					                                                             A        N    N       E      X     U        R     E
                                                 N.I.T NO:- 02/2010-11/EE/RCD-I/PHE Dte.
                                                Ref Memo No:-115/RCD-I dated:- 29.04.2010
                                                                                                             Last Date of Last Date of   Date of
                                                                                                Cost of
                                                              Estimated                                      Submission     Issue of   Droping of
SL NO/                                                                         Earnest Money    Tender                                               Time of        Eligibility for
                           NAME OF WORK                          Cost                                        Application Tender Paper Tender Paper
GROUP                                                                               (Rs)         Paper                                             Completion       Perticipants
                                                                 (Rs)                                           upto       upto 4.00   up to 3.00
                                                                                                  (Rs)
                                                                                                              2.00 PM.        PM.         PM

  1                              2                                3                 4                5           6            7            8           9                  10
         laying with supplying of 600 mm dia RCC Hume Pipe
         (NP3) for road crossing including MS structural work for
         cannel crosssing, Chairs supply & installation of 250 mm           2% at the time of
                                                                                                                                                                  Enlisted class-II
  1)     dia MS pipe &laying 200 mm dia D.I. rising main with 2236688.00   performing formal    105.00 14.06.2010 15.06.2010 17.06.2010             60 days
                                                                                                                                                                agency of PHE Dte.
         installation of MJ specials for 250 mm dia R/M from                  agreement.
         Ajoy Ghat towards OHR site and other allied work
         under Churulia W/S Scheme.
         Laying with supplying 400mm dia RCC Hume Pipe for
         road crossing work and 600 mm dia Rcc Hume pipe by
         pushing method below I.C.M.L. road for laying 200 mm
                                                                            2% at the time of
         dia rising main near Kapista OHR site including
  2)                                                          1645420.00   performing formal    105.00 14.06.2010 15.06.2010 17.06.2010             60 days              Do
         reconstruction of cement concrete road at Amuliaghat
                                                                              agreement.
         and maintenance of 80000 gallon capacity OHR at
         Kapista under Kharabar W/S Scheme.

         Laying 200 mm dia UPVC pipe line for distribution
                                                                            2% at the time of
         system and other allied works from Nandi H/W site
  3)                                                         1870959.00    performing formal    105.00 14.06.2010 15.06.2010 17.06.2010             45 days              Do
         towards Sibpur Railway crossing for Ward No-I under
                                                                              agreement.
         Aug . Of Jamuria W/S Scheme (urban Part)
         Protection work for outside wall against water
                                                                            2% at the time of
         percolation for pump house & C.W.R. at Nandi under                                                                                                      Enlisted class-III
  4)                                                         913268.00     performing formal    105.00 14.06.2010 15.06.2010 17.06.2010             90 days
         Augmentation of Jamuria W/S Scheme under RCFA                                                                                                          agency of PHE Dte.
                                                                              agreement.
         Division-I, PHE Dte.
         Making pavers road & repairing & reconstruction of
                                                                            2% at the time of
         Chairs including cleaning sludge water unit at                                                                                                         Enlisted class- I/III
  5)                                                         705281.00     performing formal        80.00    14.06.2010 15.06.2010 17.06.2010       45 days
         Kalyaneswari Plant under RCFA Part-I, W/S Scheme.                                                                                                      agency of PHE Dte.
                                                                              agreement.
         (Part-I)
      Repairing & renovation work of 80000 gallon capacity
      of RCC Elevated Reservoir including different units                    2% at the time of
                                                                                                                                                        Enlisted class -I/III
6)    Treament Plant area and town ship area & other allied 886577.00       performing formal    105.00 14.06.2010 15.06.2010 17.06.2010    45 days
                                                                                                                                                        agency of PHE Dte.
      works under RCFA Part-I, W/S Scheme.                                     agreement.

      Balance portion of laying 150 mm dia D.I rising main
                                                                             2% at the time of
      including consruction o 1(one) No Guard Room at                                                                                                    Enlisted class-III
7)                                                             501893.00    performing formal    80.00   14.06.2010 15.06.2010 17.06.2010   90 days
      Itapara OHR Site under Itapara W/S Scheme under                                                                                                   agency of PHE Dte.
                                                                               agreement.
      RCFA Division -I PHE Dte.
      Making outlet line & over flow line including
                                                                             2% at the time of
      interconnection of existing distribution line & laying                                                                                              Enlisted class-II
8)                                                             1272213.00   performing formal    105.00 14.06.2010 15.06.2010 17.06.2010    60 days
      200 mm dia D.I.pipe line & other allied work at                                                                                                   agency of PHE Dte.
                                                                               agreement.
      Kharabar OHR site under Kharabar W/S Scheme.
      Remodeling & reconstruction of RCC desinged Guard
                                                                             2% at the time of
      Wall, Filter House and other allied works at                                                                                                      Enlisted class-III/IV
9)                                                             425119.00    performing formal    80.00   14.06.2010 15.06.2010 17.06.2010   30 days
      Kalyaneswari plant areas under RCFA Part-I, W/S                                                                                                   agency of PHE Dte.
                                                                               agreement.
      Scheme.
      Protection work for floor & inside wall against water
      percolation for pump house at Nandi under                              2% at the time of
                                                                                                                                                         Enlisted Class-III
10)
      Augmentation of Jamuria W/S Scheme under RCFA            533683.00    performing formal    80.00   14.06.2010 15.06.2010 17.06.2010   30 days
                                                                                                                                                       agencies of PHE Dte.
      Division-I, PHE Dte.                                                     agreement.




                                                                                                                                    Executive Engineer
                                                                                                                                  RCFA Division-I,PHE Dte.
                                                         A      N        N       E       X       U      R       E
                                        Short N.I.T NO:- 01/2010-11/EE/RCD-I/PHE Dte.
                                          Ref Memo No:- 85/RCD-I dated:- 22.04.2010
                                                                                                                    Last Date of
                                                                                                     Last Date of                   Date of
                                                                                         Cost of                      Issue of
                                                             Estimated                               Submission                   Droping of
SL NO/                                                                   Earnest Money   Tender                       Tender                    Time of
                          NAME OF WORK                          Cost                                 Application                 Tender Paper            Eligibility for Perticipants
GROUP                                                                         (Rs)        Paper                        Paper                  Completion
                                                                (Rs)                                     upto                     up to 3.00
                                                                                           (Rs)                      upto 4.00
                                                                                                      2.00 PM.                       PM
                                                                                                                        PM.
  1                              2                              3               4            5            6               7           8            9                   10

         Laying 140 mm dia (OD) UPVC pipe line from
         Darbardanga village towards Lalbazar village (Part)                                                                                                  Enlisted Class-I/II/III
  1)                                                         506584.00       10132.00    80.00       11.05.2010 12.05.2010 14.05.2010            30 days
         for distribution main and other allied work under                                                                                                   contractor of PHE Dte.
         Augmentation of Jamuria W/S Scheme. (Part-A)

         Laying 140/125/63 mm dia UPVC pipe line from
         Darbardanga village to Lalbazar village (rest portion)
                                                                                                                                                              Enlisted Class-I/II/III
  2)     & towards Patharchur village for distribution main 510976.00        10220.00    80.00       11.05.2011 12.05.2011 14.05.2011            30 days
                                                                                                                                                             contractor of PHE Dte.
         and other allied work under Augmentation of Jamuria
         W/S Scheme. (Part-B)

         Laying 125/90 mm dia UPVC distribution Pipe line for
                                                                                                                                                              Enlisted Class-I/II/III
  3)     Patharchur village under Augmentation of Jamuria 514344.00          10287.00    80.00       11.05.2012 12.05.2012 14.05.2012            30 days
                                                                                                                                                             contractor of PHE Dte.
         W/S Scheme. (Part-C)




                                                                                                                                         Executive Engineer
                                                                                                                                       RCFA Division-I,PHE Dte.
                                                                  A      N        N       E       X       U    R       E
                                                   N.I.T NO:- 03/2010-11/EE/RCD-I/PHE Dte.
                                                  Ref Memo No:- 556/RCD-I dated:- 22.07.2010
                                                                                                  Last Date of Last Date of   Date of
                                                                                        Cost of
                                                         Estimated                                Submission     Issue of   Droping of
SL NO/                                                                 Earnest Money    Tender                                            Time of
                        NAME OF WORK                        Cost                                  Application Tender Paper Tender Paper                     Eligibility for Perticipants
GROUP                                                                       (Rs)         Paper                                          Completion
                                                            (Rs)                                     upto       upto 4.00   up to 3.00
                                                                                          (Rs)
                                                                                                   2.00 PM.        PM.         PM

  1                            2                             3               4            5           6            7           8            9                           10

         Sinking 2 nos tubewell at River Bed Ajoy                                                                                                       Bonafied outsider agency having
         including laying with supplying 80 mm dia G.I.                                                                                               credential under a single contract of
                                                                        Initially Rs.   100.00
 Gr-A    Pipe for collecting main of said 2 nos tube well 1125774.00                           16.08.2010 18.08.2010 24.08.2010          60 days     similar nature of work minimum 70%
                                                                         20000.00       + 5.00
         at Putulia Mouza under Gourbazar W/S                                                                                                        value of estimated cost put to tender
         Scheme.                                                                                                                                       in Govt./Semi Govt. Departments.

                                                                                                                                                      Manufacture / Authorised dealer /
         Supplying & laying HDPE pipe line for                                                                                                        supplier / Bonafide agency having
         distribution system including construction of 5                                                                                             credential of supplying and laying of
         Nos 3000 Ltrs capacity Community Tank &                                        100.00                                                       HDPE pipe line distribution system in
 Gr-B                                                    954932.00       19099.00              16.08.2010 18.08.2010 24.08.2010          90 days
         other allied work of Patulia (Part) & Gourbazar                                + 5.00                                                        the last 3 years minimum value of
         mouzas under Gourbazar W/S Scheme of                                                                                                         work 70% of estimated cost put to
         Baraboni Block ,Dist-Burdwan.                                                                                                                   tender in a single tender in a
                                                                                                                                                        Govt./Semi Govt. Department.
                                                                                                                                                        Bonafied outsider agency having
         Sinking 3 nos tubewell at River Bed Ajoy                                                                                                     credential under a single contract of
         including laying with supplying 100 mm dia                     Initially Rs.   100.00                                                       similar nature of work minimum 70%
 Gr-C                                                     1861419.00                           16.08.2010 18.08.2010 24.08.2010          60 days
         G.I. Pipe for collecting main of said 3 nos tube                20000.00       + 5.00                                                           value of estimated cost put to
         well under Roshna W/S Scheme.                                                                                                                     tenderin Govt./Semi Govt.
                                                                                                                                                                 Departments.
         Construction of C.W.R. (Clear water Reservoir)
         of capacity 11000 gallons with highlift pump                                                                                                Enlisted class - II agency of PHE Dte /
         house ,Switch Room ,Chloine Room , Guard                       Initially Rs.   500.00                                                         Bonafide outsider agency having
 Gr-D                                                   1411087.00                             16.08.2010 18.08.2010 24.08.2010         120 days
         Room & Boundary Wall near River bed site at                     20000.00       + 5.00                                                        credential of construction of CWR
         Daskeyari Mouza under Roshna Water Supply                                                                                                   work within PHE Dte in last 2 years.
         Scheme of Baraboni Block ,Dist-Burdwan.
       Construction of RCC elevated Reservoir of                                                                                         Bonafide outsider agency having
       capacity 45000 gallon with staging height                                                                                        credential for construction of OHR
                                                               Initially Rs.   1000.00
Gr-E   15.24 mtrs including construction of Guard 3987423.00                           16.08.2010 18.08.2010 24.08.2010    180 days    minimum 30000 gallon capacity and
                                                                20000.00        + 5.00
       Room & Boundary Wall at Daskeyari mouza                                                                                        staging height 20.00 m within PHE Dte
       under ROSHNA Water Supply Scheme.                                                                                                          in last 2 years.

                                                                                                                                        Manufacture / Authorised dealer /
                                                                                                                                        supplier / Bonafide agency having
       Laying 150 mm dia DI Rising main including                                                                                      credential of supplying and laying of
       supplying & laying UPVC pipe line for                   Initially Rs.   100.00                                                  HDPE pipe line distribution system in
Gr-F                                              1925597.00                          16.08.2010 18.08.2010 24.08.2010     60 days
       distribution system of Parulberia,Roshna &               20000.00       + 5.00                                                   the last 3 years minimum value of
       Daskeyari mouzas under Roshna W/S Scheme.                                                                                        work 70% of estimated cost put to
                                                                                                                                           tender in a single tender in a
                                                                                                                                         Govt./Semi Govt. Departments.

                                                                                                                                        Manufacture / Authorised dealer /
                                                                                                                                        supplier / Bonafide agency having
                                                                                                                                       credential of supplying and laying of
       Supplying & laying HDPE pipe line for
                                                               Initially Rs.   100.00                                                  HDPE pipe line distribution system in
Gr-G   distribution system of Roshna & Daskeyari 2762864.00                           16.08.2010 18.08.2010 24.08.2010     90 days
                                                                20000.00       + 5.00                                                   the last 3 years minimum value of
       mouzas under Roshna W/S Scheme.
                                                                                                                                        work 70% of estimated cost put to
                                                                                                                                           tender in a single tender in a
                                                                                                                                         Govt./Semi Govt. Departments.




                                                                                                                            Executive Engineer
                                                                                                                          RCFA Division-I,PHE Dte.
                                                             A        N         N       E     X       U      R      E
          Item Rate Tender Notice NO:- 04/2010-11 of Executive Engineer, RCFA Division-I,PHE Dte.
                               Ref Memo No:- 562/RCD-I dated:- 23.07.2010.
                                                                                            Last Date of Date of Issue  Date of
                                                                                Cost of
                                                                                            Submission    of Tender    Droping of
Sl.                                                         Earnest Money       Tender                                                Time of
                      NAME OF WORK                                                          Application     Paper        Tender                      Eligibility for Perticipants
No.                                                              (Rs)            Paper                                              Completion
                                                                                                upto      upto 4.00 Paper up to
                                                                                  (Rs)
                                                                                             2.00 PM.        PM.        3.00 PM

1                             2                                   3                 4           5             6            7            8                         9

   Supplying, fitting & fixing different types of CIDF     2% of tendered
                                                            amount to be
   pipes, specials, bell mouth, duck foot bend etc. for                                                                                          Enlisted Class-III contractor of PHE
1)                                                      deposited at the time   105.00      11.08.2010 12.08.2010 16.08.2010         15 days
   RCC OHR at Churulia under Improvement of Churulia of performing formal                                                                                        Dte.
   W/S Scheme.                                               agreement.




                                                                                                                                                        Executive Engineer
                                                                                                                                                      RCFA Division-I,PHE Dte.
                                                        A        N      N          E         X     U      R      E
                                      Short N.I.T NO:- 05/2010-11/EE/RCD-I/PHE Dte.
                                        Ref Memo No:- 697/RCD-I dated:- 12.08.2010
                                                                                                 Last Date of Last Date of   Date of
                                                                                       Cost of
                                                     Estimated                                   Submission     Issue of   Droping of
SL NO/                                                           Earnest Money         Tender                                            Time of
                      NAME OF WORK                      Cost                                     Application Tender Paper Tender Paper                Eligibility for Perticipants
GROUP                                                                 (Rs)              Paper                                          Completion
                                                        (Rs)                                         upto      upto 4.00   up to 3.00
                                                                                         (Rs)
                                                                                                  2.00 PM.        PM.         PM

  1                          2                          3                4               5           6            7           8             9                     10
                                                                 2 % to be deposited
         Sinking 2 nos tubewell at River Bed Ajoy at                at the time of                                                                     Enlisted Special Class
 Gr-A                                                165108.00    performing formal
                                                                                       55.00     25.08.2010 27.08.2010 31.08.2010        7 days
         Putulia Mouza under Gourbazar W/S Scheme.                                                                                                      agency of PHE Dte.
                                                                      aggrement
         Laying 100 mm dia G.I. Pipe for collecting              2 % to be deposited
                                                                    at the time of                                                                  Enlisted class - IV agency of
 Gr-B    main of 3 nos tube well at Barakar on Ajoy 346646.00     performing formal
                                                                                       80.00     25.08.2010 27.08.2010 31.08.2010        30 days
                                                                                                                                                              PHE Dte.
         River Bed under Roshna W/S Scheme.                           aggrement

         Sinking 3 nos tubewell at River Bed Ajoy at             2 % to be deposited
                                                                    at the time of                                                                     Enlisted Special Class
 Gr-C    Dashkeyari Mouza under Roshna W/S 259782.00              performing formal
                                                                                       55.00     25.08.2010 27.08.2010 31.08.2010        7 days
                                                                                                                                                        agency of PHE Dte.
         Scheme.                                                      aggrement
         Construction of C.W.R. (Clear water
         Reservoir) of capacity 11000 gallons with
         highlift pump house ,Switch Room ,Chloine               2 % to be deposited
                                                                    at the time of     500.00                                                       Enlisted class - III agency of
 Gr-D    Room , Guard Room & Boundary Wall near 1232670.00        performing formal
                                                                                              25.08.2010 27.08.2010 31.08.2010          120 days
                                                                                       + 5.00                                                                 PHE Dte.
         River bed site at Daskeyari Mouza under                      aggrement
         Roshna Water Supply Scheme of Baraboni
         Block ,Dist-Burdwan.
         Laying 80 mm dia G.I. Pipe for collecting main          2 % to be deposited
                                                                    at the time of                                                                  Enlisted class - IV agency of
 Gr-E    of 2 nos tube well at Putulia Mouza on Ajoy 205525.00    performing formal
                                                                                       55.00     25.08.2010 27.08.2010 31.08.2010        20 days
                                                                                                                                                              PHE Dte.
         river bed under Gourbazar W/S Scheme.                        aggrement




                                                                                                                                    Executive Engineer
                                                                                                                                  RCFA Division-I,PHE Dte.
                                                           A      N         N         E     X        U         R     E
                                      Short N.I.T NO:- 06/2010-11/EE/RCD-I/PHE Dte.
                                        Ref Memo No:- 698/RCD-I dated:- 12.08.2010
                                                                                      Last Date of
                                                                            Cost of                    Last Date of    Date of
                                                                                      Submission
SL NO/                                       Estimated Cost Earnest Money   Tender                   Issue of Tender Droping of        Time of
                    NAME OF WORK                                                      Application                                                         Eligibility for Perticipants
GROUP                                             (Rs)           (Rs)        Paper                        Paper      Tender Paper    Completion
                                                                                          upto
                                                                              (Rs)                    upto 4.00 PM. up to 3.00 PM
                                                                                       2.00 PM.
  1                       2                        3              4             5          6               7              8              9                            10
         Supplying & laying HDPE pipe line for
         distribution    system     including
                                                                                                                                                    Manufacture / Authorised dealer
         construction of 5 Nos 3000 Ltrs
                                                                                                                                                    /Bonafide agency of Govt./Semi
         capacity Community Tank & other                                    100.00
Gr-A                                           830515.00       16610.00            30.08.2010 31.08.2010 03.09.2010                   30 days      Govt. Department having credential
         allied work of Patulia (Part) &                                    + 5.00
                                                                                                                                                  not less than 50% in a single tender of
         Gourbazar mouzas under Gourbazar
                                                                                                                                                           HDPE pipe line works.
         W/S Scheme of Baraboni Block ,Dist-
         Burdwan.
                                                                                                                                                    Manufacture / Authorised dealer
         Laying 150 mm dia DI Rising main
                                                                                                                                                    /Bonafide agency of Govt./Semi
         including supplying & laying HDPE pipe            Initially Rs. 1000.00
Gr-B                                            3441867.00                       30.08.2010 31.08.2010 03.09.2010                     90 days      Govt. Department having credential
         line for distribution system of                    20000.00      + 5.00
                                                                                                                                                  not less than 50% in a single tender of
         Parulberia under Roshna W/S Scheme.
                                                                                                                                                           HDPE pipe line works.
                                                                                                                                                    Manufacture / Authorised dealer
         Supplying & laying HDPE pipe line for
                                                                                                                                                    /Bonafide agency of Govt./Semi
         distribution system of Roshna &                  Initially Rs. 1000.00
 Gr-C                                          3286524.00                       30.08.2010 31.08.2010 03.09.2010                      90 days      Govt. Department having credential
         Daskeyari mouzas under Roshna W/S                 20000.00      + 5.00
                                                                                                                                                  not less than 50% in a single tender of
         Scheme.
                                                                                                                                                           HDPE pipe line works.
         Construction of RCC elevated Reservoir                                                                                                      Enlisted Class-I agency of PHE
         of capacity 45000 gallon with staging                                                                                                    Dte/Bonafide outsider agency having
         height     15.24    mtrs     including            Initially Rs. 1000.00                                                                   credential for construction of OHR
Gr-D                                            3987423.00                       30.08.2010 31.08.2010 03.09.2010                    180 days
         construction of Guard Room &                       20000.00      + 5.00                                                                  minimum 30000 gallon capacity and
         Boundary Wall at Daskeyari mouza                                                                                                          staging height 15.24 m within PHE
         under ROSHNA Water Supply Scheme.                                                                                                                         Dte.




                                                                                                                                      Executive Engineer
                                                                                                                                    RCFA Division-I,PHE Dte.
                                                        A       N        N       E        X         U        R      E
                                      Short N.I.Q NO:- 04/2010-11/EE/RCD-I/PHE Dte.
                                        Ref Memo No:- 866/RCD-I dated:- 14.09.2010
                                                                                     Last Date of    Last Date of     Date of
                                                                          Cost of
                                                                                     Submission        Issue of     Droping of
SL NO/                                      Estimated Cost Earnest Money Quotation                                                   Time of
                    NAME OF WORK                                                     Application      Quotation     Quotation                           Eligibility for Perticipants
GROUP                                            (Rs)           (Rs)      Paper                                                    Completion
                                                                                         upto           Paper       Paper up to
                                                                           (Rs)
                                                                                      2.00 PM.      upto 4.00 PM.    3.00 PM
  1                      2                       3              4            5            6              7              8              9                            10

         Inspection,        Trouble     Shooting,
                                                                2% of
         Preventive       and     break     down                                                                                                  Experienced contractor of this Dte.
                                                               Quoted
         maintenance, Sampling, Storing and                                                                                                        Manufacturers / Dealers and also
                                                  Rate to be Amount or 500.00 +
  1      preparation of data base for newly                                     27.09.2010 29.09.2010 01.10.2010                   365 days      from reliable resourceful experience
                                                   Quoted Rs. 20000.00 5.00
         installed Turbine driven Flow Meter in                                                                                                 and bonafied outsiders working under
                                                             whichever is
         11 Nos. of Over Head Reservoirs under                                                                                                            Govt. Department.
                                                                 less
         R.C.F.A Part – II, Water Supply Scheme.




                                                                                                                                    Executive Engineer
                                                                                                                                  RCFA Division-I,PHE Dte.
                                                       A       N          N         E     X        U         R     E
                                     Short N.I.Q NO:- 05/2010-11/EE/RCD-I/PHE Dte.
                                       Ref Memo No:- 891/RCD-I dated:- 20.09.2010
                                                                                    Last Date of
                                                                          Cost of                    Last Date of    Date of
                                                                                    Submission
SL NO/                                     Estimated Cost Earnest Money   Tender                   Issue of Tender Droping of        Time of
                    NAME OF WORK                                                    Application                                                         Eligibility for Perticipants
GROUP                                           (Rs)           (Rs)        Paper                        Paper      Tender Paper    Completion
                                                                                        upto
                                                                            (Rs)                    upto 4.00 PM. up to 3.00 PM
                                                                                     2.00 PM.
  1                      2                       3             4              5          6               7              8              9                            10
         Supplying & laying HDPE pipe line for
         distribution    system     including          2% of
                                                                                                                                                      Manufacture having laying
         construction of 5 Nos 3000 Ltrs              Quoted
                                                                                                                                                    experience/Bonafide agency of
         capacity Community Tank & other Rate to be Amount or 100.00
Gr-A                                                                 01.10.2010 05.10.2010 08.10.2010                               30 days     Govt./Semi Govt. Department having
         allied work of Patulia (Part) & Quoted Rs. 20000.00 + 5.00
                                                                                                                                                   credential not less than 50% in a
         Gourbazar mouzas under Gourbazar           whichever is
                                                                                                                                                single tender of HDPE pipe line works.
         W/S Scheme of Baraboni Block ,Dist-            less
         Burdwan.
                                                              2% of
                                                                                                                                                  Manufacture / Authorised dealer
         Laying 150 mm dia DI Rising main                    Quoted
                                                                                                                                                  /Bonafide agency of Govt./Semi
         including supplying & laying HDPE pipe Rate to be Amount or 1000.00
Gr-B                                                                         01.10.2010 05.10.2010 08.10.2010                       90 days      Govt. Department having credential
         line for distribution system of Quoted Rs. 20000.00 + 5.00
                                                                                                                                                not less than 50% in a single tender of
         Parulberia under Roshna W/S Scheme.               whichever is
                                                                                                                                                         HDPE pipe line works.
                                                               less

                                                       2% of
                                                                                                                                                  Manufacture / Authorised dealer
         Supplying & laying HDPE pipe line for        Quoted
                                                                                                                                                  /Bonafide agency of Govt./Semi
         distribution system of Roshna & Rate to be Amount or 1000.00
 Gr-C                                                                 01.10.2010 05.10.2010 08.10.2010                              90 days      Govt. Department having credential
         Daskeyari mouzas under Roshna W/S Quoted Rs. 20000.00 + 5.00
                                                                                                                                                not less than 50% in a single tender of
         Scheme.                                    whichever is
                                                                                                                                                         HDPE pipe line works.
                                                        less




                                                                                                                                    Executive Engineer
                                                                                                                                  RCFA Division-I,PHE Dte.
                                                          A       N          N         E     X        U         R     E
                                           N.I.T NO:- 08/2010-11/EE/RCD-I/PHE Dte.
                                          Ref Memo No:-      /RCD-I dated:- 15.09.2010
                                                                                       Last Date of
                                                                             Cost of                    Last Date of    Date of
                                                                                       Submission
SL NO/                                        Estimated Cost Earnest Money   Tender                   Issue of Tender Droping of        Time of
                    NAME OF WORK                                                       Application                                                        Eligibility for Perticipants
GROUP                                              (Rs)           (Rs)        Paper                        Paper      Tender Paper    Completion
                                                                                           upto
                                                                               (Rs)                    upto 4.00 PM. up to 3.00 PM
                                                                                        2.00 PM.
  1                       2                         3             4              5          6               7              8              9                           10

                                                                                                                                                      Enlisted Class-I agency of PHE
         Construction of RCC elevated Reservoir                                                                                                    Dte/Bonafide outsider agency having
         of capacity 45000 gallon with staging             Initially Rs. 1000.00                                                                    credential for construction of OHR
  1                                             3150000.00                                                                            180 days
         height 15.24 mtrs at Daskeyari mouza               20000.00      + 5.00                                                                   minimum 30000 gallon capacity and
         under ROSHNA Water Supply Scheme.                                                                                                          staging height 15.24 m within PHE
                                                                                                                                                                    Dte.




                                                                                                                                       Executive Engineer
                                                                                                                                     RCFA Division-I,PHE Dte.

				