all grade levels 6. Not tell us? attendance in subgroup 7. Celebration(s)?Stude nts received Buccaneer bucks based on attendance. 8. OFIs? continue to increase attendance YES If yes, change target goal in order to further impact the overall goal NO If no, check the appropriate action below: Continue current strategy and update deployment plan for next Qtr Continue current strategy, but make improvements to deployment plan Abandon current strategy and identify new strategy



5. What does the data tell us? 6. Not tell us? 7. Celebration(s)? 8. OFIs?



Study



YES If yes, change target goal in order to further impact the overall goal NO If no, check the appropriate action below:



YES If yes, change target goal in order to further impact the overall goal NO If no, check the appropriate action below: Continue current strategy and update deployment plan for next Qtr Continue current strategy, but make improvements to deployment plan Abandon current strategy and identify new strategy



YES If yes, change target goal in order to further impact the overall goal NO If no, check the appropriate action below: Continue current strategy and update deployment plan for next Qtr Continue current strategy, but make improvements to deployment plan Abandon current strategy and identify new strategy



Act/Plan



Target Goal Met?



Continue current strategy and update deployment plan for next Qtr Continue current strategy, but make improvements to deployment plan Abandon current strategy and identify new strategy



Steps #1 #2 #3 #4 #5 #6 #7 #8 #9 #10



Quarter 1 Deployment Plan Collect and distribute 07-08 attendance data Analyze 07-08 Attendance data to identify SWOT Identify strategies to help improve attendance Identify the group(s) that has the biggest impact on ADA ConnectEd message for each absence Parent letter sent home for excessive absences every 2 weeks After the 3rd absence, student makes up each class missed minute for minute.



Person(s) Responsible Marilyn Foley Leadership Team and Rick Edwards Leadership Team and Rick Edwards Leadership Team SIMS SIMS Classroom Teachers and Rick Edwards



Measure(s) ADA Attendance Summary Chart Quarter 2 Deployment Plan Attendance Summary Chart Phone Log SIMS report Make-Up time log



Action Step Completion Date 10/31/08 10/31/08 10/31/08 10/31/08 Ongoing Ongoing Ongoing



Steps #1 #2 #3 #4 #5 #6 #7 #8 #9 #10



Quarter 2 Deployment Plan Collect and distribute Quarter 1 attendance data Implement incentives to improve attendance ConnectEd message for each absence Parent letter sent home for excessive absences every 2 weeks After the 4th absence, student makes up each class missed minute for minute



Person(s) Responsible Attendance AP Attendance committee SIMS SIMS Classroom Teachers and Rick Edwards



Measure(s)



ADA Minutes from committee meeting Phone Log Ongoing SIMS Ongoing Report Make-Up time log Ongoing



Action Step Completion Date 1/31/09 1/31/09



Steps #1 #2 #3 #4 #5 #6 #7 #8 #9 #10



Quarter3 Deployment Plan Collect and distribute Quarter 2 attendance data Implement incentives to improve attendance ConnectEd message for each absence Parent letter sent home for excessive absences every 2 weeks After the 3rd absence, student makes up each class missed minute for minute Investigate truant students under the age of 16



Person(s) Responsible Attendance AP Attendance committee SIMS SIMS Classroom Teachers and Rick Edwards Social Worker



Measure(s)



ADA Minutes from committee meeting Phone Log Ongoing SIMS Ongoing Report Make-Up time log Ongoing Phone Log Ongoing



Action Step Completion Date 2/10/09 3/26/09



Steps #1 #2 #3 #4 #5 #6 #7 #8 #9 #10



Quarter 4 Deployment Plan Collect and distribute Quarter 3 attendance data Implement incentives to improve attendance ConnectEd message for each absence After the 3rd absence, student makes up each class missed minute for minute Investigate truant students under the age of 16 Social Worker pursues legal options for truancy Administrative team sweeping halls randomly



Person(s) Responsible Attendance AP Attendance committee SIMS Classroom Teachers and Rick Edwards Social Worker Social Worker Administrators



Measure(s) ADA Minutes from committee meeting Phone Log Make-Up time log Phone Log Log E-mail



Action Step Completion Date 4/20/09 Ongoing Ongoing Ongoing Ongoing Ongoing Ongoing



Goals, Strategies, Monitoring and Budget

Overall SMART Goal: 3 (Your overall goal will reflect a two to three year long-range goal) GOAL #3: By 2011, PHS will increase the composite EOC score by 10% from 70.1 to 77.1, as measured by the state ABC (EOC) program.



Target SMART Goal/Measure: 3 (Selection of a one year school wide goal based upon academic or operational need and supported by data. State clearly how academic goal will provide for accelerated learning for students at risk of not meeting standards or making AYP.) GOAL #3 By 2009, PHS will increase the composite EOC score by 3% from 70.1 to 72.2, as measured by the state ABC (EOC) program. In order to improve composite EOC scores, we need to grow Algebra 1, Geometry and Physical Science. By 2009, PHS will decrease the number of students who are non-proficient in Algebra I by 10 % from 50.8 to 45.7 %. By 2009, PHS will increase the composite EOC score in Geometry by 4% from 59.1 to 63.1 as measured by the state EOC. By 2009, PHS will increase the composite EOC score in Physical Science by 8% from 20.6 to 28.6 as measured by the state EOC. Start 2009-70.1 2010-72.2 2011-74.3 Percentage Increase + 3% + 3% + 4% Total 72.2 74.3 77.1 Met (Y or N)



Supporting Data for SMART GOAL: Insert (or attach) data table to support the selection of the above stated overall SMART Goal and Target SMART Goal Overall Alg. 1 Alg. 2 Geo. Eng. 9 Bio. Physics Phy. Sci. Chem. 05-06 70.9 80.1 84.8 64.5 81.3 54.9 > 95 54.2 80.3 06-07 63.1 62.0 68.0 52.0 68.0 62.0 NA NA NA 07-08 70.1 49.2 69.2 59.1 73.9 78.2 NA 20.6 66.4



C&E 56.2 60.0 79.1



USH 66.3 72.0 71.1



QUARTERLY ACTION PLAN Quarter 1

10. What does the data tell us? Algebra 1, Geometry and Physical Science are our 3 weakest areas. 11. Not tell us? Percentage that passed course but failed the EOC 12. Celebration(s)? Biology and C & E increased over the 3 year period 13. OFIs? Increase scores for Algebra 1, Geometry, and Physical Science

OFIs: Opportunities For Improvement



Quarter 2

Based on analysis from the previous quarter, adjust strategy and deployment plan as needed.

32. What does the data tell us? We are above the district st average on 1 quarter benchmarks in Algebra 1 and Geometry. We created a CFA for Physical Science and st our 1 quarter average is 51.6. 33. Not tell us?Physical Science doesn’t tell us how we compare to district. 34. Celebration(s)?Abov e the district in Algebra 1 and Geometry 35. OFIs? Continue to increase scores for nd 2 quarter



Quarter 3

Based on analysis from the previous quarter, adjust strategy and deployment plan as needed.

36. What does the data tell us? We are above the district average on 2nd quarter benchmarks in Algebra 1 (District is 46.7 and PHS is 47.8) and Geometry( District is 50.8 and PHS is 64.7). We created a CFA for Physical Science and our 2nd quarter average is 46.8. 37. Not tell us?Physical Science doesn’t tell us how we compare to district. 38. Celebration(s)?Above the district in Algebra 1 and well above the district average in Geometry. Block Algebra 1 EOC scores were approximately 40% success rate with repeaters, significantly above the district average. 39. OFIs? Continue to increase scores for 3rd quarter



Quarter 4

Based on analysis from the previous quarter, adjust strategy and deployment plan as needed.

40. What does the data tell us? We are below the district average on 3rd quarter benchmarks in Algebra 1 (District is 39.9 and PHS is 38.4) and Geometry( District is 65.8 and PHS is 55.4). We created a CFA for Physical Science and our 3rd quarter average is 58.01. 41. Not tell us?Physical Science doesn’t tell us how we compare to district. 42. Celebration(s)?Phy sical Science continues to show improvement. OFIs? Continue to increase scores for 4th quarter



Summer

Based on analysis from the previous quarter, adjust strategy and deployment plan as needed.



Study



Data analysis: (SWOT) analysis

SWOT: Strengths, Weaknesses, and Opportunities for improvement, Threats



Identify Key Strategy (Approach)



14. Next step? (Identify key strategy or approach) Obtain and analyze EOC data from the 0708 school year to determine OFIs and develop next steps. Algebra 1-Amy Campbell Geometry-Amy Campbell Physical Science-Kim Smitherman



Person(s) Responsible for ensuring the strategy is deployed during the current quarter



Plan



5. Next step? (revise key strategy as needed to address identified OFIs) Create Physical Science CFA for 2nd quarter, administer 2nd quarter benchmarks and CFAs Kim Smitherman, Algebra 1, Geometry and Physical Science teachers



5. Next step? (revise key strategy as needed to address identified OFIs) Create Physical Science CFA for 3rd quarter, administer 3rd quarter benchmarks and CFAs Kim Smitherman, Algebra 1, Geometry and Physical Science teachers, Andrew Degges, June Britt



5. Next step? (revise key strategy as needed to address identified OFIs) Create EOC review for all classes



5. Next step? (revise key strategy as needed to address identified OFIs)



Plan



Algebra 1, Geometry and Physical Science teachers



Resources Available during NA the current quarter (include $ encumbered and name of budget) NA Resources Needed during the current quarter Professional Development during the current quarter (Indicate title, content and audience) NA



Pacing Guide



Pacing Guide, GEMS, Achievement Series



Plan



Pacing Guide, GEMS, Achievement Series



Plan



Same subject content planning



Same subject content Same subject planning, content planning, remediation remediation Data Analysis session for Benchmarks Data Analysis session for Benchmarks



Plan



Data Analysis session for Benchmarks



NA Parent and Community (Stakeholder) Involvement during the current quarter Create the deployment plan For the current quarter Evaluation: A. What data will you use to determine if the strategy was deployed? B. What data will you use to determine if the strategy was deployed with fidelity? C. What data will you use to determine if the strategy impacted the overall goal or target goal? Use the Quarter 1 deployment plan template below A.EOC data obtained, distributed and Goal Summary Sheets analyzed B.OFIs and next steps identified based on SWOT C.Interim Benchmarks for Quarter 1



NA



NA



NA



Plan



Use the Quarter 2 deployment plan template below A.Benchmark and CFA results B.Benchmark summary shared with administrators C.Interim Benchmarks for Quarter 2



Use the Quarter 3 deployment plan template below A. Benchmark and CFA results



Use the Quarter 4 deployment plan template below A. Benchmark and CFA results A. B.



Do



B. Benchmark B. . Benchmark summary shared with summary shared administrators with administrators C. Interim Benchmarks for Quarter 3 C.EOC scores



C.



Study



Report the data from the current quarter deployment plan and use the data questions to analyze the results



43. What does the data tell us? We are above the district average on st 1 quarter benchmarks in Algebra 1 and Geometry. We created a CFA for Physical st Science and our 1 quarter average is 51.6. 44. Not tell us?Physical Science doesn’t tell us how we compare to district. 45. Celebration(s)?Above the district in Algebra 1 and Geometry 46. OFIs? Continue to nd increase scores for 2 quarter



9. What does the data tell us? We are above the district average on 2nd quarter benchmarks in Algebra 1 (District is 46.7 and PHS is 47.8) and Geometry(District is 50.8 and PHS is 64.7). We created a CFA for Physical Science and our 2nd quarter average is 46.8. 10. Not tell us? Physical Science doesn’t tell us how we compare to district. 11. Celebration(s)? Above the district in Algebra 1 and well above in Geometry OFIs? Continue to increase scores rd for 3 quarter



9. What does the data tell us? 10. Not tell us? 11. Celebration(s)? 12. OFIs



9. What does the data tell us? 10. Not tell us? 11. Celebration(s)? 12. OFIs?



9. What does the data tell us? 10. Not tell us? 11. Celebration(s)? 12. OFIs?



Study



12.



YES If yes, change target goal in order to further impact the overall goal NO If no, check the appropriate action below:



YES If yes, change target goal in order to further impact the overall goal NO If no, check the appropriate action below: Continue current strategy and update deployment plan for next Qtr Continue current strategy, but make improvements to deployment plan Abandon current strategy and identify new strategy



YES If yes, change target goal in order to further impact the overall goal NO If no, check the appropriate action below: Continue current strategy and update deployment plan for next Qtr Continue current strategy, but make improvements to deployment plan Abandon current strategy and identify new strategy



YES If yes, change target goal in order to further impact the overall goal NO If no, check the appropriate action below: Continue current strategy and update deployment plan for next Qtr Continue current strategy, but make improvements to deployment plan Abandon current strategy and identify new strategy



YES If yes, change target goal in order to further impact the overall goal NO If no, check the appropriate action below: Continue current strategy and update deployment plan for next Qtr Continue current strategy, but make improvements to deployment plan Abandon current strategy and identify new strategy



Act/Plan



Target Goal Met?



Continue current strategy and update deployment plan for next Qtr Continue current strategy, but make improvements to deployment plan Abandon current strategy and identify new strategy



Steps #1 #2



Quarter 1 Deployment Plan Collect and distribute 07-08 EOC data. Share Goal Summary sheets with PHS staff. Analyze Goal Summary sheets to identify SWOT



Person(s) Responsible Marilyn Foley Algebra 1-Amy Campbell Geometry-Amy Campbell Physical ScienceKim Smitherman Physical ScienceKim Smitherman Algebra 1 and Geometry teachers Becky Hampton, Kim Smitherman and Physical Science teachers Becky Hampton, Amy Campbell, Algebra 1 and Geometry teachers



Measure(s) EOC data and Goal Summary sheets SWOT analysis from each area



Action Step Completion Date 10-31-08 10-31-08



#3 #4 #5



Common Formative Assessments created and administered at end of Quarter 1 for Physical Science GCS Interim Benchmarks administered in Algebra 1 and Geometry Analyze CFA for Physical Science and determine weaknesses



CFA results IBM results SWOT Data



10-31-08 10-31-08 11-15-08



#6



Analyze GCS Interim Benchmarks in Algebra 1 and Geometry



SWOT Data



11-15-08



#7 #8 #9 #10



Steps #1 #2 #3 #4



Quarter 2 Deployment Plan Share Quarter 1 data with departments GCS Interim Benchmarks administered in Algebra 1 and Geometry Common Formative Assessments created and administered at end of Quarter 2 for Physical Science Analyze CFA for Physical Science and determine weaknesses



#5



Analyze GCS Interim Benchmarks in Algebra 1 and Geometry



Person(s) Responsible Becky Hampton Algebra 1 and Geometry teachers Kim Smitherman Becky Hampton, Kim Smitherman and Physical Science teachers Becky Hampton, Amy Campbell, Algebra 1 and Geometry teachers



Measure(s) Benchmark results Benchmark results CFA results SWOT Data



Action Step Completion Date 10/31/08 1/31/09 1/31/09 1/31/09



SWOT Data



1/31/09



Steps #1 #2 #3 #4



Quarter3 Deployment Plan Share Quarter 2 data with departments GCS Interim Benchmarks administered in Algebra 1 and Geometry Common Formative Assessments created and administered at end of Quarter 2 for Physical Science Analyze CFA for Physical Science and determine weaknesses



#5



Analyze GCS Interim Benchmarks in Algebra 1 and Geometry



#6 #7 #8



Algebra 1 teachers team taught during 4th period block Geometry teachers team taught during 5th period Afterschool remediation by direct instruction in Algebra 1 and Biology, using GEMS remediation plans



Person(s) Responsible Becky Hampton Algebra 1 and Geometry teachers Kim Smitherman Becky Hampton, Kim Smitherman and Physical Science teachers Becky Hampton, Amy Campbell, Algebra 1 and Geometry teachers Warren and Weyant Cambell and Rennie Degges



Measure(s) Benchmark results Benchmark results CFA results SWOT Data



Action Step Completion Date 2/10/09 2/10/09 2/10/09 2/10/09



SWOT Data



2/10/09



EOC scores Ongoing EOC scores Ongoing Benchmark and EOC Ongoing scores



Steps #1 #2



Quarter 4 Deployment Plan Share Quarter 3 data with departments Analyze CFA for Physical Science and determine weaknesses



#3



Analyze GCS Interim Benchmarks in Algebra 1 and Geometry



#4 #5 #6 #7 #8 #9 #10



Algebra 1 teachers team taught during 4th period block Geometry teachers team taught during 5th period Afterschool remediation by direct instruction in Algebra 1 and Biology, using GEMS remediation plans



Person(s) Responsible Becky Hampton Becky Hampton, Kim Smitherman and Physical Science teachers Becky Hampton, Amy Campbell, Algebra 1 and Geometry teachers Warren and Weyant Campbell and Rennie Degges



Measure(s) Benchmark results SWOT Data



Action Step Completion Date 4/30/09 4/30/09



SWOT Data



4/30/09



EOC scores EOC scores



Ongoing Ongoing



Benchmark and EOC Ongoing scores



School Based Leadership Team Members Signatures

The following team members collaborated with school staff to develop the School Improvement Plan for our school (parents must be included): Name Position or Role Signature Date

Nicole Abell Anita Bachmann Jo Barley Betty Blakeman Melissa Bocci Amy Campbell Marilyn Foley Shannon Hooks Janet Holbrook Debbie Jones Elliott Jordan Jules Pegram Audrey Long Judy Lowry-Boylan Kim Smitherman Manasia Sturdivant Roger Wood Teacher Parent Treasurer Parent Teacher Teacher Principal Teacher Parent Teacher Teacher Student Counselor Teacher Teacher Student AP On file On file On file On file On file On file On file On file On file On file On file On file On file On file On file On file On file October 6, 2008 October 6, 2008 October 6, 2008 October 6, 2008 October 6, 2008 October 6, 2008 October 6, 2008 October 6, 2008 October 6, 2008 October 6, 2008 October 6, 2008 October 6, 2008 October 6, 2008 October 6, 2008 October 6, 2008 October 6, 2008 October 6, 2008



(i.e. Principal, Assistant Principal, Certified Staff, Classified Staff, Student, Parent or Community Member)



Approvals

Approved by Staff: Date of Approval by Staff: October 6, 2008 Principal’s Signature: On File Results (% Approval): 100% Date: October 6, 2008



Approved By Division of Academic Improvement Instructional Improvement Officer’s Signature: Date:



Approved by GCS Board of Education



Date:



Quarterly Review Team Members Signatures

The following team members collaborated with school staff to review the School Improvement Plan for our school: Name Position or Role Signature Date

Fannie Bratcher Garrett Dillard John Eldridge Marilyn Foley Beth Folger Feagin Fuqua Becky Hampton Morris Johnson Debbie Krasewski Martha Ray Barbara Zwadyk Curriculum Specialist Assistant Principal Instructional Improvement Officer Principal Chief of Curriculum and Organizational Development Curriculum Specialist Curriculum Facilitator Curriculum Specialist Curriculum Specialist Curriculum Specialist Officer of Curriculum and Instruction On File On File On File On File On File On File On File On File On File On File On File November 14, 2008 November 14, 2008 November 14, 2008 November 14, 2008 November 14, 2008 November 14, 2008 November 14, 2008 November 14, 2008 November 14, 2008 November 14, 2008 November 14, 2008



(i.e. Instructional Improvement Officer, Curriculum Officer, Curriculum Specialist, Principal, Assistant Principal, Curriculum Facilitator)



Quarterly Review Team Members Signatures

The following team members collaborated with school staff to review the School Improvement Plan for our school: Name Position or Role Signature Date

Fannie Bratcher Garrett Dillard John Eldridge Marilyn Foley Beth Folger Feagin Fuqua Becky Hampton Morris Johnson Debbie Krasewski Martha Ray Barbara Zwadyk Curriculum Specialist Assistant Principal Instructional Improvement Officer Principal Chief of Curriculum and Organizational Development Curriculum Specialist Curriculum Facilitator Curriculum Specialist Curriculum Specialist Curriculum Specialist Officer of Curriculum and Instruction On File On File On File On File On File On File On File On File On File On File On File February 19, 2009 February 19, 2009 February 19, 2009 February 19, 2009 February 19, 2009 February 19, 2009 February 19, 2009 February 19, 2009 February 19, 2009 February 19, 2009 February 19, 2009



(i.e. Instructional Improvement Officer, Curriculum Officer, Curriculum Specialist, Principal, Assistant Principal, Curriculum Facilitator)



Quarterly Review Team Members Signatures

The following team members collaborated with school staff to review the School Improvement Plan for our school: Name Position or Role Signature Date

Fannie Bratcher Garrett Dillard John Eldridge Marilyn Foley Beth Folger Feagin Fuqua Becky Hampton Morris Johnson Debbie Krasewski Martha Ray Barbara Zwadyk Curriculum Specialist Assistant Principal Instructional Improvement Officer Principal Chief of Curriculum and Organizational Development Curriculum Specialist Curriculum Facilitator Curriculum Specialist Curriculum Specialist Curriculum Specialist Officer of Curriculum and Instruction On File On File On File On File On File On File On File On File On File On File On File May 5, 2009 May 5, 2009 May 5, 2009 May 5, 2009 May 5, 2009 May 5, 2009 May 5, 2009 May 5, 2009 May 5, 2009 May 5, 2009 May 5, 2009



(i.e. Instructional Improvement Officer, Curriculum Officer, Curriculum Specialist, Principal, Assistant Principal, Curriculum Facilitator)



Action Plan for Healthy Students in Safe, Orderly and Caring Schools

LEA: Guilford County Schools School: Page High School Strategic Priority: Healthy Students in Safe, Orderly and Caring Schools

(Healthy Active Children (HAC) Policy, #HSP-S-000)



Please record your action steps.

Not Yet Addressed Strategy Ensure all students have recess and / or physical activity during the school day and that it is not taken away as punishment. Indicate if this is in progress or not yet addressed. (What is your plan?) In Progress (Please describe.) Need Assistance (Please describe.) NA (Provide explanation.)



High schools in North Carolina do not provide daily recess.



Strategy



Yes



No



Time over 180 days 8100 minutes



Provide physical education for Ninth graders, in order every student taught by a to meet graduation physical education teacher. requirements, must take PE. Check the appropriate “yes” or “no” box and list the exact number of minutes in PE over the 180-day school year. Provide physical activity and/or recess for every student. List the exact number of minutes provided for recess and/or physical activity over the 180day school year.



Strategy Implement a coordinated school health program. Indicate if this is in progress or not yet addressed by the school.



Not Yet Addressed



In Progress ½ time school nurse available. Vending machines turned off during the day. Health required in 9th grade as part of PE curriculum



Need Assistance (Please describe.)



We have a School Health Advisory Council. Check all that apply. What other areas of Coordinated School Health Programs are you working on implementing in your school? Please explain.



At Our School X



In Our LEA X



Unsure X



Need Assistance (Please describe.)



Unsure



Need Assistance (Please describe.)



Safe Schools Plan

According to NC Code 115C-105.47, each school must have a comprehensive safe schools plan. The following are components of that plan: Student code of conduct and designated consequences for violating the code Roles and responsibilities of all school personnel in maintaining a safe and orderly learning environment Procedures for identifying and serving the needs of students at risk of academic failure or of engaging in disorderly or disruptive behavior Mechanisms for assessing the needs of disruptive and disorderly students, providing services to them and removing them from the classroom when necessary Measurable objectives for improving school safety and order Professional development clearly matched to the objectives for improving school safety and order Plans to work with local law enforcement and court officials to ensure safety Methods of providing a safe physical environment Parent involvement in planning for school improvement, safety, and alternative education placements School conducts a needs assessment annually (from students, teachers, parents, and staff) to determine their perceptions of school safety and climate School has programs, strategies and/or activities that promote good behavior/citizenship



Strategies for maintaining safe and orderly climate, addressing the needs of students at risk, and providing services for students assigned to alternative programs.

When will it be done? What are the needed resources (including staff development)? SRO What are the costs What are success indicators?



What will be done?



Who will be in charge?



Review GCS Emergency Management plan version and share Install additional cameras in school and parking lot



Principal and SRO



February 2009



$0



Foley



August 2008



Funds for additional cameras



?



Hire Dean of students as support staff for overseeing student behavior



Edwards



August 2008



Funds for hiring personnel



Retired AP salary



Meeting synopsis. All people understand emergency plan. Decrease in incidents of breaking and entering in parking lot. Decrease incidents of truancy.



Waiver Requests

School-Based Management and Accountability Program School-Based Waiver Request for 2008-2011 LEA: Guilford County LEA Code: 410



School Code/School Name: #508 – Page High School



Requests for Waiver 1. Describe the waiver you are requesting. We are requesting a class size waiver. Exceptions are sought for ninth grade classes (29) and tenth-twelfth grade classes (32). 2. Identify the law, regulation or policy from which an exemption is requested. NC General Statutes Section 115C – 301(c) Maximum Class size and NC General Statutes Section 115C-301 (d) Maximum Teaching Load



3.



State how the waiver will be used.



The waiver will be used to provide appropriate courses for students that fall short of local promotion standards. It will also be used to more appropriately schedule students that move into our district after the first 10 days of school. Finally, the waiver would be used for students who need a class for graduation and the only way to get the class would be to use the flexibility with class size. 4. State how the waiver will promote achievement of performance goals. The waiver would promote achievement of performance goals by guaranteeing appropriate courses and levels of courses are available for students in emergency situations. More effective teaching and learning will occur as the schools are able to operate the master schedule with fluidity, moving students in and out of skill groups and classes.



38 of 38




Share This Document


Related docs
Other docs by byprogressivet...
Collection Guidelines
Views: 9  |  Downloads: 0
Independent Study
Views: 17  |  Downloads: 0
Induction Coordinator Calendar of Events
Views: 4  |  Downloads: 1
January 10, 2006 Construction Update
Views: 3  |  Downloads: 0
Attachment #A
Views: 7  |  Downloads: 0
2009 Checklist
Views: 1  |  Downloads: 0
a resolution
Views: 17  |  Downloads: 0
Salary Schedules MSE Schedule
Views: 4  |  Downloads: 0
by registering with docstoc.com you agree to our
privacy policy

You are almost ready to download!

You are almost ready to download!